12-4-91 Agenda and PacketFTLE
AGENDA
CITANHASSEN PINNNING COI{T,IISSION
I{EDNESDAY, DECEI{BER 4, t99)-,7:30 p.tt.
CITANHASSEN CITY TIALL, 690 COULTER DRIVE
CALL TO ORDER
PUBLTC HEARINGS
Zoning ordinance Amendment tofor recreational beachlots.
Prelininary Development PIan and rezoning to pUD, planned UnitDevelopment of 94 acres to create 10 industrial lots locatedsouth of the Chicago, Irlilrraukee, St. paul and pacific Railroadand east of Audubon Road, Chanhassen Business Center, RyanConstruction.
1
2
3
4
reguire an interin use permit
*TTE}I DELETED *
Conditional Use perrnit Anendment/InterinProgless Va.L1ey Storage on property zoned BF,and located at 19OO Stoughton Avlnue, Gary
Dungey.
Use Permit forFringe Business
Brorrn and Gary
Zoning Ordinance Amendnent
and ride Lots.concerning bus shelters and park
NEW BUSINESS
APPROVAL OF UTNUTES
CTTY COI'NCI L UPDATE
ONGOTNG TTEMS
ADI{TNTSTRATIVE APPROVAI,S
OPEN DISCUSSION
5. Review Lowe1 I Carlson Site plan.
ANTOI'RNUENT
CITY OF
EHINH[SSE[I
PC DATE: t2/4/9L
cc DATE: l/L3/e2
CASE #: 91-4 PUD
By: Aanenson/Krauss/ka
Fz
C)JLL
E
lrj
Ea
Prelininary and Fina1 Plat Approval for Rezoning of
Property fron A-2, Agricultural Estate to PUD, Planned
Unit Developnent-Industrial for the chanhassen Business
Center
Located south of the Chieago, l,lilwaukee, st. PauI and
Pacific Railroad and uest of Audubon Road
PROPOSAL:
IOCATION:
APPLICANT:Ryan construction conpany
700 International center
900 Second Avenue South
Minneapolis, MN 55402
PRESENT ZONTNG:
ACRE,AGE:
DENSITY:
ADJACENT ZONING AND
I,AND USE:
WATER AND SEWER:
PHYSICAL CHARACTER. :
A-2, Agricultural Estate
93.7 acres
water is availabLe for entire site, sewer is
available for Phase I. A feasibility study
may need to be courpleted before approval of
Phases II and III.
N - A-2, vacants - A-2, large lot residential
E - PUD-R, Lake susan Hills 3rd Addition
w - A-2 & IoPt Tinberwood Estates,/vacant
The site is currently being farmed and
contains a soybean field. There is a class B
wetland on the site protected by the city and
Arny Corps of Engineers. Bluff Creek runs
through the western portion of the property.
STAFF REPORT
chanhassen Business center
Ryan Construction
Deceraber 4, L99l
Page 2
PROPOEAL,/SI,Uu,ARY
Ryan construction conpany, the applicant, is proposing to develop
an industrial park south of Highway 5 and adj acent to Audubon Road.This site is a triangrular parcel which is approximately 94 acres insize. The proposal consists of a conbined prelininary and finalplat for rezoning fron A-2 to PUD. Prelininary plat approval isalso being reguested as is approval of an Environmental" Assessnentworksheet for subDittal to the Environmental Quality Board.conceptual approval was given by the Planning Conmission on
Septenber 4, 1991, and by the City Council on SepteDber 23, L99I.
Ryan Construction will be the owner and developer of the BusinessCenter.
The site is triangular in shape bounded on the north by theChicago, Milwaukee, St. Paul, Pacific RaiLroad, on the east by
Audubon Road, and on the south by a farn that is currentLy zoned A-2 but is guided for Lou Density Residential uses. Lake Susan Hills3rd Addition is located to the east of Audubon Road and is zoned
PUD-R, to the rrest Tinberwood Estates Subdivision zoned RR, and tothe north of the subj ect site the property is zoned A-2.
The preliuinary proposal calls for ultinate developnent of TOO,ooosquare feet of building. The uses include 20* office, 25*industrial, and 55t varehouse. The project will be called
Chanhassen Business Center (CBC). All of the lots will be accessedfron Lake Drive except for Lot 1, which is proposed to have direct
access on to Audubon.. Access to this si.te is fron an internal cu1-de-sac off of Audubon Road. The project includes 12 Lots fordevelopnent and two outlots. The CBC will be developed in twophases over a period of several years.
Staff had directed the applicant to prepared an EAw, including atraffic study. The EAw and traffic study are discussc i in greaterdetail at the end of the Proposal Sunnary section. The trafficelenent of the EAW states that with the first phase of developnenta traffic signal vill be warranted at T.H. S and audubon Road. Inthe EAW, one of the roajor areas of concern will be the developmentof the retention pound and the reatignment of the flood plain inOutlot A. After the Planning Connission has made their
recorlmendat j.on on the prelininary site plan, staff will publish inthe Environnental Quality Board lronitor publication, a-notice ofthe 30 day cornment period.
The intent of a PUD is to develop flexibte zoning while creating ahigher- standard of developnent. part of the iUD process is toestablish development standards by which site plans wiIl berequired to adhere to. This pUD will be governld by a finaldevelopnent plan and, as stated in the poD ordinante, ninor
Chanhassen Business Center
Ryan construction
DeceEber 4, l99L
Page 3
extensions, alterations or nodification of existing buildings or
structures uay by approved by the Planning Director. Any najor
anendments to an approved developnent plan may be made only by
approval of the city Council after revj.ew by the Planning
Cornnission. Each lot rrill have to proceed through a site plan
revi.ew before any development can occur.
The overall pretininary site plan appears to be in orderi however,
there are still a few areas of concern. These are generally of a
nore minor nature and are described in the staff report. The plan
meets the intent of the PUD zoning inctuding setbacks, landscaping,
hard surface coverage, and parking. The intended use of this park
is office, Iight industrial, and warehousing. These uses should
not create noise or generate odor.
The Public Safety Cornnission has reviewed concerns raised by the
residents about trucks parking on Audubon Road. The city council,on Decenber 9, 1991, will be give consideration to posting noparking for trucks on Audubon Road.
The applicant is proposing to grade this site in two phases. Thereis no proposed retention pond for Phase I. Staff recommends theapplicant utilize the linear retention area located in the
northrresterly section of the site parallel along the railroadtracks for this purpose. This would serve as a temporary retention
pond until the pernanent retention pond is constructed within PhaseII. The tenporary retention pond could then be elininated in thefuture with Phase II developroent.
This area is inside the I,IUSA line which recent].y was expanded bythe tletropolitan Council. This area wilL be serviced by a trunk
sewer that vill have to be constructed fron the south along Llman
Boulevard. This sill require a lift station and forcemain systemto punp back up Audubon Road to discharge into the sanitary sewerline at take Drive west and Audubon Road. The sanitary sewer in
Audubon Road vil1 also have to be extended easterly along future
Lake Drive West to the Lake Ann Interceptor. The applica.nt will bepetitioning the city Council on DeceDber 9, L991, for a feasibilitystudy so that work uay proceed innediately on the financing
arrangements. For Phase I, which includes 7 lots, the applicants
are proposing to extend the sanitary suer from the intersection of
Heron Drive and Audubon Road northerly along the test side of
Audubon Road. staff is recornmending that this be done on a
tenporary basis with the condition that the applicants ensure
there is sufficient capacity in the Iake susan Hi11s systen withthe inclusion of the residential build out area. If there issufficient capacity, each connection should be considered on a lotby Iot basis. In addition, when Phase II sanitary sewer is
Based on the traffic study prepared by RLK Associates, Ltd., onbehaLf of the developers, Ryan Construction, capacity analyses forthe intersection of T.H. 5 at Audubon Road, suggests that the cityuork with UnDOT to request a traffic signal be installed tocoincide with the conpletion of Phase I construction. Staff is
reconmending that the applicant pay a portion of that cost using aformula of traffic being genbrated by this project.
Chanhassen Business Center
Ryan Construction
December 4, 7991
Page 4
constructed that if econonical.ly feasible Phase I shouLd beredirected to flow into Phase II .
staff beLieves the proposal to be a well designed project and have
worked extensively rrith the applicant over a period of nonths. Thesite is large and the project is a substantial one that will bedeveloped over a period of years. However, through the PUDordinance it is conprehensively planned and will offer aconsistently higher standard of deveLopnent than woutd have
occurred if the parcel were to be developed in the usual nanner.Utility issues are fairly complex, but rre find this to beconsistent rrith the fact that this is the first project requestedin the new IIUSA area. staff finds the proposed PUD, plat and EAwto be acceptable and recommending approval of the prelininary andfinal stage of the PUD plan, pretininary plat and EAW subj ect to
Proposed conditions.
BACXGROI'ND
The U. S. Weather Service has announced its plans torelocate fron the Minneapolis/St. Paul fnternationalAirport to Chanhassen by L99L/1994.
They have selected a site in the southeast corner of theproperty along Audubon Road as their preferred locationand have been working with staff and the developer toprepare appropriate plans.
On SepteEber 4, 1991, the Planning conmission and on September 23,1991, the City Council reviewed and approved the concept. plans forthe Chanhassen Business Center PUD. In addition, the City Councilis proposing to enlarge the econonic/Tax Increnent FinancingDistrict to include this area.
PREIJII{INIRY IIID TINAIJ ATAGE PI'D PLEN APPROVAIJ
General Site PI an /Architecture
The site is used agriculturally and currently, soybean fields coveruost of the site. The farned area consists of 57.5 acres of the93.7 acres of developable area. The 12 lots proposed are located
o
chanhassen Business center
Ryan construction
Decenber 4, l99l
Page 5
in this farrned area. There are tuo lots being created rrhere
developnent will not occuri outlot A, which will be approxirnately
14.3 acres and outlot B vhich rill be approximately 7.8 acres. A
storn water retention pond ls being proposed on a portion of outlotA. The balance of the parcel will be used to protect Bluff Creek,
associated flood plain and the only significant stand of trees
found on the site. outLot B, located farther to the west, isphysicatly separated fron the nain portion of the site by outlot A.outlot B is currently being farned. It is not feasible to accessthis parcel fron Audubon Road uithout causing significant
environnental damage. There are no plans to develop Outlot B atthis tine. It is envisioned that this would be conbined rrith otherparcels guided for industrial use and accessed fron calpin
Boulevard.
The project wiII be developed in two phases. The first phase isthe easterly one-ha1f of the site. The Phase I developnent is
proposed to connect into the Lake Susan HilLs sanitary sewer.staff is reconmending that this rnay be done on a teBporary basis
with the condition that there is verification of excess capacity.
It was previously believed by staff that there may have been a
lretLand on the proposed Iot 6. l{e requested a site visit and
according to the Arny corps of Engineers this area is not a
uetland. Based upon this finding, no nitigative Deasures are
required.
Based on the topography a najority of the site sLopes westerly down
fron Audubon Road and the railroad track towards Bluff creek to the
west. Access is proposed to be provided by a Iong cul-de-sac
extension fron Audubon Road. staff would have normally preferred
to provide a loop street connection but this is not possible for
thil site without inpacting environmental features or surrounding
residential neighlrorhoods. Eleven of the 12 develoPnent sites are
accessed along the proposed cul-de-sac or off a secondary cul-de-
sac running north fron the nain road. Lot 1 is located in the
northeast corner of the proPerty. It is difficult to access Lot 1
internally due to the layout of the site plan and the elevation of
Lot 1. fnternal access is not impossib).e, however, and generally
preferred by staff. Holrever, it appears that access fron Lot 1
directly onto Audubon can safely be accomDodated with street
improvernents and may be acceptable.
The site plans reflects a required 50 foot landscaping buffer strip
along Audubon Road and a 100 foot landscaping buffer along the
southern property line. The higher profile, nore office-oriented
buildings witl be oriented toward Audubon Road. Near the central
portionl of the site and the rrestern edge, higher density
developnent is shown.
Chanhassen Business center
Ryan construction
December 4, l99l
Page 5
The applicant has proposed the follorcing development standards intheir PUD p1an. Staff has reviewed these proposals, uade conmentsor findings and then given the staff proposal for language to beincorporated into the final PUD plan document.
Applicantrs Proposal. The purpose of this zone is to createa PUD light industrial/office park. The use of the PUD zone isto a1loe for uore flexible design standards whiJ.e creating ahigher quality and nore sensitive proposal . A11 utilities arerequired to be placed underground. Each lot proposed for
deve).opment shall proceed through site plan review based onthe developnent standards outlined below.
Findincr.
b. Per:oltted Uses
Appliqantrs Prooosal . The applicant is reguesting that allbuilding sites within the affected property sha[ be usedsolely for office, corrnercial process, research, servicingliqht industrial, light rnanufacturing, warehousing, anidistribution purposes and services ancillary to such uses,
subj ect to the conditions set forth beIow, and subject to allapplicable ordinances. In the event that a use il pernittedby declaration but is not pernitted by applicable ordinances,such use shalI be pernitted by this declaration only if anappropriate varj.ance under such ordinance is first obtained.
Findinq. The permitted uses in this zone should be linited tolight industrial, uarehousing, and office as defined below.The uses sha1l be linited to those as defined herein. ffthere is a question as to the shether or not a use neets thedefinition, the City Council shall nake that interpretation.
1. Licrht fndustrial . The rnanufacturing, conpounding,processing, assenbling, packaging, or teiting oi goods orequipnent or reaearch activities entirely vithin anenclosed structure, rrith no outside storage. There shallbe.negligible inpact upon the surrounding environment bynoise, vibration, snoke, dust or pollutants.
2. Warehousinq. Ueans the connercial storage of Derchandiseand personal property.
DEVEI'PI,IEIS8 ATIIIDARDA
a. IDteDt
Chanhassen Business Center
Ryan construction
DecerDber 4 , L99L
Page 7
3 office. Professionat and business office, non-retailactivity.
A rrvariancen as rnentioned by the applicant is not the appropriate
procedure for deviating fron these standards. A revised PUD plan
would need to be sought and is not likely to be acceptable.
zurthennore, we are proposing that truck terninals be prohibited
fron this project due to on and off-site inpacts. Lastly, the
applicant has made representations to the city that parcels located
along Audubon Road be devoted prinarily to office uses due to their
high visibility. we agree sith this statenent and also believethat higher quality office use structures are nore appropriate nearresidential parcels and public right-of-ways. Therefore, lre are
reconnending that a condition be added to the effect that allparcels located along Audubon Road contain at least 50t of theirtotal floor area in office space and that the office components of
the building be oriented towards the exterior of the PuD.
c. Setbrcfs
Applicantrs Proposal . The applicant is proposing a building
setback of 50 feet from the required buffer yards, public
right-of-ways, front, and rear property lines and 10 feet fronall internal side tot lines. For parking setbacks, the
proposal is for a 20 foot setback fron the buffer yards, 10
feet fron internal 1ot lines and 25 feet fron Lake Drive.
Findino. In the PUD standards there is the requirement for
landscape buffering in addition to building and parking
setbacks. The landscape buffer on Audubon Road is 50 feet and
1OO feet along the southern property line. The PUD zone
requires a building to be setback 50 feet from the reguired
landscape buffer and public right-of-ways. There is no
minirnum reguirenent for setbacks on interior lot lines.
Staff is reconmending the folLouing setbacks.
Buildi Parki
50r plus 50r soi plus 1orAudubon Road Buffer & setback
100 r plus 101100 i plus 50lsouth Property Line & Setback
50r
10 rInterior Side Lot Line
25.Front & Rear ROW on Lake Drive
10 r
chanhassen Business center
Ryan construction
Decenber 4, 1991
Page 8
d. D€v.lolrDeat StaDalaads TrbulatioD Box
Lot #Lot Size
Acre
Building Size
s re Foot
Building
Coverage
site
Inpervious
The average hard surface coverage does not include Outlots A and B.The PUD standard for hard surface coverage is 7Ot for office andindustrial uses. The proposed developnent neets this standard withand average of 26* hard surface coverage.
Densit Densit
s UARE FOOTAGEUSE
1 6.0 59, OOO 23*sst
2 3.3 39, OOO 27*
3 4.0 48,000 28*70*
4 3.7 46 , OOO 29*70t
5 3.5 41,000 27*55t
6 9.5 134,000 33t
7 8.0 118, 000 752
.,5.6 51,000 64*
9 5.3 47 , OOO 20\702
1,0 4.5 57, O0O 292 608
1t 4.0 44,000 29*50*
10.0 16, 000 4*9t
Road 508
Subtotal 7 7.6 700, ooo avg. 258 avg. 258
off ice 208 140,000
l'!anufacturing 2s*175, 000
Warehouse s58 385, 000
TOTAL 100 I 700,000
PERCENT
708
7s8
348
21*
t2
4.2
Chanhassen Business Center
Ryan construction
Decenber 4, L99l
Page 9
.. Bultallag tlat.rlala .DA DaslgD
Applicantrs Proposal . The developer is proposing masonry or
concrete, poured in place, tilt-up or precast, finished in-
stone, textured or coated smooth or vith a rock face.
Finding. The POD requires that the development denonstrate a
higher gual.ity of architectural standards and site design.ALl nechanical equipnent shall be screened with material
coropatible to the building.
AIt naterials shall be of high guality and durable.
Uasonry material shall be used. Color shall be
introduced through cofored block or panels and not
painted block.
Brick nay be used and must be approved to assure
unifornity.
Stone shalL have a Ireathered face or be polished, fluted,
or broken face.
concrete nay be poured in place, tilt-up or precast, and
shall be finished in stone, textured or coated.
ltetal siding wiI). not be approved except as support
material to one of the above materials or curtain wall on
office coDponents or, as trim or as l{vAc screen.
All accessory structures shafl be designed to be
conpatible with the prinary structure.
1
2
3
4
6
7
5
o
AII roof mounted eguipnent shall be screened by walls of
conpatible appearing nateriaf. wood screen fences areprohibited. A11 exterior process rnachinery, tanks, etc.,
are to be fully screened by conpatible materials.
Iarge unadorned walls shalL be prohibited. All rralls
shal1 be given added architectural interest through
building design or appropriate landscaplng.
Space for recycling shalt be provided in the interior of
atl principal structures for all developments in the
Business center.
9
C. Site LaDdscaplDg aDd Screeaiag
Applicantis Proposal . The appticant is requesting to installthe reguired buffer landscaping incrementally or as each lot
chanhassen Business Center
Ryan Construction
December 4, L99l
Page 10
developnents. They propose the Landscaping Plan act as a
design guide for the Business Center.
Findino. Staff is reconmending that all buffer landscaping,including boulevard landscaping, included in Phase I area to
be installed when the grading of the phase is conpleted. Thismay welI result in landscaping being required ahead ofindividual site plan approvalB but we believe the buffer yardand plantings, in particular, need to be establishedirnroediately. In addition, to adhere to the higher guality of
developnent as spelled out in the PUD zone, all loading areasshall be screened. Each lot for developroent shaIl subnit aseparate landscaping plan as a part of the site plan reviewprocess .
AII open spaces and non-parking 1ot surfaces sha11 belandscaped, rockscaped, or covered with plantings and/or
lawn naterial .
1
2
3
Storage of naterial outdoors is prohibited unless it hasbeen approved under site plan review. A11 approvedoutdoor storage nust be screened with nasonry fences andlandscaping.
The naster landscape plan for the CBC pUD shall be thedesign gruide for all of the specific site landscapedevelopnents. Each lot Dust present a landscape plan forapproval with the site plan review process.
Landscape naterials proposed along the internal public
roaduays and southerly property line to and along audufonRoad shall be installed at the conclusion of phase Iutility construction.
5.Loading areas shaLlways. wing wal1
appropriate.
be screened fron public right-of-nay be required where deened
g. AlEDago
+pplieaptl! +roposaI. The applicant is proposing each lot totlyg I building nounted sign and one free itanaing sign. Inaddition, they are proposing one entrance sig-n f6r theBusiness center.
Ii_"9i"9. staff is proposing that all freestanding signs belinited to nonument signs. The sign shal1 not excled 6igfrty(qO) square feet in sign display area nor be greater thaireight (8) feet in height. The sign treatrent is a-n element of
Chanhassen Business Center
Ryan construction
Decenber 4, L99t
Page 11
the architecture and thus should reflect rrith the quality ofthe developnent. The sigms EhouLd be consistent in color,size, and material throughout the developnent. The applicant
should subnit a slgn package for staff revier.
1. Each property shall be allored one monument sign located
near the driveway into the private site.
A).1 signs require a separate pemit.
Ehe signage vill have consistency throughout thedevelopnent. A comDon thene wiII be introduced at the
developnent I s entrance monument and will be used
throughout.
consistency in signage sha1l relate to color, size,uaterials, and heights.
h. r,,,lghtlag
Applicantrs Proposal . The applicants are proposing a shoeboxfixture with high pressure sodium lamps. The plans did notprovide for street lighting.
Findinq. Lighting for the interior of the business centershould be consistent throughout the developnent. The
applicantts proposal is consistent with the lighting standardsfor the PUD ordinance. The plans do not provide for streetlighting. As uith previous industrial Parks,/roadways, theCity has required the developer to install street Iights
throughout the street systen. The street lights should be
designed consistent with the existing lighting along Audubon
Road.
A decorative, shoebox fixture (high pressure sodiun
vapor lanps) with a sguare ornamental pole shaIl be used
throughout the deveLopnent area for area lighting.
Lighting equipment sinilar to what is uounted in thepublic street right-of-trays shatl be used in the private
areas.
AIt light fixtures shalL be shielded. Light level should
be no more than L candle at the property line.
2
3
4
1
2
3
Chanhassen Business Center
Ryan Construction
December 4, 1991
Page 12
sTREET/ACCE88
The uain access to this site is off of Audubon Road. Audubon isclassified as a Class I collector street according to the Carvercounty Conprehensive fransportation planning Study, dated October,1990. Vlith fu]l developDent of the CBC, 1OO feet of rlght-of-wayon Audubon Road will be required and eventually a 44 foot wideurban street will be required. Currently a 33-foot right-of-rrayexists.along the west side of Audubon Road. staff is reiornnendin!that.uith the final plat, an additional 12 feet of right-of-way ilrequired to achieve a 50 foot dinension fron the centerline.
Proposed Lake Drive is shown as a 60 right-of-way. This isconsistent with other industrial parks in -the city. Staff isreconmending that the right-of-way be Bo feet froro the interseetionat Audubon to the short cul-de-sac off of Lake Drive. This portionof the street should be designed rrith 2 exit lanes, one for teftturns, and the other for through traffic and right turn novements.fn addition, the radius on the curbs at all inteisections should bechanged to 30 feet. The street construction plans should alsoincorporate the southbound accel,eration and dLceleration ranesalong Audubon Road and the future alignrnent of Lake Drive.
The development proposes a separate entrance from Iot 1 ontoAudubon. As discussed in the traffic eLeEent of the EAw, thisaccess is not favored by the staff. Holrever, due to the layout ofthe industrial/office park in this area, it nay be the best- way toget access to rot 1. The proposed deceleration lane should aii inright turns into Lot 1. According to the traffic report, Dost ofthe traffic novenents fron Lot 1 will travel nofth, 'reducint
conflict with the traffic exiting from r,ake orive west, wtro willalso be traveling north. staff wourd recommend that the entrancedrive to Lot 1 be noved to the north (approxinately soo feei-northof Lake Drive west) so that it aligns -with ttre efisting drive tothe east of the property (StockdaleL).
The totar estinated Average oaiiy Traffic (AEtr) generated fron thesite.is- expected i1 t\e lange br l,3oo to s,o'oo. rhe-lirringprovided for the site is 900 stalrs, p).us loading aocis ior ar:.proposed developrnents. gased on the cityrs parkin{ standards, theparking plan incrudes s6o staIls providia ftr the- office ui" ano340 stalls for the warehouse/manufacturing.
Based on the traffic study prepared by RLK Associates, LTD. onbehalf of the developers, . Ryan- Constrirction, dated Oitoler zs,1991-, the capacity analysis for the intersection of T.H. 5 atAudubon. Road. suggests. that !h-e- clty work with !,tnDOT and iequesttla!- a traffic signar be installed to coincide with trre -onlietion
of Phase r of construction. using a nethodology for the asi'essnent
chanhassen Business center
Ryan construction
Decenber 4, 1991
Page 13
of the traffic signal at T.H. 5 and Audubon Road, 8ot of thetraffic frorn this developnent (5000 ADT) divided by the total
anticipated AD{f for Audubon Road in the year 2010 (11,000) yields
a 35t share of the signal systen cost.
As developuent pressure dictates, turn lanes and traffic control
devices such as a signalized intersection at T.H. 5 and Audubon and
possibly Lake Drive west Day be required. The applicant shall be
required to participate in the acquisition of the traffic signal.
The city proposes that the developer participate in the cost of thetraffic signal based on the traffic Aenerated from this
deveLoploent.
Landscapino/Tree Preservation
The PUD landscape plan identifies plant naterial locations along
the entire perineter of the cBC, the proposed Lake Drive roadway
and two ntypicaltr planting plans for the individuaL Lots. Phase Iplanting shall occur upon completion of the utility constructj.on
ior Phase t. The tandscaping as required in the PUD ordinanceshall act as a buffer acreen to adjoining properties.
As currently planned, the city rri1l take title to outLot A and
peruranently protect and naintain this area. There is a large stand
of mature trees approxiroately 6 acres in size. The aPplicants are
planning to preserve the existing mature stand of trees which
include oak, ash, basswood and ironwood, ranging in size fron new
growth to 3or caliper. There are no other significant stands of
trees found on the property.
Gradinq/Drainaqe
The developDent will be graded in two phases. The first phase is
the easteify one-half of the site. The overalf grading plan
proposes grating the entire site and constructing a storm retention
pona for storn runoff generated fron this developnent. The
ietention pond wilL enc;oach into the flood plain and require
nitigation.- As a result, the applicant proposed- increasing the
depth of the flood plain to offset the area lost with the proposed
relention pond. The aPPlicant met with the DNR on NoveDber 27,
1991, to ahdress their -ioncerns about grading in the flood plain
(see attached letter). The grading plan has been revised to
reflect no grading through the botton of Bluff creek a-long the
banks. The slopel proposed with the retention pond will be a
maxirnun slope of 3:1. staff reconDends that the north, east, and
south slopes be a naxinum of 4:1 in order to facilitate access for
rnaintenance equiprnent to the bottom of the ponding areas as well as
safety Deasures.
Chanhassen Business Center
Ryan construction
Decenber 4, L99L
Page 14
The project proposes to construct a series of stono sewers to
convey runoff from each individual Lot to the proposed retentionpond. Storn sewer calculations for a lO-year storm event should besubnitted to the City Engineering Departnent for review. Allretention ponds shall be built to NURP atandards and providenutrient renoval calculations.
As a part of Phase I grading, the plans do not provide for anyretention pond for runoff generated over the easterly half of thisite. The plans propose draining the first phase of thedevelopnent tosards the railroad tracks with eventual.ly drainingsouthrresterly paralle1 to the railroad tracks into the flood plain.
The applicant nust receive pernission fron the railroad authorityfor this work. Staff reconhends that this low area adjacent to thetracks be constructed into a secondary pondi.ng area for interin useor possibly pernanent ponding uses.
As sith most retention ponding areas maj.ntenance responsibility aretransferred to the City. Ttre applicant shall dedicate and providea naintenance access drive to these areas for future mainlenanceconsiderations. The appropriate drainage and utility easenentsshould be conveyed over these areas with the final plat approval .
Erosion Control
With the construction of Phase I the plan purpose constructing atenporary access at Audubon Road and Lake Drive West. The plinsalso propose a silt tence along the nesterly retention pond aJweIIas the down strean side of the site grading. Due to the nagnitudeof the parcel being graded, it is recornmended that Type fII 6rosioncontrol be installed. It is also recommended with phase Iconstruction that erosion control (Type III) be installed along therresterly grading linits for erosion control neasures as well asnarking the linits of construction. Staff also recomnends that aI:rI)e I silt fence be placed along Audubon Road between the curband the proposed berr lying north of the future Lake Drive West.
rhe plans call for aIl areas being artered due to construction andbe restored with seed and disc nulched, sod, wood-fiber blanket orbe hard surfaced within two weeks after construction. staff wouldlike to change this condition to read that all turf restorationshall be conpleted within two weeks after the site is graded.
Utilities
The l,tUSA lines have recently been expanded and this site now isincluded within this district. phase r naste water wilr flow tothe east and connected ln_t-o an existing 8rr sanitary line, flowingthrough the r,ake susan Hirls west 3rd subdivision. phase rr lraste
Chanhassen Business Center
Ryan construction
Decenber 4, L99L
Page 15
water is projected to flow to the rest, cross Bluff creek and be
tied into a proposed sanitary sewer trunk line (Bluff Creek). A
feasibillty study is currently being perforned by Bonestroo Rosene
Anderlik and Associates for the Proposed Bluff creek sanitary seuer
trunk line.
Under the recently approved Comprehensive P1an, the Uwcc approved
the placenent of a lift station in the vicinity of L,yrnan Boulevard
into nhich the entire area could drain by gravity, utilj.ze
forcemains to pump the sewage back up Audubon Road into the future
Lake Drive west to the Iake Ann Interceptor. The cityrs
engineering consultant, is exploring appropriate methods of how to
serve this area.
The development plan for Phase I is proposing extending an 8rr sewer
line fron Heron Drive north along the Irest side of Audubon Road to
provide service to Lots L,2,3, 4,5, LO, and 11, Block 1. Staff
is reconnending that this nay be done on a temporary basis with the
following conditions. Each site will have to be evaluated
individualfy to ensure that there is sufficient capacity in the
Lake susan Hi11s systen. staff is requesting a copy of the
applicants calculations for capacity to verify inclusion of the
residential buifd out the renainder of the Lake susan HiIIs area.
Staff will also require that the Developers contract and the chain
of Title restrict the flow on each lot so as not to exceed the
capacity of the system. staff also recoDmends with the
impleuentation of Phase If sanitary selrer improvements, if
feasible, the sanitary sewer line proposed in Phase I should be
switched to flow into the new sanitary trunk sewer systen.
In order to provide sanitary sewer to Phase II of the cBc a trunk
sewer wilL have to be constructed fron the south aLong Llman Blvd,
which wi}l require a Lift station and forcenain system to PunP back
up Audubon Road to discharge into the sanitary sewer Line at take
Dlive West and Audubon Road. In addition, a sanj,tary seser lj.ne
previously proposed with Lake Drive west lying east of Audubon Road
witf atso have to be constructed. The Lake Ann Interceptor is
located approxirnately one-third nile east of Audubon 'Road (see
AttachDent) . As with any inproveroent project, the applicant is
responsible for petitioning the city for extension of sanitary
sewEr service to Phase II and paying for the initiat feasibility
report study. Should the project be authorized, the aPPlicant will
be- entitled to a refund of the security provided for the initial
feasibility report study.
Staff would like to point out that this parcel of land had not been
assessed for sanitary trunk sewer yet. Even if the easterly half
of the site is able to utitize the existing sanitary serrer at Heron
Chanhassen Business Center
Ryan construction
December 4, l99L
Page 16
Drive the entire tract of land should pay its fair share of thetrunk seuer systen to be built for Phase II.
Utility and drainage easeroents should be conveyed with the finalplat over those areas where the sanitary sewer line extends out
beyond the street Row. In addition the applicant shal1 dedicate tothe city an easement for the future trunk extension through outlotB. The drainage and utility easeuents shall be a nininum of 20feet wide. In an effort to provide access for maintenance it issuggested that a gravel access road or possibly a cornbination trailbe buil.t aLong the sanitary sewer route through Lots 7, 8, Out1otA and Outlot B.
l,lunicipal uater service is available to the site fron Audubon Road.
The plans call for extending a 10 inch water nain through the siteand looping back south to Audubon Road by continuing to the southand east back out to Audubon Road to conplete the loop. Staffreconnends that the watermain loop be extended southerly to within10 feet of the south property line and then proceed easterly to
Audubon Road to provide for possibte future extension and loopingto the adjacent parcel to the south.
In the areas of the developnent shere the rraternain is extendedoutside of the street right-of-rray, the final plat should convey a2o-foot wide drainage and uti].ity easenent over these areas.Detailed utility construction plans have been submitted, however nospecifications uere provided. Staff rri11 be preparing a report orthe construction plans and specifications uith the final plat.
Park and Recreation
A looped trail systen is being proposed for the north side of LakeDrive. Tbis trail systen will tie into the proposed trails forHeron Drive, Lake Drive West and access under the lailroad tracks.Tbe applicant will be required to pay the park dedication fee
( $3, 500. oolacre) and trail fees ($833.oo/acrel in the developmentcontract. }{o developDent shall occur on Outlot a it sha1l Uepreserrred as a open space.
Because the project will be developed in phases, staff isrecouuending that the trail systen for a loop even lf it is on atenporary basis. It Dey be several years befoie the developroent iscorpleted and the trail systen uil1 be Dore functional if it toopsor ties into the existing systen.
ErWIRONttEltltIr laSESStlElll rORXSEEEr
The proposed proj ect as outlined in the EAW includes 93.7 acres ofproperty intended to be developed into zOO,Ooo square feet of
buildings. Uses include 2ot office, 55* irarehousing, and 25t light
industrial .
The current land use on the eastern 71.5 acres is a conbination of
farned soybean and cornfields, sparsely wooded edge condition, and
noderate slopes and native vegetation. The proposed developnent is
conpatible with the Conprehensive PIan and is located on a
designated collector route, Audubon Road.
The amount of existing crop ]and rill be reduced to 38.9 acres of
inpervious surface and 28.3 acres of landscaping. The aDount of
wooded,/brush/grassland will be approximately the saDe anount before
and after developnent, 21.5 acres before and 24.7 acres after. Tlro
2 to 8 class rretlands will increase fron .75 acres to 1.55 acresafter development.
outlot A contains an rrecoJ.ogically sensitiverr site. This site is
a 5+ acre of hardwood forest which has evolved, and is a valuablenatural resource and will be preserved. This area of outlot A
contains the upper portion of the Bluff creek drainage basin and ifnot protected, inpacts will be felt downstream. outlot A also
contains a flood retention pond that will be built into the floodplain of Bluff creek. lhe alteration of the flood plain will need
the approval of the DNR.
Approxinately 78 acres uilI be graded which involves 480,000 cubic
yards of excavation. At1 grading will be on site with no nateri.al
being renoved. The.project will be graded in two phases. During
construction Tltre III erosion control wifL be required. As a part
of the erosion control neasures, the applicant should be reguiredto renove any naterials that manage to get into Bluff creek and to
clean Audubon Road as often as necessary if mud, etc., is tracked
out onto the right-of-way.
Under the recently approved Conprehensive P1an, the l,lwcc approved
the placenent of a lift station in the vicinity of Llman Boulevardinto uhich the entire area could drain by gravity, utilize
forcenains to punp the sewage back up the hilL into the Lake AnnInterceptor. The cityts engineering consultant, is exploring
appropriate Detbods of how to serve this area.
The proposed developDent pLan for Phase I is connect into the Lake
susan Hills sanitary sewer. The plans propose to extend an 8rl
sewer line from Heron Drive north along the uest side of Audubon
Road to provide service to Irts L, 2, 3, 4, 5, LO, and 11, Block 1.
Staff is reconmending that this may be done on a tenporary basisrrith the conditions that each site will have to be evaluatedindividually to ensure that there is sufficient capacity in the
Lake susan Hills systen. staff is requesting a copy of the
Chanhassen Business center
Ryan construction' DeceDber 4, L99L
Page 17
chanhassen Business center
Ryan construction
Decenber 4, L99l
Page 18
applicantrs caLculations for capacity to verify inclusion of theresidential build out in the renaining Lake Susan Hills area;Staff uiI] also require that a Developnent Contract be executed andplaced in the Chain of Title to restrict the flow on each Iot so asnot to exceed the capacity of the systen. Staff also reconnendswith iroplenentation of Phase II sanitary sener improvements to thedevelopnent, if feasible, the sanitary sewer proposed in phase IshouLd be switched to fLow into the new sanitary seter trunk
Eystem.
After review and reconmendation of the prelininary site plan by thePlanning Conmission there will be a 30 day conment period followingnotice of the EAw in the EQB l,lonitor.
Current Average Traffic Volumes (ADT) were received by UnlDOT andthe City. In addition RIJ( Associates took 24 hour nachine countson T.H. 5 and Audubon Road. The analysis looked at the inpacts oftraffic Aenerated by Chanhassen Business Center for the yelrs 1992and 1996.
Anticipated traffic entering and exiting the site is distributedwith 3472 ADT (80t) north and southbound on the Audubon Road.North of the site 858 ADT (20t) north and southbound from the site.Of the site traffic on Audubon Road northerLy of the site entrances2083 ADT (60t) is going to and from the eaat and T.H. 5 and 1389ADT (4ot) is going to and from the rrest on T.H. 5. The reportpredicts when T.H. 2L2 Ls built traffic patterns on Audubon RoadwiII increase 20* to the south and decreJse 20t to the north.
Capacity anaLyses were conpleted for the intersection of T.H. 5 atAudubon Road for the a.n. and p.n. peak hours in 1991, including
Trrffic Elo!6at
The traffic elenent of the EAw addresses the proposed traffj.cinpacts due to the developnent of the subject site. The site hasbeen divided into potential uses for the purpose of forecastingtrip generation. The proposed level of fuLl developDent includelthe potential of 700,000 gross feet of general office building,warehousing, and nanufacturing. The traffic reports were reviewedfor their relevance in addressing the denographic and road needsfor the next trrenty years. The two reports incLude:
T.H. 212 Traffic forecasts, I 494 to Noruood/younq America.prepared for UnlDot, 1985
Eastern Carver Countv Comprehensive Transportation planninq
Studv, prepared for Eastern Carver County Technical Conmittee,
1990
Chanhassen Business center
Ryan construction
DeceDber 4, 1991
Page 19
traffic generated rrith Phase I developnent of the cBc. with thefull developnent traffic added to the 1996 base conditions, it is
anticipated the existing unsigmalized intersection would operate at
unacceptable levels of service during both the a.n. and p.m. peak
hours. In the report it is recommended that the city contact UnDoTto request that a traffic sigmal be installed to coincide with the
conpetition of PhaEe I of construction.
The proposed driveway access onto Audubon Road from Lot 1 is not
favored by the ataff. However, due to the layout of the
industrial,/office park it may be best way to get access to Lot 1.
The traffic study shorrs that nost of the turn movernents into thesite will be coming from southbound onto Audubon. A deceleration
Iane has been designed to acconmodate right turns into Lot 1 and
also Lake Drive west. Again according to the traffic report most
of the traffic novenents from Lot 1 t iLl travel north, reducingconflict with the traffic exiting Lake Drive west, Idho will also be
traveling north. staff uould reconmend that the entrance drive to
lot 1 be Doved to the north (aPProxinately 500 feet north of Lake
Drive west) so that it offsets into the existing drive to the east
of the property (stockdales). Staff is concerned that when Audubon
and Lake Drive west becone a fu1I blown intersection Irith
channelization that there will not be enough stacking roon betlreenthe entrance drive on Iot 1 and the intersection of Lake Drive
tlest .
REZOI{IIIG
Justification for Rezoninq to PUD
The applicant is requesting to rezone approxinately 94 acres fron
A-2 Agricultural Estate District to PUD-oI, Planned Unit
Developnent office Industrial. The following review constitutes
our evaluation of the PUD request. The review criteria are taken
fron the intent section of the PUD ordinance.
Section 20-501. Intent
Planned unit developnent developnents offer enhanced flexibility to
develop a site through the relaxation of roost normal zoning
district standards. The use of the PUD zoning also allows for a
greater variety of uses, internal transfer of density, construction
phasing and a potential for lower developnent costs. fn exchangeior this enhanced flexibility, the City has the expectation that
the devetopnent plan wilL result in a significantly higher quality
and more sensitive proposal than tould have been the case hrith the
other, rnore standard zoning districts. It will be the appl.icantrs
responsibility to deDonstrate that the cityrs expectations are to
reatized as evaluated against the following criteria:
1
chanhassen Business center
Ryan Construction
December 4, 1991
Page 20
Planned unit developnents are to encourage the following:
2.
3.
Preservation of desirable site characteristics and open space
and protection of sensitive environmental features, including
steep slopes, Dature trees, creeks, uetlands, lakes and scenic
views .
