Loading...
F-1. Annual ReportMEMORANDUM CITY OF C HANHASSE N ` Chanhassen is a Community for Life -Providing for Today and Planning for Tomorrow TO: Planning Commission FROM: Kate Aanenson AICP, Community Development Director Bob Generous, AICP, Senior Planner DATE: February 20, 2018 SUBJ: 2017 Year in Review and 2018 Recommended Work Plan As a part of the City Code 2-46.03 (e) Reports: The Commission shall make an annual written report to the Council containing the Commission recommendation for the ensuing year. Staff estimates an April 1, 2018 population of 25,725. Below is a summary of items the Planning Commission reviewed in 2017 as well as possible work projects for 2018. If there are additional items, projects, or research, the Planning Commission would like to undertake, please direct staff. 2017 REVIEW Planning staff reviewed fewer applications in 2017 than in 2016. Included as part of these applications were two conditional use permits, three planned unit developments, one rezoning, three site plan reviews, three subdivisions, and thirteen variances, which resulted in 22 cases being reviewed by the Planning Commission. In addition, the Commission reviewed 13 code amendments. In 2017, the city issued building permits for 67 dwelling units. We are projecting a 2 percent increase (approximately 200 units) in housing stock for 2018. However, this estimate should be exceeded when a 134 -unit multi -tenant senior housing apartment building and eight twin homes within Mission Hills, which was approved in 2015, are constructed and with the 134 units in the Venue Building, which were approved in 2017, are included. However, as can be seen in the lot inventory with 118 platted single-family lots and 89 attached single-family lots and the average residential building permit data, there is a slight deficiency of approved residential lots available for development. PH 952.227.1100 • www 6chanhassen.mn.us • FX 952.227.1110 7700 MARKET BOULEVARD • PO BOX 147 • CHANHASSEN • MINNESOTA 55317 Planning Commission Community Development Annual Report February 20, 2018 Page 2 2018 WORK PROGRAMS Development Review Staff anticipates the development of the Prince Roger Nelson property west of Lake Ann in 2018. Additionally, a major residential project for 2018 will likely be the housing component of the proposed Avienda Lifestyle Center. Additionally, we have been having discussions about previously approved but undeveloped multi -family projects and the apartment component of the proposed redevelopment of the downtown Frontier building. We continue to have numerous discussions with office industrial developers and anticipate development proposals will come forward in 2018. New commercial developments will be included as part of the Avienda development and will continue on a lot -by -lot basis as the population increases as well as the redevelopment of existing commercial areas that have reached their effective design utility. With the City Council review of the Avienda Lifestyle Center Planned Unit Development at Highway 212 and Powers