Agenda and PacketAGENDA
CHANHASSEN PLANNING COMMISSION
TUESDAY, JUNE 18, 2019, 1:00 PM
CITY COUNCIL CHAMBERS, 7700 MARKET BOULEVARD
A.CALL TO ORDER
B.OLD BUSINESS
C.PUBLIC HEARINGS
1.Consider Camp Tanadoona Site Plan Review for Demolition of Existing Dining Hall
and Construction of New Dining Hall and Connection of City Water and Sewer,
development of Access Road and Drop Off
D.NEW BUSINESS
E.APPROVAL OF MINUTES
1.Approval of Planning Commission Minutes dated June 4, 2019
F.COMMISSION PRESENTATIONS
G.ADMINISTRATIVE PRESENTATIONS
1.City Council Action Update
H.CORRESPONDENCE DISCUSSION
I.ADJOURNMENT
J.OPEN DISCUSSION
NOTE: Planning Commission meetings are scheduled to end by 10:30 p.m. as outlined in the official bylaws.
We will make every attempt to complete the hearing for each item on the agenda. If, however, this does not
appear to be possible, the Chairperson will notify those present and offer rescheduling options. Items thus pulled
from consideration will be listed first on the agenda at the next Commission meeting.
If a constituent or resident sends an email to staff or the Planning Commission, it must be made part of the
public record based on State Statute. If a constituent or resident sends an email to the Mayor and City Council, it
is up to each individual City Council member and Mayor if they want it to be made part of the public record or
not. There is no State Statute that forces the Mayor or City Council to share that information with the public or
be made part of the public record. Under State Statute, staff cannot remove comments or letters provided as part
of the public input process.
PLANNING COMMISSION STAFF
REPORT
Tuesday, June 18, 2019
Subject Consider Camp Tanadoona Site Plan Review for Demolition of Existing Dining Hall and
Construction of New Dining Hall and Connection of City Water and Sewer, development of
Access Road and Drop Off
Section PUBLIC HEARINGS Item No: C.1.
Prepared By MacKenzie YoungWalters, Associate
Planner
File No: Planning Case 201905
PROPOSED MOTION:
“The Chanhassen Planning Commission recommends approval of the site plan for a 10,500 squarefoot dining hall,
kitchen, and program area building subject to the conditions of approval and adoption of the Findings of Fact and
Recommendation.”
SUMMARY OF REQUEST
The applicant is requesting site plan approval for the construction of a new 10,500 squarefoot dining hall in the old
dining hall’s location.
APPLICANT
Magney Architecture (Tammy Magney, AIA) 540 Lake Street Excelsior, MN 55331 (612) 7017117
tmagney@mchsi.com
SITE INFORMATION
PRESENT ZONING: RRRural Residential District
LAND USE:Public Semi Public
ACREAGE: 104.08 acres
DENSITY: 0.0023 F.A.R
APPLICATION REGULATIONS
Chapter 20, Article II, Division 6, Site Plan Review
Chapter 20, Article VII, Shoreland Management District
Chapter 20, Article XI, “RR” Rural Residential District
PLANNING COMMISSION STAFFREPORTTuesday, June 18, 2019SubjectConsider Camp Tanadoona Site Plan Review for Demolition of Existing Dining Hall andConstruction of New Dining Hall and Connection of City Water and Sewer, development ofAccess Road and Drop OffSectionPUBLIC HEARINGS Item No: C.1.Prepared By MacKenzie YoungWalters, AssociatePlanner File No: Planning Case 201905PROPOSED MOTION:“The Chanhassen Planning Commission recommends approval of the site plan for a 10,500 squarefoot dining hall,kitchen, and program area building subject to the conditions of approval and adoption of the Findings of Fact andRecommendation.”SUMMARY OF REQUESTThe applicant is requesting site plan approval for the construction of a new 10,500 squarefoot dining hall in the olddining hall’s location.APPLICANTMagney Architecture (Tammy Magney, AIA) 540 Lake Street Excelsior, MN 55331 (612) 7017117tmagney@mchsi.comSITE INFORMATIONPRESENT ZONING: RRRural Residential DistrictLAND USE:Public Semi PublicACREAGE: 104.08 acres DENSITY: 0.0023 F.A.R APPLICATION REGULATIONSChapter 20, Article II, Division 6, Site Plan Review
Chapter 20, Article VII, Shoreland Management District
Chapter 20, Article XI, “RR” Rural Residential District
BACKGROUND
Camp Fire Minnesota is in the process of conducting a multiyear and multiphased renovation, update, and expansion
of the facilities at Camp Tanadoona in accordance with the camp’s master plan. Phase 1 was completed in 2014 and it
involved building a new Day Camp Village and overnight cabins, multiple gathering areas, an archery range and garden,
and the Tree House outdoor living classroom.
They are now ready to commence Phase 2 of these updates, which involves removing the existing dining hall and
replacing it with a new 10,500 squarefoot dining hall. In addition to the new building, Phase 2 will connect the dining
hall to city sewer and water, add staff and visitor parking, and revise the existing access road and internal site
circulation.
The new building will have a 200person seating capacity and provide the camp with a flexible indoor space to meet
current demands and help grow the camp as a yearround destination.
The applicant has sent out mailers to the surrounding properties and invited them to take a tour of the camp and meet
onsite to learn about the proposed project.
A detailed discussion of the proposal can be found in the attached staff report.
RECOMMENDATION
Staff recommends that the Planning Commission approve the site plan for 10,500 squarefoot dining hall, kitchen, and
program area building dated May 17, 2019 subject to the following conditions:
Building
1. The building is required to have automatic fire extinguishing systems.
2. Building plans must be prepared and signed by design professionals licensed in the State of Minnesota.
3. Building plans must include a code analysis that contains the following information: Key Plan, Occupancy group,
Type of construction, Allowable height and area, Fire sprinklers, Separated or nonseparated, Fire resistive
elements (Ext walls, Bearing walls exterior or interior, Shaft, Incidental use), Occupant load, Exits required
(Common path, Travel distance), Minimum plumbing fixture count.
4. Detailed occupancyrelated requirements will be addressed when complete building plans are submitted.
5. Structure proximity to property lines (and other buildings) will have an impact on the code requirements for the
proposed building, including but not limited to: allowable size, protected openings and fireresistive construction.
These requirements will be addressed when complete building and site plans are submitted.
6. Retaining walls (if present) more than four feet high must be designed by a professional engineer and a building
permit must be obtained prior to construction.
Engineering and Water Resources
1. Provide top of wall and bottom of wall elevations for entire retaining wall build, which includes retaining wall built
below grade, i.e. bottom of wall.
2. Salvage existing topsoil and indicate all proposed stockpile location(s) on the plan.
3. Connection to the existing sanitary sewer manhole will require a core drill and installation of a boot to facilitate a
watertight connection.
PLANNING COMMISSION STAFFREPORTTuesday, June 18, 2019SubjectConsider Camp Tanadoona Site Plan Review for Demolition of Existing Dining Hall andConstruction of New Dining Hall and Connection of City Water and Sewer, development ofAccess Road and Drop OffSectionPUBLIC HEARINGS Item No: C.1.Prepared By MacKenzie YoungWalters, AssociatePlanner File No: Planning Case 201905PROPOSED MOTION:“The Chanhassen Planning Commission recommends approval of the site plan for a 10,500 squarefoot dining hall,kitchen, and program area building subject to the conditions of approval and adoption of the Findings of Fact andRecommendation.”SUMMARY OF REQUESTThe applicant is requesting site plan approval for the construction of a new 10,500 squarefoot dining hall in the olddining hall’s location.APPLICANTMagney Architecture (Tammy Magney, AIA) 540 Lake Street Excelsior, MN 55331 (612) 7017117tmagney@mchsi.comSITE INFORMATIONPRESENT ZONING: RRRural Residential DistrictLAND USE:Public Semi PublicACREAGE: 104.08 acres DENSITY: 0.0023 F.A.R APPLICATION REGULATIONSChapter 20, Article II, Division 6, Site Plan ReviewChapter 20, Article VII, Shoreland Management DistrictChapter 20, Article XI, “RR” Rural Residential DistrictBACKGROUNDCamp Fire Minnesota is in the process of conducting a multiyear and multiphased renovation, update, and expansionof the facilities at Camp Tanadoona in accordance with the camp’s master plan. Phase 1 was completed in 2014 and itinvolved building a new Day Camp Village and overnight cabins, multiple gathering areas, an archery range and garden,and the Tree House outdoor living classroom.They are now ready to commence Phase 2 of these updates, which involves removing the existing dining hall andreplacing it with a new 10,500 squarefoot dining hall. In addition to the new building, Phase 2 will connect the dininghall to city sewer and water, add staff and visitor parking, and revise the existing access road and internal sitecirculation.The new building will have a 200person seating capacity and provide the camp with a flexible indoor space to meetcurrent demands and help grow the camp as a yearround destination.The applicant has sent out mailers to the surrounding properties and invited them to take a tour of the camp and meetonsite to learn about the proposed project.A detailed discussion of the proposal can be found in the attached staff report.RECOMMENDATIONStaff recommends that the Planning Commission approve the site plan for 10,500 squarefoot dining hall, kitchen, andprogram area building dated May 17, 2019 subject to the following conditions:Building1. The building is required to have automatic fire extinguishing systems. 2. Building plans must be prepared and signed by design professionals licensed in the State of Minnesota. 3. Building plans must include a code analysis that contains the following information: Key Plan, Occupancy group,Type of construction, Allowable height and area, Fire sprinklers, Separated or nonseparated, Fire resistiveelements (Ext walls, Bearing walls exterior or interior, Shaft, Incidental use), Occupant load, Exits required(Common path, Travel distance), Minimum plumbing fixture count. 4. Detailed occupancyrelated requirements will be addressed when complete building plans are submitted. 5. Structure proximity to property lines (and other buildings) will have an impact on the code requirements for theproposed building, including but not limited to: allowable size, protected openings and fireresistive construction.These requirements will be addressed when complete building and site plans are submitted. 6. Retaining walls (if present) more than four feet high must be designed by a professional engineer and a buildingpermit must be obtained prior to construction.Engineering and Water Resources1. Provide top of wall and bottom of wall elevations for entire retaining wall build, which includes retaining wall builtbelow grade, i.e. bottom of wall. 2. Salvage existing topsoil and indicate all proposed stockpile location(s) on the plan. 3. Connection to the existing sanitary sewer manhole will require a core drill and installation of a boot to facilitate a
watertight connection.
4. Appropriate city permits for construction within the public rightofway shall be obtained prior to construction.
Work within city streets requires a traffic control plan.
5. A preconstruction meeting with Public Works and Engineering shall be scheduled by the contractor prior to the
connection of any public utilities.
6. All callouts on construction plans that reference a detail shall be updated to incorporate the sheet the detail is
illustrated on and the detail number referenced for construction.
7. Watermain fittings shall be epoxy coated.
8. Hydrant lead pipe shall be C900 PVC.
9. The Contractor shall examine the existing 6inch gate valve identified to remain. If mild steel bolts are inplace
on the valve or as part of the fittings the bolts shall be changed out with stainless steel or CorBlue bolts.
10. It is the applicant’s responsibility to ensure and submit proof that permits are received from all other agencies
with jurisdiction over the project (i.e. Army Corps of Engineers, DNR, MnDOT, Carver County, MCWD,
Board of Water and Soil Resources, MPCA, etc.).
Environmental Resources
1. All trees proposed for preservation shall be protected with tree preservation fencing installed at the dripline or
furthest point possible away from the trunk. Fencing shall remain in place until construction is completed.
2. A walk through of the tree preservation fencing prior to start of construction is required.
Fire
1. Full Fire Alarm and Full Sprinkler system required in the new structure.
2. Hydrant locations are acceptable.
3. No Parking Fire Lane signs and yellow curb paint will be needed on both sides of all roads under 26 feet in
width.
4. Parking shall be limited to designated parking spaces.
5. Provide information showing that the gravel roadway can support up to 75,000 pounds.
6. All landscaping, rocks, planters, etc. will need to be kept back away from the roadway to allow for proper
turnaround of emergency apparatus. Additional space shall be provided along the turnaround lane and entrance
to allow for property maneuvering.
Planning
1. The applicant shall enter into a site plan agreement and provide the security required by it prior to receiving a
building permit.
2. The applicant may install directional and wayfinding signage as need for the safe and efficient navigation of the
site, provided it meets the height, size, and location standards in section 201255(2) of the City Code.