Findino. In this proposed development the applicant intendsto save the existing stand of nature trees along Bluff Creek,located on Outlot A. The Conprehensive Plan Land Use !!apidentifies the creek corridor as Park/open Space.
I,lore efficient and effective use of 1and, open space andpubtic facilities through nixing of land uses and asse'nhly anddevelopnent of land in larger parcels.
Finding. The subj ect property is triangular in shape, boundedby the creek, railroad tracks and Audubon Road. The shape ofthe property prohibits design flexibility that one could findwith a flat square piece of property. The advantage in the
PUD proposal is that the city is gaining a totally plannedconcept. ff this rere to develop separately as individualparcels, nany of these design considerations would not beincluded. These design elements include an approved signpackage, uniforn street and parking lot lighting, conpatibleor cohesive architecture and building materials. Thecoordination of site developnent will also inprove theefficiency and cost effectiveness of public improvenents. Forexanple, the project is large enough to help facilitate asolution to providing serrer service to the ne!, UUSA area.AIso, the development of a single, coroprehensive drainagesysten sill naxirnize the effectiveness of nutrient renovilefforts while reducing the cityrs long tern rnaintenance costs.
lligh quality desigm.and design conpatibility with surroundingland uses, including both existing and planned. Sit;planning, landscaping and building architecturL should reflecthigher quality design than is found elserrhere in thecornmunity.
Findino. The applicants are proposing to subnit individualbuilding plans for each developnent lot. The city rrillutilize its nornal 6ite plan review procedure for each-. Theapproved PUD documents wilt establish firn guidelines toensure that the site is developed in a consistent and wellplanned manner. Higher quality developnent rrill result.
chanhassen Business center
Ryan construction
DeceDber 4, 1991
Page 21
4 Sensitive developnent in transitionaL areas located betweendifferent land uses and along significant corridors vithin thecity will be encouraged.
Findinq. This site is bounded on the east by Audubon Road.
The conprehensive Land use uap cal}s for a 50 foot buffer yard
for additional buffering for the subdivision to the east. In
addition, the comprehensive Plan calls for a 1oo foot bufferyard along the southern property line. This area will
eventually be developed with single fanily homes consistentwith the comprehensive PIan. concept plans call for
establishing an acceptable Iandscape buffer in the appropriateareas. site topography and tree cover will also place nuch ofthe site beyond the view of adj acent residential areas. Inaddition, the location of the U. S. weather Service site along
Audubon Road will inprove buffering. t{ost of this site will
renain pernanent open space.
Developnent which is consistent with the comprehensive P1an.
Findino. The Conprehensive Land Use uap identifies the
subj ect area as the potential land use of office,/Industrial .
The Land Use llap also identifies a Park/open space corridor,
300 to 400 hundred feet in width, running the entire length of
the property. This area is located in proposed Outlot A area
on the site plan. The conprehensive Plan also identifies abuffer strip 50 to 100 feet in width along Audubon Road and
along tbe southern side of the property 1ine. The intent ofthis buffer line is to help preserve and establish vegetationto help nitigate the inpacts of developnent to surroundingproperties. The proposal is fully consistent vith the
conprehens ive Plan.
Parks and open space. The creation of public open space may
be required by the city. such park and open space shall be
consistent uith the Conprehensive Park PLan and overafl trail
p1an.
Findina. The site plan shows a loop trail around theperimeter of the site, terrninating at the northern and
southern property line along Audubon Road. The applicants may
propose to develop only the south half of this loop, with a
connection then being ruade through the railroad tunnel and
onto the property to the north which is also controlled by
Ryan Construction. In addition, the Park/open space corridor
along Bluff creek, including the nature stand of trees, will
be preserved. The Park and Recreation commission will be
reviewing this proposal in Septeuber.
5
6
chanhassen Business center
Ryan Construction
Decenber 4, 1991
Page 22
7 Provision of housing affordable toappropriate Bith the PUD.
aLl income groups if
Findincr. This provision of the PUD district is not applicableto this proposal .
Energy conservation through the use of more efficient buildingdesigns and sightings and the clustering of buildings and tand
uses.
Findincr. Ryan Construction intends to pursue the use ofrailroad spur lines for Iots 2,4,6 and 7 during theprelininary design stage. The applicants are proposing energyconservation for the buildings in two ways. First, earth
mounding will help shield the buildings from the seasonalrreather extrenes. Secondly, architectural treatnent of thebuilding will attenpt to capture the nost efficient andeffective design related to energy conservation.
The Iighting fixtures selected for use in the parking totareas and on the public streets will be outfitted with anenerffy saving type of lanp. AdditionaLly, they will includephoto electric cells to turn thero onrloff autonatically.
Use of traffic managenent and design techniques to reduce thepotential for traffic conflicts. Inprovements to area roadsand intersections may be required as appropriate.
Findino. The nain access to the site is off of Audubon Road.Designated as a collector street by the City ConprehensivePlan, it was upgraded last year. Traffic inprovements such asturn lanes that nay be warranted to support the project willbe reconmended as a condition of approval . This road is aCarver County Collector. All access for the lots will be fronthe proposed extension of Lake Drive West. The applicants arerequesting to have access onto Audubon fron I.ot 1. Thetraffic study will also review this proposal .
8
ATIFP RECOI{XEIIDATTOX
Staff reconmends that the PUD Prelininary plan for the ChanhassenBusiness Center be approved subject to the following conditions:
1. Final PUD plan approval be subject to the 30 day cornnentperiod after public notice of publication of the EAIi in theEQB l,lonitor and a finding by the City Council tbat anEnvironmental Iupact Statement is not required.
9
2 The .applicant will be required to pay park dedication($3,5oo.oolacre) and trail fees ($833.oo/acre) in the
development contract. No developnent shall occur on outlot Aas it shall be preserrred as. open space. The trail systenshall be required to loop even if it is on a tenporary basis.
The deveLopnent standards as proposed by staff shall be
incorporated into the PUD development guide for the Business
center.
Site plan approval frou the city rrill need to be obtained for
each lot as developnent is proposed.
Provide an additional l7 feet of right-of-vay along theuesterly side of Audubon Road throughout the plat. Providethe 20 foot wide drainage and utility easenents over the
proposed sewer and water lines outside the road right-of-nay.Provide a 20 foot drainage and utility easeBent for thesanitary sewer proposed along the west side of Audubon Roadlying south of the proposed nain entrance.
The nain entrance street shall be named Lake Drive Westconsistent with the future extension of Lake Drive west eastof Audubon Road. If a curb cut is allorred for Lot 1 on to
Audubon Road, it shall be located a rnininun of 500 feet northof the proposed uain entrance (Lake Drive) and provide for adeceleration lane.
Provide the City Engineering Department with storrn sewercalculations designed for a 1o-year 6torn event and pondingcalculations to show that the ponds will retain a loo-yearstorn event and will discharge at the predeveloped runoffrate. Data sha'lI be provided on nutrient removal capacity ofall ponds for review and approval by the City. A secondaryretention pond should be constructed for the northerly 15
acres of the site which drain to and parallel of the railroadtracks (Lots 4 and 5).
the applicant shall petition the city and provide a $12,oooescrou for preparation of a feasibility report for the
extension of a trunk sewer line to service Phase fI of thesite uhich will be refunded upon proj ect approval andauthorization by the City Council .
If onfy Phase I of the site is graded, silt fence shall beincorporated along the perineter of the construction linitsand if the entire site is graded, T)rpe III erosion controlshaIl be installed and naintained along the westerly perineterof the construction linits. AIl areas disturbed during sitegrading shall be imnediately restored with seed and discnulched, sod or wood-fiber blanket rrithin tuo ireeks of sitegrading or before November L5, 1992, except in areas whereutilities and streets will be constructed yet that year.
Areas altered with a slope of 3:1 or greater nust be restored
3
5
5.
4.
7.
8.
9
Kate Aanenson
Novenber 18, 1991
Page 24
with sod or wood-fiber blanket. As a part of the erosioncontrol neasures, the applicant shall be required to remove
any rnaterials that enter into Bluff Creek.
10.The watemain loop between Lots I and 9 sha11 be extended towithin 10 feet of the southerly property line and then proceed
east and para11e1 to the south property line back to Audubon
Road.
The applicant shafl provide the Engineering Departnent uiththe calculations estiroating the capacity of the sanitary sewerline through Lake Susan Hills west developnent and thepredicted flows each lot will generate. A covenant regulatingthe anount of discharge fron Phase I shalt be placed in thetitle of each parcel as rrell as in the developrnent contract toensure that florrs will not exceed capacity tinitations
downstream. If feasible, the sanitary sewer Lines in Phase Ishould be svitched to flow into the trunk sanitary selrer
system proposed for Phase II.
L2.Inside slopes of the retention ponds shalt be reduced to anininum of 4:1.
13. As a condition of final plat approval, the applicant shallenter into a development contract and provide the financialsecurity to guarantee construction of the inproveuents.
L4. The developer shall construct the utility and street
improvenents in accordance rrith the latest edition of thecityis standard specifications and shall prepare final plans
and specifications and subnit for city approval. proj ectspecifications shall incorporate the cityrs standardspecifications. The developer shall acquire utilityconstruction pemits fron the PCA and llinnesota Departroent ofHealth.
15.
16.
11.
The developer shall obtain all necessary pernits fron the
Watershed District, DNR and Arlly Corps of Engineers and conplywith all conditions of the perrnits. Drainage plans sha1I b-revised as outl,ined in the approved staff report and shalL beresubnitted to City staff for approval . The applicant shallobtain pernission/perroit from the railroad authority for allgrading activities within the railroad property.
The developer shall incorporate street lights into the streetconstruction plans. .The street lights should be installed at150 to 2OO foot intervals. The street lights shalL bedesigned consistent sith existing lighting on Audubon Road.A 2so-watt contenporary low-profile rectilinear-rectangularstyle lighting fixture rrith pressure lamps uounted on a 25-foot high corten stee). pole (see Attachnent #2).
18.
19.
20.
The entire tract of Land developnent shall be assessed for thefuture trunk sewer system to be built for Phase II (Lots 6, 7,8, 9 and 12).
The Developer shall be responsible for 36t of the costs fortraffj.c signals at Audubon and T.H. 5.
The pemitted uses in this zone shatlindustrial, warehousing, and offices as
ordinance.
be linited to tiqhtdefined in the PUD
2t. Truck transfer terninals
proj ect .
sha1l be prohibited fron this
All parcels located along Audubon Road contain at least 5Ot oftheir total floor area in office spice and that the office
components of the building be oriented towards the exterior ofthE PUD.
23. Building materials and designs shall be:
22.
a
f
q.
AII naterials shall be of high quality andl,lasonry uaterial sha1l be used. Colorintroduced through colored block or panelspainted b1ock.
durable.
sha11 beand not
b
c
d
Brick nay be
uni fornity.used and must be approved to assure
Stone shall have a ueathered face or be polished, fluted,or broken face.
Concrete may be poured in place, tilt-up or precast, andshall be finished in stone, textured or coated.
Hetal siding will not be approved except as supportmaterial to one of the above naterials or curtain wal1 onoffice conponents or, as trin or as IIVAC Ecreen.
All accessory structures shall be designed to beconpatible with the pri:aary structure.
All roof mounted equipuent shall be screened by ua1ls ofconpatible appearing material. Wood screen fences areprohibited. AII exterior process machinery, tanks, etc.,are to be ful1y screened by conpatible naterials.
Kate Aanenson
Novenber 18, 1991
Page 25
e.
Kate Aanenson
NoveDber 18, 1991
Page 26
24.
d
25.
26.
h.Large unadorned walls shall be prohibited. AlI wa1lsshall be given added architectural interest throughbuilding design or appropriate landscaping.
I Space for recycling sha11 be provided in the interior ofall principal structures for all developnents in the
Business center.
AII freestanding signs be linited to monument signs. The signshall not exceed eighty (80) square feet in sign display areanor be greater than eight (8) feet in height.
a. Each property sha1l be alloued one Donument sign located
near the driveway into the private site.
A11 signs require a separate perrnit.b
c The signage will have consistency throughout the
developuent. A conmon theroe will be introduced at the
developnent I s entrance Donument and will be used
throughout.
consistency in signage shall relate to coIor, size,materials, and heights.
b
The street lights should be designed consistent with theexisting lighting along Audubon Road.
a. A decorative, shoebox fixture (high pressure sodium
vapor lamps) with a square ornanental pole shall be used
throughout the developnent area for area lighting.
Lightinq equipnent sinilar to what is nounted in thepublic street right-of-ways sha1I be used in the private
areas .
c. A11 light fixtures shall be shielded. Light level shoutd
be no more than * candle at the property 1ine.
An additional 17 feet of right-of-way on Audubon Road isrequired. Lake Drive West shal1 have a 60 foot right-of-way.
The right-of-uay shall be 80 feet fron the intersection of
Audubon Road to the short cul-de-sac off of Lake Drive west.
The radius on the curbs at Audubon Road shall be 30 feet.
The entrance drive to lpt 1 be noved to the north(approxiDately 5OO feet north of Lake Drive West so that italigns with the existing drive to the east of the Stockdaleproperty).
27.
Kate Aanenson
Novenber 18, 1991
Page 27
24.
ATTACHI.{ENTS
llemo fron Dave Henpel .
l{eno fron Todd Hoffnan.I€tter fron DNR.
EAW.
Narrative docuDent.Traffic report.
The city shall work with l.InDoT to request that a traffiqsignal be installed to coincide with the conpletion of phase
I of construction.
1
2
3
4
5
6
CITY OF
CH[NH[ESEN
MEMORANDIII.{
TO:
FROU:
DATE:
SU&T:
Planning Comnission
Paul Krauss, PLanning Director
NoveDber 27, L99L
Report from Director
1
2
At the city Council rneeting of Novenber 4, L99L, no itens of
interest to the Planning Conmission were reviewed. At the City
Council neeting of November 18, 1991, the foflowing itens r.rere
reviewed:
Final reading uas given to amendments to chapter 10, Article
II, Liguor ordinance requiring legal notice for liguor license
requests sirnilar to that rrhich is reguired for rezoning
actions.
Items related to a variance with an appeal of the decision of
the Board of Adj.ustnents for c. w. Freenan at 7431 Dogiwood,
relative to two' structures on a lot and zoning ordinance
amendment regarding accessory dwellings was reviewed by the
city council. The Planning Cornnission nay recall that this
item began when the individual rrho owned a lot along Lake
llinnewashta with an existing structure asked for approval of
plans for a new hone. staff indicated that only one horne is
illowed on a Iot but se vould allolr the older dwelling to
renain if it sas rendered uninhabitable. The aPPlicant agreed
to do so on the building pernit but then reneged on his
pronise. He then appealed to the Board of Adjlrsturents to be
lllowed to have two principal structures on a single lot. The
Board initially continued tbe request to a1lo!, the drafting of
a zoning ordinance amendment that could allow accessory
dwellings if the ordinance uere to be approved. The Board of
Adjustnents ultiuately reconmended denial of the request and
strongly advocated that the proposed ordinance alnendment,
which they believed to be i1l conceived, not be approved.
The Planning Commission became involved with this during a
review of the proposed ordinance anendnent. The connission
recommended deniaL of the ordinance anendment since it was
lDt,PRINTED ON BEC\CLED PAPER
690 COULTER DRIVE. P.O. BOX 147 ' CHANHASSEN, MINNESOTA 55317
(612) 937-1900. FAX (612) 937-5739
Planning Conmission
NoverDbei 27, L99L
Page 2
3
believed that it could create unforeseen probtens in thefuture and the fact that the ordinance seemed to be tailoredfor a specific individual 1ot and this did not seen to be aneffective use of the zoning ordinance.
Ultinately, the City Council sa!, the wisdoro in not creating anew zoning ordinance as presently structured. They did,
however, approve the variance to a1lor the second structure to
reroain under several conditions. The conditions generallyinvolved llr. Freenan entering into a pernanentLy recorded
agreement with the city that uould outline that if Dogwood
Road is improved in the future, that the building irould berenoved at his expense, if Mr. Freernan noves or sells theproperty that the building lrou1d be renoved at his expense,
and that as long as the building renains in plaee, it is notbeing used as a rental structure. !Ir. Freenan appeared to
agree with these conditions and, in fact, he was the one who
suggested the ultiuate renoval of the structure. At this tinethe City Attorney is drafting the document for signing andfil ing.
Replat of Lot 3, Bl,ock 1, Chanhassen Lakes Business park sthAddition into two parcels and site plan review for theconstruction of a 15,OOO square foot warehouse/office buildingfor UaiI Source, Inc., located at the northeast corner of theintersection of Park P1ace and Park Road. The City Council
reviewed a plan that had earLier been reconnended for approvalby the Planning Connission. The docurnent the City Councilreviewed is somewhat different than the one the planning
Commission revierred since poor soils were found on the easternportions of the site. In light of this, the entire site planvas shifted to the west, nhich we believe in nany respectsgives a nore aesthetically pleasing site since there is alarger anount of green space near the intersection of park
Place and Park Road. The City Council ultinately approved therequest.
The Planning CoEroission should note that staff did have aconcern regarding the use of painted trim highlights on thisbuilding. We reconmended against the use of painted trirnpreferring the use of netal or tile blocks that in our vieware Dore pernanent. The applicant pointed out that the entirestructure consists of block that would be painted. The CityCouncil agreed to the applicantls proposal to use paintedhighlight trirn but indicated that staff and the Planning
Cornnrission should uork torrards elininating allowing the use ofpainted nasonry buildings in the future.
lloon Valley Litigation. Fron tine to tj.me, staff has tried to
keep the PLanning Commission and City Council abreast of the
ongoing saga of l.{oon Valley. when rre last visited this issue,
4
Planning Conrnission
Novenber 27, l99L
Page 3
you may recal1 that I had rejected their application as being
inadeguate in responding to the infornation requirernents of
the zoning ordinance. After protracted }egal uaneuvering that
had been initiated by the applicant, they preenptively triedto stop the city fron requiring a pernit of any sort, the casefinally came to trial on Novenber 25 and 25. In the trial
before Judge Kanning at Carver county, 3 questions are up forresolution. The judge earlier found that the city does have
a right to require that Noon Valley obtain a pernit. However,
Uoon Valley sti11 naintains that the city, which nay have aright to regiulate them, has no right to linit then fromgetting every square inch of gravel out of the property thatthey so desire. we obviously take exception to thisinterpretation and our City Attorney believes that we are onstrong legal ground in this area. Secondly, rre are litigatingthe issue as to whether or not all of the l{oon val.ley
operation is grandfathered in. Fron a historical prospective,the original Moon Valley operation was on property that had
been owned by Wal1y Greipentrog and sold to Tou Zwiers, whichis located a1on9 Hrry. L69/2]-2. The city naintains that in
L972 an ordinance nas adopted by the city which nade graveland nining excavation a conditional use. In 7973, ur.creipentrog bought the northern parcel located towards PioneerTrail from the then owner IrIr. Zinnerman. In 1987, there wasexcavation of clay naterial from this northern area which thecity intervened to try to stop. To the best of our knowledge,there has been no significant grading on this site before orsince this activity. The ltoon Va1ley operation is trying toassert that their grandfathered rights extend to this northernproperty. The city naintains that they have no grandfatheredrights in this area. The third itern is whether or not thecity acted in good faith or was reasonable in rejecting the
oon Valley pernit application.
The trial uas rather lengthy and I rras personally on thewitness stand for almost four hours. It is difficult at thispoint to guess at yhat kind of rulings nay be coroing down inthe future since written surnrnations are not due for anotherten days and I wiII assume it uilI take the judge sone tinethereafter to nake his final decision. Horrever, Judge Kanningdid at one point indicate that he appeared to be favorablydisposed towards the cityls position that the grandfatherrights do not extend to the northern parcel. In any event, it
1s ny hope that the rulings rrill Dove this iten off a deadcenter. It is ny belief that negotiations prior to this pointuith tbe applicant have not been productive.
5.
Highuay 5 Corridor Study. The Hwy. 5 Corridor Task Force helda second neeting during mid-Novenber. Staff fron theUniversity of Uinnesota and Barry Warner of Barton AschnanAssociates briefed the task force on naterials they havecollected to date and their initial findings. While I wouldnot characterize the naterial that rras presented as earthshattering, a lot of it should prove to be useful in thefuture. fn many ways f believe that the findings that we
reviewed are of indication of the planning process that you
went through in developing the Conprehensive Plan. At thepresent tine, we are on track for the University to wrap uptheir initial effort by the end of the year. The task forceis discussing enbarking on a uore in-depth planning study thatrdould be conducted in the nanner made usual by the
comprehensive plan process sone time after the first of theyear.
Surface l{ater Uanagement Task Force. The task force heldtheir second neeting during nid-Novenber. They are beginning
work on developing a strategy to evaluate wetlands as to rrhatsort of strategy should be used for each one. Other aspectsof the study were also updated. Staff filled the task forcein on a $130,000 grant application under the Clean waterPartnership that rre were naking to the Pollution ControlAgency. The grant would alLow for in-depth analysis andultiroately inpleroentation of solutions into the question ofdeclining water quality in Lotus Lake. The norning followingthe task force neeting, city staff, along with staff frorn
Bonestroo Engineering, interviewed with the PCA so that rre
could verbally fill thern in on our program.
Planning Commission
Novenber 27, L99l
Page 4
4.
REVISED DECEITTBER 1, 1991
ONGOTNG ISSUES
Conprehensive PIan Issues
1.*1995 Study Area (North)
and Hwy. 5 Corridor Study
2.* 1995 Study Area (South)
3. * Tree Protection Ordinancel,lapping of significant
vegetative areas
Rezoning 2l
RR
STATUS
Several neetings held with taskforce. U of !l Program to wrap
up by January 1. Working tostructure more in depthcorridor study to begin in
January.
Assigned to Planning Conmissionstaff. work to be initiated astine comnitroents allot.
Staff preparinginfonnation for
Comnrission direction.
updated
PL anning
Work group established. Firstneeting in Novenber.
UnDNR conpleted napping progran
and will work with city todevelop. New ordinance to be
developed in 1992.
5
Acre Ipts to Adopted LO/L4/9L
Wetl.and ordinance/surface
Water llanagenent Progran
5. Shoreland Ordinance
Task force established. Firstneeting held October 7. Videosurveys of lake bottonsunderway. applicationsubnitted to UnPCA for Ctean
Water Action crant for Lotus
Lake.
In January we receivednotification froru the ItnDNRthat we are a prioritycommunitywitha2year
deadline
19 91l inactive
Approval granted by lletroCouncil. Ordinance revisions
reguired.
7.
8.
OTHER ITE!{S
1. Rezoning BF Dist. to A2
2. Sign ordinance
Group home ordinance
Rural Area Policies
9. PUD Ordinance
10. PC input in Downtown
Planning and Traffic Study
11.Review of Architectural
standards to Pronote Eigh
Quality Design
12. * Bluff Creek Corridor
Greenway
13. * uodifications to beachlotordinance - Re: Non-
conforning beachlots
t4.Ordinance anendnent to
Non-conforning use sectionto clarify ordinance.
15.* Temporary uses, sales -
new ordinance.
* chanere in status since last
report
Residential PUD standards to Pcon lO/3. I\rture meetings
required.
19 91longoing
L992
with adoption of B1uff LinePreservation ordinance, ccreferred iten to Park and
Recreation Comnission. Staffworking with Riley PurgatoryBluff Creek watershed Districtto develop joint Bluff Creekcorridor progran.
First neeting held forinfornational purposes.
Scheduled for L2/4/9f agenda.
Pc reviewed LI/ 6/9L.
Guidelines neno reviewed by PC
and scheduled for cc. ordinance
revisions to follow.
CITY OF
EH[NH[ESEN
690 COULTER DRIVE. P.O. BOX 147. CHANHASSEN, MINNESOTA 55317
(612) 937-1900. FAX (612) 937-5739
I{E}IORANDIJ},I
TO:
FROIII:
DATE:
SUBf:
Planning Conmission and City council
Jo Ann olsen, Senior Planner
Novenber 26, L99L
LoweL l carlson site Plan
On July 10, 1989, the City Council revoked L'owell Carlsonrsconditional use perrnit for his contractor i s yard located on KingsRoad. The city then took legal action against lowell carlson to
clean up the site of the contractorrs yard. The intent of theIegal action was to have the site cleaned up. The contractorrsyard activity was grandfathered in and had to be pennitted toremain. After going through the court process, LowelL carlson
pleaded guilty to naintaining a public nuisance. The terns of l{r.
carlsonrs sentence are as follows:
clean up all itens on the list by septenber 22, t99L.
ALl vehicles and equiprnent stored on site nust be
licensed, operable, and not nissing any essential parts.
1
2
3 subnit a site plan to the city by Septenber 22, 1991.within sixty (50) days after the city approves the siteplan, ur. carlson nay have no exteri.or storage outside abuilding or an approved outside storage area.
The city code now finits the size of an accessory structure in the
RsF District to a rnaximum of 1,000 square feet. The City Code alsoprohibits the use of unadorned, prestressed concrete panels and
concrete block. Since it is the goal of the city to work with !lr.
Carlson to clean up his property uhile allorring him to rnaintain his
business, the city wilt agree to the following:
1. A total storage area not to exceed 5,OOO square feet.
The storage area may consist of a building and screenedoutdoor storage. The building nay not exceed 3r00o
square feet.
tVDt,PRINTED ON RECrcLED PAPER
q
Lwell carlEon site Plan
lovenber 26, L99l
Page 2
2 The building nay be a metal agricultural t)rpe buildingbut it nust have a pitched roof and be painted an earth
tone color. The buiLding shall have landscaping to break
up the expanse of the uaI1.
The screened outdoor storage must be enclosed by a 10foot high, 1O0t opaque fence. All outdoor storage must
be completely screened by the fence. No storage which
exceeds the height of the fence wiII be perrnitted withinthe fenced area. The fence must be Iandscaped to breakup the expanse of the fence.
All storage on site nust be either within the screenedoutdoor storage area or the building. The existingstorage sheds along the easterly border and all othervehj.cles, parts, materials, etc. nust be renoved fron thesite or placed in the screened outdoor storage area orbuilding.
As part of the settlement agreement, llr. Carlson has subnitted asite plan lrith a proposed building. The site plan proposes a
L2,4OO square foot building, sinilar to what lilr. Carlson has
proposed in the past. A 12,400 square foot building is comparableto an industrial building found in the industrial office park. Thebuilding greatly exceeds the size that staff had stated would beacceptable. Therefore, staffrs current position is that theproposed site plan is excessive and cannot be accepted by the city.
Prior to replying to Mr. carlson with the cityts position, stafffelt the Planning Conmission and City Councit shouLd have anopportunity to coDment on the proposed site plan and state whatthey feel is acceptable. Staff is looking for connents on howlarge the building should be pernitted to be, keeping in rnind thatthe site is in a residentially zoned district.
ATTACm,IENTS
3
4
1
2
3
L,etter froro Elliott Knetsch dated August 23,list of itens on-site.I€tter fron Elliott Knetsch dated August 24,Site plan/building p1an.
1991,. including
1991.
,
,, 1,
Th.rm:rs l. C.rmPbcll
Rt8er N. Knuu;n
Thomas M. S<ott
Cary G. Fuchs
James R Walsron
Ellion B KneE h
CAN4PBELL, KNUTSON, SCOTT & FUCHS, P.A.
August 23, l99L
Bruce A. OLander, Esq.
Attorney at Iaw
200 First Street East
Jordan, Minnesota 55352
o-
carrson
**Y
(61:) 456-9519
Fax (612) 456-9542
Re: city of chanhassen vs. Iowellcourt File No. 78371
Dear Mr. Olander:
very truly yours,
CAI.IPBELL, KNUTSON, SCOTT
& FUCES, P.A.
BY:EUiott B. Knetsch
EBK:Elw
Enclosurecc: Judge Phillip Kanning
.rTJoAnn olsen
,.;C_.r.,-J
. AUG-fi$ l93i
iITY OF CHANHF,SSE:
\ankee Square Ottice lll ' Suite l0l ' 3460 V'bshington Dire ' Errgan
Att.xncls at Lau
Enclosed herewith please find a list conpiled froD the city'ssite visit to l,tr. Carlsonrs property on June 11, 1991. The list
has two parts:
1. Itens I{o. 1 through 31 Eust be renoved fron the site or
stored j.n an accessory building or a screened outdoor
storage area.
2. Itens No. 1 through 11 nust be renoved fron the site.
By copy of this letter, I aD sending the list to Judge
Kanning. Pursuant to the plea bargain between the parties,
!Ir. carlson has ten (10) days from the date of this letter to
dispute any iten on the list. If the parties cannot resolve the
dispute, it will be subnitted for resolution by Judge Kanning.
Also pursuant to thE plea bargain, ur. carlson has thirty (30)
days fron the date of this Letter to subnit a site plan to thecity. Please call Be if you have any questions.
The following itens ave to be removed fron th ;ite or stored in
an accessory building or a screened outdoor storage area:
11.
t2.
13.
14.
15.
16.
!7.
14, .
'to
Kerosene, signs, wheel barrows and trailer;
Bucket (fron backhoe) and miscellaneous piecesi
Bl.acktop ro1ler;Trailer housing the oi1, grease and ladderi
lero Toyota rskid Loaders and one white rbobcatrr iBarrels and boards;Anti-freeze and other barrels ;
Landscaping dragger, bucket and miscellaneous tires and rins;fto blue air compressors;
one rusty-yellow cotnpactor, one orange welder, one orange lawn
mouer, one yellow trencher and one blacktop rollert
Red flatbed truck i
Purpt
"step vanrr used for storage plunbing;
Boat and l.Iercedes iSteel racki
Large barrel with fuel oi1 dj.esel;
used oi1 barrel i
Transoj.ssion parts i
Material. for the asseEbly of the building t ill be used vhen
the building goes up, renaining pieces to be removed i
one blue van will be licensed;
one bLue trailer, one red trailer and trForeuansir tr:uck i
The trtagr! trailer for the backhoe will stay;
Big blue dump truck wj.1l stay;Trailer !,rith Pvc storage and things on top as welL as biggertrtagtt trailer i
Trro tractors and backhoe i
Trro trucks (daughterts drive) wilt be licensed. currentfy
have 1990 tabs iTto Bulldozers 45oc John Deer, one Ford -tiictor, .955
Traxadator and blue truck with sno!, plow a1I stay;
I{hite trailer;Flat bed truck will be licensedi
Large field with areas of niscellaneous equipnent will be
cleaned upiwater tank and chain link fences, snorrplows, culverts andflares.
The foltowing lteDs must be reuoved froB the site:
L.
2.
3.
4.
5.
6.
7.
8.
o
10.
1
2
4
E
5
8
9
25.
26.
28.
29.
30.
one blue and white van used for storage i
Shingles ;
Large rusty gas barrel containeri
F j.berglass bathtu.b units;
Batteries iMaterial for the asseEbly of the building rrill be used whenthe building goes up, renaining pieces to be reDoved iBlue cab for the semi-trailer lrith Gw 117,
Sna1l yeI1ow garage i
Green building fuII of plunbing supplies vill be removed lrhenthe neu storage building is built and the supplies renoved iFishing houses i
Garbage pile.10.
11.
20.
21.
22.
23.
t--
Thom,u l. Crmphell
Roger N Lnurxrn
Thonr.r' \1. Sc,.rtt
Gan C. Fuchs
James R rr)0alston
Elliotr B. Knetsch
CA}V{PBELL, KNUTSON, SCOTT & FUCHS, PA.
{ttrxncys nt Lrts
August 24, l99]-
(6l]) 456-95]9
Ex (612),15&9542
Re: City of Chanhassen vs.LoLrell Carlson
Dear lilr. Wilson:
f have been asked by Scott Harr, City of Chanhassen pulrlic
Safety Director, to advise you of the status of the case of City of
Chanhassen vs. Lor^rell Carlson. IrIr. Carlson entered a plea ofguilty to naintaining a pub),ic nuisance. Prior to entering theplea of gxriLty, remarkable progress was nade in cleaning up thesite, although there renains a long uay to go. The teras ofMr. Carlsonrs sentence are as follows:
1. clean up all itens on the attached list by SetpeEber 22,
1991.
2. A11 vehicles and equip[ent stored on site Eust belicensed, operable, and not nissing any essential parts.
3. Subnit a site plan to the City by Septenber 22, 199L.within si.xty (50) days after ttie city approves the sj.tepIan, Irlr. Carlson Bay have no exterior storage outside abuilding or an approved outside storage area.
chanhassen City Ordinances regarding fill and grading allow
some activities without a pernit. If you believe that Ur. Carlsonis exceeding the linited levels a1lolred by the ordinances, you
shouLd contact the City Engineer, Charles Folch, or Scott Harr.
Very truly yours,
CN{PBELL, KNUTSON, SCOTT
& FUCHS, P.A.
Elliott B. Knetsch
r.-CiilVlJ
\hnkee Square Oftice lll . Suite l0l . 3460 \\hshin-eton Drire . Erg"rflllftzSdggi
iITY OF CHANHAssLI
ltr. Alec Wilson
7080 Kings Road
Excels j.or, l,tN 553 31
EBK:Dlvcc: Scott Harrcharles Fo1ch
L4oArrn oI."t
By:
g E
a
1
ct
.BX 85, P 316 CHANHASSEN, MN
5 ACPES
f'
-1
)
6-+j,
tt
5
r.* i- i
Y
@
,t
a -.1
t t
-- --- -a,laE --s,:t--.-.--- -
i.l'i
,!
I
i
o
I
{**
I
:..
T
)Filo
a.l .t/I ta
t
.rt I a*@
I
,,
,tJ I
I
'="*'/tJ
*.
@-
,|
t
o{i e'-
a
4t
J.
!
7,
I
I
I
)
B
u,l
h7
/
I
I
i
!
J
,
E
e
t5
ri
_i
\'
e
itr
ir
1a!
'.;:!i
I
z
r
d
3
:
)
t
i{e.l&:
?
Yr
t"'
.t
*e
).-
flt3E(Jat
I
I
.
:
J
._a
E
:-
,t
J
7
I
J
id)
fl
I
.:
76-J
5
ID
Lo-
,
a
{i{x
d 9.2g; B TJPi ! i.. ?:i -1.eupf3!( ( rO0\'rt J, ' 'i'i;4 '
i p I lfc ii;5IE
: -iN.a:
- rl'tilriA E dA
o
i
It!
IIIII
I
Ii
l
:.,
d'
h7
I
Il_Jli
I
I
I
:
I
:
i
i
i
I
)
!!
t
I
I
I
i
I
,
l
T
d
!
-a
'5
J
,
x
I
6 :
7
or
d
ad
I
D
i
I
I
I
I
i
I
i
I
i
I
I
I
I
i
E
il
I
I
:
!
I
i
I
I
I
E
I.
i
I
I
I
I
I
!
!
I
I
CHANHASSEN PLANNING COHMISSION
REGULAR I'TEETING
NOVEMBER 6, I99I
Chairman Emmi ngs
HEMBERS PRESENT ;
called the meeting to order at 7:3O
Ladd Conrad, Steve Emmings, Brian
P.m. ,
BatzIi , Jeff Farmakesand Joan Ahrens
I{EMBERS ABSENT: TiM Erhart and Annette ElIson
STAFF ESENT 3 Jo Ann Olsen, Senior planner and Kate Aanenson, planner II
PUBLIC ARING:
CONDI T I ONAL USE PERMTT AH ENDI..IENT FOR PROGRESS VALLEY ST GE ON PRO PERTYFUSATED A s A GAR
AND UNGEY
Jo Ann Olsen presented the staffpublic hear i n9 to order.report. Chairman Emmings ca]Ied the
8F
Gary Brown: I'm Gary Brobrn. f represent progress Valley. To address theU-Haul situation. That's what we rent is U-HauI Lrucks dor^rn thereprimariry, once in a r.rhiLe there's a coup).e trailers come in, stragglersand ue try to get rid of Lhose right ar.ray because we have gross down thereand we don't like hooking them up so thaL's pretty incidenial. But rthink, r know as far as that goes, that's a lot better place to that thoseU-HauI trucks I believe sitting down there with very minimal visibilitythan they are sitting over here in the middle of tor.,n I Lhink. And as faras, I read t.hrough the staff report and stuff on this and they'rerecommending that we put in some evergreens along the southh,est corner andwe don't have anv problem with that. rt wirr maie it look a lot prettier.And as far as a gravel base goes underneath where we,re going to park thesethings, we don't have any problem with that. [.re can hanJ]e that. Andpeople do need a place to park their big boats and motorhomes and such rikethat because I think it rooks better parking them dor^rn there in the fieldLhan it does parking them aII over the city.
Emmings: Can I ask you, what kind of stuff is being stored outside? I,mnot talking about the trucks right nou,r but just what kind of outsidestorage Nas ther e?
Gary Broun: There's I believe 2 or 3 motorhomes there and a couple ofboats and I believe one construction trailer -
Emmi ngs: Okay . And if on the map that r^re ,ve got he.re of your .
Gary Brou,n: If we put it in that back corner over there, the only personthat's really going to have to see it is a person who lives right next tothe storage center who happens to be my partner who's here,.Gary Dungey.
Emmings: Okay, so the outside storage you,re proposing is the area that,sin Lhe box on that?
Gary Brown: Correct -
Planning
November
Commission HeeLi ng6, !99t - Page 2
Emmings: Then as far as where you keep the trucks and other things thatyou rent out, where are those kept?
Gary Brown: !.le've been keeping them so to speak in the backyard rlght now. -Behind the building.
Emmings: WeII, where on the map though?
Gary Broun: Right about over in this area over in here. l.Jhere thi.s open
Iand is right in here. So that is visible 6y 212. If ue put them back
over in this corner, that ttould be
Emmi ngs: Be less so -
Gary Brown: That Nou]d be less visible if that's what you rrant to see
Emmings: Now I noticed that the original approvaL required trees every 40
feet and a berm. tJas that done?
olsen: They do have the landscaping in-
Emmings: That was required by the original, okay.
olsen: They just don't have the concrete curb
Emmi ngs: okay. Is there anything else you'd Like us to take into
consideration her e?
Gary Brownr No. I think you guys are doing a great job.
Conrad: Oh sure Gary.
Gary Brown: You don't believe that Ladd?
Emmings: At Least we're doing okay so far.
Gary Brown: So far tonight we're doing great.
Emmings: okay, Lhanks. Anybody else that u,ou]d Iike to say anything about
this application? If noL, is there a motion to close the public hearing?
Batzli moved, Conrad seconded to close the public hearing. AII voted in
favor and the motion carried- The public hearing was closed-
Emmings: Let me understand. I have some troubLe understanding the
conditions Iisted on page 5. Are you ProPosing that we adopt?
olsen: No. What happened is you didn't get the, those are,
Emmings: They don't look Iike conditions.
O1sen: RishL. Those are the 12, those aren't conditions
Emmi ngs: These are criteria?
Planning
November
Commission Meeti ng
6, l99l - Page 3
O]sen: Those are the 12 criteria lhat, those are the answers to each one.It looks like the criteria itself did not set in. Vicki did not geL thosein.
Batzli: These are the anstrrers to the questions.
Olsen; Those are the answers to the criteria.
Conrad: Ah, now you come up with the questions.
Emmings: Okay. So we read the answers and make up the questions.
Batzli : Ne'Il play Jeopardy.
Olsen: They're in the ordinance. I apologize. I didn,t notice that.
Emmings: Okay, so the recommendat ions are over here. Now in therecommendations you're tarking about evergreens in the southwest corner.l^Jhere's the southwest corner? Uhich way is north on our map?
OIsen: This is north.
Emmings: So you urant screening where?
olsen: In this
app.I .i ca nts t.hatvery visible in
along here. So
Emmi ngs: So areyou assume he '1I
OIsen:
and the
area.
live
hereit's
theit'saII
It is close to the residents. I know that,sthere but when you drive down Stoughton Avenue,to where the storage is and there are residentsan area to try and screen.'
you figuring, you're putting the screening there becausebe parking the trucks in that corner? t,lhere that box is?
Risht. That's where they're proposing to keep the
U-HauIs.
outside storage
I see condition 2up here. Ladd.
you've got, okay. Let's see hrhat
storage we require. l,le require aII outdoor storage to be
Emm i ngs :
comments
Oh okay.
we've got
conrad: Outside
scr ee ned?
OI sen:Yes .
