Loading...
Control Concepts Stormwater Operations & Maintenance Plan                Operations & Maintenance Plan        Control Concepts  Chanhassen, MN      Prepared by:    Loucks NOPARKINGNOPARKING444888888CB 10 SUMP MANHOLE CB 50 SUMP MANHOLE CB 60 SUMP MANHOLE CB 70 SUMP MANHOLE CBMH 20 SUMP MANHOLE 53"x41" ARCH CMP INFILTRATION SYSTEM CBMH 30 SUMP MANHOLE N SCALE IN FEET 0 50 100 LOUCKS W:\2017\17516\HYDROLOGY\O&M\CADD\17516 - O&M ExhibitPlotted: 05 /02 / 2019 1:3 PM7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. CADD QUALIFICATION SUBMITTAL/REVISIONS PROFESSIONAL SIGNATURE QUALITY CONTROL CONTROL CONCEPTS CHANHASSEN, MN OPERATIONS & MAINTENANCE EXHIBIT EXHIBIT Control Concepts BMP Maintenance and Inspection Specifications CB 10 PLAN VIEW DETAIL/PROFILE VIEW BMP ID: CB 10 Location: Curb line in north driveway Description of Device: 48” Diameter precast manhole with a 3 foot sump. Flow enters the structure through the inlet grate where solids settle out in the sump with clean flow discharging into a 12” HDPE pipe on the south side of the structure. Structure Access: Through a standard catch basin inlet grate. Control Concepts BMP Maintenance and Inspection Specifications BMP ID: Sump Storm Sewer Structure CB 10 Maintenance and Inspection Report Inspection Date Inspector: Inspection Activity Observations/Measurements Maintenance Maint. Required Actions Required/Date Completed/Responsible Foreman Inspection of structure for trash, debris, floatables and oil Remove any floatables, accumulated trash or debris with a dip net or vacuum. More frequent cleaning is necessary if floatables regularly exceed a depth of 1 ft. Vacuum any visible oil prior to pumping permanent pool of water downstream. Yes No Yes No / / 20 Responsible Party: Measure depth of accumulated sediment Measured Depth = Pump out entire structure annually and remove sediment anytime depth exceeds 12” Note: Sediment depths in the sump over 18” dictate a more frequent cleaning regiment. Yes No / / 20 Responsible Party: Inspect contributing areas for plugged catch basins, erosion, trash, leaves, and debris. Check ground surface directly adjacent to the structure for sinkholes or depression areas Notify appropriate maintenance staff or property owner of need to sweep and/or remove litter/debris. Sink holes shall be filled and monitored for further depression. Yes No Yes No / / 20 Responsible Party: Inspect all visible structural components: Manholes, Castings, Snout Structure, Covers and pipe connections. Repair as able and note observations notifying maintenance foremen of any observed damage to structure, manholes, casings, snout structure and associated loose or missing bolts, blockages of inlets/outlets, etc. Yes No / / 20 Responsible Party: Control Concepts BMP Maintenance and Inspection Specifications CBMH 20 PLAN VIEW DETAIL/PROFILE VIEW BMP ID: CBMH 20 Location: Curb line on east side of parking lot Description of Device: 48” Diameter precast manhole with a 3 foot sump. Flow enters the structure through the inlet grate and 12” HDPE pipe from the south where solids settle out in the sump with clean flow discharging into a 12” HDPE pipe on the west side of the structure. Structure Access: Through a standard catch basin inlet grate. Control Concepts BMP Maintenance and Inspection Specifications BMP ID: Sump Storm Sewer Structure CBMH 20 Maintenance and Inspection Report Inspection Date Inspector: Inspection Activity Observations/Measurements Maintenance Maint. Required Actions Required/Date Completed/Responsible Foreman Inspection of structure for trash, debris, floatables and oil Remove any floatables, accumulated trash or debris with a dip net or vacuum. More frequent cleaning is necessary if floatables regularly exceed a depth of 1 ft. Vacuum any visible oil prior to pumping permanent pool of water downstream. Yes No Yes No / / 20 Responsible Party: Measure depth of accumulated sediment Measured Depth = Pump out entire structure annually and remove sediment anytime depth exceeds 12” Note: Sediment depths in the sump over 18” dictate a more frequent cleaning regiment. Yes No / / 20 Responsible Party: Inspect contributing areas for plugged catch basins, erosion, trash, leaves, and debris. Check ground surface directly adjacent to the structure for sinkholes or depression areas Notify appropriate maintenance staff or property owner of need to sweep and/or remove litter/debris. Sink holes shall be filled and monitored for further depression. Yes No Yes No / / 20 Responsible Party: Inspect all visible structural components: Manholes, Castings, Snout Structure, Covers and pipe connections. Repair as able and note observations notifying maintenance foremen of any observed damage to structure, manholes, casings, snout structure and associated loose or missing bolts, blockages of inlets/outlets, etc. Yes No / / 20 Responsible Party: Control Concepts BMP Maintenance and Inspection Specifications CBMH 30 PLAN VIEW DETAIL/PROFILE VIEW BMP ID: CBMH 30 Location: Curb line on south side of building Description of Device: 48” Diameter precast manhole with a 3 foot sump. Flow enters the structure through the inlet grate and 12” HDPE pipe from the east where solids settle out in the