Boulevard in 2018, a development stage (final plat) review of the Planned Unit Development will be required for the project to move forward. The applicant shall submit the development stage application including final plat with all supporting data. The preliminary plat and Planned Unit Development rezoning were approved in 2017 In conjunction with the Lifestyle Center, an update of the 2005 MUSA Alternative Urban Areawide Review (AUAR) was completed. The AUAR looked at the environmental and infrastructure impacts of proposed development and determined any appropriate mitigation measures. City Code Staff continues to research and prepare amendments to the City Code on the treatment of permeable pavers and other pervious technologies. With the adoption of the Local Water Management Plan, staff anticipates assisting the Water Resources Coordinator in the drafting of revisions to the wetland ordinance and the surface water management requirements of City Code. Comprehensive Plan The city is required by the Metropolitan Land Plan Act (MN§473) to update our Comprehensive Plan every ten years. The City of Chanhassen is designated by the Metropolitan Council as an Emerging Suburban Edge Community. A Comprehensive Plan is designed to serve as a guide for the local decision-making process. The cornerstone of such a comprehensive planning process is the development and adoption of goals and policies which identify the desired qualities and overall vision for the future of the community. These goals and policies are based on the needs of the city along with the unique characteristics and values of the community. The Comprehensive Plan is divided into six plan elements: Land Use, Housing, Transportation, Water Resources (sewer, water, and surface Planning Commission Community Development Annual Report February 20, 2018 Page 3 water), Parks and Open Space and Plan Implementation. The goals and policies established for each element will serve as guidelines for specific recommendations for future development. The city has submitted the draft 2040 Comprehensive Plan for jurisdictional review, which ends in April. The Plan may not be adopted until the review period has been completed and final reviews of the plan, addressing any revisions or comments, are held in the spring, currently scheduled for Aprill7th, by the Planning Commission and City Council in May. Surface Water Management Plan Update will be completed this spring. MN Statute Chapter 103 requires that the city prepare a surface water management plan every 10 years or when watershed management organizations update their plan. Our 2°d generation plan was adopted in 2006 and must be updated by 2018. Additionally, all four watershed management organizations with jurisdiction within the City of Chanhassen have updated their plans and National Pollution Discharge Eliminations Permits were reissued in 2013. To satisfy these changes, we are in the process of updating our Surface Water Management Plan. Miscellaneous Another joint Environmental, Parks and Planning Commission tour is proposed for late summer 2018. ACTION The Planning Commission may present additional items which they may review/research in 2018. Any other suggestions that the Commission would like to see staff address will be added to the list. Subject to Planning Commission concurrence, staff will forward this report to the City Council. ATTACHMENTS 1. Permits and Inspections. 