AreConrad:there any
Olsen: Not recently.outside storage.
excep!ions?
The way it's stated in the ordinance, it's screened
have6 foot hi gh
Conrad: And it is screened not necessarily. You said we could adopt someconditions of Iandscaping but right now our standards for screening is,would Lhese meet our current requirements for outside screening?
Olsen: No. It wouldn't be totally screened. plus when you
commercia] adjacent to residential , there's supposed to be a
Planning
November
Commission tleet i ns6, !99L - Page 4
oPaque
Conrad:
allowing
OIsen:
Conrad;
ther e .
fence and
And sothis?
There is
UeII, I
that's not there either.
under what rationale could weIn fact there 's no
r esi denti al .
don't want to put
not set a precedent by
residential , well .
words. There are residenLial houses
OIsen:
it's in
upheld.
What's
Lhe BF
been used
district
the past is thethat doesn't, Iin
but
fact that i!'s been
feel that it should
on 212 and
still be
Conrad; Truck and trailer rental . By screening this Jo Ann, are these
buildinss there r ight now?
olsen: No,
Conrad; They're not there so
be putLing up a fence in thaL
really we're right ouL in the oPen. So we'd
aY ea?
OIsen: No .
Emmings: No, that's fence isn't iL?
OIsen: Yeah, this already.
conrad: I'm Lalking about tlhere we store -
O]sen: There won't be any fencing.
Gary Brown: Maybe I can help exPlain this. The whole project nou is
fenced aII the way around.
Olsen: tJith a chainlink fence -
Gary Brown: There's 7 acres here aII completely fenced in. And we have
trees.
Conrad: That's within it?
Gary Brown: This is within it, correct. This wiII remain. We've got 4
buildings up and fu.I1. The fifth slab is poured and we're waiting to Putthe building up nord. The snow kind of slowed lhings up a little so what
we're rea.L].y asking Lo do is until we get the next three buildings up,
which will be hopefully in the next 2 to 3 years, that wiII eliminate Lhis
'problem because then we uon't have any room for outside storage.
Everylhing r,ri]l be conf ined. So what r.,e're trying to do is we're trying to
supplement, we're trying to get some income in there to use that area Lo
help defray aII the costs, t,le kind of got surprised wi.th Lhat new
watershed thing and some things Iike that that go! very exPensive on us.
So by renting ouL some U-HauI trucks and things like that, r.,e can defrav
some of the costs. So I think what Jo Ann's ProPosed and correct me if I'm
Planning
November
Commission MeeLi ng6, 7991 - Page 5
urong is to put some more evergreens along here to screen that from theresidential area. Correct?
Olsen: Yeah.
Gary Brown: I don't want to throw a monkey wrench into this deal but theone thing is, when oe first planted all the trees down Lhere, we put some 6and 7 foot evergreens in, Like about a dozen of them and we Iost everyone. tje put 5o-3 footers in and we've never rost one- Ue had the nurserycome doun and it's such sandy soil down there that those big ones, theycan't get 9oin9 in that soil. The guy told us we were kind of wasting ourmonev by putting those big ones in but nour those other ones have been inthere 2 vears and thev're about this tarr right now. r realize ulhat we'retrying to do is screen it and I don,t wanL to goof that thing up but Ithink it's kind of futire to put in 5 and 7 foot evergreen trees whenthey're not 9oin9 to last. Like I say, I don,t want io goof it up. Iagree whore heartedly Hith r^,hat staff recommends here- But r also r.Jant thething to look nice and r don't wanL to spend a rot of money on somethingthat isn't going to r.,ork. Ue bought a rot of trees from conky gros. .nL.had so much trouble they came down and tested the soil and litLle ones urillgrow wonderful in this. Big ones, they uon,t. They won't grasp because oftheir size and because of the soil conditions - t^,le i-rave takin sand as fardown as you can dig. Does that ansr^,er the question on that?
Conrad: Yeah it does. So the outside screening doesn't count asscreening? The outside chainrink doesn't count as screening of this area?
OIsen: I wouldn't consider a chainlink screening-
Emmings: Mv recolLection there Ladd is the planning commission said youhad to use, recommended opaque fencing around the entire site and then whenit u,ent to City Council, that uas changed from opaque to chainlink. AmI r i ght?
OIsen: Yes .
Gary Brown: It r^,as changed for the reason of security and fire. If it,saII screened in, r mean peopre courd be in there breaking into the unitsand nobodv wourd ever see it. And another thing is fire. A fire courd begoing in there and untir it got higher than the fence, nobody would knowwhat's goi.ng on. so everybody, the Fire Department, the porice Departmentand everybody agreed that it r^ras a lot better idea Lo do it this way. Toscreen it at that time.
Conrad: Okay. In terms of the trailer
use -
OIsen: It's a conditional use.
Conrad: It is a conditional use. Andyou dependent on TH 2L2 for visibitity
Gary Brourn: It.sure helps,
truck rental . It is a permitted
right now Gary you've got those, areto promote it?
PLanning
November
Commission Meet i ng
6, l99t - Page 6
Conrad: Yeah. You know drive by's your best .
having a U-HauI truck sittingGary Brown: Yeah. It's great advertising
along there where they can see it.
Conrad: That's what you r.rant .
synopsis. No because?
Staff's position is no. Try to give me a
Olsen: tJe say no for the outside storage just because number one Nith the
use, the rental of Lhe trailers were kind of on the fence with that one.
But that's where we added the conditions where ue feel more comfortable
with it.
conrad: A couple of things. Detr j.mental to the neighborhood. t,lill not be
hazardous or disturbing to existing or Planned neighborhood uses. tliII not
be detriment to... I'm not sure where I'm at on this one- If you think
about it in chanhassen, Gary brought up an interesting point in downLown
where we have trailer rental. It's not my favorite site for it. It's got
to be someplace. It should be someplace and I don't know how it works
here. But this should be a place where we can rent trailers in Chanhassen
so f have a tendency to b,ant to make it r^ror k somePlace, I iust don't know
how it r.lorks down there and if we've got the right standards. It seems
Iike a logical place to put it but I don't know that I'm real comfortable
yet that ure've got Lhe right standards for that. Maybe we do- I guess I'd
like to hear somebody else talk about Lhat from that PersPective. It's not
that we shouldn,t have trailer rental. Truck and trailer rentaL in chan.
There are better places for it than on our main street. And is this a good
location and do we have, trailer rental should be visible. If you want to
compare to a business Person, that's a great way to Promote it and we
don't need to not Let that Person promote it so the question is' is this
the righL place and do we have the right standards to guard the
neighborhood? Maybe someone can persuade me one b,ay or another. Right noul
I don't know.
Gary Br own :
right on Lhe
other side.
l^Je basically have
corner of 272 and
two neighbors.
Stoughton there
tle have AI Cohen who
and then Gary Dungey
lives
on the
Emmings; You haven't been asked yet. If he asks you
thi ng . OLherr^rise .
Gary Brown: I thought he was asking a question. I'm
Conrad: Yeah, I was sort of addressing the Planning
Emmings: He's musing. Ladd's in one of his musing.
for us to a nswer .
a question that's one
sorry.
Commission.
.He's posing questions
Conrad: I'm trying Lo Iet Lhem Persuade me Gary but yeah, I know what you
have for residenLs. Or very close. I guess my concern is I'd want to have
you visible there- I'd want it to be presented in the besL Possible t'uay
and I'm concerned with 212 traffic. I'd want it to look good. As much as a
truck lrailer place could Iook and what I don't know is LhaL h,e've got, I
P.l.anning
Nove mber
Commission Meeti ng6, t99t - Page 7
don't know that ure've set the standards to make tha! look good and maybe wehave. That's why I'm sort of saying Lo these folks...
Emmings: Jo Ann, we've got a mini-storage place up here on TH 5. Did we
make it a condition of their approval that Lhey not do outside storage?That's the only other one we've got in Chanhassen isn't it?
Olsen: Risht. That one's totally screened. Totally opaque.
Emmi ngs: Opaque fenci ng?
Olsen: Right. You can't see inside.
Emmings: okav but there we said no outside storage that would protrudeabove the opaque fe nc i ng?
Olsen: Cor r ecL .
Emmings: But did we say no outside storage?
O.l.sen: That I can't -
Emmings: r seem to remember there was not outside storage that you couldsee above but the idea that we didn,t Hant to see outside storage.
Olsen: Right.
Emmings: okav. And now wait, there's another one down at Lhe end of TH 101there and \H 2L2. Isn't there some kind of storage in there too?
Olsen: Mi ke Sorenson's?
Emmings: ft's very small .
Olgen: Yes .
Emmings: Is that screened? There's not outside storage there?
Olsen: No. It used Lo be screened by trees. Now it,s not screeried.
Emmings: BuL is there outside storage allou,ed there?
Olsen: I believe there was not. I think that,s b<jen a preLty muchstandard condition.
Emmings: Okay. AIright, Brian?
BatzIi: Yes.
Emmings: Okay Jeff? ft,s your turn Brian,
Batzli: WeII, I was trying to figure out here whether this r,louldn't bebetter handled as an interim use. Since Ne don,t allow this under the
Planning
November
Commission Heet i ng
6, !99! - Page I
conditionaL use, what's the difference between us approving this as an
interim or conditional use? If we decide to approve the outside storage.
Olsen: t^lhat's Lhe difference with the outside storage?
Batzli: Yes. tlould it make any difference to you or the Citv if we
approved it one way or another since it's not a permitted use under either
one of Lhose categor ies.
olsen: tJeLL I think you'd have to amend the ordinance to make outside
storage an i nter im use.
Batz]i: And not as a condiliona] use?
Olsen: You could do it eiiher $ray thaL you'd want.
Batzl.i: I'm just trying Lo ask. tJould we have to amend the ord.inance to
approve this as a conditional use?
olsen: outside storage , yes.
Batzli: But you said in our thing here that if we decide to aPProve it,
we're just supposed to do it with certain condiLions.
olsen: As an amendment to the conditional use Permit. You'd be removing
the condition that outside storage would not be Permitted.
Baf-zli: But in addition to that we'd have to amend the ordinance to do it
as a conditional use?
OIsen; No.
BatzI i : Nhy not?
Olsen: I talked tha! over with Roger and no we don't because we can do it
as parL of the condiLional use. The original conditional use.
Batzli: I'm not tracking. It's not one of the uses allowed bv the
ordinance under the conditional use. It's not allowed under interim
Olsen: Rish!.
Batzli: t^lhy can Ne do i! under Lhe condilional use?
Olsen: As a part of the mini-storage. As an accessory part of the
conditional use -
Batzli: ft's not an allowed permitted accessory use-
Ofsen: No it's not -
Batzli: t^lhat I would Like to do, if we're going to ]cok a! Lhis, is
whether or not we Hant to allow these outside storage as iL applies
anybody and not just this particular applicint if ue're going to do
use.
dec i de
tothis.
PIanning
November
And so I wou]d, I don'! know. I don't have
wheLher we want to allow other people to do
As far as the truck Lrailer rental , I think
Commission Heet i ng
6, 1997 - Page 9
Okay. And so I'm clear onwith what the staff reportrental you think. . .
enough information abou!
that dourn in the BF district.
that's fi ne.
uJhat you just said. You're agreeingsaid? It said no outside storage but
Emm i ngs :
basicallythe truck
BatzIi:that but
Right bu! if we're going to allow outdoor storage, I may allor.rthen I want to change Lhe ordinance to allow everybody to do it.
Emmings: Yeah, okav.
Conrad: t^,ait, wait. tJe don't al]ow outdoor storage period.
Batzli: teII it's defined in here but I don,L know urhere it,s used.
Conrad: I thought we did when it was screened but we don't.
Emmings: t,ie do allow outside storage. That,s not accurate because I canthink of lots of examples where we do.
Conrad: But noH f'm starting to question.
Emmings: But i!'s always been screened. t^le have the dock place over hereand they had to put up opaque fencing. Ue had the mini-storage. They hadto do opaque screening in order to have outside storage. Those are theonly two that come right to mind.
O]sen: AII of the olher business districts.
Emmings: Oh, right here off of the end of this street there was outsidestorage of something. The little street that ends in a cul-de-sac rightoff Lhe end of Kerber.
Conrad: So ls this particular toto the BF distr ict?the BF district? Is this just particular
OIsen: Yes .district.The only business district that doesn't have it is the BF
Conrad: O kay .
O]sen: And I think the reason
essentially took what ulas down
conrad: Yeah, yeah.
Emmings: Jeff.
for lhat u,as uJhen we did lhe BF district wethere and there uas an ouLside storage so -
Farmakes: on
complelion of
frame?
the completion of
Phase 3 where you
Phase 3. t,lhen
remove outs i de
you tal ked aboutstorage. Do you
the
have a time
Planning
November
Commission l.1eet i ng6, 799f - Page 10
t,lhe n
Okay,It's not a bui ldi ngbut it's SO
a
Gary Brown: Le!'s hope not but you're righ!.
Gary Brown:
Far ma kes :
sc hedu 1 e
we fiII them aII up .Jeff .
this is a progressive schedule.
Progressive situation?
could interrupt. Hy proposal would be to Iook at allowing it
use and then saying you can do it for 2 ot 3 years but then,
Gary Br own:
BatzIi: If I
as an i nter imthat's r ight .
Gar y
in or
Brown: te either have to find a different area for them or come back
we have to give them up. one or the other.
Farmakes: I r.rouLd be somewhat concerned about this. I don't think that
makes sense that you'd want to store that I guess as a temPorary use. tlhaL
concernSmeis!hat'ssortofanopenendedtimeframe.Iftherewasalimit on there, give you a Iimit I could see that as being a sensible
compromise Lo the problem. The problem's not addressed though. I'm also
concerned, in seeing .Literature from Ryder and U-Haul, Part of the
franchise suggestion in location of the signage lhat is on the trailers
themselves is to billboard it in such a r.ray Lhat it's seen from the highuay
obviously and U-Haul's very large on the trailers purposedly so if you line-
them all up, they create a signage effect - Versus having one sign uP there
that says U-HauI here, you've got 40 or 50 lined up in a row saypotentially. And in some cases the trucks are quiLe LaII. Big large
trailers. So you get outside of the storage issue and it actually becomes -potentially a signage situation. I think as a separate issue, maybe thaL's
something to deal with in a signage ordinance that we're look.ing at. AIso
on these issues of what do we do with these outside trailer situations
Suggestion anyway.
Farmakes: And I'm not listing tha! as what you're proposing. I,m just
saying potentially if you make a precedent for that, that somebody else maynot be trucks and trailers. It may be something el.se. But in an outsidestorage situation, t^rhat is painted on the side of it or whatever the intentthere is, I guess you still get sort of a visual ..- So f agree here thatthat maybe a separate issue to look at and if there,s a fixed time, maybe
Yeah.
So for instance the completion of Phase 3 may not occur for 10Farma kes :
years?
Farmakes: If at lhat point when you complete Phase 3, uhere would these
trucks go?
Gary BroNn: If you let us put Lhem back there where we want to, then you
wouldn't have this billboard effect. It would be nice if you'd Iet us put
one oul there along 212. If you don't want us to put one along 212, that'syou guy's business. That's your priviledge but all we're asking is to keep
them and keep them back there in that corner where it isn't in anybody,s
way .
Planning
November
Commission Meet i ng
6, 199f - Page 11
thaL'd be the best Nay to 90. That you would eLiminate the traj.lers out of
there . . .temporary.
Emmings: Joan. Well how about, sorry to interrupt you but you addressed
the truck thing. tlhat about the outside storage?
Farmakes: I grouped tha! in there.
Emmi ngs: Oh okay. Soeither if it was under
Farmakes: On a temporary situation. I Lhink
approved in here. That would be a reasonable
you wouldn't be opposed to allowing outside storage
those same conditions?
based on what's already beensort of Lhi ng .
Emmings: Okay . Joan, go ahead.
Ahrens: As to the truck and trailer rental , the zoning ordinancepermits. . .I'm not familiar with the site -
Gary Brown: It's just east
fami liar -
of Gednes PicLes half a miLe if you're
Ahrens:
that. . .
Gary Brown: You know where
Ahrens: Yes .
Gary Brown: It's abou! 3,24
Ahrens: I know the general
Assumption Seminary is?
ofa mi le west of that.
but I can't picture it.
Right- but I can't picture where that storage is or anythi.ng like
area
Gary Brown: It's righL on the corner there.
Ahrens: I think that u,e should be allowing truck and trailer rental.,,inour ordinance to all.ow it, I'm not sure this is the place iL should be but,correct me if I'm wrong but truck and trailer rental uras not part of thisoriginaL conditionaL use permit.
OIsen: Correct .
Ahrens: Nas or was not?
OIsen: [,Jas no! .
Ahrens: So this is kind of, you started the rental business.
Gary Brown : Correct . l.le Here naive i n that we di.dn 't know we
specia.I permit for that because of the fact that it's okay into do. You know it comes undernealh your Statute.
Ahrens; Has there been any complaints from any residents?
needed a
that di str i ct
PIa nni ng
November
Commission Meet i ng
6, f99t - Page 12
OIsen: No . No complaints .
Ahrens: Okay. f'm not opposed to thethink that we have to be careful about
houses are around. . .
truck and trailer rental lhere.
screening... Hor,Jever, how many
I
Olsen: It's about 3
ma ny
homes on
houses
orre on either
the other side of Stoughton.
are around the mi ni-storage?
side and then it's like 3 or 2 across the
Gary Brown: How
OIsen: There's
street.
Ahrens: How many trucks
Gary Br oun;
Gary Dungey:
Gary Brown :
Gary Dungey:
Ahrens: And
The boats and
At the high
Average is
Average 7
and trailers do you
point I think we've
probably 7.
TraiLers , L oY 2.
have available for rental?
had 15 trucks haven't we?
Is there any there nou?
No.
they're all jusL mixed in with your other outside storage?
the construction trailer. It's aIl mixed in together?
Gary Brown: t^le lry to keeP it confined to one end. But vou're right. No,
no, not really. The ouLside slorage is over to one side and the U-HauI r're
keep on Lhe other side because Lhe U-HauI area we keeP Plowed out in the
winter. So they are pretty much segregated right now.
Ahrens: But you can see both the outside slorage and the rental trucks
from the residential area?
OIsen: Yes .
Ahrens: And the outside storage, it was there when the City Council
approved just a chainlink fence around it?
olsen: No it was not.
Ahrens: But they knew that was.
Olsen: No. It was a specific condition that there be no outside sLorage.
Ahrens: tlhat uras the purpose of Planning Commission asking for an oPaque
fencing if there wasn'! going to be any outside storage or anything out?
Olsen: HeIl the ordinance requires 6 foot high fences between residential
and commerci.al . And then just to screen the buildings.
Batzli: It has residential on 3 sides.
PIanni ng
November
Commission Meet i ng6, 7997 - Page 13
Emmings: I think we. thought Lhe fence looked better
buildings. Basically. It uras kind of a hot item as
it kind of came dodn to aesthetics as I remembei but
490 .
than a colLection ofI recall and I think!ha! was a long time
Ahrens: It's hard for me to believe that even evergreens there areactually going to do anythi.ng to screen the outside storage. . .really want
Lo try and screen it.
Batzli: In 20 years it wiII.
Ahrens: And I can understand that the purpose of your storage facility isto store...f understand that and I don't have any problem with thaL but Iwould like Lo see if we approve this lhat there be a limit, a time Limit on
how long this outside storage can 90 on. I think that you may u,ant toforget about lhe landscaping, at least the 6 foot sized Lrees. Iunderstand his point there too. He u,ants to. plant a smaller type of tree,r'd go aLong, with that, BuL r don'! lhink Lhat if we do recommend approvalof the ouLdoor storage, that we put a time limit of tike 2 to 3 years. Andthen you'\/e got...
Emmings: f guess my feeling about this is that there shouldn,t be outsidestorage at that site. I don't think there should be outside storage at anyof these mini-storage facilities unless they,re completely screened. Butas far as lhe kinds of things you're storing outside right now, I don,treally think, there's not that much of a difference between what you,restoring outside and the U-Haul trucks. I have no problem at all with thetruck rental thj.ng. I think it fits in with what you're doing hand inglove and I don'L have any problem lJith that at all. But I guess thereason that I don't want Lo jus!, I don'L urant to step over that thresholdof outside storage even though storing a few boats and a feuJ motorhomes
seems pretty much the same thing as having trucks sitting there, I don't
know what it's going to be next week. I don't know if it's going to be apile of tires or whaL the heII it's going to be but I think the whol.e ideabehind the mini-sLorage is, we're buildins spaces for people Lo storethings in in a neat fashion and f don't want to see stuff outside. So I'mabsolutely opposed to any outside storage. Like I say.
Batz I i : Unscreened.
Emmings: Unscreened. If he Hants Lo put up opaque fencing around that
corner so it can't be seen from anywhere, then as long as it doesn't stick
up above the fencing, I don't have a problem with it. Since we've done
that other places in town, I r.lould say we could do it dou,n there. Right
now I don'! think our ordinance would aLlotl him to have oulside sLorage
period. So I Lhink we'd have to change the ordinance first. I'd r.tant to
knor"r better why we don't have to change the ordinance before we allow it-
The only other thing that uiould concern me abouL the truck rental I guess
would be the scale. I want to know something abouL, you know 15 trucks and
2 trailers doesn't bother me at all- In fact f wouldn't care if it was
more than that but if it's 15o or if they suddenly get to be real big
irucks, that,s a totally different thing. And so I don't know how we could
set any timit on scale tut can you give me some idea how big an oPeration
you see? How many vehicles maximum you'Il be parking?
Planning
Novembe r
Commission Meet i ng
6, 7991 - Pase 14
Gary Brown: It's a type of business that you've never going to
many of them there because they always have Lo be rented. They
goi ng somewhere .
get very
have to be
Emmings: Yeah. If they're alI sitting there you're in trouble.
Gary Broun: That's right. If they're all sitting there, we're not going
to be renting any .longer because U-HauI isn't going to want us as a dealer.
I can see urhere you're coming from. tlhy don't you Put a cap on it of 20
trucks and 4 trailers. I can live with that-
Emmi ngs: O kay .
Gary Brown: And
somebody said 3
on it of , I
condit ional
d like to ask for 4
use permiL. That 'd
years but
be great too.Put
year s
the
foot .
a caP
on a
Emmi ngs: t,lhal 's biggest truck you rent?
Gary Brown: 26
Emmi.ngs: okay. I guess if I was going to put caPS on it I'd want to say
no trucks bigger than 25 feet and at any one time there wouldn't be more
than 20 trucks and 4 trailers. Timewise I don't see any reason to Put a
Iimit. I don't have any interest in limiting the U-HauL Because again I
think the business fits together. If you decide not Lo do it later, that's
fine. That's up to you. I don't see anv reason on Iimiting that. I think
what they were talking about limiting was the outside storage and maybe !o
limit because you're saying that once all the buildings are built you won't
be doing it anymore anYway. Bu! since I'm oPPosed to outside storage
that's not an issue for me.
conrad: But you're not oPPosed to outside storage that's screened?
Emmings: I'm not oPPosed to outside storage if it's screened -
conrad: Are you opposed to outside storage in the BF district?
Emmings: Yeah, we'd have to consider that. See that's why I think ue've
got to look aL the ordinance. tle've got to look at Lhe BF sectiori of lhe
ordinance and decide if we're going to do that and I think we've got to do
that before Ne act on this if we want to aPprove it. If the majority of
people here trant to do that, I think ule've got to look at the ordinance
f irst.
Conrad: That makes a ]ot of sense.
Emmings: 90 I guess, I don't know
Conrad: Jt sure makes sense to me thaL this is lhe area where we do someof these things. I just don't know that u,e have everything in place. Idon't want to set a precedent for bad sLuff. I,m concerned a litt]e bit.This is, whele Gary has his place, I Iike that area but it's, for this.However, if he was to the east by the bluffg in our BF dislrict, I don'twant it there so ve got a probLem with this. rt's great urhere you are r
PIanning
November
Commission Meet i ng6, f99f - Page 15
think from our standpoint. I hope from Chaska's standpoint. l'4aybe not butit's still some real. Iogical things for these multi uses. BuL I just don't
know that we have everything in place to set the right direction for arecommendation right now. I guess I'd kind of like to table it until wecan have staff do some, a little bit more backgrounding noh, that they knowwhere we're coming from and maybe bring you back again Gary. It,s probablydealing more with the ordinance than with you. Just so we're not setti.ngprecedent for other folks. That's the wrong way Lo go.
Emmings: Wel], do you Lrant to make a motion?
Conrad: I move that we table this.
Batz 1i : Second .
Emmings: f t's been moved
discussion?and seconded to table this. Is there any
Ahr-ens:
Emm i ng: :
Co nr ac.i :
right now
Farmakes:different
l^Je're going to tabl.e both?
That 's the motion.
Yeah. I Lhink a lot of interrelated
doing -
things. Gary's in oper at i on
Emmings: tlell we recognize Lhat he'sbuL there's not, nobody's going Lo go
l-Hie
both of these things right nowhim around whiLe r^re decide
doing
chase
Gary Brown: Right now it's pretty welf hidden because . . .snow.
are currentLy? The twoHow does
issues.
that affect urhat your plans
Gary Brown: To do what?
Farma kes: Outside
del.ay.
storage and the truck proposaL that you have. The
Gary Brown: It doesn't make any difference.
Emmings: He's doing them both.
Ahrens: Hhat are we going to ask the staffthere?to do concerning lhe trucks
Conrad: I don't know. Iin the BF district period
storage but screened.
just want us to
and how can we
the use of outside storage
, hou can we find ouLside
review
make it
Ahrens: f understand that part. I,m talking about the truck traiLerrental . . .an approved activity.
Emmings: tlelL isn't Lhat outside, well yeah I see.
Planning
Novembe r
Commission Meet i ng6, 199! - Page 16
conrad: That's not outside storage. That's
know how it works Gary. I don't under'stand
stuff inside the screen.
retail service and I don't
Gary's got to put Lheir.
Batzli.: It actually fits within the definition of outside storage though
too. Having your trucks parked Lhere.
Ahrens: But our ordinance permits it.
Batzli: I know, which is interesting.
Ahrens: So why do we have to table that Part?
Emmings: Because I think what, at least r^rhat I think Ladd is saving is
that storing, you're putting these Lrucks out. Yes it's Permitted, it's
Iike a retail use. It's a conditional use that's allowed in this area but
really what you're doing is storing a bunch of trucks outside and I think
Ladd wants to make sure that ule've got ProPer condiLions for this
conditional use before we just say okav, go ahead and we don't have any
conditions in place right now. tle may want to screen somehoul however, or
Ne may not.
Emmi ngs; Yeah, exac!ly.
Conrad: And what staff wrote down here, there are no specific standards
for truck trailer renLal . GeneraL ones and it sort of seems strange thaL
we're going Lo put a fence around truck lrailer rental . t^lell it's there- I
don't k nour
Farmakes: There are other uses...of that elsewhere- Not in this area but
there are some other areas but basically it's used as a form of advertising
up front by the road in town here. In Parking lot. ReLaiI parking lot so
it is, that kind of bothers me that there isn't anvLhing at all on there
regarding. . .
Batzli: t"lell I
t^,lhether that'sa look at that.
think
Pr oPer
we
to
can Iook a! that under the general 12 conditions.
allow them to park right next to the road and take
Farmakes: I didn't say it u,as improper. It
open ended thing. It's a retail parking lot
developed area. l.Jhat is the proper area. . .
Emmings: WelI I guess basically' it
our act together.
Gary Brown: One comment I would Iike
Exactly what my feeling is is that we
U-Haul thing because that's PermilLed
just
ouL
sounds Iike we need more time to get
to make is whaL Joan brought uP here.
shouldn't be here even addressing the
in Lhis district.
-S
or
uhere,
by the
it's sort of an
highway in a
Emmings: No, it's a conditionaL use and what that means 'only allowed to do that once we say 9o ahead and do that'
right noN
the truck
you 'r e
r e nta.1.
Conrad: or He may not.
Planning
Nolrember
Commission Meet i n96, 1997 - Page t7
and you will haveuse. It's allowed
it under these conditions. It's notconditional use. That's different.
to dc
as a
a permi ttedIs that r ight?
OIsen: Yes .
Emmings: Okay. Okay there are permitted uses. That means if something,if it's just a permitted use in the district, it's something that you cando" Alright? Now that doesn't mean you don't have to get approvals onaspects of it but still it's something that you can do trithout asking anypermission from the City. On a conditional use, you have to say I h,ant todo this and then the City says, yes you can do it but only if you do itunder these conditions, And that's the difference between a permitled andconditional use and this is a conditional, all.owed conditional use.
Gary Br own:a lot.l^Jell xhy don't you h,rite us and let us know. Alright, thanks
Emmings: t,e've gfot a motion pending here. The motionentire thing and take a look at the ordinance. Let,sordinance and this proposal togeLher and get somethingmeeting. It's not that big a deal I think.
is to table the
Lake a look at the
decided at our next
conrad moved, Batzli seconded to table amending conditional Use permit*87-2 and directing staff to review the ordinance regarding outside storagein the BF district. All voted in favor and the motion carried.
Ahrens: I'd be interested in Roger,s explanation aJ.Iowing that.
Emmi ngs: Yeah, it seems
what can be a conditional
want.
arbitrary because what's
t^,e might as well urrite
the sense of ljsting
dourn anything we
real
use.
Olsen: Risht. I
Emmi ngs: I don't
agree.
get that.
understand the i ssuere in Lhe parking Lot
Farmakes: I don'trental thing up he
of oulside storage. [,Je've got theacross from the malI -
Batzli: Merlyn's?
Farmakes; Across from Herylyn's. Outside. There a.re motorcycles. Thereare trailers out Lhere and so on.
Conradr It's iIlega] .
Farmakes: That's trhat I'm saying. That's a relail parking lot so it seemsIike an item that really needs to be.
olsen: t^le've done that before where we've had certain uses as part of theconditional use tha! we've arloured. so we've done it before but Ir setsonrethi n9 in wr it i ng.
Conrad: Nobcdy has enforced that issue right there.
Planning
November
Commission Meet i n96, l99l - Page 18
Farmakes: But if somebody came in here and ulanted to put in 1OO, I think
in Savage they have a huge U-HauI situation by the freeway and they've got
1OO maybe trucks lined up along the highuray and it has a visual , not only
retail impact but a real environmental visual impact.
Ahrens: tJhat's wrong with Her]yn's thoughS It's a hardware stor e .
l-'lotorcycles.Farmakes: The/ have different rental items. Log splitLers.
Conrad: It's just terr ibLe.
Ahrens: See I don't see any problem ulith that.
Farrnakes: I didn't say Lhere was a problem r^rith it. It's just
parked out in a retail parking lot and Parking sPace. ft seems
i nconsistent use. Uhat if they Park a billboard sign?
that it's
kind of an
com e
the
conrad: They couLd keep an RV out there. They could keeP a boat out
there. It just could be a collage of stuff. That's not what you want on
your main street. It's iust not right. I don't think anvbodv's plaving.
Ahrens: I don't think we know what u,e want.
Batzli: I think if you asked most of the residenLs, thev all go there and
use the stuff and they like it there. t,lhether visually vou ]ike it is
secondary to the question to most of the PeoPIe that frequent downLown
Chanhassen.
Conrad; They like to see cement mixers on main street?
BaLzIi: I don't think they care.
it bothers anybody. I've heard anybody outside of
say that offends them.
My neighbors have said that.
Ahrens: I don't think
the Planning Commission
conrad: Ah , r have ,
Farma kes: I think the
in here and you refuse
streeL , r.rhat is the.
other problem of uhat is permitted use. If I
me one thing and I can point that out across
conrad: tJe]l I'd kind of Iike the Dinner TheaLre to store their props out
on t^,esL 78th Street too. You know it's not iust a few things. A' feul
things don't bother me and I think that's why nobody has really pushed
that. But I think if everybody did that, then ue've got a problem.
Emmi ngs :
disLr i ct?
Are there regulations on outside storage in the downtown business
Batzl i :It's no! allowed.
It's absolutely not allowed?
The CBD. Yeah.
Emm i ngs :
olsen:
Planning
November
Commission Meeti ng6, 1997 - Page 19
Aanenson: And the industrial areas. Because people
construction trailers that's supposed to be screened
would have trailers,
too .
Name A r ESS
Bernie Schneider 7501 t,est 77th Street
Emmings: I think this is pretty self expl.anatory. It is a public hearing.
Olsen: Yeah, they're here for Lhat.
Enrmirrgs: Okay. Did you want to be heard on this item?
Olsen: Haybe I should explain ulhat it is,
Emmings: Yeah, 9o ahead Jo Ann.
olsen: r think he's someurhaL familiar with this buL urhat you'rr be doing.is amendi.ng the recreational beachrot ordinance to add Lhe following: Nowatercraft shall be moored, docked or stored in the dock setback zone insuch a way that the watercraf! or any part thereof extends across theextended side Iot Iines of any lakeshor.e site. This is to prevent boatsfrom being docked irt fron! of somebody else's lakeshore property.
Emmings: t^lell there's a IitLIe more to this isn't there Jo Ann?
olsen: That arnencs a different chapter that you don't deal urith. That,samending Chapter 6.
Emmings: UeIl who's going to be ]ooking a! that?
Olsen: The City Council will be doing that one-
Emmings: Okay. So ue're only looking at.
Olsen: You're only looking at the zoning chapter.
Emmings: Ancl this other part will go in front of the, has that alreadybeen passed by the City Council?
Olsen: No. It has not,
Emmings: t^lhen wiII that be heard by them?
O]sen: In the next meeting in November. Or December.
Emmings: Okay. That's a sensible rule too. Le!'s go onto agenda item 2.
[.le can take this up again r.lhen we Iook at outside sLorage for Gary Brown.
PUBLIC HEARING:
ZONING ORDINANCE A].IENDHENT CONCERNING MOORING OF T^IATERCRAFT -
PubIic Present:
Emmings: Alright sir, if you just LeIl us your name and address.
Emmi ngs: Okay, Lhank you.
Bernie Schneider: Hy name is Bernie Schneider. I live at 7501 tlest 77thStreet. That's on the southwest corner of Lake Hinnewashta. I saw the ad -in the Chanhassen VilIager regarding the hearing tonight and apparently nottoo many other recreational beachlot participants are interested in thisbut I came here to find out what action is going to be taken tonight and
what I should direct our members of the association to do. I did notrealize that it pertained onLy !o the setback requiremenLs.
Emmings: Bernie we had at ]east one case I know of that came up this
summer and it h,as on Minnewashta where somebody actually moored Lheir boatin front of somebody else's proper.ty. Those concerns wound up motivating
us to take a look at some of this stuff. And lhe City Council r.rill be
Iooking at a specific rule against Lhat. Then also making sure that boats
are kept in front of the property they're supposed to be in front of.
That's really the intent here,
Bernie Schneider: UelI I have nothing further to say.
Ber nie Schneider: Thank you.
Emmings: Did you have something you wanLed to talk
okay. Alright, is there a motion then to close the
to close the publ ic
The public hear ing
about on this issue?
public hear i ng?
hearing. AII voted in
gras closed .
Ahrens moved, Batzli seconded
favor and the motion carried-
Emmings: Anybody goL anything on this?
Ahrens: I just have one question.
about exLended side lot lines. How
Emnriirgs; UntiI they run into some
olsen: I depends if it's meandered
of the lot lines actually slop.
Emmings: See it's weird and you can'tapplication it's not a probLem because
middle of Lhe lake.
This extended side lot line. It talks
far out does that so?
other ones I think.
or unmeandered lake too I think. Some
understand it but in practical
nobody moors their boat in the
Ahrens: I 'm just talking about.
Ernmings: Yeah, I don't know. I think you run those IoL lines out, people
moor their boats close enough to shore so they can get at them. So in anyapplication is pretty easy to figure out. It's only when you geL furLher
out that things get rea]ly, and people aren't usi.ng thaL part of the lake.
Ahrens: Nobody moors their boaLs.
Planning Commission Heet i ng
November 6, f99L - Page 20
Planning
November
Commission Meet i ng6, 1997 - Page 21
Emmings: In the middle. Somebody will probably do it sooner or later.
So we'II have to be talking about that too. But I think Joan.
Farmakes: f wasn't aware thst it extended out into the lake...high r,rater
mar k -
Emrnings: Why? tle're talking about the side tot Iines.
Farmakes: That doesn't extend out beyond.
Emmings: tJhat we're saying is, if you,re going to moor a boat, you'regoing to do it in front of your own property.
Ahrens: Why?
Emmings: tlhy? Okay let me ask you a question.
Farmakes: So somebody doesn't 9o in front of somebody else.
Ahrens : t"Jho or.rns the Ia ke?
BetzIi : PubIic.
Ahrens: Yeah.
Emmings: tle']l go moor all of our boats in front of Ladd,s house. Uhetherhe likes it or not.
Ahrens: ...but who owns lhe lake?
Farmakes: . - -deal r,lith that when you're dealing r,rith the city in regardsto welland and access Lo a r^retland. . -
Conrad: I'm surprised we have that control .
Batzli: That tJe can do this?.
Conrad: That we can do this.
Emmings: tJe can - t^le regurate docks in the Nater . t^re have setback zonesfor docks. I can't put my dock out across my neighbor,s property. Butbasically Joan I think you're trying tb keep the peace here. ...LakeHinnewashta in front of somebody else,s property. ft Has not in front ofmv propertv. rt didn't bother me at all. r think that's a bad idea. ThatPeoPIe who, that properLy r4as up for sale and the sale uasn,t closed butthe person who was buying the property was real upseL about it.
Batzli: It's a landowner,s right kind of thing. A riparian,s right kindof a real conservative which stuns me because this person isn,t normallythis conservative but you're paying for the property taxes on the lake. you
uJant to be able to see the lake. you want to be able to have access toyour dcck. Have access to the shoreline and if peopre start parking boatsin front, you don't have the rights that you think you're obtaining whenyou're paying to live on the Iake.
PIanning
N ovembe r
Commission tleeLi ng6, 1991 - Page 22
Ahrens: As long as they don't get carried
stop thei.r' boats and fish off the sides of
Emmings: It doesn't say that.
auay and say that peopJ.e can't
their boaLs .
Ahrens: I know, f know tha!.
co nr aci :
front of
Ahrens:
Batzli:
Ahr ens
rnoor ed
What's a parallel? tlhat if somebody decided to store their car in
your house?
Emmings: For the winter. Or for the year.
conrad: Hhat would you think of that? I Lhink that's verv similar.
Storing a car in front of your house which is illegal . They can't do it or
they can't even park a car'24 hours can they?
Batzli: But you know so they park it there every other day aLl winter.
They come and lhey move it a little bit so thev're inside the law. ThaL
might be an irritant to you. If it was a real junky car vou might not like
it.
I understand t hat
Uhy? The road is
Par ki n9 a junky car
out.
but . . .
Conrad: Let's not say a
publ ic .
in front of your house versus havlng a boat
junky car. Let's say a nice car. A Mercedee.
a
Ahrens: That wouldn't bother me'
Conrad; Really? See I think it would. I think i.t would bother almost
anybody if there Has one car that they didn't know utho it belonged to that
was always ou! in front of your house. I think that would drive you uild-
Batzlir Let me ask just one very dumb question. Are we knowledgeable
enough to know which Lhe Iot lines are going as they approach the Iake thaL
this doesn't impede on somebody's? t^le]l we're iusL looking at beachlot
right? Are all of our beachlots, do aII of them have reLaLivelv straight
lines as they approach the lake? Is one of them at a 45 degree angle?
Emmings: ,..that uouldn't be a Problem.
Emmings: Actually the part that u,e're Iooking at, the Part that we're
looking at here isn't even tha! Part. The only part that we've got to Pass -ris are ue going to have, when PeoPIe Put, whatever they're PermiLted to do' Ias you extend their ]ot lines out into the lake, whatever they're permitted
to do with watercraft in front of their ProPertv, thev have !o do it t^tithin
Lhose extended lot lines so they'r'e not going over onto lhe neighbors I'ot '''l
line. That seems eminently reasonable to me, This one doesn't even say
you have !o o!^,n those boats. That's the Part that the City Council's
doing. -t
Planning
November
Commission l,leet i ng
6, 7991 - Page 23
Batzli: There should be a rule of reason here.
Ahren3: The regulations sometimes causes mcre problem.
OLsen: The part you're acting on is just with Lhe recreational beachlots.