PLANNING COMMISSION STAFFREPORTTuesday, June 18, 2019SubjectConsider Camp Tanadoona Site Plan Review for Demolition of Existing Dining Hall andConstruction of New Dining Hall and Connection of City Water and Sewer, development ofAccess Road and Drop OffSectionPUBLIC HEARINGS Item No: C.1.Prepared By MacKenzie YoungWalters, AssociatePlanner File No: Planning Case 201905PROPOSED MOTION:“The Chanhassen Planning Commission recommends approval of the site plan for a 10,500 squarefoot dining hall,kitchen, and program area building subject to the conditions of approval and adoption of the Findings of Fact andRecommendation.”SUMMARY OF REQUESTThe applicant is requesting site plan approval for the construction of a new 10,500 squarefoot dining hall in the olddining hall’s location.APPLICANTMagney Architecture (Tammy Magney, AIA) 540 Lake Street Excelsior, MN 55331 (612) 7017117tmagney@mchsi.comSITE INFORMATIONPRESENT ZONING: RRRural Residential DistrictLAND USE:Public Semi PublicACREAGE: 104.08 acres DENSITY: 0.0023 F.A.R APPLICATION REGULATIONSChapter 20, Article II, Division 6, Site Plan ReviewChapter 20, Article VII, Shoreland Management DistrictChapter 20, Article XI, “RR” Rural Residential DistrictBACKGROUNDCamp Fire Minnesota is in the process of conducting a multiyear and multiphased renovation, update, and expansionof the facilities at Camp Tanadoona in accordance with the camp’s master plan. Phase 1 was completed in 2014 and itinvolved building a new Day Camp Village and overnight cabins, multiple gathering areas, an archery range and garden,and the Tree House outdoor living classroom.They are now ready to commence Phase 2 of these updates, which involves removing the existing dining hall andreplacing it with a new 10,500 squarefoot dining hall. In addition to the new building, Phase 2 will connect the dininghall to city sewer and water, add staff and visitor parking, and revise the existing access road and internal sitecirculation.The new building will have a 200person seating capacity and provide the camp with a flexible indoor space to meetcurrent demands and help grow the camp as a yearround destination.The applicant has sent out mailers to the surrounding properties and invited them to take a tour of the camp and meetonsite to learn about the proposed project.A detailed discussion of the proposal can be found in the attached staff report.RECOMMENDATIONStaff recommends that the Planning Commission approve the site plan for 10,500 squarefoot dining hall, kitchen, andprogram area building dated May 17, 2019 subject to the following conditions:Building1. The building is required to have automatic fire extinguishing systems. 2. Building plans must be prepared and signed by design professionals licensed in the State of Minnesota. 3. Building plans must include a code analysis that contains the following information: Key Plan, Occupancy group,Type of construction, Allowable height and area, Fire sprinklers, Separated or nonseparated, Fire resistiveelements (Ext walls, Bearing walls exterior or interior, Shaft, Incidental use), Occupant load, Exits required(Common path, Travel distance), Minimum plumbing fixture count. 4. Detailed occupancyrelated requirements will be addressed when complete building plans are submitted. 5. Structure proximity to property lines (and other buildings) will have an impact on the code requirements for theproposed building, including but not limited to: allowable size, protected openings and fireresistive construction.These requirements will be addressed when complete building and site plans are submitted. 6. Retaining walls (if present) more than four feet high must be designed by a professional engineer and a buildingpermit must be obtained prior to construction.Engineering and Water Resources1. Provide top of wall and bottom of wall elevations for entire retaining wall build, which includes retaining wall builtbelow grade, i.e. bottom of wall. 2. Salvage existing topsoil and indicate all proposed stockpile location(s) on the plan. 3. Connection to the existing sanitary sewer manhole will require a core drill and installation of a boot to facilitate awatertight connection. 4. Appropriate city permits for construction within the public rightofway shall be obtained prior to construction. Work within city streets requires a traffic control plan. 5. A preconstruction meeting with Public Works and Engineering shall be scheduled by the contractor prior to theconnection of any public utilities. 6. All callouts on construction plans that reference a detail shall be updated to incorporate the sheet the detail isillustrated on and the detail number referenced for construction. 7. Watermain fittings shall be epoxy coated. 8. Hydrant lead pipe shall be C900 PVC. 9. The Contractor shall examine the existing 6inch gate valve identified to remain. If mild steel bolts are inplaceon the valve or as part of the fittings the bolts shall be changed out with stainless steel or CorBlue bolts. 10. It is the applicant’s responsibility to ensure and submit proof that permits are received from all other agencieswith jurisdiction over the project (i.e. Army Corps of Engineers, DNR, MnDOT, Carver County, MCWD,Board of Water and Soil Resources, MPCA, etc.).Environmental Resources1. All trees proposed for preservation shall be protected with tree preservation fencing installed at the dripline orfurthest point possible away from the trunk. Fencing shall remain in place until construction is completed. 2. A walk through of the tree preservation fencing prior to start of construction is required. Fire1. Full Fire Alarm and Full Sprinkler system required in the new structure. 2. Hydrant locations are acceptable. 3. No Parking Fire Lane signs and yellow curb paint will be needed on both sides of all roads under 26 feet inwidth. 4. Parking shall be limited to designated parking spaces. 5. Provide information showing that the gravel roadway can support up to 75,000 pounds. 6. All landscaping, rocks, planters, etc. will need to be kept back away from the roadway to allow for properturnaround of emergency apparatus. Additional space shall be provided along the turnaround lane and entranceto allow for property maneuvering.Planning1. The applicant shall enter into a site plan agreement and provide the security required by it prior to receiving abuilding permit. 2. The applicant may install directional and wayfinding signage as need for the safe and efficient navigation of thesite, provided it meets the height, size, and location standards in section 201255(2) of the City Code.
ATTACHMENTS:
Staff Report Tanadoona
Findings of Fact (Approval)
Application for Development Review
ERS Memo
ENG Memo
MCWD Memo
Fire Comments
Parking Clarification
Affidavit of Mailing
CITY OF CHANHASSEN
PC DATE: June 18, 2019
CC DATE: July 8, 2019
REVIEW DEADLINE: July 16, 2019
CASE #: 2019-05
BY: MYW, GB, DN, JS
SUMMARY OF REQUEST: The applicant is requesting site plan approval for the
construction of a new 10,500 square foot dining hall in the old dining hall’s location.
LOCATION: 3300 Tanadoona Drive (PID: 250083200; 250092600)
APPLICANT: OWNER:
Magney Architecture (Tammy Magney, AIA) Camp Fire Minnesota (Marnie Wells, CEO)
540 Lake Street 4829 Minnetonka Blvd, Unit 202
Excelsior, MN 55331 St. Louis Park, MN 55416
(612) 701-7117 (612) 284-6816
tmagney@mchsi.com marniew@campfiremn.com
PROPOSED MOTION:
“The Chanhassen Planning Commission recommends approval of the site plan for a 10,500
square-foot dining hall, kitchen, and program area building subject to the conditions of approval
and adoption of the findings of fact and recommendation.”
Planning Commission
3300 Tanadoona Drive- Dining Hall
June 18, 2019
Page 2 of 14
PRESENT ZONING: RR-Rural Residential District
2030 LAND USE PLAN: Public Semi Public
ACREAGE: 104.08 acres DENSITY: 0.0023 F.A.R.
LEVEL OF CITY DISCRETION IN DECISION-MAKING:
The city’s discretion in approving or denying a Site Plan is limited to whether or not the
proposed project complies with Zoning Ordinance requirements. If it meets these standards, the
city must then approve the site plan. This is a quasi-judicial decision.
Notice of this public hearing has been mailed to all property owners within 500 feet.
PROPOSAL/SUMMARY
Master Plan
Camp Fire Minnesota is in the process of conducting a multi-year and multi-phased renovation,
update, and expansion of the facilities at Camp Tanadoona in accordance with the camp’s master
plan. Phase 1 was completed in 2014 and it involved building a new Day Camp Village and
overnight cabins, multiple gathering areas, an archery range and garden, and the Tree House
outdoor living classroom.
They are now ready to commence Phase 2 of these updates, which involves removing the
existing dining hall and replacing it with a new 10,500 square foot dining hall. In addition to the
Planning Commission
3300 Tanadoona Drive- Dining Hall
June 18, 2019
Page 3 of 14
new building, Phase 2 will connect the dining hall to City sewer and water, add staff and visitor
parking, and revise the existing access road and internal site circulation.
Phase 2
The new building will have a 200 person seating capacity and provide the camp with a flexible
indoor space to meet current demands and help grow the camp as a year-round destination.
The applicant has sent out mailers to the surrounding properties and invited them to take a tour
of the camp and meet onsite to learn about the proposed project.
APPLICABLE REGULATIONS
Chapter 20, Article II, Division 6, Site Plan Review
Chapter 20, Article VII, Shoreland Management District
Chapter 20, Article XI, “RR” Rural Residential District
BACKGROUND
1924: Camp Tanadoona begins operations.
2012: Camp Tanadoona developed a master plan to preserve the site, better meet the need for
summer camp, expand programs and facilities for year-round use, and help the camp be a better
neighbor and community asset.
Planning Commission
3300 Tanadoona Drive- Dining Hall
June 18, 2019
Page 4 of 14
2014: Completed Phase 1 of the master plan (new Day Camp Village and overnight cabins,
multiple gathering areas, an archery range and garden, and the Tree House outdoor living
classroom)
2018: Camp Tanadoona met with City Staff to discuss what would be required to imitate Phase 2 of
the master plan (new dining hall, connection to city sewer and water, revised parking and site
circulation).
May 22, 2019: Camp Tanadoona presented their master plan and vision for the camp during the
City Council work session. They also discussed their proposed timeline and goal of having the new
dining area completed by next spring.
SITE CONDTIONS
The property is split between a western 62.14-acre parcel (PID 250083200) and a 41.94-acre
eastern parcel (PID 250092600). Both parcels are zoned Rural Residential District (RR) and the
western parcel is partially located within the shoreland overlay district. The RR district requires a
minimum lot size of 2.5 acres, front and rear setbacks of 50 feet, side yard setbacks of 10 feet,
and limit properties to 20 percent lot coverage. The shoreland overlay district also requires a
150-foot lake setback for non-residential structures without water-oriented needs. There are also
several wetlands present on the property and portions of the western parcel are located within a
floodplain.
The site is primarily bordered by low-density residential districts with Planned Unit
Development-Residential districts to the north and east, and Rural Residential and Single Family
Residential districts to the south. Westwood Community Church, which is zoned Office
Institution District is also located south of the Camp.
Planning Commission
3300 Tanadoona Drive- Dining Hall
June 18, 2019
Page 5 of 14
Wetland Protection
No activities associated with the proposed project will be conducted near any of the wetland on
the site. There is no anticipated impact on or alteration to the wetlands.
Shoreland Overlay
The dining hall and some of the proposed parking and impervious surface is located within the
shoreland overlay district; however, the proposed lot coverage is significantly below what is
permitted and the structure is approximately 750 feet from the lake. None of the proposed
activities are outside the scope of what is permitted within the shoreland overlay district.
Floodplain Overlay
Portions of the site are located within the 100-year and 500 year flood zones; however, the
proposed structure is over 700 from the nearest flood zone and, as such, does not trigger any of
the provisions in the City’s floodplain ordinance.
DISCUSSION
The applicant is requesting site plan approval for a 10,500 square foot dining hall. The main
level building footprint is 5,135 square feet with an additional 5,365 square feet of space on the
lower level.
.
Planning Commission
3300 Tanadoona Drive- Dining Hall
June 18, 2019
Page 6 of 14
ARCHITECTURAL ASSESSMENT*
*Note: Since the property is zoned Rural Residential, it is exempted from the City’s formal
design standards; however, an informal design review is provided below.
Size Portion Placement
The main entrance is located on the north elevation and is accented by a canopy. Secondary
access is provided by walk out level doors on the south and east elevations, as well as two other
main level entrances on the north elevation. The configuration of the main entrance and
placement of secondary access would meet the location and designation standards of the City
Code.
Planning Commission
3300 Tanadoona Drive- Dining Hall
June 18, 2019
Page 7 of 14
The proposed building is approximately 92 feet wide and 72 feet deep at its greatest extent. The
applicant has made extensive use of façade modulation as well as variation in building’s
rooflines to provide architectural differentiation. The result of these techniques is that the
buildings elevations are visually broken into smaller increments. Even though the dining hall is a
single story structure, the applicant is proposing to utilize skirt board, south and east elevations,
and a rear deck, south elevation, to create a visual break between the main level and walkout
level. The overall effect is to create visually appealing building that meets the intent of the City
design ordinance.
Material, Color and Detail
The applicant is proposing to use tongue and groove siding painted in natural browns along with
large glass windows on the north and south elevations for the building’s main level. Trim board
and small amounts of prefinished metal are proposed as accent materials. As discussed above,
the elevations are articulated by the use of techniques including façade modulation and variation
in the building’s rooflines are utilized to provide architectural differentiation. The presence of
and spacing of windows and doors along the north, south, and east elevations provides additional
articulation.
The lower level walkout level is a combination of siding, windows, and unfinished concrete.
Typically, unfished concrete is not permitted; however, the ordinances does allow for its use in
areas with limited public view. As the proposed concrete is located on the lower level in the rear
of a structure which is located in the middle of a 104-acre campground, staff believes that the
proposed use of unfinished concrete in this instance meets the intent limited public view criteria.
The overall use of material, color and detail serves to create an attractive building that is
appropriate to the site’s natural context that meets the intent of the City’s design ordinance.
Height and Roof Design
The building height is 17 feet 2 inches as measured from the top of the highest grade to the
average height of the roof. The absolute highest point of the building is the chimney at 23 feet 8
inches. This is significantly below the 35 feet permitted by ordinance.
The roof is of pitched design and no rooftop mechanical equipment is present that would
necessitate screening.
Facade Transparency
The applicant is proposing large windows along the north and south elevations, which extend up
into two of the three gables and across the main floor dining area. The proposed widows meet the
intent of the design ordinance’s glazing criteria.
Planning Commission
3300 Tanadoona Drive- Dining Hall
June 18, 2019
Page 8 of 14
Site Furnishings
The applicant is proposing north
and south circular patios, the
northern one being located near a
freestanding fireplace, and the
southern one having a campfire
ring and tiered semi-circle of
benches. A mulch-walking path
with timber steps is also proposed
to facilitate pedestrian traffic
between the north and south
elevations. The applicant is also
proposing a deck along the south
side of the building.
Loading Areas, Refuse Area, etc.
The dumpsters and loading area along the east façade will be screened through the use of a
boulder retaining wall. The location of the building and size of the site mean that there is no
potential of these areas being viewed from the public right-of-way.
Lighting
No light poles or parking area lighting is proposed. Exterior lighting will be confined to wall
mounted light fixtures near building entrances. All exterior lighting shall be shielded and have 90
degree cut-off angles pursuant to city code.
Signage
The applicant is proposing building signage along the north elevation. No details have been
provided for the proposed sign and any sign would need to comply with the City’s sign
ordinance. If the sign is a nameplate or integral sign not exceeding two square feet no permit
would be required; however, any other type of wall sign would require a sign permit.
The City’s sign code permits up to four direction signs without permits; however, it allows the
City Council to authorize additional directional signs in cases where they are necessary for safe
and efficient navigation of the site. Given the unique nature and size of Camp Tanadoona, staff
recommends that the City Council permit the installation of directional signs as needed, so long
as they comply with the size and location requirements listed in the City’s sign code.
