Loading...
06 Galpin EC 100920Ali II SII I��I i I l I i rl r I HEREBY CERTIFY THAT THIS PLAN OR SPECIFICATION WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT 1 AMA DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. ,_— S/�/.��j ERs soR`� w SATHRE-BERGQUIST INC.ERJ ,,, 150 SOUTH BROADWAY WAYZATA,MN. 55391 (952)47&-6000CHECKEDBY '�DATE �.yfdCHAN Rs vv CITY PROJECT NO. EROSION CONTROL PLAN THE E�LUFFS AT LANCE LUCY THREE DEVELOPMENT, INC. sheets Erosion 03 CONSTRUCTION NOTES: 1. GRADING CONTRACTOR TO ANTICIPATE HAUL ROUTES TO BE LUCY RIDGE LANE AND GALPIN BLVD (C.R. 117) UNLESS INDICATED/REQUESTED OTHERWISE WITH CITY ENGINEER APPROVAL. 2. RESPECTIVE CONTRACTORS TO ANTICIPATE POTENTIAL GRADING AND UTILITY STAGING AREAS AS SHOWN UNLESS INDICATED/REQUESTED OTHERWISE WITH CITY ENGINEER APPROVAL. 3. TEMPORARY SEDIMENT BASIN LOCATIONS TO BE DETERMINED BY GRADING CONTRACTOR. BASIN LOCATIONS CAN BE ADDED TO PLANS IF NECESSARY. PROPOSED DETENTION BASINS MAY BE USED AS TEMPORARY BASINS - IF SO, ACCUMULATED SEDIMENT MUST BE REMOVED TO RESTORE THE REQUIRED PERMANENT POOL VOLUME AND AN ASBUILT PROVIDED. 4. GRADING CONTRACTOR TO ANTICIPATE POTENTIAL STOCKPILE AREAS AS SHOWN UNLESS INDICATED OR REQUESTED OTHERWISE WITH CITY ENGINEER APPROVAL. 6. INFILTRATION AREA - 6.1. SEDIMENT CONTROLS MUST PREVENT DISCHARGE OF SEDIMENT TO BASIN 6.2. AREA TO BE PROTECTED FROM HEAVY EQUIPMENT 6.3. BASIN AREA NOT TO BE EXCAVATED TO FINAL GRADE OR SAND MATERIAL NOT PLACED UNTIL CONTRIBUTING DRAINAGE AREAS HAVE BEEN CONSTRUCTED 7. GRADING TO OCCUR IN PROPOSED AREAS ONLY, EXISTING GROUND COVER TO REMAIN ASIS 8. DISTURBED AREAS NEAR AND ALONG THE BANKS OF THE WATERCOURSE BE IMMEDIATELY STABILIZED AFTER COMPLETION OF THE WORK (RULE G, SUBSECTION 3.7b) 9. ALL EROSION CONTROL NOTED ON THE APPROVED PLAN SHALL BE INSTALLED PRIOR TO THE INITIATION OF ANY SITE GRADING. 10. STREET SWEEPING TO OCCUR IN THE EVENT OF ANY SOIL TRACKING OFFSITE THROUGHOUT THE DURATION OF CONSTRUCTION 5. UTILITY CONTRACTOR TO ESTABLISH DEWATERING PLAN WITH CITY AND CITY 11. SWPPP TO BE PROVIDED AS REQUESTED AND AVAILABLE FOR REVIEW. ENGINEER APPROVAL IF NEEDED. EXISTING UTILITIES SHOWN ARE SHOWN IN AN APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ANY AND ALL EXISTING UTILITIES BEFORE COMMENCING WORK. HE AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES ARISING OUT OF HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL EXISTING UTILITIES. p w w W W wetland 1 w W . W1h1WL-838.b21(RPBC) w g4' -R" 100 50 0 50 100 200 0 El El El SLE IN FEET Construction Schedule: Site Grading (including tree clearing): 6-7 weeks Utility Construction: 5-6 weeks Street Construction: 3 weeks Minor Uitilty Installation: 2 weeks Sidewalk and Final Restoration 2 weeks Anticipated Grading Start Date: October 12, 2020 PROPOSED CONSTRUCTION DISTURBED AREA = +/-19.6 ACRES ONSITE BMPS 1. SILT FENCE - BEFORE CONSTRUCTION = 9,525 IF 2. SILT FENCE - AFTER CONSTRUCTION = 940 LF 3. EROSION BLANKET = 6,325 SY 4. CONCRETE WASHOUT =2 5. INLET PROTECTION = 43 °000000 PRE GRADING ROCK ENTRANCE BERM -------- POST GRADING SILT FENCE -------- PRE GRADING SILT FENCE POST GRADING CONCRETE WASHOUT POST GRADING INLET PROTECTION POST GRADING EROSION BLANKET RILEY PURGATORY BLUFF CREEK WATER SHED DISTRICT EROSION CONTROL NOTES: a. Natural topography and soil conditions must be protected, including retention onsite of native topsoil to the greatest extent possible. b. Construction should include minimization of the disturbance intensity and duration, including phasing of disturbance to minimize quantity of disturbed area at any one time. c. Additional measures, such as hydraulic mulching and other practices as specified by the District must be used on slopes of 3:1 (H:V) or steeper to provide adequate stabilization. d. Final site stabilization measures must specify that at