2. Development Review. 3. Community Development Mission Statement GAPLANTIanning Commimion\Amml Reports\2017 Year in R"iemr.dm PERMITS and INSPECTIONS BUILDING COMMUNITY DEVELOPMENT DEPARTMENT The Building Division contains 2.5 support staff, one building official and four inspectors. In August 2017, Jessica Archer became the new building official for the city. The inspectors review building plans for compliance with building codes, inspect buildings under construction and enforce property maintenance issues. The support staff issues the building permits, schedule inspections, receive all permit applications and distribute building plans for city review. Commercial and Institutional Construction In 2017, the city issued two permits for projects in excess of one million dollars Project Location Value Tweet Dental 7845 Century Boulevard $1,302,000 Water Treatment Plant 2100 Lake Harrison Road $5,651,000 New Single -Family Home Construction Inspections YEAR Year Permits Average Valuation Total Valuation Average New Single -Family Home Values excludes land cost 2017 55 $420,195 $22,798,000 2016 46 $401,638 $18,834,000 2015 80 $373,128 $30,397,000 1. 2014 57 1 $388,965 $21,863,000 2013 P2012 89 $342,413 $30,715,000 3,712 107 $326,007 $35,505,500 Inspections YEAR BUILDING INSPECTIONS MECHANICAL INSPECTIONS PLUMBING INSPECTIONS TOTAL INSPECTIONS 2017 2,583 1,490 1,405 5,478 2016 2,722 1,459 1,770 5,951 2015 1 3,835 1 1,681 1,770 7,286 2014 3,594 2,189 1,736 7,519 2013 3,712 2,322 2,323 8,357 Comparison to Other Communities The city maintains a list of Key Financial Strategies Communities, which it uses as similar communities to Chanhassen in regard to growth and size, as a measure for the city. 0201- Is' Quarter 2016 2017 Building Permits Construction Value Building Permits Construction Value Building Permits Construction Vale __= _ Chanhassen 1,216 $ 70,513,847 904 $ 62 964,418 1,037 $ 64,443,100 Andover 572 $26147657 638 $ 46-,9-0- 0- 983 731 $ 32 780,458 Chaska 837 $875170,6 1 1,416 $70,331,176 826 $ 105 409067 Cottage Grove 1,232 $79,660,245 3 560 $97,883,317 1 834 $147,846,087 Farmington 626 $15,397,703 1 184 $ 38-,9-2-85257 609 $ 17,156,162 Lino Lakes 654 $26,570,593 762 $ 53,391,914 5,432 $ 50,984,047 Prior Lake 2,195 $46,766,760 1 503 $ 77,504 700 956 $ 54 377 400 Rosemount 943 $ 49,160 677 1,006 $ 79 550,070 1,037 $ 74 700 000 Sava e 2,309 $44,491,500 1 058 $ 86 878 100 1 275 $ 84,492 962 Stillwater 997 I $ A9 997 385 655 $ 30 800 245 1 574 $ 56 859 721 2017 Building Permit Activity Residential Building Permits Is' Quarter 2nd uarter 3rd Quarter 4th Quarter Total Residential Single -Family 18 9 12 16 55 Residential Townhomes 0 0 0 12 12 Apartments/Senior