06 Galpin EC 100520CONSTRUCTION NOTES: 1. GRADING CONTRACTOR TO ANTICIPATE HAUL ROUTES TO BE LUCY RIDGE LANE AND 6. INFILTRATION AREA- GALPIN BLVD (C.R. 117) UNLESS INDICATED/REQUESTED OTHERWISE WITH CITY 6.1. SEDIMENT CONTROLS MUST PREVENT DISCHARGE OF SEDIMENT TO BASIN ENGINEER APPROVAL. 6.2. AREA TO BE PROTECTED FROM HEAVY EQUIPMENT 6.3. BASIN AREA NOT TO BE EXCAVATED TO FINAL GRADE OR SAND MATERIAL NOT PLACED 2. RESPECTIVE CONTRACTORS TO ANTICIPATE POTENTIAL GRADING AND UTILITY UNTIL CONTRIBUTING DRAINAGE AREAS HAVE BEEN CONSTRUCTED STAGING AREAS AS SHOWN UNLESS INDICATED/REQUESTED OTHERWISE WITH CITY ENGINEER APPROVAL. 7. GRADING TO OCCUR IN PROPOSED AREAS ONLY, EXISTING GROUND COVER TO REMAIN ASIS. 3. TEMPORARY SEDIMENT BASIN LOCATIONS TO BE DETERMINED BY GRADING 8. DISTURBED AREAS NEAR AND ALONG THE BANKS OF THE WATERCOURSE BE IMMEDIATELY CONTRACTOR. BASIN LOCATIONS CAN BE ADDED TO PLANS IF NECESSARY. STABILIZED AFTER COMPLETION OF THE WORK (RULE G, SUBSECTION 3.7b) PROPOSED DETENTION BASINS MAY BE USED AS TEMPORARY BASINS - IF SO, ACCUMULATED SEDIMENT MUST BE REMOVED TO RESTORE THE REQUIRED 9. ALL EROSION CONTROL NOTED ON THE APPROVED PLAN SHALL BE INSTALLED PRIOR TO THE PERMANENT POOL VOLUME AND AN ASBUILT PROVIDED. INITIATION OF ANY SITE GRADING. 4. GRADING CONTRACTOR TO ANTICIPATE POTENTIAL STOCKPILE AREAS AS SHOWN 10. STREET SWEEPING TO OCCUR IN THE EVENT OF ANY SOIL TRACKING OFFSITE THROUGHOUT UNLESS INDICATED OR REQUESTED OTHERWISE WITH CITY ENGINEER APPROVAL. THE DURATION OF CONSTRUCTION 5. UTILITY CONTRACTOR TO ESTABLISH DEWATERING PLAN WITH CITY AND CITY 11. SWPPP TO BE PROVIDED AS REQUESTED AND AVAILABLE FOR REVIEW. ENGINEER APPROVAL IF NEEDED. ;III , 1 ; // W W W , �:✓ f I/ I ,/�/;; %/� ' _ `. , ;, ' , ,9 1`I' 1 -__ ;, , _ 111 __ , ,, / ; l I I 1 1 1 / I • ___ `J- - \`\I - - 111,1111 Y-1 WetldlidQ W1 11 `1111111(11I`'renape t)W {� 1 1 I ) 1j'— 'irr-t�'1'1I I' --- 1/ ''li w ..i I 1 II I I'� __ll I.Vf. b � redi ng an Utllty °aging �rea Ir�Irwir��'i ��': ��` '�uxo y�ocxs l�e� `-, .WWW . W . W W W _ --- ---_I-------- ------------ - _-``\\- "- _ I k w , W W 1W �5'I Ij X11 11 I�I�/ � \' F J \ \`\\I \I J VIII, / � g •r ,a.. �T ___--_----__--_-_ -Y'__-_---__-•' l i 1 W - i W W Ir w 1111111'11'1 ' ' ___ -'- � I \ iljr W W W W � ISI 1111111 I'1" I' aa/l ,1 i i i -i __ �i , III iTj li j I iIT' /`\Kam ",F IYl , to efV2a it WIF WS 1 _ I 1 / � I TIS / I' � .. `� 111,111\110\ 1 i I 1 _ / �.n 11\ ` - �oH 1 �1 1 \ � _ i J`--------- ___ I E_II 1111\1, �'\ �_ ��__ F______ _�_ �,"'":' w 1 W 1 � \ , ` 1 w / 3m.r1. 11111 111 \�: \\ 1 , •_-_____ \ �� �-; �_ ______________ __ .,m._ - - - " I r '_�� r ---'/- �-----_- r 1 -_____ zp"''raga ty �_/'-'___,I - r �L I r - ASHLING . t" e 1 r / rr/r I I 1 "+ `:� i r r, rw� o ` ,T ;- _ ,_, �_ J -•- � �' - 1 - _ i i, s Jy� .\�� _ / W w 1 . ' I 1 , _ r 1z I \ _ 1 o I .