Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
05-20-98 Agenda and Packet
FILE AGENDA CHANHASSEN PLANNING COMMISSION WEDNESDAY, MAY 20, 1998 at 7:00 P.M. CHANHASSEN CITY HALL, 690 CITY CENTER DRIVE CALL TO ORDER PUBLIC HEARINGS 1. Contractor Property Developers Company request for rezoning of 16.4 acres from RR, Rural Residential to RSF, Residential Single Family; preliminary plat of 16.4 acres into 17 single family lots with variances. The property is located on the south side of Lake Lucy Road just north of Lake Lucy,Lake Lucy Estates. 2. Eden Trace Corp. request for site plan review for a 15,000 sq. ft. office/warehouse/manufacturing building on property zoned PUD and located at the southwest corner of Lake Drive West and Audubon Road on Lot 1, Block 1, Chanhassen Business Center 4`h Addition, Quantum Controls, Inc. 3. Coffinan Development Services, Inc. request for preliminary plat approval for 8 single family lots with variances to the front yard setbacks and wetland setbacks and 2 outlots and a wetland alteration permit for wetland mitigation on property zoned RSF,and located just south of Sandpiper Trail and west of Piper Ridge Lane. This project was approved in 1995 as Olivewood. NEW BUSINESS OLD BUSINESS APPROVAL OF MINUTES ONGOING ITEMS OPEN DISCUSSION ADJOURNMENT NOTE: Planning Commission meetings are scheduled to end by 10:30 p.m.as outlined in official by-laws. We will make every attempt to complete the hearing for each item on the agenda. If,however,this does not appear to be possible,the Chair person will notify those present and offer rescheduling options. Items thus pulled from consideration will be listed first on the agenda at the next Commission meeting. C 1 , C I TY F O PC DATE: 5/20/98 CC DATE: 6/8/98 UANHASSE +1 CASE #: 95-3 SUB 95-1 REZ ... .. . _ : : Al-Jaff:v STAFF REPORT PROPOSAL: 1) Rezoning of 16.40 acres of property zoned RR, Rural Residential to RSF, Residential Single Family 2) Preliminary Plat-to Subdivide 16.40 Acres into 17 single family lots, Lake },... Lucy Estates Z 3) A Variance to Allow a 20 Foot Front Yard Setback, a 10%street grade, and a 50 Foot Wide Right-of-Way, a 10 foot side yard setback on a flag lot, and V five homes to be served via a private street. -J LOCATION: South of Lake Lucy Road and North of Lake Lucy CL a_ APPLICANT: Loscheider Custom Homes,Inc. Robert Christiansen Brian and Nancy Tichy 1607 Florida Ave. N. 1511 Lake Lucy Road 1471 Lake Lucy Road Golden Valley, MN 55427 Chanhassen,MN 55317 Chanhassen.MN 55317 (612)546-8699 PRESENT ZONING: RR.. Rural Residential District ACREAGE: 16.40 acres DENSITY: 1.04 Units per Acre-Gross 1.87 Units per Acre-Net • ADJACENT ZONING AND LAND USE: N - RSF, Shadow Ridge Subdivision S - Lake Lucy E - RR, Rural Residential District W- RR, Rural Residential District WATER AND SEWER: Available to the site. PHYSICAL CHARACTER.: The site contains two single family residences. The majority of the site is wooded. It contains two wetlands. The topography varies significantly throughout the site. (n 2000 LAND USE PLAN: Residential-Low Density AZA" >-,.,. •r - - ,_:...1,--,-; - ...ux.....s.y ..,,u•+- ,... ..�. • • E .-.., "4 o 0 O O O o 0 o p O Q 0 o o Q 0 O O TO o O ko • ca°` , 'll. r'2 _.,tiUco U. - As..........=•......... Lilac Lane ���� r1�---�s`.r•• ,. 3 3.. t r creek_ •I •'^J`,Q. `otCO 'RptFs` • -r. 1 Koehnen Cit Edits v € . r • ,n %.,--:), _ YAshtxCf .- 6. • -- 1 t Lo • f `/ �� A6 `. • .. �r_West 63rd Sc `_ f } - e -- Q �e. ,= =- . rfit _ k_ .•.., - - pleasant- , • • �- -mane --.. -o- _. - —' . -. . '.' .Z,..--- • . .1 , _I -c.- -7,*:71PItc-- --. ,‘: - 4' .' pod i• 1 , ._-.___-. - ` .,,Y.'"-- �.J ',"> N. •V ' '. I ! r--I i___-,`" .' 1-'' '` I" .r •` j � - y V- 13±+-'. p �(�' t- ' � Crt dt` `� s -y S.T,ci-. ". r 'N" '' C}I!•fltl$ 1�.. 111 t• r'{r�rverBe t!+� l:' / , . •3* .�"�„y'••• v.* r----T-� _—— — --...--..-2,---1,1- p Z1012II� '. , 2/4 1.--1.44,c. ;. lap! NI tv' ' • Vim- 1 r----';-�---:•:-.K, -4 --g-4 ..i ,--4-----",--, , i , \\\i \ -. ``J 9/^ ,' •' r} ,�g�.�` �;, .. Carver Beach; —r ,- 5.11,5,t,- -,--,--;!--7– --,.-----' . ,, i ..‘ i , , , 1_-„.; dr N 1 • • • i .til..__ ,---.,--4, - i 0----i-r-c'- . ' \ . •. • '-‘4"17::•;.- �t w r mayT— 1` /' / Qr' �\ 54- -i,`I c .. `i .'i.,-132,s,.//y{ '�_�' .'; -A----1`- --7. v yJIGKttf A_�,yy� ~'' \ f it , i- `y ma - `t` •// " ` I �; �� V`_ •.r+ HN I .• ✓ i • .J1==S� ' iliwi ce•.. tsg f� C.'. •4:- .., i --1 ^S ---N 1 - � �'� "r5 5 'S.Y•V--ti- ; �r-- ",��.`* t '� 1 f "•" A/� . s. •• •• !l •! 1121 tPS5 a.t>.,�. 1 rizoir , .,..j. 210. tr - 3 - -'a 'Pdrlt+�C •i Tl 1 y' SW,�IC‘ -4....."4"- -7,", .' _•."_L. ' '_Crt•w h. +, ;.t r - - . _ '';;;45.•&%,� , -tJtiCa ane - _ ,- ,� - r V� -..• '•''T-•,i.7..=.;:`,,,,„%•;:•..... �m} t. r s - C1tCiC-t-t.'- .z r i,' e r' �@ p -. i r •Y = Greenwood ------ ?".`, -- °L :te •� a. � • _Butte Cowl : Pass'-,-.-CQrnest° es; Shores - - ' ' ----� ,= - �< Lake Lucy Estates May 20, 1998 Page 2 PROPOSAL/SUMMARY The applicant is proposing to subdivide 16.40 acres into 17 single family lots. The property is zoned RR, Rural Residential and the proposal calls for rezoning it to RSF, Residential Single Family. The average lot size is 31,986 square feet with a resulting gross density of 1.04 units per acre. All lots meet the minimum requirements of the zoning ordinance as relates to the area, width and depth. The site is located south of Lake Lucy Road and north of Lake Lucy. Access to the subdivision will be provided via a public street/cul-de-sac south of Lake Lucy Road to service the proposed lots, as well as internal private streets. The majority of the site is wooded with a diverse range of species and ages. According to the proposed plans, the minimum tree canopy to be maintained is 43%or 4.84 acres. Additional tree replacement will be required. Some of the parcels are shown as custom graded lots. The type of future home is not shown on the plat. This will result in additional tree removal and staff can not assess the extent of grading impact on the trees without this information. This application appeared before the Planning Commission and City Council in 1995 under a different applicant(Mr. Michael J. Byrne). The 1995 plan reflected 23 homes and, after numerous revisions, resulted in 18 home sites, massive retaining walls,mass grading in some areas,and excessive tree removal. The applicant eventually withdrew his application. Loscheider Custom Homes, Inc. decided to purchase and subdivide the property. The new proposal contains an in depth analysis and comprehensive forest management plan for the site. This plan does not attempt to preserve any more or less canopy than the previous plan, however,the applicant has invested time and effort in preparing a forest management plan for the site and the future development. The overall number of lots has been reduced from 18 to 17 single family lots. Staff must point out that Lot 6, Block 2,has enough area to be further subdivided in the future and the development could result in 18 lots. This will also translate into additional grading and tree loss. Due to the topography and tree coverage on the site, staff recommended the applicant utilize private driveways, increased number of homes to be served via private driveways, reduced front yard setbacks, narrower right-of-way and steeper grades on the street to minimize impact on the site. The 20 foot front yard setback variances on three of the lots is promoting the preservation of trees and wetlands. The ordinance requires a 30 foot front yard setback. We believe it is warranted. The 10 foot side yard setback on Lot 6, Block 2,will minimize impact on trees located to the west of the lot. The zoning ordinance requires a 20 foot side yard setback on flag lots. The street grade on Lakeway Drive is 10%. The ordinance allows a maximum grade of 7%. The public right-of-way is 50 feet wide and the ordinance requires a minimum of 60 feet. This variance will minimize grading. The last variance deals with the number of lots served via a private driveway. Currently, there are three lots proposed to be served via Lakeway Court. The property located to the east of the subject site has the potential for subdivision and could result in two additional lots. The only access to the two potential lots is via Lakeway Court. The total number of lots that will be served via the private driveway is five. Requiring the applicant to build a City Street will result in excessive grading and loss of mature trees. To date, the City has not approved such a variance, and though staff is cautious not to set a precedent, we believe in this case the variance is warranted. It is highly unlikely that we will encounter a second request similar to this one. Lake Lucy Estates May 20, 1998 Page 3 The property to the west of the subject site has the potential for subdivision also. The only access to this property will be via the subject site. The applicant is stubbing Lakeway Lane to the edge of the westerly property line. The rezoning of the property from Rural Residential to Residential Single Family District is in compliance with the comprehensive plan and staff is recommending approval of it. Utilities must be extended over the property located to the west of the subject site. The applicant must acquire all necessary easements from the owners of the property. The development contains two existing home sites(Tichy and Christensen). Both of these home sites are currently on their own well and septic system. The existing home on the westerly portion of the site is proposed to be removed. The other home(Tichy) is proposed to remain on Lot 4,Block 3. Both on-site well and septic systems will have to be abandoned in accordance with the city and sate health codes in conjunction with this development. The well and septic on the Christensen site will have to be abandoned in conjunction with site grading. The well and septic system on the Tichy property (Lot 4, Block 3)may be delayed since the construction activities appear not to impact the systems. However, city ordinance requires properties within 150 feet of a municipal sewer system must be connected to the City's system within 12 months after the system becomes operational. Connection to city water is not required until the well fails. Staff is recommending approval of this application with variances and conditions outlined in the staff report. BACKGROUND This application first appeared before the Planning Commission on April 5, 1995. The subdivision included 23 single family lots but through work with the applicant,the total number of lots dropped to 18 single family lots (copy attached). The application included the following requests: 1. Rezoning of 14.53 acres of property zoned RR, Rural Residential to RSF, Residential Single Family 2. Preliminary Plat to Subdivide 14.53 Acres into 18 single family lots and two outlots, Lake Lucy Estates 3. A Variance to Allow a 20 Foot Front Yard Setback, a 10% street grade, and a 50 Foot Wide Right-of-Way, a 10 foot side yard setback, and five homes to be served via a private street. Numerous issues were raised by the Planning Commission, residents,and staff. These issues included excessive grading, tree loss, environmental concerns,and variances. The applicant listened to the issues and attempted to address them through a revised plan. The application reappeared before the Planning Commission on May 3, 1995. At that meeting, staff prepared a sketch plan to act as a guideline to improve the plat. The recommendation in the report was based on the layout prepared by staff rather than the plan prepared by the applicant. The Planning Commission unanimously agreed that the plan was not ready to be sent to City Council. Action on the application was tabled and the applicant was directed to modify the plans and incorporate recommendations made by staff. Lake Lucy Estates May 20, 1998 Page 4 On May 17, 1995, the Planning Commission reviewed a plan that incorporated most of staffs recommendations. The proposal was approved with conditions. On June 12, 1995,the application appeared before the City Council. After discussion and listening to residents and comments from the City Council, the applicant withdrew his application prior to the City Council's vote. REZONING The applicant is proposing to rezone the property from RR, Rural Residential to RSF, Residential Single Family. The area to the north is zoned Residential Single Family to the east and west is zoned Rural Residential and is guided for Residential Low Density. The 2000 Land Use Plan shows this area designated for development as Low Density Residential, 1.2 -4.0 units per acre. The applicant's proposal has a gross density of 1.04 units per acre and 1.87 units per acre net after the streets and wetlands are taken out. This area is in the MUSA area. Staff is recommending approval for rezoning to RSF consistent with the Comprehensive Plan. PRELIMINARY PLAT The applicant is proposing to subdivide an 16.40 acre site into 17 single family lots. The density of the proposed subdivision is 1.87 units per acre net after removing the roads (2.08 acres) and wetlands(3.39 acres). All lots exceed the minimum 15,000 square feet of area, with an average lot size of 31,986 square feet. The width and depth of the lots meets ordinance requirements. There are a total of three lake lots shown on the plan. However, Lot 6, Block 2 has an area of 101,372 square feet and a width of 303 feet. The ordinance requires a minimum lot area of 20,000 square feet for riparian lots. This parcel has the potential for future subdivision. There is a side yard variance associated with this lot. The ordinance requires all riparian lot to maintain a 20 foot side yard setback. The majority of mature trees are located along the east side of the property. Allowing a 10 foot side yard setback will maximize the distance between the house pad on the subject lot and the trees. Staff is supporting a 10 foot side yard setback on the westerly lot line of Lot 6, Block 2. The 20 foot front yard setback variances on some of the lots is promoting the preservation of trees and wetlands. We believe it is warranted. There are a total of three 20 foot front yard setback variances as was shown on the plan(Lot 7 and 10, Block 2, and Lot 3,Block 3). The street alignment could be modified slightly to the east, closer to Lot 7, and the retention pond moved to the west between Lots 3 and 4,Block 2, to minimize impact to trees located on Lot 7,Block 2. Lots 5, and 6,Block 2, located to the south of the cul-de-sac, are proposed to be served via a private street,as well as homes proposed on Lots 9 and 10,Block 2 and Lot 1, Block 3. The lower portion of the property located to the east of the subject property(Morins)can only gain access to a public street through the subject property. The adjacent property has the potential to subdivide into three lots. Two of those lots will utilize the same driveway as proposed Lots 9 and 10, Block 2 and Lot 1, Block 3. The ordinance allows a maximum of 4 homes to be served via a private drive. The plan proposes 5 lots to be served via a private street. This will minimize grading and preserve trees in that area. Staff supports granting a variance to allow up to five lots accessing a private street. Lake Lucy Estates May 20, 1998 Page 5 Although the proposal is consistent with the Comprehensive Plan, and generally consistent with the Zoning Ordinance, we believe that revisions as recommended within this staff report should be made to minimize impacts to the natural features of the site. GRADING The plans have incorporated many design changes that staff had proposed previously. Those changes include custom grading wooded lots, increasing the street grade (Lakeway Drive)up to 10%to conform better with the existing ground contours which results in less grading, adjusting building pad locations and/or changing dwelling types to conform with existing ground. However, staff believes there still are modifications that can be completed to improve the overall site and reduce grading and tree loss. One such change would be to shorten the cul-de-sac and shift it easterly approximately 20 feet. In addition, relocate the proposed stormwater pond to the west side of the cul-de-sac and lower the cul-de-sac grade a minimum of one foot. This will result in saving significant oak trees which lie on the easterly side of the proposed cul-de-sac within the proposed stormwater basin. The west of the cul-de-sac is basically void of vegetation and may add an amenity to the proposed dwelling. One drawback of relocating the stormwater pond would be the lowest floor elevation on Lot 4, Block 2 would be affected. The City and Watershed both have a restriction that requires a lowest floor elevation of a building adjacent to a stormwater pond or wetland be two feet above the high water level. The grading plan also proposes custom- graded lots in the wooded areas with the exception of Lots 7 through 10, Block 2 where mass grading will occur to prepare house pads and Lakeway Court. The sanitary sewer is proposed along Lakeway Court which would take a swath a minimum of 40 feet wide due to the depth of the sewer regardless. Staff has learned from previous developments that front yard trees over time eventually die due to construction impacts. Therefore, staff is comfortable with the proposed grading of these lots in an effort to minimize tree impacts on the back portion of these lots. As you will note, the grading plan incorporates grading outside of the 50-foot wide right-of-way. City Ordinance requires a subdivision to dedicate 60-foot wide right-of-ways and 60-foot wide radius in a cul-de-sac. The plans are proposing a 50-foot wide right-of-way and 50-foot wide radius cul-de-sac. Staff believes that a 60-foot wide right-of-way could be dedicated without impacting too many of the lots; however, given the very steep terrain on the northerly half of the project,the additional right-of-way would increase the setbacks for the homes thus creating additional fill for driveways and dwellings which, in turn,would affect existing tree canopy coverage. Therefore, staff is comfortable with permitting a 50-foot wide right-of-way; however, the cul-de-sac will need to be 60-foot radius to provide adequate room for snow storage and utility improvements. According to the grading plan it appears the site will be short on material. Staff anticipates the applicant will need to import material to develop the site. The applicant will need to supply the City with a haul route and traffic control plan for review and approval prior to site grading commencing. In an effort to reduce grading and tree loss, staff is recommending that a retaining wall be incorporated in the northwest corner of Lakeway Drive and Lakeway Lane. In addition, retaining walls could be further extended along private driveways to minimize grading and tree loss as well. Lakeway Court also needs to provide for a temporary turnaround acceptable to the City's Fire Marshal. The temporary turnaround could be created on one of the lots(Lot 1, Block 3 or Lot 10, Block 2)until the Morin's subdivide when a permanent would then be required. The southerly private street(Lakeway Drive at the end of the cul-de-sac) is proposed to serve Lots Lake Lucy Estates May 20, 1998 Page 6 5 and 6, Block 2. However, Lot 6 is a very large lot and has the potential for further subdivision. The Fire Marshal may also require an acceptable turnaround if the driveway exceeds 150 feet in length. This will require additional grading and tree loss on Lot 6 if it is further subdivided in the future. The plans propose to fill up to four feet of material in this area to prepare the house pads and private driveway(Lakeway Drive). This is also necessary to provide adequate cover for the sanitary sewer to service these lots. In addition, fill material will give the ability to create lookout or walkout-type dwellings without further grading towards the wetland. The grading plan needs to incorporate dwelling types along with garage and first floor and lowest floor elevations for staff to review. Without this information it is relatively difficult to determine full grading impacts on the project. Custom-graded lots will require detailed grading (with two- foot existing and proposed contours), drainage,tree removal and erosion control plans at time of building permit application for City staff to review and approve. Building pad locations designated on the custom-graded lots are seldom used. The house configuration and soil factors will govern the location. Therefore, tree canopy loss may or may not be accurate and in most instances it is not. Tree loss is generally 10%to 15%higher due to construction activities outside of the home and generally impacts trees 20 feet away from the foundation. Retaining walls are a practical way of minimizing grading and tree loss. The applicant should be aware that retaining walls in excess of four feet in height will required building permits and engineered drawings. A soils report was prepared for the applicant by Braun Intertec. A summary of the results of the soils evaluation indicated soil borings typically encountered a one to four-foot layer of topsoil at the surface. Below the topsoil most of the borings encountered glacially deposited soils. Layers of alluvial deposits were encountered above the glacial till into the boring. Groundwater was encountered at four of the six boring locations. At these locations groundwater was encountered 4 to 11 feet below the surface or above elevation 950.5 to 965.5. The soil report also supplied recommendations which indicated the topsoil, the alluvial soil and some soft glacial soils found in the borings are considered unsuitable for supportive proposed loads due to high organic content and/or associated compressibility under fill and building loads. To prepare for construction the report recommended removal of these soils and any existing fill in the building or oversized area. In the streets,the soil should be removed at least three feet below the proposed roadway subgrade elevation. The excavations would then be backfilled with engineered fill as needed to achieve the building and/or street subgrade elevation. The report also indicated the natural clays on the site will be suitable for reuse as fill but will require drying to achieve compaction requirements. The City's typical street section requires a two-foot sand subcut underneath the standard pavement section in order to prepare the street in accordance with the City's typical urban street section. Typically,with the soil conditions on hilly terrain,ground water may be of concern. The City requires a drain tile system behind the curb and gutter for homes which are not adjacent to a wetland/pond. The drain tile system provides an acceptable means of controlling sump pump discharge from the homes as well as improve the street subgrade. Storm sewer and tree fencing needs to be denoted on the final grading and drainage plans prior to final plat approval. Typically, in a development like this the developer is also the builder. However, in this case staff is unsure whether the actual developer will be building the homes. Past experience has educated staff to make things as clear as possible with regards to grading and tree removal limits in the conditions of approval. Apparently,communication is lost between the developer and builder and prospective home buyer at time of building permit application. The City has envisioned one way of constructing a home on the lot; however, the prospective home buyer has another and seldom Lake Lucy Estates May 20, 1998 Page 7 do they correspond. Therefore, staff is recommending that tree removal grading limits should be specifically addressed on each of the custom-graded lots so as any prospective home buyers will know exactly what they are able to do to the lot. EROSION CONTROL Erosion measures and site restoration shall be developed in accordance with the City's Best Management Practice Handbook(BMPH). Staff recommends that the City's Type III erosion control fence which is a heavy duty silt fence be used around the wetlands for maximum protection. The final grading plan shall incorporate erosion control fence around the perimeter of the grading limits. In addition, tree preservation fencing should be denoted on the grading and drainage plan as well. UTILITIES Municipal sanitary sewer service is proposed to be extended from the Coey parcel which was subdivided into Point Lake Lucy. The Coey parcel is located approximately 200 feet east of this site. The sewer line to date has not been extended to service this parcel. The sanitary sewer has been extended through the Pointe Lake Lucy development and deadended at the property just east of the development(Morin's). The exact alignment of the sewer line has been staked in the field up to the Morin's property previously by staff and the property owner. The alignment minimizes tree loss and impacts to the wetlands and Morin's property. The applicant will need to adjust their plans to incorporate this alignment. In addition,the necessary utility easement for this extension needs to be acquired in order to proceed with the project. Without the sewer, this project should be considered premature for development. A condition has been added in the staff report that preliminary and final plat approval will be contingent upon sanitary sewer being extended through the Morin's property. At the time the Morins subdivide their parcel and connections are made to the sewer line,the applicant will be entitled to a refund of a portion of the connection charge the City will impose at time of building permit. Staff recommends that the individual sewer and water service be field verified prior to construction to determine a location on each lot which minimizes tree loss. The applicant should also be advised that,based on the soils report, there may be some areas of unsuitable material where the pipe will need to be place on pilings or significant subgrade correction performed prior to installation of the pipe. Municipal water service is available to the site from Lake Lucy Road. The plans propose on extending water service throughout the development. Detailed street and utility construction plans and specifications will be required in conjunction with final plat approval. The construction plans and specifications shall be prepared in accordance with the City's latest edition of the Standard Specifications and Detail Plates. Final construction plans and specifications will need to be submitted to the City a minimum of three weeks prior to final plat consideration for staff review and City Council formal approval. The applicant will be required as a part of final plat and construction plan approval to enter into a development contract and provide the City with financial securities to guarantee final plat conditions of approval and installation of the public improvements. The development contains two existing home sites (Tichy and Christensen). Both of these home sites are currently on their own well and septic system. The existing home on the westerly portion of the site (Lot 1,Block 2 - Christensen's) is proposed to be removed. The other home(Tichy)is proposed to remain on Lot 4,Block 3. Both have on-site well and septic systems that will need to be abandoned in accordance with the City and State building codes in conjunction with this development. The well and septic on Lot 1, Block 2 will have to be abandoned in conjunction i Lake Lucy Estates May 20, 1998 Page 8 with demolition of the home. The well and septic system on the Tichy property(Lot 1, Block 1) may be delayed since the construction activities appear not to impact the systems. However, city ordinance requires properties within 150 feet of a municipal sewer system must be connected to the City's system within 12 months after the system becomes operational. Connection to City water is not required until the well fails. The sanitary sewer to serve this development will need to be designed and constructed to service the Morin's property as well as the properties to the west of the site and north of Lake Lucy Road. The applicant has not provided sewer and water extension west of the development. Staff will be reviewing the need for providing utility service to the adjacent parcels. The applicant shall be responsible for extending sanitary sewer service west of the site and north of Lake Lucy Road in a location determined by staff. STREETS Access to the development is proposed from Lake Lucy Road. This road is classified in the City's Comprehensive Plan as a collector street. The applicant is proposing to dedicate on the final plat an additional 7 feet of right-of-way to meet the City's design criteria along Lake Lucy Road. Street right-of-way on the public street within the plat has been reduced from the 60-foot requirement to 50 feet wide in an effort to reduce grading and tree loss. Staff has evaluated this compromise and believes the reduced right-of-way may be warranted except for the cul-de-sac diameter. The plans are also incorporating the use of private driveways to service portions of the development and adjacent parcels. City ordinance provides for up to four homes to be serviced off a private driveway. A turnaround acceptable to the City's Fire Marshal will also have to be provided. The private driveways will reduce impacts to the wetlands and minimize tree loss versus a public street. Staff believes the use of a private driveway to service Lots 5 and 6, Block 2 may be warranted to reduce impacts to the area. The construction of a public street in this area would destroy the natural features. In addition,Lots 5 and 6,Block 2 would be marginal lots due to setback requirements from wetlands and the street. Staff believes the applicant has followed the layout prepared by staff to minimize the environmental concerns. If a public street was required to serve Lots 5 and 6, Block 2 there would be only two lots created at the end on Lot 6, Block 2 due to setbacks from the street and wetlands. Lot 5, Block 2 would not meet code requirements. Therefore, an argument could be made for not allowing Lot 6, Block 2 to future subdivide. Another private street is proposed to service three lots (Lots 9 and 10, Block 2 and Lot 1,Block 3) and the Morin's parcel to the east. The Morin's and staff have previously reviewed the development potential of the Morin's parcel and it appears that the site may be further subdivided into two additional lots. Therefore the private street(Lakeway Court)as proposed would be serving up to five homes which exceeds the City's ordinance. Staff believes there is no other way to create a street system to serve these lots which would minimize impacts and therefore recommends a variance be granted for up to five(5)homes accessing Lakeway Court. A turnaround which meets the City Fire Marshal's requirements will be necessary at the end of Lakeway Court. If the Morin's are not in favor of the turnaround at this time, a temporary turnaround could be developed on Lot 10,Block 2 or Lot 1, Block 3 until the Morin's are ready to subdivide. Future access was also considered for the parcel west of the development(Randall). The Randall's parcel currently gains access from Lake Lucy Road via a long gravel driveway. Part of the driveway is actually located within the proposed subdivision through Lots 1, 2 and 3,Block 1. The Randall's driveway access onto Lake Lucy Road is across from Yosemite. This intersection Lake Lucy Estates May 20, 1998 Page 9 has substandard sight distance which makes it difficult to safely turn to and from the property. Eventually, when the Randall parcel further subdivides, staff will recommend that the driveway access onto Lake Lucy Road be eliminated and the driveway be relocated to access Lakeway Lane. It appears the Randall property has ability to further subdivide into more than four lots. The applicant has proposed a 31-foot wide City street and 50-foot wide public right-of-way between Lot 1,Block 2 and Lot 3,Block 1 to provide future access to the site. Lot 1, Block 2 will also be accessed from this street. A sign will be required on the barricades as wells as a condition in the development contract indicating that "Lakeway Lane may be extended in the future". Staff has reviewed the street grades and alignment and believes,with the exception of the cul-de- sac, no further modifications are available to minimize tree loss and grading. These changes were also discussed in the grading portion of this report, i.e. retaining wall in the northeast corner of Lakeway Drive and Lakeway Lane and revise cul-de-sac configuration and relocation of stormwater pond. All lots are proposed to access the interior streets and not directly onto Lake Lucy Road. The existing driveway to Lot 4, Block 3 is proposed to be relocated to Lakeway Drive. This will result in the necessity to change their street address. Private driveway maintenance and access agreements will need to be incorporated into covenants to permit access to the lots adjacent to private driveways as well as the Morin parcel. Street grades range from 1%to 10%which exceeds City Ordinance. City Ordinance requires street grades to be between 0.75%and 7%. Staff believes that a 10%street grade may be warranted in this situation to better conform to existing terrain and minimize grading and tree loss. However, staff is recommending that a 3%or less landing minimum length of 75 feet be designed at the intersection of Lake Lucy Road and Lakeway Drive to provide adequate sight lines and acceleration onto Lake Lucy Road. Staff believes that this can be easily accomplished. MISCELLANEOUS The final plat will need to dedicate a 60-foot radius on the cul-de-sac. In addition, drainage and utility easements shall be dedicated over the stormwater pond and any utility improvements which lie outside the City's road right-of-way. The minimum easement width shall be 20 feet wide depending on the depth and location of the utility or stormwater pond basin. WETLANDS There are 2 wetlands delineated on-site and they are as follows: Wetland A is a natural wetland located on the property just east of Lots 8 through 11 along the southeastern portion of the property. The wetland is approximately 5.3 acres and is characterized as an inland shallow fresh marsh. Approximately 1.7 acres of the wetland is located on the property. Wetland B is the natural wetland complex that borders the Lake Lucy shoreline. The wetland is above the ordinary high water elevation for Lake Lucy, and therefore, is not within DNR jurisdiction. Approximately 1.4 acres of the wetland is located on the property. Since both of the wetlands are classified as natural, the buffer strip required shall be 10 to 30 feet wide with an average width of 20 feet. It is recommended that any disturbed areas of the buffer strip be seeded with a mixed variety of natural upland vegetation. Although these wetlands will not be filled or excavated as a result of the development, erosion control and maintenance on the erosion Lake Lucy Estates May 20, 1998 Page 10 control is a key factor in protecting wetlands. Type III erosion control shall be provided around the wetland at the start of construction and maintained until vegetation is fully re-established. Wetland Buffers The City wetland ordinances requires a buffer strip and buffer strip monumentation along wetlands. The buffer strip width required for natural wetlands is 10 to 30 feet with a minimum average width of 20 feet. The principal structure setback for these wetlands is 40 feet measured from the outside edge of the buffer strip. The applicant has proposed a buffer strip of 10 feet along Lots 10,9,8,7 and 4. Lot 6 is shown with a thirty foot buffer to accomplish the 20 ft. average and lot 5 has a sharp transition from 30 to 10 feet. City staff would recommend that the lot 5 buffer be adjusted so that there is a smoother transition along the Lot 5 property line. Such sharp transitions in buffer zones have resulted in buffer removal in the past. Lake Access There are three lots on this site that would meet the 90 foot width requirement for access to Lake Lucy. However,to access the lake, each of these properties must impact the wetland to get to the Lake. In the extreme case Lot 6 must go through 350 feet of wetland to reach the ordinary high water level. Staff recommends that all of these lots access the lake at the point of least impact to the wetland on a shared dock. The location of this dock would be on Lot 6. SURFACE WATER MANAGEMENT PLAN(SWMP) Storm Water Quality Fees The SWMP has established a water quality connection charge for each new subdivision based on land use. Dedication shall be equal to the cost of land and pond volume needed for treatment of the phosphorus load leaving the site. The requirement for cash in lieu of land and pond construction shall be based upon a schedule in accordance with the prescribed land use zoning. Values are calculated using market values of land in the City of Chanhassen plus a value of$2.50 per cubic yard for excavation of the pond. The City has had discussions with the applicant's engineer on the water quality ponding.The proposed SWMP water quality charge of$800/acre, (or$9,184 for the 11.48 acres) for single-family residential developments may be waived if the applicant provides water quality treatment according to the City's SWMP standards. To receive this credit the applicant must provide the City with plans for a stormwater quality pond designed to retain up to 75% phosphorus according to the Walker Pondnet model. Storm Water Quantity Fees The SWMP has established a connection charge for the different land uses based on an average city- wide rate for the installation of water quantity systems. This cost includes land acquisition, proposed SWMP culverts,open channels and storm water ponding areas for runoff storage. Single family residential developments will have a connection charge of$1,980 per developable acre. The total gross area of the property is 16.34 acres;however,4.86 acres is wetland. Therefore,the proposed development would then be responsible for 11.48 acres resulting in a water quantity connection charge of$22,730. This fee will be due payable to the city at time of final plat recording. PARK DEDICATION Full park and trail fees shall be collected per city ordinance in lieu of land acquisition and/or trail construction. The existing house located on Lot 4, Block 3, is exempt from these fees. If the Lake Lucy Estates May 20, 1998 Page 11 home is demolished and a new residence is built,the site would then be subject to these fees. TREE PRESERVATION/LANDSCAPING Tree canopy coverage and preservation calculations for the Lake Lucy Estates development are as follows: Total upland area 11.17 ac or 486,565 SF Total canopy area (excluding wetlands) 9.51 ac or 414,256 SF Baseline canopy coverage 85% Minimum canopy coverage allowed 55% or 6.14 ac/267,610 SF Proposed tree removal 42% or 4.67 ac/203,425 SF Proposed tree preservation 43% or 4.84 ac/210,830 SF Developer does not meet minimum canopy coverage allowed,therefore the difference is multiplied by 1.2 to calculate the required replacement plantings. Difference in canopy coverage 56,780 SF Multiplier 1.2 Total replacement 68,136 SF Total number of trees to be planted 63 trees A replacement planting plan must be submitted to the city for approval. Included in the plan shall be location, species and size of replacements. All replacements must meet minimum size requirements. The applicant has requested that replacement plantings vary in size, from seedling to the 2 %i minimum required by ordinance. Staff supports the request for trees planted in excess of the 63 required. Of the 63 trees required, staff recommends the minimum required size is upheld. The applicant's tree canopy preservation and replacement calculations stated that 19 trees were to be replaced. This erroneous calculation was based on incorrect removal and preservation percentages. The applicant has prepared a solid and comprehensive forest management plan for the site. Tree survey results, woodland condition and replacement plantings plans are all covered in detail. The applicant appears prepared to properly handle the development of the property and its woodlands. The plan states that trees will be and have been assessed for preservation based on their condition, location, age,and species. This technique will serve to avoid the mistakes made by developers in wooded areas in the past where inappropriate trees are preserved only to die once construction has finished. Staff recommends tree removal limits for each lot be established as shown on the grading and tree preservation plans submitted by the applicant. It appears a 20 foot removal limit from the building pad would be coincide with tree removal shown on the applicants' plans. Tree loss/preservation for the development is comparable to the loss associated with the previous Byrne application. The current applicant has not preserved significantly any more or less of the woodlands than the previous proposal. What this applicant has done,however, is invested time Lake Lucy Estates May 20, 1998 Page 12 and effort into preparing a forest management plan for the site and the future development. The Landscaping and Tree Preservation requirements state that a landscape buffer is required when a subdivision plat is contiguous to a collector street. Required buffering shall include berms and landscape materials consisting of a mix of trees and shrubs and/or a tree preservation area. The plan must identify plant material locations along Lake Lucy Road as well as planting within each front yard. Appropriate financial security will be required. This plan should show the type and size of trees proposed to be planted as well as the location of any berms along Lake Lucy Road. COMPLIANCE WITH ORDINANCE - RSF DISTRICT Lot Lot Lot Home Wetland&Buffer Area Width Depth Setback Setback Ordinance 15,000 90' 125' 30' front/rear 60' Average 10'sides BLOCK 1 Lot 1 25,890 115' 229' 30'/30' Corner lot 243' 10' Lot 2 17,663 97' 197' 30'/30' 10' Lot 3 17,746 122' 163 30'/30' Corner lot 148' 10' Block 2 Lot 1 21,905 165' 125' 30'/30' Corner lot 142' 10' Lot 2 15,000 120' 125' 30/30 10 Lot 3 19,298 193' 125' 30/30 10 Lot 4 56,715 95' 420' 307501**40'/10' 10' Lot 5 55,473 18' 332' 30750'**40'/10' 10' Lot 6 101,372 10' 336' 30'/70'**40'/30' 10' Lot 7 39,278 204' 324' 20'*/50'**40710' 10' Lot 8 24,220 137' 339' 301/501**401/10' 10' Lot 9 27,144 140' 295' 307501**40'/10' Lake Lucy Estates May 20, 1998 Page 13 10' Lot 10 20,091 140' 245' 20'*/501**401/10' 10' Block 3 Lot 1 16,777 105' 160' 30'/30' 10' Lot 2 25,307 243 180 30'/30' Corner Lot 235 10' Lot 3 19,660 132 158' 20'*/30' 10' Lot 4 40,231 185' 242' 30'/30' Corner Lot 164 10' * Side yard and/or front yard variance required. ** Wetland&Buffer setback supersedes typical setbacks. FINDINGS SUBDIVISION 1. The proposed subdivision is consistent with the zoning ordinance; Finding: The subdivision requires variances to meet the requirements of the RSF, Residential Single Family District. 2. The proposed subdivision is consistent with all applicable city, county and regional plans including but not limited to the city's comprehensive plan; Finding: The proposed subdivision is consistent with the comprehensive plan density designation. 3. The physical characteristics of the site, including but not limited to topography, soils, vegetation, susceptibility to erosion and siltation, susceptibility to flooding, and storm water drainage are suitable for the proposed development; Finding: The proposed site has a significant tree coverage and rolling topography. The applicant is attempting to minimize impact on the property and staff is making recommendations that should be incorporated into the plan. 4. The proposed subdivision makes adequate provision for water supply, storm drainage, sewage disposal, streets, erosion control and all other improvements required by this chapter; Finding: The proposed subdivision will be served by a public street and infrastructures contingent upon acquiring an easement through the Morin's parcel. 5. The proposed subdivision will not cause environmental damage; Lake Lucy Estates May 20, 1998 Page 14 Finding: The proposed subdivision will need to be revised as discussed in the staff report and in the conditions of approval. Grading and tree removal must be minimized. 6. The proposed subdivision will not conflict with easements of record. Finding: The proposed subdivision will not conflict with existing easements, but rather will expand and provide all necessary easements. 7. The proposed subdivision is not premature. A subdivision is premature if any of the following exists: a. Lack of adequate storm water drainage. b. Lack of adequate roads. c. Lack of adequate sanitary sewer systems. d. Lack of adequate off-site public improvements or support systems. Finding: The proposed subdivision will be provided with adequate public infrastructure with the extension of the sanitary sewer from the east. VARIANCE As part of this plat approval, a variance to allow 20 foot front yard setbacks, a 10 percent street grade, five homes accessing via a private street, and a 50 foot wide right-of-way is requested. The City Council may grant a variance from the regulations contained in the subdivision chapter as part of a plat approval process following a finding that all of the following conditions exist: 1. The hardship is not a mere inconvenience. 2. The hardship is caused by the particular physical surroundings, shape or topographical conditions of the land. 3. The condition of conditions upon which the request is based are unique and not generally applicable to other property. 4. The granting of a variance will not be substantially detrimental to the public welfare and is in accord with the purpose and intent of this chapter, the zoning ordinance and comprehensive plan. Finding: Staff recommends the variances be approved as shown in plans dated April 24, 1998, for the following: a. A 20 foot front yard setback for Lot 7 and 10, Block 2, and Lot 3, Block 4. b. A 10 percent street grade and a 50 foot wide right-of-way . c. Five homes accessing via a private drive. d. A 10 foot side yard setback for the west side of Lot 6, Block 2. PRIVATE STREETS As part of this subdivision, the applicant is requesting the use of private streets to service portions of the site. The subdivision ordinance allows up to four lots to be served by a private street if the Lake Lucy Estates May 20, 1998 Page 15 city finds the following conditions to exist: 1. The prevailing development pattern makes it not feasible or inappropriate to construct a public street. In making this determination,the city may consider the location of existing property lines and homes, local or geographic conditions and existence of wetlands. 2. After reviewing the surrounding area it is concluded that an extension of the public street system is not required to serve other parcels in the area, improve access,or to provide a street system consistent with the comprehensive plan. 3. The use of a private street will permit enhanced protection of wetlands and mature trees. Finding: The applicant is utilizing two private streets to access Lots 5, 6, 9,and 10, Block 2, and Lot 1,Block 3. Private streets will minimize impact on the vegetation and preserve site grades. Lakeway Court will serve 5 lots,however,we believe in this case a variance is appropriate. BUILDING OFFICIAL COMMENTS Dwelling Types. The type of dwelling is necessary to enable the Inspections Division and Engineering Department to perform a satisfactory plan review of the structure at the time of building permit issuance. For the same reason, proposed lowest level floor elevation, entry floor elevation (not top of block)and garage floor elevation is required to be indicated on the proposed pad location. Standard designations (FLO or RLO, R, SE, SEWO, TU, WO) must be shown for proposed dwelling types. These standard designations lessen the chance for errors during the plan review process. The memo explaining these designations is enclosed. Demolition Permits. Existing structures on the property which will be demolished will require a demolition permit. Proof of well abandonment must be furnished to the City and a permit for septic system abandonment must be obtained and the septic system abandoned prior to issuance of a demolition permit. A house moving permit is required if a structure is to be moved to another location within the City. House moving permits must be approved by the City Council. A road use permit is required to move a structure over City roads. Retaining Walls. Retaining walls over 48" high from the base of their footings require a building permit and inspections. RECOMMENDATION Staff recommends the Planning Commission adopt the following motion: "The Planning Commission recommends approval of rezoning 16.40 acres of property zoned RR, Rural Residential to RSF, Residential Single Family(95-1 REZ); Preliminary plat(95-3 SUB) to subdivide 16.40 Acres into 17 single family lots,with variances(a 20 foot front yard setback for Lots 7 and 10,Block 2, and Lot 3, Block 3, a 10 percent street grade and a 50 foot wide right-of- way, Five homes accessing via a private street, and a 10 foot side yard setback for the west side of Lot 6, Block 2),Lake Lucy Estates,as shown in plans dated April 24, 1998, with the following conditions: Lake Lucy Estates May 20, 1998 Page 16 1. The applicant shall plant 63 trees as replacement/reforestation plantings. Trees shall be selected from the city's Approved Tree List and meet minimum size requirements. A landscape plan shall be submitted to the city for approval. Included in the plan shall be location, species and size of replacements. 2. Tree removal limits shall be established 20 feet from the building pad for all custom graded lots, once the type of home is designated. Tree protection fencing must be installed at the limits and maintained throughout construction. 3. No berming or landscaping will be allowed within the right-of-way. The applicant shall work with the City in developing a landscaping replacement plan on the site and along Lake Lucy Road right-of-way. The vegetated areas which will not be affected by the development will be protected by a conservation easement. The conservation easement shall permit removal of dead or diseased vegetation. All healthy trees over 6" caliper at 4' height shall not be permitted to be removed. 4. A snow fence shall be placed along the edge of tree preservation easements prior to grading. 5. Building Department conditions: a. Revise the preliminary grading&erosion control plan to show the proposed dwelling pads with standard designations and indicate the lowest level floor, entry level floor and garage floor elevations. This should be done prior to final plat approval. b. Obtain demolition permits. This should be done prior to any grading on the property. c. Obtain building permits from the Inspections Division for retaining walls over 48" high. Revise Grading and Drainage Plan to indicate lowest floor level elevation, top of foundation elevation and garage floor elevation. This should be done prior to final plat approval. 6. Fire Marshal conditions: a At the east end of Lake Way Court provide an approved turnaround for fire apparatus. Pursuant to 1991 Uniform Fire Code, Section 10.204 (D). b. Relocate the existing hydrant that is located on block 8 on the south side of Lake Way Court to the north side of Lake Way Court on block 2. c. With reference to block 2, lot 6, if structure is not visible from the street, additional address numbers will be required at driveway entrance. Pursuant to Chanhassen Fire Permit Policy Premise Identification No. 29-1992. 7. Full park and trail fees shall be collected per city ordinance in lieu of land acquisition and/or trail construction. 8. The buffer on Lot 5,Block 2, shall be adjusted so that there is a smoother transition along the Lot 5 property line. 9. All repairian lots shall access the lake at the point of least impact to the wetland on a shared Lake Lucy Estates May 20, 1998 Page 17 dock. The location of this dock would be on lot 6. 10. The proposed SWMP water quality charge of$800/acre, (or $9,184 for the 11.48 acres) for single-family residential developments may be waived if the applicant provides water quality treatment according to the City's SWMP standards. To receive this credit the applicant must provide the City with plans for a stormwater quality pond designed to retain up to 75% phosphorus according to the Walker Pondnet model. 11. The proposed development would then be responsible for 11.48 acres resulting in a water quantity connection charge of$22,730. This fee will be due payable to the City at time of final plat recording. 12 The applicant will need to develop a sediment and erosion control plan in accordance with the City's Best Management Practice Handbook and the Surface Water Management Plan requirements for new developments. The plan shall be submitted to the City for review and formal approval. Type III erosion control fence shall be used adjacent to the wetlands and Type I erosion control fence shall be used adjacent the grading limits. 13. All areas disturbed as a result of construction activities shall be immediately restored with seed and disc-mulched or wood-fiber blanket or sod within two weeks of completion of each activity in accordance with the City's Best Management Practice Handbook. 14. All utility and street improvements shall be constructed in accordance with the latest edition of the City's Standard Specifications and Detail Plates. Detailed street and utility plans and specifications shall be submitted for staff review and City Council approval three weeks prior to final plat consideration. 15. The City will install wetland buffer edge signs before accepting the utilities and will charge the applicant $20 per sign. 16. The applicant shall provide detailed storm sewer calculations for 10-year and 100-year storm events and provide ponding calculations for stormwater ponds in accordance with the City's Surface Water Management Plan for the City Engineer to review and approve prior to final plat approval. The applicant shall provide detailed pre-developed and post developed stormwater calculations for 100-year storm events and normal water level and high water level calculations in existing basins, created basins, and or creeks. Individual storm sewer calculations between each catch basin segment will also be required to determine if sufficient catch basins are being utilized. In addition,water quality ponding design calculations shall be based on Walker's Pondnet model. 17. The applicant shall enter into a development contract with the City and provide the necessary financial security to guarantee compliance with the terms of the development contract. 18. The applicant shall apply for and obtain permits from the appropriate regulatory agencies, i.e. Carver County,Watershed District, Metropolitan Waste Control Commission, Health Department, Minnesota Pollution Control Agency, Minnesota Department of Natural Resources,Army Corps of Engineers and Minnesota Department of Transportation and comply with their conditions of approval. 19. The appropriate drainage and utility easements should be dedicated on the final plat for all Lake Lucy Estates May 20, 1998 Page 18 utilities and ponding areas lying outside the right-of-way. The easement width shall be a minimum of 20 feet wide. Consideration shall also be given for access for maintenance of the ponding areas. A 40-foot wide drainage and utility easement will be required over the utilities located within Lakeway Court. 20 The lowest floor elevation of all buildings adjacent to the wetlands or storm water ponds shall be a minimum of 2 feet above the 100-year high water level. 21. A water quality pond shall be provided on the west side of the cul-de-sac to pretreat runoff prior to discharging into the wetlands. The proposed stormwater pond must have side slopes of 10:1 for the first ten feet at the normal water level and no more than 3:1 thereafter or 4:1 throughout for safety purposes. The stormwater pond shall be designed and constructed with a 75%phosphorus removal efficiently. A landscape plan providing upland and wetland plants to naturally blend the pond into the surroundings is recommended. 22. Existing wells and/or septic systems on site will have to be properly abandoned in accordance to City and Minnesota Department of Health codes/regulations. The existing home (Tichy)on Lot 4,Block 3 shall be connected to the City's sanitary sewer system within 30 days after the system becomes operational. Connection to City water is not required unless the well on Lot 4, Block 3 fails. 23. The applicant shall report to the City Engineer the location of any drain tiles found during construction and shall re-locate or abandon the drain tile as directed by the City Engineer. The construction plans shall include a drain tile system behind the curbs and gutters on those lots which are not adjacent to a wetland or storm pond. 24. All lots shall take direct access to the interior street system and not Lake Lucy Road. Lot 4, Block 3 shall relocate their driveway from Lake Lucy Road to Lakeway Drive. In addition,the street address for this lot shall be changed accordingly. 25. Lots 1 through 3, Block 1,Lots 1 through 3,Block 2, and Lots 1 through 3, Block 3 shall be custom graded at time of building permit issuance. A detailed grading(with two-foot contours), drainage, tree removal and erosion control plan shall be submitted with the building permit application for review and approval by the City engineer prior to issuance of a building permit for the lot. 26. The grading, drainage,and construction plans shall be revised incorporating the following changes that conform better with the existing grades and minimize grading and tree loss: a) Tree protection fencing. b) Retaining wall along the northeast corner of Lakeway Lane and Lakeway Drive to reduce grading and minimize tree loss. c) Shorten and lower cul-de-sac and increase radius to 60 feet. d) Relocate stormwater pond to west side of cul-de-sac. e) Provide "Y" or "T" temporary turnaround on Lakeway Court. Lake Lucy Estates May 20, 1998 Page 19 f) Denote dwelling type on all lots including garage, first and lowest floor elevation. g) Label height of retaining walls. h) Provide drain tile behind the curb for those lots not adjacent to wetlands or stormwater pond. i) Design private driveway(Lakeway Drive)to drain partially back to cul-de-sac. j) Add outlet control structure to pond. k) Revise sanitary sewer alignment through Morin's parcel and provide sanitary sewer service to parcel to the west per staff. 