Loading...
16-0139 06 SHEET PRELIMINARY GRADING - PRIMARY 10-24-17z 13 ti y \� ry • ; ti -edgef bit." � r It• d/.` ex• + z« ,tom„ ,z««.z«» I••• -RE T. WALL ««�., , ~Z, 1 E ,�V ZZt,t», edge of bit.-.----' t.- 1 4.. .:..: . ..:.. _.:..,,_`� • ,:•• -tee 10000, Lo :7 110 z tiz:«. �` • 1 •1 ``` RET. WALL lee .......... ONO Y.... .. ..... V. \ �­ C)qliz� ti<<, -.-ex. rock re t - wall SE - SF Ex. CB • / ti Y - Rim = 930.61 S In v= 927.3 max, grovel' w W W � Ex. CB -Rim = 930.15 . �" W, In 356. = .0 ,5 SS SS 30 \v/ 20 FILTER FABRIC 6" MINIMUM DEPTH 1" - 2" WASHED ROCK 18" MINIMUM CUT OFF BERM TO MINIMIZE RUNOFF FROM SITE 0 SS -10, P D ' tx. A4H- S n f „_Ri In v= 22. 0 S0 S N W In v= 913.80 11 • NS. Inv=913:71 ti � y + 1 POND y edge of pond ••` ti 00 2d M�N�N,UM Ex. 15 "CMP -N.Inv=91795 S.Inv=91744 1 A //00'-) /00'-) F`*x V V cnc 0011 I IIAIA v Biore t en t ion Soil Mix B (by volum e): 70X woshed sond 30.E orgonic leof compost Max -W.- 1L Sinne ..- 'p- 21- -t, Geogrid Wrop, connected with zip ties 2" Choker Course, 18, 178, or 189 Stone 157 Stone, Pipe width + 2" Above Pipe - SOD SPILL WA Y 934.2 -Bioreten tion Soil Mix B Geogrid Wrop, connected with zip ties 2" Choker Course, 18, 178, or 189 Stone 157 Stone, Pipe width + 2" Above Pipe 3" Shredded Bork Mulch - Bioreten tion Plants 12" RCP - - - I6 J- �'6" PVC Solid Pipe Tronsition from Sold to Perforoted Pipe 00 6" Perforoted Pipe Non - Compoc ted Subgrode NOTE: FILTER FABRIC SHALL BE PLACED UNDER ROCK In-situ soils sholl be ripped to o depth of 12" prior to a zona su gra a correc �%JH or o re uce a requiremen o plocing omended sols with o chisel plow, ripper or sub -soler Select Granular Borrow to 12 based on the test roll. 0 TO STOP MUD MIGRATION THROUGH ROCK. fr it rl BIo tatin With � wEo t evatedUnderrIda No t To Scole ROCK CONSTRUCTIL)N ENTRANCE DETAIL -ICL RESIDENTIAL STREET SION5200 + y � 1 00 i ti I G ell. �, • X11 �� � �� r Edge o f•: �� • ae0 / + ` garage S S + oL '•• 20CONS TRUC TION SEMEN T ` ti 20 9 ., -. • ......... , .­= `7 111111 zap_ �t» ��ti�tia„ •zaz�z��`� °mom_ i , `����ti�za• `���ti�tiatia. -fie ,tom t E x. MH I Rim = 933.96 In v= 922.37 I � L -/-I f 25' 25' 14' to Back 14' to Back Wear Course to be 1/2" `oQe Above Edge of Gutter S e 3.0% 2.0% 1' 1.5 1 4" Topsoil, Seed 1 1/2" -Plant Mixed Bituminous Wearing Course & Mulch or Sod. Type #41 WEA50055B Tack Coat - 2357 Surmountable Concrete Curb 2" -plant Mixed Bituminous Base Course Type #31 BBB50000B 12" -Class 5 Aggregate Base, 100% Crushed 24" MNDOT 3149.28 Select Granular Borrow (See Note 7) NOTES 1. Right -of -Way Required - 50'. 2. Maximum street grade 7.0%. 3. Minimum street grade 0.75%. 4. 4.0" Topsoil placed in disturbed areas. 5. 2 Rolls sod behind curb. 6. The bituminous wearing surface shall be placed the next construction season following placement of the bituminous base. 7. A test roll of the prepared subgrode shall be performed by the owner in the presence of o city inspector. The city has the authority to require dd•t• 1 b d t' t d th t f 24" MNDOT 0 30 60 Feet SCALE: 1 "=30' Recommended Toe -In Method Set Posts Firmly (Post Shall Be Oak or green treated) Fabric per MNDOT 3886, Fasten with Lath, Nails or 4'-p" Staples. Color sholl be -Emm-ffimm/ftft�m international Orange L-- 6" Min. Depth QA Dig or Disc Trench ® Lay in Fabric & Backfill EROSION CONTROL FENCE - TYPE 1 Steel Fence Posts sholl be used to Support Snow Fence (Woven Wire may be Subsituted for Snow Fence) • - • ' EROSION CONTROL FENCE - TYPE 2 Steel Fence Posts sholl be used to Support Snow Fence Woven Wire may be Subsituted for Snow Fence) ' ' ♦ Silt Fence ' ' '' • ' ' ' s • �' '« • • • • ' ' ' ' ~'�' • " • . • • « Hav or Straw Boles Two rebors driven through bole 1.5' to 2.0' into the ground. •' • ' �" • Boles to be recessed 6" below grade. EROSION CONTROL Boles ore to be tied with a Non-Degrodoble Moteriol. FENCE - TYPE 3 SILT FENCE DETAIL GRADING AND EROSION CONTROL NOTES 1. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK. HE AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMANGES WHICH MIGHT BE OCCASIONED BY HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. 2. CONTRACTOR SHALL BE FAMILIAR WITH AND FOLLOW ALL REQUIREMENTS OF THE MPCA NPDES PHASE II PERMIT FOR CONSTRUCTION ACTIVITIES. THE CONTRACTOR SHALL CONDUCT WEEKLY EROSION CONTROL INSPECTIONS, INSPECTIONS AFTER 24 HOUR RAINFALL EVENTS OF 0.5" OR MORE AND MAINTAIN INSPECTION LOGS THAT INCLUDE CORRECTIVE MEASURES TAKEN. BY BEGINNING CONSTRUCTION, THE CONTRACTOR ACKNOWLEDGES THE TERMS OF THIS PERMIT AND AGREES TO ABIDE BY THEM. 3. ALL SILT FENCE SHALL BE INSTALLED PRIOR TO ANY GRADING ACTIVITY UNLESS OTHERWISE NOTED. 4. ALL DISTURBED AREAS SHALL BE STABILIZED WITH MN/DOT SEED MIXTURE 250 (70 LBS/ACRE) AND MN/DOT MULCH TYPE 1 (2 TON/ACRE & DISC ANCHORED). FERTILIZER SHALL BE 24/12/24. THE MAXIMUM TIME AN AREA CAN REMAIN OPEN WHEN THE AREA IS NOT ACTIVELY BEING WORKED IS: 7 DAYS FOR SLOPES STEEPER THAN 3:1, 14 DAYS FOR SLOPES 10:1 TO 3:1, AND 21 DAYS FOR SLOPES FLATTER THAN 10:1. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARY DITCHES, PIPING, OR OTHER MEANS REQUIRED TO INSURE PROPER DRAINAGE DURING CONSTRUCTION. 6. ANY DEWATERING SHALL BE DISCHARGED TO A TEMPORARY SEDIMENT BASIN. 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE OF ALL EROSION CONTROL DEVICES UNTIL SITE HAS A UNIFORM VEGETATIVE COVER WITH A DENSITY OF 70% OVER THE ENTIRE PERVIOUS AREA, MAINTENANCE SHALL INCLUDE BUT NOT BE LIMITED TO THE FOLLOWING: a. REMOVE SEDIMENT FROM PONDS AND DITCHES WHEN HALF FULL AND UPON COMPLETION OF CONSTRUCTION. (WITHIN 72 HOURS) b. REMOVE SILT WHEN ACCUMULATION REACHES ONE-THIRD THE HEIGHT OF THE SILT FENCE. (WITHIN 72 HOURS) c. MAINTAIN ROCK CONSTRUCTION ENTRANCE. REPLACEMENT DURING CONSTRUCTION MAY BE NECESSARY. d. ANY DEPOSITING OF SILT OR MUD ON NEW OR EXISTING STORM SEWERS OR SWALES SHALL BE REMOVED AFTER EACH RAIN AND AFFECTED AREAS CLEANED. 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING EXISTING HARD SURFACES CLEAN OF SEDIMENT AND MUD. SEDIMENT & MUD SHALL BE REMOVED WITHIN 24 HOURS OF DISCOVERY. 9. THE CONTRACTOR SHALL COMPLETELY REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES WHEN THE SITE HAS 70% VEGETATIVE DENSITY. 10. COLLECTED SEDIMENT, ASPHALT AND CONCRETE MILLINGS, FLOATING DEBRIS, PAPER, PLASTIC, FABRIC, CONSTRUCTION AND DEMOLITION DEBRIS AND OTHER WASTES MUST BE DISPOSED OF PROPERLY AND MUST COMPLY WITH MPCA DISPOSAL REQUIREMENTS. 11. STORAGE AND DISPOSAL OF OIL, GASOLINE, PAINT AND ANY HAZARDOUS SUBSTANCES MUST BE IN COMPLIANCE WITH MPCA REGULATIONS. 12. EXTERNAL WASHING OF TRUCKS AND OTHER CONSTRUCTION VEHICLES MUST BE LIMITED TO A DEFINED AREA OF THE SITE. & CLEARLY LABLED AS SUCH. RUNOFF MUST BE CONTAINED AND WASTE PROPERLY DISPOSED OF. NO ENGINE DEGREASING IS ALLOWED ON SITE. WASH AREAS TO BE A MINIMUM OF 200 FEET FROM ANY WETLANDS, PONDS, OR OTHER WATER BODIES. 13. STOCKPILES SHALL BE A MINIMUM OF 200 FEET FROM ANY WETLAND, POND, OR OTHER WATER BODY. STOCKPILES SHALL BE STABILIZED WITH TEMPORARY SEED (MN/DOT MIX 150) & MULCH AND SILT FENCE SHALL BE INSTALLED AROUND THE BOTTOM WITHIN 7 DAYS FROM THE LAST ACTIVITIES THAT FORMED THE STOCKPILE. 14. WOOD CHIPS MAY BE USED TO STABILIZE SLOPES. REV. NO. DATE BY DESCRIPTION DESIGNED DRAWN I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR www,ottoassociates.com PROJECT NO: 1 10-24-17 T.J.B. UPDATE PROPOSED ROAD UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY PRELIMINARY GRADING PLAN P.E.O. T.J.B. REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF 9 West Division Street LOTUS WOOD S THE STATE OF MINNESOTA. �61.� O Buffalo, MN 55313 (PRIMARY) 16-0139 CHECKED O�P.E.O. Pain E. Otto(763)682-4727 CHANHASSE N , M N SHEETNO, SSOCIATES Fax.• (763)682-3522 DATE.•DATE: 10-24-» LICENSE N0. 40062 Engineers &Land Surveyors, lnc. 6 OF 11 SHEETS 5-20-16