Landscaping
The applicant is rebuilding within a wooded area and is proposing to preserve trees in
conjunction with the development of the site. To do so successfully, the applicant will need to
provide tree protection fencing around all trees shown to be preserved within and at the edge of
Planning Commission
3300 Tanadoona Drive- Dining Hall
June 18, 2019
Page 9 of 14
grading limits. The fencing shall be located at the dripline or furthest point possible from the
trunk of the tree. All protection fencing shall remain in place until construction is complete.
The applicant has provided satisfactory foundation plantings around the building and is adding
over a dozen trees for reforestation.
Access, Lot Frontage and Parking Location
The camp access is along Tanadoona Dr. and the plan proposes to continue to utilize the existing
driveway connection to the street. An internal network of gravel roads and drives facilitates
travel within the site, and a twenty-foot fire lane provides for emergency vehicle access to the
dining hall. Some parking improvements are proposed along the access drive to the new dining
facility but the majority of the event parking is contained within a grassy area north of the access.
The staff parking along the gravel access drive is indicated to have a stall depth of 20-feet. This
depth meets the minimum requirements within the City Code but it is recommended the client
consider a 2-foot deeper stall to facilitate parking of longer vehicles and passenger trucks. The
concern being that because the area is gravel, vehicles may inadvertently protrude into the drive
lane, impacting the flow of traffic. A 2-foot minimal buffer between the ends of the parked
vehicles and the drive lane would assist with the natural flow of traffic and increase safety.
Furthermore, people unloading camping necessities from the back of their vehicles would have
additional space. It is assumed that no striping will be provided in the proposed parking stalls
along the access drive due to the gravel surfacing. The Fire Marshall should comment on the
proposed widths of the access lane to facilitate emergency vehicle access and set-up.
The Fire Department has expressed concern that some of the proposed landscaping may interfere
with the turn movements of emergency apparatus. They have noted that the turnaround lane is 12
in width and that additional room will be required on each side as well as the entrance to allow
for property maneuvering.
Planning Commission
3300 Tanadoona Drive- Dining Hall
June 18, 2019
Page 10 of 14
The Fire Department is also requiring that the gravel roadway be designed to support up 75,000
pounds and that “No parking Fire Lane” signs and yellow curb paint will be needed on both sides
of all roads under 26 feet in width. Parking will need to be confined to designated parking
spaces.
Miscellaneous
The building is required to have automatic fire extinguishing systems. Building plans must be
prepared and signed by design professionals licensed in the State of Minnesota. Building plans
must include a code analysis that contains the following information: Key plan, Occupancy
group, Type of construction, Allowable height and area, Fire sprinklers, Separated or non-
separated, Fire resistive elements (Ext. walls, Bearing walls - exterior or interior, Shaft,
Incidental use), Occupant load, Exits required (Common path, Travel distance), Minimum
plumbing fixture count. Detailed occupancy-related requirements will be addressed when
complete building plans are submitted. Structure proximity to property lines (and other
buildings) will have an impact on the code requirements for the proposed building, including but
not limited to: allowable size, protected openings and fire-resistive construction. These
requirements will be addressed when complete building and site plans are submitted. Retaining
walls (if present) more than four feet high must be designed by a professional engineer and a
building permit must be obtained prior to construction.
UTILITIES
The plan proposes to serve the dining hall from in-place public utilities under Tanadoona Drive.
Currently, drinking water is provided to the site by an existing private well. The plan proposes
to connect the site to city water. The site currently utilizes a connection to the city’s sanitary
sewer system that is approximately 100-feet west of the existing access to Tanadoona Dr.
The plan proposes to extend sanitary sewer west from the manhole north of the existing
connection to city sanitary sewer. An 8-inch PVC main is proposed to connect to the dining hall.
The connection to the existing manhole on the site shall be core-drilled and booted in order to
facilitate a watertight connection. An existing forcemain pumps sanitary sewage to the existing
manhole. The plan proposes to eliminate this connection and re-route the forcemain to a new
manhole further to the west. The connection at the existing manhole shall be abandoned by a
water-tight means.
The plan proposes a connection to the city water system near the existing sewer connection. The
plan proposes to connect to an existing 6-inch DIP hydrant lead and extend an 8-inch PVC
watermain into the site to serve the dining hall and future construction. The plan also proposes
an alternate connection to the city water system to provide a looped system and an alternative
source if there is a need for maintenance to the piping system. It is assumed the alternate
connection will be bid as a separate item and the owner will determine if the work fits into the
project budget. Engineering recommends the designer re-consider the main water connection
design. There will likely be an increase in head-loss in regards to water flow and pressure for the
service to the site by leaving in a 6-inch connection to the city watermain and then increasing to
Planning Commission
3300 Tanadoona Drive- Dining Hall
June 18, 2019
Page 11 of 14
8-inch pipe to service the site. The 6-inch pipe connection is approximately 15’ long and the
headloss amount would be expected to be small but it should be recognized and calculated. The
site is within the City’s high water pressure zone which may allow the design to be reasonable.
The 6-inch gate valve should be examined for corrosion and stainless steel bolts when excavated.
If mild steel bolts are found it is recommended the bolts on the existing valve and fittings be
replaced. The existing 6-inch connection to the watermain is DIP. It is recommended an anode
bag and pipe clamp be added to this ductile iron pipe stub if it is left in place. C900 pipe is
required per City standards for all hydrant leads and all bends shall be epoxy coated in order to
resist corrosion. Appropriate traffic control will be required for any work within the public right-
of-way.
GRADING, DRAINAGE, AND EROSION CONTROL
The applicant is proposing to grade the site with a rural section design. The access drive is
proposed to be a graveled surface in order to access the camp and the dining hall facility. Curb
and gutter is not designed to assist in the control of drainage off of the internal roadways.
Drainage across the proposed site generally follows a north-to-south pattern with water flowing
across the site and towards Tanadoona Dr.
The applicant is proposing a short retaining wall that is approximately 25-foot long near the
dining hall. While the top of wall and bottom of wall elevations provided are less than 4’, the
bottom wall elevation may be indicated at-grade rather than the true bottom of the wall. Bottom
wall elevations of the entire wall section, or below grade, shall be provided. If the wall exceeds
4’ in total height, the wall shall be designed by a registered engineer, and plans shall be
submitted for review.
The proposed development will exceed one (1) acre of disturbance and will, therefore, be subject
to the General Permit Authorization to Discharge Stormwater Associated with Construction
Activity Under the National Pollution Discharge Elimination/State Disposal System (NPDES
Construction Permit). All erosion control shall be installed and inspected prior to initiation of
site grading activities.
The plans include a proposed Storm Water Pollution Prevention Plan (SWPPP).
The proposed redevelopment will need to be permitted by the Minnehaha Creek Watershed
District (MCWD).
STORMWATER MANAGEMENT
Article VII, Chapter 19 of City Code describes the required storm water management
development standards for site plans. The proposed project is reducing the area of impervious
surface by 359 S.F. and therefore peak discharge rates from the site will not increase and a
hydrologic analysis is not required.
Planning Commission
3300 Tanadoona Drive- Dining Hall
June 18, 2019
Page 12 of 14
The project triggers the Minnehaha Creek Watershed District (MCWD) erosion control and
stormwater management rules. The applicant will need to incorporate a best management
practice (BMP) to meet MCWD requirements. MCWD staff are recommending the applicant
install an above ground bioretention basin such as a rain garden. It is the applicant’s
responsibility to work with MCWD to obtain all necessary permits.
Compliance Table Code Project (Control Concepts)
Building Height 3 stories 1 story
35 feet 17.167 feet (to average roof height)
Building Setback N* - 50' E* - 10' N* - 650'+ E* - 1600'+
W# - 150' S - 50' W# - 700'+ S - 175’+
* Wetlands are present to the north and east, but will not be impacted by the proposed project.
# Shoreland setback for nonresidential uses without water-oriented needs is double the normal 75
foot ordinary high water level setback.
Parking Stalls* 25 stalls (+166 event spaces) 25 stalls (+166 event spaces)
(Office = 4 spaces per 1,000 square feet ((11,614/1,000)*4= 46); Manufacturing = 1 per
employee on largest shift (28 employees); Warehouse = 1 space per 1,000 square feet for the
first 10,000 square feet, then 1 space per 2,000 square feet ((9,782/1,000)=10)
*Note: Camp Tanadoona represents a unique use within the City of Chanhassen and does not
nearly fit into any of the City’s parking categories. Section 20-1124.1.g allows the City to
establish parking requirements for uses not list listed in the code based on the characteristics of
the use and available information on parking demand for the use. Camp Tanadoona has provided
the City was a breakdown of how campers arrive and typical staffing levels for the camp
(included as an attachment). Given the Camp’s long history within the community, lack of any
historic parking issues, and capacity to add overflow parking areas staff is comfortable with the
proposed amount of parking.
Hard Surface Coverage 20% NA%*
Lot Area 108,900 sq. ft. (2.5 ac.) 4,533,724 sq. ft. (104.08 ac.)
*The site’s pre-existing lot cover is well below the 20 percent maximum, and the proposed
project reduces this lot cover by .009 percent.
RECOMMENDATION
Planning Commission
3300 Tanadoona Drive- Dining Hall
June 18, 2019
Page 13 of 14
Staff recommends that the Planning Commission approve the site plan for 10,500 square-foot
dining hall, kitchen, and program area building dated May 17, 2019 subject to the following
conditions:
Building
1. The building is required to have automatic fire extinguishing systems.
2. Building plans must be prepared and signed by design professionals licensed in the State
of Minnesota.
3. Building plans must include a code analysis that contains the following information: Key
Plan, Occupancy group, Type of construction, Allowable height and area, Fire sprinklers,
Separated or non-separated, Fire resistive elements (Ext walls, Bearing walls - exterior or
interior, Shaft, Incidental use), Occupant load, Exits required (Common path, Travel
distance), Minimum plumbing fixture count.
4. Detailed occupancy-related requirements will be addressed when complete building plans
are submitted.
5. Structure proximity to property lines (and other buildings) will have an impact on the
code requirements for the proposed building, including but not limited to: allowable size,
protected openings and fire-resistive construction. These requirements will be addressed
when complete building and site plans are submitted.
6. Retaining walls (if present) more than four feet high must be designed by a professional
engineer and a building permit must be obtained prior to construction.
Engineering and Water Resources
1. Provide top of wall and bottom of wall elevations for entire retaining wall build, which
includes retaining wall built below grade, i.e. bottom of wall.
2. Salvage existing topsoil and indicate all proposed stockpile location(s) on the plan.
3. Connection to the existing sanitary sewer manhole will require a core drill and
installation of a boot to facilitate a water-tight connection.
4. Appropriate city permits for construction within the public right-of-way shall be obtained
prior to construction. Work within city streets requires a traffic control plan.
5. A preconstruction meeting with Public Works and Engineering shall be scheduled by the
contractor prior to the connection of any public utilities.
6. All call-outs on construction plans that reference a detail shall be updated to incorporate
the sheet the detail is illustrated on and the detail number referenced for construction.
7. Watermain fittings shall be epoxy coated.
8. Hydrant lead pipe shall be C900 PVC.
9. The Contractor shall examine the existing 6-inch gate valve identified to remain. If mild
steel bolts are in-place on the valve or as part of the fittings the bolts shall be changed out
with stainless steel or Cor-Blue bolts.
10. It is the applicant’s responsibility to ensure and submit proof that permits are received
from all other agencies with jurisdiction over the project (i.e. Army Corps of Engineers,
DNR, MnDOT, Carver County, MCWD, Board of Water and Soil Resources, MPCA,
etc.).
Planning Commission
3300 Tanadoona Drive- Dining Hall
June 18, 2019
Page 14 of 14
Environmental Resources
1. All tree proposed for preservation shall be protected with tree preservation fencing
installed at the dripline or furthest point possible away from the trunk. Fencing shall
remain in place until construction is completed.
2. A walk through of the tree preservation fencing prior to start of construction is required.
Fire
1. Full Fire Alarm and Full Sprinkler system required in the new structure.
2. Hydrant locations are acceptable.
3. No parking Fire Lane signs and yellow curb paint will be needed on both sides of all
roads under 26 feet in width.
4. Parking shall be limited to designated parking spaces.
5. Provide information showing that the gravel roadway can support up to 75,000 pounds.
6. All landscaping, rocks, planters, etc. will need to be kept back away from the roadway to
allow for proper turnaround of emergency apparatus. Additional space shall be provided
along the turnaround lane and entrance to allow for property maneuvering.
Planning
1. The applicant shall enter into a site plan agreement and provide the security required by it
prior to receiving a building permit.
2. The applicant may install directional and wayfinding signage as need for the safe and
efficient navigation of the site, provided it meets the height, size, and location standards
in section 20-1255(2) of the City Code.
ATTACHMENTS
1. Application for Development Review
2. Findings of Fact and Recommendation
3. Public Hearing Notice and Mailing List
4. ERS Memo
5. ENG Memo
6. MCWD Memo
7. Fire Comments
8. Parking Clarification
g:\plan\2019 planning cases\19-05 camp tanadoona site plan\staff report_camp tanadoona_pc.docx
1
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
FINDINGS OF FACT
AND RECOMMENDATION
IN RE:
Application of Magney Architecture on behalf of Camp Fire Minnesota for Site Plan approval
for a 10,500 square foot dining hall.