sump with clean flow discharging into a 12” HDPE pipe on the northwest side of the structure. Structure Access: Through a standard catch basin inlet grate. Control Concepts BMP Maintenance and Inspection Specifications BMP ID: Sump Storm Sewer Structure CBMH 30 Maintenance and Inspection Report Inspection Date Inspector: Inspection Activity Observations/Measurements Maintenance Maint. Required Actions Required/Date Completed/Responsible Foreman Inspection of structure for trash, debris, floatables and oil Remove any floatables, accumulated trash or debris with a dip net or vacuum. More frequent cleaning is necessary if floatables regularly exceed a depth of 1 ft. Vacuum any visible oil prior to pumping permanent pool of water downstream. Yes No Yes No / / 20 Responsible Party: Measure depth of accumulated sediment Measured Depth = Pump out entire structure annually and remove sediment anytime depth exceeds 12” Note: Sediment depths in the sump over 18” dictate a more frequent cleaning regiment. Yes No / / 20 Responsible Party: Inspect contributing areas for plugged catch basins, erosion, trash, leaves, and debris. Check ground surface directly adjacent to the structure for sinkholes or depression areas Notify appropriate maintenance staff or property owner of need to sweep and/or remove litter/debris. Sink holes shall be filled and monitored for further depression. Yes No Yes No / / 20 Responsible Party: Inspect all visible structural components: Manholes, Castings, Snout Structure, Covers and pipe connections. Repair as able and note observations notifying maintenance foremen of any observed damage to structure, manholes, casings, snout structure and associated loose or missing bolts, blockages of inlets/outlets, etc. Yes No / / 20 Responsible Party: Control Concepts BMP Maintenance and Inspection Specifications CB 50 PLAN VIEW DETAIL/PROFILE VIEW BMP ID: CB 50 Location: Curb line on northwest side of parking lot Description of Device: 48” Diameter precast manhole with a 3 foot sump. Flow enters the structure through the inlet grate where solids settle out in the sump with clean flow discharging into a 12” HDPE pipe on the south side of the structure. Structure Access: Through a standard catch basin inlet grate. Control Concepts BMP Maintenance and Inspection Specifications BMP ID: Sump Storm Sewer Structure CB 50 Maintenance and Inspection Report Inspection Date Inspector: Inspection Activity Observations/Measurements Maintenance Maint. Required Actions Required/Date Completed/Responsible Foreman Inspection of structure for trash, debris, floatables and oil Remove any floatables, accumulated trash or debris with a dip net or vacuum. More frequent cleaning is necessary if floatables regularly exceed a depth of 1 ft. Vacuum any visible oil prior to pumping permanent pool of water downstream. Yes No Yes No / / 20 Responsible Party: Measure depth of accumulated sediment Measured Depth = Pump out entire structure annually and remove sediment anytime depth exceeds 12” Note: Sediment depths in the sump over 18” dictate a more frequent cleaning regiment. Yes No / / 20 Responsible Party: Inspect contributing areas for plugged catch basins, erosion, trash, leaves, and debris. Check ground surface directly adjacent to the structure for sinkholes or depression areas Notify appropriate maintenance staff or property owner of need to sweep and/or remove litter/debris. Sink holes shall be filled and monitored for further depression. Yes No Yes No / / 20 Responsible Party: Inspect all visible structural components: Manholes, Castings, Snout Structure, Covers and pipe connections. Repair as able and note observations notifying maintenance foremen of any observed damage to structure, manholes, casings, snout structure and associated loose or missing bolts, blockages of inlets/outlets, etc. Yes No / / 20 Responsible Party: Control Concepts BMP Maintenance and Inspection Specifications CB 60 PLAN VIEW DETAIL/PROFILE VIEW BMP ID: CB 60 Location: Curb line on northeast corner of parking lot Description of Device: 48” Diameter precast manhole with a 3 foot sump. Flow enters the structure through the inlet grate where solids settle out in the sump with clean flow discharging into a 12” HDPE pipe on the south side of the structure. Structure Access: Through a standard catch basin inlet grate. Control Concepts BMP Maintenance and Inspection Specifications BMP ID: Sump Storm Sewer Structure CB 60 Maintenance and Inspection Report Inspection Date Inspector: Inspection Activity Observations/Measurements Maintenance Maint. Required Actions Required/Date Completed/Responsible Foreman Inspection of structure for trash, debris, floatables and oil Remove any floatables, accumulated trash or debris with a dip net or vacuum. More frequent cleaning is necessary if floatables regularly exceed a depth of 1 ft. Vacuum any visible oil prior to pumping permanent pool of water downstream. Yes No Yes No / / 20 Responsible Party: Measure depth of accumulated sediment Measured Depth = Pump out entire structure annually and remove sediment anytime depth exceeds 12” Note: Sediment depths in the sump over 18” dictate a more frequent cleaning regiment. Yes No / / 20 Responsible Party: Inspect