Loading...
Lotus Woods Development ContractDocument Number: T213602 Torrens Certificate: 41075.0 Filed and/or Recorded on May 14, 2020 11:48 AM Office of the County Recorder/Registrar of Titles Carver County, Minnesota Kaaren Lewis, Registrar of Titles Deputy DL Pkg ID: 7154660 Document Recording Fees $ 46.00 Document Total $ 46.00 Requesting Party: CUSTOM HOME BUILDERS TITLE, LLC Pages: 23 This cover page has been added to this document by Carver County Land Records and is now an official part of this recorded document i .A CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA 205909v2 LOTUS WOODS DEVELOPMENT CONTRACT (Developer Installed Improvements) f,Dr,L- il---. /zk,'/j`.,- nrJl Z// I -ZZ a TABLE OF CONTENTS SPECIAL PROVISIONS PAGE 1. REQUEST FOR PLAT APPROVAL............................................................................SP-1 2. CONDITIONS OF PIAT APPROVAL........................................................................SP-1 3. DEVELOPMENT PLANS............................................................................................SP-1 4. IMPROVEMENTS........................................................ ................................................ S.P-2 5. TIME OF PERFORMANCE......................................................................................... SP -2 6. SECURITY............................................................................................ ......... SP -2 ............... 7. NOTICE..............................................................SP-3 ........................................................... 8. OTHER SPECIAL CONDITIONS................................................................................SP-3 9. GENERAL CONDITIONS...........................................................................................SP-5 GENERAL CONDITIONS 1. RIGHT TO PROCEED.................................................................................................GC-I 2. PHASED DEVELOPMENT........................................................................................GC-1 3. PRELIMINARY PLAT STATUS................................................................................GC-1 4. CHANGES IN OFFICIAL CONTROLS.....................................................................GC-I 5. iMPRO`v'EMEN T S.......................................................................................................GC-i 6. IRON MONUMENTS.................................................................... ..............................GC -2 7. LICENSE......................................................................................................................GC-2 8. SITE EROSION AND SEDIMENT CONTROL.........................................................GC-2 8A. EROSION CONTROL DURING CONSTRUCTION OF A DWELLING OR OTHERBUILDING.........................................................................................GC-2 9. CLEAN UP ......................... . GC -3 ................................................................................. 10. ACCEPTANCE AND OWNERSHIP OF IMPROVEMENTS ............................ ........ GC -3 11. CLAIMS.......................................................................................................................GC-3 12. PARK DEDICATION..................................................................................................GC-3 13. LANDSCAPING..........................................................................................................GC-3 14. WARRANTY...............................................................................................................GC-4 15. LOT PLANS....................................................................GC-4 ............................................. 16. EXISTING ASSESSMENTS.......................................................................................GC-4 17. HOOK-UP CHARGES.................................................................................................GC-4 18. PUBLIC STREET LIGHTING.....................................................................................GC-4 19. SIGNAGE ........................................... . ..........................GC -5 ............................................... 20. HOUSE PADS ............................. .......... ............................................. GC -5 .......................... 21. RESPONSIBILITY FOR COSTS................................................................................GC-5 22. DEVELOPER'S DEFAULT., ....................................................................................... GC -6 22. MISCELLANEOUS A. Construction Trailers........................................................................................GC-6 B. Postal Service....................................................................................................GC-7 C. Third Parties......................................................................................................GC-7 205909v2 i D. E. F. G. H. 1. J. K. L. M. N. O. P. Q. R. S. T. U. V. W. X Y. Z. 205909v2 Breachof Contract............................................................................................ GC -7 Severability.......................................................................................................GC-7 BuildingPermits...............................................................................................GC-7 Waivers/Amendments....................................................................................... GC -7 Release.............................................................................................................. GC -7 Insurance........................................................................................................... GC -7 Remedies........................................................................................................... GC -8 Assignability.....................................................................................................GC-8 ConstructionHours...........................................................................................GC-8 NoiseAmplification..........................................................................................GC-8 Access...............................................................................................................GC-8 StreetMaintenance............................................................................................GC-8 Storm Sewer Maintenance................................................................................GC-9 SoilTreatment Systems....................................................................................GC-9 Variances........................................................................................................... GC -9 Compliance with Laws, Ordinances, and Regulations.....................................GC-9 Proofof Title.....................................................................................................GC-9 SoilConditions ............................ .................................................................... GC -10 SoilCorrection................................................................................................GC-10 HaulRoutes.......................................................... ................................................ GC -l0 DevelopmentSigns..............................................................................................rr , n ConstructionPlans...............................................................................................GC-10 As -Built Lot Surveys...........................................................................................GC-11 CITY OF CHANHASSEN DEVELOPMENT CONTRACT (Developer Installed Improvements) LOTUS WOODS SPECIAL PROVISI� AGREEMENT dated July 22, 2019 by and between the CITY OF CHANHASSEN, a Minnesota municipal corporation (the "City"), and, LOTUS WOODS HOLDINGS, LLC, a Minnesota limited liability company (the "Developer"). 1. Request for Plat Approval. The Developer has asked the City to approve a plat for Lotus Woods (referred to in this Contract as the "plat"). The land is legally described on the attached Exhibit "A". 2. Conditions of Plat Approval. The City hereby approves the plat on condition that the Developer enter into this Contract, funvsh the security required by it, and record the plat with the County Recorder or Registrar of Titles within 30 days after the City Council approves the plat. 3. Development Plans. The plat shall be developed in accordance with the following plans. The plans shall not be attached to this Contract. With the exception of Plan A, the plans may be prepared, subject to City approval, after entering the Contract, but before commencement of any work in the plat. If the plans vary from the written terms of this Contract, the written terms shall control. Tl.e plans are: Plan A: Final plat approved July 22, 2019, prepared by Otto Associates Engineers & Land Surveyors, Inc. Plan B: Grading, Drainage and Erosion Control Plan dated June l8, 2019, prepared by Otto Associates Engineers & Land Surveyors, Inc. Plan C: Plans and Specifications for Improvements dated June 118, 2019, prepared by Otto Associates Engineers & Land Surveyors, Inc. 205909v2 SI, , 4, improvements. The Developer shall install and pay for the following: A. Sanitary Sewer System B. Water System C. Storm Water Drainage System D. Streets E. Concrete Curb and Gutter F. Street Lights G. Site Grading/Restoration H. Underground Utilities (e.g. gas, electric, telephone, CATV) 1. Setting of Lot and Block Monuments J. Surveying and Staking K. Landscaping L. Erosion Control 5. Time of Performance. The Developer shall install all required improvements by November 15, 2020. The Developer may, however, request an extension of tune from the City Engineer. If an extension is granted, it shall be conditioned upon updating the security posted by the Developer to reflect cost increases and the extended completion date. 6 Security. To guarantee compliance with the terms of this Contract, payment of special assessments, payment of the costs of all public improvements, and construction of all public improvements, the Developer shall furnish the City with a letter of credit in the form attached hereto, from a bank acceptable to the City, or cash escrow ("security") for $52,074,97. The amount of the security was calculated as 110% of the following: Site Grading/Erosion Control! Restoration $5,445.00 Sanitary Sewer $11,468.00 Watermain $10,719.00 Storm Sewer, Drainage System, including cleaning and maintenance $ - Streets $12,000.00 Street lights and signs $800.00 Sub -total, Construction Costs $43,432.00 Engineering, surveying, and inspection (7% of construction costs) $3040.24 Landscaping (2% of construction costs) $868.64 Special assessments (to be re -assessed to the lots and outlots in the final plat) 5 - _ Sub -total, Other Costs $3,908.88 TOTAL: COST OF PUBLIC IMPROVEMENTS $47,340.88 FCL RITZ AMOI;'N C (11.0% of 47.340 88) $52,074.97 205909v2 S11--1111 . This breakdown is for historical reference; it is not a restriction on the use of the security. The security shall be subject to the approval of the City. The City may draw down the security, without notice, for any violation of the teens of this Contract. If the required public improvements are not completed at least thirty (30) days prior to the expiration of the security, the City may also draw it down. If the security is drawn down, the draw shall be used to cure the default. With City approval, the security may be reduced from time to time as financial obligations are paid, but in no case shall the security be reduced to a point less than 10% of the original amount until (1) all improvements have been completed, (2) iron monuments for lot comers have been installed, (3) all financial obligations to the City satisfied, (4) the required "record" plans have been received by the City, (5) a warranty security is provided, and (6) the public improvements are accepted by the City. 7. Notice. Required notices to the Developer shall be in writing, and shall be either hand delivered to the Developer, its employees or agents, or mailed to the Developer by registered mail at the following addresses: Paul T. Eidsness Lotus Woods Holdings, LLC 1217 Cape Coral Parkway East #346 Cape Coral, FL 33904 E-Mail:._i: Phone: 612-889-5764 Paul T. Eidsness Lotus Woods Holdings, ILC 35 Interlachen Place Excelsior, MN 55331 Notices to the City shall be in writing and shall be either hand delivered to the City Manager, or mailed to the City by certified mail in care of the City Manager at the following address: Chanhassen City Hall, 7700 Market Boulevard, P.G. Box 147, Chanhassen, Minnesota 55317, Telephone (952) 227-1100. 