On June 10, 2019, the Chanhassen Planning Commission met at its regularly scheduled meeting
to consider the application of Magney Architecture on behalf of Camp Fire Minnesota for site
plan approval. The Planning Commission conducted a public hearing on the proposed
development preceded by published and mailed notice. The Planning Commission heard
testimony from all interested persons wishing to speak and now makes the following:
FINDINGS OF FACT
1. The property is currently zoned Rural Residential Distract (RR),
2. The property is guided in the Land Use Plan for Public Semi Public.
3. The legal description of the property is:
ALL THAT PART OF GOVT LOT 9 IN SEC 8, AND ALSO ALL PART OF SW1/4
NW1/4 OF SEC 9; ALL LYING NLY OF THE FOLLOWING DESCRIBED: COMM AT
THE SE CORN SW1/4 NW 1/4 OF SEC 9' TH N69*W 1585.7'; TH N86*W 1210' TO THE
SHORE OF LAKE MINNEWASHTA.
And
ALL THAT PART OF SW1/4 NE1/4 AND SE1/4 NW 1/4 LYING WLY OF THE
CENTERLINE OF STATE TRUNK HIGHWAY NO. 41, AS NOW LA ID OUT (FORMERLY
TRUNK HIGHWAY NO. 12) EXC THAT PARCEL DESCRIBED AS FOLLOWS: THAT
PART OF SW1/4 NE1/4: COMM AT THE POINT OF INTERSECTION
4. Site Plan Review:
a. Is consistent with the elements and objectives of the city's development guides, including
the comprehensive plan, official road mapping, and other plans that may be adopted;
Finding: The proposed development is in compliance with the elements and objectives
of the city's development guides and facilities the continued use of the property in
accordance with its Public Semi Public designation.
2
b. Is consistent with site plan division;
Finding: The proposed development complies with the Site Plan review requirements of
the Chanhassen City Code.
c. Preserves the site in its natural state to the extent practicable by minimizing tree and soil
removal and designing grade changes to be in keeping with the general appearance of the
neighboring developed or developing areas;
Finding: The applicant is rebuilding within a wooded/natural area and has proposed a
plan with minimal impact to the surrounding environment. The applicant is adding over a
dozen trees for reforestation within the site and is proposing to reduce the existing
impervious cover.
d. Creates a harmonious relationship of building and open space with natural site features
and with existing and future buildings having a visual relationship to the development;
Finding: The proposed building is part of a comprehensive master plan and is well suited
to site’s overall development plan. The building’s design and architecture is well suited
to the natural environment that surroundings it.
e. Creates a functional and harmonious design for structures and site features, with special
attention to the following:
1) An internal sense of order for the buildings and use on the site and provision of a
desirable environment for occupants, visitors and general community;
2) The amount and location of open space and landscaping;
3) Materials, textures, colors and details of construction as an expression of the design
concept and the compatibility of the same with adjacent and neighboring structures
and uses; and
4) Vehicular and pedestrian circulation, including walkways, interior drives and parking
in terms of location and number of access points to the public streets, width of
interior drives and access points, general interior circulation, separation of pedestrian
and vehicular traffic and arrangement and amount of parking.
Finding: The proposed building is part of a comprehensive master plan and is well
suited to site’s overall development plan. The building’s design and architecture is
well suited to the natural environment that surroundings it. The proposed interior
circulation, subject to compliance with the conditions of approval, will provide for
the safe and efficient circulation of vehicles and pedestrians within the site.
f. Protects adjacent and neighboring properties through reasonable provision for surface
water drainage, sound and sight buffers, preservation of views, light and air and those
3
aspects of design not adequately covered by other regulations which may have
substantial effects on neighboring land uses.
Finding: The proposed development protects adjacent and neighboring properties
through reasonable provision for surface water drainage, sound and sight buffers,
preservation of views, light and air and traffic circulation.
5. The planning report #2019-05, dated June 10, 2019 prepared MacKenzie Young-Walters, et
al, is incorporated herein.
RECOMMENDATION
The Planning Commission recommends that the City Council approve the Site Plan for
Camp Tanadoona subject to the recommended conditions of approval contained within the staff
report.
ADOPTED by the Chanhassen Planning Commission this 10th day of June 2019.
CHANHASSEN PLANNING COMMISSION
BY:
Steve Weick, Chairman
COMMUNITY DEVELOPMENT DEPARTM ENT
Planning Division - 7700 Market Boulevard
Mailing Address - P.O. Box 147, Chanhassen, MN 55317
Pho e: (952) 227-1300 / Fax: (95?) 227-1110 *
CNYOICIHffiMMMt
suumittar oatSl rr I r 9
A,PPLICATION FOR DEVE
pco.r. Gl tXlF. cc Date:
LOPMENT REVIEW
1l ?(ta 6ooa y Revi "*gg+rilstil
Section 1: Application Type (check all that apply)
(Retet to the awropriate Application Checldist lot rcqui@d sublittal intomation that mug, accompany this application)
E Comprehensive Plan Amendment......................... $600 [ Subdivision (SUB)
tr
tr
tr
tr
a
! Minor MUSA line for failing on-site sewers ..... $100
Conditional Use Permit (CUP)
D Single-Family Residence ................................ $325! ett otners....... .................... $425
lnterim Use Permit (lUP)
E ln conjunction with Single.Family Residence.. $325! ntl ottrers....... .................... $425
Rezoning (REZ)
! Planned Unit Development (PUD) .................. $750D Minor tunendment to existing PUD................. $100E ell ottrers....... .......-............ $500
Sign Plan Review. .................... $150
Site Plan Review (SPR)
! Administrative .................... $100[l GommerciaUlndustrial Districts'......................$500
Plus $10 per 1,000 square feet of building area:
! Create 3 lots or less ........................................$3OO
fl Greate over 3 |ots.......................$600 + $15 per lot( lots)
Ll Metes & Bounds (2 lots)..................................$300n Consolidate Lots..............................................$1 SO! Lot Line Adjusrnent.........................................$1 50E Final Plat........ ....................$700
(lncludes $450 escrow for attomey costs)'*Additbnal escow may be required for othe. applications
though the development conuaci.
Vacation of Easements/Right-ol-way (VAC)........ $300
(Additbnal recoding b€s may apply)
Variance (VAR).... .................. $200
Wetland Alteration Permit (WAP)
fl Single-Family Residence............................... $150n lut ottrers....... .................. $275
Zoning Appeal...... .................. $100
E Zoning Ordinance Amendment (ZOA)...... $s00
$200
( 38 addresses)
. $3 per address
tr
!
!
tr
( 10 thousand square feet)
'lnclude number of g!ls[!g employees
@ Notification S ign (ci9 to install and remove) .......... ...........
E Property Owners' List within 500' (city lo generate afrer preapplicali$ meeting)
'lnclude number oflgg employees:
n Residential Disficts:......................------- SSOO N.gfE: When multiple applicttions aro processed concunontlv,
plus g5 per dwelling unit f ,nii;i ---- th' appropriate fee shall be charged fo' each application.
E Escrow for Recording Documents (check all that apply)..................-.......
E Condilional Use Permit E lnterim Use Permit
E Vacation E Variance
I Metes & Bounds Subdivision (3 docs.) E Easements L-easements)
....... ............... $50 per document
E] Site Plan Agreement
E Weuand Alteration Permitl-l Deeds
16141pgE' $964.00
Section 2: Required lnformation
3300 Tanadoona Drive, Excelsior, MN 55331Property Address or Location
Parcet #: 250093200 at
'ret
p.fl of l}ovt toi 9 in se 6, and ds d p.n c, s1/vt/4 twu4 o, sec aj ,lLegal UeSCnpIlOn: co,rrna Oe SE dn S\a/r,1,tgr, ,4 of lec 9 TH 115gr/v 1565 ,!: TH Na6$, I
rying dy ol tne ldtoNing .!6adib.d:
21q lo ths si6.e d t€ta Mnll*sht,
62.10 Wetlands Present? Z ves n l.lo
Rural Residential District (RR)Rural Residential District (RR)
Public/Semi-Public
Total Acreage:
Present Zoning
Existing Use of Property:
Requested Land Use Design
"1;on.
Public/Semi-Public
MAY 17 20ts
Descriotion of proDosal: Demolition of exsiting Dining Hall, construction of new Dining hall in exsiting location.
Connection to city water and sewer, developemnt of access road and drop off.
Requested Zoning:
Present Land Use Designation:
Camp
lCheck box 'rf separate narative is attached.
Sectigl 3: Properly Qwner a nd Applicant lnlormation
APPLICANT OTHER THAN PROPERTY_OWNER: In signing lhis application, l, as applicant, represent to have obtainedauthorization from the property owner to file this applicalion. I agree to be bound by condi0ons oi approval, subdt onty tothe right to obiect at the hearings on the application or duing lhe appeal period. lf ihis application has not Gen-iigneo oylhe property owner, I have attached separate docunentation of full legal ;apacity to file ihe applicalion. rtris ippficationshould be processed in my name and l.am_lhe party whom th€ city should cont;ct regarding'any matter pertiinlng to tnisapplication. I will keep myself informed of the deadlines lor submission of material and the ;roq;ess of this aooticatron. Ifurther understand that additional fees may be charged for consulting fees, feasibility stuote!. eic. wnn a"
".t'i,iai" prio, toany authorization to proceed wlth the sludy. I certify that the informrtion and exhibiG submitted are true "na-*i""t.Tammy Magney, AIA Magney Architecture Tammy Magney
540 Lake Slreet
Contact
Phone:(612t 7 01-7117
Excelsior MN 55331 (6't2) 7 01 -7 1 17City/State/Zip
Email:
Cell:
Fax:
Date
tmagney@mchsi.com
Signature 5/16/19
PROPERTY OWNER: ln ning this application, l, as property owner, hava full legal capacity to, and hereby do,authorize the [iling of this application. I understand that condilions ol approvala re binding and agree to be bound b y thoseconditions, subject only to the right to object at the hearings or duri ng the appeal periods. I witl keep myselt intorm ed ofthe deadlines for submission of material and the progress of this a
be charged for consultiog fees, feasibility studies, etc. wilh an es tim
plication. I further understand that additional fees may
ate prior to any authorization to proceed with the
p
study I certify that the informatiofl and exhibits submitted are true
Camp Fire Minnesota
and conect
Name
Address
City/State/Zip
Email:
st Park, MN 55416
iew@
PROJECT ENGINEER (if applicable)
Name: Carlson Mccain Engineers
Address
Email
Contact Marnie Wells, CEO
Phone: (612) 284-6816
(612) 242-01 41Cell:
Fax:
Date
This application must be completed in full and must b€ accompanied by all lnformation and plans reauired bv
applicable City Ordinance provisions. Before filing this application. refer to the appropriate Application Cn""iti.t
and confer wilh the Planning Department to determine the specific ordinance and applicabte procedural
requirements and fees
A determ inatjon of completeness of the application shall be made wilhin 1 5 business days of application submittal. Awritten notice of application deficiencies shall be mailed lo the applicant within 15 business days oI appficeitn.
Contact
Phone:
Joe Radach, PE
15650 36th Ave N,
Plymouth, MN 55,146
jradach@carlsonmccain.com
(763) 489-7912
(612),73O-226s
Seclion 4: Notification lnformation
Who should receiye copies of staff reports?
E Property Owner Via: E Email
iOther Contact lnformation
Name:Applicant Via: El EmaitEngineer Via: E EmaitOther' Via: E Email
I tvaited Paper Copy
L_l Mailed Paper Copy
LJ Mailed Paper Copy
L_l Mailed Paper Copy
Address
INSTRUCTIONS TO APPLICANT
device -- : -r and deliver
copy to the city for processing
: Complete all necessary form fiolds, lh€n select : \ , : =: i ,,! to save a copy to your
to cily along with required documents and payment. S.Bu:ilp,u-tose;dadigtal
SAVE FORM PRINT FORM SUBMIT FORM
City/State/zip
Email:
N ame
Address.
4829 Minnetonka Blvd Unit 202
Signature:
City/State/Zip:
5t't6120
Cell:
Fax:
A
MEMORANDUM
TO: MacKenzie Walters, Planner II
FROM: Jill Sinclair, Environmental Resources Specialist
DATE: June 18, 2019
SUBJ: Camp Tanadoona dining hall, Landscaping and Tree Preservation
The applicant is rebuilding within a wooded area and is proposing to preserve trees in
conjunction with the development of the site. To do so successfully, the applicant will need to
provide tree protection fencing around all trees shown to be preserved within and at the edge of
grading limits. The fencing shall be located at the dripline or furthest point possible from the
trunk of the tree. All protection fencing shall remain in place until construction is complete.
The applicant has provided satisfactory foundation plantings around the building and is adding
over a dozen trees for reforestation.
Recommendations:
1. All tree proposed for preservation shall be protected with tree preservation fencing
installed at the dripline or furthest point possible away from the trunk. Fencing shall
remain in place until construction is completed.
2. A walk through of the tree preservation fencing prior to start of construction is required.
Memorandum
To: MacKenzie Young-Walters, Associate Planner
From: George Bender, PE, Assistant City Engineer
CC: Jason Wedel, PE, Public Works Director/City Engineer
Erik Henricksen, Project Engineer
Renae Clark, Water Resources Coordinator
Kevin Crooks, Utility Superintendent
Jill Sinclair, Environmental Resources Specialist
Don Nutter, Fire Marshall
Date: 6/7/2019
Re: Camp Fire Site Plan Review – City Planning Case No. 2019-05
ACCESS
The camp access is along Tanadoona Dr and the plan proposes to continue to utilize the existing
driveway connection to the street. Some parking improvements are proposed along the access
drive to the new dining facility but the majority of the event parking is contained within a grassy
area north of the access. The staff parking along the access drive is indicated to have a stall
depth of 20-feet. This depth meets the minimum requirements within the City Code but it is
recommended the client consider a 2-foot deeper stall to facilitate parking of longer vehicles and
passenger trucks. The concern being that if vehicles protrude into or are close enough to impact
the flow of traffic through the drive lane. A minimal buffer between the ends of the parked
vehicles and the drive lane would assist with the natural flow of traffic and increase safety.
People unloading camping necessities from the back of their vehicles would have additional
space. It is assumed that no striping will be provided in the proposed parking stalls along the
access drive due to the gravel surfacing. The Fire Marshall should comment on the proposed
widths of the access lane to facilitate emergency vehicle access and set-up.