Facilities 0 0 0 0 0 Total Residential 1 18 1 9 1 12 1 28 1 67 Commercial Building Permits Is' Quarter 20d Quarter 3rd Quarter 4th Quarter Total New 0 1 0 0 1 Redeveloped 0 0 0 0 0 Remodeled 12 25 19 16 72 Total Commercial 12 26 19 16 1 73 Available Lot Inventory 2013 2"a 2015 2016 end of Quarter)Quarter I" Quarter 89 3' Quarter m 4 Quarter Single -Family Lots 135 128 125 118 Residential Townhome 37 37 101 89 Lots 0 76 0 Commercial Total Available Lots 1 172 165 226 207 Total Permit History 2013 2014 2015 2016 2017 Single -Family 89 57 100 48 55 Townhomes 86 96 4 0 12 Apartments/Senior Facilities 1 0 0 76 0 Commercial 68 82 109 59 73 Total Number of All Permits 244 235 213 183 140 Residential Building Permits Issued Year SinpJe Faruilv Duplex Town Houses Apartments Dwelling 1980 41 18 40 99 1981 22 2 24 1982 19 2 21 1983 60 8 36 104 1984 108 34 24 166 1985 189 38 20 18 265 1986 246 8 8 262 1987 289 2 32 323 1988 352 26 34 412 1989 307 14 62 383 1990 197 197 1991 191 191 1992 228 Attached single-family* 228 1993 251 16 267 1994 269 110 379 1995 216 197 65 478 1996 170 37 207 1997 177 97 274 1998 263 162 425 1999 187 88 277 2000 124 34 162 320 2001 85 44 100 229 2002 54 246 300 2003 59 94 243 396 2004 76 16 92 2005 60 24 0 84 2006 89 42 48 179 2007 65 86 18 169 2008 28 38 66 2009 71 14 85 2010 71 30 101 2011 106 62 168 2012 107 78 185 2013 89 86 0 175 2014 57 96 0 153 2015 80 24 0 104 2016 48 0 76 124 2017 55 12 0 67 Average 134 72 57 222 500 400 L goo $00 Z 100 rim HOUSING PERMITS Housing Permits v u� w 11 w W O I N N Q U C ! OD GJ O N n V 0 CD h to tT TO ON NO OO O Nr Nr r Nr r N NNNYerNNN NNNN ®Apts OAttuhed SF DEVELOPMENT REVIEW PLANNING COMMUNITY DEVELOPMENT DEPARTMENT The Planning Division consists of the Community Development Director, three planners and a natural resource specialist. The planning staff enforces the zoning ordinance, reviews building plans, prepares current and long range plans for the community, discusses development potential for individual properties, reviews development proposals and coordinates this review with other departments and agencies, prepares reports for the Planning Commission and City Council, provides information about the community to businesses, property owners and the general public, performs research projects and writes ordinances and resolutions. There were 111 applications submitted to the Planning Division resulting in 25 cases reviewed by the Planning Commission. PLANNING CASES TYPE 2013 2014 2015 2016 2017 5 Yr. Avg. 17 Yr. Avg. SIGN PERMITS 68 48 92 75 37 64 62 VARIANCES 9 7 9 12 13 10 11 CONDITIONAL USE PERMITS 4 5 6 3 2 4 4 INTERIM USE PERMITS 2 3 3 4 0 2 2 REZONINGS 4 2 3 2 1 j 2 3 SITE PLAN REVIEWS 8 8 6 3 3 6 7 PLANNED UNIT DEVELOPMENTS 2 2 5 2 3 3 4 SUBDIVISIONS 7 11 5 4 3 6 9 VACATIONS 2 3 1 3 6 3 4 WETLAND ALTERATION PERMITS 2 3 0 2 1 2 2 CODE AMENDMENTS 3 5 2 1 13 5 10 LAND USE PLAN AMENDMENTS 2 1 1 0 0 1 2 TOTALI 113 98 123 111 82 108 119 RESIDENTIAL SUBDIVISIONS CASE # PROJECT NAME GROSS ACRES NET ACRES TOTAL UNITS GROSS DENSITY NET DENSITY 2015-16 Arbor