8. Other Special Conditions. A. SECURITIES AND FEES A $52,074.97 letter of credit or escrow for the developer -installed improvements, the 522,593.56 cash administration fee and the fully -executed development contract must be submitted and shall be submitted prior to scheduling a pre -construction meeting. B. The developer agrees to implement the recommendations listed in the .July 22"d, 2.019 staff report. 205909v2 SP -3 Fill n seri n g: I . The applicant shall submit an existing conditions survey prior to the recording of the final plat. 2. The applicant shall provide an exhibit demonstrating how snow removal operations from the existing driveway providing access to 630 and 640 Carver Beach Road will be perfonned without conflict or nuisance to the proposed subdivision prior to recording of final plat. 3. A copy of the executed construction easement shall be provided to the city prior to grading. 4. The applicant will be required to dedicate 50 feet of right-of-way (ROW) to the east abutting Lot 2, as shown on the preliminary plat as "Lotus Woods Drive". 5. The developer shall put into escrow $29,788.40 for the future street construction of "Lotus Woods Drive" abutting Lot 2 prior to recording of final plat. The construction of the street will occur when the property to the north of Lotus Woods Subdivision is developed, or when the city determines it is appropriate to construct the street, whichever occurs first. 6. A sign approved by the city shall be placed in the ROW at the corner of "Lotus Woods Drive" and Big Woods Boulevard indicating a future street will be constructed. 7. Updated plans illustrating the location and connection methodologies of sanitary and water services for Lot 1 will be required prior to the issuance of building permits. From as -built information, it appears there was water and sanitary laterals stubbed to the property in 1975. If these services are currently in use by an existing property, the developer shall relocate those services to avoid having private service lines running through the subdivision. If these services are not in use, the developer shall field verify their locations and serviceability prior to connecting services to the laterals. 8. A fire hydrant shall be constructed on the end of the water main extension in "Lotus Woods Drive". 9. All newly constructed public utilities shall adhere to the city's most recent Standard Specifications and Detail Plates, and city review and approval of all construction plans shall be completed prior to issuance of building and/or grading permits. 10. All required permits from the appropriate regulatory agencies shall be required prior to construction, including but not limited to the Minnesota Pollution Control Agency, the Department of Health, and the City of Chanhassen. 11. The development of Lots 1 and 2 will be required to pay all required city WAC and SAC fees associated with service connections for the rate in force at the time of building permit applications. 12. The applicant shall enter into a Development Contract. 13. On Sheet 1 of 6 of the sanitary sewer and watennain plan: curb stop for water service shall be installed at the property line per detail #1005; the PVC sanitary sewer service to Lot 2 shall be 6" in accordance with detail #2001; the note describing work to existing bituminous and curb and gutter on future Lotus Woods Drive shall read "remove existing bituminous and curb & gutter" for clarity; a gate valve shall be installed where the 8" water main is to be extended from the existing 8" water main stub (show in profile); the 5.98 205909v2 SP -4 lineal foot outside drop connection to the sanitary manhole shall be an inside drop per detail #2104. 14. On Sheet 2 of 6 of the grading and erosion control plan: grading and erosion control notes reference the NPDES permit, as this site will not disturbed over 1 acre it is not anticipated that the general requirements of the permit will have to be met, this may be updated at the developer's/engineer's discretion; note 6 discusses dewatering practices and references a temporary sediment basin, however the plans do not illustrate its location, update plans or note accordingly; note 8 should specify that a sweeper/vac truck shall be utilized for cleaning operations. 15. On Sheet 6 of 6 of the details: detail plate #5200 should be updated from "typical residential street section" to "modified residential street section"; provide detail of the future street construction sign, coordinate with the street superintendent (952-227-1303). Water Resources: 1. Provide an erosion and sediment control plan in accordance with Sec. 19-145 of city ordinances upon submittal of building permits for individual lot development. 2. Provide drainage and stonnwater management plans as prescribed in Chapter 18, Sec. 18- 40 and Section 19-143. Parks: 1. Full park fees in lieu of additional parkland dedication and/or trail construction shall be collected as a condition of approval for the two lots. The park fees will be collected in full at the rate in force upon final plat submission and approval. Based upon the current single- family park fee rate of $5,800 per dwelling, the total park fees would be $5,800. Environmental Resources Coordinator: 1. The rear 140 feet of Lot 1 and the rear 40 feet of Lot 2 shall be covered by a Conservation Easement. Tree preservation fencing will be required on each lot. 2. Fencing must be installed at the edge of grading limits prior to the start of any construction activities. 9. General Conditions. The general conditions of this Contract are attached as Exhibit "B" and incorporated herein. 205909v2 S1�_, y fit r CITY OF CHANHASSEN I ' BY n Elise Ryan, Mayor 'U� AND: dd Gerhardt, City Manager STATE OF MINNESOTA) (ss. COUNTY OF CARVER ) p 4-,h The foregoing instrument was acknowledged before me this 0 day of �y-Lt 20aQby Elise Ryan, Mayor, and by Todd Gerhardt, City Manager, of the City of Chan.hasse , a Menne ota :runicipal corporation, on Behalf of the corporation and pursuant to the authority granted by its City Council. NOTARY kli.JC KIM T. MEUWISSEN Notary Public -Minnesota ,. My Commisebn Expires Jen 31, 2025 205909v2 SP -6 LOTUS WOODS HOLDING BY: PALTQ1'. EIDSNTWPRESIDENT STATE OF ) ( ss. COUNTY OF ► The foregoing instrument was acknowledged before me this 2T da cif to 202 , by Paul T. Eidsness, President of Lotus Woods Holdings, LLC, a Mi esota limited li ity company, on behalf of the company. NOT y IXIDA MABEL PAEZ NOTARY PUBLIC STATE OF FLORIDA Com, FF99M7 Expires 5/23/2020 DRAFTED BY: City of Chanhassen 7700 Market Boulevard P.O. Box 147 Chanhassen, MIS` 55317 (952)227-1100 205909v2 S1) FEE OWNER CONSENT TO DEVELOPMENT CONTRACT Paul T.F,idsness and Mira Srdanov, spouses married to each other, fee owners of all or part of the subject property, the development of which is governed by the foregoing Development Contract, affirm and consent to the provisions thereof and agree to be bound by the provisions as the same may apply to that portion of the subject property owned by them. Dated this O`/'day of M , 2020. STATE OF E I - ) )ss. COUNTY OF ) The foregoing instrument 2020, by Paul T. Eidsness ano. ledged before me this � ay of Srdanov, spouses mgried to each o*er e c Brittni A9 Notary Public State of Florida My Commission Expires 02/07/2023 Commission No. GG 299334 DRAFTED BY: City of Chanhassen 7700 Market Boulevard P.O. Box 147 Chanhassen, MN 55317 (952) 227-1100 2059090 EXHIBIT "A" TO DEVELOPMENT CONTRACT LEGAL, DESCRIPTION OF SUBJECT PROPERTY: Lot 1 and Lot 2, Block 1, Lotus Woods, according to the recorded plat thereof, Carver County, Minnesota. 