Loading...
Operations & Maintenance PlanC. LoUCKS Operations & Maintenance Plan Control Concepts Chanhassen, MN Prepared by: Loucks CITY OF CHANHASSEN RECEIVED JUN 15 2018 CHANHASSEN PLANNING DEPT PLANNING I CIVIL ENGINEERING I LAND SURVEYING I LANDSCAPE ARCHITECTURE I ENVIRONMENTAL v .loucksinc.com 1 7200 Hemlock Lane, Suite 300, Maple Grove, MN 55369 1 763.424.5505 CBMH 110 SUMP MANHOLE CBMH 10 SUMP MANHOLE CONTECH JELLYFISH JFPDO806 SYSTEM CBMH 100 SUMP MANHOLE CBMH 30 SUMP MANHOLE CBMH 20 SUMP MANHOLE CBMH 70 — SUMP MANHOLE CBMH 80 CBMH MO SUMP MANHOLE SUMP MANHOLE + {+'+'+/+"++ + + + } + + ++++ R + + + + + a% ++++ + + + + + + + + + + 4 + + + +, ++++•,+++++++f++ ++/ + f + + + + +/ +, + +/ CBMH 40 SUMP MANHOLE CBMH 50 SUMP MANHOLE STMH 60 SUMP MANHOLE cp HCB » RIM=976.04INV=a I_I 9 9.69(NW) jam 0 50 100 SCALE IN FEET ■■ LOUCKS PLANNING CML ENGINEERING LAND SURVEYING IANDSCAPEARCHITECTURE ENVIRONMENTAL 9200 Hemlock Lama, Suitt 300 Maple Grove. MN 55369 763.AM.5505 o,—.leuckainc.ccm Control Concepts BMP Maintenance and Inspection SDeciiications CBMH 10 CONCRETE ADJUSTING RINGS, MIN. 4• -MAX, 10' 42� - y. CBMH 1111 /� BMH 10 SUMPMANHOLE / b•PRECAST REINFORCED MI' MANHO CONCRETE SUB. - S"TOP TO BE SET IN .1 AMORTAREED. ----------- �P�MAI, -STEPS ib• O.C. ON DOWNSTREAM SIDE. ARIA •W IXALUMMUM RSTEEL _ REINFORCED COPOLYaIER PLASTIC. '1 M • /x PRECAST CONCRETE a1ANHOLE SECTIONS :r '+ WITH •O' -RING RUBBER GASKfiS. I •r�• . ^ ;ra•Y:Y:e::T:: .«'Y...r«t.u;. Y�r7•{xRFtilJ'+ta.:«rfS#Y ...a'••':":'j •'$":' •!:'t:«.::C•ty..«» NYLOPLt ST SNOUT STRUCTUREV» JN :,t:.y1I«'•.':'t•:CYk::::•"i.N»t'ra �••R.'.•:••^".:t✓O::«Va ' :! .«..: :::rx.-:•in..«.. t rw. t:.:...«. ' �'� i{:. •ti.t .....f' anti{.. : '1:•. i• ••.:•• a .. .... :::.. .:._.: .r ".'ri:::«:i.:m _.a .x ....«• :a::•::. .:.. • ar?«..........•. .a�•• u..rirh�:.: ' .^� ORAPPROVED EQUAL. _ g '1 •«s _.uaa� r ...xu.« ... .........».7nr..:•i:�:.Y.. . wi.«iarEiti i'h..t ri: i« .wxu'.'.•t. .:...7v�yyem•• Vii« ... .. r.:«.....«�. x'i•�a-K:.�'" ':: • ...rrs a Fw'i R F z ovnEr isr.:acv •hi. i W FLOW iii« •. F. .x: .. FOMENTREV LMRCLEAN1 MUM fY DE TN INMIM SLAB THICKNESS IS V FOR 14' 't DEPTH. INCREASE THICKNESS 1' FOR 4. Of DEPTH GREATER THAN 14'. 3' T PLAN VIEW DETAIL/PROFILE VIEW BMP ID: CBMH 10 Location: Curb line on northwest side of parking lot Description of Device: 48" Diameter precast manhole with a 3 foot sump. Flow enters the structure through the inlet grate where solids settle out in the sump with clean flow discharging into a 12" HDPE pipe on the south side of the structure. Structure Access: Through a standard catch basin inlet grate. Control Concepts BMP Maintenance and Inspection Specifications BMP ID: Sump Storm Sewer Structure CBMH 10 Maintenance and Inspection Report Inspection Date Inspector:. Inspection Activity Observations/Measurements Maintenance Maint. Actions Required/Date Required Completed/Responsible Foreman Inspection of structure for Remove any floatables, accumulated Yes No trash, debris, floatables trash or debris with a dip net or vacuum. and oil More frequent cleaning is necessary if floatables regularly exceed a depth of 1 ft. Vacuum any visible oil prior to Yes No pumping permanent pool of water downstream. / /20 Responsible Pa Measure depth of Pump out entire structure annually and Yes No accumulated sediment Measured Depth = remove sediment anytime depth exceeds 12" Note: Sediment depths in the sump over 18" dictate a more frequent cleaning regiment. / /20 Responsible Part Inspect contributing areas Notify appropriate maintenance staff or Yes No for plugged catch basins, property owner of need to sweep and/or erosion, trash, leaves, and remove litter/debris. debris. Check ground surface directly adjacent Sink holes shall be filled and monitored Yes No to the structure for for further depression. sinkholes or depression areas / /20 Responsible Party: Inspect all visible Repair as able and note observations Yes No structural components: notifying maintenance foremen of any Manholes, Castings, observed damage to structure, Snout Structure, Covers manholes, casings, snout structure and and pipe connections. associated loose or missing bolts, blockages of inlets/outlets, etc. / /20 Responsible Party: Control Concepts BMP Maintenance and Inspection Specifications CBMH 20 CONCRETE ADJUSTING RINGS, MIN. 4' -MAX. 10 - 'SUMP,MAN1101 1 SUMP MAN 1101r • PRECAST REINFORCED CONCRETESUe. T y f y ♦ y pia y f y 1 ♦( ♦ y COMH 2O �. 44 �I+j �,4, SUB TOP TO BE SET IN AMORTAR BED. i()Lt SUMP MANHOLE 11 IIy 1r I III Ir EXTRUDED ALWIN IORSTTEEE {SIDE. }• REINFORCED COPOLYMER PLASTIC. D' y'wi+ ~ PRECAST CONCRETE MANHOLE SECTIONS RUBBERW ITH'O'-RING GASKETS. I "OPIAST SNOUT STRUCTURE } ORAPPROVED EQUAL. —N1 _.... ::M. .«•tl.'L:tttiti?t tY:« .L::�t :::yC::A:A::Y:::::j'::::......:LYC':.l1ttLTY:J'iA9l]lA]I:tGY.y. •jC` .T•'r.'i+i'. ....j},,ss+?:::::m:::•:=vii x. Fi=a vi{': •ye7;•«:::V / i \ �/ ..-.