Loading...
Cutting Edge Snow and Ice Contract E3 CUTTINGEOGE Tuesday,August 20, 2019 �'��"i ''t'Il l L - PROPOSAL SUBMITTED TO: PROPERTY NAME/ LOCATION: Control Concepts, Inc. Control Concepts 18760 Lake Drive East 8077 Century Blvd. Chanhassen Channhassen MN 55317 Plowing Square Feet: Don Christner 952.345.6207 Shoveling Linear Feet: CEPM hereby submits proposal and specifications for: 2019 / 2020 Snow & Ice Management 'Hourly' Contract �z Snow removal services on parking lot areas shall commence at:�zinch(s) accumulation of snow. C d Snow removal services on sidewalk areas shall commence at: "ikSf'-v°inch(s) accumulation of snow. Ice control services will be performed automatically for snow events under the trigger or for ice events. All parking lot,shovel and ice control services will be performed on a'hourly'basis: Hourly rates for equipment and services: 4 x 4 Plow Truck-Standard $59.00 per hr. Sidewalk Shovel Labor $40.00 per hr. 4 x 4 Truck w/8'Str Plow $65.00 per hr. Shovel Crew Truck $40.00 per hr. 4 x 4 Truck w/9'Str. Plow $70.00 per hr. Two-Stage Snow Blower $45.00 per hr. 4 x 4 Truck w/10'Str. Plow $75.00 per hr. Walk-Behind Broom $50.00 per hr. 4 x 4 Truck w/8.5'V-Plow $72.00 per hr. ATV w/Plow $55.00 per hr. 4 x 4 Truck w/9.5'V-Plow $75.00 per hr. Utility Tractor w/Broom/Plow $75.00 per hr. 4 x 4 Truck w/10'Containment Plow $80.00 per hr. Polar Trac w/Broom/Plow/Bucket $85.00 per hr. 4 x4 Truck w/11'Containment Plow $85.00 per hr. Tractor w/Plow $115.00 per hr. 4 x 4 Truck(2 ton)w/Plow $90.00 per hr. Tractor w/Blower $160.00 per hr. Bobcat w/Bucket-Sidewalks $55.00 per hr. Dump Truck w/12' Snow Plow $115.00 per hr. Bobcat w/Bucket $60.00 per hr. Dump Truck Tri-Axle(Hauling) $100.00 per hr. Bobcat w/Snow Bucket $75.00 per hr. Dump Truck Quad-Axle(Hauling) $125.00 per hr. Bobcat w/Bucket-Multi-Speed $80.00 per hr. End Dump(Hauling) $145.00 per hr. Bobcat w/Snow Plow-Str. $85.00 per hr. Bull Dozer $200.00 per hr. Bobcat w/Snow Plow-V-Plow $90.00 per hr. Road Grader w/Plow&Wing $165.00 per hr. Bobcat w/Snow Blower $125.00 per hr. High Capacity Salt Truck $75.00 per hr. Bobcat w/Snow Blower-Hi-Flow $145.00 per hr. 80%Sand/20%Salt Mixture $100.00 per ton* Front End Loader-Mid Compact $100.00 per hr. 100%Road Salt $150.00 per ton* Front End Loader w/3yd Bucket $135.00 per hr. Treated D.O.T. Road Salt $200.00 per tont Front End Loader w/Plow $125.00 per hr. Liquid Magnesium Chloride De-icer $5.00 per gallon* Containment Plow 8'-10' $50.00 per hr. Safety Salt Buckets $50.00 per unit Containment Plow 12'-16' $80.00 per hr. Safety Sand/Salt Barrels $125.00 per unit 600 hp Snow Blower S265.00 per hr. Safety Sand/Salt Barrel Refills $50.00 per unit Airport Snow Blower S350.00 per hr. Sidewalk De-icer $0.70 per lb* Snow Melter Price On Request *Market rates will apply. CEPM Initial:Ilk Control Concepts, Inc. Initial: C 1/"-J Ns 2735 Cheshire La 7.rth,Plymouth MN 55447 www.CuttingEdgePM.com Office:763 755.3800 Fax:763.780.3802. • Tuesday,August 20, 2019 PROPOSAL SUBMITTED TO: PROPERTY NAME/ LOCATION: Control Concepts, Inc. Control Concepts 18760 Lake Drive East 8077 Century Blvd. Chanhassen Channhassen MN 55317 2019 / 2020 Snow & Ice Management 'Ice Control' Contract Pre-Treatment Application: A pre-treatment of liquid magnesium chloride will be applied to parking lots and/or sidewalks 24 to 48 hours prior to an impending snow event. CEPM will use its'discretion in applying the liquid pre-treatment relative to weather conditions. In the event that it does not snow,the pre-treatment will remain effective for up to(5)days. Material: Liquid Magnesium Chloride: $5.00` per gallon applied,plus$75.00 truck charge *Market rates will apply. Parking Lots-Accepted: Sidewalks-Accepted: Both-Accepted: Not Accepted: During and Post Event Application Protocol: Daytime Event Application: De-icing services will be performed on parking lot and sidewalk areas during daytime or business hours on an as needed basis to maintain safe conditions on the site. Post-Event Application: A post-treatment will be applied as needed to maintain safe conditions following a final full plowing and shoveling after a snow event. *Cutting Edge Property Maintenance will use its'discretion on when to apply de-icing material and what type of material used relative to weather conditions. All deicing will be billed on a time and material basis. Material#1: 100%D.O.T. Road Salt: 5150.00* per ton applied,plus$75.00 salt truck charge Material#2: Treated D.O.T.Road Salt: $200.00* per ton applied,plus$75.00 salt truck charge Material#3: 80%Sand/20%Salt: $100.00` per ton applied,plus$75.00 salt truck charge Material#4: Liquid Magnesium Chloride: $5.00* per gallon applied,plus$75.00 salt truck charge Material#5: Sidewalk De-icer: $0.70* per pound applied,plus sidewalk labor charge *Market rates will apply. Accepted: I Not Accepted: *Any Ice Control will be Per Request. *If not accepted, customer shall hold contractor harmless for claims by any person or party claiming an accident or injury due to slippery or icy conditions on any and all parking and sidewalk areas on the property. Property Safety Checks-Ice