205909v2 CITY OI' CHANHASSEN DEVELOPMENT CONTR:AC IF (Developer Installed Improvements) EXHIBIT "B" �z11EI.,t:0i�%}:":C'I tiS 1. Right to Proceed. Within the plat or land to be platted, the Developer may not grade or otherwise disturb the earth, remove trees, construct sewer lines, water lines, streets, utilities, public or private improvements, or any buildings until all the following conditions have been satisfied: 1) this agreement has been fully executed by both parties and filed with the City Clerk, 2) the necessary security and fees have been received by the City, 3) the plat has been recorded with the County Recorder's Office or Registrar of Title's Office of the County where the plat is located, and 4) the City Engineer has issued a letter that the foregoing conditions have been satisfied and then the Developer may proceed. 2. Phased Development. If the plat is a phase of a multiphased preliminary plat, the City may refuse to approve final plats of subsequent phases if the Developer has breached this Contract and the breach has riot been remedied. Development of subsequent phases may not proceed until Development Contracts for such phases are approved by the City. Park charges and area charges for sewer and water referred to in this Contract are not being imposed on outlots, if any, in the plat that are designated in an approved preliminary plat for future subdivision into lots and blocks. Such charges will be calculated and imposed when the outlots are final platted into lots and blocks. 3. Preliminary Plat Status. If the plat is a phase of a multi -phased preliminary plat, the preliminary plat approval for all phases not final platted shall lapse and be void unless final platted into lots and blocks, not outlots, within two (2) years after preliminary plat approval. 4. Changes in Official Controls. For two (2) years from the date of this Contract, no amendments to the City's Comprehensive Plan, except an amendment placing the plat in the current urban service area, or official controls shall apply to or affect the use, development density, lot size, lot layout or dedications of the approved plat unless required by state or federal law or agreed to in writing by the City and the Developer. Thereafter, notwithstanding anything in this Contract to the contrary, to the ftrll extent permitted by state law the City may require compliance with any amendments to the City's Comprehensive Plan, official controls, platting or dedication requirements enacted after the date of this Contract. 5. Improvements. The improvements specified in the Special Provisions of this Contract shall be installed in accordance with City standards, ordinances, and plans and specifications which have been prepared and signed by a competent registered professional engineer furnished to the City and approved by the City Engineer. The Developer shall obtain all necessary permits the the ivietropoiitan Council Environmental Services and other pertinent agencies before proceeding 205909v2 GC- with construction. The City will, at the Developer's expense, have one or more construction inspectors and a soil engineer inspect the work on a full or part-time basis. The Developer shall also provide a qualified inspector to perform site inspections on a daily basis. Inspector qualifications shall be submitted in writing to the City Engineer. The Developer shall instruct its project engineer/inspector to respond to questions from the City Inspector(s) and to make periodic site visits to satisfy that the construction is being performed to an acceptable level of quality in accordance with the engineer's design. The Developer or his engineer shall schedule a preconstruction meeting at a mutually agreeable time at the City Council chambers with all parties concerned, including the City staff, to review the program for the construction work. 6. Iron Monuments. Before the security for the completion of utilities is released, all monuments must be correctly placed in the ground in accordance with Minn. Stat. § 505.02, Subd. 1. The Developer's surveyor shall submit a written notice to the City certifying that the monuments have been installed. 7. License. The Developer hereby grants the City, its agents, employees, officers and contractors a license to enter the plat to perform all work and inspections deemed appropriate by the City in conjunction with plat development. 8. Site Erosion and Sediment Control. Before the site is rough graded, and before any utility construction is commenced or building permits are issued, the erosion and sediment control plan, Plan B, shall be implemented, inspected, and approved by the City. The City may impose additional erosion and sediment control requirements if they would be beneficial. All areas disturbed by the excavation and backfilling operations shall be reseeded forthwith after the completion of the work in that area. Except as otherwise provided in the erosion and sediment control plan, seed shall be certified seed to provide a temporary ground cover as rapidly as possible. All seeded areas shall be fertilized, mulched, and disc anchored as necessary for seed retention. The parties recognize that time is of the essence in controlling erosion and sediment transport. If the Developer does not comply with the erosion and sediment control plan and schedule of supplementary instructions received fi-om the City, the City may take such action as it deems appropriate to control erosion and sediment transport at the Developer's expense. The City will endeavor to notify the Developer in advance of any proposed action, but failure of the City to do so will not affect the Developer's and City's rights or obligations hereunder. No development will be allowed and no building permits will be issued unless the plat is in full compliance with the erosion and sediment control requirements. Erosion and sediment control needs to be maintained until vegetative cover has been restored, even if construction has been completed and accepted. After the site has been stabilized to where, in the opinion of the City, there is no longer a need for erosion and sediment control, the City will authorize the removal of the erosion and sediment control, i.e. hay bales and silt fence. The Developer shall remove and dispose of the erosion and sediment control measures. 