27. Preliminary and final plat approval shall be contingent upon sanitary sewer service being extended to the plat from the Coey property(Point Lake Lucy)to this site and the applicant obtaining a drainage and utility easement from the Morins. 28. All private streets shall be designed and constructed in accordance to City Ordinance No. 209 and a turnaround acceptable to the City's Fire Marshal. A private maintenance agreement and access easement shall be provided for all parcels served by a private street(s). A temporary turnaround may be permitted on Lot 10,Block 2 or Lot 1, Block 3 until the Morin's parcel further subdivides. 29. The applicant shall extend utilities to the parcel to the west through a location determined by staff. Temporary barricades shall be placed at the end of Lakeway Lane. A sign shall be placed on the barricades indicating "this street shall be extended in the future". A condition will also be placed in the development contract to inform all property owners in Lake Lucy Estates of this street extension. The property to the west may continue to utilize the existing private driveway,until such time when the property further subdivides. It will then gain access via Lakeway Lane only and the existing private driveway shall be abandoned. 30. The applicant or their assignee shall submit a haul route and traffic control plan to the City Engineer for review and approval prior to site grading commencing. 31. Individual sewer and water services to the lots shall be field verified to determine the path of least impact to the trees. 32. The applicant shall be entitled to a refund(up to 90%depending on construction costs) of a portion of future sewer connection charges collected from Morin's parcel when building permits are issued. 33. Cross-access and maintenance agreements will need to be prepared for use of the private driveway including the Morin's parcel." Lake Lucy Estates May 20, 1998 Page 20 ATTACHMENTS 1. Copy of Lake Lucy Estates plan dated April 2, 1995. 2. Memo from Dave Hempel, Asst. City Engineer dated May 14, 1998. 3. Memo from Mark Littfm, Fire Marshal, dated May 4, 1998. 4. Memo from Steve Kirchman,Building Official,dated May 6, 1998. 5. Application. 6. Narrative. 7. Notice of Public Hearing. 8. Forest Management Plan prepared by Westwood Professional Services, Inc. 9. Letter from The Lake Lucy Environment Preservation Committee. 10. Reduced Plans dated April 24, 1998. 11. Preliminary plat dated April 24, 1998. \\cfsI\volt\plan\sa\Iklucy.contractors.doc i I i I; 1 �p , W 4 8 b i p J W A3111ib}rl WW ---_ - i g el - 1 N `; I. gl _ V ss .,t ` � Y .. ♦ r • \ii(I / / ,I 1 • lak__:-"' ; -------- . e. 1 1 ;' ; '' -'-• f ssA ,,i, -..,,‘ , \ < / . 11 Ai I•—'/..(C';% ,''25,/':'. '''\ s' s \ I - -I, ,--,-/,',,,,-, -,- --.,,,,,,,,;,-• , ..., „,.. k......L.. ,„ ,,,,,,„, ..../....,,,,.„.„: , ,,,,,,/, ,, „... ,„ .. , ,,, , ,,,,, ,,,,,, ---,--Nc„ --, -,:s, ‘ \ • , ,• ,„ , ... z , .. ., ,,, ,‘, . .. „--,---:,,,,,,,,, , ,,, _. ,,, k ..ss.:,„ k P.', %„‘ :; ::::. 0 , . , ,,,,,:. -,„ s ,i'itz's,:s.,,,. ,.,... ,. ., -- •_ . _ _„, ,,,' i-�_- • 11\\�l i,� \`• - _---- ... 't,�I/ ter'' /,06 ^L, if- -i i-,�_ ,--„--,/,,,�- - ' ti f , ,/" I '�. •�� .:.----,--1,•,-- .'i.' i ilii il'-_��__'1�, ''- 111 1, -'. i' •i I �, •-• - t��! yea'. • 1 ''/-' • \ \\`,`, ea -/' '''• , 1, 1 ,fi-- , i-' i 1 Ci)Ala i ----, �'` ill • ',W `� i..::::---------== , 1 I 11;11-1 I,1 i / - i i 1 W‘-11-...-11:- ::::::.1.:7: ..."%kt.s - - --. ' '' I"I A'41 r •• . i gi i______:--- • % ?( 1-, ,."' -- ----- •-•::--'e ,--- -.---------.\• ',;1: •-1 \\‘'IL' s:.:" ..---,j. 1 ,....-4.m.7a'J-. '� .. - M•A rib.,,'-,,•• 1`` :ft'. 1; ,\.�:,":"::-* 01101 �t -_, . :I 1 101 CITY OF CHANHASSEN MEMORANDUM 690 City Center Drive,PO Box 147 TO: Sharmin Al-Jaff, Planner II Chanhassen,Minnesota 55317 �', Phone 612.937.1900 FROM: Dave Hempel, Assistant City Engineer General Fax 612.937.5739 Engineering Fax 612.937.9152 DATE: May 14, 1998 Public Safety Fax 612.934.2524 Web wuw.ci.chanhassen.mn.us SUBJ: Review of Preliminary Plat for Lake Lucy Estates Project No. 95-12 Upon review of the preliminary plans dated April 24, 1998,prepared by Westwood Engineering,I offer the following comments and recommendations: GRADING The plans have incorporated many design changes that staff had proposed previously. Those changes include custom grading wooded lots, increasing the street grade (Lakeway Drive) up to 10% to conform better with the existing ground contours which results in less grading, adjusting building pad locations and/or changing dwelling types to conform with existing ground. However, staff believes there still are modifications that can be completed to improve the overall site and reduce grading and tree loss. One such change would be to shorten the cul-de-sac and shift it easterly approximately 20 feet. In addition,relocate the proposed stormwater pond to the west side of the cul-de-sac and lower the cul-de- sac grade a minimum of one foot. This will result in saving significant oak trees which lie on the easterly side of the proposed cul-de-sac within the proposed stormwater basin.The west of the cul-de-sac is basically void of vegetation and may add an amenity to the proposed dwelling. One drawback of relocating the stormwater pond would be the lowest floor elevation on Lot 4, Block 2 would be affected. The City and Watershed both have a restriction that requires a lowest floor elevation of a building adjacent to a stormwater pond or wetland be two feet above the high water level. The grading plan also proposes custom-graded lots in the wooded areas with the exception of Lots 7 through 10, Block 2 where mass grading will occur to prepare house pads and Lakeway Court. The sanitary sewer is proposed along Lakeway Court which would take a swath a minimum of 40 feet wide due to the depth of the sewer regardless. Staff has learned from previous developments that front yard trees over time eventually die due to construction impacts. Therefore, staff is comfortable with the proposed grading of these lots in The City of Chanhassen.A growing community with clean lakes,quality schools,a charming downtown,thriving businesses,and beautiful parks.A great place to live,work,and play. Sharmin Al-Jaff Lake Lucy Estates Preliminary Plat Review May 14, 1998 Page 2 an effort to minimize tree impacts on the back portion of these lots. As you will note, the grading plan incorporates grading outside of the 50-foot wide right-of- way. City Ordinance requires a subdivision to dedicate 60-foot wide right-of-ways and 60-foot wide radius in a cul-de-sac. The plans are proposing a 50-foot wide right-of-way and 50-foot wide radius cul-de-sac. Staff believes that a 60-foot wide right-of-way could be dedicated without impacting too many of the lots; however, given the very steep terrain on the northerly half of the project, the additional right-of-way would increase the setbacks for the homes thus creating additional fill for driveways and dwellings which, in turn, would affect existing tree canopy coverage. Therefore, staff is comfortable with permitting a 50-foot wide right-of- way; however, the cul-de-sac will need to be 60-foot radius to provide adequate room for snow storage and utility improvements. According to the grading plan it appears the site will be short on material. Staff anticipates the applicant will need to import material to develop the site. The applicant will need to supply the City with a haul route and traffic control plan for review and approval prior to site grading commencing. In an effort to reduce grading and tree loss, staff is recommending that a retaining wall be incorporated in the northwest corner of Lakeway Drive and Lakeway Lane. In addition, retaining walls could be further extended along private driveways to minimize grading and tree loss as well. Lakeway Court also needs to provide for a temporary turnaround acceptable to the City's Fire Marshal. The temporary turnaround could be created on one of the lots (Lot 1, Block 3 or Lot 10,Block 2) until the Morin's subdivide when a permanent would then be required. The southerly private street(Lakeway Drive at the end of the cul-de-sac) is proposed to serve Lots 5 and 6, Block 2. However, Lot 6 is a very large lot and has the potential for further subdivision. The Fire Marshal may also require an acceptable turnaround if the driveway exceeds 150 feet in length. This will require additional grading and tree loss on Lot 6 if it is further subdivided in the future. The plans propose to fill up to four feet of material in this area to prepare the house pads and private driveway (Lakeway Drive). This is also necessary to provide adequate cover for the sanitary sewer to service these lots. In addition, fill material will give the ability to create lookout or walkout-type dwellings without further grading towards the wetland. Sharmin Al-Jaff Lake Lucy Estates Preliminary Plat Review May 14, 1998 Page 3 The grading plan needs to incorporate dwelling types along with garage and first floor and lowest floor elevations for staff to review. Without this information it is relatively difficult to determine full grading impacts on the project. Custom- graded lots will require detailed grading (with two-foot existing and proposed contours), drainage, tree removal and erosion control plans at time of building permit application for City staff to review and approve. Building pad locations designated on the custom-graded lots are seldom used. The house configuration and soil factors will govern the location. Therefore, tree canopy loss may or may not be accurate and in most instances it is not. Tree loss is generally 10% to 15% higher due to construction activities outside of the home and generally impacts trees 20 feet away from the foundation. Retaining walls are a practical way of minimizing grading and tree loss. The applicant should be aware that retaining walls in excess of four feet in height will required building permits and engineered drawings. A soils report was prepared for the applicant by Braun Intertec. A summary of the results of the soils evaluation indicated soil borings typically encountered a one to four-foot layer of topsoil at the surface. Below the topsoil most of the borings encountered glacially deposited soils. Layers of alluvial deposits were encountered above the glacial till into the boring. Groundwater was encountered at four of the six boring locations. At these locations groundwater was encountered 4 to 11 feet below the surface or above elevation 950.5 to 965.5. The soil report also supplied recommendations which indicated the topsoil,the alluvial soil and some soft glacial soils found in the borings are considered unsuitable for supportive proposed loads due to high organic content and/or associated compressibility under fill and building loads. To prepare for construction the report recommended removal of these soils and any existing fill in the building or oversized area. In the streets, the soil should be removed at least three feet below the proposed roadway subgrade elevation. The excavations would then be backfilled with engineered fill as needed to achieve the building and/or street subgrade elevation. The report also indicated the natural clays on the site will be suitable for reuse as fill but will require drying to achieve compaction requirements. The City's typical street section requires a two-foot sand subcut underneath the standard pavement section in order to prepare the street in accordance with the City's typical urban street section. Typically,with the soil conditions on hilly terrain, ground water may be of concern. The City requires a drain tile system behind the curb and gutter for homes which are not adjacent to a wetland/pond. The drain tile system provides Sharmin Al-Jaff Lake Lucy Estates Preliminary Plat Review May 14, 1998 Page 4 an acceptable means of controlling sump pump discharge from the homes as well as improve the street subgrade. Storm sewer and tree fencing needs to be denoted on the final grading and drainage plans prior to final plat approval. Typically,in a development like this the developer is also the builder. However, in this case staff is unsure whether the actual developer will be building the homes. Past experience has educated staff to make things as clear as possible with regards to grading and tree removal limits in the conditions of approval. Apparently, communication is lost between the developer and builder and prospective home buyer at time of building permit application. The City has envisioned one way of constructing a home on the lot; however, the prospective home buyer has another and seldom do they correspond. Therefore, staff is recommending that tree removal grading limits should be specifically addressed on each of the custom- graded lots so as any prospective home buyers will know exactly what they are able to do to the lot. EROSION CONTROL Erosion measures and site restoration shall be developed in accordance with the City's Best Management Practice Handbook(BMPH). Staff recommends that the City's Type III erosion control fence which is a heavy duty silt fence be used around the wetlands for maximum protection. The final grading plan shall incorporate erosion control fence around the perimeter of the grading limits. In addition,tree preservation fencing should be denoted on the grading and drainage plan as well. UTILITIES Municipal sanitary sewer service is proposed to be extended from the Coey parcel which was subdivided into Point Lake Lucy. The Coey parcel is located approximately 200 feet east of this site. The sewer line to date has not been extended to service this parcel. The sanitary sewer has been extended through the Pointe Lake Lucy development and deadended at the property just east of the development(Morin's). The exact alignment of the sewer line has been staked in the field up to the Morin's property previously by staff and the property owner. The alignment minimizes tree loss and impacts to the wetlands and Morin's property. The applicant will need to adjust their plans to incorporate this Sharmin Al-Jaff Lake Lucy Estates Preliminary Plat Review May 14, 1998 Page 5 alignment. In addition, the necessary utility easement for this extension needs to be acquired in order to proceed with the project. Without the sewer, this project should be considered premature for development. A condition has been added in the staff report that preliminary and final plat approval will be contingent upon sanitary sewer being extended through the Morin's property. At the time the Morins subdivide their parcel and connections are made to the sewer line,the applicant will be entitled to a refund of a portion of the connection charge the City will impose at time of building permit. Staff recommends that the individual sewer and water service be field verified prior to construction to determine a location on each lot which minimizes tree loss. The applicant should also be advised that, based on the soils report, there may be some areas of unsuitable material where the pipe will need to be place on pilings or significant subgrade correction performed prior to installation of the pipe. Municipal water service is available to the site from Lake Lucy Road. The plans propose on extending water service throughout the development. Detailed street and utility construction plans and specifications will be required in conjunction with final plat approval. The construction plans and specifications shall be prepared in accordance with the City's latest edition of the Standard Specifications and Detail Plates. Final construction plans and specifications will need to be submitted to the City a minimum of three weeks prior to final plat consideration for staff review and City Council formal approval. The applicant will be required as a part of final plat and construction plan approval to enter into a development contract and provide the City with financial securities to guarantee final plat conditions of approval and installation of the public improvements. The development contains two existing home sites (Tichy and Christensen). Both of these home sites are currently on their own well and septic system. The existing home on the westerly portion of the site (Lot 1, Block 2 - Christensen's) is proposed to be removed. The other home (Tichy) is proposed to remain on Lot 4, Block 3. Both have on-site well and septic systems that will need to be abandoned in accordance with the City and State building codes in conjunction with this development. The well and septic on Lot 1, Block 2 will have to be abandoned in conjunction with demolition of the home. The well and septic system on the Tichy property (Lot 1, Block 1) may be delayed since the construction activities appear not to impact the systems. However,city ordinance requires properties within 150 feet of a municipal sewer system must be connected to the City's system within 12 months after the system becomes operational. Connection to City water is not required until the well fails. • Sharmin Al-Jaff Lake Lucy Estates Preliminary Plat Review May 14, 1998 Page 6 The sanitary sewer to serve this development will need to be designed and constructed to service the Morin's property as well as the properties to the west of the site and north of Lake Lucy Road. The applicant has not provided sewer and water extension west of the development. Staff will be reviewing the need for providing utility service to the adjacent parcels. The applicant shall be responsible for extending sanitary sewer service west of the site and north of Lake Lucy Road in a location determined by staff. STREETS Access to the development is proposed from Lake Lucy Road. This road is classified in the City's Comprehensive Plan as a collector street. The applicant is proposing to dedicate on the final plat an additional 7 feet of right-of-way to meet the City's design criteria along Lake Lucy Road. Street right-of-way on the public street within the plat has been reduced from the 60-foot requirement to 50 feet wide in an effort to reduce grading and tree loss. Staff has evaluated this compromise and believes the reduced right-of-way may be warranted except for the cul-de-sac diameter. The plans are also incorporating the use of private driveways to service portions of the development and adjacent parcels. City ordinance provides for up to four homes to be serviced off a private driveway. A turnaround acceptable to the City's Fire Marshal will also have to be provided. The private driveways will reduce impacts to the wetlands and minimize tree loss versus a public street. Staff believes the use of a private driveway to service Lots 5 and 6, Block 2 may be warranted to reduce impacts to the area. The construction of a public street in this area would destroy the natural features. In addition, Lots 5 and 6,Block 2 would be marginal lots due to setback requirements from wetlands and the street. Staff believes the applicant has followed the layout prepared by staff to minimize the environmental concerns. If a public street was required to serve Lots 5 and 6, Block 2 there would be only two lots created at the end on Lot 6, Block 2 due to setbacks from the street and wetlands. Lot 5, Block 2 would not meet code requirements. Therefore, an argument could be made for not allowing Lot 6, Block 2 to future subdivide. Another private street is proposed to service three lots (Lots 9 and 10, Block 2 and Lot 1,Block 3) and the Morin's parcel to the east. The Morin's and staff have previously reviewed the development potential of the Morin's parcel and it appears that the site may be further subdivided into two additional lots. Therefore the private street(Lakeway Court) as proposed would be serving up to five homes Sharmin Al-Jaff Lake Lucy Estates Preliminary Plat Review May 14, 1998 Page 7 which exceeds the City's ordinance. Staff believes there is no other way to create a street system to serve these lots which would minimize impacts and therefore recommends a variance be granted for up to five (5) homes accessing Lakeway Court. A turnaround which meets the City Fire Marshal's requirements will be necessary at the end of Lakeway Court. If the Morin's are not in favor of the turnaround at this time, a temporary turnaround could be developed on Lot 10, Block 2 or Lot 1, Block 3 until the Morin's are ready to subdivide. Future access was also considered for the parcel west of the development (Randall). The Randall's parcel currently gains access from Lake Lucy Road via a long gravel driveway. Part of the driveway is actually located within the proposed subdivision through Lots 1, 2 and 3, Block 1. The Randall's driveway access onto Lake Lucy Road is across from Yosemite. This intersection has substandard sight distance which makes it difficult to safely turn to and from the property. Eventually, when the Randall parcel further subdivides, staff will recommend that the driveway access onto Lake Lucy Road be eliminated and the driveway be relocated to access Lakeway Lane. It appears the Randall property has ability to further subdivide into more than four lots. The applicant has proposed a 31-foot wide City street and 50-foot wide public right-of-way between Lot 1,Block 2 and Lot 3, Block 1 to provide future access to the site. Lot 1, Block 2 will also be accessed from this street. A sign will be required on the barricades as wells as a condition in the development contract indicating that "Lakeway Lane may be extended in the future". Staff has reviewed the street grades and alignment and believes, with the exception of the cul-de-sac, no further modifications are available to minimize tree loss and grading. These changes were also discussed in the grading portion of this report, i.e. retaining wall in the northeast corner of Lakeway Drive and Lakeway Lane and revise cul-de-sac configuration and relocation of stormwater pond. All lots are proposed to access the interior streets and not directly onto Lake Lucy Road. The existing driveway to Lot 4, Block 3 is proposed to be relocated to Lakeway Drive. This will result in the necessity to change their street address. Private driveway maintenance and access agreements will need to be incorporated into covenants to permit access to the lots adjacent to private driveways as well as the Morin parcel. Street grades range from 1% to 10% which exceeds City Ordinance. City Ordinance requires street grades to be between 0.75% and 7%. Staff believes that Sharmin Al-Jaff Lake Lucy Estates Preliminary Plat Review May 14, 1998 Page 8 a 10% street grade may be warranted in this situation to better conform to existing terrain and minimize grading and tree loss. However, staff is recommending that a 3% or less landing minimum length of 75 feet be designed at the intersection of Lake Lucy Road and Lakeway Drive to provide adequate sight lines and acceleration onto Lake Lucy Road. Staff believes that this can be easily accomplished. MISCELLANEOUS The final plat will need to dedicate a 60-foot radius on the cul-de-sac. In addition, drainage and utility easements shall be dedicated over the stormwater pond and any utility improvements which lie outside the City's road right-of-way. The minimum easement width shall be 20 feet wide depending on the depth and location of the utility or stormwater pond basin. RECOMMENDED CONDITIONS OF APPROVAL 1. The applicant will need to develop a sediment and erosion control plan in accordance with the City's Best Management Practice Handbook and the Surface Water Management Plan requirements for new developments. The plan shall be submitted to the City for review and formal approval. Type III erosion control fence shall be used adjacent to the wetlands and Type 1 erosion control fence shall be used adjacent the grading limits. 2. All areas disturbed as a result of construction activities shall be immediately restored with seed and disc-mulched or wood-fiber blanket or sod within two weeks of completion of each activity in accordance with the City's Best Management Practice Handbook. 3. All utility and street improvements shall be constructed in accordance with the latest edition of the City's Standard Specifications and Detail Plates. Detailed street and utility plans and specifications shall be submitted for staff review and City Council approval three weeks prior to final plat consideration. 4. Wetland buffer areas shall be surveyed and staked in accordance with the City's wetland ordinance. The City will install wetland buffer edge signs before accepting the utilities and will charge the applicant$20 per sign. Sharmin Al-Jaff Lake Lucy Estates Preliminary Plat Review May 14, 1998 Page 9 5. The applicant shall provide detailed storm sewer calculations for 10-year and 100-year storm events and provide ponding calculations for stormwater ponds in accordance with the City's Surface Water Management Plan for the City Engineer to review and approve prior to final plat approval. The applicant shall provide detailed pre-developed and post developed stormwater calculations for 100-year storm events and normal water level and high water level calculations in existing basins, created basins, and or creeks. Individual storm sewer calculations between each catch basin segment will also be required to determine if sufficient catch basins are being utilized. In addition,water quality ponding design calculations shall be based on Walker's Pondnet model. 6. The applicant shall enter into a development contract with the City and provide the necessary financial security to guarantee compliance with the terms of the development contract. 7. The applicant shall apply for and obtain permits from the appropriate regulatory agencies, i.e. Carver County,Watershed District, Metropolitan Waste Control Commission, Health Department,Minnesota Pollution Control Agency, Minnesota Department of Natural Resources, Army Corps of Engineers and Minnesota Department of Transportation and comply with their conditions of approval. 8. The appropriate drainage and utility easements should be dedicated on the final plat for all utilities and ponding areas lying outside the right-of-way. The easement width shall be a minimum of 20 feet wide. Consideration shall also be given for access for maintenance of the ponding areas. A 40- foot wide drainage and utility easement will be required over the utilities located within Lakeway Court. 9. No berming, retaining walls or landscaping will be allowed within the right- of-way. 10. The lowest floor elevation of all buildings adjacent to the wetlands or storm water ponds shall be a minimum of 2 feet above the 100-year high water level. 11. A water quality pond shall be provided on the west side of the cul-de-sac to pretreat runoff prior to discharging into the wetlands. The proposed Sharmin Al-Jaff Lake Lucy Estates Preliminary Plat Review May 14, 1998 Page 10 stormwater pond must have side slopes of 10:1 for the first ten feet at the normal water level and no more than 3:1 thereafter or 4:1 throughout for safety purposes. The stormwater pond shall be designed and constructed with a 75%phosphorus removal efficiently. A landscape plan providing upland and wetland plants to naturally blend the pond into the surroundings is recommended. 12. Existing wells and/or septic systems on site will have to be properly abandoned in accordance to City and Minnesota Department of Health codes/regulations. The existing home (Tichy) on Lot 4, Block 3 shall be connected to the City's sanitary sewer system within 30 days after the system becomes operational. Connection to City water is not required unless the well on Lot 4, Block 3 fails. 13. The proposed single-family residential development of 11.48 developable acres is responsible for a water quantity connection charge of$22,730. These fees are payable to the City prior to the City filing the final plat. The water quality fees will be waived if the applicant provides for on-site stormwater treatment. 14. The applicant shall report to the City Engineer the location of any drain tiles found during construction and shall re-locate or abandon the drain tile as directed by the City Engineer. The construction plans shall include a drain tile system behind the curbs and gutters on those lots which are not adjacent to a wetland or storm pond. 15. All lots shall take direct access to the interior street system and not Lake Lucy Road. Lot 4, Block 3 shall relocate their driveway from Lake Lucy Road to Lakeway Drive. In addition, the street address for this lot shall be changed accordingly. 16. Lots 1 through 3, Block 1, Lots 1 through 3, Block 2, and Lots 1 through 3,Block 3 shall be custom graded at time of building permit issuance. A detailed grading (with two-foot contours), drainage, tree removal and erosion control plan shall be submitted with the building permit application for review and approval by the City engineer prior to issuance of a building permit for the lot. Sharmin Al-Jaff Lake Lucy Estates Preliminary Plat Review May 14, 1998 Page 11 17. The grading,drainage,and construction plans shall be revised incorporating the following changes that conform better with the existing grades and minimize grading and tree loss: a) Tree protection fencing. b) Retaining wall along the northeast corner of Lakeway Lane and Lakeway Drive to reduce grading and minimize tree loss. c) Shorten and lower cul-de-sac and increase radius to 60 feet. d) Relocate stormwater pond to west side of cul-de-sac. e) Provide "Y" or "T" temporary turnaround on Lakeway Court. f) Denote dwelling type on all lots including garage,first and lowest floor elevation. g) Label height of retaining walls. h) Provide drain tile behind the curb for those lots not adjacent to wetlands or stormwater pond. i) Design private driveway (Lakeway Drive)to drain partially back to cul-de-sac. j) Add outlet control structure to pond. k) Revise sanitary sewer alignment through Morin's parcel and provide sanitary sewer service to parcel to the west per staff. 18. Preliminary and final plat approval shall be contingent upon sanitary sewer service being extended to the plat from the Coey property (Point Lake Lucy)to this site and the applicant obtaining a drainage and utility easement from the Morins. 19. All private streets shall be designed and constructed in accordance to City Ordinance No. 209 and a turnaround acceptable to the City's Fire Marshal. A private maintenance agreement and access easement shall be provided Sharmin Al-Jaff Lake Lucy Estates Preliminary Plat Review May 14, 1998 Page 12 for all parcels served by a private street(s). A temporary turnaround may be permitted on Lot 10, Block 2 or Lot 1,Block 3 until the Morin's parcel further subdivides. 20. The applicant shall extend utilities to the parcel to the west through a location determined by staff. Temporary barricades shall be placed at the end of Lakeway Lane. A sign shall be placed on the barricades indicating "this street shall be extended in the future". A condition will also be placed in the development contract to inform all property owners in Lake Lucy Estates of this street extension. 21. The applicant shall obtain a variance to the City's private street ordinance to allow up to 5 homes to access Lakeway Court, 10% street grade on Lakeway Drive and 50-foot right-of-way throughout except for the cul-de- sac is recommended. 22. The applicant or their assignee shall submit a haul route and traffic control plan to the City Engineer for review and approval prior to site grading commencing. 23. Individual sewer and water services to the lots shall be field verified to determine the path of least impact to the trees. 24. The applicant shall be entitled to a refund (up to 90% depending on construction costs) of a portion of future sewer connection charges collected from Morin's parcel when building permits are issued. 25. Cross-access and maintenance agreements will need to be prepared for use of the private driveway including the Morin's parcel. c: Anita Benson, City Engineer g.'en&\projects'4ake lucy estates\ppr memo.doc • CITY OF CIIAN IASSEN MEMORANDUM 690City Center Drive,POBox 14% TO: Sharmin Al-Jaffe,Planner II Chanhassen,Minnesota 55317 Phone 612.937.1900 FROM: Mark Littfin, Fire Marshal General Fax 612.937.5739 Engineering Fax 612.937.9152 DATE: May 4, 1998 Public Safety Fax 612.934.2524 SUBJ: Request for rezoning of 16.4 acres from RR, Rural Residential to Web u'u'i ci.chanhassen.mn.ns RSF, Residential Single Family. Preliminary Plat of 16.4 acres into 17 single family lots with variances. Property is located on the south side of Lake Lucy Road just north of Lake Lucy, Lake Lucy Estates,contractor Property Developers Company. Planning Case; 95-3 SUB & 95-1 Rezoning(File 2). I have reviewed the site plans for the above project. In order to comply with the Chanhassen Fire Department/Fire Prevention Division, I have the following fire code or city ordinance/policy requirements. The site plan is based on the available information submitted at this time period. If additional plans or changes are submitted,the appropriate code or policy will be addressed. 1. At the east end of Lake Way Court provide an approved turnaround for fire apparatus. Pursuant to 1991 Uniform Fire Code, Section 10.204(D). 2. Relocate the existing hydrant that is located on block 8 on the south side of Lake Way Court to the north side of Lake Way Court on block 2. 3. With reference to block 2, lot 6, if structure is not visible from the street, additional address numbers will be required at driveway entrance. Pursuant to Chanhassen Fire Permit Policy Premise Identification No. 29-1992. ML:ebb g:/safety/ml/case95-3 The City of Chanhassen.A growing community with clean lakes,quality schools,a charming downtown,thriving businesses,and beauti f:ul parks.A great place to live,work,and play. CITY OF CHANHASSEN MEMORANDUM TO: Sharmin Al-Jaff, Planner II 690 City Center Drire,PO Box 147 Chanhassen,Minnesota 55317 FROM: Steve A.Kirchman,Building Official Phone 612.937 1900 General Fax 612.9375.739 DATE: May 6, 1998 Engineering Fax 612.937.9152 SUBJECT: 95-3 SUB and 95-1 REZ, file 2(Lake Lucy Estates,Contractor Property Public Safety Fax 612.934.2524 Developers Company) Web www.ci.chanhassen.nu.us I was asked to review the subdivision proposal stamped "CITY OF CHANHASSEN, RECEIVED, APR 24 1998, CHANHASSEN PLANNING DEPT." for the above referenced project. Analysis: Dwelling Types. The type of dwelling is necessary to enable the Inspections Division and Engineering Department to perform a satisfactory plan review of the structure at the time of building permit issuance. For the same reason, proposed lowest level floor elevation, entry floor elevation (not top of block) and garage floor elevation is required to be indicated on the proposed pad location. Standard designations (FLO or RLO, R, SE, SEWO, TU, WO) must be shown for proposed dwelling types.These standard designations lessen the chance for errors during the plan review process. The memo explaining these designations is enclosed. Demolition Permits. Existing structures on the property which will be demolished will require a demolition permit. Proof of well abandonment must be furnished to the City and a permit for septic system abandonment must be obtained and the septic system abandoned prior to issuance of a demolition permit. A house moving permit is required if a structure is to be moved to another location within the City. House moving permits must be approved by the City Council. A road use permit is required to move a structure over City roads. Retaining Walls. Retaining walls over 48"high from the base of their footings require a building permit and inspections. Recommendations: The following conditions should be added to the conditions of approval. 1. Revise the preliminary grading & erosion control plan to show the proposed dwelling pads with standard designations and indicate the lowest level floor, entry level floor and garage floor elevations. This should be done prior to final plat approval. 2. Obtain demolition permits. This should be done prior to any grading on the property. 3. Obtain building permits from the Inspections Division for retaining walls over 48"high. enclosure: January 29, 1993 memorandum g:`safery'saklmemos'.plan'Ikelcyest I The City of Chanhassen.A growing community with clean lakes,quality schools,a channing downtown,thriving businesses,and beautifid parks.A great place to lire,work,and play CHANHASSEN. ; .y CITY OF 0., <: ‘,..„ • 690 COULTER DRIVE • PO. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937-1900 • FAX (612) 937-5739 MEMORAN i UM TO: Inspections, Planning, & Engineering Staff FROM: Steve A. Kirchman, Building Official DATE: January 29, 1993 SUBJ: Dwelling Type Designation We have been requesting on site plan reviews that the developer designate the type of dwelling that is acceptable on each proposed lot in a new development. I thought perhaps it might be helpful to staff to explain and diagram these designations and the reasoning behind the requirements. FIA)or RLO Designates Front Lookout or Rear Lookout This includes dwellings with tae basement floor level approximately 8'below grade at its deepest with the surrounding grade sloping down to approximately 4' above the basement floor level. R Designates Rambler. This includes dwellings with the basement floor level approximately 8'below grade with the surrounding grade approximately level. This would include two story's and many 4 level dwellings. SE Designates Split Entry. This includes dwellings with the basement floor level approximately 4'below grade with the surrounding grade approximately level. SEWO Designates Split Entry Walk Out. This includes dwellings with the basement floor level approximately 4' below grade at its deepest with the surrounding grade sloping down to lowest floor level. TU Designates Tuck Under. This includes dwellings with the basement floor level approximately 8' below grade at its deepest with the surrounding grade sloping down to the lowest floor level in the front of the • dwelling. WO Designates Walk Out. This includes dwellings with the basement floor level approximately 8'below grade at its deepest with the surrounding grade sloping down to the lowest floor level in the rear of the dwelling. r $E` SEWO Wo °r RLO Inspections staff uses these designations when reviewing plans which are then passed to the engineering staff for further review. Approved grading plans are compared to proposed building plans to insure compliance to approved conditions. The same designation must be used on all documents in order to avoid confusion and incorrect plan reviews. ..f PRINTED ON RECYCLED PAPER ve1d/y3 rxl u :iu FAX 612 937 9152 CITY CHAN ENGINEERING tth002 CITY OF CHANHASSEN 690 COULTER DRIVE CHANHASSEN, MN 55317 (612)937.1900 DEVELOPMENT REVIEW APPLICATION APPLICANT: Loscheider Custom Homes, Inc. OWNER: Robert Christiansen 1511 Lake Lucy Road ADDRESS: 1607 Florida Ave. N. ADDRESS: Chanhassen, MN 55331 Golden Valley, MN 55427 Brian & Nancy Tichy 1471 Lake Lucy Road Chanhassen, MN 55331 "TELEPHONE(Day time) (612) 546-8699 TELEPHONE: Comprehensive Plan Amendment — Temporary Sales Permit Conditional Use Permit Vacation of ROW/Easements Interim Use Permit X Variance $ 75 Non-conforming Use Permit Wetland Alteration Permit Planned Unit Development' ` Zoning Appeal X Rezoning $500 _ Zoning Ordinance Amendment Sign Permits - 1 Sign Plan Review X Notification Sign $150 Site Plan Review' Escrow for Filing Fees/Attorney Cost" • ($50 CUP/SPRNACNAR/WAP/Metes and Bounds,$400 Minor SUB) X Subdivision- $655 TOTAL FEE$- 1380 A list of all property owners within 500 feet of the boundaries of the property mustbe included with the application. Building material samples must be submitted with site plan reviews. `Twenty-six full size folded copies of the plans must be submitted, Including an 81/2"X 11"reduced copy of transparency for each plan sheet "'Escrow will be required for other applications through the development contract NOTE-When multiple applications are processed, the appropriate fee shall be charged for each application. 02/13/98 FRI 09:10 FAX 612 937 9152.:,. --CITY CHAN EJB II D; ' . tit 4 PROJECTNAME Lake Lucy Estates: - LOCATION South of Lake Lucy Road and North of Lae ' c•., Chaanhass= LEGALDESCRIPTION See Attached ,,. . vITIIIT'S,' 144 TOTAL ACREAGE 16.40 Total, 14.56 above„0.11.W.L WETIARIDS PRESENTX YES ,c �. - PRESENTZONING RR, Rural Residential Dist ' a.`? REQUESTED ZONING RSF, Residential Single Family District PRESENT LAND USE DESIGNATION Low Density Residential REQUESTED LAND USE DESIGNATION Low Densit Residential:. TEA5ON FOR THIS REQUEST Create Residential Lots .:?fi This application must be completed in full and be typewritten or clearly printed and must • aCoomp ;X71h r• n„_„. and plans required by applicable City Ordinance provisions. Before filing this application,iirfrota 0.tf,p,) r) _ii , ,,, Department to determine the specific ordinance and procedural requirements applicable to • ;). • it a : A determination of completeness of the application shall be made within ten business •a •• .-tr•)a..j►1_•1 ilii{_u ,',,;i,::, notice of application deficiencies shall be mailed to the applicant within ten business da"' 0 :;,• . • .Til ?his i5 to certify . ;,�. Y; that I am making application for the described action by the City and that am fes••i ir! -4%`,7=W •i.,.,,,, all City requirements with regard to this request. This application should be processed in my riarne`=:i f„h1;t_ :t1,,, ,. the City should contact regarding any matter pertaining to this application. I have attached a copy of pr.. :j;y. t^;?:,. copy of Owners Duplicate Certificate of Title,Abstract of Title or purchase agreement), • if , -,- ,•iz=. zh , this application and the fee owner has also signed this application. �' 41//tw I wili keep myself informed of the deadlines for submission of matena 'and the progr- •;+.iii. :,.. understand that additional fees may be charged for consulting fees, feasibility studies, etc.-.."-.fit =ac- -11“r ,'•' authorization to proceed with the study. The documents and information I have sub itt-• . -, le.i 0.,,,::.., ,. ;., my knowledge The city hereby notifies the applicant that development review cannot be completedlwtin ris;;-el ar ri ; requirements and agency review. Therefore, the city is notifying the applicant Ihattthe c iy u --1 Int �„..,, -11 :7,: extension for development review. Development review shall be com•leted�.,.,i�ti , •f, 1-4,x1 161(47 .1.•.,0.ir. - . extensions are ved by the applicant. ' 4111 APJT- F_. 4/2 Sig re of Appiicarit ,, .G, :-fes D .- /4)./ i (. l 4/24/913- --_ Sign i.ire of Fee O -her Date: Appria-ation Received on Fee Paid �13$O Recei• -41.1111111•11114W-- - ,1„ the appfcartt should contact staff fora copy of the staff report which Wil •e -) - 11:1. • `,i`.; If riot contacted,a copy of the report will be mailed to the applicant' ad! 4--:.-.. . The following Legal Description is from Coffin & Gronberg, Inc.'s Proposed Subdivision Plan for Michael J. Byrne, dated 7-12-94: LEGAL DESCRIPTION OF PREMISES: That part of Government Lot 5,Section 2,Township 116,North,Range 23 West of the 5i°Principal Meridian,described as follows: Commencing at the northeast corner of said Government Lot 5;thence on an assumed bearing of North 87 degrees 50 minutes 47 seconds West,along the north line of said Government Lot 5,a distance of 488.42 feet,to the point of beginning of the land to be described;thence continuing North 87 degrees 50 minutes 47 seconds West,along said north line,a distance of 205.56 feet,to a point distant 647.29 feet easterly from the northwest corner of said Government Lot 5;thence South 0 degrees 24 minutes 23 seconds West, parallel with the west line of Section 2,about 1342 feet to the shoreline of Lake Lucy;thence easterly, along said shoreline,to the intersection with a line drawn South 0 degrees 24 minutes 23 seconds West, parallel with the west line of Section 2,from the point of beginning;thence North 0 degrees 24 minutes 23 seconds East,about 1247 feet,to the point of beginning,Carver County,Minnesota. ALSO That part of Government Lot 5,Section 2,Township 116 North,Range 23 West of the 5`h Principal Meridian,described as follows: Beginning at a point on the North line of said Government Lot 5 distant 375.00 feet East of the Northwest corner of said Lot 5;thence east along said North line a distance of 272.29 feet;thence south parallel with the West line of said Government Lot 5 a distance of 1320.00 feet; thence southerly,deflecting right 22 degrees 37 minutes a distance of 214.50 feet;thence south parallel with said west line a distance of 132.00 feet;thence southeasterly,deflecting left 51 degrees 53 minutes a distance of 107.00 feet;thence west parallel with with said north line to its intersection with a line drawn southerly parallel with said west line;thence northerly along said parallel line to the point of beginning. (Note: this legal is preliminary,and is subject to a title search for proper wording.) LAKE LUCY ESTATES Chanhassen, Minnesota by Contractor Property Developers Company April 24, 1998 PROPOSAL This project is proposing to develop 17 single family lots on 16.40 acres. The project requires the following approvals: 1. Rezoning of property zoned RR, Rural Residential to RSF, Residential Single Family. 2. Preliminary Plat/Subdivision of the property. 3. Variances to allow 20 foot front yard setbacks on 3 lots, a 10%street grade,a 50' wide right- of-way,a 50' radius cul-de-sac R.O.W.width,and five homes to be served via a private street. SITE CONDITIONS Land Use The 16.40 acre site(14.56 acres located above the OHW level) is located south of Lake Lucy Road, north of Lake Lucy: and southeast of the intersection of Yosemite Avenue and Lake Lucy Road. The site currently is made up of two lots with two existing single family homes. Surrounding land uses include the Shadow Ridge Subdivision to the north(RSF, Residential Single Family), Lake Lucy to the south, and RR, Rural Residential land use to the east and west. The City of Chanhassen 2000 land use plan has identified the subject property as well as the properties located to the east and west as Residential- Low density(net density range 1.2-4 units per acre). Natural Environment Site topography ranges from elevation 956.1 at Lake Lucy to a high point of 1036,adjacent to Lake Lucy Road. Much of the change in elevation and steep slopes occur on the northern half of the site. The southern half of the site gradually slopes to Lake Lucy. The site contains two wetlands that have a combined total of approximately 3.39 acres that are located on the site. The wetland that is located along the east property line is characterized as an inland shallow fresh marsh. Approximately 1.79 acres of the wetland is located on the property. The second wetland that is found to the south is part of the natural wetland complex that borders the Lake Lucy shoreline,above the OHWL of Lake Lucy. Approximately 1.60 acres of the wetland is located on the property. The majority of the site is wooded. The most prevalent tree species found on the site is Ash which makes up approximately 30%of the total tree canopy. The next most prevalent tree species is the Box Elder(16.3%)followed by Oak(13.7%), Linden (8.4%), Elm (7.2%), Hickory (5.8%), Aspen (5.5%), and Pin Cherry(5.3%). Apple,Cottonwood, Hackberry, Ironwood and Willow percentages are below 5%of the total tree inventory. CITY of CHPNHASSEN APR 2 41998 _ ��CFT There is a significant area made up of invasive Buckthorn/Amur maple that is found on the lower portion of the site that is included in the tree canopy(9.51 acres-April 7, 1998)that has been determined by the City. In addition,there are areas of diseased Oak and other canopy areas that have been impacted by part use of off-road recreation vehicles. These areas reduce the quality of the forested area and are discussed in greater detail an attached forest management plan prepared for the development. Site Access and Utilities The proposed site access is from Lake Lucy Road. Lake Lucy Road is classified as a collector street in the City's Comprehensive Plan. The existing two properties that make up the site are currently unsewered and have private septic sewer systems. An 8"sanitary sewer stub exists approximately 200' away from the eastern property line of the subject site. Municipal water service is available to the site from Lake Lucy Road. No storm sewer system currents exists on site. The majority of the storm water drains naturally from Lake Lucy Drive to the wetland on the eastern border of the proposed development. PROPOSED DEVELOPMENT Rezoning The proponent is requesting a rezoning to RSF, Residential Single Family District and subdivide the property into 17 lots. As previously stated,this request for rezoning is in compliance with the Comprehensive Plan and the City of Chanhassen 2000 Land Use Plan which identifies the property as Residential Low Density(Net Density 1.2 -4 units per acre). The subdivision of 17 lots will establish a density of 1.16 units per acre. Variances The proponent is requesting variances to allow 20' front yard setbacks on 3 lots, 10% street grade, a 50' wide R.O.W. and 50' cul-de-sac R.O.W. width and 5 homes to be served by a private street. These variances are requested to reduce grading and subsequent tree lots,due to the particular physical surroundings, shape and topographical conditions of the land. SITE ACCESS Site access will come from Lake Lucy Drive. All of the proposed lots will be served by Lakeway Drive and private drives that access it. None of the lots will have direct lot access to Lake Lucy Drive. Lakeway Drive is proposed as an ±850' long cul-de-sac with a 50' wide right-of-way and a 50' radius for the right-of-way at the turnaround. A 50' public street right-of-way and roadway stub will be established by this development which allows for future development of the property to the west(Willis Property). One of the lots(Lot 1, Block 2)will have lot access from this stub which is to be named Lakeway Lane. UTILITIES AND DRAINAGE Sanitary sewer is available at the west boundary of the Point Lake Lucy subdivision. This will be extended weterly across the Morin property to the site. An 18 inch watermain is located in Lake Lucy Road. A lateral line will extend into the site and provide opportunity for future looping to the west. Storm water runoff will be collected into a storm sewer system and be directed to a stormwater treatment pond at the end of the cul-de-sac and next to a wetland The proposed development utilizes private streets that access Lakeway Drive and serve 5 lots. The private drive will have a right-of-way width of 30', and pavement width of 20'. Lakeway Drive will serve Lots 5,6 of Block 2, and Lakeway Court serves Lots 9, 10 of Block 2 and Lot 1 of Block 3. The Moran parcel to the east of the development may be further subdivided in the future by others into 2 additional lots and be served by Lakeway Court. The site grading is intended to minimize site alteration,preserve the natural features of the site and yet allow for the creation of lots. Use of retaining walls has been minimized to the greatest extent possible yet used in a few key areas. Tree preservation was a prime concern. Canopy removal has been minimized when possible and prudent to do so. Areas at quality,healthy trees were given the greatest priority. Areas of invasive, exotic species and older,diseased trees were considered expendable. The attached Forestry Manage Program explains the existing forest condition,plan to reverse the current forest degradation and intent to help re-establish a healthy, native forest environment. DEVELOPMENT DATA Total Site Area - 16.40 Acres Site Area Above Lake Lucy OHWL - 14.56 Acres Wetland Area -3.39 Acres Net Site Upland Area - 11.17 Acres Land Use Plan Designation -Low Density Residential (1.2-4 units per acre) Existing Zoning - RR- Rural Residential -RSF- Single Family Residential Proposed Units - 17 Proposed Density (17 Lots 16.40 Acre) - 1.04 Units/Acre (17 Lots 14.56 Acre) - 1.16 Units/Acre Lake Lucy Road(40' ROW) - 0.44 Acres Internal Public Row(50' ROW;100'dia sac) - 1.26 Acres Private Streets(30' ROW) - .038 Acres Lot Standards Minimum Width -90 feet Minimum Depth - 125 feet Minimum Lot Area - 15,000 sq. ft. Average Lot Area - 31,986±sq. ft. Yard Setbacks Front-Typical - 30 feet -Variance request -20 feet Side - 10 feet Rear -30 feet Lakeshore Setback- Lake Lucy - 75 feet Wetland Setbacks Buffer - 10 to 30 feet - 10' minimum - 20 minimum average Structure Setback from Buffer -40 feet \f3.'i'. Ck 1.111101 !:MIL-4 IMIW 1.1."46.* 3 Al iiii h t� rl Inmk NOTICE OF PUBLIC HEARING ��!r`.�■■ Q�_■�r_ ��r.�`• , PLANNING COMMISSION tst:�� ��'�7 ���� Iw �4 \�`v- a 4 Rea r Wednesday, May 20, 1998 :,�� ��ys•Pj°wfimrmataiiig ' I��II�� r4�� at 7:00 p.m. :���iiira=I- Jrf# City Hall Council Chambers 1` Int"I =�ilr�1` �.���Q 690 City Center Drive13211r �� ' i�� � �� J4s Koa• . 1Fill nall ' my". vcr,Ar ake lea ---- . SUBJECT: Rezoning and Preliminary Plat r Lake Lucy EstatesI WASP ° APPLICANT: Contractor Propertykoina 46, 0 tin Developers Company Lake Lucy s IF ,..!,1 Br iii LOCATION: South side of Lake Lucy Road `,m .1© just north of Lake Lucy ■ ' aa °i NOTICE: You are invited to attend a public hearing about a proposal in your area. The applicant, Request for a rezoning of 16.4 acres from RR, Rural Residential to RSF, Residential Single Family; preliminary plat of 16.4 acres into 17 single family lots with variances. The property is located on the south side of Lake Lucy Road just north of Lake Lucy, Lake Lucy Estates, Contractor Property Developers Company. What Happens at the Meeting: The purpose of this public hearing is to inform you about the developer's request and to obtain input from the neighborhood about this project. During the meeting, the Commission Chair will lead the public hearing through the following steps: 1 . Staff will give an overview of the proposed project. 2. The Developer will present plans on the project. 3. Comments are received from the public. 