}ciui'riyiy;{xu •••••• »». t .1VPl! It}.tl•:•::::•••::tt::::l:t'L': istY::::L-.-.::CJLI:::l lt1::'.T.::\::::':'t: :'.::5'Rt«:F!!«jk\:'fTL:'S:' '•' aFp�..........'t.::::Ata^::::a.Va::.'J:L'!Y.]J...G..............tA^::[{':Nl :....bTYSl :T.t•R::2 LY.: �:] OUTLET .. FLOW 1••tYN.tt................................tt«.::LaYJ%51::M1«.»:.»......I L:M]::....»..».»..S :tttt:• FOMENT LEVEL FOR CLEANING MINI fY DFITM • INLMUM SU8 THICKNESS IS 6' FOR 14' - DEPTH. INCREASE THICKNESS V FOR 4' OF DEPTH GREATER THAN 14'. 3' u T PLAN VIEW DETAIL/PROFILE VIEW BMP 1D: CBMH 20 Location: Curb line on north side of parking lot Description of Device: 48" Diameter precast manhole with a 3 foot sump. Flow enters the structure through the inlet grate where solids settle out in the sump with clean flow discharging into a 12" HDPE pipe on the south side of the structure. Structure Access: Through a standard catch basin inlet grate. Control Concepts BMP Maintenance and Inspection Specifications BMP ID: Sump Storm Sewer Structure CBMH 20 Maintenance and Inspection Report Inspection Date Inspector: Inspection Activity Observations/Measurements Maintenance Maint. Actions Required/Date Required Completed/Responsible Foreman Inspection of structure for Remove any floatables, accumulated Yes No trash, debris, floatables trash or debris with a dip net or vacuum. and oil More frequent cleaning is necessary if floatables regularly exceed a depth of 1 ft. Vacuum any visible oil prior to Yes No pumping permanent pool of water downstream. / /20 Responsible Party: Measure depth of Pump out entire structure annually and Yes No accumulated sediment Measured Depth = remove sediment anytime depth exceeds 12" Note: Sediment depths in the sump over 18" dictate a more frequent cleaning regiment. / /20 Responsible Part Inspect contributing areas Notify appropriate maintenance staff or Yes No for plugged catch basins, property owner of need to sweep and/or erosion, trash, leaves, and remove litter/debris. debris. Check ground surface directly adjacent Sink holes shall be filled and monitored Yes No to the structure for for further depression. sinkholes or depression areas / /20 Responsible Party: Inspect all visible Repair as able and note observations Yes No structural components: notifying maintenance foremen of any Manholes, Castings, observed damage to structure, Snout Structure, Covers manholes, casings, snout structure and and pipe connections. associated loose or missing bolts, blockages of inlets/outlets, etc. / /20 Responsible Party: Control Concepts BMP Maintenance and Inspection Specifications CBMH 30 CONCRETE ADJUSTING RINGS, MINA• -MAK. 10' f ( fantlisn St:AW MA:�lt(N f 4 . PRECAST REINFORCED CONCRETE SEAS. ♦ y ! ♦ ♦ y CBy ♦ ♦ ♦ ♦ 1 CBMI'1 20 (� y+ii+i iiAy SEASTOPTO BESETIN �! E�♦ 1 AMORTAR SED. -STEPS ♦ y ♦ y SUMP MANHOLF ♦ ♦ J ♦ y 16. O.C. ON DOWNSTREAM SIDE. �- EXTRUDED ALUNINLM ORSTEEL 1 i 4 i JYi J ♦ i Jf i 40, REINFORCED COPOLWER PLASTIC. 1 y A1� :•� PRECAST CONCRETE MANHOLE SECTIONS I ------------------ T WITH•O'-RING RUISERCASKETS. ! Ily WtOPIAST SNOUT STRUCTURE ^ ORAPPROVED EQUAL. ::i iii:?: : 2:::s;•.v:: �::. �:.j�.y:.:�v.::::�.; ..:: : i:••:t::?»tii«YF..... ••::.:.::.•f•J.:.:.....Y«....... i.. •aVIF•tA'.::::':•:^.. V K:1flT.•.::�..VAI::.Y.jY:j:::l.':.:::tj':.:::.'lRhLTI::PFJlJ.'J:L'....�..l:......:•»Y'}:::II�'J�.':.�•f.'JJ.'.::Y.:••: .Y :• »T ...... i»}L{:1��:•ii:; OUTLET {:e:.«_.y;....x:.::..............:. .........�.»......::...:.::.::::.:.n:::.�::•.v::::.n......_.........�.: ••Az•r.•^......AT..A ... A..:»x:•rw:e:•m}.:J er:,:•. ......... FLOW—yr ..:..............................r.:::::w:: �«:..............T::a.':.:L-•'...........::M•J:.•JNYY:.•.£:.t :1x:: ......................................................... ... ............. ... ..:::. .......• "G. EO MENS LEVEL FOR CLEANING . Tr MUM EY DEP M STAB THICKNESS IS 6' FOR 14' DEPPTH. INTHAN CREASE THICKNESS S• FOR 4' OE DEPTH GREATER THAN 14'. 3' T DETAIL/PROFILE VIEW PLAN VIEW BMP ID: CBMH 30 Location: Curb line on northeast side of parking lot Description of Device: 48" Diameter precast manhole with a 3 foot sump. Flow enters the structure through the inlet grate where solids settle out in the sump with clean flow discharging into a 12" HDPE pipe on the south side of the structure. Structure Access: Through a standard catch basin inlet grate. Control Concepts BMP Maintenance and Inspection Specifications BMP ID: Sump Storm Sewer Structure CBMH 30 Maintenance and Inspection Report Inspection Date Inspector: Inspection Activity Observations/Measurements Maintenance Maint. Actions Required/Date Required Com leted/Res onsible Foreman Inspection of structure for Remove any floatables, accumulated Yes No trash, debris, floatables trash or debris with a dip net or vacuum. and oil More frequent cleaning is necessary if floatables regularly exceed a depth of 1 ft. Vacuum any visible oil prior to Yes No pumping permanent pool