8a. Erosion Control During Construction of a Dwelling or Other Building. Before a building permit is issued for construction of a dwelling or other building on a lot, a $500.00 cash escrow or letter of credit per lot shall also be furnished to the City to guarantee compliance with City Code § 7-22. 205909v2 GC.', -2 9. Clean up. The Developer shall maintain a neat and orderly work site and shall daily clean, on and off site, dirt and debris, including blowables, from streets and the surrounding area that has resulted from construction work by the Developer, its agents or assigns. 10. Acceptance and Ownership of Improvements. Upon completion and acceptance by the City of the work and construction required by this Contract, the improvements lying within public easements shall become City property. After completion of the improvements, a representative of the contractor, and a representative of the Developer's engineer will make a final inspection of the work with the City Engineer. Before the City accepts the improvements, the City Engineer shall be satisfied that all work is satisfactorily completed in accordance with the approved plans and specifications and the Developer and his engineer shall submit a written statement to the Citv Engineer certifying that the project has been completed in accordance with the approved plans and specifications. The appropriate contractor waivers shall also be provided. Final acceptance of the public improvements shall be by City Council resolution. 11. Claims. In the event that the City receives claims from laborers, materialmen, or others that work required by this Contract has been performed, the sums due them have not been paid, and the laborers, materialmen, or others are seeking payment out of the financial guarantees posted with the City, and if the claims are not resolved at least ninety (90) days before the security required by this Contract will expire, the Developer hereby authorizes the City to commence an interpleader action pursuant to Rule 22, Minnesota Rules of Civil Procedure for the District Courts, to draw upon the letters of credit in an amount up to 125% of the claim(s) and deposit the funds in compliance with the Rule, and upon such deposit, the Developer shall release, discharge, and dismiss the City from any further proceedings as it pertains to the letters of credit deposited with the District Court, except that the Court shall retain jurisdiction to determine attorneys' fees. 12. Park Dedication. The Developer shall pay full park dedication fees in conjunction with the installation of the plat improvements. The park dedication fees shall be the current amount in force at the time of final platting pursuant to Chanhassen City Ordinances and City Council resolutions. 13. Landscaping. Landscaping shall be installed in accordance with Plan D. Unless otherwise approved by the City, trees not listed in the City's approved tree list are prohibited. The minimum tree size shall be two and one-half (2'/z) inches caliper, either bare root in season, or balled and burlapped. The trees may not be planted in the boulevard (area between curb and property line). In addition to any sod required as a part of the erosion and sediment control plan, Plan B, the Developer or lot purchaser shall sod the boulevard area and all drainage ways on each lot utilizing a minimum of six (6) inches of topsoil as a base. Seed or sod shall also be placed on all disturbed areas of the lot. If these improvements are not in place at the time a certificate of occupancy is requested, a financial guarantee of $750.00 in the form of cash or letter of credit shall be provided to the City. These conditions must then be complied with within two (2) months after the certificate of occupancy issued, except that if the certificate of occupancy is issued between October 1 through May l these conditions must be complied with by the following July 1 st. Upon expiration of the time period, 205909v2 GG 3 inspections will be conducted by City staff to verify satisfactory completion of all conditions. City staff will conduct inspections of incomplete items with a $50.00 inspection fee deducted from the escrow fund for each inspection. After satisfactory inspection, the financial guarantee shall be returned. If the requirements are not satisfied, the City may use the security to satisfy the requirements. The City may also use the escrowed funds for maintenance of erosion control pursuant to City Code Section 7-22 or to satisfy any other requirements of this Contract or of City ordinances. These requirements supplement, but do not replace, specific landscaping conditions that may have been required by the City Council for project approval. 14. Warranty. The Developer warrants all improvements required to be constructed by it pursuant to this Contract against poor material and faulty workmanship. The Developer shall submit either 1) a warranty/maintenance bond for 100% of the cost of the improvement, or 2) a letter of credit for twenty-five percent (25%) of the amount of the original cost of the improvements. A. The required warranty period for materials and workmanship for the utility contractor installing public sewer and water mains shall be two (2) years from the date of final written Citv acceptance of the work. B. The required warranty period for all work relating to street construction, including concrete curb and gutter, sidewalks and trails, materials and equipment shall be subject to two (2) years from the date of final written acceptance. C. The required warranty period for sod, trees, and landscaping is one full growing season following acceptance by the City. 15. Lot Plans. Prior to the issuance of building permits, an acceptable Grading, Drainage, Erosion Control including silt fences, and Tree Removal Plan shall be submitted for each lot for review and approval by the City Engineer. Each plan shall assure that drainage is maintained away from buildings and that tree removal is consistent with development plans and City Ordinance. 