PC Staff Report 12-1-20PLANNING COMMISSION STAFF
REPORT
Tuesday,December 1,2020
Subject Consider a Request for an Amendment to the Chanhassen Gateway PUD,Modification to PUD-
Specific Design Features,and Amendment to Crossroads of Chanhassen Site Plan with
Variances for Construction of a 5,100 SF Automotive Repair Shop Located at 8941 Crossroads
Boulevard
Section PUBLIC HEARINGS Item No:C.1.
Prepared By Sharmeen Al-Jaff,Senior Planner File No:Planning Case No.2020-21
PROPOSED MOTION:
The Chanhassen Planning Commission recommends the City Council approve the site plan consisting of a 5,100
square-foot automotive repair shop,Planning Case 2020-21 as shown in plans dated received October 30,2020,
including the attached Findings of Fact and Recommendation,subject to conditions .”
SUMMARY OF REQUEST
Planned Unit Development amendment to allow auto repair facilities,amendments to design standards and a site plan
for the construction of a 5,100 square-foot automotive repair shop (Christian Brothers Automotive).
APPLICANT
Kimley-Horn Assoc.,Inc.Christian Jones 767 Eustis Street,Suite 100 St.Paul,MN 55114
Christian.Jones@kimley-horn.com 763-251-1016
SITE INFORMATION
PRESENT ZONING:Planned Unit Development,Mixed Use PUD,Mixed Use
LAND USE:Mixed Use
ACREAGE:0.79 acres
DENSITY:NA
APPLICATION REGULATIONS
Chapter 20,Article II,Division 2,Amendments
Chapter 20,Article II,Division 6,Site Plan Review
Chapter 20,Article VII,Planned Unit Development District
Chapter 20,Article XXIII,Division 7,Design Standards for Commercial,Industrial,and Office Institutional
PLANNING COMMISSIONSTAFFREPORTTuesday,December 1,2020SubjectConsideraRequest for an Amendment to the Chanhassen Gateway PUD,Modification to PUD-Specific Design Features,and Amendment to Crossroads of Chanhassen Site PlanwithVariancesforConstructionofa5,100 SF Automotive Repair Shop Located at 8941CrossroadsBoulevardSectionPUBLICHEARINGSItemNo:C.1.Prepared By Sharmeen Al-Jaff,Senior Planner File No:Planning Case No.2020-21PROPOSEDMOTION:“The Chanhassen Planning Commission recommends the City Council approve the site plan consisting of a 5,100square-foot automotive repair shop,Planning Case 2020-21 as shown in plans dated received October 30,2020,including the attached Findings of Fact and Recommendation,subject to conditions .”SUMMARY OFREQUESTPlannedUnitDevelopmentamendment to allow auto repair facilities,amendments to design standards and a siteplanfortheconstructionofa5,100 square-foot automotive repair shop (Christian Brothers Automotive).APPLICANTKimley-Horn Assoc.,Inc.Christian Jones 767 Eustis Street,Suite 100 St.Paul,MN55114Christian.Jones@kimley-horn.com 763-251-1016SITEINFORMATIONPRESENTZONING:Planned Unit Development,Mixed Use PUD,MixedUseLANDUSE:MixedUseACREAGE:0.79 acresDENSITY:NAAPPLICATIONREGULATIONSChapter20,Article II,Division 2,Amendments
Chapter 20,Article II,Division 6,Site Plan Review
Chapter 20,Article VII,Planned Unit Development District
Chapter 20,Article XXIII,Division 7,Design Standards for Commercial,Industrial,and Office Institutional
Developments
BACKGROUND
The Land Use Plan designates areas around the TH 101/TH 212 interchange as Mixed Use.This category has been
established to accommodate either commercial or high-density residential developments.The high-density category,
which includes units with a maximum net density of
16.0 units per acre,accommodates apartments and higher density condominium units,but would also permit the
development of townhome-type units.
The commercial use is intended to support or complement high-density residential development.Commercial uses
may include convenience grocery stores,daycare facilities,etc.,or those uses that meet the daily needs of the
residents.
The Planned Unit Development governing this development needs to be amended and standards for the use developed
in order for the site plan to be considered and approved.
RECOMMENDATION
The Chanhassen Planning Commission recommends the City Council approve the site plan consisting of a 5,100
square-foot automotive repair shop,Planning Case 2020-21 as shown in plans dated received October 30,2020,
including the attached Findings of Fact and Recommendation,subject to conditions .”
ATTACHMENTS:
Staff Report
Findings of Fact and Recommendation Approval
Findings of Fact and Recommendation Denial
Ordinance Amendment
Development Review Application
Narrative
Landscaping Plans
Letter from Riley Purgatory Bluff Creek Watershed District
Letter from Carver County
Email from Nancy Smith
Email from Jeff Erpelding
Letter from MnDOT
Affidavit of Mailing
Memo from Applicant dated October 30,2020
Architectural Plans
Civil Plans
Overall Development
Colored Site Plan
Stormwater Report
Signage Plan
Architectural Design Letter dated October 23,2020
Photometrics and Lighting Plan
Colored Renderings
Colored Exterior Elevations
CITY OF CHANHASSEN
PROPOSED MOTION:
The Chanhassen Planning Commission recommends the City Council approve the site plan
consisting of a 5,100 square-foot automotive repair shop, and Planned Unit Development
amendment for Chanhassen Gateway allowing Automotive Repair shops with standards,
Planning Case 2020-21 as shown in plans dated received October 30 , 2020, including the
attached Findings of Fact and Recommendation, subject to conditions.”
Note: A motion for denial and appropriate Findings of Fact are also included at the end of the
report.)
PC DATE: December 1, 2020
CC DATE: December 14, 2021
REVIEW DEADLINE: Waived
CASE #: 2020-21
BY: SJ, ET, EH, MU, DJ, JS
SUMMARY OF REQUEST: Planned Unit Development amendment to allow auto repair
facilities, amendments to design standards and a site plan for the construction of a 5,100 square
foot automotive repair shop (Christian Brothers Automotive).
LOCATION: SE of Crossroads Boulevard, 8941 Crossroads Boulevard (Lot 3, Block 1,
Crossroads of Chanhassen).
APPLICANT: PROPERTY OWNER:
Kimley-Horn & Assoc., Inc. Kraus-Anderson Inc.
Christian Jones Chrystal Seelhammer
767 Eustis Street, Suite 100 525 S.8th Street
St. Paul, MN 55114 Minneapolis, MN 55404-1030
Christian.Jones@kimley-horn.com chrystal.seelhammer@krausanderson.com
763-251-1016 612-255-2345
PRESENT ZONING: Planned Unit Development, Mixed Use - PUD, Mixed Use
2040 LAND USE PLAN: Mixed Use
ACREAGE: 0.79 acres
DENSITY: N/A
LEVEL OF CITY DISCRETION IN DECISION-MAKING:
The City has a relatively high level of discretion in approving amendments to PUDs because
the City is acting in its legislative or policy-making capacity. A PUD amendment must be
consistent with the City's Comprehensive Plan.
The City's discretion in approving or denying a site plan is limited to whether or not the
proposed project complies with Zoning Ordinance requirements. If it meets these standards,
the City must then approve the site plan. This is a quasi-judicial decision.
Notice of this public hearing has been mailed to all property owners within 500 feet.
Christian Brothers Automotive
Planning Case No. 2020-21
December 1, 2020
Page 2
PROPOSAL/SUMMARY
The request consists of two
applications to facilitate the
construction of an automotive
facility. The request includes a
Planned Unit Development
amendment to existing standards,
and Site Plan Approval for a 5,100
square foot automotive facility.
The site is located southeast of
Crossroads Boulevard. Access to
the site will be gained off of
Crossroads Boulevard. The site is
zoned Planned Unit Development-
Mixed Use.
The following is a summary of the
requests:
1. Planned Unit Development
Amendment:
The first request is to amend the
permitted uses section to allow
automotive repair shops.
2. Site Plan:
The second request is for a site plan to
construct a 5,100 square foot
automotive repair shop. This use is
not permitted under the PUD
ordinance governing the site. If the
requested amendment is not approved,
the request for the site plan cannot
proceed.
The total permitted site coverage is 70 percent. The proposed development has a total hard
coverage area of 43.8%.
The design of the building is attractive and is proposed to be constructed of high-quality
materials which include brick, concrete block and EIFS. The design of the building is
harmonious with the surrounding buildings. Approval of this site plan is contingent upon
amending the planned unit development to allow the use of automotive repair shops. Parking
and nine garage doors have been screened properly.
Access to the site is provided via internal curb cuts off of Crossroads Boulevard.
Christian Brothers Automotive
Planning Case No. 2020-21
December 1, 2020
Page 3
APPLICABLE REGULATIONS
Chapter 20, Article II, Division 2, Amendments
Chapter 20, Article II, Division 6, Site Plan Review
Chapter 20, Article VII, Planned Unit Development District
Chapter 20, Article XXIII, Division 7, Design Standards for Commercial, Industrial, and Office-
Institutional Developments
BACKGROUND
The Land Use Plan designates areas around the TH 101/TH 212 interchange as Mixed Use. This
category has been established to accommodate either commercial or high-density residential
developments. The high-density category, which includes units with a maximum net density of
16.0 units per acre, accommodates apartments and higher density condominium units, but would
also permit the development of townhome-type units.
The commercial use is intended to support or complement high-density residential
development. Commercial uses may include convenience grocery stores, daycare facilities,
etc., or those uses that meet the daily needs of the residents.
The Planned Unit Development governing this development needs to be amended and
standards for the use developed in order for the site plan to be considered and approved.
Christian Brothers Automotive
Planning Case No. 2020-21
December 1, 2020
Page 4
Concept Plan
On January 4, 2005, the
Planning Commission
reviewed and approved the
Concept PUD for the site
not to be confused with
site plan approval). This
plan was later approved by
City Council on
January 24, 2005. This
final concept layout
reflected a residential
component within the
areas located north and
south of Lake Susan Drive
with the highest density
concentration facing
Highway 101.
The portion of the site located south of Highway 212 consisted of a mix of commercial and
residential uses. In that instance, the residential part encompassed the western portion of the site
while the commercial part occupied the remainder of the site, and faced Highways 101, 212, and
Lyman Boulevard.
Christian Brothers Automotive
Planning Case No. 2020-21
December 1, 2020
Page 5
Development Plan
On June 27, 2005, the City Council approved rezoning the property from Residential Single
Family to Planned Unit Development-Mixed Use and adopted the Planned Unit Development
ordinance that regulated and set standards for the development of this site including permitted uses,
landscaping, setbacks, signage, building materials, architectural standards, parking, etc.
On Februar y 27, 2006, the Chanhassen City Council approved a site plan for the construction of a
three-story multi-family building containing 48 units, located northwest of the intersection of
Highways 212/101 (north site).
On January 24, 2008, the City requested the vacation of right-of-way along old Trunk Highway
101. A portion of the old highway occupies the westerly portion of the site. Development of the
westerly portion of the site is contingent upon Minnesota Department of Transportation vacating
the right-of-way.
Amended Development Plan
On March 10, 2008, the Chanhassen City Council approved the following:
Planned Unit Development amendment clarifying setbacks, signage, and retail building
size.
Variance request to allow a 20-foot setback from Lyman Boulevard and a 20-foot setback
from Highway 101.
Preliminary plat for Planning Case 2008-01 for Crossroads of Chanhassen.
Seven site plans consisting of a 5,300 square-foot convenience store with gas pumps and a
2,805 square-foot
car wash (Building
4A), a multi-tenant
building with an
area of 11,000
square feet
Building 4B), a
two-story multi-
tenant building with
a first floor area of
13,800 square feet
and second floor
area of 15,000
square feet
Building 4C), a
one-story retail
building with an
area of 8,000 square feet (Building 4D), a 5,000 square-foot bank with drive-thru
window (Building 4E), a 3,400 square -foot retail building (Building 4F), and a 10,000
square-foot Deli and Liquor Store (Building 4G).
Christian Brothers Automotive
Planning Case No. 2020-21
December 1, 2020
Page 6
On April 28, 2008, the City Council approved a final plat to subdivide 14.9 acres into three lots
and one outlot - Crossroads of Chanhassen.
On July 14 , 2008, the Chanhassen City Council granted final plat approval for Crossroads of
Chanhassen 2nd Addition creating two lots and one outlot for the area of the development that is
being reviewed as part of the development proposal for the daycare. That plat was never
recorded.
As part of the submittal, staff directed the applicant to conduct a traffic study to evaluate
the trip generation and circulation of the site along with the impact to the intersection of
Lyman Boulevard and Highway 101. A traffic study was performed by the applicant's
engineer and reviewed by the City’s traffic consultant. Internally, the site has acceptable
circulation. The only external site issue that was discovered is at the intersection of Lyman
Boulevard and Crossroads Boulevard. Access spacing guidelines for Carver County do not
allow a signal at this intersection. The possibility exists that the County could some day
switch the access to Crossroads Boulevard to a right-in/right-out or block some of the
turning movements.
On March 26, 2012, the Chanhassen City Council approved a Planned Unit Developm ent
amendment to the existing standards; Preliminary and Final Plat to subdivide 6.15 acres into
one lot and one outlot (Crossroads of Chanhassen 2nd Addition); and Site Plan Approval
for construction of a daycare facility (Primrose of Chanhassen). This request combined
Buildings 4F and 4G into a single building.
Christian Brothers Automotive
Planning Case No. 2020-21
December 1, 2020
Page 7
SITE PLAN
In order to provide a better understanding of the overall development, staff will first review the
site plan component , which in turn leads to the PUD amendment. The building must comply
with the Development Design Standards for Chanhassen Gateway. A PUD is required to be
developed to a higher quality than other projects. Site coverage is averaged over the entire
development. This is permitted under the PUD ordinance (Section 20-505(e)). The total
permitted site coverage is 70 percent. The proposed development has a total hard coverage
area of 43.8%.
The design of the 5,100 square foot building is attractive and is proposed to be constructed of
high quality materials. They include br ick, EIFS accents, rough-face block, awnings, and
glass. All elevations that can be viewed by the public have received equal attention. Shared
parking is centrally located on the site. It is buffered from views by buildings and
landscaping.
Staff had multiple conversations with the applicant and explained that the proposed building
should be unique yet be harmonious and complement the buildings on the block. The
proposed design of the building, as well as the materials used, fit and complement existing
structures. All 9 garage doors and parking lot are properly screened. Complimentary design
elements include parapet walls, pronounced entryway and awnings around the windows to
soften the look of the building.
Christian Brothers Automotive
Planning Case No. 2020-21
December 1, 2020
Page 8
Below is a colored rendering with the proposed materials which will make the building
architecturally a fitting element of the overall development.
Christian Brothers Automotive
Planning Case No. 2020-21
December 1, 2020
Page 9
Parking is proposed along the southeast half of the site. Buffering/screening of the parking and
the garage doors will be discussed in the L andscaping section of this report.
The applicant is proposing a bench at the entrance of the building.
The structure is proposed to be located on Lot 3, Block 1, Crossroads of Chanhassen.
One monument sign is
proposed along the
northwest corner of the
site. The sign must meet
all sign ordinance
requirements.
Christian Brothers Automotive
Planning Case No. 2020-21
December 1, 2020
Page 10
The ordinance regulating this development limits signage to two elevations per building.
The size of the individual letters may not exceed 30 inches and the sign must comply with
ordinance. Wall signs are proposed above the three middle garage doors and the rear of the
building.
All signage (Monument and Wall signs) shall use individual dimension letters, at least
one-half inch deep . The logo may not exceed 30% of the total sign area.
All buildings within the development of Crossroads of Chanhassen must maintain a 20-
foot setback from the right-of-way. To continue the vernacular perspective, the applicant
will maintain this setback.
Christian Brothers Automotive
Planning Case No. 2020-21
December 1, 2020
Page 11
LIGHTING
The applicant has submitted a lighting and photometric plan. Light levels for site lighting
shall be no more than one-half foot candle at the project perimeter property line. This does
not apply to street lighting. All light fixtures must be consistent with the approved lighting
plans. Staff is recommending that the lights be consistent with the approved fixtures in the
development. Parking lot light fixtures may be 25 feet tall. All fixtures must be shielded.
Monterey
PARKING
The ordinance requires auto repair shops to provide one parking space per 500 square feet of
gross floor area. The entire Crossroads PUD shares parking spaces. The total required for
the entire development is 247. The total proposed including the subject site is 278.
ARCHITECTURAL COMPLIANCE
Size, Portion and Placement
Entries: The building has a pronounced entrance.
Articulation: The building is part of a PUD. The buildings are intended to complement
each other. The proposed building blends in and complements the architecture of the
surrounding structures. It has unique features. All garage doors, parking and trash
enclosure are properly screened.
Signs: All signage must meet the sign criteria in the Planned Unit Development Design
Standards for Chanhassen Gateway.
W. 78th Street
Christian Brothers Automotive
Planning Case No. 2020-21
December 1, 2020
Page 12
Material and Detail
High quality materials are being used on the building.
Color
The colors chosen for the building are earth tones. All materials are highly compatible with
the existing buildings.
Height and Roof Design
The maximum building height in this PUD varies based on the use. The building meets the
minimum set in the ordinance. The roofline is staggered, complements and is harmonious
with the surrounding buildings. All rooftop equipment must be screened from views.
Façade Transparency
All facades viewed by the public contain more than 50 percent windows and/or doors except
the southwest elevation. It is however properly screened.
Loading Areas, Refuse Areas, Etc.
The trash enclosure is located along the northeast corner of Lot 3, Block 1. The exterior
material must be of the same exterior material as the building. Recycling space and other
solid waste collection space should be contained within the same enclosure.
SITE PLAN FINDINGS
In evaluating a site plan and building plan, the City shall consider the development's
compliance with the following:
1) Consistency with the elements and objectives of the City's development guides,
including the Comprehensive Plan, official road mapping, and other plans that may be
adopted;
2) Consistency with this division;
3) Preservation of the site in its natural state to the extent practicable by minimizing tree
and soil removal and designing grade changes to be in keeping with the general
appearance of the neighboring developed or developing areas;
4) Creation of a harmonious relationship of building and open space with natural site
features and with existing and future buildings having a visual relationship to the
development;
Christian Brothers Automotive
Planning Case No. 2020-21
December 1, 2020
Page 13
5) Creation of a functional and harmonious design for structures and site features, with
special attention to the following:
a. An internal sense of order for the buildings and use on the site and provision of a
desirable environment for occupants, visitors and general community;
b. The amount and location of open space and landscaping;
c. Materials, textures, colors and details of construction as an expression of the design
concept and the compatibility of the same with adjacent and neighboring structures
and uses; and
d. Vehicular and pedestrian circulation, including walkways, interior drives and
parking in terms of location and number of access points to the public streets, width
of interior drives and access points, general interior circulation, separation of
pedestrian and vehicular traffic and arrangement and amount of parking.
6) Protection of adjacent and neighboring properties through reasonable provision for
surface water drainage, sound and sight buffers, preservation of views, light and air and
those aspects of design not adequately covered by other regulations which may have
substantial effects on neighboring land uses.
Finding: The proposed development creates a harmonious relationship with existing
and future buildings. It does provide a compatible visual relationship.
Approval of this building is contingent upon approval of the permitted uses of the Planned
Unit Development ordinance to allow auto repair shops with standards.
PUD AMENDMENT
Allow an Auto Repair Shop: The language in the PUD currently does not permit any type
of auto repair facilities.
Staff has been working with the applicant and has had numerous discussions to prepare a
plan that can meet the intent of the ordinance. The proposed location is the farthest from
any residential development but staff still has concerns. This type of establishment can
generate loud noises from power tools. In the summer, all garage doors remain open and
the sound can carry to surrounding areas.
Should the City approve this amendment, staff recommends adding the following
language under permitted uses:
Automotive Repair Shop on Lot 3, Block 1, with the following standards:
o No unlicensed or inoperable vehicles shall be stored on-premises except in
appropriately designed and screened storage areas.
o All repair, assembly, disassembly and maintenance of vehicles shall occur
Christian Brothers Automotive
Planning Case No. 2020-21
December 1, 2020
Page 14
with closed building except minor maintenance including, but not limited to,
tire inflation, addition oil and wiper replacement.
o No public address system.
o No sales, storage or display of used automobiles or other vehicles such as
motorcycles, snowmobiles, or all-terrain vehicles.
o Disposal of vehicle fluids shall comply with PCA regulations.
o Facilities for the collection of waste oil must be provided.
o All service/garage doors shall be screened.
o The building architecture shall co mplement surrounding buildings.
PLANNED UNIT DEVELOPMENT AMENDMENT FINDINGS
The Zoning Ordinance directs the Planning Commission to consider six (6) possible adverse
effects of the proposed amendment. The six (6) effects and our findings regarding them are:
a) The proposed action has been considered in relation to the specific policies and
provisions of and has been found to be consistent with the official City Comprehensive
Plan.
Finding: The site is guided Mixed U se (residential and neighborhood commercial). An
auto repair shop can provide some convenience to neighboring properties.
b) The proposed use is or will be compatible with the present and future land uses of the
area.
Finding: The proposed use can generate noise. The design and architecture of the
proposed building is compatible with the surrounding buildings (design standards,
landscaping, architecture, etc.).
c) The proposed use conforms with all performance standards contained in the Zoning
Ordinance.
Finding: The proposed use will conform with all performance standards contained in
the Zoning Ordinance such as design standards, signage, durable materials, uses, etc.
d) The proposed use will not tend to or actually depreciate the area in which it is proposed.
Finding: The proposed use is intended to meet the daily needs of the area. It could
potentially add convenience to the homeowners in the area.
e) The proposed use can be accommodated with existing public services and will not
overburden the City's service capacity.
Christian Brothers Automotive
Planning Case No. 2020-21
December 1, 2020
Page 15
Finding: The site is located within the Municipal Urban Service Area. The proposed
use can be accommodated with existing public services and will not overburden the
City's service capacity.
f) Traffic generation by the proposed use is within capabilities of streets serving the property.
Finding: Traffic generation by the proposed use is within capabilities of streets serving
the property.
ACCESS
Vehicular access to the site was originally provided from Crossroads Boulevard, a public street
designed and built to Municipal State Aid Standards, during the construction of the original
build-out of Crossroads of Chanhassen in 2008. The applicant is proposing to remove and
restore the single access from Crossroads Boulevard in order to facilitate the proposed site plan
layout. The removal and restoration of the original access will be required to meet the City’s
Standard Specifications and Detail Plates and will require a traffic control plan for review and
approval prior to commencement of construction activities on-site. The applicant is proposing
that the building be located at the western edge of the site, angled parallel to Crossroads
Boulevard, with the customer facing side of the building internal to the development, with
parking located directly east of the building. With the proposed layout, vehicular access will be
had from two driveways connected by the internal, private roads of the Crossroads of
Chanhassen to the north and south of the site (see image below).
Christian Brothers Automotive
Planning Case No. 2020-21
December 1, 2020
Page 16
The south driveway appears to propose no extraordinary issues, however , the north driveway
entrance may negatively impact vehicular traffic on Crossroads Boulevard due to the spacing
from the intersection with Crossroads Boulevard. The applicant was required to provide analysis
that the proposed north driveway location is adequately spaced as to not create adverse impacts
to Crossroads Boulevard and that the largest design vehicle accessing the site could turn into the
north driveway access fr om Crossroads Boulevard (from both northbound and southbound
movements). The provided analysis proved the north access feasible.
Crossroads Boulevard intersections with Lyman Boulevard, a Carver County road, and Highway
101, which is governed by MnDOT. Plans were provided to both parties for review, and any
applicable comments and conditions set by Carver County and MnDOT must be addressed. The
applicant will be required to provide a brief traffic memo identifying changes to the PUD trip
generation leve ls, traffic patterns, and impacts to the County and MnDOT intersections
compared to the original PUD plan and traffic study as the site was not analyzed based on the
intended use (previous trip generations were based on a drive-thru bank).
EASEMENTS
A 10-foot public drainage and utility easement along the western portion of the property was
recorded with the original plat from 2008 for Crossroads of Chanhassen. As all utilities and
Christian Brothers Automotive
Planning Case No. 2020-21
December 1, 2020
Page 17
roads within the development are privately owned and maintained and covered under cross
access agreements or private easements, no additional public easements are required from the
proposed site plan. It is recommended that the applicant verify that all private easements and
cross access agreements and their subsequent conditions are adhered to prior to construction.
GRADING
The first phase of the Crossroads of Chanhassen PUD completed mass grading of the site to
achieve the relative elevations required for the site to be built-out. As such, the applicant is not
proposing mass grading or major alterations to existing elevations of the site. However, as
improvements are installed (underground and surface stormwater facilities, installation of
utilities, paving and construction of parking areas, building pads, etc.) the site will expose soils
and will be required to meet all erosion control measures as addressed under “Drainage and
Erosion Control” of this report.
DRAINAGE AND EROSION CONTROL
The proposed development will exceed 5,000 square feet of land area disturbance, and as such,
will require an erosion and sediment control plan submitted to the City. This shall be a stand
along document that includes all required information listed in Chapter 19-145(a)(2) of the
Chanhassen City Code. The applicant appears to have provided a sufficient erosion and sediment
control plan, with minor amendments required. All erosion control shall be installed and
inspected prior to initiation of site grading activities.
The proposed erosion control measures and BMPs appear adequate. However, if at any time
during the construction of the site prior to final stabilization, these measures are found to be
inadequate, additional BMPs will be required to meet the NPDES permit. All exposed soil areas
shall have temporary erosion protection or permanent cover year round. In the event that
dewatering is needed, the city inspector shall be contacted prior to any dewatering activities.
STORMWATER MANAGEMENT
The proposed development consists of a new automotive repair building, parking lot, associated
utilities, and an underground and surface stormwater management BMPs. The 0.80-acre site is
subject to the requirements of the Riley Purgatory Bluff Creek Watershed District (RPBCWD).
The existing site consists of a vacant grass area with slopes of 1% to 4% encompassing much of
the site. Prior to the proposed development, stormwater from the northeastern portion of the site
flows to an existing inlet to the north of the site along an internal road for the overall
development and is conveyed to the public storm sewer system. The western and northwestern
portion of the site flows west to Crossroads Boulevard, a paved public street. Stormwater from
the eastern and southern portion of the site flows to an existing area drain inlet on the south
portion of the site and connects to the existing underground stormwater system. After
development, site improvements will maintain existing drainage patterns. Stormwater runoff
from a portion of the roof and a majority of the paved parking surface will discharge to a
proposed underground stormwater infiltration system, noted on the plans as BMP #2. The
Christian Brothers Automotive
Planning Case No. 2020-21
December 1, 2020
Page 18
underground stormwater infiltration system is proposed to be perforated 36” pipe. Overflow
from this BMP is routed to the existing underground storm sewer network. Stormwater runoff
from the western portion of the roof will discharge to an infiltration basin, noted on the plans as
BMP #1, on the west side of the proposed building. Overflow from this BMP is routed to an
existing catch basin within Crossroads Boulevard. These BMPs appear to be adequate to treat
stormwater runoff from the site. All stormwater from the site eventually runs to MnDOTs
BraeBurn Pond, which was constructed with the off ramp of Highway 212. The applicant has
evaluated that the impervious surface from this site will not inundate or negatively impact the
downstream MnDOT facility based on new rainfall requirements (TP-40 vs NOAA Atlas 14).
Article VII, Chapter 19 of City Code describes the required stormwater management
development standards. Section 19-141 states that “these development standards shall be
reflected in plans prepared by developers and/or project proposers in the design and layout of site
plans, subdivisions and water management features.” These standards include abstraction of
runoff and water quality treatment resulting in the removal of 90% total suspended solids (TSS)
and 60% total phosphorous (TP).
In addition, the project will need a permit from the Riley Purgatory Bluff Creek Watershed
District prior to beginning construction activities. The RPBCWD provided a memorandum
outlining the need for a permit and listed potential District rules that this project might meet.
These rules are not considered exhaustive of all potential RPBCWD rules or provisions that may
apply. The City encourages the applicant to work directly with RPBCWD to obtain the necessary
approvals and permit.
UTILITIES (SANITARY/WATER)
The developer of the Crossroads of Chanhassen installed private sanitary sewer and water main
throughout the development during the 2008 build-out of the PUD, and the proposed site has
adequate sanitary and water services which will be had from these private utility extensions. The
applicant is proposing to abandon an existing water service stub located near the southwest
corner and southeast corner of the site. These service laterals were installed with the Crossroads
of Chanhassen and the proposed abandonment appears to be due to the proposed site layout.
Abandonment of the existing water services shall meet the City’s Standard Specifications and
Detail Plates (Specifications). The applicant is proposing to service the site with 1” PVC water
service and a 6” PVC sanitary sewer service to be connected directly to the existing 8” stub.
As required by Ordinance, the subject development is required to pay sanitary sewer and water
hookup charges. These fees are based on the number of SAC units assigned by the Met Council
and are due at the time of building permit issuance. The 2020 rates are $2,302.00/unit and
7,974.00/unit for sanitary sewer and water, respectively.
LANDSCAPING AND TREE PRESERVATION
Minimum requirements for landscaping at the proposed development include 1,484 sq. ft. of
landscaped area around the parking lot, 3 landscape islands or peninsulas, and 6 trees for the
Christian Brothers Automotive
Planning Case No. 2020-21
December 1, 2020
Page 19
parking lot. The applicant’s proposed as compared to the requirements for landscape area and
parking lot trees is shown in the following table.
Required Proposed
Vehicular use landscape area 1,484 sq. ft. 1,484 sq. ft.
Trees/parking lot 6 trees 6 trees
Islands or peninsulas/parking lot 3 islands/peninsulas 3 islands/peninsulas
The applicant meets minimum requirements for landscaping.
The applicant has proposed screening for the garage doors or parking spaces. Adequate
screening of this area is provided by evergreen shrubs along the eastern property line.
Boulevard trees are required along Crossroads Boulevard every 30 feet. The applicant has
proposed additional trees to meet the current spacing of existing trees.
The applicant is protecting seven existing trees on site. These trees will be covered by the same
standards as the proposed landscaping and will require replacement if damaged or dead upon
inspection.
Compliance Table
Boundary Building/Parking Setbacks
feet)
Proposed
Lyman Boulevard 20/20 NA
Highway 101 North of Highway 212 50/50 NA
Highway 101 South of Highway 212 20/20 NA
Highway 212 50/50 NA
Northerly Project Property Line 50/20 NA
Westerly Project Property Line 50/20 NA
Internal Project property lines 0/0 N 20’ E 70’
S 37’ W20’
Internal Right-of-Way (Crossroads
Boulevard)
20/20 20/20
Hard Surface Coverage-Residential 50% NA
Commercial and Office Hard Surface
Coverage
70% 68.1%.
Maximum Commercial (Retail)
Building/Structure Height
1 story 1 Story
Maximum Office Building/Structure
Height
2 stories NA
Maximum Residential Building/Structure
Height
35 or 3 stories, whichever
is less
NA
Christian Brothers Automotive
Planning Case No. 2020-21
December 1, 2020
Page 20
RECOMMENDATION
Alternative 1:
The Planning Commission recommends approval of:
PLANNED UNIT DEVELOPMENT AMENDMENT
The Planning Commission recommends the City Council approve the Planned Unit
Development amendment in the attached ordinance for Chanhassen Gateway allowing
Automotive Repair shops with the following standards:
Automotive Repair Shop on Lot 3, Block 1, with the following standards:
o No unlicensed or inoperable vehicles shall be stored on-premises except in
appropriately designed and screened storage areas.
o All repair, assembly, disassembly and maintenance of vehicles shall occur
within closed building except minor maintenance including, but not limited
to, tire inflation, adding oil and wiper replacement.
o No public address system.
o No sales, storage or display of used automobiles or other vehicles such as
motorcycles, snowmobiles, or all-terrain vehicles.
o Dispos al of vehicle fluids shall comply with PCA regulations.
o Facilities for the collection of waste oil must be provided.
o All service/garage doors shall be screened.
o The building architecture shall complement surrounding buildings."
SITE PLAN APPROVAL
The Planning Commission recommends the City Council approve the site plan consisting
of a 5,100 square -foot automotive repair shop, Planning Case 2020-21 as shown in plans
dated received October 30, 2020, including the attached Findings of Fact and
Recommendation, subject to the following conditions:
Environmental Resources Conditions:
1. All existing trees on site to be saved during construction shall be protected at all times by
tree preservation fencing. Trees that are damaged or dead will be replaced.
Engineering:
1. The applicant shall provide a traffic control plan for review and approval for the removal
and restoration of the original access had from Crossroads Boulevard prior to
commencement of construction activities on-site.
2. The applicant shall pay the appropriate sanitary sewer and water trunk hook-up fees at the
time of building permit issuance. These fees are based on the number of SAC units
Christian Brothers Automotive
Planning Case No. 2020-21
December 1, 2020
Page 21
assigned by the Met Council and are due at the time of building permit issuance. The
2020 rates are $2,302.00/unit and $7,974.00/unit for sanitary sewer and water,
respectively.
3. Prior to commencement of any construction activities, a copy of all required permits from
the appropriate regulatory agencies shall be provided to the City which shall include, but
is not limited to: the Minnesota Department of Health, the Minnesota Department of
Transportation, the Metropolitan Council Environmental Services, the Minnesota
Pollution Control Agency, Riley Purgatory Bluff Creek Watershed, etc.
Water Resources:
1. The applicant has provided an erosion and sediment control plan as required by Chapter
19-145 of the City Code. The applicant shall update the plans to include the City’s Water
Resources Coordinator as the contact on the plans (Matt Unmacht, Water Resources
Coordinat or, 952-227-1168).
2. The applicant shall evaluate and analyze that the impervious surface from this site will
not inundate or negatively impact the downstream MnDOT facility based on new rainfall
requirements (TP-40 vs NOAA Atlas 14). This analysis must be provided to the City
under separate cover.
Planning:
1. Approval of the site plan shall be contingent upon approval of the Planned Unit
Development amendment to allow Automotive Repair shops.
2. All rooftop and ground equipment must be screened from views.
3. Sign illumination and design shall comply with ordinance.
4. The exterior material for the trash enclosure must be of the same exterior material as
the building. Recycling space and other solid waste collection space should be contained
within the same enclosure.
5. The monument sign may not exceed 24 square feet in area nor be higher than five feet. The
sign shall be located 10 feet from the property line. A sign permit is required before
construction of the sign.
6. Sign illumination and design shall comply wit h ordinance.
7. Recycling space and other solid waste collection space should be contained within the same
enclosure as the trash.
8. Any prior approvals for a bank building on the subject site shall be null and void.
9. No unlicensed or inoperable vehicles shall be stored on-premises except in appropriately
designed and screened storage areas.
Christian Brothers Automotive
Planning Case No. 2020-21
December 1, 2020
Page 22
10. All repair, assembly, disassembly and maintenance of vehicles shall occur within closed
building except minor maintenance including, but not limited to, tire inflation, adding oil
and wiper replacement.
11. No public address system.
12. No sales, storage or display of used automobiles or other vehicles such as motorcycles,
snowmobiles, or all-terrain vehicles.
13. Disposal of vehicle fluids shall comply with PCA regulations.
14. Facilities for the collection of waste oil must be provided.
15. All service/garage doors shall be screened.
Alternative 2:
The Planning Commission recommends denial of the Planned Unit Development
Amendment to allow an Automotive Repair Shop and denial of a site plan consisting of a
5,100 square -foot automotive repair shop, Planning Case 2020 -21 as shown in plans dated
received October 30, 2020, and including the attached Findings of Fact and
Recommendation.
ATTACHMENTS
1. Findings of Fact and Recommendation – Approval
2. Findings of Fact and Recommendation – Denial
3. Ordinance Amendment
4. Application and Narrative
5. Reduced Copy of Plans dated "Received October 30, 2020 "
6. Landscaping Plans
7. Letter from Riley Purgatory Watershed District dated September 12, 2020
8. Letter from Carver County Public Works dated September 25, 2020
9. E-mail from Ms. Nancy Smith dated September 28, 2020
10. E-mail from Mr. Jeff Erpelding dated September 17, 2020
11. Letter from MnDOT
12. Public Hearing Notice and Affidavit of Mailing
g:\plan\2020 planning cases\20 -21 8941 crossroads blvd (christian bros automotive)\revised documents 10-30-20\staff report december 1, pc.doc
1
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
FINDINGS OF FACT
AND RECOMMENDATION
APPROVAL)
IN RE:
Application of Kimley-Horn & Assoc. Inc. for the following:
1. Planned Unit Development Amendment to the existing standards – Chanhassen Gateway.
2. Site Plan Review for the construction of a 5,100 square foot Automotive Repair Shop (Building 4E).
On December 1, 2020, the Chanhassen Planning Commission met at its regularly scheduled
meeting to consider the application of Kimley-Horn & Assoc. Inc. for a Planned Unit
Development Amendment and Site Plan Review (Planning Case 2020-21). The Planning
Commission conducted a public hearing on the proposed Site Plan and Planned Unit
Development Amendment preceded by published and mailed notice. The Planning Commission
heard testimony from all interested persons wishing to speak and now makes the following:
FINDINGS OF FACT
1. The property is currently zoned Planned Unit Development-Mixed Use, PUD-Mixed Use.
2. The property is guided in the Land Use Plan for Mixed Use.
3. The legal description of the property is Lot 3, Block 1, Crossroads of Chanhassen.
4. The Zoning Ordinance directs the Planning Commission to consider six (6) possible adverse
effects of the proposed amendment. The six (6) effects and our findings regarding them are:
a) The proposed action has been considered in relation to the specific policies and
provisions of and has been found to be consistent with the official City Comprehensive
Plan.
