Loading...
CBA-Chanhassen_Project Narrative kimley-horn.com 767 Eustis Street, Suite 100, St. Paul, MN 55114 651 645 4197 September 4, 2020 City of Chanhassen 7700 Market Boulevard, P.O. Box 147 Chanhassen, MN 55317 Attention: Sharmeen Al-Jaff, City Planner RE: Proposed Christian Brothers Automotive – Project Narrative Christian Brothers Automotive is requesting the proposed site to be considered for approval within the existing PUD. The parcel is legally described as: Lot 3, Block 1, Crossraods of Chanhassen, Carver County, Minnesota. Proposed Development Overview Christian Brothers Automotive is proposing to construct an approximately 5,100 SF, 9 -bay automotive repair center located at 8941 Crossroads Boulevard in Chanhassen. The customer facing portion of the building will face the internal road of the Crossroads of Chanhassen development. The proposed development is within the Crossroads of Chanhassen PUD which was approved in 2008. The two lots east of the proposed site have been previously developed as retail and a gas station/convenience store, a child care facility is located to the south and west of the proposed site, and the rest of the PUD is currently undeveloped. Proposed Concept Plan & Development Stage Christian Brothers Automotive is proposing an amendment to the existing planned unit development (PUD). The PUD is designated as mixed use PUD including neighborhood commercial, office and residential. Christian Brothers provides light automotive repair and the scope of repairs provided by Christian Brothers has been included within the submittal package. Overnight parking only occurs when customers have a conflict retrieving their vehicle during business hours or to drop off their vehicles. Long term exterior storage is not permitted at Christian Brothers Automotive. Consultants: Civil Engineer – Christian Jones, Brandon R. Elegert, P.E. – Kimley-Horn Architecture – Dana King – Cortland Morgan Architect Landscape Architecture – Evergreen Design Group, Inc. – Rodney McNabb Photometrics – City Lighting Products Company – Mike Hohl Page 2 kimley-horn.com 767 Eustis Street, Suite 100, St. Paul, MN 55114 651 645 4197 Site Design The site currently vacant land with water and sanitary sewer utilities provided as part of the Crossroads of Chanhassen Development to the south. Gas, communications, and electric utilities are provided to the west along Crossroads Boulevard. The proposed building is to be located at the western edge of the site angled parallel to Crossroads Boulevard, with the customer facing side of the building internal to the development. The surface parking will be located directly east of the building. Access is proposed to be east of the building and at both the north and south side of the parking lot, with two proposed driveways connecting the internal roads of the Crossroads of Chanhassen. The existing site is currently vegetated with no impervious area; the proposed site will be comprised of approximately 70% impervious area. Above ground and underground stormwat er management will be provided adhering to City and Watershed treatment and rate control requirements. Architecture Architectural elevations and site photometric plans are provided within the submission. The proposed building is to be constructed of primarily brick and limestone. The trash enclosure is also to be constructed in materials similar to the building and will have gates to screen the trash from the public right-of-way. Landscape Architecture A landscape plan is included within the submission to comply with the city code. Trees, shrubs, and other plantings will complement the site. Christian Brothers Automotive is seeking a landscape variance for screening of the vehicular area. Please contact me at (763) 251-1016 or christian.jones@kimley-horn.com should you have any questions or comments. Sincerely, Christian Jones Project Manager