Loading...
CUP 3-4GED 4' hemp W det18" VERT GRAB BAR 42" GRAB BAR 1'-0" 3'-4" 6’-5” VERIFY 36" TO TOPOF BAR18"4"SIDE WALL T.P. DISP. OPEN TOILET PARTITION TO MATCH EXISTING. 5" WOMENS ROOM H.C. COMPARTMENT ELEV 1/4" = 1'-0" 4’-6” EXISTING WALL FINISH TO REMAIN. TOUCH UP AS NECESSARY FIXTURE WALL 36" GRAB BAR 6" 1’-6” VERIFY EXISTING TOILET PARTITION TO REMAIN. REMOVE TOILET PARTITION. 5’-0” VERIFY SIDE WALL TOILET PARTITIONS AND DOOR TO MATCH EXISTING. EXISTING PARTITION AND SUPPORTS 1’-10” 7 A3 4’-6” FIXTURE WALL 1’-6” VERIFY EXISTING TOILET PARTITION TO REMAIN. REMOVE TOILET PARTITION. NEW TOILET PARTITION PANELS AND DOOR TO MATCH EXISTING. 7 A3 18" VERT GRAB BAR 42" GRAB BAR 1'-0" 3'-4" MENS ROOM H.C. COMPARTMENT ELEV 1/4" = 1'-0" 4’-6” EXISTING WALL FINISH TO REMAIN. TOUCH UP AS NECESSARY FIXTURE WALL 5’-3” VERIFY 36" GRAB BAR 6"36" TO TOPOF BAR18"4"SIDE WALL 1’-6” VERIFY EXISTING TOILET PARTITION TO REMAIN. REMOVE TOILET PARTITION. T.P. DISP. OPEN 5"5’-0” VERIFYSIDE WALL TOILET PARTITIONS AND DOOR TO MATCH EXISTING. EXISTING PARTITION AND SUPPORTS 1’-10” 8 A3 15’-0”9’-7”9’-7”32’-3”4’-11” MECH 21’-1”11’-6”8’-10”55’-0” 5’-3” 60’-1” OFFOFF REBUILD 2 WC COMPARTMENTS INTO 1 H.C. ACCESSIBLE COMPARTMENTDF ELECTRICAL TRANSFORMERS STEEL FRAMED STOOP W/ STEEL DECK DS DSDS 8-0x10-0O.H.DR.100’-0”96’-3” 1:20 SLOPE 1:20 SLOPE 44’-6” 29’-6”4’-4”4’-4”5’-0” 6 R @ 7 1/2” 5T @ 12” 98’-3”8’-8”HANDRAIL 3’-2”1’-4”8’-0”5’-0”8’-6”8’-0” INSTALL ACESSIBLE DRINKING FOUNTAIN 15’-0”22’-0”8-4x10-9roll-up8-0x8-0 O.H.DR. 9’-7”9’-7”32’-3”4’-11” MECH 21’-1”11’-6”8’-10”55’-0” 5’-3” 60’-1” BREAK ROOMOFF DF DS DS 8-0x8-0 O.H.DR. 8-0x8-0 O.H.DR. M. W.8-4x10-9roll-upEXISTING SE CORNER 1/16” = 1’-0” 12 13 1491011 4B 4A SE CORNER, OFFICE AND RESTROOM AREA 1/8” = 1’-0” 8” 25’-0”25’-0”25’-0”19’-11”25’-0”BUILDING STRUCTURAL BAY DIMENSIONS REMOVE ENTRANCE DOOR AND TRANSOM GLASS & FRAME ABOVE. BUILD CMU WALL TO 5” BELOW FLOOR AT EXT. WALL OPENING. FILL STAIR WITH CLASS V MATERIAL, COMPACT AND FINISH W/ 4” CONC FLOOR TO MATCH ELEVATION OF EXISTING BUILDING FLOOR. RESET ALUM. FRAME DOOR AT NEW FLOOR ELEVATION. STEEL FABRICATED H.C. ACCESS 4” CONC FILLED BOLLARDS-(3) 3’ INTO GROUND 4’ ABOVE GROUND 4” CONC FILLED BOLLARDS (3) ACCESSIBLE PARKING SIGN 100’-0”3’-2”4’-4”4’-4”3’-0”5’-6”2’-0”5’-8”EXISTING TRANSOM WINDOW HEAD EXISTING VESTIULE STAIRS REMOVE DOOR AT GRADE AND TRANSOM GLASS & FRAME ABOVE. BUILD CMU WALL TO 5” BELOW FLOOR. FILL STAIR WITH CLASS V MATERIAL, COMPACT AND FINISH W/ 4” CONC FLOOR TO MARCH ELEVATION OF EXISTING. RESET ALUM. FRAME DOOR AT NEW FLOOR ELEVATION. FRAME FOR TRANSOM TO EXISTING OPENING. 7’-6”4’-4” SECTION THRU ACCESSIBLE ENTRANCE 1/4” = 1’-0” SECTION THRU ENTRANCE STOOP 1/4” = 1’-0” DS DSDS SE CORNER, OFFICE ACCESSIBLE ENTRANCE 1/8” = 1’-0” NEW CONSTRUCTION 32’-3”4’-11” MECH 11’-6”8’-10”5’-3” OFFICE REMOVE CIRCULAR HAND SINK. INSTALL 7’-6” COUNTERTOP WITH THREE LAVATORIES. REMOVE ONE WATER CLOSET. REMOVE ONE DIVIDER PARTITION AND 2 DOORS. INSTALL GRAB BARS AND COMPARTMENT WALLS AND DOOR AS SHOWN. VERIFY WATER CLOSET LOCATION.6’-10”REMOVE ONE WATER CLOSET. REMOVE ONE DIVIDER PARTITION AND 