16. Existing Assessments. Any existing assessments against the plat will be re -spread against the plat in accordance with City standards. 17. Hook-up Charges. . At the time of final plat approval the Developer shall pay 30% of the City Sewer Hook-up charge and 30% of the City Water hook up charge for each lot in the plat in the amount specified in Special Provision, Paragraph 8, of this Development Contract. The balance of the hook-up charges is collected at the time building permits are issued are based on 70% of the rates then in effect, unless a written request is made to assess the costs over a four year teen at the rates in effect at time of application. 18. Public Street Lighting. The Developer shall have installed and pay for public street lights in accordance with City standards. The public street lights shall be accepted for City ownership and maintenance at the same time that the public street is accepted for ownership and maintenance. A plan shall be submitted for the City Engineer's approval prior to the installation. Before the City 205909v2 GC -4 signs the final plat, the Developer shall pay the City a tee of $300.00 for each street light installed in the plat. The fee shall be used by the City for furnishing electricity and maintaining each public street light for twenty (20) months. 19. Signage. All street signs, traffic signs, and wetland montlnentation required by the City as a part of the plat shall be furnished and installed by the City at the sole expense of the Developer. 20. House Pads. The Developer shall promptly furnish the City "as -built" plans indicating the amount, type and limits of fill on any house pad location. 21. Responsibility for Costs. A. The Developer shall pay an administrative fee in conjunction with the installation of the plat improvements. This fee is to cover the cost of City Staff time and overhead for items such as review of construction documents, preparation of the Development Contract, monitoring construction progress, processing pay requests, processing security reductions, and final acceptance of improvements. This fee does not cover the City's cost for construction inspections. The fee shall be calculated as follows: i) if the cost of the construction of public improvements is less than $500,000, three percent (3%) of construction costs; ii) if the cost of the construction of public improvements is between $500,000 and $1,000,000, three percent (3%) of construction costs for the first $500,000 and two percent (2%) of construction costs over $500,000; iii) if the cost of the construction of public improvements is over $1,000,000, two and one-half percent (2'/z%) of construction costs for the first $1,0()0,000 and one and one-half percent (1 %i%) of construction costs over $1,000,000. Before the City signs the final plat, the Developer shall deposit with the City a fee based upon construction estimates. After constriction is completed, the final fee shall be determined based upon actual construction costs. The cost of public improvements is defined in paragraph 6 of the Special Provisions. B. In addition to the administrative fee, the Developer shall reimburse the City for all costs incurred by the City for providing construction and erosion and sediment control inspections. This cost will be periodically billed directly to the Developer based on the actual progress of the construction. Payment shall be due in accordance with Article 21 F., of this Agreement. C. The Developer shall hold the City and its officers and employees harmless from claims made by itself and third parties for damages sustained or costs incurred resulting from plat approval and development. The Developer shall indemnify the City and its officers and employees 205909v2 GC -5 for all costs, damages, or expenses which the City may pay or incur in consequence of such claims, including attorneys' fees. D. In addition to the administrative fee, the Developer shall reimburse the City for costs incurred in the enforcement of this Contract, including engineering and attorneys' fees. E. The Developer shall pay in full all bills submitted to it by the City for obligations incurred under this Contract within thirty (30) days after receipt. If the bills are not paid on time, the City may halt all plat development work and construction, including but not limited to the issuance of building permits for lots which the Developer may or may not have sold, until the bills are paid in full. Bills not paid within thirty (30) days shall accrue interest at the rate of 8% per year. F. In addition to the charges and special assessments referred to herein, other charges and special assessments may be imposed such as, but not limited to, sewer availability charges ("SAC"), City water connection charges, City sewer connection charges, and building permit fees. G. Private Utilities. The Developer shall have installed and pay for the installation of electrical, natural gas, telephone, and cable television service in conjunction with the overall development improvements. These services shall be provided in accordance with each of the respective franchise agreements held with the City. H. 'Ile developer shall pay the City a five established by City Council resolution, to reimburse the City for the cost of updating the City's base maps, GIS data base files, and converting the plat and record drawings into an electronic for-nat. Record drawings must be submitted within four months of filial acceptance of public utilities. All digital information submitted to the City shall be in the Carver County Coordinate system. 22. Developer's Default. In the event of default by the Developer as to any of the work to be performed by it hereunder, the City may, at its option, perform the work and the Developer shall promptly reimburse the City for any expense incurred by the City, provided the Developer is first given notice of the work in default, not less than four (4) days in advance. This Contract is a license for the City to act, and it shall not be necessary for the City to seek a Court order for permission to enter the land. When the City does any such work, the City may, in addition to its other remedies, assess the cost in whole or in part. 23. Miscellaneous. A. Construction Trailers. Placement of on-site construction trailers and temporary job site offices shall be approved by the City Engineer as a part of the pre -construction meeting for installation of public improvements. Trailers shall be removed from the subject property within thirty (30) days following the acceptance of the public improvements unless otherwise approved by the City Engineer. B. Postal Service. The Developer shall provide for the maintenance of postal service in accordance wirn the local Postmasters request. 