Loading...
Certified Variance Resolution Document#: A681338 Date: 08-13-2019 Time: 09:38 AM Pages: 5 Recording Fee: $46.00 Paid on 08-13-2019 County: Carver State: MN Requesting Party:CAMPBELL KNUTSON PA Kaaren Lewis County Recorder CERTIFICATION STATE OF MINNESOTA ) ) ss COUNTY OF CARVER ) I, Kim T. Meuwissen, duly appointed and acting Deputy Clerk for the City of Chanhassen, Minnesota, do hereby certify that I have compared the foregoing copy of Resolution No. 2019-11 "Approving a Final Plat with a Variance Creating Comer Addition" adopted by the Chanhassen City Council on February 25, 2019 with the original copy now on file in my office and have found the same to be a true and correct copy thereof. Witness my hand and official seal at Chanhassen, Minnesota, this 27th day of February, 2019. ill l . '��_ (,I Ki T. Meuwissen, Deput erk / 0‘;`:- ; u ; 7 .s j Qjs w• .',Ay/ om.`.�'` i '.......... ,A ' CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: February 25,2019 RESOLUTION NO: 2019-11 MOTION BY: Campion SECONDED BY: Coleman A RESOLUTION APPROVING A FINAL PLAT WITH A VARIANCE CREATING COMER ADDITION WHEREAS, Colson Custom Homes has requested a subdivision of the property located at 3800 Red Cedar Point Road into two single-family lots with areas of 23,139 square feet and 23,140 square feet; and WHEREAS, the proposed subdivision complies with all requirements of the Chanhassen City Code. WHEREAS,the Chanhassen Planning Commission held a public hearing on February 19, 2019 and found the plan consistent with the Chanhassen Comprehensive Plan and Chanhassen Zoning Ordinance and recommended approval of the subdivision. NOW,THEREFORE,BE IT RESOLVED that the Chanhassen City Council hereby approve the final plat with a variance for Comer Addition, creating two lots subject to the following conditions: Building: 1. Demolition permits required for the removal of any existing structures. 2. A final grading plan and soils report must be submitted to the Inspections Division before permits can be issued. Engineering: 1. Lot 1 shall have a 10-foot drainage and utility easement along its front lot line (northernmost lot line)prior to recording of final plat. 2. An accurate soils report indicating soil conditions, permeability, slope, and groundwater elevations shall be provided upon the submittal of grading permits. 3. The contact information for the responsible person(s) for erosion and sediment control best management practices shall be updated on the plans prior to issuance of grading permits. 4. Review and approval of the use of silt fence and bio rolls for perimeter control shall be conducted by the city prior to the issuance of grading permits. 1 5. Add city Detail 5302B—Erosion Control for Individual Lots,to the detail sheet. 6. If the 1974 sanitary and water services stubbed off Red Cedar Point Road that will service Lot 2 are inadequate for use, they shall be abandoned in accordance with city standards and re-installed. 7. The developer of Lot 2 will be required to pay all required city WAC and SAC fees associated with service connections for the rate in force at the time of building permit application. Environmental Resources: 1. Any trees removed in excess of what is shown on the grading plan dated 12/5/18 will be required to be replaced at a ratio of 2:1 diameter inches. Additionally, a birch and maple on Lot 1 are not shown on the tree inventory, but are larger than the 10"dbh minimum for the inventory. They will be preserved on Lot 1. 2. Tree preservation fencing shall be installed around existing trees to be saved prior to any construction activities and remain installed until completion. Fire Department: 1. The home on Lot 1, Block 1 must be addressed off of Hickory Road. Parks: 1. Park dedication fees shall be paid for one lot at the rate in force at the time of final plat approval. Planning: 1. An escrow of 110 percent(110%) of the estimated removal cost for the concrete pad on the interior lot line between Lot 1 and Lot 2 must be received, and the concrete pad removed within four months of the approval of the final plat. Water Resources: 1. All permits and approvals must be received from other regulatory agencies prior to issuing permits. 2. The applicant shall pay the SWMP fee for 1.06 acres at the rate in force at the time of final plat approval. 2 Passed and adopted by the Chanhassen City Council this 25th day of February 2019. ATTEST: li :"."4"1—r1/144 odd Gerhardt, City Clerk/Manager E ' e Ryan, Mayor YES NO ABSENT Ryan Campion Coleman McDonald Tj ornhom 3