Finding: The site is guided mixed use (residential and neighborhood commercial). An
Automotive Repair Shop will add a convenience to the area. The architectural design of the
structure complements and blends well with surrounding buildings.
b) The proposed use is or will be compatible with the present and future land uses of the
area.
Finding: The proposed use is and will be compatible with the present and future land uses
of the area through the implementation of the design standards, landscaping, architecture, etc.
2
c) The proposed use conforms to all performance standards contained in the Zoning
Ordinance.
Finding: The proposed use will conform to all performance standards contained in the
Zoning Ordinance such as design standards, signage, durable materials, uses, etc.
d) The proposed use will not tend to or actually depreciate the area in which it is proposed.
Finding: The proposed use is intended to meet the daily needs of the area. It could
potentially add convenience to the homeowners in the area.
e) The proposed use can be accommodated with existing public services and will not
overburden the city's service capacity.
Finding: The site is located within the Municipal Urban Service Area. The proposed use
can be accommodated with existing public services and will not overburden the city's service
capacity.
f) Traffic generation by the proposed use is within capabilities of streets serving the
property.
Finding: Traffic generation by the proposed use is within capabilities of streets serving the
property.
5. In evaluating a site plan and building plan, the City shall consider the development's
compliance with the following:
1) Consistency with the elements and objectives of the City's development guides,
including the Comprehensive Plan, official road mapping, and other plans that may be
adopted;
2) Consistency with this division;
3) Preservation of the site in its natural state to the extent practicable by minimizing tree
and soil removal and designing grade changes to be in keeping with the general
appearance of the neighboring developed or developing areas;
4) Creation of a harmonious relationship of building and open space with natural site
features and with existing and future buildings having a visual relationship to the
development;
5) Creation of functional and harmonious design for structures and site features, with
special attention to the following:
a. An internal sense of order for the buildings and use on the site and provision of a
desirable environment for occupants, visitors and general community;
3
b. The amount and location of open space and landscaping;
c. Materials, textures, colors and details of construction as an expression of the design
concept and the compatibility of the same with adjacent and neighboring structures
and uses; and
d. Vehicular and pedestrian circulation, including walkways, interior drives and
parking in terms of location and number of access points to the public streets, width
of interior drives and access points, general interior circulation, separation of
pedestrian and vehicular traffic and arrangement and amount of parking.
6) Protection of adjacent and neighboring properties through reasonable provision for
surface water drainage, sound and sight buffers, preservation of views, light and air and
those aspects of design not adequately covered by other regulations which may have
substantial effects on neighboring land uses.
Finding: The proposed development creates a harmonious relationship with existing
and future buildings. It provides a compatible visual relationship.
Approval of this site plan is contingent upon approval of the permitted uses of the
Planned Unit Development ordinance to allow auto repair shops with standards.
6. The planning report #2020-21, dated December 1, 2020, prepared by Sharmeen Al-Jaff, et al,
is incorporated herein.
RECOMMENDATION
The Planning Commission recommends that the City Council approve the Planned Unit
Development Amendment to the Chanhassen Gateway PUD and Site Plan for an automotive repair
shop (Building 4E).
ADOPTED by the Chanhassen Planning Commission this 1st day of December 2020.
CHANHASSEN PLANNING COMMISSION
BY:
Steven Weick, Chairman
g:\plan\2020 planning cases\20-21 8941 crossroads blvd (christian bros automotive)\revised documents 10-30-20\findings of fact approval.doc
1
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
FINDINGS OF FACT
AND RECOMMENDATION
DENIAL)
IN RE:
Application of Kimley-Horn & Assoc. Inc. for the following:
1. Planned Unit Development Amendment to the existing standards – Chanhassen Gateway.
2. Site Plan Review for the construction of a 5,100 square foot Automotive Repair Shop (Building 4E).
On December 1, 2020, the Chanhassen Planning Commission met at its regularly scheduled
meeting to consider the application of Kimley-Horn & Assoc. Inc. for a Planned Unit
Development Amendment and Site Plan Review (Planning Case 2020-21). The Planning
Commission conducted a public hearing on the proposed Site Plan and Planned Unit
Development Amendment preceded by published and mailed notice. The Planning Commission
heard testimony from all interested persons wishing to speak and now makes the following:
FINDINGS OF FACT
1. The property is currently zoned Planned Unit Development-Mixed Use, PUD-Mixed Use.
2. The property is guided in the Land Use Plan for Mixed Use.
3. The legal description of the property is Lot 3, Block 1, Crossroads of Chanhassen.
4. The Zoning Ordinance directs the Planning Commission to consider six (6) possible adverse
effects of the proposed amendment. The six (6) effects and our findings regarding them are:
a) The proposed action has been considered in relation to the specific policies and
provisions of and has been found to be consistent with the official City’s Comprehensive
Plan.
Finding: The site is guided Mixed Use (residential and neighborhood commercial). An
Automotive Repair Shop will add a convenience to the area, however, it will generate noise.
b) The proposed use is or will be compatible with the present and future land uses of the
area.
Finding: The proposed use is and will be compatible with the present and future land uses
of the area through the implementation of the design standards, landscaping, architecture, etc.
c) The proposed use conforms to all performance standards contained in the Zoning
Ordinance.
2
Finding: The proposed does not conform to all performance standards contained in the
Zoning Ordinance such as potential noise generated from the building.
d) The proposed use will not tend to or actually depreciate the area in which it is proposed.
Finding: The proposed use is intended to meet the daily needs of the area. It could
potentially add convenience to the homeowners in the area but can generate noise.
e) The proposed use can be accommodated with existing public services and will not
overburden the city's service capacity.
Finding: The site is located within the Municipal Urban Service Area. The proposed use
can be accommodated with existing public services and will not overburden the city's service
capacity.
f) Traffic generation by the proposed use is within capabilities of streets serving the
property.
Finding: Traffic generation by the proposed use is within capabilities of streets serving the
property.
5. In evaluating a site plan and building plan, the city shall consider the development's
compliance with the following:
1) Consistency with the elements and objectives of the city's development guides, including
the Comprehensive Plan, official road mapping, and other plans that may be adopted;
2) Consistency with this division;
3) Preservation of the site in its natural state to the extent practicable by minimizing tree
and soil removal and designing grade changes to be in keeping with the general
appearance of the neighboring developed or developing areas;
4) Creation of a harmonious relationship of building and open space with natural site
features and with existing and future buildings having a visual relationship to the
development;
5) Creation of functional and harmonious design for structures and site features, with
special attention to the following:
a. An internal sense of order for the buildings and use on the site and provision of a
desirable environment for occupants, visitors and general community;
b. The amount and location of open space and landscaping;
3
c. Materials, textures, colors and details of construction as an expression of the design
concept and the compatibility of the same with adjacent and neighboring structures
and uses; and
d. Vehicular and pedestrian circulation, including walkways, interior drives and
parking in terms of location and number of access points to the public streets, width
of interior drives and access points, general interior circulation, separation of
pedestrian and vehicular traffic and arrangement and amount of parking.
6) Protection of adjacent and neighboring properties through reasonable provision for
surface water drainage, sound and sight buffers, preservation of views, light and air
and those aspects of design not adequately covered by other regulations which may
have substantial effects on neighboring land uses.
Finding: The proposed development creates a harmonious relationship with existing
and future buildings. It does provide a compatible visual relationship.
Approval of this building is contingent upon approval of the permitted uses of the
Planned Unit Development ordinance to allow auto repair shops with standards.
7) The planning report #2020-21, dated December 1, 2020, prepared by Sharmeen Al-Jaff, et
al, is incorporated herein.
RECOMMENDATION
The Planning Commission recommends that the City Council approve the Planned Unit
Development Amendment to the Chanhassen Gateway PUD and Site Plan for an Automotive
Repair Shop (Building 4E).
ADOPTED by the Chanhassen Planning Commission this 1st day of December 2020.
CHANHASSEN PLANNING COMMISSION
BY:
Steven Weick, Chairman
g:\plan\2020 planning cases\20-21 8941 crossroads blvd (christian bros automotive)\revised documents 10-30-20\findings of fact denial.doc
1
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
ORDINANCE NO.
AN ORDINANCE AMENDING CHAPTER 20 OF THE
CHANHASSEN CITY CODE, THE CITY'S ZONING ORDINANCE,
BY AMENDING A PLANNED UNIT DEVELOPMENT
THE CITY COUNCIL OF THE CITY OF CHANHASSEN ORDAINS:
Section 1. Chapter 20 of the Chanhassen City Code, the City's zoning ordinance, is hereby
amended by amending the Chanhassen Gateway Planned Unit Development Design Standards in its
entirety as follows:
CHANHASSEN GATEWAY
PUD DEVELOPMENT DESIGN STANDARDS
a. Intent
The purpose of this zone is to create a MIXED USE PUD including a Neighborhood
Commercial, office and Residential. The use of the PUD zone is to allow for more flexible
design standards while creating a higher quality and more sensitive development. Each structure
proposed for development shall proceed through site plan review based on the development
standards outlined below. The Neighborhood Business District regulations shall apply to Lots 1-
3, Block 1 and Outlot A, Crossroads of Chanhassen , except as modified by this ordinance. The
R-16 District regulations shall apply to Outlot C, except as modified by this ordinance. Exhibit
A, as revised herein to reflect the changes to the commercial portion, reflects the site layout and
buildings as referenced herein.
2
b. Permitted Uses
The permitted uses in this zone should be limited to appropriate commercial and service uses
consistent with meeting the daily needs of the neighborhood. The uses shall be limited to
those as defined herein. If there is a question as to whether or not a use meets the definition,
the Community Development Director shall make that interpretation. The type of uses to be
provided on these lots shall be low intensity neighborhood oriented retail and service
establishments to meet daily needs of residents. Commercial and office uses shall be limited
to the area located south of Highway 212. Residential uses shall be located north of Highway
212 and along the western portion of the southern half.
Small to medium-sized restaurant-not to exceed 8,000 square feet per building. Fast food
restaurants with a drive-thru is limited along the north end of Building 4B. It must be part of
and attached to the multi-use building. The drive-thru lane shall be screened and the exterior
wall of the drive-thru shall contain the same level of architectural detail as any other
elevation visible by the public.
Banks with a drive-in service window
Office
Day care
Neighborhood scale commercial up to 8,000 square feet per tenant with the exception of
building 4C. A tenant may occupy up to 10,000 square feet of said building and building 4G
for a daycare to occupy 12,000 square feet. No individual service component of a retail
building shall occupy more than 8,000 square feet of a building.
Convenience store with or without gas pumps and car wash.
Specialty retail (Book Store, Jewelry, Sporting Goods Sale/Rental, Retail Sales, Retail Shops,
Apparel Sales, etc.)
Personal Services (an establishment or place of business primarily engaged in providing
individual services generally related to personal needs, such as a Tailor Shop, Shoe Repair,
Self-Service Laundry, Laundry Pick-up Station, Dry Cleaning, Dance Studios, etc).
Residential High Density (8-16 units per net acre). The total number of units for the entire
site may not exceed 150 units.
Automotive Repair Shop on Lot 3, Block 1, with the following standards:
o No unlicensed or inoperable vehicles shall be stored on-premises except in
appropriately designed and screened storage areas.
o All repair, assembly, disassembly and maintenance of vehicles shall occur within
closed building except minor maintenance including, but not limited to, tire
inflation, adding oil and wiper replacement.
o No public address system.
o No sales, storage or display of used automobiles or other vehicles such as
motorcycles, snowmobiles, or all-terrain vehicles.
o Disposal of vehicle fluids shall comply with PCA regulations.
o Facilities for the collection of waste oil must be provided.
o All service/garage doors shall be screened.
o The building architecture shall complement surrounding buildings."
c. Building Area
Commercial/Office – Not to exceed 75,000 square feet for the entire development
Maximum Commercial/Office lot usage is a Floor Area Ratio of 0.3
3
Maximum office/commercial building area per tenant may not exceed 8,000 square feet
Maximum residential units may not exceed 150 units.
d. Prohibited Ancillary Uses
Drive-thru Windows except banks, coffee shops, fast food restaurants or pharmacies.
Outdoor storage and display of merchandise such as propane, salt, window washer fluid, etc.
except on the sidewalk surrounding the convenience store 4A. The outdoor display of
merchandise shall not impede nor interfere with pedestrian traffic.
e. Setbacks
The PUD ordinance requires setbacks from roadways and exterior property lines. The following
table displays those setbacks.
Boundary Building/ Parking
Setbacks (feet)
Lyman Boulevard 20/20
Highway 101 North of Highway 212 50/50
Highway 101 South of Highway 212 20/20
Highway 212 50/50
Northerly Project Property Line 50/20
Westerly Project Property Line 50/20
Internal Project property lines 0/0
Internal Right-of-Way (Crossroads Boulevard) 20/20
Hard Surface Coverage-Residential 50 %
Commercial and Office Hard Surface Coverage 70 %
Maximum Commercial (Retail) Building/Structure Height 1 story
Maximum Office Building/Structure Height 2 stories
Maximum Residential Building/Structure Height 35 or 3 stories,
whichever is less
f. Non-Residential Building Materials and Design
There shall not be underdeveloped backsides of buildings. All elevations shall receive nearly
equal treatment and visual qualities. Buildings and site design shall comply with design
standards outlined in Article XXIII. General Supplemental Regulations, Division 7 of the Zoning
Ordinance.
g. Residential Standards
Buildings and site design shall comply with design standards outlined in Article XXIII. General
Supplemental Regulations, Division 9 of the Zoning Ordinance.
1. All units shall have access onto an interior private street.
4
2. A design palette shall be approved for the entire project. The palette shall include colors for
siding, shakes, shutters, shingles, brick, stone, etc.
3. All foundation walls shall be screened by landscaping or retaining walls.
h. Site Landscaping and Screening
The intent of this section is to improve the appearance of vehicular use areas and property
abutting public rights-of-way; to require buffering between different land uses; and to protect,
preserve and promote the aesthetic appeal, character and value of the surrounding
neighborhoods; to promote public health and safety through the reduction of noise pollution, air
pollution, visual pollution and glare.
1. The landscaping standards shall provide for screening for visual impacts associated with a
given use, including but not limited to, truck loading areas, trash storage, parking lots, Large
unadorned building massing, etc.
2. Each lot for development shall submit a separate landscaping plan as a part of the site plan
review process.
3. All open spaces and non-parking lot surfaces, except for plaza areas, shall be landscaped,
rockscaped, or covered with plantings and/or lawn material. Tree wells shall be included in
pedestrian areas and plazas.
4. Undulating berms, north of Lyman Boulevard, north and south of Highway 312 and west of
Highway 101 shall be sodded or seeded at the conclusion of grading and utility construction.
The required buffer landscaping may be installed where it is deemed necessary to screen any
proposed development. All required boulevard landscaping shall be sodded.
5. Loading areas shall be screened from public right-of-ways. Wing walls may be required where
deemed appropriate.
6. Native species shall be incorporated into site landscaping, whenever possible.
i. Street Furnishings
Benches, kiosks, trash receptacles, planters and other street furnishings should be of design and
materials consistent with the character of the area. Wherever possible, street furnishings should
be consolidated to avoid visual clutter and facilitate pedestrian movement.
j. Signage
The intent of this section is to establish an effective means of communication in the
development, maintain and enhance the aesthetic environment and the business’s ability to
attract sources of economic development and growth, to improve pedestrian and traffic safety, to
minimize the possible adverse effect of signs on nearby public and private property, and to
enable the fair and consistent enforcement of these sign regulations. It is the intent of this
section, to promote the health, safety, general welfare, aesthetics, and image of the community
by regulating signs that are intended to communicate to the public, and to use signs which meet
5
the city's goals:
a. Establish standards which permit businesses a reasonable and equitable opportunity to
advertise their name and service;
b. Preserve and promote civic beauty, and prohibit signs which detract from this objective
because of size, shape, height, location, condition, cluttering or illumination;
c. Ensure that signs do not create safety hazards;
d. Ensure that signs are designed, constructed, installed and maintained in a manner that does
not adversely impact public safety or unduly distract motorists;
e. Preserve and protect property values;
f. Ensure signs that are in proportion to the scale of, and are architecturally compatible with,
the principal structures;
g. Limit temporary commercial signs and advertising displays which provide an opportunity for
grand opening and occasional sales events while restricting signs which create continuous
visual clutter and hazards at public right-of-way intersections.
j.1. Project Identification Sign
One project identification sign for the commercial portion of the development located at the
entrance off of Highway 101. Project identification signs shall not exceed 80 square feet in sign
display area nor be greater than eight feet in height. The sign shall be setback a minimum of 10
feet from the property line.
As an alternative, the project identification sign may be located at the southeast corner of Lot 2,
Block 1. If the sign is located in the right-of-way, an encroachment agreement must be obtained.
Otherwise, the sign must maintain a 10 foot setback from property lines and may not exceed 24
square feet nor be higher than 5 feet.
j.2. Monument Sign
One monument sign shall be permitted at the entrance to the development off of Lake Susan
Drive. One monument sign per lot shall be permitted for the commercial portion of the site. One
multi-tenant sign shall be permitted at the entrance into the development off of Highway 101 and
two signs off of Lyman Boulevard. These signs shall not exceed 24 square feet in sign display
area nor be greater than 5 feet in height except Kwik Trip, located on Lot 1, Block 1, shall be
permitted a 48 square-foot, 8-foot high monument sign. These signs must comply with all
ordinances pertaining to size and percent of sign area dedicated to gas prices as well as any other
applicable regulations. These signs shall be set back a minimum of 10 feet from the property
line.
j.3. Wall Signs
6
a. The location of letters and logos shall be restricted to the approved building sign bands, the
tops of which shall not extend above parapet height. The letters and logos shall be restricted to
a maximum of 30 inches in height. All individual letters and logos comprising each sign shall
be constructed of wood, metal, or translucent facing.
b. Second story illuminated signs that can be viewed from neighborhoods outside the PUD site,
are prohibited.
c. Tenant signage shall consist of store identification only. Copy is restricted to the tenant’s
proper name and major product or service offered. Corporate logos, emblems and similar
identifying devices are permitted provided they are confined within the signage band and do
not occupy more than 15% of the sign area unless the logo is the sign.
d. Wall signs are limited to two elevations per building.
j.4. Festive Flags/Banners
a. Flags and banners shall be permitted on approved standards attached to the building facade
and on standards attached to pedestrian area lighting.
b. Flags and banners shall be constructed of fabric or vinyl.
c. Banners shall not contain advertising for individual users, businesses, services, or products.
d. Flags and banners shall project from buildings a maximum of two feet.
e. Flags and banners shall have a maximum area of 10 square feet.
f. Flags and banners which are torn or excessively worn shall be removed at the request of the
city.
j.5. Building Directory
a. In multi-tenant buildings, one building directory sign may be permitted. The directory sign
shall not exceed eight square feet.
j.6 Directional Signs
a. On-premises signs shall not be larger than four (4) square feet. The maximum height of the
sign shall not exceed five (5) feet from the ground. The placement of directional signs on the
property shall be so located such that the sign does not adversely affect adjacent properties
including site lines or confusion of adjoining ingress or egress) or the general appearance of
the site from public rights-of-way. No more than four (4) signs shall be allowed per lot. The
city council may allow additional signs in situations where access is confusing or traffic
safety could be jeopardized.
b. Off-premises signs shall be allowed only in situations where access is confusing and traffic
safety could be jeopardized or traffic could be inappropriately routed through residential
7
streets. The size of the sign shall be no larger than what is needed to effectively view the sign
from the roadway and shall be approved by the city council.
c. Bench signs are prohibited except at transit stops as authorized by the local transit authority.
d. Signs and Graphics. Wherever possible, traffic control, directional and other public signs
should be consolidated and grouped with other street fixtures and furnishings to reduce visual
clutter and to facilitate vehicular and pedestrian movement. A system of directional signs
should also be established to direct traffic within the commercial area and away from
residential areas.
j.7. Prohibited Signs
Pylon signs are prohibited.
Back lit awnings are prohibited.
Window Signs are prohibited except for company logo/symbol and not the name. Such logo
shall not exceed 10% of a window area.
Menu Signs are prohibited.
j.8. Sign Design and Permit Requirements
a. The sign treatment is an element of the architecture and thus should reflect the quality of the
development. The signs should be consistent in color, size, and material and height
throughout the development. A common theme will be introduced at the development's
entrance monument and will be used throughout.
b. All signs require a separate sign permit.
c. Wall business signs shall comply with the city’s sign ordinance for the Neighborhood
business district for determination of maximum sign area. Wall signs may be permitted on
the “street” front and primary parking lot front of each building.
k. Lighting
1. Lighting for the interior of the development shall be consistent throughout the development. High
pressure sodium vapor lamps or LED with decorative natural colored pole shall be used throughout
the development parking lot area for lighting. Decorative, pedestrian scale lighting shall be used in
plaza and sidewalk areas and may be used in parking lot areas. Parking lot light poles may not
exceed 25 feet in height.
2. Light fixtures in areas other than parking lots should be kept to a pedestrian scale (12 to 18
feet). Street light fixtures should accommodate vertical banners for use in identifying the
commercial area.
3. All light fixtures shall be shielded. Light level for site lighting shall be no more than ½ foot
candle at the project perimeter property line. This does not apply to street lighting.
4. Lighting for parking areas shall minimize the use of lights on pole standards in the parking area.
Rather, emphasis should be placed on building lights and poles located in close proximity to
8
buildings.
l. Non-Residential Parking
1. Parking shall be provided based on the shared use of parking areas whenever possible. Cross
access easements and the joint use of parking facilities shall be protected by a recorded
instrument acceptable to the city.
2. The development shall be treated as an integrated shopping center and provide a minimum of
one space per 200 square feet of commercial/retail area. The office/personal service
component shall be treated as an integrated office building and provide 4.5 space per 1,000
square feet for the first 49,999 square feet, four per thousand square feet for the second
50,000 square feet, and 3.5 per thousand square feet thereafter.
m. Residential Parking shall comply with city code requirements.”
Section 2. This ordinance shall be effective immediately upon its passage and publication.
PASSED AND ADOPTED this -----th day of October, 2020, by the City Council of the City of
Chanhassen, Minnesota
Heather Johnston, City Manager Elise Ryan, Mayor
Published in the Chanhassen Villager on )
kimley-horn.com 767 Eustis Street, Suite 100, St. Paul, MN 55114 651 645 4197
September 4, 2020
City of Chanhassen
7700 Market Boulevard, P.O. Box 147
Chanhassen, MN 55317
Attention: Sharmeen Al-Jaff, City Planner
RE: Proposed Christian Brothers Automotive – Project Narrative
Christian Brothers Automotive is requesting the proposed site to be considered for approval within the
existing PUD. The parcel is legally described as: Lot 3, Block 1, Crossraods of Chanhassen, Carver
County, Minnesota.
Proposed Development Overview
Christian Brothers Automotive is proposing to construct an approximately 5,100 SF, 9 -bay automotive
repair center located at 8941 Crossroads Boulevard in Chanhassen. The customer facing portion of
the building will face the internal road of the Crossroads of Chanhassen development. The proposed
development is within the Crossroads of Chanhassen PUD which was approved in 2008.
The two lots east of the proposed site have been previously developed as retail and a gas
station/convenience store, a child care facility is located to the south and west of the proposed site,
and the rest of the PUD is currently undeveloped.
Proposed Concept Plan & Development Stage
Christian Brothers Automotive is proposing an amendment to the existing planned unit development
PUD). The PUD is designated as mixed use PUD including neighborhood commercial, office and
residential.
Christian Brothers provides light automotive repair and the scope of repairs provided by Christian
Brothers has been included within the submittal package. Overnight parking only occurs when
customers have a conflict retrieving their vehicle during business hours or to drop off their vehicles.
Long term exterior storage is not permitted at Christian Brothers Automotive.
Consultants:
Civil Engineer – Christian Jones, Brandon R. Elegert, P.E. – Kimley-Horn
Architecture – Dana King – Cortland Morgan Architect
Landscape Architecture – Evergreen Design Group, Inc. – Rodney McNabb
Photometrics – City Lighting Products Company – Mike Hohl
Page 2
kimley-horn.com 767 Eustis Street, Suite 100, St. Paul, MN 55114 651 645 4197
Site Design
The site currently vacant land with water and sanitary sewer utilities provided as part of the
Crossroads of Chanhassen Development to the south. Gas, communications, and electric utilities are
provided to the west along Crossroads Boulevard.
The proposed building is to be located at the western edge of the site angled parallel to Crossroads
Boulevard, with the customer facing side of the building internal to the development. The surface
parking will be located directly east of the building. Access is proposed to be east of the building and
at both the north and south side of the parking lot, with two proposed driveways connecting the
internal roads of the Crossroads of Chanhassen.
The existing site is currently vegetated with no impervious area; the proposed site will be comprised
of approximately 70% impervious area. Above ground and underground stormwat er management will
be provided adhering to City and Watershed treatment and rate control requirements.
Architecture
Architectural elevations and site photometric plans are provided within the submission. The proposed
building is to be constructed of primarily brick and limestone. The trash enclosure is also to be
constructed in materials similar to the building and will have gates to screen the trash from the public
right-of-way.
Landscape Architecture
A landscape plan is included within the submission to comply with the city code. Trees, shrubs, and
other plantings will complement the site. Christian Brothers Automotive is seeking a landscape
variance for screening of the vehicular area.
Please contact me at (763) 251-1016 or christian.jones@kimley-horn.com should you have any
questions or comments.
Sincerely,
Christian Jones
Project Manager
C
R
O
S
S
R
O
A
D
S
B
O
U
L
E
V
A
R
D
C
C
Scale
1" = 20'
10'
40'20'
0'PLANTING
LEGENDTHE CONTRACTOR
SHALL INSTALL
ROOT BARRIERS
NEAR ALLNEWLY-
PLANTED TREES
THAT
ARELOCATED
WITHIN
FIVE (5)
4X2X3215674123SHRUB, PERENNIAL, ORORNAMENTAL
GRASS.
MULCH, TYPE
AND
DEPTH PER
PLANS. PLACE
NOMORE THAN
1" OF
MULCH WITHIN
6" OF
PLANTCENTER.FINISH
GRADE.
BACKFILL. AMEND
AND FERTILIZE
ONLY ASRECOMMENDED
C
R
O
S
S
R
O
A
D
S
B
O
U
L
E
V
A
R
D
C
C
Scale
1" = 20'
10'
40'20'
0'SHEET
NUMBER(800)
680-66301200
US Highway
22 E
Suite 2000-
2248Bridgewater,
NJ08807www.
EvergreenDesignGroup.comEVERGREEND
C
R
O
S
S
R
O
A
D
S
B
O
U
L
E
V
A
R
D
C
CCR
MFQCQCFFFSSSS17.
11"A65.
61"
A517.41"
A4A31"17.
14.11"
A1WS1-1/
4"3/
4"3/
4"3/
4"
3/4"
3/4"
SHEET
NUMBER(800)
680-
66301200 US
Highway 22
E Suite
2000-2248Bridgewater,
NJ 08807www.
EvergreenDesignGroup.comEVERGREEND
E S
I
GN
G
R O
U
PI HEREBY
CERTIFY THATTHIS
PLAN, SPECIFICATION,
OR REPORT
WAS PREPAREDBY
SHEET
NUMBER(800)
680-
66301200 US
Highway 22
E Suite
2000-2248Bridgewater,
NJ 08807www.
EvergreenDesignGroup.comEVERGREEND
E S
I
GN
GR
O U
PI HEREBY CERTIFY
THATTHIS PLAN,
SPECIFICATION,OR
REPORT WAS
PREPAREDBY ME
OR UNDER
MY DIRECTSUPERVISION
AND THAT
I AMA
DULY LICENSEDLANDSCAPE
ARCHITECTUNDER THE
LAWS OF
Carver County
Public Works
11360 Highway 212, Suite 1
Cologne, MN 55322
Office (952) 466-5200 | Fax (952) 466-5223 | www.co.carver.mn.us
CARVER COUNTY
September 25, 2020
City of Chanhassen
c/o Sharmeen Al-Jaff
Senior Planner
952-227-1134
saljaff@ci.chanhassen.mn.us
Re: Development / Access Review Comments: Amendment to the Chanhassen Gateway
Planned Unit Development (PUD) and Conditional Use Permit for Christian Brothers
Automotive at 8941 Crossroads Blvd – Located near the intersections of CSAH 101
Great Plains Blvd.)/Crossroads Blvd. and CSAH 18 (Lyman Blvd.)/Crossroads Blvd.
Thank you for the opportunity to review the subject development in the City of Chanhassen. Please
reference the Public Works Development Review Process document on the County’s website for
detailed instructions. The County assumes compliance with State Statute 505.03 Subdivision 2
regarding road authority review.
Consistent with the County Comprehensive Plan and County Codes, the following are comments and
recommended conditions of approval and potential requirements for any necessary permits to be
issued for the project:
1. Impacts to County Right of Way and Access to County Highways
a. The subject site is not adjacent to County right of way and no direct access to County
Highways is proposed. Additional County review and approval will be required if this
condition changes.
2. Traffic Impacts
a. It is recommended to provide a brief traffic memo identifying changes to PUD trip
generation levels, traffic patterns, or impacts to the County highway intersections of
CSAH 101 (Great Plains Blvd.)/Crossroads Blvd. and CSAH 18 (Lyman Blvd.)/Crossroads
Blvd. compared to the original PUD plan and traffic study. The memo should note the
expected level of service at these intersections and any findings that impact future
traffic operation needs.
3. Required Permits
a. Prior to any work affecting or on County highways or in County right of way (none
currently proposed), the applicant shall coordinate plans with the County Engineer and
obtain a Utility or Excavating/Filling/Grading Permit(s) from Carver County Public
Works: (http://www.co.carver.mn.us/how-do-i/apply-for/a-permit). Final details of
locations, grades, and profiles affecting County roads as well as any utility connections
will need to be reviewed and approved prior to any permits.
b. Any damages, modifications, or changes incurred on County highways from current or
approved conditions will need to remedied or updated at development expense,
including costs incurred by the County.
These are the County’s comments at this time. If you have any questions or need further assistance,
please contact staff noted below:
Joan Guthmiller
Administrative Technician
Carver County Public Works
952.466.5201
jguthmiller@co.carver.mn.us
Angie Stenson AICP
Sr. Transportation Planner
Carver County Public Works
952.466.5273
astenson@co.carver.mn.us
Dan McCormick, P.E. PTOE
Traffic Services Supervisor
Carver County Public Works
952.466.5208
dmccormick@co.carver.mn.us
CITY OF CHANHASSEN
AFFIDAVIT OF MAILING NOTICE
STATE OF MINNESOTA)
ss.
COLNTYOFCARVER )
I, Kim T. Meuwissen, being first duly sworn, on oath deposes that she is and was on
November 19,2020, the duly qualified and acting Deputy Clerk ofthe City ofChanhassen'
Minnesota; that on said date she caused to be mailed a copy ofthe attached notice ofa Public
Hearing to consider a request for an amendment to the chanhassen Gateway PUD to allow
Automotive Repair Shops; and an amendment to the Crossroads of chanhassen site Plan
with variances for the construction of a 51100 sf automotive repair shop @uilding 4E)
located at 8941 Crossroads Boulevard. Zoned Planned Unit Development @UD). Planning
Case No. 2020-21to the persons named on attached Exhibit "A", by enclosing a copy ofsaid
notice in an envelope addressed to such owner, and depositing the envelopes addressed to all
such owners in the United States mail with postage fully prepaid thereon; that the names and
addresses ofsuch ownets were those appearing as such by the records of the County Treasurer,
Carver County, Minnesota, and by other appropriate records.
Kim T. Meuwissen, Deputy Cl
Subscribed and swom to be me
JEAiI M SIECI(LJI{G
ilmry n..Io.ilfnt€.ota
ry*i3rar..Lltr,r@1
t
thisRlh day of 2020.
Notary Public
Seal)
2
Disclaiire,
This map is rErther a legally rccorded map nor a survey and is not intendd lo be used
as one. This map is a comFilaton of reco.ds, informatron and data located in various city,
county, state and tederal offices and other sources regading the area shown and is to
be ud for refeence purposs only The City does not wanant thal the Geographic
lniormatbn System (GlS) Data used to prepare this map are eror free, ancl the City does
not represent that the GIS Data can be used for navioatjonal. tracking or any other
Durpose requidng exacting measurement of distance or dareclion or precision in the
depiction of geoOhphic features. The prerceding disclaimer is provided pu6uant to
Minnesota stalutes s466.03, Subd. 21 (2000), and lhe uger of this map acknowledges
that the City shall not be liable for any damag€s, and expressly waives all claims, and
agrees to defend, andemnify. and hold hamless the City ftom any and all daams blought
by User, its employees or agents. or third parties which ads€ out of the use/s access or
use of data provrded.
TAX_NAMEI
cTAX_ADD-LI r
cTAX_ADD_L2l
Next RecordD(TAX-NA lEr
I<TAX_ADD_Llr
ITAX_ADD_L2r
This map is nejther a leoally recorded map nor a survey and is not intended to b€ used
as one. This mep is a compilaton of records, informatlon and data located in vaious crty,
county, state and federal offices and other sources regarding the area shown, and is to
b€ used for reference purposes only. The Crty does not wanant that the Geographic
lniormaton System (GlS) Data used to prepare tiis map are enor free. and the City does
not represenl thal the GIS Oata can be used for navigat,onal, t acking or any other
purpose requiring exactng measurernenl of distance or directon or precision in the
deprcton ol geographic features. The preceding d6daamer is provrded pulsuant to
Minnesota Stat es y66.03. Subd. 21 (2000), and tne user of this map acknowledge5
Ulat tie City shall not be liaue for any damages, and e)Q.essly waives all daims, and
agrees to defend, indemnify, and hold hamless lhe Crty from any and allclaims b.ought
by User, its employees or agents. or thard partres whici atise out of the use/s acaess or
use of dala provided.
rv
ID
I ;
E-.tIF-:
J
tl.
EI
I
z
J
r :":ri.:--7
I
ti
r
I
o,
E
q
E
P
EI
2
F
E
cioIF.
oNoN
o)
o
Eoo
IDotoE
o)
fF
2(
I)
o
ooF.
F-
u;
tu.
o
E
o
c
oo
r
o
olc
o
Eo.
9o
o,)o
c5rF SE
ca :c(!< :
r!
h }EEE€
O ., YE
s! gEs
otl Q o_-;?
xesk >, --, I ar
EX:fE66: E:
39EE:;
T€ EP-.
e* 6; I
9E c E I
rE;!:
6 o ;a E
acorlrr
Ee54ii!.=-E':b 88ts
tr EEO(,
o
E
6q)
rn'6
o
06
c
oI
9
Ev
q)
g
o
06
o
o!
EY
o
c] .iU'9
6E
i9.
oo
op
uJoeE'
oo
NO
D o
cob9o
AcYOot
loor-@<
EiE€ Elo:Ylo6tq-
o-c- Y. ar0cDE .!1 ;
r'6 I 9i5 ;o c E oo F>org odiF-cir o = oE- rJ tt*.l'=
Ee 4 EEE E
dr ^L c O- -Y
EE-pe E + e
E; HE:i.A;
94i"9.96!!
riEqEsaS
rEa-gs= H :
E EtE sE t E'
s iE:8-EEo-o *E t HE.9
iE:TEE5Ee339..
F O (! OF N (Y) \t
EDE
0,
o
E
9
2
E
Eoo
E!
c
o
o
i,$ilE$tE
EiEiriEEEsPaEd.33E =':.,lB =.!e rrb lll BE;
a-EEEEtt!
aeltflatE;
eIIE EI $E€
u;
oocoq)
g
o)oc-
BoEg
EE:g
La6.>
Eoo0)
O^
cE
XE.(
tr
6_9
cr(0ol'
6o
oU
OE.>
t3pE6
eEo-;
fEcEODL
@P
9fiPzii
l
oi'-o
o
o)
E
aoc
fc
Ec
0)
5.
cc
GEq
6
z
E
a
3
I
t*Effis:EtiiE
gEltIiEgggEilEEi
liisEi;e:iiiEEaffEa
EF
oa,
o
t!
o
Eo
t!(,
oJ
oo
CI
iio
o
EoiLor
trr.9
o.Geto-J
9glt
d, .=
E
r! .c
E
c6 ..
o9trcO{,
6=
rl, E3Ooo
6c
oo
gro
o
EC
LE.
9oEo5E'
G.S
bE
0, l!.
9dot2g
ot!
c!!
o
C'c
alto
P.E
r!o(, '=
E(
JE
onri
t
gt
otr
sE:
q
2="
oooEEt!
Eo
9 oIc6;.YoeE x
oo>oo.. r! llor€ oE9r3a
B_aEi9EE€
ExP g
t1iooFU)'=06 .! (!
sE€E.:
g O, rJ o
E t*
5:Ei9P96
AEtr.StEie
5.= 3 e
eE 3?
a1E 6
Jc
P *eE650
Bq
oS:<(!-
J O-
cE
3E
aO !.r3E-
c
EtB
Rlfr
31.!D;
l cr
t ZlE
s El0'o Elclo,old
E HI€> -
al l.,
El o
E EI€'dq9
b.Et b.,.l P
ailH
o
o
9e
cn
E
Q'
o,
E
q,
a
Io
o)
co
I
o(,
o
li
o
F-(\l
6t
t
o
s
q)
o-
e
oI
t
co
o
c
G
q
@tso
I
o
G
Eo
q,(,
E
9
9
E
Eoo
Eo
o.
E
o
oE
o
o'6
o
6
o
o,)!
E
Y
i
2d)d
a .9.
PBoLi .9.
o
OE
ur '
6
e.fr'
ooEiqo
6:
cob9aqe
YOoE
o<
o{
E* E;xo =x=-:
ilt B* €
iis rlH , fi
EeaaeEE
O - ;jg ! . O--Y
EiEg€E;riETEAEE{
E; s+ EsEgo659IEIo.9;.56tori.!