4. Public hearing is closed and the Commission discusses project. The commission will then make a recommendation to the City Council. Questions and Comments: If you want to see the plans before the meeting, please stop by City Hall during office hours, 8:00 a.m. to 4:30 p.m., Monday through Friday. If you wish to talk to someone about this project, please contact Sharmin at 937-1900 ext. 120. If you choose to submit written comments, it is helpful to have one copy to the department in advance of the meeting. Staff will provide copies to the Commission. Notice of this public hearing has been published in the Chanhassen Villager on May 7, 1998. JUDITH A DIRKS DALE CARLSON RONALD KNUDTEN 1205 ASH STREET WEST 6900 UTICA LANE 6850 UTICA TERRACE OLIVIA, MN 56277 CHANHASSEN, MN 55317 CHANHASSEN, MN 55317 JOSEPH & D GAYLE MORIN EDWIN NEWINSKI PATRICK MOHR 1441 LAKE LUCY ROAD 6930 UTICA LANE 6890 UTICA TERRACE CHANHASSEN, MN 55317 CHANHASSEN, MN 55317 CHANHASSEN, MN 55317 BRIAN TICHY WILLIAM WARD 1471 LAKE LUCY ROAD 6960 UTICA LANE EXCELSIOR, MN 55331 CHANHASSEN, MN 55317 ROBERT CHRISTENSEN WILLIAM D LAMBRECHT 1511 LAKE LUCY ROAD 6990 UTICA LANE EXCELSIOR, MN 55331 CHANHASSEN, MN 55317 JACK RANDALL HEIDI JO CARISCH 1571 LAKE LUCY ROAD 7000 UTICA LANE EXCELSIOR, MN 55331 CHANHASSEN, MN 55317 ALAN WEINGART DICK&ALICE FOWLER 1685 STELLER COURT 7050 UTICA LANE EXCELSIOR, MN 55331 CHANHASSEN, MN 55317 PAISLEY PRK ENTERPRISES ANN BUTCHER ATTN:ACCOUNTANTS 7090 UTICA LANE 7801 AUDUBON ROAD CHANHASSEN, MN 55317 CHANHASSEN, MN 55317 ROBERT MASON JUDY CHRISTENSEN 14201 EXCELSIOR BLVD 7100 UTICA LANE MINNETONKA, MN 55345 CHANHASSEN, MN 55317 ALAN WEINGART JAMES SCHLUCK 1685 STELLER COURT 6800 UTICA TERRACE EXCELSIOR, MN 55331 CHANHASSEN, MN 55317 ERIC RIVKIN GERALD HOFFMAN 1695 STELLER COURT 6830 UTICA TERRACE EXCELSIOR, MN 55331 CHANHASSEN, MN 55317 • GREGORY & JULIE CARTER SANDRA/ROBERT KENDALL MICHAEL & AMY PETERSON 6600 CHARING BEND 1645 LAKE LUCY ROAD 6550 SHADOW LANE CHANHASSEN, MN 55317 EXCELSIOR, MN 55331 CHANHASSEN, MN 55317 GENNINE NAVICKAS MARK & TRACY WILLIAMS LECY CONSTRUCTION INC 1420 LAKE LUCY ROAD 1655 LAKE LUCY ROAD 10340 VIKING DRIVE CHANHASSEN, MN 55317 EXCELSIOR, MN 55331 EDEN PRAIRIE, MN 55344 ALFRED HARVEY COFFMAN DEVELOPMENT CO. WILLIAM & PAMELA PAULSEN 1430 LAKE LUCY ROAD 7409 W 112TH STREET 6560 SHADOW LANE EXCELSIOR, MN 55331 BLOOMINGTON, MN 55438 CHANHASSEN, MN 55317 JOSEPH & D GAYLE MORIN ROBERT MASON DANIEL MCGRAW 1441 LAKE LUCY ROAD 14201 EXCELSIOR BLVD 6573 SHADOW LANE CHANHASSEN, MN 55317 MINNETONKA, MN 55345 CHANHASSEN, MN 55317 BRIAN TICHY ANDREW AGEE DANIEL & RANEA HAIGHT 1471 LAKE LUCY ROAD 6629 POINTE LAKE LUCY 6587 SHADOW LANE EXCELSIOR, MN 55331 CHANHASSEN, MN 55317 CHANHASSEN, MN 55317 ELIZABETH A GLACCUM CRAIG MANDERY WILLIAM & PAMELA ASPLIN 1510 LAKE LUCY ROAD 6670 POINTE LAKE LUCY 1665 STELLER COURT EXCELSIOR, MN 55331 CHANHASSEN, MN 55317 EXCELSIOR, MN 55331 ROBERT CHRISTENSEN JOHN & CAROL GOODMAN P THIESSE/KIM TERNING 1511 LAKE LUCY ROAD 6686 POINTE LAKE LUCY 1675 STELLER COURT EXCELSIOR, MN 55331 CHANHASSEN, MN 55317 EXCELSIOR, MN 55331 JACK RANDALL PAUL LUNSFORD ALAN WEINGART 1571 LAKE LUCY ROAD 6511 SHADOW LANE 1685 STELLER COURT EXCELSIOR, MN 55331 CHANHASSEN, MN 55317 EXCELSIOR, MN 55331 ALMOND L KRUEGER ALLEN SATTER ERIC RIVKIN 1600 LAKE LUCY ROAD 6515 SHADOW LANE 1695 STELLER COURT EXCELSIOR, MN 55331 CHANHASSEN, MN 55317 EXCELSIOR, MN 55331 GRAIG & DEANNA CLAYBAUGH WILLIAM SCHABEL 1630 LAKE LUCY ROAD 6545 SHADOW LANE EXCELSIOR, MN 55331 CHANHASSEN, MN 55317 Forest Management Plan Lake Lucy Estates S 1/2 of Section 2, T 116 N, R 23 W Chanhassen, Minnesota April,1998 City of Chanhassen Ilk 690 City Center Drive Chanhassen, Minnesota 55317 (612) 937-1900 CITY OF CH.ANHASSEN Project Proposer Contractor Property Developers Company 9110 83`d Avenue North _: am Brooklyn Park, Minnesota 55445 (612) 627-0823 Consultant W Westwood Professional Services, Inc. 7599 Anagram Drive Eden Prairie, Minnesota 55344 (612) 937-5150 CITY OF CHANHASSEN APR 241998 .,nH11InMJJGIV r�,ir,,, .0 utPT FOREST MANAGEMENT PLAN LAKE LUCY ESTATES, CHANHASSEN, MINNESOTA April, 1998 TABLE OF CONTENTS Page PROJECT PURPOSE, DESCRIPTION, AND WOODLAND IMPACTS 1 WOODLAND OVERVIEW 1 Tree Survey Results 1 DESIGNATED WOODLAND AREAS 2. Location and size of Replacement/Forestation tree planting areas 2 List of all replacement trees including species, caliper, and planting method 3 METHODS OF TREE PROTECTION 6. Location of all protective fencing 6. Special construction methods to be utilized 6 Location of all retaining walls 6. Statement explaining why replacement trees are necessary 6 Rationale for selection of replacement/forestation trees 6 CONTROL OF EXOTIC SPECIES 7 • ©Westwood Professional Services,Inc. January, 1998 Westwood Professional Services, Inc. considers the information contained in this document and any attachments to be proprietary. This document and any information contained or referenced herein shall not be disclosed,duplicated, our used in whole or in part for any purpose other than processing the permit applications referred to herein without written permission from Westwood and the Applicant. Westwood Professional Services, Inc. (612)937-5150 FOREST MANAGEMENT PLAN LAKE LUCY ESTATES, CHANHASSEN, MINNESOTA April, 1998 PROJECT PURPOSE, DESCRIPTION, AND WOODLAND IMPACTS The Lake Lucy Estates is a proposed single family residential development located on approximately 14.56 acres with 11.17 acres of upland in Chanhassen,Minnesota. The development proposes to provide 17 single family residences. The site is located in the S '/2 of Section 2,T 116 N,R 23 W,City of Chanhassen,Carver County,Minnesota (Exhibit 1). The property is bordered on the south by Lake Lucy,on the north by Lake Lucy Road and on the east and west by private residences. The total area of canopy on the property is approximately 9.51 acres(per City calculation 4/22/98)or 85%of the site. The baseline canopy coverage(minimum coverage to remain after development)is 55%or 5.23 acres. The proposed impacts are 4.67 acres(49%)canopy removal and 4.84 acres(51%)of canopy remaining. This results in 0.39 acres of canopy that need to be replaced. Replacement requirements are calculated by multiplying the replacement acres by 1.2. This results in 0.78 acres of canopy to be replaced. Replacement trees are required at a rate of 40 trees per 1 acre of removed canopy;therefore,the required number of replacement trees for the proposed impact is 19 trees. However,the project proposes to actually provide more trees and shrubs in association with forest under-planting and landscaping efforts. We propose a variety of sizes from seedlings(underplanting)to 2 '/2 inch diameter. The quantity and/or value will be at least equivalent to the required replacement. WOODLAND OVERVIEW The woodland on this property is quite diverse in terms of species,size,and condition. The forest is comprised of approximately 30%ash, 16%box elder, 14%oak, 8%linden,7%elm, 6%hickory,6%aspen,5%cherry,and scattered ironwood,cottonwood,apple,willow,spruce,cedar and hackberry. In general,the oaks represent the trees of largest diameter and apparent canopy dominance;however,the ash and box elder appear better suited for larger areas of the site which experience periods of wet conditions. Significant areas of recent ash and box elder establishment exist on the property. There is a moderate buckthorn problem in the understory of the forest and shrubs and saplings dominate in areas adjacent to Lake Lucy in the southern part of the property. Tree Survey Results Woodland areas were inventoried in connection with a previous project proposal. This data was evaluated and additional site visits were made to collect more information and confirm the accuracy of the available tree survey. As the survey and subsequent site visits indicate,the woodland on this property is in a stage of transition. A large portion of the oaks in the dominant canopy are in a declining state of health due to over maturity,wet conditions, and Armillaria root rot. The dieback of the oaks is slowly opening up the forest establishment of ash,box elder and buckthorn. Ash and box elder are better suited for the wet conditions occurring on portions of the site and buckthorn is a very aggressive,invasive exotic. There are two pockets of oaks occurring on the property. One pocket is located in the southeast corner of the site and is comprised of small diameter(<10")oaks. The second pocket is located in the central portion of the site and is comprised of large diameter(>18")oaks. The small diameter oak pocket is in fairly good health while the large diameter pocket shows significant signs of decline and dieback due to various pathogens including Armillaria root rot. Westwood Professional Services, Inc. (612)937-5150 Lake Lucy Estates Page 2 Forest Management Plan April 1998 These observations suggest that preservation efforts within this woodland developed in support of activities such as construction be focused on the small diameter pocket of oaks as well as any individual large diameter oaks not exhibiting serious dieback symptoms. It is also suggested that restoration efforts be focused on establishing desirable tree regeneration and understory composition in the area of oak and canopy dieback. DESIGNATED WOODLAND AREAS Location and size of Replacement/Forestation tree planting areas The required number of replacement trees for the proposed 0.39 acres of excess impact is 19 trees. However,the project proposes to actually provide more trees and shrubs in association with forest under-planting and landscaping efforts This site represents a unique opportunity for the developer,the City of Chanhassen,and the neighborhood surrounding Lucy Lake. The woodland on this property shows a history of productive hardwood growth and development. The level of productivity has declined in recent years dues to dieback of the overstory due to disease and decadence and a lack of desirable,viable tree regeneration in the understory to fill the resulting gaps. Other minor impacts have combined to start a transitional trend in this woodland. Impacts such as moderate to heavy recreation use and trail development,historic orchard management,and moderately wet conditions in association with Lake Lucy and the wetland have created conditions less suitable for oak dominance and which facilitate buckthorn invasion. If left to develop without disturbance,it is highly probably that this woodland would slowly transform from a mature oak woodland to a mixed lowland hardwood stand to a ash and box elder dominated forest with significant areas of buckthorn brush and a understory consisting almost exclusively of invasive exotic species. The opportunity for the parties involved is to restore this woodland and reverse the transition. It is requested that the City support the developer's proposal to do reforestation and replacement planting on the site using planting materials averaging less than 2.5 inches in diameter. The developer proposes to do some understory planting using small diameter seedlings and saplings. These understory plantings will consist of native trees and shrubs that represent high quality species suited to the site and providing more of the natural diversity of a Minnesota forest with greater ecosystem functionality. It is the desire of the developer that they understory plantings be established as advanced regeneration to help insure that oak and other hardwoods will remain a part of the forest canopy even as the current specimens dieback. It is also the intention of the developer to reestablish shrub diversity on this site as desirable understory material,wildlife habitat,water quality protection,and competition for the invading common buckthorn. By properly designing,planting,protecting,maintaining,and managing the proposed understory planting,it is the intention of the developer to help restore this woodland to a more functional example of a native Minnesota hardwood forest. Westwood Professional Services, Inc. (612)937-5150 Lake Lucy Estates Page 3 Forest Management Plan April 1998 List of all replacement trees including species, caliper, and planting method Replacement tree species, quantity and size Primary Specimen Deciduous Trees Sugar Maple/Acer saccharum Red Oak/Quercus rubra White Oak/Quercus alba Bicolor OaklQuercus bicolor Bur OaklQuercus macrocarpa Basswood/Tilia americana Hackberry/Celtis occidentalis Conifers Tamarack/Larix laricina Balsam fir/Abies balsamea Picea glauca/White spruce White Pine/Pinus strobes Trees/Shrubs not listed in City Tree Ordinance Paper Birch/Betula papyrifera Black Cherry/Prunus serotina Pagoda Dogwood/Cornus alternifolia Ironwood/Ostrya virginiana Allegheny Serviceberry/Amelanchier laevis Nannyberry/Viburnum lentago Silver Maple/Acer saccharin um Willow/Salix discolor Black Spruce The trees and shrubs listed above were selected following recommendations contained within the City of Chanhassen Ordinances and Recommended Trees For:Southeast Minnesota,An Ecosystem Approach(Fo-6574-s, 1996). Proposed tree sizes will range from seedlings(understory planting)up to 2 '/2 inch diameter(e.g.,seedlings,3-6' whips, 1", 1 ''/2",2",2 V2",etc.). Materials will be potted,balled and/or bareroot as seasonal availability and situation requires. The intent is to provide an equivalent quantity and or value to the required replacement trees. Westwood Professional Services, Inc. (612)937-5150 Lake Lucy Estates Page 4 Forest Management Plan April 1998 Planting notes for trees planted in yards and as landscaping: 1. Contractor shall provide one year guarantee of all planting materials. The guarantee begins on the date of the Landscape Architect's written acceptance of the initial planting. Replacement plant materials shall also have a one year guarantee commencing upon planting. 2. All plants to be Minnesota-grown and/or hardy. 3. Plants to be installed as per standard AAN planting practices. 4. Use minimum 12"loam planting soil on trees and 6"on shrubs(sides and bottom of hole). 5. Staking of trees optional;reposition is not plumb after one year. 6. Wrap all smooth-barked trees-fasten top and bottom. Remove by April 1. 7. Open top of burlap on BB materials;remove pot on potted plants;split and break apart peat pots. 8. Prune plants as necessary-per standard nursery practice and to correct poor branching. 9. Owner shall be responsible for maintenance after initial watering by Contractor. 10. Plants shall be immediately planted upon arrival at site. Properly heel-in materials if necessary,temporary only. 11. All disturbed areas to be sodded unless otherwise noted;sod to be standard Minnesota-grown and hardy bluegrass mix. 12. Shredded hardwood bark mulch shall be used around all trees. 13. Contractor shall contact Gopher State"One Call"(454-0002)to verify underground utility locations. 14. Areas to be watered,adjacent to residential lots,by homeowner. Other open areas to be watered by natural rainfall. Planting notes for trees and shrubs used in understory restoration: 1. Contractor will guarantee survival rates off 40%in areas of at least 50%crown closure and 50%in areas with crown closures less than 50%. These expectations are consistent with data presented by D.Zastrow and T. Marty. (Tree Shelter Experience,The Oak Resource in the Upper Midwest, 1991). 2. All plants to be Minnesota-grown and/or hardy. 3. Plants to be installed as per standard AAN planting practices. 4. 1.2 meter plastic shelters of rigid plastic mesh will be used to shelter seedlings if it is determined that animal browse is a substantial threat. 5. Planting material will selected per recommendations in Inspection and Contract Administration Guidelines for Mn/DOT Landscape Projects(1993). 6. Planting sites may be flagged to facilitate easy relocation for survival survey. �� Westwood Professional Services, Inc. (612)937-5150 Lake Lucy Estates Page 5 Forest Management Plan April 1998 Tree planting methods: EVERGREEN PLANTING METHOD: III Prune out misdirected bronches Leow leaders intoct `� ./' Guying and staking o optionor: \ ' Top of stcSes S' above ground (max.)or to first branch. Bottom of stake Y(rn i.)Meow ground s1 f' / St osM Stoking poets to 2-c2' stained wood or pointed eta& d.lhector poets. Rau 3 porta egildirtant crowd and outside root ball. l Seur. tree to porta with 16" long pdypropyi.ne of pdyethyle•nr, 40 ml. 1 1/2' old.strap. 1N \� -': *ter. wrapping Is colied for wrap from ,\��1 f.:. / grounding upward to first branches -`�� /�' Ili plea 6' depth of wood mulch over plant pits - do not pie against trunk 'killI , . scarify sides and bottom of hole \/W��// \���/~� -141. A/' i,,� Set root bat on undt:turt»d ub,oa or '/ \�i\\ '' idie \\\4 ccmpocted son mound matching trees \4e4'*-V•C. ,"Yg/\\���/�/W- 1, - �.<%mak•/ natural groundme with finished site grade • \\Q Forty 3" deep watering basin Eadell plant pit with specified baakfJl eon TREE PLANTING METHOD: 401( Pnr a out m sdrected branches �/ L.cne leaders infect Guying and staking V optional: Top of*takes 3' above ground (unmt_)or to Prat crancn. Bottom of etck• Y(mtn.) below ground staking posts to be 2"7Q" st dn.d wood or pointed stud delineator porta. 1... .;;;-64 1 Roc. 3 posts equidistant amid and outside root bee. sea+n Ver to post, .tan 16'long palyQropy{.rx of psi ye lhylene, 40 ml, 1 7/2' wide strop. �III� *here wrapping In coiled for. wrap from groundne upward to first branches Flocs 4' depth of specified mulchover II plant pita - do rat pie oganst trunk Scorfy sides and bottom of hole 4'- //\ \o • ':.%:r_" �,�j Set root ball on undisturbed sub»7 or \\\\. IMF 4, \ compacted sol mound matdnrg trw -\\/.e\Or\�f/t-%,;,- - // u- ' /\\/'\-f natural groundin. with Mished site grade Form 3" deep watering basin Backfill plant pit with specified backfll eel Westwood Professional Services, Inc. (612)937-5150 Lake Lucy Estates Page 6 Forest Management Plan April 1998 METHODS OF TREE PROTECTION Tree protection methods to be implemented on the Lake Lucy Estates site follow recommendations and guidelines set forth in Protecting Trees from Construction Damage,Minnesota Extension Service Publication#FO-6135-S (Miller,et.al. 1995,). As grading limits are staked in the field,the trees anticipated to be impacted by these activities will be assessed and marked for removal or preservation as determined by their location,general health,condition,and potential to present a hazard in an area with increased levels of human occupation. Location of all protective fencing Protective fencing will be installed as recommended per Minnesota Extension Service Publication#FO-6135-S (Miller,et.al. 1995)or as deemed necessary by contractors and site developers. Protective fencing will be established in accordance with the above cited recommendations for all trees in proximity to disturbance activities and marked in the field as feasible and desirable to preserve. Special construction methods to be utilized Special construction methods are not anticipated at this time. However,if situations develop recommendations will be followed as outlined in Minnesota Extension Service Publication#FO-6135-S(Miller,et.al. 1995)or as deemed necessary by contractors and site developers. Location of all retaining walls Retaining walls to be established on the property will be identified on site plans and built in such a manner as to reliably protect the tree resource by protecting as much of the critical root radius as is feasible. Statement explaining why replacement trees are necessary Site development plans will include activities which necessitate the removal of some trees. These development activities are necessary to meet project goals and provide housing to meet local market demands. The establishment of ponding on the site will protect the quality of the local water resource and help prevent any water level increases on the site which would further reduce the suitability of the site as oak woodland habitat. • -Rationale for selection of replacement/forestation trees Trees to be used in replacement and forestation were selected primarily on the basis of suitability to site conditions. Only native species will be used and predominantly species already present on the site to help retain and restore the historic forest composition on the site. High quality hardwoods such as hackberry,basswood,cherry,and ironwood were selected for their superior growth form and desirability as both forest and boulevard trees. Bicolor oak were selected in addition to other oak species already occurring on the site because of their reduced susceptibility to oak wilt and their greater tolerance of the moderately wet habitat occurring in planting areas adjacent to Lake Lucy. By maintaining a variety of oak species on the site there is a reduced likelihood of any single pathogen causing an epidemic in the forest. Sugar maple and birch are both native species which are a natural component of mature oak woodlands with moderately wet pockets. The coniferous species,including black spruce and white pine,were selected to be used in areas were higher levels of screening and view preservation are required. It is suggested that some of the replacement requirements be met through the use of innovative planting designs and materials. One of the desires of the project proposer is to design a planting plan which actual improves the current woodland in terms of regenerative capacity,dominance of high-quality species in both the canopy and understory, Westwood Professional Services, Inc. (612)937-5150 Lake Lucy Estates Page 7 Forest Management Plan April 1998 and overall canopy health. It is suggested that these goals can be met by removal of diseased oaks during construction,and establishing replacement trees to consist in part of understory plantings of tree seedlings. The goal of project designers is to establish tree species such as various oaks,maples and ironwood in the understory to help combat the buckthorn invasion and provide replacement canopy for future oak dieback. Installation design would include the establishment of protective measures such as plastic tubing or mesh to prevent rodent,rabbit and deer damage to the seedlings;however,seedlings would be planted in such numbers as to allow some loss without significantly impacting the ability of surviving seedlings to meet project goals. CONTROL OF EXOTIC SPECIES It is recognized that buckthorn occurs on the property in such a degree as to limit the establishment and regeneration of desirable,native shrub and tree species. It is the desire of the developer to determine a method of effective and economic control of buckthorn. At this time such a method has not been identified for the property. It will be difficult to effectively,efficiently,and economically control buckthorn on this site because of the fairly large area of woodland that would need to be treated,proximity to water resources,and the abundance of a buckthorn seed source in the immediate vicinity. It is not recommended that buckthom controls be initiated until all or the vast majority of site disturbance and proposed landscaping has been completed. Attempts to control buckthorn before project completion have a reduced likelihood of success due to the presence of appropriate seedbeds for buckthorn invasion. Project developers will continue to investigate new buckthorn controls that are being developed and their applicability for treatment of this property. It is anticipated that development of some areas will remove buckthorn from these areas and quick establishment of sod and other ground covers will limit buckthom reestablishment. It is also anticipated the understory restoration efforts will establish some more desirable seed sources in the area for native species and also provide competition to slow the invasion of common buckthorn. The extent of buckthom on the site will be reinvestigated during and following the various phases of development. Westwood Professional Services, Inc. (612)937-5150 Lake Lucy Estates Page 8 Forest Management Plan April 1998 Replacement Requirement Calculations (The first row represents values referred to throughout the Forest Management Plan.) Canopy % of Baseline Proposed Proposed Canopy Total Coverage total Canopy Canopy to Canopy to be to Replacement (acres) areal Coverage" Remain Removed Replace Trees (40/acre) 9.51"' 85% 55% 51% 49% 0.39 191' (5.23 (4.84 acres) (4.67 acres) acres acres) 8.35' 75% 46% 45% 55% 0 0 (3.84 acres) (4.84 acres) (4.67 acres) 8.34" 75% 46% 52% 48% 0 0 (3.84 acres) (4.32 acres) (4.02 acres) 11.17 acres "City of Chanhassen Tree Ordinance requirements Calculated from canopy outlined provided by the City 4/22/98 and based on 1989 Aerial Photography. 0.39 X 1.2 X 40 trees/acre= 19 replacement trees "Calculated by City as recorded in a memo dated March 23,1995. ""Calculated by Westwood Professional Services,Inc.on April 23,1998 using the canopy outline provided by the City less the area of low stocking and shrub dominance along Lake Lucy(1.17 acres) Westwood Professional Services, Inc. (612)937-5150 Westwood Professional Services,Inc. 117 7599 Anagram Drive Eden Prairie,Minnesota 55344 612/937-5150 MEMORANDUM DATE: April 6, 1998 TO: Greg Kopischke,Westwood Professional Services FROM: Kathryn Fernholz,Westwood Professional Services RE: Evaluation of Wetland and Woodland Resources on the Lake Lucy Estates Site At your request, on March 31 and April 1, 1998 a review was made of the site referred to as the Lake Lucy Estates and located in the South %2 of Section 2,T116N,R23W, City of Chanhassen,Carver County, Minnesota. The intention of this visit was to assess the accuracy and acceptability of the wetland delineation and assess the condition and composition of the wooded portion of the property. A wetland delineation was prepared for the property by Peterson Environmental Consulting,Inc. The final wetland report submitted to the City of Chanhassen is dated March 22, 1995. The project manager was Scott Krych. Conversations with the Water Resources Coordinator for the City of Chanhassen indicate that the City still accepts this delineation and will not require a new delineation be performed at this time. During the site review on April 1, 1998, several wetland delineation flags were observed and appeared to correspond consistently and correctly with the wetland edge as was evidenced by distinct contrasts in vegetation types, topography,and hydrology. Before examining the woodland resource on the property, several sources of information were reviewed. In 1995,a tree survey was completed for the property. The survey recorded a diverse mix of tree species including willow, ash,linden(basswood),box elder,red oak,red cedar,elm,hackberry,hickory,black oak, scotch pine, and ironwood. Conversations with the forester for the City of Chanhassen and a memo dated March 23, 1995 dispute the accuracy of the black oak observations. Previous documentation concerning the woodland on this property disagrees on the extent of canopy coverage.The various calculations are as follows: Canopy Percent of Total Canopy to Canopy Total Canopy Total Date/Author of Coverage Upland' be Removed Remaining to Replace Replacement Calculation (acres) (acres) (acres) (acres) Trees 9.11 79% 5.28 3.83 1.74 70 Applicant, 3/23/95 8.35 73% 5.89 2.46 3.38 135 City, 3/23/95 7.45 N/A 3.58 3.87 1.63 65 Unknown,5/17/95 Observations on the property indicate that the density of the canopy varies greatly throughout the property. Also, the forest is criss-crossed with trails which reduces the amount of area effectively covered by tree ' Upland Area was calculated as 11.48 acres(Applicant,March 23, 1995). Memorandum - CPDC April 6, 1998 Page 2 canopy. Rough estimates indicate that the basal area in the well-stocked areas of the woodland ranges from about 100 square feet per acre in a small pocket of mature oak to as high as 130 square feet in another area with smaller diameter ash. Previous observations of these woods, as reported in the various documents, appear to have neglected mention of the condition of these woods in terms of disease or insect stress. The general condition of this woodland is difficult to access because it varies greatly throughout. The "best"area in terms of desirable species which are healthy and presumably vigorously growing is located in a narrowing between the wetland to the north and Lake Lucy to the south, in the southeast corner of the property. Another pocket of woodland located in a diagonal band between the wetland and the southernmost residence on the property exhibits characteristics of a mature oak woodland; however, this pocket also shows signs of disease and insect stress. Areas between and surrounding these two pockets are largely populated with small diameter box elder, ash, and aspen. The woodland situated between the wetland and Lake Lucy is of primary importance because it consists generally of oak and basswood of moderately small diameter(6-12"). There is less indication of the diseases evidenced in other parts of the property. These trees are presumably vigorously growing and healthy enough to withstand moderate disturbance. The woodland located between the wetland and the residence is of interest because it is the one area on the site containing large diameter oaks. Most canopy trees in this area are over 20" in diameter. If one just looks at this area of woodland in a horizontal fashion, it is aesthetically pleasing. However, by looking over one's head, it is quickly noted that the crowns of many of these majestic oaks are plagued with dead branches and broken limbs. The oaks in this area vary greatly in their condition and degree of health. There are some individuals which have little or no crown dieback,but the majority have significant decay and low probability of long-term survival or successful regeneration. The selection of viable trees to be preserved in this area will be difficult. The woodlands located between these two pockets are an indication of what the entire forested area may convert to if or when the oak canopy thins due to decadence and disease. It is feasible to presume that this forest is currently in a state of transition. Ecologically speaking, there are several scenarios to consider about the history and potential future of this woodland. Firstly, this is a mesic site with abundant water and clayey soils. These are atypical conditions for an oak dominated forest. Secondly, oak on the site is highly unlikely to remain a major component in the canopy through the next generation of trees. Thirdly, the most likely successors to oak in the canopy are ash,box elder and aspen. Lastly, it is likely that buckthorn will continue to increase its presence in the understory. Therefore, if left alone this woodland will slowly but surely convert from a oak forest to a shrubby ash and box elder woods with a buckthorn understory. Observations were made of several diseases and other damaging agents operating in this woodland. These agents and the species most affected are listed below: • Armillaria mellea (shoestring root rot) (oak) • termites (oak, large diameter trees) • Eutypella canker(maple) • bacterial wetwood (elm) • Rhizosphaera needlecast(spruce) • smooth patch(oak) • white pine blister rust(white pine) Westwood Professional Services, Inc. (612)937-5150 Memorandum-CPDC April 6, 1998 Page 3 Some of these diseases, such as smooth patch and bacterial wetwood, are highly unlikely to cause tree mortality and are generally undesirable only because of the aesthetic degradation they cause. Rhizosphaera needlecast observed on the property was occurring on large spruce in the front yards of current residences. Through properly applied and timed pruning and spraying, this problem can also be limited to the loss of only a few lower branches. The white pine blister rust was observed on yard trees of the adjacent property. This observation does not directly affect the trees currently occurring on the property,but is important to note when selecting new species to be planted in the area. The most serious indications of forest decline in this woodlot are the termites and shoestring root rot. The termites were observed in the base of a large,nearly dead oak tree. The presence of these insects indicates that some of the trees on the property that may appear structurally sound and stable may in fact have severely degraded support in the main stem and base. These trees may be highly susceptible to wind throw and pose a hazard in a setting with high levels of human activity. These trees also have large, dead limbs in their crowns which could cause damage or be hazardous to prune. Trees infested with termites are unlikely to survive even low or moderate levels of disturbance within the critical root zone. Evidence of shoestring root rot(Armillaria mellea)was found throughout the wooded portion of the property. Shoestring root rot is a fungus that attacks the "circulatory system" of the tree. Outbreaks are most common on both red and white oaks, but ash and maple can also be infected. The fungus grows through the soil and attacks the roots of stressed trees. The fungus causes girdling of the stem, root and shoot dieback, and even death if site conditions are not changed. The oak species on the property show the most signs of root rot infection. There is extensive crown dieback occurring. Large, dead branches are in the crowns of most large diameter(>20") oaks on the property. It is probably that these oaks are succumbing to root rot because they are being stressed by the flooded or waterlogged conditions on much of the property. The fact that the oaks are being so heavily affected by a stress related fungus is an indication that this species is ill-suited for the conditions occurring on this property. Conversations with the pathology professor at the University of Minnesota indicate that it is unlikely that the oaks will survive the root rot if the stress factor is not alleviated. Conversations with the DNR Area Hydrologist indicate that the recent development in the Lake Lucy area may be increasing runoff levels to the wetland and lake and causing water levels to slowly increase. These possible changes in water table could be closely related to the stress exhibited by the oaks on the property and the appearance of woodland transition. If a trend of water level increase is suspected, it expected that the site will continue to become less suitable for continuation as oak habitat. The continuing and increasing water stress will keep the remaining oaks in a state of stress and highly susceptible to two-lined chestnut borers and root rot. It is evidenced that this area was once grazed. This landuse facilitated the invasion of exotic, noxious plants such as common buckthorn. Also the criss-crossing trails through the woodland have probably assisted the introduction of buckthorn and exposure of viable seedbeds. The invasion of buckthorn in the understory functions to limit the viability of tree regeneration in the forest floor. „� Westwood Professional Services, Inc. (612)937-5150 Species Abundance Lake Lucy Estates April 7, 1998 cottonwood spruce cedar 2% 1% 0% applewillow hackberry ironwood 1% 1% 1% cherry 2% i ash 5% -_ ' 30% aspen =11\\11. hickory 696 • elm = •' 7°h linden oak box elder 8% 14% 16% species count percent ash 174 29.8% box elder 95 16.3% oak 80 13.7% linden 49 8.4% elm 42 7.2% hickory 34 5.8% aspen 32 5.5% cherry 31 5.3% ironwood 11 1.9% cottonwood 10 1.7% apple 8 1.4% willow 7 1.2% spruce 3 0.5% hackberry 3 0.5% cedar 2 0.3% scotch 2 0.3% TOTAL 583 100.0% • • r r• • .. e o • e• • \N....\\\\:\\\ z / // • Wetland I_ Legend Diameter(dbh) • Box Elder • 0-7 inches 8-14 inches ,e 15-21 inches 0 22-28 inches Lake Lucy n 29-36 inches Ash 0-7 inches 8-14 inches 15-21 inches 22-28 inches 29-36 inches N Lake Lucy Estates w .1; E Chanhassen,Minnesota Box Elder and Ash Distribution (N=95; N=174) „�Westwood Professional Services,Inc. • >: • • • / ;/ . 111 • " ...--, //i , f i/ / • 1 Wt/rnd y _� ......4 • 1 / • / •. 1 .././- 7 ••• • t \ • �•� -_ Legend Diameter(dbh) Lake buy • 0-7 inches • 8-14 inches • 15-21 inches • 22-28 inches • 29-36 inches f dead/diseased tree N Lake Lucy Estates W E Chanhassen,Minnesota Q S Oak Distribution (N-80) W Westwood professional Services Inc Y i J --p : ..- I .. : . ,-- - - ...---:;..:-ita• a-.-' • s . -'''� _ i - _ 1� (1 -'\•••\,. / ,..........„...::, . . . . . • , .., .. ... ... ,.,:, . .• . •. .. . ..... •_. .• • • . -_ . ..N..:' , - .. ..- . , ..__ _ _ • . ... . . • , .... , fi • _ •• . .. Legend • Diameter(dbh) 0-7 inches Lake buy 8-14 inches 15_21 inches 22-28 inches 29-36 inches N Lake Lucy Estates W E Chanhassen,Minnesota S Tree Diameter Distribution W Westwood Professional Services,Inc • -,-:•.... '----...-k\:‘..,...,‘,..-„,\, ' -....1,...;,-;;I ".— . \. . ,r,t i ire ' r• • rsr r. `..__. • i. ` t'' t.•` :�-•ter-.- ;• `( " ' _J Jr • • • •' .-7- -211....--. r • / `` J/• // ` 777 ' / ... \\♦ . I • O lbetland • J ; • a c �/ • i . • \11 (....._...„...........______________,........N... : •. • •- • • ' Legend • Ili • �... • • • ..' c apple - -_ 0 aspen • box `� --- cherry • i' cottonwood i,; elm hackbeny hickory ironwood linden • oak willow dead N Lake Lucy Estates E Chanhassen,Minnesota S Tree Canopy Composition W Westwood Professional Seances,Inc Westwood Professional Services, Inc. 7599 Anagram Drive Eden Prairie,Minnesota 55344 612/937-5150 MEMORANDUM DATE: April 8, 1998 TO: Greg Kopischke,Westwood Professional Services /I FROM: Kathryn Femholz, Westwood Professional Service- f 1 RE: Suggestions for Successful Tree Preservation •n the ake Lucy Estates At your request, a review was made of the site plan for the project referred to as the Lake Lucy Estates and located in the South '/ of Section 2, T116N,R23W, City of Chanhassen, Carver County, Minnesota. The intention of this review was to assess the grading limits and tree preservation potential for the project There are several rules of thumb when selecting trees to be preserved during construction`; 1. Favor preservation of smaller diameter trees; 2. Favor preservation of species best suited to site; 3. Favor species less susceptible to any diseases or insect problems on the site; 4. Favor a variety of species; and 5. Favor groups rather than individuals. In short, "Favor the best; Remove the rest". There is little point to making extravagant efforts to protect trees during construction if actual tree survival is highly unlikely. The money would be better spent purchasing high quality planting material to be established following construction. Because the woodland on this site has a diverse mix of species, it is important to note that not all trees have the same level of tolerance for disturbance in the root zone. For open grow trees, such as those located in the front lawns or backyards of the current residences, the dripline or edge of the tree canopy is a fair indication of the "protected root zone". For trees grown in a forested or closed canopy condition, the protected root zone is best calculated on the basis of diameter(dbh). The protected root zone for forest trees is equal to the dbh, in inches, multiplied by 1.5 which gives an answer which should be interpreted as a radius in feet. Examples include: Protected Root Zones for Example DBHs. dbh (inches) Protected Root Zone (feet) 6 9 12 18 18 27 24 36 36 54 Much of the information in this memo is taken from the Minnesota Extension Service publication FO-6135-S, entitled Protecting Trees from Construction Damage(Miller, et al. 1995). Memorandum- CPDC April 8, 1998 Page 2 The protected root zone is the area where disturbance should be minimized to the extent possible. The amount of disturbance that a tree will tolerate before becoming stressed and increasingly susceptible to pathogens varies by species and condition. Some trees are highly sensitive to disturbance while some healthy trees of disturbance tolerant species have been known to survive after losing up to 50% of their root systems. Examples of tolerance levels for tree species occurring on this site include; Root Severance Tolerance Levels for Various Tree Species. Tolerant Intermediate Sensitive cedar spruce ironwood ash hickory white oak aspen basswood black oak box elder cherry cottonwood elm hackberry maple red oak Compaction/Flooding Tolerance Levels for Various Tree Species. Tolerant Intermediate Sensitive cedar elm aspen spruce hackberry cherry ash hickory ironwood box elder basswood cottonwood red oak maple white oak black oak If a species is considered "tolerant" it may be possible to disturb up to 25% of the area within the protected root zone. For"intermediate" species, it is recommended that no disturbance occur within the protected root zone, and for"sensitive" species, it may be necessary to restrict construction levels and activities even beyond the protected root zone. Another thing to consider during construction is relocation of smaller diameter trees. Healthy, small trees of intermediate or tolerant species may survive transplanting. On this site, it is not recommended that excessive efforts be made to preserve large diameter oaks located in low lying areas adjacent to the wetland. This is the area of the site with the most evidence of root rot infection of the oaks. Also, oak is ill-suited for the wet conditions along the wetland. Beyond simply selecting trees to be preserved during and following construction, it will be important to minimize all activities in the areas of selected trees. Driving and parking heavy machinery within the protected root zone of these trees can not be allowed. The soil compaction that would result from such activities would increase root stress to the point of negating any preservation efforts. The rule of thumb on this site during construction will have to be "if the machine is in the shade, it's in the wrong place". Up to 95% of a tree's root system is located in the upper three feet of soil. Any rutting, compaction, excavation, or trenching in this area has a large, negative impact on the likelihood of tree survival. r Westwood Professional Services, Inc. (612)937-5150 MEMORANDUM TO: Sharmin Al-Jaff, Planner II FROM: Jill Kimsal,Forestry Intern DATE:March 23, 1995 SUBJ: Tree Inventory and Preservation, Point Lake Lucy West, Michael Byrne The applicant submitted a tree inventory survey and canopy coverage calculations for the development. The inventory failed to list all trees 12 inches in diameter and larger. Upon inspection of the site, staff found many trees that failed to be shown on the inventory. Therefore, the submitted inventory does not present the true image of the woodlands on site. Before approval of the development is granted, a revised tree inventory denoting all trees 12 inches and larger on site must be submitted. The site is heavily wooded with a wide range of species and age classes. Large, mature oaks exist throughout the site as well as thick stands of young ironwoods, aspens, ash, elms, and cottonwoods. There is a range of ages in all species on site implying that the woodlands are fertile and productive. One interesting find on the tree survey is the existence of a 24" Black Oak. While this tree is the most common upland oak in the eastern United States, its presence in Chanhassen is unique since the range of this species only extends to the three most southeastern counties in Minnesota. The tree is nearly identical in appearance to red and pin oaks, common to this area, but differs from them in the shape of the acorn. On inspection of the site, no acorns could be found to support or refute the claim. In the absence of the City's verification, however, the benefit of the doubt should be granted and measures taken to plan the preservation of such a rare and unique tree. Development in the southern portion as specified in plans would not be an option. Alternatives must be considered that would not allow development within a distance of 1 1/2 times the dripline from the tree. According to applicant, existing tree canopy covers 9.11 acres out of the total 11.48 of upland acres. Therefore the existing canopy coverage would be 79%. The City's tree protection ordinance states that 46%of the existing canopy remain or 4.19 acres. The developer plans on removing 5. 28 acres of canopy during construction which would leave only 3.83 acres. The 1.45 acres that are lost are multiplied by 1.2 as specified in the tree preservation ordinance to calculate the reforestation requirements. A total of 1.74 acres or approximately 70 trees would have to be planted to meet city standards. Staff calculation of the site figured canopy coverage at 73%, or 8.35 acres. The developer is required to maintain 46%, 5.28 acres, canopy coverage after development. Canopy removal due to development was calculated to be 5.89 acres, leaving only 2.46 acres remaining. Replacement requirements would be for 1.2 times 2.82 acres for a total reforestation of 3.38 acres, or 135 trees. Since calculations of canopy coverage and removal differ significantly, applicant will need to verify calculations. Alignment of the city sewer lines is recommended along the northern edge of the wetland on the east side of the development. This route can be aligned so as to avoid a number of large trees and to take advantage of an existing cleared path. The site will be irrevocably changed by development. Because of extensive grading few, if any, trees will be able to be saved within the grading limits. Only those on the outer edges will be left relatively unaffected. The applicant has proposed boulder walls to preserve some of the larger trees on site. Applicant will need to show elevations of all trees that are planned to be preserved. Mature trees with grade changes of more than 4 feet inside 50%or more of their dripline will not be recommended for preservation. So little of the original grades and environment will be retained that the future health of the remaining trees within grading limits must be carefully planned. Lake Lucy Estates May 17, 1995 Page 12 TREE PRESERVATION/LANDSCAPING The revised development plan for Lake Lucy Estates has been submitted by the applicant. Custom grading on home sites should help preserve wooded areas on each lot. Changes have been made in the positioning of homes and streets although removal of canopy coverage has not changed significantly. Where applicable, homes have been moved either closer or farther from the street in order to avoid individual or stands of trees. Accommodations such as this could be applied to additional lots. In Lot 2, Block 3, pulling the home a minimum of five feet closer to the road would give the ash trees in the rear at least 15 feet from the grading limits. On Lots 9 and 10 in Block 2, moving the building pads closer to the roadway would give additional distance from the grading limits to the very large oaks that exist on the lots. The same is true for the 32 inch oak on Lot 11, Block 2. Sliding the building pad to the east would insure a reasonable amount of space between the grading limits and the tree. To assume that the shaded areas on the tree inventory denote the extent of tree loss in the development is unrealistic. Additional trees that are near the grading limits will have questionable survival possibilities. At least ten trees on the survey appear to be near enough to the grading limits that preserving them will be difficult, although they are shown as being saved. Case in point is a 30 inch Linden that will sit on a corner approximately 7 feet from a 12 foot retaining wall and 10 feet from a 10 foot retaining wall. Severance of roots that close to such a large tree are usually fatal. Shifting the entrance of Lakeway Lane to the south may help the tree's odds. Twenty feet from the base to the retaining wall would give the tree the extra distance it may need. Whether or not it will live because of the shift depends on the treatment it receives during construction, as is the case with all preserved trees in the development. It's important that preservation of trees in the development does not become a tree by tree issue at the time of construction. Trees in front yards are much more difficult to protect during construction as well as trees near cuts or fills. To avoid tree conflicts and attempt to save as many trees as possible, a tree removal plan must be clearly identified. Preservation areas are one alternative, they provide coverage of large wooded areas, but also allow for significant removal and prove difficult to regulate after the Certificate of Occupancy is issued. Another alternative is a numbered inventory which authorizes tree removal by number prior to construction. This is valuable for saving trees that would otherwise fall outside of a preservation area but are not within the construction limits. An encumbrance is that excellent judgement and foresight must be used in order to realistically decide which trees should be saved. This can be a difficult task. Canopy coverage on the site is 7.45 acres. Removal of the canopy due to grading and construction will be 3.58 acres, leaving 3.87 acres on site. The minimum requirement of canopy coverage to maintain is 5.23 acres. The applicant exceeds the minimum by 1.36 acres FIDL - Oak Decline Page 1 of Forest Insect 0 - & Disease Leaflet 165 U.S. Department of Agriculture sr Forest Service Oak Decline Philip M. Wargo,' David R Houston,2and Leon A. LaMadeleine3 1 Research Plant Pathologist,U.S.Department of Agriculture,Forest Service,Northeastern Forest Experiment Station,Hamden,Conn. 2Research Work Unit Leader,U.S.Department of Agriculture,Forest Service,Northeastern Forest Experiment Station,Hamden,Conn. 3 Plant Pathologist,U.S.Department of Agriculture,Forest Service,Northeastern Area,State and Private Forestry,Broomall,Pa. Periodic occurrences of decline and death of oaks over widespread xz.t,•�: s areas have been rccorded since 1900. These outbreaks, variously „,,' •.' ; named Oak decline, Oak dieback, or oak mortality, are caused by a complex interaction of environmental stresses and pests and given the name oak decline. `~" =f tt��k�, tr. • Hosts h .;� . I, Although the most frequent outbreaks of oak decline have been in "w , yc southern New England, the Middle Atlantic States, and the � n-. • Southeastern States, the disease has occurred throughout the range of oak in both forest and urban situations (fig. 1). It is not limited to any ;* �' g•= - r' : one species or species group. Outbreaks have been most frequent and , t -trm-,;+ severe among red (Quercus rubra), scarlet (Q. coccinea), pin (Q. �'- _-=' s ti' palustris), and black oak (Q. velutina) in the red oak group and ,.;. ' . among white (Q. alba)and chestnut oak(Q.prinus) in the white oak ,.`A' ;"'''''•. group. Other important tree species that have suffered serious declines include ash, birch, beech, and maple. http://winow.ncfes.umn.edulfidl-oakdcline'oakdecline.htm 1/30/9S FIDL - Oak Decline Page 2 of 6 ' i `� ,- i n �A —-- i wtr-.1 3-, .4.,0 iit I ,f, ' 2..........4--_, - ....._ A...:Ift. __.__ 1 4 s. I - Q,�i -_—_ 1� Figure 1 -Range of oak-the oak-hickory t— — - and oak pine forest types. I I T ille 1 C o,r-:�,0„y _� --L Q OQ\ ry 1 Disease Progression Trees are weakened by environmental stresses such as drought, waterlogging, or frost or by pests such as defoliating or sucking insects. Weakened trees are then invaded and killed by insects and diseases that cannot successfully attack healthy trees. Usually the progression of decline is slow, occurring over several years. Trees affected by oak decline show a general and progressive dying back from the tips of the branches. (See cover.) Other symptoms include production of chlorotic, dwarfed, and sparse _ foliage; development of sprouts on main branches and stem; and premature autumn leaf color and leaf drop. Often, growth is reduced before the appearance of symptoms. The amount of food stored as starch is reduced, especially in the roots. The Initiating stress factors associated most frequently with oak decline are drought, frost injury, or insect defoliation. Trees on ridge tops and in wet areas suffer most severely from drought. Frost often affects trees growing in valleys and frost pockets. Defoliated trees that refoliate the same season may exhibit dieback symptoms the next year. Other factors such as leaf diseases and soils that are waterlogged, compacted, or shallow have occasionally been implicated in oak decline. Waterlogging is especally important in the heavier clay soils of the Midwest. Stress facton may be more frequent and severe in urban forests, where trees are often subjected to disturbances assoiated with human activities. These stress factors often weaken trees so much that they succumb, sometimes suddenly, to the root killing and girdling actions of insects and diseases. The two major pests associated with oak decline are Armillaria mellea (Vahl: Fr.), a root disease commonly called armillaria root rot, and Agrilus bilineatus (Weber), the twolined chestnut borer. http://willow.ncfes.umn.edu'fidl-oakdcline'oakdecline.htm 1/30/9S FIDL - Oak Decline Page 3 cel - • r�1i . .ti ' s liti j1fAs. .Yi.:;W•. . • rv" ,. <!41/ 6. ' - r }: ^!�' f �1irsi • S ` :s.��t;� .� }' :.,i. =air r 2_ '`.�;�i� o`� �t �.�Figure 3- White my r;. i., - K „Figure r � r'f. f:-. :,- celial i..: o-. t- _r -C _ r. ;5 Shoestringlike '•jarsojA.melleagrowing;;�` '"`s � - `� _ +�4 betlreenrhebarkand&.7%. A Y rhizomorphs ofA. C+ rr ,-f•'• Je,; - 11,re t:.brood at the root:L? ., '• -- 1 .mellea rowin on the r �.:t- nutloa on r��- g g • ' .�;: a declinirr chestnut oak ..� surface of a white oak t= .' c.f. y a �; , ,41'04•4r,. .4 -root. fit 'y r � indicate that the tree is � • . ".' `,..-419 beinggirdled. [jam\ .ii,NY f: • ' I- ...: 3'- • mss._ �. • ry:. Yom' -'iY.�ryhi <. ..-ew• The common forest fungus A. mellea usually lives on stumps and . roots of dead trees, but can attack the roots of stressed oaks. It . ' produces rootlike structures -rhizomorphs-which grow through the ` soil and over the surface of healthy tree roots (fig.2). When trees are r _ stressed, chemical changes occurring in the roots allow the fungus to . infect and kill them. Continued infection will eventually result in girdling of the large buttress roots and root collar(fig. 3).This,in Figure 5-Adult of the turn, kills the tree. The roots of these killed trees serve as food twobiline ed chestnut borer, A. bilineatus. sources for the fungus. In the autumn, clustus of honey-colored v.-r:t:-1,k-,t. 7_ , mushrooms may form at the base of invaded trees (fig. •4). 'ir• t. ,` -- 7'4, . ,ce ,.,� , " Figure 4-Clusters of -4. '�,. + ' - 1. mushrooms ojA.mellea form ' s'' g4.. --••�� :in autumn at the base of �a "�' ,. '' , ;rz invaded trees. .. •.."1""411.;‘,. A. bilineatus (fig. 5) attacks the crowns and sterns of weakened trees. 'z = : �%'' `,� 'n; The larvae bore into the inner bark, begin feeding and form meandering galleries in the inner bark and outer wood (fig. 6). The r : • , larvae molt three times (fig. 7); and as they grow, they form larger 7-'`, is..- ="_ Y'`::t: galleries, which cause more damage. The meandering and - .== 3`:�=` • overlapping feeding galleries of many larvae effectively block x ,s �+.`_�;r . ;_ movement of food to the roots and water to the shoots. These borers ~' `' first infest the upper crown; later infestations are lower down and Figure li-Feeing ca galleries ofA.bilineatus cause often reach the base of the tree. The combined actions of the borer in girdling action. the stem and the fungus in the roots can bring about rapid decline and death. As dieback and reduced growth continue, larger branches die and form the characteristic stag-headed crown (fig. 8). Foliage is mainly limited to sprouts on the larger branches and main stem. http: v.illow.ncles.umn.edu/fidl-oakdcline'oakdechne.htm 1/30/9S FIDL - Oak Decline Page 4 of 6 Figure 7-Four --•: Figure 8-A •-._ larval stages of A. zz.' stag-headed oak with bilineatus. -�- rt,'�,�1,. ' - • ;:.- ...;.7.-, , bole sprouts. iS . - +, - := Diagnosing Oak Decline Dieback symptoms can result from the effects of stress alone. Indeed, stress, if sufficiently severe or prolonged, can result in tree mortality. However, the continued decline and death of stressed oaks usually results from lethal attacks by armillaria root rot and twolined chestnut borers. Final symptoms of oak decline primarily reflect the root killing and girdling effects of these organisms. In attacked trees, leaves sometimes fail to develop in the spring or wilt shortly alter budbreak; sometimes they wilt or brown suddenly in the latter part of the growing season. A characteristic of Oak decline is that it may develop suddenly on many trees in the area affected by the initiating stress factor. Within the affected areas. howevcr, decline and mortality occur in patterns, which my reflect the intensity and seveity of the stress, the distribution of the hosts, the aggressiveness of armillaria root rot, and the abundance of twolined chestnut borers, coupled with site features such as poor or excessive soil drainage and frost pockets (fig. 9). :y 1: .. -��-_�' �✓, _ • ,- �,p� Yom.�.t '.�..;�Yiy�� ''� ':=-;.,r;i M��," y 'frog:'„-•:_.:�•.?;,•%..97F X3: "' ' '''- ' ^moi `� ''' t" Figure 9-Pockets of oak 71:-...t...10'7%-...1„..,-;0,,,,F, 'l am .,-. ,, mortality resulting from the . ._ - :ti. . .''711. 1-i5A' 7-.:11 ti I► -_f� ''y3 � „.."... 1 ,..,c1 ,,... vi,:ri,-7.*:.,1 �Ytrialf` ��� }`�'� }yy ;:moi interaction of stress, insects, . ' _ =i r: j i diseases, and site factors. . ....... zrid...4. . .* .t.4,_-..,- .1.:,--_ .r, p,..t:D.u..... _. ....:,..:, , .u..._ .. .s,..1.:.s.„42. _ ....„,b_140.2„:.7.;.5.7.A:t . -A - In many instances, the species that are affected and their location can provide dues to the cause of oak decline. For example, symptoms only on white oaks or only on red oaks might suggest that preferential insect defoliation was the cause. Frost may be implicated if damage is limited to trees growing in depressions or valley bottoms. Symptom development can also indicate the stage of decline and approximate beginning of the problem. The age of bole sprouts and patterns of radial and terminal growth can be used to estimate the date of the events that triggered their development. Although some trees die soon after being stresed, others may not succumb for 5 years or more. The timng of peak mortality, if known, can give some indication of when the stress may have occurred. For example, mortaity is usually highest 2 years after heavy insect defoliation. Such tree growth information, when coupled with an analysis of weather and forest records, can be used to develop a composite picture of the cause and stage of the oak decline problem. http:-1«•illo v.ncfes.umn.edu'fid!-oakdcline'oakdecline.htm 1/30/95 FIDL- Oak Decline Page 5 of In the diagnosis of oak decline, it is important to determine if stress factors are associated with the specific problem and, at the same time, to rule out the involvement of primary pathogenic organisms such as the oak wilt fungus. Oak wilt caused by the fungus Ceratocystis fagacearum (Bretz)Hunt has been reported from the Lake States east to Pennsylvania and south to Terxas. It has not been found in New England,New York, or New Jersey. All oak species are susceptible to the fungus. Red oaks are more susceptible than white oaks. Differences Between Oak Decline and Oak Wilt Oak Decline. Within both red and white oak groups, oak decline is characterined by(1) progressive terminal branch dieback; (2)branch and bole sprout and staghead development; (3) sudden foliage wilt and browning,but no leaf drop; (4) fans and rhizomorphs of A. mellea often present beneath bark of roots and root collars on dying trees; (5) galleries and exit holes of A. bilineatus often present in stems of dying or dead trees (6) decline found throughout the range of oak; (7)mortality related to site features, tree stress, and affects of insets and diseases; and (8) tree mortality peaking 2 to 5 years following stress. Oak wilt in the red oak group. In the red oak group, oak wilt is characterized by(1) leaf wilt and drop over entire crown, (2) leaf portions bronzing or browning, (3)rapid tree mortality, (4) no progressive branch dieback, (5) formation and then death of short-lived sprouts in the season after infection, and (6)vascular streakikg (dark longitudinal streaks) found occasionally in outer growth ring. Oak wilt in the white oak group. In the white oak group, oak wilt is characterized by(1) leaf wilt on scattered branches that die back and form sprouts and(2)vascular streaking common in outer growth ring. Some trees may continue to wilt and die back until all branches and sprouts are dead, yet other trees may survive. In both red and white oaks, armillaria root rot and twolined chestnut borers are not usually associated with trees dying of oak wilt In oak wilt, unlike oak decline, isolated trees or small pockets of trees can be diseased with no history of environmental stress. The infection centers are not related to site features. Laboratory diagnosis is usually required to conclusively identify oak wilt-diseased trees. Control The unique relationship of cause and affect and patterns of distribution of oak decline must be considered, and control efforts should focus on reducing or preventing the predisposing stree factors. In the forest, factors such as drought and frost cannot be controlled. However, management can reduce their effects. Thinning can reduce competition for moisture and nutrients and promote better physiological condition of the remaining trees. Silvicultural practices designed to encourage species best adapted to the site can help reduce the effects of drought or frost. Removal of weak and dying trees may also reduce or delay population buildup of the twolined chestnut borer. Stress from insect defoliation can be reduced or eliminated in high-value forest stands by spraying the trees with insecticides. Landowners can get specific information on insecticides available for control from cooperative extension agents or local forestry officials. In urban sites, additional control measures are feasible. Moisture shortages can be alleviated by watering, mulching to reduce competition from sod, and reducing or avoiding soil compaction. Trees can also be treated to control sucking and defoliating insects and disease http://willow.ncfes.umn.edu/fidl-oakdcline/oakdecline.htm 1/30/98 FIDL- Oak Decline Page 6 of 6 organisms that cause defoliation. Nutritional deficiencies can be corrected by fertilizing. These practices eliminate some forms of stress and promote good physiological condition. Oak dellne is Initiated by stresses,which can disappear before effects are manifested.A systematic evaluation of the problem can usually reveal the initiating factors and the agents responsible for mortality. Practices to promote good tree health can reduce the potential impacts of damage by oak decline. References Dunbar,Dennis M.;Stephens,George R.Association of twolined chestnut borer and shoestring fungus with mortality of defoliated oak in Connecticut.For.Sci.21: 169-174; 1975. Houston,David R.Diebacks and declines:diseases initiated by stress,including defoliation.Int.Shade Tree Conf.Proc.49:73-76; 1973. Houston,David R. Classifying forest susceptibility to gypsy moth defoliation.Agric.Handb.542. Washington, D.C.:U.S.Department of Agriculture; 1979.23 p. Houston,David R.Spreading tree diseases:the hand of man.The Ecol.4/5:120-124; 1979. Jones,Bill F.;Barnes,Gordon;McDaniel,M.C.Arkansas Forest Pest Report.Little Rock,AR:University of Arkansas Cooperative Extension Service; 1975.2 p. Nichols,James 0.Oak mortality in Pennsylvania-a ten year study.J.For.66:681-694; 1968. Sinclair,W.A.Comparisons of recent declines of white ash,oaks and sugar maple in Northeastern woodlands. Cornell Plant.20: 62-67; 1965. Skelly,J.M.Oak decline.Bull,MR-FTDA.Blacksburg,VA:Virginia Polytechnic Institute,Cooperative Extension Service; 1967.4 p. Skelly,J.NI.Growth loss of scarlet oak due to oak decline in Virginia.Plant Dis.Rep.58:396-399; 1974. Staley,John M.Decline and mortality of red and scarlet oaks.For.Sci. 11:2-17; 1965. U.S. Department of Agriculture,Forest Service.Oak symposium proceedings.Broomall,PA:U.S.Department of Agriculture,Forest Service,Northeastern Forest Experiment Station; 1971.161 p. Ware,George H.Decline in oaks associated with urbanization.In:Proceedings,Urban and suburban trees:pest problems, needs,prospects,and solutions; 1982 April 18-20;East Lansing,MI.East Lansing,MI:Department of Resource Development, Department of Entomology,Michigan State University; 1982: 61-64. Wargo,Philip M.Armillariella mellea and Agrilus bilineatus and mortality of defoliated oak.For. Sci.23: 485492; 1977. Wargo,Philip M.Defoliation by gypsy moth:how it hurts your trees.Home and Gard.Bull.223.Washington, D.C.: U.S.Department of Agriculture; 1978. 