GRADING AND DRAINAGE
The applicant is proposing to grade the site with a rural section design. The access drive is
proposed to be a graveled surface in order to access the camp and the dining hall facility. Curb
and gutter is not designed to assist in the control of drainage off of the internal roadways.
Drainage across the proposed site generally follows a north-to-south pattern with water flowing
across the site and towards Tanadoona Dr.
The applicant is proposing a short retaining wall that is approximately 25-foot long near the
dining hall. While the top of wall and bottom of wall elevations provided are less than 4’, the
bottom wall elevation may be indicated at-grade rather than the true bottom of the wall. Bottom
wall elevations of the entire wall section, or below grade, shall be provided. If the wall exceeds
4’ in total height, the wall shall be designed by a registered engineer, and plans shall be
submitted for review.
EROSION CONTROL
The proposed development will exceed one (1) acre of disturbance and will, therefore, be subject
to the General Permit Authorization to Discharge Stormwater Associated with Construction
Activity Under the National Pollution Discharge Elimination/State Disposal System (NPDES
Construction Permit). All erosion control shall be installed and inspected prior to initiation of
site grading activities.
The plans include a proposed Storm Water Pollution Prevention Plan (SWPPP).
The proposed redevelopment will need to be permitted by the Minnehaha Creek Watershed
District (MCWD).
STORMWATER MANAGEMENT
Article VII, Chapter 19 of City Code describes the required storm water management
development standards for site plans. The proposed project is reducing the area of impervious
surface by 359 S.F. and therefore peak discharge rates from the site will not increase and a
hydrologic analysis is not required.
UTILITIES
The plan proposed to serve the dining hall from in-place public utilities under Tanadoona Drive.
Currently, drinking water is provided to the site by an existing private well. The plans propose
to connect the site to city water. The site is currently utilizes a connection to the city’s sanitary
sewer system that is approximately 100-feet west of the existing access to Tanadoona Dr.
The plan proposes to extend sanitary sewer west from the manhole north of the existing
connection to city sanitary sewer. An 8-inch PVC main is proposed to connect to the dining hall.
The connection to the existing manhole on the site shall be core-drilled and booted in order to
facilitate a watertight connection. An existing forcemain pumps sanitary sewage to the existing
manhole. The plans propose to eliminate this connection and re-route the forcemain to a new
manhole further to the west. The connection at the existing manhole shall be abandoned by a
water-tight means.
The plan proposed a connection to the city water system near the existing sewer connection. The
plan proposes to connect to an existing 6-inch DIP hydrant lead and extend an 8-inch PVC
watermain into the site to serve the dining hall and future construction. The plan also proposed
an alternate connection to the city water system to provide a looped system and an alternative
source if there is a need for maintenance to the piping system. It is assumed the alternate
connection will be bid as a separate item and the owner will determine if the work fits into the
project budget. Engineering recommends the designer re-consider the main water connection
design. There will likely be an increase in head-loss in regards to water flow and pressure for the
service to the site by leaving in a 6-inch connection to the city watermain and then increasing to
8-inch pipe to service the site. The 6-inch pipe connection is approximately 15’ long and the
headloss amount would be expected to be small but it should be recognized and calculated. The
site is within the City’s high water pressure zone which may allow the design to be reasonable.
The 6-inch gate valve should be examined for corrosion and stainless steel bolts when excavated.
If mild steel bolts are found it is recommended the bolts on the existing valve and fittings be
replaced. The existing 6-inch connection to the watermain is DIP. It is recommended an anode
bag and pipe clamp be added to this ductile iron pipe stub if it is left in place. C900 pipe is
required per City standards for all hydrant leads and all bends shall be epoxy coated in order to
resist corrosion. Appropriate traffic control will be required for any work within the public right-
of-way.
Engineering
1. Provide top of wall and bottom of wall elevations for entire retaining wall build, which
includes retaining wall built below grade, i.e. bottom of wall.
2. Salvage existing topsoil and indicate all proposed stockpile location(s) on the plan.
3. Connection to the existing sanitary sewer manhole will require a core drill and
installation of a boot to facilitate a water-tight connection.
4. Appropriate city permits for construction within the public right-of-way shall be obtained
prior to construction. Work within city streets requires a traffic control plan.
5. A preconstruction meeting with Public Works and Engineering shall be scheduled by the
contractor prior to the connection of any public utilities.
6. All call-outs on construction plans that reference a detail shall be updated to incorporate
the sheet the detail is illustrated on and the detail number referenced for construction.
7. Watermain fittings shall be epoxy coated.
8. Hydrant lead pipe shall be C900 PVC.
9. Require Contractor to example the existing 6-inch gate valve identified to remain. If
mild steel bolts are in-place on the valve or as part of the fittings the bolts shall be
changed out with stainless steel or Cor-Blue bolts.
10. It is the applicant’s responsibility to ensure and submit proof that permits are received
from all other agencies with jurisdiction over the project (i.e. Army Corps of Engineers,
DNR, MnDOT, Carver County, MCWD, Board of Water and Soil Resources, MPCA,
etc.).
June 6th, 2019
MacKenzie Walters
Community Development Department
City of Chanhassen
RE: Agency Review Request, Land Development Proposal: 3300 Tanadoona Drive
• This project triggers MCWD’s erosion control and stormwater management rules.
o This project is occurring on a site greater than 5 acres with a less than 40% site
disturbance and a 0-9% reduction in impervious surface. Within our stormwater
management rules, this category of site is required to incorporate BMPs into their design.
• The initial site plan for the dining hall rebuild reduces impervious surface by 0.09% and contends
that this reduction constitutes as ‘better site design’ and therefore their BMP and that they are
exempt from incorporating additional BMPs. This interpretation stems from a portion of our rules
which states “BMPs addressing the potential water resource impacts associated with the proposed
activity must be incorporated to limit creation of impervious surface, maintain or enhance on-site
infiltration and peak flow control and limit pollutant generation on and discharge from the site.
BMPs may include site design, structural and non-structural practices.” [Section 3(d) of our
Stormwater Management Rules]
• MCWD maintains that they need to incorporate a BMP into their site and that ‘better site design’
is not able to constitute the BMP. Section 3(d) does have site design and non-structural BMPs
listen in order to align with the definitions in the MN stormwater manual, however, Staff require
that a structural BMP be incorporated into the plans to fulfill the intent of the rule.
• It is Staff’s interpretation of the Stormwater Management Rule that a better site resulting in 10%
of a reduction in impervious surface would constitute as a non-structural BMP and would be
exempt from Stormwater Management rule requirements. If a site with a reduction in impervious
surface falls into the 0-9% range, they are required to incorporate a structural BMP. Site design
that reduces impervious by this amount cannot count as the BMP because it’s the 0-9% reduction
range that sets the parameter for requiring the BMP.
• They are not required to incorporate a BMP that has a specific treatment scope or capture amount.
MCWD staff recommend that they incorporate an above ground bioretention basin such as a rain
garden. This could also provide an important educational opportunity for campers to learn about a
tangible and specific aspect of environmental stewardship beyond the usual “reduce, reuse,
recycle” and facilitate discussions on the purpose of stormwater capture as well as native
vegetation and habitat for pollinators.
The following notes from my review of the Camp Tanadoona submittal:
• Full Fire Alarm and Full Sprinkler system required in the new structure.
• Hydrant locations are acceptable.
• No parking Fire Lane signs and yellow curb paint will be needed on both sides of all roads under
26 feet in width, which looks to be all roads on the plan. Parking only in designated parking
spaces.
• The gravel roadway will need to support up to 75,000 lbs for fire apparatus. Information will
need to be provided to show this road structure will be sufficient.
• All landscaping, rocks, planters, etc will need to be kept back away from the roadway to allow
for proper turnaround of emergency apparatus. The turn around lane is 12 feet in width, will
need more room on each side as well as the entrance to allow for proper maneuvering.
Don Nutter
Fire Marshal
CITY OF CHANHASSEN
PH. 952.227.1151
MB. 612.268.8515
FX. 952.227.1190
www.ci.chanhassen.mn.us
Hi MacKenzie,
Please see below, I hope this is helpful and not too much information.
1) Staff levels summer/winter
Summer staff – 15-20 total , daily staff (3-4 cars) – Most staff are choosing to live on site whether they work
day camp or overnight camp. There are just a few commuters.
Parking for overnight staff is in the maintenance area which holds 15 cars, or along the curved drive which
holds 17 cars
Directors house, 2 adults, 2 cars - parking holds 3-4 cars if needed for overflow
Fall Winter Spring - 5-10 Staff including director and maintenance staff who parks at the directors house and
maintenance building. The Rest will park in curved parking along the new drive
2) How campers/groups typically arrive
Day camp 120 - 130 campers daily
Day campers arrive daily by parent drop off/pick up loop, they arrive between the hours of 7:15 (early drop)
, regular drop off 7:45 to 8:30AM
Day camp drop off holds 18 cars for quick drop off and pick up, staff escort kids to and from cars and keep
drop off line moving. Lines rarely form.
Overnight camp 100 - 110 get dropped off on Sunday night and picked up Friday night.
Drop off - Parents are directed to park in the open field and escort their kids to their cabins.
Pick up - Parents use the drop off/Pick up loop
3) How event parking works –
Weekly end of the week celebration
Parent parking needs to be for approximately 200 - 225 cars they all fit in the open field area, the drop off
loop and, visitor area and the inside drop of island
Staff stays parked along the curved drive and in the maintenance area
Fall and winter activities generally are for 25 - 150 students who arrive by bus and are dropped off at the
loop. 2 - 6 Visiting parent chaperones will park in visitor area or ride the buses
Staff will park along the curved drive
Weddings in the fall will be maximum 200 guests with up to 100 cars. They will first fill the drop off parking
(18), visitor parking( 7), curved road parking(17) then the field (200+)
CITY OF CHANHASSEN
AFFIDAVIT OF MAILING NOTICE
STATE OF MINNESOTA)
) ss.
COUNTY OF CARVER )
I, Kim T. Meuwissen, being first duly sworn, on oath deposes that she is and was on
June 6, 2019, the duly qualified and acting Deputy Clerk of the City of Chanhassen, Minnesota;
that on said date she caused to be mailed a copy of the attached notice of Public Hearing for
Site Plan Review for Demolition and Reconstruction of then Dining Hall at Camp
Tanadoona, Planning Case 2019-05 to the persons named on attached Exhibit "A", by
enclosing a copy of said notice in an envelope addressed to such owner, and depositing the
envelopes addressed to all such owners in the United States mail with postage fully prepaid
thereon; that the names and addresses of such owners were those appearing as such by the
records of the County Treasurer, Carver County, Minnesota, and by other appropriate records.
Subscribed and sworn to before me
this jjj!'day of :J,lf1f , 2019.
Notary Public
Date & Time:
Location:
Proposal:
Applicant/
Prooerty Owner:
Property
Location:
What Happens
at the Meeting:
Questions &
Comments:
Notice of Public Hearing
Chanhassen Planning Commission Meeting
Tuesday, June 18, 2019 at 7:00 p.m. This hearing may not start until
later in the evenin_g, depending on the order of the agenda.
City Hall Council Chambers, 7700 Market Blvd.
To consider a Site Plan Review for demolition of the existing
dining hall and reconstruction of a new 10,500 sq. ft. dining
hall in the existing location and connect to city water and
sewer, development of an access road and drop off. Zoned
Rural Residential District (RR).
Magney Architecture I Camp Fire Minnesota
3300 Tanadoona Drive, Excelsior
A location map Is on the reverse side of this notice.
The purpose of this public hearing is to inform you about the
applicant's request and to obtain input from the neighborhood
about this project. During the meeting, the Chair will lead the
public hearing through the following steps:
1. Staff will give an overview of the proposed project.
2. The applicant will present plans on the project.
3. Comments are received from the public.
4.Public hearing is closed and the Commission discusses
the J>roject.
If you want to see the plans before the meeting, please visit
the City's projects web page at:
www.ci.chanhassen.mn.us/2019-05. If you wish to talk to
someone about this project, please contact MacKenzie
Young-Walters by email at mwalters@.ci.chanhassen.mn.us or
by phone at 952-227-1132. If you choose to submit written
comments, it is helpful to have one copy to the department in
advance of the meeting. Staff will provide copies to the
Commission. The staff report for this item will be available
online on the project web site listed above the Thursday
prior to the Planning Commission meeting.
NEWI Sign up to receive email and/or text notifications when meeting agendas,
packets, minutes and videos are uploaded to the city's website. Go to
www.ci.chanhassen.mn.us/notlfyme to sign up!
City Review Procedure:
• Subdivisions, Plamed Unit Developments, Sile Plan Reviews, Conditional and Interim Uses, Wetland Alterations, Rezonings,
Comprehensive Plan Amendments and Code Amendments require a public hearing before the Planning Commission. City
ordinances require all property within 500 feel of the subject site to be notified of the application in writing. Any interested party is
invited to attend the meeting.
• Staff prepares a report on the subject application that includes all pertinent information and a recommendation. These reports are
available by request. At the Planning Commission meeting, staff will give a verbal overview of the report and a recommendation.
The item will be opened for the public to speak about the proposal as a part of the hearing process. The Commission will close the
public hearing and discuss the item and make a recommendation lo the City Council. The City Council may reverse, affirm or modify
wholly or partly the Planning Commission's recommendation. Rezonings, land use and code amendments take a simple majority
vote of the City Council except rezonings and land use amendments from residential to commercial/industrial.
• Minnesota Slate Statute 519.99 requires all applications to be processed within 60 days unless the applicant waives this standard.
Some applications due to their complexity may take several months to complete Any person wishing to follow an item through the
process should check with the Planning Department regarding its status and scheduling for the City Council meeting,
• A neighborhood spokesperson/representative is encouraged to provide a contact for the city. Often developers are encouraged to
meet with the neighborhood regarding their proposal. Slaff is also available lo review the project with any interested person(s).