2 DOORS. INSTALL GRAB BARS AND COMPARTMENT WALLS AND DOOR AS SHOWN. VERIFY WATER CLOSET LOCATION. MENS AND WOMENS RESTROMS ACCESSIBLE TOILET COMPARTMENTS 1/4” = 1’-0” C OF STOOP & DOORL 9’-6” REMOVE EXISTING CIRC SINK. INSTALL C’TOP W/ LAVS. WOMENS MENS EXISTING CMU WALL EXISTING WAREHOUSE CMU WALL BEYOND RIVER VALLEY BUSINESS CENTER2100 STOUGHTON AVENUECHANHASSEN, MNMARCH 6, 2020 A3TENANT PLANtenant proposal for:HEMP ACRESSTOUGHTON AVENUE VENTURES102 JOHNATHAN BOULEVARDCHASKA, MNDETAIL PLANS9116 34th avenue northminneapolis, mn 55427 763-545-1072architectPHILLIP D. JOHNSONPHILLIP D. JOHNSONJUNE 5, 20202 A3 3 A3 5 A3 4 A3 6 A3 4 A3 4 A3 1 A3 5 A3 6 A3 7 A3 6 A3 JUNE 5, 2020 HANDRAIL EXISTING WINDOW AC UNIT 96’-5” CONC. SHELF CAST TO SUPPORT STEEL BEAMS BITUMINUOUS OVERLAY BUILT UP TO ELEVATIONS SHOWN. TAPER BIT. TO EXISTING PAVEMENT STEEL BEAMS ON STEEL POSTS ELECTRICAL TRANSFORMERS BITUMINUOUS OVERLAY BUILT UP TO ELEVATIONS SHOWN CONC. CAST TO SUPPORT STEEL BEAMS 6” 8’-0”8”8’-0” 96’-3” VERIFY 96’-0”19’-0”4” WIRE MESH RAIL INFILL SEE RAIL AT EAST BUILDING ENTRANCE, MATCH METAL DECK ON “C” JOISTS AND STEEL FRAMING NOTE: FINAL DESIGN BY STEEL FABRICATOR ST. CHANNEL ANCHORED INTO CMU & CONC. FLR. EDGE METAL DECK ON STEEL FRAMING CONC. SHELF CAST TO SUPPORT STEEL BEAMS BITUMINOUS BEYOND 2” BLDG WALL METAL DECK ON STEEL FRAMING METAL DECK ON STEEL FRAMING STEEL BOLLARDS BEYOND EAST BLDG ENTRANCE 5’-0”35’-10” YELLOW PAINT STRIPING AND ACCESSIBLE SYMBOL NOTE: FINAL DESIGN BY STEEL FABRICATOR 5 A3 4 A3 20’-0”8-0x16-0O.H.DR.1 2 1’-0” 1.4 2.5 3 1’-0”30’-0”29’-0” 4” METAL FRAMED WALLS TO ROOF DECK W/ CORRUGATED STEEL FINISH EACH SIDE SEED CLEANING 30’-2”3-0 x 7-0MET DRMET FR6-0 x 7-0 PRMET DRMET FR3-0 x 7-0MET DRMET FR5’ X 10’ X 4” REINFORCED CONC SLAB. TENANT TO PROVIDE THICKNESS AND REINFORCING SPEC.FLR SLAB SLOPE 1/8” / 1’-0”FLR SLAB SLOPE 1/8” / 1’-0”10’-0”10’-0”10’-0”8”8”55’ X 18’ X 6” REINFORCED CONC SLAB. TENANT TO PROVIDE THICKNESS AND REINFORCING SPECIFICATION 4’-8”4’-8”25’-0” 4 EXISTING CMU EXTERIOR WALLS EXISTING CIP CONC COLUMNS EXISTING CMU EXTERIOR WALLS OPENINGS SIZED AND LOCATED IN EXTERIOR WALLS FOR TENANT PRODUCTION BY TENANT 3’-4”3’-4”5’-4”19’-0”10’-0”9’-8”3’-0”8’-8”17’-4”26’-8”3’-4” 4E 4F NW CORNER, SEED CLEANING ROOM 1/8” = 1’-0” EXISTING NW CORNER 1/16” = 1’-0” 1 21.4 2.5 3 4 4E 4F 1’-0”1’-0”30’-0”29’-0”30’-2”20’-0”25’-0” EXISTING CMU EXTERIOR WALLS EXISTING CIP CONC COLUMNS EXISTING CMU EXTERIOR WALLS 8-0x16-0O.H.DR.EXISTING CIP CONC COLUMNS 4G 20’-0”CONCRETE FLOOR ON EXISTING CONC. WITH SLOPE TO NEW TRENCH DRAINS. DR. HDWR. 1 1/2 BUTTS CLOSER LEVER LATCHET DR. HDWR. 1 1/2 BUTTS CLOSER LEVER LATCHET DR. HDWR. 1 1/2 BUTTS EACH DR CLOSER EACH DR DEADBOLT AT TOP COORDINATOR LEVER LATCHET21’-0””PROPOSED BINS BY TENANT RIVER VALLEY BUSINESS CENTER2100 STOUGHTON AVENUECHANHASSEN, MNMARCH 6, 2020 A4TENANT PLANtenant proposal for:HEMP ACRESSTOUGHTON AVENUE VENTURES102 JOHNATHAN BOULEVARDCHASKA, MN9116 34th avenue northminneapolis, mn 55427 763-545-1072architectPHILLIP D. JOHNSONPHILLIP D. JOHNSONJNE 5, 20202 A4 1 A4 JUNE 5, 2020 DETAIL PLANS AIR HANDLING COMPRESSORS ETC