15 p. Wargo,Philip M.Judging vigor or deciduous hardwoods.Agric.Info.Bull.418.Washington,D.C.:U.S. Department of Agriculture; 1978. 15 p. Issued August 1983 Return to Forest and Tree Health Publications http://willow.ncfes.umn.edu/fidl-oakdcline/oakdecline.htm 1/30/98 _. . . • •;,.,,,‘!-.;..0..,m1.-z.-,•-„•••,,,,,,w.if.x.4.,••,tri,%:-.*:.ix....z......!...',.:,•-••,:,?;414F,11;;•". 1,1,•:•411;i•r-VPc;tWA-7‘..,4;-•••-,.!!".•.,.-..-... •.... •-4-_:...„-••••• -.•-.2 Alr ;•,..Acitt.4,1"44 4-4;:,_-,..?,,S..gfr."-'•.e-*.v.,..-•'••••'•'•,..ik•-••-•;',";.•_.141),..r.V.1,`.0.44*1.1V':-.."-,-,-'' - "- •.... .'1,..7.7.....f.:::!:,:-..3'.,r7.-..,r..s.....4,V-".:•-.....--,...S.:-.1::4.,.`:'.',.-v...le.: 4,-..,..Y.....,.. ..!..,,r.z.•ne...-- . •-• ,:.:.:.: -;.. .• _, ' M - s-:'-.:\ - ae". . .wry.- 2 111.."--419- -• ‘ '..,... -- . a h . ••-•-•••-•••• . •••••• or.Ca. * .....o. • - '7:: -.--, • j:, , 7 .."111111•10 . '' . •••- -„. ,. • _ - l .-- ., 8 , - .,... ... .. - ,--- , .:.• - _ • V' G'' _. -ci' .---..." - . - v* ...- ..,,,,,j -1-•••"' .• . •-:1 s .4. . ..... , • -.• --7,,' '''' •, ,.......4./ -cra - 4 --0 -..-• ; .4 t 6 , •f.'-;.• --. .... . , - 0.•:-. • _ --, - _ __, . 1,,,, *\ U :•-.:.:-::...•. . ( 1-, k•-,i -., te . ,I1 • ,,..i: ,11`• . .,zz3 _ — ,,....j 1 — -, . • i,... .. -4 1 t:* --\-:,...-• •:, • . . ...a," i •. I .0 .,. ..•. (... r 7.; ,•:., . ..--- . \ ---,• - 1,4 , , .. ....- - . . „.44.... . ••• • ‘i .. 1 .. . , r .s. '...,0.......-MIN,•:-** .....4.40, v._ ,k- 4__ 4, 4.-7 , .-----....,,,-- -7-.- •4•L'‘ _____.•.---,::. •ril-4`1'--1 -A_I-14...:•::::.::...:.:. •-.- - . -..• • - • / .. g• • • -9 - - .'--ID !aq...,. ,fi-- , - .. •. -,1/4 s 0.„-z---::' , . . i_--------,„ ,_,76....-,• 0,- riv ,,,: .. ...;.--- _..- -- • ... ... . . ... - 4, -,....-......,, . ..• : ,...; - • - ..... ,• iv., .....,„,„,, N - . •4,ii-,-,- . ,,- -- .-- ' -.- ,.....:,...„--, . ,- __. • til1 '?) '' ' • ,a/- - • ;c . .. . . .,,,..,zrxi,-..:. .. - . :f.ftz':'WY-4-77:••; -,1t1-.- --ri- ..- .-- ‘• ..-':.-•=!-4. 3:-.1.7ti-7A'A-C.41W2:''r.e5.•.. :-- ' - "- i:----(4.F.t•,•_-":•-i'-....--%.,'=.:',.‘....- -::i ----.K-•-:____..s . - -.. - , ....1:.:.:...:-F.i..:.i..... _—...„--.. ......._ ivoi .-, - -.-__ -_,54%,, ._ . . ItIb.t.-. , _ ..... .._- - 0._:-..„......„ . . , , _,...--,.. ••_.,.._..„. r• I 71IP -I. r . I, . N fair..40e. 0 r ' - -.411‘."Vilro 0 Ai , i --,LA. - - - -f .- Li ,411Prol---- . NZasipc'q , - 1- - i • ' : -g.t< --_, - at' -l'AV-ty . ., .. .„..:,. • !. ... .. -_____ MVI mittsilkif 4 NUE. -.— ---/j — J - • - .. ... ..... . .: • . -,. V . ,. ,__\ f. :... ,„,...41 4 ita • _19) -. -:- ..„,i. . ‘. _-...- • A.- -. I ...7 • . •771) 40.. .Q =Iv :icki...a{:%:-:•. 41.1 ,1%6r' '•----7-t- . -,. *••1' .4;i4:(11:,• . ' V k i ., . ._ 7 • ,It,ijk.. . --. -..... - ... . ..-•-/- I)% - I, I ''''--- - - - - -7-^Q} _--_-- 1,r''. " . -%-' •-.1%-::. .....I f 1... . oe.-"-"*.i."4/00r: • ,-.4tUt p.'' - - ' - ' opoilt" ..--- • - .1 4..-...---.- .# --- 1,00,--. -. ‘i 7,c•Iki i r,_ -- I - i " . '1 •••. ... ;.......000 s‘. ._ ..;:.. . 4 . , - :-• —• ,,,i • „ . . .,.. . •• --, -- - - - - . ' - --- --oro---- -. o ' r . , ... ........ ..... ..., _ .....„,,,,........,._. ..., ,_ _ , . • .. .7.--- . 11.4111. •''I .....:;!.-":::: ," ••••• !!! : . - • •=c .--- '.• .•., . . • . .)‘/Y7e /,,.1 .1-Cr.),c •..1 • _ .-. 1 • _ . ••••7. _ • •---• Aftw-il ,./-'' -- ....-. . -.-.: : ---,, ..- -' . re-1/_---- I - -„,- • •.••;;.- - - - r,—., 4 1.......c.li. . „.....„. ....._ . .-. ay. . 0 , '-_ -• . . ., "..-.4.......;.1...., ".• .....1 .!.1.:7.?".62%.:.;'S..r;?.4.4173S.44'..011:t:::. '":::;";-.:'......VJS4''ii;it.";';"." :.'...f-::::::;;-4 .'t.;'•f•! `..,t.,'S.:t.a.; „ .."*.":-•!•:,•11.1.._1: .:?..'et-:1- '.i--'.•-=•--.7: '...1-.7:..: •;."'ASiFel....-.4•••:".. --,n-.••:..,!-.-,:e•-tp.....1;:..t.; g• '...2.. ..:rtFY'..E.Z.-•• -c.;•;tt'•4.4,4'- .-''' • 1.'",..f.Vz-. •-r-,•.r7.-,-,'•A.1:-.rf31....../ .-.7.4..r..r.Z.::::,, .::„!._•••••;,-4.-.. ...• '.•"L;;:iiz :, , ,, ,... ::.... .:.111-4-. :, ?4•...i.i.,.-,.. ro eicc.: , n kr- reestm7:ii:: -- -- -_-.;- ,-.21::;: m.rA .,:0dE.-ke-V143.'-',Zr-..- -7:;:i•ii.. --"t'-':...:-.7-::.:.,..,..,":-.:;:s.f.=.'._,. .----..-F.'t,'..'-j'''•'-'•.'. .---...'::;:-.'-'-':."';'.:.:•.- . . ,...:?......,..i„,.....41441aB„ •-..., ,,...w......, tsg.t it oh ;A.0 vizi E3-;_.,.-r: -11LI ......4 - ..„..-A. .-••!,?..1:;.4-..--;_ ,...-_-•.;.:—,ii.-.........A„.,-:: ,:..._-.. ._-..-.;.,.••,•,..,,--a -...:. - . ...• 3;7*-, ''' 'F'!':•T'Oer "."-41?-f..-.:-.:-•:*7!..-t..."-':•1:'.'....-'-‘,A.=.,'t: :"..••--1...-.1"1.---:.1-'-.:'.'.:-'..;-.'1:.: : :-''. -.- - C"1-iFlinitirliCtriOn. - ......:-..;.'‘ : :...7( - .-:,. .. . .. . :. . . . . . . . . .• ... . . • .. . ..• ... • .. ..._ -, .... _ - _ - - _.• __- -- ..„ ::.„...:.•.... ...., . .. . . .. . ._. ;,...................Damage ..,.,..„.„1!:‘,,.,7„....,. ...s.e...„..i.,.:_..,.....f. .....„ .. .......,.. ,:.: .. .. . • . ... •.• .,....„.... .... . ..,.. gilt ROMEOWNERI'VIID „....-...- ..,_ ..._,•....--„,.....„..-,:.:. ......„... - ,..........„.,,.,.„.:-,- • .wiz.1.,,,6...e,:pg....,----. .-_ ..,..z.,..,-71,......,,,,,,,,...„,,,.....„ . ..,...„.,:„......_......„..„,.......,........„.....u.........::„.....,• . Nancy L. Miller David M. Rathke F0-6135-5 Revised 1995 Gary R. Johnson 11111111 - - - - Contents. _ - The Root of the Matter 1- — _ Plan Ahead! _ 2 — Minimize the Impact of _ - Construction Activities 6 - _ SITE CLEARING - , 6 _ SOIL DAMAGE . 6 - - . - _ - GRADE CHANGES 6 - _ - _ -- - EXCAVATION_....._...�_....._.__....__...._..._.,7 - - - - - PAVEMENT__ _ _ 7 _ _ Symptoms of Construction - - - Damage 9 - - Treatment of = -Damaged Plants 10 - _ WATER________________________10 - . — -.- ._ - EXCAVATION OF - - BACK-FILLED TREES w_ _ 10 AERATION_ _.._. _ 10 - FERTILIZER____ _____ .11 _. PRUNING AND WOUND REPAIR__ 11 . - OAK WILT _ ._ :..11 - OTHER INSECT AND • _ . _ DISEASE PROBLEMS..._____„._-_,__,,,,,,..._,.,_,_11 . TREE REMOVAL___________________ .12 Conclusion 12 Q To order additional copies of this publication,fax or write: . Minnesota Extension Service _ Distribution Center - 20 Coffey Hall 1420 Eckles Avenue Saint Paul MN 55108-6064 _ - FAX Number(612)625-2207 . . . _ Are you planning to - The Root build or remodel a home? ®® Hiringa Tree Care _ ,=_- ==; Before you start,.consider the I Wa 1 a of the -.•S •:. ........„.. . ,.-..c.:;,::- .::-.,:.,.eialist - • ;impact of construction on Matter . . plants. Each construction site has its own a: • _ unique set^of soil,tree species;•arid Trees can be damaged or killed by building process con Foi .P Trees and shrubs contribute a wide variety of construction activi- . `this reason:we recom rciend that' to property values enhancingties. Some practices lead to obvious ou et advice front a` rofessiQnal P oP hJ .�J •y. g. p r appearance, reducing noise, in)unes such as broken branches or . urban forester or.arborist with ,;,...7.i...: cutting energy costs,screening- torn bark. Open wounds of thistype e erieitce in rotecfin trees om=. deplete a lant's energyresources and p" 8- . • unsightly views, and_attracting provide entry points for insects,or for ..will befamiliar with the growth: songbirds and other wildlife. diseases such as oak wilt. _.characteristics and common ••;•.;.•". . Unfortunately,plants meant to ..problems faced by_tr• ee specie.s m- be part of a ho:ne's permanent-. . your area.,-He,or she can help you landscape often are needlessly evaluate plant health and the :'.; :- -" 'likely impacts bf construction:-.'A.,:. damaged or killed during - ' '.. construction. Careful planning activities. . -, . `!± r - . ::: ::.., . :; and coordination with a tree- ...ie.?: - For your own protection: care specialist and your builder ..-' ✓.hire only professionals•who gaze can reduce damage and save you " . partof an established business.- the trouble and expense of .,., `listed in the phane'book; treating or removing injured --�"� %'� ✓ ask for references plants. ,�,.. . :,% V.make-sure the person you lure • i' . _ • , - carries insurance forproperty: 4. . . . This publication explains �r damage,personal liability,and 'f' workers compensation. some things that landowners i�_ 4 i � �, • :. can do to minimize the impact / Protected. . �'' % ` ' \ Membership in the • of construction on trees. It I Root Zone • .s;,S- • . � -Aiborist Association,Minnesota describes landscape protection (PRZ).• ;• - . -_ . .2 Society of Arboriculture,•or �`'- _ International Society of ` plans,special construction %'� Arboriculture or certification f_iom techniques, symptoms of dam- `-- dripline the International Society of- : - - age,and-treatment strategies. Arboriculture are'good indicators Although the information Figure 1. One common method used to of reputable businesses. - define a tree's protected root zone(PRZ) x presented focuses on trees, it is to consider it to be the part of the • . .... also can be applied to protecting roots that lie directly below its branches shrubs. within on area known os the dripline. root system is in the top three feet of soil, and more than half is in the top The worst damage,however,often one foot. The part of this root system remains hidden underground. Roots in which construction damage should are one of the most vital parts of a tree. be avoided is called the Protected Root They are responsible for nutrient and Zone(PRZ). water uptake,store energy,and One common method used to anchor the plant. Because they are so identify the PRZ is to define it as the important,it is critical that you protect "dripline"—the area directly below roots that lie in the path of construc- the branches of the tree(Figure 1). tion. However,many roots extend beyond Trees are never the same shape the longest branches a distance equal below ground as they are above,so it to two or more times the height of the is difficult to predict the length or tree. For this reason you should location of their roots. However, protect as much of the area beyond the approximately 90-95 percent of a tree's dripline as possible. 2 • Figure 2. Approximate a tree's �� Plan protected root zone by calculating the _ critical root radius(CRR).First, •• . • measure the tree diameter in inches at _ I ,.�� Ahead! breast height(D8H). Then multiply that •-• • number by IS.Express the result in `a - You'll save time and money if you feet. -• 4 -~ develop a landscape protection plan .. - before construction begins. Careful Example: DBH=8 inches g 8 X 15=12 • ''• �"' .✓,-',`' -'•yi •tw ` planning will help you avoid the CRR=12 feet �, ,- ` � r expense and heartache of later repair- --; ' ing or removing trees located too close „ MeasureJ + to construction activities. ' diameter(width) 41* �� ' -, ' ''•= - These steps will help you create a - =dbh i '1.;- en " successful landscape protection plan: dbhx 15 1. Mark construction zone =critical root radius 1 boundaries. - Obtain a complete set of site Protected • development plans,including the Root Zone i� ;-.7---...,. �� proposed location of buildings, (PRZ) %` _- 1 - .. 4.5 feet driveways,sidewalks,and utility ,_ • lines. Ask the builder or architect to `.r• ;et\ „;'critical root radius.:`` mark areas where heavy equipment •- r% . will be used,where soil will be ' .-_,-;,..i -'= : �-;./ permanently added or removed and to \�� - dripline -_- - ! i7 what depth,and where fill and ` building materials will be temporarily ___ _ � stockpiled. Use a measuring tape, • stakes,and string to temporarily mark the boundaries of construction activi- Unfortunately,on most sites space naturally have a narrow growth habit, ties on the site. is limited and this rule must be bent. an approach called the"critical root Just how close an activity can come radius"is more accurate than the 2. Inventory trees without seriously threatening the dripline method for determining the on the site. survival of a tree depends upon the PRZ. This is particularly true for species,the extent of damage,and the columnar trees and for those where Record the location,size,and plant's health. Some healthy trees can competition has reduced the canopy health of each tree. Wilted leaves, survive after losing 50 percent of their spread. broken or dead limbs, trunk rot,and roots. However,other species are To calculate critical root radius, thin tops are all signs of stress. Trees extremely sensitive to root cutting, begin by measuring the diameter at that are overmature,display poor even outside the dripline. breast height(dbh).This is done by form,lean heavily over future build- Table 1 shows the relative sensi- measuring the tree's trunk diameter ings,or have severe insect or disease tivity of various tree species to root (thickness)at a point 4.5 feet above the problems(Figure 3)should be marked disturbance. If possible,disturb no ground.The measurement should be for removal prior to construction. more than 25 percent of the roots done in inches.For each inch of dbh, Also mark trees that need pruning to within the dripline for any tree, allow for 1.5 feet of critical root radius. make room for future structures and protect intermediate species to the For example,if a tree's dbh is ten construction equipment. dripline,and allow extra space beyond inches, then its critical root radius is 15 the dripline for sensitive species. For feet(10 x 1.5= 15).The PRZ is an area 3. Select the trees all trees,avoid needless or excessive around the tree with a diameter of 30 to be saved. damage. A qualified tree-care spe- feet(2 x radius),and is the area in cialist can help you determine how which a critical amount of the tree's Examine the site carefully and _ much root interference a particular roots may be found.Whenever note how each tree fits into the future tree can tolerate. possible, isolate this area from con- landscape. Keep in mind that the When dealing with trees that have struction disturbance(see Figure 2 builder may be able to shift the been growing in the forest or that above). location of a building, utility line,or driveway. Although local ordinances Table 7. Tree Characteristics f Species P Root Soil Soil pH Mature Mature Hazard Damage- Landscape Severance6 Compaction Preference8 Tree Crown Tree Causing Value'*1 61 Flooding6 Height Spread Rating*7 Roots (feet)8 (feet)8 Northern white cedar Tolerant Tolerant 6.0-8.0 40-50 10-20 Low - High Balsam fir Tolerant Tolerant 4.0-6.0 40-60 20-35 Medium - • Medium White fir Tolerant Sensitive 4.0-6.5 50-75 10-20 Medium - - High Tamarack Tolerant Tolerant 4.0-7.5 . 50-75 15-25 Medium - - High White pine Tolerant Sensitive 4.5-6.5 80-100 50-80 Medium - High , Jack pine Tolerant . Sensitive 4.5-6.5 . 30-80 20-30 High - Low Red pine Tolerant Sensitive 4.5-6.0 50-80 20-40 (Medium) - Medium Scotch pine • (Tolerant) (Sensitive) 4.0-6.5 60-100 30-50 Medium . - - Medium Eastern redcedar Tolerant Sensitive 4.7-7.8 40-50 10-20 Low - Low Black spruce Tolerant Tolerant 3.5-7.0 30-70 _ - 15-30 (Medium) - . - Low-- Colorado spruce Intermediate Tolerant 4.6-6.5 50-100 20-30Medium - High White spruce - Tolerant Intermediate 4.5-7.5 40-80 20-30 ' -Medium - Medium Black ash Tolerant Tolerant 4.1-6.5 40-70 30-60 (Medium) - Medium Green ash Tolerant Tolerant 6.0-7.5 - 30-60 30-50 Medium - Low White ash Tolerant Intermediate 5.0-7.5 70-80 50+ (Medium) - Medium • Bigtooth aspen Tolerant Sensitive 4.8-6.3 50-75 20-35 Medium Yes Low - Quaking aspen Tolerant Sensitive 4.8-6.5 40-60 20-35 Medium Yes Low Blue beech - Sensitive Sensitive 6.5-7.5 20-30 15-20 - Low . -- - High Paper birch Intermediate Sensitive 5.0-8.0 50-70 30-50 Medium - Medium River birch - Tolerant Tolerant 4.0-6.5 • 40-70 30-50 Low - High_ _ Yellow birch Intermediate Sensitive 4.5-8.0 50-70 25-50 Medium - Medium Boxelder Tolerant Tolerant 6.5-7.5 40-60 35-50 High Yes - Low Ohio buckeye Intermediate Intermediate 6.1-6.5 30-50 30-40 Medium Yes Medium Butternut Sensitive Intermediate 6.6-8.0 40-60 50-60 (Medium)_ - Medium Catalpa Intermediate Tolerant 6.1-8.0 50-80 30-50 Medium - Medium Black cherry Intermediate Sensitive 6.0-7.5 50-70 40-50 Low Low Kentucky coffeetree Intermediate Intermediate 6.5-7.5 50-80 40-50 Low - High - Eastern cottonwood Tolerant Tolerant 5.5-8.0 80-100 80-100 High Yes Low Red-osier dogwood Tolerant Intermediate 6.1-8.5 8-10 10-12 (Low) - Medium American elm Tolerant Intermediate 5.5-8.0 70-100 70-150 Medium Yes Low Slippery elm (Tolerant) (Intermediate) 6.6-8.0 60-70 40-60 Medium Yes Low Hackberry Tolerant Intermediate 6.6-8.0 30-130 50+ , Low. - High Hawthorn Intermediate Intermediate 6.0-7.5 20-40 20-30 Low - High Bitternut hickory Intermediate Intermediate 6.0-6.5 40-75 30+ (Medium) - Medium Honeylocust Tolerant Intermediate 6.0-8.0 50-75 50-75 Medium Yes Medium Ironwood Sensitive Sensitive 6.1-8.0 25-50 20-30 (Low) - High Basswood (Intermediate) Sensitive 5.5-7.3 70-100 50-75 (High) - Medium Black locust Tolerant Sensitive 4.6-8.2 30-60 20-50 (Medium) - . Low Red maple Tolerant Tolerant 4.5-7.5 50-70 40-60 Medium Yes High Silver maple Tolerant Tolerant 5.5-6.5 60-90 75-100 High Yes Low .Sugar maple (Intermediate) Sensitive 5.5-7.3 60-80 60-80 Medium Yes High Mountain ash Tolerant Intermediate 4.0-7.0 15-25 15-25 Medium - High Black oak Sensitive Sensitive 6.0-6.5 50-80 50-70 (Medium) - High Bur oak (Tolerant) Intermediate 4.0-8.0 . 70-80 40-80 Low - High Northern pin oak Sensitive Sensitive 5.5-7.5 50-75 30-50 (Medium) - Medium Red oak Tolerant Sensitive 4.5-7.0 60-80 40-50 (Medium) - High - Bicolor oak (Intermediate) Tolerant 6.0-6.5 60-70 40-50 Low - High White oak . Sensitive Sensitive 6.5-7.5 60-100 50-90 Low - High Wild plum Tolerant Sensitive 6.5-6.6 20-25 15-25 Low - Medium Serviceberry Intermediate Sensitive 6.1-8.5 6-35 6-15 (Low) - High Black walnut Sensitive Intermediate 6.6-8.0 70-100 60-100+ Medium - Medium Black willow Tolerant Tolerant 6.5-8.0 30-60 20-40 High Yes Low Numbers in column headings correspond to numbered sources in the 'target-(e.g.,a house,a sidewalk,or other trees)must be present. A reference section. high hazard tree rating does not imply that the tree will always fail. Values in parentheses reflect the authors'or technical advisors' **Landscape Value refers to the relative value of each species in opinions. Minnesota based on hardiness, form,color,growth habits,flowering *Hazard Tree Rating refers to the relative potential for a tree to and fruiting characteristics,structural strength,longevity,insect and become hazardous. For a tree to be considered hazardous,a potential disease resistance,maintenance requirements,a-.d general desirability. •4 ME driveway. Although local ordinances - differ,driveways and utility lines _ �+ don't always have to be straight,lity • lik homes don't always have to be in the t: .Q. center of the lot(Figure 4). If the PRZ t -�'• .E of a tree falls inside the construction �`�' ,.ad . - zone,you should seriously consider �a changing the original design,adding b .1 ` protection measures,or removing the �, f tree before construction begins. -y t o e a J lk 10 rrAw.• ....a 0. - :TREE SELF CTlQ1V TIPS:; 6� z Save only Elie best;.remoy the; : a rest: It is expensiye for the .yy7`= - :Build r e t�tworkai r ouiid trees rand it also is exile � = — � . • e to; _.; ns1V '+%r. �. .►�r� i t.r�.•• o � •j;._ _ �� ::�,����s;.'f..�op x�*'• •~'•r-! -.remove damaged trees alta '1 -- • ` l =• •:-. :. .-:- ?� -:-:---7,,r•••-•.:.:;•:,..tutihbeen coral' ;;Z:"..fj- eii� -�y sem. ` '.2}; • 5 • Pm 4. Protect the trees Figure S. Put up fences and signs around ' you plan to save. trees you wont to save to alert construc- tion workers to damage potential. Develop a map with the builder or arch!tect showing the location of trees • to be protected and the safest route for . acce- : to the building zone. Then. insta:i bright orange polypropylene fencing and post"Off Limits"signs at "'"°'' the PRZ of the trees you plan to save ,�t� ' • •7•:.„ ' (Figure 5). Your primary objective is ' • ..:�: CA.44 '114,1- :._:�` �. . •.,� �, �� to protect delicate root systems,so �;;;$441'y!�!y�,�:;f!'�� • •; . provide your trees with as much space r:� r1 as possible.Make sure all construction ,Y( , ' • . workers know that nothing inside this ' ` Protected area is to be raked,cut,stored,or n I; Root Zone = I otherwise �!J ?� :� PRZ ”' `. �� ;' ,, e vise disturbed. A landscape %%;� ?'-- •�-,�. �. 'S� •�,.�.1. a` protection contract signed by the _ • u IA!., `il builder and all contractors will help r'�s`,• • ` "' 1• , 4.7* ; `1i ensure compliance. Take several 7e•�4A .' g 'y?yL� �� ,>,s4;&\-4-:1. ',.•'`>��4i L I[�I l TS� j���� .. �1 photographs of the site before con- �c��o:;!<�• •• ••:;. '..;s:• y� " struction begins to document the '‘4•1444‘.!"4• •. protection methods used and the condition of individual trees. the damage. Damage penalties should S. Prepare the trees be based on the appraised value of for construction each plant as described in Landscape disturbance. Tree Valuation (Minnesota Extension Service publication NR-FO-7026). You'll boost your trees'chance for Insist that protective fences remain in survival if you make sure they're as place until all construction workers vigorous as possible before construc- have left the site. tion begins. Regularly water the trees if rainfall is not adequate. Fertilize 7. Make a final them if soil tests or deficiency symp- inspection of the site. toms indicate they are nutrient stressed. (For soil test information, After construction has been contact your county extension agent or completed,evaluate the condition of call the University of Minnesota's Soil the remaining trees. Look for signs of Testing Lab at 612-625-3101.) Prune damage or stress. It may take several branches that are dead,diseased, years for severe problems to appear. hazardous or detrimental to the Careful monitoring and preventive plant's natural form. treatment(e.g.,watering)may help minimize damage. 6. Monitor the construction process. Visit the site regularly and inspect the trees. Your presence alerts work- ers of your concern for the careful treatment of the trees. Should damage occur,begin repairs as soon as pos- sible. Immediately inform the builder of any violations in the landscape protection contract and photograph 6 o - ' '11 04Minimize the than individuals. When possible, ing concrete from the truck through - Q ,,,y, remove the unwanted plants in winter conveyor pipes. i i Impact of after the leaves have fallen. Dormant Improper handling or disposal of .P Construction plants are less susceptible to damage, materials used during construction and frozen ground helps protect roots. also can harm roots. For example, Activities Bulldozers should not be used to wood products treated with penta- remove trees near plants to be pre- chlorophenol and creosote can be served. Heavily wooded sites should deadly to tree roots;CCA-treated In addition to protecting the PRZ, be gradually thinned over two to three timber(greenish color)is a better there are other ways in which you can years to reduce removal shock on alternative. Ask the builder about the reduce the impact of construction remaining plants. This is especially materials to be used on the site and activities on your trees. Some of these important in dense pine,spruce,or fir read product labels. Chemical spill are relatively simple;others can be forests. damage can be prevented by filling extremely expensive. Carefully gas tanks,cleaning paintbrushes and consider the importance of each tree to tools,and repairing mechanical.- the future appearance of the site and SOIL DAMAGE equipment well outside tree PRZs. _ consult a tree-care specialist before Soil compaction is the single Insist that all building debris and deciding whether protective measures largest killer of urban trees. Tree roots chemical wastes be hauled away for are worth the cost. need loose soil to grow,obtain oxy- proper disposal,and not burned or gen,and absorb water and nutrients. buried on the site. SITE CLEARING Stockpiled building materials,heavy Finally,avoid changes in:;oil pH When you remove a large number machinery,and excessive foot traffic (acidity). Increases in pH are particu- of trees,you expose the remaining all damage soil structure. Lacking larly dangerous to many species plants to new conditions. Sudden good soil aeration,roots suffocate and (Table 1). Alkaline clays or limestones increases in amounts of sunlight and tree health declines. should not be used for fill or paving, wind will shock many of your trees. It Prevent soil compaction by and concrete should be mixed on a is not uncommon to find scorched carefully selecting storage areas and thick plastic tarp or outside the site. leaves,broken branches,and uprooted traffic routes(the future driveway is a Mixing trucks should never be rinsed trees after a site is cleared. Although good choice for both)and installing out on the site. some of these problems are tempo- protective fences and signs. If you rary,they may compromise tree health can't reroute traffic,install root system when coupled with additional con- bridges(Figure 6)or spread several GRADE CHANGES struction damage. inches of wood chips on the soil Moving large amounts of soil You can avoid sun and wind within the PRZ. Heavy mixing trucks within the PRZ usually kills a tree. stress by saving groups of trees rather can be kept off tree roots by transport- Except where absolutely necessary, avoid disruptions to the natural Figure 6. A root system bridge will help contour of the site or shift ther.:a well protect trees in the path of construction outside the PRZ. vehicles. Soil additions compact the soil steel around a tree and often raise the water _ plate table. You may be able to protect compaction-tolerant trees(Table 1) .t__________,-: . - - -. • ' . `-` from additions of six inches or less of -.. "'' ` _ ' — soil by using a porous fill within the --- _ 4 j~___ -_ - -_ _ ,� `_ PRZ. Porous fill can be made by . ▪ " •• -- A mixing one part loam,one parr:coarse _• _ ' . „i -. ,:. s ' -• _ sand,and one part shredded bark. i Deeper fills require more ex en- .. P - -� 1 ; "t4► _ , sive measures. A retaining wall ' beyond the PRZ may protect some 1 - _ trees(Figure 7a). These walls preserve much of the original root system and • -_ redirect excess water away from railroad ties, -- ' sensitive plants. Your tree-care - _placed radially to trunk - specialist may suggest other,more - - - - - - elaborate measures for protecting trees iiiimmam 7 Effli that must be covered with soil close to construction of a retaining wallno _ the trunk. However,as a general rule closer than the limit of the PRZ it is best to remove trees that would be (Figure 7b). 1 I 1 Trenching buried by 24 inches or more of fill - - • i •'\ kills around the base. - roots. Cutting the soil away from a tree EXCAVATION - � : 1,\ • removes vital feeder roots,eliminates . As much as 40 percent of a tree's /0.,,, .. nutrient-rich topsoil,and often lowers root system could be cut during the `''•• �%'.•,•. .- :::•.... •.-•; •i the water table. .Dama a caused by • :' ".s= '�-: :.-,'.::• :::• Damage installationof a nearby utility line. .k�e� .;•..-.4--:-...-.‘.1:,-•- ,, ti., ..,, , shallow cuts(lessthan two inches)at • •'"• ,;1.4,;1.-:.--.-1.....-;- ''' ice= This reduces water and nutrient '::';.:':t- _::- --' least three feet away from the base of uptake,and may compromise the `'.. - ' -"'�'-•'- t =.•.` y. :he tree maybe minimal,but still can - L-' =r°- '�t - = " stability of the tree. If it is not possible ,- - 1[7:i.1.7.:::• -t-,;,:;_,:=. .'e a shock to a tree's vigor. If pos- to relocate the utility line outside the • .•.t - ..ible,avoid making the cut during hot, tree's PRZ,you can reduce root- Tunneling two feet below. : . -' dry weather;water the tree(undis- damage by as much as 25 percent by grade reduces root ddmage; ra:r}._,, curbed portions)before and after soil tunneling under the trees root system "' removal;and allow only hand digging (Figure 8). When digging a trench Figure 8. Protect roots from damage - =aside the PRZ. A shallow layer of near a tree,begin tunneling when you when laying utility lines by tunneling mulch(pine needles,wood chips,or encounter roots larger than one inch in rather than trenching. coarsely chopped twigs and bark)and diameter. _ clean root cuts will help wound Trenching for building founda- Minnesota,posts,pilings or I-beams - closure and regrowth. Deeper cuts tions also poses a danger to nearby sometimes can be substituted for within the root zone will require trees. Although not often used in foundation walls and footers on homes(Figure 9). Drilling single holes Figure 7. If you change the grade within as opposed to cutting deep trenches the root zone,use retaining wall to keep saves many critical roots. as much of the original grade as possible. For all digging operations,insist a)bock filling;b)cutting. that exposed roots be cut cleanly to - promote quick wound closure and regeneration. Vibratory plows,chain • = -•'_ trenchers,and hand tools do a better :. job at this than bulldozers and back- 4 f ,.;..1r/Air V,, .��,• , ' ' / ,7. U' _post. �J, I • y 7a.8ockifilling `���--� I� behind -r '.:: � • ,f �11 -. •;,•'":::•!;;; ���61•11 S,5-"—TAWKIiiga,•-lb.4:-0,--: retaining wall •.•4 :: .6.0: _-,14.‘;:•:' �/' Protected l • ` �� • ' - Root Zone_ - ./�_ s ` `��41� < a: s', :1 . z..7 ,� , ; l _ kept at original gra le / • • 1-}: ��, � 'ea�_���-.0347""r- ' ` .... ' I '•\, "•.: , I • + .....-...:1:.::- t.:-. :•, - iii 7b.Soil removed . , / beyond I-beam • . retaining wall _ Figure 9. You can minimize damage to trees near foundations by using posts, pillars,or I-beams rather than foundation walls. 8 ' $ —� hoes. Minimize damage by avoiding r k,it . � There are several techniques for excavation during hot,dry weather; A repairing pavement that has-been keeping the plants well watered 414'" 0"' A"' ' .•'-% i t ,:.: • ,) ,f,f .::- damaged by protruding roots. For • before and after digging;and covering .: ,fifi 1 i trees that are highly sensitive to root • exposed roots with soil,mulch,or r , x. r :, '' � .` _ }l� �;,._. �' disturbance,consider creatinga damp burlap as soon as possible. �'�.. ,• 3r- _ concrete or asphalt'.'mini-ramp" to - PAVEMENT . ; smooth the uneven surface between. ' • . - ' :- f two sidewalk sections(Figure 11). Sidewalks and driveways located brick � • `• ,:j ---;-- Local ordinances governing liability o' too close to a tree endanger its health , a=••,• . - should be consulted prior to using this and may threaten pavement stability. �. • - _, ••••••:. flagstone technique. Relocate walkways with Factors such as frost heaving,poor �•• :' Ai:,' r.�`�.. broken concrete slabs a few . drainage,andpavement flawsgive _ feet g `,' ill by: c farther from the tree. For trees that roots an opportunity to expand,gain a 'E•:-. ...,!..;:s43- ,:,_ :: 'A1�'/;a• � can tolerate root disturbance,a foothold,and cause damage. -- - ,>'' ,• ; �- Ap Homeowners are faced with costly "., . -_44214h.,..• _•�. � "r '��- vertical underground barrier may repair bills and potential liability for "�` O-�^ redirect root expansion away from honeycomb ' ,;-•-•4--,•.,-- ..4,...e , .:-A Pavement(Figure 12). the hazardous situation that develops. block'�_ All tree species are capable of These problems can be avoided if chips/gravel causing root damage to sidewalks, you consider the spatial needs of a tree foundations,or pipes. Species notori- and its root system when designing Figure 10. Paving materials such as brick ous for damage-causing roots are the layout of new sidewalks and or flagstone over sand will produce less disruption than poured concrete to the noted in Table 1. driveways. Just how much space is roots of a nearby tree. required depends upon a tree's sensitivity to root cutting and its future size(Table 1). It's best to locate • sidewalks and driveways outside the anticipated PRZ. At a minimum, • , walkways should be at least three feet �r • from the trunk of a tree;driveways 'I.1 may cover up to half the distance from $,1• the tree's PRZ to its trunk,as long as 1 7:.� • - ' no excavation occurs. No tree should {. \ - • concrete or be boxed into an area less than eight �� • '14!IIIIIasphalt "mini ramp" feet by eight feet by three feet,with \— - r. ,•,,y� .,_ larger trees receiving at least 300 cubic - '" ' • ``` ,� feet of root/soil volume. You can minimize disruption by using alternatives to conventional Figure 11. A "mini-ramp"can be used to smooth the uneven surface caused by paving materials. In some communi- ties,brick or flagstone walkways on root damage to pavement. sand foundations can be substituted for concrete(Figure 10). These materi- • als protect soil pH and allow water root control and oxygen penetration.Preserve barrier • 3 natural contouring by spanning sideowolk / � __ ....---,—•uneven areas with wooden walkways curb Y elevated on posts. Elevated decks are .. - -. ' � - alternatives to concrete " ' 1 + :- excellent — '� fie e.... porches. Where additional pavement 1 q I :''y III + �Q, 4- 1 strength is needed (e.g.,driveways), ' o o• ! u ° '�'''�•'''�. I'', concrete requires less excavation than 0' o', ; o•. , •, ° asphalt. Ask your builder about • • • raised pavement techniques near -.. valuable trees. - • Figure 12. A vertical underground barrier • '•, trench,bock filled will help keep tree roots from damaging • • with sand concrete as they grow. 9 ` s 4 Symptoms of . 1-74 weather-related stress. Examine the 1l CODS truC tlOn - annual shoot and branch growth one year's (Figure 14). Healthy trees generally will grow at least two to six inches at Damage growth - the ends of the branches each year. bud scale - Photographs and records of the tree Conspicuous symptoms of con- scars prior to construction also can help struction damage may take years to identify growth problems. appear. Tree decline from soil corn- If you purchased your home paction,for instance,may take three to following construction,you can seven years to appear as obvious- - identify deep fills around large trees .: - symptoms of distress. Because of this by looking for buttress flares at the --\:>-.. 411! delay,landowners often attribute tree one year's base of the trunk(Figure 15). Most _ losses to other causes. Carefully - growth common shade trees in Minnesota • monitor affected plants and keep ;` have buttress flares,and their absence written records to help you recognize _ usually indicates that the tree's basee - the lass visible signs of tree stress. - has been covered. It may be helpful to Remember,the most serious damage examine the condition of trees on remains hidden in the root system. Figure 14. Annual growth is the distance other sites where your builder has _` between bud scale scars on twigs. The worked. twigs of healthy trees usually grow two • to six inches longer each year. In many cases you would be wise ' • -, . to have a tree-care specialist look for :. survival and commonly indicate that early symptoms of tree stress. Dollars %� invested in consultations with rofes- . ,t f the plant is experiencing extreme P r�.,f !t+ stress. sionals before damage becomes ,,' !• ,1� ;, In addition to observing a tree's obvious may be repaid in considerable savings later on. suckering appearance,monitor its annual g I .........e.-- / growth. A slightly damaged plant -•":09-es l -' ,/ will grow more slowly and be less I ¶ 4.. resistant to insects,diseases,and - 1 <� l•,' I":i . Figure 13. Suckering is one symptom of . ' /J. Fr I �� construction damage. , • 1/ Wilted or scorched leaves and 1 �, l I JI I , t, drooping branches usually are the first l r( . ;;I signs of construction damage. In - . . . I i I - 1 ' , • I deciduous plants these symptoms =. " '`:' ;, -- :_ Fill hos s;. ma be followed byearlyfall coloring :' y Y� I. 1 :covered- - and premature leaf drop. Damaged •...-4-'• t "� - „'thebose conifers will drop excessive amounts 't t 1s, • 1� !I -of the"tree. inner needles. In subsequent , . •, ''•""r -, of subse uen s. I• l years � t_ I .^, you may notice yellowed or dwarfed • I- - - • • ►.` -- 'i• ' 'eaves,sparse leaf cover,or d • rr 1 - +ranches. dead -buttress" / - • '' � I t'i- _ ,1 flares - - _ -, ,! _ k: Other indicators might include - - • - _ ' lowering out of season,excessive ' •ucker formation on the trunk(Figure Figure 75. To determine whether the ;_;• l =�'r ; 3),or abnormally large amounts of grade hos been changed around trees `,' : :`_`` eed. These responses are defense on a newly built site,check for the - -_ - sechanisms for ensuring species Presence of buttress flares at the base of the trunk. 10 - • _—MI . �11 R Treatment Q f -, to restore the original grade,at least - ® /o �._ . within the PRZ. i► `i Damaged .�it so+. , - - Approach thisgrade re - �::.. ..,Jr ..41,_,.,..."' �, P restoration-- PI an is .. .. carefully. Determine how much fill :,�! f 'll ��, _ . has been added by sampling depths at several different points within the When a tree is injured by con- samplelePRZ(Figure 16). If the depth is great struction activities,energy and (more than 12 inches),you may resources normally used for growth 1 remove most of the backfill with must be redirected towards the 1 : • n 'grode y ,_:;.. ,_- mechanical equipment.-Once you are -process of wound closure and ® ;4 ??..1.7,5. Y f� within 10 to 12 inches of the original regrowth. During this critical period = _ ''•'.'i:•:• .-.- ;�.:; grade,complete the fill excavation plants are particularly vulnerable to - carefully with shovels and rakes. additional stress,especially insects, ' - -'' .:: _ o�� - Make certain no soil is piled up diseases,and severe weather.You can �'f7u/grade against the tree trunk,and aerify the minimize these problems by quickly _. soil within the PRZ to complete the treating the damage. operation. If the tree is already Figure 16. Before you remove fill that has exhibiting advanced symptoms of WATER been added around trees, take vertical decline,however,restoration to Construction activities often alter samples to determine how deep you need original grade will probably be the amounts of water received by to go. fruitless. In this case,remove the tree trees. Thoroughly water plants before receiving too much water,contact a and plant a new one. and immediately after they receive tree-care specialist for an evaluation of any kind of direct damage(e.g., the problem. Treatment differs by tree AERATION severed roots). Continue periodic species and by the amount of time the Soil compaction around a tree's watering(four to five times per water remains on or close to the roots may cause leaf wilt,early fall summer) throughout the next growing surface. For some species,a retaining coloring,top dieback,and slow _ season. Be careful not to overwater wall or culvert may be needed to growth. Reduce the effects of compac- your trees. A one-inch depth of water redirect the flow of water. tion by carefully drilling a series of applied throughout the PRZ is a good two-inch diameter holes in the soil to a rule of thumb. A tin can or glass jar EXCAVATION OF BACK- depth of 12 to 18 inches. Begin three can be used to measure the amount of FILLED TREES feet from the tree trunk and continue water applied if an overhead irrigation If you or your tree-care specialist drilling at two-foot intervals in system is used. Concentrate most of has determined that excessive soil concentric rings around the tree out to the water on undamaged sections of additions have been made around the PRZ(Figure 17). Each hole maybe the root system. valuable trees,efforts should be made refilled with sand,peat moss,or Two to three inches of mulch (wood chips or bark)spread over as / much of the root system as practical • �2"diameter holes will help the tree retain water and .\*:,\,,,_ ` b . . .. , stimulate root regeneration. Living . ground covers over the root system :.; �• ' will have a similar effect,and may be , more aesthetic. Apply these tech- �_ f niques to any deciduous tree exhibit- - -� _ ing wilted leaves or any coniferous / - • - • - - tree dropping excessive amounts of i _ - - • - needles from the inner branches. 1 - - } Drainage systems and grade _ - - --. - changes may cause some trees to - - - - -. _ receive too much water. Species differ \ -• - - - in the amount of water they can �\ - tolerate(Table 1). Intolerant plants - will exhibit twig and branch death. Figure 77. A series of two-inch holes 12 to Don't wait for these symptoms to appear. If you suspect your plant is 18 inches deep will help alleviate root damage ccJ:ed b, compaction. 11 I= depends on the extent of damage. If Dead branch B the bark has been completely removed / 111 Live branch around the entire trunk, the tree will ``{"^-i..›.•'� not survive and should be removed. If . ''" -. ,N. - branch N� ••'� It 1 brrk ridge only a patch of bark has been removed •%4:1'.5"-,- B leaving a few splinters,use a sharp \ �� \ knife to cleanly cut off the loose bark � � • to a place on the stem where it is A \4.11%,, r j firmlyattached. DO NOT make the r - %�, %1%1 •-. wound any larger than necessary. C lel ' d. • 1 %j -, You do not need to use pruning �i .' j- \ paint or dressing to cover exposed branch fir ?fie, A wounds or pruned limbs.Except for collar t l special cases involving disease control, if4 these products do little more than first,cut part way I . % C improve appearance. through the brunch at A;then cut it off branch OAK WILT at B. Make the final collar cut at C. Oak wilt is a lethal fungal disease normally spread through root grafts between adjoining oak trees.The Figure 78. Prune branches at the disease also may be spread overland branch collar. by picnic beetles. In Minnesota, _ construction activities that injure - mulch. A tree-care specialist may is dead,bend several twigs. Twigs on roots,break branches,or otherwise recommend other alternatives,includ- live branches tend to be pliable,while open a wound on an oak between May _ ing soil injections of air or pressurized twigs on dead branches tend to break. 1 and July 1 provide the beetles easy water,to improve soil aeration. Buds also can be used to evaluate access to transmit the fungus. (Some branch condition. Live buds appear studies have found the occurrence of FERTILIZER full and normal in color while dead oak wilt to be four times more likely _ Injured trees may need additional ones appear shriveled or dry. within 160 feet of a construction site.) nutrients to replace damaged root Pruning is commonly recom- Immediately cover all open wounds systems. Fertilizers containing mended for large trees that have with any latex paint during this phosphorous and nitrogen can help suffered root damage. Opinions differ period. If you suspect oak wilt, stressed plants recover since these over the merits of this practice. contact your city forester or private - nutrients promote root and plant Assuming that the tree has adequate tree-care specialist. If you have oaks growth. Avoid excessive nitrogen; water and is not in severe decline, on your site,obtain a copy of Oak Wilt increased stem and foliage growth can some experts believe that retaining in Minnesota (Minnesota Extension cause stress,especially during hot,dry maximum leaf cover is important for Service publication MI-3174)for weather or if the tree has been stressed root regeneration and only dead limbs additional information on identifying due to construction activities. Because should be removed. Others argue that the disease and protecting your trees. of this problem,many experts recom- pruning selected live limbs is neces- mend waiting two years after damage sary to compensate for lost roots. OTHER INSECT AND DISEASE has occurred before fertilizing the Generally,it is best to follow the PROBLEMS trees. Specific guidelines for selecting recommendation of your tree-care Insects are attracted by distinctive and applying fertilizer are described specialist. chemicals that are released by plants in Tree Fertilization (Minnesota When properly done in modera- recovering from injuries. Examples of Extension Service publication tion by a skilled professional,pruning insect pests that can sense a tree under F0-2421). may reduce wind resistance and limb stress include the pine bark beetle, failure and improve tree health and bronze birch borer, two-lined chestnut PRUNING AND WOUND appearance. Except in extreme cases borer,picnic beetle(transports oak REPAIR (e.g.,overhead powerlines), DO NOT wilt fungus)and some scale insects. Careful pruning and wound let anyone cut off all of the top These insects can kill a plant by their repair are important treatments for branches to the same height("top- feeding or boring or by transmitting damaged trees. Prune broken or dead ping"). disease. branches cleanly at the branch collar The treatment of trunk wounds Likewise,some diseases multiply (Figure 18). To test whether a branch I 12 t • , 0 Crown dieback. Broken limbs,dead Figure 19. Trees with extensive dieback, p" branches,thin crowns. propertyadisease,or ddpe pie. A�ee-ore ose a threat to -- o$og�o,e �'' •\ i / - - specialist should evaluate and if necessary w� ► ;jVAPollards. xrac remove such trees. \ from poor pruning practices . i� .�`:` � Napping" • 1 , �/i7 I Weak fork. V-shaped crotch it �� ,l 1� ii with decoy B Broken-branch cavity. t �• \V1�-' Pruningwound . ��� cavitis. I l.t a _ Exit holes. Evidence of )�`�. internal insect damage. R • ' Torn or missing bark. , • Deep trunk cracks. I I1 ,%! I' • ' Conks or Basal cavities. ..i.i 1 fungi. i I Damaged or broken roots. i • , "".i. s t ti :....._4;, ----- -,...1.„;,... ..i.---.-= Soli heaving. I • Sawdust. Evidence of , �t4'4: .i -' .I' y,tr. I r:. internal insect damage. _ .._ t I . ' . . .--.. ....- --•...... -. .:_•.c Likewise,some diseases multiply trunk cracks,or extensive top dieback ''''Z' ' "' in plants experiencing stress. Verticil- are potentially hazardous(Figure 19). ! Conclusion it... hum wilt,ash yellows,and Armillaria They should be evaluated by a 'A. mellea are examples of diseases that tree-care specialist or be removed. attack weakened trees. Dead trees are excellent for wildlife, It's not always easy to save trees Continually monitor the health of but dangerous to people and build- during construction,but your efforts your trees,especially those near ings. Large trees should be carefully are worth the trouble. Healthy, construction activities,for insect and removed by professionals so as not to well-placed trees can increase prop- disease problems. Proper treatment, damage the remaining plants. erty values by 9 to 27 percent. Protect- including corrective pruning,water- Tree loss can have a dramatic ing tree health on a construction site is ing,and pesticide or fungicide appli- impact on site appearance. Prompt a matter of recognizing the potential cations,can restore tree health. replacement will minimize your grief. impacts. Advance planning and Contact your county extension agent Remember,the tree you plant is your simple steps to minimize damage or local forester for additional infor- own. often can prevent future problems. mation on specific tree pests. Many trees have a tremendous TREE REMOVAL capacity to survive disturbance,but in an urban setting we continually test Even the best protection plans them. Take the time to protect and cannot guarantee plant survival. monitor the health of your investment. Death may occur shortly after con- Your home and our communities will struction or years later. Look for trees be healthier,more attractive places to with very few leaves and many dead branches. If the tree does not leaf out live. the following year it is dead. Large trees that lean or exhibit rot,deep - 13 "= do.A References %'� Contributors . of 1. Baughman,M.J.,D.W.French,C. 8. Minnesota Association of Soil and AUTHORS G.Hard,K Holman,and M.E. Water Conservation Districts Nancy L.Miller,Research Assistant, Zins. 1990. Landscape Tree Valita- Forestry Committee. 1986. Department of Forest Resources. - tion (-FO-0726). Universityof David M.Rathke,Teaching Specialist-- Minnesota, Minnesota Tree Handbook. Adven- Minnesota,Minnesota Extension ture Publication,Staples,MN Forest Resources,Department of Forest Service,St.Paul,MN 55108. 6 p. 56479. 408 p. Resources. _ Gary R.Johnson,Extension Educator and 2. Fazio,J.R.,ed. 1988. Resolving 9. Perry,T.O. 1982. "The ecology of Associate Professor,Urban and Commu- Tree-Sidewalk Conflicts(No.3). tree roots and the practical signifi- nity Forestry. Tree City USA,National Arbor - cance thereof,"Journal of _ Day Foundation,100 Arbor Arboriculture 8(8):197-211. ' _ TECHNICAL ADVISORS Avenue,Nebraska City,NE Melvin J Baughman,Extension Special- 68410. 8 p. 10. Swanson,B.T.and C. Rosen. ist-Forest Resources and Associate 1990. Tree Fertilization (FO-2421). Professor,University of Minnesota, 3. Fazio,J.R.,ed. 1989. How to Save University of Minnesota,Minne- Department of Forest Resources. - Trees During Construction(No. 7). sota Extension Service,St.Paul, David W.French,Professor Emeritus, Tree City USA,National Arbor MN 55108. 4 p. University of Minnesota,Department of Day Foundation,100 Arbor Plant Pathology. . Avenue, Nebraska City,NE 11. Maryland Department of Natural Jonathan Stiegler,Urban Forestry Coordi- 68410. 8 p. Resouices. October 30,1990. nator,Minnesota Department of Natural Natural Design in Development... Resources. 4. French,D.W. 1989. Oak Wilt in Development Potential Through Paul G.Walvatne,Senior Forestry Staff Minnesota (MI-3174). University Forest Conservation. Maryland Specialist,Minnesota Department of • of Minnesota,Minnesota Exten- Department of Natural Resources, Transportation,Environmental Services. sion Service,St.Paul,MN 55108. Annapolis,MD. The authors also wish to acknowledge 6 p. Scotty Scholten,Michael Zins,Charlie 12. Cervelli,Janice A. 1984. "Con- Blinn and Carl Vogt of the University of 5. Harris,R.W. 1992.Arboriculture: tamer tree plantings in the city," Minnesota for reviewing the manuscript Integrated Management of Landscape Journal of Arboriculture 10(3):83-86. and providing valuable insights. Trees,Shrubs,and Vines. - Prentice-Hall,Inc.Englewood 13. Moll,Gary A. ed. 1990. "Commu- PRODUCTION Cliffs,NJ 07632. 674 p. pity forests get a check up," Urban Forest Forum 9(6):10-12. Produced by the Educational Development 6. Hightshoe,G.L. 1988. Native System,Minnesota Extension Service. Trees,Shrubs,and Vines for Urban 14. Miller,F.D. and D.Neely."The Product Manager: Gail M.Tischler and Rural America. Van Nostrand Effect of Trenching on Growth Editor: Mary Hoff Reinhold,New York,NY 10003. and Plant Health of Selected Design&Illustration: Jim Kiehne 819 p. Species of Shade Trees,"Journal of Arboriculture 19(4):226-229. 7. Matheny,N.P.,and J.R.Clark. 1991. Evaluation of Hazard Trees in Urban Areas. International Society of Arboriculture,Urbana,IL 61801. 72 p. Copyright®1995 by Minnesota Extension The University,including the Minnesota Service,University of Minnesota. Copyright is Extension Service,is committed to the policy claimed for all material in this publication that all persons shall have equal access to its except the table on page 3. programs,facilities,and employment without regard to race,color,creed,religion,national The information in this publication is for origin,sex,age,marital status,disability,public educational purposes only. Reference to assistance status,veteran status,or sexual commercial products or trade names is made orientation. with the understanding that no discrimination is intended and no endorsement by the Minnesota Extension Service is implied. • • MINNESOTA EXTENSION SERVICE <yrd�. UNIVERSITY OF IsefINNFSOTA COLLEGE OF Ura•.it Com rs...iq Feroot"y Ret,.m NATURAL RESOURCES This publication was produced with the support of the USDA Forest Service,Northeastern Area, State and Private Forestry;the Minnesota Department of Natural Resources,Division of Forestry,Urban and Community Forestry Program;the Minnesota Shade Tree Advisory Committee;and the Minnesota Extension Service. Printed on recycled paper. 0,t .....,-:,z..--1,7-7.1•-•;:..,.;:ge,:ivoi.i6...,_,1:„.,..„,....,c . , • NR-BU-5663-S --•;;:11, '..1.:-;'-i;: :::•-f-;tiir:34. THE • '' -:••;:._ -4-' . .'•' 4., -.Z.... 1 e .,... 1..tt.b.,..... . ..' la. .1.-VIOL-...:II..., .1:;'•-. -•.. • 1 Nil,Ft.i". VS4- ..f..;• ..„.. .r.37;?•-7,,,..7 ;:, t ) .•-.., .toth.-'2ftr,..:'•i iitocilk4.1),.,, ••. •.:.: _ .,..,".4.1... -- • 'Ne:'• ak , .., esteuirce 0 .., . • ,c,,...,, . ... . .. •-.. k S . .• . _. IN THE UPPER MIDWEST ..ii-i-. Implications for Management -.,--• •.4--frt..,,.....-74i... .•- ::!-,-,-.4•••y..„-. - :•::•,::-.,,e;-1. ...•i.t,....w4". •- ' - .•-•••.iz,-tri.A.. June 3 - 6 1991 .. ......., • • _• •._ :or •,..:4 ••..-N!.'.4.'11-`7,c,.. St. Mary's College :?_:.,,, .. . ... Winona, Minnesota ..:.„....:,-, • ... '' ''''..7%.:;A .,• **2A-t-• 7,4. :''„..-;e„l'-,• '......11- -`:',J...----:.e. .:. . .0.. _--- . ...••• ------ ..... 2 .. ......______ ..- 2 _-- -.... .. ---- . ... .. . . . . . • . . . --------- ..- • -,. • - . . . - . . . , . z ji-.. . .... • . . , . •.. :...... . _.. . .... . .. . . .._ . ..... , . . , . . .. ... . ..... ---- r.:1.-7-0, 't.r•-•-•• ••• • ••• i - '-'1•-• :4%4'w_; -•-•-•-• / t, :•f-,!,:41;.. .4-- / z-- , • .1„...1.- -.-'-'7•• • 4*-1.--fr-- : -•,.7.4.-:: - "E•4'-k 1 .r. , -•-qt„,},,,,::: r 4* • •',..••P.I.'.. i 7..',..- 1:•". ', ,.. I -• ,irs.b-,,,. Edited by Steven B. Laursen and Joyce F. DeBoe .. .-.,-...tt. • ! -. . •-•:`,.dfg...4: . 198 The Oak Resource in the Upper Midwest TREE SHELTER EXPERIENCES Darrell E. Zastrow and Trenten L. Martyr ABSTRACT. In May 1987, 2-0 red oak (Quercus rubra) seedlings were planted in two separate trials and protected with 1.2 meter plastic tree shelters on a variety of forested sites and vegetative cover types. Additional 2-0 red oak seedlings with plastic tree shelters were planted in similar fashion in May 1988. Initial survival of the planted stock was excellent, but decreased dramatically over time as overhead competition increased. In May 1989, 1-0 red oak seedlings were established in an old field situation. Three treatments were compared; protection of the seedling with a 1.2 meter plastic tree shelter, protection of the seedling with a rigid plastic mesh, and no protection of the seedling as a control situation. After two years, survival is significantly higher in both of the protected seedlings and height growth is significantly higher in the plastic tree shelters. INTRODUCTION The establishment and maintenance of red oak (Quercus rubra) on private and public lands is vital for wildlife habitat and forest products. The specific ecological natural-regeneration requirements of red oak has led to numerous research trials and stand prescriptions to supplement natural regeneration of red oak (Johnson et. al. 1984; Johnson 1984; Johnson 1985; Lorimer 1989). The continual lack of consistent success in natural and artificial regeneration of red oak has been attributed to slow initial seedling growth (Lorimer 1989), acorn predation (Auchmoody 1990), seedling browse by deer and small mammals (Hannah 1987), and competition of surrounding vegetation (Johnson et. al. 1989). This lack of regeneration success in red oak has provided emphasis for other artificial regeneration trials in the Lake States. One of these alternatives is the use of plastic tree shelters. The use of tree shelters by Tuley (1983) in Great Britain identified a technique to establish and protect oak seedlings. Follow-up studies in Great Britain identified the following benefits of tree shelters: increased survival and height growth, protection from browsing, easy location of planted stock, effectiveness of herbicide application to target species, and creation of a greenhouse effect within the shelter (Potter 1988). A disadvantage of tree shelters is the cost associated with the purchase and establishment in forest plantings (Jamil et. al. 1991). An applied Lake States study in Michigan documented an increased height growth of red oak in shelters (Lantagne et. al. 1991). [State Lands Management and Recreational Specialist and Tree Improvement and Nurseries Specialist,Wisconsin Department of Natural Resources,Bureau of Forestry, 101 South Webster Street,Box 7921,Madison,WI 53707-7921. Presented at The Oak Resource in the Upper Midwest Conference,Winona,MN,Junc 3-6, 1991. The Oak Resource in the Upper Midwest 199 Tree shelters are made of a translucent, polypropylene plastic, 1.2 m high and 8-12 cm wide in diameter. These shelters are designed to last five to seven years under field conditions. Wooden stakes, preferably white oak (Quercus alba) approximately 1.2 meter long are utilized to anchor the shelter. A plastic fastener is used to attach the shelter to the stake, after the stake is driven in the ground next to a seedling. This paper presents observations and results of tree shelter trials established on several public lands in central Wisconsin. METHODS TRIAL #1 In 1937, 240 2-0 red oak seedlings were hand planted in the Mead Wildlife Area in central Wisconsin. The intent of this trial was to observe red oak seedling responses in shelters compared to nonsheltered seedlings in a variety of vegetative covertypes. Observational plots of ten sheltered seedlings and ten nonsheltered seedlings were established on twelve different sites within the property. The sites were generally Rietbrock silt loams, and Meadland loams, and habitat types were generally Acer-Hydrophyllum (Kotar et. al. 1988). The twelve sites demonstrated a range of vegetative covertypes including a sod field, fresh aspen (Populus grandidenta and Populus tremuloides) clearcuts, established one to two year old aspen reproduction stands, and several brush openings created by older herbicide treatments. Seedlings planted without a tree shelter were marked with a flagged metal stake. Initial survival was measured after the first growing season in September 1987, and in September 1990. TRIAL #2 In 1937, 196 2-0 red oak seedlings with tree shelters were hand planted on a site on the Marathon County Forest, central Wisconsin. This trial was established as an underplanting of a red oak stand. The intent of this trial was to observe sheltered trees under a high shade crown controlled canopy. The stand was treated with a shelterwood harvest in 1986 with a 70 percent crown closure residual. The site is a Mosinee sandy loam and the habitat type is Acer-Quercus-Viburnum (Kotar et. al. 1938). Survival was measured during the third growing season of June 1989 and in September 1990. TRIAL #3 In 1938, 200 sheltered 2-0 red oak seedlings were hand planted in the Mead Wildlife Area in fresh aspen clearcuts. The intent of this trial was to observe initial sheltered oak seedling development with aspen competition. Incorporation of a future oak component within aspen stands is desirable both from a forestry and wildlife management objective. A total of six observational plots were established with plots ranging in size from 24 planted sheltered seedlings to 60 planted sheltered seedlings. The sites were primarily Rietbrock silt loams and habitat types were Acer-Hydrophyllum, (Kotar et. al. 1988). In September 1990, after the third growing season, survival was assessed. . , . 