Approval letter 18-03February 13, 2018
CITY OF CHANHASSEN
Chanhassen is a Community for Life -Providing for Today and Planning for Tomorrow
Crown Castle Services
Mr. Richard Krueger
1600 Utica Ave. S., STE 475
St. Louis Park, MN 55416
Re: Planning Case #2018-03
Dear Mr. Krueger;
This letter is to confirm that the City Council approved the amendment to Conditional Use Permit #2000-
06 to permit the construction of an extension of the communication tower up to 90 feet monopole, plans
prepared by Design 1, dated revised April 4, 2017, subject to the following conditions:
1. A building permit is required to construct the platform and tower extension; the tower must be
designed for a 90 MPH wind load and include the effect of one-half inch of radial ice.
2. The original plans must be signed by a professional engineer licensed in the State of Minnesota.
3. The contractor shall meet with the Inspections Division as early as possible to discuss plan review
and permit procedures.
4. The applicant shall submit a detailed grading, drainage, and erosion control plan for staff review
and approval.
5. The tower extension shall be of the same color as the existing tower.
6. A letter of intent committing the tower owner and his or her successors to allow the shared use of
the tower if an addition user agrees in writing to meet reasonable terms and conditions for shared
use shall be submitted to the city.
You will need to submit a building permit application for the extension, platform and fence. If you have
any questions or need more information, please contact me at (952) 227-1131 or
buenerous(a)ci.chanhassen.mn.us.
Sincer
Robert Generous, AICP
Senior Planner
c: Marilyn Beddor
ec: Kate Aanenson, Community Development Director
Jessica Archer, Building Official
George Bender, Assistant City Engineer
Todd Gerhardt, City Manager
PH 952.227.1100 • www.ci.chanhassen.mn.us • FX 952.227.1110
7700 MARKET BOULEVARD • PO BOX 147 • CHANHASSEN • MINNESOTA 55317