Loading...
Response Letter 7-30-19SATHRE.BERGQUIST, INC.AUG 02 20t9 150 SOUII{ BROADWAY WAYZAIA, MINNESOTA s5391 TEL:(952)47tu&m FAX:(952X74104 wEB:wwW.SAI1IRE.C0M CITY OF CHAIiIHASSEN RECEIVED CHANHASSEN PLAJil'llilG DEPI Bob: July 30,2019 Robcn CeDcrous, AICP Senior PlalD€r City of Chanhassen Phone:952.227.1131 wrrw.ci.charhass€o.m&us Parcel: Moon Vallev Pit We have preparcd a line by tine rEsponse to yorr egtail. Please let us know ifyou have any questioDs. a. Apply for oew IUP with Developent Rwiew Ap?licatioD witb your revised proposal. rru$.ci.chanhassen.mn.usDoctunentCentcrAy'ie* 1488 Response: See attached Permit. I ) O,Uiog -oaiti*" $rv€y with crrrrot topogr+hy Response: See attached pages I through 4 prepared by Sathre Bergquist, Inc. 2) n*b"a crrairg, Ercion codol od storn wrtrr Ple Response: See attached pages 5 through 8 prepared by Sathre Bergquist, Inc. 3 ) S*fr". watrr fomto" Prevenrio Plo, SWPPP. Response: See attached Storm Water Pollution Prevention Plan prepared by Merjent, Inc. 4) n"***io" rm Response: See attached page 9 prepared by SCT.I{NET Sathre Bergquist, Inc 5) fm to "aa.o "p"ot line stockpilc Response: The lime will be backfilled in the excavation as needed. The lifts will be no more than 12". A minimum of 3 feet of overburden will be placed on top of the spent lime. 6) tm ror "quip"m rtmora Response: Terry Brothers plan to store their equipment on site for the near future. The equipment will be used intermittently and as needed. The temporary staging area for Ames Construction will be used until the highway construction is complete. b, cb6€ w op€idin l) nr"t raO-t qrt "-."t" Response: a. All slopes to be seeded and blanketed in accordance with the Restoration Plan. b. Atl slopes to be seeded h accordance with the Restoration Plan (?age 9) and by the direction ofJill Sinclair. Environmental Resources Specialist, Cilv of Chanhassen 952-227-1133 c. The East side shall be completed and fully resorted prior lo the start ofthe $adilg ofthe East side. 2) sto.. w*rr sy.r. Response: The pit currently drains to a large pond in the center ofthe site. A perforated riser pipe with a valve is the current outlet. In typical rainfall events, water is not discharged from the pond. In large rain events, the valve is opened and the stonn water is discharged to a sedimentation basin. The sedimentation basin outlets under the highway in an existing culvert. When the site begins final restoration a permanent outlet structure will be designed. C. Permits: Copy of permits tom DN& MPCA l,owcr Miancsota Watcrshod, Cancr County, gtc. Response: We currently have an MPCA Industrial Storm Water Permit. The permit is in the SWPPP. I have emailed copies of the plans and have inquired with the DNR, Lower Minnesota Watershed, and Carver County. They have been contacted in the past and have stated that permits were not required. If you have ay qwstions, coomenls, or concems, pleag€ cootact me "t95247660W o, 612- 741-9830. Daniel L. Schmi<h PE. SATHRE.BERGQUSI INC. Date CITY OF CHANHASSEN CARVER AND HENNEPIN COLNTIES 1. Permit. Subject to the terms and conditions set forth hereirq the City of Chanhassen hereby gmnts an interim use to grade portions ofthe Moon Valley Aggregate site. 2. Prooertv. The permit is for the following described property ("subject property") in the City of Chanhassen, Carver County, Minnesota: All that part of Govemment Lot l, Section 36, Township I 16, Range 23, Carver County, Miruresota, which lies northerly of Flying Cloud Drive; and, 27 acres in the west half of northeast % south of the railroad and north of Flying Cloud Drive, Section 36, Township 116, Range 23, Carver County, Minnesota; I acre in Govemment Lot 3 north ofFlying Cloud fhive being that part ofthe northwest % ofthe northeast % and the northeast % of the northwest % in Govemment lots 2 & 3, Section 36, Township I 16, Range 23, Carver County, Minnesota. 