200 The Oak Resource in the Upper Mid;zst TRIAL #4 In May 1989, 450 1-0 red oak seedlings were hand planted in Council Grounds State Park, in central Wisconsin. The intent of this trial was to compare survival and height growth of sheltered seedlings and nonsheltered seedlings in an old field situation. The planting design contained ten completely randomized replications with three treatments per replication, and 15 trees per treatment. The plots established were on a Newood-Pence sandy loam soil type and Acer-Tsuga/Maianthemum habitat type (Note: habitat type adjacent to field reflective of site.) Site preparation targeting grass control for all replications consisted of four pounds a.i.per acre of Simazine in a spot application treatment. Further grass control in the second growing season was accomplished with a spot application of Fusilade at a rate of 1/2 pound a.i. per acre. Within each replicated plot, three treatments were compared including 1) protection of the seedling with a plastic tree shelter, 2) protection of the seedling with a rigid plastic mesh, and 3) a control where.seedlings had no protection. Survival and dieback of the seedlings were measured and compared in April of 1990. Dieback was only measured on seedlings that survived. Height growth was measured in September of 1990 after the second growing season. RESULTS TRIAL #1 Initial overall survival, after the first growing season in September 1987 for sheltered trees was 89 percent while for nonsheltered trees survival was 86 percent (Table 1). Initial browse damage occurred on 10 percent of the nonsheltered stock. In September 1990 seedlings established utilizing tree shelters had overall survival decrease to 37 percent (Table 1). Nonsheltered seedlings could generally not be relocated due to mortality, heavy competition and the natural degradation of the flagged metal stakes that marked their location. Those plots with a canopy of young trees or brush overtopping were generally dead or dying. Competition for sunlight in these plots was very high. Individual oak seedlings were noted to maintain their vigor only if sunlight was available. An example of this was in a field plot where six out of ten trees in shelters were alive. Of the nonsheltered trees on this plot only one tree was surviving. All of the nonsheltered trees or remaining stems had severe browse damage. It should be noted that as individual trees grew out of the four foot shelter, browsing above shelters occurred. The Oak Resource in the Upper Midwest 201 TRIAL #2 Survival during the third growing season of June 1989 indicated a total of 87 percent were alive (Table 1). It was noted that understory vegetation was becoming a significant competitor at this time. Survival in September 1990 showed a decrease to 58 percent. Understory competition of stump and stool sprout red maple (Acer rubrum), previously cut in the shelterwood harvest, was overtopping many of the sheltered seedlings. Overtopped seedlings predominantly reflected loss in vigor and mortality. TRIAL #3 In September 1990, after the third growing season, total survival was 46 percent (Table 1). Generally, with these plantings occurring in fresh clearcuts from 1988, vigorous aspen sprouts and other woody vegetation [red maple, blackberries (Rubus spp.), etc.] overtopped the red oak sheltered seedlings. Table 1. Survival of 1987 and 1988 sheltered seedlings. Trial #1 Mead 1987 Planting (various forest sites) Date Survival Not Found Checked # Planted # Alive # Dead or Damaged % Survival 9-87 120 107 13 0 89% 9-90 120 37 77 6 37% Trial #2 Marathon County 1987 Planting (underplanting of 70% crown closure shelterwood) Date Survival Not Found Checked # Planted # Alive # Dead or Damaged % Survival 6-89 196 170 22 4 87% 9-90 196 114 78 4 58% Trial #3 Mead 1988 Planting (fresh aspen clearcuts) - Date Survival Not Found Checked # Planted # Alive # Dead or Damaged % Survival 9-90 200 97 92 5 46% TRIAL #4 Assessment of dieback and survival occurred in April 1990 after the first year of establishment. Height growth was measured in September 1990 after the second growing season. First year survival of seedlings with plastic tree shelters was 98.7 percent. The rigid plastic mesh provided similar results with 94 percent survival, whereas the survival of the control seedlings was only 64 percent. Survival was 34.7 percent greater in the plastic tree shelters as compared to the control. There was no significant difference in survival of the seedlings protected by plastic tree shelters or the rigid plastic mesh. 202 The Oak Resource in the Upper Midwest Height growth after the second growing season of seedlings in plastic tree shelters was 44.3 cm compared to a height of 28.3 cm in the rigid plastic mesh and 24.9 cm in the control seedlings. Height growth was significantly greater in the seedlings in plastic tree shelters then in either of the other two treatments. Dieback of surviving seedlings was on 3.4 percent in the plastic tree shelters, 10.6 percent in the rigid plastic mesh and 60.4 percent in the control (Table 2 and Figures 2A and 2B). Table 2. Survival, height growth, and dieback of planted red oak seedlings with three treatments for seedling protection. Survival (%) Height Growth (cm) Dieback (%) Plastic Tree Shelter 98.7 44.3 3.4 Rigid Plastic Mesh 94.0 28.3 10.6 Control 64.0 24.9 60.4 Percent Survival (Loss) 120 100 80 80 40 20 0 _ —20 %/ //. —40 —80 4 —80 Plastic Tree Shelter Rigid Plastic Meeh Control ® Survival ® Dieback Figure 2A. Percent survival and dieback of planted red oak seedlings with three treatments for seedling protection. The Oak Resource in the Upper Midwest 203 50 Height Growth (cm) 40 - 30 - 20 - 10 - 1 Plastic Tree Shelter Rigid Plastic Mesh Control Method Figure 2B. Second year height growth of planted red oak seedlings with three treatments for seedling protection. DISCUSSION The trials in this study have demonstrated several benefits in artificial regeneration of red oak seedlings similar to other studies in England and the Lake States (Potter 1988; Lantagne 1990; Teclaw and Isebrands 1991). These include increased initial survival, increased initial height growth, vigor decline with increased overstory competition for sunlight, protection from animal browse, and an increased ability for seedling relocation. Seedlings protected from browse with either the plastic tree shelter or the rigid plastic mesh had similar survival, but the growth of the seedlings was significantly greater in the plastic tree shelters. This is attributed to the enhanced microenvironment created by the plastic tree shelter. Although initial survival and growth of seedlings protected by a plastic tree shelter is encouraging in forested sites, subsequent overtopping competition must be controlled to realize future benefits. Survival over time in all of the forested situations decreased due to competition. This scenario is similar to other natural and artificial regeneration studies, indicating the need to control competition (even when using tree shelters) to have a significant number of red oak seedlings survive and become established. The Oak Resource in the Upper Midwest One of the intriguing findings of the old field trial was the reduction of dieback of seedlings protected with plastic tree shelters as compared to the control. In the spring of 1990 only 3.4 percent of the seedlings in the plastic tree shelters exhibited dieback, whereas 60.4 percent of the control seedlings had some dieback. This is quite the opposite of what was expected, with the plastic tree shelters creating a greenhouse effect and prolonging the growing season of the seedlings, theoretically making them more susceptible to fall frosts. Reasons for this are unknown, but it could be postulated that the seedlings in the plastic tree shelters had better growing conditions throughout the year, were more vigorous, were less susceptible to desiccating winter winds, and less susceptible to a winter dieback of the main stem. CONCLUSION Tree shelters improve height growth and survival in the initial years of red oak seedlings when compared to nonsheltered seedlings. In the forest trials, survival consistently was excellent after the first growing season, but decreased over time due to overtopping competition. Planting oak seedlings with shelters in heavy competition for sunlight is not recommended unless these seedlings can be released. Protection from animal browse is a benefit and dieback appears to be significantly less in sheltered seedlings. The use of plastic tree shelters can assist in the establishment of red oak seedlings. LITERATURE CITED Auchmoody, L. R. 1989. A study to determine the factors limiting natural establishment and development of red oak seedlings. Presented at the Fourth Workshop on Seedling Physiology and Growth Problems in Oak Plantings, Columbus, OH. Hannah, P. R. 1987. Regeneration methods for oaks. No. J. Applied For. 4:97-101. Jamil, A., T. L. Marty, and J. C. Stier. In press. Cost effectiveness of tree shelters. Staff Paper Series #42. Department of Forestry, University of Wisconsin, Madison. Johnson, P. S. 1984. Responses of planted red oak to three overstory treatments. Can. J. For. Res. 14:536-542. Johnson, P. S. 1985. Regenerating oaks in the Lake States. Proceedings, Challenges in Oak Management and Utilization(ed.)J.E. Johnson). Coop.Extension Serv.,University of Wisconsin, Madison. pp. 98-109. Johnson, P. S., C. D. Dale, K. R. Davison, and J. R. Law. 1986. Planting northern red oak in the Missouri Ozarks: A prescription. No. J. Appl. For. 3:66-68. Johnson, P.S., R. D. Jacobs, A. J. Martin, and E. Godel. 1989. Regenerating northern red oak: Three successful case histories. No. J. Appl. For. 6:174-178. The Oak Resource in the Upper Midwest Kotar, J., J. A. Kovach and C. T. Locey. 1988. Field guide to forest habitat types of northern Wisconsin. Department of Forestry, University of Wis., Madison and Wis. Dept. of Nat. Res. Lantagne, D. 0., C. W. Ramm, and D. I. Dickmann. 1990. Tree shelters increase heights of planted oaks in a Michigan clearcut. No. J. Appl. For. 7:24-26. Lorimer, C. G. 1989. The oak regeneration problem: New evidence and possible solutions. Forest Resource Analyses No. 8. Bull. R3484. Department of Forestry, University of Wis., Madison. Potter, M. 1988. Tree shelters improve survival and increase early growth rates. J. For. 86:39-41. Teclaw, R. M. and J. G. Isebrands. 1991. Artificial regeneration of northern red oak in the •• Lake States. To be presented at the Oak Resource in the Upper Midwest, Winona, Minn., June 3-6, 1991. • • Tuley, G. 1985. The growth of young oak trees in shelters. For. 58:181-195. • • • Is j C • I INSPECTION and CONTRACT . ADMINISTRATION GUIDELINES •,;• for r • • 6'••, : - ,, 14 ,... -,.. t) • -: ,.,_\ ,) ,- _. - 4 ...,5,_ .„,, :::,...t_ __ _ vs;N,.._ , i "kt.\..1.._?.. •••• `••.- -5'-C---•--%-.•-• .••.,.__L,„.,s .1.,_ _.\... ". ... . .. ....._1_ ...„ i•2 . ...„. .. ._ ,, • .PI , ?ad, ).,,c S.:: . -- :."- -. • K+d *wt„ vim ... .. - I •-�`� -' I F�• Jam!e*`,� , ,trifer All �4:,':�: ' r Z ,� °= .�•- .� Alk►!� it 111• V- E -o• ter- -, .-1.%C�,;�� _ - •- _A-. , - - -,-_...i....ife Ai- ..-•-4,---,.....-,;‘,.;,. .4,----.-.._-_,^ ,-,e,.'�•� e`1 �, k • • i.:• MN/DOT ._• LANDSCAPE PROJECTSi., .4, Fij. if-.._.,, . 1 l; MARCH 1, 1993 EDITION ` r,.r T �i DETERMINING PLANT STOCK ACCEPTANCE WHAT Prior to plant stock delivery, all plant stock documentation (licenses, certifications, invoices), tests, and initial installation operations thus far must be acceptable. If there have been problems with compliance and unacceptable work up to this point, corrective measures shall be taken prior to accepting plant stock. HOW A four step process is used in measuring objective criteria to determine whether or not plant stock is physically acceptable upon delivery, initial installation, replacement installation, and upon final acceptance. The criteria are defined in the four sets of guidelines which follow in this section. 1) ACCEPTING DELIVERY OF PLANT STOCK. 2) ACCEPTING PLANT TYPE AND FORM. 3) ACCEPTING PLANT SIZE. 4) ACCEPTING PLANT HEALTH AND VIGOR. • WHY It is necessary to have clearly defined and objective standards and criteria which can be measured as a basis for all landscape project work to ensure that: Landscape Contractors, Material Suppliers and Mn/DOT Personnel know exactly what the Project expectations and requirements are. Inexperienced personnel can carry out their responsibilities and perform in a consistent and satisfactory manner. - . High levels of "quality" in materials and work are promoted and obtained. The landscape design intent is satisfied. 7B-1 ACCEPTING PLANT STOCK DELIVERY WHAT Prior to acceptance, the Contractor must provide: - A 3 day notice prior to the expected date of plant material delivery. - A dated, current year Minnesota Nursery Stock Dealer or Grower Certificate/Certificate of Nursery Inspection. - A final (revised if changes occurred) Certificate of Compliance. - Bill of lading or invoices to validate the Certificate of Compliance. Plant stock with identification labels attached to all individually shipped plants and/or all bundles, bales, flats, or boxes of plants. The specified plant material (no substitutions unless authorized). Good quality plant stock in good condition. Proper storage, transport, and handling must be evident. See Appendix D for the Minnesota Nursery Law/The Plant Pest Act for further explanation of certification and plant care, storage, and handling requirements prescribed by State law. HOW 3 Day Notice The 3-day notice must be written and it is recommended that the Contractor send the notice by facsimile transmission and an accompanying phone call for verification with the Project Engineer or Inspector. Nursery Stock Dealer/Grower Certificate A copy of the Dealer or Grower Certificate must be provided by the landscape Contractor if the certificate was not provided at the Pre-Construction conference or prior to plant delivery. MINNESOTA DEPARTMENT OF AGRICULTURE 1owLIT PLATO BOIAEiLR .ST.PAULMHiLSOTASS1C7-7f1 LUCENSEJCERTIFICATION FOR L-sC SCAP 1117-SDt7-S.'Og•OZ1:.II+'t CGI: IssuEOTo • j_'!' •`r '. Sample nursery stock SAMPLE • Dealer/Grower Certificate • ; c7 't..7.;:=m :M ....... ULckrtMc. LkXi.tFaP2ld. EftictheDlb F:ArrticaData Tra:kra=+be p=at!N..r r;taan plops rid B rot Snrhntk 7B-2 Certificate of Compliance A final Certificate of Compliance must be submitted no later than one week prior to the proposed beginning of planting to allow the Engineer sufficient time to review and approve it. Preliminary Certificate of Compliance information must be provided at the Pre-Construction conference. The Certificate of Compliance must be filled out as shown in the example that follows. It must include: Plant name/species/variety. Size. Root type. Quantity. Name, location, and phone number of the oriainal plant source (nursery growing range). Attached documentation from the "source". The documentation must confirm that the seed source or root stock and graft stock of plants that have not been grown inside the acceptable boundaries shown on the Plant Hardiness Zone Map for the past 2 years are midwest or northern source and Minnesota zone hardy. - Acceptable hardiness ranges Z include portions of zones 2. 3, 4 • Z ,\ ACCE •-� (and zone 5 for only those plants -� that will be planted in zone 4 in Z7.E 41 Minnesota). 2.5� _ LL; _ 3 r i) - A plant source is considered acceptable and nursery grown Z«F when plant stock has been _ consistently grown and cultivated IccEF7TA-E E \,J on State-inspected growing ___► 1 I ranges within the boundaries L; is:l shown on the attached U.S.D.A. Hardiness Zone Map for a minimum of 2 years. Plant stock_ not grown inside the acceptable Axeptable growing range for Midwest & boundaries for 2 years will be - northern grown plant stock as adapted to the accepted only if the seed source U.S.D.A. Hardiness Zone Map or root stock and.graft stock isp certified.and documented as� originally midwest_or northers. source and Minnesota zone hardy. This documentation and certification must be `provided by the propagator or-grower as a condition for plant stock acceptance and shall be in the form of a letter. The letter must state the actual date of plant transport back into the acceptable hardiness zones areas must also be documented. See the following Certificate of Compliance for an enlarged U.S.D.A. Hardiness Zone Map. 7B-3 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION CERTIFICATE OF COMPLIANCE FOR PLANT STOCK Project S.P. Number 2 4 -- 5(o Date 02./2.o/9 3 Project Description 1--d-N0 CP.r►,J A 10 Project Engineer ‘Joi-!-rJ St-17H Prime Contractor xYz (--0N rF-P‘r_.-ri I-:c, Landscape Contractor ,c, ',le-- Landscape ,1 .Landscape Contractor Address 1S/0 o441- F-0 As•D sr. P . FIN .5l Authorized Representative 15D e' r, , p Work Phone j I2 2 - OOoo Home Phone (6,12-) Zg - do I The Landscape Contractor acknowledges that the supply of plant stock specified on this project has been thoroughly investigated and firm commitments have been obtained from all growers/suppliers assuring delivery of the specified plant stock as required for completion of the contract. Each bundle, bale or Individual plant delivered to the Project Site shall be accompanied by a Certificate of Nursery Inspection for the grower, an invoice and a securely attached, legibly marked label identifying plant species, variety, size and quantity. Failure to provide the Engineer this information upon delivery of the plant stock shall be grounds for rejection of plant stock. The Contractor shall furnish the Engineer this Certificate of Compliance for Plant Stock no later than one week prior to the proposed planting date. As a condition for delivery and approval of plant stock, this Certificate of Compliance states that all plant stock furnished by the Contractor on this project is in conformance with the current edition of Mn/DOT Standard Specifications for Construction, the Supplemental Specifications, the Plans and Special Provisions. This Certificate of Compliance shall state on the attached Plant Stock Schedule the following information for all plant stock specified: plant species, variety, size, root, quantity and growing range name, address and phone number. This Certificate of Compliance states that all plant stock furnished by the Contractor on this project has been consistently grown and cultivated on State inspected growing ranges within the boundaries shown on the attached U.S.D.A. Plant Hardiness Zone Map for a minimum of two years or that plant stock grown outside of the boundaries shown is propagated from seed or is propagated on root stock and graft stock that can be certified and documented as midwest or northern source and Minnesota zone hardy in accordance with the map. The Landscape Contractor certifies that the information provided herein is accurate to the best of his or her knowledge: Signed: .75(151. Landscape Contractor 7B-4 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION Certificate of Compliance for Plant Stock -Attachment Plant Stock Schedule Plant Name/SpeciesNariety Size Root Quantity Growing Range Name/Address! Phone v t W.-4-Ks IS� e.s 5 Lo f2• d . evx 607 H-01 w a4-4i, W� 5444r'5 a-45 1 1 Riad ... k 4(5 4"7{-VW T ' Fa tr�n "V e'13 2 S _Iv-f. 3 j Dox 201 . I-}in w; MtJ. 5037 (or-0- 54 -Ls /34A - P'l(s 17oruccJ - 5, l;• fork l <<c� I je,� t\1 t,*..f s-;e k Co r~•.r err, l�wc,{�Lam► t FO. 1-25! ,t'k,,.i 124. r 'ii. Paµ:(., qr.) 551i1 (Grz451-1744. doati- if / ijg- 5 l I ( �Cr�GL. $ N(d L (0 . Arnwt- Z' 8 q00 P.o. 8�x iS5 F??...___ !-.oa f e-loo Wt. 53s 4 (.414-)47i -2.v-L4 1larmed vii((ow [ , t w+^swy IS tt Dr- 3z- Rj Z Sox 247 F61--h)_ett1►J 5,,,5-4-0 6-+8)574- 22-W OOciI nPi I z�r�l gat rPh `� F2j= 5 LI u � S- �OdGt.lo4�ner iVY 2 'IP t 64--o64--o�5 Nt rfe.5t Inc. / g7F. 35 IQ774- kert�oOe. Trx� ( • NOTE:Separate entries are required when a plant species quantity is supplied by more Clan one source. If additional space for entries is needed,make duplicate copies of this blank form and attach accordingly. 7B-5 State of Minnesota Minnesota Department of Transportation Certificate of Compliance for Plant Stock - Attachment U. S.D.A. Plant Hardiness Zone Map Limits of acceptable midwestern and northern source growing ranges. vilmsamiss �®. r miimmo AI Am. . : .. Eimmor- . , . umbemomr 1.0rmum „ imumi ammiww-- =,- / // /A ....... .... miNitAlmillmor vow / I • -....1 '1.1111MIMMEI7117 .■■■••■"_____ ,...... • , „.....46. #71277 ear- ..--,411MMIIMINEF .4;[-tflfr,z... Mallirlikomm, 4103, , 4r. r ,, „,,...-..-„,.---....., ,..„,...„,,...,,,...„.,, , , ',. ',1;-ffir" '3.6/r , . / / i / . / '. visas Isearie / ..�.� .41:a ! :aJ+r F - `,1^ .c' /4 fit; f-4 ,„ ' ' "" . / • 4o. / 4 ' ,,,, , , ,,/,,e1rAR2 '. , //// '4 -- 755,/ / / /4 // ,' *imp)am . -f:,,, Ofeavamou_glir ,. '''-' '." ' '' ty • i 6 '' ' • ' / ••'/. /• " • ',..mWvinnagir',',..sw.—...anre-4,--7: -1.'nfrlY/ '''/ i• 44 P•,',/,•//,',/,•/ / • • • //,,,W$Iinei . ,(‘-''dvirgispfur -kr ' r •• ,' , _b, 4/ 41111V--....g0R11111ftweilIM Mr `t' "/ '/. /' ./� ,/ / ,/�'1mll A Or�e� �W1 .1s-'� X' /'s... ,',' ' ',' /'..eta Aniutminenhmweeesmv W/ —_- -r,n: Im�.r esgfeneeennnleIar 1 E'"� -Vow •' 1 1 1,m e:nnnMUMIL eeseeneeen .amu a� / , IIIRI Ill eaneensrv" v ' , . . .- , �m enenneee� fie ' :. sr Air : 4,4"11111111111114'07- Miff • lnleeeet ____/, i L.:— "gric.1:ir ZONE 2: -50 to -40 L ZONE 6: -10 to 0 ZONE 3: -40 to -30 � ZONE 7: 0 to 10 77 •/;; ZONE 4: -30 to -20 ZONE 8: 10 to 20 r--r- ZONE 5: -20 to -10 Approximate Range of Average Annual Minimum Temperatures for Each Zone Revised May 1992 7B-6 Certificate of Nursery Inspection M:tiNESOTADEPARTMENTOFAGR1CltTURE - A current Certificate of Nursery „ �,, ti._P ,). .�.I...tk,,.. .,., IIC£NSE/CERTIFlCAT.ONFOR Inspection from the Department of cm �TM _ . : Agriculture must be provided from SAMPLE ,:s.. each state of origin for each ;.t,: , e-� ,.M ; 2 separate grower providing plants '` ::°= -':y;<<:� z` for the project. In Minnesota, `• '.: ":`F�,?`` nurseries commonly duplicate i.,-...,..... ��.r Polo•''. costheir Grower Certificate. This is ,,..._..`...,.t. .. ."""""` acceptable and serves as the Certificate of Nursery Inspection. • Expect to see a tag similar to this on plants (lots or shipments but not each individual plant) and note that there must be an effective date and an expiration date. Nursery stock inspection reports may be obtained from the Chief of Nursery Inspection at the Minnesota Department of Agriculture. CERTIFICATE OF INSPECTION Expect to see a tag similar to this on s r.,..., 6 to certify thzt 1h• pionh o=espv+isof by Ls dr mac=• is,•d 10 - plants "collected" (transplanted) as wild, ' ha-v•been cr,- y•m.:y,•d by a ch.-1y av s d inspector rather than nursery grown, if the Project free from dangerously tn; ;�U 4'' Special Provisions permit collected Tyr t.rtifcat. ° not .std al•a ;�.c,r. stock. (Typically collected stock is not �laP• .brow. earec�ca e.4 Division of Plant Industry permitted). Deportment of Agr;cvttur• rntok sttw.M Inv Bill of Lading or Invoices Compare all bills of lading (shipping papers) and/or invoices for plant stock against the Certificate of Compliance to verify accuracy and validity of the Certificate. Accurate and valid documentation must be provided for all plant stock before the stock can be considered for acceptance, especially if the stock is not as stated on the Certificate of Compliance. 7B-7 Plant Stock Labels Plant stock without identification labels on all individually shipped plants and on all bundles, bales, flats, or boxes of plants must be rejected. Ilik ! / - I Plants are labeled by either a �/ common name or botanical name. For example: ft/ < < {t , ' The common name is: L—Y s.stir 4404 °'�` Marshall's seedless ash /-7--- 111 (1/1/, Q The botanical name is: . . . ef orGenus = Fraxinus Species = pennsylvanica '1-iir Variety = 'Marshall's Seedless' Plants must be labeled - Reject plants labeled differently from the plants specified unless a substitution has been authorized. Plant stock substitutions should not be authorized unless the Contractor has provided written documentation to the Engineer that the plants cannot be obtained in full or split orders from Mn/DOT's Partial List of Nursery Stock Growers and Suppliers (Appendix E). If Mn/DOT's Landscape Unit verifies that the specified plant stock is not available, the Landscape Unit will recommend substitutions or waiting until the next acceptable plant installation period to obtain the specified plant stock. Storage, transport, and handling If all the plant stock documentation is acceptable, examine the plant stock for proper storage, transport, and handling in the truck before it is unloaded. Plant stock must arrive in good condition. Plants are perishables and a perfectly acceptable plant can become worthless in a short time through improper care. Determine that bare root material was protected against drying out during transport. To remain viable and healthy, roots must be kept covered with a suitable moisture- holding material (moist mulch, straw, soil, etc.), or refrigerated (34 to 38 degrees F.) and humidified (90 to 95% relative humidity). Feel the roots and scrape some with a fingernail to ensure that the woody tissue is pliable and whitish colored rather than dried out and darker colored. Determine that plant material has been adequately protected against damaging climatic conditions such as sun, wind, or freezing temperatures. Some bare root plants require "sweating" before planting because they do not come out of dormancy easily. For a list of the plants that require "sweating" and for procedural information, see Initial Planting Operation Installation Requirements, section 7H. 7B-8 ' Plants transported in an open vehicle must have a 1vit t y �• protective covering over the plants. Open vehicle--plants must be covered Plants transported in closed vehicles must have adequate ifn ventilation to prevent overheating damage or sweating ` _ which prematurely breaks their dormancy. Deciduous 1111' ; plants must arrive in a dormant condition unless specified Closed vehicles otherwise. For example, in the case of approved must be ventilated extended season planting, container grown plants or balled and burlapped plants that were previously dug in a dormant condition may be planted after they have broken dormancy. 1 Machine moved trees that have broken dormancy must be !+ ,w414. • protected. The foliage must be wrapped to prevent the leaves from drying during transport. • If storage, transport and handling of plant stock are Protect leaves during acceptable, inspect plants for compliance and acceptance transport either in the delivery truck or as they are unloaded. - Accept only specified plants that meet the criteria for type, form, size, health and vigor following in this section of the Guidelines. Allow plenty of time to inspect the plants and do not rush since this is the most important part of landscape project inspection. Often an entire semi-truck load of plants is delivered at one time. Begin by looking at individual plants or by opening bundles of bare root plants. Look at a representative sampling. If you see numerous problems, examine all plants very closely--many or all of the plants may be unacceptable. Although the Contractor may be capable of bringing unhealthy, undersized, poorly formed, or otherwise substandard plants into compliance by the end of a 2-year Plant Establishment Period, these plants will not be accepted for initial plant installation. 7B-9 my ,, - /, yrs, / . �,,, According to the Minnesota Nursery Law/The Plant , k2IieVi' '��' Pest Act, nsery stock held, spp , and stored • y. for sale, until subsequently being planted, must be ~; % "�, : watered and protected so the roots are moist at all ?)" • . - - ' •.-�:_}- times. Roots must be kept moist and cool so that y i '4'.' ' '" '-' they never dry out (whether bare root�-� ..., ,;�:_ _ :,.� ��4 -� �r:Y or in a soil �' •� -"'� ' ��':•� car �.':i-t f ..�. , -:: Store or heal-in plants so the ball). Plants with dry roots may fail to grow roots are always cool and moist normally or die, depending on the length of time, extent of injury and species (See Appendix D). A "reefer"or refrigerated truck is a good way to keep plants cool, •. moist, and dormant until it is time to plant. tyzy M ry Reject unacceptable plants as they arrive, and before they Closed refrigeration are installed, whenever possible. WHY A 3 day notice is needed to allow the Engineer to schedule enough time and personnel to properly inspect all plant material. Contractors operating without a current Nursery Stock Dealer or Grower's Certificate are in violation of State law and Mn/DOT exposes itself to liability and punitive action by permitting them to perform work. Accepting plants without all acceptable plant stock documentation poses serious and unacceptable risks that may not show up as dead, dying, or diseased plants until after final acceptance of the Contract. Plants originating and grown outside acceptable hardiness zones and acceptable Midwest and northern growing ranges will not reliably survive in Minnesota. An EXCEPTION exists: Plants, seed, or root and graft stock from the acceptable (midwest and northern source) hardiness zones area, if they are Minnesota zone hardy, can be grown or used for propagation outside the acceptable source and hardiness zones area and can then be brought back and planted in our area with reliable survival. Timing of transport may be critical to prevent potential injury from cold weather to unacclimated plants being moved through or between seasonally varied geographic areas. Bills of lading or invoices must be checked to verify the accuracy of the Certificate of Compliance since Contractors continually seek and often switch to different suppliers to obtain better quality plants, cheaper plants, or better payment terms. 7B-10 Potential problems with uncertified plants may not show up as serious problems until after the Contract period ends or they may show up as serious disease and insect problems that endanger plants in the adjacent area. Therefore, uncertified plants cannot be accepted. Without labels, it is difficult to properly identify many plants and their varieties, especially when they are dormant, therefore unlabeled plant stock must not be accepted. Requiring written documentation and verification that specified plant stock is unavailable before authorizing substitutions, provides fairness relative to unsuccessful bidders who may have added extra costs for materials that are more expensive due to limited availability. This procedure also makes every reasonable effort to obtain the specified plants and to avoid compromising the design intent. 7B-11 THE LAKE LUCY ENVIRONMENT PRESERVATION COMMITTEE April 24, 1998 Mr. Homer Tompkins President Contractors Property Developers Company 9110 83rd Avenue North Brooklyn Park, MN 55445 Mr. Richard A. Loscheider President Loscheider Custom Homes 1607 Florida Avenue North Golden Valley, MN 55427 Dear Mr. Tompkins & Mr. Loscheider, Thank you for holding the neighborhood meeting on April 9th regarding the proposed development for the north shore of Lake Lucy. Your presentation was well organized, and all of you appeared to be truly interested in the input of the neighbors affected by this project. Per your request, we would like to comment on the plan that you presented. We ask that you consider our comments and serious concerns, and integrate them into the final plan that you present to the Planning Commission, and ultimately to the City Council. If possible, we would appreciate another presentation prior to any submission of your preliminary plat. We want you to understand that we are not opposed to this property being developed. We acknowledge that, subject to city ordinances, a property owner has the right to develop his/her property. We are, however, steadfast in our commitment that the property be developed with an appreciation and sensitivity to the surrounding neighborhood. This will make your project a success, and will also benefit the adjacent property owners and the city as a whole. The plan that you presented on April 9th appears to be quite similar to the final plan that was withdrawn by Mike Byrne due to the neighbors' and the City Council's concerns about it. The primary difference is that you appear to have the experience and financial wherewithal to carry it through to completion. We were pleased to see that you had reviewed the chronology surrounding the development of this project, and have thought about one of the key issues, i.e., the removal of existing, mature tree canopy. But let us briefly review our list of major concerns and our suggestions to improve this plan: 1. Lot Size A number of your proposed lots are only 15,000 to 20,000 square foot lots, and most of these are backed up along the Randall's 12+ acre lot. This density is inconsistent with not only the Randall's property, but also with all of the surrounding properties. Apart from Pointe Lake Lucy, most, if not all, other homesites along the east, west, north sides, and across from the south shore are 5 or more acres. Even Pointe Lake Lucy (which had a much different original terrain......high, wide, flat and relatively open) has a density of 1.71 units per acre. Given the uniqueness of the parcel you are looking to develop (as further discussed below), a minimum (not average) lot size of no less than 44,000 square feet, or 1 acre, would be more consistent with the surrounding lots in this neighborhood. We envision a development somewhat like "The Frontier", the Streeter and Associates development on the East Side of Chanhassen. This development utilizes the mature trees and natural rolling terrain to enhance its beauty and value. 2. Homesites Along the Lakeshore Our concerns with having four homes along the lake stem from the following long-term impacts: a. Up to 9' of fill is required for these homesites to be buildable, thereby creating potential erosion and excessive runoff of water and fertilizers into an already nutrient-rich bay. This would also create an unsightly transition with the adjoining properties to the east and west. b. There appears to be a natural spring in this area which is quite active particularly in the Spring (no pun intended). c. Unlike the Pointe Lake Lucy development, there would be very little setback of the homes from the wetland area, thereby providing virtually no natural buffer for such runoff. d. This area is an active and sensitive wildlife corridor. The environmental impact of disturbing this area with 4 homesites should be seriously considered. 3. Clearing and Grading of a Significant Portion of the Site • As you indicated at the neighborhood meeting, the unique topography of this site makes it "very difficult to develop". According to your proposed plan, to do so requires the removal of a significant amount of existing vegetation, including many mature trees. Your forester. while quite thorough and knowledgeable, said that many of the trees around the inland marsh were in various stages of disease or instability. However, no real estimates could be given for the ultimate life span of these "threatened" trees. We are not attempting to "hug" every tree, but your plan (given that it is based upon Mr. Byrne's old plan) would remove upwards of 72% of the existing tree canopy! And this doesn't even account for the trees near the grading limits that would have questionable survival possibilities. We don't think this reasonable and consistent with the surrounding neighborhood. Also, due to the difficulty of developing this parcel, shouldn't more thought and consideration be given to minimizing the clearing and grading than would otherwise be given to a typical developable property? One unique characteristic of the property is the distinct "valley", or basin that runs from Lake Lucy Road down towards the lake. This basin naturally attracts the runoff of water from the parcel, and happens to be where the road is being proposed. This, along with all of the other clearing and grading, will likely cause the runoff of water to impact Lake Lucy quite dramatically. While you have provided a Walker Pond for the retention of such runoff, we doubt that it is adequate to handle downpours and snow melts. It will also not handle the runoff from the homes along the lake. The excess water from these properties will either flow directly into the lake or into the inland shallow fresh marsh.... and then into Lake Lucy. Our concerns involve the fluctuations in the water level of Lake Lucy when these events occur, together with the impact of the nutrient runoff into the already nutrient-rich marsh and lake. These are our major concerns. Since you've reviewed the file on this property at City Hall, you can see that these are not new concerns. Additionally, these concerns were not only voiced by the neighbors immediately surrounding this property, but were also echoed by the people who reside along the east shore of Lake Lucy, i.e., the Greenwood Shores residents who are also affected. Once again, we are not opposed to the property being developed. It will be developed! And from what we've seen of your group and your product, we believe that your organizations are qualified to do so. With consideration of our concerns, we will support your efforts to develop it. We also desire a win-win situation and outcome. Thank you again for soliciting our input upfront. With due consideration being given to our concerns, we believe a new development can be created on this property which is consistent with the type of natural, sensitive and sensible environment we sought in choosing this neighborhood for our own families. Sincerely, The Lake Lucy Environment Preservation Committee ?;01.;/1 4 , ,(0,t <✓�' � " /� �� olf// 411 Jack & Betsy Randall Joe & Gayle Morin 1571 Lake Lucy Road 1441 Lake Lucy Road Chanhassen 55331 Chanhassen 55331 /4/1a,/ 6)/iii/AirtIT Al & Ma eingart 1685 Steller Court Chanhassen 55331 cc Sharmin Al-Jaff City Planner i • ,---1 S .__ r t».to.r. .nig - t ' I' iF fill { TF 4 �l W r � ----- 1 It �i#Cq:i• 3 Fly lgII . 6 I Yi I ay r 4$ e t ! O r • '/c • !1I•' I If t a '+.:14 p I i °n 4.N; t I I. Qy L �, e-1 44.44. Egsa.ki' i i4li ° r4 qj /1 #• 4 „, .11101 ..,. ttt ) tf i/ ttAt �ar',, / �,,''� Se V W r 1 4 I I _iff if(ii :---1 I ,I-` I :a 711• , Ix.. w e _ 12 R 'y _ I ) t '°` n -- � f • xx a -, !; ---- I ', i i I --le a [C i �J ti 1 h' t1i 3y 7• I y• {•" is 2 Q L-- ' f / I,- 4i ,-' — �\ .. •-i of..-J ti ' i W I -� t ``I I r -.1 �/ L �a J i 4144 4 T L I ' * '" �-, 3 f t L. ... -i I `->an ' ii . -,(..j I „, --J lc � ♦ t9� �F I - I I I s I` . 1 4 8 �1 1 a I 1 e I = �e w r— • ; /......:4........)1 er ! E • { II i i Il 1 f' ,��r/'a I 114 112'' - ? r �\ ' I I I if / \ - , \ S 1 'llMllllllllllll : F • \ppt F_flt t 1tri .3 }( cS �r_t rif•l �" 7 /(C:hfd III ` it -- — ,---.— '�,4, -�_i;•: kk .01:!1.-; 41 .111 if t } 3 • 1 - t Iti 11 r.= 1' r err ' M 1 . /. 4114111z -�.. , .., .. t �fitF�t � i r�'f, b F ` Ff If C X xq a: i gq :a N i if - ���f. , Ii) iii,2i b - m� RI IIi 4 '----:si Z c 0 r _ { 70 to .!II! Ic z ■°;E4 3 °1= ' � � up Rad ` i ; t ' isp-.F F f F i !' — �1a_ _ — 1r Z I i9 La ili i '.' '° 1I iii 11 1 is-11 i €e: 1 "t -- -- _� I c 4 l°' is al f i gill'' i ,:t i e �\\'T' .._, /`y - / j ; "4 •p ill f -il ` •i Nil i Yp i t , . J o ° .. i.I � d : ''° 9 Z F `i €1 1 5 i •€, f -is i i IF 7 ty 11 1..._. C t E Ff S !! el3 s . „..-....., i/ I I; x 1 ,i1g1 i !b 1 I '' ' 'F -4- 1".4VIP fi ... :''X' '' - :I- -II Ei{ji* -, _ . , st ' - : i i i / � t- ........_. --..,...4. , , ... -,-, .....is j>i,115....,0 , RFI FIT."� F i �� �i , / "''F ;^r//y�,1 _, i i'`i4111i Al ( r, i .i 1• z•• • o i I c=til t`'i11 ta, 010114kV ,.. ..7N 1:ISA i. I III, MIL" .'` f I j'', , ' . F■ IS e _ / ice F� 10 �}6 ,�, �1 e :-. : : il,E:'-, -.....— --' 14irL gift'a ,r 4..._ ._.., Lr,'1'.(4'.' : ,,//''''' Lr ,, • . ., ,... . e_....., i .. s PRI.i lit a �.r ,,,,,, , ....... . . : WI i � \ v ��� ' `�` '., , e R 'if Rt � _ ., s7:, -"AT % C1 , _ iii 11 6 i 'Y'., w`� \ ;` ♦. �`.` •. ^� 4.---# \ .;.• ''.._, ...\ .„„ 4,:', 414% .,i) ......•' .....':// i ill 4 1 ,,...1., A li - • • 0 -.A; , 1111111 O Rin RAAAAAA 1f 8 2 = Pa X 131Q ' f �g€131VT 'p , a iI 'ice .; ziu:iiiiJ I i R ix R 1 Rt Aid3`igi fR `' ' o.• / s. : 2 'i1a if :i 11023aRi133 t E e----% IF ; c Ex!°:'' as cl ax8 � x f[it ,ygy a: 1st C) 7 i lEfle,f At ' !o 15 / w ` 11* 0 3 : F Qiq ii " C) r [Yr �ijp � 3 S Q R���F C� � .--------p--- _�� rl; � In 0 ty° �pp•g �( NI " ♦ ! i 4 f4e719 9 11 V R4 �1 F , ilif g w�� / ;11 �: :ii $ E' I I( S 7111 i Iem 11! c iii � i , li Ill I IP i ii ' s i 1 }IIIA . I!I l \ !s" --- r \ /./ _-_ _ • i" C2 1`t n 5 X 4m= p:j A P • - Lake Luc, 'oa• L—:_T__ _ Elt.:0_ ,�'..t:-; " — --::.L=7"—.777-7. - _ _ V r ti 7".s::i : „tomr l-_. • • :in* 1,t_ • _ 1. .' ,.l... —.' - r' f N. 1. •1+ �1}i� ..fir'I_/?�' rte,.�1i/ •- •/ • ` .'.i. ..• 1,0 fi; xi ' a_x/ II: i c is i;: �';� i r 7 ~�-- , �,� - � ,. \tea;: ,.,.,, r.. ,,,,,,,,,..„:„. , „., 7,„, ..... . •,..:• :. ••.. ,-,..,,.. ,, /0 • ''. I. i VI. 1 ••,ff;, :.,712t:I' € , .;4,.j;,::• •:». .Jar i; ,�•, // � .Y.4: r"�w by esr- -.7.---.4.-:=,. iii.C::... ..•;f il ill C3 —,:;-..--:--1..:-P7–....---,,,,,,,,,,.•.N ` s:- -:`oma .P.. • 4 Vi .. .: . t\.=:.L.:: • s a i. .95 4* a s4.• Y , R .. , "7"CM .«+i . �S x `I 6' gib= a,13 •/, /` f. . '..=..: , - --• ` _ r G '-E0. .-g:a ' •'` / /� ' V - — • t p< C 'A y X gs i. ' • - ' ''' '. . . l'aThli.7,_. .7---7445MEN _n.n_....._ It lijr:1115"MeCt. .,_ ......::::-••••:-:• -.:::....:1:4;.1.; ' il tZI , FT' T gM�•o ' lie g. 1 ,•' / ' "--'•.--7.------;-"."-:-:-.--.� ' _ ---••�; -iii = lila Aga • •,... ,/ *� ....4-:-.' / • /• �. Io / ..:'_� ";'/ if.',- :?_--- :i is J• / .� •-• — — 'a •-i o d:0 ::-. ion, / '/r 0 ,/ -,// - �� r •'� ♦ \ Ili ai5A- Yo Qat • ' f, "/.•,• 1 " / ' I — — _ s._2...., int,s„ ,i ;4E: , ,.... i .!....„••••, / # co •ice tail! ira f • i Y•. a ps , . :V. :, ,�� • • fp. P p- .1p W ,4'..44-\ p - ,` , , 1 1741 o:iyoN2 ?';-! -- -a a.\ ` , ♦ ' - . -.. , . p�4 ado i --.. ,s, 4 \ ' --m �i 1 is Y mo'-° / • / ', — r ♦ , Pty + f�� G• -- — i-lt I 6,5! .. , , // -.. _ :II 'i Stir kQLR6 “., ", ilt 11.717 Vi ao O. Sas- A: °a g45 gz_4 4s n RI-6 "174a•. il ,Y oC ' ..L� Z5..=41. n Au g N. 14Siyi f A� 2 •; , C I TY O F P.C. DATE: 5-20-98 C U A N U A C s E N C.C. DATE: 6-8-98 CASE: 98-3 Site Plan 98-3 Subdivision STAFF REPORT PROPOSAL: Site Plan Approval for a 15,000 square foot office/warehouse building LOCATION: Lot 1, Block 1, Chanhassen Business Center 4`h Addition .XPPLICANT: Eden Trace Corporation Peter Pemrick z Suite 2000 Suite 2000 Q 14500 Martin Drive 14500 Martin Drive Eden Prairie, MN 55344 Eden Prairie, MN 55344 ._J (612) 975-9452 (612) 975-9452 0 PRESENT ZONING: Planned Unit Development. Pl..,L) ACREAGE: 2.75 acres ADJACENT ZONING AND LAND USE: N - IOP, Lake Drive West and Vacant Industrial Lot W- PUD, Eden Trace/Matthews E - PUD-R, Residential Single Family Subdivision and Audubon Rd. S - PUD-R, Residential Single Family Subdivision and Audubon Rd. ift. WATER AND SEWER: Available to site. QPHYSICAL CHARACTER: The site is devoid of vegetation with the exception of the buffer area along Audubon Road. t" l.l.'./ 2000 LAND USE PLAN: Office/Industrial (1) ' ( lvd Park :a� inn .. - i: . ..... ....,. ._ _:,... . . ili 1111111/pliIrsmin��iumu mo Lake �! %.•'.,,1l,:.•' " .:,. . ,-. : ,..— . ,,....,,,,,. .. .. : * .,...:','.:.. Z iY�fl....ni:L• +.!7 \ \ Park ::: lif Alk t!.... c,„ •N .E . . / _- ,,. ... •: t ill "it Park M G1 nn Rd • IliFiliji 11111.11.1 — t y i Court RIMI •` •`Coulter ;Iva Coult Blvd. f� a (Gtllj °u/ter Blvd q, ��4 /� `ZID St .' ••• Dr �0 • gill: \ *\ _a"' t,.•, „,,,,,,,,,i will° _. 1,,,,. IP. lik41{14*Ili 1101° '' .. . .. ''Iek,#;,... -.-- ::. _F7- — ' ,, f� 1:�� :"',�0 . OSED SIT"0�? ?f..-. _' • S to,e Creek-•.ark - as -11 o r— . E ,� Q Aill); . pronto ,./..z,...,,, f IL 0 414 110:'. '. f coot.t 0r:or swop g /17,.., .6 ,1:14% 2: -,elootuttla 1111 i;a1v41111111.7 711 L.- • iii i lioiiiiiiils � La VITOP.40111k4 4:3, „ At , ' 11144:1:12ts1/4 7114::".4.:4•141114 N •? ►ti \ey - � ` fili t' 494.21 , llrli�/ mit • v HIGS ; fi-moC `, 4.gr��'� 1111an B 0 . *dray E. Ipta.1',Lai f. �'� '�� .0.,,,-, c� v 1,•►-, �,'441...10* All All C I. m ani Par Ca"jr*>\'`` 4. 4: wo(D id S& it, ►♦ i...:, ,.A_ 3 _ •i�����.MITI ,` •.-•_' - j+. �i 83II . /�,,�- • I / > �'7 South I Park , (.,,.b4, 1 fir .,:,,s4is...t.. . ..,_ -___„0-0 _,Ii. . , . \ ., ......._-- , ,,.....•, \ , / . , ._ lg . _ . i.-- ik! = lib ,S.: ...7„1.. (7\ ?2,1.,..„ �—+ % Lyman Blvd (C.R.i 8) Eden Trace May 20, 1998 Page 2 PROPOSAL/SUMMARY The applicant is proposing site plan approval for a 15,000 square office/warehouse building on Lot 1, Block 1, Chanhassen Business Center 4th Addition. There is potential future expansion area which would expand the footprint of the building on the southeast portion, towards Audubon Road. The building is proposed to be constructed using rock face block. The PUD requires that all walls shall be given added architectural interest through building design or appropriate landscaping. Horizontal bands and windows accentuate the building. The building footprint is constrained by the shape of the parcel, so the proposal is essentially a rectangle. The applicant does provide variation in the facade of the building to compensate for the ordinary shape. The proposal contains three loading dock areas. Two loading docks are located along Lake Drive West and the third is situated at the intersection of Lake Drive West and Audubon Road. The preliminary plat for Chanhassen Business Center was approved on January 13, 1992. The subject building is proposed to be constructed on Lot 1, Block 1, Chanhassen Business Center 4th Addition, which was approved April 13, 1998. Staff believes that the proposed development meets the standards established as part of the PUD and is recommending approval of the site plan subject to the conditions contained in this report. BACKGROUND On January 13, 1992, the City Council approved the preliminary plat for the Chanhassen Business Center as shown on the attached site plan. The PUD was amended on February 8, 1993 to allow for a church as a permitted use and the final plat for phase I of the project was approved. On April 24, 1995, the Chanhassen Business Center 2nd Addition, subdividing Outlot C into 7 lbts, was approved by the City. On September 25, 1995, the City Council approved the replat of Outlot A into 4 lots, Chanhassen Business Center 3rd Addition. The City Council approved Chanhassen Business Center 4th Addition on April 13, 1998. The Chanhassen Business Center is an industrial/office park on 93.7 acres. The original plat consisted of 12 lots and 2 outlots. The ultimate development for this proposal was to have a total of 700,000 square feet of building area with a mix of 20%office, 25% industrial and 55% warehouse. Eden Trace May 20, 1998 Page 3 GENERAL SITE PLAN/ARCHITECTURE OVERVIEW The proposed building is situated between Lake Drive West and Audubon Road on a triangle- shaped parcel. Access is gained off of Lake Drive West. Parking is located to the north, west and west of the proposed building. Direct views of the loading docks, which are located to the northwest and northeast of the proposal, will be screened by the landscaping. The location of the docks are constrained or limited by the shape of the parcel and the future expansion of the building towards Audubon Road. The applicant is proposing to add landscaping along the parameter of the site to maximize the screening of the loading docks. The building height is 19 feet. It is located 100 feet from property line abutting Audubon Road and 94 feet from Lake Drive West. The 7,500 sq. ft. building is also located 100 feet from the property line abutting Audubon Road, because of the shape of the lot. The materials used on the structure will be rock face block accented by horizontal bands. The building is essentially a rectangle, however, the applicant creates the illusion of a varied faced through smooth face block accents. The applicant has not shown the trash enclosure location. Staff discussed this issue with the applicant and was informed that it will be located inside the building. The overall design is of a high quality providing variation and detail on the facade of the building. DEVELOPMENT STANDARDS The development standards will remain the same as previously approved with the PUD. a. Intent The purpose of this zone is to create a PUD light industrial/office park. The use of the PUD zone is to allow for more flexible design standards while creating a higher quality and more sensitive proposal. All utilities are required to be placed underground. Each lot proposed for development shall proceed through site plan review based on the development standards outlined below. b. Permitted Uses The permitted uses in this zone should be limited to light industrial, warehousing, and office as defined below. The uses shall be limited to those as defined herein. If there is a question as to whether or not a use meets the definition, the City Council shall make that interpretation. Eden Trace May 20, 1998 Page 4 1. Light Industrial. The manufacturing, compounding,processing, assembling,packaging, or testing of goods or equipment or research activities entirely within an enclosed structure, with no outside storage. There shall be negligible impact upon the surrounding environment by noise, vibration, smoke, dust or pollutants. 2. Warehousing. Means the commercial storage of merchandise and personal property. 3. Office. Professional and business office, non-retail activity. FINDING: The proposed uses of light industrial, warehouse and office are consistent with the parameters established as part of the PUD. c. Setbacks In the PUD standards, there is the requirement for landscape buffering in addition to building and parking setbacks. The landscape buffer on Audubon Road is 100 feet. The PUD zone requires a building to be setback 50 feet from the required landscape buffer and public right-of-ways. There is no minimum requirement for setbacks on interior lot lines. The following setbacks shall apply from the right-of-way: Building Parking Required (interior road system) 25' 15' Required (exterior road system) 100' 100' Required (interior lot lines) 10' 0' Provided Lake Drive West 75' 25' Provided from Audubon Rd. 160' 100' Provided from interior lot lines 10' 10' FINDING: The proposed development meets or exceeds the minimum setbacks established as part of the PUD. Eden Trace May 20, 1998 Page 5 d. Development Standards Tabulation Box Chanhassen Business Center Fourth Addition Lot# Lot Size- Acres Building Sq. Ft. Building Pervious Coverage 1 4.5 57,000 29% 60% 2 4.0 44,000 25% 60% Subtotal 8.5 101,000 avg. 27% avg. 69% COMPLIANCE TABLE PUD Eden Trace Corp. Building Height 2 stories 1 story Building Setback N-25' E-100' N-110' E-100' S-25' W-25' S-10' W-50' Parking stalls 38 stalls 44 stalls Parking Setback N-0' E-100' N-25' E-100' S-0' W-20' S-10' W-25' Hard surface 70% 31% Coverage Lot Area 1 acre 2.75 acres Variances Required - none The PUD standard for hard surface coverage is 70% for office and industrial uses. Parking Standards: Office - 4.5 spaces per 1,000 square feet; Warehouse - 1 space per 1,000 for first 10,000 square feet, then 1 space per 2,000 square feet; Manufacturing- 1 parking space for each employee on the major shift and 1 space for each motor vehicle when customarily kept on the premises. Staff has estimated the required parking at 38 spaces. The applicant has provided Eden Trace May 20, 1998 Page 6 4 spaces. The applicant has shown that future parking will be located on the northeast portion of the building. The proposed parking exceeds the ordinance requirements. Building Square Footage Breakdown for entire development Office 20% 120,700 sq. ft. Manufacturing 25% 150,875 sq. ft. Warehouse 54.09% 326,425 sq. ft. Church 0.91% 5,500 sq. ft. Total 100% 603,500 sq. ft. FINDING: The proposed development meets the development standards established as part of the PUD. The city has previously approved the following square footage within the Chanhassen Business Center: church- 5,500 square feet; office - 54,303 square feet (National Weather Service, Power Systems, Paulstarr Enterprises and Construction Heaters, KNS Investments, Postal Service and Matthews); and warehouse - 74,192 square feet (Power Systems, Paulstarr Enterprises, Postal Service, Construction Heaters and Matthews). e. Building Materials and Design 1. The PUD requires that the development demonstrate a higher quality of architectural standards and site design. All mechanical equipment shall be screened with material compatible to the building. 2. All materials shall be of high quality and durable. Masonry material shall be used. Color shall be introduced through colored block or panels and not painted block. 3. Brick may be used and must be approved to assure uniformity. 4. Block shall have a weathered face or be polished, fluted, or broken face. 5. Concrete may be poured in place, tilt-up or pre-cast, and shall be finished in stone, textured or coated. 6. Metal siding will not be approved except as support material to one of the above materials or curtain wall on office components or, as trim or as HVAC screen. 7. All accessory structures shall be designed to be compatible with the primary structure. Eden Trace May 20, 1998 Page 7 8. All roof mounted equipment shall be screened by walls of compatible appearing material. Wood screen fences are prohibited. All exterior process machinery, tanks, etc., are to be fully screened by compatible materials. 9. The use of large unadorned,prestressed concrete panels and concrete block shall be prohibited. Acceptable materials will incorporate textured surfaces, exposed aggregate and/or other patterning. All walls shall be given added architectural interest through building design or appropriate landscaping. 10. Space for recycling shall be provided in the interior of all principal structures for all developments in the Business Center. FINDING: The applicant is proposing the use of rock face block with smooth face block accents. The PUD requires that all walls shall be given added architectural interest through building design or appropriate landscaping. The building design is of a high quality and meets the intent of the PUD design requirements. f. Site Landscaping and Screening 1. All buffer landscaping, including boulevard landscaping, included in Phase I area to be installed when the grading of the phase is completed. This may well result in landscaping being required ahead of individual site plan approvals but we believe the buffer yard and plantings, in particular, need to be established immediately. In addition, to adhere to the higher quality of development as spelled out in the PUD zone, all loading areas shall be screened. Each lot for development shall submit a separate landscaping plan as a part of the site plan review process. 2. All open spaces and non-parking lot surfaces shall be landscaped, rockscaped, or covered with plantings and/or lawn material. 3. Storage of material outdoors is prohibited unless it has been approved under site plan review. All approved outdoor storage must be screened with masonry fences and/or landscaping. 3. The master landscape plan for the CBC PUD shall be the design guide for all of the specific site landscape developments. Each lot must present a landscape plan for approval with the site plan review process. 4. Undulating or angular berms 3' to 4' in height, south of Lake Drive along Audubon Road shall be sodded or seeded at the conclusion of Phase I grading and utility construction. Eden Trace May 20, 1998 Page 8 The required buffer landscaping may be installed in phases, but it shall be required where it is deemed necessary to screen any proposed development. All required boulevard landscaping shall be sodded. 5. Loading areas shall be screened from public right-of-ways. Wing walls may be required where deemed appropriate. FINDING: Existing conditions on site include boulevard trees planted along Audubon Road and Lake Drive West. No tree removal will take place. Existing trees located in proposed construction areas will be transplanted to permanent locations. Since the commercial development is along Audubon Road bufferyard B plantings are required. g. Signage 1. All freestanding signs be limited to monument signs. The sign shall not exceed eighty (80) square feet in sign display area nor be greater than eight (8) feet in height. The sign treatment is an element of the architecture and thus should reflect with the quality of the development. The signs should be consistent in color, size, and material throughout the development. The applicant should submit a sign package for staff review. 2. Each property shall be allowed one monument sign located near the driveway into the private site. All signs require a separate permit. 3. The signage will have consistency throughout the development. A common theme will be introduced at the development's entrance monument and will be used throughout. 4. Consistency in signage shall relate to color, size, materials, and heights. FINDING: The applicant has not provided details regarding signage for the site. All signs must receive a permit prior to installation. h. Lighting 1. Lighting for the interior of the business center should be consistent throughout the development. 2. A decorative, shoe box fixture (high pressure sodium vapor lamps) with a square ornamental pole shall be used throughout the development area for area lighting. 