There's a section, the identical section that's going to be going under
more under the water, boats and u,,aterhrays section of the ordinance so Lhiswill be applying to aII lots. Not just recrealional beachlots
Batz]i: That's right and that's what kind of scares me from the standpointthat we have no clue what these lot, Iines look like and if it's approachingthe lake at a 45 degree angle, you can park your boat way out in front ofthe other guy's house anyway. t",lhat are Ne rea]Iy doing?
Emmings: Again you're looking at.
Batzli: There have got to be a lot of lots around the Lakes that don'thave a 9C cjegree tangent.
Farmakes: l.4ine's a lrapezoid. Goes down to the lake.
Ennring:: I doubt that there are a lot of them. I'm sure they're theexcepticn rather than the ruIe.
Farmal..e=: I 'ci say you're right .
Batzli: I don't live on lhe Lake in Chanhassen so.
Emming.: Lrs don't have to pass on that. Is there a motion on iLenr number
z '_eY c
Batz]i: f nrove we approve the section we're supposed to be looking at topass along to the City Council.
Conr ad: I'11 second Lhat.
Emmings: Any d i scuss io n?
Batzli moved, Conrad seconded that the Planning Commission recommendapproval of an amendment to Section 20-263 by adding subparagraph (16) toread as follous:
No watercraft shall be moored, docked or slored in the dock
seLback zone in such a way that the waLercraft or any part lhereofextends acrogs the exLended side lot lines of any lakeshore site.
All voted in favor and the motion carried.-
PUBLIC HEARING:
ZONING ORDINANCE AHENDHENT CONCERNING NONCONFORH ING USES. STRUCTURES AND
LOTS .
Jo Annpublic C:lsen presented the staff report. Chairman Emmj.ngs called thehearing to order, even though there ulas no one present in the room.
Planning
November
Commission Meet i ng6, f997 - Pase 24
Conrad moved, Emmings seconded to close the public hearing- AII voted infavor and the motion carried. The public hearing uras closed-
Emmings: Is there any discussi.on about this?
Batzli: Yeah, can you attack a non-conforming use? If I buy the property.
Do I get the benefit of the non-conforming from the person I buy the stufffrom? Is that like by StaLe law that's allor^red? Can we distinquish it
somehow by City Code?
OIsen: tJ hat ?
Batzli: Li ke for example.fringe. Somebody comes into use it as a junkyard?
By way of example, junkyard
and buys that from the guy.
In
they
Iong as he continues to use it as a junkyard.
salvage operation. t,hatever it is.
think so.
goes with the Iand.
that a State }ar.r that they can do that?
goes with the land, not with the ouner.
goes with the ]and.
as long as it's been continued. You knou if it hasn'l beenyear.
about can't we make it just for one day so that if a person
dourn
Can
busi ness
co nt i nue
OIsen: Yes .
Emm i ngs: As
Batzl i : or
Emmi nge: I
Conrad: It
E)-+-l i. Y-
conrid t rL
BatzIi; It
OIsen:
ope ned
And
for a
Batzl i : How
Ieaves?
olsen:
from -
BatzL i :
stu f f .
Emmings: I live on a non-conforming lotstructure on that lot.
Batzli: f'm talking non-conforming use.
Emmings: I'm not a non-conforming use.
Batzli: Struc+-ure and Lots I don't have
boLher s rne -
It's always been one year. I don'l know where that one year came
One year just seems like an awful long time for some of this
and I have a non*conforming
Just structure and Iot.
a problem with. It's the use that
Planning
November
Commission l4eeting6, 799! - Page 25
Olsen: t^le discussed bef ore, I 'm lrying ttimes than the year. Like docks where we6re, or uith the recreational beachlots.
o remember what
've had iIIegaI
but we had s hor ter
docks and peop I e
Emmings: [,las that a season instead of a year?
Olsen: Yeah, instead of a year . So I could check into that. t",lhether ornot uJe could reduce that year. I,m not sure.
Batzli: Do we say anyLhing about rebuilding or anything Iike that?
OIsen: Yes.
Batzl i : l,Jhere Has Lhat?
Olsen: Of the uses?
Batzli; Yeah.
Olsen: That's under ( e ).
Balzli: (e). More than SOZ.
Conrad: Jo Ann ,
come f r onr? tJhy
OIsen: t,le I I it'
Carver Beach and
was kind of the
Emm i ngs : Carver
where that would
under 20-73( b ).is that the r ight t^le have a 752 factor. t^lhere did that
number ?
s what we've had in the past. That kind of came fromit comes out to 11,5OO square feet and I think that thataverage in Carver Beach and they just picked.
Beach and probabLy
applv.Red Cedar Point would be another place
Batzli: f move that the p).anning Commission recommend approvalzoning orciinance concerning nonconforming uses, structures, Iotsin Attachment fl1 of the memo dated October 10, 1991 .
of
AS
the
shown
Ahr e ns i Second -
Batzli moved, Ahrens seconded that the planning Commission recommendapproval of zoning ordinance amendment concerning nonconforming uses,structures and lots as .shown in Attachment *1 of the memo dated octoberl99t- AII voted in favor and the motion carried.
PUBL I C ARING:
ZONING ORDINANCE AI.IENDME NT CONCERNING BUS SHELTERS AND RI S.
10,
Chairrnan Emmi.ngs called the public hearing to order.
Ahrens moved, Emmings seconded to close the public hearing- AII voted infavor and the motion carried. The public hearing was closed.
Conrad: Soride lots?
re al]owing, what have wehaven't set any standards
done for bus shelters and park andfot tha!. So bre're assuming that
we'
We
Planning
November
Comrnission Heet i ng
6, 799L - Page 26
the ordinance is, the zoning ordinances have already set the standards
wiII be followed which would include landscaping? So uhatever's on the
books risht rror,r will. apply to lhe park and ride?
Emmings: tlell that's a conditional use though.
Olsen: Yes. But it goes through the site plan Part of the conditional
permit.
Emmings: Bus shelters and bus benches wiII be a Permitted use on citv
property as I understand it but the park and ride is a conditional use.
Olsen: No. Both of them are conditional use.
Conrad: And uJhat are the conditions?
that -
use
O]sen: Yeah, right. You're right. tje do not have any.
Conrad: I guess, Lhe only thing that just jumped out at me Nas ure're going j
to have parl: and ride. Does that mean ure don't have any conditions for
that. Park and ride is great but do we want it certain Places? Do we want -'!
it !o look a certain way? Are there Places where we don't wanL it? So I
I guess, I just didn't feel this was complete.
O]sen: That's a good point. tle can come back with them- '']
conrad: I think we should.
Olsen: Because that's helpful when we actually go through the conditional
use permit, Lhat's Lhe first thing I Iook for are those sPecific
conditions.
Conrad: And maybe there aren't any but I guess I just b,ant to challenge
staff to say, where could Lhese be and r,lhat raould we Hant and are there
specific conditions for the particular zone it's in.
Emmings: okay. Anybody else have any comments on this?
BaLzlir Did we Nant to aclually have the farmers market as a conditional
use and not as a potential interim use? Do ure Hant People to come back in
from time to time on the farmers market concept rather than iust give them
a blanket one as a conditional use?
Aanensoni tje could talk about
what my memo addresses.
that under the temporary use. It's kjnd of
Batzlir I guess I would rather on a farmers market thing allow it for a
year. See how it goes and give them a temporary. It would be seasonal
anyway. I just don't know that it's ProPoer as a conditional use.
Emmings: If people t.rant to set uP a market like that, r,rho does it?
Aanenson: That's t"rhat the wholepackeL. t^,e're trying to address
temporary use
Lhose types of
thing that
uses .
I have in the
Planning
Nove mt, e )-
Commission Heet i ng
€,, f99f - Page 27
Olsen: The farmers usual Iy
Emmings: Do they have to get a license from the City to do it?
OIsen: No.
Aanenson:
in pIace.
Emmi ngs :
then?
That's wh
That 's wh
at we're
aL He're
trying to address. tle don't have a mechanismtrying to address.
Okay, Iet's go back to this one. Is there a motion to table this
Conrad: I move !o table this.
BaLzIi: Second.
conrad moved, Batzli seconded to table the ordinance amendment addingprovisions concerning essential services, bus sherters and park and iidelots. AII voted in favor and the motion carried-
BLIC H AR
DINANC NT M NT ACTS ITE
APPROVALS.
Chairnran Emmj.ngs called the public hearing to order.
Conrad moved, Emmings seconded to close the public hearing. AII voted infavor and the motion carried. The public hearing was cloied_
Emnrings: TelI me what number 5 is about. I,ve not read it.
oLser, ; It's just making it clear that you have to record the conditions ofthe siLe plan approval so it stands trith the property. I think this wasone of F'aul 's that he uranted -
Conrad: Sc it's on record?
Ol sen: Yeah.
Emm.ings: t^jho's required to do the recording? tie took over a ]ot of that.
Olsen: Lle record it . t^le charge them and have Roger record it .
Emmings: Okay. Sounds good to me.
Conrad: Makes sense.
Batzli: Jo Ann, is lhe contract supposed to be recorded or just Lhepermit?
Olsen: The permit is. tJe have a form, iL's a site plan permit form thathas the conditions listed on it. rt's not realry a deveropment contract.
Batzli: But you calL it a contracl in your memo.
PIanni ng
Nov embe r
Commission Heeting6, !991 - Page 28
olsen: Yeah.
Batz] i : You 're tal king about perrnit?
what it would look like in your packet.
the
ofOlsen: Right. There's a coPy
It's called a site plan permit.
Batzli: How does this grab you though. A lot of times People come in and
the sale of the property is contingent on aPProval of whatever by us' So
then in order to proceed the owner of the Property's going to sign it but
Lhe actual developer uon't have signed it. What!s the effect of the first
own who's no longer involved in the transaction having something on file?
Olsen: I believe as Iong as it's recorded against
goes r^rith whoever owns it.
the property, agai n it
Emmings: How would they get it off there to do something else to their
property? How would they do that?
Ahrens: It's real tough on registered proPerty. You have Lo 9o Lhrough an
expensive procedure called a...to get this off. I! costs about $1,5oo,oo.
Emmings: Sc, it would be fine in the situation where lhe project went just
right along but if it stalled out and you've got this rePort, now you've
goi a]] kinds of restrictions on Lhe ProPerty and you want to Put it to a
different use. And those not only are they involved but they take a lot of
time. Right?
Ahrens: You'd have to have a lawyer drafL a document to take it off. Some
kind of agreement betwee.n the Parties to remove that. on abstract
property. On torrens ProPerty, you'd have to have, you'd have to 9o
through probably a Proceedings. . .
Emmings: tlhich is a judicial Proceedings and you have to Put the PeoPle on
notice. That sounds pretty cumbersome.
olsen: But iL's for a site Plan so you want those conditions to stay t'lith
uhoever owns it.
Emmings: I guess ulhat we're saying is, what about
goes through the site plan and then it just never
el.se wants to do something di.fferent out there'
the
gets
situation where it
buiIt. Now somebody -
Ahrens: Maybe the timing of Lhe recording should be specified '
Batzli: HoH about befor e
going to happen.
a building permit is issued? once you know it's
Ahrens: Yeah.tJait to record
ulou ldn 't sign
ir until it's a done deal.
on the building permit Lhough until itOlsen: Yeah you
was recorded,
off
Batzli: Right but that seems to me like a good time to do it.
Planning
Novemb e r
Commission Meet i ng6, 799t - Page 29
Emmings: Do many people pull. a building permit and then not build?
Olsen: I don't believe so. Not for commercial sites.
Batzlir Does it make sense to have a timing in Lhere Jo Ann?
Olsen; If it's something that's difficult to set off, yes. I Lhink that,s
somethi ng ule can just do administratively, I don'L knor,l if it's, where youpuL it in here, the timing.
Emmings: l^lell you could do it just like Brian says. It says the permitshaIl be recorded against the tiLle to the property.
Batzli: Prior to building permits being issued by the City or.
Ernm i ngs : Or conLemporarneously.
Ahrens: gimultaneousLy, yeah.
Emmings: fL shaII be recorded when the building permit is issued or:o:,e '-hirrg like thaL because we've got control of when it gets recorded.
Olsen: 9o how did you say that again?
Emnrings: -'rust say thaL second sentence in there. The permit shall berecor,ie J agains'. the litle to the property at the time Lhe buirding permitis i ssued .
OIsen:Or submitted?
t"lhat do you mean
tlel I I uras goi ng to
r^las r ecor ded .
Emm i ngs :
OIsen;until it
submi tted?
say r.ie wouldn't sign of f on the buiLding permit
Ahrens: It's not lhat important that itI mean you could put it in the mail.be recorded on that same day.
OLsen: So issued, okay.
Emmings: t,,haL's your concern? you want to make sure it,s recorded beforethey issue the building permit?
Aanenson: Yeah.
Batzli: Prior to issuance of lhe building building.
Emnrings: But you're doing the recording so you know iL's done.
Aanenson: You have to, it Lakes a coupre days to actually physicallyrecord iL. You send it down and then before it gets registered _ If yousign them off at Lhe same time, there's no guarantee that it's done andrecor ded -
Planning
Novembe r
Commission Meet i ng6, !991 - Page 30
Aanenson; Right.
Conrad: Prior is Lhe word, yeah.
Ahrens: That could occur then at any time.
to handle it administratively though becauseBatz]i: But they're going
they're going to file it.
Ahrens: As }ong as they understand.
Olsen: Okay .
Batzli: Are we protecting the public by iust letting
administratively? Do we need to? Oo ure trust them?
but what happens when these guys aten't here?
them do it
t^leII, we trust t hem
Emmings: tleII, aIl I uant
front of my house, That's
to know is do they plan to moor any boaLs in
a]l I care about.
Batzli: t^Jell Ladd, do you want to put something in there that talks about
the liming of record or are you comfortable?
Conrad: Yeah. I think ule should.
Balzl i : f would li ke to
appl ied for then .
say thaL we record it when the building Permit is
Olsen; At time of buiLding permit application, okay.
that typically work? HoH long before the Permit is
so.
makes sense. AIrisht.
a motion then?
Emm i ngs :
i ssued?
OIsen:
imm i ngs t
Conrad:
Emmi ngs:
Conrad:
How does
Tbio wee ks or
Okay, that
Do you want
r sure do.
Br ian , go ahead .
BatzIi: I move that the Planning Commission recommend aPProva] of the
aLtached zoning ordinance amendment requiring develoPment contracts for
siLe p.]an approvaL as shown in Attachment fr1 in the memo dated octobeY 29,
1991 r^,ith the change in the second sentence of Section 2O-L22 reading, at
the time the building permi! application is made, HouJeve)- t.he heck vou
Hrot€ that down. However ue said that. That's the iist-
Emmings: But then you could put anything in there because that's t,hat they
uranted anyway. f guess maybe trhat you should do is be sensitj.ve to the
fact thaL you're going to cause somebody a lot of expense and trouble if
you record them early and try and record them as ]ate as you can.
Planning
I'lovembe r
Comnnission Heet i ns6, 799L - Page 31
Emmings: Okay, I think I know what you meant so I think I'II go ahead and
second it. Is there any discussion?
Batzli moved, Emmings seconded that the Planning Commission recommend
approval of zoning ordinance amendment requiring development contracts forsite plan approval as shown in Attachment *1 in the memo dated October 29,
1991 with the change in the second sentence of Section 2O-L22 reading, atthe time the building permit application is made. All voted in favor andthe motion carr ied.
APPROVAL OF I,lINUTES:Chairman2, ]-997 .
Emmings so noLed the PLanning ConrmissionHinutes dated October
TY COUNCIL D
Emmings: We've got a report fromI guess. ff everybody knours fromjust take a quick look and see if
our Planning Director uho's convalescinga Iittle surgery on his esophagus. Let's
anybody 's got any questions.
Ahrens:
OIsen:
Ahrens:
Olsen:
tJher e 's Lhe Lundgren?
It got approved.
rr did finally?
Yes .
Conr ad : t^,that
4 conditions.
related to the
our s?
I didn't understanC in the report, they objected to 3 of theUltimately the City Council voted to approve alI 3 requestsLundgren proposal . l^lhose requests were those? Lundgrens or
OLsen: They backed up staff and the plannins
Iot. The road width. Providing utilities to
Ahrens: tJhen do they plan breaking ground?
Olsen; Actually they're going for aPlanning Commission meeting. They'rejust trying to get the permiL beforeeffect.
grading permit, trying at the nextnot going to acttally grade.. They,reall. these other regulaLions go into
Commission.the adjacent
The 3 trees per
properLies.
Ernmi ngs: The Iandscaping
Batzlir t^Jhat happened to
Emmi ngs: They pu]led that
TuesCay and then there were
knows what happened.
and tree preservation thing nour-
that?
and
no
then they were
HinuLes taken
to co ns i der
sounds Iike
going
and it
it on
nobod y
Aanenson: It was finally resoLved.
Emmings: How hJas it resolved?
Planning
November
Commission Meet i ng6, 799t - Page 32
Olsen: They approved it but not r^rith the 3 trees per Iot.
Emmi ngs: How ma ny?
Olsen: One. They nere just concerned with the money.
Emmings: But it's so little.
Batzli: It's such a joke.
Ahrens: That's ridiculous.
Olsen: They said it was going to be extra !E1 ,5OO.OO.
Batzli: You've got to be kidding? It's $1OO.Oo for a tree. You Pay for
lhat over 30 years. Boy that's a lot of money.
olsen; People u:ere quoting $25O.OO per tree plus $5oO.Oo for seed and sod. -
Batzli: L.Jell the seed and sod's already in there right? Tha!'s in our
currertL " DiC they take that out?
Aanenson: No, but you have to pay for it yourself,
Emmings: uell that all depends on Hhat you negotiate with vour builder.
t^lell actual ly it's not . You Pay f or it. Thev give you an al.Iowance but
you sLill pay for it.
Ahrens: You can get big trees for $125.00 here in Chanhassen.
Ernmings: And it aII gets rolled in. It's easier I trould sav for if vou're-
buying your first house to have it in the mortgage than it would be to go
out and buy them separately because you're so strapped urhen you're getLing
i nlo something. tJell okay.
conrad: Did Dick t,ling resign?
Olsen: Yeah he was a little frustrated by the whole thing
Ahrens: Hoi.r did the vole go?
olsen: I think it was pretty unanimous excePt for Dick
Emmi ngs: t^,le're sure aI I out of steP .
Batzl i : l^le.L I , potential Iy not. Haybe there's 4 PeoPIe that are out of
step a little bit higher up Lhan us.
Ahrens: That's right Brian. That's the way to look at it.
Emmings: No it isn't because we're up for.
Batzli: f 've got another couple years. I'm hoping they forget that
commenL
PIanning
November
Commission Meet i ng
e, f997 - Page 33
Emm i ngs :
our.
I think lhat was a wise and prominenL decision on the Part of
Ahrens: I'm going to sit in the back of the
out uhen you have your interview. TeII them
that have come up j.n the past.
room and pu! a litt]e recorder
about Lhe alI Lhe decisions
Emmings: I'm going to give them my name, rank and serial number and I
won't answer any olher question.
Batzli: You know the interesting thing is, if the PeoPIe buying the house
are savy enough, they can get Lhe builder to Put them in there and include
them in Lhe mortgage. The problem is that most first time homeowners
aren't savy enough to do that. Builders wi]l, and like for examPle
Rottlund. If I had gone and said put in a couple extra trees, Lhey would
have. They would have charged me for it but I iust didn't knou any better.
Emmings: And it's easy for them Lo do it. So easy for them.
Ahrens: Yeah. They buy them in bulk and it's probably even cheaper than
$1OO.oo a piece. I'm sure they get them for nothing. tlell not nothing butyou know,
Batzli: ft's obvious they're buying them wholesale because they're buying
them in such volumes and we guys 9o to the local. Oid you guys knour that
next to thc .]oca], what is it the Phillips 66 gas station, Big Red or
whatever on CR 4 burned. Not the Bis Red but next door to it.
Ahrens: Andersons -
Batzli: Boy was that place torched. It happened just
It's a nursery kind of a place. CR 4 and VaIIey View.
SchooI .
last nigh! f guess.
Right by the High
Emmings: I don't know it.
Ahrensr It's really nice. You knour where ValLey View Road is?
Emmings: Yes.
Batzli: tlhere it crosses over cR 4?
Olsen: Southeast of there.
Batzl.i: It's this liLLle nursery type place.
olsen: It looks like a nice Iooking house.
Batzl i : Yeah, beautiful place.
1992 GOALS.
olsen: I was thinking u:e shouLd maybe wait for Paul .
PIanni ng
Novembe r
Commission Meet i ng6, t99l - Page 34
Yeah,
Can I
Yeah.
sood idea.
ask one more question about the update?
. The Corridor 5 study options. There's something about Peter OIinI didn'! understand that.
On what page are you on?
It's the memo to TH 5 corridor study task force.
That 's history.
Oh, that's no! something tha!'s right now? I read that wrong.
Ernm i ngs :
Batz I i :
Emm i ngs :
Bat z.I i :
in here.
olsen:
BatzIi:
Emm i ngs :
Batzli:
Okay.
Emmi ngs :
and we're
and f are
r^,a nted to
Ahrens:
things
tleI I
going
That's history and in fact we
meeLing again on the 18th and
attendi ng. Maybe you weren't
90.
had one meeting of the task forceLry and get something goin9. Jeff
here uhen people volunteered uJho
I'II teII you we are 9oin9 to meet. I just had a couple of
on in my office. ..
Batzli: Do you have a card on you? Business card?
Ahrens: Yeah.
Batzlir Let me send you
Emmings: This is kind of
Aski ng for cards.
that information I 've
personal isn't it?
90t .
You guys are out of order.
Ahrens: This is imporLant stuff.
Batzl i : This is important. I 'vefinancing for golf courses that Iit besides me.
got aLl lhis information on
should send so somebody else
how
can
you get
Iook at.
Emmings: tlell okay. tlhat's going on with nonconforming recreational
beachlots Kate?
RECREATIONAL BEACHLOTS UPDATE.
Aanenson: Okay, Jo Ann and I met with the 13 recreational beachloLs that
were grandfathered in. tJhat Ne're trying Lo do is come up with an
undersLanding of what their grandfathering staLus i.s. tlhat Lhey have asfar as the standing. So what we did is we presented them urith the bestinforrnation ue have as far as u,hat r.re feel they had in place when the
ordinance was adopted. tJe provided them with that information and asked
them to mee! uith Lheir association and to bring back uhatever
documentation lhey have to chalLenge or verify that's.hrhat they have in
Planning
l.lovember
Commission Heeting
6, l99l - Page 35
place. Just for your advocation, we'Il be having the ordinance on the 20threquiring Lhat alI recreational beachlots coming into conformance and thenafter that we'c like to do, Lhroughout the winter take 1or 2 at a time onthe Planning Cor,:mission and bring it through that process. I think we
answered a ]ot of questions. There were a few that didn't show up but we
had a representative from each of the associations.
Emmings: [^,ere they hostile to this or prelty recepLive?
Aanenson: There uias a few that are going to be sticky.
Olsen: Because they admit Lhat they've expanded but they want to keep whatthey've got.
Aanens.)n: I thi nk one of the most , . . issues too is some of these r.rhen thesubdivision firsL Has in place they had maybe 20 lots and now there's beenother additions, to the subdivision put in with maybe 2O-3O-40 more homesgoing in and these people feel like they have a right so that's kind of a
st ic ky pci nt too .
Emmings: Okay. That wiII be interesting. So are we doing here what wekind cf did to Lhe contractors yards at one point? Is this the same kindof a pr ocess?
O l:+ n: Yes, exactly -
Emmings: Alright. tjelI, that will be inLeresting. That's going to be.
Olsen: Tough -
a:an6nson: 90 hopefully by the time the ice is out, we,Il have them all inplace an'J be able to enforce something.
MOON VALL Y UPDATE.
Emmings: I suppose we can
ZONING ORDINANCE AHENDHENT
aII read this.
FOR ISTIlAS
Anybody want to talk about this?
TREE SALES,/TEI.IPORARY USES -
Kate Aanenson presented Lhe staff report on this item.
on the Christmas tree one, can this be done inEmmings: Is there anythi ng
any zoni ng distr ict?
Aanenson: tlell it had to be compatible with the zoning district. Thatwould be one of the criteria.
Emmings: Alrigh!, *hat is Christmas tree sales compatible r.rith?
Aanenson: I would consider that a retail and it would have to be in a
commercia.I zone. Ice cream vendor I would say it r.lould be compatible withthe residential zone. Any retail b,ould have to be in the commercialbasically. Nor^, some neighborhood if they !,anted !o have a street bazarre
Planning
November
Commission Meet i n96, 799! - Page 36
I thought this was supposed to be underget under , meet that.
sort of thins. If they wanted to bl.ock off the street and have a blockparty or someLhing Iike Lhat for a ueekend.
Ahrens: tJhat about produce sales?
Aanenson: That if it's grown on the property.
Ahrens: t^lhat if it's not grou,,n on the property like Kerber's?
Aanenson: That one's grandfathered in. There are some that aregrandfathered. But if it's grown on the site, that I guess we ask for
somebody. If you have different feelings on that. But ue have set up
other standards too. I'Il take the time to go through some of those, The
inforriration that Ne require they submit and that the Director would havethe authority to revoke, close them down if they weren't meeting Lhe
condi t ions -
Emmings: You're suggesting that we adopL Lhis ordinance,
Aanenson: tlell if you u,ant us to apply it for Christmas tree sales. If you
want us Lo come back with a specific ordinance, we'd draf! something uP. If-you felt comfortable looking at that. tle'd Iike something in Place to
evaluate Christmas tree sales only at this time.
Emmings: can we adopt ordinances urithout having a public
publ ic
hear i ng?
hearing. Somehob,,Aanenson:it didn 't
Emmings: tjas i! published and adverlised?
Aanenson:I don't
Then we
think so.
Emm i ngs :couldn't adopt it.
Aanenson; Nor so it needs to be, technically to be
Lo be a public hearing. So if you feel comfortable
ordinance, I guess Lhat urould be what we're Iooking
Aanenson: No , it'ssection in the Code
under each chapter.
Emmings: Right but it seems to fle
have maybe something this Iong for
Emmings: Are you going to have to write, this is a fairly lengthy and
detailed ordinance. Are we going to have to do this, something of Lhis
Iength for each and every one of these things that comes along? Or aregoing to Lry and do something that, you knou uhat I mean? t"Jhat if, is
Lhere some way that we can write this into a single ordinance or do weto have one for Christmas trees? One for ice cream vendors?
an ordinance it needs
as far as drafting anfor some direction.
that that chapter is going to have to
each. You don't foresee that?
you
ha ve
one ordinance. It would fit under, we would create athat just says temporary uses. Boom. It doesn'L go
I! doesn't get amended.
PIanning
Nove mber
Commission Heet i ng6, L99L - Page 37
Aanenson: No. No. It wouLd just be a separate section in the zoning
t^rould say, f found a place to put it. You know you Iook under general.
standards or supplementary regulations. Say Iike temporary sales andwould be the criteria. You uouldn't have to put it under each one. Irevieu that uifh Roger but.
that
this
can
Batzli: f'm just not tracking tonight I don't think. t,hyconsidered an interim use and processed under the interim
isn'
use
t this just
perm it?
Aanenson: LeL me 90 back to mv background information where r talked aboutthat. rf vou Iook specificalrv under interim uses it Iists specific usesokay? And thi.s goes back to r.,,hat Steve is saying. If you try to so backand try to build criteria under each one of those, then you have to putthis lengthy documenL under each one of those interim uses. So what we'retrving tc do is cover all the zoning districts in one prace and that r.rouldbe this. If you tried to do it the way you,re talking about Brian, you,dhave to go back and develop the criteria under each interim use.
Ahrens: I think this is a good idea.
Batzli: See I look under our current ordinanceaIl.owed, it's temporary sales of retail things.it in our interim use. I don,t understand this.
and under most uhere it'sI mean we've already got
Emmi nge: WeL Ito allcr,r,
as he says here, the purpose of the interim use permi! was
Batzli: I understand wha! b,e put in here,
Aanenson: There's a couple of problems u,ith interimto come to the Planning Commission and the,uses. Okay, you have
Emmings: This is temporary sares that are kind of self limiting wherethere what we're saying is, you can do this here temporarily uniil youthis. UntiI this event. I think there,s a distinction.do
Aanenson: And the other thing is, i.f somebody comes in for an inLerim,they have to go to the Planning Commission and the City Council. Ifsomebody comes in for Christmas tree sales every year, basically r.re,regoing to know where it's going Lo go. you,ve told us what eriteria. Doyou hrant them !o come back through the planning commission and city councilevery year when ue arready know we've got estab!.ished criteria and we feelcomfortable with that. That's !.rhat ne,re Lrying to do. Those types ofuses that ule don't have to bring back every year.
Emminss: So it wiII be handled administratively.
Aanenson r Exactly. You've set forth the criteria that you urant us toevaluate those. And thev come in 10 days before i.nstead now we have peopre
ccme in and we say gee, weII really to get your ChrisLmas tree sales youhave to start in October to get through the whole process. So that'srealIy the intent of this.
Emrnings: That makes sense doesn't it?
Planning
November
Ccmmission Meet i ng6, 799! - Page 38
Batzli: So you Hant.
Emmings: Are you tracking now Brian?
Batzli: I'm tracking. I understand t^rhat she
a temporary use. I just don't like temporary
used in the definition of interim use.
wants now.
use because
You can 't
temporary
call
use
itis
Emm i ngs :
Aanenson:
How about LemPorary sales?
Yeah. Tha!'s really what it is. Except some are seasonal .
Emnrings: But basically they're coming in saying I want a ]icense Lo seII
christmas trees for 2O days. It's kind of Iike getting a dog license.
Batz]i: Then the question is under, for examP]e. If you ]ook under
business neighborhood. One of the interim uses is temPorarv outdoor
djsplay of merchandise for sa]e. Then the quesLion is, do we still
that in the interim use as a PermitLed interim use tvPe thins?
Emminss: I'm starting to actually dislike vou. Just kidding-
Batzli: You're not starting. You never did like me.
our
ne ed
Emmings: Okay, let's talk about iL.
Eatzli: Ne have a Iot of Places in the ordinance where we talk about
temporary outdoor display of merchandise for sale which I thought included
Christnras trees. Now the fact that we don't want to have to make these
people jump through some hooPs to start in SePtember, actually Planning
ahead for the Christras trees thev're going to seII in December, I mean do
r^re c.are? Do we want this easy little way for administrative aPProvals so
we don't have to see it? If He want that, why do ule need it still under
the interim use section? Is Lhere a distinction that something !^re may h,ant
somebody to have a Ionger time Period that Ne would want them to jumP
through hoops?
Emmj.ngs: or they need no space at a.II because Lhey're driving around with
their ice cream truck. But the other one aPplies to someone who has an
established Iocation and they're doing someLhing on a temporary basis Iguess. I don't know. I never thought about it. Have you looked through
lhe ordinance Lo see if these things fit together?
Ahrens: !.JeIl the distinction seems to be thaL for existing retail shoPs
where they may have on an ongoing basis maybe monLhly sales, special sales
uhere they pull all Lheir merchandise out of the store and set it out in
front of the store and it's not a seasonal use. It's not a sPecial kind of-
use. I!'s something they do on an ongoing basis. Right?
Aanenson: RighL. And it's not a ProPerty ou,ner. This Person is probablv
somebody who's just renting some sPace from somebody for a short period of
time whereas Iike you're saying Joan, maybe the hardware store in the
winter puts out their snotblouoers and in lhe summer their lar,rnmoNers are
out.
Planning
November
Commission Meet i ng6, 1991 - Page 39
Aanenson: Yes. Paul and I spent some time going through that and like Isey, it specifically talked about Chri-stmas tree sales but we aLso wantedto know what ycrur feelings were on other temporary sales. .If you wanted !oIook at something like that. Those types of uses.
Conr ad : l.Jhat gover ns , I guess myyou, tYy and finish your concern.
question wiLl be secondary. Brian are
Emmi ngs: Your hyper tech n i ca I concer n .
hypertechnical petty concerns thank you. No,Batzli: No, I don't have anyIet's move on.
Conracl: Okay, what governs a
branting to rnove from Shakopee
temporar y?
carnival coming to town or theup here or an outdoor concert,
Rena i ssa nceIs thaL a
Aanenson: We put a perusal in here thatthat the Planning Director would take itthat scale, that would have to go throughCounciI.
says if something of that nature,to you and I'm certain some ofthe Planni ng Commission, CiLy
Conrad: Butconcert on.
let's say right now a farmer had a field Lhat wanted to have aUhat would govern that? Is Lhere anything Lhat would govern?
Aanenson:RighL
Right.
now without !his temporary use?
Conrad:
Aanenson: f don't think uJe wouLd permit it.
Conracj: Because you can't do thaL in the.
Aanenson: f'm assuming it's in the residential, yeah.
OIsen: lJe'd say there's no regulaLions permiLting that.
Batzli: Let's put it more in perspective. !^le're going to have an artfair. At the art fair 10 to 1 they,re going to have a IitLIe donut truck.Do these people need to come in and get a temporary sales permit?
Aanenson: Right now I believe they're supposed to get a solicitationpermiL.
Emmi ngs: A what?
Aanenson: A peddlers or solicitors. And all it does, they're registeringwith the City so ue know u,rho they are if ue have a complaint. There's no,whic-h gets into a whole different thing. It's business Iicensing butthaL's just so we know ulho's in the city. Because He do have peopLe thatgo door to door and they are supposed to register.
Emmings: Nor.r what's the difference beLueen the donuL truck at lhe art fairand the Christmas tree sales?
Planni ng
November
Commission Meet i ng6, 7991 - Page 40
Aanenson: Right now we don't have any control . That's what I'm saying.
t^le're not controlling them. tJhaL I'm Suggesting is we have some sort ofcontrol that ure're regulating where they are so we're not crealing ahazard. tle don't have any control. Risht nou unLess they're continually
moving we say no. Because right now uJe're just handling it as peddlers andsoliciLors.
Batzli: If this was passed they'd have to get a temporary sale permit?
Aanenson: RishL and ure'd regulaLe where they would go. And we'd say it's
an unapproved site. You're creating a hazard- I mean if they're plugging
in for electricity, r^,e want to inspect. That sort of Lhing. AII health
a nci safety issues .
Ahrens: tle're going to put velvet paintings on a boat and moor it out infront of Steve's property.
Emmings: Go ahead. My torpedoes are armed and I'm ready to fire.
in velvet. Bobbing in front of my house. Yeah, that couLd get me
Olsen; t^Ji!h some artificial Christmas trees.
Elvisgoing.
Batzli:
Aanenson:
Ahr ens :
Emmi ngs :
Conrad:
Ahrens:
Conrad:
Emrni ngs :ir.
Aanenson:collector.
I move that we do something with this.
l.Jould you like to see some sort of ordinance format?
Sure .
I think it's a good idea.
Yeah , for sure.
I do too.
Broader than Christmas trees.
Yeah. I don't knou how that's going to work but if you can do
Aanenson: I've uorked with this type of ordinance before and it was
successful ,
Batzli: The second part of the question is the farmers mar ket issue as it
relaLes to the earlier one ure looked at. The park and ride lots. Should
we handle these things via temporary sales rather than include it in the
ordinance as a conditional use for those things?
Emmings: t^Jhat do you think?
Ol sen: It can be.
Yeah. That would be
I'm assuming that 's
a perfect site because you're on
urhere we're going to want those.
a maJor
You 've
Planning
Novembe r
Commission Meet i ns6, 7991 - Page 41
got p.I enty of ,Iocation.
you've got controlled access. The parking. It's a perfect
Batzl i : But wouldconditional use or
sa I es?
you be able to
would you feel
have more contr o I
comfortable doi ng
over itit as a
as a
temporary
Aanenson:criteria.
annuaLly.
Emmi ngs: Okay, we've got
Interceptor Agreement. I
I'd feel comfortable under temporary sales ifIf you uanted to review it. Again it's uhereIt's an annual thing where you want !o see j.t
it meets t hatit comes in'every year.
Batzli: I don't knotr if I taant to review it until we have problems withit. Then ue're going to change the ordinance in a hurry so we review themI suppose
an
see
item here on the amendment to the Lake Annthey finally passed that huh?
OIsen: Yeah.
Ernmings: Ihat took a while.
Olsen; tJe'11 corne back on a future agenda talking about lot area.
Batzli: Kate, the definition of interim use is on page 114g. It,sdefineC, interim use means a temporary use. I,d just stay auray from it.
Aanenson: That wor-ding. Okay.
Ahrens: Can we vote not^t on these people?
Emmings: Yeah, that's next.
conrad moved, Ahrens seconded to adjourn the meeting. All voted in favorand the motion carried. The meeting was adjourned at 9:OO p-m._
Submitted by Pau I Krauss
Planning D i r ector
Prepared by Nann Opheim
CITY OF
TH[NH[SEEI{
690 COULTER DRIVE ' P,O. BOX 147 ' CHANHASSEN, MINNESOTA 55317
(612) 937-1900. FAX (612) 937-5739
IiIEUORINDI'I,I
fo: Planning Comission
FRou: Kate Aanenaon, Planner fi fg*
DATE: Novenber 27, L99L
SUBT: llon-confot ing Beachlots
Attached is an ordinance anending chapter 20 of the chanhassen city
prior to adoption of the Recrea I Beachlot section of the CityCode. The ordinance states tha in one year after adoption of
Code concerning non-conforning
necessary to acconnodate those
this ordinance a1l legal non-
non-conforming use pernit.
RECOH}TENDATION
staff reconmends
o beachlots nust receive a
Planning Conmiss adopt the following
tto
chlots. This anendment ischlots that uere in existence
As staff stated earlier to Plann
with homeowners associations rd non-conforning beachlotsto review the non-confo pemit s. After adopti'on ofthis ordinance by the Ci council ,ff uiII Btart the pernit
process before the PI Counission
t-motion:
section 20-79 the city code. rl
ATTACHUETgT
1. Proposed ordinance
t']Dt,PRINTEO ON REC\CLEO PAPEN
e
Connission, staff has Det
a
rThe Planni.ng coldmisBion
CITY OF CEAITITASS E}I
CARVER A}ID EEN}IBPIN SOI'NTIES, TINIESOTA
oRDTTANCE NO. _
IIT ORDIXITCE IXEITDIf,O CETPIER 20 OIEB SENIETSSET CITI OODE OO|ISInIIITO
ICIT-OOXFOBI'IUC BEICEIOITS
THE CITY COT'NCIL OF TIIE CITY OF CHANHASSEN ORDAINS:
Scctton t. cha pter 20 of tbe cbanha3aen Clty Code le
anended by aading Section 20-79 to read:
8.c. 20-79. foa-Coatornl.lEt l.cr.atlolal De.cLtot..
(a) llithin one year after ttre adoption of thls ordinanceprovision, all legal non-confolaing recreational beachlots nustreceive a non-conforming uee petxit or the use lust cease. Orepernit rhall be issued follouing receipt of aatisfactory proof
concerning the nature and extent of the legal non-conformLng use.Ihe petnlt shall describe the nature and extend of the alloweduse. The use nay not be expanded or intenaified over uhat lB
described in the pernlt.
(b) AppJ.ications for a non-confor:ning use pernit shall befiled sith the Zonlng Adninlstrator on prescrlbed fomE. A fee,as established by the City Council, ehall be paid upon filing theapplication. Itre Zoning Adninlstrator shall aet a time and placefor a hearLng before the Planning Cornnleeion. At the hearing the
Conmiesion shall hear auch persons ae siah to be heard. Notice ofthe hearing shall be Dalled not lesB ttran ten (10) days beforethe date of the heaiinE to all ounera of property on the lake
uhere the beachLot ir located. Pr.rbl lshed notice shall also be
uade once at least ten (1O) days before the hearlng. Fallure togive notice, houever, Ehal1 not lnvalldate the proceedlng. At theclose of the hearing the Planning Coronisslon shall lake a
recoDnendation to the Clty Council. The City Councll shall ualcethe final decision.
Scctlop 2. Thls ordlnance Bhall be effectlve hnediatelyupon its pasaage and publication.
PASSED AND ADOPIBD by the ChanbaaEen city Councll thlsday of 1991.