2059092 GC- 6 C. Third Parties. Third parties shall have no recourse against the City under this Contract. The City is not a guarantor of the Developer's obligations under this Contract. The City shall have no responsibility or liability to lot purchasers or others for the City's failure to enforce this Contract or for allowing deviations from it. D. Breach of Contract. Breach of the terms of this Contract by the Developer shall be grounds for denial of building permits, including lots sold to third parties. The City may also issue a stop work order halting all plat development until the breach has been cured and the City has received satisfactory assurance that the breach will not reoccur. E. Severability. If any portion, section, subsection, sentence, clause, paragraph, or phrase of this Contract is for any reason held invalid, such decision shall not affect the validity of the remaining portion of this Contract. F. Building Permits. Building permits will not be issued in the plat until sanitary sewer, watermain, and storm sewer have been installed, tested, and accepted by the City, and the streets needed for access have been paved with a bituminous surface and the site graded and revegetated in accordance with Plan B of the development plans. G. Waivers/Amendments. The action or inaction of the City shall not constitute a waiver or amendment to the provisions of this Contract. To be binding, amendments or waivers shall be in writing, signed by the parties and approved by written resolution of the City Council. The City's failure to promptly take legal action to enforce this Contract shall not be a waiver or release. H. Release. This Contract shall run with the land and may be recorded against the title to the property. After the Developer has completed the work required of it under this Contract, at the Developer's request the City Manager will issue a Certificate of Compliance. Prior to the issuance of such a certificate, individual lot owners may make as written request for a certificate applicable to an individual lot allowing a minimum of ten (10) days for processing. I. Insurance. Developer shall take out and maintain until six (6) months after the City has accepted the public improvements, public liability and property damage insurance covering personal injury, including death, and claims for property damage which may arise out of Developer's work or the work of its subcontractors or by one directly or indirectly employed by any of them. Limits for bodily injury and death shall be not less than $500,000 for one person and $1,000,000 for each occurrence; limits for property damage shall be not less than $500,000 for each occurrence; or a combination single limit policy of $1,000,000 or more. The City shall be named as an additional insured on the policy, and the Developer shall file with the City a certificate evidencing coverage prior to the City signing the plat. The certificate shall provide that the City must be given ten (10) days advance written notice of the cancellation of the insurance. The certificate may not contain any disclaimer for failure to give the required notice. 2059092 GC -'7 J. Remedies. Each right, power or remedy herein conferred upon the City is cumulative and in addition to every other right, power or remedy, expressed or implied, now or h hereafter arising, available to City, at law or in equity, or under any other agreement, and each and every right, power and remedy herein set fortor otherwise so existing may be exercised from time to time as often and in such order as may be deemed expedient by the City and shall not be a waiver of the right to exercise at any time thereafter any other right, power or remedy. K. Assi iabiliit. The Developer may not assign this Contract without the written permission of the City Council. The Developer's obligation hereunder shall continue in full force and effect even if the Developer sells one or more lots, the entire plat, or any part of it. L. Construction Hours. Construction hours, including pick-up and deliveries of material and equipment and the operation of any internal combustion engine, may only occur from 7:00 a.m. to 6:00 p.m. on weekdays, from 9:00 a.m. to 5:00 p.m. on Saturdays with no such activity allowed on Sundays or on legal holidays. Contractors must require their subcontractors, agents and supplies to comply with these requirements and the Contractor is responsible for their failure to do so. Under emergency conditions, this limitation may be waived by the written consent of the City Engineer. If construction occurs outside of the permitted construction hours, the Contractor shall pay the following administrative penalties: First viclation -)VV.00 Second violation $ 1,000.00 Third & subsequent violations All site development and construction must cease for seven (7) calendar days M. Noise Amplification. The use of outdoor loudspeakers, bullhorns, intercoms, and similar devices is prohibited in conjunction with the construction of homes, buildings, and the improvements required under this contract. The administrative penalty for violation of construction hours shall also apply to violation of the provisions in this paragraph. N. Access. All access to the plat prior to the City accepting the roadway improvements shall be the responsibility of the Developer regardless if the City has issued building permits or occupancy permits for lots within the plat. O. Street Maintenance. The Developer shall be responsible for all street maintenance until streets within the plat are accepted by the City. Warning signs shall be placed by the Developer when hazards develop in streets to prevent the public from traveling on same and directing attention to detours. If streets become impassable, the City may order that such streets shall be barricaded and closed. The Developer shall maintain a smooth roadway surface and provide proper surface drainage. The Developer may request, in writing, that the City plow snow on the streets prior to final