• Because the Planning Commission holds the public hearing, the City Council does not. Minutes are taken and any correspondence
regarding lhe application will be included in the report to the City Council. ff you wish to have something to be included in the report,
please contact the PlanninQ Staff person named on the notification.
Date & Time:
Location:
Proposal:
Applicant/
Property Owner:
Property
Location:
What Happens
at the Meeting:
Questions &
Comments:
Notice of Public Hearing
Chanhassen Planning Commission Meeting
Tuesday, June 18, 2019 at 7:00 p.m. This hearing may not start until
later in the evenina, deoendina on the order of the aaenda.
Citv Hall Council Chambers, 7700 Market Blvd.
To consider a Site Plan Review for demolition of the existing
dining hall and reconstruction of a new 10,500 sq. ft. dining
hall in the existing location and connect to city water and
sewer, development of an access road and drop off. Zoned
Rural Residential District (RR).
Magney Architecture I Camp Fire Minnesota
3300 Tanadoona Drive, Excelsior
A location map is on the reverse side of this notice.
The purpose of this public hearing is to inform you about the
applicant's request and to obtain input from the neighborhood
about this project. During the meeting, the Chair will lead the
public hearing through the following steps:
1. Staff will give an overview of the proposed project.
2. The applicant will present plans on the project.
3. Comments are received from the public.
4. Public hearing is closed and the Commission discusses
the oroiect.
If you want to see the plans before the meeting, please visit
the City's projects web page at:
www.ci.chanhassen.mn.us/2019-05. If you wish to talk to
someone about this project, please contact MacKenzie
Young-Walters by email at mwalters@.ci.chanhassen.mn.us or
by phone at 952-227-1132. If you choose to submit written
comments, it is helpful to have one copy to the department in
advance of the meeting. Staff will provide copies to the
Commission. TJle staff report for this item will be available
online on the project web site listed above the Thursday
orior to the Plannina Commission meetina.
NEW! Sign up to receive email and/or text notifications when meeting agendas,
packets, minutes and videos are uploaded to the city's website. Go to
www.ci.chanhassen.rnn.us/notifvme to sian up!
City Review Procedure:
• Subdivisions, Planned Unit Developments, Site Plan Reviews, Conditional and Interim Uses, Wetland Alterations, Rezonings,
Comprehensive Plan Amendments and Code Amendments require a public hearing before the Planning Commission. City
ordinances require all property within 500 feel of the subject site lo be notified of the application in writing. Any interested party is
invited lo allend the meeting.
• Staff prepares a report on the subject application that includes all pertinent information and a recommendation. These reports are
available by request. At the Planning Commission meeting, staff will give a verbal overview of the report and a recommendation.
The item will be opened for the public lo speak about the proposal as a part of the hearing process. The Commission will close the
public hearing and discuss the item and make a recommendation lo the City Council The City Council may reverse, affirm or modify
wholly or partly the Planning Commission's recommendation. Rezonings, land use and code amendments take a simple majority
vole of the City Council except rezonings and land use amendments from residential to commercial/industrial.
• Minnesota State Statute 519 99 requires all applications to be processed within 60 days unless the applicant waives this standard.
Some applications due to their complexity may take several months lo complete. Any person wishing lo follow an item through the
process should check with the Planning Department regarding its status and scheduling for the City Council meeting.
• A neighborhood spokesperson/representative is encouraged lo provide a contact for the city. Often developers are encouraged to
meet with the neighborhood regarding their proposal. Staff is also available to review the project with any interested person(s).
• Because the Planning Commission holds the public hearing, the City Council does not. Minutes are taken and any oorrespondence
regarding the application will be included in the report to the City Council. ff you wish to have something to be included in the report,
please contact the Plannina Staff aerson named on the notification.
PIN TAX_NAME TAX_ADD_Ll TAX_ADD_L2 TAX_ADD_L3 SHAPE
250092500 THOMAS L & JODI L DYVIG 13418 EXCELSIOR BLVD MINNETONKA MN 55345-4910 7250 HAZELTINE BLVD
254530210 NICHOLAS H STILLINGS 2670 LONGACRES DR CHANHASSEN MN 55317 2670 LONGACRES DR
254530060 JAMES WILLIAMSON 2701 LONGACRES DR CHANHASSEN MN 55317 2701 LONGACRES DR
254530200 SAMANTHA SUZANNE SCHMIDT 2710 LONGACRES DR CHANHASSEN MN 55317 2710 LONGACRES DR
254530050 ASHLEY R VILLELLA 2711 LONGACRES DR CHANHASSEN MN 55317 2711 LONGACRES DR
254530040 YO YEOL PARK 2715 LONGACRES DR CHANHASSEN MN 55317 2715 LONGACRES DR
254530010 JOHN T & VICTORIA RILEY 2717 LONGACRES DR CHANHASSEN MN 55317 2717 LONGACRES DR
254530020 ALLISON M WALSH 2719 LONGACRES DR CHANHASSEN MN 55317 2719 LONGACRES DR
254530030 MICHAEL C CAMNETAR 2721 LONGACRES DR CHANHASSEN MN 55317 2721 LONGACRES DR
252160020 JAMES P LINN 2735 CHES MAR FARM RD EXCELSIOR MN 55331-8041 2735 CHES MAR FARM RD
250570050 WESTWOOD COMMUNITY CHURCH 3121 WESTWOOD DR EXCELSIOR MN 55331-8044 3121 WESTWOOD DR
250092700 GRETCHEN L F STARKS 3301 TANADOONA DR EXCELSIOR MN 55331-8048 3241 TANADOONA DR
250083330 PETERSON REVOCABLE TRUST 3301 TANADOONA DR EXCELSIOR MN 55331-8048 3301 TANADOONA DR
250093000 HERITAGE DEVELOPMENT OF MN INC 422 EAST COUNTY ROAD D ST PAUL MN 55117-1218 -250092600 MINNESOTA CAMP FIRE FOUNDATION 4828 MINNETONKA BLVD# 202 ST LOUIS PARK MN 55416 Null
250083200 MINNESOTA CAMP FIRE FOUNDATION 4828 MINNETONKA BLVD# 202 ST LOUIS PARK MN 55416 3300 TANADOONA DR -250091000 CARVER COUNTY 602 4TH STE CHASKA MN 55318-2102
252160010 CALVIN T FAGLEY 7140 HAZELTINE BLVD EXCELSIOR MN 55331-8056 7140 HAZELTINE BLVD
252160030 JAMES G WAYNE JR 7200 HAZELTINE BLVD EXCELSIOR MN 55331-8035 7200 HAZELTINE BLVD
253360441 DAVID J & STEPHANIE L SEWARD 7205 HAZELTINE BLVD EXCELSIOR MN 55331-8036 7205 HAZELTINE BLVD
254530300 CESAR N DOMINGUEZ 7250 HILLSDALE CT CHANHASSEN MN 55317 7250 HILLSDALE CT
254530310 AHMAD SHALABI 7260 HILLSDALE CT CHANHASSEN MN 55317 7260 HILLSDALE CT
254530290 ANDREW J PAUTZ 7265 HILLSDALE CT CHANHASSEN MN 55317 7265 HILLSDALE CT
254530240 DANS & WENDY L SPILLUM 7270 HILLSDALE CT CHANHASSEN MN 55317 7270 HILLSDALE CT
254530280 ERICK & KELLY J DETTMER 7275 HILLSDALE CT CHANHASSEN MN 55317 7275 HILLSDALE CT
254530230 ANDREA F FLOREK 7298 HILLSDALE CT CHANHASSEN MN 55317 7298 HILLSDALE CT
258350010 JAMES R WIBERG 7301 DOGWOOD AVE EXCELSIOR MN 55331-8015 7301 DOGWOOD RD
258350020 SCOTT A VERGIN 7311 DOGWOOD RD EXCELSIOR MN 55331-8015 7311 DOGWOOD RD
258350030 JUSTIN FAULK 7321 DOGWOOD RD EXCELSIOR MN 55331-8015 7321 DOGWOOD RD
250092000 BRUCE A & YVONNE M GESKE 7325 HAZELTINE BLVD EXCELSIOR MN 55331-8038 7325 HAZELTINE BLVD
251230030 ASHBAUGH FAMILY TRUST 7329 HAZELTINE BLVD EXCELSIOR MN 55331-8038 7329 HAZELTINE BLVD
258350040 MICHAEL P QUIST 7331 DOGWOOD AVE EXCELSIOR MN 55331-8015 7331 DOGWOOD RD
251230020 GREGORY AARON KLINGELHUTZ 7331 HAZELTINE BLVD EXCELSIOR MN 55331-8038 7331 HAZELTINE BLVD
251230010 MARK D BLISS 7333 HAZELTINE BLVD EXCELSIOR MN 55331-8038 7333 HAZELTINE BLVD
258350050 RICHARD C LUNDELL REV LIV TRUST 7341 DOGWOOD RD EXCELSIOR MN 55331 7341 DOGWOOD RD
258350060 MELANIE L REILLY TRUST AGREEMENT 7401 DOGWOOD RD EXCELSIOR MN 55331 7401 DOGWOOD RD
250091900 THOMAS J DOLL PO BOX 148 EXCELSIOR MN 55331-0148 7264 HILLSDALE CT
254530390 LONGACRES HOMEOWNERS ASSN INC PO BOX 542 CHANHASSEN MN 55317
PLANNING COMMISSION STAFF
REPORT
Tuesday, June 18, 2019
Subject Approval of Planning Commission Minutes dated June 4, 2019
Section APPROVAL OF MINUTES Item No: E.1.
Prepared By Nann Opheim, City Recorder File No:
PROPOSED MOTION:
The Chanhassen Planning Commission recommends approval of the minutes from their June 4, 2019 meeting.
ATTACHMENTS:
Planning Commission Summary Minutes dated June 4, 2019
Planning Commission Verbatim Minutes dated June 4, 2019
CHAHASSEN PLANNING COMMISSION
REGULAR MEETING
SUMMARY MINUTES
JUNE 4, 2019
Chairman Weick called the meeting to order at 7:05 p.m.
MEMBERS PRESENT: Steve Weick, Mark Undestad, John Tietz, and Doug Reeder
MEMBERS ABSENT: Mark Randall, Michael McGonagill, and Laura Skistad
STAFF PRESENT: Kate Aanenson, Community Development Director; and Bob Generous,
Senior Planner
PUBLIC PRESENT:
Katrina Fiihr BDH & Young
Jeff Gears BDH & Young
Mike LaQua Bauer Deign Build
PUBLIC HEARING:
CONSIDER A SITE PLAN REVIEW FOR DEVELOPMENT WITHIN THE BLUFF
CREEK CORRIDOR FOR PROPERTY LOCATED AT 8077 CENTURY BOULEVARD
AND ZONED PLANNED UNIT DEVELOPMENT (PUD).
Bob Generous presented the staff report on this item. Commissioner Tietz asked about the
changes in the footprint from the previous application. Chairman Weick opened the public
hearing. No one spoke and the public hearing was closed.
Undestad moved, Tietz seconded that the Planning Commission recommends approval of
the site plan for a 54,276 square-foot, two-story office, warehouse and manufacturing
building, plans prepared by Loucks and BDH & Young, dated 05-03-2019, subject to the
following conditions and adoption of the Findings of Fact and Recommendation:
Building
1. The building is required to have automatic fire extinguishing systems.
2. Building plans must be prepared and signed by design professionals licensed in the State
of Minnesota.
3. Building plans must include a code analysis that contains the following information: Key
Plan, Occupancy group, Type of construction, Allowable height and area, Fire sprinklers,
Planning Commission Summary – June 4, 2019
2
Separated or non-separated, Fire resistive elements (Ext walls, Bearing walls - exterior or
interior, Shaft, Incidental use), Occupant load, Exits required (Common path, Travel
distance), Minimum plumbing fixture count.
4. Detailed occupancy-related requirements will be addressed when complete building plans
are submitted.
5. Structure proximity to property lines (and other buildings) will have an impact on the
code requirements for the proposed building, including but not limited to: allowable size,
protected openings and fire-resistive construction. These requirements will be addressed
when complete building and site plans are submitted.
6. Retaining walls (if present) more than four feet high must be designed by a professional
engineer and a building permit must be obtained prior to construction.
Engineering and Water Resources
1. The applicant shall provide a traffic memo, prepared by a licensed traffic engineer,
evaluating conflicting driving movements with Water Tower Place and the northern
driveway access
2. Vacate drainage and utility easements except the standard 10-foot wide easement
associated with the front of the parcel in addition to the standard 5-foot wide easement
associated with the side and rear portions of the parcel.
3. The wetland, wetland buffer, and the Bluff Creek Overlay District on the site shall be
preserved and protected in perpetuity. Staff recommends that the developer dedicate
those areas to the city to ensure conservation of these critical areas.
4. Provide a permanent 20’ easement over the trail throughout the parcel.
5. The applicant shall remove all existing fence located on the east side of the property.
6. Apply for an Encroachment Agreement for the private sidewalk.
7. Provide top of wall and bottom of wall elevations for entire retaining wall build, which
includes retaining wall built below grade, i.e. bottom of wall.
8. Replace any striping removed in Century Boulevard.
9. All striping and signage shall meet the requirements of the MN-MUTCD manual.
10. Indicate lineal (running) slope design for the trail. Trail slopes shall meet ADA
requirements.
11. Staff recommends the installation of a gate valve downstream of the trench drain to
isolate possible hazardous material from entering the storm system. The operation and
Planning Commission Summary – June 4, 2019
3
maintenance plan for the storm system should include the procedure for this isolation
protocol.
12. Salvage existing topsoil and indicate stockpile location.
13. Water main fittings shall be epoxy coated.
14. Core drill to existing sanitary sewer main will require the installation of a boot at
connection.
15. As the developer will be required to remove all material surrounding the existing public
sanitary sewer manhole that is being proposed for connection, Public Works will inspect
and determine if repair or rehabilitation of the manhole is required (e.g. rebuilding
chimney, installing I/I barrier, etc.).