Glen 8.49 4.59 18 2.12 3.92 2017-12 West Park 9.8 9.01 64 6.53 7.1 2017-15 Fawn Hill 11.64 6.08 10 0.86 1.64 TOTALS 29.93 19.68 92 3.07 4.67 SITE PLAN REVIEW Building Project Location Developer Square Acres Type of Use Feet Tweet Pediatric 7485 Century RGR Holding, Dental Boulevard LLC 5,700 2.0 Dental clinic Aldi/Venue 541 W. 781h Chanhassen 19,000 4.0 Retail/134 Street Frontier, LLC unit apartment TOTAL 24,700 6.0 RESIDENTIAL LOT INFORMATION DEVELOPMENT STATISTICS 0 CASE PROJECTNAME Final Plat TOTAL \'A('ANT ('I"' TED 2012 2013 2014 2015 2016 2017 ApprovN UNITS: LOTS LOTS UNITS niu PERMITS PERMITS PERMITS PERMITS PERMITS PERMIT' 'SINGLE. -FAMILY DETACHED Previnm plot snod Panels 10 14 8 10 14 13 94-1 SUB Ntianeaavhu Landlags 27 4 23 3 2 2 2 94-3 SIJB Olheryand 8 8 94-10 SOB Brenden Pond 21 21 94-13 SUB Pointe Lake Lucy 19 1 18 95-10 SOB F.n,I hlmdmv, 19 1 18 95-20 SOB Knob Hill 12 12 95-22 SIJB The Frontier 9 3 6 98-1 PIID Lyamore Addition 7/12/1999 8 8 1 1 2001-3 Big Woods 82]2001 9 9 1 2001-10 Lake Lues Ridge 5282002 17 17 2002-2 Knob Hill lad 7/222002 9 9 2002-6 Buyer Lake Minoeaashla Add. 8262002 10 1 9 04-05 SeBien West ]/12/2004 48 2 46 5 1 1 04-03 Kenyon Bluff 4/122004 3 3 1 04-23 Lotm Vlna Addition VIOAK)"05 2 2 1 04-31 Hidden Creek Meadaas 6/13/2005 21 21 3 04-36 Piaehuol 3/142005 41 5 36 2 1 2 1 04-43 Hight., Aubein Farm1 4/112005 57 57 1 2 05-02 cca,l iax 5/92005 5 l 4 63-05 John Henn 4/112005 33 - 05-14 Lake Hanlon. 7/122005 38 4 34 2 1 05-21 M-26 Frontier 2nd Addition 8232004 5 5 1 05-25 Mlooenahsm Creek Hilh 8222005 3 1 2 2 05-26 Hanlous Addition 9292005 3 1 2 05-37 SoaeRedd 4/10/1006 30 1 29 1 1 1 07-02 The.Arbon 4/92007 22 2 20 07-03 Fas Hill 7/92007 3 3 07,07 'Gaon 483/2007 2 2 M-14 1%, Po t'n, Ch Bluff Creek) 6262006 138 13 125 16 7 8 12 9 12 OW Apple True Ethnics 0/2009 7 1 6 1 1 2 10-09 Pioneer Pas, 9/13.12010 94 94 29 36 1 10.12 ReBediom on lake Riley 228/2011 66 1 65 37 20 2012-19 WyuScng 2/11/2013 4 4 3 2013-04 Fnibam 1516 Add 826/2013 4 4 3 2013-09 BIoR Creek Woods 826/2013 3 3 1 1 2013-12 Preserve al Ria Lnke 8/12/2013 16 3 13 1 5 1 5 2013-13 Camden Ridge (Includes M ins) 9/9/2013 58 3 55 29 22 5 3 2013-I8 Lake M. Joe', Cove 9/9/2013 8 8 6 2 201402 Hummingbird Heights 127/2014 2 2 1 1. 2014-06 Arbor Cove 6/9/2014 4 1 3 1 1 / 2014-09 Boulder Cove 6/92014 30 7 23 3 27 2014-12 Back Valued Acct Ind 5272014 1 1 1 2014-18 VBmv at Beau Farm 1027/2014 15 3 12 4 3 5 2014-30 2061 W. 6541 Street Melo & Boi 11842014 2 2 I 2014-36 2631 Forne Avenue Mein & Bm 12/82014 2 2 1 2015-08 Redstone Rid, 526/2015 4 4 1 1 2015-18 Gbaum 9/142015 4 4 1 3 2016-09 Anthea iu the Park 82220116 12 12 2016-13 Fuca ood 7252016 46 39 7 7 2017-15 Fmin Hill 71 10 8 2 1 SI'RTOT'cl cINGI 17-F,a1lIA 984 US 866 107 88 65 92 46 55 PERI ENI 5 u IVT 12.0% Pre0minan approval or nol recorded SUBTOTAL SINGLE-FAMILY - - TOTALSINGL&FAMILY 984 Iib 866 107 a 65 92 46 55 PERCENT VACANT 12.0% MULTI-t'AMILY 964 PUD Wahml Grove 1sT. an lot+ laula 05/27/977 247 247 2003-3 PUD Higblaods on Bluff Creek 6/152004 16 2 14 2 05-11 Liberty on Bluff Creek 