Loading...
02-118100 - The Park 2nd Add Grading - EstimateItem # Contract Item Unit Unit Price Quantity Amount G-1 Mobilization LS $5,000.00 1 $5,000.00 G-2 Perimeter Erosion Control Fence (Steel Posts) LF $1.65 3,591 $5,925.15 G-3 Perimeter Heavy Duty Erosion Control Fence (Wire Backed) LF $2.25 1,266 $2,848.50 G-4 Secondary Erosion Control Fence (Around Pond) (Steel Posts) LF $1.65 501 $826.65 G-5 Rock Entrance EA $1,750.00 1 $1,750.00 G-6 Clear and Grub AC $3,550.00 15.9 $56,445.00 G-7 Common Excavation CY $1.87 113,080 $211,459.60 G-8 Subgrade Correction (Measured) CY $1.95 78,644 $153,355.80 G-9 Common Borrow (On Site) CY $2.30 45,676 $105,054.80 G-10 Topsoil Re-spread CY $1.95 21,247 $41,431.65 G-11 Infiltration Basin Media (In Place Volume) CY $30.00 72 $2,160.00 G-12 Sand for Infiltration Basin CY $10.00 72 $720.00 G-13 Mobilize for Seed and Mulch LS $1,000.00 1.0 $1,000.00 G-14 Permanent Seed & Mulch (MN Mix 25-131) AC $1,150.00 24.0 $27,600.00 G-15 Temporary Seed and Mulch (MN Mix 21-111) AC $540.00 24 $12,960.00 G-16 Basin Seeding ((MN Mix 35-241) - Bench to HWL SY $0.27 516 $139.32 G-17 Upland Open Space Seeding (MN Mix 36-211) SY $0.28 8,105 2269.4 G-18 Erosion Control Blanket (Cat. 3) SY $1.10 14,975 16472.5 $647,418.37 Total Grading and Site Estimate Amount $647,418.37 TOTAL GRADING ESTIMATE AMOUNT $647,418.37 $647,418.37 Section A - Grading & Miscellaneous Sitework Total Grading & Miscellaneous Sitework Estimate Amount Bid Estimate CHANHASSEN, MN November 1, 2019 ENGINEER'S ESTIMATE FOR GRADING AND EROSION CONTROL THE PARK PHASE 2 GRADING IN