Loading...
06 - EC - FH 083017/-----i / /` �� i/ ,h/ wLET LocnnbN \\ \\�\\\\ \\\ \sass � \\� _\���— Imo\ \\`—_—��///�— _ iii � j j /_/ �� — — �/ aae 9�•/ //—'-- � / /—� -- / ';� I 1 992 -------- aes 7 esb _ 3'►' \ aea _ I �I l \szs��9vs — � I asi vvv �s ���_ —�— — �9aa _ - 9va-4 "'I rn rnrn 10 �/(s?�s� �,-� '4-Q'i zs o \ 9g \ \ a,-- // I — — a°� — - m `I m LLU' 2 I� / \ �9 6 — —x Dazs / I + /-// \ ss\ \� �sd.\`—�--_—V—� — �- `�_aa)� O � —� I�—�-- /1 // /\ _-----Il oec ,9aa-� �4 �a o•.- 1� --�0/ \ *Dy// � 0* � � �/ / /—\ \ \ \ 11 4 \ GF9g3 / � � \ J ,� `�� _ — � � 9]b• — � — — 9>6 1 ` � � \ L J 2 982 p \ I \ \ y. (� iA_ — �S/I u ��✓ ✓ ✓v�>e / �/� oa --_v%� -✓ -_✓ w ✓/ Np =,.�s6 s� A V, �97 V A 1A 41 d\ ep >zoI V Al 1.5+ 6 RM 14 '/ 0 A �. c � rY` were ^�.o ✓� m I I III / / v A \ sive_9fz a �-- / v/ ♦ s�� 11 �/ \....... ese \ \ _ 2 v i v v x 6 v 0 1111 974 w w w ✓ ✓ ✓ w\ sz77�eH ����_ v® vv v �-V �r �iw\ 4 I �o Q� i w / erl G_—� /7 / � 1" � d3 � I 1 // � I / / A / A P NO v s A`�\V lc� vv v, I / AV A \V .....q l I I l0 \ x \ 9 t/ I 9 v v v v A A 0 11v OUTLOT A \ i Pond #1 -- / NWL-956.0 / HINL-95 . 80 /✓ J 1 d l li / v l I l I vv j� A 1 I 11 �00}c I 1 v A/ vvv vw w w vw v= w v= ✓ ✓ = // — /��\\\\—/ %\ 1, .r r 0 0 0 ROCK ENTRANCE BERM -- SILT FENCE S CONCRETE WASHOUT ". INLET PROTECTION ® BLUFF CREEK OVERLAY DISTRICT MONUMENT NOTE: ALL SIGNAGE FOR BLUFF CREEK OVERLAY DISTRICT MUST BE INSTALLED PRIOR TO ANY EARTH DISTURBING ACTIVITY UNLESS OTHERWISE APPROVED BY THE CITY ENGINEER. RILEY PURGATORY BLUFF CREEK WATER SHED DISTRICT EROSION CONTROL NOTES: a. Natural topography and soil conditions must be protected, including retention onsite of native topsoil to the greatest extent possible. b. Additional measures, such as hydraulic mulching and other practices as specified by the District must be used on slopes of 3:1 (H:V) or steeper to provide adequate stabilization. c. Final site stabilization measures must specify that at least six inches of topsoil or organic matter be spread and incorporated into the underlying soil during final site treatment wherever topsoil has been removed. d. Construction site waste such as discarded building materials, concrete truckwashout, chemicals, litter and sanitary waste must be propedy managed. e. All temporary erosion and sediment control BMPs must be maintained until completion of construction and vegetation is established sufficiently to ensure stability of the site, as determined by the District. f. All temporary erosion and sediment control BMPs must be removed upon final stabilization. g. Soil surfaces compacted during construction and remaining pervious upon completion of construction must be decompacted through soil amendment and/or ripping to a depth of 18 inches (8 inches for single-family home properties)while taking care to avoid utilities, tree roots and other existing vegetation prior to final revegetation or other stabilization. h. All disturbed areas must be stabilized within 7 calendar days after land -disturbing work has temporarily or permanently ceased on a property that drains to an impaired water, within 14 days elsewhere. 1. The permittee must, at a minimum, inspect, maintain and repair all disturbed surfaces and all erosion and sediment control facilities and soil stabilization measures every day work is performed on the site and at least weekly until land -disturbing activity has ceased. Thereafter, the permittee must perform these responsibilities at least weekly until vegetative cover is established. The permittee will maintain a log of activities under this section for inspection by the District on request. Activities must be conducted so as to minimize the potential transfer of aquatic invasive species (e.g., zebra mussels, Eurasian watermilfoil, etc.) to the maximum extent possible. Lo x Z x NQRTN EXISTING UTILITIES SHOWN ARE SHOWN IN AN APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ANY AND ALL EXISTING UTILITIES BEFORE COMMENCING WORK. HE AGREES TO BE FULLY RESPONSIBLE FOR ANY 50 25 0 25 50 100 AND ALL DAMAGES ARISING OUT OF HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ANY ® Ir[] ❑ ❑ ❑ AND ALL EXISTING UTILITIES. SCALE IN FEET DRAWING NAME NO. BY DATE REVISIONS USE (INCLUDING COPYING, DISTRIBUTION, AND/OR CONVEYANCE OF I HEREBY CERTIFY THAT THIS PLAN OR SPECIFICATION WAS Sp CITY PROJECT NO. FILE NO. BASE FAWN 01 CAW 07/07/17 RPBCWD COMMENTS INFORMATION) OF THIS PRODUCT IS STRICTLY PROHIBITED WITHOUT PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I ERs E RAF' — EROSION CONTROL PLAN 37865-001-200 DRAWN BY 02 — TCW 07/12/17 — — — — — COUNTY COMMENTS — — — — — — — — — — — — — — — — SATHRETHRIZATIO,ICONEXPRESS WRITTEN AUTHORIZATION. USE WITHOUT SAID AUTHORIZATION CONSTITUTES AN ILLEGITIMATE USE AND SHALL THEREBY AMA DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. o w SATHRE-BERGQUIST INC. TCW 03 TCW 07/18/17 — CITY COMMENTS---- ------ INDEMNIFY SATHRE-BERGQUIST, INC. OF ALL RESPONSIBILITY. m CHAN HASSEN, FAWN HILL G OV CHECKED BY 04 TCW 07/31/17 _ _ _ _ _RPBCWD COMMENTS _ _ — SATHRE-BERGQUIST, INC. RESERVES THE RIGHT TO HOLD ANY ILLEGITIMATE S ,^ ��� �� i'z�/ o ,,,, m y 150 SOUTH BROADWAY WAYZATA, MN. 55391 (952) 47G6000 RSM 05 DATE TCW 08/30/17 — CITY COMMENTS — — — — USER OR PARTY LEGALLY RESPONSIBLE FOR DAMAGES OR LOSSES RESULTING ROBERT S. P.E. s MINNESOTA H P HOLDINGS, LLC. — — — — — — — — — — — — — — — — — — — — — — FROM ILLEGITIMATE USE. 4L,STAD, Dale: O � �7 Lic. No. FRS vaP11 06/14/17 T —pLiZB Lo x Z x