Loading...
Tenant PlanBELOW SLAB SANITARY WASTE BELOW SLAB TO FUTURE FLAMMABLE WASTE TRAP SANITARY WASTE CONNECTED TO EXISTING SANITARY BELOW PARKING AREA BELOW SLAB FUTURE FLAMMABLE WASTE TRAP NORTHTRUE NORTHTWO STORY OFFICE WD FR. 24’ ROOF BOILER RM 3 2 1 office t t break rm m open dock w/ roof canopy ramp5 PP PP 4 1 1.4 2 2.5 3 4 5 6 9 10 11 12 40’-2”40’-2”40’-0”16’-0”15’-1”14’-11 14’-6”10’-3” RECEIVINGWAREHOUSE 17’-4” conc plank clg 2’-0”12’-2” SHIPPING WAREHOUSE STORAGE 1’-0”1’-0”1’-0” 13’-0” 25’-0”25’-0”25’-0”25’-0”25’-0”25’-0”8-4x10-9roll-up8-4x10-9roll-up18’-3”15’-0”22’-0”7-11 x 8-69’-1”15’-11” 25’-0” 1’-10” 25’-0” 16’-11” 30’-0”29’-0” 25’-0”20’-0”25’-0”8” 25’-0”19’-11” 7 8 13 14 8”20’-1”18’-4”18’-7”18’-4”8-0x8-0 O.H.DR. 201’-10” 329’-4”8-0x8-2M.O.8-0x8-0O.H.DR.25’-0” 100’-6” 25’-0”25’-0”25’-0” ”30’-0”30’-0”30’-0”30’-0”8’-1” 26’-6”152’-0”8-0x8-0 O.H.DR.DNUP14’-5”12’-1”5R 13R 8-0x8-0 O.H.DR. 20’-4”19’-3”20’-0” 101’-8” RIVER VALLEY BUSINESS CENTER CHANHASSEN, MN 20'0'20'60'40'80'100' 8-0x8-0 K.O. PANEL SLOPED ROOF 12’ - 17’11’-0”28’-8” 9’-10”EXPANSION POINT4” METAL FRAMED WALLS TO ROOF DECK W/ 5/8” GYP BD EACH SIDE SEED CLEANING 30’-2”TENANT PLAN 270’-0”59’-8”29’-6”28’-10”123’-9”22’-0”OIL CRUSHING PROCESS PROTEIN MILLING SERVICE SINK TRENCH BOT.SLOPE 1/8” / 1’-0” TRENCH BOT.SLOPE 1/8” / 1’-0” TRENCH DRAIN TO SANITARY WASTE BELOW SLAB TO FUTURE FLAMMABLE WASTE TRAP 8”FLR SLAB SLOPE 1/8” / 1’-0”FLR SLAB SLOPE 1/8” / 1’-0”TRENCH BOT.SLOPE 1/8” / 1’-0” TRENCH DRAIN 10’-0”10’-0”42’-0”57’-0”57’-0”42’-0” TRENCH DRAIN TO SANITARY WASTE BELOW SLAB TO FUTURE FLAMMABLE WASTE TRAP TRENCH BOT.SLOPE 1/8” / 1’-0”FLR SLAB SLOPE 1/8” / 1’-0”FLR SLAB SLOPE 1/8” / 1’-0”TRENCH BOT.SLOPE 1/8” / 1’-0” TRENCH BOT.SLOPE 1/8” / 1’-0” TRENCH DRAIN8”P1 P1 P2 P1 P13-0 x 7-0MET DRMET FR6-0 x 7-0 PRMET DRMET FR3-0 x 7-0MET DRMET FR55’ X 18’ X 6” REINFORCED CONC SLAB 5’ X 10’ X 4” REINFORCED CONC SLAB 4’-0”9’-0”5’-0”8’-0”8’-0”18’-0”18’-0”6’-0”OUTDOOR BULK STORAGE TANKS BY TENANT, 6- 16’ DIA X 35’ ABOVE GRADE ON CONC SLAB.3-0 x 7-0INSUL. MET DRMET FR40’-0”40’-0”10’-0”10’-0”10’-0”10’-0”1:7 SLOPE RAMP TO GRADE152’-0”8-0x16-0O.H.DR.6 A3 2 A4 RIVER VALLEY BUSINESS CENTER2100 STOUGHTON AVENUECHANHASSEN, MNMARCH 6, 2020 TENANT PLANtenant proposal for:HEMP ACRESSTOUGHTON AVENUE VENTURES102 JOHNATHAN BOULEVARDCHASKA, MN9116 34th avenue northminneapolis, mn 55427 763-545-1072architectPHILLIP D. JOHNSONPHILLIP D. JOHNSONAPRIL 4, 2020TENANT PLAN MAY 8, 2020 2 A3 2 A3PROJECT OPEN DOCK WITH ROOF CANOPY PROPOSED FOR DEMOLITION OPEN DOCK WITH ROOF CANOPY PROPOSED FOR DEMOLITION 4’-0”9’-0”5’-0”8’-0”8’-0”18’-0”18’-0” EQUIPMENT PLATFORM ABOVE EQUIPMENT PLATFORM ABOVE EQUIPMENT PLATFORM ABOVEEQUIPMENT PLATFORM ABOVEPROCESSING 20,000 SQ FT WAREHOUSE 27,355 SQ FT OFFICE 2,805 SQ FT 50,160 SQ FT MILLING PROCESS HEMP MILKING PROCESS DEHULING PROCESS 15’-0”9’-4”9’-7”32’-3”4’-11” MECH 21’-1”11’-6”8’-10”55’-0” 5’-3” 60’-1” OFFOFF 96” SS. HAND WASH SINK REBUILD 2 WC COMPARTMENTS INTO 1 H.C. ACCESSIBLE COMPARTMENTDF DS ELECTRICAL TRANSFORMERS CONC STOOP DS 100’-0” 96’-0” 1:20 SLOPE 1:20 SLOPE 4’-4”4’-4”5’-0” 7 R @ 7” 6T @ 12” DS 98’-3”8’-8”HANDRAIL 3’-2”1’-4”7’-0” 5”7”6”6”6” 5’-0”8’-6”8’-0”8’-0” 44’-6” 29’-6”