acceptance of the streets. The City shall have complete discretion to approve or reject the request. The City shall not be responsible for reshaping or damage to the street base or utilities because of snow plowing operations. The provision of City snow plowing service does not constitute final acceptance of the streets by the City. 205909v2 GC -8 P. Storm Sewer Maintenance. The Developer shall be responsible for cleaning and maintenance of the storm sewer system (including ponds, pipes, catch basins, culverts and swales) within the plat and the adjacent off-site storm sewer system that receives storm water from the plat. The Developer shall follow all instructions it receives from the City concerning the cleaning and maintenance of the storm sewer system. The Developer's obligations under this paragraph shall end two (2) years after the public street and storm drainage improvements in the plat have been accepted by the City. Twenty percent (20%) of the storm sewer costs, shown under section 6 of the special provisions of this contract, will be held by the City for the duration of the 2 -year maintenance period. Q. Soil Treatment Systems. If soil treatment systems are required, the Developer shall clearly identify in the field and protect from alteration, unless suitable alternative sites are first provided, the two soil treatment sites identified during the platting process for each lot. This shall be done prior to the issuance of a Grading Permit. Any violation/disturbance of these sites shall render them as unacceptable and replacement sites will need to be located for each violated site in order to obtain a building permit. R. Variances. By approving the plat, the Developer represents that all lots in the plat are buildable without the need for variances from the City's ordinances. S. Cornpliance with Laws Ordinances and Regulations. In the development of the plat the Developer shall comply with all laws, ordinances, and regulations of the following authorities: 1. City of Chanhassen; 2. State of Minnesota, its agencies, departments and commissions; 3. United States Army Corps of Engineers; 4. Watershed llistrict(s); 5. Metropolitan Government, its agencies, departments and commissions. T. Proof of Title. Upon request, the Developer shall furnish the City with evidence satisfactory to the City that it has the authority of the fee owners and contract for deed purchasers to enter into this Development Contract. U. Soil Conditions. The Developer acknowledges that the City makes no representations or warranties as to the condition of the soils on the property or its fitness for construction of the improvements or any other purpose for which the Developer may make use of such property. The Developer further agrees that it will indemnity, defend, and hold harmless the City, its governing body members, officers, and employees from any claims or actions arising out of the presence, if any, of hazardous wastes or pollutants on the property, unless hazardous wastes or pollutants were caused to be there by the City. V. Soil Correction. The Developer shall be responsible for soil correction work on the property. The City makes no representation to the Developer concerning the nature of suitability of soils nor the cost of correcting any unsuitable soil conditions which may exist. On lots which have 205909v2 GC -9 no fill material a soils report from a qualified soils engineer is not required unless the City's building inspection department determines from observation that there may be a soils problem. On lots with fill material that have been mass graded as part of a multi -lot grading project, a satisfactory soils report from a qualified soils engineer shall be provided before the City issues a building permit for the lot. On lots with fill material that have been custom graded, a satisfactory soils report from a qualified soils engineer shall be provided before the City inspects the foundation for a building on the lot. W. Haul Routes. The Developer, the Developer's contractors or subcontractors must submit proposed haul routes for the import or export of soil, construction material, construction equipment or construction debris, or any other purpose. All haul routes must be approved by the City Engineer X. Development Signs. The Developer shall post a six foot by eight foot development sign in accordance with City Detail Plate No. 5313 at each entrance to the project. The sign shall be in place before construction of the required improvements commences and shall be removed when the required improvements are completed, except for the final lift of asphalt on streets. The sips shall contain the following information: project name, name of developer, developer's telephone number and designated contact person, allowed construction hours. Y. Construction Plans. l�pon final plat approval, the developer shall provide the City with two complete sets of frill -size construction, plans and four sets of i I"x17" reduced construction plan sets and three sets of specifications. Within four months after the completion of the utility improvements and base course pavement and before the security is released, the Developer shall supply the City with the following: (1) a complete set of reproducible Mylar as -built plans, (2) two complete full-size sets of blue line/paper as -built plans, (3) two complete sets of utility tie sheets, (4) location of buried fabric used for soil stabilization, (5) location stationing and swing ties of all utility stubs including draintile clearouts, (6) bench mark network, (7) digital file of as -built plans in both .dxf & .tif format (the .dxf file must be tied to the current county coordinate system), (8) digital file of utility tie sheets in either .doc or .tif format, and (9) a breakdown of lineal footage of all utilities installed, including the per lineal foot bid price. The Developer is required to submit the final plat in electronic format. Z. As -Built Lot Surveys. An as -built lot survey will be required on all lots prior to the Certificate of Occupancy being issued. The as -built lot survey must be prepared, signed, and dated by a Registered Land Surveyor. Sod and the bituminous driveways must be installed before the as -built survey is completed. If the weather conditions at the time of the as -built are not conducive to paving the driveway and/or installing sod, a temporary Certificate of Occupancy may be issued and the as -built escrow withheld until all work is complete. Rev. 3/31/06 205909v2 GC -1 0