of water downstream. / /20 Responsible Party: Measure depth of Pump out entire structure annually and Yes No accumulated sediment Measured Depth = remove sediment anytime depth exceeds 12" Note: Sediment depths in the sump over 18" dictate a more frequent cleaning regiment. / /20 Responsible Party: Inspect contributing areas Notify appropriate maintenance staff or Yes No for plugged catch basins, property owner of need to sweep and/or erosion, trash, leaves, and remove litter/debris. debris. Check ground surface directly adjacent Sink holes shall be filled and monitored Yes No to the structure for for further depression. sinkholes or depression areas / /20 Responsible Party: Inspect all visible Repair as able and note observations Yes No structural components: notifying maintenance foremen of any Manholes, Castings, observed damage to structure, Snout Structure, Covers manholes, casings, snout structure and and pipe connections. associated loose or missing bolts, blockages of inlets/outlets, etc. / /20 Responsible Party: Control Concepts BMP Maintenance and Inspection Specifications CBMH 40 CONCRETE A OIVSTING RfNGS, MIN. 4' -MAK. 10' 40 CBMH2MA • PRECAST REINFORCED SUMP NHOLE ...1 •.lti CONCRETES AB. SLABTOP TO BE SET IN Sit A MORTAR BED. -STEPS 16' O.C. ON DOWNSTREAM SIDE. EXTRUDED ALUMINUM ORSTEEL Y0. REINFORCED COPOLYMER PLASTIC. CBMH iA PRECAST CONCRETE MANHOLE SECTIONS WITH '01RING RUBBER GASKETS. SUM MANHOLE NYLOPUST SNOUT STRUCTURE ORAPPROVED EQUAL. / \\ _OUTLET FLOW �. ED ME NT LEVEL FOR CLEANING AXNLlH11]' DEPTH INNN.M SLAB THICKNESS IS 6' FOR 14' DEPTH, INCREASE THICKNESS V FOR 4' OF DEPTH GREATER THAN IV - 3' 3 T PLAN VIEW DETAIL/PROFILE VIEW BMP ID: CBMH 40 Location: Curb line on east access drive Description of Device: 48" Diameter precast manhole with a 3 foot sump. Flow enters the structure through the inlet grate where solids settle out in the sump with clean flow discharging into a 12" HDPE pipe on the west side of the structure. Structure Access: Through a standard catch basin inlet grate. Control Concepts BMP Maintenance and Inspection Specifications BMP ID: Sump Storm Sewer Structure CBMH 40 Maintenance and Inspection Report Inspection Date Inspector: Inspection Activity Observations/Measurements Maintenance Maint. Actions Required/Date Required Completed/Responsible Foreman Inspection of structure for Remove any floatables, accumulated Yes No trash, debris, floatables trash or debris with a dip net or vacuum. and oil More frequent cleaning is necessary if floatables regularly exceed a depth of 1 ft. Vacuum any visible oil prior to Yes No pumping permanent pool of water downstream. / /20 Responsible Party: Measure depth of Pump out entire structure annually and Yes No accumulated sediment Measured Depth = remove sediment anytime depth exceeds 12" Note: Sediment depths in the sump over 18" dictate a more frequent cleaning regiment. 1 /20 Responsible Party: Inspect contributing areas Notify appropriate maintenance staff or Yes No for plugged catch basins, property owner of need to sweep and/or erosion, trash, leaves, and remove litter/debris. debris. Check ground surface directly adjacent Sink holes shall be filled and monitored Yes No to the structure for for further depression. sinkholes or depression areas / /20 Responsible Party: Inspect all visible Repair as able and note observations Yes No structural components: notifying maintenance foremen of any Manholes, Castings, observed damage to structure, Snout Structure, Covers manholes, casings, snout structure and and pipe connections. associated loose or missing bolts, blockages of inlets/outlets, etc. / /20 Responsible Party: Control Concepts BMP Maintenance and Inspection Specifications CBMH 50 CONCRETE ADJUSTING RINGS, jff�� Irk MIN. 4• -MAX. IB' CBMH s0 SUMP MANHOLE PRECAST REINFORCED SfMH 60 CONCRETE 5�5' ' SUB TOY TO BE SET IN 'i A MORTAR BED. SUMP MANHOLE y ­STEPS I6. O.C. ON DOWNSTREAM SIDE. S INTRUDED ALUMIN MA ORSTEEL 11 REINFORCED COPOLYMER PLASTIC. 40, .1 PRECAST CONCRETE MANHOLE SECTIONS "�'\~ •R T » .• • _� ... w J.• • ..) .. .P ..... ••' 4. P i ••• 'yl • •.: •.I W ITM'O'-RING RUBBER W SKETS. �.. N \..i7 y,• ,y Y 4 . •. 'r y •••' L, •,••• NYLOPUTi STRUCTURP � 'i.' ••.. \.�. �. �\„'w'^,ryrr 1�•�'6••••• w ENOUT z ORAIPROVED EQIAi. • ” ±. • �:: •:... .. s � •; ..:: ..,. ;:; :.� .... .......:•:.i.tt:::.: •' • < 11 _• R ht: +» .. ;q t:':•i:::.'.•.A• ^:t::A i:p.;.. . :: �. ..;. 't.;': OUTLET j•. Y•'+:: .•.YS ��l•.«t:'`'w::' It ::l:h. PEMV; A... .. A� : S. • SJa.',{'A`:1..:.•.t is J. .. q•'Y • t' Sl"• ::.::'(t:" :�Y p t.Y:. •t'J :Y.'•t:::Yr3:.':Y::.L':'Y.l't».l'�JJ.:SL•.:•t: '^ «:J• { y S ENV.,Jf SV'G!t'•'• tl• jlt, {Nt,{'• -PEDIMENT IEVEt FOR CLEANING f1}rti•'l.•'' Th'SY �•.......... . » -IN OF ::1:• 'tt•• •tStXL•.Tt.YCt:JE. '«t• t.•.'lt IMUN 12' DEITY t.ti„S::I:•t:��j�l' �t::•.l�t%F}' :f: L•: ty'•: "f•:'•f• •tt'titu„'t:jS.•'Sy.', •11t =Z4=6 M. »�:'ti 't.