ATTEST:
Don Ashworth, Clerk/t{anager Donald J. chDiel, uayor
(Hrbllshed ln the ChanhasEen Villager on
r08 102 I 91
19e1. )
4
CH[NH[SSEN
690 COULTER DRIVE . PO. BOX 147 ' CHANHASSEN, MINNESOTA 55317
(612) 937-1900. FAX (612) 937-5739
MEMORANDTJ}I
TO:
FROI,!:
DATE:
SUBT:
Planning Conmission
Jo Ann olsen, Senior fil.anner {}
SepteDber 24, l99t
Discussion Iten - Zoning Ordinance Amendnent to Add BusShelters and Park and Ride Lots
The City will be receiving a request in the near future for a park
and ride 1ot located at the southuest corner of Hwy. 5 and 184thStreet. The City currently has no uay of regulating a park andride lot. The City directed the City Attorney to provide an
ordinance for bus shelters, bus benches, park and ride fots andessential services. The proposed ordinance rrrould allow park andride lots in all zoning districts, except residential districts asa conditional use pernit. The ordinance also requires aconditional use permit for bus shelters and bus benches on publicrights-of-uay or on property orned by the city.
Since park and ride lots are not always in use, rre have added thata fanoerts narket could be allorred as part of the conditional usepermit for a park and ride lot. The final iten that the anendmentprovides for is a definition of essentiaL services and allowingessential services as a pernitted use in all zoning districts.
PI,ANNING COM}{ISSTON UPDATE
On Novenber 6, 1991, the Planning Connission revieved an anendnentto the zoning ordinance concerning bus shelters and park and ridelots. The Planning Corunission tabled action on the iten untilspecific conditions could be established. llhe following are
p-roposed conditions to be added to Article IV, Conditional Uses,
Standards For Agricultural and Residential Districts, Division 3
and Standards for Business, Office, Institutional and IndustrialDistricts, Division 4 of the city code.
tt,t,
CITY OF
PRINTED ON REC\CLED PAPER
Bus shelters/Park and Ride Lots
Page 2
aoctl,oD 20-256 rDal Sactl,oD 20-291. BU8 SEErTTERA IIID BUa BEI{SEEa
(1) The structure shall not block sideiraLks or utilities.
(2) The structure shall be approved by the City Engineer.
(3) The structure sha1I not contain advertising signage.
(4) The atructure nay only be located at official bus stops.
(5) The bus shelter shal1 reflect the architecture of the
surrounding area.
(5) Lighting sha1l be conpatible with surrounding adj acent uses.
(7) The bus shelter shall be required to cornply uith all necessaryBuilding Code requirenents, including inspections forelectrical connecti.ons.
Soctlon 20-29t. PInI IIID RIDA IOIS
(1) The park and ride lot shall only be located on a collector
street.
(2't The park and ride lot 6hat1 not direct traffic through a
residential neighborhood.
(3) The structure shal.l not block sidevalks or utilities.
(4) The structure shall be approved by the city Engineer.
(5) The structure shaIl not contain advertising sigmaqe.
(6) The structure shall reflect the architecture of the
aurrounding area.
(71 Lighting shall be conpatible with surrounding adJacent uses.
(8) The shelter shall be required to conply sith all necessaryBuilding Code requirenents, including inspections forelectrical connections.
ATTACHI,IENTS
1. Proposed ordinance anendment.
CITY OF CIIANHASSEN
CARVER AND HENNEPIN COT]NTTES, I,IINNESOTA
ORDINANCE NO.
IIT ORDINENCE IIIETIDI}IG CEIP'ITER 2 O OP TEE
cElrrEASSEtr crrY coDE, IIEE ZOXIUC ORDIXTITCE,
EY IDDIIIG PNOYI8ION8 CONCERITIXG ESSENITIAL
sERVICE8, BI'8 AEEIJTERA, IITD PIRX IITD RIDE IPTA
THE CITY COIJNCIL OF THE CTTY OF CHANHASSEN ORDAINS:
Sectlop 1. Section 2O-1 of the Chanhassen City Code is
anendEE-E!-EE[ing the following def inition :
Farmersr ltlarket means occasional sales held outdoors where agroup of farners prirnarily offer the produce and fruit whichthey have raised for sale.
SectioD 2.Chapter 20 of the Chanhassen City Code is
amended by adding Section 20-920 to read as follows:
8ec. 20-920. Bus Sbelters aDdl Bus B€DcLes.
The erection or placenent of bus shelters and bus benches onpublic right-of-ways or property owned by the City is pernittedin all zoning districts by conditional use pernit.
Sectio! 3.Chapter 20 of the Chanhassen City Code is
amended by adding Section 20-927 to read as follows:
sec. 20-921. Parf aDd Ride Lots.
Parking lots intended for use by persons parking their carsto use public transportation is perroitted by conditional usepenoit in all zoning districts except residential districts. Theconditional use penoit Day a1low use of the lot as a farnerslnarket. Park and ride l.ots are prohibited in residentialdistricts.
SectioD a.Chapter 20 of the Chanhassen City Code is
anended by adding Section 20-922 to read as follows:
Except as provided in Section 2o-90l , essential services area perrnitted use in all zoning districts and are exeDpt fron theprovisions of this chapter.
SectioD 5.Chapter 20, Section 2 0-1 the Chanhassen Citynition:Code is amended by adding the folLowing de
offi
106/03/91
Bac. 20-922. EsssDtil1 Sert ices.
rrEsseDtLal Sarvic€srr. Underground or overhead gas,
electrical , steam or rrater transnission or distribution
systensi collection, conmunication, supply or disposal
systems including poles, wires, na5.ns, drains, sewers,pipes, conduits, cables, fire alam boxes, police call
boxes, traffic slgnals, hydrants, or other sinilar equipnent
and accessories in conjunction therewith, but not including
buildings .
8€ctr.oD 5. This ordinance shall be effective innediately
upon its passage and official publication.
PASSED AND ADOPTED by the Chanhassen City Council this
-
day of , 1991.
ATTEST:
Don Ashrrorth, clerk/Manager Donald J. chnief, Mayor
(Published in the chanhassen Villager on
-2-
, 1991. )
OFFI CIAL COCOIIMUNIIY DEV ELOPMEHI
ctry
ENVIRONMENTAL ASSESSMENT WORKSHEET
I{ARRATIVE DOCI]MENT
FOR.
CHANHASSEN BUSINESS CENTER
ocroBER 2l,l99l
PREPAR.ED FOR
crTY oF CTTANHASSEN I{INNESOTA
DEYELOPEK
nYrlN COnSrnUClrON OOMPANY
9OO SECOND AVE. SOUTH
7OO INTERI{AIIOI{AL CENTER
L!PI.S"MN55402
PREPAREDBY
922 Mainstraet
Hopkins. lh.
55313
ASSOCT IES LTO.
RLK (612) 93-0972lu: (612) 9331153
PY
DEPT.
CBCSITE
AssessrEnlW6ksE (EAW
TO PFIEPARERS
This worksheet is to be completed by ttre Besponsible Governrnenlal Uril (RGU) or its agents. The proiect Froposer must
supply any reasonably accessible dala necessery tor the workslEet, but is not to complele the final worksheel itsell. ll a
complete answer does nol fit in tlE space allotled, attach addilional sheets alri necessary.
For assistance with this worksheet, contact the Minnesota Environrnental Ouality Board (EOB) at (612) 296@53 or (toll
nee) 1-80G652-9747 (ask operator lor the EOB environrnental review program) or consult'EAW Guiddines," a booklet
available ,rom lhe EOB.
NOTE TO REVIE:\,VERS
Comments must be submifled to the RGU (see item 3) during the 3$day comarent period tollowing notice ol the EAW in
the EOB Monilor. (Contact the RGU or lhe EOB to l€rn wllen lhe comment period ends). Comrneds should address the
accuracy and completeness ol lhe intormation, potential impacls that rnay warranl further investigation, and lhe need lor an -
ElS. ll the EAW has been prepared lor the scoping ol an EIS (s€e item 4) comments should address lhe accuracy and
completeness ol the inlormation and suggesl issues lor investigaton in the ElS.
1. Proiect Title Chanhassen Busi ness C€nter
n
Contact Person Kent Carlson Contact Person Paul Krause
Address 900 Second Ave. So., Ste.700 and lite Plannina Director
MinneaDolis, MN 55402 Address 600 Couller Drive
Phone 33S9847 P.O. Box 147, Chan hassen. MN 54317
Phone 937-1900
4.Fleason ld EAW Prepration
_ElS scoping X mandatory EAW _citizen petjtion _BGU discretion _Proposer volunleered
5. Proied Location
SE 1 /4 SW 1 /4 Section -]g
Counly Carver
3. reU City ol
Attach copies ol each ol tlE lollowing lo E AW:
a. a county map showing the general localion o, the proiecl;
b. copy(ies) ol USGS 7.5 minute, 1:24,m0 scale rnap (photocopy is OK) indicaling the proied boundaries;
c. a site plan showing all signifcanl project and natural hatJres
Descriplion Give a complete description ot the proposed proiect and ancillary facilities (attach addilional sheets as -necessary). Emphasize constuclion and operation methods and leatures that will cause physical manipulation ol
the environmeni or produce wasles. lndicate the timing and duralion ol construction aclivities.
The property is located in Ca rer 6unty, MN (see Figure t) C:ity ol Chanhassen, south ol Highway 5 and adiacent
lo Audubon Road. The site is tiangula, in shape; bound€d on the north and wesl by the Twin Cities and Weslern
Railroad, on lhe east by Audubon Fload, on lhe south by a iarm that is currently zoned A-2 but is guided tor Low
Density Residenlial uses (see Figure 2). To lhe easl ol Audubon Road is LaIe &san Hills &d Addition Subdivision
zoned PUD-B, to the west Tmberwood Estates gJbdMsion and lo lhe north or lhe subiecl sile the property is
zoned ot lhis A-2 (see Figure 3).
1
2. Proposer Bvan Construclion Comoanv
Township 116 Bange @.
Clity/Twp Chanhassen
6.
The site is currently used agriculturally, soybean felds cover mosl ol the site. The tarmed atea consisls of 71.6
acres ot the 93.7 developable area. The 12 lots proposed are localed in this farmed area. There are lwo lots being
created where developmenl is nol scheduled lo occur; Outlol A which will be approximately 14.3 acres and Outlot
B which will be approximately 7.8 acres. A storm water retenlion pond is bdng proposed on a portion ol Outlot A.
Oullot B, located larther to lhe west, is physically separated llom the main portion ol the site by Outlot A lt is not
leasible lo access this parcel trom Audubon Road without causing significant environnrental darnage.
The 71.6 acre, 12 lot development will be developed in two phases lor lhe grading, utility and roadway installations.
Phase I will occupy the eastern 341 acres; along Audubon Boad and Phase ll will occupy lhe weslern 38 + acres.
The limits ol Phase I and ll are identifed on Figures 6 and 7. Phase I grading will utilize the low area on Lot 6 (see
Figure '10) tor the storm water runotl withoul an outel to Blut eeek. Nol until Phase ll begins will any development
run-ot, be direcled towards the storm retention pond in Outlot A and the Bluf, creek watershed .
Phases I sanitary sewer will be direcled lo lhe easl, into the tr line serving the Lake Susan Hills atea. Phase ll
sanitary sewer is proposed to flow to the west and b€ conn€cted to the proiected Blun creek tunk line, currently
under a ,easibility study.
All lots will be connected to City water and sanitary sewer.
2
The proposed plan would result in the ullimate devdopinent of approximatery 7m,000 square ,eet ol olfce and
industrial space on lhe easlern 71.6 acre subdMded into 12 lots (see Figure 4). lt is proposed thal this be
developed in phases over a period ol several )rears and that some ol the internal ampro\ernenls will also be
accordingly phased. Access inlo the site will be provided by an inlernal public cuFdesac roadway lhat would align
with the future connection ol Lake Orive to the easl. Oue lo site topography and sunounding land uses, it is not
,easible to construct a loop street syslem or to connecl lhis steet farthet to the wesl. Audubon Road will provide
lhe sole access to the internal public cuFdesac proposed lo be called Lake Orive. Audubon Boad was upgraded
by the Cily in 1990 in the expectalion thal tatlic volumes would be increased in the near future. There are no steep
slopes, malure Eees, creeks, or olher unique site characte.islics within lhe gently rolling lopography ol the 71.6
acres (see Figure 2).
Wthin the north, norlheaslern portion ol Ou{ot A thete exists a latge, rnature stand ol Oak, Ash, Basswood,and
lronwood trees (see Figure 5). A recent tree irwenlory has lound lhese deciduous trees ranging in size tom new
growth to 30 inch caliper measured al the trunk. AII ot these tees will be protecled, Besides the loresl ol fees, the
characteristics ol Outlot A and B include upland and lowland vegetation, the Blult creek sream bed, iood plain
area and interesting transitional slope areas. Both ol lhese outots will be mainlained in lheir exasting condition,
excepl to grade on Oullots A and B lo provide nood slorage and mitigation. There are no plans lo develop the
western 22.1 acres ol this triangular piece ol property. Howe^rer, il should be noted, a drainage pond 6 proposed
to be located on Outlol A in lhe low land area east o, the Blutl Oeek sfeam bed. The proposed storag€ capacity ol
the drainage pond is sized to handle lhe anticipated runotl tom the de\eloprnenl. The siorm water pond and all
outlets will be constructed to NURP and Best Management Praclic6. Wetland miligation in order not to decrease
the currenl storage capacity ol lhe frood plain area has been calculaled and is provided in the g,?ding plan. Slopes
and ground cover within the outol areas will remain in nalive grass€s and will be cultivaled lor a noft.
maintenance/ wildlite rich habitat.
Unattached
Commercial/ lndustial (gross floor space)Told 7m.0@ square leet;
lndicate area o, specilic uses:Otfice approximately 2096 or 14OJO0 s.t
Retail
or Length (miles)
Attached
Manufaciri ng_ app!9x..r?52Lor 1ZE l@L
olher lndusrid q
lnstihrtional ++Lighl lndustrial Agricultural
Other Commercial (specily)
Building Heigh(s)one to two storv
8
9.
10.
Perrits and App.oals Bequied Ust all known local, state, and Ederal perrnits, app.o\als and funding required:
Unit ol Government Type ol Applicalion Stiatus
City o, Chanhassen EAW
Final PUD
Streel, Utility, Grading, Erosion,
Landscape
Park & Flecrealion Committee tax
incremenl devdopable distict
Sanitrary Sewer Exlension
Sedimentation / nutient
removal ponding
Final grading/ plan
Pending
Pending
Pending
ln Oiscussion
Petitioning _
Applicalion in Phase ll
See attached plan package
Watershed/DNR
Types2toSwetland
Wooded/Forest
Brush/ &assland
Cropland
land Use Describe current and recent pasl land use and d€^/doprnent on the site and on adiacenl lands. Oiscuss
the compatibility o, the project wilh adiacent and nearby land use$ indicate whettEr any potential conflicts involve
environmental matters. ldentity any potential environmental hazard due to past land uses, such as soil
contaminalion or abandoned storage tanks.
Corcr Tpes Estimate lhe acreage ol lhe site with each o, the tollowing cover types betore and afier development
(betore and atler totals should be equal):
To be described in acres Berore Atler
0
0
1.6
5.0
19.7
0
.75
5.0
16.35
71.6
Urban/SlJburban Lawn
landscaping
lmp€n/ious Surtace
other
Belore
0
Atter
28.3
38.9
0
7.ftoiect Magritude Data
Tolal Project Area (acres) 93.7 acres
Number ol Besidential Unils
Warehouse aooroximatelv 55% or 385.000 s.r.
o
o
o
o
o
o
o
Current land use on the eastern 71.5 acres is a combination ol hrnled soybean and corn felds, sparsdy wooded
edge condition, and moderate slopes with nalive vegetalion. The proposed developrnent is compatible with the
Comprehensive plan and is located on a designated colleclor roule ot Audubon Boad, Where residenrial property
abuts the property a 100 butlet/easement is being provided. Based upon a\Eilable inlormation this area has
always been larmed and there is no knowledge of any ad\€rse envionmenlal aclivilies which have operated within
this site (see Figure 5). An environmental PtEse I audit will be comdeted on this site.
.1
a.
1 1. Frsh, WildliE, and Ecologacally Se?xilit/e Fl6ol,c€s
Describe fish and wildlile resources on or near the sile and discuss how they would be arlected by ttle proiect.
Describe any measures to be taken to minimize or avoid adverse impacts.
The exisling crop land o171.6 acres proposed lo be altered and regraded will ullimalely reduce the amounl ot
wildlile habital, provided tjllable cropland is able to be designated as wildliE habitat. Al the conclusion ol the
development, additional acreage will be placed inlo'hnmowed or nor}.lillable acreage" such as the easlern slope ol
Ouflot A and ltle 1m ,oot easernent on th€ south edge ol the sile. The 10O easernent is provided lo have a
landscaped bufler between commercial d€r\relopr€nl and residential prop€rly. The 10O setback along the south
side ol lhe site and easemenl area adFcent to lhe norlh railroad tackage will expand the undisturbed
wildlile/ grassland habitat vs. the current land use ot farming fom prop€rty line to prop€rty line. No change is
proposed io occur to lhe wooded area in Outot A Surface runoll will be caplured in the storm drainage pond on
OuUot A (once Phase ll is construcled), which will allow the phosphorus, sedirnent and \€locity ot runon to be
controlled. Oue lo the tact that row crops cunently allow wate. and sedimenls to run directly toward the Blutf Creek
sfeam bed, conlainment of the runot, wilhin the proposed pond will improye ttE overall water quality and
sedimentation confol cunently entering Bluff Oeek.
Are there any statelisted endangered, tt[ealened, or speciaFconc€rn species; ra'e plant communitieq colonial
walerbird nesting colonies; native prairie or other sensitive ecological resources on or near lhe sile? _ Yes X No
It yes, describe the resource and how il would be atlecled by the project. lndicate i, a site survey ol ttle resources
was conducled. Describe measures lo laken to minimize or avoid ad\€rse impacls.
Outlot A is the only portion ol the site which is "ecologically sensiwe'; however, in the surveyors opin'on, it does
not meet the strict criteria necessary lo answer question 11b as yes.
The developer is highly concerned as to the impacl lhe proposed devdopment will have on the sunounding land
use and waler resources. Precaulions identified in the other sections ot lhis EAW speak to prolective ftpans which
will be utilized prior, during and atler consfuction.
The Outlol A' pond will require placing 20,000 c.y. o, fill, which will displace 12.4 acres - ft. ol storage within the
iood plain. This will be mitigaled by increesing ltle storage capacity ol the f,ood plain in Outlot A and a portion of
Outlot B by excavating 20,000 c.y., according to the grading plan on Figure 6. AI grading operations will utilize
erosion control measures as shown on Figure 6 and all disturbed areas will be reseeded at the conclusion ol the
grading process. An outlall stucture will be included to provide regulaled outiow lrom the pond, discharging as
shown inlo an existing diich draining lo Elutl Ge€k.
b
12.
A site survey was conducted lo identity the exislence ot any "ecologically sensiti\re resources," The site survey did
not uncover any threatened or endangered species, habitats that are rare state! ride or locally, cblonial waterbird
nesling colonies or "high" quality weuand complexes. Howe\rer, it was noled the 5 + acres ol hardwood lorest
which has evolved is a valuable natural resource and will be preseryed. The area basically contained by Ouuot A
(see Figures 4 and 5) contains lhe upper reaches of the Blul, OEek drainage basin and ll not properly protected,
lhe downstream water quality and ultimately the Minnesota Ri\€r, will srJtl€r lhe consequences. Curren0y, there is a
small cornfeld in Ou ot A and it is lhe dsrdope/s intent io ulilize lhis area for llood storage mitigation which, at the
conclusion ol Phase ll, will increase the welland cover/ habitat. The miligali\€ grading rneasures proposed ror
Outlot A will relurn this area to a more materialislic frood slorage/lowland environment vs. the current co.nfield.
Physical lmpacts on Waler Flesolrces Wll the proiect invohre the physical or hydrologic alteration (dredging, filling,
stream diversion, outlall struclure, diking, impoundmenl) ol any surhce waler (lake, pond, wetland, steam,
drainage ditch)? X Yes _No
It yes, idenlity the water resource to be aftecled and describe: the alteration, including the construction process;
volumes ot dredged or fill malerial; area afrected; lenglh o, steam diy€rsion; water surface area anectedi liming
and extent ot lluctuations in waler surtace elevations; spoils disposal silesi and proposed mitigation measures to
minimize impacls.
a
13. Wat€r Use
Will the proiect involve the irrslallation or abandonment ol any wells? _Yes X No
Foa abandoned wdls giw the localion and Unique well number. For new wells, or ottrer previously unpermitted
wells, give the localion ard prpose o, the wdl and the Unique wdl number (it known).
Wll the proiecf require an approprialion ot ground or surhce water (including deuratering)?
-Yes -L No
ll }res, indicate the sourc€, quantity, duralion, purpose ot the appropriation, and DNR watsr approprialion permit
numbe, ot any existing appropriation. Discuss the impacl ot lhe appropriation on ground waler levds.
Wll the proiect require conn€clion to a public wate. supply? X Yes _ No
l, yes, identily the supply, the ONR waler approprialion permit number ol the supply ard the quanlity to be used.
The water sen ice is proposed to be connected and looped to lhe municipal wate. srpdy exislirE wilhin Audubon
Road.
All necessary City permils will be adh€red to.
'14.
The proposed development is within 300 Eet ol ttle Blufi eeek steam bed and secondly encroaches into the 10O
year flood plain. All modificalion to the flood plain will be appro\red by the ONB and Wate.shed Distict engineers.
The encroachrnenl occurs fom the proposed local,on oI the sloim water detenlion pond. Mitigation will be
necessary so that the existing flood storage area is not reduced in order to accommodate the ponding area.
15
15.
The SCS soil classification identifies two maioi soil types existing on site, lhe L6ter loam and Hayden loam soil
series. One additional soil type is identifed in the north cental low area o, the site and tlE rnaiority ol Outlot A this
soil type is a Glencoe silty clay loam. The low area (cunenuy identifed as Lot No.6) has periodic sianding water
and is subiected lo seasonal ponding.
The Hayden/Lester soils are deep rnedium texture lo moderalely fine lextured soils and are typically associated
with upland/rolling lopography. The sile is typically wdl drained with the soils lormed under lurdwoods in loamy
glacial till high in lime carbonates. The site currendy drops 3040 le€l trom Audubon Road to lhe west edge ol lhe
developable lots. The sile drops again an avqage ol20 ,e€t lo th€ Blut Geek 1m )€ar ltood plain. Bas€d on the
lay ol lhe land, there is nol anlicipated to be a problem with a high water table.
WaleHdated land Use MarBgenEr Elisticts Does any pan of the proiecl site involve a shoreland zoning district, -
a delineated loGyear flood plain, or a stale or lederally designated wild or scenic river land use disrict? X Yes
_ No ll yes, identity the disrict and discuss lhe compalibility ol lhe project with the land use restrictions ol lhe
disficl.
Waler grtrace Use Wll the prorect change the number or type ot walercran on any waler body? _Yes X No
l, yes, indicate lhe cunenl and proiected wate.cratt usage and discuss any potenlial ov€rcrowding or conflicts wilh
other us€rs or fsh and wildlite resources.
&ils Approximate depth (in leet) to:
Ground waler: minamum _ average _ Bedrock minimum _ average _
Describe the soils on the site, gMng SCS classificalions, il known. (SCS interpretaliors and soil boring logs need
not be attached).
b.
c.
17.E oson and SedirrEfilalion Gi\re the acreage lo be graded or excavaled and the cubic yards ol soils lo be moved:
acres _; cubic yards _.
Oescrib€ any steep slopes or highly erodible soils and identity them on lhe sile map.
Describe the erosion and sedi.nentalion measures to be used during lhe atter construclion ol the proiect.
There exists a moderate slope running north to south along the boundary b€lween OJtot A and Lots 7 and I
which, according to the SCS survey, contains erodible slopes. A second moderate slope exists along the
south/soulhwest corner of Lol 8, All ol these existing moderate slop€s are in lhe range ol 5 to 1 slopes and are
covered with nali\€/in sive planl rmlerial. The abo\€ slopes are not scheduled to be modifed except lor
installing underground ulililies and a ponding area west ol Lol 8. Subsequenl to the grading operations, a 3:1 slope
is proposed between the ponding area and the ds/dopablo lots. Al 3:1 slopes will be seeded with native/grassy
vegetation and left to naturally mulliply withoul providing mowing or regular rnainlenance.
During construction silt lencing and/or hay bales will be utilized to protect the steep slope and minimize erosion.
The erosion control plan will be in coniunction with Oty and Watershed Oasficl standrds. (see Figure 6)
1 8. Water Ouality - &rlace \r+atsr R nofi
Compare the quantity and quality o, sile runott belore and atter ttle proiecl. Describe rnelhods to be used to
manage and/or teal runotl.
a
The runoll ,rom the northerly 15 de\rdoped acres will b€ routed norlhwesterly lowards ttle ditch ard swale area
along lhe south side ol lhe railroad. This area cunen{y recd\res runot{ lrom the northwesterly portion o, lhe site,
and does not outlet to the fioodplain. The increase in impervious surlace lor lhis area will be relawely small, on the
order of 4 acres. The increase in tota, runoll is estimated al one acre-root, only 20% greater than the present 4
acreteet. This small increase in runoll should have no significant impact, and will be absorbed into the ground and
evaporaled as in the existing case.
ln addilion, approximately two (2) acr6 ol developed area fom Lot 1 and 3 will drain e-<tedy into Audubon road
and the existing slorm sewer syslem.
6
Approximately 78 acres to be graded, with 480,0@ cu. yds. ol excavation.
Cunenlly, the area occupied by the proposed Lot 6 is a low atea which receives runol, fom 52 acres. Based upon
our analysis, lhere does not appear to be an ouuet lrom this low area. The remaining 22 acres fbw loward the Blutt
Creek. The existing land use is row ctops which allows valuable soils to be continually rvashed towards these two
low areas. The existing runot fom ll€ row crops contaan a high amount ol sedimenl at relatively slow velocities
and excessive lertilizer nufients within the runotf. Phase I ol lhe development will not impact the Blutl Creek
Watetshed with any surhce runoft. As shown in Figure 10 the surhce runotl will be captured in proposed Lot 6.
Phase ll proposes the installalion o, a storm retention pond which has been designed lq a 1*year,24-hour storm
duration, single event. This pond is proposed to be partially within the flood plain elevation o, Ou{ot A The runoll
lrom 57 developed acres will concenfate and increase the rale of runoll due lo the imp€rvious acreage. However,
lhrough ponding and outflow resfictions, the runolt entering Blufi qeek will not exceed lhe predevelopment rate
ot 3 cubic leet per second. Secondly, lhe reduclion in sedirnent and tertilizer nufienls removed ,rom the pre-
developmenl row crop status will improve the waler quality entering the Blutl Oeek Walershed. The amounr ot
sedimentralion entering ttE Blut Oeek steam bed will be minimal due to the ponding and weir sfucture proposed
in the drainage pond. The proposed pond is designed to provide approximately 10.5 acreleet o, temporary
storage and 5 acr+reet o, permanent or "dead storage'at a depth of 4 ,eet, with a water surlace ,ea ol 1.5 acres.
b
The roule proposed lor tt|e stormwaler fom most ol the devdoprnent shall be ltyough a combinalion ol curb and
gutler, surrace runotl and storm sewer piping. Aboul 5/ acres ot de\€loped runoll will be tkough lhe proposed
ponding area. Permanent slorage or S acreteet, 4 leet de€p is lo set{e oul soil s€diment and detain nutienls.
Nutrienl concentation should decrease since much ol lhe area is presenty agricullural - row ctops, soy beans. A
pond ou ot structnre is proposed lo include a skimrner lo prevenl enry o, petoleum, surtace oil wasles, and
debris inlo lt|e Blutl creek nood plain.
19. Ware. Ouality - Wasteuatsrs
Describe sources, quanlities, and composilion (except tor norrnal dornestic 6ewage) ol a[ sarirary and industial
waslewaters produced or teated at the sile.
The Phase 1 area includes Lots 1, 2, 3,4, 5, 10 and 11. &dinary dornestic wastewale. nows were calculated, using
average generation rates ol z/4 gpd over 2400 s.L ol building area or 2,000 gpd per acre. The higher flows were
used in cases where bolh building arees and lol areas were provided. Ttle total average waslewaler flow fom
Phase 1 development is estimaled at 54,000 gallons/day, and Phase 2 al 58,000 gallons/day. (see Figure 7)
Describe any wasle featment methods to be used and give estjrnates o, composilion aner tr€t nent o. it the
proiect involves oft.site sewage systems, discuss the suitability ol the site condilions lor such syttems. ldenlity
receiving waters (including ground water) and estimate the impact o, the discharge on the quality ol the receiving
watqs. (f tte discharge may allect e lake consult EAW GuiddirEs" about whethq a nutienl budgpt analtris is
neded).
The larger issue with sanilary se{r€, relates lo how lhe city plans to provide services to a large part ol lhe newly
acquired MUSA area which is localed in whal is called lhe Blufl Oeek Drainage Area originally, when the 1980
City Comprehensive Plan was approved, this area was to be served by lhe Blufi qeek lnterceptor rdich would
have been either a regional tacility or one constructed between lhe Gty o, Eden Prairie and Chanhassen. Over the
)reats; however, lhe possibility ol this line being buih has b€corne virtrally noF€xistent Tfuq the Oty ol
Chanhassen must work wilh Metopolitan Waste Contol Commission to find viable allernali\r€s. Urder ille recently
approved Comprehensive Plan, tfie MWCC appro'ved lhe placemenl ol a litl stalion in the vicinity ol Lfnan
Boulevard into which lhis entle area could drain by gravity, and utilize lorcemains lo pump tfE sewage back up the -hill into the Lake Ann lnterceplor. The Cltys engineering consultant, Bonestroo Rosene Anderlik and Associates, is
exploring appropriate melhods o, how lo s€rve this area. Most il nol all ot the Chanhass€n Business Cer er along
with virtually all the other land located in the MUSA area soulh ol Hwy. 5 may be requied to dain into this new
system.
a
b
7
ldentity the route(s) and recdving rater bodies tor runott f,om the site. Estimate the impact ol the runon on the
quality ot lhe receiving waters. (lt ttts runoll may allect a lake conslt EAW Guiddit 6' about whett q a nutient
budget anelysis is tded).
All waslewater and sewage anticipaled to be generated lrom this development are sclreduled to be added to lhe
Metropolitan wasle water treatment system.
The MUSA lines have recenty been expanded and lhis sile now is included within ttis disticl Phas€ lwastewater
will flow to the east and be conn6led into an e{sting 8'sanitary lirE, flowing ttyough lhe Lake Susan Hills
Subdivision (See Figure 7). Phase ll wastewater is pro,ected to flow lo the west, cross Blutl Oeek and be lied into
a proposed sanitary sewer tunk line. A leasibility study is cunenuy being perlorrned by Bonestoo Rosene Andedik
and Associates ,or the proposed Blutt Oeek sanitary sewer runk line.
c l, wastes will be dasctwged into a sewer syslem or prefeatment system, identity lhe syslem and discuss the ability
ol system to accepl the volunre and composition of the wasles. ldentity any improvements which will b€
necess:vy.
The total predicled Phase 1 ltow ot 54,000 gallons/day is proposed to be rouled to an odsling I rnain at a rnanhole
on lhe west side o, Audubon Road opposit€ Heron Drive. From this manhole the existing 8r main runs easterly
ttvough the l-ake Srsan Hills grbdMsion to Counv Road 17. At that point, lh€ main diarneler becomes 10 inches,
lo ils conneclion poinl to lhe exisling Trunk Main norlhwesl ot lake Susan.
The capacity ol ttle tr main wesl o, County Boad 17, at grades o10.3% and more, is estirnated at 0.78 c.r.s. (cubic
leet p€r second). The lotal reidential iow lrom Srsan Hills West, west ol County 17 is estimated ar 58,000 gpd.
Adding the pro,ecled frow ol54,m0 gpd lrom Phase I ot the proiect, totals 112,000 gpd iust west o, County Road
17. Using a peak f,ow bctor ol tour (4) lhe eslimated peak tlow at thal localion is 0.68 c.t s., less than the eslirnated
0.78 c.t.s. minimum pipe capacity.
The total residential tow tom the entire dq/doprnenl wesl and easl of County 17 is esfirnabd at 76,0@ gpd.
Adding this lo the Phase 1 flow ol 54,000 gpd gi\€s a total ol 130,000 gpd tor a peak iow ol 0.80 c.l.s. This would
be considerably less lhan lhe eslirnaled capacity o, 1.4 c.t.s. for lhe lO' rnain.
It is concluded lhal the existing Lake Susan Hills system has sufficient capacity lo ssve Phase 1 waslewaler peak
fows. The proposed City Trunk sewer west ol the site will need lo be sized to accommodale lhe estirnaled Phase 2
flow o, 58,000 gpd average.
eound Waler - PoEr id ior Contarrinalion
Approximale depth (in bel) to ground waler: l?9_ minimum; _rq average.
Deplh ot groundwaler is anticipaled lo be 20 lo /m Gel with an average ol 30 leet. Soil borings will have to be
perlofmed in order lo delermine actual deplhs.
Describe any ol the lollowing sile hazards to ground wate. and also identity them on the site rnap: sinkholes;
shallow limeslone lorrnalions/karst conditions; soils with high infltration rates; abandoned or unused wells.
Describe measures lo avoid or minimize environmental problems due lo any o, these hazads,
None are known
ldenlity any loxic or hazardous materials to be used or present on the projecl site and identity rneasures to be used
to prevent them lrom contaminating ground water.
None are expecled to be ulilized.
An Environmental Plrase One Ste Ardit will be prepaed on this site with ltE f ndings srbrftted to the City.
n
a.
b
o
a
b
21. Solid WasEs; Hadqls t raSq Sorage Tar*s
Describe the types, amount and composilions ol solid or hazardous wasies to be generated, including animal
lrlanures, sludges and ashes. ldentity the method and localion o, disposal. For proiects generating municipal solid -
waste indicale il th€re will be a souroe separation plani list h/pe(s) and how the proiect will be modified to a.llow
recycling.
Trash, rubbish and recycling pick up will be necessary ror each lot proposed. Allrefuse generaled on site will be
disposed ol in a legal m.lnner. Sourog separalion will occtn on an individual lot basis and will meet and / or exceed
the City and/or UBC standard requirerT€nts.
lndicate the number, location, size and use ol any above oa bdow ground tanks to be used ,or storage ol
petroleum products or other ftllerials (excepl wals).
Unknown at lhis time.
Tratfc Parking spaces added 900 stalls olus loadino docks ,or each orooertv. (Based uoon Citv codas. it is
estimated that 560 slalls are ,or orfice and 340 stalls tor lhe warehouse/ manufacturino) Existing spaces (il proiect
invotves expansion) 0 Estimated totat A\rerage Daily Tratfic (ADT) generated a ranoe to be expected wi be
4.300 - 5.000 . Estimated maximum peak hour falfic gene.ated (it known) and its timing: 637 a.m. oeak. For
each atlecled road indicate the ADT and the directional distribution o, tatfic with and without the pro,ect. Provide
an estimate ,or the impact on tatllc congestion on the atlected roads and describe any tatfic improvements which
will be necessary. Please rerer to Appendix A lor a complele taffc study on the developrnent and site.
All tafllc aenerated by this proposed de\eloprnenl enlers and exits Aidubon Road via one internal roadway, Lake
Drive, with the exception ol Lol 1. Aidubon Road is a ntrtl}south collector between T.H.5 on the north and Lyman -Eoulevard/CSAH 18 and 17lo the south. Curenty, Audubon has an ADT ol 2,939 south ol T.H. 5 and 1,594 north
ot Lyman. These roadwa)E are included in the 'Eastern Ca^er County Comprehensive Transporlation Planning
Study." This Study docurnents the existing volurnes and year 2010 lorecasted volumes and related improvernent
pro,ects needed to supporl the anticipaled growlh based on project land uses and growth potential. Yeer 2O1O
lorecasled volumes on Audubon are 10,780 to t 1,100 ADT which includes the anficipated growth in this area. 1989
and 1990 consfucton proiecls ha\re been compleled that have addressed both the capacity and salety
defciencies to handle anticipated g.owth to the )rear 2010.
23 vetide.fdabd ai e.risgo.E Provide an estimate ol tho etlect ol the proiecl's tatfic generation on air quality,
including carbon monoxide levels. Oscuss the eflect o, tatfc improvementrs or olher mitigation rneasures on air
quality impacts. (f the project involva fio q mqe parking spec€f,, consull'EAW Guiddirr$" about whethq a
delailed air quality analysis is n*cled),
The amount ol acreage proposed to be developed and gen€.al amount ol gr€en space with the addition of gOO
parking stalls will not gen€rale a need lo require a detailed ak quality analysis.
The 900 stalls are proposed to be sp.ead over the 71 + acres and tkoughout 12 individual lots.
I
Stalionary souce ai enisdons Wll lhe project invohe any stationary sources of air emissions (such as boilers or
exhaust slacks)? _Yes X No
Each site is subiecl to sile developmenl guidelines and emission review ol the particular land use and lhe PUD
developmenl guideli nes.
Wll the proiect generate dust! odors, d noise during consiuction and/or operation? X Yes
-Nol, yes, describe the sources, characleristics, duration, and quanlities or intensity, and any proposed rneasures lo
miligate adverse impacls. Also identily the locations ol sensilive receptors in the vicinity and estimate the impacts
on these receplors.
The regrading ol this site, approximatdy 480,000 cu. yd. will have the potential to gendate dust and air borne
particles. Care must be taken lo prolect the areas lo the south and easl (residential) and sensitive Blut creek area
to the west. The grading operation will keep the soil on sile and should greaty minimize the need to utilize public
roadways lor earth moving/hauling etlorts, All grading operations will occur at the inception ol each phase olthe
project, with staged consfuction and ground cover added lo lhe site at the conclusion ol the grading/utility
operalions lor each phase.
Phase I will move approximately 260,000 cubic yards and Phase ll will move approximately 220,000 cubic yards.
Are any ol the lollowing resources on or in proximity to the site:
ll any o, the iterns are answered Yes, describe the resource and identit any impacls on the resource due to the
proiect. Describe any measures lo be taken to minimize d avoid a(foerse impacts.
a archeological, historical, or architectural resources? .L Yes - No
Adjacent to the site are the 4 Chaska brick homes which have been identified on the historical regisler.
b. Prime or unique larmlands? X Yes
-
No
The comprehensive Plan identifes the Blult Qeek conidor as a recrealion rail. lt is anticipated a rail will extend to
the north through an exisling tunnd under lhe railroad traclG. This park area gerErally conrorms lo Outol A The
developer has committed lo dedicaling Ou{ot A to lhe Oty lor rectealional purposes in lieu ot park improvement
funds.
A tail is proposed to be constucled fom Ardubon Boad and H€ron Drive, along the soulhern side ol the sile and
into Ourlot A where it may be incorpdated into the City ol CtEnhassenl Comprehensive Trail SFtem (see Figure
8).
c
10
26.
Existing site is a prime larmland, howarer, property adiacent to lhe sile has been fanslened lrom tarmland lo
housing. The proximity to Audubon Road and the railroad facks present this site with tiavorable access and the
opportunity lo be devdop€d.
designated parks, recrealion atees, or tails? X Yes
-No
Audubon Road is one ol the higher ridges in the area and the vista lo th€ west and east is signifcanl. A second
vista is lhe top ot the blutt between Outlot A and lots 7 and 8. The view towards Outlot A and B will continue to be a
significant and pleasanl, naturalistic view.
e.other unique resources? _ Yes X No
Will the project creale adverse visual impacts? (Examples include: glare lrom inlens€ lights; lights isible in
wildsness areas; and large visible plumes lrom cooling lowqs q exhausl stacks). _ Yes X No
All proposed lights will be ol the cut-otf fixlure sve lo prohibit light glre to encroach on adiacent property. All
loading docks will be screened lrom public roadwa)6, residential zoned areas.
Compalibility with plarB ls lhe proiect subiect lo an adopled local comprehensive land use dan or any other
applicable land use, waler, or resource mnnagemenl plan ol a local, regional, state, or lederal agency? X yes
-Nolf yes, identity the applicable plan(s), discuss the compatibility o, the proiect with the provisions ol the plan(s) and
explain how any conflicts between the pro.iect and the plan(s) witl be resolr/ed. lf no, explain.