3 Lighting equipment similar to what is mounted in the public street right-of-ways shall be used in the private areas. Eden Trace May 20, 1998 Page 9 4. All light fixtures shall be shielded. Light level for site lighting shall be no more than 1/2 foot candle at the property line. This does not apply to street lighting. FINDING: The applicant has not provided lighting details or calculations for this development. However, city ordinance and the PUD standards provide sufficient control to assure compliance to an established standard. GRADING & DRAINAGE SITE GRADING The site was previously graded in conjunction with Chanhassen Business Center 15` Addition. Upon review of the preliminary grading plan, it appears building and parking areas will blend into the existing land form. The site will be re-graded to prepare the building pads and parking lot areas. If exporting or importing of earthwork materials is necessary, a haul route and traffic control plan will need to be submitted to the City for review and approval prior to construction commencing. The site contains an existing earth berm along Audubon Road. The berm will not be disturbed as a result of this project. The top of berm will be approximately three feet above the first floor elevation. Staff believes that the berm should be extended northerly to wrap around the corner of the site to help screen the east side of the building and parking lots from Audubon Road. DRAINAGE In conjunction with Chanhassen Business Center, a comprehensive storm water drainage system was constructed to address runoff from this site. No on-site ponding will be required with this development. The plans propose on utilizing existing and/or proposed stormwater services to convey stormwater runoff from the site into the City's storm drainage system. The applicant's engineer has submitted to the City detailed storm drainage calculations and a drainage area map for a 10 and 100-year storm event,24-hour duration for staff review and approval. STREETS The project is proposed to be accessed through a new driveway access off of Lake Drive West. Staff has reviewed the location of the driveways and are comfortable with the location. The parking lot provides adequate traffic circulation around the building site. A future parking area is Eden Trace May 20, 1998 Page 10 proposed in the easterly corner of the site; however, no layout is shown. There is an existing 6- foot wide concrete sidewalk on the north side of Lake Drive West. All driveway access points on Lake Drive West shall incorporate the City's industrial driveway detail apron (Detail Plate No. 5207). This will also decrease the driveway radii onto Lake Drive West. There are existing City street lights along Lake Drive West that are not shown on the plans. The developer should verify that the access points will not be in conflict with the City's street lights. The applicant shall be responsible for any relocation of street lights in conjunction with site improvements. UTILITIES Municipal utility service is available from Lake Drive West. The plans propose on extending sanitary sewer and water service from Lake Drive West. According to city records, there are no sanitary sewer services extended to the property line. The plans propose on cutting open Lake Drive West and extending a sanitary sewer service from the existing sewer manhole. To reduce impact to the street and traffic staff is recommending an inside drop into the manhole. This will minimize the trench width. In addition, the contractor will be able to maintain one lane of traffic along Lake Drive West. Staff is also recommending Lake Drive West be restored in kind within seven days after construction commences on the sewer service. A $2,500 escrow will be required to guarantee restoration of Lake Drive West. No open trenches will be permitted overnight. The site does have water service extended to the property line from Lake Drive West. The proposed sanitary sewer and water improvements shall be installed by the developer and/or their assignee. The utility improvements with the exception of a portion of the storm sewer will be considered private and not maintained by the City. These utilities will be inspected by the City's Building Department. The utility improvements shall be constructed in accordance with the City's latest edition of Standard Specifications and Detail Plates and/or State Plumbing Codes. This property has been previously assessed for sewer and water improvements under City Project No. 91-17. However, according to city ordinance,the property may be subject to additional sewer and water hookup charges at time of building permit issuance. Sewer and water hookup charges are determined based on the number of sewer availability charges (SAC units) which is determined by the Metropolitan Council Environmental Services upon plan review of the building. The applicant and/or contractor applying for the building permit will be responsible for the sanitary sewer and water hookup charges. 1998 hookup charges for sanitary sewer and water are $1,216 and$1,584, respectively, per unit. Eden Trace May 20, 1998 Page 11 MISCELLANEOUS The applicant should be aware that no construction activities may commence on the site until the final plat and development contract for Chanhassen Business Center 4th Addition has been recorded. EROSION CONTROL The preliminary erosion control plan is in general conformance with the City's Best Management Practice Handbook. Catch basins shall also be protected with hay bales and silt fence or rock construction dikes. In addition, erosion control fence will need to be installed along the easterly property line for extension of the existing berm. LANDSCAPING Landscaping requirements for the development include parking lot landscaping and buffer yard plantings. The parking lot area is 21,128 square feet. The minimum required amount of landscaping for the parking lot is 1,690 sq. ft. and 7 overstory trees. The applicant meets the landscaping requirement in both area and number of trees. Since the commercial development is along Audubon Road bufferyard B plantings are required. The planting area is 50 feet in width,but the minimum bufferyard standard of 30 feet width will be applied. For every 100 feet, one overstory, 2 understory and 2 shrubs are required. Frontage along Audubon is approximately 460 feet, therefore buffer yard plantings must include at least 5 overstory trees, 9 understory and 9 shrubs. The applicant has proposed 5 overstory, 15 evergreens, and 3 understory. Staff feels the absence of shrubs in the plantings is compensated for by the evergreen plantings and that the buffer yard is adequate. Staff recommends the three additional trees be planted in the eastern corner of the property to help screen the parking lot from Audubon Road and incoming traffic. These trees should be an extension of the bufferyard plantings and not interfere with any plans for future expansion of the parking lot. LIGHTING/SIGNAGE The applicant has not provided lighting details or calculations for this development. The applicant has not provided signage details for the project. However, city ordinance and the PUD standards provide sufficient control to assure compliance to an established standard. Eden Trace May 20, 1998 Page 12 SURFACE WATER MANAGEMENT PLAN (SWMP) Storm Water Quality Fees The SWMP has established a water quality connection charge for each new subdivision based on land use. Dedication shall be equal to the cost of land and pond volume needed for treatment of the phosphorus load leaving the site. The requirement for cash in lieu of land and pond construction shall be based upon a schedule in accordance with the prescribed land use zoning. Values are calculated using market values of land in the City of Chanhassen plus a value of$2.50 per cubic yard for excavation of the pond. SWMP water quality charge is $4,633/acre for industrial developments. The fees were paid at the time when Chanhassen Business Center 4th Addition was platted. The applicant has provided on-site water quality ponds in accordance to the SWMP in Chanhassen Businesses Center 2nd Addition; therefore,these fees have been waived. Storm Water Quantity Fees The SWMP has established a connection charge for the different land uses based on an average city-wide rate for the installation of water quantity systems. This cost includes land acquisition, proposed SWMP culverts, open channels and storm water ponding areas for runoff storage. Industrial developments have a connection charge of$4,360 per developable acre. The fees when paid at the time when Chanhassen Business Center 4th Addition was platted. INSIDE PARKING At grade overhead doors raise a concern that motor vehicles may be parked in the building. There are specific code requirements if this occurs. The plumbing code requires a flammable liquids separator if vehicles are parked in the building, and the building code requires a one-hour fire- resistive occupancy separation between a parking area and a warehouse, office, manufacturing facility or storage facility. The Inspections Division interprets parking as being overnight parking. The presence of a motor vehicle in the building during the operation of the facility does not trigger the additional code requirements. PERMIT REQUIREMENTS Plans are often bid before the building code plan review is done by the Inspections Division reviewer, making changes necessary for code compliance difficult and expensive to incorporate later. Accordingly,the developers and designers my desire should meet with Inspections as early as possible to discuss commercial building permit requirements and the code review process. Eden Trace May 20, 1998 Page 13 SITE PLAN FINDINGS In evaluating a site plan and building plan, the city shall consider the development's compliance with the following: (1) Consistency with the elements and objectives of the city's development guides, including the comprehensive plan, official road mapping, and other clans that may be adopted; (2) Consistency with this division; (3) Preservation of the site in its natural state to the extent practicable by minimizing tree and soil removal and designing grade changes to be in keeping with the general appearance of the neighboring developed or developing or developing areas; (4) Creation of a harmonious relationship of building and open space wi:h natural site features and with existing and future buildings having a visual relationship to the development; (5) Creation of functional and harmonious design for structures and site features, with special attention to the following: a. An internal sense of order for the buildings and use on the sit and provision of a desirable environment for occupants,visitors and general community; b. The amount and location of open space and landscaping; c. Materials,textures, colors and details of construction as an expression of the design concept and the compatibility of the same with adjacent and neighboring structures and uses; and d. Vehicular and pedestrian circulation, including walkways, in:erior drives and parking in terms of location and number of access points to the public streets,width of interior drives and access points, general interior circulation, separation of pedestrian and vehicular traffic and arrangement and amount of parking. Eden Trace May 20, 1998 Page 14 (6) Protection of adjacent and neighboring properties through reasonable provision for surface water drainage, sound and sight buffers, preservation of views, light and air and those aspects of design not adequately covered by other regulations which may have substantial effects on neighboring land uses. Finding: The proposed development is consistent with the comprehensive plan, the zoning ordinance, the design guidelines established as part of the Chanhassen Business Center PUD with the modifications outlined in the staff report, and the site plan review requirements. The site has few existing natural amenities due to previous development in the area. The site design is compatible and harmonious with the approved industrial developments throughout the City. RECOMMENDATION Staff recommends the Planning Commission adopt the following motion: "The Planning Commission recommends approval of Site Plan 98-9 for Eden Trace Corp.- Quantum Control as shown on the plans dated received April 24, 1998, and subject to the following conditions: 1. All driveway access points onto Lake Drive West shall incorporate the City's industrial driveway apron (Detail Plate No. 5207). The developer shall be responsible for relocating any conflicting street lights along Lake Drive West. 2. Rock construction entrances shall be maintained by the applicant until all parking lots are paved with a bituminous surface. In addition, all catch basin inlets shall be protected with silt fence, rock filter dikes,or hay bales, as well. 3. All drive aisles shall be revised to meet the City Code requirements (20-1101 and 20- 1118). Driveway radiuses onto Lake Drive West shall be increased to 20-foot radii. 4. Sanitary sewer and water hookup charges shall be applied to the building permit. Charges shall be based upon the number of SAC units determined by the Metropolitan Council Environmental Services. 5. The applicant shall provide the city with a financial guarantee in the amount of$2,500 to guarantee boulevard restoration as a result of the driveway access point. Eden Trace May 20, 1998 Page 15 6. The contractor and/or developer shall contact the City's Engineering Department for inspection of the driveway apron and curb/street restoration prior to pouring the concrete. A 24-hour notice is required to schedule an inspection. 7. All utility improvements shall be constructed in accordance with the latest editions of the City's Standard Specifications and Detail Plates and/or State Plumbing Code::. Detailed utility plans and specifications shall be submitted in conjunction with the fin l plat approval for staff review and approval. The private utilities will be inspected by the City's Building Department. The developer and/or builder shall be responsible for obtaining the necessary permits from the City. 8. The final utility plans shall be revised to include a inside drop for the sewer s.rvice connection to the existing manhole. One lane of traffic must be maintained at all times. The street(Lake Drive West) shall be restored in kind within 7 days after work commences. The contractor shall be responsible for providing and maintaining traffic control. The developer shall escrow with the City in the form of a letter of credit or cash escrow in the amount of$2,500 to guarantee street restoration. 9. The developer shall extend the existing berm northerly to wrap around the corner of the site to screen the easterly side of the building and parking lot. All existing trees shall be protected during the construction of the berm and replaced by the applicant if necessary. 10. The applicant shall revise the landscape plan to include three additional trees be planted in the eastern corner of the property to help screen the parking lot from Audubon Road and incoming traffic. These trees should be an extension of the bufferyard plantings and not interfere with any plans for future expansion of the parking lot. Landscaping shall be consistent with bufferyard B planting requirements of the landscaping ordina ice. 11. Overnight parking of motor vehicles will not be permitted unless applicable portions of the building is designed to meet the code requirements for a parking garage. 12. Meet with the Inspections Division plan reviewer as soon as possible after approval to begin the building code plan review process 13. Fire Marshal conditions: a. Refer to Utility Plan. A post indicator valve must be added to the 8 inch water main running into the building. NFPA 13 1991 Section 4-5.1.1.7. Eden Trace May 20, 1998 Page 16 b. The post indicator must have tamper protection which is connected to the sprinkler system monitoring. Chanhassen Fire Department/Fire Prevention Division Policy#40-1995. 14. Please contact Fire Marshal for exact size and location for installation of a lock box on the side of the building for fire department access. MN Uniform Fire Code 1991 Section 10.302. 15. The applicant shall enter into a site development contract with the city and provide the necessary financial security to guarantee compliance with the terms of approval. 16. All roof mounted equipment shall be screened by walls of compatible appearing material. Wood screen fences are prohibited. All exterior process machinery, tanks, etc., are to be fully screened by compatible materials. As an alternative, the applicant can use factory applied panels on the exterior to the equipment that would blend in with the building materials. 17. All freestanding signs shall be limited to monument signs. The sign shall not exceed eighty(80) square feet in sign display area nor be greater than eight (8) feet in height. The sign treatment is an element of the architecture and thus should reflect with the quality of the development. A common theme will be introduced at the development's entrance monument and will be used throughout. Each property shall be allowed one monument sign located near the driveway into the private site. The monument sign must maintain a ten foot setback from the property line. The signs should be consistent in color, size, and material throughout the development. The applicant should submit a sign package for staff review. A separate permit is required for all signage on site. 18. Lighting for the interior of the business center should be consistent throughout the development. A decorative, shoe box fixture(high pressure sodium vapor lamps) with a square ornamental pole shall be used throughout the development area for area lighting. All light fixtures shall be shielded. Light level for site lighting shall be no more than %2 foot candle at the property line. This does not apply to street lighting. Lighting equipment similar to what is mounted in the public street right-of-ways shall be used in the private areas. Wall pack units may be used provided no direct glare is directed off- site and no more than V2 foot candle of light is at the property line. 19. Park fees shall be paid in accordance with city ordinance requirements. Eden Trace May 20, 1998 Page 17 ATTACHMENTS 1. Chanhassen Business Center Preliminary Plans. 2. Memo from Dave Hempel dated May 12, 1998. 3. Memo from Steve Kirchman dated May 6, 1998 4. Memo from Greg Hayes dated May 12, 1998 5. Public hearing and property owners list. 6. Site plan dated received April 24, 1998. e:\plan\sa\eden trace-quantum control.doc a„• - 9f3SS'Nn'3Wntld NIC3 a.]t.S•G --Gi .l.a:.. - %.'e'-s Y1Srn }}1'33 SS3NlSn8•355.100LW103 3C-5).33C3‘./Si SY3;.•_!.3 2,...-:V..:".: P•l$ NLL O3nyASNO31101 AON I d�NSs3Nta.d L6 PO6nCnr �_ � _� -.w•'S3S..: _GSS+aC ,1 .n.•r.... Yt .......... SNd AWVWWW113tld "`�"� ' -_ • 2.,.0 i.a:Sid 1._____ 31•04e I .114.0 S•OSA. .u•..Yauai: ...._•. •T.. .-.-..___y�.__-.1.1_.1 ..... urea ti;.' - �....-�_._•______......�:.: _ • .1.1-.1:.1:'::'-' . „ _4.:•ei•Vr•�••V•d�►•W:4wi+r .1.1.1.1. ._,. ' • zl. 1- _�.L:--i `1' Gs�-3I�•a•••C:.ei•a j••••!+. , • N. ��,-`"�r �_ � '.ac / /•p��••• ....,..,•t•-...-:.,,,,-.4,....!...:, .....▪ .....\ : /� 4...„....::.. \ •.... 'vim '• - :. :,•.,..............,-(0.•,,,t,•-•„„...,1„� \.. Y t J • 'tr,0-4.4•.-1,....„ jc+.iv)••er•a,0 •`•-••� � ':-..'f: •`o,� 5 c - _ 1 .•• +•.t 't. `'.--'i fei0•••'f,41.-4trt6-••71��••.jrri►•44.> fir. \1O i $• 4 •' �•" � ....,.....,,, i `VV.114"7-406IPs•16 i,`A p4•••**0114"J•'r•••�f►- • 4J1 ' / _ "?.i :: i0t•••i••,..0.. 04-mo4110. - ••1 \•`' !-. ,..-„,..•.. 46 •w • r 7T .4 •�••9tt•• g — -: __ - ---- - = tIbli Z . a ' j °^// Ni; - - :VC :flLman• 4 _ v•N �' CO UJ h' . - - - . .1 r . \ it _i < Y/ ! i_ o Icn - . :s F :I 063E 'f <- d• f11 u3•S :: IICE T Jj a- i• o 1 1 : l 1 = _r a i d� : ° �J• is i tl !- o , as 1 j .1 ; i e t i F die ��B a s 1f i, it •! L J% \ \�I; m 1 3 i 1 F ! F . .. . si 11 s F \\ i6 \ - q ! } ! i I •I - t : ,\ Ni,m fill Ll j rl1 I j *f I ( il�F :. : : : . I! S PI ! , 4'. _ 1. ': F ! -f- 1 1 ii: ! 11 f ! 1 1l:�IiFISi ! !! 3 1 F3 S� i\ , 1 !-;1•� : i• .i-�sj F ; , • iii:. Ii Ii•1 Ii Iiiiii \ f t f F s 1zf s s • 4; \ !i- I !_ li I ; !i i_.1 ! = _ , \ - ! I F1i e}' I - 1Iii1 i 1f i 3 1 \ .I IOW MEMORANDUM TO: Sharmin Al-Jaff, Planner II CITY OF CHANHASSEN FROM: Dave Hempel, Assistant City Engine j��IlHJ 1� DATE: May 12, 1998 690 City Center Drive,PO Box 147 Chanhassen,Minnesota 55317 SUBJ: Review of Site Plan for Quantum Controls Phone 612.937.1900 Eden Trace Corporation General Fax 612.9375739 Lot 1, Block 1, Chanhassen Business Center 4th Addition Engineering Fax 612.937.9152 File No. 98-13 LUR Public Safety Fax 612.934.2524 Web www.ci.chanhassen.mn.us Upon review of the site plan prepared by RSP Architects dated April 17, 1998 and civil drawings prepared by Schoell &Madson dated April 17, 1998, I offer the following comments and recommendations: SITE GRADING The site was previously graded in conjunction with Chanhassen Business Center 1st Addition. Upon review of the preliminary grading plan,it appears building and parking areas will blend into the existing land form. The site will be re-graded to prepare the building pads and parking lot areas. If exporting or importing of earthwork materials is necessary, a haul route and traffic control plan will need to be submitted to the City for review and approval prior to construction commencing. The site contains an existing earth berm along Audubon Road. The berm will not be disturbed as a result of this project. The top of berm will be approximately three feet above the first floor elevation. Staff believes that the berm should be extended northerly to wrap around the corner of the site to help screen the east side of the building and parking lots from Audubon Road. DRAINAGE In conjunction with Chanhassen Business Center,a comprehensive storm water drainage system was constructed to address runoff from this site. No on-site ponding will be required with this development. The plans propose on utilizing existing and/or proposed stormwater services to convey stormwater runoff from the site into the City's storm drainage system. The applicant's engineer has submitted to the City detailed storm drainage calculations and a drainage area map for a 10 and 100-year storm event, 24-hour duration for staff review and approval. The City of Chanhassen.A growing community with clean lakes,quality schools,a charming downtown,thriving businesses,and beautiful parks.A great place to lire,work,and play Sharmin Al-Jaff Quantum Controls Site Plan Review May 12, 1998 Page 2 STREETS The project is proposed to be accessed through a new driveway access off of Lake Drive West. Staff has reviewed the location of the driveways and are comfortable with the location. The parking lot provides adequate traffic circulation around the building site. A future parking area is proposed in the easterly corner of the site; however, no layout is shown. There is an existing 6-foot wide concrete sidewalk on the north side of Lake Drive West. All driveway access points on Lake Drive West shall incorporate the City's industrial driveway detail apron (Detail Plate No. 5207). This will also decrease the driveway radii onto Lake Drive West. There are existing City street lights along Lake Drive West that are not shown on the plans. The developer should verify that the access points will not be in conflict with the City's street lights. The applicant shall be responsible for any relocation of street lights in conjunction with site improvements. UTILITIES Municipal utility service is available from Lake Drive West. The plans propose on extending sanitary sewer and water service from Lake Drive West. According to city records, there are no sanitary sewer services extended to the property line. The plans propose on cutting open Lake Drive West and extending a sanitary sewer service from the existing sewer manhole. To reduce impact to the street and traffic staff is recommending an inside drop into the manhole. This will minimize the trench width. In addition, the contractor will be able to maintain one lane of traffic along Lake Drive West. Staff is also recommending Lake Drive West be restored in kind within seven days after construction commences on the sewer service. A $2,500 escrow will be required to guarantee restoration of Lake Drive West. No open trenches will be permitted overnight. The site does have water service extended to the property line from Lake Drive West. The proposed sanitary sewer and water improvements shall be installed by the developer and/or their assignee. The utility improvements with the exception of a portion of the storm sewer will be considered private and not maintained by the City. These utilities will be inspected by the City's Building Department. The Sharmin Al-Jaff Quantum Controls Site Plan Review May 12, 1998 Page 3 utility improvements shall be constructed in accordance with the City's latest edition of Standard Specifications and Detail Plates and/or State Plumbing Codes. This property has been previously assessed for sewer and water improvements under City Project No. 91-17. However, according to city ordinance, the property may be subject to additional sewer and water hookup charges at time of building permit issuance. Sewer and water hookup charges are determined based on the number of sewer availability charges (SAC units) which is determined by the Metropolitan Council Environmental Services upon plan review of the building. The applicant and/or contractor applying for the building permit will be responsible for the sanitary sewer and water hookup charges. 1998 hookup charges for sanitary sewer and water are $1,216 and $1,584, respectively, per unit. MISCELLANEOUS The applicant should be aware that no construction activities may commence on the site until the final plat and development contract for Chanhassen Business Center 4'h Addition has been recorded. EROSION CONTROL The preliminary erosion control plan is in general conformance with the City's Best Management Practice Handbook. Catch basins shall also be protected with hay bales and silt fence or rock construction dikes. In addition, erosion control fence will need to be installed along the easterly property line for extension of the existing berm. RECOMMENDED CONDITIONS OF APPROVAL 1. All driveway access points onto Lake Drive West shall incorporate the City's industrial driveway apron (Detail Plate No. 5207). The developer shall be responsible for relocating any conflicting street lights along Lake Drive West. 2. Rock construction entrances shall be maintained by the applicant until all parking lots are paved with a bituminous surface. In addition, all catch basin inlets shall be protected with silt fence, rock filter dikes, or hay bales as well. Sharmin Al-Jaff Quantum Controls Site Plan Review May 12, 1998 Page 4 3. All drive aisles shall be revised to meet the City Code requirements (20- 1101 and 20-1118). Driveway radiuses onto Lake Drive West shall be decreased to 20-foot radii. 4. Sanitary sewer and water hookup charges shall be applied to the building permit. Charges shall be based upon the number of SAC units determined by the Metropolitan Council Environmental Services. 5. The applicant shall provide the City with a financial guarantee in the amount of$2,500 to guarantee boulevard restoration as a result of the driveway access point. 6. The contractor and/or developer shall contact the City's Engineering Department for inspection of the driveway apron and curb/street restoration prior to pouring the concrete. A 24-hour notice is required to schedule an inspection. 7. All utility improvements shall be constructed in accordance with the latest editions of the City's Standard Specifications and Detail Plates and/or State Plumbing Codes. Detailed utility plans and specifications shall be submitted in conjunction with the final plat approval for staff review and approval. The private utilities will be inspected by the City's Building Department. The developer and/or builder shall be responsible for obtaining the necessary permits from the City. 8. The final utility plans shall be revised to include a inside drop for the sewer service connection to the existing manhole. One lane of traffic must be maintained at all times. The street(Lake Drive West) shall be restored in kind within 7 days after work commences. The contractor shall be responsible for providing and maintaining traffic control. The developer shall escrow with the City in the form of a letter of credit or cash escrow in the amount of$2,500 to guarantee street restoration. 9. The developer shall extend the existing berm northerly to wrap around the corner of the site to screen the easterly side of the building and parking lot. g:,e ng'dave\pc\q uan tum.doc CITY OF CHANHASSEN 690 COULTER DRIVE CHANHASSEN, MN 55317 (612)937-1900 DEVELOPMENT REVIEW APPLICATION APPLICANT: ECin --ricacz (U/p, OWNER: i")(14-vv etl.Ari E k ADDRESS: 1 c-i5Th 0 ( ,Ma Dr, Zoc o ADDRESS: ` SV> / ✓ Et¢n M'' c 53`{(t TELEPHONE(Day time) (t Z- Y 7 - ' S Z TELEPHONE: Comprehensive Plan Amendment Temporary Sales Permit Conditional Use Permit _ Vacation of ROW/Easements Interim Use Permit _ Variance Non-conforming Use Permit _ Wetland Alteration Permit Planned Unit Development' _ Zoning Appeal Rezoning _ Zoning Ordinance Amendment Sign Permits Sign Plan Review X Notification Sign Site Plan Review* 1,1-j-00 _ (g24,,;(:)---4._2133) X Escrow for Filing Fees/Attorney Cost" ($50 CUP/SPRNACNAR/WAP/Metes and Bounds,$400 Minor SUB) Subdivision' TOTAL FEE$`S. d, — A list of all property owners within 500 feet of the boundaries of the property must be included with the application. Building material samples must be submitted with site plan reviews. *Twenty-six full size folded copies of the plans must be submitted, including an 81/"X 11" reduced copy of transparency for each plan sheet. **Escrow will be required for other applications through the development contract NOTE-When multiple applications are processed,the appropriate fee shall be charged for each application. 11011 CITY OF CHANHASSEN MEMORANDUM 690 City Center Drive,PO Box 1-i- TO: Sharm in A I-Jaff,Planner II Chanhassen,Minnesota 55317 Phone 612.937.1900 FROM: Steve A.Kirchman,Building Official - General Fax 612.9375739 DATE: May 6, 1998 Engineering Fay 612.9379152 Public Safety Fax 612.934.2524 SUBJECT: 98-9 SPR(Quantum Controls,Inc.,Eden Trace Corp.) Web wwwci.chanhassen.nm.us I was asked to review the site plan proposal stamped „CITY of CHANHASSEN, APR 2 4 19 9 8, CHANHASSEN PLANNING DEPT." for the above referenced project. Analysis: Inside parking. At grade overhead doors raise a concern that motor vehicles may be parked in the building. There are specific code requirements if this occurs. The plumbing code requires a flammable liquids separator if vehicles are parked in the building,and the building code requires a one-hour fire-resistive occupancy separation between a parking area and a warehouse,office, manufacturing facility or storage facility. The Inspections Division interprets parking as being overnight parking. The presence of a motor vehicle in the building during the operation of the facility does not trigger the additional code requirements. Permit requirements. Plans are often bid before the building code plan review is done by the Inspections Division reviewer,making changes necessary for code compliance difficult and expensive to incorporate later. Accordingly,I would like to request that you relay to the developers and designers my desire to meet with them as early as possible to discuss commercial building permit requirements and the code review process.. Recommendations: The following conditions should be included with the conditions of approval: 1. Overnight parking of motor vehicles will not be permitted unless applicable portions of the building is designed to meet the code requirements for a parking garage. 2. Meet with the Inspections Division plan reviewer as soon as possible after approval to begin the building code plan review process. g:lsafety sak\memos plan`quntum I The City of Chanhassen.A growing community with clean lakes,quality schools,a charming downtown,thriving businesses,and beaurifitl parks.A great place to live,work,and play: 11011 CITY OF CHANHASSEN 690 City Center Drive,PO Box 147 Chanhassen,Minnesota 55317 MEMORANDUM Phone 612.937.1900 TO: Sharmin Al-Jaff, Planner II General Fax 612.937.5739 Engineering Fax 612.937.9152 FROM: Greg Hayes, Fire Inspector/Training Coordinator Public Safety Fax 612.934.2524 ll''ebwwu'ci.chanhassen.mn.us DATE: May 12, 1998 SUBJECT: Request for a site plan review of a 15,000 square foot office/warehouse/manufacturing building on property zoned PUD and located at the southwest corner of Lake Drive West and Audubon road on Lot 1, Block 1,Chanhassen Business Center 4th Addition, Climate Controls,Inc., Eden Trace Corporation Planning Case 98-9 Site Plan I have reviewed the site plan review for the above project. In order to comply with the Chanhassen Fire Department/Fire Prevention Division, I have the following fire code or city ordinance/policy requirements. The site plan is based on the available information supplied at this time. If additional plans or changes are submitted the appropriate code or policy items will be addressed. Please correct the following: 1. Refer to Utility Plan. A post indicator valve must be added to the 8 inch water main running into the building. NFPA 13 1991 Section 4-5.1.1.7. 2. The post indicator must have tamper protection which is connected to the sprinkler system monitoring. Chanhassen Fire Department/Fire Prevention Division Policy#40-1995. If you have any questions, please give me a call at extension 262. g:\safety\gh\plrev98-9 The City of Chanhassen.A growing community with clean lakes,quality schools,a charming downtown,thriving businesses,and beautiful parks.A great place to live,work,and play I2ii . '-' -J Ilrif RE i D> NOTICE OF PUBLIC HEARING 1 ♦ !►� PLANNING COMMISSION um La Wednesday, May 20, 1998 No r at lst:i I 7:00 p.m. ��• City Hall Council Chambers 690 City Center Drive of of o� Mira* 5;%1 "illAST * 04 Xake DTO SQ',1i„�, f ., a 49 0 SUBJECT: Site Plan Review for an ' AIWA 411 ;1 Office/Warehouse/Manufacturing ' /rugs Building Alt���`RIEM / oil upPf APPLICANT: Eden Trace Corporation 441 �` /�' ns ���r LOCATION: Southwest corner of Lake Drive �A'-� I West and Audubon Road 4r • ,4,4r12� a. 6I @►/1MY NOTICE: You are invited to attend a public hearing about a proposal in your area. The applicant, Eden Trace Corporation, is requesting site plan review of a 15,000 square foot office/warehouse/manufacturing building located at the southwest corner of Lake Drive West and Audubon Road on Lot 1 , Block 1 , Chanhassen Business Center 4th Addition, Quantum Controls, Inc., Eden Trace Corporation. What Happens at the Meeting: The purpose of this public hearing is to inform you about the developer's request and to obtain input from the neighborhood about this project. During the meeting, the Commission Chair will lead the public hearing through the following steps: 1 . Staff will give an overview of the proposed project. 2. The Developer will present plans on the project. 3. Comments are received from the public. 4. Public hearing is closed and the Commission discusses project. The commission will then make a recommendation to the City Council. Questions and Comments: If you want to see the plans before the meeting, please stop by City Hall during office hours, 8:00 a.m. to 4:30 p.m., Monday through Friday. If you wish to talk to someone about this project, please contact Sharmin at 937-1900 ext. 120. If you choose to submit written comments, it is helpful to have one copy to the department in advance of the meeting. Staff will provide copies to the Commission. Notice of this public hearing has been published in the Chanhassen Villager on May 7, 1998. PAULSTARR ENTERPRISES INC. JON EVENSON GARY& PATTI LUND 1660 LAKE DRIVE W 8600 ALISA COURT 8471 BITTERN COURT CHANHASSEN, MN 55317 CHANHASSEN, MN 55317 CHANHASSEN, MN 55317 CONTROL PRODUCTS RAY F&TERESA R VAN STRAATEN JEFFREY ALAN KULLBERG 1724 LAKE DRIVE W 8601 ALISA COURT 8480 BITTERN COURT CHANHASSEN. MN 55317 CHANHASSEN, MN 55317 CHANHASSEN. MN 55317 US POSTAL SERVICE BARBARA SCHILLING MIKE & DENISE CHOINIERE 6800 W 64TH STREET #100 8616 ALISA COURT 8481 BITTERN COURT OVERLAND PARK, KS 66202-4171 CHANHASSEN. MN 55317 CHANHASSEN. MN 55317 PHU TRINH PETER D& NICOLE D JOHNSON DAVID& SHEILA KELLER 8548 ALISA COURT 8617 ALISA LANE 8491 BITTERN COURT CHANHASSEN. MN 55317 CHANHASSEN. MN 55317 CHANHASSEN, MN 55317 PHILIP JENSEN SOMBOUN HOMESOMBATH HERAKLES, LLC 8551 ALISA COURT 8632 ALISA COURT 8345 COMMERCE DRIVE CHANHASSEN. MN 55317 CHANHASSEN, MN 55317 CHANHASSEN, MN 55317 JOHN SCHLIESMAN SCOTT& SHARON KOBASICK POWERS SYSTEMS 8559 ALISA COURT 8450 BITTERN COURT 8325 COMMERCE DRIVE CHANHASSEN. MN 55317 CHANHASSEN, MN 55317 CHANHASSEN, MN 55317 TOM JOHNSON DAWNE CHRISTIANSEN K&S INVESTMENTS, LLC 8560 ALISA COURT ROBIN WHITE 11415 VALLEY VIEW ROAD CHANHASSEN. MN 55317 8451 BITTERN COURT EDEN PRAIRIE. MN 55344 CHANHASSEN, MN 55317 KARRI & PETER PLUCINAK KURT KLINGELHUTZ HERAKLES, LLC 8565 ALISA COURT 8460 BITTERN COURT 8345 COMMERCE DRIVE CHANHASSEN, MN 55317 CHANHASSEN, MN 55317 CHANHASSEN, MN 55317 PHILLIP M MARTY BRIAN ROME DAVID OBEE 8572 ALISA COURT 8461 BITTERN COURT 2060 MAJESTIC WAY CHANHASSEN, MN 55317 CHANHASSEN, MN 55317 CHANHASSEN. MN 55317 TIM PASS THANH TANG PAULSTARR ENTERPRISES, INC. 8584 ALISA COURT 8470 BITTERN COURT 1660 LAKE DRIVE WEST CHANHASSSEN. MN 55317 CHANHASSEN. MN 55317 CHANHASSEN. MN 55317 'REDMOND PRODUCTS INC CHRISTOPHER T.ACKERMAN 18930 WEST 78TH STREET 1591 HERON DRIVE CHANHASSEN, MN 55317 CHANHASSEN, MN 55317 BARRY PATEL RAYMOND COLLINGS 1480 PARK ROAD 1490 HERON DRIVE PO BOX 879 CHANHASSEN, MN 55317 CHANHASSEN, MN 55317 JOHN &CONNIE HERRING NATIONAL WEATHER SERVICE FORECAST OFFICE 1500 HERON DRIVE 1733 LAKE DRIVE WEST CHANHASSEN, MN 55317 CHANHASSEN. MN 55317 KEVIN OLSON AUDUBON 92. A MN PTNRSHP LISA JOHNSON 36 SOUTH 9TH STREET 1520 HERON DRIVE MINNEAPOLIS. MN 55402 CHANHASSEN. MN 55317 DANIEL&GAIL SUTER PAULSTARR ENTERPRISES. INC 1530 HERON DRIVE 1660 LAKE DRIVE WEST CHANHASSEN, MN 55317 CHANHASSEN. MN 55317 DANIEL& KIM OBERMEYER CURT SANTJER 1540 HERON DRIVE 8460 SWAN COURT CHANHASSEN, MN 55317 CHANHASSEN, MN 55317 JODI &QUENTIN STAPP CHRIS PAROLA 1551 HERON DRIVE 8470 SWAN COURT CHANHASSEN, MN 55317 CHANHASSEN, MN 55317 TIM & SHARON BAKKE GREG DOEDEN 1561 HERON DRIVE 8480 SWAN COURT CHANHASSEN, MN 55317 CHANHASSEN, MN 55317 PAUL&TONI COLEMAN DAVE KREITLOW 1571 HERON DRIVE 1702 VALLEY RIDGE TRL NO CHANHASSEN, MN 55317 CHANHASSEN, MN 55317 CHARLES J OLSON GARY THEIS 1581 HERON DRIVE 1696 VALLEY TRAIL NORTH CHANHASSEN, MN 55317 CHANHASSEN. MN 55317 4 _ 3, C I TY 0 F PC DATE: June 3, 1998 CATUAE ' \�� CC DATE: June 22, 1998 • CASE #: 94-3 SUB, 94-2 CUP 94-2 WAP 94-2 VAC STAFF REPORT PROPOSAL: Preliminary Plat of 25.95 acres into 8 single family lots with variances on property zoned RSF; Conditional Use Permit for a Recreational Beachlot; Wetland Alteration Permit for construction and mitigation of a wetland; and vacation of 1-1 right-of-way located on Minnewashta Avenue, Olivewood Subdivision. z Q LOCATION: South of Highway 7, South of Sandpiper Lane, West of Piper Ridge Lane, along V the northeast shoreline of Lake Minnewashta. APPLICANT: Coffman Development Services, Inc. Mrs. Henry Neumann CL Bill Coffman 2841 Sandpiper Trail 7409 W. 112`h Street Excelsior, MN 55331 Q Bloomington, MN 55438 828-0077 PRESENT ZONING: RSF, Single Family Residential District ACREAGE: 23.95 Acres Gross 5.53 Acres Net(upland without Outlots A & B) DENSITY: 0.38 Units per acre (Gross) 0.69 Units per acre (Net Upland) ADJACENT ZONING AND LAND USE: N - RSF, Single Family Q S- RSF/RD, Lake Minnewashta E - RSF, Single Family W-RSF/RD, Lake Minnewashta ILL WATER AND SEWER: Available to the property • PHYSICAL CHARACTER: The northeast portion of the property is characterized by gentle rolling (I) slopes, a small Inland Shallow Fresh Marsh Wetland and sparsely wooded areas. There are also two existing homes upon this portion of the parcel. The south and western portions of the development area contain portions of severe slopes and may be recognized as "Bluff Impact Zones" by the DNR along the Lake Minnewashta shoreline. At the bottom of these slopes are natural wooded wetlands lying adjacent to the shoreline of the lake. A SATNCART gME4WTSAPARK C gill 1 —_ I _ = •...w• ■o I /1 0200 / I ��We ii;XI ,�fi—0; r/7 � - �� Mil LACE • E ••;:`�f:•Ir sl liA"111 g 1�� 0$14V, ...■. ��_ q1 `�1�y■ �� 0300— DiWM)ifi a '/�..•.- 4,.., \�+ • 1. 0400 r��I� = ��I...;,=�i� • j , 'ir '"`u•zilligo i i1i�P- *500 rE s+s.J //� _, �hOirw... //-;- ... .-.'5" :::ligibliiiiiiii ` PARK I ►AN FIELD 4i7 IF 1�� i� �y1•�irrN+';;req 1 F . 1 rla �' J moo ��� ��i �r�En SUBJECT PROPERTY �� MP IlW ra,,in I, �; 0700 ,y��i■=�ra1i ram ! LAKE �' �����• .. I LAKE ,\ /, / r IMO nwrif;,' / 417:. O.KS ao•0 S-.. -bit I M I N N E W A S N T A `�, 1, 0000 s.�• z _; �l t / /4£fi/ONAL a N _1 4 7000 CO 1..0 po.� \>. ,.j -- a V -- a \ I C in 'w.AR'jOM 1. _ 7100 p p LAKE A Jimmiti*4 4 7200 I / C .aea'� - I �p iii if„ I Ate �y• sa r 7300 .`�� `� t�'� e N... 1 I S /Wa ' .as•n at•MA ' fi ! 44' r %7400 �w. r ' / ` : i =SM ,.� 7500 4 -114,\.. H= r ____ m, le— .sk" , ;rs•-•—''' '- 1111.11, i) ME 7600 _. -1/4.• •� MI.ii abk.--. Mit 6:3 Ab 7700 � A Mai I 1 Op Ai 111 1 r ' o moo 4.1 ■000 I C • ik 0100 02lia 00 , 1 7 1k MCSTRUT _ - - ORD , 11 r' _s .1.; 1 PggA, 6300 .` ,� .7. .TY I 6+00 - / .. ,_�. � \ i /. / 8 1\ 13 \I 4 �\ \N-- / / 7 0 12 \ 3 ' W ,i P ER z ...._.. \\ so II i5cT . Q�.1 li _ W 6 - a *INNEW, C9 9 7 i 5 10 Q \� z 113 a o OUTLOT B ; H --i t 2 3 4 ?) / S�� • . .Ea 50 I o ..1 27 7. ) Q- 5 / �` E � LANE _ 2s ,o/p RI�� /PER . 7 1 R `, P z 0.25 'i �*�PS`,� _ 22 21 • Illi PII 8 i G� GO•i 24 10 Ii MS -14 vEc - 12 ►9 23 \ .., I 20 k\ /// r,___„---_---- 7_ -77 ..... \\ 1 r --,- -- . .„..„,. . ,_ / ../ _.„.„. ---------,„„, ..._________________ N...„___ _______________=_____,_____ __„,,,.. z.,„____. -- ____.)------ •-.1 .i . 7-- ------ - ----..n \K /p. -%� � 1 Olivewood Subdivision June 3, 1998 Page 2 PROPOSAL/SUMMARY The project was originally approved in 1994, was given two preliminary plat extensions but was never recorded. Coffman Development is now requesting approval of the plat with a few minor modifications. These include elimination of the two existing homes,the addition of a cul-de-sac island, different house elevations, and elimination of wetland replacement. The applicant is proposing to develop an 8 lot single family subdivision. This subdivision is a replat of Lots 19-27 in the Minnewashta Park Addition, which was platted and recorded on November 14, 1887. The proposed development also includes a request to vacate and abandon the unimproved right-of-way from this original plat known as "Minnewashta Avenue." Two of the proposed 8 lots will contain the existing homes presently located upon Lots 1 and 3,Block 2 owned by Mrs. Neumann and Ann& Arnold Weimerskirch (daughter and son-in-law of Mrs. Neumann). The proposed access to the development will occur from the proposed 360'cul-de-sac which aligns as an extension of Tanagers Lane to the north. Access to Lot 1, Block 1 along the easterly edge of the property will be the only lot which will gain its access from Piper Ridge Lane. In general, the overall density and large lot single family use of the land is found to be a quality approach to land development in an area that may be classified as "sensitive" from an environmental perspective. The applicant is requesting a conditional use permit for a recreational beachlot. The beachlot does meet the standards to allow 3 docks with 3 boats. Staff is recommending that there be one dock with eight slips to lessen the impacts to the wetland. The applicant is also requesting a wetland alteration permit. Another engineering issue is the location of the storm water ponds. Staff is requesting that they be relocated. BACKGROUND The subject property was a portion of the Minnewashta Park Addition platted in the late 1800's. The portion of the original plat has remained on the books since this time and was never developed according to the plat of record, except with regard to the homes built upon the two lots in the development which presently access Sandpiper Lane via a private drive. Minnewashta Avenue is a platted,undeveloped right-of-way which circumscribes the perimeter of the Lake Minnewashta wetlands area. This roadway was never built from a practical engineering perspective as well as from a strong ecological rationale. To staffs knowledge,there have been no other formal development proposals for this property. SUBDIVISION DESIGN The subdivision is laid out so that there is minimal street improvements planned, large lot features,preservation of wetland areas,etc. The variances identified in this proposal are limited to the following: 1. Street ROW width at 50'vs. the 60' required. Olivewood Subdivision June 3, 1998 Page 3 2. Lot 1, Block 2 existing house front setback 17'vs. 30' required. This home will be removed and the applicant is requesting that a 20' variance be granted. Staff supports this variance because it preserves trees to the rear of the lot. SUBDIVISION COMPLIANCE TABLE - RSF DISTRICT Lot Lot Lot Home Wetland Area Width Depth Setback Setback Ordinance 15,000 90' 125' 30' front/rear 10'side Block 1 Lot 1 34,000 100+' 260' 40'avg. 10'buffer Lot 2 38.116 100' 234'+ 40'avg. 10'buffer Lot 3 40,900 126' 218' 40'avg. 20'buffer Block 2 Lot 1 20,300 128' 130' 20'front existing home to be removed Ordinance 20,000 90' 125' 30' front/rear75' 10'side Block 2 Lot 2* 35,130 126' 218' Lot 3* 40,750 90' 250' existing home to be removed Lot 4* 41,220 125' 250' (flag) Lot 5* 44,010 130' 295' (flag) Outlot A 40,989(upland area- 16,716 s.f./wetland area-24,273 s.f.) * Lot area based upon Lake Shoreline - Must subtract waterward portion of lot below OHW Elevation FINDINGS Preliminary Plat - Section 18-39 Olivewood Subdivision June 3, 1998 Page 4 1. The proposed subdivision is consistent with the zoning ordinance; Finding: The subdivision meets all the requirements of the RSF, Residential Single Family District and the RD Shoreland Zoning District for Lake Minnewashta. The variances requested are reasonable to protect natural features on the site. 2. The proposed subdivision is consistent with all applicable city, county and regional plans including but not limited to the city's comprehensive plan; Finding: The proposed subdivision is consistent with applicable land use plan element of the City's Comprehensive Plan. 3. The physical characteristics of the site, including but not limited to topography, soils, vegetation, susceptibility to erosion and siltation, susceptibility to flooding, and storm water drainage are suitable for the proposed development; Finding: The proposed site is suitable for development The design works to preserve the natural features of the site. 4. The proposed subdivision makes adequate provision for water supply, storm drainage, sewage disposal, streets, erosion control and all other improvements required by this chapter; Finding: The proposed subdivision is served by adequate urban infrastructure, including sewer, water and storm water improvements and streets. 5. The proposed subdivision will not cause environmental damage; Finding: The proposed subdivision is not anticipated to cause environmental or structural damage provided. 6. The proposed subdivision will not conflict with easements of record. Finding: The proposed subdivision will not conflict with existing easements, but rather will expand and provide all necessary easements and vacate and abandon an inappropriate unimproved right-of-way. As a part of this application, a paper street will be vacated. 7. The proposed subdivision is not premature. A subdivision is premature if any of the following exists: a. Lack of adequate storm water drainage. b. Lack of adequate roads. c. Lack of adequate sanitary sewer systems. d. Lack of adequate off-site public improvements or support systems. Finding: The proposed subdivision is provided with adequate urban infrastructure Olivewood Subdivision June 3, 1998 Page 5 including proper storm water drainage. SHORELAND REQUIREMENTS The entire development falls within the Shoreland Zoning District of Lake Minnewashta, which is entitled a Recreational Development Lake. All lots meet the minimum 20,000 sq. ft. lot size requirement where adjacent to the lakeshore. The upland area of the lot is the standard imposed by the DNR relative to meeting the minimum lot size area requirements in the Shoreland District. According to the DNR,the upland portion of the lot begins at the OHW (ordinary high water elevation)which is 944.5' (NGVD, 1929) for Lake Minnewashta(please reference the letter from Joe Richter of the DNR dated April 18, 1994). For Lot 2, and all other proposed lots with lake frontage, the OHW level occurs out into the wetland areas. Therefore, all lots are found to be in compliance with the minimum shoreland lot area requirements. These same provisions hold true for the recreational beachlot which will have a total lot area in excess of 70,000 sq. ft., but below the 233,805 sq. ft. gross area which follows the shoreline as identified on the preliminary plat. Based upon these requirements as established by the DNR, staff recommends that the applicant resubmit the lot area calculations based upon a property line which follows the OHW Elevation of 945' (NGVD, 1929). LANDSCAPING/TREE PRESERVATION Tree canopy coverage and preservation calculations for the Olivewood/Neumann property were incorrectly calculated for the original staff report. Correct calculations are as follows: Total upland area (including outlots) 301,756 SF Total canopy area (excluding wetlands) 189,600 SF Baseline canopy coverage 63% Minimum canopy coverage allowed 46% or 138,808 SF Proposed tree preservation 34% or 96,700 SF The applicant does not meet minimum canopy coverage allowed,therefore the difference is multiplied by 1.2 to calculate the required replacement plantings. Difference in canopy coverage 42,108 SF Multiplier 1.2 Total replacement 50,530 SF Total number of trees to be planted 46 trees A replacement planting plan must be submitted to the city for approval. Included in the plan shall be location, species and size of replacements. All replacements must meet minimum size requirements. The applicant has proposed two retaining walls within the development for tree preservation. One is shown on Lot 1, Block 2 and the other on Lot 5,Block 2. If the walls are used to save groupings of trees,they are generally successful. If, however,the walls are used to protect a single tree,the effort is usually in vain. Staff will support the use of a wall on Lot 5,but views the retaining wall on Lot 1 as unnecessary since it appears to be protecting a single tree. The Olivewood Subdivision June 3, 1998 Page 6 applicant may still wish to install both walls, but the city is not concerned with the Lot I wall. Tree conservation easements have been proposed on all lots. No easement documentation has been submitted and staff is reluctant to support preservation easements without reviewing the easement conditions. The applicant will need to submit sample easement restrictions. Tree protection fencing will be required around all trees to be saved on each lot. Prior to grading and excavation for homes on each lot, fencing shall be installed to protect the preservation easement and any other trees to be preserved on the lot. WATER RESOURCES Lake Minnewashta is a Department of Natural Resources (DNR)protected water(10-9P). Therefore, development around the lake will have to meet the DNR's shoreland ordinance requirements. The lake is designated as a recreational lake and this requires a minimum structure set back of 75 feet. Alteration of vegetation and topography shall be regulated to prevent erosion into the lake, fix nutrients, and preserve shoreland aesthetics and wildlife. Limited clearing of trees and shrubs and cutting,pruning,and trimming of trees is allowed to provide a view of the water from the principal dwelling site and to accommodate the placement of stairways and landing,picnic areas, access paths,beach and watercraft access areas, and permitted water oriented accessory structures or facilities. If an area is to be filled for a beach, a DNR permit was secured with the previous application. This permit needs to be renewed. WETLANDS The following is a discussion of the two wetlands associated with the proposed project: A wetland designated by the City as natural surrounds the proposed project on the west and south side and lies adjacent to Lake Minnewashta. The wetland is identified in the City's Surface Water Management Plan(SWMP)as A4-6(2). The wetland is superficially characterized in the SWMP as a wooded swamp (Circular 39; Types 7) or as a seasonally flooded palustrine forested wetland(Cowardin PFO 1 C). The value and function of this wetland as identified in the City's Wetland Ordinance highly discourages alteration to this wetland. A wetland designated by the City as agricultural/urban is located in the northeast corner of the proposed project(Lot 1,Block 1). The wetland is identified in the SWMP as A4-6(1). The wetland is superficially characterized in the SWMP as a combination of inland shallow and deep fresh marsh and wooded swamp(Circular 39; Types 3/4/7) or as a seasonally flooded palustrine emergent/forested wetland(Cowardin PEM/FO 1 C). The value and function of this wetland as identified in the City's Wetland Ordinance may allow some alteration to the wetland under the use of the Wetland Conservation Act's (WCA) sequencing criteria. City Wetland Ordinance-Permit Requirements The City will require a wetland alteration permit for any impacts to associated wetlands. In general the ordinance follows the guidelines of the WCA with the additional requirement of a Olivewood Subdivision June 3, 1998 Page 7 buffer strip and a structure setback from the buffer strip. The structure setback and buffer strip widths are as follows: Wetland Buffer Strip Buffer Strip % Native Structure Setback from Type Minimum Vegetation in Outer Edge of Buffer Average Width Buffer Strip Strip Natural 10 - 30 ft 20 ft Required 40 ft Ag/Urban 0-30 ft 10 ft Optional 40 ft WCA The WCA permanent rules have been effective since January 1, 1994 and the City of Chanhassen is the Local Governing Unit(LGU) administering the WCA permit process. The replacement requirement is not longer necessary because the legislature amended the WCA to allow for 2,000 sq. ft. of alteration without replacement. The LGU may not consider or approve a wetland replacement plan unless the it finds that the applicant has demonstrated that the activity impacting a wetland complies with the principles associated with sequencing(WCA rule 8420.0520). If this is considered a minor project by the LGU,however, where the functions and values lost due to the proposed drain or fill are less than that of the proposed replacement, an elaborate search for practicable alternatives will not be required. Clean Water Act Section 404 The discharge of dredged or fill material into any wetland or water area requires authorization, under Section 404 of the Clean Water Act from the Corps of Engineers. The Corps has issued a nationwide Section 404 permit for up to a half acre of fill in isolated wetlands without notification to the Corps and between a half acre and three acres in such basins with predischarge notification [(see 33 CFR 330.5 (a)(26)(ii)]. For impacts to areas between a half acre and three acres, the Corps requires that the applicant demonstrate that the impact cannot be avoided or minimized before considering compensatory mitigation. The wetland for the proposed project can be considered isolated if the impact to the wetland is less than 10,000 square feet. Staff believes impact to the wetland can be avoided by adjusting the lot lines to the south which may eliminate one lot. GRADING The preliminary plans propose grading for the street,utilities and storm pond. The lots are proposed to be custom graded at time of building permit issuance except for Lots 1 and 3, Block 2. On these lots the existing homes will be razed. Detailed grading(with two-foot contours), drainage, tree removal and erosion control plans will be required at time of building permit application for staff to review and approve. The plans propose a stockpile area on Lot 2,Block 1. Staff assumes this area will be used as a staging area when foundations are dug and the excess material will be deposited for use later. Olivewood Subdivision June 3, 1998 Page 8 The stockpile will be required to be removed at the time the last home site is developed. Security will be required to guarantee removal upon completion of the project. In the interim, erosion control measures will need to be maintained. Staff will place a condition in the development contract that this stockpile is a temporary situation and must be removed or reshaped into small berms. The plans propose to save a 12-inch maple tree on the southeast corner of Lot 1,Block 2 which results in a steep bank adjacent the street. Staff commends the applicant for trying to save the tree;however, experience from past projects suggests that this tree will not survive due to construction activities and therefore should be removed and the boulevard graded per the City's standard street section. A small portion of the wetland on Outlot A is proposed to be filled as a result of street grading. Staff believes the boulevards in this area could be reduced to five feet wide with a 3:1 slope to the wetlands to help minimize filling/impacts to the wetlands. The plans propose a water quality pond to be constructed on Lots 3 and 4, Block 2. The dike around the pond is proposed to be built with excavated material from the pond. Staff is concerned that the material used to build the dike may not be structurally sound to prevent the dike from failing in the future. Staff recommends that structural fill material be used to construct the dike. SURFACE WATER MANAGEMENT PLAN Storm Water Quality Fees The SWMP has established a water quality connection charge for each new subdivision based on land use. Dedication shall be equal to the cost of land and pond volume needed for treatment of the phosphorus load leaving the site. The requirement for cash in lieu of land and pond construction shall be based upon a schedule in accordance with the prescribed land use zoning. Values are calculated using market values of land in the City of Chanhassen plus a value of$2.50 per cubic yard for excavation of the pond. The City has had discussions with the applicant's engineer on the water quality ponding. The proposed SWMP water quality charge of$800/acre, (or$4,424)for single-family residential developments may be waived if the applicant provides water quality treatment according to the City's SWMP standards. To receive this credit the applicant must provide the City with plans for a stormwater quality pond designed to retain up to 75%phosphorus according to the Walker Pondnet model. Storm Water Quantity Fees The SWMP has established a connection charge for the different land uses based on an average city-wide rate for the installation of water quantity systems. This cost includes land acquisition, proposed SWMP culverts, open channels and storm water ponding areas for runoff storage. Single family residential developments will have a connection charge of$1,980 per developable acre. The total gross area of the property is 23.95 acres;however,only 5.53 acres is developable land. Therefore,the proposed development would then be responsible for 5.53 acres resulting in a water quantity connection charge of$22,730. This fee will be due payable to the City at time of final plat recording. DRAINAGE Olivewood Subdivision June 3, 1998 Page 9 The wetland located on Lot 1 currently drains through a culvert underneath the existing driveway on Lot 1,Block 2 along Minnewashta Avenue to Lake Minnewashta via an open ditch. This culvert will be eliminated so that the discharge from the wetland outlet will be rerouted through the proposed storm sewer system in the street. The plans propose on conveying stormwater runoff through a series of catch basins which carry the storm runoff to a stormwater pond for pretreatment prior to discharging into the wetland. Stormwater calculations for ponding and piping shall be submitted to the City for review and approval. Stormwater ponds shall meet Walker standards. The storm sewers shall be designed for a 10-year storm event. EROSION CONTROL Erosion control measures need to be incorporated on the plans around the wetland area and stockpile area as well as the stormwater retention pond. The applicant will need to develop a sediment and erosion control plan in accordance with the City's Best Management Practice Handbook (BMPH). The plan shall be incorporated into the fmal grading plan and submitted to the City for review and formal approval with final plat consideration. UTILITIES The site is located within the City's Urban Service Area. Sanitary sewer and water service is available from Sandpiper Lane. The applicant is proposing on extending the sewer and water lines into the site. The utility installation shall be in accordance with the City's latest edition of the Standard Specifications and Detail Plates. The applicant will be required to enter into a development contract with the City and provide the necessary financial security to guarantee installation of the public improvements and conditions of final platting. Final construction plans must be submitted to the City three weeks prior to final plat consideration for review and formal approval by the City Council. There are two existing homes on the parcel. According to the city's records, one home is connected to city sewer and the other one is not. Both homes will be razed. The existing wells and septic system on the site will have to be abandoned in accordance with state and city codes. STREETS The preliminary plat proposes a 50-foot right-of-way along with a 60 foot radius on the cul-de- sac. The city's ordinance requires that a 60-foot wide right-of-way with a 60-foot radius on the cul-de-sac for residential urban development. The applicant is requesting the reduced right-of- way to minimize the impact to the wetland on Outlot A and save trees on Lot 1, Block 2. Staff feels that due to the close proximity of the wetland on Outlot A and the trees on Lot 1,Block 2 along with the existing right-of-way in the neighborhood, the street right-of-way may remain at 50 feet. An island is proposed within the cul-de-sac to reduce impervious surface. Due to the reduced turnaround space available, a No Parking Zone has been established in these cul-de-sacs. The City Council will need to approve a resolution establishing a No Parking Zone in the cul-de-sac. Olivewood Subdivision June 3, 1998 Page 10 The plans will need to include traffic signage for review and approval by the city. The developer is responsible for the cost of the signs and the city will install at no cost. The street appears to be a continuation of Tanagers Lane south of Sandpiper Lane, therefore, it may be prudent to require the street be named Tanagers Lane to maintain a consistency in street names and addresses. The applicant is also requesting vacation of Minnewashta Avenue which exists as a paper street and is located in Lake Minnewashta. The street will never be built and therefore vacation of Minnewashta Avenue is recommended. RECREATIONAL BEACHLOT CONDITIONAL USE PERMIT The development proposal includes a conditional use permit request for a private recreational beachlot. The beachlot area contains a total of 233,805 gross sq. ft. with a total net upland area of 45,165 sq. ft. excluding wetland area. The lot area calculation will need to be recalculated as previously identified. The private beachlot would include a boardwalk which will extend 190' across the wetlands and into the lake area where a common dock would be located with 8 boat slips. Staff strongly supports the combined approach to providing a common lake access via a single boardwalk through the lake wetlands area. This proposal as presented complies with the requirements prescribed by the city's beachlot requirements and the standards as set forth by the DNR. The location selected for dock access is also the most practical from a positioning point as being the shortest path through this important ecological area. RECREATIONAL BEACHLOT CUP COMPLIANCE TABLE Association Compliance P.C. Item Request Standard With Standard Recommended Association Neumann Sub. Lake Minnewashta RD Number 8 80% / Yes of Homes 1000' rule Size, Sq. Ft. 233,805* 30,000 s.f. Yes 1st Dock 20,000 s.f. each add'l dock up to 3 max. * Size to be reduced based upon area to be recalculated relative to OHW Elevation Shoreline 1,2001.f** 2001.f. per dock Yes Olivewood Subdivision June 3, 1998 Page 11 ** Shoreline distance to be reduced based upon calculation relative to OHW Elevation Association Compliance P.C. Item Request Standard With Standard Recommended Motor Vehicle Access No Prohibited Yes Off-Street Pkg. No Prohibited Yes Boat Launch No Prohibited Yes Buildings No Permitted n/a Seasonal Dock 1 3 Permitted Yes Dock Length (190' Brdwk.) 