• •F�:t..t'SSG.tY.«• •• :l�« .« - .5'J:ALG .... ........q^,.:L»,».,"yY7S:««l iy'�^tt»,y;:C• AY.�'tt1t•�«:.tf x'fyGT tS •J .:.»::Y '•••t.• INMUM SUBTMI[KNE55156'FOR 1T •Y•f:t.t .... ::y: Alt:yt/.{ :�xT.ASa; YA :Wtt.::a:,. •:ti..rr.:.tt.:a:u::x.•ruA•s.::. ar.:v -� -FOR .:::......:..:.. .. .....:.............t�:•:i:^•r ;. �. DEPTN, I Of 1X.4. I V. DEPTN GRMTER THAN 14'. GREATER ' :Tll»t{t {({'.a f l.':«}•::YV. S1 :•:':: N!)a}•:::.]SJ ::: :::.•.............womb 1• R• 3• T DETAIL/PROFILE VIEW PLAN VIEW BMP ID: CBMH 50 Location: Curb line on southeast corner of loading dock area Description of Device: 48" Diameter precast manhole with a 3 foot sump. Flow enters the structure through the inlet grate where solids settle out in the sump with clean flow discharging into a 12" HDPE pipe on the north side of the structure. Structure Access: Through a standard catch basin inlet grate. Control Concepts BMP Maintenance and Inspection Specifications BMP ID: Sump Storm Sewer Structure CBMH 50 Maintenance and Inspection Report Inspection Date Inspector: Inspection Activity Observations/Measurements Maintenance Maint. Actions Required/Date Required Completed/Responsible Foreman Inspection of structure for Remove any floatables, accumulated Yes No trash, debris, floatables trash or debris with a dip net or vacuum. and oil More frequent cleaning is necessary if floatables regularly exceed a depth of 1 ft. Vacuum any visible oil prior to Yes No pumping permanent pool of water downstream. / /20 Responsible Party: Measure depth of Pump out entire structure annually and Yes No accumulated sediment Measured Depth = remove sediment anytime depth exceeds 12" Note: Sediment depths in the sump over 18" dictate a more frequent cleaning regiment. / /20 Responsible Party: Inspect contributing areas Notify appropriate maintenance staff or Yes No for plugged catch basins, property owner of need to sweep and/or erosion, trash, leaves, and remove litter/debris. debris. Check ground surface directly adjacent Sink holes shall be filled and monitored Yes No to the structure for for further depression. sinkholes or depression areas / /20 Responsible Party: Inspect all visible Repair as able and note observations Yes No structural components: notifying maintenance foremen of any Manholes, Castings, observed damage to structure, Snout Structure, Covers manholes, casings, snout structure and and pipe connections. associated loose or missing bolts, blockages of inlets/outlets, etc. / /20 Responsible Party: Control Concepts BMP Maintenance and Inspection Specifications STMH 60 Co" CRETE STING RINGS, 8• MIN. - MA%. 10 - CBMH SO SUMP MANHOLE j;A0J,U o • PRECAST REINFORCED STMH 60 I ONCRETE SLAB. LAB TOP TO BE SET IN SUMP MANHOLE MORTARBED. S 16.O.C. ON DOWNSTREAM SIDE. E%RUDED ALUMINUM OR STEEL 1 40' REINFORCED COPOLMIERPLASTIC. •5 }.' :: PRECAST CONCRETE MANHOLE SECTIONS P q~• P , .• �... ' .♦ 4 £' •••t. _•iu�'L' 'yE'•i V' •,•�,•\[♦ •a•f •• gip•: `•••:«N +! }:tiV.' : �^ WITH •O' -RING RUBBER GSKETS. •• NACIPIAST SNOUT STRUCTURE i �. L;:t YR" f A .` ,S • r _ ORAPPROVEO EQUAL Wt •'h•�^ ••'� • • .`• .' : •r,.;«xt:�;iii....::•rYititi:" � ounEr ja ~f Y.t ��t »... »»:. �:?�::: �h •••., r ••'\• _______ �___ FLOW—r „::::a:: tit: :.. • • '::: :K .^•y.l. .. H.— ' •u:; i• •: ii't!»•r.:•.het,..•• . wti5iik%=tiff: �'•rtiiviti••• • ��iei:.. .. •ri ::r'1iftis?tisit ' s .. vrr.}{;x«.»tii•:iia:i:X:,C❖vlra:t :,,•�' •.. .. »..:»moi{YG :':':: t: ...•.... ........... tiµt •�h:7S55^•:rtt:i s;�•.•^ ;•»t1•«ly »titi':httiti«:.gq.:At:.•t.:ttVt FOMENT LEVEL iOR CLBSNING �-. }f.••pp5{:•5i�5Y::" t:t l V:MIMTI'DEPTM j ::r.»lr .. .. }.t •tlf »:.'.'.'{• h ••" 515 • G;r 1 :i. ti unrt .�m rt :::irxwi;Yr i i?} »:r _ ' lt:ti' :R:.:F:.i: w«:«:.lett •» rS:S:i;:CLr^'C:y:r ti.0•tl.,SR» t l':•l::t•r::Fl::: •5 ' :•:;;5 ':::: :55•L•::: t•: «' .«:.:..A:..:' •SJM1t:lt.........t....:...... r 'r INMLWISUBTMICKNFSS IS 6'fOR i4' DEPTH, INCREASE THICKNESS i' FOR 4' OF h: :}::f''Lti�:•: :5`t :. .. Stiti'Y: • •••••••••.... ...... ....•. .: 'i •. DEPTH GREATER THAN I4'. ----- •%w•�t --...__..•1.�.�•,-•...-.__. -- DETAIL/PROFILE VIEW PLAN VIEW BMP ID: STMH 60 Location: East loading dock area Description of Device: 48" Diameter precast manhole with a 3 foot sump. Flow enters the structure through a 12" HDPE pipe on the northwest side of the structure where solids settle out in the sump with clean flow discharging into a 12" HDPE pipe on the south side of the structure. Structure Access: Through a standard catch basin inlet grate. Control Concepts BMP Maintenance and Inspection Specifications BMP ID: Sump Storm Sewer Structure STMH 60 Maintenance and Inspection Report Inspection Date Inspector: Inspection Activity Observations/Measurements Maintenance Maint. Actions Required/Date Required Completed/Responsible Foreman Inspection of structure for Remove any floatables, accumulated Yes No trash, debris, floatables trash or debris with a dip net