CUP 1 GED 4' Hemp W CoverTWO STORY OFFICE
WD FR. 24’ ROOF
BOILER RM
3 2 1
office t t break rm
m
open dock
w/ roof canopy
ramp5
PP
PP
4
20'0'20'60'40'80'100'
SITE PLAN
200'
TOTAL PROPERTY
1,019,800 SQ FT = 23.41 A
NORTH PROPERTY
457061 A = 10.49A = 44.8 %
SOUTH PROPERTY
561760 SQ FT = 12.90 A = 55.2%
= 30%
1.54A = 6.6%
.18A = .7%.33A = 1.4%
.22A = .9%
.57A = 2.4%102'75'82'90'53' TRAILER
53' TRAILER
Audubon Blvd
PROJECT
Stoughte
n
Ave.
PROJECT NORTHTRUE NORTH1 1.4 2 2.5 3 4 5 6 9 10 11
12
40’-2”40’-2”40’-0”1’-0”1’-0”1’-0”
13’-0”8-0x8-2M.O.8-0x8-0O.H.DR.16’-0”15’-1”14’-11
25’-0”25’-0”
17’-4”
conc plank
clg
25’-0”25’-0”25’-0”25’-0”8-4x10-9roll-up8-4x10-9roll-up18’-3”15’-0”22’-0”7-11 x 8-69’-1”15’-11”
25’-0”
1’-10”
14’-6”10’-3”
25’-0”
16’-11”
30’-0”29’-0”
25’-0”20’-0”25’-0”8”
25’-0”19’-11”
7 8
13 14
8”20’-1”18’-4”18’-7”18’-4”8-0x8-0
O.H.DR.
101’-8”
201’-10”127’-6”
329’-4”
25’-0”
100’-6”
25’-0”25’-0”
25’-0”
”30’-0”30’-0”30’-0”30’-0”OPEN DOCK WITH ROOF CANOPY
PROPOSED FOR DEMOLITION
101’-10”2’-0”12’-2”
8’-1”
9’-7”9’-7”32’-3”4’-11”
MECH
21’-1”11’-6”8’-10”26’-6”
8-0x8-0
O.H.DR.DNUP14’-5”12’-1”5R
13R
8-0x8-0
O.H.DR.
20’-4”19’-3”20’-0”
RIVER VALLEY BUSINESS CENTER
CHANHASSEN, MN
20'0'20'60'40'80'100'
55’-0”?
5’-3”
8-0x8-0
K.O. PANEL
60’-1”?
SLOPED ROOF
12’ - 17’11’-0”28’-8”
9’-10”EXPANSION POINT4” METAL FRAMED WALLS
TO ROOF DECK W/ 5/8”
GYP BD EACH SIDE
SEED CLEANING
OIL CRUSHING PROCESS
MILLING PROCESS HEMP MILKING PROCESSDEHULING PROCESS
BELOW SLAB PIPE TO
NEW FLAMMABLE
WASTE TRAP
TRENCH DRAIN
TO FLAMMABLE
WASTE TRAP
OUTDOOR BULK STOARAGE TANKS,
6- 16’ DIA X 35’ ABOVE GRADE
FLR SLAB SLOPE 1/8” / 1’-0”FLR SLAB SLOPE 1/8” / 1’-0”30’-2”10’-0”10’-0”8”10’-0”10’-0”50’-0”65’-0”65’-0”50’-0”
TRENCH DRAIN
TRENCH BOT.SLOPE
1/8” / 1’-0”
TRENCH BOT.SLOPE
1/8” / 1’-0”
TRENCH BOT.SLOPE
1/8” / 1’-0”RIVER VALLEY BUSINESS CENTER2100 STOUGHTON AVENUECHANHASSEN, MNMARCH 6, 2020
A1TENANT PLANtenant proposal for:HEMP ACRESSTOUGHTON AVENUE VENTURES102 JOHNATHAN BOULEVARDCHASKA, MNJUNE 5, 2020
TENANT PLAN
270’-0”59’-8”29’-6”28’-10”123’-9”22’-0”STORAGE
WAREHOUSE
RECEIVING SHIPPING
OFFOFF
WAREHOUSE
P1 P1 P2 P1 P1
FOR PLUMBING AND
CONCRETE REFERENCE
96” SS. HAND WASH SINK
4 FAUCETS REBUILD 2 WC COMPARTMENTS INTO
1 H.C.ACCESSIBLE COMPARTMENTDF
SS HAND SINK
SUMPPUMP
SERVICE SINK
P1P1P1P2P1P1
2015 Minnesota Building Code, 2015 Minnesota Accessibility Code
Original construction; Building section 4: 1963
Construction: Type II A, 1 hr fire resistance with fire sprinkler system installed. 1 hour separation
fire doors from adjacent heavy wood frame construction. These doors to be
secured in closed position.