50'or 4' Depth (90'dock,plus whichever is cross bars) greater Dock Width 4 ft. 4 ft. Yes Cross Bar 20 ft. 25 ft. Yes Length Dock SetBack 500 10 ft. Yes Canoe Racks None 1.5 racks n/a 1 Rack Slip per lot(8) Sail Boats None 3 n/a Moored Boats at Dock 8 8 Yes Swimming Beach None Permitted n/a Marker Buoys None Permitted n/a Swimming Raft None Permitted n/a Beachlot Buffering Yes Required Yes Urban 80%/ 100%/ 80%/ Yes Olivewood Subdivision June 3, 1998 Page 12 1000'Rule 500' 1000' Port-a-Potties None Permitted n/a PARK AND RECREATION On April 26, 1994,the Park and Recreation Commission reviewed this plat and made the following recommendation: The Park and Recreation Commission recommended that the City Council accept full park and trail dedication fees for the Neumann Subdivision in lieu of parkland dedication and/or trail construction. One-third of the park and trail cash contribution shall be paid contemporaneously with the filing of the subdivision plat. The balance,calculated as follows, shall be paid at the time building permits are issued: rate in effect for residential single family property when a building permit is issued minus the amount previously paid. Current residential single family park and trail fee rates are$900.00 and$300.00 per home, respectively. Section 20-232, General Issuance Standards 1. Will not be detrimental to or endanger the public health, safety, comfort, convenience or general welfare of the neighborhood or city. Finding: The dock will be a boardwalk reducing the impacts to the wetland. A combined dock with 8 slips will also lessen the impact. 2. Will be consistent with the objectives of the city's comprehensive plan and this chapter. Findin : The beachlot is consistent with the city's comprehensive plan and zoning ordinance. 3. Will be designed,constructed, operated and maintained so to be compatible in appearance with the existing or intended character of the general vicinity and will not change the essential character of that area. Finding: The applicant needs to provide details about the trail to the dock as well as specifications about the dock. 4. Will not be hazardous or disturbing to existing or planned neighboring uses. Finding: There are several beachlot associations on Lake Minnewashta. This subdivision is just to the east of Minnewashta Manor Homeowners Association. 5. Will be served adequately by essential public facilities and services, including streets, police and fire protection, drainage structures,refuse disposal,water and sewer systems and schools; or will be served adequately by such facilities and services provided by the persons or agencies responsible for the establishment of the proposed use. Finding: There will be a trail off of a public street to access the beachlot. The members of the subdivision should form an association. Olivewood Subdivision June 3, 1998 Page 13 6. Will not create excessive requirements for public facilities and services and will not be detrimental to the economic welfare of the community. Finding: The beachlot should provide members of the association a recreational amenity. 7. Will not involve uses, activities,processes, materials, equipment and conditions of operation that will be detrimental to any persons,property or the general welfare because of excessive production of traffic, noise, smoke, fumes, glare, odors, rodents, or trash. Finding: The subdivision needs to form an association to keep the beachlot maintained. 8. Will have vehicular approaches to the property which do not create traffic congestion or interfere with traffic or surrounding public thoroughfares. Finding: Members of the association all live within close proximity. Boats will be launched at the regional park. 9. Will not result in the destruction, loss or damage of solar access, natural, scenic or historic features of major significance. Finding: The development of this site will not result in the loss of any features. 10. Will be aesthetically compatible with the area. Finding: The beachlot should be properly maintained to remain compatible with the surrounding uses. 11. Will not depreciate surrounding property values. Finding: The beachlot should be an asset to the neighbors by providing recreational opportunity as well as protected open space. 12. Will meet standards prescribed for certain uses as provided in this article. Finding: The request meets the beachlot ordinance standards. RECOMMENDATION Preliminary Plat Staff recommends the City Council adopt the following motion: "The City Council approves the preliminary plat (#94-3) of 25.95 acres into 8 single family lots with variances for Olivewood, as shown on the plans stamped April 24, 1998 and subject to the following conditions: 1. A 20 foot front yard setback variance for Lot 1, Block 2. Olivewood Subdivision June 3, 1998 Page 14 2. Approval of the vacation of Minnewashta Avenue at the time of final plat. 3. Approval of the 50 foot right-of-way for street. The radius of the cul-de-sac shall be 60 feet. 4. A moving and demolition permit for the existing homes as per Building Official's memo dated May 6, 1998. 5. Revise grading plan to include the following: a) Erosion control measures in accordance with the City's Best Management Practices Handbook. Type III erosion control fence shall be installed along the wetlands and stormwater pond b) Provide boulevard per City's typical street detail along Lots 1 and 2,Block 2. c) Denote temporary stockpile to be removed upon completion of the project. d) The dike along the proposed pond shall be constructed with structural fill material. e) The high point on Tanagers Point shall be relocated from Station 3+00 to Station 1+00 to reduce drainage to Sandpiper Lane. 6. Replacement plantings for the development total 46 trees. The applicant shall submit a planting plant to the city that includes location, species, and size. 7. The applicant shall submit sample tree preservation easement document to the city for review 8. Tree preservation fencing will required around all trees to be saved. Fencing shall be installed prior to grading and excavation for homes on each lot. 9. Lowest floor elevations of the homes adjacent to the wetland areas shall be two feet above the wetland's ordinary high water level. 10. Individual detailed grading,drainage,tree removal and erosion control plans will be required for all lots. The plans shall be submitted to the City for review and approval at time of building permit application. 11. The applicant shall pay the appropriate storm water quality and quantity fees or provide storm water management improvements in accordance to the City's Surface Water Management Plan. 12. Storm water calculations for ponding and piping shall be submitted to the City Engineer for review and approval. All storm water ponds shall meet Walker standards. The storm sewer shall be designed for a 10-year storm event. 13. All utility and street installation for public improvements shall be in accordance with the Olivewood Subdivision June 3, 1998 Page 15 City's latest edition of standard specifications and detail plates. Detailed construction plans and specifications shall be submitted to the City at least three weeks prior to final plat consideration for review and formal approval in conjunction with final plat approval. 14. The applicant shall be required to enter into a development contract with the City and provide the necessary financial security to guarantee installation of the public improvements and conditions of final platting. 15. The applicant shall receive and comply with all pertinent agency permits, i.e. Watershed District, DNR, MWCC, MPCA, Minnesota Dept. of Health, etc. 16. Submit street name to Public Safety Department for review prior to final plat approval. 17. Accept full park and trail dedication fees for the Olivewood Subdivision in lieu of parkland dedication and/or trail construction. One-third of the park and trail cash contribution shall be paid contemporaneously with the filing of the subdivision plat. The balance, calculated as follows, shall be paid at the time building permits are issued: rate in effect for residential single family property when a building permit is issued minus the amount previously paid. 18. The City shall establish a No Parking Zone in the cul-de-sac. The cul-de-sac shall be posted and signed as per the Fire Marshal for no parking. 19. Any existing or deferred assessments against the parcel shall be respread over the development on a per lot basis. 20. The existing wells and septic system on the site shall be abandoned in accordance with City and/or State codes. 21. The street construction plans shall include a traffic signage plan. Conditional Use Permit "The City Council approves the conditional use permit#94-2 for the recreational beachlot subject to the following conditions: 1. Receive DNR approval for dock with more than 4 slips and updated DNR permit. 2. Verify water depth and submit the appropriate configuration of dock. 3. The dock shall have a maximum of 8 boat slips. 4. The recreational beachlot shall meet all of the General Issuance Standards of Section 20- 232, conditional uses." Wetland Alteration Permit "The City Council approves the wetland alteration permit#94-2 for mitigation of a wetland subject to the following conditions: Olivewood Subdivision June 3, 1998 Page 16 "The City Council approves the wetland alteration permit#94-2 for mitigation of a wetland subject to the following conditions: 1. As per WCA deminus rules, 812 square feet of the wetland on Tanagers Court may be filled in without replacement. 2. The discharge of dredged or fill material into any wetland or water area requires authorization under Section 404 of the Clean Water Act from the Corps of Engineers. 3. The following wetland setbacks shall be maintained: Natural wetland 10'-30'buffer strip and 40 foot structure setback Ag/urban wetland 0-30'buffer strip and 40 foot structure setback" Street Vacation "The City Council approves the request#94-2 for vacation of Minnewashta Avenue subject to final plat approval of Olivewood Subdivision." ATTACHMENTS 1. Letter from Schoell and Madson dated April 24, 1998. 2. Letter from DNR dated September 29, 1994. 3. Memo from Steve Kirchman dated May 6, 1998. 4. Memo from Mark Littfin dated May 4, 1998. 5. Application. 6. Public hearing notice and property owners list. 7. Preliminary plat dated April 24, 1998. g:\planVcablivewood 98 pc.doc Schoell Madson , Inc. Engineers • Surveyors • P/anners Soil Testing • Environments/ Services 10580 Wayzata Boulevard, Suite 1 Minnetonka, MN 55305-1525 Office 612-546-7601 Fax 812-548-9085 April 24, 1998 City of Chanhassen c/o Ms. Kate Annenson, Planning Director P.O. Box 147 Chanhassen. MN 55317-0147 Subject: Olivewood Ladies and Gentlemen: Transmitted herewith are 26 copies of the final plat, construction plans and tree protection plan for Olivewood. These plans were originally prepared and approved by the City in 1995. Following is a description of the changes made to the previous plans: A. Final plat - no change B. Construction plans 1 . Sheet 1, Cover Sheet - no change 2. Sheet 2, Street and Storm Sewer construction - a. Added cul-de-sac island b. Revised pond inlet storm sewer c. Added pond outlet structure d. Added driveway to Lot 5, Block 2 3. Sheet 3, Sanitary Sewer and Watermain a. Revised manhole 3 top elevation 4. Sheet 4, Grading and Drainage Plan a. Added 60' x 60' house pad and related information on Lots 1 and 3, Block 2 and removal of house. Note front set back variance to 20 feet on Lot 1. b. Added driveway to Lot 5, Block 2 c. Revised house pad type on Lots 1 and 2, Block 1 and Lot 5, Block 2 d. Revised house pad elevations on most lots e. Removed wetland mitigation in Outlot A 5. Sheets 5 through 8 - Details a. Substitue current standard details ale4e, 40 g Affirmative Action Equal Opportunity Employer r� SCHOELL & MADSON, INC. City of Chanhassen 2 April 24, 1998 C. Tree Protection Plan 1. Reduced tree conservation easement on Lot 1, Block 2, by 1 ,920 square feet A front set back variance was previously approved for the existing home on Lot 1 , Block 2. A 20-foot front set back is requested for the proposed home and is necessary to provide a 60-foot deep house pad. The alternatives to this variance are a variance in the 40-foot wetland buffer set back in the rear yard or shifting the street farther east. The later would result in additional filling of wetland. The construction of a new house on Lot 1 , Block 1 also requires a reduction in the tree conservation easement in the rear yard. The easement line is shown about 20 feet behind the 60-foot by 60-foot pad. The plan requires 812 square feet of wetland filling. Current WCA rules allow filling of up to 2,000 square feet without wetland replacement. Therefore, the wetland mitigation previously shown in Outlot A has been deleted. Please contact me with any questions or if additional information is requires. Very truly yours, SCHOELL & MADSON, INC. Kenneth Adolf K EA/cj enc. cc: Arnold Weimerskirch Bill Coffman MINNEHAHA CREEK � `.,AHA Cy -.�-'11:--(;•-.L.. _._. WATERSHED DISTRICT. ,� - � 14600 Minnetonka Boulevard ? QMinnesota 55345-1597 :, t. Minnetonka, 9SHED 0�6 LAKE MINNETONKA oNice:(612)939-8320 tax:(612)939-8244 • } -•M, EypTA pryER DISTRICT ADMINISTRATOR:Ellen B.Sones ARD OF MANAGERS: Thomas Maple,Jr.,Pres.•C.Woodrow Love•John E.Thomas !V ;rkson Lindley•Thomas W.LaBounty•Martha S.Hardie)•Pamela G.Blixt August 29, 1994 • Permit lication No. 94-147: Mrs. Henry Neumann Applicant: 2841 Sandpiper Trail Excelsior, MN City of Chanhassen, T116, 1 R23, Section 4, NW 1/4 Location: plan involving the development of Stormwater management �developmen Purpose: a 7-lot residential subdivision called Dear Mrs. Neumann: ers, the ust 25, 1994 meeting of the Board of exhManagers: At the regularly scheduled Aug with the following subject permit application was reviewed along 1994. 1. permit Application 94-147 received August 4, 2. Construction plans received August 4, 1994. calculations as revised per city staff review comments 3. Drainage August 4, 1994. received Aug 1994. received August 4, 4. Hydrologic calculations for runoff analysisreceipt and staff roving your permit application pending Action was taken approving approval of the following with proposed 1. Revised sgrading and drainage plan ro osed contours consistent ro sed home walk out elevations a minimum of two feet above t thee p y°100-year pond elevation. wetland. Clarification of proposed outlet function for existing 2, above has been Please be advised that the project is not authorized issuuntil the p and you have been notified of permit e. submitted, Sincerely, Ellen B. Sones District Administrator EBS/cr c; Paul Krauss, City of Chanhassen Ken Adolf, Schoell and Madson STATE OF DEPARTMENT OF NATURAL RESOURCES METRO WATERS - 1200 Warner Road, St. Paul, MN 55106 FILE NO. PHONE No. 772-7910 September 29, 1994 Ms. Olive W. Neumann c/o Mr. Arnold M. Weimerskirch 2841 Sandpiper Trail Excelsior, Minnesota 55331 RE: Permit #95-6029, Multiple-slip Dock for Olivewood Addition, Lake Minnewashta (10-9P) , City of Chanhassen, Carver County Dear Ms. Neumann: Enclosed is DNR Protected Waters Permit #95-6029, which authorizes construction of a permanent nine-slip mooring facility extending 148' along the shore and 100' waterward of the ordinary high water elevation. Please note Special Provision 3, which limits activities during the fish spawning period. Also note Special Provision 2, which requires this permit to be amended should there_ be any additions to the dock or repairs that exceed 50% of the replacement cost. In addition to the special provisions noted above, some important permit details are summarized below: 1. Read all permit conditions and attachments carefully. 2 . The orange Permit Card must be posted conspicuously at the project site. This will indicate a permit has been issued for your project and may avoid unnecessary misunderstandings. 3 . If there are changes in the project which could affect Lake Minnewashta, an amendment to the permit may be required. The regional office should be contacted to determine whether the change necessitates an amendment. 4. All written correspondence should be addressed to: DNR - Metro Waters, 1200 Warner Road, St. Paul, MN 55106 5. Please note the permit provision regarding wetlands not subject to DNR water permit jurisdiction. You should contact your local government unit (County, City, or Soil and Water Conservation District) to determine your compliance with the Wetland Conservation Act of 1991. Your DNR water permit does not authorize you to proceed with your project until you comply with the Act. AN EQUAL OPPORTUNITY EMPLOYER Ms. Olive W. Neumann September 29, 1994 Page 2 If you have any questions or concerns, please contact Area Hydrologist Ceil Strauss at 772-7910. Sincerely, 11,6 l /7`r Dale E. Homuth Regional Hydrologist Enclosures DEH/JGR/cds c: Arthur Johnsen, Johnsen-Bormes Realtors U.S. Army Corps of Engineers, Gary Elftmann City of Chanhassen, Kate Aanenson Minnehaha Creek Watershed District, Ellen Sones Carver Soil and Water Conservation District, Paul Neumann Conservation Officer, Steve Walter DNR Fisheries, Dave Zappetillo DNR Wildlife, Jon Parker Central Waters, Ron Anderson Lake Minnewashta File (10-9P) INNESOTA _ . Sep,rt nsmt or Natural lterrorsen - --. 1 e.. .;..... .-.r ..y. Division of ' !Division of I •Cera 'R, fi ,... ri�. ... Pursuant to • Statute,Chapter 103G,and on the basis of statements and information contained in cite permit application, •7=:, 1 't 7 ' submitted by the applicant and other supporting data,all of which are made a part hereof by reference,PERMISSIO HEREB , ' _v VI 3+1 h - ire , '.,, the work as authorized below: w . wt ,.-- a1lrtwwsrr.:ciiAl i, Protected Water -)/ Lake Minnewashta (10-9P) Name of Permittee ��- . -+ _r•!�. _ ir=is 1 Olive W. Neumann - • - i t ., r • '�',-e,.py.l t ,: tet . -mawsIit:Na►siiMUAtawal,oftar--,"- /Address(No. &Street, RFD, Bax No. City, State, Zip Code) c/o Arnold M. Weimerskirch : ' ' - 2841 Sandpiper Trail, Excelsior, Minnesota 55331 Authorized Work: __ Construct a nine-slip permanent dock extending 148': = ong__ he_ ore_an• = :'I ,'!FI.V-)-T:21-;•., -3 of the ordinary high water elevation; all in accordance with the plans and a•4rk�:7 i received August 12, 1994. w+arrrrrsr Tymmo..: Purpose of Permit Expiration Dale ofPTT Multiple-slip mooring facility 1.:n..5. ' ... c1.4A) Property Described as: N 1/2 of Section 4, T116N-R23W Address of Property,{f Known: Outlot B, Olivewood Subdivision -• ,._ As Indicated in General Provision No. 11: The ordinary high water elevation of 944.5' (NGVD, 1929) ,, This permit is granted subject to the following GENERAL and SPECIALPROVSIO 3 GENERAL PROVISIONS 1. The permittee is not released from any rules,regulations,requirements,or standards of any applicable f I r'� .=-' '. to,the U.S.Army Corps of Engineers,Board of Water and Soil Resources,MN Pollution Control Agency,watershed , county,city and township zoning. This permit does not release the permittee of any permit requ __ _ r Engineers,Army Corps of Engineers Centre, 190 Fifth Street East,St.Paul,MN 55101-1638. , ._,._ 2. This permit is not assignable by the permittee except with the written consent of the Commissioner of Wizard ' • . -" 3. The permittee shall notify the Area Hydrologist at least five days in advance of the commencement of thew.'Wit' -: '''` •,`r • 'i ' ` its completion within five days. The Notice of Permit issued by the Commissioner shall be keptNewel .. -• _ - _----'�-37` r' ''t �� --1..' Fla 4. The permittee shall make no changes,without written permission previously obtained from the Commissioner g:C74>r_._i,: 1 r`-,' ai or location of any items of work authorized hereunder. 5. The permittee shall grant access to the site at all reasonable times during and after construction to authorized representatrvea0 j am•' .:ter',ii" '"''' Resources for inspection of the work authorized hereunder. a y 6. This Permit may be terminated by the Commissioner of Natural Resources at any time deemed necessary for the onservation-of wa • rtes' '_S.3r::2.'.3i or in the interest of public health and welfare,or for violation of any of the provisions of this permit,unless otherwise provided in the '} .t' 7. Construction work authorized under this permit shall be completed on or before date specified above. The permittee may request an extension • •r. '� complete the project,stating the reason thereof,upon written request to the Conunissioner of Natural Resources $.. ..- 8. In all cases where the permittee by performing the work authorized by this permit shall involve tri.-taking,using,or damaging of any property rights or interests of any other person or persona,or of any publicly owned lands or improvements thereon or interests therein,the permittee,before proceeding,shall obtain the written consent of all persons,agencies,or authorities concerned,and shall acquire all property,rigi.'s and interests needed for the work. 9. This permit is permissive only. No liability shall be imposed by the State of Minnesota or any of its officers, agents or employees,officially or personally, on account of the granting hereof or on account of any damage to any person or property resulting from any act or omission of the permittee or any of its agents,employees,or contractors. This permit shall not be construed as estopping or limiting any legal claims or right of action of any person other than the state against the permittee,its agents,employees,or contractors,for any damage or injury resulting from any such act or omission,or as estopping or limiting any legal claim or right of action of the state against the permittee, its agents,employees,or contractors for violation of or failure to comply with the permit or applicable provisions of law. 10. Any extension of the surface of public waters resulting from work authorized by this permit shall become protected waters and left open and unobstructed for use by the public. 11. No material excavated by authority of this permit nor material from any other source,except as specified herein,shall be placed on any portion of the bed of said waters which lies below(as indicated above.) 12. Where the work authorized by this permit involves the draining,filling or burning of wetlands not subject to DNR jurisdiction,the permittee shall not initiate any work under this permit until the permittee has obtained official approval from the responsible governmental unit as required by the Minnesota Wetlands Conservation Act of 1991. SPECIAL PROVISIONS 1. Erosion control measures shall be adequately designed for the site characteristics. They may include staked haybales, diversion channels, sediment ponds, or sediment fences. They shall be installed in accordance with "Protecting Water Quality in Urban Areas - Best Management Practices for Minnesota" MPCA, October 1989, prior to commencement and maintained throughout the project. All exposed soil shall be stabilized as soon as possible and no later than 72 hours after the completion of the project. Topsoil should be used to re-dress disturbed soil areas and indigenous plant species should be used to revegetate disturbed areas whenever possible. 2. Structures shall be maintained in good condition. Any additions or reconstruction (rebuilding at a cost exceeding 50% of replacement cost) of the structures must be authorized by amendment to this permit. 3. No activity affecting the bed of Lake Minnewashta may be conducted between April 1 and June 30 in order to minimize impacts on fish migration and spawning. 4. The permittee shall monitor all disturbed areas for the presence of purple loosestrife and control the plant as described in the enclosed pamphlet titled "Purple Loosestrife Alert. " The DNR aquatic plant manager should be contacted at 772-7950 for permit needs and additional information. c: Arthur Johnsen, Johnsen-Bormes Realtors U.S. Army Corps of Engineers, Gary Elftmann City of Chanhassen, Kate Aanenson ,7 Minnehaha Creek Watershed District, Ellen Sones Carver Soil and Water Conservation District, Paul Neumann Conservation Officer Steve Walter DNR Fisheries, Dave Zappetillo DNR Wildlife, Jon Parker Central Waters, Ron Anderson Lake Minnewashta File (10-9P) Authorized Signature Title Deue Dale E. Homuth Regional Hydrologist 101 CITY OF CHANHASSEN MEMORANDUM 690 City Center Drive,PO Box 147 TO: Kathryn Aanenson,Planning Director Chanhassen,Minnesota 55317 Phone 612.937.1900 FROM: Steve A. Kirchman,Building Official 4. (A General Fax 612.937.5739 DATE: May 6, 1998 Engineering Fax 612.937.9152 Public Safety Fax 612.934.2524 SUBJECT: 94-3 SUB(Olivewood,Coffman Development Services,Inc.) Web wu'u ci.chanhassen.mu.us I was asked to review the subdivision proposal stamped"CITY OF CHANHASSEN, RECEIVED, APR 2 4 19 9 8 , CHANHASSEN PLANNING DEPT." for the above referenced project. Analysis: Demolition. Demolition of the existing structures may require multiple permits. A house moving permit is required if a structure is to be moved to another location within the City. House moving permits must be approved by the City Council. A road use permit is required to move a structure over City roads. A demolition permit is require for the removal of structure foundations. Recommendation: The following should be included with the conditions of approval: 1. Obtain applicable permits from the Inspections Division before existing structures are moved or demolished g'safety\saklmemoslplanblivewd I The City of Chanhassen.A growing community with clean lakes,quality schools,a charming downtown,thriving businesses,and beautif,l parks.A great place to live, work,and pktj CITY OF CHANHASSEN MEMORANDUM 690 CityCenter Drive,PO Box 147 TO: Kate Aanenson, Planning Director Chanhassen,Minnesota 55317 Phone 612.937.1900 FROM: Mark Littfin, Fire Marshal General Fax 612.9375739 Engineering Fax 612.9379152 DATE: May 4, 1998 Public Safety Fax 612.934.2524 SUBJ: Request for preliminary plat approval for eight single family lots Web www.ci.chanhusen.mn.u$ and two outlots and a wetland alteration permit for a wetland mitigation on property zoned RSF and located just south of Sandpiper Trail and west of Piper Ridge Lane. This project was approved in 1995 as Olivewood, Kaufman Development Services, Inc. Planning Case 94-3 Subdivision. I reviewed the case for preliminary plat approval for the above project. In order to comply with the Chanhassen Fire Department/Fire Prevention Division, I have the following fire code or city ordinance/policy requirements. The site plan is based on the available information submitted at this time. If additional plans or changes are submitted,the appropriate code or policy will be addressed. 1. If the existing homes on lot 1 and lot 3 are scheduled for demolition, please contact Chanhassen Fire Marshal for possible fire training options. Due to the large number of trees in the area, burning may not be feasible; however,other training options may be possible. No other additional comments at this time. ML:ebb L:\safety\ml\case 94-3 The City of Chanhassen.A growing community with clean lakes,quality schools,a charming downtown,thriving businesses,and beautiful parks.A great place to lire,work,and plays CITY OF CHANHASSEN 690 COULTER DRIVE CHANHASSEN, MN 55317 (612)937-1900 DEVELOPMENT REVIEW APPLICATION teff N.AN 4V Loel-1�ur SERv cc-5 .7.ve. MIS. f/ //Y NFv y 4Niv APPLICANT: 6/Lt (�oFrfff,1"- OWNER: AaNOL11 %4,t/NE &)&/,vEg 57e i,z Cf/ ADDRESS: )Y09 w• //z Sj. ADDRESS: Z g '/ 5-4")DP/P44 7241 L Z04' ON 67-&^1 /y/v Ss`13? 6)cccc 5"/ /Z Mn. 53-3 3 / TELEPHONE(Day time) 22-g -O07? TELEPHONE: '717`V-- S 2 3 Comprehensive Plan Amendment Temporary Sales Permit Conditional Use Permit _ Vacation of ROW/Easements Interim Use Permit _ Variance Non-conforming Use Permit Wetland Alteration Permit Planned Unit Development* _ Zoning Appeal Rezoning _ Zoning Ordinance Amendment Sign Permits Sign Plan Review KNotification Sign /SD Site Plan Review* X Escrow for Filing Fees/Attorney Cost** ($50 CUP/SPRNACNAR/WAP/Metes and Bounds,$400 Minor SUB) 50 Subdivision' 'you $ y /5- = /z TOTAL FEE$ 700 / \ errs A list of all property owners within 500 feet of the boundaries of the property must be included with the application. Building material samples must be submitted with site plan reviews. 'Twenty-six full size folded copies of the plans must be submitted, including an 81" X 11" reduced copy of transparency for each plan sheet. "Escrow will be required for other applications through the development contract NOTE-When multiple applications are processed,the appropriate fee shall be charged for each application. NOTE - When multiple applications are processed, the appropriate fee shall be charged for each application. PROJECT NAME 00 vEcJ o v?) LOCATION . .4� =.P/PE2 72,11L ?,4.vAG&25 c(4JE LEGAL DESCRIPTION ZDS /9 717//0v6/-74 27 � M ,JA) A 74 ISA 2 K / C V E(L C o)NYri / rr/Am.) 074 PRESENT ZONING / P4- REQUESTED ZONING i 5 F-- PRESENT GPRESENT LAND USE DESIGNATION REQUESTED LAND USE DESIGNATION REASON FOR THIS REQUEST /O 57/4 D/ V//).E:- No P62 Ty /A1? 76//T 5/N6C c FA�J/L/ L' o7 This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information and plans required by applicable City Ordinance provisions. Before filing this application, you should confer with the Planning Department to determine the specific ordinance and procedural requirements applicable to your application. This is to certify that I am making application for the described action by the City and that I am responsible for complying with all City requirements with regard to this request. This application should be processed in my name and I am the party whom the City should contact regarding any matter pertaining to this application. I have attached a copy of proof of ownership (either copy of Owner's Duplicate Certificate of Title, Abstract of Title or purchase agreement), or I am the authorized person to make this application and the fee owner has also signed this application. I will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. The documents and information I have submitted are true and correct to the best of my knowledge. I also understand that atter the approval or granting of the permit, such permits shall be invalid unless they are recorded against the title to the property for which the approval'permit is granted within 120 days with the Carver County Recorder's Office and the original document returned to City Hall Records. /2/9/ Signature-77.p ic� ate 1 Signature of Fee Owner Date Application Received on Fee Paid Receipt No. ' The applicant should contact staff for a copy of the staff report which will be available on Friday prior to the meeting. If not contacted, a copy of the report will be mailed to the applicant's address. NOTICE OF PUBLIC HEARING PLANNING COMMISSION Wednesday, May 20, 1998 A at 7:00 p.m. arIIIPINFIW City Hall Council Chambers " rn ,,' �ej� ;J ,'��A 690 Cit Center Drive t�.� ��` • Lake � ��� : °� Minnewashta riM Wag i OLP I SUBJECT: Preliminary Plat , Wetland Alteration Permit, Conditional Use Permit, and Vacation of Right-of-way for Olivewood • APPLICANT: Coffman Development Services LOCATION: Just south of Sandpiper Trail and west of Piper Ridge Lane I NOTICE: You are invited to attend a public hearing about a proposal in your area. The applicant, Coffman Development Services, Inc. request for preliminary plat approval for 8 single family lots with variances to the front yard setbacks and wetland setbacks and 2 outlots; a wetland alteration permit for wetland mitigation; conditional use permit for a recreational beachlot; and vacation of right-of-way (Minnewashta Avenue) on property zoned RSF, and located just south of Sandpiper Trail and west of Piper Ridge Lane. This project was approved in 1995 as Olivewood. What Happens at the Meeting: The purpose of this public hearing is to inform you about the developer's request and to obtain input from the neighborhood about this project. During the meeting, the Commission Chair will lead the public hearing through the following steps: 1 . Staff will give an overview of the proposed project. 2. The Developer will present plans on the project. 3. Comments are received from the public. 4. Public hearing is closed and the Commission discusses project. The commission will then make a recommendation to the City Council. Questions and Comments: If you want to see the plans before the meeting, please stop by City Hall during office hours, 8:00 a.m. to 4:30 p.m., Monday through Friday. If you wish to talk to someone about this project, please contact Kate at 937-1900 ext. 118. If you choose to submit written comments, it is helpful to have one copy to the department in advance of the meeting. Staff will provide copies to the Commission. Notice of this public hearing has been published in the Chanhassen Villager on May 7, 1998. ROBERT ALFORD CHARLES III & C ROSENBERGER ROBERT BAUER 6355 MINNEWASHTA WOODS D 2727 PIPER RIDGE LANE 2700 SANDPIPER TRAIL EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 PAUL & CAROLINDA PRENEVOST DARRELL JOHNSON KERI FREIENMUTH 6351 MINNEWASHTA WOODS DR 2731 PIPER RIDGE LANE 2720 SANDPIPER TRAIL EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 FRANCIS JESSUP KEVIN PETTIS ROBERT & JENNIFER BUSHWAY 6350 MINNWASHTA WOODS DR 2742 PIPER RIDGE LANE 2721 SANDPIPER EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 CARVER COUNTY MARK GRAY ALBERT & CYNTHIA WILL ATTN: PLANNING DEPT 2751 PIPER RIDGE LANE 2730 SANDPIPER TRAIL 600 EAST 4TH STREET EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 CHASKA, MN 55318 HARRY NIEMELA DEAN E. ERICKSON TODD LADERED & MELISSA PODLOGAR 10670 POPPITZ LANE 2762 PIPER RIDGE LANE 2731 SANDPIPER TRAIL CHASKA, MN 55318 EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 ESTATE OF HARRY/LOUIS AHRENS WILLIAM GREER HARLAN NINOW 13441 WEST OHIO DRIVE 2771 PIPER RIDGE LANE 2740 SANDPIPER TRAIL LAKEWOOD, CO 80228 EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 JOHN & BARBARA NEVIN CHARLES ROSENBERGER III STEPHEN & MARY HUGHES 6361 MINNEWASHTA WOODS D 2772 PIPER RIDGE LANE 2741 SANDPIPER TRAIL EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 MELISSA & TERRY CLAUS DONALD C GRANT FRANK M & LINDA YOUNG 2701 PIPER RIDGE LANE 2782 PIPER RIDGE LANE 2750 SANDPIPER TRAIL EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 BURNET RELOCATION MICHAEL FAULK DOUG ROPER 7550 FRANCE AVE S, STE 320 2791 PIPER RIDGE LANE 2751 SANDPIPER TRAIL EDINA, MN 55435 EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 HENRY & DONNA BECHTHOLD RANDOLPH HERMAN R & K HINDERAKER 2722 PIPER RIDGE LANE 2792 PIPER RIDGE LANE 2800 SANDPIPER TRAIL EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 HOWARD SCHMIDT HERB PFEFFER 2810 SANDPIPER TRAIL 2850 TANAGERS LANE EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 TOM SHOENECKER CHRISTOPHER HOLDEN 2820 SANDPIPER TRAIL 2851 TANAGERS LANE EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 MRS HENRY NEUMANN JAMES & SUZANNE SENST 2841 SANDPIPER TRAIL 2810 WASHTA BAY ROAD EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 DEAN & JUDITH BERSIE GENE FURY 2800 TANAGERS LANE 2821 WASHTA BAY ROAD EXCELSIOR , MN 55331 EXCELSIOR, MN 55331 STEWART & MARILYN PETERSON IVAN MIELKE 2810 TANAGERS LANE 2830 WASHTA BAY ROAD EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 ART KIMBER KRISTEN ORTLIP 2820 TANAGERS LANE 2831 WASHTA BAY ROAD EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 GARY & KATHERINE OLSEN LESLIE MICHEL 2821 TANAGERS LANE 2840 WASHTA BAY ROAD EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 BRUCE JOHNSON JEANNINE & BRUCE HUBBARD 2837 TANAGERS LANE 2841 WASHTA BAY ROAD EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 PER JACOBSON MRS. HAZEL ANDERSON 2840 TANAGERS LANE 2851 WASHTA BAY ROAD EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 SIDNEY LEVIN CURRENT RESIDENT 2841 TANAGERS LANE 2901 WASHTA BAY ROAD EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 GARY KIRT SUSAN FIEDLER RICHARD LUNDELL 7140 HAZELTINE BLVD 3121 DARTMOUTH DRIVE 7341 DOGWOOD EXCELSIOR. MN 55331 EXCELSIOR, MN 55331 EXCELSIOR. MN 55331 PEMTOM COMPANY C.JOANNE GINTHER WILLIAM C. GETSCH 8200 HUMBOLDT AVE S 3131 DARTMOUTH DRIVE 7530 DOGWOOD BLOOMINGTON. MN 55431 EXCELSIOR, MN 55331 EXCELSIOR. MN 55331 KENNETH & DONNA DURR THOMAS MERZ MARJORIE GETSCH 4830 WESTGATE ROAD 3201 DARTMOUTH DRIVE 7530 DOGWOOD ROAD MINNETONKA, MN 55345 EXCELSIOR, MN 55331 EXCELSIOR, MN 55331-8053 HAROLD J. TAYLOR. TREASURER STEVE MARTIN MARJORIE GETSCH STRATFORD RIDGE HOMEOWN 3211 DARTMOUTH DRIVE 7530 DOGWOOD ROAD 3861 STRATFORD RIDGE EXCELSIOR, MN 55331 EXCELSIOR. MN 55331-8053 EXCELSIOR, MN 55331 ABRAHAM ABBARIAO PAULA S ROETTGER CHARLES&JENNIFER NEWELL PO BOX 26 3221 DARTMOUTH DRIVE 7550 DOGWOOD ROAD CHANHASSEN, MN 55317 EXCELSIOR, MN 55331 EXCELESIOR. MN 55331 MINNEWASHTA CREEK ASSN. MARY J. MOORE SCOTT VERGIN ATTN NANCY NELSON 3231 DARTMOUTH DRIVE 7311 DOGWOOD ROAD 3891 LINDEN CIRCLE EXCELSIOR, MN 55331 EXCELSIOR. MN 55331 EXCELSIOR. MN 55331 RAFAEL FERNANDEZ WARREN HANSON MARJORIE GETSCH 7620 CRIMSON BAY ROAD 3241 DARTMOUTH DRIVE 7530 DOGWOOD ROAD CHASKA, MN 55318 EXCELSIOR, MN 55331-8844 EXCLESIOR, MN 55331-8053 DANIEL& KAREN HERBST ROGER W. OAS CHARLES&JENNIFER NEWELL 7640 CRIMSON BAY ROAD 7301 DOGWOOD 7550 DOGWOOD ROAD CHASKA, MN 55318 EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 JOHN FUNARI MARTIN JONES PETER& DEANNA BRANDT 7660 CRIMSON BAY ROAD 7321 DOGWOOD 7570 DOGWOOD ROAD CHASKA. MN 55318 EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 ROB& CALI OLSON JANET M QUIST ETAL STEVE EMMINGS 7700 CRIMSON BAY ROAD 7331 DOGWOOD 6350 GREENBRIAR CHASKA. MN 55318 EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 ANNALEE HANSON MARVIN YORK JIM& BETH GINTHER 6400 GREENBRIAR 3716 HICKORY 3611 IRONWOOD EXCELSIOR. MN 55331 EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 EDWARD MONSER TIMOTHY NELSON DONNA HOELKE 3920 HAWTHORNE CIRCLE 3724 HICKORY 3621 IRONWOOD EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 DAVID PETERJOHN JOAN E RASK KENNETH & DONNA DURR 3921 HAWTHORNE CIRCLE 3728 HICKORY 4830 WESTGATE ROAD EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 MINNETONKA, MN 55345 EDWARD V. OATHOUT LOUIS PARSONS KENNETH & DONNA DURR 3940 HAWTHORNE CIRCLE 3732 HICKORY 4830 WESTGATE ROAD EXCELSIOR. MN 55331 EXCELSIOR. MN 55331 MINNETONKA. MN 55345 RICHARD FOWLER SUSAN MORGAN JOHN &JEAN GEISLER 2429 MAYFLOWERS AVE 3734 HICKORY 3680 LANDINGS DRIVE HOPKINS. MN 55305 EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 JEFFREY SIMON JAMES GARFUNKEL VINCENT & BETH BEACOM 3980 HAWTHORNE CIRCLE 3738 HICKORY 11665 57TH AVE NORTH EXCELSIOR, MN 55331 EXCELSIOR. MN 55331 PLYMOUTH. MN 55442 JAMES J MOORE SAMUEL POTTS JAMES &CONNIE VOLLING 3630 HICKORY 3628 HICKORY ROAD 3700 LANDINGS DRIVE EXCELSIOR, MN 55331 EXCELSIOR. MN 55331 EXCELSIOR, MN 55331 ED PETERSON EILEEN BOYER BRUCE& KARLA WICKSTROM 2219 ARTHUR ST NE 3630 VIRGINIA AVENUE 3716 LANDINGS DRIVE MINNEAPOLIS. MN 55418 WAYZATA, MN 55391 EXCELSIOR, MN 55331 GREG BOHRER RICHARD ZWEIG BRUCE WICKSTROM 3706 HICKORY 3601 IRONWOOD 3716 LANDINGS DRIVE EXCELSIOR. MN 55331 EXCELSIOR, MN 55331 EXCELSIOR. MN 55331 ALFRED SMITH ROBERT W HEBEISEN PAUL&ALYSSA NESS 3714 HICKORY 3607 IRONWOOD 3732 LANDINGS DRIVE EXCELSIOR, MN 55331 EXCELSIOR. MN 55331 EXCELSIOR. MN 55331 TIMOTHY& MARY O'CONNOR JOEL ANDERSON ZOE BROS 3748 LANDINGS DRIVE 3894 LONE CEDAR LANE 6631 MINNEWASHTA PKWY EXCELSIOR. MN 55331 CHASKA, MN 55318 EXCELSIOR, MN 55331 THOMAS LONDO JEROME S AHLMAN JAMES &JEAN WAY 22695 MURRAY STREET 3896 LONE CEDAR LANE 6641 MINNEWASHTA PKWY EXCELSIOR. MN 55331 CHASKA, MN 55318 EXCELSIOR, MN 55331 STEPHEN &JAN VONBEVERN TERRANCE JOHNSON BRUCE BOSSHART PO BOX 874 3898 LONE CEDAR LANE 6671 MINNEWASHTA PKWY CHANHASSEN. MN 55317 CHASKA, MN 55318 EXCELSIOR. MN 55331 MARILYN K. MITLYNG MARK AMBROSEN ROBERT M. JOSEPHS 3800 LONE CEDAR LANE 3830 MAPLE SHORES DRIVE 6701 MINNEWASHTA PKWY CHASKA, MN 55318 EXCELSIOR. MN 55331 EXCELSIOR. MN 55331 SCOTT GAUER KENT FORSS BARBARA HEADLA 3820 LONE CEDAR LANE 3850 MAPLE SHORES DRIVE 6870 MINNEWASHTA PKWY CHASKA. MN 55318 EXCELSIOR. MN 55331 EXCELSIOR. MN 55331 JOSEPH STASNEY GABRIELE WITTENBURG DONALD LINKE 3840 LONE CEDAR LANE 3870 MAPLE SHORES DRIVE 7301 MINNEWASHTA PKWY CHASKA, MN 55318 EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 ARNOLD HED DEAN/JACQUELINE SIMPSON FRANCES BORCHART 3860 LONE CEDAR LANE 7185 HAZELTINE BLVD 7331 MINNEWASHTA PKWY CHASKA, MN 55318 EXCELSIOR, MN 55331 EXCELSIOR. MN 55331 JAMES LIPE NANCY& DANA JOHNSON STEPHEN V. BAINBRIDGE 3880 LONE CEDAR LANE 6541 MINNEWASHTA PKWY 7351 MINNEWASHTA PKWY CHASKA, MN 55318 EXCELSIOR. MN 55331 EXCELSIOR, MN 55331 MICHAEL A JUREWICZ CHARLES F. ANDING WILMER LARSON 3890 LONE CEDAR LANE 6601 MINNEWASHTA PKWY 7381 MINNEWASHTA PKWY CHASKA. MN 55318 EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 DAN PETERJOHN THOMAS ALLENBURG JOHN T. FOLEY 3892 LONE CEDAR LANE 6621 MINNEWASHTA PKWY 304 ORANGEWOOD LANE CHASKA, MN 55318 EXCELSIOR, MN 55331 LARGO. FL 34640 CITY OF CHANHASSEN PAUL W LARSON GARY COBB 690 COULTER DRIVE 3609 RED CEDAR POINT DR 3859 RED CEDAR POINT DR CHANHASSEN. MN 55317 EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 PLEASANT ACRES HOMEOWNER DR LUMIR PROSHEK T. LYMAN BOX 12 3613 RED CEDAR POINT DR 3603 RED CEDAR POINT RD EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 JEFFREY& DEBRA PAPKE MARK BROECKERT DK CONSULT B.V. 6180 CARDINAL DRIVE SO 3616 RED CEDAR POINT DR 3605 RED CEDAR POINT RD SHOREWOOD, MN 55331 EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 CAMPFIRE BOYS&GIRLS MN COUNCIL EMIL SOUBA RICHARD FRIEDMAN 2610 UNIVERSITY AVE. W. 14025 VALE COURT 3601 RED CEDAR POINT ROAD ST. PAUL. MN 55114 EDEN PRAIRIE, MN 55344 EXCELSIOR. MN 55331 ABRAHAM & DOROTHY ABBARI K LOCKHART TROLLS-GLEN HOMEOWN ASSN 3750 ARBORETUM BLVD, PO BOX 26 3618 RED CEDAR POINT DR 7501 WEST 77TH STREET CHANHASSEN. MN 55317 EXCELSIOR. MN 55331 CHASKA. MN 55318 TOM RUHLAND STEVE KEUSEMAN MRS HENRY NEUMANN MINNEWASHTA BEACH ASSN 3622 RED CEDAR POINT DR 2841 SANDPIPER TRAIL 6211 GREENBRIAR AVE EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 KATHLEEN LOCKHART ERIC BAUER WILLIAM NAEGELE 3618 RED CEDAR POINT DR 3624 RED CEDAR POINT DR 4300 BAKER ROAD EXCELSIOR. MN 55331 EXCELSIOR, MN 55331 MINNETONKA. MN 55343 MINNEWASHTA SHORES BIRUTA M. DUNDURS RALPH HEGMAN STEVE WOOD 3627 RED CEDAR POINT DR 3311 SHORE DRIVE 6341 CYPRESS DRIVE EXCELSIOR. MN 55331 EXCELSIOR, MN 55331 EXCELSIOR. MN 55331 BARBARA 0 FREEMAN LINDA JOHNSON BARBARA WINTHEISER 7431 DOGWOOD 3629 RED CEDAR POINT DR 3321 SHORE DRIVE EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 EXCELSIOR. MN 55331 DOUG ANDERSON KENNETH SMITH FLORENCE BISCHOFF 3607 RED CEDAR POINT DR 3837 RED CEDAR POINT DR 3331 SHORE DRIVE EXCELSIOR. MN 55331 EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 WILLIAM MCDANIEL BILL COLDWELL RICHARD ANDING 3341 SHORE DRIVE 3501 SHORE DRIVE 3715 SOUTH CEDAR EXCELSIOR, MN 55331 EXCELSIOR. MN 55331 EXCELSIOR. MN 55331 MABEL I. WHITE CHARLES ANDING KEVIN &ANN EIDE 3351 SHORE DRIVE 3631 SOUTH CEDAR 3719 SOUTH CEDAR EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 HENRY ARNESON HELEN M ANDING JIM &SUSAN ROSS 3401 SHORE DRIVE 1708 EAST 57TH STREET 3725 SOUTH CEDAR EXCELSIOR, MN 55331 MINNEAPOLIS, MN 55417 EXCELSIOR. MN 55331 KARL VAN LANGEN CHESTER LOBITZ WILLIAM HAUGH 3411 SHORE DRIVE 3637 SOUTH CEDAR 3727 SOUTH CEDAR EXCELSIOR. MN 55331 EXCELSIOR, MN 55331 EXCELSIOR. MN 55331 WAYNE HAGEN EVELYN BEGLEY WILLIAM HAUGH 3421 SHORE DRIVE 3701 SOUTH CEDAR 5441 JAMES AVENUE SO EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 MINNEAPOLIS, MN 55419 JOHN MCKELLIP GEORGE/MELANIE WERL PER JACOBSON 3431 SHORE DRIVE 10 ACORN DRIVE 2840 TANAGERS LANE EXCELSIOR, MN 55331 SUNFISH LAKE, MN 55077 EXCELSIOR. MN 55331 PAUL MODELL JAMES JASIN HERB PFEFFER 3441 SHORE DRIVE 3705 SOUTH CEDAR 2850 TANAGERS LANE EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 MORRIS MULLIN JILL HEMPEL KRISTEN ORTLIP 3451 SHORE DRIVE 3707 SOUTH CEDAR 2831 WASHTA BAY ROAD EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 EXCELSIOR. MN 55331 FRANCIS FABER BLAKE HORTON JEANNINE& BRUCE HUBBARD 3471 SHORE DRIVE 3711 SOUTH CEDAR 2841 WASHTA BAY ROAD EXCELSIOR. MN 55331 EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 RICHARD WING CLIFF PEDERSEN MRS. HAZEL ANDERSON 3481 SHORE DRIVE 3713 SOUTH CEDAR 2851 WASHTA BAY ROAD EXCELSIOR. MN 55331 EXCELSIOR, MN 55331 EXCELSIOR. MN 55331 CURRENT RESIDENT 2901 WASHTA BAY ROAD EXCELSIOR, MN 55331 WAYNE HOLZER 2911 WASHTA BAY ROAD EXCELSIOR, MN 55331 JEROME COVENY 2921 WASHTA BAY ROAD EXCELSIOR. MN 55331 ALAN TOLLEFSON 2931 WASHTA BAY ROAD EXCELSIOR. MN 55331 GLENN COPPERSMITH 2941 WASHTA BAY ROAD EXCELSIOR. MN 55331 MARK&YOMARIE OLSON 2961 WASHTA BAY ROAD EXCELSIOR. MN 55331 N m 0 C w " i o 3O m N T• till I-o > 2 -rn ' Zi �n 26I ZI- 0 8 Z U2 LL Q U i 0 i f. '. ...,4 -7 la . - , I RIK4 Z i il 5 ,,,9).) 0 8 a (i) ;__ i.. ) yi • . ' t08• = - - � kk- Z � - `77.-:;4 .� ,... _ ! E (A > p p >- i_ � Wr- vm w ii,o i p, I-1-1 3031' . , ,` . °ts uzl a < E 1 Ul co i p_ n MIME i LIU u , -.. - • , I'l0I .1 ,.,.:4 . _0. 1 iti. : Ari - 0 ici) i 0 0 60 CC U M :4iei6 iiq X511 u I- r L, W I 0 N GL G e 6 6l I Z Z o& a I I I I $ I l N Lid r^ .i. 1 I . in w VII1 l a tI ya i I I I Z z cc 5 100 1 iry 1.S b E {I — � aci 1191 1 II -1 it g I $ e ; I O as g j .( s 3 * E. _ L a I i 3 I I 5 1 I I 1 (n 12 1131E-' I € A' 1's €la ; I I r S1 I I 0 OZ t_ :S fi �1.I T a � P i a I o It l • `.a L S. a il II il Ildp' il Y II.. $ I I I I J . 0 I`et E'= 1 ..# W �z IV:I. . a O wF6i} E / I 's 2 ZL' it;g 11 � 3 SEE' [ I g gg ` a i 1 =1 Zo 111 _ :ll- Fig S E l I E I cn r b YaST' 1,11 y § n.I1I� � € Zi a et .a, Y z t V 1.L,Fit -14- i1 t4f at bS ` l F� £.3 . F f Y i a r4b11; Q 01Es a e ` la s c _1111, 3 o 0 0 W Js el 0 a b i !Y� 'e b i $e bra 1 I I 11 _Y Ia V ili 1r sS az i/1p i3 _Z i € b � a yI of III= �Y I - It I €� 1 5 r $ 5 Y g2 € IE ' �� 1E Z 16 "I s if �e e I I Y_ 6t S 1- t1 ya 1 !.3 I it I 11 II Yo f SSey 6F II �` j j. 1 4s'I . _ ' '1 i a I 8a tC i I I Ia t . 1 I' 1� i`4 11 1 I ItIt "0€y �$ I 4 Ie &� £ c:a 6 e1 'I III tj C 11 !f i IS It €3' 1 Z £S 112 V o It V Y : / -& CY El .Fs i l - I ,. El e li g'6 € /1 li IwIHH it I i I - I .1 �b y j ,� Cl WO r "t e,' 11! ! eR IIIIAr CI1 I II 1 i \ i1Y /, !It E[t 5E R 1 1 t\ 1 r t Zi ri e; 1.6 ISi iiEllY to s lil R e l a e.sb as-, �l N �t • 0909 x fi ¢U S • I - .�i! $ SF z 2 W g"i I f€ I :2._-...1 _ ffg l N 4 Z E i 1 2 Z a z t � �� , I g3 ' e o N 4 r kit ji jjYYYj g1. .i C,1o x iia [ K 0 41 D 5 c4 .." 0. 5.) It - 11 11 9---' —?Os! iil i I u i r 1 1R c B.,' w 72 3 / io o 4 P A P2A 0 CS --- 1"�`�•> > I 1 l; _ / /!i. ' In ' t O1 ,; "- - �� -•J 8 i.31�1 =------- ser ` -J I - - IeTt• s 22 ..1- `�sr'...\-.I�1 `J 'C' J )'1 1 0 ,- J.I'�,, t 1 :� _ Q: --- dt., �e6i�'-- ' \1 1 1\ 1 -- _ -..,....ii-,:".......... , 'C• II(.4,•_ 1 1 -- 796t ' .tel 12,t T / O'f - it - .i \� I - a -=>� 11° I - — '711 J: ti I I I h^ .-'i.;8� ..g e:1., P') x"117 l y ~ ii, ,z L• V _:--• ZARA? �s ,� iia,^ \fi-ffi . 1 ,<:73 Y r Il G[2.MAU.,9O63 .G 1.9L.U. , �'. `7 C'' J.:: ,'a: ,1.09:i'O r osiz-, -S i O , .l 0900 7j s.0 Z 0,1 L_ - ` _ -- 3CI' -`-- iSt[ er 3aS.9sb93 -- n ,__ fl°'ate ai si[0--i[_� \ i` } Iry 8=• 8.. g .-VC' ' >- tVi. �92 2.... .. : Ler 3� : .4+ Z ,.., ` 1t- �1: h yn� i g3',°� 6 ..i AT /: ..it,''� Kstl 1 Z sle ' .I '�\ — //4./ '1„e0 P 1 ^ ,s q,, iLli 79G2L6 •' -2 J1, .♦ 'J' Y J. 1 J• :: o ' t xslaa+f�. 1 .a e. •_' I ,• ` ' `.i., /, - - -.1 %•I.: <-• 1. o. H ti 1 (� afi (,�,' /` ,',..4_0,----,. T , 1- 3Ts=T---.B<`zs ` ��rr y - i i '1• I 7 }¢ .c..‘„ _.._.4 __,„.....,,„,r , .. , - -,e,9979[.9.x93 J.1 O 1,' �1 11 Sea ..Oro S 1. I 8 1 r 1 ,, . e, k g:�, •I •• I•i.''a.:` r. ' .'• •H '” / _ • i.i 1 ! . ^) , , ' i� •`�, I . , /1 '� V - , . w El al al HEI PI a k i "'i 0 o 8 8 - y cc - a P ef r F O<i'1Z A' <I YM WAN Z Z W 1 � D 2 = i . g 00O .n o.a•n 3 / � ,n O °- ° o 3 IN •v s. W W W ._� W> < H rtj p2 _ :,_..1 U1 O - Y I- a ucc....s1 — ..ca uw. g o (0 - a I n 6 F \ Jlif 7 \ 25+....: c..��� mer Wlw __ _ 8 Id € Y' a A. S ` Z Q o A 8 2 Ilsi — i..., w ( � " _I£ } 811 CCW i.-. . PI ml FI tem Ui W 1 X CI ...„..., i V / (j- I - o 8111)//: .u5 fA / 1 — :tri EI PI PI al x €g I LS P a Y I_' 3b, hr— 1�1 e �b� .Me , , -• Ali 41\tiVr.''' Vc.ose \ 1 s . 0 I IN 8 /}p \ 141$1.....,,,,a h i R J / ‘2 0...°. Vg! I I i 11 O 'e = a . 8 I 8 8 Ss`= a 8 �r:R I 8g.. 8 pk a :t.!..!: 3 W s .- I a cse#4 ' ~ tLl y 1 �f`I o I 4 _ r :'Y I ti 3- f ~_ _ 8• \J,, x = m<r - . _._-.— _ a 111111 % 1 J IN 126 �_� ,/ 1 1 g SP y \\5 i I —taw- —o�cwrcvnnsoo i . i all Qi.1 N 51 51 °1 5I 51 PI x �f5 6- +i \y Ui w W S R . ¢ L Q cc-r.-,,.1 H W o o �, usr c,v.o„a,.. Q Z Z = O C'''r.,. 4 / e a U a • 3 to o 6C996• I KM F ^ 7 ¢ W in W W W g 1 '2 Z N `° ai — err.unw no r<- $ m U t., 2 W I Q O p cea troos-a ? C rcG __ arta 1a.. O C — Y a Ifill N \ 1 1 A uzoe-a c uas — 07096 wv« A R `51:Z t.2t; z -='; W a Pi . :VII 02 / r:„, g Ien iii m �� i 61 : al g 1 El 6t cocr 1 0 / _,,, igd - -- ei — :I fir'''. • i \ A-- '1 0 0 0 il 0 21 6 .f ps -... ;'-‘01111117- -1 11 ;i'i 010114114 1 LA Vt.! , . ..,. ir..,,,, gy !'::124----- ,, t,a II tar �P. re KO ' + III 34— 1j111 � ,....... ...., .,... 0il ?lit IA 1 i $- a �i �r r, -.., $` 1 % $ :--.- 5939 m :neR pp 8$$ :5.: 'NO W W S 3N c< m i Q O IL I- I- o z3L' z O a G N O z 32 < t W wa cw =J = w tO - ,O < co o ,-L,, >. z QI < Ua a'1'< 1 oF vi _ J 9- AL / ` 0. N ° Z 7 Z Q 2 W Z cr Z �/_ Lc A oCC A CC / o 2 .gel / I aI a o d lI a gl a a 111,9. N� -1 /1-,, -u �.. g Y 744 1 v /6 ' i I .., I a n pg i ' g Wr Y: i` oar_gni bb a •� ' O i C - al � � 1 ,,,,,.,-11'L W)VT O _ , k I • e I O tiO iv « N n sail' uocoa-n e 1 I / •-.0 M® ascro wrV. 03 y WI 4 a nIg i; li .., e. lig! II - i 2 s �aiiia 8�LNO e b� gSia J p ` 4 1 g a 3 Z O � ���•11 I Osco-o-+s0°.1A"ij a'..a WPM ` E § r 1x I1\3 3a imp 8 i.-1 y ya� Lp }-i i L Ei ai N b LD ya3 IP. 1 1Lb .- gypg 21; Zs N \'Z nig § 4§ h1m19 1 n Ii i 6 ;- K0.a N 11 Q co 01 • \., A. ,. Z 1 1 1 1 1 1 1 i * j.—�- `�� J m j - O 1 a , d 111111111 / W ! l Al I o a W , i � irrlriii 1.S ' 3 < - i' G -, 1, W >_ 0 N -1 ` F J Z t0 r! G o < o = • ZW 7 , �, -r 1 o • o i a m 1 / / t . / til iiiiiiiisi ;III 1 ',f—, .'! Yb6aa••,r6d i i •t u < r i3 W '4 a . . Viasr ," 11111 ill i� ,t II lig IPJ ga Id ._ _ i ... : , 11:;:l r.!, --41'.• .4 - .4- „t,/,' ff, i _ _ ,' „,,.•:_-•---.' -/jr- ' A_?.-7f` �.• - ,""'.,111 -Fr - a /' •y ii! 1NNN . \ «aMilt ii. te,.._ ;--)\-2-10)::-....1 I • !� .a� .;,. A1 •T2 „....4,„-- .._i. '^ _ . •.� --• a `i, ISI �• - Yq- , ( � 1 i% --'2.;;;:V � �:.* • ,Ii• f ry - INF �f a• •01, 8 8:I Ill Ili 1 E.. , ,, v,' .,: ‘-- Eli,: hi , i LL,,, g_ ... _.3 L . :•,__ I. .. ,., i . ..ic--;, . f .----7.1 „ --7,-. -I t.i,1 _ ,... ,-- . .a L-3'4', a • , • --------- - illo fV`` ]E / c. O d: _ 5. st 11 I '5 ,,, ._Q • x, ,.1,: :d V ii lee' ,4 i 1. E . • W, i r- rFF {r : t i i N 1 W QQ1 11 ' , 41 - ' 3 F d" 3� E" z - r I 's �a ' 1 W• / \,,, La W W N �t p m v , JQW ! QwJ p igla yy a irma,2ZQ O_ Cad - F�� f 1 q 4 •() N O Q N SS ! a G FS0 t y�•:• i f y 5I y O d a Lai - i1 q ;g0 r I -nuri •• - •• ,,Asaizq q ! g I i ap o i. 11 i ,� ,hi ;15a f O III - i1 't �3 2in 111 O7Al1IG ai >p oa3c'" Lb 1it� is �C < Z ,.F< • .i 3Yo 1 U... @ e oe �• lai lie as W W Wag; 11 ragygiti -s: A 111 peot3$0e ,g g ..... 0 v g. . . 11 n vi J r 1 i.^ y Ya 0W Z 1•4�3,YL �wis A • J1-O 3 1es �� y JQ� Z ra..s a...:: r�>a...._x...mesio,: aO j 0 • L F3 i S :6 S1 1 - ;j 222 N C a. 111 . ' CO,YAOmA ~_� -1 a Yg bq 1� s pp cW ze Z �� e ■ AAA V o g -NEIN 'A h s` a0 A: —i a $ e _...t A II IIw �� _• I .Oft iiti sr g 1 - II- Umi e ! � r g o CC .a30rd sraaar*36 11 LG slaraaA:- i 5 1 y �""' !-� 0 J C 1 l�4it: 'La i QW O ..~21 6iiiii� S g WAY ; ' =.��t(A sof o0 K. '31111 p b a a aq i Ur� s yat Sq gi. zZ " y3 a €§ i"S�f■F■in��p�v�!ip�1G� 3 As ! foolr. t o,1_, is i_ s i 1j S: .4 t s F� . • �� .��■��Iv��ia�� a ��� r �.� a U m ft I"E ! =(Et 1 -I^ f f iiiii H 9 W ! !Ij■q !��y 3 y it +77+ ijilli. {!idilt �d 7 2 2 e ho 11E111 am N v Ilitir y N n �e� ' I J:1.1 LA= I 1 ®i:iiiii 4 p 2a y p6 I 9 } mms_/ -!.rei f- ! y-{ —'III II! iff iii I II I J. 121 f•i w } Ti.• i_ 1i i - c I� I •afif J 2 ell vieJle3eil7E €£"=_a ; v �.. g ww 11 1 I e 3 fair . ' 'la �( r.A ¢W gil "2 i z - — { a U lila S. iii a i!if a U o I I ?f +; 2 a w o IN.. L Ps GONciN ;fi ..ii, am iii J¢'cui N i Ul , lit / 1 • li 1 '1"0 ... / � I In N WW! lit In A O . us M.-.r{ . `�. QO2 N NS Ib-'I Lid (II 0� & �. !-t1Ei LL ii-ii I I c iS is Jill ii ciiz� t " :al i 1 g_. 