or vacuum. and oil More frequent cleaning is necessary if floatables regularly exceed a depth of 1 ft. Vacuum any visible oil prior to Yes No pumping permanent pool of water downstream. / /20 Responsible Party: Measure depth of Pump out entire structure annually and Yes No accumulated sediment Measured Depth = remove sediment anytime depth exceeds 12" Note: Sediment depths in the sump over 18" dictate a more frequent cleaning regiment. / /20 Responsible Part Inspect contributing areas Notify appropriate maintenance staff or Yes No for plugged catch basins, property owner of need to sweep and/or erosion, trash, leaves, and remove litter/debris. debris. Check ground surface directly adjacent Sink holes shall be filled and monitored Yes No to the structure for for further depression. sinkholes or depression areas / /20 Responsible Party: Inspect all visible Repair as able and note observations Yes No structural components: notifying maintenance foremen of any Manholes, Castings, observed damage to structure, Snout Structure, Covers manholes, casings, snout structure and and pipe connections. associated loose or missing bolts, blockages of inlets/outlets, etc. / /20 Responsible Party: Control Concepts BMP Maintenance and Inspection Specifications CBMH 70 ONCRETE A OJUSTING RINGS, MIN. 6• -MAX. 10' u PRECAST REINFORCED I CONCRETE SIAB. SLPubl'.%AAVH( SUMPMA SUBTOP TOBFSET IN A MORTAR BED. C EU i �'l,l� TIES 16- O.C.ON DOWNSTREAM SIDE. EXTRUDED ALUMINW ORSTEEL SIDSIP S1AVIiOLF REINFORCED COPOLYMERPIASTiC. 4.0' ,T - '6 . .. i •y •P •• •• "•'�:.E, 1••'y.• • �" PRECAST CONCRETE MANHOLE SECTIONS • T y: { Z ! S'", .,.. WITH •O' -RING RUBBER GSKETS. ,.r ;, ` :': ,... �• `�,'' •iti•. .1 . NYLOPLAST SNOUT STRUfTURE �• ••• • ! r T YN : � yl'•,,• � •. ORAPPROVtO EQUAL. f, F'.4} .. ....'` T.".tr e _ • f.A. .in..:a: .. o. 1 .•:.:•s" OUTLET FLOW—� . ti;4.:w.r C�i��f•:.4 .� •i�if:., :i..• ..'r•.tl:i t fu h.1^1.'..:«•{kS.:(.»Ti.I5.LS{fi:¢:':• «x•':ti.»lI.Tll..,al'.1':J.:T:.r^.'«v.::•.r::..i::.,�::l:i.w1':.{.:::�GG:::.:{'i.:::'.:::.:'::.:..�.: G::.::.Y»TF:.Si:+:']a::SG:J:Ji••::^l::Y:iuKl.S S:.:.'GLTT:.Ta :::.�Y{Y{y�'G.•:••:{T«L5•: • :.Tk.a..:f.:T1......J:M'}S::«iti�::Ya1..«•f.G{%.. G' }:'.::'.i.t ::«:it P2W:'.l:.:.G'«.• A' Gt.i'.•.r.: EOMENiWH2.FOR CLUNING ftTH .S:'.:::.:Sx•'.G«.t«'.:.:::i.::g:.:•a:i.:•:i:.•:.•..'::�..i'R^.:i.:::.:::'.:::.:::{.:::•...::.:•.:+:.«..•..•...:'G.1.f:'Gc:.::.::.... ...6 "�. MM ^. Rl:{. K:GY:«.'Y.•$W:Ai G:«:GSNT:B::::::::a:S:::.9:F:.:.::::G'.'{S{SS•»:G'•r::'.'::ITC.«:L:'YIV.53Y.L.�......r......L...3'M.:S«.y . INM WISL" THICKNESS IS 6- FOR Y9' • •. DEPTH. INCREASE THICKNESS V MR V Of _ _ ___ DE PTH GREATER THAN I4'. T PLAN VIEW DETAIL/PROFILE VIEW BMP ID: CBMH 70 Location: Middle loading dock area in Description of Device: 48" Diameter precast manhole with a 3 foot sump. Flow enters the structure through the inlet grate and a 12" HDPE pipe on the northwest side of the structure where solids settle out in the sump with clean flow discharging into a 12" HDPE pipe on the south side of the structure. Structure Access: Through a standard catch basin inlet grate. Control Concepts BMP Maintenance and Inspection Specifications RMP ID: Sump Storm Sewer Structure CBMH 70 Maintenance and Inspection Report Inspection Date Inspector: Inspection Activity Observations/Measurements Maintenance Maint. Actions Required/Date Required Completed/Responsible Foreman Inspection of structure for Remove any floatables, accumulated Yes No trash, debris, floatables trash or debris with a dip net or vacuum. and oil More frequent cleaning is necessary if floatables regularly exceed a depth of 1 ft. Vacuum any visible oil prior to Yes No pumping permanent pool of water downstream. / /20 Responsible Party: Measure depth of Pump out entire structure annually and Yes No accumulated sediment Measured Depth = remove sediment anytime depth exceeds 12" Note: Sediment depths in the sump over 18" dictate a more frequent cleaning regiment. / /20 Responsible Party: Inspect contributing areas Notify appropriate maintenance staff or Yes No for plugged catch basins, property owner of need to sweep and/or erosion, trash, leaves, and remove litter/debris. debris. Check ground surface directly adjacent Sink holes shall be filled and monitored Yes No to the structure for for further depression. sinkholes or depression areas / /20 Responsible Party: Inspect all visible Repair as able and note observations Yes No structural components: notifying maintenance foremen of any Manholes, Castings, observed damage to structure, Snout Structure, Covers manholes, casings, snout structure and and pipe connections. associated loose or missing bolts, blockages of inlets/outlets, etc. / /20 Responsible Party: Control Concepts BMP Maintenance and Inspection Specifications CBMH 80 CONCRETE ADJUSTING RINGS, MIN. 4• - MAX. 10' CBMH 70 5 PRECAST REINFORCED CONCRETE SLAB. SUMP.MANHOLE SI.MPMA - SUB TOP TO BE SET IN ,t AMORTARBED. CBMH 80TEPS16'O.Cn .ONDOWNSTREAMSIDE. Al SUMP MANHOLE ?