Q6;OEE(
Ei BH= cE td:<E q F€d.e=.e6F6doo-o-o
F G a! O-- N (t t
E
9
F
E
cio9F.
oNoN
o)-
o
E(
l)
o
o)o;
o!
q)
aF
L
p
E
e
2m
o
E
ooF.
F.
o.
o
Eo
o
c
oo
nI
o
s
E N!
i*
EIOELL
odF6
NSEio
O- r).c t
o:oca:;
9EE:bqE0'nz>+(
E ot -
hN=*
o 6*.
EE9Eg;a Eo,c:
coofo-c Q (6
E(D ffi,::!.
E<:
o AEo
6tro.r)
o
qp
o
o
6
o
o
9.
o)
E(!
o
o
c)
o.
J
o
F
G
f
o-
c
o)
o
o
1
q)
6
o
06
oI
9
EY
o.
lc.
q
o
l)
E
oc
lc
EE
o.)
o-
cE([
Eq
o
oo
C)
ooi
u,
6
It).
c
o
o
o,
a,
oooa
Eo
oIt)p
E
rt,
o)
f
E
E
ui
o(
lt
o,
co'-
5
E
oc
o)
Eo
5
E
o)
o
6
oo
o
c.
9
U)
uJz
o
lioac
n)
o)
o
o,c
n)o
E
E
0)
E
a
g€EEp Ei EP
EEIEEE;iEE:;
EESgBEEtEiiE
E?tEitIlErigEE;:
E E IIBJ:: H;:€
i '-:f:;ia;;eEIrgEEeEfEFEE$i
EiEEEiiEEEiEEE
EEE B?eEEEEEEEE
EEtEEiEi3AgEiEE
sEig€Eigte;EEE
E
3
q
E
z
I
E
6
5 a
E
I
E
E
6
6 ..
o9ECoo
o=
OE3Ogo
o
o
otr;
o
Eocto
G
tsoa, 'E
cL a!
eto-J
qa
o.=
o. !l
r'E
o.€
E
id
i:
o5
0,
clo
o
oJ
l!
ooco
G
qo
o
t!
6orLo
o.
9o
o
ooQQQnQO9OQe)e)OOOOOOOOOOOOOOOOOOOOOOOOc)c,c|.{ d !t @ o) o o .\. .n < Ln O'r O ..,r m !^ or sl r^ @ F\ oO m .{ r^ (o F\ co 6 O H - m - r^ 6 - - <'iOornoo (o N o F{ d d q, n n !r Q !r':r i n d d O O o o o 6 6 i H i i ; - H o d ; rrQQQ <) I .r F{ Q O O a Cf o o o o o O O O o <) o O O O 6 6 o o o O O c) o o - o <) c)ce (D i. t t m + 0Q Q' a a a rg st st sr 9 <r sl q <t rr F- F. T. F. F F F F- F. l< F |< F F F F F F.!o sl @ co o .! .{ st 0o to .o oo a @ q) q, oo !9 ao @ co 60 <t <t 6 co .o 6 @ .o oo .o .o 6 6 6 <t (o (o ioryEQ, a Q, Ql ry r- F: .: r: c] a a Q F. o o o o o ca o0 d !r d ai n - - ti - - - ;i .a F. F Fv'!t4 4 '4
ul 14 '
4
rrl {r {r !n L,ll.rarnI^ ln !/1 !^ !^ rr1 rnI^rn !n .^ !^ !^ r^ !,r rn Ln !^ !n !^ !a !/) i-oin6- at a{ .! .!.! ^t .{ a\l .\t r\ N.!.r N a{ a\ N a\t N a\.!.! N ^
i
o-d6-
t^ t^ a \^ t^ tA t^ t^ t^ tA.^ a 88IOEG,G,GG,G,.tC,GGEG,
OOO66OOOO6OO lrJ tr.r r!
a t^ t^.^ (,(9(,
rrr-riiiiiii ===
SSSSSeeHHHHHggggsuuohhh
5 3 5 5 64443 3 3 3 ????€ E E
E*8F, 9, z 222 22 2 2 2 2 ) ) ) ) zl I I
EEEEH=I55EE565EEEEE=999
rn ln 6 r,t rn i H .r .t m an rf (6{o6Hdirndrn {o F\ ao cD o !n lar.n !n 6 6 !,t r./l !n r^ 6 Llt 6 dr dr diinF\ F\ l\ f,\ F- 0o @ 0o.O @ @.O @.a o0 o.o co - 6 6 6 6
6
6066(^
6666JJJ<!!!
l!!
d,d,c,
a>5>
Y>=>
9f,:)f
ororoo
q6;
q:=
JTO=FF-
3;""y,
t<iiQQ3P=66.
IALEE
8:EApp<(^
oduol.uo!^r^oo
@or(Dsld(^\D6oF-F-
F$ E$. $E gg P EEHSH H HE *S.r (n TFFF..: or o! c. 00o@6@ oo ++ "
g ","i r- .t n 9X N N N !? F\ \ F\ F. <r F\ r'\ r.\ r- F i r- n r.. r'. i * F N Fl r- * r.. r.<t <t vro.iYdddrr id;iiiiiHAam (o @ q:.n o.n S.nm m rn.n.n ri.n.n !') an m rn .n lYl m.n.n.n m., m m.n.n rn .nmfls3 _ 3 ; x 4 I S S ti S B S 3 S 3 S * * S S S S S S * n 3 S * S S 3 B n $ S *
i fr fr * H
g 4 B : : 2 i !, i a i 4 a i i i i_ i i i i i i i i i i i i 2 i 2 i i 2 i 2 i i i
nvvv F H H E uivuafrfrvvavahvavvauuuva-sa
E r r 3. s s j j { i f i E i + f + r s + s f s + + s + + $ s $ $ + s f $ + + + f $-tz z; ttt t^ < < z Z Z z z z z z z 2 z z z z z z z z z z z z Z z z z 2 - Z = - = =<
O Or I rF r- = I - -= I rI - O - I I I I - -- I r r - r r II r r - -I IjFruy (J (J i, i^ z u (J e z e (J (J o ur (J (J O O O O O O O O O O O O U O O O O O - O O
Zo<od 6 o .Lo_a_
FUJFd F ." <???!?,*t1,1 ut6a ggg
4Gddde,t)G,d,dce,o A E ;00006,,.16666oe22 =92!2!=22!2! 229o_= a ddc.e 5 |, =
J!:=|:-:!J=)
Ii j.
6 oooi
l;;ir=
EE EEEEEEEEEAeA= ?!ggt1g=i1ii= a=EE6'|-'o H> <r'r rr': I I I ZvEEEd-EPEEE= lE55EE6;EEE6U= g g9:,
8 S P X E 91i A i ie Y 9 9 9 e 9 9 9 Y e 1- !^ o,.o F. H !', (h ol r c.,, s (o){ !n F- tr) c) \o !^ c) ln Or rn F- o Ln r/t rr a O !^ Lo r^ 16 rJt d rnt s i 6!^roro (o dm.nli< m F d.{ m (h o N or o o rr.r.n $ 'a rl !/l io t-.(i oi o r^ ui iri a lri '
n
Jr ;t ./i rri 6 6 !^ or oi iiariF!r.r.trYr.n.nr^I^r^ro(DF-r.-F\F-F-F-F.FF.F-F-.o.odi.(j-('d-od-od.d--6cd66
FFFF
oooo
oooo
oooo
JoguJ<
9LUHEE>r6
E = a3 H qeE s e q== iEEE= IE H r;e : E -s64
z
E EsEEEEIBEE*;EE*EEEiEE=5E==EE:rE;EEEEE
3=;iE;!;=*!EEfiEEIEEE=
Ea
irBb= s "ga-=iBEE= - EE =-
Jz= =
t ,tt6re'2< -r
oay 2
oa
oz
o 6 6 (D @ @ @ Co @ @ @ 0o co c! Q o!' 09 !! 9-o 9o cocbA :l 6 6 6 6 6 6 (o b (o @ ii (o 6 6 io @ (o (D to !9 !9 !0 \o (orovl.i 6 6 6 n n n n n -J ..J i n 5 6 or 6' 6 u (, (n L 5a5(,
rt,:-;.1 i 6 d di \i .h u A (! r.i p \D n (n u, P (o .{ L ur lD r\r o co
O'!aa aa.ttj6a<t4 14t4U't4qoa:
HPPP=PP=P<PPPCPSP=PE8PPE8PF -< = = - < = = < = < = = --r a i --{ --{ > --{ --{ -.{ --{ -{ -.1 --{ -.{OTTIIF-I=-=III--TI6)--I-I-II':===
E==E=E===€€€E-=={€€€€€
EEEnqEaEnEqqEqqqsqEqqEEqq;===x==x= x=== ====q======- -
FEFVEF;iVSFEEEEEEEEE!EEEE2'6'c1 -6 66 6 616o6a:)anan 6)66)6lo6)6)oaii;i m- rmm4-e-bbb bb b b600000aaaaasaaE€€ €g e cceggee ceeeseee
6 6 .1 .1 .) .) r) .) .) at al rt o 6 6 a) .) o o o o o o>tiiiai-iii- jii--I---rIr-II
A a Z ? Z Z Z 2_? Z == z z z z z z z z z z z z z z2H**I*sIIt***ItrI*fSI***iEEE2Z'6 i''6 i^ i^'6 a^ v\ 'u1 in a^ -q i^ a^ a^ tn t a^ a a q u, t v\ t,.
l"C 6;i;66a;i 66ata^a t 11 v1 a^ 6 a vt a a \4 lt t \ tA
i; in ri n! nr m m m m m ir - m m m r m m
a ? ? ? ? "? ??? ? ??? ??? ? ? ?
6 s. 2 z - = - 2 - = 2 2 z z z z z z z z z z z z z z2FEssssssssssuussBsssssB$sgsnJ =;
i
ni ni ni ni 6J ae au u,, '.! u, (, (,@ u, (, oJ (, u, (,t u, ur (! (rr
iiP-EE-;;i;iiiiiFPPoN{ ! { ! -r { \J.{..r ! {.{ \J !rJ \J -.1 !! \l'.J:J! {\J<*J -"i -d;& -d; - d; &&&&& && &&aee!
IG 6 6 L,i an .n r,(nan(/llJi ! !r! !!(Jl(,(nu'; 5o a. 66 do co @-o@@ a. c. q,aa@@
6 6 66 6 tlt 6iato@ro (o(.l ro(o(o@
6 6 6 @ @ @ @ @ @ @ ca @ @co 6 @ @ @ aa @F6666i66b (o b \o ro @ @ 6 \o (o tO ao (o (D \O Q p !o (o5EE;;=;;x;J:sssSEs$$sAt3sv,t^t t49r6566666666ooOOOOoooooQQQo-E-E---ccccCc-ecccccccccc! - i = --{ --l --{ --r -.1iiiiiii-iiirrrirr--rrrr-r
E========a{€€€{{{€EEE<ri ri ri ri ri.'i ni ni m m rri ri nFq!!lP9199222199Ig22222222299.24
E'EE'Fii5''EEsEEEEEEEE''c\'61'ct'6 -Gt -a -6 6 6 6 6 Zr 6, o 6 6 an an o o o 6) o O 6)
ninirrin;mrnm55555555555555555666666E6EEEEggegccccccceeeeseeees
o
o
a
I
I"JNNJI\,^JNNJNJ ^
JNI\JNJNI9I!\?N'NNJi.i ii :i ii n n n{ ir..r -r..1 n n n'{ ! ! '.J \.r .'l {{ !:r>l:lEdddo' or oi oi oi oi or or o\ o1 ororootolqoro!oo1 or(^ol
EHEEEddEHEEdEEHEd$EdddHdEHE5EXEEEEEsEsEtsgg838336ts38838
Page 1
October 30, 2020
Sharmeen Al-Jaff
Senior Planner
City of Chanhassen
7700 Market Boulevard, P.O. Box 147
Chanhassen, MN 55317
RE: Kimley Horn and Associates- Case No. 2020-21
Dear Ms. Al-Jaff,
Kimley-Horn has reviewed the comments provided by City of Chanhassen, dated September 30, 2020,
and has modified the plans accordingly. The comments and responses are listed below. Responses to
comments are in bold italics.
ENVIRONMENTAL RESOURCES
1. The applicant shall plant a minimum of six trees in the parking lot.
Two trees have been provided within the parking lot islands to provide screening of the
garage doors as well as 5 additional trees throughout the rest of the site. In addition to the
two trees provided in the parking lot, and to provide additional screening, tall shrubs have
been placed along the east property line and southwest of the parking lot to screen the
parking area and service garage doors. Please refer to Landscape Plan for details.
2. The applicant shall meet the minimum 10’ interior width for all landscaped islands and peninsulas.
Island widths have been revised to provide a minimum interior width of 10’. Please refer to
Sheet C2.0.
3. The applicant shall include landscaping along the eastern property line that screens the parking
area and garage door.
Tall shrub landscaping has been provided along the east property line to provide screening
of the garage service doors. Please refer to Sheet LP-1.
4. The applicant shall include a minimum of two over story trees to be planted along Crossroads
Boulevard.
Two over story trees have been provided along Crossroads Boulevard. Please refer to
Sheet LP-1.
5. All existing trees on site to be saved during construction shall be protected at all times by tree
preservation fencing. Trees that are damaged or dead will be replaced.
Existing trees on site and within the limits of disturbance are to be protected in place
through the duration of construction. Please refer to Sheet C1.0 for tree protection location
and Sheet C1.1 for tree protection detail.
Page 2
ENGINEERING
1. The applicant shall provide a traffic control plan for review and approval for the remo val and
restoration of the original access had from Crossroads Boulevard prior to commencement of
construction activities on-site.
Traffic control plans shall be prepared by the Contractor for work completed within the
public right-of-way. The Contractor shall submit a traffic control plan to the City for review
prior to construction activity onsite.
2. The applicant shall provide analysis that the proposed north driveway location is adequately
spaced as to not create adverse impacts to Crossroads Boulevard and that the largest design
vehicle accessing the site can turn into the north driveway access from Crossroads Boulevard
from both northbound and southbound movements) prior to permits being issued.
The northern access to the proposed project is aligned with the curb line with the existing
gas station, and is spaced approximately 55 feet from Crossroads Blvd. Vehicles entering
the site will have a free right turn movement into the site, so impacts on Crossroads Blvd
from cars entering the site shall be minimal. The preliminary PUD plans show a direct
access to Crossroads Blvd, to us direct access to Crossroads Blvd would have a greater
impact to traffic flow on Crossroad Blvd. By moving the access to the north side of the
property, vehicles will only enter and exit the development in three locations, allowing
Crossroads Blvd to have a better traffic flow pattern. Additionally, by removing the parking
from the southerly access road that was shown in Preliminary Plans, the southern drive to
Crossroads Blvd functions much better as well.
A vehicle access exhibit (EX-1) included in the proposed civil documents is provided
displaying the vehicle access route for a design vehicle entering the site from Crossroads
Boulevard.
3. The water service lateral located on the existing condition survey near the southeast corner of the
site shall be abandoned by removing the stub to the main and capping per City Standards.
Noted. The existing water service on the southeast corner of the property shall be removed
to the main and capped per City Standards and Specification. Please refer to Sheet C1.0.
4. The water service lateral shall meet current City specifications, which shall include a 1” plastic
service lateral.
Noted. The proposed water service lateral shall be a 1” plastic service lateral per City
Standard Plate 1005. Please refer to Sheet C4.0 and C4.1.
5. The sanitary service lateral shall connect to the existing manhole via a core and boot connec tion.
Noted. A note on the utility plan has been added to direct the contractor on how to make
this connection.
6. The applicant shall pay the appropriate sanitary sewer and water trunk hook-up fees at the time of
building permit issuance. These fees are based on the number of SAC units assigned by the Met
Council and are due at the time of building permit issuance. The 2020 rates are $2,302.00/unit and
7,974.00/unit for sanitary sewer and water, respectively.
Noted. Applicable fees shall be paid prior to permit issuance.
CONSTRUCTION PLANS
1. Sheet C0.1:
Page 3
a. Grading and drainage note 5 shall be updated to require placement of 6” of topsoil, and
not 4”, in accordance with City Standards
This note has been modified on Sheet C0.1.
b. Note 10 shall be updated to also require coordination with the City’s Water Resources
Coordinator (952-227-1168)
This note has been modified on Sheet C0.1.
2. Sheet C1.0:
a. Add note that any construction outside the property limits of the site shall be
coordinated with the other owners of the PUD (typ.)
This note has been added on Sheet C1.0.
b. Add note to remove stub to main for existing water service stub near southeast corner
of the site
This note has been added on Sheet C1.0.
c. Update erosion control plan note 7 to “remove” and not “removal”
This note has been updated on Sheet C1.0.
d. Update erosion control plan note 10 requiring the use of bio logs in the event of frozen
soils as a temporary measure and requires approval from the City’s erosion control
inspector
This note has been updated on Sheet C1.0.
e. Update erosion control note 11 to eliminate “at City Hall” and replace “City Engineer”
with “Water Resources Coordinator”
This note has been updated on Sheet C1.0.
f. The sequencing of construction indicates the use of wheel washes, Porta-Pottys,
trailers, etc. and all proposed locations shall be located on the plans, update
accordingly
An area for these construction-related items has been added to the Erosion
Control Phase 1 and Phase 2 plans, please refer to Sheets C1.0 and C3.0.
g. Add to notes the requirement that a traffic control plan shall be adhered to during the
removal and replacement of the driveway access off Crossroads Boulevard and
coordination shall be had through the City’s Public Works Department (952-227-1300)
prior to commencement of construction operations
This note has been added on Sheet C1.0.
3. Sheet C1.1:
a. Add concrete washout detail (#5304) as the use of a concrete wash-out was called out
for on subsequent plan sheets
Concrete washout detail (5304) has been added to sheet C1.1.
b. Verify all details are the most recent versions (typ.)
The most recent versions of City standard details are incorporated into the civil
plan set.
Page 4
4. Sheet C3.0:
a. Call out for BP-1 indicates storage volume of 1,645 square feet, update unit of
measurement accordingly
The volume now has a unit of CF, cubic feet.
b. Existing stormwater conveyance system is showing incorrect flow directions, adjust
accordingly for clarity
The conveyance direction of existing infrastructure has been updated to reflect
correct flow direction.
c. Update grading plan note 13 to require 6” of topsoil
This note has been updated on Sheet C3.0.
5. Sheet C3.1:
a. Note 5 discusses that no excavation equipment shall travel within underground
infiltration system area; it is recommended that this area be called out on all plan sheets
that will require construction equipment to travel near the underground system or add a
note to applicable sheets
Underground BMP limits have been added to construction sheets.
6. Sheet C4.0:
a. Verify the call-out for the existing 27” storm sewer is HDPE as City records indicate it as
RCP
Existing 27” storm sewer callout has been revised to reflect RCP material.
b. Consider adding insulation where water services cross existing and proposed storm
sewer pipes
Minimum 4” thick rigid polystyrene installation has been added between
proposed and existing storm sewer and proposed water main. Please refer to
sheet C4.0.
c. Relocate the curb stop to the property line, update plans accordingly
The curb stop has been relocated to the property line. Please refer to sheet C4.0.
d. Update note for sanitary sewer service connection to be “core and boot”
We are proposing to connect to the existing sanitary sewer service using an
8”x6” reducer; a “core and boot” connection is not needed for the sanitary sewer
service connection
e. Clarify the method for the removal of the existing 8” sanitary stub either on the call -out
or in the notes
Since the stub is already in place, we are proposing to install an 8” X 6” reducer
connection right outside of the manhole to preserve the watertight connection to
the manhole and then extend the service.
f. In the upper left corner of the plan sheet there is a call out for “Water” and “Sanitary”
with contact information for Ashley McGovern the City Finance Clerk responsible for
billing; however, the Public Works Department or the Engineering Department would be
the departments to assist with construction, specifications, and detail questions as it
relates to build-out, update accordingly
This note has been updated to reference the correct City of Chanhassen contacts
for construction.
Page 5
g. Utility plan note 3 shall be updated as to eliminate the use of type “k” copper tubing and
reflect current City Standards, see detail #1005 for water services or the City’s Standard
Specifications
The note has been updated to use PE/HDPE or PEX piping per City Standard
detail 1005. Please refer to Sheet C4.0.
h. Update keynote legend to eliminate the use of type “K” copper tubing and ¾” sizing, see
detail #1005 for water services or the City’s Standard Specifications
The keynote has been updated to use PE/HDPE or PEX piping per City Standard
detail 1005. Please refer to Sheet C4.0.
7. Sheet LI-1
a. No private irrigation lines shall be located within public ROW, adjust plans accordingly
Irrigation design is diagrammatic. All piping, valves, and other equipment shown
within paved areas or out of property boundaries are for design clarification only,
and shall be installed in planting areas within the property lines or limits
indicated on plan. Please see Irrigation Disclaimer on Sheet LI-1.
WATER RESOURCES
1. The applicant has provided an erosion and sediment control plan as required by Chapter 19-145 of
the City Code. The applicant shall update the plans to include the City’s Water Resources
Coordinator as the contact on the plans (Matt Unmacht, Water Resources Coordinator, 952-227-
1168).
The point of contact has been updated and provided on Sheets C1.0 and C3.0.
2. The applicant shall evaluate and analyze that the impervious surface from this site will not inundate
or negatively impact the downstream MnDOT facility based on new rainfall requ irements (TP-40
vs. NOAA Atlas 14). This analysis must be provided to the City under separate cover.
It is our understanding the downstream MnDOT facility was designed utilizing the TP -40
rainfall data. The stormwater report has been revised to analyze the proposed development
using Atlas-14 rainfall data in comparison to the originally designed MnDOT drainage
facility using TP-40. Based on this analysis, the stormwater retention BMPs proposed for
the project release stormwater at a rate that is less than the rate that is assumed to be
accounted for in the previous TP-40 event. This project does not adversely impact the
downstream stormwater system.
PLANNING
1. Approval of the site plan shall be contingent upon approval of the Planned Unit Development
amendment to allow Automotive Repair shops.
Noted. It is understood that amendment of the Planned Unit Development to allow for
automotive repair use is required for site plan approval.
2. All rooftop and ground equipment must be screened from views.
Noted. All rooftop and ground mechanical equipment shall be screened from public view.
Any roof-mounted mechanical equipment is screened by proposed building parapet.
Additionally, the pad-mounted transformer is proposed to be screened to the extent feasible
with plant materials.
3. Sign illumination and design shall comply with ordinance.
Page 6
The proposed monument sign meets the required ordinance of a maximum of 24 square
feet and maximum 5’ height and set back a minimum from all property line. The building
mounted signage meets the required ordinances for both the street frontage and internal
road view. The building mounted signs comply with the maximum allowed percentage of
wall area. All sign illumination and sizing comply with the city ordinances, please see
included monument sign design plans.
4. The exterior material for the trash enclosure must be of the same exterior material as the building.
Recycling space and other solid waste collection space should be contained within the same
enclosure.
Recycling and trash shall be located within the same enclosure. The trash enclosure
attached to the building utilizes the same materials as the building for uniformity.
5. The design of the building shall be modified to complement surrounding buildings.
The design of the building has been modified to complement surrounding buildings . Colors,
materials and textures, and key design elements have been incorporated to complement the
surrounding buildings within the Planned Unit Development. Please refer to Architectural
Elevations.
6. The applicant must prepare a lighting plan and include photometrics. Light levels for site lighting
shall be no more than one-half foot candle at the project perimeter property line. This does not
apply to street lighting. The applicant has not submitted a light fixture design. This fixture must
meet the light fixture specified in the Planning Unit Development governing the subject site.
A photometrics plan has been included within the architectural plans. Light levels ar e less
than one-half foot candles at the project perimeter property line .
7. The monument sign may not exceed 24 square feet in area nor be higher than 5 feet. The sign
shall be located 10 feet from the property line. A sign permit is required before constr uction of the
sign.
Sign design conforms to the maximum 24 square feet in area and height restriction of 5
feet. The sign is located 10 feet from the western property line. Please refer to Monument
Design sheet included in this submittal and Sheet C2.0 for monument sign location. A sign
permit shall be obtained prior to construction.
8. Recycling space and other solid waste collection space should be contained within the same
enclosure as the trash.
Recycling and trash shall be contained within one enclosure located on the north side of
the building.
9. Any prior approvals for a bank building on the subject site shall be null and void.
Noted. Prior approvals for a proposed bank building as part of the initial planned unit
development
10. No unlicensed or inoperable vehicles shall be stored on-premises except in appropriately designed
and screened storage areas.
Inoperable or unlicensed vehicles shall be stored indoors or screened storage areas.
Vehicles which are inoperable, or while being prepared for multiple consecutive days shall
be stored indoors.
11. All repair, assembly, disassembly and maintenance of vehicles shall occur within closed building
except minor maintenance including, but not limited to, tire inflation, adding oil and wiper
Page 7
replacement.
Noted. Repairs, assembly, disassembly and maintenance of vehicles shall all occur within
closed building.
12. No public address system.
A public address of 8941 Crossroads Boulevard per Carver County GIS is assigned to the
subject property.
13. No sales, storage or display of used automobiles or other vehicles such as motorcycles,
snowmobiles, or all-terrain vehicles.
Noted. The proposed Christian Brothers development does not sell, store, display used
automobiles or other vehicles such as motorcycles, snowmobiles, or all-terrain vehicles.
14. Disposal of vehicle fluids shall comply with PCA regulations.
All vehicle fluids are collected interior to the building and disposed of in accordance with
MPCA guidelines and regulations.
15. Facilities for the collection of waste oil must be provided.
All vehicle oil is collected interior to the building and disposed of in accordance with MPCA
guidelines and regulations.
16. All service/garage doors shall be screened.
Service/garage doors are screened from neighboring development view utilizing trees
within the parking lot and perimeter landscaping along the east property line and southwest
of the proposed parking lot.
17. The building architecture shall complement surrounding buildings."
The design of the building has been modified to complement surrounding buildings. Colors,
materials and textures, and key design elements have been incorporated to complement the
surrounding buildings within the Planned Unit Development. Please refer to Architectural
Elevations.
Thank you for the thorough review of the layout. Please contact me with any questions regarding the
responses.
Sincerely,
KIMLEY-HORN AND ASSOCIATES, INC.
Christian Jones – Project Manager
This document,
togetherwith
the
concepts
and designs presented
herein,
as an instrument of
service, is intended only for the specific purpose and client for which
it was prepared. Reuse of and improper reliance on this
document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without
liability to Kimley-Horn and Associates, Inc.SHEET NUMBER 2020 KIMLEY-HORN
AND ASSOCIATES, INC.767 EUSTIS STREET, SUITE 100, ST. PAUL,
MN 55114PHONE: 651-645-4197WWW.KIMLEY-HORN.
COMK:\TWC_LDEV\CHRISTIAN BROTHERS AUTOMOTIVE\Chanhassen, MN\3 Design\CAD\
PlanSheets\C0-COVER SHEET.dwg October 29, 2020 - 1:59pmBYREVISIONSNo.
DATE1CITY
COMMENTS10/16/
2020CJJPRELIMINARY - NOT FOR CONSTRUCTIONPREPARED
FORCOVER SHEETC0.08941
CROSSROADSBLVDCHRISTIAN BROTHERSAUTOMOTIVECHANHASSENMNDATE:I
HEREBY CERTIFY THAT THIS
PLAN,SPECIFICATION OR REPORT
WAS PREPARED BYME
OR UNDER
MY
DIRECT SUPERVISION ANDTHAT I
AM A DULY LICENSED PROFESSIONALENGINEER UNDER
THE LAWS OF
THE STATE OFMINNESOTA.MNLIC.
NO.BRANDON R.
ELEGERT,
P.E.10/29/202050387DATECHECKED
BYSCALEDESIGNED BYDRAWN BYKHA PROJECT16068400510/16/
2020AS SHOWNCJJKAMBRENORTH
VICINITY N.T.S.SITE
CHANHASSEN, CARVER COUNTY, MN
1.CONTRACTOR SHALL CONFIRM
THAT THE
EXISTING CONDITIONS FOR
THE SITE MATCH
WHAT IS SHOWN
ON THE DRAWINGS INCLUDED
PRIOR TO CONSTRUCTION.
2.IF REPRODUCED,
THE SCALES SHOWN ON
THESE PLANS ARE
BASED ON A 22X34 SHEET.3.
ALL
NECESSARY INSPECTIONS AND/
OR CERTIFICATIONS REQUIRED
BY CODES AND/OR
UTILITY
SERVICES COMPANIES SHALL
BE PERFORMED PRIOR TO
ANNOUNCED BUILDING POSSESSION
AND THE FINAL CONNECTION
OF SERVICES.4.ALL
GENERAL CONTRACTOR WORK
TO BE COMPLETED (
EARTHWORK, FINAL
UTILITIES,AND FINAL GRADING) BY THE MILESTONE
DATE IN
PROJECT DOCUMENTS.NOTES:LANDSCAPE
ARCHITECT EVERGREEN DESIGN GROUP,
INC.PO BOX 2193
GARNER, NC 27529 TELEPHONE: (
800) 680-6630 FAX: (866) 579-8452 CONTACT: RODNEY
MCNABB PROJECT TEAM:SURVEYOR EGAN, FIELD & NOWAK,
INC.1229 TAYLOR STREET
NE, SUITE 100 MINNEAPOLIS,
MN 55413 TELEPHONE: (612)
466-3300 CONTACT: ERIC ROESER ENGINEER KIMLEY-HORN AND
ASSOCIATES, INC.PREPARED BY: BRANDON R.
ELEGERT,P.E.767
EUSTIS STREET, SUITE 100
ST. PAUL, MN 55114 TELEPHONE (
This document,
togetherwith
the concepts and
designs presented herein, as an instrument of service, is intended only for the specific
purpose and client for which it was prepared. Reuse
of and improper reliance on this document without written authorization and adaptation by
Kimley-Horn and Associates, Inc. shall be without liability to
Kimley-Horn and Associates, Inc.SHEET NUMBER 2020 KIMLEY-HORN AND ASSOCIATES, INC.767
EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114PHONE: 651-645-4197WWW.KIMLEY-HORN.COMK:\
TWC_LDEV\CHRISTIAN BROTHERS AUTOMOTIVE\Chanhassen, MN\3
Design\CAD\PlanSheets\C1-GENERAL NOTES.dwg October 29, 2020 - 1:59pmBYREVISIONSNo.DATE1CITY
COMMENTS10/16/2020CJJPRELIMINARY - NOT FOR CONSTRUCTIONPREPARED FORGENERAL
NOTESC0.18941 CROSSROADSBLVDCHRISTIAN BROTHERSAUTOMOTIVECHANHASSENMNDATE:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED
BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE
LAWS OF THE STATE OFMINNESOTA.MNLIC. NO.BRANDON R. ELEGERT, P.E.
10/29/202050387DATECHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT16068400510/16/2020AS SHOWNCJJKAMBREGENERAL CONSTRUCTION NOTES 1.THE
CONTRACTOR AND SUBCONTRACTORS SHALL OBTAIN A COPY OF THE MN DEPARTMENT OF TRANSPORTATION "STANDARD
SPECIFICATIONS FOR CONSTRUCTION" (LATEST EDITION) AND BECOME FAMILIAR WITH THE CONTENTS PRIOR TO COMMENCING
WORK, AND, UNLESS OTHERWISE NOTED, ALL WORK SHALL CONFORM AS APPLICABLE TO THESE
STANDARDS AND SPECIFICATIONS.2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING ALL MATERIAL
AND LABOR TO CONSTRUCT THE FACILITY AS SHOWN AND DESCRIBED IN THE CONSTRUCTION
DOCUMENTS IN ACCORDANCE WITH THE APPROPRIATE APPROVING AUTHORITIES, SPECIFICATIONS AND REQUIREMENTS. CONTRACTOR SHALL CLEAR
AND GRUB ALL AREAS UNLESS OTHERWISE INDICATED, REMOVING TREES, STUMPS, ROOTS, MUCK,EXISTING
PAVEMENT AND ALL OTHER DELETERIOUS MATERIAL.3.THE EXISTING SUBSURFACE UTILITY INFORMATION IN THIS PLAN
IS QUALITY LEVEL "D" UNLESS OTHERWISE NOTED. THIS QUALITY LEVEL WAS DETERMINED ACCORDING TO
THE GUIDELINES OF CI/ACSE 38/02,ENTITLED STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION
OF SUBSURFACE QUALITY DATA BY THE FHA. EXISTING UTILITIES SHOWN ARE LOCATED ACCORDING
TO THE INFORMATION AVAILABLE TO THE ENGINEER AT THE TIME OF
THE TOPOGRAPHIC SURVEY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR THE ENGINEER.
GUARANTEE IS NOT MADE THAT ALL EXISTING UNDERGROUND UTILITIES ARE SHOWN OR THAT
THE LOCATION OF THOSE SHOWN ARE ENTIRELY ACCURATE. FINDING THE ACTUAL LOCATION OF
ANY EXISTING UTILITIES IS
THE CONTRACTOR'S RESPONSIBILITY AND SHALL BE DONE BEFORE COMMENCING ANY WORK IN
THE VICINITY. FURTHERMORE,THE CONTRACTOR SHALL
BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES DUE TO THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE
AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES.THE OWNER
OR ENGINEER WILL ASSUME NO LIABILITY FOR ANY
DAMAGES SUSTAINED OR COST INCURRED BECAUSE OF THE OPERATIONS IN THE VICINITY OF EXISTING UTILITIES
OR STRUCTURES, NOR FOR TEMPORARY BRACING AND SHORING OF SAME. IF IT IS
NECESSARY TO SHORE, BRACE, SWING OR RELOCATE A UTILITY, THE UTILITY COMPANY OR DEPARTMENT AFFECTED
SHALL BE CONTACTED AND THEIR PERMISSION OBTAINED REGARDING THE METHOD TO USE FOR SUCH WORK.4.IT
IS THE CONTRACTOR'S RESPONSIBILITY TO
CONTACT THE VARIOUS UTILITY COMPANIES WHICH MAY HAVE BURIED OR AERIAL UTILITIES WITHIN
OR NEAR THE CONSTRUCTION AREA BEFORE COMMENCING WORK. THE CONTRACTOR SHALL PROVIDE 48
HOURS MINIMUM NOTICE TO ALL UTILITY COMPANIES PRIOR TO BEGINNING CONSTRUCTION.5.THE
CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL REQUIRED CONSTRUCTION PERMITS AND BONDS IF REQUIRED
PRIOR TO CONSTRUCTION.6.THE CONTRACTOR SHALL HAVE AVAILABLE AT THE JOB SITE AT ALL
TIMES ONE COPY OF
THE CONSTRUCTION DOCUMENTS INCLUDING PLANS, SPECIFICATIONS, GEOTECHNICAL REPORT AND SPECIAL CONDITIONS AND COPIES OF ANY REQUIRED CONSTRUCTION PERMITS.
7.ANY DISCREPANCIES ON THE DRAWINGS SHALL BE IMMEDIATELY BROUGHT TO THE
ATTENTION OF THE OWNER AND ENGINEER BEFORE COMMENCING WORK.
NO FIELD CHANGES OR DEVIATIONS FROM DESIGN ARE TO BE MADE WITHOUT PRIOR APPROVAL
OF THE OWNER AND NOTIFICATION TO THE ENGINEER.8.ALL
COPIES OF COMPACTION, CONCRETE AND OTHER REQUIRED TEST RESULTS ARE TO BE SENT
TO THE OWNER DIRECTLY FROM THE TESTING AGENCY.9.THE CONTRACTOR SHALL BE RESPONSIBLE FOR
DOCUMENTING AND MAINTAINING AS-BUILT INFORMATION WHICH SHALL BE RECORDED AS CONSTRUCTION PROGRESSES
OR AT THE COMPLETION OF APPROPRIATE CONSTRUCTION INTERVALS AND SHALL BE RESPONSIBLE FOR PROVIDING AS-BUILT DRAWINGS
TO THE OWNER FOR THE PURPOSE OF CERTIFICATION TO JURISDICTIONAL AGENCIES
AS REQUIRED. ALL AS-BUILT DATA SHALL BE
COLLECTED BY A STATE OF MN PROFESSIONAL LAND SURVEYOR WHOSE SERVICES ARE ENGAGED
BY THE CONTRACTOR.10.ANY WELLS DISCOVERED ON SITE THAT WILL
HAVE NO USE MUST
BE PLUGGED BY A
LICENSED WELL DRILLING CONTRACTOR IN A MANNER APPROVED BY ALL JURISDICTIONAL AGENCIES. CONTRACTOR
SHALL BE
RESPONSIBLE FOR OBTAINING ANY WELL ABANDONMENT PERMITS
REQUIRED.11.ANY WELL DISCOVERED DURING EARTH
MOVING OR EXCAVATION SHALL BE REPORTED TO THE APPROPRIATE
JURISDICTIONAL AGENCIES WITHIN 24 HOURS AFTER DISCOVERY IS MADE.12.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR
VERIFYING THAT THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS DO NOT CONFLICT
WITH ANY KNOWN
EXISTING OR OTHER PROPOSED IMPROVEMENTS.