Patrol: $35.00 Flat rate charged per day. (Any Ice Control material not included) CEPM personnel will patrol property prior to 6:00 am on non-snow days,checking parking lots and sidewalks for any hazardous conditions that may exist. Any hazardous conditions will be addressed and serviced immediately Any ice control materials will be charged separately. (5)Days Per Week: (4)Days Per Week: (3)Days Per Week: Not Accepted: C �" (2) Days Per Week: (1)Day Per Week: Weekends: Safety Sand/Salt Barrels $150.00 per unit delivered—50 gallon barrels containing 80%sand/20%salt mixture. Operable lid and application scoop. Barrels are typically placed near loading docks,entry/exits,garage ramps,problem and sloped areas. Accepted: Not Accepted: ( Vsl Total Needed: Safety Salt Buckets $75.00 per unit delivered—5 gallon buckets containing de-icer material. Operable lid and application scoop. Buckets are typically placed near building entrances and loading docks. Accepted: Not Accepted: C'sj Total Needed: CEPM Initial: kali Control Concepts,Inc. Initial: 2735 Cheshire La"orth,Plymouth MN 55447 www.CuttingEdgePM.com Office:763.755 3800 Fax•763.780.3802. Tuesday,August 20, 2019 PROPOSAL SUBMITTED TO: PROPERTY NAME/LOCATION: Control Concepts,Inc. Control Concepts 18760 Lake Drive East 8077 Century Blvd. Chanhassen Channhassen MN 55317 2019 / 2020 Snow & Ice Management Contract Specifications 1. Contract Duration: November 1,2019 through March 31,2020 or longer if multiple year term is selected. 2. Snow removal services on parking lot areas shall commence at: 2 Ritch(s)accumulation of snow. C lJ 3. Snow removal services on sidewalk areas shall commence at: F:S,tjrich(s)accumulation of snow. 4. All parking lots and sidewalk areas will be cleared by 7:00 am.. 5. During late and/or continuous snowfalls after midnight,parking lot areas and sidewalks will be made accessible with an initial clearing by 7:00am. 6. During continuous and/or heavy daytime snowfalls,parking lot areas and sidewalks will be"opened up"throughout the day and billed on an hourly basis. 7. De-icing services will also be performed as needed to maintain safe conditions during periods of light snowfall,ice events or events under the plow and shovel trigger depths and billed on a hourly basis. 8. Snow accumulations will be cleared from all plowable areas curb-to-curb and stacked on appropriate or designated areas of the parking lot. Snow will only be pushed over curbs onto turf areas when instructed by the Owner or representative. 9. If snow levels become excessive,it may be necessary to relocate or remove snow piles to provide space for parking of future snow storage. This work will be performed on non-snow days and will be billed on an hourly basis. 10. All parking lot and sidewalk de-icing services will be performed on a hourly basis. De-icing treatment will be performed following each snow event. During periods of heavier snow,de-icing services will be performed on an as needed basis until a final clearing is completed to maintain safe conditions. 11. Contractor will mark curblines,islands,entry/exits,drains,catch basins and hydrants. 12. Contractor will be responsible for mechanical damage to plantings and turf areas due to snow operation if instructed not to stack snow onto turf areas. 13. Contractor will not be responsible for mechanical damage to plantings and turf areas due to snow operation if instructed to stack snow onto turf areas. 14. Contractor will not be responsible for any plant or turf damage due to ice control applications or from stacking snow on turf areas. 15. Contractor will repair at our option any previously intact concrete curbs that are damaged from the snow operation. Both parties acknowledge that surface chipping and scratching may occur from normal operation and contractor shall not be held liable for these damages. We will repair any damage to previously patched concrete curbs at owners cost if instructed. Damages to any asphalt curbs will not be repaired by the contractor. It is understood that asphalt curbs cannot standup to the rigors of snow removal. 16. Contractor will not be responsible for damage to irrigation systems along sidewalks or curblines. 17. One hour minimum charge on all equipment and labor. One ton minimum on all bulk ice control material. Portal-to-Portal charges prevail. 18. Contractor will provide qualified personnel to perform and supervise all operations. 19. All payments are due within 30 days of invoice date. A 1.5%finance charge will be added to the remaining balance for any past due accounts. Account may be suspended if open invoices are not paid within 60 days. 20. A 30 day written notice is required by either party before termination of this contract. Contract Duration Options: 1 Season: C V' thru 3/31/20 3 Seasons: (2%Increase) thru 3/31/22 *Please choose option. 2 Seasons: (Pricing Flat thru 3/31/21 4 Seasons: (4%Increase)thru 3/31/23 By: Title: 7 refc c) Date: S/2 2 lin Control • cepts,Inc. . B : • Title:A(40Vn}{ f tattiv(G Date:g to iK CI": - • Maintenance C� 2735 Cheshire Lane North,Plymouth MN 55447 www.CuttingEdgePM.com Office.763.755 3800 Fax:763.780.3802.