Primary structural frame:
Concrete columns and beams supporting roof only.
Bearing walls: Exterior structural walls,12” cmu
Interior structural walls, None
Roof: concrete beams and prestressed concrete plank @ 17’-0”
2800 sq ft office and restroom area: (office only = 1900 sq ft)
Bearing walls: Exterior,12” cmu req’d 1 hr,
Interior structural walls, None
Roof: steel bar joists and roof deck w/ suspended acoustical tile ceiling
PROPOSED TENANT:
Hemp acres is a hemp processor, making consumable food product from the hemp seed. The
seed is brought to the site in grain trucks, sent into storage bins then brought into the building
by conveyors and processed by removing the shell, squeezing out the oils and further processing
the shell for additional products.
Allowable area:
Occupancy F-1: 25,000 sq ft.:, height 4 stories
1 story building
Area increase 2015 MBC Section 506 Increase to 112,000 sq ft
Sprinklered building - 3x allowable area
Building open on 2 sides
Occupancy: F-1, Hemp Products
Processing 20,000 Sq Ft (F-1), 39.9% @ 1/200 = 100 occupants
Warehouse 27,355 (S-1), 54.5% @ 1/500 = 55 occupants
Office & RR 2,805 Sq Ft (B) incidental less than 5.6% @ 1/100 = 28 occupants
(office only = 1900 sq ft @ 1/100 = 19 occupants)
Non separated ocupancies
Open space between F-1, S-2 occupancies. Non rated separation between
S-2 and B occupancies, B is accessory to other occupancies.
Exits: Common path of egress MBC table 1014.3 - 100 feet, Greatest common path - 100 FEET
Exit access travel distance MBC 1016.2 - 250 feet. Real travel distance to exit - 240 feet
plumbing fixtures:
processing W.C. 1/100 =1 W.C. LAV. 1/100 =1 lav DF 1/400 = .25
warehouse W.C. 1/100 =.55 W.C. LAV. 1/100 =.55 lav DF 1/1000 = .055
offices only W.C. 1/25 =.76 W.C. LAV. 1/40 =.48 lav DF 1/100 = .19
total req’d 2.31w.c. req’d 2.03 lav req’d .495 df 1 service sink
TOTAL PLBG FIXT IN REMODELING
6 W.C., 2 URINALS 7 LAV 1 DF 1 SERVICE SINK
IN PRODUCTION AREA 4-HAND SINK, 1-3 COMP SINK
HANDICAP RESTROOM FACILITIES AND EXIT ARE PROVIDED.
CHASKA
COMMON PATH OF EXIT
COVERED
PLATFORM
DS
100’-0”
96’-0”
FROST FOOTING
1:20 SLOPE
1:20 SLOPE
47’-6”
32’-6”4’-6”4’-6”5’-0”
7 R @ 7”6T @ 12”
DS
98’-3”10’-0”53' TRAILER
53' TRAILER
8-0x16-0O.H.DR.9116 34th avenue northminneapolis, mn 55427 763-545-1072architectPHILLIP D. JOHNSONPHILLIP D. JOHNSONJUNE 5, 2020COVER
COVERED DOCK
TO BE REMOVED
ARIEL PHOTO OF EXISTING BUILDING
LOCATION PLAN
EQUIPMENT PLATFORM ABOVE
EQUIPMENT PLATFORM ABOVE EQUIPMENT PLATFORM ABOVEEQUIPMENT PLATFORM ABOVESEED CLEANING
OIL CRUSHING PROCESS
MILLING PROCESS HEMP MILKING PROCESSDEHULING PROCESS
PROCESSING
20,000 SQ FT
WAREHOUSE
27,355 SQ FT
OFFICE
2,805 SQ FT
50,160 SQ FT