least six inches of topsoil or organic matter be spread and incorporated into the underlying soil during final site treatment wherever topsoil has been removed. e. Soil Surfaces compacted during construction and remaining pervious areas upon completion of construction must be decompacted to achieve: 1. a soil compaction testing pressure of less than 1,400 kilopascals, or200 pounds per square inch in the upper 12 inches of soil or, ii. a bulk density of less than 1.4 grams per cubic centimeter of 87 pounds per cubic foot in the upper 12 inches of soil. f. Construction site waste such as discarded building materials, concrete truck washout, chemicals, litter and sanitary waste must be properly managed. g. All temporary erosion and sediment control BMPs must be maintained until completion of construction and vegetation is established sufficiently to ensure stability of the site, as determined by the District. h. All temporary erosion and sediment control BMPs must be removed upon final stabilization. I. Soil surfaces compacted during construction and remaining pervious upon completion of construction must be decempacted through soil amendment and/or ripping to a depth of 18 inches (8 inches for single-family home properties)while taking care to avoid utilities, tree roots and other existing vegetation prior to final revegetation orother stabilization. (builder. 20' in the front yard, side yards (where possible), and 25' benind the home site) j. All disturbed areas must be stabilized within 7 calendardays after land -disturbing work has temporarily or permanently ceased on a property that drains to an impaired water, within 14 days elsewhere. k. The permittee must, at a minimum, inspect, maintain and repair all disturbed surfaces and all erosion and sediment control facilities and soil stabilization measures every day work is performed on the site and at least weekly until land -disturbing activity has ceased. Thereafter, the permittee must perform these responsibilities at least weekly until vegetative cover is established. The permittee will maintain a log of activities under this section for inspection by the District on request. Activities must be conducted so as to minimize the potential transfer of aquatic invasive species (e.g., zebra mussels, Eurasian watermilfoil, etc.) to the maximum extent possible. DENOTES DRAINAGE DIRECTION Developer Contact Information Chan Three Development, Inc, 10850 Old County Road 15 Suite 200 Plymouth, MN 55441 Craig Allen cell: 952-270-4473 email: craig@gonyeacompany.com DRAWING NAME NO. BY DATE I REVISIONS USE (INCLUDING COPYING, DISTRIBUTION, AND/OR CONVEYANCE OF INFORMATION) OF THIS PRODUCT IS STRICTLY PROHIBITED WITHOUT SATHRE-BERGQUIST, INC.'s EXPRESS WRITTEN AUTHORIZATION. USEWITHOUT SAID AUTHORIZATION CONSTITUTES AN ILLEGITIMATE USE AND SHALL THEREBY INDEMNIFYSATHRE-BERGQUISE INC. OFA LLRESPONSIBILITY. USERSATHRE-BERGQUIST, INC. RESERVES THE RIGHT TO HOLD ANY ILLEGITIMATE USER OR PARTY LEGALLY RESPONSIBLE FOR DAMAGES OR LOSSES RESULTING FROMILLEGITMATEUSE. I HEREBY CERTIFY THAT THIS PLAN OR SPECIFICATION WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT 1 AMA DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. ,_— S/�/.��j ERs soR`� w SATHRE-BERGQUIST INC.ERJ ,,, 150 SOUTH BROADWAY WAYZATA,MN. 55391 (952)47&-6000CHECKEDBY '�DATE �.yfdCHAN Rs vv CITY PROJECT NO. EROSION CONTROL PLAN THE E�LUFFS AT LANCE LUCY THREE DEVELOPMENT, INC. sheets Erosion 03 _MJ_V 09/0_4/2_0 MJV 09/16/20 MJV 09/23/20 MJV 10/OSM20 MJV10/07/20 -- --- MJV 10/09M20 _ _ _ _ _ CITY COMMENTS _ CITY COMMENTS ----------- CIN&Ri— -COMMENTS RPBCWDCOMMENTS _ _ _ CITV 8,MCECOMMENS _ _ — RPBCWDCOMMENTS ---------------- CITU COMMENTS 2020-12 DRAWNBY 04 CHANHASSEN, MINNESOTA O5 J3120-O79 O6MJV09/29/20_CIN& RSM 07 08 ROBERTS.M LSTAD,P.E. Date: 07 08 ZO Lic. No. ZPI-1�L8 — 07/OSY20 09