Loading...
Reports_Storm B - 092320 - SBI ReportHydraflow Storm Sewers Extension for Autodesk@ Civil 3D@ Plan uutrau Project File: Storm B - 092320.stm Number of lines: 18 1 Date: 9/25/2020 Storm Sewers v2019.20 SBI Page 1 Line Line Line Line Line Total Runoff Flow Capac Vel Cover Cover Q Q Gutter No. ID Size Length Slope Area Coeff Rate Full Ave Up Dn Byp Capt Spread (in) (ft) (%) (ac) (C) (cfs) (cfs) (ft/s) (ft) (ft) (cfs) (cfs) (ft) 1 1-2 30 91.594 0.22 8.48 0.40 14.25 19.16 5.00 17.30 0.38 0.00 0.86 6.25 2 2-3 15 29.444 9.85 5.46 0.40 9.17 20.27 11.91 8.15 3.05 0.00 0.05 1.24 3 3-4 15 155.232 9.73 4.30 0.40 7.22 20.14 10.75 3.05 3.05 0.00 1.43 9.10 4 4-5 15 124.911 1.44 3.32 0.40 5.58 7.75 5.26 4.04 3.05 0.00 0.24 1.91 5 5-12 15 197.065 1.93 0.74 0.40 1.24 8.97 4.18 3.63 3.04 0.04 0.61 3.82 6 12-13 15 29.250 1.03 0.27 0.40 0.45 6.54 2.74 3.06 3.33 0.15 0.30 3.01 7 12-13A 15 156.426 0.38 0.08 0.40 0.13 4.00 0.97 2.75 3.63 0.00 0.13 2.00 8 5-6 15 32.993 0.61 2.46 0.40 4.13 5.03 4.30 4.13 4.04 0.09 0.73 4.35 9 6-7 15 36.516 0.55 2.06 0.40 3.46 4.78 2.95 3.39 4.13 0.00 0.29 2.66 10 7-8 15 155.857 0.51 1.53 0.40 2.57 4.63 3.20 3.46 3.09 0.00 0.18 2.27 11 8-9 15 116.652 0.34 1.42 0.40 2.39 3.78 2.56 2.25 3.46 0.00 2.39 13.07 12 7-14 15 29.250 1.03 0.41 0.40 0.69 6.54 0.60 3.04 3.39 0.33 0.36 5.17 13 4-4A 15 7.935 2.52 0.55 0.40 0.92 10.25 1.87 3.10 3.15 0.71 0.55 6.55 14 2-45 15 219.683 4.96 2.51 0.40 4.22 14.38 7.52 7.35 3.05 0.00 1.97 11.40 15 45-46 15 36.958 0.54 1.34 0.40 2.25 4.75 3.82 4.48 4.15 0.00 0.86 6.25 16 46-47 15 85.241 0.59 0.83 0.40 1.39 4.95 2.59 3.25 4.48 0.00 1.39 8.92 17 3-10 15 194.150 2.06 1.13 0.40 1.90 9.27 4.80 3.15 3.05 0.00 0.17 2.00 18 10-11 15 144.712 1.04 1.03 0.40 1.73 6.57 3.46 3.05 3.15 0.00 1.73 10.41 Project File: Storm B - 092320.stm Number of lines: 18 Date: 9/25/2020 NOTES: "Critical depth Storm Sewers