�• REINFFORCE REINFORCED PLASTIC. 6, ': i•�� '�•}•; •`aI CONCRETE MANHOLE SECTiONS c;•'•• •�' "�•:. WITH'O'-RING RUBER CASKETS. r. •l, •,''./ - ,:`:�`" ; .cf. ,/.•._•.. NLOPIA6T SNOUT STRUCTURE ••i. R �• •a �,µ..l. as •�• Ntt < ti a:::, _ OR APPROVED EQUAL. _ f •`? Tal•• � f� SII .t .;.••'t•. 'i�: OUTLET •N ;r • j. �: �.: r ' .»::^.. •': �aT t ic» FLOW •a • e;"� µ _ ...i•. •. ... A, u4t»rr.•.:tixd'»itsiiu .::L•. i:•»k.': ......««. ... ur.•n••.....«w: rrux.•r..:r« :::::::::::::cra-:::::::::::::: iiir •• .......... rm»:::.::..... "••..•rpSk.':x:=.-2u.':':':•:':':::.-:'%•:`.:YLJ:'..'}:....... ....:{,{:J�:.C.tttYJF«.CU.'a ::.......:...........y......:•: C:.; .;...j:: (:.^ •..J........ �iit:V:Y«::«.A'a::•X:•f: •••:••« :•:•:•:':!' :.rY:'A::::::::::R:::J:A66.:.:d::✓::.::5: 0..« ....... a«....:. �....0 `. ..EDMENT LEVEL R CLFAN WG ..». .._...:.x: .... ................ r:: n:�.�:.�:n r:::::::::. '.. M 12' DEPFOTH 1« ...:: ..:.... ....................................................... :C:'«aai:FCLZ•LC2:4L•.•:.•:a::a:.r.'«:« :•CLA.•a:::U:::t.::rJ.::aF.•.•.'.'1Rl':':i'l�'t::^..rliil::.Yii}:'J��•.•.':>r•'•:.r:::::T:a:N :i :•t:'a::. '. INNS UIf SLAB THICKNF55156'fOR 14' DEPTH. INCRW E THICKNESS V FOR 4' Of DEPTH GREATER THAN 14'- 3' PLAN VIEW DETAIL/PROFILE VIEW BMP ID: CBMH 80 Location: West loading dock area Description of Device: 48" Diameter precast manhole with a 3 foot sump. Flow enters the structure through the inlet grate and a 12" HDPE pipe on the northwest side of the structure where solids settle out in the sump with clean flow discharging into a 12" HDPE pipe on the south side of the structure. Structure Access: Through a standard catch basin inlet grate. Control Concepts BMP Maintenance and Inspection Specifications BMP ID: Sump Storm Sewer Structure CBMH 80 Maintenance and Inspection Report Inspection Date Inspector: Inspection Activity Observations/Measurements Maintenance Maint. Actions Required/Date Required Completed/Responsible Foreman Inspection of structure for Remove any floatables, accumulated Yes No trash, debris, floatables trash or debris with a dip net or vacuum. and oil More frequent cleaning is necessary if floatables regularly exceed a depth of 1 ft. Vacuum any visible oil prior to Yes No pumping permanent pool of water downstream. / /20 Responsible Pa Measure depth of Pump out entire structure annually and Yes No accumulated sediment Measured Depth = remove sediment anytime depth exceeds 12" Note: Sediment depths in the sump over 18" dictate a more frequent cleaning regiment. / - /20 Responsible Party: Inspect contributing areas Notify appropriate maintenance staff or Yes No for plugged catch basins, property owner of need to sweep and/or erosion, trash, leaves, and remove litter/debris. debris. Check ground surface directly adjacent Sink holes shall be filled and monitored Yes No to the structure for for further depression. sinkholes or depression areas / /20 Responsible Part : Inspect all visible Repair as able and note observations Yes No structural components: notifying maintenance foremen of any Manholes, Castings, observed damage to structure, Snout Structure, Covers manholes, casings, snout structure and and pipe connections. associated loose or missing bolts, blockages of inlets/outlets, etc. / /20 Responsible Party: Control Concepts BMP Maintenance and Inspection Specifications CBMH 90 CONCRETE ADJUSTING RINGS, MIN, 9• - MA%. 10' }} 'A. .... *4.Y'A . {t CBMH 100 y ' PRECASTREINFORCED - �........... SUMP MANHOLE ONCRTE SAB. ETIN ,1 AMORTAR BED. TEPS 16. O.C. ON DOWNSTREMI SIDE. �t;�:';:; f•; E TRUDED ALLMMIM ORSTEEL 40• RONFORCED COPOLYMER PLISTIC. h`{YTY 5Y7•• i� "i PRECAST CONCRETE MANHOLE SECTIONS J:.Y•• WITH •O'-RMG RUBBER CASKETS. ' �' [ NA H 90 t 1!11 OP CTURE :'7•l: APPROVED UAL. S .++ OR APPROVCD EQUAL. UMP)AAN11 >1 OUTLET FLOW-'. FOMENT LEVE MR CURNINO A%MUSI 12• DEPT •; 11NNIUM SUB THICKNESS IS 6• FOR 14' DEPTH. INCREASE THICKNESS I- MR Y OF DEPTH GREATER THAN 14'. 3• I DETAIL/PROFILE VIEW PLAN VIEW BMP ID: CBMH 90 F Location: Curb line in southwest corner of parking lot Description of Device: 48" Diameter precast manhole with a 3 foot sump. Flow enters the structure through the inlet grate and a 12" HDPE pipe on the southeast side of the structure where solids settle out in the sump with clean flow discharging into a 12" HDPE pipe on the west side of the structure. Structure Access: Through a standard catch basin inlet grate. Control Concepts BMP Maintenance and Inspection Specifications BMP ID: Sump Storm Sewer Structure CBMH 90 Maintenance and Inspection Report Inspection Date Inspector: Inspection Activity Observations/Measurements Maintenance Maint. Actions Required/Date Required Completed/Responsible Foreman Inspection of structure for Remove any floatables, accumulated Yes No trash, debris, floatables trash or debris