3 d LEI hlitit 001.0",v r NI J 6 a a, m I \N L I pct l 3N Id yy P. s' =zC o sI. € I=3 3 Lim o_ a3 i _ = w a p c up `e i �c=i n =F'i i {�� 3 f7 7 Wpi n F ,IIS•—:< .' - ' : a ¢r i = is _ F a a V N O Z LLx 53:, _ =��' ii o'-°: U ^� .:.+. it al ; LLNF s O 0 CO 0. 4 �� III I E i $ } ill i 1 -''s i. Y - 3 .- � II�` III1I' 1 is _ ^ tiF9a is c w .J� w W o Ii!Ii1I!1I!hi iii C4 ^ 7 iii a=� �j/ Dil�z :E-Fi F ��/ az{a{ri LA I I t I ^ A A z z h •s lbIs s' w e , f e: $ 1` 1; m Q o L aq IE WU « ,. • Ws -' =e E M a aIT 112y.>. • ••�••;••s•s•�•��.••�' anyy °{ °; ¢0 a^aq *d ••i•! P4•1N II iip: ;i iiti!'iYiiV��• ti �. i i! r ;:t '`':7,17.1 lL va .i!)0-*74• a . 1g J •• y c. CEZ aY.Q fil 0•,mC r.y.,y, y�.l:• 0 ur. �tl�l �Tjm a,aasPi �_�" :��"� 3dtttt ; cepa = _ .an-ia.� UK Bri r:•ii: ����. rtRiF �. p•e co _ ,,,SSS Yel •;2n:, ill .-, -= cc j f i ; F i Aiitx ...h4s ` _ `z 4 1- A z i" d= =tea � t. ' §� 0¢ 'gill � ;. [9 ONS ti / li Sao -„-- ,. ^. Qom= p� O p-i a - E� 'Eton. ii �¢U n . _ f2 \ F f Uri a =R f wOU \ F i is E ti: n0¢ \ s �' In U c 2 tafFd \ Sl f Ur g a 2Ir. - Ii rP3i r.1 I\I\ \ • _ __� N I • f'fp..:it U-Kra m lL iiia m i . F 11;1'5 :ti Ood'W N ;2i \\ \ {a F �� OC T to afe tdc �.a _ t \. {[i F A ' r II i FF i axi6ai Um 33 e! �s 1 1di� I [, : Ucm .: , . a= *Ili .iso. a tus 3 3• I NI. $ ..f gi34 "r IN � I = Z pix F�tF i.LL6 �� i Z J � wj illy e� 6 a Pp-5e (<1._11- E F� YYYYtttt ;=F j{3 N s r_ 11, _$ f�,_ o t _• ecs; mo it!' {�D. sit.- Wiz=tP •�'ti g 3; s it; iii'; �Z 2; G QF:iE ; z€ {: {FF €6 €€jj [[ !x. ° t f �:� t! i li Agi iii i; Y s a sc l\ ppr i itfi=lz L� a \ LLH nCjill L a r t^ Ura n �� \ ao Ora PIO j _ _ L •Q I, } / N W W I N to f / Y s oV O i} I�-�4! t�-�i�1 p �' LU n if! : 1JI •i 1�1i•� !1 ~ �I ZttZ (• '6` • 1- P vw '— '� Q Z w ��!i t� ��',l i� It .. 'In wN2 x 3' di-i t i l 441!11 1 t.T Q'm�v O a (A 0 HAi '9 i ; • a = rs• O J O ® _ < ; 1'''‘S1‘ I lit t:": A , E.,.i; ot /14 1 14,• i'il -- 1- . L_____Ie - ,? El - -; d1„,....1..... ..,,,,—T. ® .1.'1^12...Z.1 s s - q• la` lit 'ftlt-- (I Si 4. . , i i z • J • 1 U .,-, 4 I < ' OOp Z z I •f - cc I` z Z r QN o '� =.4 I\ 1 ! tl \ = ;it: J Q •a �71 c!w n . .a yI � � �s = er� / aDo -- r $ is i : �/� n c 9.a.a �U /�/ t4�1 Pr a IL 5 1 f m'z e W 17 s I1 i, 444 1 o..... p 0...1.4.......* ei.}g i a:',1 u _El n Z . 010' i ! Ill i ' , .11 3i a --AI-- , el • {{ Wg Cr 1. 111EL.1 b 1❑.. • au � � 5 ! o Q;S ., r;..Si.. l u 0 J _/— . 'S4 I/!: illi 8 L?, :94 -i.1! ;_ !_ • t C ,:,.--_,.,=,....y _ °, =iriii 0 a K _ S N u s c „ \l'-'74i _., :is In ,. / § ip, \ ' I it A. ra A _ ! ra -,3)- s �=1 — / jai i m —' Sa. i^ a ag 1 CID Q —Ill q• I 0 N liQb #j i; ♦ f 5 d ea 1 a c7 .;. Ley!17,W #, g 0¢x " 5: 3RB{ fa E1 >-E_2 Y.G..", 6 zW �_ a ELT N / LLm n rsk 0" 1!Jr!' II g 0. n,; k 1 b - s • , ' w \o'.• .a sit: -i : • = _ ,,,,v/ ; :1 .,- m CV A -a- 40 ! , \ \ . 1 a a elII N n Q m m ( %; Cii co 0 co CI Lo 0 0 co LU 0 N \ to . / z \ a. \ 1` ( z - z < « •A M 0 w z > _ z w I @ ui ( 2 \. / f \ k°{; ! y§" !!i . \// : \ l§ }` aeGg �|!\ / ; % of1= : g ; .:!--- ===1 ° }^ _ /k( e!!/|! 5 � /� `F. ^ - . : §|;! `f ) - ` . d ,�§ _ Ui , ( | 6 m & , 41, 1111,„ _ _ (. �) _ - y 2 ... ,, . .. . , .._ , d! \ ihf / 2l q ■ � ;' / ! ! �oluo WO ( Vd /H_• • • - _ F) kMI .\ 11) ) : \ ! ; ■ ■. ; I | J)IA +I irsi, )q � ! % \/ G 11 'A I | . |) ' sl-.! 'au. _ „414 dI [� , <55 �I!\/� | Cig 3| \ : Si ! ■ (ƒ) 1 E U 0 } \ Z z F F p d PJ L �° G 5' 7 z , 9 - R I o 0 —� i m r F ( cin w o y�� _ I" I I— �r N "( T�•K�� Fir c Z ' 1 cls-` \ J$ •; eta: $ ri i - �. '1. .: i Y 7- . :� La .W.''4', . ,; \;i1f4.ACII.:':'..i. -. i fi "(4. % 47 y-..a,::--''4 1 '.:. z it 5 Ihmilligil 11\ - Will° ) itt; . .- -' ' ' : Arkr---' ' AP /IT / , l.i.:illi'-a. .: : .,ii:et . , _ :r .,-,- , -,:i.f.ohy. a• '%T —1 R V. 1 A . >� lie ill l i 0.4 / 'e2.''.' l— --- ,T _ - �i V i:i'(,q O ail 7 p - 'w FQ"ed Qtr- i..g- N '1 , {� • Eg �I RS L Iz - .• 1--- -t : Li, 1i:a 1(.1, , Vr i'44,4- �I 4t�'Ft3i E. * •--c� 1 • r - :� Fin v c, tir •sem: — ( �3!e OP\PER � -- — / /' ' I \,1w 1 a ` rF g SP z ' g I g 1k Pi t: r Le w. L_l . I— CHANHASSEN PLANNING COMMISSION REGULAR MEETING MAY 6, 1998 Chairman Peterson called the meeting to order at 7:05 p.m. MEMBERS PRESENT: Allyson Brooks, Matt Burton, Craig Peterson, LuAnn Sidney, Alison Blackowiak, and Ladd Conrad MEMBERS ABSENT: Kevin Joyce STAFF PRESENT: Kate Aanenson, Planning Director; Sharmin Al-Jaff, Planner II; Dave Hempel, Asst. City Engineer; and Phillip Elkin, Water Resource Coordinator BLOOMBERG COMPANIES REQUESTING SITE PLAN REVIEW TO REMODEL A PORTION OF THE FRONTIER BUILDING, WHICH IS PART OF THE ENTERTAINMENT COMPLEX, LOCATED JUST EAST OF THE CHANHASSEN CINEMA. Public Present: Name Address Nancy Mancino 6620 Galpin Avenue Vernelle Clayton 422 Santa Fe Circle Robert Davis 9973 Valley View Fred M. Oelschlager 7410 Chanhassen Road Clayton T. Johnson 1808 Hillside Lane Sharmin Al-Jaff and Dave Hempel presented the staff report on this item. Peterson: Other comments to staff? You talked about architecturally you said that...the recommendations are relatively vague in the conditions. Can you expand upon it a little bit more as far as what you were looking for when you talked about the roof...is that really it or how do you see the building? You define it that significant and architectural differences between...where are you at in that recommendation? Al-Jaff: Well right now the roof edge proposed it has one large roof with no breaks in it whatsoever. It lacks in architectural interest. We don't want to design the building for the applicant but we're making suggestions and one of them would be for instance utilizing dormers. That would give the roof line some interest. The same is used on Country Suites. You can also find something similar on the Dinner Theater so those would be just suggestions. Also with the brick. Right now you have veneer brick along the bottom of the building only. That could be extended up higher. You can see that along the Frontier building facing West 78`h. That would give additional architectural interest to the building. Some type of siding has to take place along Planning Commission Meeting - May 6, 1998 the alley. Again, that hasn't changed. It's still corrugated metal and staff does not believe that this is, what the applicant is proposing,we don't believe is an acceptable solution. Our conditions of approval basically addresses the roof as well as the addition of some type of siding. Peterson: Other questions of staff? Conrad: Sure. ...and this probably doesn't have anything to do with the application right now but do we have, is there a bigger vision for that back side area of the Dinner Theater? You know we've got a neat parking lot there now and the back side of the Dinner Theater is really pretty ugly and there seems to be, it seems to be an area that has some potential. It could be an entertainment area. There could be more than what we're just talking about right now but do we have a vision for that? It just looks outstanding. It looks like it's a cul-de-sac with all sorts of potential. To block off really the back side of the Dinner Theater, which is a functional area. Which is a working area,but in front of that,towards the parking lot, is anything happening? Aanenson: I can address that in a couple of ways. One, I think they've attempted to screen, such as the outdoor storage for Maytag and the dumpster so that's going to help to clean up some of the back but as you go further down, as you pointed out, one of the things that we are looking at now, which you may not be aware of. We undertook a parking study looking at the mix of uses and the potential for additional development back behind the Dinner Theater which would help screen and we want to still enhance the back of that. The applicants may want to talk to what they're looking at as far as further enhancing that property specifically but they are working to screen and enclose some of those storage areas and again put in additional development on the back of that area. Conrad: And it's an aside. It really has nothing to do with what we're talking about but it just looked like great potential. We have an entertainment area back there and you can put, theoretically we can put something up to screen the Dinner Theater and the working parts of that, yet making it something really quite attractive in that area. Anyway, that's an aside. The vision for the alley. What's our vision? You know the hotel side of it's not a pretty thing either so what are we doing? Are we cleaning up one side, the corrugated side versus the other side or what are we going to end up with? Al-Jaff: The alley will be paved. The sidewalk. Conrad: The gravel will go, okay. Al-Jaff: That will go. It is intended to be pedestrian friendly. Heavily traveled. Conrad: And the wall, on the inside of that whatever, what's happening to that wall? It is a pretty ugly wall there so. On the Country Suites side. Al-Jaff: On Country Suites? 2 Planning Commission Meeting - May 6, 1998 Conrad: Yeah. There's an office and there's a pretty ugly wall there so we're making recommendations to the Dinner Theater side but I'm just curious what we're doing to the other. I'm trying to set a standard you know as I, we take a look and making them upgrade it. This one side is bad and the other side is good, you know what have we accomplished? Al-Jaff: When Timber Lounge went in the, we completed the wall was stucco. Conrad: You took it back about 20 feet or so. Al-Jaff: Yes. Conrad: And the rest of the wall between that and the entertainment center is pretty bleak. So I'm just, my question is, what's happening to that? Is it staying that way? Is that the way it is is my question? Al-Jaff: We're talking about the wooded, the area... Conrad: It looks like concrete block and I'm not sure if I've got a good... Well the cinema has some really nice concrete to the surface of it but between that and the front of. Al-Jaff: That will be restored as part of the cinema. Conrad: It will be? Al-Jaff: It will be restored, yeah. Conrad: Okay. So our vision is a walking alley? Aanenson: Right. That's why we put the lights in there so people can park in the front. Go to the Timber Lounge and we wanted to make it inviting... Conrad: ...okay. And that's still our vision? Aanenson: Yes. Conrad: That's what we want to do? Okay. Aanenson: That was our concern about this side to making sure we still have that continuity and I think that kind of goes back to Alison's question that she had last week and how does this tie into the vision and I'm not sure that was articulated last time. How this works into the vision we had before of keeping that. Conrad: Okay. Next question. Do we care about TIF? Aanenson: No. 3 Planning Commission Meeting- May 6, 1998 Conrad: We don't. Aanenson: I think you should know that it's there but that's ultimately for the Council... Conrad: We don't care if they're got money. Aanenson: That's always been the planning, Council. Information to know but it's really the Council's decision ultimately. We're holding this to the standards that we believe it should meet. The Council will ultimately... Conrad: So we don't care if they get money from, it's not our job. Okay. What governs the metal wall? What is the ordinance...? Al-Jaff: The site plan standards, architectural standards prohibit corrugated,prohibits metal. You can use it as an accent or...top of the roof but that's it. It's... Conrad: Site plan standards. What's that? Aanenson: The zoning ordinance. It is in the zoning ordinance for design. Conrad: Okay. Last question. What governs the signage and the location of signage? You're recommending bringing it down. Aanenson: That's in the sign ordinance. Al-Jaff: And there is a variance... Conrad: We're letting them have it. We're just questioning where it should be? Al-Jaff: Correct. One of the conditions of approval of the variance is to bring it down. Conrad: And if we didn't like to bring it down, how could we rationalize not bringing it? How could we rationalize leaving it where they proposed it? What would give us the feeling that we could not follow the ordinance? Aanenson: If we were to go through the variance procedure and the criteria you'd look at that. Maybe you would say because this building's so architecturally significant that it merited something, a different type of a treatment. Some criteria such as that. I guess that's what we're saying is not there. Conrad: We need a positive. We need something. 4 Planning Commission Meeting - May 6, 1998 Aanenson: Well there's a hardship such that there's absolutely no other way to do it. That they would be denied something that everybody else has a right to visually see a sign. Something like that. Conrad: Could it be that? As we take it under, and you once take it off the roof, which is what they've done on the other side which would be real, that would be the integrity of the building. Aanenson: Although what they did do some different architectural treatments such as dormers that may be more difficult to put those up there. Also, they're significantly higher on the back side than they are on the front side. I understand what you're saying, that it would mirror what's happening on the front but these are a lot higher. Our sign ordinance only allows, the highest sign we allow is 20 feet and that's where these are. So it's really almost like a free standing sign. I'm not sure where your sight line's going to be. 20 feet seems pretty high for that type of traffic but. Conrad: You can't see the sign from the street?... Aanenson: No, I'm not saying. I'm not sure that that's, are they marketing to Highway 5? Are people... Conrad: No, we're giving them. They don't have a street frontage and so...there's no visibility except in the parking lot. Al-Jaff: The parking lot, you will be able to see... Burton: Yeah, I'm looking at the staff report and it talks about lighting and then it talks about the lights on the east side. No, on the west side. Are there any other... Al-Jaff: The applicant is not proposing any light fixtures on any other elevation. As far as parking lot lights, those are already there and they were constructed as part of the cinema. Burton: You don't think that...lighting on the east side, on the front or south?... Peterson: Questions? Blackowiak: I have another quick question. One of the conditions talks about the brick being higher. Can you define that? Do you have a specific height in mind or? Al-Jaff: Well it would be extended up to the roof line, similar to what you see along the north elevation facing West 78th Street on the Frontier Building. Peterson: Other questions? Burton: Yeah, one more. On the same condition...that would minimize the appearance of the corrugated metal and I believe I'm correct in that...whole side covered. 5 Planning Commission Meeting- May 6, 1998 Al-Jaff: Correct. Peterson: Any other questions? Seeing none, would the applicant or their designee wish to address the Planning Commission tonight? Clayton Johnson: Hi, I'm Clayton Johnson again from the Bloomberg Companies and I thought before Bob Davis runs throughout plan, I did want to give you,have an opportunity to answer your questions that were asked last time. I felt the public hearing was closed and there were a number of questions that were asked that we didn't get a chance to address and one of them seems to be we can't seem to bury this old entertainment center and I tried to make the point and is that the entertainment complex, as it was presented, is dead. It never got built. And our plan is a totally new plan that, a plan for the Frontier Building. It's the first time it's been presented. I think we've been characterized as all of a sudden changing the plan. We never changed the plan. We are a new applicant with a new use for all the Frontier Building. And there are several things about the old plan that you all raised concerns about that you know you don't like the new plan as well, or functional that relates to the use that we have found. And you know if you have any questions about that, the issue of TIF and some of those things, you know I'd like to be able to answer those. Some of those were asked last time. You must have concerns. Conrad: TIF is not our job. And to be honest with you, I don't know what the entertainment part was. Clayton Johnson: Yeah,as far as the vision, we've got a vision for the balance of the property to the rear. It's been, we've presented it on more than one occasions to the HRA. It involves, Herb's always envisioned an office use on a part of that property and I don't know if you're familiar with the current MLT proposal but basically that's an out growth of Herb's vision. A complimentary use to the Dinner Theater with the parking that is already there for the Dinner Theater would be able to be used during the day. We also envision further retail uses on the east side. However we didn't,you know we're not able to address those. There are current leases on those properties. Those tenants have rights and by agreement we presented this as a phased project and we're dealing with the Frontier Center right now. The east elevation is being addressed. You know the parking lot made that east elevation very visible. There's no question about that. And over there we were faced with four different types of material that we were trying to cover. So the decision was made to panel or to side that whole thing because it really was the only solution that would have been attractive. On the alley side on the other hand though,we simply disagree. You know the code issue is on new structures. This is an existing structure and very honestly we just have a very honest disagreement about what would look better. Herb thinks that a combination of the structural field panel with the billboards that we're going to erect there,and the way it's painted out, is going to look better than siding it. And it's about a $7,000.00 issue. We will side the building but we think it's a mistake. We think that siding on that big structure and that little alley is going to be less attractive. But that's not, that's just a judgment call. Otherwise I'd like Bob Davis to run through, I think the last time, parts of the presentation got missed and so Bob's going to run it through real quick for you. 6 Planning Commission Meeting - May 6, 1998 • Bob Davis: Good evening, I'm Bob Davis. I'm back. Our program here is to rework a building that is 33 years old. Was a lumber yard. It was a steel,metal structural building. I don't want to argue the point. The metal has been there 33 years. We think we can live with it in the alley. We hope you can live with it in the alley. It's not a driving street. We are adding a sidewalk down the alley. People can cross over. But let me go on with some of the items that we're covering here. The design is based on a retail space, what the owner would like to do, and the character of the Frontier complex. And let me go a different direction and remind you what the other buildings look like. Can you focus on the... One of the things that you'll see is a mansard, on almost all of these facades and the last work that Bloomberg did was the High Timber Lounge and that has the high mansard. It has the signs in front of it. Let me pass this around so you can get a good close-up look of it. On this building we're using the same architectural feature of the mansard roof. We're using the same sign pattern. We're raising, or rather lowering the glass on the existing old lumber yard building is 16 feet high. We're lowering it to 10 feet. We're bringing the mansard up here to lower the appearance of the building. This is a structural metal building that in all purposes here on the south side is being covered up. We think it's retail friendly. There are some tenants that would like to lease space here. If we go to the top elevation, the east elevation,as Clayton mentioned there were three different kinds of material on that side. There's some block. There's some wood. There's some metal. The solution is to side that whole panel. It's far more visible to the parking lot. Actually both parking lot areas, but the alley we feel that the metal siding which has been there, can remain. It's a narrow alley. It's not our vision that people would drive down that alley. But if people choose to walk, there is some interest created by these billboards which would have a theme of the history of the community. Let's look at the colors. ...we're looking at a silver, gray on that area where the side is. We're looking at a teal color, which is this color accent for the doors and trim. The brick is a red brick, similar color... building in front. If we take a look at that,the brick does not go higher than the, the brick has columns but it isn't a high wall of brick anymore. The whole brick idea is the same panel that is used all the way around the complex as a wood siding that comes up...and it's 30 inches high and...all around that whole block area. I think it's inappropriate to carry the brick all the way up. I would not choose to do it. I guess I don't want to argue the point... It's a building that really needs a new life. I think all the landscape questions you had last time have been resolved. If you take a look at this. We're quite intensively landscaping three of the corners... This is the alley here from the main street side down to where the cinema entrance is across the way here. This is where the sidewalk is added. The front of this building would be the south side and the entrance of the retail space has sidewalks. The suggestion about flower boxes I think is a good idea. Something that certainly this time of year, if somebody will maintain, could be a nice spark of color. This area will be highly landscaped...and I think we all agree that we're screening the air conditioning units. We're screening the dumpster areas and we're screening some of the loading docks. I'd just like to ask if there any other questions that I can help clarify? Does anybody have anything that needs further explanation? Conrad: Talk to me about signage a little bit. Do you want to talk about that now or should we do it later? Bob Davis: Yes. I think we're matching the High Timber Lounge signage. That has a high mansard roof. The signage is up high. I think this is the place to put the signage. It's on a 7 Planning Commission Meeting- May 6, 1998 parking lot, it's not on the street. If you take the cue from all this other frontier complex, the signs are the same. We're matching what we're doing in the high, what we did on the High Timber Lounge. I think it's inappropriate to pull them down under the mansard. Clayton Johnson: ...we're designing a retail building with a lot of flexibility. The whole... In other words, we don't know exactly how many square feet... One of the reasons for putting the signs on the roof is because we don't know how many tenants we're going to have and how many signs. Once you go to the suggestion,and to bring the signs down below the mansard, you end up with three spaces because there are posts that allow for three spaces. If we were to do that, then we'd have to have the flexibility of going over and putting the signs on the wall, because we don't know how many tenants... So that's one of the reasons. Vernelle did you have... Vernelle Clayton: ...You talked about the signage being, I think it's a real part of architectural element. I guess I'd disagree with the staff report. I think if the signs were on the mansard roof it could be considered to do that. I also, from a perspective,and this frequently unless they're talking about the development and this particular case of while historically I would assume the same thing for the same building. This time I am involved in working with someone who is wanting to be a tenant there and signage is very important to them. They are not at all happy with having signs under the, what we're calling the mansard roof and I don't believe it's a roof but under the mansard. It's not very visible. It's not going to be very easy to have attractive looking signs. There's going to be no background for the signs because behind the sign will be the clutter of the windows and so forth. And visibility is important. If you go out, if you go and sit in the back of that parking lot, coming off Pauly Drive,they will want to be able to be seen from people driving up, not only once you get to the parking lot. So I think that the building will look better with the signs on the roof. I think the mansard will look better with the signs on it and I think it will look better for the building because all the rest of the signs are on what we are calling roofs. Now as I said, I don't think that the roof, I think it's just an attachment to the wall which historically all mansards are anyway. They're not roofs. They're walls. They were made originally to avoid having to pay taxes on wall space in Europe so they really are walls but I guess I just want to be clear that it will be a disadvantage and a hardship for the tenant if they don't have signage that is easily seen because that's a remote spot. I also wanted to mention something about the alley while I have a chance. Historically I've been involved in two projects that related to the alley. Always it was seen...pedestrian oriented walkway. On the last go around, when we talked...kind of lumped together as a"entertainment complex". Which started out as kind of an acronym and kind of got to be...but there's nothing that says that legally it is. We just kind of called it that. At that time the alley was perceived to be something that we would hope to be a little bit fanciful. Kind of fun. At the time we were at the dialogue during the presentation as it were, that based on the comments...even graffiti,planned graffiti... So to summarize then,I think this is,his ideas of the representations of some of our history, with the train,the farmer, and the Indians I guess, or whatever they are. Frontiersmen,okay. Yes. Are kind of a good,a nice kind of fun, intervening kind of thing and I'd like to see those there. I think they're kind of cute. The other side of the wall,just to be perfectly,to clarify, the other side of the wall, everything that is opposite that is the cinema. The hotel starts farther to the north. That's all cinema. They're going to paint it. I think they're past the rough spots and it 8 Planning Commission Meeting- May 6, 1998 will be painted. So it's not going to be anything really gussied up. It's just going to be painted. So we need a balance. And whether you like the corrugated or not, I think the corrugated with the signs, with those, are a lot more fun, I'm sorry, than a flat surface of wood boards. Peterson: Other questions of the applicant from fellow commissioners? ...can answer it obviously. One of the staffs conditions that I alluded to earlier was their condition about adding architectural interest to the mansard roof. Can somebody respond to that? I mean are you thinking of entertaining that idea? No pun intended there. Bob Davis: No. It would be truly a fake dormer for nothing, would serve no purpose. I mean if I can see it was a ventilation for something or it was a window to someplace or, the one on the Dinner Theater actually has a function. I don't want to get caught up on just adding something because somebody thinks it looks better than somebody thinks it looks. I think we need to take the direction from the owner of the building, from the retail tenants who are here and from the frontier complex itself, which really started the idea of the wood shingle roof and shingle mansard. And it's 35 or 40 years old. Peterson: Not putting words into your mouth, you're saying that architecturally right now, the way you presented it is where you want it to be. Bob Davis: Yes it is. Peterson: A number of the conditions that the staff has presented, you're still not in support of is what I'm hearing, right? Bob Davis: I think my charge was here, not to be argumentative. Peterson: ...clarification is where we're at. Bob Davis: But no, I stand on that...what is the dormer for? Aanenson: To add interest to the building. We have fake dormers throughout the entire community. We have them on the hotel next door. I mean your picture doesn't go to the building next door which has pitched roofs. We put them on the new hotel going in. We have fake windows over there too. It's to add architectural interest instead of the mansard roof. I mean people do that all the time. Bob Davis: I think I'll let the owner of the building, if you want to negotiate that, I'll let it go there. Clayton Johnson: I ran it by Herb tonight. You know I guess what do you do? Do you tell Picasso to make the ears bigger on the drawing? I don't know. I'm in the middle but basically we presented that and Herb's vision is that's his architectural vision. And he doesn't, you know the dormers on the Dinner Theater are functional. They're offices. There are windows. I don't know what they did on the hotel. We didn't build the hotel but yes. I ran it by him. You know 9 Planning Commission Meeting-May 6, 1998 there are things that we're willing to compromise and things we're not. We unfortunately, you do have to understand the economics a little bit because there is this conception, or there is this perception the city's going to pay for it. The first thing that happens is, we spend a half a million dollars, $550,000.00 remodeling the building. The second thing that happens is are taxes go from $25,000.00 to $75,000.00 a year. We have to make an economic judgment that what we do to that building is going to functional and going to be of interest and going to be rentable. So when it comes to that, and I'm faced with making the economic decision, who do I rely on? I will rely on Herb. That was the whole purpose of bringing the people here the other night. They weren't here to offer testimonials of Herb. They were here as neighbors saying we like his architecture. We're happy with his design and as an officer of the company I have to bet on that. We are going to be dependent on the financial success and we have had a long history of building buildings that people like and will occupy. So I don't know what more to say. It's an honest disagreement. We're not disagreeing to be disagreeable. It's an honest disagreement. Peterson: Other questions of the applicant? Seeing none, this is not open for a public hearing so I'm just looking for comments from my fellow commissioners. Fred Oelschlager: Can I just say one thing about, Hempel right? Hempel: Yeah. Fred Oelschlager: I'm Fred Oelschlager with Bloomberg Companies. I've been with him for 40 years and to address the questions you had about the sheeting of the water coming down the side of the building. Sharmin and I talked about that I think the first part of the week and shortly after our conversation Steve Kirchman called me because I did talk to him and bring it up to him and so forth. And we had about a 15 minute conversation on the phone about the sheeting of the water on the alley side of that building. And the reason there's gutters and will be gutters on the east side is because we have an erosion problem if we don't have gutters on the east side. That's the Dinner Theater side. Steve basically does not have any problem, in our conversation with the sheeting of the water coming off of that balen roof, which is an oval roof. It comes off uniform. It doesn't shoot out more than about a foot to 18 inches when it does come down. He wanted to know the volume of water that would come off of there. We're researching that right now. He is not insistent upon a gutter. He says it's not necessary. If we have a problem and gutters would have to be used somewhere in the future, we could address it at that time. As of now, the water would come off in a sheet. Hit this flume and still come out every 30 foot intervals underneath the sidewalk into the alley, like the cinema is doing right now. Clayton Johnson: And into the storm sewer... Fred Oelschlager: Right, right, because there are storm sewers... So if that answers your question about whatever. Okay. Peterson: Do you want to respond? 10 Planning Commission Meeting - May 6, 1998 Hempel: Mr. Chairman. I guess I'll disagree a little bit with that. During the summertime and so forth I'll agree but during the late winter, early spring where we do get a lot of freeze/thaw, that dripping will have icicles. You'll have icicles dropping off the roof as well onto a sidewalk area so I guess I would strongly recommend the use of downspout roof gutters is the recommendation. And also there is a storm sewer down the alleyway. They're not proposing to tie into it. It's simply a gutter drain underneath the sidewalk and flow out into the alleyway which is acceptable. The cinema's doing it that way but I would think from an icicle standpoint, that you'd want to look at doing something with that. Fred Oelschlager: Can I just rebuttal on one thing. I meant to mention that at the top here also. ...because water can't away...sheeting operation like that...never have any problems on that building. We did have icing on the cinema building...but putting a gutter on the alley side would cause more... I mean I've been here 40 years, I know what that roof does... Peterson: ...another disagreement. Fred Oelschlager: Well Steve,when I talked to Steve he said if we do have problems...and maybe we can make adjustments at that time. Peterson: LuAnn, do you want to start this one out? Sidney: Sure. I'd be happy to. I had a lot of thoughts about this application and I guess maybe I'll start off with kind of the overall issue that I'm kind of wrestling with and I think the applicant has talked a lot about blending architecture. You know continuation of the architecture from the rest of the complex and I guess I'm having a hard time with that because on the south side of the building now we started a different type of architecture with the cinema and I would think that that would be the focal point where your architecture would tie in to any other buildings that would be developed in that area. So I think the idea that, you know the architecture should reflect the Dinner Theater architecture, I'm not sure if I'm really convinced that it should. And I see this building as a transition between the cinema and the Dinner Theater style of architecture. And at this point I see it more closely tied to what you've already done and it, to me it isn't really showing some you know new type of innovative design that would kind of enhance that south side of that whole complex. So I guess what I'm trying to say is that I'm a little concerned about still the overall architecture and your insistence on a mansard roof but you know I can see where, you know I can live with it but I'm still rather confused by it not tying in with the cinema. Fred Oelschlager: Can I put... Peterson: Let's go through all the comments. I don't think we're going to get response to every one of them so. Sidney: So I guess that's my overall concern and I think when this was presented to the HRA and City Council, you know you were to the point where you were talking about colors of bricks and basic architecture was discussed at that time and I see what was presented at that point, tying more into what the cinema has developed into at this point. So I'd like to jump to a few other 11 Planning Commission Meeting - May 6, 1998 points, specific ones about the corrugated metal. I'm concerned that, I don't think we want that on the side of the building to be visible. We can see it in your photo and we're remarking about that and I don't think it really adds to the appearance of the building. And so I would really want to see us strive for a higher quality material on that side of the building. A few other things. I guess my concern, I guess there's a lot of concern about the signage and I think I'm in agreement with the applicant at this point because I do think the building needs to be really supported by a visible sign. It's in a remote location. I think the applicant does need a break in terms of signage. I'll see if there are some other things that I could comment on here. Maybe I'll leave it at that and have the other commissioners comment. Peterson: Thank you. Matt. Burton: I sort of feel like I'm being pressured to like something that I really don't like...like very much. As we discussed at the last meeting, this is anticipated to be one of the most frequented areas of the city. I think the staff has...held it to higher standards, sort of like the theater and what I think the entertainment complex was envisioned to be. And I don't see this design meeting those higher standards and in terms of just general appearance and design and materials, as LuAnn mentioned, I do not like the corrugated metal on the side. I think that putting, finishing the side really almost anyway it would be an improvement to what's proposed. I find the front to be unappealing. I don't think taking the 78`h Street Frontier complex look around to the back translates very well aesthetically. I think, I tried to figure out why and I think it's just because it's so much bigger in the back and so much higher that it just, I don't believe it works and I know that's a fundamental disagreement that you have with a lot of the comments that have been made. I think that the mansard look,and I don't know if I'm using the right terminology but the big, the mansard hanging off the, over the roof on the south,to me it looks dated also and I look at what was given to us and what was the prior application and I find that significantly more appealing and I also,when I look at that I see without the mansard there and having...wall, you could lower the sign so I think that, those two could go hand in hand. So I guess that's basically it. I just don't really like much about it at all. I agree that the staff's recommendation of the brick veneer should be elevated if this is the plan that we have. And I agree with the staff conditions, but based upon what I'm seeing here, I don't believe that I could support this plan because I just don't think it fits at all into what's envisioned for that area of the city. Peterson: Thank you. Alison. Blackowiak: I still don't know how I'm ultimately going to vote tonight. I have been struggling with this as well. And again architecturally maybe I just don't like it but I guess that's not my main problem. My problem is how does it fit in with the area. Mr. Johnson said that the original plan was dead. That this is not the original plan but although we're not supposed to consider TIF, they were given money based on an original plan and I, I don't know. As a taxpayer I just have a problem giving money to something that I really don't like. And I don't know. I don't want to get into that right now. The mansard roof I don't really think fits with the cinema. We've got an area right now. I think we need to think about how it ties in with the whole southern exposure. This would probably, and if it had a northern exposure. If it looked out onto the parking lot to the north. If it looked out onto the parking lot to the east maybe. But on the 12 Planning Commission Meeting-May 6, 1998 south I don't think it really fits. Matt made a good point about the size of the building and I think that's part of the problem. When you look at how tall the building is, adding a roof,or the mansard in front, is just going to make it look taller and I don't know if that's really what we want to have. It's,aesthetically I'm having a problem with the look of the building. I do agree with the staffs recommendations. I agree that if we do go with this plan,we need to have the brick go all the way to the top. I do not like the corrugated metal on the west side. I do believe we should have some sort of a water catch system, whether it's downspouts or whatever because I'm not convinced that we're not,pedestrians going down that area aren't going to get drenched at any given point from water sheeting off the building. I don't know. I don't think it fits well with the existing cinema and unfortunately the cinema got there first and maybe is tending to set the standard for that area. I don't know if that's good or bad but I think I would like to see this tie in more with the cinema than with the Dinner Theater. Peterson: Allyson. Brooks: Well, I think something really needs to be done with the building as it is now. I mean it really is an eyesore. I'm not overwhelmed with this design. I'm not under whelmed with this design. I think I'm like Alison. I have really mixed feelings. I would love to see something happen in that area. This gives me kind of a bland feeling. I don't think, if we go with this design,to me the signage is okay on the roof. I don't really have a problem with it. I do agree with Vernelle that people do need to see the signs somehow. And for the rest of the recommendations that the planning staff has, I do think we should go with the planning staff. I think they have,they really do have good vision for our community and that we should continue to follow their direction. Peterson: Ladd. Conrad: Isn't it a nice testimonial? Boy,this is sort of...we get into architecture and stuff like that. Thank you for coming back and making the presentation better. I feel better about it. I felt you made some changes and that helps. These are tough issues you know we get into. Architect versus some standards and it gets messy. I can't really figure out some of this stuff. I just can't . so I mean I have to roll with the staff report. I'm not convinced that the alley is going to be, you know I wouldn't make the alleyway a big deal because the flip side of an alley is not a big deal. We're not going to have a beautiful alleyway,walkway there but staff report I think covers it. I really do. I'm comfortable with that. The only thing that I disagree with on the staff report is the signage. Just,we all have personal opinions on this whole thing so that's why we can't even talk about it. You know we've got to rely on the staff to help and stuff but the nice thing about architecture is difference. It's not the sameness. At one point in time we were going to have the whole city being a frontier style city. Isn't it nice that it's not. You know just, so to think that we should match the entertainment center,no. That's boring. That really is boring. I think the variety back there, I think this is fine. Is this my choice? Probably not but that's not my business. I think it will add some variety back there and that's okay. I'm more interested in how else we can, what else we can do back there. I think that's a bigger issue but at hand, you know staff report's fine. Other than the signage, I'm not comfortable with the applicant's signage, yet I don't want to bring it down below the roof. I think that will hide them. I think that's a problem. 13 Planning Commission Meeting - May 6, 1998 I think that destroys some of the visibility and signage is so major in these buildings. It is just a big deal so I'm sort of begging the question here and,not begging the question. I think the staff report is pretty close to being what we should follow. Peterson: Well,you've obviously heard opinions. Across the board from staff. From fellow commissioners and I guess I too have opinions. I'm struggling as to how to articulate them and I think that in many ways we're tasked by the City Council to offer our opinions and recommendation about a lot of different things within the zoning and architectural consistency and compatibility and I think that's really what you're hearing tonight. And we're dealing with Herb's opinion tonight. You guys may not even agree with him. What we're trying to do is listen to your comments. Listen to staff's comments and sort through what's best for the city in that area. And as I gather that, I'll get to you in a second. I'll get to you in a second. Let me finish my comments. As I get to that, and my opinion is not dissimilar to some of my fore colleagues in that architectural compatibility, I just don't see it fitting in to what I envision for that area. Whether you call it the entertainment complex is dead. I don't know if anything is dead. Something will go there and we're going to be asked for our opinion on that also. And I clearly do think that Ladd's comment about Chanhassen was once going to be a frontier city, now aren't we glad it's not. Some people may be glad. Some people may not be. And I think that there's a balance and I think right now where I'm at is that the balance is, this is not the way that I see that area going. I would not support the development...as presented without adhering to the staff's comments in totality. That means that I have a difficult time approving this because the staff is asking for some architectural change that I don't see. I can't approve something that is being asked for in a pretty generic sense. Those are my comments. I saw a hand in the audience. I'd be happy to entertain. Joseph Boyer: I really didn't come here,to this meeting for this but anyway I just wanted to offer my comments. I've been in the building business in this area for 55 years and my family continues on and we have dealt with the Bloomberg Companies and Herb Bloomberg and all their designs and their architecture of their buildings has been excellent. If Herb Bloomberg told me he could make a corrugated building look like a crown jewel, I'd have to believe him. Because this man is that kind of a person and I think what they're giving you is another Bloomberg good design. Very functional,well designed building because that's been their nature. That's their character. That's the way they've always worked. That's my experience with Mr. Bloomberg. Thank you. Peterson: Thank you for those comments. Hearing all the comments from the fellow commissioners,may I have a motion and a second please. Conrad: I'd make the motion that the Planning Commission approve the site plan for the Frontier Building, 98-7 SPR with a variance to allow signs on a building that does not have direct frontage on a public street as shown on the site plan dated March 23rd, 1989. And revised on April 27th, 1998, with the conditions as listed in the staff report dated May 6th with the following changes. That we strike the first line in condition number 6 and that we add a condition number 15 that the applicant work with the City Engineer on the appropriate roof drainage on the west side of the building. 14 Planning Commission Meeting- May 6, 1998 Peterson: Is there a second to that motion? Brooks: I'll second it. Peterson: Any discussion? I don't know how I want to either ask for a friendly amendment or not. On condition number 12, that's a huge condition and I have a hard time voting, passing this onto Council and basically saying let them deal with it. Conrad: Absolutely Craig. Peterson: I think, that's my only concern. On that note I will ask for a. Conrad: Can I respond? The Council will have opinions. Why keep it here? We don't know what...we can't guide these folks and the City Council and the Bloombergs but... Peterson: We've done our civic duty. With that may I ask for a vote. Conrad moved, Brooks seconded that the Planning Commission recommends approval of the site plan for the Frontier Building (98-7 SPR) with a variance to allow signs on a building that does not have direct frontage on a public street, as shown on the site plan dated march 23, 1989, and revised on April 27, 1998, with the following conditions: 1. All existing and proposed roof top equipment shall be screened from views, specifically from Highway 5. 2. The applicant must obtain a sign permit prior to erecting any signage on the site. 3. The letters and logos shall be restricted to 30 inches in height. All individual letters and logos comprising each sign shall have a minimum depth of five inches and shall be constructed with a translucent facing over neon tube illumination. Tenant neon illuminated signage shall consist of store identification only. Copy is restricted to the tenant's proper name and major product or service offered. Corporate logos, emblems, and similar identifying devices are permitted provided they are confined within the signage band and do not occupy more than 15% of the sign area. The applicant shall consider utilizing a font/sign style that is compatible with the building. 4. The applicant and/or their assignee shall be responsible for any additional sewer and water hook up charges associated with remodeling the building based on the number of SAC units determined by the Metropolitan Environmental Sewer Commission. 5. Fire Department recommends the following policies be followed (copies attached). Policy#01-1990 Policy #02-1990 15 Planning Commission Meeting- May 6, 1998 Policy#04-1991 Policy#06-1991 Policy#07-1991 Policy#29-1992 Policy#34-1993 Policy#36-1994 Policy#40-1995 Policy#44-1997 6. The west elevation shall be redesigned in a fashion that would minimize the appearance of the corrugated metal. The brick on the building shall be extended higher. 7. The applicant shall enter into a site plan agreement with the City and provide the necessary financial security in the form of a letter of credit or cash escrow to guarantee compliance with the conditions of approval. 8. The applicant shall add some architectural interest to the mansard roof along the south elevation. This could be done in the form of dormers. 9. The applicant shall add flower boxes around the base of the columns along the south elevation. 10. The design should be revised to collect the roof runoff into downspouts and conveyed underneath the sidewalk. 11. The applicant shall work with the City Engineer for the appropriate roof drainage on the west side of the building. All voted in favor,except Burton and Peterson who opposed, and the motion carried with a vote of 4 to 2. Burton: Basically I articulated earlier. Even with the staff's recommendations, I still don't think it fits in to the area back there. I just have too many problems with this design in that location. Peterson: ...the simple fact is, I want to be sure we get Council's attention that it needs some more work. Motion carried. PUBLIC HEARING: THE CITY OF CHANHASSEN (LGU) DURING THE YEAR 1998 HEREBY PROVIDES NOTICE THAT IT HAS APPLIED FOR A WETLAND ALTERATION PERMIT AS PART OF THE 1998 TRAIL PROJECTS. THIS APPLICATION PROPOSED TO IMPACT 1.4 ACRES OF WETLANDS ALONG PORTIONS OF HWY 7, GALPIN BOULEVARD, POWERS BLVD, GREAT PLAINS BLVD,AND PIONEER TRAIL. THE PROPOSED IMPACT FROM THE TRAIL PROJECTS WILL BE MITIGATED BY 16 Planning Commission Meeting- May 6, 1998 THE CREATION OF NEW WETLANDS AND WETLAND CREDITS FROM THE CITY'S WETLAND BANK. Public Present: Name Address Eileen&Joseph Boyer 3630 Virginia Avenue Jim Sommers 8683 Chanhassen Hills Drive No. Chris Hol 8687 Chanhassen Hills Drive No. Phillip Elkin presented the staff report on this issue. Peterson: Questions of staff? Conrad: Impact on a high grade wetland? Elkin: No. They're all, they all have been either impacted by agriculture or most have been impacted by road construction. Conrad: The BluffCreek wetland Phillip is, what is that? That's the biggest one. Elkin: Right. Conrad: What kind of wetland is that? Elkin: That's still ag urban. If you look down there,they still farm as much as they can. It's just been classified a wetland because over the years the draintiles have broken and it no longer drains effectively to farm so it's a very low grade wetland. Dominated by reed canary grass. I haven't been up here for a while. I wanted to talk. Peterson: Let him go. Other questions? This item is open for a public hearing. May I have a motion and a second please. Sidney moved, Blackowiak seconded to open the public hearing. The public hearing was opened. Peterson: This is a public hearing. Anyone wishing to address the Planning Commission,please come forward and state your name and address please. Conrad moved, Blackowiak seconded to close the public hearing. The public hearing was closed. Peterson: Comments. Ladd. 17 Planning Commission Meeting- May 6, 1998 Conrad: It's a good way to approach... Peterson: Allyson. Brooks: I don't have any comments. Peterson: Alison. Blackowiak: No problems with this. Peterson: Matt. Burton: No problems. Peterson: LuAnn. Sidney: Looks good. Peterson: ...thorough. May I have a motion please. Blackowiak: I'll move that the Planning Commission recommend adoption, recommend the City Council approve the Wetland Alteration Permit 98-1 as shown on site plan drawings prepared by Howard R. Green Company, March 9, 1998 and subject to conditions 1, 2 and 3. Brooks: Second. Peterson: Discussion. Blackowiak moved, Brooks seconded that the Planning Commission recommends approval of Wetland Alteration Permit#98-1 as shown on the site plan drawings prepared by Howard R. Green Company, March 9, 1998, and subject to the following conditions: 1. Wetland Conservation Act and the City of Chanhassen Surface Water Management Plan requirements. 2. The applicant receive permits from the jurisdiction agencies such as the Army Corps of Engineers, MN DNR and the Bluff Creek Watershed District. 3. The applicant shall develop a sediment and erosion control plan in accordance with the City's Best Management Practice Handbook. Type III erosion control fencing will required around the existing wetlands. All voted in favor and the motion carried. 18 Planning Commission Meeting - May 6, 1998 RSS/PERMA GREEN, INC. REQUEST FOR A CONDITIONAL USE PERMIT AND SITE PLAN REVIEW TO ALLOW A GOLF IMPROVEMENT CENTER/DRIVING RANGE TO BE LOCATED SOUTH OF THE INTERSECTION OF GREAT PLAINS BLVD. AND TH 212 ON PROPERTY ZONED A2,AGRICULTURAL ESTATE DISTRICT, RSS GOLF IMPROVEMENT CENTER. Peterson: Item number 3, RSS Perma Green has been deleted from tonight's public hearings. Aanenson: If I can just comment on that. Because we do have to notice and we wouldn't make the time limit for the 20`h, it will be on the June 3`d meeting. At that time, it does require a conditional use for altering the flood plain. It does require interim use permit for the golf. It does require a wetland alteration permit and also they're asking for some variances to the code so there's about 6 items that we'll be doing. It's pretty complex even though it's a small use. So because we hadn't noticed all those issues, and to meet the legal requirement, it's going to be another cycle so it will not be on in 2 weeks but rather a month. We have had two very productive meetings trying to resolve some of the issues and I think we're moving in the right direction. We do think it's a reasonable use of the property but we want to make sure that we have a good enough understanding of the issues so we can appropriately mitigate the impacts of that. NEW BUSINESS: Aanenson: I had tentatively looked at putting on the comprehensive plan public hearing next, in two weeks. We do not have all the information back from the consultants doing the traffic study and the sewer comp plan final data. We are typing it into an easy to read format...make sure you have enough time to read through that before we call the public hearing. Right now we have that scheduled for the first item in June. That meeting. I propose to take as many meetings as we need to get through that. It may take two. It may take three. • APPROVAL OF MINUTES: Commissioner Blackowiak noted the Minutes of the Planning Commission meeting dated April 15, 1998 as presented. ONGOING ITEMS: Aanenson: As long as Phil's here, I'd like to let him tell you a little bit. We had a work session, he talked about the project he was going to do on Lake Susan and that's been underway and it's pretty exciting so maybe he can take a couple minutes and talk about it. Elkin: All right. You may have read in the paper,we've been,an ongoing project with Lake Susan this winter. We took out part of the problem with Lake Susan is there's very little game fish, very eutrophic or a lot of algae. We've been trying to get the algae under control so we did harvest 20,000 pounds of carp this winter along with 10,000 pounds of bullhead and nets were put out this spring and we have taken an additional 30,000 pounds of bullheads. They were all 19 Planning Commission Meeting - May 6, 1998 about the same size. Stunted growth. A quarter pound. We got those out. The alum treatment came. Before the alum treatment was done, we had a seci disc reading of 2 Y2 feet. A seci disc is the white, black and white disc you put in the water to judge the, you drop it in until it disappears and that determines, gives you a rough idea of how much algae clarity is in the water. A week after the alum treatment we could see all the way to the bottom of the lake, so 17 feet. So it did increase dramatically. Unfortunately, it hasn't maintained that. We don't know how much it's declined but with all the sun and very little rain, it's subject or conducive to a large number of algae growth so it's still very clear. You can, it's very noticeable if you walk around the lake how far you can see out compared to years past but we have noticed some more vegetation taking hold where it hadn't been before so it's looking good so we're real excited about that and keep, if you get a chance go down there and look off the dock and you can, it's a noticeable difference. Peterson: They were water skiing on Sunday. Elkin: All right, great. Peterson: With wetsuits on. Aanenson: If you go out to the pier, you can see to the bottom off the pier so I'd encourage you to take a walk, take a look at it. Elkin: If you also have a chance, we did some plantings on the wetlands across from Applebee's and we did that on Arbor Day. I was out there today and four lilies are coming up so it's, we have about 7 different types of species out there that we planted so that's another thing to look for so. Peterson: On the west side? Elkin: Both sides. All along, in the water. We planted from about the edge of the water to about 4 feet deep. And then we planted a strip of wild flowers along the whole perimeter of the wetland so. We need rain. Peterson: Not to wash it away though. Elkin: No, that's right. Peterson: Open discussion? Burton: Is there going to be any construction activity at all that you're aware of at the Villages? Is there anything, I just never see anything going on out there. Aanenson: Yeah. They do have the projects approved. They're in for building permits. Working through that. There's a couple issues that need to be ironed out as far as some utility stuff but. 20 Planning Commission Meeting- May 6, 1998 Blackowiak: You said they. Houlihan's or? Aanenson: Famous Dave's. Those two. Blackowiak: Oh Famous Dave's,okay. Brooks: Any of the retail sites coming in? Aanenson: I haven't talked to Vernelle about the leasing. How that's going but I don't think that they're ready for that phase yet. Two restaurants are coming in... Conrad moved, Peterson seconded to adjourn the meeting. All voted in favor and the motion carried. The meeting was adjourned at 8:17 p.m. Submitted by Kate Aanenson Planning Director Prepared by Nann Opheim 21