The Comprehensive Land Use Map identifes the subiect area lor Office/ lndustrial. The Land Use Map also
identifies a Park/Open space corridor,3O0 to 400 Eel in width, running the entire length or the Foperty, north to
south. This area is located in proposed Outlol A area on the sile plan. The Comprehensive Plan also identifes a
butfer strip 50 teet in width along Audubon Road and 100 leet in width along ttle southern side ol the property tine.
The intent of this buter line is to help pres€rve and esiablish vegetation to lrclp mitigate the impacts ol development
to surrounding properties. This proposal is fully consistent with the Comprehensive plan.
This area south ol the developrnenl will eventually be developed wilh single tamily homes comistent with the
Comprehensive Plan. Concept plans call lor establishing an acceptable landscape ptan in the appropriate bufier
areas. Site lopography and tee cover will also place much o, lhe site beyond the view of ad,acent residential
areas. (see Figure 10)
n lmpact on tntashrctre and R Hic Serices Wll new or expanded uiilities, roads, other in ras,tucture, or public
services be required to serve lhe proiect? _L Yes _No
ll yes, describe the new or additional intastructure/services needed. (Any intesiucire thet is a'connected
ection" with respect to the project must be asses9€,d in this EAW; se "EAW Guiddircs" lu detaits).
Based upon the tatfic study, additional imFovetnents rnay be necessary lo Audubon Fload. Turn lanes and
acceleration lanes have been re,viewed in conjunction wilh the proiecled improvement to Highway 5 and future 212
connection. These lacilities are discussed at length in the tratfc study. Tlle proposed inlernal cul-desac road and
all utilities will be constucted lo City standards and will have the opportunity to be turned o\rer to the City at a
fulure date.
11
27.
d. scenic views and vistas? x Yes No
28.
30.
The proposed Blufl Oeek sanitary sewer inceplor leasibility repori will have a signifcant impacl to this site's future
development. Based upon the liming ot tle reporl and anticipated consfuction dates, developmenl ol the western
lots (6,7,8,9, and 12) rnay b€ ddalred.
FdaEd Det €lopr€nt$ Orm,ialive lmpects
Are tuture slages ol this de\rdoprner danned or likdy? X Yes - No
All 12 lots are anticipated to be de\doped as proposed in the final plan. Howe^€r, Phase I ot the development
specifies the lots adiacent lo Atdubon Road and the eastern edge o, ltle siE lo be devdoped immediately.
b. ls this proiect a subsequenl strage o, an errlier proiect?
-
Yes X No
ls other developrnent anticipaied on adiacent lands or outots? -L Yes - No
Outlot B has the polenlial to be a det/elopable lol il roadway access could be gained to it. However, ,or this EAW,
Outlol B has not been included in any building square ,ootage calculalions.
All cumulative environmental/dedoprnenl impacts were built inlo this EAW ,or the purpose ol presenting the
maximum impact to expecl lrom lhis Ste.
All figures and quantities discussed and identifed in lhis reporl speak to the 71.6 ac'es being deieloped.
Essentially, this includes all lots in Phase I and Phase ll.
OttEr Pofedial EnvtonrEntal lmpacts ll the proiecl may cause any adverse environmental impacts which were
not addressed by items 1 to 28, identty and discuss them he.e, along with any proposed mitigation.
gJMrrAFnf OF sST ES (This s€r.tion ,ed not b comdetd il tE EAW is bing dotE ft EIS scoping; instead,
edclress rdevant issues in ttP- drafi *oping Deciion docuttw t wtich must accompany tl?€ EAW. Usl any
impacts and issues identified above that may requiro further invesligalion belore lhe pfoiect is commenced.
Oiscuss any alternatives or miligati\€ measures that have been or rnay be considered lor these impacts and issues,
including those thal have been or tnay be ordered as perldt conditions.
Final approval for rezoning ol the subject property lo PUD is required as is acceptance o, the tatfic study. Phase I
development will require a commilrnent fom lhe regulatory agencies to allow conlpction to lhe I'sanitary sewer al
Heron Drive and Audubon Boad.
Approval ol the roadway layout wilh Lot t having access di€ciy on to Audubon Road is also required.
Phase I grading and drainage layout will not impact the flood slorage/runotl lo Blult Geek. Not until Phase ll will
lhe permits be necessary to consfud the ponding grade tor lhe mitigation measures ot llood storage.
a
d
.1)
12
lf a, b, or c were marked Yes, discuss any cumulali\re environrnental impacls resulling fom lhis proiect and lhe
olher development.
B.
CERTF|CAIONS AY THE BGIJ (all 3 cqlifications nast be signed lq EOB acceptence ol the EAW ld publicetion
ol notice in the EOB Monitd)
A.I lEreby certity lhat lhe inlormalion contained in this docunpnt is accurale and complete to the best ol my
knowledge.
Signature
I heteby certily that the proirt desctibed in lhis EAW is the compbie p.or€lct and thqe are no other proiects,
proiect stages, or pro.iect componenB, olher lhan lhosa d€scribed in this docur€nl, which are rdated to the
proiecl as "connected actions" ff'phased adions," as d€fned, respeclhdy, at Minn. Rules, pts. 11410.0200, subp.
9b and subp. 60.
Signature
I hereby cerlily thal copies ol the completed EAW are being sent to all pointrs on the ofick EOB EAW distsibution
list.
ggnature
Title ol Sign€r Oate
13
EAW ATTACHMENTS
Carver County Map - general proiect localion
USGS 1:24,000 scale topo rnap
City ol Chanhassen - proiecl localion tnap
Chanhassen Business Center (CBC) Ste Plan Sheet 1 ol 7
CBC Existing Site Condilions Sheet 2 ol7
CBC Phasing, Grading, Drainage and Erosion Confd Sheet 3 ol 7
CBC Ulility and Phasing Sheel4 ol7
CBC Landscape Plan Sheet 5 ol7
CBC Preliminary Plal Sheet 6 ol7
Qoss seclion of sile, lighG, signage Sheet 7 ol7
Phase lGrading Plan Sheet 1 ot 1
Appendix A CBC Tratfic Study
Figure 1
Figure 2
Figure 3
Figure 4
Figure 5
Figure 6
Figure 7
Figure 8
Figure 9
Figure 10
Figure 11
14
Carver County
Minnesota
H IGHWAY TI A P
ar.r. ru.r tnait.r.-.------- OC.{rlr ar.r. .r. [r.ir.r. ----- @c.i.rr r.t.. -----.-......--- E
t....i|, lr.at . -,. . r. - -. - -. - €
l --l
a i:;
=i-
\\/
4
I
J.
'I-.'-
7
).:
,F .tt.L
--t
) '-.
I
J-
I
l
-.- .l= -
I
'
'.11
I
i.l
,. .:;-\, ,:..1
I
I
II
PROJECT AREA
CHANHASSEN BUSINESS CENTER)I
t I
c L--.(
t?i'
i"
'I
RLK
LTD.
CARVER COTI{TY f,AP
cac - EAw
FIGT.IRE 1.
fr/n/91
.(
(
() ! i(
I
Ih tr Li..i .
it l.l
il
I
I
,G
(t.1.,
-_\_-
I
/(
)(
)
(
)
. .UNITED STATES
DEPARTMENT OF THE INTERIOR
GEOLOGICAL SURVEY
/{ O QU^oP^|GLE LOCaTlOll
SHAKOPEE, MINN.
sE/1 LAI{E t{rN!{lTOtlXl 15', OUAORANGLE
N 4445-w9330/7.5
961._l9E8
._.. -1, 19,...,'I r sE-s:PlEs v872
qJ n :nv
.l
,aao' -a ao
:I
:\
i
It
t.Ib o
La.key
alL.ti
l 11 Il
i
I
.L,-H N )
c.
€\=[
I
I
3-:2 T
CL
SCALE l:24000
0 I r.rlt
6000 ,(n tttltcq,l0@ ao@ !@o
G I X -OraatEF
CONTOUR INTERVAL IO FEET
o^ru rs l.lEAN SiA LEV€L
Garo rxo r9r: r.^ctarlc xoirr
cllrr^r|ox rt canrt. ot 5Htar
rHls MAD COMPLTES WlTlt llAlroNAL M P ACCURACT STAI{DAROS
foR SALE BY U, S GEOLOGICAa SUn'ev. DENVER' COLORAOO 80225 0R WASHINGTON' O- C' 202'i
i roioa* or"c*g,nc roPocRAPHlc MAPS aNo sYMaoLs ls avaluglE oN REQUEST
PROJECT AREA
CHANHASSEN BUSINESS CENTER
oO
j- --- I Ij?' ;-
,!':\r-t,",'
t*=-
5
ti
b
q El
t'
BGI.nE 2.
fr/21/91
t scs I24,OOO TOPO CARVER COT NTY
CBC - EAW
LK
ASSOCIATES, LTD.
ROAD CLASSIFICATION
Heavy{uty- - -
-
LighlCuty.
l.lediumiuty-
-
Unimprovec dirt =...-....
[u.s. noutc QState Route
OnNU
\)o0
(\
:.U
0 rm 20m
0
I
o_
0
I
Yit
-Jl
a-
t)
I
II
r
t.
I
Jc
t
I
I
t.
l;
t.
I !
ir
I
2
li
i
I
I
i
I
t'2
4
6
:l-
(_
i
oTf ff
CT'AAIFIASSEN
:
.)
\i
:
9
I
1
I )
J
,-.
1i
t
I
-:..1.
/,
I
(
I
i
1
I
II
I
I
1
I
!
l I
,
PROJECT AREA
CHANHASSEN BUSINESS CENTER
RLK
LTD.
CITY OF CI{AN{ASSEil
cac - EAW
A
t I tt t r!
I
(
-,t,.,t'
(
:r-t:
1.1?
)tl
-1A
aer{srEe &.o.ra.,ir, E t.
r
\
,4,'
'a
..-j:
I
FTGURE 9
fi/21/91
11
CHANHASSEN
BUSINESS CENTER
CHANHASSEN MINNESOTA
AVttr Ot er*AVEnAOI l2t
iarnoao R.o.w.
LOr /r
LOT T2
OAS EASI EIIT
III.D|IIO EITE_!ort:!gr_llzr rlfqig ErzE---!9vEn^cE.-oEr.grY--!.PEnYQg9-o!!!!!!--
ror I ao ia.t 6e,ooo 3.r' 23* lsta
LOT 2 l.t Ac.r 3e.ooo t.f. ?fa 7ot_
LOT r a.O AC.r a!,OOO 3r. zta ?o*
ior i ii ec., .c,ooo ir. 2rr ?oa
aoi i ii ecr rt,ooo g.r. .ra' clt-LOt a t.t AC.! tll,ooo lr. llt ,!a'ioi ; io ec.t ur,ooo ar. 3.t 7!t
tor ! !.a ac,r lt.0o0 t.t. 2la tat
ior o !.! ac, ar,ooo 3;. mt 7ox
LOT tO a.! AC.t !7.ooo Lf. 291 aoa
LOT tt a.o ac.! a.,ooo 3.f, 26t cor
-LO' 12 .t0.o ac.r ta,000 3f. atl e*_nO D a.Z AC.. - .|)A
LOT 3
Fro
tlltorat 7t.a Ac.r ,!o.ooo l.F.(tfE t.orc r)(xfiLor A la.l lc.tqrTtoT ! ?.a ac.r
l.ol! ! : tOlrAI FOOIIOI EAXoOI,| T
ot;Et. lcf i tao.ooo lr-I^ilrlcnnllO. 2!t - l7l,0OO Sr.u rllolrat - ltt . lll'ooo l.t.
- 700,000 8.F.
.-s
Lor it //
,/
rettnc ltero ,/
Of IFEE3lo ruat{ I
A
IOT '
LOT '
,.-;\ i'
-!o rr !d
l
I
(
-1
I
,
I
a
\
,II
t-
o
ffia
El(
i
Ie-, a !'4J,
-. L,l-l1t ..- 1tt
tla- - -
WEArllilrrcltr(r.o
Sr Trota
FIGURE 4
LOr 2
I
SIETOIAL 2'.i ACJ
rol L rt,7 ac.t
rotat . roor
LOY C
I t'\
I
I
LOT I
RYAII'tl'fi i-1i3['Tll'J" i iri,il;c.u.{aaa( dbrr
IAtrEf, grt P(lll
t{.s.P. I OA3
EASETTTT
OUTLOT B
too'lwfEn zol'
/l
LOC IE'I IAP
I
t
I P
nlt(t.!{- dlql trI r-rar c6,tEf o.-"ro, *--E- ''T1'*
iE!#.!4.,!-r_5cir-r
FIGURE 5ttt
r::l_l__l__-_t___L
e-LP?X,"jl i
I
l (--
a-tF
)
,!tl..t. -\
-r.
\ ..)
l/-.
l
I
o
t (
FY+]lto,.srT::T::,,ea,,v m
I
GnlD[ tEr rS
1t60
(
(
it
I t:
f,,I;
il',,-
,,:^,.c4
ECTiETTofir^ld
-*, 'ib*s-d
(D
tt r-.J'
/at '/,,
,.,
L
!
l:*'
ti.,8&"2
I t1y1-,
lloT Foa coirsTnucnoll
tffi ["Ji
rl
ir i( t t-- tl
\
a
*l
Ird
(
(r.
l
(
rrJ
\L.il
:\
I
t
II a.(
.L ftt;.-r,{'
\
I i t'i
,l
t'.. -
ll
I
i(#r
-\
I
I
Iil
D
ffi Qf[]l consrr ml|clr0ll c0rllpalll
6Ll D '.\'1-lr. r,/tl.t ., - t1.tt
I
FIGURE 6
I
,1\
a)
(nrmo x)tEs
.:,/
,I
o
t-
l'. (
Hll', \,
str
I
Ib
lit
r\E,x
i=
I
It
B
I
I
!
E,ti
,ij I
-:r-.-'-t:
UJE
=-otr
\
II
I
fi
5
t
I
E
Ir I
I
\
I
II
,/l
I
I
I
I
I
I
I
I
I*-!
I
I
I
I
t!
I
bIt
I
I
E
EI
t
ItI
I
lt ! r r I r I r t
Ii ta ll tr tlII
I
I
I Iirr!
5
\
I
!:
ll E
I
T
t
I
I
I
!
''{"
E\La
t
i\'l
iiE
r-[
tqt
I
II
I
ii
I
I
I
I
i
I
I
I
i
I
fItilt
I
E:
?!i ilt!
T
.ti
I
a
E
5
-
I {li
I
E
/
1la
I
I
I
il
1l
'l
I
5
Iit
zz
=
=.CJ
i_
-stdLJ
?-'
Kt\l'.a
I
!,
I
I
tt
i
I ltrr!ll @I
coq
il*i
ifi$
Ii'
i
t:
iiIIll
[[
T
EtF
anto
I
F
3
@
I
I
EIrl'{
i
ii
rii!
it
ii
ii
l
l!
ii
ii
iiri
iirii
II
I
I
a
II
I
ii
II
I
I
Ia
I
!
I
II
toa
o
o
II
I
t-t'
j
,
I
I
.{
. t-\
:I
iil!
ii
!l
i
I
Ii
!I
,,1:
!lIt
Irlr,lr
tIlt
Ilit
litil:
rtt
lr'
irI
ilti
i.'i.
llli,,-!.
li
Itril
iiiiii,iii
Itll! tllr
i!
i-
i!tii
itl!!l
iii ili
lttlt!lrl
,il
iil,l
It.
I ,li:l
iitiii
iliilii
I
I
I
T
I
II,
L
rl
li
I
a
t,t )
)
!.
I
,,:I
!l
lt
:r
ii
I
I
I
iiiiiiiiiiiiiiilili
.!l
!ti
iilt-w
lrli
ir
I
.l
iirlt
i
h
IInli
lr
fi
!
i
I
I
I
!
I
I
T
I
\It
lr
t
e!-
Clz
let-.
-
d=Li-
s
!
lEt
I
E
I
EI
O
o
l,o' '\
I I
It
!
t.
I
I
I
I
I
I ---'1
aa'
J
a-
I
a
\r I
I
H
it
ii
I
il
1I
I
at
l,l- t{i
jilliiillliilil
ffi
lIt!
I
I
E
I
I-{
T
iiiii
I
I
!
I
I
I
I
iI
co
UJG
=glr
II(9
I
J
it
!lii
I
!
I
!
!
\
\
tir!i
It iiI
I
iiilli
o..r0i
Ifl
B
p
iI
t
E
e
E
I
I
l!'
I
II
II
ilifi"'lffi
rrr !
'al!,., I
I
ilt
lltt
r!tt
ii
1.
IaI
,
e
;
a
tr
ii
I
t.i
-i-f.Tt
oc,m
(o
IIt:I rla irI
Irli s
il
r
I
II
IIa
Ili ;!
.: l.
;-a i''l
aI
T
tIt
:
I
t
I
Iiii
tr
rti
ri
.I
IAstat
a oaa
!38
I
I
Ft
i
I
F
I
j
!-i.-r
ii'j,'
it
(!
o
z
rFt
aa.)s
ct
e,
g
zz
!o
aa
II
I
I
it
t!
I
!i.I
I
I
:
!
II
IEr6t;
Trl
I
I
II
c-
1!
,
i:
I
I
I
1
I
ta
I
1
Ii
I'- l
tt!
I
I
I
t!lr:!
IiiI
I
I tI
II
I
I
It
I
I
1:I
I
I
I
r!t-
:.
t:
i:
I
Ii i:
i:
I:
5 :-
t;
tao
lattl
-
I I
tat'-'aU=='., --:: ,-n'.
,i ., rll':f-t :' -j-\i=s,'t.,__l--'l:=-
,i:
't
i
.,1
J]
a\
''l r
/} ___
4t===-
I
:i
I
i
JI
lr
- rrrl
d+r-Er:: t1
-t- J,. -!-
14,€)+e /!.:k,r- ot#c4j,j. *:-'- €)r.-trjli rE!--
PROPOSED MONUMENT DEVELOPiENT I D. SIGN
(ErACr COTT|GUAAT|oi. rO lE OETEart[€D)
I IYPIC L Mll*rT gG
-
I TYPEAL IIG'II SI^}OAND
-
I
}
t
( ;lt\NAt | \
I{. r5lNl.,
IARK
I TYP|CIL CROSS SECT|OI{
l-,'-,il
cturu$Hr,srfss cExrEnt:mt(ffi,, 'rBtNG
'l
I !, LsL,
FIGURE 10
[r;.1 i
I
RYAII clqltlll g!10[ tg,llll9fl
MINNEAPOLIS
T
E
I
E
@
tl
I
:
.L
I:i- .--i r.i
.t
tr:
J
fir
I
I
I
I
*s Ii
I
I
!
IIII
irt
I
I
I
I
It
5
F
I
I
I
I
I
ilt
iiiii
ll{lr
ri
illlll,lrnl*lllfilfilfi
(
l
BI
t.''rl\(
\
I
I
,
\\\\]lri i?fi'::lr iiir
-
E
\I
)
)
(
tri
2
(I(
LT,Jz
4
a
I,
ta
I-!!
5
iI tl
'7
l-r,
!
I
I
I
a
E
E
I
tt
I
E
I
)(
i
ll
,it
!_
n .lf
lfiiiiu.,' il6LEI!
I
I
iI
:
I
:
:t!
1
E!
o:
-€
d\Jl
I
I
I,
U'
(
II
I
I
I
I
I
I
'ilril
OFFIC|AL COPY
COMMU N ITY-DEVELOPMENT DE}T.
CIIY OF CTIAT{HASSEN
NARRATIVE DOCI.JMENT
CHAI\HASSEN BUSINESS CTNTER
FII{AL P.UJ). SI.JBMISSION
ocToBER 21,lggr
PREPAREDT1OK
CITY OF CITAIYHASSEN, MrI\TNESOTA
DEVELOPEK
RYA}I OONSTRI.rcION COMPA}TY
9(n SDCOIYD AVENT'E SOUTII
7OO INTERNATIOITAL CENTER
MIhII\TEAPOLIS, MII{I\'ES'OTA 55{N
PREPAREDBY:
Rr,r AssocIATEs, urD.
922 MAINSTREET
HOPENS, MrhaI\ESOTA 55343
FINAL SI'BUII:TAI, FOR PUD ON TIIE CHANITASSEN BUSIIESS SITE (CBC)
IMTRODUCIION TO THE NARRATII/E
In the western portion of the City of Chanhassen south of Highway 5
and adjacent to Audubon Roaal lies a 94 acre triangular area ofproperty. Figure 1 shows the site that is bounded on the north and
west by the Twin Cities and l{estern Railroad, on the east by Audubon
Road, on the south by land guided in the Conprehensive PIan forresidential purposes. The western portion of the site is occupied bythe Bluff Creek fl,ood plain district. Ryan Construction Company,hereafter referred to as the developer, is proposing to develop theproperty into what sha1l be hereafter referred to as the Chanhassen
Business Center (CBC).
The first strategic step in the implenentation of the CBC developmentplan is to rezone the property from its current Agriculture - 2
zoning classification into a Planned Unit Development (PUD) zoningclassification. This docunent represents the narrative that
accompanies the seven sheet plan submittal and demonstrates in moredetai.l the development proposal . The developer, is submitting theFinal PUD DeveLopment .package including a narrative, plan sheets, the
EAw, and a traffic study. Upon approval of the final PUD a finalplat will then be filed in accordance with the City Councilapprovals. It is the expectation of the developer that this entireprocess will be successfully completed prior to the end of thecalendar year of 1991 .
'l . To lealize the development of twelve buildable lots withan building density of ?00,000 s.f.;2. To leave the two outlots on the lrestern end of thetriangular area as open space;3. To create a public utility systern, pond and roadwaywithin the Business Center;4. To lay-out a long range developrnent schedule that
emphasizes controlfed development sites; and5. To construct a guality Industrial park in the City of
Chanhassen .
GOALS OF THE PROJECT: Ultinately, the primary goal of the developeris to devel-op the 94 acre Chanhassen Business Center (CBC) using the
PUD zoning concept. There are several objectives that support theprimary goal:
Chanhassen Narrative, Final Plan Submittal
The site described earlier and shown on Sigure 11 is guided forindustrial developrnent by the City's Comprehensive Plan. In order to
create a PUD for this site, the developer intends to follow the City
PUD zoning approval process. The developer wishes to enhance theflexibility of development of the sites within the 94 acre tract of
land through the relaxation of the zoning district standards. Inreturn, the developer's intent is to exchange improved guality of the
finished development project.
The PUD will encourage the itens listed in Article VIII, Divisionof Section 20-501 . Later, in the details that are contained in thnarrative document, the methods by which the City's expectations w
be met are demonstrated. The discussion relates to the submittalplan sheet documents.
DEVELOPMENT SUBMITTAL PACKAGE EXPLANATION:
A. Concept Submittal - August 12t 1991
Iis
i11
1.APPLICATION FOR DEVELOPMENT REVIEW
PROJECT NARRATIVE BOOKI,ET EXPLAINING THE PROJECT IN
DETAILED FASHION USING VERBAGE, SKETCHES, CHARTS, AND
AN APPENDICES
SET OF SIX PLAN SHEETS THAT DESCRIBE IN CONCEPT SCHEMATICS
THE COMPONENTS OF THE PROJECT WITH DETAIL
Plan-Sheet
2
3
4
Plan
Plan
Pl an
PIan
Plan
eet
eet
eet
eet
eet
sh
Sh
Sh
Sh
Sh
Master site PIanExisting Conditions
Concept crading Drainage and Erosion Control
Concept Utility and Phasing Plan
Concept Landscaping PIan
Concept PIat
LIST OF PROPERTY OWNERS WITHIN 5OO FEET OE THE SITE (P).
TOPOGRAPHY MAP AND LEGAI, DESCRIPTION OF PROPERTY PROPOSED
FOR PUD ZONING AND DEVETOPMEMP (P).
B. Final PUD Subnittal October 21 , 1991
The f inal- PUD Submission for the CBC site submittal to the City
of Chanhassen on October 21 , 1991 contains the following items:
Subdivision Application
Narrative Report
EAW
5
6
1
2
3
Page 2
WRITTEN CONSENT OF AI,L PROPERTY OI'INERS WITHIN THE PUD
1
2
3
4
5
6
Chanhassen Narrative, Final Plan Submittal Page 3
4
5
Traffic Study
Plan Sheets 1
- Landscape Plan
- Pleliminary Final Plat
- Design Criteria Plan
7
Plan
Pl.an
Pl,an
Sheet
Shee t
Shee t
Shee t
ltasterExistin
GradingUtility
NO
No
NO
No
No
No
No
1
2
3
4
5
6
7
Site PIang Conditions
, Drainage and Erosion Control
and Phasing PlanPI an
Plan
PIan
P 1an
Sheet
Shee t
Shee t
DISCUSSION OF THE BACKGROUND OF ITIE DEVELOPMEIIT TEN,I
PARTICIPNiITS ON TIIE CIIN{HASSEN BUSINESS CENTER
Ryan Construction Company of Minnesota, Inc. will be the owner anddeveloper of the Chanhassen Business Center. Under the dj.rection ofthe Property Development lrlanager, Kent Carlson, the project will bethe first development that Ryan has nanaged in Chanhassen. Ryan hasconsiderable experience in developing Industrial and Office CorporateParks incLuding developments in Maple Grove, Brooklyn Center,Plymouth, Eden Prairie, and Eagan, Minnesoea. Thej.r connitment tothe business client and the City to provide a quality businessenvironnent helps to assure that the Chanhassen Business Centerproject wiLl be a successful developrneat venture.
Architecture for the site development within the CBC wj.ll beperformed by the architects on the Ryan Construction Company staff.Jeff Cupka will be in charge of the architecture design andcoordination with the other design team members.
Site planning, surveying, engineering and lanctscape architectureservices will be provided by RLK Associates, Ltd. Dick Koppy andJohn Dietrich will serve to facilitate the project,s involvementbetween the City and the developer on alI itens related to site
The narrative report specifically addresses how the PUD is
intended to function as to the setbacks, guidelines and phasing
of the development. The E:Aw and DetaiLed Traffic Study reviewsthe impact this development will have on the surrounding area
and what ls to be expected from the proposed development. The
seven plan sheets that cover all of the detaiLs necessary for
PUD final approval are listed below.
Chanhassen Narrative, Fina1 Plan Submittal
planning and infrastructure development. RLK Associates has served
Ryan Construction Company for over four years on many of theirIndustrial and Office Park development projects around the TwinCities metropolitan area.
DTSCUSSTON OF ITIE PRO'EET DETAILS
(1) Preservation of clesirable site characteristics and open space
and protection of sensitive environoental features, including steep
slopes, mature trees, creeks, retlands, lakes and scenic views.
The site exists as an agricultural. fieltl that has been farmed for
crop production for many years. Plan Sheet f2, Existing conditions,
demonstrates the Soybean field that overLays nost of the site, this
area consists of the eastern 71 .5 acres of the 93.7 acre site. The
12 developable lots are proposed for the 71 .5 acre area. Gradingwitl be completecl to maintain an earthwork balance (cut and fill)
arrangement oo the site. There are no steep sloPes, mature trees,
creeks, wetlands, or other site characteristics in the 71.6 acre area
that need unusual protection. An Environmental Assessment Worksheet
has been prepareil to assess the inpact of development on this
property .
within the portion of the site labelled Outlot A and B, there is a
large, mature stand of oak, Ash, Basswood, and rronwood trees. A
recent tree inventory has found these deciduous trees ranging in size
from new growth to 30 inches neasured at the trunk. A11 of these
trees will be naintained. Besides the forest of tf,ees, the
characteristics of Outlot A and B include upland and lolrland
vegetation, the Bluff creek stream bed, flood plain area and
interesting transitional slope areas. Both of these outlots wifl be
maintained in their existing condition. There are no Plans to
develop the western 22.1 acres of this tliangular Piece of property.
Page 4
PLanned Unit Developments (PUD) offer enhanced flexibility for the
developer to achieve a more creative use of the land while easing the
normal zoni.ng district stanilards. In exchange, the City expects thatthe development plan will result in a sigmificantly higher guality
and more sensitive proposal than in the tnore standard zoning district
development proposal . This section of the Narrative discusses thestrategies of the developnent plan for the CBC related to criteria
the City has indicated an interest in reviewing.
Chanhassen Narrative, Final PIan Submittal
A drainage pond sized accordingly for the future development of the
12 lots is proposed to be constructed in the southeast corner ofOutlot A (see sheet 3). This storm water retention pond will be
constructed to DNR standards, and the Best Managernent Practices inorder to remove sediment and nutrients and keep all runoff below pre-
development rates. It should be noted the EAw addresses the
stormwater runoff in greater detail . Slopes abutting the storrn
drainage pond will be at a maximum of 3:1 and wiII be seeded withnative/grass mixtures and are not scheduled to be mowed. Additionalflood storage in Outlot A and B is necessary because of the placementof the storm water pond. The grailing proposed in Outlot A and B willincrease the Type IIf vegetation, resulting in a more natural floodplain environment .
The Comprehensive Plan Land Use Map identifies Bluff Creek Basin(essentially Outlot A) as a park/open space corridor. It may befeasible for the developer and the City to prepare agreenents whichtransfer ownership of Outlot A to the City as part of the f inal.platting process.
(2) More efficient and effective use of 1and, open space ald pubticfacilities through mixing of land uses and asseably and developmentof land in larger parcels.
The twelve developable lots range from 3.3 acres to 10.0 acres ins1?e. Approximately 4 acres of roadway and utility easement area, inaddition to 14 acres of open space (Outlot A) will be dedicated tothe City. The PUD wiII a11ow the developer flexibility in planningthe actual developed lots dependent upon the specific interlstexhibited by the business community. If this were to developseparately as individual parcels, many of the following designconsiderations would not be included, such as an approved signpackage, uniform street and parking lot Iighting, compatible orcohesive architecture and buiLding materiars. ihe coordination ofsite deveLopment will also improve the efficiency and costeffectiveness of public improvements. For example, the project islarge enough to help facilitate a solution to pioviding iarrit.rysewer service to the new MUSA area. AIso, the development of asingre, comprehensive drainage system will maxinize tie effectivenessof nutrient removal efforts while reducing the City,s long termmaintenance costs.
-(3) _ Bigh quality of desigm and. desigm copatible with surroundingIand uses, including _both existing ana p:.annea. Site planning,randscaping and building architecture should reflect higher quaritydesign than is found elsenhere in the comunity-
Subsequent to the final puD approvar and prior to construction, eachLot will be submitted to the city of chanirassen for formar revi.ew of
Page 5
Chanhassen Narrative, Final Plan Submittal Page 6
building plans, landscaping, signage, Iighting, and compliance with
the PUD Development Guidelines. The City will utilize its normalsite plan review procedure for each lot. The approved PUD documentswiII establish firn guidelines to ensure that the site j.s developedin a consistent and well planned nanner.
The site plan alIows for a SO-foot buffer of open space and
landscaping on the lots abutting Audubon Road where the view shedwill be greater. A 1O0-foot buffer and landscape area is provided
between the CBC and the land to the south. This land is guided in
the City Comprehensive Plan for residential development. The higherprofile buildings will be orientated toward Audubon Road. Near the
central portions of the site and the western edge, higher developmentdensity is forecasted. This is screened and set back fron the
traffic development that is adjacent to the site so as to be
comparatively unnoticed.
The PUD site plan provides a consistent edge buffer on both Audubon
Road and the southern property J.ine. The buffer yards proposed will
allow landscaping and a trail system to be planned as an integral
component of the site p1an. This consistency of the buffer, trail
setbacks and landscaping would not be achieved through conventionaf
zoning.
Landscaping Plan
The PUD landscape plan identifies plant material locations along the
entire perimeter of the chanhassen Business Center, the proposed Lake
Drive roadway and two "typical" planting plans for individual lots.
All plant material proposed for Phase I lnstallation is identified
with a code nunber which relates to the plant schedu.Le as shown on
Sheet 5. Phase I planting will occur at the entrance to the CBc site
and a1on9 the public roadways which are developed to a permanent
status in Phase r. The planting identified adjacent to Audubon Road
and the remaining perimeter is not scheduled to be instafLed until
each Lot adjacent to the Buffer area is developed. At that time, the
The layout of the 94 acre palcel is rneant to complement thecharacteristics of the property. ?he design will be comrnensuratewith a first class rndustrial Park that wiII be an asset to the Cityof Chanhassen. Impervious levels and building densities are below
the acceptabLe standards for the City. The table on sheet 1 mastersite plan identifies the anticipated building square footages and
impervious densities on a lot by lot basis. It is important to notethat while the density within a PUD is calculated on gross acreagewithin the property ).ines of the site, the densities shown in thetable on sheet t have been calcufated ignoring Outlot A and Outlot B.
This is because no development has been forecasted on either of theseoutlots at this time. The preservation of the marsh land andforested areas in Outlot A is a highlight of the planned PUD
development.
Chanhassen Narrative, Fina1 PIan Submittal Page 7
buffer area and individual 1ot will be landscaped jointly. This
would aLlow for a water source and/or irrigation system to sustain
the plant materials.
Two lots on Sheet 5 have been identified with a generic landscapeplan. Specific species are not identified and the guantities shogrn
are to be used as a guide toward how the individual Lots are to be
landscaped. Each lot will be required to have site plan approval
from the City of Chanhassen, at lrhich tine, the specific location of
the building, parking lot and landscape plan will be presented.
A trail is proposedl to run from Heron Road and Audubon Road, afongthe south buffer area and eventual.ly into Outlot A. The City of
Chanhassen is proposing a recreational trail to run the entire lengthof Bl,uf f Creek from Highway 5 to Lyman Boulevard. This trail system
would utilize a tunnel already in place under the railroad tracks atthe northwest corner of Outfot A. Sheet 2 existing conditions mapidentifies this tunnel .
Additionally, an entrance nonument design is planned for the roadway
entrance on Audubon Road (see Sheet 7 for a sample monunent sign).The landscaped area to the south between the CBC and the futureresidential neighborhood is a feature of the landscape plan.
Continuous plantings are shown along Audubon Road to assist in
eventual screening the industrial development from the outsidepublic. As each lot develops, all parking lots will be screened from
Audubon Road by berming and/or plant material .
Architectural Standards and Building llaterials: Before a Citysubmittal i.s nade, individual site plans will be submitted to RyanConstruction Company, the property agent, for approval relative toarchitecture, building materials, and site improvements. The basisof their approval shal1 adhere to the guidelines mentioned below and
whi.ch establish the Planned Unit Developrnent Criteria for Chanhassen
Business Center.
A. BUILDING MATERIALS AND DESIGN
ALL MATERTAIS AND COLORS SHALL BE APPROVED BY THE PROPERTY
AGENT PRIOR TO COIiIMENCE!,IENT OF PROPERTY IMPROVEMENTS.
BRICK MAY BE USED AND MUST BE APPROVED TO ASSURE
UNIFORMITY .
STONE SHALL HAVE A WEATHERED FACE OR BE POLISHED,
FLUTED, OR BROKEN FACE.
CONCRETE MASONRY DETAILS MUST BE APPROVED BY RYAN
PRIOR TO CONSTRUCTION OR ALTERATION. CONCRETE MAY BE-
POURED TN PLACE, TILT-UP OR PRECAST, AND SHAIL BE
FINISHED IN STONE, TEXTURED OR COATED ( SMOOTH SURTACE
OR ROCK FACE).
METAL SIDING WILL NOT BE APPROVED EXCEPT AS A SUPPORT
MATERIAI TO ONE OF THE ABOVE MATERTATS.
1
2
3
4
5
Chanhassen Narrative, Final Plan Submittal Page 8
NO ANCILLARY STRUCTURES THAT ARE CONSIDERED TO BE PART
OF THE BUITDING STRUCTURE CAN BE CONSTRUCTED TIITHOUT
PRIOR APPROVAI OF RYAN CONSTRUCTION COMPANY.
ROOF MOUNTED EQUIP!{ETiTT SHALL BE LOCATED, PATNTED AND/OR
SCREENED TO MINI!.{IZE VTSIBILITY FROM STREET AND
ADJACENT PROPERTIES .
LOADING DOCKS SHALL NOT BE CONSTRUCTED FACING ANY STREET.
ANY LOADING AREAS FACING THE SOUTH PROPERTY SITLL HAVE TO
BE SCREENED FROM VIEW. SCREENING SIIALL BE A COMBINATION
OT' BERMS, FENCTNG AND LANDSCAPING.
B.SITE LANDSCAPING AND SCREENING STANDARDS
AI,L OPEN SPACES AND NON-PARKING LOT SURFACES SHAIL BE
LANDSCAPED, ROCKSCAPED, OR COVERED WITH PLANTINGS AND/
OR LAWN I4ATERIAIS .
APPROVED SCREENING TECHNIQUES SHALL BE USED TO BLOCK
SIGHT LINES FROM ADJACENT PROPERTIES AND ROADWAYS OF
STORAGE MATERIAIS, WHETHER TEMPORARY OR PERMANENT.
THE MASTER LANDSCAPE PLAN FOR THE CBC PUD SHALL BE THE
DESIGN GUTDE FOR AI,L OF THE SPECIFIC SITE LANDSCAPE
DEVELOPIIENT .
LANDSCAPE MATERIAIS AIONG THE INTERNAI PUBLIC ROAD9IAYS
AND AT THE ENTRANCE TO AUDUBON ROAD WILL BE INSTAILED AT
THE CONCLUSION OF PHASE I GRADING OPERATIONS. ( REFER
TO SHEET 5 )
INDIVIDUAL LOT LANDSCAPING SHALI, INCLUDE AN IRRIGATION
SYSTEM FOR ALL FRONT YARDS, STREET RIGHT-OF-WAY AND BUFFER
AREA ALONG AUDUBON ROAD.
PRTOR TO BEGINNING PHASE IT AIL TREES PROPOSED ADJACENT TO
AUDUBON ROAD ARE TO BE INSTAILED, WHETHER OR NOT
AI,L tOTS ABUTTING AUDUBON ROAD HAVE BEEN DEVELOPED.
C. OPEN SPACE AND TRAILS, PARK DEDTCATION
7
8
1
2
3
4
1
2
1 OUTLOT A WIIL BE DEDICATED TO THE CITY IN LIEU OF PARK
DEDICATION LAND/FEES. CONSTRUCTION OF THE POND AND
SUITABLE GRADING WILt BE COMPLETED BY THE DEVELOPER.
THE TRATL SYSTEM AND APPROPRIATE EASEIiIENTS SHOWN ON THE
MASTER SIGN PLAN PRELI},,IINARY FINAL PLAT IYILL BE DEDICATED
TO THE CITY IN LIEU OF PARK DEDICATTON LAND/FEES.
2
D.SIGNAGE
SIGNS WILL BE BUTLDING !{OUNTED IN CONFORMANCE 9IITH THE
CITY' S SIGN ORDINANCE. EACH PROPERTY SHALL BE AILOWED ONE
FREE STANDING SIGN LOCATED NE,AR THE DRIVEWAY INTO THE
PRIVATE SITE.
THE SIGNAGE WILL HAVE CONSISTENCY THROUGH OUT THE
DEVELOPMENT. A COMMON THEME WItL BE IMTRODUCED AT THE
DEVELOPMENT ' S ENTRANCE }iIONIJII{ENT AND USED THROUGHOUT .
6.
(
6.
Chanhassen Narrative, Final Plan Submittal
CONSISTENCY IN SIGNAGE IYII,L RELATE TO COLOR, SIZE,
MATERIAIS AND HEIGHTS .
E. LIGHTING
Page 9
3
1 A DECORATTVE, SHOEBOX FIXTURE (HTGH PRESSURE SODIUM VAPOR
TAMPS ) WITH A SQUARE ORNAMENTAL POLE VIILL BE USED THROUGH
OUT THE DEYELOPMEMT AREA FOR LIGHTING.
SIMILAR LIGHTING EQUIPMENT THAT IS MOUNTED IN THE PUBLIC
STREET RIGHT OF VIAY SHALL BE USED IN THE PRIVATE AREAS.