3. Conditions. The permit is issued subject to the following conditions b) Permis fiom the appropriate regulatory agency must be obtained; including but not limited to the Minnesota Pollution Control Agency, Lower Minnesota River Watemhed District and Carver Coturty. c) The applicant must submit a phasing plan.This information shall be submitted annually a minimum of 30 days before the anniversary of City Council approval. d) An administration fee shall be collected each year and shall be based on the number of cubic yards of material being graded as identified in the phasing plan. The fees are taken from the Uniform Building Code Appendix, Chapter 33. e) The applicant must submit a summary of the quantity of material that has been removed from the site and the quantity of remaining material. This information shall be submitted annually a minimum of 30 days before the anniversary of City Council approval. f) Grading on the east side of the creek must cease at or above the 756-foot contour; this must be reflected on the next plan submittal. INTERIM USE PERMIT #?????? a) The interim use permit shall be approved for a period often (10) years from the date ofCity Council approval. The applicant will need to request a formal extension 60 days prior to the expiration date ofthe interim use permit. I g) The applicant must provide the City with a cash escrow or letter of credit in the amount of 1 10% ofthe construction costs for the appropriate phase ofthe gmding operations to guarantee erosion control measures, site restoratioq and compliance with the interim use perrnit The amount of the security shall be established annually and shall be submitted by the armivenary date of City Cormcil approval. h) Permitted hours of operation will be 7:00 a.m. to 6:00 p.m., Monday through Friday, and 9:00 a.m. to 5:00 p.m. on Saturday with no work permitted on Sunday or legal holidays. i) Grading on the east side ofthe creek must cease at or above the 756-foot contourand all disturbed soils must be permanently stabilized and restored in accordance with the Restoration Plan as specified in the Grading, Drainage, and Erosion Control Plan dated July 29,2019. j) If the excess material is hauled to another site in Chanhassen, a separate grading permit will be required for the other property. k) Type II, reinforced silt fence must be installed and maintained at the northwest comer of project, and in all areas specified in the Grading, Drainage, and Erosion Control Plan. Type II silt fence must be reinforced using sediment logs, wire-backing, or other effective Best Management Practice. l) Exposed, rmworked soils must continue to be stabilized with temporary or permanent stabilization BMPs in accordance with the construction sequencing as stated in the Grading, Drainage, and Erosion Control Plan. m) Exposed, unworked erodible soils with positive slopes mus continue to be stabilized using erosion control blanket or altemate effective BMPs according to the Grading, Drainage, and Erosion Control Plan. n) All other sediment and erosion control measures must be in place and maintained according to the Grading, Drainage and Erosion Control Plan dated July 29,2019. o) , and phasing plan to be submitted by applicant. p) Tree preservation fencing must be installed at the edge of grading limits. q) No tree removal is allowed beyond the 756-foot contour on the east side of the creek. s) All restored slopes shall be planted with trees. The trees shall be bare-root, native species, one-half to one-inch in diameter, five to ten-foot spacing in a random pattern from the top to the toe of the slope. The approximate number of trees needed is 20,000 (7' x 7' spacing). 2 r) MnDOT Native Mix 340 must be used for the seeding. Spacing (feet)Trees per acre 5x5 1,742 6x6 1,210 7 x7 889 8x8 68t 10x10 436 t) A driveway access to 230 & 240 Erie Avenue must be maintained at all times during construction. u) Submit a plan showing a permanent driveway access alignment for 230 & 240 Erie Avenue. v) Grading west 6f fts rrnnamed sreek shall not commence rmtil the grading on the existing mining operation and site restoration has been completed east ofthe creek. 4. Termination of Permit The City may revoke the perrnit following a public hearing for violation ofthe tenns of this permit. 5. Lapse. Ifwithin one year of the issuance ofthis permit the authorized construction has not been substantially completed or the use commenced, this perrnit shall lapse, unless an extension is granted in accordance with the Chanhassen Zoning Ordinance. 6. Criminal Penaltv. Violation of the terms of this conditional use permit is a criminal misdemeanor. Dated:Julv 30,2019 ) CITY OF CHANHASSEN Mayor By: City Manager STATE OF MINNESOTA ) (ss COUNTYOFCARVER ) The foregoing insrument rlas acknowledged before me this day of, 2019, by Mayor, and City Manager, of the City of Chanhassen, a Minnesota municipal corporatioq on behalf of the corporation and pursuant to authority granted by its City Council. Notary Public DRAFTEDBY: City of Chanhassen 7700 Market Boulevard P.O. Box 147 Chanhasseq MN 55317 (9s2)227-1100 By: 4