Loading...
17-0442 07 SHEET SWPPP NARRATIVE 2-16-18GENERAL PROJECT INFORMATION CONSTRUCTION A C TI VI TY NOTES CONSTRUCTION NOTES PR 0 JEC T L OCA TION AND NA RRA Tl VE: THIS PROJECT CONSISTS OF A 3 L 0 T SUBDIVISION IN CHA NHA SSEN, MN. THE SITE IS L OCA TED NEAR LONGITUDE -9,3.6077, LA Tl TUDE 44.8675. THE SITE IS ACCESSED FROM DOGWOOD ROAD. CONSTRUCTION A C Tl Vl TIES INCLUDE GRADING., A GGREGA TE AND BITUMINOUS PLACEMENT .. CURB AND GU T TER lNS TA L L A TION, AND U TIL l T Y lNS TA L L A TION. SITE CONSTRUCTION IS PLANNED TO BEGIN SUMMER OF 2018 AND COMPL E TED BY THE FALL OF 2018. RESP ONSI BL E PAR TIES: CONTRACTOR MUST BE TRA/NEO FOR BOTH CONSTRUCTION INSTALLER AND SITE MANAGEMENT PER REQUIREMENTS OF THE PERMIT PART lll. F. PETER & DEANNA BRA ND T PETER & DEANNA BRA ND T 952 - 334 - 0565 0 WNER 0 T TO A SSOCIA TES, INC. CON TA C T PERSON PAUL 0 T T 0 PHONE 76,3-682-4727 PLAN PREPARER CONTACT PERSON PHONE TRAINING: 112012016 (EXP/RES 20 7 9) U OF MN CER T/F/CA TION -DES/GN OF CONSTRUCTION SWPPP CONTRACTOR (RESPONSIBLE FOR CONTACT PERSON PHONE INS TALLA T1 ON &INSPECT/ON) TRAINING: -------------------------------------------------------------- PROJECT AREAS: PROJECT SIZE (DIS TURBED FOR S/ TE DEVELOPMENT) = 0.6 ACRES EXI S TING A REA OF IMPER VI O US SURFA CE = 0. 1 A CRES POST- CONSTRUCTION AREA OF IMPERVIOUS SURFACE = 0.6 ACRES TO TA L NEW IMPERVIOUS SURFACE AREA CREA TED = 0.5 ACRES RECEIVING WA TERS: SURFACE WATERS AND WETLANDS THAT WILL RECEIVE STORM WATER RUNOFF FROM THE SITE AND ARE WITHIN ONE (1) MILE OF THE SITE ARE INDICATED WITH DIRECTION ARROW ON THE SWPPP PLAN SHEET AND ARE LISTED BELOW.- NAME OF WA TER BODY L A KE MI NNE WA SH TA I MPA I RED WATER YES THE OWNER SHALL SUBMIT A NOTICE OF TERMINATION (NOT) WITHIN 30 DAYS AFTER FINAL STABILIZATION IS COMPLETE. ALL CONSTRUCTION A C Tl Vl TIES MUST MEET THE REQUIREMENTS OF THE MPCA 'S NPDES GENERAL S TORM WA TER PERMIT FOR CONSTRUCTION A C Tl Vl T Y. EROSION PREVENTION:- ALL REVENTION: ALL EXPOSED SOIL AREAS (INCL. STOCKPILES) MUST BE STABILIZED. STABILIZATION MUST BE lNl TlA TED IMMEDIATELY TO L lMl T SOIL EROSION BUT COMPLETED NO CASE LATER THAN 7 DAYS AFTER THE CONSTRUCTION A C Tl Vl T Y IN THAT PORTION OF THE SITE HAS TEMPORARILY OR PERMANENTLY CEA SED. TEMPORARY TURF RES TORR TION SHALL BE MNDO T SEED MIX 21-111 @ 100 LB/ACRE WITH MNDOT TYPE 7 MULCH @ 2 TONS/ACRE (D/SC ANCHORED). STABILIZATION MUST BE INITIATED I MMED/A TEL Y BUT /N N 0 CASE COMPLETED LATER THAN 7 DA YS AFTER THE A C Tl Vl T Y IN THA T POR TION OF THE S/ TE HAS TEMPORAR/L Y OR PERMANENTLY CEASED. PERMANENT TURF RES TORR T/ON SHALL BE MND 0 T SEED MIX 25-1,31 C°? 