2
G
F.PERMITTED USES
ALL BUILDING STTES WITHIN THE AFFECTED PROPERTY SHALL BE USED
SOLELY FOR OFFICE, COMMERCIAI PROCESSING, RESEARCH, SERVICING
LIGHT INDUSTRIAL, LIGHT MANUFACTURING, gIAREHOUSING, AND
DISTRIBUTION PURPOSES AND SERVICES ANCILLARY TO SUCH USES,
SUBJECT TO THE CONDITIONS SET FORTH BELOW, AND SUBJECT TO ALL
APPLICABLE ORDINANCES. IN THE EVEI{T THAT A USE IS PERMITTED
BY THIS DECLARATTON BUT IS NOT PERIiIITTED BY APPLICABLE
ORDINANCES, SUCH USE SHAIL BE PERMITTED BY THIS DECLARATTON
ONLY IF AN APPROPRTATE VARTANCE UNDER SUCH ORDINANCES IS
FIRST OBTAIMED.
SETBACKS (unless otherwise approved by the City under the
PUD zoning requirements during the site plan
approval process )
BUILDINGS
1. FRO!{ BUFFER YARDS, PUBLIC RIGHT OA WAY, AND FRONT AND
REAR PROPERTY LTNES, AI,t BUILDINGS TO BE SET BACK 5O'.
2. FROI4 ALL IT{TERNAI, SIDE LOT LINES 10'
PARKING AREAS
1 . FRO!iI BUFFER YARDS 20'
2. FROU INTERNAI LOT LINES 10'
3. FROIII PUBLIC RIGHT OF IIAY ( LAKE DRIVE ) 25'
4. FROM ABUTTING RATLROAD PROPERTY - O'
Sensitive developuent ia transitional areas l-ocated betweendifferent land uses and along significant corridors within thecity.
4
Chanhassen Narrative, Final. PIan Submittal Page 10
Additionally, the industrial developnent occurring irnmediately northof the buffer lj.ne, lots #8 and #9 will have lower densities thanother developments within the CBC. Lot 12 is proposed to house thenational weather service site, which will have a building coveragedensity of approximately 4t. Outlot A to the vrest will not have
development and will further serve as a buffer to the different land
uses to the south.
5- Development irhich is consistent rith the couprehensive plan.
The Comprehensive plan has guided this site for fndustrial Office
Park development. Ryan Construction Company is proposing the
Chanhassen Business Center development to be an Industrial OfficePark, consistent with the Comprehensive Plan. The zoning for thesite wilL be IOP, which is Industrial Office Park district. Ryan is
proposing to rezone the site to a PUD, Planned Unit Development.
6. Parks and Open Space.
The creation of public open space may be required by the City. Suchpark and open space shaIl be consistent with the comprehensive plan
and overall trail plan.
As mentioned earlier in the narrative, Outlot A and a trail system
:lIong the southern perineter of the CBC development are proposed to
be dedicated to the City in lieu of Park dedi.cation land/fees. The
value of this dedication is greater than the required normal park
dedication for a development of this nature. Ryan has reviewed theCity's overall trail plan and proposes to provide a connection
between Audubon Road and Bluff Creek. The trail is proposed to beinstalled at the conclusion of Phase If grading operations and willrun from the existing railroad underpass on the northwest corner ofOutlot A through Outlot A and up to Heron Drive and Audubon Road. Apedestrian crosswalk is proposed at lleron Drive which will connect tothe existi$g sidewalk on the east side of Audubon Road and facilitatepedestrian movement from the Lake Susan Hills area. The trail isillustrated on sheet 1 and on sheet 5. The City Master Trail PIan
addresses a trail paralleling Bluff Creek running from Highway 5 to
Lyman Boulevard. Ryanrs proposed trail segrnent rril1 be a valuable
ease/west connection to the comprehensive trail p1an.
The sensitivity to transitional areas for the CBC developnent is tothe south and the southeast. Southeast of the CBC industriaL
developrnent the City has guided residential development for thefuture. The CBC p1at, see Sheet #6, allows for a 100 foot bufferarea. This will alfow an open space and landscaped buffer betrreenthe industrial development and the different land use to the south.
Chanhassen Narrative, Final Pl-an Submittal Page 11
This item is not applicable to the cBc development proposal .
Ryan Construction Company intends to explore the possible use ofrailroad spur lines for Lots #2, ll4, #5, and f7 during thepreliminary design stage. This will enhance conservation of energy
through the use of the best and nost desirable transport method.
The lighting fixtures seLected for use in the parking lot areas andon the public streets will be outfitted with an energy savings typeof 1amp. Additionally, they will include photo electric ceLls toturn them on/off automatically. These integrations will aid slightlyin the energy conservation area.
9. Use of traffic manageoent ancl desigrn techniques to reduce thepotential for traffic conflicts. Inprovenents to area roads andintersections oay be required as appropriate -
The main access to the site is off of Audubon Road at Lake Drive,designated as a coflector street by the City Comprehensive Plan in
1991 . The CBC developrnent will irnpact Audubon Road, Highway 5intersection and the proposed Highway 212 with additional. traffic.
The 1and use proposed consisting of office, nanufacturing and
warehouse has been reviewed as to the irnpact anti,cipated, .and a
comprehensive report is contained in the CBC Traffic Study, whichwill be submitted with the final set of PUD plans. The trafficreport provides a range of development impact and scenarios to beanticipated. The use of turn lanes for Lake Drive and access to Lot1, sight distances, safety concerns and projected volumes have beenexplored.
Refer to the CBC Traffic Study for a lnore detailed analysis of theprojected impact this development will have on the surrounding
roadway system.
7 - Provision of housing affordable to all income groups if
appropriate within the PLrD.
8. Energy conservation through the use of rcre efficient building
desigms and sightings and the clustering of buildings and land uses.
Energy conservation for the building structures will occur in atleast two manners. First, earth mounding will help shield thebuildings from the rigors of the seasonal weather extremes.
Secondly, architectural treatrnent of the building will attempt tocapture the nost efficient and effective design relateil to energyconservation. Each building will be evaluated for energy efficiencywith a cost/benefit analysis regarding insul.ation technigues and R-
values .
Chanhassen Narrative, Final Plan Submittaf Page 12
FINAT PLAN SUBMISSION
FOR
PLANNED UNIT DEVELOPMENT
(PUD)
CHANHAS SEN BUSTNESS CEI(|ER
The final PUD Submission for the CBC site submitted to the City of
Chanhassen on October 21 , 1991 contains the following items:
Subdivision Application
Narrative Report
EAI{Traffic Study
Plan Sheets 1-7
The Narrative report specifically addresses how the PUD is intendedto function as to the setbacks, guidelines and phasing of the
development. The EAvl and Detailed Traffic Study reviews the inpactthis ilevelopment wi1J. have on the surrounding area and what is to be
expected from the proposed development. The seven plan sheets that
cover aLl of the details necessary for PUD final approval are listed
below .
SHEET 1 -- MASTER SITE PLAN: This plan sheet describes the basicintent of the entire CBC development proposal . It includes, but isnot limited to, the following items.
SHEET 2 -- EXISTING CoNDITIONS: The project boundaries and existing
conditions of the site are shown through the use of a two foot
topographical sulvey map (accurate as of May 9, 1989). Additionally,
on JuIy 17, 1991 a tree survey rras completed on the site. The surveyresults are drawn on the plan sheet in schematic forn indicating
areas of protection. Flood plain boundaries of Bluff Creek are also
shown.
SHEET 3 -- GRADING, DRAINAGE, AND EROSION COI{TROt PLAN 3 This plan
illustrates the mass changes to the existing topography of the site
that will take place during the grading operation. The plan
identifies two phases of development on the site, Phase I and Phase
II. The grading linits and utility limits are shown, however, detail
information on the Phase I development reference should be nade to
the Phase I site construction plans lrhich ale being subnitted with
the PUD submission. By closely reviewing this plan, an understanding
of the movement of earth on the site can be appreciated to arrive at
,l
2
3
4
5
Overall site impervious and building density coverage.Identification of each lot size and dimension.
Location of streets and pedestrian trails.
Location and extent of public and conrmon open space.
GeneraL location and type of land uses and intensities of
development.
1)
2l
3)
4)
s)
Page 13
SHEET 4 -- UTILITY AND PHASING PLNiI: StOrm SCHCT, SANiIATY SCWCT,
and watermain utilities are shown on this plan sheet. The staging
and time schedule table that is shown on sheet 4, the Phasing for theinfrastructure placement is proj ected.
It is important to note that one of the key features of the project
is the sanj.tary sewernot sized for the totaI development is propo
flowing to the east.1l dump directly into
development is to flowsanitary trunk line ru
ategy. The serrer line on Aualubon Road is
apacity of this development. However, Phaseto be a pernanent sanitary sewer location,is proposeil to have Lots 1, 2, 3, 4, 10 and
Audubon Road serrer. Phase If of the
the west and eventually hook up to proposed
ng para1Ie1 to Bluff Creek.
strIc
sedIt
the
to
nni
SHEET 5 -- LANDSCAPE PIAN: An ovelall landscape plan identifying thegeneral intent and phasing of the lantlscape plan installation. Fourprimary areas are identified on the Landscape P1an.
1) Perimeter of the site2l Planting to be installed with Phase I developnent3) Planting to be installed on a lot by lot basis4) Typical planting plan for the interior of lot
The plan outfines the general guideline of were landscape materialswill be placed, in addition to preservation of mature landscapematerials, erodible slopes, wetlands and creek basin. The 100 foot
Iandscaped buffer area on the south perimeter of the site is also
shown in detail. Additionally, an entrance monument, boulevardplantings, and a trail system are shown.
SHEET 6 -- PRELIIIIINARY FINAI PLAT: Easenents and public right of waydedication is shown on this sheet, as well as the 12 lots and 2outlots. A legal description of the conplete property layout isincluded. Finally, a table wh the site developnent criteria isincluded such as setbacks, roaderay widths, and zoning details. Afinal plat will be prepared by a registered land surveyor uponapproval of the prelininary final plat.
SHEET 7 -- DESIGN CRITERIA: This plan sheet identifies general
design criteria for the entry monunent sign; downcast lightingfixtures. A typical cross section from the existing farm east of
Audubon Road to Lot 10 is illustrated. The cross section ].ine is
shown on Sheet 5, Landscaping Plan.
Chanhassen Narrative, Final Plan Submittal
a balanced earthwork condition. AIso shown on this plan is the storm
sewer and street layout, including the pond on Outlot A.
Chanhassen Narrative, Final Plan Submittal
APPEI{DICES
THE ITEMS EXPLAINED BELOII ARE INCLUDED IN THE APPENDTCES TO THE
REPORT TN THE ORDER LISTED BELOW.
A. SUBDIVISIONAPPLICATION
B. DETAILS, SKETCHES
Page 14
c
-- SHEET 1
-- SHEET 2
-- SHEET 3
-- SHEET 4
-- SHEET 5
-- SHEET 6
-- SHEET 7
WRITTEN CONSEril:T OF AI,L PROPERTY OVTNERS VIITHIN THE PROPOSED
PUD FOR THE CHANHASSEN BUSINESS CENTER ( SUBMITTED AUGUST12, 1991 )
APPLICATION FOR DEVELOPUENT REVTEW (SUBMITTED AUGUST 12,1991 )
D LIST OF PROPERTY OI{NERS WITHIN 5OO FEET OF THE PROPOSED PUDSITE OF THE CHANHASSEN BUSTNESS CENTER (SUBMITTED AUGUST12, 1991 )
1I
!
I
a
I
I
II;
!t
t
I
I
tII
I\
,_--rn---
e
{Fo
o
Fo
, ,1
!r
plc}..\
Fo
\
ot
E
2t
o
a
"a
E
t
oo
UTz
==z
IJJoo
Ez
o
tr
uJzl-wz
Crl.J.JU,O
T,Aza<El?4,oofo
a,ar!l
J?
o
I
o
Z
J
I
!
o
i
o
t
:I
t
F
9
I
ctt
I
I
a
FoJFt
ir:r
t{J
*
t
Fl9:erL o
tso
9"
fu:
Etit
J
E
.!qtt
...:
oo
E:6d
c
E
!o
I
o
It
ipppiiiSpgglE
,r r l'tl ,ttrrrlari-4ts6
d'!i'i\'i('iii'4i.i.iriara..rr
.rxr!.in!
??2t?t2?gt?t?
oao:r60.anoe'!a.ii.i.i.-4.i.-!.
55b5555655,JJAJJJlJJ
t
8-t
,I:{
E
I gge
i gfir...
UTE .rQ ca
tiEiirll
:EIII
EsE33E3E3E3.giesgai:;!;::
i
t
l',
iliri
illl
=::-_: .:lrt
-Ed
==EE
-c,c) vt
- tlr
a5=
E-
2EE'(,I
-sratLI
F
a
2
P
II
<d
! rl
5 Fil
I!
.=
it
I
ErII!;
r3
I,
l-lOr
'l
ir
I
I
Flo.
t
lii!:lr iit
i
IE
,7;
E!
L
!E
1i
IE
!_L'
it't. !
illi r
rlt ^!
ili.$ill'i
I't
fx.l
i.E;
i :--iiliiirl
Lr lI1I r'!i., : !
v
I
!
I
t
il
---, .
4
II
{
5:I
'ttI
I
T
If
I
I
:z
=>
-s:d:\--:.
et-E--E',
\
-*$
@
Il
II
It
!r
!ri
!:!l.
llJ
i
rr!rltt I
I
)
I
II
t
a:'
L-
a/.
I
I
I
I
i)
E
rE
@
i\
1,,
tt
rt
(
E!-
.J
\
a. - ';.:.
L
i;(
,1.
't\
I
I
-t
;ftlilt lt
lrl 3-4>
!Eh
sii
r
6
6
fI
I
i;t:r
E
F
I
I
{r;l
!t
I
t
It
il
ti
I
i
I
I
$
J
Fl
i! lFr
-.r-)tr I-r-t-ii:it-7--
i
I,fill
r
a
T
E
I
,3
lr
i:
ir
IIit
!tt:!l
.t.
E
;I
l1
aiI
1
a
II
t
I
t
E
tir
E
,
E
ti
lr!tit
t:
al
rit
ile
rii
H
g
d
.--+
(
l!tr
T
I
I
I
(B3
It
!l
li
ii
I
!
II
II
I
I
lr
Ilr:l
!iti
?
!iii
il
ii
iiii
iiiiiii
ii
lr
r!
(.
ti
tt
*,jt
E
5
'/
!--
t,
ii\r
,.--+
)';
\'
E
a--z .','
ir- -t-.1--'./,
J
\
L
3(tY-tI
(
,\)
{rt
-#
III
I
\
6
fi-
,"'f l
l
EEr!
I l,
F.llilt !i
ill ', 'L, llr.t r
r iiili
I
:
II
I I
I
I II
I
)
t'.
I
,
:
ri
11
I
I
I
I
ar
I
I
I
I
I
I
I
i
ti
II
Li
i,
\r
L t
\
,\'
III
I
.-_--i--.r
I
E
E
E
E
FI
I
EIr
IIE
I
@t
a
I
!
h
li{
I
I
I
t:
li
f------------i-!
It(\
5
It
I
a
h
I
It
t.\a\
(
I
I
Il*
!
t
I
5
E
:
I
Id
It
I
t
i
ilJi
ifi$tr\"i
lit.l
'iJ
I
!
\
E
5
\
t?tt
:!-
t
t
E
I
c
:
tlt
2
I'
I
I
I
i
Tii
i
t
I
I
l
l
i
i
I
I
I
I
i
l
I
I
.
.
I
II
I
I
a;a )\E\r
t:
!ilrli
i,i,
I'r rIIIIIII
II I I T I T I I '
I
\
ltrIIt
t
I
E
3G
t
t
,l
II
-!a
)
I!
{li
t!
I
I /
I
II
I
I
!
t
I
I
E
E
2z
Kt\t"a
lr
Il!rr!tlIIIrl!t
II
ao
e
=
-
d\-t
5
\
!
I
II
I
B
;
II
III
t
I
3(,
I
2
@
I
EI
l,ir
i,l
EI
B
af,
I
I
I
IIII
I
TtI
Io
\
oao
!,
t
tl
ii
!ilrili:
I
I
rl
ri
it
liiiiii
ilii!iiii
iiiiiiiii
E
c
iIi
T
i!i
llrrlr
iiil
,ili
iil!i
iliii
!
tr
t:,l.i
I
I
;
It
at
t: ti ti
ti li li
irlr
jitril|
:liliiiti
ttttllltiiiili
ll
,l,lrl
iiili
ll
I
J
i
t
ii'iiiii
!liii.nl.
*l,lri
:t r:
rrl,li
iiiiii
ii!!i fii
r:f:
I
lr
I q.]
IllI
I
I
I
irffiiii
I
I
iirii
iii!i
t!I
iiit
rl
!r!,
iiii
Iiii
illt
t;ll
ii
lr
tiItll
l!
i!
lr
II
I
!
I
aI
i
I
I
i
.t
,l;
I\t
/i
(
I
ll
I
I
I
li
tl
ii
il
iil(
E
er
=
-
ara\_t
I
't
,---i'r-)
I
I
tI
r
\ .'I
-), .
/ a-t.
J
-t_\
a-
tI
,\t
ilitr:i
ix li
,
r
I
J
E
ti'iilr rit
i :jtf;',rrtt t ., l-a- l
II
E
EI
I
eI
Ic3
I
I
EtIt
!
I
I
I
I
I
I
I
I
iiil*ir it
IIii
I
t.
I
I
i
I
\
iii!tio..,oi
i\-. r'!'
E o ''r,.1
[ \ l:ilil
nElr;
Elit
'L-,-il
i
,lI
i I
Cr
I!
I
I
I
I ilrl
Xilj
fli
ti
Iti ii
Ii' i:
J
E
rI
I
E
I
t tlt.
ltt ttt I tttt
tI
Itl
trtII
II tt
iii ! ,,, iiiii,, $
I
!i
riirlllllii
I
5ert
st4\-I
2
A
zz
5
el
;!
II
i!i.,i
t:ri
:!il
lrii
1i
I
I(J
H
o
5
I
I
I
T
E
H
H
aI
T
I
b
r!
::'J @r!tI
aI,III
I
Et
I
rJ
t
II
IJ
aat
ELI
4
tc
PI
;!
:l
;!
I
t
ta
I
D-Ii
I
I
I
I
I
I
I
;llt
ill!
I
I
!
I
I
I
i!,l
;I !f
,l
;!
!
I
I
;l
;l'l
El.
-j
n'f1 , ' --l'-\'*,.t l-r-J,- ,t s_.i-=-- .i.14+--FJt/gr- L.-. L =---
.t.
I)
t
II
P 4t
(:,
!rle-.,,. k,r'- o t9,'!q () fft "4r:-:---
PFOPOS€D i'OM'i'ENT I'CVELOPi,ENT I. D. SION
([tACi CotlrlcuhAlloL lO OC OcrEet/i'f,O]
I TYPTCAL lroirrf,ttr sldr
-
I IYPTCAT UG'TI SIAT{)ANO T-
{
a
I
q
r rYPrcaL ctx)ltt -crE{
nu(l,r,",l I -f;]
....n'
( ;td\NAr '
\
lr( rslNl\ .
IARK
L__- ll II .:4o. u.,.*
-
..oil||,-....)!,fi-,
C AIII SIEIirsrf ss cfrilEn
tr ,:: . '.i
--=,/l .---
h!:---l-_"-=--
*-#,r- iI' fi
-L -'.- -"- -!.
I
!
I
iA
rlrllllllllllllllll
RYA ]l ctr llllj c
!
r"olL 99fl P"all
r, 'lBlNc MINNEAPOLI9
JOf,..
CT,I.NHESSUX BUSINESS CENTER
ocroBER 25,1!D1
PREPAREDFOR.
CITYOTCIIANHASSEN,MIIYNESOIA .
TRAIT'IC STIJDY
DEVELOPEK
RYAN CONSTRUCTION COMPANY
9OO SECOND AVE. SOUTH
7OO INTEN,NATIONAL CENTER
MPLS, MN55402
PREPAN.ED BY
922 Mainsreet
Hopkins. M'L
55344t
(612) 93-0972
iiE (612) 93}1153
RIK
ASSOqATES LTD.
TRATPIC SIUDY
CHANHASSEN BUSIMSS CENTER
CITY OF CEANITASSEII, I{INNESOTA
october, 1991
Prepaled for
The City of Charhassen
PrePared by:
RLK Assocj.ates, Ltd.
Hopkins, llj.nn€sota
RI.K ASSOCIATES, LTD.
PI'RIOSE
This report is to evafuate and docuEeat if thele is any adverse traffic
iEpacts as a result of the fuII developnent poteatial of the OEnhassen
Eusiness Center. If any advelse irpacts are identified, litigative oeasures
HiU be suggested.
Figure 1 shoBs the sile location. A conceptual layout of the laster Site Plan
for lhe proposed Chanhassen Business Center is shora on Figure 2.
METHODOLOGY
The proposed land use wi.ll be inventoried to detelaine specificalty rhat type
and size facilities $ould potentially be built on this site. the traffic
generated by the full developEent potential of this site eill be forecasted
and tabulated. This rrill deterEj.n6 the nunber of raw trip ends having either
an origin o! destj.nation at the Charhassen Business Center. The fiDa1
forecasted a.n. and p.n. peak hour vol,umes could tEve the ho8e-based rrorktlj.ps adjusted for the following:
Shared Tlips
Internal Trips
vehicle Occupancy
Building Occupancy
For thj.s analysis, however, no reduction will be eade for these factors.
A directional distribution of these trips rill be Dade based on both zonal
socio-econoEi.c Cata from the uetropolitan Council and historical eaploynent
data obtained frorn current Charhassen businesses.
The trips wi.ll then be assigmed to the highway systea, and an iDpact analysi.swi.l] be oade.
DATA INVENTORY
The study site includes 93.7 acres, triangular in shap€ and is bounded by
Audubon Road on the east, 86th Street extended on the south, and the Gicago,Uilraukee, St. PauI and Pacific Railload on the Dorthrrest.
The proposed Level of fuI] developDent inctudes the potentj,al of ?00,000 gross
square feet of gerlelal office buildings. xarehousing arrd oanufactulingfacilitj.es, rith the exception being a transoiision toHer site and ueathernonj,toring site located withj.n the developnent.
The individual building sites uj,l] be developed in stages rrith the firstutilj.ty infrastructure work connencing in 1992.
TRAFFIC STUDT
CHANHASSE}I BUSIMSS CEITTER PAGE 1
I IJ
{o
(
I
t
\-l .
t
==t^
t ,l
IEI T
rl
I.
)
frI
I
llrlc
t I
i *7
tI
/,,
I
.J
lrxt
ntLlf
.1..'
.J
N $
FGINE 1LOCATION MAPRLK
ASSOClAllis, ljl'l).
I
I
:.
SITE
I
I
I
I
IIIIIIIIIIIIII
I
-tq!,aol
aol arraI aa lc,r
arro o allt.rrD{ r.r__9grr i^ot p!f.t!w_ lqrlvauf _qq!!M__
-lor tlot I
aot a
'lor t'lor a
.tol I
-tot la1l,t tt_lor ri
It
atta
aaat
aa
a.t
aa
aartaat ^c.a^t..
aa.ooo
ta.oca
at.
ar,
ar.
tr,ta.tt.tt.lt,
ar,
t0r
aaralt
atl
toT I
LOT
'I
Itl
LOt t
Dp
lrnoaa. t t-a rc..
lr,rrol
^
ra.t
^c..orr.ot a t.a
^c..
ltaa r6rt 0 .{d
totrt
LO' a
),II
tollt tt-t.lc..,l'
il
tot ,
t
,mft I I lqrfi tootloa ItlrDoui IqtEl. l?t . laa.aaa !r.Illtr Gtlra. lll - lra,aoil ttllrrdraa. aat .Ia.aoa lt.
lottt . tcal . ,lc.oao ar.
r^tux at^toot t.rtat
lo xra^al
lor tt
t'.
'\.
tal r. I o !
LOY 'lol a
,N',__
\..
-.r:.
-il a
nt!
A
t.,
IJ
t,:
1ounot t
i, "L
-6
IJ;T trnB BlYAll *t?'f,
I'f*''lEBfoll['d" ! iir i,, ;
iiEl:.:'. !-Gi?:@ f
L
ASSOCtAlRS,:t t),
FIGINE 2
II I IIIIIII II
CHANHASSEN
BUSINESS CENTER
CHANHASSEN MINNESOTA
-.'r r-
!
ror !.)
i
:
II
I
i
I
', : MASTER SITE PLAN ,
RI.K ASSOCIATES, LTD.
there have been tro extensive reports prepared that addless the deoograPhics.
traffic ard related roadray neteork needs for the oext 20 years. These ale
the following:
T.H. 212 ?raffic Forecasts, I-494 to Norerood/Younq ADerica, prepared for
Mn/DOT, 1985
Eastern Carver Countv ConDr€hensive TransDortation Plarurino Studv,
prepard fo! Eastern Carver County Teclnical coEEittee. 1990.
these reports have been reviered for their relevance in assessing future
growth in the iEsediate area a,ld to rrhat extent this future grovth inPacts the
ioadway network and .,hat roadray iaprove'ents have been identified as needed
to address this gro*th.
Current traffic voluues (ADT voLu8es ) were received fron xn/Dor aDd the City of
chalrhassen. tn addition, RLN Associates has taken 24 hour nacbine counts on
T.H. 5 and Audubon Road. Peak Peribd Eanual turning Bovenent counts and truck
counts were also taken at the intelsection of f-H. 5 and Audubon Road '
Add.itional infornalion received fron Mn/DoT reveal that the culrent voluEes at
the interseclion of T.H. 5 at Audubon Road do not aeet the xatrants as
reguired for installation of a traffic sigrE1 systes. currently, this
intersection ranks 35th on un/DO1's Prioritized List of unsignalized
intersections that do not Eeet Halrants. this list is oaintained for
evaluative purposes onl.y.
TRIP GENERATION
Established trip generation rates as docunented in rRIP GENERATIoN, 5th
Edition and published by the Institute of Transportation Engineers (ITE) eere
used to arrive at the forecasted nunber of triPs generated in tbe study area.
Table 1 tabulates forecasted AErr and Peak hou! volunes for valious land use
categories coEpatible with industrial.,/connercial land uses Possible for this
site. This table also gi.ves the range of volu.nes froE which the ITE voluaes
are derived. table 2 tabulates the lorecasted traffic voluroes based on the
breakdown of land use proposed by the developer. these volunes are further
broken down by each separate entrance/exit !o the site and tabulated in fable
3. These nusbers have been rounded off to the nearest 5 but have not been
adjusted further for any shared rides or fess than 100t building occuPa.cy to
deternine optiEal values.
Excerpts froE the Trip G€neration publication describing each individual ITE
land use categoly is inctuded in the ApPendix.
TFTFFIC STUDY
CHANHASSE}I EUSINESS CBITER PAGE 4
I I t I
ASSOCTATES, LTt).
TABLE 1
ITE LAND USE
ADT
( R!ngo,
120
GENENAL
IEAVY
INDUSTR IAL
INDUSTN IAI,
PARK
1879
(617-2s,879)
MANUFACTT'RING
t 50
HANEIIOUSI NG
750 ?60
RESEARCII
& DEVELOPMENT
CENTEN
t 050
( 406-t,280 )
2695
(350-36,135)3{16
( 1,057-l I ,900 )
799 {
( 5,292-21,2t0)
5390
( t,2r6-r 7.155 )
A.tl, Total (ll
(Rlngrll. H. Entcr (t,
A.ll. Erlt ltl
6{{
( r r 9- 2,800 )335 (,8ll
109 (.17t
5r6(r6t-t,5961tot ( .92,r (. ro)
546
( 7O-6, t25)306 (.91)
30 ( .07,
399(231-r, t5r I241 1,121
I r2 (,28)
t 288(686-a,l2lltrt6 (,89,
t a2 ( . r'r )
86t
( 2s9-2, 6l I
'7rr (.8t{6 (.t?l
749
( 280-2,09t )t'r2 (.151
637 (.8s)
Itl{
( 623-2, O!O )964 ( .051t?0 (.15)
P.ll. Totrl (21(ntn9.l
P.H. Ent.r (t)
P,ll. Exlt (l)
606
( 56-l, r l0).82 (,t2t
601 (.08,
t t3
N/^
N/A
N/^
6!7
( l t9-r,995)t3r (.2r)
501 (.?9)
1057(rlt-3,r50,
t59 (.151
898 (.8sl
'1036
(t20-2,0?91
229 1.221000 (. ?8)
!.r. pk. houror o! (l)
ganarrtor
lR!n9. )ht.r (tlrxlr (r I
?0, (r.r.l
( t89-2,8001
6!6 .(.901
?t (.101
t76 ((3rt-dl
N/
P.tr.,5{6 )
A
A
voh. Occ.
N/^
t.3
N/^
t.3
8t
t.37
N/r
t.2-t.t t.3
N/r
N/A
| .0tt
lt0
GENENAL
LlcllT
INDUSTN IAI.
{ 879(t,t06- ,809
t 0059
( 5,089- 19.5? 2l
t, A.H. P.!k llour ol ldrrco2l P.u. Pe.k llour ol AdJlcel, tl.oLdly !.r. P.rh llour o
nt
ntt
8tr6at Trlfllc - ono hour botxesn 7 e.m. and g !.n.Strost Trafllc - ona hour betyaen { p.m, arrd 6 p.n.cEnerrtor ll not ulthln a.n. or p.rn. peak comnuto hr.
POSSIBLE LAND
USE FORECASTS
IIIIIIIII
DESCRIPTION
t 30 | {0
OFF I CE
PARK
'r't0
BUSINESS
PARK
157
( I l3- 560
'N/A
N/^
525
( 6r-5,495 )2?8 ( .53)24'' | .17 |
510(230-1,r62'l8r (.35'
337 .( .6s)
I Truck!
t.19
CIIANTIAS SEII BUSI}IESS CEI{TSR
93 Acres
7OO,O0O GSF - 2Ot Offlce, 55t tfarehous ing, 25t ltlanufacturing
f i1e: c'acaDT
ITT LAND USE:7',I 0 150 140
GENERAL
OEFICE
BUILDING
IIAREHOgS ING !IA!II'FACTT'RTNG
cac
DETILOP ENT
TOTILS
GROSS SQUARE
FEET (GSF)140,000 385, 000 175,000 700,000
ADT
( Range )
1879
(s81-6s4s )
671
( 88-91 09 )
{3'10
( 2458-17443 )
A!,r tota].
( Range )
Att Enter (t)
Arrt Exit (t)
245
N/A
218 (.89)
27 (.11)
219
1127 -713)
1s8 (.72)
61 (.26)
137
( 18-1s31 )
'l 27 (.93)
10 ( .07
601
( 390-2519 )
503 (.E{)
9E (.16)
PM TOtAl
( Range )
PM Enter (t)
Pu Exit (t,
285
(131-539 )
100 ( .3s )
1Es (.5s)
* Trucks N/A N/A N/A
veh. Occ.1.3 1 .2-1 .3 1.25
PROPOSED LAND
USE FORECASTSR TABLE 2
A.SSOCIATES LTII
source: "IrE friP Generation, 5ti Edition"
DESCRIPTION:
COMBINED
1789
N/A
237
N/A
40 (.17)
197 (.83)
131
( 16-1374 )
59 (.s3)
62 (.47,
5s3
( 384-22s 0 )
209 ( .32 )
44{ (.58)
1.2
MAIN
ENTRT!{CE
SINGLE
Et[Ri]rcr
TOTAI
DE1IELOPUEIII
ADT
A. U.TOTAI.
ENTSR
EXTT
3820
485
415
75
520
115
92
25
{3{0
600
505
100
P.U. TqTAI.
ENTTN
E)(I?
520
175
350
135
35
95
555
2r0
{{5
These nuobers have been rounded to tbe nearest 5
RL
ASSOCIAIES LTD.
CBC ENTRANCE VOLUMES TABLE 3
\t
lrJ
Et
F
tti
E)t
a
oo
11
l11l*
orl
a
@
!
o
ao
o
o
F
!
F
oo
o
i-ro
o
,lsolo
sl.
@l{o
Glo
o
1
lJ)
$:
53oq
\,
Fo
oF
oG
ntl
c
o
o
cJo
s N
o
o
"l
l..9 F r.l
oo
3
\It
{l
{
YJ
o
o
:o b
+
lI)
o
N
q
n9
ttiJ\
Nloo
ooo
ahoF
l-
_l
"1
o t-I o
h
N
ei
{
q.thoI
r-=lE9Irt
J,s<:bg;
.aF '-
I
I
l"
F
N
.at\
t
.t
i,0
N'J)N
F nJ
J
1
F
.9a$
o
F
t-
{
ol*l
!
N o
.3 oo
N lsi
i"l
.!N t I
\$
o
F
rJ
N
F\t(\lf)N
>-
sr 6 \l l.{
^rl
'l_
R
Jl-
It t'-i €|-
N o
E3oo I I ldrll-L--------\
r:
€
I
€o
t @I oI
I
+JFxlts:!
,l ...
3l=n
\\,n6s +3i6["1"]'
ao 0l!.
h
.l\$l t\\
b
{x
a
ot\e
oG
o
o dFii
of
Jri
.,I
I
*tE ,
(o
o
9
I
oo
!
(D
oo
@
:!
ooo
@
o
I
oo
oo
I
F
+
o
!r
6
o
6
s
"l
F
?
(.)
F(roo-
trJ&
o)
EJ
LL
Fz.
trJ
=t!
o
=(9
=G
=F
oz
trj
Jo
(J
q-
!-
(I
F
!JJ
!Jr
LrJ
EI
\9
i in !!=; r
E :.': i
:-o. i-s :
hi
t
i
l'1
s
t
lil
J
E
nt
!
II
i
J*
tl$
.l
,rl
:
E
q
II
I
E
a
1
n!
o
l.lf il
€.e
{+<!
N
F {e 6
Ajs3 loo l
0!/i'a g,
).c
o o
.a
I
I I
=l
a
)\
I
I
lllilllll
lli
1-tl
l
I
I
-t
I
si
l
nrlF-t
lIl
n-tlll
'RAFEIC
COT]MT SUU!'IARY
0'l :00
02:00
03:00
04:00
05 :00
06:00
07:00
08:00
09:00
10:00
11 :00
NOON
01 :00
02:00
03:00
04:00
05:00
06:00
07:00
08:00
09:00
'I 0:00
11 :00
I,IIDNIGII?
{5
35
35
45
73
307
750
791
50J
s24
485
506
501
494
561
550
553
s65
516
324
225
177
160
97
126
85
47
28
53
168
26s
502
505
494
,l{ 6
534
61 I
627
638
826
E81
888
649
488
353
312
293
210.
77
12
15
8
11
26
120
58
50
45
80
99
171
91
85
106
131
121
195
40
45
31
55
19
8905 10098 19004 1698
file : CtsCTrARR
L K
A.SSOCIATES LTD.
TRAFFIC COUNT SUMMARY TABLE 5
CrrY: Chanhassen , GrANIIASSEN BSSIIIESS CE
LOCATION: T.E. 5 at Auaubon Road
APPROAOI VOIUI{ES ' OEIOBER,
HOUR E.B 9l-B. EB+VIB ll.B.
=:::------l:1-l---11-l---11-:-----------13=:I17't
121'83
73
126
475
1015
1293
1069
1018
931
1042
1119
1121
1199
1386
1444
1454
1165
812
578
549
rl5 3
307
RLK ASSOCIATES, LTD.
Existinq Traffic Conditions
The only culrent traffic data available in this area froo the city or t{n/DoT
was average daily traffic (ADT) volures. The following traflic counts xele
taken in october, 1991 for this study:
o 5 hour aanual peak Period j'ntersection tutning DoveDent counts
at T.H. 5 and Audubon Road. This count is included as lable l.
o truck counts on l.H. 5 and on Audubon Road
Truck volumes
Data from Mn/DOT's truck classificatj.on counts shos tha! 7.38? of the tlaffic
on T.H. 5 in this vicinity is classified as heavy connercial, or trucks ' our
nanual. vehicle classification count shoss that 6.571 of the intersection
traff j.c, at T.H. 5 and Audubon Road during the 3 hour a.m. peak period are
trucks. ITE'S "TriP Generation" data sholts 8t of the traffic aenerated by an
industrial park land use as trucks. For purposes of inpact anafysis and to
arrive at a "worst case" scenario, we have used a value of 8l trucks '
Directi.onal D istribution
Trave] distribution patterns are used to establish in rhich direction the
forecasted vofunes frou the trro Previous sections are loutd'
Traffic entering and exiting the site is dj.stributed 80t to and fron.Audubon
north of the site and 20t to and froo the south- Of the site traffic on
Audubon Road northerly of the site entrances, 60t is to and froB the east on
T.H. 5 and 40? is to and flon the lrest- These Percenlage sPlits are shovrn on
Fignlre 3.
The directional distribution is based on the follotding:
october 1991 peak Period intelsection turning EoveEent counts at T'B' 5
and Audubon Road shor that 6Ot of the traffic on Audubon Road turns to
and fron T.H. 5 east of Audubon, {0t turns to ar:d fron the eest'
A survey of individual businesses located in Chanhassen and enPloying
over 150 perso*i. A list of all businesses located in Chanbassen was
furnished by the City. This Phone survey confirDed that the 50/10 split
is appropriate at T.H. 5 and Audubon but, approxiaately 20t of their
daily trips are orientated southerly and are not via l.H. 5-
PAGE 10
o 24 hou! Eachine counts - intersection aPProach voluoes at T.H. 5
and Audubon Road. The traffic counts are included in the APPendix
and the traffic corDt su [ary is shonn on Table 5.
CHANHASSEN BUSINESS CENTER
AREORETUU BOUI€VARD 7Es)
32'L 8'A
o
oc
o
o
No
2080
3/70
870
80./.
n'/.SITE
lil90
}IOT TO SCALE
L
A.StrIXTESLTD.
SITE TRAFFIC
DISTRIBUTION FIGURE 3
RLK ASSOCIATES, LTD.
ANALYSIS
TheanalysisPortionofthisstudyfirstinvolvedathoroughinvestigationof
the "T.H. 212 rrattic Forecas!" and "Eastern calver county conprehensive
Transportation Planning study" rePorts -
It uas dilficult to ascertain to rrhat sPecific leve] of develoPnent this
parcel was assigrned. In general. the "Eastern Carver County TransPortation
ilanning Study" looked at the Potential for growlh for the entire area and
eva].uated road,,ay seg[ents to deternine Potential deficiencies in both safety
and capacity.
ou! anal.ysis looked at the inpacts of traflic generated by Chanhassen Business
center fir the yeals 1gg2 and 1995. 1gg2 is uhen the first phase of the cBc
is scheduled to be conPleted. FulI devetopnent of this site will not occu!
until 1996.
For the ''worst case scenario',, horever, the ful] developnent tralfic volunes
were used for each analYsis Year-
Entrance Analyses:
conPuterizationofthehi.ghwaycaPacityanalysisproceduresalloredanunber
of lnalyses to b€ run tO evaluate a variety of Scenarios. Analyses xere run
with the full developnent traffic volumes added to the 1992 and 1996 base or
background volunes at each entlance onto Audubon Road and at the intersection
ot f .n. 5 and Audubon Road. Analyses rrere n,rr xith oPerating sPeeds 30, 45
and 50 nph on Audubon Road. At each intersection for both years and for each
differeni operating speed the Level, of service (Los) on Audubon reDains at
level o! service A.
AnatlixshowinglheconparativelevelofserviceforeachtrafficEoveEent
for each run is shown in Table 6.
CHANHASSEN BUSINESS CE}TTER PAGE 12
Tri.p Assiqnnent
A1] ingress aJrd egress to the site is via Audubon Road on the eastern edge of
the site.
The forecasted full developnent volunes are routed out of the naj.n entrance
and the single dliverday on to Audubon Road. That Portion of the develofnent
traffic forecasted to and fron T.H. 5 has been assigmed to the aPpropriate
turoing noveoents at the intersection of T.H. 5 and Audubon Road'
Figrure 4 shors the forecasted ful1 developnent average daiJ'y traffic (rDT)
.roirr.s. Figrure 5 shots the a.o. and P-D. P€ak hours assigned to the turning
Eovements at each entrance to the chatrhassen Business center. Figure 5 shows
the development traffic volunes assigned to the individuaL traffic loveoents
at the intersection of t.H. 5 and ludubon Boad.
SilGI-E EilTNANCE
415
o5
t3820 +
IA'{ EXTRANCE
3055
765
I
o
3
I
N
O
__ xoT.To scArE .
t.