16. Appropriate city permits for construction within the public right-of-way shall be obtained
prior to construction. Work within city streets requires a traffic control plan.
17. A preconstruction meeting with Public Works and Engineering shall be scheduled by the
contractor prior to working within the public right-of-way and the connection to any
public utilities.
18. Identify stockpile locations on plan.
19. All call-outs on construction plans that reference a detail shall be updated to incorporate
the sheet the detail is illustrated on and the detail number referenced for construction.
20. It is the applicant’s responsibility to ensure and submit proof that permits are received
from all other agencies with jurisdiction over the project (i.e. Army Corps of Engineers,
DNR, MnDOT, Carver County, RPBCWD, Board of Water and Soil Resources, PCA,
etc.).
21. A SWPPP shall be submitted for review that meets the conditions of the NPDES
Construction Permit
22. Provide design details for the stormwater management systems and associated hydrology
models.
23. The applicant shall assess alternatives to conveying stormwater system discharge on and
across City property that will not cause erosion or degradation.
24. The applicant shall demonstrate through modeling that the receiving municipal
stormwater system has adequate capacity to accept the increased drainage volume.
25. Provide a planting and revegetation plan specific for grading within the bluff impact zone
and the wetland buffer.
Planning Commission Summary – June 4, 2019
4
26. Provide boring locations on grading and stormwater utility plan sheets.
Environmental Resources
1. The applicant shall revise the landscape plan to meet minimum requirements for the north
bufferyard. Plantings shall be located between trail and parking lot.
2. The applicant shall protect existing trees to be preserved along Century Boulevard. Tree
protection fencing shall be placed at the dripline or greater distance prior to any
construction activities and maintained until construction is complete. Any trees that die
will be required to be replaced.
3. The trail alignment within the Bluff Creek Overlay District shall be field inspected and
approved by the city prior to any removals and construction activity. No live, significant
oak trees shall be removed for trail construction.
Fire
1. There is only one hydrant on the property. Several are needed to meet minimum spacing
requirements per MN Fire Code.
Parks
1. The developer shall be responsible for planning, engineering, and constructing the
“wetland trail.” Connection points for this new trail shall be the terminus of the Trotters
Ridge trail, the intersection of Century Boulevard and West 82nd Street, and the
intersection of Century Boulevard and Water Tower Place. Bid documents, including
plans and specifications, shall be approved by the Park & Recreation Director and City
Engineer prior to soliciting bids. Project bidding shall occur in a competitive
environment with a minimum of three bids being received. The results of the bidding
process shall be reviewed with the Park & Recreation Director and City Engineer prior to
award. Cash payment for trail construction shall be made from the City of Chanhassen to
the developer upon completion, inspection, and acceptance of the trail.
2. Trail easements within Lot 2, Block 1, Arboretum Business Park 7th shall be dedicated to
the city to accommodate the “wetland trail”.
Planning
1. The applicant shall enter into a site plan agreement and provide the security required by it
prior to receiving a building permit.
2. A separate sign permit application, review and approval shall be required prior to site
sign installation.
Planning Commission Summary – June 4, 2019
5
3. The building needs additional articulation to break up long expansions of wall area on the
north side of the building.
All voted in favor and the motion carried unanimously with a vote of 4 to 0.
APPROVAL OF MINUTES: Commissioner Undestad noted the verbatim and summary
Minutes of the Planning Commission meeting dated May 21, 2019 as presented.
COMMISSION PRESENTATIONS. None.
ADMINISTRATIVE PRESENTATIONS. Kate Aanenson provided the City Council action
update from the May 28, 2019 City Council meeting and discussed future agenda items.
Commissioner Undestad moved to adjourn the meeting. All voted in favor and the motion
carried unanimously with a vote of 4 to 0. The Planning Commission meeting was
adjourned at 7:30 p.m.
Submitted by Kate Aanenson
Community Development Director
Prepared by Nann Opheim
CHAHASSEN PLANNING COMMISSION
REGULAR MEETING
JUNE 4, 2019
Chairman Weick called the meeting to order at 7:05 p.m.
MEMBERS PRESENT: Steve Weick, Mark Undestad, John Tietz, and Doug Reeder
MEMBERS ABSENT: Mark Randall, Michael McGonagill, and Laura Skistad
STAFF PRESENT: Kate Aanenson, Community Development Director; and Bob Generous,
Senior Planner
PUBLIC PRESENT:
Katrina Fiihr BDH & Young
Jeff Gears BDH & Young
Mike LaQua Bauer Deign Build
PUBLIC HEARING:
CONSIDER A SITE PLAN REVIEW FOR DEVELOPMENT WITHIN THE BLUFF
CREEK CORRIDOR FOR PROPERTY LOCATED AT 8077 CENTURY BOULEVARD
AND ZONED PLANNED UNIT DEVELOPMENT (PUD).
Generous: Thank you Chairman Weick, commissioners. As you stated this is a site plan review.
Control Concepts has approximately a 54,000 square foot office/warehouse manufacturing
building that they’re proposing within the Arboretum Business Park which is the property is
located at 8077 Century Boulevard. That’s Lot 2, Block 1, Arboretum Business Park 7th
Addition. It’s just on the east side of Century Boulevard just south of Water Tower Place at that
intersection. The property to the east of it and to the north of it is part of the Bluff Creek primary
zone. As part of this development we will be preserving that area. Again this is site plan review
for two story, 54,276 square foot office/warehouse manufacturing building. Previously, last year
they came in for a two tenant building and they’ve revised their plans and come in with a slightly
smaller building. Now there’s only going one tenant in this building. The property is guided in
the Comprehensive Plan for office industrial uses. It’s zoned planned unit development (PUD)
for the Arboretum Business Park so it has it’s own design standards. Office manufacturing and
warehouse uses are permitted in the PUD district. Again the site plan, the site is approximately 5
acres in size. This development will have 48 percent coverage on the property. The balance will
be open space, green space or other open spaces. As part of this project a trail connection to the
Bluff Creek, there’s a wetland trail that goes around the approximately 100 acres of open space
that’s in to the east of this site. This is the last segment. There is a small retaining wall as a part
of this project. Previously they had a 17 foot tall one. Now they’re down to 4 foot tall one so
they shifted the building farther south and reduced it’s expansion to the east. Building
Chanhassen Planning Commission – June 4, 2019
2
schematics. This is a, how it would appear from Century Boulevard. Two story building. The
main entrance is on the left side of the northwest corner of the building. Building materials
consists of exposed aggregate, concrete panels. The top part is exposed aggregate. The bottom
part would be racked finish and then there’s darker portions of the building that are sand blasted
finish so it helps to give it a little bit of articulation and artistic value so. Again two levels of
offices on the western third of the building approximately will be two story. The rest of it is a
one story structure. The north elevation of the building was something that we were a little
concerned about. The original presentation had a long wall that was broken up by a lot of
architectural detailing. The bottom portion of this shows that they’re adding another area of sand
blasted concrete panels so it will get a darker color out of that and also they’ve combined
groupings of windows up for overstory windows in the warehouse portion of the building. We
believe that this change in the elevation has improved it’s aesthetic value. The dark gray, the
light gray and the medium gray plus the red highlight at the entrance and then if you add in the
landscaping will provide an opportunity to have a pleasing industrial building so again the, like I
said the western portion of the building has office space in it and meeting areas and break rooms
and then the northern part of the eastern side of the building is warehouse space and the southern
part is the manufacturing area. At present the second floor office area is just an open space and
they’re going to use it for storage until they need to expand their offices. As part of the site
again the grading for the trail system into the City’s wetland trail and then they’ve reduced the
grading on the site. There’s a reduction in the amount of retaining walls that will be required on
this development. They’re proposing two access off of Century Boulevard, the northerly one and
the southerly one. This, well it disappeared. This will be a 16 foot drive aisle so it will be for
emergency access and for truck access out of the site. Primary entrance will be in the northwest
corner of the development. Parking is located on both the west, north and there’s a few parking
spots on the east side of the building. The truck docks are located on the east side of the building
so they’ll be screened from public view on Century Boulevard. There’s not a whole lot of issues
in the grading from an engineering standpoint. Landscaping plan, they’re slightly deficit in the
amount of landscaping in this north buffer yard. They’ve been working with the City Forester to
do improvements and so I don’t believe that will be an issue. Again the grading of the grade will
be, create a nice contrast in the building outlay. I should point out that in the southwest corner of
the building they have a patio area for their employees and then again the trail connection.
Access out on the, pedestrian access out onto Century Boulevard and from the main entrance of
the building. Sewer and water services are available in Century Boulevard. They’ll be brought
into the southern part of the building so no problems with that. Storm sewer improvements,
they’re using an underground system for infiltration purposes and for pre-treatment. It
discharges out to the City owns this outlot up on the north side. There is one condition in there
that they look at the discharge point in there and evaluate how that will impact our outlot and the
stormwater. There’s two issues involved with that. Is there sufficient capacity in the existing
stormwater pond for the water that’s coming in and will the discharge from the pipe create a
channelized system and so we want them to evaluate that prior to beginning construction. And
then they have another drain system, underground drain system that connects up to the front and
again it all discharges up to the north. Like I stated before 48 percent of the site will be covered
with hard surface and the balance would be some green area so generally in industrial
Chanhassen Planning Commission – June 4, 2019
3
developments you have a 70 percent coverage so they’re doing very well. And again the
engineering wanted me to put this in. Right now water sheet drains across this property so all the
water that’s coming off this site goes over a large area into the wetland. Into the natural area.
There’s some wetland out there and then the City’s stormwater pond. This is a pond we would
need to have evaluated to make sure that it’s sized correctly to accommodate their development.
And then one other thing that the engineering staff has requested the applicant determine is
there’s a slight offset where the entrance is from Water Tower Place and they want a traffic
engineer to look at it to make sure that traffic movement is efficient and safe for everyone so we,
it’s one of the condition number 1 under the engineering design. With that staff is
recommending approval of the site plan subject to the conditions in the staff report and adoption
of the Findings of Fact and Recommendation. With that I’d be happy to answer any questions.
Weick: Jump in if you have any questions. Anybody? From the presentation. No? Nothing.
With nothing we would invite the applicant or developer to have the opportunity to give a
presentation. Welcome.
Applicant’s Representative: Good evening commissioners. Thanks for your time this evening.
Bob thank you for your presentation. I don’t know if we have a lot more to add. I think Bob did
a very good job of going through there and explaining the design that we’ve proposed here. One
thing I would mention, and you may have said it and I just maybe didn’t catch it is in the revised
elevation that we did submit one of the things we did is we did a little bit of articulation with the
parapet height just to add some visual interest. So I think that would be the only other thing that
I might add. Oh they’re putting it up there. There it is. So being that it’s a warehouse use we
had some limitations in terms of what the actual function is going on the inside and how else we
could achieve articulation so through color choice and creating vertical elements and extending
the parapet and reorienting the windows we were hoping that we’re achieving some articulation.
That’s all I have.
Weick: Thank you. Any questions of the applicant? Wow.
Tietz: How much did you, I know Bob mentioned and I didn’t look back at the old presentation.
What’s the footprint and how much did you reduce the footprint of the building?
Applicant’s Representative: Do you remember that number offhand. I think it was.
Audience: I think it was only about, I think maybe 5,000 square feet on the actual footprint of
the building. But the location of the building and how the parking lot was structured the.
Aanenson: Maybe you can come up to the microphone.
Audience: Yeah so the location of the two tenant building it made it really, really difficult to
achieve you cost effective structure to deal with the 20 foot retaining wall. It just wasn’t
working so we went back to the drawing board. Made it a single tenant. Moved where the
Chanhassen Planning Commission – June 4, 2019
4
loading docks were. You know changed the parking lot to a fire lane. Skeech the building south
as much as we could and that really reduced everything. Just everything just kind of worked out
better so we’re excited about it.
Tietz: Yeah it looks a lot better. Hope it works for you guys.
Audience: So thank you.
Weick: Thank you. At this time we would open the public hearing portion of this item. If
anyone would like to come forward please do so. Seeing nobody come forward I will close the
public hearing and open for commissioner discussion. Sounds like there isn’t much.
Undestad: Like everybody said it’s a much better layout for engineering and it looks like they’re
going to get what they want out of the building so I think it looks nice.
Weick: Yeah.
Tietz: Yeah agree, no problems.
Weick: I mean you had concerns John about just the path right and the retaining wall.
Tietz: …precedent with that huge retaining wall and the path was like here and all the snow was
going to come down on top of the path and you know parks got their, a much better path
connection and there’s a modest retaining wall so there’s some savings there which I’m sure in
construction so yeah it looks like a good use finally of that site.
Weick: Perfect. We could certainly entertain a motion if there’s no other discussion.
Undestad: I’ll make a motion. The Chanhassen Planning Commission recommends approval of
the site plan for a 54,276 square foot two story office/warehouse manufacturing building subject
to the conditions of approval and adopting of the Findings of Fact and Recommendation.
Weick: We have a valid motion. Do we have a second?
Tietz: I’ll second.
Weick: Second from Commissioner Tietz. Any further discussion on the item?
Undestad moved, Tietz seconded that the Planning Commission recommends approval of
the site plan for a 54,276 square-foot, two-story office, warehouse and manufacturing
building, plans prepared by Loucks and BDH & Young, dated 05-03-2019, subject to the
following conditions and adoption of the Findings of Fact and Recommendation:
Chanhassen Planning Commission – June 4, 2019
5
Building
1. The building is required to have automatic fire extinguishing systems.
2. Building plans must be prepared and signed by design professionals licensed in the State
of Minnesota.
3. Building plans must include a code analysis that contains the following information: Key
Plan, Occupancy group, Type of construction, Allowable height and area, Fire sprinklers,
Separated or non-separated, Fire resistive elements (Ext walls, Bearing walls - exterior or
interior, Shaft, Incidental use), Occupant load, Exits required (Common path, Travel
distance), Minimum plumbing fixture count.