220 LB/ACRE WITH MNDO T TYPE 7 MULCH @ 2 TONS/ACRE (DISC ANCHORED). SEDIMENT CONTROL PRA C Tl CES: THE CON TRA C TOR SHA L L BE RESPONSIBL E TO CON TROL SEDIMEN T- L A DEN SURFA CE WA TER FROM LEAVING THE CONSTRUCTION ZONE. ALL M OBI L I ZED SED I MEN T THAT HAS LEFT THE CONS TRUC TION ZONE SHALL BE CDL L EC TED BY THE CDN TRA C TOR AND PROPERLY DISPOSED OF A T NO A DDI TIONA L COS T TO THE 0 WNER. EN TERING/EXI TING THE Sl TE SHALL OCCUR ONL Y A T TEMPORAR Y CONS TRUC TION EN TRANCE TO L lMl T TRACKING OF SED I MEN T ONTO S TREE TS. TEMP ORA R Y SOIL STOCKPILES SHALL HAVE SILT FENCE OR OTHER EFFE C Tl VE SED I MEN T CONTROLS INSTALLED AROUND THE PERI ME TER. DUST CONTROL MEASURES SHALL BE I MPL EMEN TED AND MAINTAINED AT ALL TIMES DURING C DNS TR U C TI ON, AND WITHIN 4 HOURS OF N 0 TI FI CA TION BY THE Cl T Y. CONSTRUCTION SEQUENCING: 7) PRECONS TRUC TION MEETING. 2) INS TA L L PER/METER SIL T FENCE, lNL E T PRO TEC TION ON EXISTING CA TCH BASINS & CONSTRUCTION ENTRANCE. 3) CLEAR/NG & GRUBBING. 4) ROUGH GRADE SITE. 5) INS TALL U TIL / TIES. 6) TEMPORARY STABIL lZE Sl TE AS INDICA TED ON THE PLANS. 7) COMPLETE STREET CONSTRUCTION. 8) PRI VA TE UTlLl TY INS TALLA TION. 9) RES TORE Sl TE Wl TH PERMANENT RES TORR TION. 7 0) REMOVE SED/MEN T CONTROL DE VICES & SUBM/ T NO TICE OF TERM/NA TION (NOT) TO MPCA ONCE ALL DISTURBED AREAS HAVE 70% l/EGE TA T/ VE DENS/ T Y. EROS/ON &SEDIMENT CONTROL BMP ESTIMATED QUANTITIES: QUANTITIES L /S TED ARE APPROXIMATE. REFER TO CONTRACT DOCUMENTS FOR EXA C T QUANT/ TIES. tMa QUA N TI TY SIL T FENCE 765 LF R 0 CK CONST. ENTRANCE I EACH MND O T 3885 CAT 3 EROSION CONTROL BLANKET 1440 S Y INLET PR 0 TEC TI ON 4 EACH MND O T SEED MIX 25-1,31 W/TYPE I MULCH 0.3 ACRES INSPECTIONS AND MA IN TENA NCE: THE CONTRACTOR MUST ROU T/NEL Y INSPECT THE CONSTRUCTION SITE ONCE EVERY SEVEN (7) DAYS DURING ACTIVE CONSTRUCTION AND WITHIN 24 HOURS OF A RAINFALL EVENT GREATER THAN 0.5 INCHES INA 24 -HR PERIOD. INSPECTION LOGS SHALL INCLUDE ANY CORREC Tl VE MEASURES TAKEN. ALL INSPECTIONS MUST BE RECORDED AND RECORDS RETAINED WITH THE SWPPP ON SITE. THE SWPPP, ALONG WITH INSPECTIONS AND MAINTENANCE RECORDS, SHALL BE RETAINED FOR THREE YEARS AFTER SUBMITTAL OF THE NOT/CE OF TERMINATION (NOT). SILT FENCE MUST BE MAINTAINED WHEN A CCUMUL A TED SEDIMENT REACHES 1/3 OF THE DEVICE HEI GH T. l NL E T PR 0 TEC TI ON D E Vl CES SHALL BE CLEANED ON A R 0 U TI NE