IF ANY CONFLICTS ARE DISCOVERED,
THE CONTRACTOR SHALL NOTIFY THE OWNER PRIOR TO
INSTALLATION OF ANY PORTION OF THE SITE WORK
THAT WOULD BE AFFECTED. FAILURE TO
NOTIFY OWNER OF AN IDENTIFIABLE CONFLICT PRIOR TO PROCEEDING WITH INSTALLATION RELIEVES
OWNER OF ANY OBLIGATION TO PAY FOR A RELATED CHANGE ORDER.13.SHOULD CONTRACTOR
ENCOUNTER ANY DEBRIS LADEN SOIL, STRUCTURES NOT IDENTIFIED IN THE
DOCUMENTS, OR OTHER SOURCE OF POTENTIAL CONTAMINATION, THEY SHALL IMMEDIATELY CONTACT THE
ENGINEER AND OWNER.TYPICAL OWNER/ENGINEER OBSERVATIONS CONTRACTOR SHALL NOTIFY OWNER
AND/OR ENGINEER 48 HOURS IN ADVANCE OF THE FOLLOWING ACTIVITIES:
PRE-CONSTRUCTION MEETING, SUBGRADE PREPARATION, BASE INSTALLATION ASPHALT INSTALLATION, UNDERGROUND PIPING AND
UTILITIES INSTALLATION,INSTALLATION OF
STRUCTURES, CHECK VALVES, HYDRANTS, METERS, ETC., SIDEWALK INSTALLATION, CONNECTIONS TO WATER AND
SEWER MAINS, TESTS OF UTILITIES 3RD PARTY TEST REPORTS REQ'D TEST REPORTS
REQUIRED FOR CLOSE OUT INCLUDE, BUT ARE NOT LIMITED TO:
DENSITY TEST REPORTS BACTERIOLOGICAL TESTS OF WATER SYSTEM PRESSURE TEST OF WATER/SEWER
LEAK TESTS ON SEWER SYSTEM AND GREASE TRAPS ANY OTHER TESTING REQUIRED BY THE AGENCY/
MUNICIPALITY WATER STORM SEWER & SANITARY SEWER NOTES 1.THE CONTRACTOR SHALL CONSTRUCT GRAVITY SEWER
LATERALS, MANHOLES, GRAVITY SEWER LINES,AND DOMESTIC WATER AND FIRE PROTECTION SYSTEM AS SHOWN ON THESE PLANS.
THE CONTRACTOR SHALL FURNISH ALL NECESSARY MATERIALS, EQUIPMENT, MACHINERY, TOOLS, MEANS OF TRANSPORTATION AND LABOR NECESSARY
TO COMPLETE THE WORK IN FULL AND
COMPLETE ACCORDANCE WITH THE SHOWN, DESCRIBED AND REASONABLY INTENDED REQUIREMENTS OF THE
CONTRACT DOCUMENTS AND JURISDICTIONAL AGENCY REQUIREMENTS. IN THE EVENT THAT THE CONTRACT DOCUMENTS AND THE JURISDICTIONAL AGENCY
REQUIREMENTS ARE NOT IN AGREEMENT, THE MOST STRINGENT SHALL GOVERN.2.ALL EXISTING UNDERGROUND UTILITY
LOCATIONS SHOWN ARE APPROXIMATE. THE CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS FOR UTILITY LOCATION AND COORDINATION IN ACCORDANCE
WITH THE NOTES CONTAINED IN THE GENERAL CONSTRUCTION SECTION OF THIS SHEET.3.THE
CONTRACTOR SHALL RESTORE ALL DISTURBED VEGETATION IN KIND, UNLESS SHOWN OTHERWISE.4.
DEFLECTION OF PIPE JOINTS AND CURVATURE OF PIPE SHALL NOT EXCEED THE MANUFACTURER'S SPECIFICATIONS. SECURELY
CLOSE ALL OPEN ENDS OF
PIPE AND FITTINGS WITH A WATERTIGHT PLUG WHEN WORK IS NOT IN PROGRESS. THE INTERIOR
OF ALL PIPES SHALL BE CLEAN AND JOINT SURFACES WIPED CLEAN
AND DRY AFTER THE PIPE HAS BEEN LOWERED INTO THE TRENCH. VALVES
SHALL BE PLUMB AND LOCATED ACCORDING TO THE PLANS.5.
ALL PIPE AND FITTINGS SHALL BE CAREFULLY STORED FOLLOWING MANUFACTURER'S RECOMMENDATIONS. CARE SHALL BE
TAKEN TO AVOID
DAMAGE TO THE COATING OR LINING IN ANY D.I.PIPE FITTINGS. ANY PIPE OR
FITTING WHICH IS DAMAGED OR WHICH HAS FLAWS OR IMPERFECTIONS WHICH, IN THE OPINION
OF THE ENGINEER OR OWNER, RENDERS IT UNFIT FOR USE, SHALL NOT BE
USED.ANY PIPE NOT SATISFACTORY FOR USE SHALL BE CLEARLY MARKED AND IMMEDIATELY REMOVED FROM THE
JOB SITE, AND SHALL BE
REPLACED AT THE CONTRACTOR'S EXPENSE.6.WATER FOR FIRE FIGHTING SHALL BE MADE
AVAILABLE FOR USE BY THE CONTRACTOR PRIOR TO COMBUSTIBLES BEING BROUGHT
ON SITE.7.ALL UTILITY AND STORM DRAIN TRENCHES LOCATED UNDER AREAS TO RECEIVE PAVING
SHALL BE COMPLETELY BACK FILLED IN ACCORDANCE WITH THE GOVERNING JURISDICTIONAL AGENCY'
S SPECIFICATIONS. IN THE EVENT THAT THE CONTRACT
DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN AGREEMENT, THE MOST STRINGENT SHALL GOVERN.
8.UNDERGROUND LINES SHALL BE SURVEYED BY A STATE OF MN PROFESSIONAL
LAND SURVEYOR PRIOR TO BACK FILLING.9.CONTRACTOR SHALL PERFORM, AT HIS OWN EXPENSE,
ANY AND ALL TESTS REQUIRED BY THE SPECIFICATIONS AND/OR ANY AGENCY HAVING JURISDICTION.
THESE TESTS MAY INCLUDE, BUT MAY NOT BE LIMITED TO, INFILTRATION AND EXFILTRATION, TELEVISION INSPECTION
AND A MANDREL TEST ON GRAVITY SEWER. A COPY OF THE TEST RESULTS
SHALL BE PROVIDED TO THE UTILITY PROVIDER, OWNER AND JURISDICTIONAL
AGENCY AS REQUIRED.10.CONTRACTOR SHALL PROVIDE FOR A MINIMUM HORIZONTAL CLEARANCE OF 10'
AND A VERTICAL CLEARANCE OF 18" BETWEEN WATER AND SANITARY SEWER MANHOLES
AND LINES.11.IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION IT
SHALL BE THE CONTRACTORS RESPONSIBILITY TO REPAIR AND/
OR REPLACE THE EXISTING STRUCTURE AS NECESSARY TO RETURN IT TO EXISTING CONDITIONS
OR
BETTER.12.ALL STORM PIPE ENTERING STRUCTURES SHALL BE GROUTED TO ASSURE CONNECTION AT STRUCTURE IS
WATERTIGHT
UNLESS OTHERWISE STATED BY CITY AND STATE DESIGN STANDARDS AND SPECIFICATIONS.13.UNLESS OTHERWISE STATED
IN CITY AND STATE DESIGN STANDARDS AND SPECIFICATIONS, ALL STORM SEWER MANHOLES IN PAVED AREAS
SHALL BE FLUSH WITH PAVEMENT, AND SHALL HAVE TRAFFIC BEARING RING & COVERS.
MANHOLES IN UNPAVED AREAS SHALL BE 6" ABOVE FINISH GRADE. LIDS SHALL BE LABELED "STORM SEWER". EXISTING
CASTINGS AND STRUCTURES WITHIN PROJECT LIMITS SHALL BE ADJUSTED TO MEET THESE
CONDITIONS AND THE PROPOSED FINISHED GRADE.14.
TOPOGRAPHIC INFORMATION IS TAKEN FROM A TOPOGRAPHIC SURVEY BY LAND SURVEYORS. IF THE
CONTRACTOR DOES NOT ACCEPT EXISTING TOPOGRAPHY AS SHOWN ON THE PLANS, WITHOUT EXCEPTION,
THEN THE CONTRACTOR SHALL SUPPLY, AT THEIR EXPENSE, A TOPOGRAPHIC SURVEY BY A REGISTERED LAND SURVEYOR
TO
THE OWNER FOR REVIEW.15.CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE GOVERNING CODES AND BE CONSTRUCTED TO
SAME.
16.ALL STORM STRUCTURES SHALL HAVE A SMOOTH UNIFORM POURED MORTAR FROM INVERT
IN TO INVERT OUT.17.ROOF DRAINS SHALL BE CONNECTED TO STORM
SEWER BY PREFABRICATED WYES OR AT STORM
STRUCTURES. ROOF DRAINS AND TRUCK WELL DRAIN SHALL RUN
AT A MINIMUM 1% SLOPE, UNLESS NOTED OTHERWISE, AND TIE IN AT THE CENTERLINE OF
THE STORM MAIN.18.ALL ROOF AND SANITARY SEWER DRAINS SHALL BE INSULATED
IF
7' OF COVER CANNOT BE PROVIDED.19.THE CONTRACTOR SHALL PROTECT EXISTING
UNDERGROUND
UTILITIES AND APPURTENANCES THAT ARE TO REMAIN FROM DAMAGE DURING CONSTRUCTION OPERATIONS.20.THE
LOCATION OF EXISTING UTILITIES, STORM DRAINAGE STRUCTURES AND OTHER ABOVE AND
BELOW-GRADE IMPROVEMENTS ARE APPROXIMATE
AS SHOWN. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE EXACT LOCATION, SIZE
AND INVERT ELEVATIONS OF
EACH PRIOR TO THE START OF CONSTRUCTION.21.A MINIMUM OF 5' SEPARATION IS REQUIRED BETWEEN
UTILITIES AND TREES UNLESS A ROOT BARRIER IS UTILIZED.22.GAS, PHONE
AND ELECTRIC SERVICES SHOWN FOR INFORMATIONAL PURPOSES ONLY. DRY UTILITY COMPANIES MAY ALTER THE
DESIGN LAYOUT DURING THEIR REVIEW. CONTRACTOR TO COORDINATE FINAL DESIGN AND
INSTALLATION WITH UTILITY COMPANIES.23.COORDINATE UTILITY INSTALLATION WITH
IRRIGATION DESIGN AND INSTALLATION.24.ALL DIMENSIONS ARE TO FLOW LINE OF CURB UNLESS OTHERWISE NOTED. PERIMETER
WALL DIMENSIONS ARE TO INSIDE WALL FACE. REFERENCE ARCHITECTURAL PLANS FOR EXACT WALL
WIDTH AND SPECIFICATIONS.25.REFERENCE ARCHITECTURAL PLANS (BY
OTHERS). FOR EXACT BUILDING DIMENSIONS, AND MATERIALS SPECIFICATIONS.26.REFERENCE M.E.P. PLANS (
BY OTHERS) FOR MECHANICAL EQUIPMENT DIMENSIONS AND SPECIFICATIONS.27.CONTRACTOR SHALL REFERENCE STRUCTURAL
PLANS (BY OTHERS) FOR MECHANICAL EQUIPMENT DIMENSIONS AND PAD PREPARATION SPECIFICATIONS.28.CONTRACTOR SHALL REFERENCE
M.E.P PLANS (BY OTHERS) FOR LIGHT POLE WIRING.GRADING AND DRAINAGE
NOTES 1.PRIOR
TO GRADING AND DURING THE GRADING OF THE SITE THE CONTRACTOR SHALL COORDINATE
WITH THE CITY OF CHANHASSEN'S WATER RESOURCES COORDINATOR AT 952-227-1168.2.GENERAL
CONTRACTOR AND ALL SUBCONTRACTORS SHALL VERIFY THE SUITABILITY OF ALL EXISTING AND
PROPOSED SITE CONDITIONS INCLUDING GRADES
AND DIMENSIONS BEFORE START OF CONSTRUCTION.THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCIES.
3.THE CONTRACTOR SHALL GRADE THE SITE TO THE ELEVATIONS INDICATED AND SHALL ADJUST BMP'S AS
NECESSARY AND REGRADE WASHOUTS WHERE THEY OCCUR AFTER EVERY RAINFALL UNTIL A GRASS STAND
IS WELL ESTABLISHED OR ADEQUATE STABILIZATION OCCURS.4.CONTRACTOR SHALL ENSURE THERE IS
POSITIVE DRAINAGE FROM THE PROPOSED BUILDINGS SO THAT SURFACE RUNOFF WILL DRAIN BY GRAVITY TO
NEW OR EXISTING DRAINAGE OUTLETS. CONTRACTOR SHALL ENSURE NO PONDING OCCURS IN PAVED AREAS AND
SHALL NOTIFY ENGINEER
IF ANY GRADING DISCREPANCIES ARE FOUND IN THE EXISTING AND PROPOSED GRADES PRIOR TO
PLACEMENT OF PAVEMENT OR UTILITIES.5.CONTRACTOR SHALL PROTECT ALL MANHOLE COVERS, VALVE
COVERS, VAULT LIDS, FIRE HYDRANTS,POWER POLES, GUY WIRES, AND TELEPHONE
BOXES THAT ARE TO REMAIN IN PLACE AND UNDISTURBED
DURING CONSTRUCTION. EXISTING CASTINGS AND STRUCTURES TO REMAIN SHALL BE ADJUSTED TO MATCH THE
PROPOSED FINISHED GRADES.6.BACKFILL FOR UTILITY LINES SHALL BE PLACED PER DETAILS, STANDARDS, AND SPECIFICATIONS SO
THAT THE UTILITY WILL BE STABLE. WHERE UTILITY LINES CROSS
THE PARKING LOT, THE TOP 6 INCHES SHALL BE COMPACTED SIMILARLY TO THE REMAINDER
OF THE LOT. UTILITY DITCHES SHALL BE VISUALLY INSPECTED DURING THE EXCAVATION PROCESS
TO ENSURE THAT UNDESIRABLE FILL IS NOT USED.7.CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND
REPLACEMENT OF 6"
OF TOPSOIL AT COMPLETION OF WORK. ALL UNPAVED AREAS IN EXISTING RIGHTS-OF-
WAY DISTURBED BY CONSTRUCTION SHALL BE REGRADED AND SODDED.8.AFTER PLACEMENT OF SUBGRADE AND PRIOR
TO PLACEMENT OF PAVEMENT, CONTRACTOR SHALL TEST AND OBSERVE
PAVEMENT AREAS FOR EVIDENCE OF PONDING. ALL AREAS SHALL ADEQUATELY DRAIN TOWARDS THE INTENDED STRUCTURE
TO CONVEY STORM RUNOFF. CONTRACTOR SHALL IMMEDIATELY NOTIFY OWNER AND ENGINEER IF ANY DISCREPANCIES ARE
DISCOVERED.9.WHERE EXISTING PAVEMENT IS INDICATED TO BE REMOVED AND
REPLACED,
THE CONTRACTOR SHALL SAW CUT FULL DEPTH FOR A SMOOTH AND STRAIGHT JOINT AND REPLACE THE
PAVEMENT WITH THE SAME TYPE AND DEPTH OF MATERIAL AS EXISTING OR AS INDICATED.10.
THE CONTRACTOR SHALL INSTALL PROTECTION OVER ALL DRAINAGE STRUCTURES FOR THE DURATION OF CONSTRUCTION
AND UNTIL ACCEPTANCE OF THE PROJECT BY THE OWNER. ALL DRAINAGE STRUCTURES SHALL BE CLEANED OF
DEBRIS AS REQUIRED DURING AND AT THE END OF CONSTRUCTION TO PROVIDE POSITIVE DRAINAGE FLOWS.11.
IF DEWATERING IS REQUIRED, THE CONTRACTOR
SHALL OBTAIN ANY APPLICABLE REQUIRED PERMITS.THE CONTRACTOR IS TO COORDINATE WITH THE OWNER, THE
DESIGN ENGINEER, AND THE CITY'S WATER RESOURCE COORDINATOR (952-227-1168) PRIOR
TO ANY EXCAVATION.12.FIELD DENSITY TESTS SHALL BE TAKEN AT
INTERVALS IN ACCORDANCE WITH THE
LOCAL JURISDICTIONAL AGENCY OR TO MN/DOT STANDARDS. IN THE EVENT THAT THE CONTRACT DOCUMENTS AND
THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN AGREEMENT, THE MOST STRINGENT SHALL GOVERN.13.
ALL SLOPES AND AREAS
DISTURBED BY CONSTRUCTION SHALL BE GRADED AS PER PLANS. THE AREAS SHALL THEN
BE SODDED OR SEEDED AS SPECIFIED IN THE PLANS, FERTILIZED, MULCHED, WATERED AND MAINTAINED
UNTIL HARDY GRASS GROWTH IS ESTABLISHED IN ALL AREAS. ANY AREAS DISTURBED FOR ANY REASON PRIOR
TO FINAL ACCEPTANCE OF THE JOB SHALL BE
CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. ALL EARTHEN
AREAS WILL BE SODDED OR
SEEDED AND MULCHED AS SHOWN ON THE LANDSCAPING PLAN.14.THE CONTRACTOR SHALL BE
RESPONSIBLE FOR THE
CONTROL OF DUST AND DIRT RISING AND SCATTERING IN THE AIR
DURING CONSTRUCTION AND SHALL PROVIDE WATER SPRINKLING OR OTHER SUITABLE METHODS OF CONTROL. THE CONTRACTOR
SHALL COMPLY WITH ALL GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION.15.SOD, WHERE
CALLED FOR, MUST
BE INSTALLED AND MAINTAINED ON EXPOSED SLOPES WITHIN 48 HOURS OF COMPLETING FINAL
GRADING, AND AT ANY OTHER TIME AS NECESSARY, TO PREVENT EROSION,
SEDIMENTATION
OR TURBID DISCHARGES.16.THE CONTRACTOR SHALL ENSURE THAT LANDSCAPE ISLAND
PLANTING AREAS AND OTHER PLANTING AREAS ARE NOT COMPACTED AND DO NOT CONTAIN ROAD BASE MATERIALS. THE
CONTRACTOR SHALL ALSO EXCAVATE AND REMOVE ALL UNDESIRABLE MATERIAL FROM ALL AREAS
ON THE SITE TO BE PLANTED AND PROPERLY DISPOSED OF IN A LEGAL MANNER.17.THE CONTRACTOR SHALL INSTALL
ALL UNDERGROUND STORM WATER PIPING PER MANUFACTURER'S RECOMMENDATIONS
AND MN/
DOT SPECIFICATION.18.ALL CONCRETE/ASPHALT SHALL BE INSTALLED PER GEOTECH REPORT, CITY OF CHANHASSEN AND
MN/
DOT SPECIFICATIONS.19.SPOT ELEVATIONS ARE TO FLOWLINE OF CURB UNLESS OTHERWISE NOTED.20.LIMITS
OF CONSTRUCTION ARE TO THE PROPERTY LINE
UNLESS OTHERWISE SPECIFIED
ON THE PLAN.21.IMMEDIATELY REPORT TO THE OWNER ANY DISCREPANCIES FOUND BETWEEN ACTUAL
FIELD CONDITIONS AND CONSTRUCTION DOCUMENTS.22.THE CONTRACTOR IS RESPONSIBLE FOR LOCATING
AND PROTECTING EXISTING UTILITIES, AND SHALL REPAIR ALL DAMAGE TO EXISTING UTILITIES THAT
OCCUR DURING CONSTRUCTION WITHOUT COMPENSATION.23.BLEND NEW EARTHWORK SMOOTHLY TO
TRANSITION BACK TO EXISTING GRADE.24.ALL PROPOSED GRADES ONSITE SHALL BE 3:1 OR FLATTER
UNLESS OTHERWISE INDICATED ON THE PLANS.ANY SLOPES STEEPER THAN 4:
1 REQUIRE EROSION AND
SEDIMENT CONTROL BLANKET.25.ADHERE TO ALL TERMS AND CONDITIONS AS NECESSARY IN THE GENERAL
N.P.D.E.S. PERMIT AND STORMWATER POLLUTION PREVENTION PLAN
FOR STORMWATER DISCHARGE ASSOCIATED WITH CONSTRUCTION ACTIVITIES.26.ADJUST AND/
OR CUT EXISTING PAVEMENT AS NECESSARY TO ASSURE A SMOOTH FIT AND CONTINUOUS GRADE.27.CONTRACTOR
SHALL ENSURE MINIMUM GRADES ARE MET WITHIN PAVED AREAS, 1.2% FOR
ASPHALT PAVING AND 0.6% FOR CONCRETE PAVING.EROSION CONTROL NOTES 1.THE STORM
WATER POLLUTION PREVENTION PLAN ("SWPPP") IS COMPRISED OF THE EROSION CONTROL PLAN, THE STANDARD DETAILS, THE
PLAN NARRATIVE, ATTACHMENTS INCLUDED IN THE SPECIFICATIONS OF THE SWPPP, PLUS THE PERMIT AND
ALL SUBSEQUENT REPORTS AND RELATED DOCUMENTS.2.ALL CONTRACTORS AND SUBCONTRACTORS INVOLVED WITH STORM
WATER POLLUTION PREVENTION SHALL OBTAIN A COPY OF THE STORM WATER POLLUTION PREVENTION PLAN
AND THE STATE OF MN NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL
PERMIT (NPDES PERMIT) AND BECOME FAMILIAR WITH THEIR CONTENTS.3.BEST MANAGEMENT PRACTICES (BMP'S)
AND CONTROLS SHALL
CONFORM TO FEDERAL, STATE, OR LOCAL REQUIREMENTS OR MANUAL OF PRACTICE, AS APPLICABLE. THE
CONTRACTOR SHALL IMPLEMENT ADDITIONAL CONTROLS AS DIRECTED BY THE PERMITTING AGENCY OR OWNER.4.
SITE ENTRY AND EXIT LOCATIONS SHALL BE MAINTAINED IN A
CONDITION THAT WILL PREVENT THE TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC ROADWAYS.
ALL SEDIMENT SPILLED, DROPPED,WASHED, OR
TRACKED ON A PUBLIC ROADWAY MUST BE REMOVED IMMEDIATELY. WHEN WASHING IS REQUIRED TO
REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO A PUBLIC ROADWAY, IT SHALL BE DONE IN AN
AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT BASIN. ALL FINES IMPOSED FOR DISCHARGING
SEDIMENT ONTO PUBLIC AREAS SHALL BE PAID BY THE CONTRACTOR.5.TEMPORARY
SEEDING OR OTHER APPROVED METHODS OF STABILIZATION SHALL BE INITIATED WITHIN 7 DAYS OF
THE LAST DISTURBANCE ON ANY AREA OF THE SITE.6.THE CONTRACTOR SHALL
MINIMIZE CLEARING TO THE MAXIMUM EXTENT PRACTICAL OR AS REQUIRED BY THE GENERAL
PERMIT.7.CONTRACTOR SHALL DENOTE ON PLAN THE TEMPORARY PARKING AND STORAGE AREA WHICH SHALL
ALSO BE USED AS
THE EQUIPMENT MAINTENANCE AND CLEANING AREA, EMPLOYEE PARKING AREA, AND AREA FOR LOCATING PORTABLE FACILITIES,
OFFICE TRAILERS, AND TOILET FACILITIES.8.ALL WASH WATER (CONCRETE TRUCKS, VEHICLE
CLEANING, EQUIPMENT CLEANING, ETC.) SHALL BE
DETAINED AND PROPERLY TREATED OR DISPOSED.9.SUFFICIENT OIL AND GREASE ABSORBING MATERIALS
AND FLOTATION BOOMS SHALL BE MAINTAINED ON SITE OR READILY AVAILABLE TO CONTAIN
AND CLEAN-UP FUEL OR CHEMICAL SPILLS AND LEAKS.10.THE CONTRACTOR SHALL
BE RESPONSIBLE FOR DUST CONTROL ON SITE. THE USE
OF MOTOR OILS AND OTHER PETROLEUM BASED OR TOXIC LIQUIDS FOR DUST SUPPRESSION
OPERATIONS IS PROHIBITED.11.RUBBISH, TRASH, GARBAGE, LITTER, OR OTHER SUCH MATERIALS
SHALL BE DEPOSITED INTO SEALED CONTAINERS. MATERIALS SHALL BE PREVENTED FROM LEAVING THE PREMISES THROUGH THE
ACTION OF WIND OR STORM WATER
DISCHARGE INTO DRAINAGE DITCHES OR WATERS OF THE STATE.12.ALL STORM WATER POLLUTION PREVENTION MEASURES
PRESENTED ON THE PLAN SHALL BE INITIATED AS SOON AS IS PRACTICABLE.13.
ALL STAGING AREAS, STOCKPILES, SPOILS, ETC. SHALL BE LOCATED
SUCH THAT THEY WILL NOT ADVERSELY AFFECT STORM WATER QUALITY. OTHERWISE, COVERING OR ENCIRCLING
THESE AREAS WITH SOME PROTECTIVE MEASURE WILL BE NECESSARY.14.CONTRACTOR SHALL BE RESPONSIBLE FOR
RE-ESTABLISHING ANY EROSION CONTROL DEVICE WHICH THEY DISTURB. EACH CONTRACTOR SHALL NOTIFY THE
OWNER'S REPRESENTATIVE OF ANY DEFICIENCIES IN THE ESTABLISHED EROSION CONTROL MEASURES
THAT MAY LEAD
TO UNAUTHORIZED DISCHARGE OR STORM WATER POLLUTION, SEDIMENTATION, OR OTHER POLLUTANTS. UNAUTHORIZED POLLUTANTS INCLUDE (BUT
ARE NOT LIMITED TO) EXCESS CONCRETE DUMPING OR CONCRETE RESIDUE, PAINTS,SOLVENTS, GREASES, FUEL
AND LUBRICANT OIL, PESTICIDES, AND ANY SOLID WASTE MATERIALS.15.EROSION CONTROL DEVICES SHOWN ON
THESE PLANS SHALL BE INSTALLED PRIOR TO THE START OF LAND-DISTURBING ACTIVITIES ON
THE PROJECT.16.ALL EROSION CONTROL DEVICES ARE TO BE INSTALLED IN ACCORDANCE WITH THE APPROVED PLANS AND SPECIFICATIONS FOR
THIS PROJECT. CHANGES ARE TO BE APPROVED BEFORE CONSTRUCTION BY
THE DESIGN ENGINEER AND THE CITY OF CHANHASSEN ENGINEERING DIVISION.17.IF THE EROSION CONTROL
PLAN AS APPROVED
CANNOT CONTROL EROSION AND OFF-SITE SEDIMENTATION FROM THE PROJECT, THE EROSION CONTROL PLAN WILL HAVE TO
BE REVISED AND/OR ADDITIONAL EROSION CONTROL DEVICES WILL BE REQUIRED
ON SITE. ANY REVISIONS TO
THE EROSION CONTROL PLAN MADE BY THE CONTRACTOR MUST BE APPROVED BY THE ENGINEER.EROSION
CONTROL MAINTENANCE ALL MEASURES STATED ON THE EROSION AND SEDIMENT CONTROL PLAN, AND IN THE STORM
WATER POLLUTION PREVENTION PLAN, SHALL BE MAINTAINED IN FULLY FUNCTIONAL CONDITION AS REQUIRED BY
ALL JURISDICTIONS UNTIL NO LONGER REQUIRED FOR A COMPLETED PHASE OF WORK OR FINAL STABILIZATION OF
THE SITE. ALL EROSION AND SEDIMENTATION CONTROL
MEASURES SHALL BE CHECKED BY A CERTIFIED PERSON AT LEAST ONCE EVERY 7 CALENDAR DAYS
AND WITHIN 24 HOURS OF THE END OF A 0.5" RAINFALL EVENT, AND
CLEANED AND
REPAIRED IN ACCORDANCE WITH THE FOLLOWING:INLET PROTECTION DEVICES AND BARRIERS SHALL BE REPAIRED OR REPLACED IF THEY
SHOW SIGNS OF UNDERMINING, OR
DETERIORATION.1.ALL SEEDED
AREAS SHALL BE CHECKED REGULARLY TO SEE THAT A GOOD STAND IS MAINTAINED.
AREAS SHOULD BE FERTILIZED, WATERED AND RESEEDED AS NEEDED. FOR MAINTENANCE REQUIREMENTS REFER
TO THE STANDARD SPECIFICATIONS.2.SILT FENCES SHALL BE REPAIRED TO THEIR ORIGINAL CONDITIONS IF
DAMAGED.
SEDIMENT SHALL BE REMOVED FROM THE SILT FENCES WHEN IT REACHES ONE-THIRD THE
HEIGHT OF THE SILT FENCE.3.THE CONSTRUCTION ENTRANCE(S) SHALL BE MAINTAINED
IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOW OF MUD ONTO PUBLIC
RIGHTS-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING OF THE CONSTRUCTION
ENTRANCES AS CONDITIONS DEMAND.4.THE TEMPORARY PARKING AND STORAGE
AREA SHALL BE KEPT IN GOOD CONDITION (SUITABLE FOR
PARKING AND STORAGE). THIS MAY REQUIRE PERIODIC TOP DRESSING OF THE TEMPORARY PARKING AS
CONDITIONS DEMAND.5.ALL MAINTENANCE OPERATIONS SHALL BE DONE IN A TIMELY MANNER BUT IN
NO
CASE LATER THAN 2 CALENDAR DAYS FOLLOWING THE INSPECTION.PAVING AND STRIPING NOTES 1.
ALL PAVING, CONSTRUCTION, MATERIALS, AND WORKMANSHIP WITHIN JURISDICTION'S RIGHT-OF-
WAY SHALL BE IN ACCORDANCE WITH LOCAL OR COUNTY SPECIFICATIONS AND STANDARDS (LATEST EDITION)
OR MN/DOT SPECIFICATIONS AND STANDARDS (LATEST EDITION) IF NOT COVERED BY LOCAL OR COUNTY
REGULATIONS.2.ALL SIGNS, PAVEMENT MARKINGS, AND OTHER TRAFFIC CONTROL DEVICES SHALL CONFORM TO MANUAL ON
UNIFORM TRAFFIC CONTROL DEVICES (M.U.T.C.D) AND CITY STANDARDS.
3.CONTRACTOR SHALL FURNISH ALL PAVEMENT MARKINGS FOR FIRE LANES, ROADWAY LANES, PARKING STALLS,
ACCESSIBLE PARKING SYMBOLS, ACCESS AISLES, STOP BARS AND SIGNS, AND MISCELLANEOUS
STRIPING WITHIN THE PARKING LOT AS SHOWN ON THE PLANS.4.ALL EXPANSION JOINTS
SHALL EXTEND THROUGH THE CURB.5.THE MINIMUM LENGTH OF OFFSET JOINTS AT RADIUS POINTS SHALL BE
2 FEET.6.ALL JOINTS, INCLUDING EXPANSION JOINTS WITH REMOVABLE TACK STRIPS, SHALL
BE SEALED WITH JOINT SEALANT.7.THE MATERIALS AND PROPERTIES OF ALL CONCRETE SHALL MEET
THE APPLICABLE REQUIREMENTS IN THE A.C.I. (AMERICAN CONCRETE INSTITUTE) MANUAL
OF CONCRETE PRACTICE.8.CONTRACTOR SHALL APPLY A SECOND COATING OVER ALL PAVEMENT MARKINGS PRIOR
TO ACCEPTANCE BY OWNER FOLLOWED BY A COAT OF GLASS BEADS
AS APPLICABLE PER THE PROJECT DOCUMENTS.9.ANY EXISTING PAVEMENT, CURBS AND/OR SIDEWALKS
This document,
togetherwith
the concepts and
designs presented herein,
EXISTING SIGN TO BE REMOVED
921
921
922
922
922
922923924921
922
923924924924921922
9231.70%
1.00%
2.
261.
17%0.
30%3.
69%
2.
89
0.
82%1.
4 5 4.51%
0.86%2.35
1.75%A A
A A 50.
0'20.0'PROTECT
IN PLACE EXISTING8"
PVC SANITARY SEWER PROTECT
IN PLACE
EXISTING 10" DIP
WATERMAIN PROTECT IN
PLACE EXISTING 27"
HDPE STORM
SEWERCROSSROADS
BOULEVARDPROTECT IN PLACE
EXISTING UTILITIES (TYP.)
SFSFSFSFSFSFSFSFSFSFSFSFPROTECT IN PLACE
EXISTING TREE (
TYP.)PROTECT IN
PLACE EXISTING TREES,
TYP.)PROTECT IN
PLACE
EXISTING
TREE (
TYP.)PROTECT
IN PLACE EXISTING TREES AND PLANTER,
TYP.PROTECT IN PLACE EXISTING
STORM SEWER 4.
6 8 SF SF SFSFSFREMOVE EX.
WATER STUB TO MAIN,CAP
PER CITY OF
CHANHASSEN STANDARDS
AND SPECIFICATIONS
REMOVE EX.
WATER STUB
TO MAIN,CAP
PER CITY OF
CHANHASSEN STANDARDS AND
SPECIFICATIONS REMOVE EXISTING CURB RAMP REMOVE EXISTING
CURB RAMP PROTECT IN PLACE EX. STORM
SEWER CONCRETE WASHOUT AREA WATER FROM
THE SITE DRAINS VIA SURFACE SHEET FLOW
TO THE EXISTING PUBLIC STORM SEWER
SYSTEM, WHICH FLOWS NORTH
AND EAST TO PUBLIC STORM SEWER SYSTEM
AT
THE INTERSECTION
OF MN-101 AND
CROSSROADS BOULEVARD AND
EVENTUALLY TO
LAKE RILEY
SOUTHEAST OF THE
SITE CONSTRUCTION RELATED
ITEMS PROTECT
IN PLACE
EXISTING8"
SANITARY SEWER CONTRACTOR TO PROVIDE PEDESTRIAN DETOUR ROUTE DURING REMOVAL OF SIDEWALK AND DRIVEWAY This
document, together with the concepts and designs presented herein, as an instrument
of service, is intended only for the specific purpose and client for which
it was prepared. Reuse of and improper reliance on this document without written authorization and
adaptation by Kimley-Horn and Associates, Inc. shall be without
liability to Kimley-Horn and Associates, Inc.SHEET NUMBER 2020 KIMLEY-HORN AND ASSOCIATES, INC.767 EUSTIS
STREET, SUITE 100, ST. PAUL, MN 55114PHONE: 651-645-4197WWW.KIMLEY-HORN.COMK:\
TWC_LDEV\CHRISTIAN BROTHERS AUTOMOTIVE\Chanhassen, MN\3 Design\CAD\PlanSheets\C2-DEMO PLAN.
dwg October 29, 2020 - 2:01pmBYREVISIONSNo.DATE1CITY COMMENTS10/
16/2020CJJPRELIMINARY - NOT FOR CONSTRUCTIONPREPARED FORDEMOLITION ANDEROSIONCONTROL - PH.1PLANC1.08941 CROSSROADSBLVDCHRISTIAN BROTHERSAUTOMOTIVECHANHASSENMNDATE:I HEREBY CERTIFY
THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY
DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER
UNDER THE LAWS OF THE STATE OFMINNESOTA.MNLIC. NO.BRANDON R. ELEGERT, P.E.10/
29/202050387DATECHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT16068400510/16/2020AS SHOWNCJJKAMBRE1.THE CONTRACTOR IS
RESPONSIBLE FOR THE DEMOLITION, REMOVAL, AND DISPOSAL (IN A LOCATION APPROVED BY ALL GOVERNING AUTHORITIES) ALL STRUCTURES,
PADS, WALLS, FLUMES, FOUNDATIONS, PARKING, DRIVES,DRAINAGE STRUCTURES, UTILITIES, ETC. SUCH THAT THE IMPROVEMENTS ON THE
PLANS CAN BE CONSTRUCTED. ALL
FACILITIES TO BE REMOVED SHALL BE UNDERCUT TO SUITABLE MATERIAL AND BROUGHT TO GRADE WITH SUITABLE COMPACTED
FILL MATERIAL PER THE PROJECT DOCUMENTS.2.THE CONTRACTOR IS RESPONSIBLE FOR REMOVING
ALL DEBRIS FROM THE SITE AND DISPOSING THE DEBRIS IN A LAWFUL MANNER. THE CONTRACTOR
IS RESPONSIBLE FOR OBTAINING ALL PERMITS REQUIRED FOR DEMOLITION AND DISPOSAL. CONTRACTOR SHALL PROVIDE
COPIES OF THE
PERMIT AND RECEIPTS OF DISPOSAL OF MATERIALS TO THE OWNER AND OWNERS REPRESENTATIVE.3.THE CONTRACTOR SHALL
MAINTAIN ALL UTILITY SERVICES TO ADJACENT PROPERTIES AT ALL TIMES. UTILITY SERVICES SHALL NOT BE INTERRUPTED
WITHOUT APPROVAL FROM THE CONSTRUCTION MANAGER AND COORDINATION WITH THE ADJACENT PROPERTIES
AND/OR THE CITY.4.THE CONTRACTOR SHALL COORDINATE WITH RESPECTIVE UTILITY COMPANIES PRIOR TO THE
REMOVAL AND/OR RELOCATION OF UTILITIES. THE CONTRACTOR SHALL COORDINATE WITH THE UTILITY COMPANY CONCERNING PORTIONS
OF WORK WHICH MAY BE PERFORMED BY THE UTILITY COMPANY'S FORCES AND
ANY FEES WHICH ARE TO BE PAID TO THE UTILITY COMPANY FOR THEIR
SERVICES. THE CONTRACTOR IS RESPONSIBLE FOR PAYING ALL FEES AND CHARGES.5.THE LOCATIONS
OF ALL EXISTING UTILITIES SHOWN ON THE PLAN HAVE
BEEN DETERMINED FROM THE BEST INFORMATION AVAILABLE AND ARE GIVEN FOR THE CONVENIENCE OF THE
CONTRACTOR. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THEIR ACCURACY. PRIOR TO
THE START OF ANY DEMOLITION ACTIVITY, THE CONTRACTOR SHALL NOTIFY THE UTILITY
COMPANIES FOR LOCATIONS OF
EXISTING UTILITIES WITHIN ALL AREAS OF PROPOSED WORK.6.ALL EXISTING SEWERS, PIPING
AND UTILITIES SHOWN ARE NOT TO BE INTERPRETED AS THE EXACT LOCATION,OR AS ANY
OBSTACLES THAT MAY OCCUR ON THE SITE. VERIFY EXISTING CONDITIONS AND PROCEED WITH
CAUTION AROUND ANY ANTICIPATED FEATURES. GIVE NOTICE TO ALL UTILITY COMPANIES REGARDING DESTRUCTION AND REMOVAL OF ALL SERVICE
LINES AND CAP ALL LINES BEFORE PRECEDING WITH THE WORK.7.ELECTRICAL, TELEPHONE, CABLE, WATER, FIBER
OPTIC, AND/OR GAS LINES NEEDING TO BE REMOVED OR RELOCATED SHALL
BE COORDINATED WITH THE AFFECTED UTILITY COMPANY. ADEQUATE TIME SHALL BE PROVIDED FOR RELOCATION AND CLOSE
COORDINATION WITH THE UTILITY COMPANY IS NECESSARY TO PROVIDE A SMOOTH TRANSITION
IN UTILITY SERVICE. CONTRACTOR SHALL PAY CLOSE ATTENTION TO EXISTING UTILITIES WITHIN ANY ROAD
RIGHT-OF-WAY DURING CONSTRUCTION.8.CONTRACTOR MUST PROTECT THE PUBLIC AT
ALL TIMES WITH FENCING, BARRICADES, ENCLOSURES, ETC. (AND OTHER APPROPRIATE BEST MANAGEMENT PRACTICES) AS
APPROVED BY THE CONSTRUCTION MANAGER.MAINTENANCE OF TRAFFIC CONTROL SHALL BE COORDINATED IN ACCORDANCE WITH CHANHASSEN,
CARVER
COUNTY AND MN/DOT.9.CONTRACTOR SHALL MAINTAIN ACCESS TO ALL
ADJACENT PROPERTIES DURING CONSTRUCTION, AND SHALL NOTIFY
ALL PROPERTIES IF ACCESS WILL BE INTERRUPTED OR ALTERED AT ANY TIME DURING CONSTRUCTION.10.PRIOR TO
DEMOLITION OCCURRING, ALL EROSION CONTROL DEVICES ARE TO BE INSTALLED.11.CONTRACTOR MAY LIMIT SAW-CUT AND
PAVEMENT
REMOVAL TO ONLY THOSE AREAS WHERE IT IS REQUIRED AS SHOWN ON THESE CONSTRUCTION PLANS
BUT IF ANY DAMAGE IS INCURRED ON ANY OF THE SURROUNDING PAVEMENT, ETC. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR ITS REMOVAL
AND REPAIR.12.THE CONTRACTOR SHALL COORDINATE WATER MAIN WORK WITH THE FIRE DEPT. AND THE
CITY WATER DEPARTMENT TO PLAN PROPOSED IMPROVEMENTS AND TO
ENSURE ADEQUATE FIRE PROTECTION IS CONSTANTLY AVAILABLE TO THE SITE THROUGHOUT THIS SPECIFIC
WORK AND THROUGH ALL PHASES OF CONSTRUCTION. CONTRACTOR WILL BE
RESPONSIBLE FOR ARRANGING/PROVIDING ANY REQUIRED WATER MAIN SHUT OFFS WITH THE CITY OF CHANHASSEN DURING
CONSTRUCTION. ANY COSTS ASSOCIATED WITH WATER MAIN SHUT OFFS WILL BE THE RESPONSIBILITY OF
THE CONTRACTOR AND NO EXTRA COMPENSATION WILL BE PROVIDED.13.REFER TO
SURVEY FOR ALL
EXISTING
INVERT AND
RIM ELEVATIONS.
