Parking Analysis Planting PlanYELLOW PAINT STRIPINGAND ACCESSIBLE SYMBOL
24’-0”40’-6”16’-5”
179’-0”39’-8”80’-2”100’-7”40’-5”238’-0”26’-4”1’-0”34’-8”34’-8”34’-8”34’-8”34’-8”36’-4”1’-0”163’-4”
39’-4”1’-0”40’-0”40’-0”40’-0”3’-0”
163’-4”22’-0”127’-6”
office t
t
break rmm
101’-8”90’-10”61’-8”29’-9”13’-7”10’-7”ramp14’-0”10’-0”
PP
PP201’-10”152’-6”29’-6”268’-10”162’-0”179’-0”184’-2”329’-4”
1962
TIMBER FR/WD DECK
SPRINKLERED
22’ DECK
TWO STORY OFFICE
WD FR. 24’ ROOF
BOILER RM
13-4 X 11-8
PP
F
U
E
L
F
I
L
L
E
R
C
A
P
F
U
E
L
M
O
N
I
T
O
R
ELEC. TRANS.
TOWER
PP
BITUMINUOUS PVMT
BITUMINUOUS PVMTBITUMINUOUS PVMT
FENCEBITUMINUOUS PVMT
1984
CONC. FR/CONC. DECK
SPRINKLERED
24’ ROOF
60’-5”77’-0”ST. FR/ST. DECK
24’ ROOF
1962
ST. FR/ST. DECK
SPRINKLERED
21’ DECK
1962
ST. FR/ST. DECK
SPRINKLERED
21’ DECK
20'0'20'60'40'80'100'200'NORTHWAREHOUSE
2100 STOUGHTON AVENUE
CHANHASSEN, MN238’-0” ?TANK
39’ DIA
35’ HIGH
BITUMINUOUS PVMT
6-9 x 16-1053' TRAILER
ELECTRICAL TRANSFORMERS
COVERED PLATFORM
DS DS
100’-0”
96’-0”FROST FOOTING1:20 SLOPE
1:20 SLOPE
47’-6”
32’-6”4’-6”4’-6”5’-0”
7 R @ 7”6T @ 12”
DS
98’-3”10’-0”HANDRAIL 2’-8”1’-4”8’-0”8’-0”8’-0”
95 spaces 53' TRAILER45’ -5 spacesfut pkg110’18’266’ = 30 SPA
C
E
S
261’ = 29 SPA
C
E
S
171’ = 19 SPA
C
E
S100’175’ = 19 spaces future pkg53' TRAILER53' TRAILER297’ = 33 spacesfuture pkg53' TRAILER53' TRAILER53' TRAILER72’ -8 spaces
fut pkg 1:20 slope70’ -6 spaces+ acc space54’ -6 spaces52’ -6 spaces54’ -6 spacesFUT
DRIVE IN
DR
FUT DRIVE IN DR175’ = 19 spaces future pkg175’ = 16 spaces+3 spaces future pkg57’ -1 space+ 2 acc spacesWEST PARKING:
TOTAL: 86 EXISTING PKG SPACES
89 FUTURE SPACES
1.54A = 6.6%
11
SLOPED ROOF12’ - 17’11’-0”28’-8”
SCALE
53' TRAILER
53' TRAILER53' TRAILER53' TRAILER53' TRAILER53' TRAILER
SITE PLAN
1” = 50’-0”RIVER VALLEY BUSINESS CENTER2100 STOUGHTON AVENUECHANHASSEN, MNMARCH 6, 2020
A1 a
PARKING site development: parking analysisplanting planSTOUGHTON AVENUE VENTURES102 JOHNATHAN BOULEVARDCHASKA, MNSUPPLEMENT9116 34th avenue northminneapolis, mn 55427 763-545-1072architectPHILLIP D. JOHNSONPHILLIP D. JOHNSONJUNE 5, 2020JUNE 5, 2020
PARKING PLAN
open dock
w/ roof canopy
to be removed
MECH
PLANTING
DETAIL 1 PLANTING
DETAIL 2
EAST PARKING:
TOTAL: 24 EXISTING PKG SPACES
13 FUTURE SPACES
TOTAL 212 PARKING SPACES
(includes 102 future spaces)
(includes 8 accessible spaces)99’-0”98’-0”97’-0”96’-6”97’-6”99’-6”98’-6”99’-10”6-9 x 16-10BITUMINUOUS PVMTBITUMINUOUS PVMT