4. Detailed occupancy-related requirements will be addressed when complete building plans
are submitted.
5. Structure proximity to property lines (and other buildings) will have an impact on the
code requirements for the proposed building, including but not limited to: allowable size,
protected openings and fire-resistive construction. These requirements will be addressed
when complete building and site plans are submitted.
6. Retaining walls (if present) more than four feet high must be designed by a professional
engineer and a building permit must be obtained prior to construction.
Engineering and Water Resources
1. The applicant shall provide a traffic memo, prepared by a licensed traffic engineer,
evaluating conflicting driving movements with Water Tower Place and the northern
driveway access
2. Vacate drainage and utility easements except the standard 10-foot wide easement
associated with the front of the parcel in addition to the standard 5-foot wide easement
associated with the side and rear portions of the parcel.
3. The wetland, wetland buffer, and the Bluff Creek Overlay District on the site shall be
preserved and protected in perpetuity. Staff recommends that the developer dedicate
those areas to the city to ensure conservation of these critical areas.
4. Provide a permanent 20’ easement over the trail throughout the parcel.
5. The applicant shall remove all existing fence located on the east side of the property.
6. Apply for an Encroachment Agreement for the private sidewalk.
7. Provide top of wall and bottom of wall elevations for entire retaining wall build, which
includes retaining wall built below grade, i.e. bottom of wall.
Chanhassen Planning Commission – June 4, 2019
6
8. Replace any striping removed in Century Boulevard.
9. All striping and signage shall meet the requirements of the MN-MUTCD manual.
10. Indicate lineal (running) slope design for the trail. Trail slopes shall meet ADA
requirements.
11. Staff recommends the installation of a gate valve downstream of the trench drain to
isolate possible hazardous material from entering the storm system. The operation and
maintenance plan for the storm system should include the procedure for this isolation
protocol.
12. Salvage existing topsoil and indicate stockpile location.
13. Water main fittings shall be epoxy coated.
14. Core drill to existing sanitary sewer main will require the installation of a boot at
connection.
15. As the developer will be required to remove all material surrounding the existing public
sanitary sewer manhole that is being proposed for connection, Public Works will inspect
and determine if repair or rehabilitation of the manhole is required (e.g. rebuilding
chimney, installing I/I barrier, etc.).
16. Appropriate city permits for construction within the public right-of-way shall be obtained
prior to construction. Work within city streets requires a traffic control plan.
17. A preconstruction meeting with Public Works and Engineering shall be scheduled by the
contractor prior to working within the public right-of-way and the connection to any
public utilities.
18. Identify stockpile locations on plan.
19. All call-outs on construction plans that reference a detail shall be updated to incorporate
the sheet the detail is illustrated on and the detail number referenced for construction.
20. It is the applicant’s responsibility to ensure and submit proof that permits are received
from all other agencies with jurisdiction over the project (i.e. Army Corps of Engineers,
DNR, MnDOT, Carver County, RPBCWD, Board of Water and Soil Resources, PCA,
etc.).
21. A SWPPP shall be submitted for review that meets the conditions of the NPDES
Construction Permit
Chanhassen Planning Commission – June 4, 2019
7
22. Provide design details for the stormwater management systems and associated hydrology
models.
23. The applicant shall assess alternatives to conveying stormwater system discharge on and
across City property that will not cause erosion or degradation.
24. The applicant shall demonstrate through modeling that the receiving municipal
stormwater system has adequate capacity to accept the increased drainage volume.
25. Provide a planting and revegetation plan specific for grading within the bluff impact zone
and the wetland buffer.
26. Provide boring locations on grading and stormwater utility plan sheets.
Environmental Resources
1. The applicant shall revise the landscape plan to meet minimum requirements for the north
bufferyard. Plantings shall be located between trail and parking lot.
2. The applicant shall protect existing trees to be preserved along Century Boulevard. Tree
protection fencing shall be placed at the dripline or greater distance prior to any
construction activities and maintained until construction is complete. Any trees that die
will be required to be replaced.
3. The trail alignment within the Bluff Creek Overlay District shall be field inspected and
approved by the city prior to any removals and construction activity. No live, significant
oak trees shall be removed for trail construction.
Fire
1. There is only one hydrant on the property. Several are needed to meet minimum spacing
requirements per MN Fire Code.
Parks
1. The developer shall be responsible for planning, engineering, and constructing the
“wetland trail.” Connection points for this new trail shall be the terminus of the Trotters
Ridge trail, the intersection of Century Boulevard and West 82nd Street, and the
intersection of Century Boulevard and Water Tower Place. Bid documents, including
plans and specifications, shall be approved by the Park & Recreation Director and City
Engineer prior to soliciting bids. Project bidding shall occur in a competitive
environment with a minimum of three bids being received. The results of the bidding
process shall be reviewed with the Park & Recreation Director and City Engineer prior to
award. Cash payment for trail construction shall be made from the City of Chanhassen to
the developer upon completion, inspection, and acceptance of the trail.
Chanhassen Planning Commission – June 4, 2019
8
2. Trail easements within Lot 2, Block 1, Arboretum Business Park 7th shall be dedicated to
the city to accommodate the “wetland trail”.
Planning
1. The applicant shall enter into a site plan agreement and provide the security required by it
prior to receiving a building permit.
2. A separate sign permit application, review and approval shall be required prior to site
sign installation.
3. The building needs additional articulation to break up long expansions of wall area on the
north side of the building.
All voted in favor and the motion carried unanimously with a vote of 4 to 0.
Weick: Thank you Bob.
APPROVAL OF MINUTES: Commissioner Undestad noted the verbatim and summary
Minutes of the Planning Commission meeting dated May 21, 2019 as presented.
COMMISSION PRESENTATIONS. None.
ADMINISTRATIVE PRESENTATIONS.
Weick: Kate.
Aanenson: Yes just give you a couple council updates. The one thing that we put in here is
there is a, Solomon Real Estate Group has been working on the Applebee’s site. They bought
that piece of property and they had restrictions on it. There was when that project went in, where
the Walgreen’s was there was a bank so there was a condition put across, there were 4 properties
there. Or actually, yeah 4. The tire store, the Chipotle and Buffalo Wild Wings and then
Applebee’s and then the bank. They all had a common interest in parking and access and so
there was restriction on there for no additional banks even though the bank had left, that
restriction still lies in place so Solomon went to the City Council and said can we have that
restriction removed. They were interested in doing a bank and then the council asked them to
give hard consideration to doing a restaurant so they’ve been working on trying to land a
restaurant. They’ve got an end user in mind but based on some of the parking things, how
Applebee’s operated and then the restaurant they would like to put there, they want additional
parking and in order to accommodate that would have to be across the street. So we’ve been
working with them. The staff. Their engineer. Our engineer working on looking at a site plan
there for additional parking. I’m not sure that would come to you. It’d probably be just
administrative and mostly remodel but what they’re looking at is a significant you know million
dollar reinvestment and remodeling on that site if they can make it go so that’s what the
Chanhassen Planning Commission – June 4, 2019
9
council’s working on right now so stay tuned on that one so. Then for your schedule your next
meeting is June 18th and we have Camp Tanadoona coming on that site plan so they’re redoing
the lodge building so they’re taking that one down so they’re getting through the process now
because as soon as camping season ends, which is I believe Labor Day weekend, they want to
start moving dirt and it’s you’ll see the plans. A very, very nice plan how they’ve redone that
and it’s got a lower level walkout so it accommodates not only if there’s storms or something.
Also the people that stay there that they’ve got a kitchen area for them to eat in too so.
Tietz: Kate I have a question.
Aanenson: Yeah.
Tietz: Are they connected to sewer and water?
Aanenson: Yes that’s a good question. They did connect to sewer a couple years ago. They had
a failing system and we let it go on and I think like 2 years ago we insisted that they had to fix
that so they are connected and with this project they will do water yep. So that was one of the
things that they’ve been raising funds for to get all that to put in place so yeah, thanks for asking.
So that will be on your meeting on the 18th. I don’t think we have anything else on for that
meeting right now. Then there’s no meeting, historically we don’t have on the fourth of July
because there’s so much going on up here and a lot of people are traveling. And then on the 16th
we’re revisiting the design standards which is Chapter 18 of Subdivision and that includes cul-
de-sac lengths and some of those things. The Fire Marshal has commented on that and so you’ll
be reviewing those and giving recommendations to the City Council. In addition to that Xcel has
a tower as a conditional use that is over a certain height and they’ll need that. Just wanted to let
you know we are working through, there’s some properties that are trying to do subdivisions.
Maybe some are up to, you saw one last time a split at your last meeting but these other ones,
maybe it might be 4. Might be 10 lots. They’re all complicated so, so if you’re interested in any
of those some of those may be going to the City Council for work sessions first. Again this ties
into the whole discussion of how we connect streets and the like. When we’ve got a stub street
and we don’t connect them so that will be going on. We also have our annual retreat. Excuse
me tour we’ll be taking with the other commissions so I think one of the places we want to be
able to stop at, and they should be far enough along that we can potentially get in the building
and that would be the Venue so we can get inside that building so we’ll work on that but if
anybody has something that they’d really like to see let me know. The last update I give you is
we have been working with Avienda. We did have a meeting with them again last week. They
did get their NPDES permits. They are getting their watershed approvals so they’re working to
proceed to grading. I know I keep saying that and lose some credibility there so hopefully by the
end of July so everything’s lining up that way that they would start grading in July.
Tietz: So the crop that’s planted.
Chanhassen Planning Commission – June 4, 2019
10
Aanenson: It’s just a question. I’ve gotten a lot of calls on that too. So I think it depends on the
dollar so that would be compensated so yeah. I think there’s also someone that enjoys planting
so put that out there so. So if you’re on the tractor you might as well keep, so I’ll keep you
posted on that but right now I’ll give you a heads up on that one too. Oh thank you. There is a
variance appeal on your item that was heard last time. Both parties appealed. The applicant and
the neighbors so that is going to the City Council on the 10th. So they have wo unhappy parties
so. So that’s it so.
Tietz: I have one question Kate.
Aanenson: Yeah.
Tietz: You mentioned parking at the old Applebee’s site. I read with interest the council work
session on the proposed breweries on that site that was going to be a dental office.
Aanenson: Yes.
Tietz: How does parking work on that site and how does access work for all those folks that
might want to go to the brewery?
Aanenson: Correct. So they have to do a traffic study too so there’s a purchase agreement put
together. That was one of the things they have to look at. One was a little bit smaller. Had more
parking than the other one. One user had probably little bit more robust plan so I think the
council kind of went with the smaller plan but they have to demonstrate how that works too so
that’s great.
Tietz: I just remember that dental office that was really kind of a contorted parking situation
with a kind of spearhead site.
Aanenson: Correct.
Tietz: And it wasn’t, you know there was land but not very developable.
Aanenson: Right. So it will be a challenge. I think long term wise we looked at other ways to
service that. You know we’ve talked about if the, if we could connect where we come in to the
restaurant, Potbelly and the like if that would come up where Valvoline is or one of those, you
could make that street connection there too and try to eliminate some of those turn movements.
It’s difficult there because of the train tracks there so providing some additional, just better sight
lines and some of those sort of things so we’re looking at that too so you guys will see that
project for sure. So that will come in for review so they’re working on just putting together a
more detailed business plan and some of their landscaping detail and so they’re using the same
architect on that one that Camp Tanadoona is so it’s a nice looking building. I think that was one
of the goals too that we had. A nice presence because that’s a gateway to downtown so. Just
Chanhassen Planning Commission – June 4, 2019
11
status on projects. As you can see the Venue is zipping right along and now the Aldi’s has got
their steel up and they’re both hoping to open by September and if you’ve gone by Lake Riley
Crossings the senior housing, that’s coming right along too so both those projects are kind of
wrapping up so starting some other ones here pretty soon so that’s all I had.
Tietz: Now that you mentioned senior housing I just drove by the other day on 7 and 41, I
noticed the Beehive is now a…
Aanenson: Yeah they bought their franchise with Beehive out of Utah so now.
Tietz: So now it turned into Pendleton?
Aanenson: Yep. And they also wanted to expand. I think they wanted to just preserve most of
that area that was Mr. Gowan’s property with the hostas yep. They had talked about that and that
they might do a better regional ponding there so they would add on that third phase and then do a
significant regional pond that which they could use for all that area just south of 7. That drains
that way. Yep, yep. And then also I don’t know if you’ve noticed the North Coop is open now.
That new restaurant there. You can see it was a remodel. It’s right on the corner of 7 and 41 just
right across from the middle school there so they just opened last week or the week before, yeah
so doing very well. They have long waits for dinner so. Yeah.
Tietz: Good.
Aanenson: Yeah, that’s all I had Chair.
Weick: Thank you very much. I would entertain a motion to adjourn.
Commissioner Undestad moved to adjourn the meeting. All voted in favor and the motion
carried unanimously with a vote of 4 to 0. The Planning Commission meeting was
adjourned at 7:30 p.m.
Submitted by Kate Aanenson
Community Development Director
Prepared by Nann Opheim
PLANNING COMMISSION STAFF
REPORT
Tuesday, June 18, 2019
Subject City Council Action Update
Section ADMINISTRATIVE
PRESENTATIONS
Item No: G.1.
Prepared By Jean Steckling, Senior Admin. Support
Specialist
File No:
ATTACHMENTS:
City Council Action Update
City Council Action Update
MONDAY, JUNE 10, 2019
Approve Subdivision with Variance for Lotus Woods (formerly Eidsness)-Approved
Consider Request for Variances for Lot Cover, Lake Setback and Front Yard Setback for Property
Located at 3617 Red Cedar Point-Tabled to 6/24/19
The minutes for these meetings can be viewed from the City’s website. Go to
www.ci.chanhassen.mn.us, and click on “Agendas and Minutes” from the left-side links.
g:\plan\forms\development forms\city council action update.docx