14.ALL
UTILITIES
SHOWN
ARE EXISTING UTILITIES.15.IN
THE
EVENT A WELL
IS FOUND, THE
CONTRACTOR SHALL CONTACT THE
ENGINEER AND
OWNER IMMEDIATELY.ALL WELLS
SHALL BE SEALED
BY A LICENSED
WELL CONTRACTOR IN
ACCORDANCE WITH ALL
STATE OF MN
REQUIREMENTS.16.
IN THE EVENT
THAT UNKNOWN CONTAINERS
OR TANKS ARE
ENCOUNTERED, THE
CONTRACTOR SHALL
CONTACT THE OWNER AND/
OR OWNERS REPRESENTATIVE
IMMEDIATELY. ALL CONTAINERS
SHALL BE DISPOSED
OF AT A
PERMITTED LANDFILL PER
THE PROJECT
DOCUMENTS.17.CONTRACTOR
SHALL NOTIFY THE
ENGINEER IF ANY
EXISTING DRAINTILE IS
ENCOUNTERED ON
SITE. NO
ACTIVE DRAINTILE SHALL
BE REMOVED WITHOUT
APPROVAL
FROM THE ENGINEER.
18.ANY CONSTRUCTION WITHIN
NEIGHBORING PROPERTIES SHALL REQUIRE WRITTEN APPROVAL BY THE OWNER OF THE PROPERTY AND PLANNED
UNIT
DEVELOPMENT PRIOR TO CONSTRUCTION.19.A TRAFFIC CONTROL PLAN SHALL
BE ADHERED TO DURING THE REMOVAL AND REPLACEMENT OF THE DRIVEWAY ACCESS OFF CROSSROADS BOULEVARD AND
COORDINATION SHALL BE HAD THROUGH THE CITY'S PUBLIC WORKS DEPARTMENT (
952-227-1300) PRIOR TO COMMENCEMENT OF CONSTRUCTION OPERATIONS.DEMOLITION PLAN NOTES NORTH KEYNOTE
LEGEND INLET PROTECTION SILT FENCE
A B LIMITS OF CONSTRUCTION (OFFSET FOR CLARITY)REMOVE BITUMINOUS SURFACE REMOVE CONCRETE
SURFACE REMOVE CONCRETE CURB & GUTTER PROPERTY LINE EXISTING OVERHEAD POWER LINE EXISTING
CHAINLINK FENCE EXISTING J-BARRIER EXISTING RETAINING WALL EXISTING SANITARY SEWER EXISTING STORM
SEWER EXISTING WATERMAIN EXISTING GAS MAIN EXISTING UNDERGROUND TELEPHONE EXISTING
UNDERGROUND CABLE EXISTING CONTOUR EXISTING SIGN EXISTING FLARED END SECTION EXISTING STORM MANHOLE EXISTING
STORM CATCHBASIN EXISTING GAS METER EXISTING ROOF DRAIN EXISTING GATE VALVE EXISTING HYDRANT
EXISTING
ELECTRICAL METER EXISTING GUY WIRE EXISTING POWER POLE EXISTING LIGHT POLE EXISTING TREE CLEARING & GRUBBING EXISTING
TREE LINE EXISTING CURB &
GUTTER LEGEND FULL DEPTH SAWCUT EROSION CONTROL PLAN NOTES 1.ALL PERIMETER SILT FENCE AND ROCK CONSTRUCTION
ENTRANCES SHALL BE INSTALLED PRIOR TO CONSTRUCTION.2.THE CONTRACTOR SHALL INSTALL CATCH
BASIN EROSION CONTROL
MEASURES.3.WITHIN TWO WEEKS (14 DAYS) OF SITE GRADING, ALL DISTURBED AREAS SHALL BE
STABILIZED WITH SEED, SOD, OR ROCK BASE. REFER TO LANDSCAPE PLANS FOR
MATERIALS.4.ALL EROSION CONTROL MEASURES SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH
CITY,STATE, AND WATERSHED DISTRICT PERMITS.5.THE CONTRACTOR SHALL MAINTAIN ALL
EROSION CONTROL MEASURES, INCLUDING THE REMOVAL OF SILT IN FRONT
OF SILT FENCES DURING THE DURATION OF THE CONSTRUCTION.6.ANY
EXCESS SEDIMENT IN PROPOSED BASINS SHALL BE REMOVED BY THE
CONTRACTOR.7.REMOVE ALL EROSION CONTROL MEASURES AFTER VEGETATION IS ESTABLISHED.8.THE CONTRACTOR SHALL
REMOVE ALL SOILS
AND SEDIMENT TRACKED ONTO EXISTING STREETS AND PAVED AREAS AND
SHALL SWEEP ADJACENT STREETS AS NECESSARY IN ACCORDANCE
WITH CITY REQUIREMENTS.9.IF BLOWING DUST BECOMES A NUISANCE, THE
CONTRACTOR SHALL APPLY
WATER FROM A TANK TRUCK TO ALL
CONSTRUCTION AREAS.10.IN THE EVENT OF FROZEN SOILS, THE CONTRACTOR MAY UTILIZE
BIO LOGS WITH THE APPROVAL
FROM THE CITY'S EROSION CONTROL INSPECTOR. THE CONTRACTOR
IS TO PROHIBIT SEDIMENT DISCHARGE FROM THE SITE.11.A
PRE-CONSTRUCTION MEETING SHALL BE HELD WITH THE CITY WATER RESOURCES COORDINATOR AND EROSION CONTROL SHALL BE
INSTALLED AND INSPECTED BY THE
WATER RESOURCES COORDINATOR
PRIOR TO COMMENCING WORK
UNDER THIS AGREEMENT. A PLAN SHOWING
HAUL ROUTES WILL BE
REQUIRED FOR APPROVAL
AT THIS MEETING AS OUTLINED IN
THE IMPROVEMENT AGREEMENT.UPON IMPLEMENTATION AND
INSTALLATION OF THE FOLLOWING AREAS: TRAILER,
PARKING,LAYDOWN, PORTA-POTTY, WHEEL WASH,
CONCRETE WASHOUT, FUEL AND MATERIAL STORAGE
CONTAINERS, SOLID WASTE CONTAINERS, ETC., THE
CONTRACTOR SHALL
IMMEDIATELY
DENOTE THEM ON
THE SITE MAPSAND
NOTE ANY
CHANGES IN LOCATION
AS THEY
OCCUR
THROUGHOUT THE CONSTRUCTION
PROCESS.BMP AND EROSION
CONTROL INSTALLATION SEQUENCE
SHALL BE AS FOLLOWS:
1.INSTALL INLET
PROTECTION AT
EXISTING STORMWATER CULVERTS.
2.
CONSTRUCT STABILIZED CONSTRUCTION
ENTRANCE (1), CONCRETE WASHOUT
PIT (1) AND INSTALL SILT
FENCE.3.
PREPAREDFOREROSIONANDSEDIMENTCONTROLDETAILSC1.
18941
CROSSROADSBLVDCHRISTIAN
BROTHERSAUTOMOTIVECHANHASSENMNDATE:
I
HEREBY
CERTIFY
THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY
DIRECT SUPERVISION ANDTHAT
I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA.MNLIC. NO.BRANDON R. ELEGERT, P.E.10/
29/202050387DATECHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT16068400510/16/2020AS SHOWNCJJKAMBREThis document, together with the
concepts and designs presented herein, as an instrument of service, is intended only for the
specific purpose and client for which it was prepared. Reuse of and improper
reliance on this document without written authorization and adaptation by Kimley-Horn and
Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.SHEET
NUMBER 2020 KIMLEY-HORN AND ASSOCIATES, INC.767 EUSTIS STREET,
SUITE 100, ST. PAUL, MN 55114PHONE: 651-645-4197WWW.KIMLEY-HORN.COMK:\TWC_LDEV\CHRISTIAN
BROTHERS AUTOMOTIVE\Chanhassen, MN\3 Design\CAD\PlanSheets\C3-EROS DETAILS.dwg October
29, 2020 - 2:01pmBYREVISIONSNo.DATE1CITY COMMENTS10/16/2020CJJPRELIMINARY - NOT FOR CONSTRUCTION1 3B 3A
4
5 2 1.PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME,
FERTILIZER, AND SEED.2.BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE
BLANKET IN A 6" DEEP X 6" WIDE TRENCH WITH APPROXIMATELY 12" OF BLANKET
EXTENDED BEYOND THE
UP-SLOPE PORTION OF THE TRENCH.ANCHOR THE BLANKET WITH A ROW OF STAPLES/
STAKES APPROXIMATELY 12" APART IN THE BOTTOM OF THE TRENCH. BACKFILL
AND COMPACT THE TRENCH AFTER STAPLING.
APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" PORTION OF BLANKET
BACK
OVER
SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY
12" APART ACROSS THE WIDTH OF
THE BLANKET.3.ROLL THE BLANKETS (A.) DOWN OR (B.)
HORIZONTALLY ACROSS
THE
SLOPE.
BLANKETS
WILL UNROLL WITH
APPROPRIATE SIDEAGAINST
THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE
CROSSROADS BOULEVARDCCPROPOSED
CHRISTIAN
BROTHERS
AUTOMOTIVE 5,100
SF FFE: 923.
00'26.0'26.
0'9.
0'
TYP.18.0'18.
0'9.
0'
TYP.
9.
0'
TYP.
EX.
20'
BUILDING
AND
PARKING
SETBACK
PROPOSED
STORMWATER
MANAGEMENT
AREA
BB C D
H F F F G G
G G EX.
PROPERTY LINE
EX.
10'
DRAINAGE
AND UTILITY
EASEMENT
EX.
PROPERTY
LINE
10.
0'
A
A
E
26.
0'
8
16
2 5 G B
B 18 0 16
0 20.0
PROPOSED MONUMENT
SIGN SEE
ARCH PLANS FOR
DETAILS PROPOSED TRANSFORMER
PAD EX. LANDSCAPING
TO REMAIN 5.0'14.
5'6.0'=
55°42'56"R=
270.00'
L=262.55'CB=
N28°21'
12"E C=252.
33'S55°
34'
14"
E 96.19'
S0°00'00"
E 170.
67'N90°
00'
00"
W
199.20'26 0
PROPOSED10' DRAINAGE AND
UTILITY EASEMENT 20.
0'PROPOSED
COMPACT PARKING STALL
56.1'
30
3 K
PR. "NO
PARKING"
SIGN
WITH BOLLARDPR. STOP
SIGN PR. STOP
SIGN PROPOSED APPROXIMATE
LIMITS OF UNDERGROUND
INFILTRATION SYSTEM 20
7 10.0'
20.5'16.
6'
11.
4'11.4'
20
0 R=20.00'R=20.00'R=
34.33'
R=12.00'R=4.00'R=
10.00'
PR. SITE BENCH 18
0 DATE:
I HEREBY CERTIFY THAT
THIS PLAN,SPECIFICATION
OR REPORT WAS PREPARED BYME OR UNDER
MY
DIRECT SUPERVISION ANDTHAT I
AM A DULY LICENSED
PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA.MNLIC.
NO.BRANDON R. ELEGERT, P.E.
10/29/202050387DATECHECKED BYSCALEDESIGNED BYDRAWN BYKHA
PROJECT16068400510/16/
2020AS SHOWNCJJKAMBREBUILDING DATA
SUMMARY AREAS
PROPOSED PROPERTY 34,691 SF (
0.80 AC)BUILDING AREA
5,100
SF (14.7%
OF TOTAL PROPERTY AREA)
PUD ALLOWABLE
MAXIMUM HARD SURFACE
COVERAGE 34,691 SF *
70%24,284 SF
PROPOSED HARD
SURFACE COVERAGE 23,
656 SF
PARKING REQUIRED PARKING 22 SPACES
PROPOSED PARKING 30 SPACES ADA
STALLS REQ'D / PROVIDED
2
STALLS / 2
STALLS EXISTING
OVERALL PUD PARKING 247 SPACES PROPOSED OVERALL
PUD PARKING 277 SPACES PROPERTY
SUMMARY 8941
CROSSROADS BLVD ZONING SUMMARY EXISTING ZONING PLANNED UNIT DEVELOPMENT PROPOSED
ZONING PLANNED UNIT DEVELOPMENT
PARKING SETBACKS CROSSROADS BLVD = 20'
INTERNAL PROJECT ROADS = 0'
BUILDING SETBACKS CROSSROADS BLVD =
20'INTERNAL PROJECT ROADS =
0'PROPOSED
CURB
AND
GUTTER
PROPERTY
LINE
LIMITS
OF
DISTURBANCE
SETBACK
LINE
PROPOSED
HEAVY DUTY
ASPHALT
PAVEMENTPROPOSED
HEAVY DUTY CONCRETE PAVEMENT PROPOSED
STORMWATER MANAGEMENT AREA
LEGEND KEYNOTE LEGENDCONCRETE
SIDEWALK
MATCH EXISTING EDGE OF PAVEMENT/ CURB & GUTTER ACCESSIBLE
PREPAREDFORSITEDETAILSC2.18941
CROSSROADSBLVDCHRISTIAN BROTHERSAUTOMOTIVECHANHASSENMNDATE:I
HEREBY CERTIFY
THAT
THIS PLAN,
SPECIFICATION OR REPORT WAS
PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT
I AM A DULY LICENSED PROFESSIONALENGINEER
UNDER THE LAWS
OF THE
STATE OFMINNESOTA.MNLIC. NO.BRANDON R. ELEGERT, P.E.
10/29/202050387DATECHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT16068400510/16/2020AS SHOWNCJJKAMBREThis
document, together with the concepts and designs presented herein,
as an
instrument of
service, is intended only
for the specific purpose and
client for which
it was prepared. Reuse
of and improper
reliance on this
document
withoutwritten
authorization and adaptation by Kimley-
Horn and Associates,
Inc. shall
be
without liability to Kimley-Horn and Associates, Inc.SHEET
NUMBER 2020 KIMLEY-HORN AND ASSOCIATES, INC.767 EUSTIS
STREET, SUITE 100, ST. PAUL, MN 55114PHONE:
651-645-4197WWW.KIMLEY-HORN.COMK:\TWC_LDEV\CHRISTIAN
BROTHERS AUTOMOTIVE\Chanhassen, MN\3 Design\
CAD\PlanSheets\C4-SITE DETAILS.dwg
October 29, 2020 - 2:03pm©BYREVISIONSNo.DATE1CITY COMMENTS10/16/
2020CJJPRELIMINARY - NOT FOR CONSTRUCTION9'9'9'18.0'(PER PLAN)HANDICAP ACCESSIBLE SIGN
4" PAINTED WHITE STRIPING 4" WHITE STRIPE AT 2'-0"
O.C.NOTE: REFER TO
PLAN FOR DETAILED LAYOUT AND DIMENSIONS FLUSH CURB NO PARKING" SIGN, CENTERED AT
HEAD OF SPACE, 2'
MIN.
AND 8' MAX FROM FACE OF CURB. NO SIGN
REQUIRED IF THE
SIGN
OBSTRUCTS A
CURB
RAMP OR PEDESTRIAN ROUTE.
NO PARKING
PAINT THE
WORDS "NO PARKING" WITHIN
EACH
9'-0"
ACCESS AISLE WHERE SHOWN
USE12"
MINIMUMHIGHWHITELETTERSHANDICAPACCESSIBLE
SIGN
1/
2"
6"12"
FIN.
GRADE60"-
66"'
18"WHITESYMBOLON
BLUE
BACKGOUND
LEGEND & BORDER: WHITE
BACKGROUND:
BLUE
NOTES:1.ALL LETTERS ARE 1"
AERIES "C" PER MUTCD.2.
SIGN SHALL HAVE A REFLECTORIZED (
ENGINEERING GRADE) BLUE BACKGROUND
WITH WHITE REFLECTORIZED LEGEND AND BORDER.
3.FINE
NOTIFICATION SIGN SHALL HAVE A
REFLECTORIZED (ENGINEERING GRADE) WITH WHITE
LEGEND AND
BORDER.4.CONTRACTOR
SHALL VERIFY
FINE AMOUNT.5.
ONE(1) SIGN REQUIRED FOR
EACH
PARKING SPACE.6.
INSTALLED HEIGHTOF SIGN SHALL BE
IN ACCORDANCEWITH
SECTION 24-23
OF THE MANUAL ONUNIFORMTRAFFICCONTROL
DEVICES (MUTCD) ANDSTATE
OF MINNESOTA ACCESSIBILITY
CODE.7.ALL
ACCESSIBLE FEATURES TO
BE IN STRICT ACCORDANCE WITHA.
D.A STANDARDS AND LOCAL LAWS.
SIGNAGE K-1479
12"x6" PLAQUE TYPICAL AT ALL
VAN ACCESSIBLE PARKING SPACES PARKING
VEHICLE ID REQUIRED UP
TO $200 FINE FOR VIOLATION
2'-9"3'-0"WHITE
LEGEND RED BACKGROUND30"
30"CURB
TAPER B612
CURB AND GUTTER TR A N
S I T
I O N LE N G
T H V A R
I E S SE
E P L A N
20"PAVEMENT SECTIONS ARE PROVIDED
AS A COURTESY
ONLY. REFER TO
GEOTECHNICAL
REPORTFOR
ALL
PAVEMENT,
SUBGRADE
PREPARATION, AND
COMPACTION REQUIREMENTS
7" 4,
000 PSI CONCRETE PER MNDOT 2301
4" AGGREGATE
BASE PER
MNDOT CLASS
V
IN SECTION
3138 APPROVED
SUBGRADE
HEAVY DUTY CONCRETE PAVEMENT DETAIL N.
T.S.PAVEMENT DETAILS (FOR REFERENCE ONLY)7 N.
T.S.ACCESSIBLE PARKING SIGNAGE3 N.T.S.ACCESSIBLE
PARKING SYMBOL4 N.T.
S.
ADA ACCESS
AISLE NO
PARKING6N.T.S.TYPICAL
ACCESSIBLE STALL PARKING5 N.
T.S.CONCRETE
CURB TRANSITION8 N.T.S.R1-
1 30"X30" "STOP" SIGN91.
PREPAREDFORSITEDETAILSC2.28941
CROSSROADSBLVDCHRISTIAN BROTHERSAUTOMOTIVECHANHASSENMNDATECHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT16068400510/16/2020AS SHOWNCJJKAMBREThis document, together with
the concepts and designs presented herein, as an instrument of service, is
DCROSSROADS
BOULEVARDLP:922.04
ME:921.27
ME:923.58
ME:921.95
922.00
923.00
922.87
922.25
922.16
922.25
922.40
922.19
922.05
922.23
922.90
922.48
922.60
922.60
922.47 921.75
921.85
921.88
HP:923.20
EOF:922.40
922.53
922.95
922.79
2.29%
1.10%
1.76%
2.
061.
13%
2.2
0 1.
7
6
1.73%
1.
66%
2.
90%9 2
3
924922922922 923924922
921
921921922
922 922 922
923 922PROPOSED CHRISTIAN
BROTHERS
AUTOMOTIVE
5,
100 SF
FFE: 923.
00'ROCK
CONSTRUCTION ENTRANCE
923.00
923.00
923.
00
923.
00 922.
95
922.
89
A
A A
A
A
A
B B
B 50.
0'20.
0'B
B B
1.61%1.
23%
1.
54%922.72 922.66
922.23 LP:921.85
2.49 3.38%BP-
1: STORMWATER INFILTRATION BASIN BOTTOM
OF BASIN: 919.50 TOP
OF BASIN: 921.50 100-
YR HWL: 920.
78 STORAGE VOLUME: 3,
519 CF TREATMENT
VOLUME: 2,
470 CF LP:922.
15 10
LF - 12" HDPE @
2.00%
ST-17 CONNECT TO
U/G
INFILTRATION SYSTEM IE:917.
51 W
ST-18 CONNECT TO U/
G INFILTRATION
SYSTEM IE:917.60
SE ST-
16
CONNECT TO U/
G STORMWATER MANAGEMENT
SYSTEM IE:917.92
N ST-9 CBMH
W/ 3'
SUMP RE:922.
04 IE:917.66 W
IE:917.66 E OCS-1
OUTLET CONTROL STRUCTURE
PROVIDE 6" WIDE WEIR
WALL TOP
OF WEIR WALL:
918.50 RE:
922.56 IE:
915.40 S ST-
11 CB
24"X36"W/
3' SUMP RE:921.83
IE:917.80
NW ST-
8 CATCH BASIN, CONNECT TO
U/G STORM SEWER RE:
921.85
ST-20 CONNECT TO
EX. STORM STRUCTURE CONTRACTOR
TO VERIFY INV.
PRIOR TO CONSTRUCTION
IE:915.20
N
IE: 915.
40
S
ME:
921.
68
EOF:
922.80
EOF:921.50 2.5
5 2 5 0%2.
6 1 ST-26
CORE
DRILL AND CONNECT TO
EX. STORM STRUCTURE PER
CITY OF CHANHASSEN STANDARDS
AND SPECIFICATIONS IE:
913.29 NW IE:
917.52 SE
19 LF -
12" HDPE
@ 1.06%
56 LF - 12"
HDPE @ 0.
50%922.25 ST-
7 CB 27" DIA.
W/ 3' SUMP
RE:922.15 IE:
918.20 S
56 LF -
12" HDPE
@ 0.
50%31
LF - 12"
HDPE @
0.
50%
922.
50
922.
50
922.
50
922.50
923.00 923.00 A
9 2
3 922922 92292192092 1
922922923923922 ST-25 24"
RISER PIPE W/
DOME GRATE
TOP OVERFLOW ELEV =
921.20
IE:918.00
NW 6" EXPOSED
FOUNDATION 7.83
EOF:920.81 ST-
29 CB 27"
DIA.W/
3' SUMP RE:
919.99
IE:917.94
E ADJUST
RIM TO PROPOSED GRADE LP:
921.95 PROPOSED APPROXIMATE LIMITS OF UNDERGROUND INFILTRATION SYSTEM BMP
2: UNDERGROUND INFILTRATION SYSTEM ADS 36"
N-12 PERFORATED HDPE PIPE
OR APPROVED EQUAL TOTAL STORAGE
VOLUME: 6,420 CF
TREATMENT VOLUME: 5,669 CF
TOP OF PIPE: 918.90
PIPE INV.: 915.
90 BOTTOM OF
STONE: 915.40100-YR
HWL: 918.80
ME:923.52
ME:923.20
ME:922.61ME:922.11 CONSTRUCTION RELATED
ITEMS ME:921.34 ME:921.43
WATER FROM THE SITE DRAINS VIA
SURFACE SHEET FLOW TO THE EXISTING PUBLIC
STORM SEWER SYSTEM, WHICH FLOWS NORTH
AND EAST TO PUBLIC
STORM SEWER SYSTEM AT THE INTERSECTION OF
MN-101 AND CROSSROADS
BOULEVARD AND EVENTUALLY
TO LAKE
RILEYSOUTHEAST
OF
THE SITE 24
LF - 12" RCP @ 2.00%This document, together with the concepts and
designs presented herein, as an
instrument of service, is intended only for the specific purpose and client for which it was
prepared. Reuse of and improper reliance on this document
without written authorization and adaptation by Kimley-Horn
and Associates, Inc. shall be
without liability to Kimley-Horn and Associates,
Inc.SHEET NUMBER 2020 KIMLEY-HORN AND ASSOCIATES,
INC.767 EUSTIS STREET, SUITE 100, ST.
PAUL, MN 55114PHONE: 651-645-4197WWW.KIMLEY-
HORN.COMK:\TWC_LDEV\CHRISTIAN BROTHERS AUTOMOTIVE\Chanhassen, MN\3 Design\CAD\PlanSheets\C5-GRADING
PLAN.dwg October 29,
2020 - 2:05pm©BYREVISIONSNo.DATE1CITY COMMENTS10/16/2020CJJPRELIMINARY - NOT FOR
CONSTRUCTIONPREPARED FORGRADING,DRAINAGE &EROSION CONTROLPH. 2 PLANC3.08941 CROSSROADSBLVDCHRISTIAN BROTHERSAUTOMOTIVECHANHASSENMNDATE:I
HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR
UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY
LICENSED PROFESSIONALENGINEER UNDER
THE LAWS OF THE STATE OFMINNESOTA.MNLIC. NO.BRANDON R.
ELEGERT, P.E.10/29/202050387DATECHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT16068400510/16/2020AS
SHOWNCJJKAMBRENORTH GRADING PLAN NOTES 1.ALL WORK SHALL BE PERFORMED
IN ACCORDANCE WITH THE CITY OF CHANHASSEN,SPECIFICATIONS AND BUILDING
PERMIT
REQUIREMENTS.2.CONTRACTOR TO CALL GOPHER STATE CALL ONE @ 1-
800-252-1166 AT LEAST TWO WORKING DAYS PRIOR TO
EXCAVATION/CONSTRUCTION
FOR UTILITY LOCATIONS.3.STORM SEWER PIPE SHALL BE AS FOLLOWS:
RCP PER ASTM C-76 HDPE: 0" - 10"
PER AASHTO M-252 HDPE: 12" OR GREATER PER ASTM
F-2306 PVC SCH. 40 PER ASTM D-3034 STORM SEWER
FITTINGS SHALL BE AS FOLLOWS:RCP PER ASTM C-76, JOINTS
PER ASTM C-361, C-990, AND C-443 HDPE PER ASTM 3212
PVC PER ASTM D-3034, JOINTS PER
ASTM D-3212 4.CONTRACTOR TO FIELD VERIFY THE LOCATIONS AND
ELEVATIONS OR EXISTING UTILITIES AND TOPOGRAPHIC FEATURES PRIOR TO
THE START OF SITE GRADING. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE PROJECT ENGINEER OF ANY
DISCREPANCIES OR
VARIATIONS.5.SUBGRADE EXCAVATION SHALL BE BACKFILLED IMMEDIATELY AFTER EXCAVATION TO
HELP OFFSET ANY STABILITY PROBLEMS DUE TO WATER SEEPAGE OR STEEP
SLOPES.WHEN PLACING NEW SURFACE MATERIAL ADJACENT TO EXISTING
PAVEMENT, THE EXCAVATION SHALL BE BACKFILLED PROMPTLY TO AVOID UNDERMINING OF EXISTING
PAVEMENT.
6.CONTRACTOR SHALL BE RESPONSIBLE FOR ALL HORIZONTAL AND VERTICAL
CONTROL.7.CONTRACTOR SHALL EXCAVATE DRAINAGE TRENCHES TO FOLLOW PROPOSED STORM
SEWER ALIGNMENTS.8.GRADES SHOWN ARE FINISHED GRADES. CONTRACTOR SHALL ROUGH GRADE TO
SUBGRADE ELEVATION AND LEAVE STREET READY FOR SUBBASE.9.ALL EXCESS MATERIAL,
BITUMINOUS SURFACING, CONCRETE ITEMS, ANY ABANDONED UTILITY ITEMS, AND OTHER UNSTABLE MATERIALS
SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF OFF
THE CONSTRUCTION SITE.10.REFER TO THE UTILITY PLAN FOR SANITARY
SEWER MAIN, WATER MAIN SERVICE LAYOUT AND ELEVATIONS AND CASTING / STRUCTURE NOTATION.11.
CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTION OF PAVEMENTS AND CURB AND GUTTER WITH SMOOTH
UNIFORM
SLOPES TO PROVIDE POSITIVE DRAINAGE.12.INSTALL A MINIMUM OF 4" CLASS
5 AGGREGATE BASE UNDER CURB AND GUTTER AND CONCRETE SIDEWALKS.13.UPON COMPLETION OF
EXCAVATION AND FILLING, CONTRACTOR SHALL RESTORE ALL STREETS AND DISTURBED AREAS ON SITE. ALL DISTURBED
AREAS SHALL
BE RE-VEGETATED WITH A MINIMUM OF 6" OF TOPSOIL.14.ALL SPOT ELEVATIONS/CONTOURS
ARE TO GUTTER / FLOW LINE UNLESS OTHERWISE NOTED.15.GRADING
FOR
ALL SIDEWALKS AND ACCESSIBLE ROUTES INCLUDING CROSSING DRIVEWAYS SHALL CONFORM TO CURRENT
ADA STATE/
NATIONAL STANDARDS. IN NO CASE SHALL ACCESSIBLE RAMP SLOPES EXCEED 1 VERTICAL TO 12
HORIZONTAL. IN
NO CASE SHALL SIDEWALK CROSS SLOPES EXCEED 2% . IN NO CASE SHALL LONGITUDINAL SIDEWALK SLOPES EXCEED
5%. IN NO
CASE SHALL ACCESSIBLE PARKING STALLS OR AISLES EXCEED 2% (1.
5% TARGET) IN ALL DIRECTIONS. SIDEWALK ACCESS TO EXTERNAL BUILDING
DOORS AND GATES SHALL
BE ADA COMPLIANT. CONTRACTOR SHALL NOTIFY ENGINEER IMMEDIATELY IF ADA CRITERIA CANNOT BE MET
IN ANY LOCATION PRIOR TO PAVING. NO CONTRACTOR CHANGE ORDERS WILL BE
ACCEPTED FOR A.D.
A COMPLIANCE ISSUES.
16.MAINTAIN A
MINIMUM OF
0.5%
GUTTERSLOPE
TOWARDS LOWPOINTS.17.
CONTRACTOR
TO PROVIDE 3" INSULATION
BY 5' WIDE
CENTERED ON STORM PIPE
IF LESS THAN
4' OF COVER IN PAVEMENT
AREAS AND LESS THAN 3'
OF COVER IN
LANDSCAPE AREAS.18.
ROOF DRAIN INVERT CONNECTIONS AT
THE BUILDING SHALL BE AT ELEVATION
918.50 OR LOWER UNLESS NOTED OTHERWISE. REFERENCE
MEP PLANS FOR ROOF
DRAIN CONNECTION.
19.ALL STORM SEWER
CONNECTIONS
SHALL
BE GASKETED AND WATER
TIGHT INCLUDING MANHOLE CONNECTIONS.20.ALL STORM SEWER PIPE SHALL BE AIR TESTED IN
ACCORDANCE
WITH THE CURRENT PLUMBING CODE.21.MAINTAIN A MINIMUM OF
1.25% SLOPE IN BITUMINOUS PAVEMENT AREAS, 0.5% SLOPE IN CONCRETE PAVEMENT AREAS.22.CONTRACTOR SHALL
REVIEW PAVEMENT GRADIENT AND CONSTRUCT "INFALL CURB"WHERE PAVEMENT DRAINS
TOWARD GUTTER, AND "OUTFALL" CURB WHERE PAVEMENT DRAINS AWAY FROM GUTTER.23.ALL PORTIONS
OF THE STORM SEWER SYSTEM
LOCATED WITHIN 10' OF THE BUILDING OR WATER SERVICE LINE MUST BE TESTED IN
ACCORDANCE WITH MINNESOTA RULES,CHAPTER 474, SECTION 1109.PROPOSED STORM SEWER
PROPOSED STORM SEWER PROPERTY LINE EXISTING CONTOUR PROPOSED CONTOUR925 PROPOSED SPOT ELEVATION100.00
LEGEND PROPOSED HIGH POINT ELEVATION HP:0.0 PROPOSED LOW
POINT ELEVATION LP:0.0 0.0%PROPOSED DRAINAGE DIRECTION 0.00%PROPOSED ADA
SLOPE ME:0.0 MATCH EXISTING ELEVATION PROPOSED STORM MANHOLE (SOLID CASTING)PROPOSED
STORM
MANHOLE (ROUND INLET CASTING)PROPOSED STORM MANHOLE/ CATCH BASIN (CURB INLET CASTING)PROPOSED STORM SEWER CLENOUT
PROPOSED RIPRAP PROPOSED FLARED
END SECTION CO D EROSION CONTROL PLAN NOTES 1.ALL PERIMETER SILT FENCE AND ROCK CONSTRUCTION ENTRANCES SHALL BE INSTALLED
PRIOR TO CONSTRUCTION.2.THE
CONTRACTOR SHALL INSTALL CATCH BASIN EROSION CONTROL MEASURES.3.WITHIN TWO
WEEKS (14 DAYS) OF SITE GRADING, ALL DISTURBED AREAS SHALL BE STABILIZED
WITH SEED,SOD, OR ROCK BASE. REFER TO LANDSCAPE PLANS FOR MATERIALS.4.ALL EROSION
CONTROL MEASURES SHALL BE INSTALLED AND MAINTAINED IN
ACCORDANCE WITH CITY,STATE, AND WATERSHED DISTRICT PERMITS.5.THE
CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL MEASURES, INCLUDING THE REMOVAL OF SILT IN
FRONT OF SILT
FENCES DURING THE DURATION OF THE CONSTRUCTION.6.ANY EXCESS SEDIMENT
IN PROPOSED BASINS SHALL BE REMOVED BY THE CONTRACTOR.7.REMOVAL ALL EROSION
CONTROL MEASURES AFTER
VEGETATION IS ESTABLISHED.8.THE CONTRACTOR SHALL REMOVE ALL SOILS AND SEDIMENT TRACKED ONTO
EXISTING STREETS AND PAVED AREAS
AND SHALL SWEEP ADJACENT STREETS AS
NECESSARY IN ACCORDANCE WITH CITY REQUIREMENTS.9.IF BLOWING DUST BECOMES A
NUISANCE, THE CONTRACTOR SHALL APPLY WATER FROM A TANK TRUCK TO
ALL CONSTRUCTION AREAS.10.IN THE EVENT OF FROZEN SOILS, THE GC MAY UTILIZE
BIO LOG (
EROS-11). THE GC IS TO PROHIBIT SEDIMENT DISCHARGE FROM THE
SITE.UPON IMPLEMENTATION AND INSTALLATION OF THE FOLLOWING AREAS: TRAILER, PARKING,
LAYDOWN,PORTA-POTTY,
WHEEL WASH, CONCRETE WASHOUT,
FUEL AND MATERIAL STORAGE CONTAINERS, SOLID
WASTE CONTAINERS, ETC., IMMEDIATELY DENOTE THEM
ON THE SITE MAPS
AND NOTE
ANY CHANGES IN LOCATION
AS THEY OCCUR
THROUGHOUT THE
CONSTRUCTION PROCESS.