contributing areas for plugged catch basins, erosion, trash, leaves, and debris. Check ground surface directly adjacent to the structure for sinkholes or depression areas Notify appropriate maintenance staff or property owner of need to sweep and/or remove litter/debris. Sink holes shall be filled and monitored for further depression. Yes No Yes No / / 20 Responsible Party: Inspect all visible structural components: Manholes, Castings, Snout Structure, Covers and pipe connections. Repair as able and note observations notifying maintenance foremen of any observed damage to structure, manholes, casings, snout structure and associated loose or missing bolts, blockages of inlets/outlets, etc. Yes No / / 20 Responsible Party: Control Concepts BMP Maintenance and Inspection Specifications CB 70 PLAN VIEW DETAIL/PROFILE VIEW BMP ID: CB 70 Location: Curb line on northeast of loading dock area Description of Device: 48” Diameter precast manhole with a 3 foot sump. Flow enters the structure through the inlet grate where solids settle out in the sump with clean flow discharging into a 12” HDPE pipe on the southwest side of the structure. Structure Access: Through a standard catch basin inlet grate. Control Concepts BMP Maintenance and Inspection Specifications BMP ID: Sump Storm Sewer Structure CB 70 Maintenance and Inspection Report Inspection Date Inspector: Inspection Activity Observations/Measurements Maintenance Maint. Required Actions Required/Date Completed/Responsible Foreman Inspection of structure for trash, debris, floatables and oil Remove any floatables, accumulated trash or debris with a dip net or vacuum. More frequent cleaning is necessary if floatables regularly exceed a depth of 1 ft. Vacuum any visible oil prior to pumping permanent pool of water downstream. Yes No Yes No / / 20 Responsible Party: Measure depth of accumulated sediment Measured Depth = Pump out entire structure annually and remove sediment anytime depth exceeds 12” Note: Sediment depths in the sump over 18” dictate a more frequent cleaning regiment. Yes No / / 20 Responsible Party: Inspect contributing areas for plugged catch basins, erosion, trash, leaves, and debris. Check ground surface directly adjacent to the structure for sinkholes or depression areas Notify appropriate maintenance staff or property owner of need to sweep and/or remove litter/debris. Sink holes shall be filled and monitored for further depression. Yes No Yes No / / 20 Responsible Party: Inspect all visible structural components: Manholes, Castings, Snout Structure, Covers and pipe connections. Repair as able and note observations notifying maintenance foremen of any observed damage to structure, manholes, casings, snout structure and associated loose or missing bolts, blockages of inlets/outlets, etc. Yes No / / 20 Responsible Party: Control Concepts BMP Maintenance and Inspection Specifications 53” X 41” Perforated Arch CMP Infiltration System PLAN VIEW DETAIL/PROFILE VIEW BMP ID: 53” x 41” Arch CMP Infiltration System Location: Underground west drive aisle Description of Device: 53”x41” perforated arch CMP underground infiltration system. Flow enters the structure through four 12” inlet pipes on the northwest, northeast, southeast, and east sides of the system taking drainage from the driveway, parking areas, building, and underground detention system. An outlet at elevation 959.97’ is located on the north side of the system. Water below the outlet is designed to infiltrate into the underlying soil. Structure Access: Five 36” risers are provided for access points into the system. Control Concepts BMP Maintenance and Inspection Specifications BMP ID: Storm Sewer Infiltration System 53” x 41” Arch CMP Infiltration System Maintenance and Inspection Report Inspection Date Inspector: Inspection Activity Observations/Measurements Maintenance Maint. Required Actions Required/Date Completed/Responsible Foreman Inspection of structure for trash, debris, floatables and oil Remove any floatables, accumulated trash or debris with a dip net or vacuum. More frequent cleaning is necessary if floatables regularly exceed a depth of 1 ft. Vacuum any visible oil prior to pumping permanent pool of water downstream. Yes No Yes No / / 20 Responsible Party: Visual inspection of accumulated sediment and presence of salt or other corrosive substances Remove sediment buildup as needed to maintain infiltration capacity. Remove or rinse the system as needed if salt or corrosive substances are present. Yes No / / 20 Responsible Party: Inspect contributing areas for plugged catch basins, erosion, trash, leaves, and debris. Check ground surface directly adjacent to the structure for sinkholes or depression areas Notify appropriate maintenance staff or property owner of need to sweep and/or remove litter/debris. Sink holes shall be filled and monitored for further depression. Yes No Yes No / / 20 Responsible Party: Inspect all visible structural components: Manholes, Castings, Covers and pipe connections. Repair as able and note observations notifying maintenance foremen of any observed damage to structure, manholes, casings and associated loose or missing bolts, blockages of inlets/outlets, etc. Yes No / / 20 Responsible Party: