Results of Double-Ring Infiltrometer Testing - The Park Residential Deve... Braun Intertec Corporation 11001 Hampshire Avenue S Minneapolis, MN 55438 Phone: 952.995.2000 Fax: 952.995.2020 Web: braunintertec.com AA/EOE December 6, 2019 Project B1805858.00 Mr. Mark Bode Lennar Corporation 16305 36th Avenue North, Suite 600 Plymouth, MN 55446 Re: Results of Double-Ring Infiltrometer Testing The Park Residential Development (Nelson Property) 7141 Galpin Boulevard Chanhassen, Minnesota Dear Mr. Bode: We are pleased to present the results of the requested double-ring infiltrometer (DRI) testing completed at the above referenced site in Chanhassen, Minnesota. We completed the requested tests in general accordance with ASTM International (ASTM) D 3385; Standard Test Method for Infiltration Rate of Soils in Field Using a Double-Ring Infiltrometer. We also completed observations on a number of test pit excavations that were also completed within the proposed stormwater/infiltration basins. The two basins where the testing and test pits were completed were noted as Basins 100 and 200. The DRI testing and test pit observations were performed in the field by Braun Intertec Corporation personnel on November 25, 2018, at the approximate locations identified on the attached sketches. Excavations to reach test elevations were performed by the Contractor provided by the owner. Upon completion of testing, the excavations were backfilled with excavated spoils and bucket compacted. DRI Test Results The results of the DRI testing performed, including graphical representation, are attached to this report letter. To summarize the results, no infiltration was noted during any of the three tests. Two of the test locations, DRI-1.2 and DRI-2.2, had groundwater coming up into the excavation. Only one test was able to be performed in Basin 100 as two of the other proposed DRI test locations filled up with water prior to being setup, and tests were unable to be completed. Please note, soil infiltration rates will vary with soil moisture content, the introduction of fine-grained soils, topsoil, filter media, seasonal changes, compaction of the subgrade, or with changes in localized groundwater levels. This test does not constitute a review of site suitability for infiltration or evaluate the potential impacts, if any, from infiltration of large amounts of stormwater. We also note that topsoil, filter media or compaction of the subgrade can limit the effectiveness of soil infiltration. WETLAND 1 OUTLOT I 00-ENG-118100-SHEET-GRAD 20PRELIMINARY GRADING PLAN I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c 39OFTHE PARK CHANHASSEN, MINNESOTA LENNAR 16305 36TH AVENUE NORTH 12-05-18 PJC/BNM BNM/NCR Name Reg. No.Date Revisions 1. 2-28-2019 City Comments Date Designed Drawn 2018 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 12-05-2018 Paul J. Cherne PLYMOUTH, MINNESOTA 5544619860 2. 4-2-2019 City Comments3. 5-20-2019 City Comments WETLAND 2 WETLAND 1 OUTLOT G OUTLOT H 00-ENG-118100-SHEET-GRAD 21PRELIMINARY GRADING PLAN I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c 39OFTHE PARK CHANHASSEN, MINNESOTA LENNAR 16305 36TH AVENUE NORTH 12-05-18 PJC/BNM BNM/NCR Name Reg. No.Date Revisions 1. 2-28-2019 City Comments Date Designed Drawn 2018 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 12-05-2018 Paul J. Cherne PLYMOUTH, MINNESOTA 5544619860 2. 4-2-2019 City Comments3. 5-20-2019 City Comments Results of Double Ring Infiltrometer Testing (ASTM D 3385)- Mariotte Tube Method Test Number:DRI-1.2 Project Description: Nelson Property Project Number:B1805858.00 Test Location: Date: November 25, 2019 Liquid used:Potable Water Test Elevation:969 Inner Ring Area:113 square inches Ground Temperature Fo: 34 Outer Ring Area:452 square inches Water Temperature Fo:47 Water depth Inner Ring (in):3 Test performed by:Trey Krautkremer Water depth annular Ring (in):3 Moisture Content of soil at test depth before test:30% Weather:36 Degrees F, Clear Percent Fines passing a 200 sieve on soil at test depth:54% Time Infiltration Rate (in/hr)Depth below bottom of test Soil Profile 30 0.0 0-6 inches 60 0.0 6-12 inches 90 0.0 12-18 inches 120 0.0 18-24 inches 150 0.0 24-30 inches 180 0.0 30-36 inches 210 0.0 240 0.0 Groundwater depth 0" 0.0 0.0 Average Infiltration Rate of Inner Ring Over Entire Test (in/hr) Steady State Infiltration Rate of Inner Ring Over Last 4 intervals (in/hr) See Sketch Sandy Lean Clay, Light Brown, Wet 0.0 0.5 1.0 1.5 0 15 30 45 60 75 90 105 120 135 150 165 180 195 210 225 240 255Infiltration Rate (in/hr)Time (minutes) Inner Ring Infiltration Rate vs. Time Test performed by Braun Intertec personnel in general accordance with test method ASTM D 3385. Results of Double Ring Infiltrometer Testing (ASTM D 3385)- Mariotte Tube Method Test Number:DRI-2.2 Project Description: Nelson Property Project Number:B1805858.00 Test Location: Date: November 25, 2019 Liquid used:Potable Water Test Elevation:969 Inner Ring Area:113 square inches Ground Temperature Fo: 34 Outer Ring Area:452 square inches Water Temperature Fo:47 Water depth Inner Ring (in):3 Test performed by:Trey Krautkremer Water depth annular Ring (in):3 Moisture Content of soil at test depth before test:33% Weather:36 Degrees F, Clear Percent Fines passing a 200 sieve on soil at test depth:53% Time Infiltration Rate (in/hr)Depth below bottom of test Soil Profile 30 0.0 0-6 inches 60 0.0 6-12 inches 90 0.0 12-18 inches 120 0.0 18-24 inches 150 0.0 24-30 inches 180 0.0 30-36 inches 210 0.0 240 0.0 Groundwater depth 0" 0.0 0.0 Average Infiltration Rate of Inner Ring Over Entire Test (in/hr) Steady State Infiltration Rate of Inner Ring Over Last 4 intervals (in/hr) See Sketch Sandy Lean Clay, Light Brown, Wet 0.0 0.5 1.0 1.5 0 15 30 45 60 75 90 105 120 135 150 165 180 195 210 225 240 255Infiltration Rate (in/hr)Time (minutes) Inner Ring Infiltration Rate vs. Time Test performed by Braun Intertec personnel in general accordance with test method ASTM D 3385. Results of Double Ring Infiltrometer Testing (ASTM D 3385)- Mariotte Tube Method Test Number:DRI-3.2 Project Description: Nelson Property Project Number:B1805858.00 Test Location: Date: November 25, 2019 Liquid used:Potable Water Test Elevation:964 Inner Ring Area:113 square inches Ground Temperature Fo: 34 Outer Ring Area:452 square inches Water Temperature Fo:47 Water depth Inner Ring (in):3 Test performed by:Trey Krautkremer Water depth annular Ring (in):3 Moisture Content of soil at test depth before test:19% Weather:36 Degrees F, Clear Percent Fines passing a 200 sieve on soil at test depth:42% Time Infiltration Rate (in/hr)Depth below bottom of test Soil Profile 30 0.0 0-6 inches 60 0.0 6-12 inches 90 0.0 12-18 inches 120 0.0 18-24 inches 150 0.0 24-30 inches 180 0.0 30-36 inches 210 0.0 240 0.0 Groundwater depth Not Encountered 0.0 0.0 Average Infiltration Rate of Inner Ring Over Entire Test (in/hr) Steady State Infiltration Rate of Inner Ring Over Last 4 intervals (in/hr) See Sketch Clayey sand, Light Brown, Moist 0.0 0.5 1.0 1.5 0 15 30 45 60 75 90 105 120 135 150 165 180 195 210 225 240 255Infiltration Rate (in/hr)Time (minutes) Inner Ring Infiltration Rate vs. Time Test performed by Braun Intertec personnel in general accordance