BMP AND
EROSION
CONTROL
INSTALLATION SEQUENCE SHALL
BE AS FOLLOWS:1.
TEMPORARILY
SEED, THROUGHOUT
CONSTRUCTION, DENUDED AREAS
THAT WILL
BE
INACTIVE FOR 7
DAYS OR MORE.2.
INSTALL UTILITIES, UNDERDRAINS,
STORM SEWERS, UNDERGROUND SYSTEM,
CURBS AND GUTTERS.
3.INSTALL APPROPRIATE
INLET
PROTECTION AT ALL
STORM SEWER STRUCTURES AS
EACH INLET STRUCTURE IS
INSTALLED.4.
PREPAREDFORGRADINGANDDRAINAGEDETAILSC3.18941
CROSSROADSBLVDCHRISTIAN BROTHERSAUTOMOTIVECHANHASSENMNDATE:I HEREBY
CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT
I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA.MNLIC. NO.BRANDON
R. ELEGERT, P.E.10/29/202050387DATECHECKED BYSCALEDESIGNED BYDRAWN
BYKHA PROJECT16068400510/16/2020AS SHOWNCJJKAMBREThis document, together with the concepts and designs presented herein, as an instrument of
service, is intended only for the specific purpose and client for which it was prepared.
Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates,
Inc. shall be without liability to Kimley-Horn
and Associates, Inc.SHEET NUMBER 2020 KIMLEY-HORN AND ASSOCIATES, INC.767 EUSTIS STREET, SUITE 100, ST. PAUL,
MN 55114PHONE: 651-645-4197WWW.KIMLEY-HORN.COMK:\TWC_LDEV\CHRISTIAN BROTHERS AUTOMOTIVE\Chanhassen, MN\3 Design\
CAD\PlanSheets\C5-GRADING DETAILS.dwg October 29, 2020 - 2:06pmBYREVISIONSNo.DATE1CITY COMMENTS10/16/
2020CJJPRELIMINARY - NOT FOR CONSTRUCTIONUNDERGROUND STORMWATER MANAGEMENT NOTES 1.CONTRACTOR TO PROVIDE (2) DOUBLE RING INFILTROMETER TESTS WITHIN
THE UNDERGROUND SYSTEM EXCAVATION PRIOR TO INSTALLATION OF THE UNDERGROUND SYSTEM. THE CONTRACTOR SHALL PROVIDE THE RESULTS TO
THE
ENGINEER FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION OF THE UNDERGROUND SYSTEM.2.CONTRACTOR SHALL
OVER-EXCAVATE ALL TOPSOIL AND FILL AS NECESSARY TO NATIVE FREE DRAINING SOILS.
EXCAVATION SHALL BE REPLACED WITH SUITABLE ENGINEERED FILL MEETING THE MNDOT SPECIFICATION FOR COARSE FILTER AGGREGATE PER
SECTION 3149.2H. DEPTHS OF FILL/URBAN FILL EXPECTED TO VARY, CONTRACTOR SHALL VERIFY DEPTHS OF EXCAVATION AND
PERFORM INFILTROMETER
TESTS PRIOR TO INSTALLING UNDERGROUND SYSTEM.3.IF NATIVE SUBGRADE SOILS BELOW FILL ARE DETERMINED
TO NOT BE CONDUCIVE TO THE DESIGN INFILTRATION REQUIREMENTS,THE CONTRACTOR SHALL REMOVE AND REPLACE
THE POORLY INFILTRATING SOILS TO A DEPTH WHERE THE EXISTING NATIVE SUBGRADE SOILS MEET OR EXCEED THE DESIGN INFILTRATION RATE AS REVIEWED BY
THE ENGINEER.4.UPON COMPLETION OF THE STORMWATER BMP AND
FINAL STABILIATION OF THE TRIBUTARY DRAINAGE AREA, THE CONTRACTOR SHALL PROVIDE DOCUMENTATION THE BMP AFTER A SIGNIFICAT RAIN EVENT
THAT SHOWS THE BMPS DRAWS DOWN WITHIN 48 HOURS.5.NO
CONSTRUCTION EQUIPMENT SHALL TRAVEL WITHIN THE UNDERGROUND INFILTRATION SYSTEM AREA. USE EXCAVATOR WITH TOOTHED
BUCKET FOR INFILTRATION BASIN EXCAVATION TO AVOID COMPACTING OR SMEARING OF SOILS.6.
FINAL EXCAVATION OF UNDERGROUND INFILTRATION SYSTEM AREA AND
INSTALLATION OF OF ENGINEERED SOIL MUST OCCUR IN DRY SOIL CONDITIONS TO PREVENT SMEARING AND COMPACTION. DO NOT
WORK IN INFILTRATION SYSTEM AREA IF SOIL CONDITIONS ARE
WET.7.IMMEDIATELY
FOLLOWING SYSTEM
CONSTRUCTION, THE
EXCAVATION FOR THE TRENCH SHALL
BE IMMEDIATELY BACKFILLED WITH APPROVED
BACKFILL MATERIAL PER
MANUFACTURER'S RECOMMENDATION, OR THE EXCAVATION
SHALL BE PROTECTED WITH SILT FENCE
AND OR BIO-
ROLLS SUCH THATON-
SITE SOILSDONOTENTER
THE TRENCH EXCAVATION AND CLOG UP
THE BOTTOM/SIDES
OF THETRENCHLIMITINGTHE
INFILTRATION CAPACITY OF THE UNDERGROUND SYSTEM.8.IF ANY
CROSSROADS
BOULEVARDD
A
A
F
A
A
F
E
H
G
F
D
I
J PR. TRANSFORMER PAD, SEE
PLANS BY OTHERS FOR
DETAILS
K PR. GAS METER,
SEE MEP PLANS
FOR
DETAILS
A
C CONNECT
TO
EXISTING BY
OTHERS)
B
L RIM: 922.
55 INV: 912.
08 RIM:922.
74 INV: 912.
51
D WYE
CONNECTION INV: 912.
50 REMOVE EX. 8" SANITARY SEWER STUB PER CITY
OF CHANHASSEN STANDARDS AND
SPECIFICATIONS,CONSTRUCT PR 6" SANITARY SEWER SERVICE. CORE
AND BOOT CONNECTION PER CITY OF
CHANHASSEN STANDARDS AND
SPECIFICATIONS RIM: 921.
95 INV: 910.8
N INV: 910.7
W INV: 910.8
E RIM: 922.
75 INV: 912.
50
D CONNECT TO
EXISTING BY
OTHERS)WYE
CONNECTION INV: 912.
08 21 LF @ 2.
0%44 LF @ 2.
0%UTILITY
CROSSING EX. 27" STRM BOTTOM: 912.
60 6" SSWR TOP: 911.
18 CLEARANCE: 1.
42'WATERMAIN
CROSSING,MAINTAIN 1.5'
VERTICAL
CLEARANCE 95
LF WATERMAIN CROSSING,
MAINTAIN 1.5' VERTICAL
CLEARANCE UTILITY
CROSSING 12" STRM BOTTOM: 918.
90 6" SSWR TOP: 911.
40 CLEARANCE: 7.
50'PROPOSED
CHRISTIAN
BROTHERS
AUTOMOTIVE 5,100
SF FFE: 923.
00'RIM:922.
65 INV: 913.
06 INV: 913.
19 PR. STORM SEWER, SEE
GRADING AND DRAINAGE PLAN FOR
DETAILS
UNDERGROUND STORMWATER
MANAGEMENT SYSTEM, SEE GRADING
AND DRAINAGE PLAN FOR
DETAILS 10.
0'PR. POWER, SEE
MEP PLANS FOR
DETAILS PR. 10' DRAINAGE
AND UTILITY
EASEMENT EX. 27" RCP STORM
SEWER INV: 912.
71 PROPOSED
APPROXIMATE LIMITS OF
UNDERGROUND INFILTRATION
SYSTEM 8' WIDE X MIN 4"
THICK RIGID
POLYSTYRENE 8.
0'19.
9'ADJUST
MANHOLE
ELEVATION
TO PROPOSED GRADES
RE: 921.95 CONNECT
TO EXISTING 8"SSWR STUB WITH
A
6"X8"REDUCER INV:
911.20 S INV:
911.30
NThis
document, together with
the concepts and designs presented herein, as an instrument of service, is intended only
for the
specific purpose and client for which it was
prepared. Reuse of and improper reliance on this document without written authorization and
adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn
and Associates, Inc.SHEET NUMBER 2020 KIMLEY-HORN
AND ASSOCIATES, INC.767 EUSTIS STREET,
SUITE 100, ST. PAUL, MN 55114PHONE: 651-
645-4197WWW.KIMLEY-HORN.COMK:\TWC_LDEV\CHRISTIAN BROTHERS AUTOMOTIVE\
Chanhassen, MN\3 Design\CAD\PlanSheets\C6-UTILITY
PLAN.dwg October 29, 2020 - 2:07pm©BYREVISIONSNo.DATE1CITY
COMMENTS10/16/2020CJJPRELIMINARY - NOT FOR CONSTRUCTIONPREPARED FORUTILITY PLANC4.08941 CROSSROADSBLVDCHRISTIAN BROTHERSAUTOMOTIVECHANHASSENMNDATE:I HEREBY CERTIFY THAT THIS
PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I
AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS
OF THE STATE OFMINNESOTA.MNLIC. NO.BRANDON R. ELEGERT, P.E.10/29/202050387DATECHECKED
BYSCALEDESIGNED BYDRAWN BYKHA PROJECT16068400510/16/2020AS SHOWNCJJKAMBREUTILITY PLAN NOTES 1.ALL FILL MATERIAL
IS TO BE IN PLACE,
AND COMPACTED BEFORE INSTALLATION OF PROPOSED UTILITIES.2.SANITARY SEWER PIPE SHALL BE AS
FOLLOWS:8" PVC SDR35 PER ASTM D-3034, FOR PIPES LESS THAN
16'
DEEP 8" PVC SDR26 PER ASTM D-3034, FOR PIPES MORE THAN 16'-
26' DEEP 6" PVC SCHEDULE 40 PER ASTM D-3034 DUCTILE IRON PIPE
PER AWWA C150 3.WATER LINES SHALL BE AS FOLLOWS:6" AND
LARGER, PVC C-900 PER ASTM D 2241 CLASS 200 UNDER COUNTY ROADS, OTHERWISE CLASS
150 4" AND LARGER DUCTILE IRON PIPE PER AWWA C150 SMALLER THAN 3" PIPING SHALL
BE 1" ID PE/HDPE OR PEX PIPE 200 PSI
RATING ANSI 816.22 OR PVC, 200 P.S.I., PER ASTM
D1784 AND D2241.4.MINIMUM TRENCH WIDTH SHALL
BE 2 FEET.5.ALL WATER JOINTS ARE TO BE
MECHANICAL
JOINTS WITH RESTRAINTS SUCH AS THRUST BLOCKING, WITH STAINLESS STEEL OR COBALT BLUE BOLTS,
OR AS INDICATED IN THE CITY SPECIFICATIONS AND PROJECT DOCUMENTS.6.ALL
UTILITIES SHOULD BE KEPT TEN (
10') APART (PARALLEL) OR WHEN CROSSING 18"VERTICAL CLEARANCE (OUTSIDE EDGE OF
PIPE TO OUTSIDE EDGE OF PIPE
OR STRUCTURE).7.CONTRACTOR SHALL MAINTAIN A MINIMUM OF 7'-5" COVER ON ALL
WATERLINES.
8.IN THE EVENT OF A VERTICAL CONFLICT BETWEEN WATER LINES, SANITARY
LINES,STORM LINES AND GAS LINES, OR ANY OBSTRUCTION (EXISTING AND PROPOSED),
THE SANITARY LINE SHALL BE SCH. 40 OR C900 WITH MECHANICAL JOINTS
AT LEAST 10 FEET ON EITHER SIDE
OF THE CENTER LINE OF THE CROSSING. THE WATER LINE SHALL HAVE
MECHANICAL JOINTS WITH APPROPRIATE FASTENERS AS REQUIRED TO PROVIDE A MINIMUM OF 18" VERTICAL
SEPARATION. MEETING REQUIREMENTS OF ANSI A21.10 OR ANSI 21.
11 (AWWA C-151) (CLASS 50).9.LINES UNDERGROUND SHALL BE INSTALLED, INSPECTED AND APPROVED
BEFORE BACKFILLING.10.TOPS OF MANHOLES SHALL BE RAISED AS NECESSARY
TO BE FLUSH WITH PROPOSED PAVEMENT ELEVATIONS, AND TO BE ONE FOOT
ABOVE FINISHED GROUND ELEVATIONS, IN GREEN AREAS, WITH WATERTIGHT LIDS.11.
ALL CONCRETE FOR ENCASEMENTS SHALL HAVE A MINIMUM 28 DAY
COMPRESSION STRENGTH AT 3000 P.S.I.12.EXISTING UTILITIES
SHALL BE VERIFIED IN FIELD PRIOR TO INSTALLATION OF
ANY NEW LINES.13.REFER TO INTERIOR PLUMBING DRAWINGS FOR
TIE-IN OF
ALL UTILITIES.14.CONTRACTOR IS RESPONSIBLE FOR COMPLYING TO THE SPECIFICATIONS
OF THE
CITY OF CHANHASSEN AND/OR STATE OF MN WITH REGARDS TO MATERIALS AND
INSTALLATION OF THE WATER AND SEWER LINES.15.
THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF
EXISTING
UTILITIES AS SHOWN ON THESE PLANS IS BASED ON RECORDS
OF
THE
VARIOUS UTILITY
COMPANIES, AND WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD.
THE INFORMATION IS NOT TO BE RELIED ON
AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE
APPROPRIATE UTILITY
COMPANIES AT LEAST 72 HOURS
BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. IT
SHALL
BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL
EXISTING UTILITIES WHICH
CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON
THE PLANS.16.CONTRACTOR IS RESPONSIBLE FOR ALL NECESSARY INSPECTIONS AND/
OR CERTIFICATIONS REQUIRED BY CODES AND/OR UTILITY SERVICE COMPANIES.
17.
CONTRACTOR SHALL COORDINATE WITH ALL UTILITY COMPANIES FOR INSTALLATION REQUIREMENTS AND
SPECIFICATIONS.18.CONTRACTOR SHALL REFERENCE ARCH / MEP PLANS FOR SITE LIGHTING
AND
ELECTRICAL
PLAN.
19.
BACKFLOW
DEVICES (
DDCV
AND
PRZ
ASSEMBLIES)
AND
METERS
ARE
LOCATED IN THE
INTERIOR OF
THE BUILDING.
REF.
ARCH / MEP
PLANS.
20.
ALL
ONSITE WATERMAINS
AND
SANITARY SEWERS
SHALL BE
PRIVATELY
OWNED ANDMAINTAINED.
21.ALL
WATERMAIN STUBOUTS SHALL
BE MECHANICALLY RESTRAINEDWITH
REACTION
BLOCKING.
NORTH KEYNOTE LEGEND
POINT OF CONNECTION,
REFER TO MEP
PLANS FOR CONTINUATION TAP
EXISTING 10" DIP
WATERMAIN WITH 1" CORP
1" DOMESTIC PVC WATER
SERVICE
PER CITY OF
CHANHASSEN SPECIFICATIONS INSTALL
CLEANOUT CONNECT TO
EXISTING SANITARY SERVICE INSTALL
6" PVC SDR40
SANITARY SEWER SERVICE, LENGTH
AND SLOPE PER PLAN
PROPOSED
GREASE INTERCEPTOR LOCATION,
REFER TO MEP
PLANS FOR
DETAILS AND SIZING
PROPOSED SAMPLING WELL, SEE
PLANS BY OTHERS INSTALL
ELECTRIC LINE, PLANS
BY
OTHERS, SEE
MEP PLANS FOR
CONTINUATION INSTALL COMMUNICATIONS LINE,
PLANS BY OTHERS,
SEE MEP PLANS FOR
CONTINUATION INSTALL GAS
LINE,
PLANS BY
OTHERS, SEE MEP PLANS
FOR CONTINUATION INSTALL 1"
CURB CORP STOP
PER CITY OF CHANHASSEN
STANDARDS AND SPECIFICATIONS
PREPAREDFORUTILITYDETAILSC4.18941
CROSSROADSBLVDCHRISTIAN BROTHERSAUTOMOTIVECHANHASSENMNDATE:I HEREBY
CERTIFY THAT THIS
PLAN,SPECIFICATION OR
REPORTWAS
PREPARED BYME OR UNDER MY DIRECT
CROSSROADS BOULEVARDCCPROPOSED
CHRISTIAN
BROTHERS
AUTOMOTIVE 5,100
SF FFE: 923.
00'Lock to Lock
Time Wayne Royal
GT16
Width
Track Steering
Angle
feet 8.
04 8.
00 48.
0:6.
017.423.
39 28.
22 DATECHECKED
BYSCALEDESIGNED
BYDRAWNBYKHAPROJECT16068400510/16/2020AS
SHOWNCJJKAMBREThis document, togetherwith
the
CROSSROADS BOULEVARDCCThis
document,
togetherwith
CROSSROADS
BOULEVARDCCNORTH
LEGEND EX-
CCOLOR
SITE
PLANEXHIBIT10/16/
Stormwater
Management Plan
Christian Brothers Automotive
Chanhassen, MN
City of Chanhassen
Riley Purgatory Bluff Creek Watershed District
Prepared for:
Christian Brothers Automotive Corporation
17725 Katy Freeway
Houston, TX 77094
Contact: Jonathan Wakefield
Prepared by:
Kimley-Horn
767 Eustis Street, Suite 100
St. Paul, MN 55114
Contact: Christian Jones, Project Manager.
Brandon Elegert, P.E.
Prepared On: September 18, 2020
Revised On: October 29, 2020
Christian Brothers Automotive - Stormwater Report Page 2
Chanhassen, MN
Stormwater Management Report
for
Christian Brothers Automotive – Chanhassen, MN
Prepared for:
Christian Brothers Automotive Corporation
October 29, 2020
Prepared By:
Kimley-Horn and Associates, Inc.
767 Eustis Street, Suite 100
St. Paul, MN 55114
I hereby certify that this plan, specification, or report was
prepared by me or under my direct supervision and that I
am a duly Registered Professional Engineer under the
laws of the State of Minnesota.
Brandon R. Elegert, P.E.
Date: October 29, 2020 Registration No. 50387
Christian Brothers Automotive - Stormwater Report Page 3
Chanhassen, MN
Table of Contents
1.0 Introduction ............................................................................................... 4
2.0 Pre-development Conditions ..................................................................... 4
3.0 Post-development Conditions .................................................................... 4
4.0 Rate Attenuation Summary ....................................................................... 5
5.0 Volume Reduction Summary ...................................................................... 6
6.0 Water Quality Summary ............................................................................ 6
Exhibits ............................................................................................................... 8
Exhibit 1. Existing Drainage Exhibit ....................................................................................................... 9
Exhibit 2. Proposed Drainage Exhibit .................................................................................................. 10
Appendices ....................................................................................................... 11
Appendix 1. Pre-Development HydroCAD Model Analysis (TP-40) .................................................... 12
Appendix 2. Pre-Development HydroCAD Model Analysis (Atlas-14) ................................................ 13
Appendix 3. Post-Development HydroCAD Model Analysis (TP-40) ................................................... 14
Appendix 4. Post-Development HydroCAD Model Analysis (Atlas-14) ............................................... 15
Appendix 5. Water Quality Calculations (MIDS) ................................................................................. 16
Appendix 6. Operations and Maintenance Plan ................................................................................. 17
Christian Brothers Automotive - Stormwater Report Page 4
Chanhassen, MN
1.0 Introduction
The proposed development consists of a new ±5,100 square foot automotive repair building, parking
lot, associated utilities, and an underground and surface stormwater management BMPs. The 0.80-
acre site is located at 8941 Crossroads Boulevard in Chanhassen, MN, and is part of the Crossroads of
Chanhassen planned unit development. The Site is subject to the requirements of the Riley-Purgatory-
Bluff Creek Watershed District (furthermore referred to as RPBCWD). This report is to provide
information for the pre-development drainage conditions, the post-development drainage conditions,
and the stormwater management system(s) designed to meet the RPBCWD storm water requirements
for the proposed development.
Kimley-Horn has analyzed the drainage conditions of the site and provides computations for applicable
RPBCWD stormwater requirements in this report. The analysis of the pre-development and post-
development drainage models was completed using HydroCAD, Version 10.00, a computer aided
design system for modeling the hydrology and hydraulics of stormwater runoff. These calculations are
largely based on the hydrology techniques developed by the Soil Conservation Service (SCS/NRCS),
combined with other hydrology and hydraulics calculations. All calculations, hydrographs, and
drainage area maps are provided in the appendix of this report.
2.0 Pre-development Conditions
The existing site consists of a vacant grass area, with slopes of 1% to 4% encompassing much of the
Site. Although a Geotechnical report has not been completed for this site, soil conditions referenced
from the USDA NRCS Web Soil Survey outline a large majority of the site being encompassed by sandy
loam and loamy sand from the surface to a depth of at least 6’ below finished grade. Based on this
data, an infiltration rate of 0.80 in/hr is assumed for design calculations.
In the existing conditions, stormwater from the northeastern portion of the site (V-DA-2) flows to an
existing inlet to the north of the site along an internal road for the overall development and is conveyed
to the public storm sewer system. The western and northwestern portion of the Site (V-DA-1 and V-
DA-3) flows west to Crossroads Boulevard, a paved public street. Stormwater from the eastern and
southern portion of the site (V-DA-4) flows to an existing area drain inlet on the south portion of the
site and connects to the existing public underground stormwater system offsite.
A summary of the pervious and impervious coverage for existing conditions is included below:
Drainage Area = 0.80 acres
o Existing Pervious Area = 0.79 acres (99%)
o Existing Impervious Area = 0.01 acres (1%)
o Weighted Curve Number (CN) = 61
3.0 Post-development Conditions
The proposed development consists of an approximately 5,100 sf commercial building, concrete
parking lot, utilities, underground and above-ground stormwater management areas, and landscaping.
Site improvements will maintain existing drainage patterns.
Christian Brothers Automotive - Stormwater Report Page 5
Chanhassen, MN
Stormwater runoff from a portion of the roof and majority of the paved parking surface will discharge
to a proposed underground stormwater infiltration system, BMP #2. The underground stormwater
infiltration system is proposed to be perforated 36” pipe. Overflow from this BMP is routed to the
existing underground storm sewer network. Stormwater runoff from the western portion of the roof
will discharge to an infiltration basin (BMP #1) on the west side of the proposed building. Overflow
from this BMP is routed to an existing catch basin within Crossroads Boulevard.
A summary of the pervious and impervious coverage for proposed conditions is included below.
Drainage Area = 0.80 acres
o Proposed Pervious Area = 0.25 acres (31%)
o Proposed Impervious Area = 0.55 acres (69%)
o Weighted Curve Number (CN) = 87
4.0 Rate Attenuation Summary
The Riley-Purgatory-Bluff Creek Watershed District requires that sites limit peak flow rates from the
site in the 2-, 10-, and 100-year, 24-hour nested rainfall events and the 100-year, 10-day snowmelt
event using Atlas 14 precipitation depths and storm distributions. In addition to City requirements, the
site must maintain existing drainage patterns including volume and rate of existing runoff. The
proposed development achieves this requirement as outlined in the table below:
Table 1: Rate Attenuation – Atlas 14
Table 2: Rate Attenuation – TP-40
2 Year
2.84 in.)
10 Year
4.20 in.)
100 Year
7.18 in.)
100 Year, 10-day Snow
Melt Event (7.30 in.)
Rate Attenuation Summary – Total Site
Pre-Development Rate (CFS) 0.23 1.04 3.69 1.08
Post-Development Rate (CFS) 0.13 0.33 2.41 0.22
Rate Attenuation Summary – Existing Onsite Inlet
Pre-Development Rate (CFS) 0.09 0.41 1.40 0.36
Post-Development Rate (CFS) 0.02 0.08 0.26 0.06
2 Year
2.75 in.)
10 Year
4.20 in.)
100 Year
5.95 in.)
100 Year, 10-day Snow
Melt Event (5.95 in.)
Rate Attenuation Summary – Total Site
Pre-Development Rate (CFS) 0.20 1.07 2.51 0.88
Post-Development Rate (CFS) 0.12 0.34 0.65 0.18
Rate Attenuation Summary – Existing Onsite Inlet
Pre-Development Rate (CFS) 0.08 0.41 0.95 0.30
Post-Development Rate (CFS) 0.01 0.08 0.18 0.05
Christian Brothers Automotive - Stormwater Report Page 6
Chanhassen, MN
Stormwater drainage from the proposed development flows via public storm sewer system to an
existing MNDOT facility downstream within the MNDOT right-of-way at the corner of Crossroads
Blvd. and MN 101. It is our understanding the existing MnDOT drainage facility was originally
designed utilizing Technical Paper-40 rainfall data administered by the National Oceanic and
Atmospheric Administration. The pre-development runoff rate utilizing TP-40 rainfall intensity data,
as shown in Table 2 above, shows the existing runoff rate from the site is 2.51 CFS. The post-
development condition is assessed using the Atlas-14 distribution, where the 100-year rainfall event
for the total site is 2.41 CFS. The proposed post-development runoff rate utilizing the TP-40 rainfall
intensity data yields a runoff rate of 0.65 CFS, which is lower than the existing MNDOT drainage
facility was designed for. The proposed runoff rate utilizing the Atlas-14 analysis, as well as the TP-
40, is lower than the existing conditions TP-40 runoff rates, as shown above.
5.0 Volume Reduction Summary
The Riley-Purgatory-Bluff Creek Watershed District requires applicants provide onsite retention of 1.1
inches over the proposed impervious surface of the Site. Based on the proposed plans the required
onsite retention is met based on the following:
Table 3: Volume Reduction
Proposed Impervious Area
Reconstructed and New)
0.55 AC
Treatment Depth Required 1.1 Inches
Required Infiltration Volume 2,196 CF
Provided Infiltration Volume BMP #1: 2,470 CF
BMP #2: 5,669 CF
8,139 CF TOTAL
6.0 Water Quality Summary
The Riley-Purgatory-Bluff Creek Watershed District requires removal of 60% of the total phosphorus
TP) and 90% of the total suspended solids (TSS). Watershed requirements will be achieved through
the use of infiltration in BMP #1 and BMP #2.
All BMPs systems are required to provide water quality volume below the lowest flow outlet and
provide draw down within 48 hours. An infiltration rate of 0.8 in/hr was used per the USDA Web Soil
Survey information and Minnesota Stormwater Manual recommendations. Based on this infiltration
rate, the maximum allowable infiltration for these systems is based on a ponding depth of 3.2 feet
above the bottom of the system. BMP #1 proposes a ponding depth of 1.70 feet, which is within the
required limit. BMP #2 proposed a ponding depth of 2.60 feet, which is within the required limit. In
addition to
Results of the Minimal Impact Design Standards (MIDS) analysis for the site is shown in the Summary
below. These results show that BMP #1 and BMP#2 increase the site’s removal efficiency of TP and TSS
when compared to existing conditions, which is consistent with requirements of the RPBC Watershed
District. A full analysis is provided in Appendix 3. Water Quality Calculations.
Christian Brothers Automotive - Stormwater Report Page 7
Chanhassen, MN
Minimal Impact Design Standards (MIDS) Summary:
Christian Brothers Automotive - Stormwater Report Page 8
Chanhassen, MN
Exhibits
Christian Brothers Automotive - Stormwater Report Page 9
Chanhassen, MN
Exhibit 1. Existing Drainage Exhibit
9
2
3924922922922
923924922921
921921922
922 922 922
923
922V-DA-3
3.19%
3.99%
1.
89
1.8
0
2
1
9%3.
49%
1.44%
2.
64%1.
34%2 99%
3.28%2.
35 1.17%
0.9 5 CROSSROADS BOULEVARDV-DA-4
V-DA-2 V-DA-1 WATER
FROM THE SITE DRAINS VIA SURFACE
SHEET FLOW TO THE EXISTING PUBLIC STORM
SEWER SYSTEM, WHICH FLOWS NORTH AND
EAST TO PUBLIC STORM
SEWER SYSTEM AT THE INTERSECTION OF MN-
101 AND
CROSSROADS
BOULEVARD AND
EVENTUALLY TO
LAKE
RILEY SOUTHEAST OF THE SITE
Thisdocument,
together with the concepts
Christian Brothers Automotive - Stormwater Report Page 10
Chanhassen, MN
Exhibit 2. Proposed Drainage Exhibit
CROSSROADS
BOULEVARDCROSSROADS
BOULEVARD92
3
924922922922
923924922
921
921921 922 922
922
922
9239222.
1 0
1.
87
2.
7 1
1.90%
2.05%
1.
03%
1.
78 1.
86%2.5
9 3.02%7.99%
10.22%3.
15%1.44
4.34%1.
19%
6.
38%
C-
DA-
3
C-DA-1C-DA-2
C-DA-4 C-DA-
5 C-DA-6 923
923 921 922922922 923923922 920921922922D
BP-1: STORMWATER INFILTRATION BASIN BOTTOM
OF BASIN: 919.50 TOP
OF BASIN: 921.50 100-
YR HWL: 920.78 TOTAL STORAGE VOLUME: 3,159 CF
TREATMENT VOLUME: 2,470 CF BMP
2: UNDERGROUND INFILTRATION SYSTEM ADS
36" N-12 PERFORATED HDPE
PIPE OR APPROVED EQUAL
TOTAL STORAGE VOLUME: 6,420
CF TREATMENT VOLUME: 5,669
CF TOP
OF PIPE: 918.90 PIPE INV.: 915.
90 BOTTOM OF STONE: 915.40 100-
YR HWL: 918.80 8.86%
WATER FROM THE SITE DRAINS VIA SURFACE
SHEET FLOW TO THE EXISTING PUBLIC
STORM SEWER SYSTEM, WHICH
FLOWS NORTH AND EAST TO PUBLIC STORM
SEWER SYSTEM AT
THE INTERSECTION
OF
MN-101
AND
CROSSROADS BOULEVARD
AND EVENTUALLY TO
LAKE RILEY SOUTHEAST
OF THE
SITEEXISTING
STORM SEWER
This document, together
with the concepts
and designs presented
herein, as an instrument of
service, is intended only
for the specific
purpose and client for which
itwas
prepared. Reuse of and improper
Christian Brothers Automotive - Stormwater Report Page 11
Chanhassen, MN
Appendices
Christian Brothers Automotive - Stormwater Report Page 12
Chanhassen, MN
Appendix 1. Pre-Development
HydroCAD Model Analysis (TP-40)
1S
V-DA-1
2S
V-DA-3
3S
V-DA-4
6S
V-DA-2
4R
TOTAL SITE
9R
EX ONSITE INLET
Routing Diagram for CBA Chanhassen Ex Cond_TP-40_Rainfall
Prepared by Kimley-Horn and Associates, Printed 10/25/2020
HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Subcat Reach Pond Link
CBA Chanhassen Ex Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page2HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Area Listing (all nodes)
Area
acres)
CN Description
subcatchment-numbers)
0.889 61 >75% Grass cover, Good, HSG B (1S, 2S, 3S, 6S)
0.889 61 TOTAL AREA
CBA Chanhassen Ex Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page3HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Soil Listing (all nodes)
Area
acres)
Soil
Group
Subcatchment
Numbers
0.000 HSG A
0.889 HSG B 1S, 2S, 3S, 6S
0.000 HSG C
0.000 HSG D
0.000 Other
0.889 TOTAL AREA
CBA Chanhassen Ex Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page4HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Ground Covers (all nodes)
HSG-A
acres)
HSG-B
acres)
HSG-C
acres)
HSG-D
acres)
Other
acres)
Total
acres)
Ground
Cover
Subcatchment
Numbers
0.000 0.889 0.000 0.000 0.000 0.889 >75% Grass cover, Good 1S, 2S,
3S, 6S
0.000 0.889 0.000 0.000 0.000 0.889 TOTAL AREA
Type II 24-hr 2-Year Rainfall=2.75"CBA Chanhassen Ex Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page5HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Time span=1.00-72.00 hrs, dt=0.05 hrs, 1421 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=0.097 ac 0.00% Impervious Runoff Depth=0.28"Subcatchment 1S: V-DA-1
Flow Length=70' Slope=0.0200 '/' Tc=7.8 min CN=61 Runoff=0.03 cfs 0.002 af
Runoff Area=0.326 ac 0.00% Impervious Runoff Depth=0.28"Subcatchment 2S: V-DA-3
Flow Length=140' Slope=0.0200 '/' Tc=13.6 min CN=61 Runoff=0.06 cfs 0.007 af
Runoff Area=0.297 ac 0.00% Impervious Runoff Depth=0.28"Subcatchment 3S: V-DA-4
Flow Length=100' Slope=0.0400 '/' Tc=7.9 min CN=61 Runoff=0.08 cfs 0.007 af
Runoff Area=0.169 ac 0.00% Impervious Runoff Depth=0.28"Subcatchment 6S: V-DA-2
Flow Length=100' Slope=0.0400 '/' Tc=7.9 min CN=61 Runoff=0.04 cfs 0.004 af
Inflow=0.20 cfs 0.020afReach4R: TOTAL SITE
Outflow=0.20 cfs 0.020 af
Inflow=0.08 cfs 0.007afReach9R: EX ONSITE INLET
Outflow=0.08 cfs 0.007 af
Total Runoff Area = 0.889 ac Runoff Volume = 0.020 af Average Runoff Depth = 0.28"
100.00% Pervious = 0.889 ac 0.00% Impervious = 0.000 ac
Type II 24-hr 2-Year Rainfall=2.75"CBA Chanhassen Ex Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page6HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: V-DA-1
Runoff = 0.03 cfs @ 12.04 hrs, Volume= 0.002 af, Depth= 0.28"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Type II 24-hr 2-Year Rainfall=2.75"
Area (ac) CN Description
0.097 61 >75% Grass cover, Good, HSG B
0.097 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.8 70 0.0200 0.15 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 1S: V-DA-1
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
028 0.
026 0.
024 0.
022 0.
02 0.
018 0.
016 0.
014 0.
012 0.
01 0.
008 0.
006 0.
004 0.
002
0 Type II 24-
hr 2-Year Rainfall=2.
75"Runoff Area=0.097
ac Runoff Volume=0.002
af Runoff Depth=0.
28"Flow Length=
70'Slope=0.
0200 '/'Tc=7.8
min CN=
61 0.03
Type II 24-hr 2-Year Rainfall=2.75"CBA Chanhassen Ex Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page7HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 2S: V-DA-3
Runoff = 0.06 cfs @ 12.11 hrs, Volume= 0.007 af, Depth= 0.28"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Type II 24-hr 2-Year Rainfall=2.75"
Area (ac) CN Description
0.326 61 >75% Grass cover, Good, HSG B
0.326 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
13.6 140 0.0200 0.17 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 2S: V-DA-3
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
07 0.
065 0.
06 0.
055 0.
05 0.
045 0.
04 0.
035 0.
03 0.
025 0.
02 0.
015 0.
01 0.
005
0 Type II 24-
hr 2-Year Rainfall=2.
75"Runoff Area=0.326
ac Runoff Volume=0.007
af Runoff Depth=0.
28"Flow Length=
140'Slope=0.
0200 '/'Tc=13.6
min CN=
61 0.06
Type II 24-hr 2-Year Rainfall=2.75"CBA Chanhassen Ex Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page8HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 3S: V-DA-4
Runoff = 0.08 cfs @ 12.04 hrs, Volume= 0.007 af, Depth= 0.28"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Type II 24-hr 2-Year Rainfall=2.75"
Area (ac) CN Description
0.297 61 >75% Grass cover, Good, HSG B
0.297 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.9 100 0.0400 0.21 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 3S: V-DA-4
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
085 0.
08 0.
075 0.
07 0.
065 0.
06 0.
055 0.
05 0.
045 0.
04 0.
035 0.
03 0.
025 0.
02 0.
015 0.
01 0.
005
0 Type II 24-
hr 2-Year Rainfall=2.
75"Runoff Area=0.297
ac Runoff Volume=0.007
af Runoff Depth=0.
28"Flow Length=
100'Slope=0.
0400 '/'Tc=7.9
min CN=
61 0.08
Type II 24-hr 2-Year Rainfall=2.75"CBA Chanhassen Ex Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page9HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 6S: V-DA-2
Runoff = 0.04 cfs @ 12.04 hrs, Volume= 0.004 af, Depth= 0.28"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Type II 24-hr 2-Year Rainfall=2.75"
Area (ac) CN Description
0.169 61 >75% Grass cover, Good, HSG B
0.169 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.9 100 0.0400 0.21 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 6S: V-DA-2
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
048 0.
046 0.
044 0.
042 0.
04 0.
038 0.
036 0.
034 0.
032 0.
03 0.
028 0.
026 0.
024 0.
022 0.
02 0.
018 0.
016 0.
014 0.
012 0.
01 0.
008 0.
006 0.
004 0.
002
0 Type II 24-
hr 2-Year Rainfall=2.
75"Runoff Area=0.169
ac Runoff Volume=0.004
af Runoff Depth=0.
28"Flow Length=
100'Slope=0.
0400 '/'Tc=7.9
min CN=
61 0.04
Type II 24-hr 2-Year Rainfall=2.75"CBA Chanhassen Ex Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page10HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 4R: TOTAL SITE
40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 0.889 ac, 0.00% Impervious, Inflow Depth = 0.28" for 2-Year event
Inflow = 0.20 cfs @ 12.05 hrs, Volume= 0.020 af
Outflow = 0.20 cfs @ 12.05 hrs, Volume= 0.020 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Reach 4R: TOTAL SITE
Inflow
Outflow
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
22 0.