3272006 417 10 407 58 59 56 4 06-26 Iakedde Toanhouses 10232006 101 7 94 20 21 7 2013-19 SouthW'esl VilHgel'aunhomes 9/92013 38 38 6 32 2015-01 Mission Hills Senior Hunting 18 19 201742 West hes ]24201] 64 52 12 12 SUBTOTAL MULTI -FAMILY 901 89 812 78 86 88 11 2 12 PERCENTVACANT 9.9% Plan APP.M. but and ecosirueled or Planed 6.4 Platted 2002 -]SP - Building C Villages an be Ponds 10//42002 06-26 -Lakeside Pond.10832006 99-19 SPR Proven Ridge Apartments 1252000 164 88 76 76 2015-01 Mission Hill, Senior Hooting 134 134 SU BTOTAL MULTI -FAMILY 298 222 76 - - - - 76 TOTAL MULTI -FAMILY 1.199 311 888 78 86 88 II - R PERCENTVACANT 25.9/. TOTAL RESIDENTIAL 2,183 429 1.754 185 174 153 103 124 67 PERCENT 19.7 RESIDENTIAL DEVELOPMENT STATISTICS PROJECT NAME _SINGLE-FAMILY DETACHED Highlands of Lake St. Joe Windmill Ron Roy at Oaks Estates _Lotus Lake Woods _'Oaks at Minnewashta _Tower Heights Shenandoah Ridge Church Road TJO _ Minger Addition _Minnewashta Landings _Olivewood _Shadow Ridge Mission Hills/Single-family Woodridge Heights 'Creekside _ Breeden Pond ,Pointe Lake Lucy Hobeas Wild Woods Farm Forest Meadows .Meadows at Longacres Trotters Ridge Willow Ridge Stone Creek Ithilien Addition BluHCreek Estates Woods at Longacres Springfield Lake Lucy Estates knob Hill Dempsey Addition Minnewashta _Melody Hill Arundel Rice Lake Manor Estates _.Rook Place _ Black Walnut Acres Song Addition .Highover Addition Monson, Sunridge Addition _ Lynmore Addition Eric Peterson imith Hill Addition Wowhead Development Tandy Point Marsh Glen .Deas Igel Addition iummerfield 2nd Addition lrvidson's Addition Vhitc Oak Addition Tristan Heights Lake Lucy Ridge Knob 111112nd Hidden Creek Estates _ Vasserman Ridge Boyer Lake Minnewashta Add. Willow Ridge 3rd Addition Walnut Grove 2nd Settlers West Kenyon Bluff Lotus View Addition Frontier 2nd Addition Hidden Creek Meadows Pinehurst Yoberrs Farm (Highcrest) Final Plat GROSS ROWWETLAND/ MISC. PARK NET TOTAL GROSS Approved ACRES ACRES PRIMARY/ ACRES LAND ACRES UNITS DENSITY POND ACRES phMNPeµPmen4Fu4ulNdanub 4 RESIDENTIAL DEVELOPMENT STATISTICS 0 Christianson Sub 40544 Ekhmas Metes & Bounds Boulder Cosy The Arbors Fox Hill Gauer _Lotus Woods _Apple Tree Estates _ Senn Metes & Bounds _ Pioneer Pass _ Lakevieve (Reflections al Lake Riley) Wynsong Fretham 15th Addition _Bluff Creek Woods Preserve at Rim Lake Camden Ridge Lake St. Joe's Cow _ Hummingbird Heights Arbor Cove Fretham 19th Addition Boulder Cove Black Walnut Acres 2nd Vistas at Bentz Farm 2061 W. 65th Street Metes & Bounds 2631 Forest Avenue Metes & Bounds _ Redstone Ridge Arbor Glen Glaccum Anthem on the Park FOYWond Fawn Hill '(II (I (.klnc FI=T LN111 MAA lf% OLx1111 SUBTOTAL 1,786.49 241.21 329.12 7.65 7057 1,137.95 2,299.00 PERCENT 13.5 18.4% 0.4% 4.0% 63.7% AVG 1.29 2.02 _ Autumn Ridge Final Plat GROSS ROP' PROJECT NAME Approved ACRES ,ACRES John Henry 4/11/2005 _ 1.19 0 Fox Den 4/25/2005 2.77 0.64 Lake Harrison 7/122005 62 6.17 Frontier 3rd Addition 7/25/2005 0.77 0 Minnewahsta Creek Hills 8/22/2005 1.4 2.92 Harvieux Addition 929/2005 1.99 