with test method ASTM D 3385. Elev./ Depth ft 985.4 1.3 973.7 13.0 WaterLevelDescription of Materials (Soil-ASTM D2488 or 2487; Rock-USACE EM 1110-1-2908) CLAYEY SAND (SC), trace roots, and fibers, black, moist (TOPSOIL) SANDY LEAN CLAY (CL), brown, moist (GLACIAL TILL) END OF TEST PIT Test pit then backfilled with spoils 5 10 SampleSample Blows Recovery qₚ tsf MC %Tests or Remarks Water not observed while excavating. LOG OF TEST PIT See Descriptive Terminology sheet for explanation of abbreviations Project Number B1805858.00 Factual Report Nelson Property 7141 Galpin Boulevard Chanhassen, Minnesota TEST PIT:TP-1 LOCATION: See attached sketch NORTHING:EASTING: EXCAVATOR:Doboszenski & Sons LOGGED BY:R. Braun START DATE:11/25/19 END DATE:11/25/19 SURFACE ELEVATION:986.7 ft RIG:Excavator SURFACING:Woods/brush WEATHER:Partly sunny, 40° B1805858.00 Braun Intertec Corporation TP-1 page 1 of 1 Elev./ Depth ft 974.5 2.0 970.5 6.0 WaterLevelDescription of Materials (Soil-ASTM D2488 or 2487; Rock-USACE EM 1110-1-2908) CLAYEY SAND (SC), trace roots, and fibers, black, moist (TOPSOIL) SANDY LEAN CLAY (CL), brown, moist (GLACIAL TILL) END OF TEST PIT Test pit then backfilled with spoils 5 10 SampleSample Blows Recovery qₚ tsf MC %Tests or Remarks Water not observed while excavating. LOG OF TEST PIT See Descriptive Terminology sheet for explanation of abbreviations Project Number B1805858.00 Factual Report Nelson Property 7141 Galpin Boulevard Chanhassen, Minnesota TEST PIT:TP-2 LOCATION: See attached sketch NORTHING:EASTING: EXCAVATOR:Doboszenski & Sons LOGGED BY:R. Braun START DATE:11/25/19 END DATE:11/25/19 SURFACE ELEVATION:976.5 ft RIG:Excavator SURFACING:Woods/brush WEATHER:Partly sunny, 40° B1805858.00 Braun Intertec Corporation TP-2 page 1 of 1 Elev./ Depth ft 971.0 3.0 967.0 7.0 WaterLevelDescription of Materials (Soil-ASTM D2488 or 2487; Rock-USACE EM 1110-1-2908) CLAYEY SAND (SC), trace roots, and fibers, black, moist (TOPSOIL) SANDY LEAN CLAY (CL), brown, moist to wet (GLACIAL TILL) END OF TEST PIT Test pit then backfilled with spoils 5 10 SampleSample Blows Recovery qₚ tsf MC %Tests or Remarks Water observed at 7.0 feet while excavating. LOG OF TEST PIT See Descriptive Terminology sheet for explanation of abbreviations Project Number B1805858.00 Factual Report Nelson Property 7141 Galpin Boulevard Chanhassen, Minnesota TEST PIT:TP-3 LOCATION: See attached sketch NORTHING:EASTING: EXCAVATOR:Doboszenski & Sons LOGGED BY:R. Braun START DATE:11/25/19 END DATE:11/25/19 SURFACE ELEVATION:974.0 ft RIG:Excavator SURFACING:Woods/brush WEATHER:Partly sunny, 40° B1805858.00 Braun Intertec Corporation TP-3 page 1 of 1 Elev./ Depth ft 982.4 0.7 980.1 3.0 969.1 14.0 WaterLevelDescription of Materials (Soil-ASTM D2488 or 2487; Rock-USACE EM 1110-1-2908) PAVEMENT, 4 inches of bituminous over 4 inches of aggregate base CLAYEY SAND (SC), trace roots, and fibers, black, moist (TOPSOIL FILL) SANDY LEAN CLAY (CL), brown, moist (GLACIAL TILL) END OF TEST PIT Test pit then backfilled with spoils 5 10 SampleSample Blows Recovery qₚ tsf MC %Tests or Remarks Water not observed while excavating. LOG OF TEST PIT See Descriptive Terminology sheet for explanation of abbreviations Project Number B1805858.00 Factual Report Nelson Property 7141 Galpin Boulevard Chanhassen, Minnesota TEST PIT:TP-4 LOCATION: See attached sketch NORTHING:EASTING: EXCAVATOR:Doboszenski & Sons LOGGED BY:R. Braun START DATE:11/26/19 END DATE:11/26/19 SURFACE ELEVATION:983.1 ft RIG:Excavator SURFACING:Woods/brush WEATHER:Partly sunny, 40° B1805858.00 Braun Intertec Corporation TP-4 page 1 of 1 Elev./ Depth ft 967.2 