21 0.
2 0.
19 0.
18 0.
17 0.
16 0.
15 0.
14 0.
13 0.
12 0.
11 0.
1 0.
09 0.
08 0.
07 0.
06 0.
05 0.
04 0.
03 0.
02 0.
01
0 Inflow Area=0.889
ac 0.20
cfs 0.20
Type II 24-hr 2-Year Rainfall=2.75"CBA Chanhassen Ex Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page11HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 9R: EX ONSITE INLET
40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 0.297 ac, 0.00% Impervious, Inflow Depth = 0.28" for 2-Year event
Inflow = 0.08 cfs @ 12.04 hrs, Volume= 0.007 af
Outflow = 0.08 cfs @ 12.04 hrs, Volume= 0.007 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Reach 9R: EX ONSITE INLET
Inflow
Outflow
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
085 0.
08 0.
075 0.
07 0.
065 0.
06 0.
055 0.
05 0.
045 0.
04 0.
035 0.
03 0.
025 0.
02 0.
015 0.
01 0.
005
0 Inflow Area=0.297
ac 0.08
cfs 0.08
Type II 24-hr 10-Year Rainfall=4.20"CBA Chanhassen Ex Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page12HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Time span=1.00-72.00 hrs, dt=0.05 hrs, 1421 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=0.097 ac 0.00% Impervious Runoff Depth=0.92"Subcatchment 1S: V-DA-1
Flow Length=70' Slope=0.0200 '/' Tc=7.8 min CN=61 Runoff=0.13 cfs 0.007 af
Runoff Area=0.326 ac 0.00% Impervious Runoff Depth=0.92"Subcatchment 2S: V-DA-3
Flow Length=140' Slope=0.0200 '/' Tc=13.6 min CN=61 Runoff=0.35 cfs 0.025 af
Runoff Area=0.297 ac 0.00% Impervious Runoff Depth=0.92"Subcatchment 3S: V-DA-4
Flow Length=100' Slope=0.0400 '/' Tc=7.9 min CN=61 Runoff=0.41 cfs 0.023 af
Runoff Area=0.169 ac 0.00% Impervious Runoff Depth=0.92"Subcatchment 6S: V-DA-2
Flow Length=100' Slope=0.0400 '/' Tc=7.9 min CN=61 Runoff=0.23 cfs 0.013 af
Inflow=1.07 cfs 0.068afReach4R: TOTAL SITE
Outflow=1.07 cfs 0.068 af
Inflow=0.41 cfs 0.023afReach9R: EX ONSITE INLET
Outflow=0.41 cfs 0.023 af
Total Runoff Area = 0.889 ac Runoff Volume = 0.068 af Average Runoff Depth = 0.92"
100.00% Pervious = 0.889 ac 0.00% Impervious = 0.000 ac
Type II 24-hr 10-Year Rainfall=4.20"CBA Chanhassen Ex Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page13HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: V-DA-1
Runoff = 0.13 cfs @ 12.01 hrs, Volume= 0.007 af, Depth= 0.92"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Type II 24-hr 10-Year Rainfall=4.20"
Area (ac) CN Description
0.097 61 >75% Grass cover, Good, HSG B
0.097 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.8 70 0.0200 0.15 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 1S: V-DA-1
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
15 0.
14 0.
13 0.
12 0.
11 0.
1 0.
09 0.
08 0.
07 0.
06 0.
05 0.
04 0.
03 0.
02 0.
01
0 Type II 24-
hr 10-Year Rainfall=4.
20"Runoff Area=0.097
ac Runoff Volume=0.007
af Runoff Depth=0.
92"Flow Length=
70'Slope=0.
0200 '/'Tc=7.8
min CN=
61 0.13
Type II 24-hr 10-Year Rainfall=4.20"CBA Chanhassen Ex Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page14HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 2S: V-DA-3
Runoff = 0.35 cfs @ 12.08 hrs, Volume= 0.025 af, Depth= 0.92"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Type II 24-hr 10-Year Rainfall=4.20"
Area (ac) CN Description
0.326 61 >75% Grass cover, Good, HSG B
0.326 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
13.6 140 0.0200 0.17 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 2S: V-DA-3
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
38 0.
36 0.
34 0.
32 0.
3 0.
28 0.
26 0.
24 0.
22 0.
2 0.
18 0.
16 0.
14 0.
12 0.
1 0.
08 0.
06 0.
04 0.
02
0 Type II 24-
hr 10-Year Rainfall=4.
20"Runoff Area=0.326
ac Runoff Volume=0.025
af Runoff Depth=0.
92"Flow Length=
140'Slope=0.
0200 '/'Tc=13.6
min CN=
61 0.35
Type II 24-hr 10-Year Rainfall=4.20"CBA Chanhassen Ex Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page15HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 3S: V-DA-4
Runoff = 0.41 cfs @ 12.01 hrs, Volume= 0.023 af, Depth= 0.92"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Type II 24-hr 10-Year Rainfall=4.20"
Area (ac) CN Description
0.297 61 >75% Grass cover, Good, HSG B
0.297 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.9 100 0.0400 0.21 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 3S: V-DA-4
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
44 0.
42 0.
4 0.
38 0.
36 0.
34 0.
32 0.
3 0.
28 0.
26 0.
24 0.
22 0.
2 0.
18 0.
16 0.
14 0.
12 0.
1 0.
08 0.
06 0.
04 0.
02
0 Type II 24-
hr 10-Year Rainfall=4.
20"Runoff Area=0.297
ac Runoff Volume=0.023
af Runoff Depth=0.
92"Flow Length=
100'Slope=0.
0400 '/'Tc=7.9
min CN=
61 0.41
Type II 24-hr 10-Year Rainfall=4.20"CBA Chanhassen Ex Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page16HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 6S: V-DA-2
Runoff = 0.23 cfs @ 12.01 hrs, Volume= 0.013 af, Depth= 0.92"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Type II 24-hr 10-Year Rainfall=4.20"
Area (ac) CN Description
0.169 61 >75% Grass cover, Good, HSG B
0.169 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.9 100 0.0400 0.21 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 6S: V-DA-2
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
26 0.
25 0.
24 0.
23 0.
22 0.
21 0.
2 0.
19 0.
18 0.
17 0.
16 0.
15 0.
14 0.
13 0.
12 0.
11 0.
1 0.
09 0.
08 0.
07 0.
06 0.
05 0.
04 0.
03 0.
02 0.
01
0 Type II 24-
hr 10-Year Rainfall=4.
20"Runoff Area=0.169
ac Runoff Volume=0.013
af Runoff Depth=0.
92"Flow Length=
100'Slope=0.
0400 '/'Tc=7.9
min CN=
61 0.23
Type II 24-hr 10-Year Rainfall=4.20"CBA Chanhassen Ex Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page17HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 4R: TOTAL SITE
40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 0.889 ac, 0.00% Impervious, Inflow Depth = 0.92" for 10-Year event
Inflow = 1.07 cfs @ 12.02 hrs, Volume= 0.068 af
Outflow = 1.07 cfs @ 12.02 hrs, Volume= 0.068 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Reach 4R: TOTAL SITE
Inflow
Outflow
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)
1
0 Inflow Area=0.889
ac 1.07
cfs 1.07
Type II 24-hr 10-Year Rainfall=4.20"CBA Chanhassen Ex Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page18HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 9R: EX ONSITE INLET
40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 0.297 ac, 0.00% Impervious, Inflow Depth = 0.92" for 10-Year event
Inflow = 0.41 cfs @ 12.01 hrs, Volume= 0.023 af
Outflow = 0.41 cfs @ 12.01 hrs, Volume= 0.023 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Reach 9R: EX ONSITE INLET
Inflow
Outflow
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
44 0.
42 0.
4 0.
38 0.
36 0.
34 0.
32 0.
3 0.
28 0.
26 0.
24 0.
22 0.
2 0.
18 0.
16 0.
14 0.
12 0.
1 0.
08 0.
06 0.
04 0.
02
0 Inflow Area=0.297
ac 0.41
cfs 0.41
Type II 24-hr 100-Year Rainfall=5.95"CBA Chanhassen Ex Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page19HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Time span=1.00-72.00 hrs, dt=0.05 hrs, 1421 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=0.097 ac 0.00% Impervious Runoff Depth=1.97"Subcatchment 1S: V-DA-1
Flow Length=70' Slope=0.0200 '/' Tc=7.8 min CN=61 Runoff=0.31 cfs 0.016 af
Runoff Area=0.326 ac 0.00% Impervious Runoff Depth=1.97"Subcatchment 2S: V-DA-3
Flow Length=140' Slope=0.0200 '/' Tc=13.6 min CN=61 Runoff=0.84 cfs 0.054 af
Runoff Area=0.297 ac 0.00% Impervious Runoff Depth=1.97"Subcatchment 3S: V-DA-4
Flow Length=100' Slope=0.0400 '/' Tc=7.9 min CN=61 Runoff=0.95 cfs 0.049 af
Runoff Area=0.169 ac 0.00% Impervious Runoff Depth=1.97"Subcatchment 6S: V-DA-2
Flow Length=100' Slope=0.0400 '/' Tc=7.9 min CN=61 Runoff=0.54 cfs 0.028 af
Inflow=2.51 cfs 0.146afReach4R: TOTAL SITE
Outflow=2.51 cfs 0.146 af
Inflow=0.95 cfs 0.049afReach9R: EX ONSITE INLET
Outflow=0.95 cfs 0.049 af
Total Runoff Area = 0.889 ac Runoff Volume = 0.146 af Average Runoff Depth = 1.97"
100.00% Pervious = 0.889 ac 0.00% Impervious = 0.000 ac
Type II 24-hr 100-Year Rainfall=5.95"CBA Chanhassen Ex Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page20HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: V-DA-1
Runoff = 0.31 cfs @ 12.00 hrs, Volume= 0.016 af, Depth= 1.97"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Type II 24-hr 100-Year Rainfall=5.95"
Area (ac) CN Description
0.097 61 >75% Grass cover, Good, HSG B
0.097 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.8 70 0.0200 0.15 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 1S: V-DA-1
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
34 0.
32 0.
3 0.
28 0.
26 0.
24 0.
22 0.
2 0.
18 0.
16 0.
14 0.
12 0.
1 0.
08 0.
06 0.
04 0.
02
0 Type II 24-
hr 100-Year Rainfall=5.
95"Runoff Area=0.097
ac Runoff Volume=0.016
af Runoff Depth=1.
97"Flow Length=
70'Slope=0.
0200 '/'Tc=7.8
min CN=
61 0.31
Type II 24-hr 100-Year Rainfall=5.95"CBA Chanhassen Ex Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page21HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 2S: V-DA-3
Runoff = 0.84 cfs @ 12.07 hrs, Volume= 0.054 af, Depth= 1.97"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Type II 24-hr 100-Year Rainfall=5.95"
Area (ac) CN Description
0.326 61 >75% Grass cover, Good, HSG B
0.326 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
13.6 140 0.0200 0.17 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 2S: V-DA-3
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
9 0.
85 0.
8 0.
75 0.
7 0.
65 0.
6 0.
55 0.
5 0.
45 0.
4 0.
35 0.
3 0.
25 0.
2 0.
15 0.
1 0.
05
0 Type II 24-
hr 100-Year Rainfall=5.
95"Runoff Area=0.326
ac Runoff Volume=0.054
af Runoff Depth=1.
97"Flow Length=
140'Slope=0.
0200 '/'Tc=13.6
min CN=
61 0.84
Type II 24-hr 100-Year Rainfall=5.95"CBA Chanhassen Ex Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page22HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 3S: V-DA-4
Runoff = 0.95 cfs @ 12.00 hrs, Volume= 0.049 af, Depth= 1.97"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Type II 24-hr 100-Year Rainfall=5.95"
Area (ac) CN Description
0.297 61 >75% Grass cover, Good, HSG B
0.297 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.9 100 0.0400 0.21 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 3S: V-DA-4
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)
1
0 Type II 24-
hr 100-Year Rainfall=5.
95"Runoff Area=0.297
ac Runoff Volume=0.049
af Runoff Depth=1.
97"Flow Length=
100'Slope=0.
0400 '/'Tc=7.9
min CN=
61 0.95
Type II 24-hr 100-Year Rainfall=5.95"CBA Chanhassen Ex Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page23HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 6S: V-DA-2
Runoff = 0.54 cfs @ 12.00 hrs, Volume= 0.028 af, Depth= 1.97"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Type II 24-hr 100-Year Rainfall=5.95"
Area (ac) CN Description
0.169 61 >75% Grass cover, Good, HSG B
0.169 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.9 100 0.0400 0.21 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 6S: V-DA-2
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
6 0.
55 0.
5 0.
45 0.
4 0.
35 0.
3 0.
25 0.
2 0.
15 0.
1 0.
05
0 Type II 24-
hr 100-Year Rainfall=5.
95"Runoff Area=0.169
ac Runoff Volume=0.028
af Runoff Depth=1.
97"Flow Length=
100'Slope=0.
0400 '/'Tc=7.9
min CN=
61 0.54
Type II 24-hr 100-Year Rainfall=5.95"CBA Chanhassen Ex Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page24HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 4R: TOTAL SITE
40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 0.889 ac, 0.00% Impervious, Inflow Depth = 1.97" for 100-Year event
Inflow = 2.51 cfs @ 12.01 hrs, Volume= 0.146 af
Outflow = 2.51 cfs @ 12.01 hrs, Volume= 0.146 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Reach 4R: TOTAL SITE
Inflow
Outflow
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)
2
1
0 Inflow Area=0.889
ac 2.51
cfs 2.51
Type II 24-hr 100-Year Rainfall=5.95"CBA Chanhassen Ex Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page25HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 9R: EX ONSITE INLET
40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 0.297 ac, 0.00% Impervious, Inflow Depth = 1.97" for 100-Year event
Inflow = 0.95 cfs @ 12.00 hrs, Volume= 0.049 af
Outflow = 0.95 cfs @ 12.00 hrs, Volume= 0.049 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Reach 9R: EX ONSITE INLET
Inflow
Outflow
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)
1
0 Inflow Area=0.297
ac 0.95
cfs 0.95
1S
V-DA-1
2S
V-DA-3
3S
V-DA-4
6S
V-DA-2
4R
TOTAL SITE
9R
EX ONSITE INLET
Routing Diagram for CBA Chanhassen Ex Cond_TP-40_10 Day Snow Melt
Prepared by Kimley-Horn and Associates, Printed 10/25/2020
HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Subcat Reach Pond Link
CBA Chanhassen Ex Cond_TP-40_10 Day Snow Melt
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page2HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Area Listing (all nodes)
Area
acres)
CN Description
subcatchment-numbers)
0.889 100 >75% Grass cover, Good, HSG B (1S, 2S, 3S, 6S)
0.889 100 TOTAL AREA
CBA Chanhassen Ex Cond_TP-40_10 Day Snow Melt
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page3HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Soil Listing (all nodes)
Area
acres)
Soil
Group
Subcatchment
Numbers
0.000 HSG A
0.889 HSG B 1S, 2S, 3S, 6S
0.000 HSG C
0.000 HSG D
0.000 Other
0.889 TOTAL AREA
CBA Chanhassen Ex Cond_TP-40_10 Day Snow Melt
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page4HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Ground Covers (all nodes)
HSG-A
acres)
HSG-B
acres)
HSG-C
acres)
HSG-D
acres)
Other
acres)
Total
acres)
Ground
Cover
Subcatchment
Numbers
0.000 0.889 0.000 0.000 0.000 0.889 >75% Grass cover, Good 1S, 2S,
3S, 6S
0.000 0.889 0.000 0.000 0.000 0.889 TOTAL AREA
Type II 24-hr 240.00 hrs Custom Rainfall=5.95", AMC=4CBAChanhassenExCond_TP-40_10
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page5HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Time span=1.00-240.00 hrs, dt=0.01 hrs, 23901 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=0.097 ac 100.00% Impervious Runoff Depth>5.94"Subcatchment 1S: V-DA-1
Flow Length=70' Slope=0.0200 '/' Tc=7.8 min CN=100 Runoff=0.10 cfs 0.048 af
Runoff Area=0.326 ac 100.00% Impervious Runoff Depth>5.94"Subcatchment 2S: V-DA-3
Flow Length=140' Slope=0.0200 '/' Tc=13.6 min CN=100 Runoff=0.32 cfs 0.161 af
Runoff Area=0.297 ac 100.00% Impervious Runoff Depth>5.94"Subcatchment 3S: V-DA-4
Flow Length=100' Slope=0.0400 '/' Tc=7.9 min CN=100 Runoff=0.30 cfs 0.147 af
Runoff Area=0.169 ac 100.00% Impervious Runoff Depth>5.94"Subcatchment 6S: V-DA-2
Flow Length=100' Slope=0.0400 '/' Tc=7.9 min CN=100 Runoff=0.17 cfs 0.084 af
Inflow=0.88 cfs 0.440afReach4R: TOTAL SITE
Outflow=0.88 cfs 0.440 af
Inflow=0.30 cfs 0.147afReach9R: EX ONSITE INLET
Outflow=0.30 cfs 0.147 af
Total Runoff Area = 0.889 ac Runoff Volume = 0.440 af Average Runoff Depth = 5.94"
0.00% Pervious = 0.000 ac 100.00% Impervious = 0.889 ac
Type II 24-hr 240.00 hrs Custom Rainfall=5.95", AMC=4CBAChanhassenExCond_TP-40_10
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page6HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: V-DA-1
Runoff = 0.10 cfs @ 119.09 hrs, Volume= 0.048 af, Depth> 5.94"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-240.00 hrs, dt= 0.01 hrs
Type II 24-hr 240.00 hrs Custom Rainfall=5.95", AMC=4
Area (ac) CN Description
0.097 100 >75% Grass cover, Good, HSG B
0.097 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.8 70 0.0200 0.15 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 1S: V-DA-1
Runoff
Hydrograph
Time (hours)
240230220210200190180170160150140130120110100908070605040302010Flow (
cfs)0.
105 0.
1 0.
095 0.
09 0.
085 0.
08 0.
075 0.
07 0.
065 0.
06 0.
055 0.
05 0.
045 0.
04 0.
035 0.
03 0.
025 0.
02 0.
015 0.
01 0.
005
0 Type II 24-hr 240.00
hrs Custom Rainfall=5.
95"AMC=
4 Runoff Area=0.097
ac Runoff Volume=0.048
af Runoff Depth>5.
94"Flow Length=
70'Slope=0.
0200 '/'Tc=7.8
min CN=
100 0.10
Type II 24-hr 240.00 hrs Custom Rainfall=5.95", AMC=4CBAChanhassenExCond_TP-40_10
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page7HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 2S: V-DA-3
Runoff = 0.32 cfs @ 119.15 hrs, Volume= 0.161 af, Depth> 5.94"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-240.00 hrs, dt= 0.01 hrs
Type II 24-hr 240.00 hrs Custom Rainfall=5.95", AMC=4
Area (ac) CN Description
0.326 100 >75% Grass cover, Good, HSG B
0.326 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
13.6 140 0.0200 0.17 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 2S: V-DA-3
Runoff
Hydrograph
Time (hours)
240230220210200190180170160150140130120110100908070605040302010Flow (
cfs)0.
34 0.
32 0.
3 0.
28 0.
26 0.
24 0.
22 0.
2 0.
18 0.
16 0.
14 0.
12 0.
1 0.
08 0.
06 0.
04 0.
02
0 Type II 24-hr 240.00
hrs Custom Rainfall=5.
95"AMC=
4 Runoff Area=0.326
ac Runoff Volume=0.161
af Runoff Depth>5.
94"Flow Length=
140'Slope=0.
0200 '/'Tc=13.6
min CN=
100 0.32
Type II 24-hr 240.00 hrs Custom Rainfall=5.95", AMC=4CBAChanhassenExCond_TP-40_10
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page8HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 3S: V-DA-4
Runoff = 0.30 cfs @ 119.09 hrs, Volume= 0.147 af, Depth> 5.94"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-240.00 hrs, dt= 0.01 hrs
Type II 24-hr 240.00 hrs Custom Rainfall=5.95", AMC=4
Area (ac) CN Description
0.297 100 >75% Grass cover, Good, HSG B
0.297 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.9 100 0.0400 0.21 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 3S: V-DA-4
Runoff
Hydrograph
Time (hours)
240230220210200190180170160150140130120110100908070605040302010Flow (
cfs)0.
32 0.
3 0.
28 0.
26 0.
24 0.
22 0.
2 0.
18 0.
16 0.
14 0.
12 0.
1 0.
08 0.
06 0.
04 0.
02
0 Type II 24-hr 240.00
hrs Custom Rainfall=5.
95"AMC=
4 Runoff Area=0.297
ac Runoff Volume=0.147
af Runoff Depth>5.
94"Flow Length=
100'Slope=0.
0400 '/'Tc=7.9
min CN=
100 0.30
Type II 24-hr 240.00 hrs Custom Rainfall=5.95", AMC=4CBAChanhassenExCond_TP-40_10
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page9HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 6S: V-DA-2
Runoff = 0.17 cfs @ 119.09 hrs, Volume= 0.084 af, Depth> 5.94"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-240.00 hrs, dt= 0.01 hrs
Type II 24-hr 240.00 hrs Custom Rainfall=5.95", AMC=4
Area (ac) CN Description
0.169 100 >75% Grass cover, Good, HSG B
0.169 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.9 100 0.0400 0.21 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 6S: V-DA-2
Runoff
Hydrograph
Time (hours)
240230220210200190180170160150140130120110100908070605040302010Flow (
cfs)0.
18 0.
17 0.
16 0.
15 0.
14 0.
13 0.
12 0.
11 0.
1 0.
09 0.
08 0.
07 0.
06 0.
05 0.
04 0.
03 0.
02 0.
01
0 Type II 24-hr 240.00
hrs Custom Rainfall=5.
95"AMC=
4 Runoff Area=0.169
ac Runoff Volume=0.084
af Runoff Depth>5.
94"Flow Length=
100'Slope=0.
0400 '/'Tc=7.9
min CN=
100 0.17
Type II 24-hr 240.00 hrs Custom Rainfall=5.95", AMC=4CBAChanhassenExCond_TP-40_10
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page10HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 4R: TOTAL SITE
40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 0.889 ac,100.00% Impervious, Inflow Depth > 5.94" for Custom event
Inflow = 0.88 cfs @ 119.11 hrs, Volume= 0.440 af
Outflow = 0.88 cfs @ 119.11 hrs, Volume= 0.440 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-240.00 hrs, dt= 0.01 hrs
Reach 4R: TOTAL SITE
Inflow
Outflow
Hydrograph
Time (hours)
240230220210200190180170160150140130120110100908070605040302010Flow (
cfs)0.
95 0.
9 0.
85 0.
8 0.
75 0.
7 0.
65 0.
6 0.
55 0.
5 0.
45 0.
4 0.
35 0.
3 0.
25 0.
2 0.
15 0.
1 0.
05
0 Inflow Area=0.889
ac 0.88
cfs 0.88
Type II 24-hr 240.00 hrs Custom Rainfall=5.95", AMC=4CBAChanhassenExCond_TP-40_10
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page11HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 9R: EX ONSITE INLET
40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 0.297 ac,100.00% Impervious, Inflow Depth > 5.94" for Custom event
Inflow = 0.30 cfs @ 119.09 hrs, Volume= 0.147 af
Outflow = 0.30 cfs @ 119.09 hrs, Volume= 0.147 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-240.00 hrs, dt= 0.01 hrs
Reach 9R: EX ONSITE INLET
Inflow
Outflow
Hydrograph
Time (hours)
240230220210200190180170160150140130120110100908070605040302010Flow (
cfs)0.
32 0.
3 0.
28 0.
26 0.
24 0.
22 0.
2 0.
18 0.
16 0.
14 0.
12 0.
1 0.
08 0.
06 0.
04 0.
02
0 Inflow Area=0.297
ac 0.30
cfs 0.30
Christian Brothers Automotive - Stormwater Report Page 13
Chanhassen, MN
Appendix 2. Pre-Development
HydroCAD Model Analysis (Atlas-14)
1S
V-DA-1
2S
V-DA-3
3S
V-DA-4
6S
V-DA-2
4R
TOTAL SITE
9R
EX ONSITE INLET
Routing Diagram for CBA Chanhassen Ex Cond_Atlas 14_Rainfall
Prepared by Kimley-Horn and Associates, Printed 10/25/2020
HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Subcat Reach Pond Link
CBA Chanhassen Ex Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page2HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Area Listing (all nodes)
Area
acres)
CN Description
subcatchment-numbers)
0.889 61 >75% Grass cover, Good, HSG B (1S, 2S, 3S, 6S)
0.889 61 TOTAL AREA
CBA Chanhassen Ex Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page3HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Soil Listing (all nodes)
Area
acres)
Soil
Group
Subcatchment
Numbers
0.000 HSG A
0.889 HSG B 1S, 2S, 3S, 6S
0.000 HSG C
0.000 HSG D
0.000 Other
0.889 TOTAL AREA
CBA Chanhassen Ex Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page4HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Ground Covers (all nodes)
HSG-A
acres)
HSG-B
acres)
HSG-C
acres)
HSG-D
acres)
Other
acres)
Total
acres)
Ground
Cover
Subcatchment
Numbers
0.000 0.889 0.000 0.000 0.000 0.889 >75% Grass cover, Good 1S, 2S,
3S, 6S
0.000 0.889 0.000 0.000 0.000 0.889 TOTAL AREA
MSE 24-hr 3 2-Year Rainfall=2.84"CBA Chanhassen Ex Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page5HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Time span=1.00-72.00 hrs, dt=0.05 hrs, 1421 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=0.097 ac 0.00% Impervious Runoff Depth=0.31"Subcatchment 1S: V-DA-1
Flow Length=70' Slope=0.0200 '/' Tc=7.8 min CN=61 Runoff=0.03 cfs 0.002 af
Runoff Area=0.326 ac 0.00% Impervious Runoff Depth=0.31"Subcatchment 2S: V-DA-3
Flow Length=140' Slope=0.0200 '/' Tc=13.6 min CN=61 Runoff=0.08 cfs 0.008 af
Runoff Area=0.297 ac 0.00% Impervious Runoff Depth=0.31"Subcatchment 3S: V-DA-4
Flow Length=100' Slope=0.0400 '/' Tc=7.9 min CN=61 Runoff=0.09 cfs 0.008 af
Runoff Area=0.169 ac 0.00% Impervious Runoff Depth=0.31"Subcatchment 6S: V-DA-2
Flow Length=100' Slope=0.0400 '/' Tc=7.9 min CN=61 Runoff=0.05 cfs 0.004 af
Inflow=0.23 cfs 0.023afReach4R: TOTAL SITE
Outflow=0.23 cfs 0.023 af
Inflow=0.09 cfs 0.008afReach9R: EX ONSITE INLET
Outflow=0.09 cfs 0.008 af
Total Runoff Area = 0.889 ac Runoff Volume = 0.023 af Average Runoff Depth = 0.31"
100.00% Pervious = 0.889 ac 0.00% Impervious = 0.000 ac
MSE 24-hr 3 2-Year Rainfall=2.84"CBA Chanhassen Ex Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page6HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: V-DA-1
Runoff = 0.03 cfs @ 12.20 hrs, Volume= 0.002 af, Depth= 0.31"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
MSE 24-hr 3 2-Year Rainfall=2.84"
Area (ac) CN Description
0.097 61 >75% Grass cover, Good, HSG B
0.097 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.8 70 0.0200 0.15 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 1S: V-DA-1
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
032 0.
03 0.
028 0.
026 0.
024 0.
022 0.
02 0.
018 0.
016 0.
014 0.
012 0.
01 0.
008 0.
006 0.
004 0.
002
0 MSE 24-hr
3 2-Year Rainfall=2.
84"Runoff Area=0.097
ac Runoff Volume=0.002
af Runoff Depth=0.
31"Flow Length=
70'Slope=0.
0200 '/'Tc=7.8
min CN=
61 0.03
MSE 24-hr 3 2-Year Rainfall=2.84"CBA Chanhassen Ex Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page7HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 2S: V-DA-3
Runoff = 0.08 cfs @ 12.29 hrs, Volume= 0.008 af, Depth= 0.31"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
MSE 24-hr 3 2-Year Rainfall=2.84"
Area (ac) CN Description
0.326 61 >75% Grass cover, Good, HSG B
0.326 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
13.6 140 0.0200 0.17 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 2S: V-DA-3
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
085 0.
08 0.
075 0.
07 0.
065 0.
06 0.
055 0.
05 0.
045 0.
04 0.
035 0.
03 0.
025 0.
02 0.
015 0.
01 0.
005
0 MSE 24-hr
3 2-Year Rainfall=2.
84"Runoff Area=0.326
ac Runoff Volume=0.008
af Runoff Depth=0.
31"Flow Length=
140'Slope=0.
0200 '/'Tc=13.6
min CN=
61 0.08
MSE 24-hr 3 2-Year Rainfall=2.84"CBA Chanhassen Ex Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page8HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 3S: V-DA-4
Runoff = 0.09 cfs @ 12.20 hrs, Volume= 0.008 af, Depth= 0.31"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
MSE 24-hr 3 2-Year Rainfall=2.84"
Area (ac) CN Description
0.297 61 >75% Grass cover, Good, HSG B
0.297 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.9 100 0.0400 0.21 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 3S: V-DA-4
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
1 0.
095 0.
09 0.
085 0.
08 0.
075 0.
07 0.
065 0.
06 0.
055 0.
05 0.
045 0.
04 0.
035 0.
03 0.
025 0.
02 0.
015 0.
01 0.
005
0 MSE 24-hr
3 2-Year Rainfall=2.
84"Runoff Area=0.297
ac Runoff Volume=0.008
af Runoff Depth=0.
31"Flow Length=
100'Slope=0.
0400 '/'Tc=7.9
min CN=
61 0.09
MSE 24-hr 3 2-Year Rainfall=2.84"CBA Chanhassen Ex Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page9HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 6S: V-DA-2
Runoff = 0.05 cfs @ 12.20 hrs, Volume= 0.004 af, Depth= 0.31"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
MSE 24-hr 3 2-Year Rainfall=2.84"
Area (ac) CN Description
0.169 61 >75% Grass cover, Good, HSG B
0.169 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.9 100 0.0400 0.21 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 6S: V-DA-2
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
055 0.
05 0.
045 0.
04 0.
035 0.
03 0.
025 0.
02 0.
015 0.
01 0.
005
0 MSE 24-hr
3 2-Year Rainfall=2.
84"Runoff Area=0.169
ac Runoff Volume=0.004
af Runoff Depth=0.
31"Flow Length=
100'Slope=0.
0400 '/'Tc=7.9
min CN=
61 0.05
MSE 24-hr 3 2-Year Rainfall=2.84"CBA Chanhassen Ex Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page10HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 4R: TOTAL SITE
40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 0.889 ac, 0.00% Impervious, Inflow Depth = 0.31" for 2-Year event
Inflow = 0.23 cfs @ 12.22 hrs, Volume= 0.023 af
Outflow = 0.23 cfs @ 12.22 hrs, Volume= 0.023 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Reach 4R: TOTAL SITE
Inflow
Outflow
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
24 0.
22 0.
2 0.
18 0.
16 0.
14 0.
12 0.
1 0.
08 0.
06 0.
04 0.
02
0 Inflow Area=0.889
ac 0.23
cfs 0.23
MSE 24-hr 3 2-Year Rainfall=2.84"CBA Chanhassen Ex Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page11HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 9R: EX ONSITE INLET
40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 0.297 ac, 0.00% Impervious, Inflow Depth = 0.31" for 2-Year event
Inflow = 0.09 cfs @ 12.20 hrs, Volume= 0.008 af
Outflow = 0.09 cfs @ 12.20 hrs, Volume= 0.008 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Reach 9R: EX ONSITE INLET
Inflow
Outflow
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
1 0.
095 0.
09 0.
085 0.
08 0.
075 0.
07 0.
065 0.
06 0.
055 0.
05 0.
045 0.
04 0.
035 0.
03 0.
025 0.
02 0.
015 0.
01 0.
005
0 Inflow Area=0.297
ac 0.09
cfs 0.09
MSE 24-hr 3 10-Year Rainfall=4.20"CBA Chanhassen Ex Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page12HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Time span=1.00-72.00 hrs, dt=0.05 hrs, 1421 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=0.097 ac 0.00% Impervious Runoff Depth=0.92"Subcatchment 1S: V-DA-1
Flow Length=70' Slope=0.0200 '/' Tc=7.8 min CN=61 Runoff=0.13 cfs 0.007 af
Runoff Area=0.326 ac 0.00% Impervious Runoff Depth=0.92"Subcatchment 2S: V-DA-3
Flow Length=140' Slope=0.0200 '/' Tc=13.6 min CN=61 Runoff=0.35 cfs 0.025 af
Runoff Area=0.297 ac 0.00% Impervious Runoff Depth=0.92"Subcatchment 3S: V-DA-4
Flow Length=100' Slope=0.0400 '/' Tc=7.9 min CN=61 Runoff=0.41 cfs 0.023 af
Runoff Area=0.169 ac 0.00% Impervious Runoff Depth=0.92"Subcatchment 6S: V-DA-2
Flow Length=100' Slope=0.0400 '/' Tc=7.9 min CN=61 Runoff=0.23 cfs 0.013 af
Inflow=1.04 cfs 0.068afReach4R: TOTAL SITE
Outflow=1.04 cfs 0.068 af
Inflow=0.41 cfs 0.023afReach9R: EX ONSITE INLET
Outflow=0.41 cfs 0.023 af
Total Runoff Area = 0.889 ac Runoff Volume = 0.068 af Average Runoff Depth = 0.92"
100.00% Pervious = 0.889 ac 0.00% Impervious = 0.000 ac
MSE 24-hr 3 10-Year Rainfall=4.20"CBA Chanhassen Ex Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page13HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: V-DA-1
Runoff = 0.13 cfs @ 12.16 hrs, Volume= 0.007 af, Depth= 0.92"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
MSE 24-hr 3 10-Year Rainfall=4.20"
Area (ac) CN Description
0.097 61 >75% Grass cover, Good, HSG B
0.097 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.8 70 0.0200 0.15 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 1S: V-DA-1
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
15 0.
14 0.
13 0.
12 0.
11 0.
1 0.
09 0.
08 0.
07 0.
06 0.
05 0.
04 0.
03 0.
02 0.
01
0 MSE 24-hr
3 10-Year Rainfall=4.
20"Runoff Area=0.097
ac Runoff Volume=0.007
af Runoff Depth=0.
92"Flow Length=
70'Slope=0.
0200 '/'Tc=7.8
min CN=
61 0.13
MSE 24-hr 3 10-Year Rainfall=4.20"CBA Chanhassen Ex Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page14HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 2S: V-DA-3
Runoff = 0.35 cfs @ 12.25 hrs, Volume= 0.025 af, Depth= 0.92"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
MSE 24-hr 3 10-Year Rainfall=4.20"
Area (ac) CN Description
0.326 61 >75% Grass cover, Good, HSG B
0.326 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
13.6 140 0.0200 0.17 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 2S: V-DA-3
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
38 0.
36 0.
34 0.
32 0.
3 0.
28 0.
26 0.
24 0.
22 0.
2 0.
18 0.
16 0.
14 0.
12 0.
1 0.
08 0.
06 0.
04 0.
02
0 MSE 24-hr
3 10-Year Rainfall=4.
20"Runoff Area=0.326
ac Runoff Volume=0.025
af Runoff Depth=0.
92"Flow Length=
140'Slope=0.
0200 '/'Tc=13.6
min CN=
61 0.35
MSE 24-hr 3 10-Year Rainfall=4.20"CBA Chanhassen Ex Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page15HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 3S: V-DA-4
Runoff = 0.41 cfs @ 12.17 hrs, Volume= 0.023 af, Depth= 0.92"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
MSE 24-hr 3 10-Year Rainfall=4.20"
Area (ac) CN Description
0.297 61 >75% Grass cover, Good, HSG B
0.297 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.9 100 0.0400 0.21 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 3S: V-DA-4
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
44 0.
42 0.
4 0.
38 0.
36 0.
34 0.
32 0.
3 0.
28 0.
26 0.
24 0.
22 0.
2 0.
18 0.
16 0.
14 0.
12 0.
1 0.
08 0.
06 0.
04 0.
02
0 MSE 24-hr
3 10-Year Rainfall=4.
20"Runoff Area=0.297
ac Runoff Volume=0.023
af Runoff Depth=0.
92"Flow Length=
100'Slope=0.
0400 '/'Tc=7.9
min CN=
61 0.41
MSE 24-hr 3 10-Year Rainfall=4.20"CBA Chanhassen Ex Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page16HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 6S: V-DA-2
Runoff = 0.23 cfs @ 12.17 hrs, Volume= 0.013 af, Depth= 0.92"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
MSE 24-hr 3 10-Year Rainfall=4.20"
Area (ac) CN Description
0.169 61 >75% Grass cover, Good, HSG B
0.169 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.9 100 0.0400 0.21 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 6S: V-DA-2
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
26 0.
25 0.
24 0.
23 0.
22 0.
21 0.
2 0.
19 0.
18 0.
17 0.
16 0.
15 0.
14 0.
13 0.
12 0.
11 0.
1 0.
09 0.
08 0.
07 0.
06 0.
05 0.
04 0.
03 0.
02 0.
01
0 MSE 24-hr
3 10-Year Rainfall=4.
20"Runoff Area=0.169
ac Runoff Volume=0.013
af Runoff Depth=0.
92"Flow Length=
100'Slope=0.