�- ?Grading an 1�d [il�ty�faging Area -er% I - I 1/ 1 11 ' _-' y. ° • r/ / - �, 4� d 1 I L 77 / l�IJv=yq��,wo \ / 111fPYAsev� W W W /, W NWL959.62 (RP9C) L W In w � / et land iW 1 1 1 s -w W W W W W W W W W W W W �� W W. Wr�1G/L 859'SP'(RPBC}, jrW W. -------------- WW WW WW WW WW WW WW WW WW WWWW\\W WWWWWWWWWWWWWWWWWWWWWWWWWW WWWW WWWWWWWWW w-WaWW WW�`W WWW W W \\` WW W -----_ _ __-' W- '�� \1\,\\\`, ,�� \W W c -w -W -w---- w W W WWW WWW W W WWW W WW WWW WWW W WWW .,W W 1WW W W WWWW \\\ i\ W W W `// ; \•��1\�\\11\1 • \ �y��� W W m W!W W W - W '1 W W W W WWW W W W W W W W W W W W W W WWW WWW WWW W W WWW 1W W W W J W W \1111 �\ W W W W W Construction Schedule: Site Grading (including tree clearing): 6-7 weeks Utility Construction: 5-6 weeks Street Construction: 3 weeks Minor Uitilty Installation: 2 weeks Sidewalk and Final Restoration 2 weeks Anticipated Grading Start Date: October 12, 2020 PROPOSED CONSTRUCTION DISTURBED AREA = +/-19.6 ACRES ONSITE BMPS 1. SILT FENCE - BEFORE CONSTRUCTION = 9,525 LF 2. SILT FENCE - AFTER CONSTRUCTION = 940 LF 3. EROSION BLANKET = 6,325 SY 4. CONCRETE WASHOUT =2 5. INLET PROTECTION = 43 F' -7F '- or ROCK ENTRANCE BERM POST GRADING SILT FENCE SILT FENCE 3 CONCRETE WASHOUT INLET PROTECTION EROSION BLANKET RILEY PURGATORY BLUFF CREEK WATER SHED DISTRICT EROSION CONTROL NOTES: a. Natural topography and soll conditions must be protected, Including retention onsite of native topsoil to the greatest extent possible b. Construction should Include minimization of the disturbance Intensity and duration, including phasing of disturbance to minimize quantity of disturbed area at any one time. c. Additional measures such as hydraulic mulching and other practices as specified b the , Y 9 P P Y District must be used on slopes of 3:1 (H:V) or steeper to provide adequate stabilization. d. Final site stabilization measures must specify that at least six inches of topsoil or organic matter be spread and incorporated into the underlying soil during final site treatment wherever topsoil has been removed. e. Soil Surfaces compacted during construction and remaining pervious areas upon completion of construction must be decompacted to achieve: 1. a soil compaction testing pressure of less than 1,400 kilopascals, or200 pounds per square inch in the upper 12 inches of soil or, ii. a bulk density of less than 1.4 grams per cubic centimeter of 87 pounds per cubic foot in the upper 12 inches of soil. f. Construction site waste such as discarded building materials, concrete truck washout, chemicals, litter and sanitary waste must be properly managed. g. All temporary erosion and sediment control BMPs must be maintained until completion of construction and vegetation is established sufficiently to ensure stability of the site, as determined by the District. h. All temporary erosion and sediment control BMPs must be removed upon final stabilization. I. Soil surfaces compacted during construction and remaining pervious upon completion of construction must be decempacted through soil amendment and/or ripping to a depth of 18 inches (8 inches for single-family home properties)while taking care to avoid utilities, tree roots and other existing vegetation priortofinal revegetation or other stabilization. (builder. 