BASIS SUCH THAT THE DE VI CES ARE FULLY FUN C Tl DNA L FOR THE NEXT RA lNS TORM EVENT. REMOVAL AND DISPOSAL OF THE SEDIMENT SHALL BE INCIDENTAL TO THE CONTRACT. TEMP ORA R Y C ON S TR U C Tl ON ENTRANCE SHALL BE CLEANED AND REFRESHED AS NECESSARY TO CONFORM TO DE TA lL . OFF- Sl TE VEHICLE TRACKING SHALL BE REMOVED WITH 24 HOURS OF DISCOVERY. P OL L U Tl ON PREVENTION:- ALL REVENTlON: ALL SOLID WASTE GENERATED B Y/COL L EC TED FROM THE CONSTRUCTION SITE MUST BE DEPOSITED IN A DUMPS TER. NO CONSTRUCTION MA TERI A L SHALL BE BURIED OR BURNED ON Sl TE. ALL HAZARDOUS MA TERIA L S OIL, GA SOL INE, FUEL, PAINT, ETC) MUST BE PROPERLY STORED/CON TA INED TO PREVENT SPILLS, LEAKS OR OTHER DISCHARGE. STORAGE AND DISPOSAL OF HAZARDOUS WASTE MUST BE IN COMPLIANCE WITH ALL APPLICABLE STATE AND FEDERAL REGUL A TI ONS. ALL VEHICLES LEFT ONSITE SHALL BE M ONI TORED FOR LEAKS TO REDUCE THE CHANCE OF C ON TA MI NA TION. EXTERNAL WASHING OF TRUCKS OR OTHER CONSTRUCTION VEHICLES, ENGINE DEGREASING, NOR CONCRETE WASHOUTS ARE ALLOWED ON SITE. TRUCKS ARE TO USE SELF-CONTAINED WASHOUT S YS TEM. ALL SPILLS SHALL BE CLEANED IMMEDIA TEL Y UPON DISCOVERY. SPILLS LARGE ENOUGH TO REACH THE STORM CONVEYANCE SYSTEM SHALL BE REP OR TED TO THE MPCA STA TE DU TY OFFICER A T 1-800-422-0798. CON TRA C TOR SHALL MONITOR AND PR 0 VIDE DUST CONTROL COLLECTION WHEN NEEDED. FI NA L S TA BIL I ZA TI ON: THE CON TRA C TOR MUS T ENSURE FINAL S TA BIL IZA TION OF THE Sl TE. THE PERMI TEE MUS T SUBMI T A N 0 Tl CE OF TERMI NA Tl ON WITHIN 30 D A YS A F TER FINAL S TA BI L I ZA TION IS COMPLETE. SUFFICIENT TOPSOIL (6-f) SHALL BE PLACED ON DISTURBED AREAS FOR RE- VEGETA TION. ALL TEMP ORA R Y ER O Sl ON CONTROL MEASURES AND BMP 'S MUST BE REMOVED AS PART OF THE FINAL SITE S TA BI L I ZA Tl ON. TRA /N/NG REQU/REMEN TS: CONTRACTOR MUST BE TRA/NEO FOR BOTH CONSTRUCTION INSTALLER AND SITE MANAGEMENT PER REQUIREMENTS OF THE PERM/ T, PART Ill. F. DOCUMEN TA TION SHALL BE ADDED TO THE SWPPP DOCUMENTS LOCA TED ONS/ TE. REV. NO. DATE BY DESCRIPTION DESIGNED DR,4WN C. S. 0. T. J. B. CHECKED C.S.O. l hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that l am a duly Licensed profes Tonal Engineer under the laws of the State of Minnesota. Paul E Otto # 40062 Date: 2-16-18 r7 9 West Division Street TTO (763)682-4727Buffalo,MN 313 Engineers & Land Surveyors,. Inc. Fax (763)682-3522 SOCiATES"cense THE A SECOND A PETER & DEANNA BRANDY CHANHASSEN , MN STORMWATER POLLUTION PREVENTION PLAN NARRATIVE 17-0442 SHEET NO. 7 OF 9 SHEETS DATE.' 2-16-18