RL
^.SSoCI,{IES LTD.
ENTRANCE ADT. VOLUilES
{-520-}
FIGIJRE 4
a
p
20
75r90p35:t
.25p95
SilGTE EilTRANCE
,l
fl5
20
3at5
140
ENp5
a
p
a
p415
t75
a
p
lrAl{ E{IR/ANC€
15
70
335
140
a
P
60
280
a75
0s7o
o
t N
O
PEAK HOUR
ENTRANCE VOLUMERLK
A.SSCI TES. LTD.
_. NOT.TO SCAIE .
a
p
a
p
a80
P35
FIGURE 5
ARBOBETUU BOII-EVARD rr}t 5)
f"245p1oo
a160prO a
1i
No
NOT.IO SCALE
R
A.SSOCI{TES. TTD.
SITE TRAFFIC AT T.}t 5
& AUDUBON RD.
ou)o SF
5 cLcLlE ooz (?U)
O GG
EJo
FIGT'RE 6
Si.DgI. Et=alce
tt
NOT!: BaseC @ 1991 cstEts aad 5* eaosaJ' gEot't!'
sbeets i.Dcludad i.B I!C':3'
CcErgutEued caPacit,'i- l rsis
uortlbou:i
lu&bon
lrf t ttJ=t
EastloDd
EigbtNoJr-lDoEd
rE&bo8
t€tt tusl
R- <tbausd
Lc!tlsstlorad
Eight
tuts
Eastlortdhtt
l!!3
I OO.,
a.a./30
P.a./30
EFb
EFb
./45 EPb
. /{5 Bph
a.!
P.E
a.n. /50
p.n. /50
EFb
Epb
l
c
I
I
I
I
D
I
A
I
I
I
A
t
I
t
I
I
B
c
I
I
I
I
D
I
I
I
I
a.!
P.!
l30
l30
Eph
tr?h
P.s
. /45 oph
-/{5 apb
a.a- /5 0
p.r./50
EFb
I
c
I
I
I
t
D A
I
l
I
I
B
c
tI
I
t
I
l
t
I
D
RLK
A.SSOCI.{TES LTD.
LEVEL OF SERVICE
EVALUATION
TABLE 6
rcs Et Ecrrton xr Erl8llG rc ?E
csllGrssEil BuslGS e!EER
tlaLa DrieeYa,
t
c
I
I
I
t
I
I
RLX ASSOCIATES, LTD.
Intersection Analys i s
Capacity analyses were conpleted for T.H. 5 at Audubon Road for the a.n. and
p.rB. peak hours in 1991 (existing conditions ) and for 1996 base conditions (no
CBC traffic) and 1996 with the CBC traffic added to the base condition.
Currently, the intersection operates at level. of service (LOS) B/A on T.H. 5
and D/E on Audubon Road in the a.o. and p.n. peak ttours respectively.
For the '1996 base condition this intersection will operate at LoS C/B and E/F.
This assunes an annuaL glowth rate of 5t in vehicul.ar traffic and does not
include the CBC traffic. i{ith the fulI developnent traffic added to the 1996
base conditions, it j.s anticipated the exj.sling unsigmalized intersection
would operate at unacceptable levels of service during both the a.n. and p.m.
peak hours. with the addition of traffic Aenerated by phase 1 of the
chanhassen Business Center to the forecasted 1992 approach voluoes at theintersection of T.H. 5 at Audubon Road, the nininu& vehicular volumes for
sigmal lrarrants 1 and 2 sill be uret. It is recoEnended that the City contact
r,rn/DoT to reguest a traffic sj.gnal be installed to coinside with the
cornpletion of phase I construction. If Hn/DOT is unr.rilling to install asignal based on forecasted traffic voluses, they should be reguested toclosely moiritor the traffic at the intersection upon cornpletion of phase I.
Mn/DO? currently plans to include the reconstruction of T.H. 5 fron C.R. 1? toT.H. 41 in its 1996 construction progran. th/DOT also has a nunber of
segrnents of new T.H. 212 proglanmed for construction beginning i.n 1993 through1995. They anticipate progranning the resterly segrnents of ne!, T.H. 212 for'1988 cr' Iater. The coffidor studies fo! T.H. 5 and T.H. 212 shows the year
2005 ADT volunes up to 20t lower on T.B. 5 rrith T.H. 21Z corlpl.eted versus the"No-Build" options. Based on Mn/DOT's zonal forecasts 20? of the Chanhassen
Business Center traffic noh, routed via T.H. 5 would be assigned to T.H. 212.This would reduce the inpact of the CBC on T.H. 5. Although the specifictraffic associated with the completion of the chanhassen Business center cannot be identified in the corrj.dor studles for T.H. 5 and T.H, 2.12, they have
addressed a future level of development based on the lretroporitan council'ssocio-economic data base and local Comprehensive pLans. future T.H. 5 and T.H.
212 have been or will be designed to adeguately acconodate this traftic.
Fi$lres ? through 11 shoe the a.n. and p.D. peak hour intersection volurnes for
1991 , 1992 and 1996. The computerized capacity analysi.s reports for 199,1 and
1996 are included in the appendj,x.
CHANHASSEN BUSINESS CENTER
Mi.tioative Measures
There are no nitigative measures such as turn lanes or bypass lanes proposedat the developnent entrances to Audubon Road. .The naj.n entrance, however,sirl be provided t lth southbound acceleratiotr and deceleration tapers to al.rowtruck tralfic a less abrupt turn into and out of the site.
Mn/DOT is conti.nuing to nonito! the traffic vol,umes at T.H. 5 and AudubonRoad. At such time the traffic volunes Eeet the reguj.red traffic signatrrarlant threshold volunes, this intersection Hilr be added to the pri,oritizedlist of intersections to signalize.
PAGE 'I 7
ABBORETUM BOI'.EVARD (TI{ 5)f a392p881
f ^
7ep110
a7819 475
a33P31
+a
1r"looNrOe ooo (o(o
fE6-Zoo
E
o)
N
SOURCE: 1991 TURNTNG MOVETTENT COUNT O
NOT TO SCALE
FIGURE 71991 PEAK HOUR VOLUMESR
A.SSOCIATES. [TD.
ABBOBETUM BOIJLEVARD (T}t 5)<-f a 410 p 995
a85p115
a 820 p 5OO
a35p30 ->a
1i
loO
o N(O
9 lou)
E.zooE
Q
o 5% ANNUAL GBOWTH
o NO CBC TRAFFIC
O ROUNDED iO NCMEST S
N
O
lroT To scAlr
FIGUBE 8K
AssocldrEs" XTD.
1992 BASE VOLUMES
ARBOBETUM BOII-EVARD (Tl{ 5)<rf a 410 p 925
a 330 p 775
a 82O p sOOrf>
a1e5plos a
o
oEzo
@
o
J
1iloto9No
rOc)
6
CL
lo
@
6
N
OROUNDED TO NEAREST 5 O
XOT TO SCALE
FIGT.IBE 91992 WITH FULL
DEVELOPMENTR
ASSOCTATES [TD.
ARBOBETUM BOtIEVARD (Tlt 5)<-
€
a 5OO p 1125
a 1OO p 140
a 995 p 605 {>a4opnoa
1rto|o
^ (?N
= o'oe eR
266o
@3
Q
o5% ANNUAL GBOWTH
oNO CBC TBAFFIC
oROIJNDED TO NEAREST 5
N
NOT TO SCALE
FIGUBE 101996 BASE VOLUMES
A.SSOCIATES. [TD.
e
ARBOBETUM BOI,ILEVARD (TIT 5)(ra 5OO P 1125
f a3asczao
a 995 p 605
a 2OO P 11O
+a
o
o
E,zo
@
J
QJ
rr17
P8tsN
CLost
.o
CLo
6
N
oROUNOED TO NEABEST 5 o
IOT TO SCATE
FIGURE 111996 WITH FULL
DEVELOPMENTLK
AssoclArEs. LirD.
LOT I EXTMT€€
LAKE DR]VE
(llAX EIIBATi|CB
o5c
@ ACCEL,/DECEL
LATGS N
toT ro scll.E
RLK
A.SSOCIAIES IJTD.
RECOMMENDED
ROADWAY IMPROVEMENTS
!
o
FIGUBE 12
ARBORETUM BOI'LEVAHD CTH 5){r a392p881
€
a79p11O
a781p 475
a33P31
+a
1i
'oo)NrOe o'oo ro(ofE6-Zoo
@
-tEJ
Ne
IIOT IO SCALE
FIGUBE 71991 PEAK HOUR VOLUMESRLK
Assocl{rEs. xrD.
SOURCE 199.t TURNING MOVEMENT COUTIIT
(r a41Op995
f .85 p 115
a 820 p 5OO
a35p30
.+a
1i
loON@E acLe :P
=oo
!e
s
o 5% ANNUAL GROWTI{
o NO CBC TRAFFIC
o ROTJT.IDED TO NEABEST 5
N
O
lloT To scArE
FIGI'RE 81992 BASE VOLUMES
ASSOCI TES. LTD.
A8BORETUM EOULEVARD (Ttt 5)
ARBORETUM BOTJLEVARD CTT 5)<-a 410 p 925
a 3il0 p 775
a 82O p s00rf>f
a1e5prcs a
1f"
N
OROUNDED TO NEAREST 5
FIGURE 91992 WITH FTJLL
DEVELOPMENTRL
A.SSOCI{TES. LTD.
l.tloo 9N
H .o.n
6 oo
CD
o
o
loT To scArE
ARBORETUM BOTJLEVARD (T1T 5)
{ra5O0p1125
€"1o0p140
a 995 p 605 rf>
a4opooa
1io'oe)Ne o.cLI eR
='66o
@
e
o5% A}S{UAL GROWTH
oNO CBC TRITRC
oROUNDED TO TGAREST 5
No
lroT To scAr.E
FIGURE 101996 BASE VOLUMESR
AssocldrEs. ErD.
<-f a 50O p 1125
aW 9 24O
a99sp605 +
a2OOP rro a
1t'
P8O rN
= cLo.E oostN
6 66
@
cl
-t
N
oROUNDED TO NEAREST 5 O
NOT.TO SCATE
FIGTNE 111996 WlrH
DEVELOPMENT
FULLRLK
ASSOCI.AIES. LTD.
ARBOBETUM BOIJLEVARD TTE 5)
690 COULTER DRIVE. P.O. BOX 147. CHANHASSEN, MINNESOTA 55317
(612) 937-1900. FAX (612) 937-5739
CITY OF
EH[NH[SSEN
-1//
Attached is a copy of the staff report presented to the park andRecreation Conmissi,on on Septenber 24, 1991, in regard to theproposed Chanhassen Business Center, and the follow upcorrespondence to I{r. Kent Carlson. The recommendations outlinedon pages 2 and 3 of the staff report dated Septenber 18, 1991, inregard to park and trail issues, rrere approved by the park andRecreation Conmission at their Septenber neeting.
As you are aware, Mr. Carlson believes the park and RecreationCor.rmission and the Park and Recreation Department areuncompromising on these reconmendations. This is true to theextent that the commission and staff does not accept the positionthat the dedication of Outlot A and the construction of asidewalk/trail be accepted in lieu of park and trail fees. Thereasons for this are clearly docurnented in the attachedinformation.
Attachnents: Letter to Mr. Kent Carlsonstaff report dated S€ptember 18, 1991
Todd cerhardt, Assistant City Manager
Paul- Krauss, Planning Director
However, it is now my understanding, through conversation withAssistant City Manager cerhardt, that Ryan Construction Company hasagreed. to the inclusion of park ($2500,/acre) and trail ($8ir7icre1fees in the developrnent contract for the Chanhassen ausinessCenter, with the understanding that the acquisition of Out1ot Aand the construction of any trails be negotiated as part of the TaxIncrenent F j.nancing package.
It
ofthpr
should be noted that acceptable naterials for the constructiona sidewalk/trai1 include concrete and/or biturninous, and thate final configuration of the trail aI1ol, for connection tooposed Lake Drive West, Heron Drive, and the raiLroad tunnel .
pc:
PRINTED ON RECrcLEO PAPER
UEI.{ORANDIT!,!
TO: Kate Aanenson, Planner II
FROM: Todd Hoffnan, Park and Recreation Coordinator
DATE: oveDber 8, 1991
SUBJ: Chanhassen Business Center
tf,).4!t
STAIE OF
N!NtrS@TA
DEPARTMENT OF NATURAT RESOURCES
RO WATERS - 1200 I{ARNER ROAD, ST. PAUL, tIN 55106PHONENo. 772-791O
Novenber 18, 199L
FILE NO
30, 1991) for
116N. R.23W)
l{s. Kate Aanenson
Planning Departmentcity of chanhassen
690 Coulter Drive, P.O.
Chanhassen, lilN 553L7
Box 147
RE CHANHASSEN BUSINESS CENTER (9].-4 PUD), BLUFF CREEK, CITY OF
CHANHASSEN, CARVER COUNTY
Dear }ls. Aanenscn:
We have reviewed the site pl,ans (received Octoberthe above-referenced project (S 1/2 Section 15, T.
and have the following conments to offer:
1 Protected watercourse Bluff creek is on the proposedsite. The construction of the footbridge, the gradinq
and any other activity which is below the top of the
bank of Bluff Creek, is under the jurisdiction of the
DNR and may require a DNR protected waters pernit.
It appears that grading is proposed in the creekitself at the south end of the site. Since the DNR isgenerally opposed to alterations of the natural creekcondition, I see a problen with the current proposal.
In addition, the intent of the proposed grading is notcIear.
2 It appears thatthrough settlingobject to havingBluff Creek.
most of the stornwater is routed
basi.ns, which is good. We wouldthe stormlrater routed directly to
3 The Loo-year flood elevation of Bluff Creek appears onthe plans, which is good. AII the work that is donefor this project should conply hrj.th applicablefloodplain regulations of both the city and the Riley-Purgatory-Bluff Creek Watershed District.
Bluff Creek has a shoreland classification ofTributary. The shoreland district extends 3OO feetfrom the top of the bank, or the hridth of thefl-oodplain, which ever is greater. The developnentmust be consistent v/ith the city,s shoreland
management regulations. The city is in the process ofupdating its shoreland management ordinance to be
RECElVtti
Nov 19 1991
ClTY 0F Urlnr\rlASSil'
AN EOUAL CPPORTUNITY EMPLOYER
4.
!!s. Kate Aanenson (Chanhassen Business Center)
Novenber 18, 19 91.
Page fvJo
a
consistent hrith the 1989 version of the stateguidelines, holrever, I see several areas in thecurrent Chanhassen Business Center proposal that couldpotentially be in conflict with the current stateshoreland guidelines:
The northern haLf of outlot A contains bluffs(i.e. slopes that average 30 percent or greater
and rise 25 feet above the top of the banki alongBluff Creek. The bluffs overlooking Bluff Creekshould not be disturbed and all structures shoutdbe setback at least 30, fron the top of thebIuff.
c
The southern haLf ofslopes. Topographicninimized in this area.
outlot A contains steepalterations should be
should be
and the top
5
The vegetation and topography should be retainedin a naturaf state in the shore and bluff impactzones. The mininum shore j.mpact zone is i Zsfoot strip along both sides of the creek. Thebluff inpact zone is the area within 20 feet ofthe top of the bluff. See the state shorelandmanagement guidelines and sarnple ordinance formore details on what can be all,owed in the inpact
z ones .
DNR protected Lratercourse Bluff Creeklabe1led as such in future plans or platsof the bank should be noted.
Appropriate erosicn control treasures should be takenduring the construction period. The IrlinnesotaConstruction Site Erosion and Sedinent ControlPlanning Handbook (Board of Water & soil, Resources andAssociation of Metropolitan Soil and Waterconservation Districts) guidelines, or theirequivalent, should be follor4red
If construction involves dewatering in excess of10,o00 gallons per day or 1 rnillion gallons per year,the contractor r^ril1 need to obtain - a - DNiappropriations permit. you are advised that ittypically takes approximately 60 days to process thepernit application
b.
6.
7.
ItIs. Kate Aanenson (Chanhassen Business Center)
November 18, 1991
Page Three
ceil Strauss
Area Hydrologist
Thank you for the opportunity to comment. Please contact StaffHydrologist Joe Richter or ne at 772-79LO should you have anyquestions regarding these comnents.
Sincerely,
C.,J )ru
Bob Oberneyer, Riley-Purgatory-Bluff Creek WSD
Wayne Barstad, EcoI ServicesBluff creek Fi leCity of Chanhassen Shoreland File
\Qk Ar )a.,; .-til\Zut t s s.*
clrY oFx"&te 7eAAr^-{
H[I{H[SSEN
tu"9
c
G-!
690 COULTER DRIVE. P.O. BOX 147. CHANHASSEN, MINNESOTA 55317
(612) 937-1900. FAX (612) 937-5739
MEMORANDUM
TO:Kate Aanenson, planner II
FRoM: Todd Hoffnan, park and Recreation Coordinator
DATE :Novenber 8, 1991
SUBJ:Chanhassen Business Center
il
Attached is a copy of the staff report presented to the park andRecreation Conmission on SepteDbei 24,- L991, in regard to tfr.proposed .chanhassen
--Busines-s Center, anil the - follow upcorrespondence to Mr. Kent carlson. The reconmendations outlinelon pages 2 and 3 of the.staff report dated SepteDber 18, 1991, inregard. to park .and trail issueJ, nere approied by the park andRecreation Cornrnission at their Septenber -lreeting.
As you .are a!/are, Mr. carlson believes the park and Recreationcornrnission and the park and Recreation oepartmlni-' areuncornpromising on these recoDnendations. This is true io tireextent that the cornmission and staff does not accept the positionthat the dedication of outlot A and the consiructi& of aside$ralk/trail be accepted in tieu.of park and trail fees. Thereasons for this are clearly docurnented in the attachedinformation.
However, it j.s now ny understanding, through conversation t ithAssistant city.Irlanager cerhardt, that-Ryan conitruction company nasagreed to the inclusion of park (g2s0O/acre) and trail ($8ia7acre1
!.": in the developrnent tontrict fLr ttre chanhassen su'sinesicenter, with the understanding that the acquisition of ortrot aand the construction of any trails be negotiated as part ot ihe raxIncrement Financing package.
rt shourd be noted that acceptable raterials for the constructionof a sidewalk/trail incLude concrete and/or bituminous, i"a tr,.tthe final configuration of the trail irrow for conie"tion t"proposed Lake Drive West, Heron Drive, and the railroad tunnel.
Attachnents: Letter to Mr. Xent CarlsonStaff report dated September 18, 1991.
pc: Todd Gerhardt, Assistant Citv l1anaserPaul Krauss, planning pirectir
tvDt,PRINTEO ON RECrcLED PAPEB
3s
?<2zerro
*rd
I
I
Fr
-d
+dt \\
cz
\
I
b
-r
--co-BE
-.\
!;
,
i
v,
l"i
XTENCEPIO,R
I
.=<@r
lrxE Ato{
T1cFrrue
_5
I
\!!
ig
,!
I
2t
t 2s'
NOTES:
LUMINAIRE - EXTRUDED ALUMINUM FRAMT
RTCIANGULAR CASE IIITH FLAT. IMPACI
RTSISTAN] GLASS I.INS. ONE PItCi SPECULAR
ALUUINUM RETI.ICTOR,' OPTICAL ASSIMBLYIq M SEALEq AND TO HAVE IES IYPE II,
UEDIUM CUTOfF UGHI OISIRIBUIION FURNISHED
IVIIH 250 IVATI.24O VOIT H.P.S, LAMP IN
ITOGUL 8AST, ({OO WAN MAX.) BALLASI SHALL
BT CAPABLI OF SIARTING ONE H.P.S. 250
WATT LAIIP FROU A NORUAL 240 VOLI POVIER
SOIJRCI AT A TTUPTRATURE DOIIN IO -20 C.
AND BT CAPABLT OF OPERATION ffTH LAMP
IN OPEN OR SHORT CIRCUIT COND]ION FOR
6 UOiIIHS IIIIHOUT SIGNIFICANI TOSS OF
BALLAST UFE. LUMINAIRE S}IALL BI Ut LISTED
FOR TIIT LOCATIONS. SEE RXIURE SCHEDULE.
COIOR I'AICH ]O ITEAIHERING SIEEI POLE.
ARM SHATL BE RECTNGULAR ALUMINUM
APPROXIMATI DIMENSI0N 2 l/1"x 6'x 12"
LONC.
POLE S{ALL 8T IIILITRBIRND MODEL SOHSOO
OR VATIIONI UOOEL OS 22o-FP-HBAST
EOUAL SOIJARE TAPER FOR SIDE MOUN]
LUUINAIRE, AND SHAI.I BE FAERICATED
OF IIEAIHERING SITEL.
RT.ilOVA8U WIAIHIRPROOT IOP COVER.
IYPI H BASE TH 7 l/2"x ll'rl4-
VITAIHERPROOT REMOVSLE DOOR AND
ITITH INTTRNAL GROUND.
LIGHTING POLI ilRING CONNTCIED IO FITD
IYITH JOY - X89 OR APPROVTD TOUAL
STRIES FUSED CONNECIORS AND FUSTD WTH
6 AMP BUSSMAN TY?E KIK OR APPROVED
EOUAL FUSIS.
FOUNDATION BASE - SEE FOUNDAIION DTIAIL
I
1
I
I
1
1
I
I
I
I
1
1
I
1
@
30'
APPROX.
a'\ ryPt-Ri sTRtrT LTGHTTNEfIIEUIII
LIGHT FIXTURE SCHEOULE
TYPE OESCRIPTION L AIIP
lt slERXEi r zPO-!aO{ 7- OO-2aO
9l!0EL 250:^Tr HPS Lurtil^tRE ttTHOI€ PIECE DIE-fORIIO IUII t{UI
EEFLECT(n IITH SPECUL^R ALUYINUIFlNlsx, o.E pl€cE Ex?RuoEo llutatilt,,
H(US IN6. CL€^R.,FLA'.
'EIfEREO
GL SSLElrs. iYPE Ir otstntBUrto{ cmrEiCOLOR. SUPPLTEO TIIX CAEL€ X^[O'E!m g?€ltlrc D(m. pRovtoE lt rsF rrllr-
EBdIEE ?tBHlES'Eilii. i?t[.iBlhhD.E !o F€Er
r so{-!oo-rFs rlTx IYPE ,t{. BlsE.
I
I I
Af,TACHMENT 2
o
120'
1E"
o
NO SCALE
?50 HPS
I{EII{ORANDI,I,I
TO:
FROI{:
DATE:
su&T:
Upon review of the plansdated October 21, 1991,
reconmendations:
GRADTNG AND DRATNAGE
690 COULTER DRIVE . P.O. BOX 147 . CHANHASSEN, MINNESOTA 55317
(512) 937-1900. FAX (612) 937-5739
Xate Aanenson, Planner II
Dave Henpel , Sr. Engineering Technician r'
l{ovenber 27. L99l
Prelininary PLat Review of Chanhassen Business CenterProposalFile No. 91-13 LUR
CITY OF
CH[NH[SSEN
subnitted by Ryan Construction Companyf offer the following conments and
W-
It appears that this development is to be graded in two phases withtle first phase concentrating over the easterly one-hLlf of thesite. The overal,l grading plan proposes grading the entire siteand constructing a siorn r6tlntioir pina rof stonn- runoff g-nerateafrom this. developnent. Construction of the retention pond wi1lencroach into the flood plain and reguire nitigation. AsL result,the applicant proposes increasing the depth oi the flood plain tooffset the area lost rrith the proposed retention pond. Thel,linnesota Departnent of Natural Resoulces will need to- review andapprove of this nitigation reaaure. The alopes proposed with theretention pond will be a maximuu of 3:1. staaf reconnends that theslopes be a naximun slope of 4:1 in order to facilitate naintenanceequipnent in accessing the botton of the ponding area as we1l assafety neasures.
The project proposes to construct a seri.es of storm ser{rers toconvey runoff fron each individual lot to the proposed retentionpond. Storn sewer calcuLations for a 1o-year storm event alongwith ponding calculations for a 100-year event shouLd be subnittedto the City Engineering Departnent for review. Detailed stormsewer construction plans have been subnitted to the city forreview. Staff wiLl prepare a separate report on the streei andutility construction plans during the final plat approval process.
tIt,PBINTED ON REC\CLED PAPER
Kate Aanenson
NoveDber 18, 1991
Page 2
As a part of Phase I grading, the plans do not provide for any
tenporary retention pond for runoff generated over the easterly
half of the site. The plans propose draining the first phase of
the development northwesterly towards the raifroad tracks uhich
eventually drain southwesterly paralle1 to the railroad tracks into
the ftood p1ain. This grading activity rill involve encroaching
upon the railroad property. The applicant nust receive
pernission,/per:ait from the railroad authority for this work. staff
reconmends that this lor area adj acent to the tracks be constructed
into a ponding area for interin use or possibly a pernanent second
retention pond.
As with nost retention ponding areas, naintenance responsibil ities
are generally transferred over to the City. The applicant shall
dedicate and provide a naintenance access drive to these areas for
future maintenance considerations. The appropriate drainage and
utility easenents should be conveyed over these areas with the
final plat approval .
EROSION CONTROL
The plans propose with Phase I construction a temPorary rock
construction entrance at Audubon Road and Lake Drive west. The
plans also propose silt fence along the rresterly retention pond as
rell as the dounstrean side of the site grading. Due to the
nagnitude of the parcel being graded, it is reconmended that Type
III erosion control be installed. It is also recornrnended that
erosion control fence (T!Pe III) be installed along the westerly
grading linits for erosion control measures as rrell as narking the
iinits-of construction. staff also reconnends that Type I silt
fence be placed along Audubon Road between the curb and the
proposed bern lying north of future Lake Drive west.
The plans propose for all areas altered because of construction to
be restored with seed and disc nulched, sod, Irood-fiber blanket or
be hard surfaced within two ueeks after coupletion of construction.
staff uould like to change this condition to read that all turf
restoration shall be coupleted within two weeks after the site isgraded except in areas designated for utility or street
construction that year.
UTILITIES
tilunicipal water service is available to the site from Audubon Road.
The plans propose extending a 10-inch waternain through the site
and looping back to Audubon Road by continuing to the south between
I-ots 8 and 9 and then easterly back out to Audubon Road to complete
Kate Aanenson
Novenber 18, 1991
Page 3
the Ioop. Staff recornmends that the waten0ain loop be extendedsoutherly to uithin 10 feet of the south plat boundary and thenproceed easterly to Audubon Road to provide for possible future
extension and looptng to the adjacent parcel to the south.
In the areas of the developnent where the waternain is extendedoutside of the street right-of-nay, the final plat should convey2o-foot wide drainage and utility easements over these areas.Detailed utility construction plans have been subrnitted; however,
no specifications were provided. Staff will be preparing a staffreport on the construction plans and specifications with the finalplat approval . A11 utility construction should be constructed in
accordance with the Latest edition of the City of Chanhassenrs
standard specifications. Project specifications shall incorporatethe Cityrs standard specifications.
SANITARY SEWER
t{unicipal sanitary sewer service is not readily available to theentire site. Audubon Road does have an 8-inch sanitary sewer linethat rras constructed in conjunction with the Audubon Road upgradelast year with the intent that a sanitary sewer line would beextended through the Rednond parceL (1ying east of Audubon Road)along the future Lake Drive West which rrould eventually tie the trrosystens together. Louever, that project did not proceed;therefore, the sanitary Eewer line in Audubon Road is inoperationalat this time.
As a part of the Lake Susan Hi11s West 3rd Addition, a sanitarysewer line rras extended underneath Audubon Road at Heron Drive.This line has Linitations with regards to capacity as well aselevation to serve the site. The plans propose on extending an 8-inch sewer nain fron Heron Drive north along the west side of
Audubon Road to provide service to Ipts L, 2, 3,4, 5, 10 and 11,Block 1. Staff is concerned with the capacity of the existing linethrough Lake susan HiIIE west 3rd Addition. In a report preparedby the developerts engineer (R.L.K., Incorporated) revealed thatthere appears to be enough capacity in the existing line on HeronDrive to accor0Dodate these new lots in the Chanhassen BusinessCenter. Staff is requesting copies of their calculations forverification and to see if it included future irbuilt-outl
conditions of the residential area south of Iake Susan Hil1s rrhichwill eventually drain into the Lake Ann Interceptor. If staffconcurs with their calculations and allorrs connection to thesysten, there should be a nechanisn to track and regulate the
amount of flow discharged from Phase I through the sewer line at
Heron Drive to insure that flows do not exceed the capacity linits.
The exact sanitary sewer discharge linitation fron each of these
Kate Aanenson
Novenber 18, 1991
Page 4
lots should be placed in the chain of title as welL as in the
devetopment contract to insure that the flows do not exceed thecapacity linits dovnstrean. staff also reconmends rith
inplenentation of Phase II sanitary seuer improvenents to the
developnent if feasible the sanitary sewer line proposed in PhaseI should be switched to flou into the new sanitary sewer trunk
systen.
The city recently included this area into the uusA. The city'sconsultant, Bonestroo, Rosene, Anderlik & Associates, Inc. ispreparing conprehensive sanitary seser plans shich includes this
parcel . In order to provide sanitary sewer service to Phase II of
the Chanhassen Business center a trunk sewer line iri1l have to be
constructed froD the south along Llman Boulevard which will require
a lift station and forceuain systeu to purtrp back up Audubon Road to
discharge. into the sanitary. serrer line at Lake Drive west and
Audubon Road. In addition, the sanitary sewer line previously
proposed along Lake Drive West lying east of Audubon Road (Re&trondproperty) wiII also have to be constructed. The Lake Ann
Interceptor is located approxiuately one-third nile east of Audubon
Road (see Attachnent #1).
As with any inproveroent project, the applicant is generally
responsibte for petitioning the city for extension of public
iroprovements, i.e. sanitary serrer, and providing a cash escrow forthe preparation of a feasibility study. should the project be
authorized by the City, the appLicant si1l be entitled to a refundof the security escrow. staff uould like to point out that thisparcel of land has not been assessed for sanitary trunk selrer yet.
Even if the easterly half of the site is able to utilize theexisting sanitary sewer stub at Heron Drive, the entire tract of
land should pay its fair share of the trunk sewer systen to bebuilt in conjunction with Phase II of this developnent. This nay
require that pending trunk sanitary sewer assessnents be recorded
against each parcel in Phase I.
Utility and drainage easements should be conveyed with the finalplat over those areas uhere the sanitary sewer line extends out
beyond the street right-of-way. In addition, the applicant shoulddedicate to the city an easeDent for the future trunk sewer
extension through Outlot B. The drainage and utiLity easenentsshalI be a ninimum of 20 feet wide. fn an effort to provide accessfor maintenance purposes it is suggested that a qravel access roador possibly a conbination trail be built along the sanitary sewerroute through Iots 7, 8, Outlot A and outlot B.
Kate Aanenson
November 18, 1991
Page 5
STREETS
The plans propose a 36-foot vide face-to-face street with 8-618
concrete curb and gir.rtter inside of a 60-foot lride street right-of-rray. This is consistent with other industrial parks in the City.ft is reconmended for the segment of roadway betrdeen Audubon Road
and rstreet Arr which is the first cul-de-sac to the north, that theright-of-way be extended to 80 feet wide to accomnodate additionalturn lanes and signalization in the future. In addition, allintersection curb radiuses should be increased to 30 feet wide to
accomnodate truck turning rnovements. The street construction plansfor Lake Drive West should be expanded to provide for a left turnIane, and through/right turn lane for outbound traffic on to
Audubon Road. The street construction plans should alsoincorporate the southbound acceleration and deceleration lanesalong Audubon Road as proposed with the site plan. Theacceleration and deceleration lanes sha1l be built according to
ITInDOT standards .
The plans propose a separate entrance to Lot 1 off Audubon Road.Staff is not confortabLe rrith allowing any additional driveway curbcuts on Audubon Road. However, if the driveway access is granted,it is reconmended that the entrance be located a ninirnun of 5OOfeet north of the naj.n entrance to the development. This shouldprovide adequate spacing betlreen the future turn lanes andchannelizations to be incorporated at the intersection of proposedIake Drive west and Audubon Road. The applicant should also beadvised there nay be a possibility that future roadrray inprovernents
such as medians nay linit traffic movenents to right-in/right-outonly on Lot 1.
Audubon Road south of the railroad tracks to the future extensionof Lake Drive vlest currently exists as a 44-foot wide urban street.South of Iake Drive West, Audubon Road is built to rural citystandards (24-foot wide bitulinous Dat with 5-foot wide gravelshoulders. According to the Eastern Carrrer County TransportationStudy (ECCTS), Audubon Road is classified as a CLass I collectorstreet which requires a nininun right-of-way of 80 feet and
reconroends a 100 feet to accoDmodate a 44-foot wide urban street.
There currently exists a 33-foot rride right-of-way along the westside of Audubon Road and 50 feet along the east. An additional 17feet of street right-of-way should be dedicated along the west sideof Audubon Road with the final plat.
The EAW addresses the proposed traffic iurpacts anticipated rrith
developtoent of the site. The site has been divided into potential
uses for the purpose of forecasting trip generation. The proposedlevel of fu1l developnent includes the potential of 700,000 grossfeet of general office building, warehousing, and nanufacturing.
Kate Aanenson
Novenber 18, 1991
Page 6
1\ro traffic reports uere revieued and applied for their relevancein addressing the denographic and road needs for the next twentyyears. The two reports include:
T.H. 212 Traffic forecasts, I-494 to Norrood./Younq Anerica,
prepared for l{n/DoT, 1985
Eastern carver countv conprehensive Transportation Planninq
studv, prepared for Eastern carver county Technical conmittee,
1990
current Average Traffic Volumes (ADT) were received fron IihDoT andthe City. In addition, the developerts engineering firn, RtK
Associates took 24-hour nachine counts on T.H. 5 and Audubon Road
and prepared a traffic analysis. Currently, this intersection does
not meet uarrants as required for installation of a traffic signal.
UnDOT ranks this intersection 35th on their priority list. The
analysis looked at the inpacts of traffic Aenerated by chanhassen
Business center for the years 1992 and 1996. Anticipated traffic
entering and exiting the site is distributed with 3472 ADT (80t)
north and southbound on to Audubon road north of the site and 858
ADT (208) north and southbound fron the south. of the site traffic
on Audubon Road northerly of the site entrances, 2083 ADT (60t) is
going to and fron the east on T.H. 5 and 1389 ADT (40*) is going to
and fron the rrest on T.H. 5. The report predicts then T.H. 212 isbuilt, traffic patterns on Audubon Road wiII increase by 20t to the
south and decrease 20* to the north.
capacity analyses were conplet€d for the intersection of T.H. 5 at
Audubon Road for the a.n. and p.n. peak hours in 1991 includingtraffic generated with Phase I developuent of the chanhassen
Business Center (CBc). With the fuII developnent traffic added tothe 1991 base conditions, it is anticipated the existingunsignalized intersection at T.I{. 5 and Audubon Road lrou1d operateat unacceptable leve1s of service during both the a.D. and p.n.
peak hours. In the report it is reconmend that the City contact
l.InlDOT to request that a traffic signal be installed to coinciderrith the conpletion of Phase f of the construction. As developnentpressure dictates turn lanes and traffic control devices such assignalized intersections along Audubon Road at T.Il. 5 and possibly
L,ake Drive I{est may be sarranted. The applicant should be awarethey nay be required to participate in the acguisition of thesetraffic signals.
The plans do not provide for street lighting. As with previousindustrial parksr/roadways the City has required the developer toinstall street lights throughout the street systen. The streetlights should be designed consistent with the existing lightingalong Audubon Road. A 2so-uatt contenporary low-profile,
Kate Aanenson
}{oveEber 18, 1991
Page 7
rectilinear-rectangular rtyle lighting fixture with high-pressure
lamps mounted on a 25-30 foot high corten steel po1e. the poles
should be placed betueen 150 and 200 feet apart.
RECOI{}TENDED CONDITIONS OF APPROVAL
1. Provide an additional L? feet of right-of-way along the
westerly side of Audubon Road throughout the plat.
2.
3.
4
Provide the 2o-foot uide drainage and utility easenents overthe proposed selrer and rrater lines outside the road right-of-
way.
Provide a 2o-foot drainage and utility easement for thesanitary sewer proposed along the west side of Audubon Roadlying south of the proposed nain entrance.
The Dain entrance street sha1l be naned Lake Drive West
consistent sith the future extension of Lake Drive tlest eastof Audubon Road.
5
8
Provide the City Engineering Department with storn seqrercalculations designed for a lO-year storm event and ponding
cal.culations to sho!, that the ponds wiII retain a '100-yearstonE event and rill discharge at the predeveloped runoffrate.
If a curb cut is alLowed for Lot 1 on to Audubon Road, itshall be located a mininun of 5OO feet north of the proposed
main entrance (Iake Drive West) and provide a deceleration
lane.
The applicant shall petition the city and provide a $12,000escrow for preparation of a feasibility report for the
extension of a trunk sewer line to service Phase II of thesite which will be refunded upon project approval andauthorization by the city council.
A secondary retention pond should be conEtructed for thenortherly 15 acres of the site which drain to and paraIlel ofthe raiLroad tracks (Lots 4 and 5).
If only Phase I of the site is graded, silt fence shalf be
incorporated along the perineter of the construction linits
and if the entire site is graded, Tl4le III erosion controlshall be installed and maintained along the westerly perineterof the construction linits.
6.
7.
9.
Kate Aanenson
Novenber 18, 1991
Page 8
11.
12.
13.
14.
15.
L7.
The applicant shall provide the Engineering Departnent withthe calculations estinating the capacity of the sanitary sewer).ine through Lake Susan Hills development and the predictedflows each lot uiII generate. Sanitary sener discharge
through Lake Susan Hilfs West 3rd Addition shalI be considereda temporary condition if future trunk facilities on Audubon
Road can feasibly serve Phase I.
A covenant regrulating the anount of discharge from Phase Ishall be placed in the title of each parcel as weLl as in the
development contract to insure that flowS will not exceedcapacity linitations downstrean.
Inside slopes of the retention ponds shal1 be reduced to a
mininum of 4:1.
As a condition of final plat approval , the applicant shaI1enter into a development contract and provide the financialsecurity to guarantee construction of the iroprovenents.
fhe developer shaIl construct the utility and street
inprovenents in accordance nith the latest edition of theCityts standard specifications and shal1 prepare final plans
and specifications and subroit for City approval . Projectspecifications sha1l incorporate the Cityrs standardspecifications. The developer shall acquire utility
construction penDits fron the PCA and l{innesota Departnent of
Bealth.
The developer sha11 obtain all necessary pernits fron the
Watershed District, DNR and An0y Corps of Engineers and conplywith all conditions of the pernits. Drainage plans shal.1 berevised as outlined in the approved staff report and shal.l beresubnitted to City staff for approval.
The applicant shall obtain pennission/perrnit fron the railroadauthority for all grading activities within the railroadproperty.
The developer shall incorporate street lights into the streetconstruction plans. The street lights should be installed at150 to 2oo-foot intervals. The street lights shalf bedesigned consistent with existing lighting on Audubon Road.A 250-watt contemporary 1ow-profile rectilinear-rectangular
18.
10. The rraternain loop between Lots 8 and 9 shall be extended towithin 10 feet of the southerly property line and then proceed
east and para11el to the south property line back to Audubon
Road.
16.
Kate Aanenson
NoveDber 18, 1991
Page 9
style lighting fixture with pressure lanps mounted on a 25-
foot high corten steel pole (see Attachnent #2).
19. AIl areas disturbed during site grading shall be irnrnediately
restored with seed and disc Dulched, sod or sood-fiber blanketvithin two seeks of site grading or before NoveDber 15, 1992except in areas where utilities and streets will be
constructed yet that year. Areas attered rrlth a slope of 3:1or greater nust be restored vith sod or sood-fiber blanket.
20. The entire tract of land developnent shall be assessed for the
future trunk serrer systen to be built for Phase II (Lots 5, 7,8, 9 and 12).
2L.If feasible, the sanitary sewer lines in Phase r should be
switched to ftow into the trunk sanitary serrer system proposed
for Phase II.
22.
ktn
Attachments:
The developer shall be responsible for a share of the cost for
traffic signats on Audubon Road at Lake Drive west and T.H. 5.
1
2
Lake Ann Interceptor location l,[ap.
Street Light Detail.