with a dip net or vacuum, and oil More frequent cleaning is necessary if floatables regularly exceed a depth of 1 ft. Vacuum any visible oil prior to Yes No pumping permanent pool of water downstream. / /20 Responsible Party: Measure depth of Pump out entire structure annually and Yes No accumulated sediment Measured Depth = remove sediment anytime depth exceeds 12" Note: Sediment depths in the sump over 18" dictate a more frequent cleaning regiment. / /20 Responsible Party. Inspect contributing areas Notify appropriate maintenance staff or Yes No for plugged catch basins, property owner of need to sweep and/or erosion, trash, leaves, and remove litter/debris. debris. Check ground surface directly adjacent Sink holes shall be filled and monitored Yes No to the structure for for further depression. sinkholes or depression areas / /20 Responsible Party: Inspect all visible Repair as able and note observations Yes No structural components: notifying maintenance foremen of any Manholes, Castings, observed damage to structure, Snout Structure, Covers manholes, casings, snout structure and and pipe connections. associated loose or missing bolts, blockages of inlets/outlets, etc. / /20 Responsible Party7 Control Concepts BMP Maintenance and Inspection Specifications CBMH 100 CONCRETE ADJUSTING RINGS, ,6 r r CBI►4N 100 ASS »7 :' P A N t I O L E ' PRECAST REINFORCED L�•7yyYtt .71J.ti1 iM y ^tj(}•tt.�`i�, _ _ CONCRETE SUB. SUBTOP TO BE SET IN .{S7Ay{{L jfit .1 AMORTAKIRD. TIPS 16- OC. ON DOWNSTREV I SIDE. EKTRVOED ALU INL ORSTEEL REINFORCED COPOLYMER PLASTIC. J 15'y.Y•l: TAYL717Y � r.y� {l�N� COW PRECAST WITH'OCONCRETOWNIANHOLE WITH •O' : ., s p KESFCi10NT -RING RU BEER GASKETS. SUMP MANHt)iE aiV �•«• 1 • NVtOP1AST TNDUT STRUfTURE �.•:+hS Rlt S. � /?�\\ OR APPROVED EQUAL. +�' F1 j a i� • .aA:V.: \ Yw{51+'hV E 6 :•••7 . • '/, ,'.'•••'7 +� .,Si OVTLET FLOWS ,aaa y' '! �� •P••�• +�, •F n. F • EDMENTLEVa FORCLEANING A% MlM iS D P H M%iI $IAB THICKNESS IS 6- FOR 1,P DEPTH. INCREASE THICKNESS V FOR4' OF DEPTH GREATER THAN 14'. X 4+. I T PLAN VIEW DETAIL/PROFILE VIEW BMP ID: CBMH 100 Location: Curb line on west side of parking lot Description of Device: 48" Diameter precast manhole with a 3 foot sump. Flow enters the structure through the inlet grate where solids settle out in the sump with clean flow discharging into a 12" HDPE pipe on the west side of the structure. Structure Access: Through a standard catch basin inlet grate. Control Concepts BMP Maintenance and Inspection Specifications BMP ID: Sump Storm Sewer Structure CBMH 100 Maintenance and Inspection Report Inspection Date Inspector: Inspection Activity Observations/Measurements Maintenance Maint. Actions Required/Date Required Completed/Responsible Foreman Inspection of structure for Remove any floatables, accumulated Yes No trash, debris, floatables trash or debris with a dip net or vacuum. and oil More frequent cleaning is necessary if floatables regularly exceed a depth of 1 ft. Vacuum any visible oil prior to Yes No pumping permanent pool of water downstream. / /20 Responsible Party: Measure depth of Pump out entire structure annually and Yes No accumulated sediment Measured Depth = remove sediment anytime depth exceeds 12" Note: Sediment depths in the sump over 18" dictate a more frequent cleaning regiment. / /20 Responsible Party: Inspect contributing areas Notify appropriate maintenance staff or Yes No for plugged catch basins, property owner of need to sweep and/or erosion, trash, leaves, and remove litter/debris. debris. Check ground surface directly adjacent Sink holes shall be filled and monitored Yes No to the structure for for further depression. sinkholes or depression areas / /20 Responsible Party: Inspect all visible Repair as able and note observations Yes No structural components: notifying maintenance foremen of any Manholes, Castings, observed damage to structure, Snout Structure, Covers manholes, casings, snout structure and and pipe connections. associated loose or missing bolts, blockages of inlets/outlets, etc. / /20 Responsible Party: Control Concepts BMP Maintenance and Inspection Specifications CBMH 110 CONCRETE ADIUSTINGRINGS, MIN, 4- -MAX. 10' {th CBMH 110 CBMH 10 SUMP .MANHOLE , SUMP MANHOLE q PRECAST REINFORCED CONCRETE e ET IN .i AMORT.ARISED. TEFS 16. O.C. ON DOWNSTREAM SIDE. EXTRUDED ALLNIINOM ORSTEEL IMIMMIEErYtl R� ~�• -------------------- 4.0• REINFORCED COPOLMIERPLASTIC. _ _ `; �n M PRECAST CONCRETE MANHOLE SECTIONS % WFTH'O'-RINGRU88ERGASMTS. rt ( .. t' Yxi� '1F.1a. : tt ,:}y' ••{t'!:•ES::: T.:•y��Vt.S•i2^..V:..5:'65tttt V: M:^..L:.VG..A t M•.iY..:.:_::A'Id'»}»:: �.':. RS•i.:t At.;Sv. w �ORAPPPIRAOSTa U[TIIRf :.f. l y .....nd.:.5..l a�t'l.l.t:«.•• Vyyi. st .:.:.K..:.t..•..'..t...:.�..:'.a. :1: ^fA'a v . ..... S.. FSDN _ EQUAL. ivavm.•^rFRivi'rim} .... : ••• yrtaM,u9ir; ::: •...xa}ggyt;•I;g}^y: OUTLET •,; _ va 5 .Y T-7-, FLOW—r { w xt{f If 4J.:i YQti4 .14:'::•.'