20' in the front yard, side yards (where possible), and 25' benind the home site) j. All disturbed areas must be stabilized within 7 calendardays after land -disturbing work has temporarily or permanently ceased on a property that drains to an impaired water, within 14 days elsewhere. k. The permittee must, at a minimum, inspect, maintain and repairall disturbed surfaces and all erosion and sediment control facilities and soil stabilization measures everyday work is performed on the site and at least weekly until land -disturbing activity has ceased. Thereafter, the permittee must perform these responsibilities at least weekly until vegetative cover is established. The permittee will maintain a log of activities under this section for inspection by the Districton request. Activities must be conducted so as to minimize the potential transfer of aquatic invasive species (e.g., zebra mussels, Eurasian watermilfoil, etc.) to the maximum extent possible. DENOTES DRAINAGE DIRECTION Developer Contact Information: Chan Three Development, Inc, 10850 Old County Road 15 Suite 200 Plymouth, MN 55441 NO RTN Craig Allen cell: 952-270-4473 EXISTING UTILITIES SHOWN ARE SHOWN IN AN APPROXIMATE WAY ONLY. THE 100 50 0 50 100 200 email: craig@gonyeacompany.com CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ANYAND ALL EXISTING BEFORE COMMENCING WORK. HE AGREES TO BE FULLY RESPONSIBLE FOR ANY n—n —�—� ®❑ El El AND ALL DAMAGES ARISING OUT OF HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ANY SLE IN FEET AND ALL EXISTING UTILITIES. DRAWING NAME NO. BY DATE REVISIONS USE (INCLUDING COPYING, DISTRIBUTION, AND/OR CONVEYANCE OF I HEREBY CERTIFY THAT THIS PLAN OR SPECIFICATION WAS soR CITY PROJECT NO. FILE NO. sheets Erosion 01 _MJV07/2_9/2_0 _ _ _ _ LAYOUT REVISIONS _ INFORMATION) OF THIS PRODUCT IS STRICTLY PROHIBITED WITHOUT PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT 1 ERs 2020-12 EROSION CONTROL PLAN 3120-079 DRAWN BY 02 — MJV 08/27/20 -- --- RPBCWD COMMENTSSATHRE-BERGQUIST, --------------- — INC.'s EXPRESS WRITTEN AUTHORIZATION. USE WITHOUT SAID AUTHORIZATION CONSTITUTES AN ILLEGITIMATE USE AND SHALL THEREBY AMA DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. o w SAT H RE-BERGQUIST INC. EKE 03 CHECKED BY 04 MJV 09/04/20 MJV 09/16/20 CITY COMMENTS CITY COMMENTS INDEMNIFY INC. OF LLRESPONSIBILITY. / N # 150 SOUTH BROADWAY WAY 1, MN. 55391 CHANHASSEN, THE BLUFFS AT LAKE LUCY 16 _ _ _ _ — INC. RESERVES THE RIGHT TO HOLD ANY ILLEGITIMATE ,_ S, /�/.��j o ,,, (952)47&-6000 RSM DATE MJV 09/23/20 ___CITY&RPBCWDCOMMENTS — COMMENTS USER O-BERGQUIST, USER ORPARIMATEU LLYRESPONSIBLEFORDAMAGESORLOSSESRESULTING ROBERT S. M LSTAD, P.E. �"� ��YFRs MINNESOTA CHAN THREE DEVELOPMENT, INC. 06 O6 _MJ_V 09/2_9/2_0 _ _ _CIN_&_RPBCW_D _ _ FROM ILLEGITIMATE USE. / Date: 07 08 ZO Lic. No. Zpl-/�8 Pvp\'`� 33 07/OSY20 07 MJV 10/05/20 CITY & MCES COMMENTS