2.0 962.2 7.0 WaterLevelDescription of Materials (Soil-ASTM D2488 or 2487; Rock-USACE EM 1110-1-2908) CLAYEY SAND (SC), trace roots, and fibers, black, moist (TOPSOIL) SANDY LEAN CLAY (CL), brown, moist (GLACIAL TILL) END OF TEST PIT Test pit then backfilled with spoils 5 10 SampleSample Blows Recovery qₚ tsf MC %Tests or Remarks Water not observed while excavating. LOG OF TEST PIT See Descriptive Terminology sheet for explanation of abbreviations Project Number B1805858.00 Factual Report Nelson Property 7141 Galpin Boulevard Chanhassen, Minnesota TEST PIT:TP-5 LOCATION: See attached sketch NORTHING:EASTING: EXCAVATOR:Doboszenski & Sons LOGGED BY:R. Braun START DATE:11/25/19 END DATE:11/25/19 SURFACE ELEVATION:969.2 ft RIG:Excavator SURFACING:Woods/brush WEATHER:Partly sunny, 40° B1805858.00 Braun Intertec Corporation TP-5 page 1 of 1 Elev./ Depth ft 964.6 2.5 959.1 8.0 WaterLevelDescription of Materials (Soil-ASTM D2488 or 2487; Rock-USACE EM 1110-1-2908) CLAYEY SAND (SC), trace roots, and fibers, black, moist (TOPSOIL) POORLY GRADED SAND with SILT (SP-SM), fine to medium-grained Sand, trace Gravel, gray, moist (ALLUVIUM) END OF TEST PIT Test pit then backfilled with spoils 5 10 SampleSample Blows Recovery qₚ tsf MC %Tests or Remarks Water not observed while excavating. LOG OF TEST PIT See Descriptive Terminology sheet for explanation of abbreviations Project Number B1805858.00 Factual Report Nelson Property 7141 Galpin Boulevard Chanhassen, Minnesota TEST PIT:TP-6 LOCATION: See attached sketch NORTHING:EASTING: EXCAVATOR:Doboszenski & Sons LOGGED BY:R. Braun START DATE:11/25/19 END DATE:11/25/19 SURFACE ELEVATION:967.1 ft RIG:Excavator SURFACING:Woods/brush WEATHER:Partly sunny, 40° B1805858.00 Braun Intertec Corporation TP-6 page 1 of 1 Elev./ Depth ft 965.7 1.3 961.0 6.0 WaterLevelDescription of Materials (Soil-ASTM D2488 or 2487; Rock-USACE EM 1110-1-2908) CLAYEY SAND (SC), trace roots, and fibers, black, moist (TOPSOIL) POORLY GRADED SAND with SILT (SP-SM), fine to medium-grained Sand, trace Gravel, gray, moist to wet (ALLUVIUM) END OF TEST PIT Test pit then backfilled with spoils 5 10 SampleSample Blows Recovery qₚ tsf MC %Tests or Remarks Water observed at 6.0 feet while excavating. LOG OF TEST PIT See Descriptive Terminology sheet for explanation of abbreviations Project Number B1805858.00 Factual Report Nelson Property 7141 Galpin Boulevard Chanhassen, Minnesota TEST PIT:TP-7 LOCATION: See attached sketch NORTHING:EASTING: EXCAVATOR:Doboszenski & Sons LOGGED BY:R. Braun START DATE:11/25/19 END DATE:11/25/19 SURFACE ELEVATION:967.0 ft RIG:Excavator SURFACING:Woods/brush WEATHER:Partly sunny, 40° B1805858.00 Braun Intertec Corporation TP-7 page 1 of 1 Elev./ Depth ft 964.0 3.0 960.0 7.0 WaterLevelDescription of Materials (Soil-ASTM D2488 or 2487; Rock-USACE EM 1110-1-2908) CLAYEY SAND (SC), trace roots, and fibers, black, moist (TOPSOIL) SILTY SAND (SM), fine to medium-grained Sand, trace Gravel, gray, moist to wet (ALLUVIUM) END OF TEST PIT Test pit then backfilled with spoils 5 10 SampleSample Blows Recovery qₚ tsf MC %Tests or Remarks Water observed at 7.0 feet while excavating. LOG OF TEST PIT See Descriptive Terminology sheet for explanation of abbreviations Project Number B1805858.00 Factual Report Nelson Property 7141 Galpin Boulevard Chanhassen, Minnesota TEST PIT:TP-8 LOCATION: See attached sketch NORTHING:EASTING: EXCAVATOR:Doboszenski & Sons LOGGED BY:R. Braun START DATE:11/25/19 END DATE:11/25/19 SURFACE ELEVATION:967.0 ft RIG:Excavator SURFACING:Woods/brush WEATHER:Partly sunny, 40° B1805858.00 Braun Intertec Corporation TP-8 page 1 of 1