.•nVCi�y'. ,•I' 6L ••:•••...•.• CLMNG EDMENT LEVEL FOR IN AKMUM 13' DEPTH 11NMUM SLAB THICKNESS IS 6- FOR 14' DEPTH. INCREASE THICKNESS t• FOR 4' Of Df PTH OREATER THAN 14'. 4.: PLAN VIEW DETAIL/PROFILE VIEW BMP ID: CBMH 110 Location: Curb line in north driveway entrance Description of Device: 48" Diameter precast manhole with a 3 foot sump. Flow enters the structure through the inlet grate where solids settle out in the sump with clean flow discharging into a 12" HDPE pipe on the southeast side of the structure. Structure Access: Through a standard catch basin inlet grate. Control Concepts BMP Maintenance and Inspection Specifications BMP ID: Sump Storm Sewer Structure CBMH 110 Maintenance and Inspection Report Inspection Date Inspector: Inspection Activity Observations/Measurements Maintenance Maint. Actions Required/Date Required Completed/Responsible Foreman Inspection of structure for Remove any floatables, accumulated Yes No trash, debris, floatables trash or debris with a dip net or vacuum. and oil More frequent cleaning is necessary if floatables regularly exceed a depth of 1 ft. Vacuum any visible oil prior to Yes No pumping permanent pool of water downstream. / /20 Responsible Party: Measure depth of Pump out entire structure annually and Yes No accumulated sediment Measured Depth = remove sediment anytime depth exceeds 12" Note: Sediment depths in the sump over 18" dictate a more frequent cleaning regiment. / /20 Responsible Party: Inspect contributing areas Notify appropriate maintenance staff or Yes No for plugged catch basins, property owner of need to sweep and/or erosion, trash, leaves, and remove litter/debris. debris. Check ground surface directly adjacent Sink holes shall be filled and monitored Yes No to the structure for for further depression. sinkholes or depression areas / /20 Responsible Party: Inspect all visible Repair as able and note observations Yes No structural components: notifying maintenance foremen of any Manholes, Castings, observed damage to structure, Snout Structure, Covers manholes, casings, snout structure and and pipe connections. associated loose or missing bolts, blockages of inlets/outlets, etc. / /20 Responsible Pa Thrivent Corporate Headquarters BMP Maintenance and Inspection Specifications Jellyfish JFPD0806 Filter System waia------------- ------------ roiuuu+s�nre►nnsa II � t JXLLVFlSX E93 NOIEB v • m a::. . ........... ••� • r. T� lip: '•if«Yf ••y• of 6 1 �•� x t. a: g f t E 1 { L + I •I+ i. I 1 J5] , s I � ♦ ♦ %r:#. CON l Kf♦'\." Y\'J' JELLYF9X JfPNON • 1! wnyry FiM p NL 1 jFVD0130eFr'' V SYSIFM DETAIL/PROFILE VIEW PLAN VIEW BMP ID: Jellyfish JFPD0806 Filter System Location: Driveway on northwest side of property Description of Device: Jellyfish JFPD0806 Filter System consisting of an 8'x6' precast structure with a 2' sump, seven 40" Jellyfish cartridges, and a bypass weir. Flow enters the structure through a 12" HDPE pipe from the east where solids settle out in the sump prior to entering the filter cartridges with clean flow discharging into a 18" RCP pipe on the west side of the structure. Structure Access: Through two maintenance access manholes. Thrivent Corporate Headquarters BMP Maintenance and Inspection Specifications BMP ID: Jellyfish JFPD0806 Filter System Jellyfish JFPD0806 Filter System 4 Maintenance and Inspection Report Inspection Date Inspector: Inspection Activity Observations/Measurements Maintenance Maint. Actions Required/Date Required Completed/Responsible Foreman Inspection of structure for Standing water in backwash pool Yes No standing water, trash, indicates filter cartridges require debris, floatables and oil rinsing. Remove any floatables, accumulated trash or debris with a dip net or vacuum. More frequent cleaning is necessary if Yes No floatables regularly exceed a depth of I ft. Vacuum any visible oil prior to pumping permanent pool of water downstream. / /20 Responsible Party: Measure depth of Pump out entire structure annually and Yes No accumulated sediment Measured Depth = remove sediment anytime depth exceeds 12" / /20 Responsible Party: Inspect contributing areas Notify appropriate maintenance staff or Yes No for plugged catch basins, property owner of need to sweep and/or erosion, trash, leaves, and remove litter/debris. debris. Check ground surface directly adjacent Sink holes shall be filled and monitored Yes No to the structure for for further depression. sinkholes or depression / /20 Responsible Party: areas Inspect all visible Repair as able and note observations Yes No structural components: notifying maintenance foremen of any manhole, maintenance observed damage to the structure. access wall, backwash pool weir, cartridges, and Rinse filter cartridges as required by pipe connections. most recent inspection results, or within 12 months of most recent rinsing, whichever occurs sooner. Replace filter cartridges as needed. / /20 Responsible Part