0 Christianson Sub 40544 Ekhmas Metes & Bounds Boulder Cosy The Arbors Fox Hill Gauer _Lotus Woods _Apple Tree Estates _ Senn Metes & Bounds _ Pioneer Pass _ Lakevieve (Reflections al Lake Riley) Wynsong Fretham 15th Addition _Bluff Creek Woods Preserve at Rim Lake Camden Ridge Lake St. Joe's Cow _ Hummingbird Heights Arbor Cove Fretham 19th Addition Boulder Cove Black Walnut Acres 2nd Vistas at Bentz Farm 2061 W. 65th Street Metes & Bounds 2631 Forest Avenue Metes & Bounds _ Redstone Ridge Arbor Glen Glaccum Anthem on the Park FOYWond Fawn Hill '(II (I (.klnc FI=T LN111 MAA lf% OLx1111 SUBTOTAL 1,786.49 241.21 329.12 7.65 7057 1,137.95 2,299.00 PERCENT 13.5 18.4% 0.4% 4.0% 63.7% AVG 1.29 2.02 _ Autumn Ridge 3.25 28.13 4.29 _Oak Pond/Oak Hills 20.3 1 24.19 2.09 _ Prairie Creek Townhomn AVG 4.82 _ 8.14 4.6 0 Powen Place I 1,505.67 9.7 0 Lake Susan Hills'Fownhontn 4.8% I 729 0 Centennial Hills 2.2 0 North Bay 52.1 2.92 _ Tnwnhomn at Creekside T03 2.18 _ Walnut Grove (A son lot +twnhouses 05/27/97 49.8 6.81 Lake Susan Apartment Homes 6/28/1999 9.9 0 Powers Ridge Apartments 12/11/2000 21.34 0 Arboretum Village 5/14/2001 120.93 21.59 _ Presbyterian Homes 10/14/2002 5.11 0 Highlands of Bluff Creek 6/15/2004 6.52 0.86 Lihem on Buff Creek 3/27/2006 91.02 11.45 _The Preserxe 6/26/2006 79.86 10.85 Gateway Place 2/27/2006 6.2 0.25 _SoutbWrst Village 9/9/2013 2.773 1.547 Lakeside 10/23/2006 26.29 1.74 Mission Hilix Senior Housing -West 8,64 Park 7/24/2017 9.8 0.79 SUBTOTAL 620.603 78.967 PERCENT 1 12.7% TOT.AI S 1 2,407.10 1 320.18 PLRCENT 1 I I I 13.3% I NobNPnn,PmmLPowmiaeneoy t 125.73 3.25 44.93 367.726 2,992 20.3 1 0.5% 1 7,2% 59.3 AVG 4.82 _ 8.14 454.85 10,90 1 115.50 I 1,505.67 I I 51291 18.9% 1 0.5% I 4.8% I 62.6% AVG 2.21) 3.51 I CHANHASSEN POPULATION Number Increase Percent Increase Met Council 1960 CENSUS 3,411 1970 CENSUS 4,879 1,468 43% 1980 CENSUS 6,359 1,480 30% 1990 CENSUS 11,732 5,373 84% 1995 ESTIMATE 15,588 3,856 33% 1996 ESTIMATE 17,021 1,433 9% 1997 ESTIMATE 17,571 550 3% 1998 ESTIMATE 18,331 760 4% 1999 ESTIMATE 19,357 1,026 6% 2000 CENSUS 20,321 964 5% 20,321 2001 ESTIMATE 20,982 661 3.3% 21,100 2002 ESTIMATE 21,561 579 2.8% 21,345 2003 ESTIMATE 22,376 1,394 6.5% 21,600 2004 ESTIMATE 23,431 1,055 4.7% 22,042 2005 ESTIMATE 23,652 221 0.9% 22,518 2006 ESTIMATE 23,864 212 0.9% 22,017 2007 ESTIMATE 23,506 (358) -1.5% 22,395 2008 ESTIMATE 23,153 (353) -1.5% 22,590 2009 ESTIMATE 22,806 (347) -1.5% 23,629 2010 CENSUS 22,952 146 0.6% 22,952 2011 ESTIMATE 23,179 227 1.0% 23,247 2012 ESTIMATE 23,484 305 1.3% 23,779 2013 ESTIMATE 23,954 470 2.0% 24,155 2014 ESTIMATE 24,388 434 1.8% 2015 ESTIMATE 24,655 267 1.1% 25,194 2016 ESTIMATE 24,951 296 1.2% 2017 ESTIMATE 25,273 322 1.3 2018 PROJECTION 25,725 452 1.8 2020 PROJECTION 26,882 2,227 4.5% 26,700 2025 PROJECTION 29,022 2,140 8% 2030 PROJECTION 30,834 1,812 6% 31,700 2035 PROJECTION 31,995 1,161 4% 2040 PROJECTION 33,339 1,344 4% 37,100 Arbor Glen The applicant, Arbor Glen Chanhassen, LLC, requested rezoning from Agricultural Estate District (A-2) to Planned Unit Development -Residential (PUD -R); Conditional Use Permit for development within the Bluff Creek Corridor; and Subdivision with Variances creating 18 lots and 5 outlots (Arbor Glen). The development incorporates cottage style, detached townhouses. ...:J.ri.M NU. its 1.7iviniJ MU; LZ inKv 3k bl ry '1F u' L,�#Y54'[ 'x5118 <x �4 'ar � titi COUTLOT B_ R-n3rx.