24’ GATE
HINGED
40’ GATE
CANTILEVERE
D
40’ GATE
HINGED 30’ GATE
CANT/HINGE
9’-0”7’-0”15’-0”2 - AUTUMN
BLAZE MAPLE
PLANTING DETAIL 1
3 - JAPANESE TREE
LILAC
6 - DWARF AMUR
MAPLE 3’-0” O.C. MINACCESSIBLE
RAMP
LANDING 4’-6”7’-6”
PLANTING DETAIL 2
CUT PVMT FOR
PLANTINGS
PLANTING SCHEDULE
SYMBOL
ABM AUTUMN BLAZE MAPLE
JLT JAPANESE LILAC TREE
DECIDUOUS TREES
DECIDUOUS SHRUBS
BOTANICAL NAME COMMON NAME
2.5"
15
CAM
MATURE H X WQTYROOT
16"7’ X 7’
25’ X 20'
SIZE
6
3
B/B 50' X 40'2 'JEFFERSRED'
ACER X FREEMANII
SYRINGA RETICULATA multi stem
'BAILEY COMPACT'AMUR MAPLE
ACER GINNALA BAILEY COMPACT
GAL
5
GAL
AL AMERICAN LINDEN
CONIFEROUS TREES
BLACK HILLS SPRUCE
EASTERN WHITE PINE
PICEA GLAUCA VAR.
BS
WP
2.5"
6'
6'
B/B
B/B
B/B
TILIA AMERICANA
PINUS STROBUS
40' X 30'
40' X 15'
60' X 35'
2 DENSATA
3
4
CUT PVMT FOR
PLANTINGS
FENCE
FENCE
FENCEFENCE FENCE
FENCEFENCE
FENCE 71’-0”2 - acc spacePPPP
elec trans53' TRAILERALAL
AL
AL
BS BS
WP
WP
WP
Re:
Gedney building
2100 Stoughton Avenue
Chanhassen, MN
SITE TRAFFIC COMPILATION:
Anticipated traffic volumn from Hemp acres tenant ‘4’:
Occupying 50,000 sq ft.
Present expected employees
10 - 12 in the building on a given workday.
Anticipated expanded operations employees
25 - 30 in the building on a given workday.
Existing tenant ‘1’ in the building:
Occupying 40,000 sq ft.
Present
1 visit to the space each week
Maximum occupants during turnover of storage
3 occupants for two days, three times per year.
Projected warehouse tenants ‘2’ and ‘3’ in the building.
Occupancy of remaining 90,000 sq ft.
Projected at 1 occupant per 1000 sq ft. = 90 occupants.
Total projected occupancy: 123 occupants
At projected occupant arriving at the site to be 1 1/4 occupants per
vehicle that would become 99 vehicles onto and off of the site at
peak arrival and departure times.
Deliveries by truck to the site:
Anticipated truck traffic from Hemp acres ‘4’:
Present, 1 tractor/trailer per day incoming,
1 tractor/trailer per week outgoing
Projected 3 years, 2 tractor/trailer per day incoming,
2 tractor/trailer per day outgoing.
Existing tenant ‘1’ in the building:
Anticipated 1 tractor trailer per month incoming,
1 tractor/trailer per month outgoing.
Projected warehouse tenants in the building tenant ‘2’ & ‘3’.
Projected 3 tractor/trailer per day incoming,
3 tractor/trailer per week outgoing. A U D
U B
O
N A V E
N
U E