�.wmw'rJnn[m.tr.unw- yl� ��R �. _= _.. _ — _. �_—fir____ sre•.wTrt ?9r a,-_ "w'wza r�u.v :_m ewr—__-___ ., 3�5N- 3�1.--043Jti X'b _�{. 566U � •'KW -i ^la.00 _54tl9 31.00 •v40P —�..— C" ! 7 r— el I 2 qo I $ $II ", II wi "1 7 "-I !8 "I i„ 9e1 { s `l I I Iia a 4I �a�3 I a! I JS zl se x4z a r — J L_ �1 g 3 °L„xaLiriaS°rrr� n.:T" �+ I ., er Siw 54mJ 5. oa J !4r °, "• I R `''\ JO ni fa'Orx n w3xf ap Rl�•nY .6 (�'J�jV1'i�L T R.MWY/ Ilk i ocwrsN g S< _ 36 53 Lx yp<p p Yy rnt i )y — Y: vramae { i Z p Yc £ N• 1+1 {ry 'fri , Syj Y ..a "_w 54m T! 4� , «' 4 i + <-.. 9 1$ "� ! -P gl IRa ail al^as,� I !P IIP sl Iii ,,ua o w_ 1 , 17 y 13 4C i IGa i ! I I, 14 ! I-! i 12 sT o ✓ - 3<,x._� {3 1 R s„I 'w 4th n 81 ° X574.50•[ arnpy, x' �L v F� IA ! I � } I i m L fs. J L _�mjF en y Nx[r uxo � � ae.R'E b .nJ 1 OUTLOT D OUTLOT E '4, , 6Y+ Lu+0 ` • h\r� West Park The applicant, Pulte Homes, requested Rezoning from Planned Unit Development (PUD) and Single Family Residential (RSF) to Planned Unit Development — Residential (PUD -R), Site Plan Review f or the construction of an 82 unit town -home development for an 82 unit town -lots and six outlots and public right-of-way, and Vacation of Drainage and Utility Easement located southeast of Waters Edge Drive. Fawn Hill The applicant, HP Holdings, LLC & Chanhassen Investments, LLC, requested rezoning of the property from Agricultural Estate (A-2) to Residential -Low & Medium Density (RLM); a Conditional Use Permit to permit development within the Bluff Creek Corridor; and subdivision approval for 10 lots, 6 outlots and public right of way with variances for a double fronted lot for a single-family detached subdivision and a roadway slope in excess of 7.0%. i..:3'vl-f %V+,lvYll�liRAKaWa(as: W9p s.+noaww w.w®arsm�nv�wa Tweet Pediatric Dental The applicant, RGR Holdings, LLC., requested site plan approval for a 5,700 square foot, one story, dental clinic with space for future expansion. ro�� WEST WATER TREATMENT PLANT The City of Chanhassen is developing a 6.57 -acre site as Water Treatment Plant. The applicant replated the property and received site plan approval to construct a 16,950 water treatment facility with two outlots. The site is located at 2070 Lake Harrison Road. The property is bordered on the south by Lake Harrison Road and to the east by Galpin Lake Road. Immediately east and west are outlot A and B. Access to the site will be for a 30 - foot wide access of Lake Harrison Road. Community Development MISSION STATEMENT To serve the community by providing the resources in an efficient, consistent and effective manner to ensure a safe, healthy sustainable environment. ©Chanhassen is a Community for Life Providing for Today and Planning for Tomorrow