0400 '/'Tc=7.9
min CN=
61 0.23
MSE 24-hr 3 10-Year Rainfall=4.20"CBA Chanhassen Ex Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page17HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 4R: TOTAL SITE
40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 0.889 ac, 0.00% Impervious, Inflow Depth = 0.92" for 10-Year event
Inflow = 1.04 cfs @ 12.18 hrs, Volume= 0.068 af
Outflow = 1.04 cfs @ 12.18 hrs, Volume= 0.068 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Reach 4R: TOTAL SITE
Inflow
Outflow
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)
1
0 Inflow Area=0.889
ac 1.04
cfs 1.04
MSE 24-hr 3 10-Year Rainfall=4.20"CBA Chanhassen Ex Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page18HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 9R: EX ONSITE INLET
40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 0.297 ac, 0.00% Impervious, Inflow Depth = 0.92" for 10-Year event
Inflow = 0.41 cfs @ 12.17 hrs, Volume= 0.023 af
Outflow = 0.41 cfs @ 12.17 hrs, Volume= 0.023 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Reach 9R: EX ONSITE INLET
Inflow
Outflow
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
44 0.
42 0.
4 0.
38 0.
36 0.
34 0.
32 0.
3 0.
28 0.
26 0.
24 0.
22 0.
2 0.
18 0.
16 0.
14 0.
12 0.
1 0.
08 0.
06 0.
04 0.
02
0 Inflow Area=0.297
ac 0.41
cfs 0.41
MSE 24-hr 3 100-Year Rainfall=7.18"CBA Chanhassen Ex Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page19HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Time span=1.00-72.00 hrs, dt=0.05 hrs, 1421 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=0.097 ac 0.00% Impervious Runoff Depth=2.83"Subcatchment 1S: V-DA-1
Flow Length=70' Slope=0.0200 '/' Tc=7.8 min CN=61 Runoff=0.46 cfs 0.023 af
Runoff Area=0.326 ac 0.00% Impervious Runoff Depth=2.83"Subcatchment 2S: V-DA-3
Flow Length=140' Slope=0.0200 '/' Tc=13.6 min CN=61 Runoff=1.22 cfs 0.077 af
Runoff Area=0.297 ac 0.00% Impervious Runoff Depth=2.83"Subcatchment 3S: V-DA-4
Flow Length=100' Slope=0.0400 '/' Tc=7.9 min CN=61 Runoff=1.40 cfs 0.070 af
Runoff Area=0.169 ac 0.00% Impervious Runoff Depth=2.83"Subcatchment 6S: V-DA-2
Flow Length=100' Slope=0.0400 '/' Tc=7.9 min CN=61 Runoff=0.80 cfs 0.040 af
Inflow=3.69 cfs 0.210afReach4R: TOTAL SITE
Outflow=3.69 cfs 0.210 af
Inflow=1.40 cfs 0.070afReach9R: EX ONSITE INLET
Outflow=1.40 cfs 0.070 af
Total Runoff Area = 0.889 ac Runoff Volume = 0.210 af Average Runoff Depth = 2.83"
100.00% Pervious = 0.889 ac 0.00% Impervious = 0.000 ac
MSE 24-hr 3 100-Year Rainfall=7.18"CBA Chanhassen Ex Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page20HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: V-DA-1
Runoff = 0.46 cfs @ 12.16 hrs, Volume= 0.023 af, Depth= 2.83"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
MSE 24-hr 3 100-Year Rainfall=7.18"
Area (ac) CN Description
0.097 61 >75% Grass cover, Good, HSG B
0.097 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.8 70 0.0200 0.15 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 1S: V-DA-1
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
5 0.
48 0.
46 0.
44 0.
42 0.
4 0.
38 0.
36 0.
34 0.
32 0.
3 0.
28 0.
26 0.
24 0.
22 0.
2 0.
18 0.
16 0.
14 0.
12 0.
1 0.
08 0.
06 0.
04 0.
02
0 MSE 24-hr
3 100-Year Rainfall=7.
18"Runoff Area=0.097
ac Runoff Volume=0.023
af Runoff Depth=2.
83"Flow Length=
70'Slope=0.
0200 '/'Tc=7.8
min CN=
61 0.46
MSE 24-hr 3 100-Year Rainfall=7.18"CBA Chanhassen Ex Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page21HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 2S: V-DA-3
Runoff = 1.22 cfs @ 12.23 hrs, Volume= 0.077 af, Depth= 2.83"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
MSE 24-hr 3 100-Year Rainfall=7.18"
Area (ac) CN Description
0.326 61 >75% Grass cover, Good, HSG B
0.326 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
13.6 140 0.0200 0.17 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 2S: V-DA-3
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)
1
0 MSE 24-hr
3 100-Year Rainfall=7.
18"Runoff Area=0.326
ac Runoff Volume=0.077
af Runoff Depth=2.
83"Flow Length=
140'Slope=0.
0200 '/'Tc=13.6
min CN=
61 1.22
MSE 24-hr 3 100-Year Rainfall=7.18"CBA Chanhassen Ex Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page22HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 3S: V-DA-4
Runoff = 1.40 cfs @ 12.16 hrs, Volume= 0.070 af, Depth= 2.83"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
MSE 24-hr 3 100-Year Rainfall=7.18"
Area (ac) CN Description
0.297 61 >75% Grass cover, Good, HSG B
0.297 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.9 100 0.0400 0.21 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 3S: V-DA-4
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)
1
0 MSE 24-hr
3 100-Year Rainfall=7.
18"Runoff Area=0.297
ac Runoff Volume=0.070
af Runoff Depth=2.
83"Flow Length=
100'Slope=0.
0400 '/'Tc=7.9
min CN=
61 1.40
MSE 24-hr 3 100-Year Rainfall=7.18"CBA Chanhassen Ex Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page23HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 6S: V-DA-2
Runoff = 0.80 cfs @ 12.16 hrs, Volume= 0.040 af, Depth= 2.83"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
MSE 24-hr 3 100-Year Rainfall=7.18"
Area (ac) CN Description
0.169 61 >75% Grass cover, Good, HSG B
0.169 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.9 100 0.0400 0.21 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 6S: V-DA-2
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
85 0.
8 0.
75 0.
7 0.
65 0.
6 0.
55 0.
5 0.
45 0.
4 0.
35 0.
3 0.
25 0.
2 0.
15 0.
1 0.
05
0 MSE 24-hr
3 100-Year Rainfall=7.
18"Runoff Area=0.169
ac Runoff Volume=0.040
af Runoff Depth=2.
83"Flow Length=
100'Slope=0.
0400 '/'Tc=7.9
min CN=
61 0.80
MSE 24-hr 3 100-Year Rainfall=7.18"CBA Chanhassen Ex Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page24HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 4R: TOTAL SITE
40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 0.889 ac, 0.00% Impervious, Inflow Depth = 2.83" for 100-Year event
Inflow = 3.69 cfs @ 12.17 hrs, Volume= 0.210 af
Outflow = 3.69 cfs @ 12.17 hrs, Volume= 0.210 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Reach 4R: TOTAL SITE
Inflow
Outflow
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)
4
3
2
1
0 Inflow Area=0.889
ac 3.69
cfs 3.69
MSE 24-hr 3 100-Year Rainfall=7.18"CBA Chanhassen Ex Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page25HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 9R: EX ONSITE INLET
40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 0.297 ac, 0.00% Impervious, Inflow Depth = 2.83" for 100-Year event
Inflow = 1.40 cfs @ 12.16 hrs, Volume= 0.070 af
Outflow = 1.40 cfs @ 12.16 hrs, Volume= 0.070 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Reach 9R: EX ONSITE INLET
Inflow
Outflow
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)
1
0 Inflow Area=0.297
ac 1.40
cfs 1.40
1S
V-DA-1
2S
V-DA-3
3S
V-DA-4
6S
V-DA-2
4R
TOTAL SITE
9R
EX ONSITE INLET
Routing Diagram for CBA Chanhassen Ex Cond_Atlas 14_10 Day Snow Melt
Prepared by Kimley-Horn and Associates, Printed 10/25/2020
HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Subcat Reach Pond Link
CBA Chanhassen Ex Cond_Atlas 14_10 Day Snow Melt
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page2HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Area Listing (all nodes)
Area
acres)
CN Description
subcatchment-numbers)
0.889 100 >75% Grass cover, Good, HSG B (1S, 2S, 3S, 6S)
0.889 100 TOTAL AREA
CBA Chanhassen Ex Cond_Atlas 14_10 Day Snow Melt
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page3HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Soil Listing (all nodes)
Area
acres)
Soil
Group
Subcatchment
Numbers
0.000 HSG A
0.889 HSG B 1S, 2S, 3S, 6S
0.000 HSG C
0.000 HSG D
0.000 Other
0.889 TOTAL AREA
CBA Chanhassen Ex Cond_Atlas 14_10 Day Snow Melt
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page4HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Ground Covers (all nodes)
HSG-A
acres)
HSG-B
acres)
HSG-C
acres)
HSG-D
acres)
Other
acres)
Total
acres)
Ground
Cover
Subcatchment
Numbers
0.000 0.889 0.000 0.000 0.000 0.889 >75% Grass cover, Good 1S, 2S,
3S, 6S
0.000 0.889 0.000 0.000 0.000 0.889 TOTAL AREA
MSE 24-hr 3 240.00 hrs Custom Rainfall=7.30", AMC=4CBAChanhassenExCond_Atlas 14_
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page5HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Time span=1.00-240.00 hrs, dt=0.01 hrs, 23901 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=0.097 ac 100.00% Impervious Runoff Depth>7.30"Subcatchment 1S: V-DA-1
Flow Length=70' Slope=0.0200 '/' Tc=7.8 min CN=100 Runoff=0.12 cfs 0.059 af
Runoff Area=0.326 ac 100.00% Impervious Runoff Depth>7.30"Subcatchment 2S: V-DA-3
Flow Length=140' Slope=0.0200 '/' Tc=13.6 min CN=100 Runoff=0.40 cfs 0.198 af
Runoff Area=0.297 ac 100.00% Impervious Runoff Depth>7.30"Subcatchment 3S: V-DA-4
Flow Length=100' Slope=0.0400 '/' Tc=7.9 min CN=100 Runoff=0.36 cfs 0.181 af
Runoff Area=0.169 ac 100.00% Impervious Runoff Depth>7.30"Subcatchment 6S: V-DA-2
Flow Length=100' Slope=0.0400 '/' Tc=7.9 min CN=100 Runoff=0.20 cfs 0.103 af
Inflow=1.08 cfs 0.541afReach4R: TOTAL SITE
Outflow=1.08 cfs 0.541 af
Inflow=0.36 cfs 0.181afReach9R: EX ONSITE INLET
Outflow=0.36 cfs 0.181 af
Total Runoff Area = 0.889 ac Runoff Volume = 0.541 af Average Runoff Depth = 7.30"
0.00% Pervious = 0.000 ac 100.00% Impervious = 0.889 ac
MSE 24-hr 3 240.00 hrs Custom Rainfall=7.30", AMC=4CBAChanhassenExCond_Atlas 14_
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page6HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: V-DA-1
Runoff = 0.12 cfs @ 120.77 hrs, Volume= 0.059 af, Depth> 7.30"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-240.00 hrs, dt= 0.01 hrs
MSE 24-hr 3 240.00 hrs Custom Rainfall=7.30", AMC=4
Area (ac) CN Description
0.097 100 >75% Grass cover, Good, HSG B
0.097 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.8 70 0.0200 0.15 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 1S: V-DA-1
Runoff
Hydrograph
Time (hours)
240230220210200190180170160150140130120110100908070605040302010Flow (
cfs)0.
13 0.
125 0.
12 0.
115 0.
11 0.
105 0.
1 0.
095 0.
09 0.
085 0.
08 0.
075 0.
07 0.
065 0.
06 0.
055 0.
05 0.
045 0.
04 0.
035 0.
03 0.
025 0.
02 0.
015 0.
01 0.
005
0 MSE 24-hr 3 240.00
hrs Custom Rainfall=7.
30"AMC=
4 Runoff Area=0.097
ac Runoff Volume=0.059
af Runoff Depth>7.
30"Flow Length=
70'Slope=0.
0200 '/'Tc=7.8
min CN=
100 0.12
MSE 24-hr 3 240.00 hrs Custom Rainfall=7.30", AMC=4CBAChanhassenExCond_Atlas 14_
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page7HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 2S: V-DA-3
Runoff = 0.40 cfs @ 120.78 hrs, Volume= 0.198 af, Depth> 7.30"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-240.00 hrs, dt= 0.01 hrs
MSE 24-hr 3 240.00 hrs Custom Rainfall=7.30", AMC=4
Area (ac) CN Description
0.326 100 >75% Grass cover, Good, HSG B
0.326 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
13.6 140 0.0200 0.17 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 2S: V-DA-3
Runoff
Hydrograph
Time (hours)
240230220210200190180170160150140130120110100908070605040302010Flow (
cfs)0.
44 0.
42 0.
4 0.
38 0.
36 0.
34 0.
32 0.
3 0.
28 0.
26 0.
24 0.
22 0.
2 0.
18 0.
16 0.
14 0.
12 0.
1 0.
08 0.
06 0.
04 0.
02
0 MSE 24-hr 3 240.00
hrs Custom Rainfall=7.
30"AMC=
4 Runoff Area=0.326
ac Runoff Volume=0.198
af Runoff Depth>7.
30"Flow Length=
140'Slope=0.
0200 '/'Tc=13.6
min CN=
100 0.40
MSE 24-hr 3 240.00 hrs Custom Rainfall=7.30", AMC=4CBAChanhassenExCond_Atlas 14_
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page8HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 3S: V-DA-4
Runoff = 0.36 cfs @ 120.51 hrs, Volume= 0.181 af, Depth> 7.30"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-240.00 hrs, dt= 0.01 hrs
MSE 24-hr 3 240.00 hrs Custom Rainfall=7.30", AMC=4
Area (ac) CN Description
0.297 100 >75% Grass cover, Good, HSG B
0.297 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.9 100 0.0400 0.21 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 3S: V-DA-4
Runoff
Hydrograph
Time (hours)
240230220210200190180170160150140130120110100908070605040302010Flow (
cfs)0.
4 0.
38 0.
36 0.
34 0.
32 0.
3 0.
28 0.
26 0.
24 0.
22 0.
2 0.
18 0.
16 0.
14 0.
12 0.
1 0.
08 0.
06 0.
04 0.
02
0 MSE 24-hr 3 240.00
hrs Custom Rainfall=7.
30"AMC=
4 Runoff Area=0.297
ac Runoff Volume=0.181
af Runoff Depth>7.
30"Flow Length=
100'Slope=0.
0400 '/'Tc=7.9
min CN=
100 0.36
MSE 24-hr 3 240.00 hrs Custom Rainfall=7.30", AMC=4CBAChanhassenExCond_Atlas 14_
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page9HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 6S: V-DA-2
Runoff = 0.20 cfs @ 120.51 hrs, Volume= 0.103 af, Depth> 7.30"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-240.00 hrs, dt= 0.01 hrs
MSE 24-hr 3 240.00 hrs Custom Rainfall=7.30", AMC=4
Area (ac) CN Description
0.169 100 >75% Grass cover, Good, HSG B
0.169 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.9 100 0.0400 0.21 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 6S: V-DA-2
Runoff
Hydrograph
Time (hours)
240230220210200190180170160150140130120110100908070605040302010Flow (
cfs)0.
22 0.
21 0.
2 0.
19 0.
18 0.
17 0.
16 0.
15 0.
14 0.
13 0.
12 0.
11 0.
1 0.
09 0.
08 0.
07 0.
06 0.
05 0.
04 0.
03 0.
02 0.
01
0 MSE 24-hr 3 240.00
hrs Custom Rainfall=7.
30"AMC=
4 Runoff Area=0.169
ac Runoff Volume=0.103
af Runoff Depth>7.
30"Flow Length=
100'Slope=0.
0400 '/'Tc=7.9
min CN=
100 0.20
MSE 24-hr 3 240.00 hrs Custom Rainfall=7.30", AMC=4CBAChanhassenExCond_Atlas 14_
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page10HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 4R: TOTAL SITE
40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 0.889 ac,100.00% Impervious, Inflow Depth > 7.30" for Custom event
Inflow = 1.08 cfs @ 120.81 hrs, Volume= 0.541 af
Outflow = 1.08 cfs @ 120.81 hrs, Volume= 0.541 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-240.00 hrs, dt= 0.01 hrs
Reach 4R: TOTAL SITE
Inflow
Outflow
Hydrograph
Time (hours)
240230220210200190180170160150140130120110100908070605040302010Flow (
cfs)
1
0 Inflow Area=0.889
ac 1.08
cfs 1.08
MSE 24-hr 3 240.00 hrs Custom Rainfall=7.30", AMC=4CBAChanhassenExCond_Atlas 14_
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page11HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 9R: EX ONSITE INLET
40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 0.297 ac,100.00% Impervious, Inflow Depth > 7.30" for Custom event
Inflow = 0.36 cfs @ 120.51 hrs, Volume= 0.181 af
Outflow = 0.36 cfs @ 120.51 hrs, Volume= 0.181 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-240.00 hrs, dt= 0.01 hrs
Reach 9R: EX ONSITE INLET
Inflow
Outflow
Hydrograph
Time (hours)
240230220210200190180170160150140130120110100908070605040302010Flow (
cfs)0.
4 0.
38 0.
36 0.
34 0.
32 0.
3 0.
28 0.
26 0.
24 0.
22 0.
2 0.
18 0.
16 0.
14 0.
12 0.
1 0.
08 0.
06 0.
04 0.
02
0 Inflow Area=0.297
ac 0.36
cfs 0.36
Christian Brothers Automotive - Stormwater Report Page 14
Chanhassen, MN
Appendix 3. Post-Development
HydroCAD Model Analysis (TP-40)
1S
C-DA-1
2S
C-DA-2
3S
C-DA-3
7S
C-DA-4
8S
C-DA-6
9S
C-DA-5
8R
EX ONSITE INLET
10R
TOTAL SITE
6P
U/G 36" INFILTRATION
7P
INFILTRATION BASIN
Routing Diagram for CBA Chanhassen Pr Cond_TP-40_Rainfall
Prepared by Kimley-Horn and Associates, Printed 10/25/2020
HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Subcat Reach Pond Link
CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page2HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Area Listing (all nodes)
Area
acres)
CN Description
subcatchment-numbers)
0.297 61 >75% Grass cover, Good, HSG B (1S, 2S, 3S, 7S, 8S, 9S)
0.501 98 Paved parking, HSG B (1S, 2S, 7S, 9S)
0.066 98 Roofs, HSG B (3S)
0.864 85 TOTAL AREA
CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page3HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Soil Listing (all nodes)
Area
acres)
Soil
Group
Subcatchment
Numbers
0.000 HSG A
0.864 HSG B 1S, 2S, 3S, 7S, 8S, 9S
0.000 HSG C
0.000 HSG D
0.000 Other
0.864 TOTAL AREA
CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page4HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Ground Covers (all nodes)
HSG-A
acres)
HSG-B
acres)
HSG-C
acres)
HSG-D
acres)
Other
acres)
Total
acres)
Ground
Cover
Subcatchment
Numbers
0.000 0.297 0.000 0.000 0.000 0.297 >75% Grass cover, Good 1S, 2S,
3S, 7S,
8S, 9S
0.000 0.501 0.000 0.000 0.000 0.501 Paved parking 1S, 2S,
7S, 9S
0.000 0.066 0.000 0.000 0.000 0.066 Roofs 3S
0.000 0.864 0.000 0.000 0.000 0.864 TOTAL AREA
CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page5HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Pipe Listing (all nodes)
Line# Node
Number
In-Invert
feet)
Out-Invert
feet)
Length
feet)
Slope
ft/ft)
n Diam/Width
inches)
Height
inches)
Inside-Fill
inches)
1 6P 915.40 915.05 50.0 0.0070 0.011 12.0 0.0 0.0
2 7P 918.00 917.50 25.0 0.0200 0.012 12.0 0.0 0.0
Type II 24-hr 2-Year Rainfall=2.75"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page6HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Time span=1.00-72.00 hrs, dt=0.05 hrs, 1421 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=0.035 ac 68.57% Impervious Runoff Depth=1.45"Subcatchment 1S: C-DA-1
Flow Length=145' Slope=0.0200 '/' Tc=14.0 min CN=86 Runoff=0.07 cfs 0.004 af
Runoff Area=0.060 ac 1.67% Impervious Runoff Depth=0.30"Subcatchment 2S: C-DA-2
Flow Length=140' Slope=0.0200 '/' Tc=13.6 min CN=62 Runoff=0.01 cfs 0.002 af
Runoff Area=0.147 ac 44.90% Impervious Runoff Depth=0.95"Subcatchment 3S: C-DA-3
Tc=7.0 min CN=78 Runoff=0.24 cfs 0.012 af
Runoff Area=0.538 ac 86.43% Impervious Runoff Depth=2.02"Subcatchment 7S: C-DA-4
Tc=7.0 min CN=93 Runoff=1.74 cfs 0.090 af
Runoff Area=0.053 ac 0.00% Impervious Runoff Depth=0.28"Subcatchment 8S: C-DA-6
Tc=7.0 min CN=61 Runoff=0.01 cfs 0.001 af
Runoff Area=0.031 ac 35.48% Impervious Runoff Depth=0.75"Subcatchment 9S: C-DA-5
Tc=7.0 min CN=74 Runoff=0.04 cfs 0.002 af
Inflow=0.01 cfs 0.001afReach8R: EX ONSITE INLET
Outflow=0.01 cfs 0.001 af
Inflow=0.12 cfs 0.009afReach10R: TOTAL SITE
Outflow=0.12 cfs 0.009 af
Peak Elev=916.83' Storage=2,070 cf Inflow=1.74 cfs 0.090afPond6P: U/G 36" INFILTRATION
Discarded=0.06 cfs 0.090 af Primary=0.00 cfs 0.000 af Outflow=0.06 cfs 0.090 af
Peak Elev=919.74' Storage=207 cf Inflow=0.24 cfs 0.012afPond7P: INFILTRATION BASIN
Discarded=0.02 cfs 0.012 af Primary=0.00 cfs 0.000 af Outflow=0.02 cfs 0.012 af
Total Runoff Area = 0.864 ac Runoff Volume = 0.111 af Average Runoff Depth = 1.54"
34.37% Pervious = 0.297 ac 65.63% Impervious = 0.567 ac
Type II 24-hr 2-Year Rainfall=2.75"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page7HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: C-DA-1
Runoff = 0.07 cfs @ 12.06 hrs, Volume= 0.004 af, Depth= 1.45"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Type II 24-hr 2-Year Rainfall=2.75"
Area (ac) CN Description
0.011 61 >75% Grass cover, Good, HSG B
0.024 98 Paved parking, HSG B
0.035 86 Weighted Average
0.011 31.43% Pervious Area
0.024 68.57% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
14.0 145 0.0200 0.17 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 1S: C-DA-1
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
075 0.
07 0.
065 0.
06 0.
055 0.
05 0.
045 0.
04 0.
035 0.
03 0.
025 0.
02 0.
015 0.
01 0.
005
0 Type II 24-
hr 2-Year Rainfall=2.
75"Runoff Area=0.035
ac Runoff Volume=0.004
af Runoff Depth=1.
45"Flow Length=
145'Slope=0.
0200 '/'Tc=14.0
min CN=
86 0.07
Type II 24-hr 2-Year Rainfall=2.75"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page8HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 2S: C-DA-2
Runoff = 0.01 cfs @ 12.11 hrs, Volume= 0.002 af, Depth= 0.30"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Type II 24-hr 2-Year Rainfall=2.75"
Area (ac) CN Description
0.059 61 >75% Grass cover, Good, HSG B
0.001 98 Paved parking, HSG B
0.060 62 Weighted Average
0.059 98.33% Pervious Area
0.001 1.67% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
13.6 140 0.0200 0.17 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 2S: C-DA-2
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
016 0.
015 0.
014 0.
013 0.
012 0.
011 0.
01 0.
009 0.
008 0.
007 0.
006 0.
005 0.
004 0.
003 0.
002 0.
001
0 Type II 24-
hr 2-Year Rainfall=2.
75"Runoff Area=0.060
ac Runoff Volume=0.002
af Runoff Depth=0.
30"Flow Length=
140'Slope=0.
0200 '/'Tc=13.6
min CN=
62 0.01
Type II 24-hr 2-Year Rainfall=2.75"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page9HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 3S: C-DA-3
Runoff = 0.24 cfs @ 11.99 hrs, Volume= 0.012 af, Depth= 0.95"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Type II 24-hr 2-Year Rainfall=2.75"
Area (ac) CN Description
0.081 61 >75% Grass cover, Good, HSG B
0.066 98 Roofs, HSG B
0.147 78 Weighted Average
0.081 55.10% Pervious Area
0.066 44.90% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.0 Direct Entry,
Subcatchment 3S: C-DA-3
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
26 0.
25 0.
24 0.
23 0.
22 0.
21 0.
2 0.
19 0.
18 0.
17 0.
16 0.
15 0.
14 0.
13 0.
12 0.
11 0.
1 0.
09 0.
08 0.
07 0.
06 0.
05 0.
04 0.
03 0.
02 0.
01
0 Type II 24-
hr 2-Year Rainfall=2.
75"Runoff Area=0.147
ac Runoff Volume=0.012
af Runoff Depth=0.
95"Tc=7.0
min CN=
78 0.24
Type II 24-hr 2-Year Rainfall=2.75"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page10HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 7S: C-DA-4
Runoff = 1.74 cfs @ 11.98 hrs, Volume= 0.090 af, Depth= 2.02"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Type II 24-hr 2-Year Rainfall=2.75"
Area (ac) CN Description
0.073 61 >75% Grass cover, Good, HSG B
0.465 98 Paved parking, HSG B
0.538 93 Weighted Average
0.073 13.57% Pervious Area
0.465 86.43% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.0 Direct Entry,
Subcatchment 7S: C-DA-4
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)
1
0 Type II 24-
hr 2-Year Rainfall=2.
75"Runoff Area=0.538
ac Runoff Volume=0.090
af Runoff Depth=2.
02"Tc=7.0
min CN=
93 1.74
Type II 24-hr 2-Year Rainfall=2.75"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page11HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 8S: C-DA-6
Runoff = 0.01 cfs @ 12.02 hrs, Volume= 0.001 af, Depth= 0.28"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Type II 24-hr 2-Year Rainfall=2.75"
Area (ac) CN Description
0.053 61 >75% Grass cover, Good, HSG B
0.053 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.0 Direct Entry,
Subcatchment 8S: C-DA-6
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
016 0.
015 0.
014 0.
013 0.
012 0.
011 0.
01 0.
009 0.
008 0.
007 0.
006 0.
005 0.
004 0.
003 0.
002 0.
001
0 Type II 24-
hr 2-Year Rainfall=2.
75"Runoff Area=0.053
ac Runoff Volume=0.001
af Runoff Depth=0.
28"Tc=7.0
min CN=
61 0.01
Type II 24-hr 2-Year Rainfall=2.75"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page12HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 9S: C-DA-5
Runoff = 0.04 cfs @ 11.99 hrs, Volume= 0.002 af, Depth= 0.75"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Type II 24-hr 2-Year Rainfall=2.75"
Area (ac) CN Description
0.011 98 Paved parking, HSG B
0.020 61 >75% Grass cover, Good, HSG B
0.031 74 Weighted Average
0.020 64.52% Pervious Area
0.011 35.48% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.0 Direct Entry,
Subcatchment 9S: C-DA-5
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
042 0.
04 0.
038 0.
036 0.
034 0.
032 0.
03 0.
028 0.
026 0.
024 0.
022 0.
02 0.
018 0.
016 0.
014 0.
012 0.
01 0.
008 0.
006 0.
004 0.
002
0 Type II 24-
hr 2-Year Rainfall=2.
75"Runoff Area=0.031
ac Runoff Volume=0.002
af Runoff Depth=0.
75"Tc=7.0
min CN=
74 0.04
Type II 24-hr 2-Year Rainfall=2.75"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page13HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 8R: EX ONSITE INLET
40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 0.053 ac, 0.00% Impervious, Inflow Depth = 0.28" for 2-Year event
Inflow = 0.01 cfs @ 12.02 hrs, Volume= 0.001 af
Outflow = 0.01 cfs @ 12.02 hrs, Volume= 0.001 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Reach 8R: EX ONSITE INLET
Inflow
Outflow
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
016 0.
015 0.
014 0.
013 0.
012 0.
011 0.
01 0.
009 0.
008 0.
007 0.
006 0.
005 0.
004 0.
003 0.
002 0.
001
0 Inflow Area=0.053
ac 0.01
cfs 0.01
Type II 24-hr 2-Year Rainfall=2.75"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page14HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 10R: TOTAL SITE
40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 0.864 ac, 65.63% Impervious, Inflow Depth = 0.12" for 2-Year event
Inflow = 0.12 cfs @ 12.03 hrs, Volume= 0.009 af
Outflow = 0.12 cfs @ 12.03 hrs, Volume= 0.009 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Reach 10R: TOTAL SITE
Inflow
Outflow
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
13 0.
12 0.
11 0.
1 0.
09 0.
08 0.
07 0.
06 0.
05 0.
04 0.
03 0.
02 0.
01
0 Inflow Area=0.864
ac 0.12
cfs 0.12
Type II 24-hr 2-Year Rainfall=2.75"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page15HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 6P: U/G 36" INFILTRATION
Inflow Area = 0.538 ac, 86.43% Impervious, Inflow Depth = 2.02" for 2-Year event
Inflow = 1.74 cfs @ 11.98 hrs, Volume= 0.090 af
Outflow = 0.06 cfs @ 11.15 hrs, Volume= 0.090 af, Atten= 97%, Lag= 0.0 min
Discarded = 0.06 cfs @ 11.15 hrs, Volume= 0.090 af
Primary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 af
Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Peak Elev= 916.83' @ 13.85 hrs Surf.Area= 3,154 sf Storage= 2,070 cf
Plug-Flow detention time= 334.2 min calculated for 0.090 af (100% of inflow)
Center-of-Mass det. time= 334.2 min ( 1,130.0 - 795.8 )
Volume Invert Avail.Storage Storage Description
1A 915.40' 3,692 cf 38.00'W x 83.00'L x 4.50'H Field A
14,193 cf Overall - 4,962 cf Embedded = 9,231 cf x 40.0% Voids
2A 915.90' 3,976 cf ADS N-12 36" x 28 Inside #1
Inside= 36.1"W x 36.1"H => 7.10 sf x 20.00'L = 142.0 cf
Outside= 42.0"W x 42.0"H => 8.86 sf x 20.00'L = 177.2 cf
7 Rows of 4 Chambers
7,668 cf Total Available Storage
Storage Group A created with Chamber Wizard
Device Routing Invert Outlet Devices
1 Discarded 915.40'0.800 in/hr Exfiltration over Surface area
2 Device 3 918.50'4.0' long x 0.5' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00
Coef. (English) 2.80 2.92 3.08 3.30 3.32
3 Primary 915.40'12.0" Round Culvert L= 50.0' Ke= 0.100
Inlet / Outlet Invert= 915.40' / 915.05' S= 0.0070 '/' Cc= 0.900
n= 0.011 Concrete pipe, straight & clean, Flow Area= 0.79 sf
Discarded OutFlow Max=0.06 cfs @ 11.15 hrs HW=915.45' (Free Discharge)
1=Exfiltration (Exfiltration Controls 0.06 cfs)
Primary OutFlow Max=0.00 cfs @ 1.00 hrs HW=915.40' (Free Discharge)
3=Culvert ( Controls 0.00 cfs)
2=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Type II 24-hr 2-Year Rainfall=2.75"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page16HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Pond 6P: U/G 36" INFILTRATION - Chamber Wizard Field A
Chamber Model = ADS N-12 36" (ADS N-12® Pipe)
Inside= 36.1"W x 36.1"H => 7.10 sf x 20.00'L = 142.0 cf
Outside= 42.0"W x 42.0"H => 8.86 sf x 20.00'L = 177.2 cf
42.0" Wide + 21.0" Spacing = 63.0" C-C Row Spacing
4 Chambers/Row x 20.00' Long = 80.00' Row Length +18.0" End Stone x 2 = 83.00' Base Length
7 Rows x 42.0" Wide + 21.0" Spacing x 6 + 18.0" Side Stone x 2 = 38.00' Base Width
6.0" Base + 42.0" Chamber Height + 6.0" Cover = 4.50' Field Height
28 Chambers x 142.0 cf = 3,976.0 cf Chamber Storage
28 Chambers x 177.2 cf = 4,962.2 cf Displacement
14,193.0 cf Field - 4,962.2 cf Chambers = 9,230.8 cf Stone x 40.0% Voids = 3,692.3 cf Stone Storage
Chamber Storage + Stone Storage = 7,668.3 cf = 0.176 af
Overall Storage Efficiency = 54.0%
Overall System Size = 83.00' x 38.00' x 4.50'
28 Chambers
525.7 cy Field
341.9 cy Stone
Type II 24-hr 2-Year Rainfall=2.75"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page17HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Pond 6P: U/G 36" INFILTRATION
Inflow
Outflow
Discarded
Primary
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)
1
0 Inflow Area=0.538
ac Peak Elev=916.
83'Storage=2,070
cf 1.74
cfs 0.06
cfs 0.06
cfs 0.00
Type II 24-hr 2-Year Rainfall=2.75"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page18HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 7P: INFILTRATION BASIN
Inflow Area = 0.147 ac, 44.90% Impervious, Inflow Depth = 0.95" for 2-Year event
Inflow = 0.24 cfs @ 11.99 hrs, Volume= 0.012 af
Outflow = 0.02 cfs @ 12.83 hrs, Volume= 0.012 af, Atten= 93%, Lag= 50.5 min
Discarded = 0.02 cfs @ 12.83 hrs, Volume= 0.012 af
Primary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 af
Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Peak Elev= 919.74' @ 12.83 hrs Surf.Area= 954 sf Storage= 207 cf
Plug-Flow detention time= 110.2 min calculated for 0.012 af (100% of inflow)
Center-of-Mass det. time= 110.2 min ( 965.6 - 855.4 )
Volume Invert Avail.Storage Storage Description
1 919.50' 3,159 cf BASIN WEST (Irregular) Listed below (Recalc)
Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area
feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
919.50 790 255.4 0 0 790
920.50 1,584 274.3 1,164 1,164 1,630
921.50 2,436 293.2 1,995 3,159 2,529
Device Routing Invert Outlet Devices
1 Discarded 919.50'0.800 in/hr Exfiltration over Surface area
2 Device 3 921.20'24.0" Horiz. Orifice/Grate C= 0.600
Limited to weir flow at low heads
3 Primary 918.00'12.0" Round Culvert L= 25.0' Ke= 0.100
Inlet / Outlet Invert= 918.00' / 917.50' S= 0.0200 '/' Cc= 0.900
n= 0.012 Corrugated PP, smooth interior, Flow Area= 0.79 sf
Discarded OutFlow Max=0.02 cfs @ 12.83 hrs HW=919.74' (Free Discharge)
1=Exfiltration (Exfiltration Controls 0.02 cfs)
Primary OutFlow Max=0.00 cfs @ 1.00 hrs HW=919.50' (Free Discharge)
3=Culvert (Passes 0.00 cfs of 4.74 cfs potential flow)
2=Orifice/Grate ( Controls 0.00 cfs)
Type II 24-hr 2-Year Rainfall=2.75"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page19HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Pond 7P: INFILTRATION BASIN
Inflow
Outflow
Discarded
Primary
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
26 0.
24 0.
22 0.
2 0.
18 0.
16 0.
14 0.
12 0.
1 0.
08 0.
06 0.
04 0.
02
0 Inflow Area=0.147
ac Peak Elev=919.
74'Storage=207
cf 0.24
cfs 0.02
cfs 0.02
cfs 0.00
Type II 24-hr 10-Year Rainfall=4.20"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page20HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Time span=1.00-72.00 hrs, dt=0.05 hrs, 1421 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=0.035 ac 68.57% Impervious Runoff Depth=2.73"Subcatchment 1S: C-DA-1
Flow Length=145' Slope=0.0200 '/' Tc=14.0 min CN=86 Runoff=0.13 cfs 0.008 af
Runoff Area=0.060 ac 1.67% Impervious Runoff Depth=0.97"Subcatchment 2S: C-DA-2
Flow Length=140' Slope=0.0200 '/' Tc=13.6 min CN=62 Runoff=0.07 cfs 0.005 af
Runoff Area=0.147 ac 44.90% Impervious Runoff Depth=2.05"Subcatchment 3S: C-DA-3
Tc=7.0 min CN=78 Runoff=0.51 cfs 0.025 af
Runoff Area=0.538 ac 86.43% Impervious Runoff Depth=3.41"Subcatchment 7S: C-DA-4
Tc=7.0 min CN=93 Runoff=2.85 cfs 0.153 af
Runoff Area=0.053 ac 0.00% Impervious Runoff Depth=0.92"Subcatchment 8S: C-DA-6
Tc=7.0 min CN=61 Runoff=0.08 cfs 0.004 af
Runoff Area=0.031 ac 35.48% Impervious Runoff Depth=1.74"Subcatchment 9S: C-DA-5
Tc=7.0 min CN=74 Runoff=0.09 cfs 0.005 af
Inflow=0.08 cfs 0.004afReach8R: EX ONSITE INLET
Outflow=0.08 cfs 0.004 af
Inflow=0.34 cfs 0.021afReach10R: TOTAL SITE
Outflow=0.34 cfs 0.021 af
Peak Elev=917.71' Storage=3,978 cf Inflow=2.85 cfs 0.153afPond6P: U/G 36" INFILTRATION
Discarded=0.06 cfs 0.153 af Primary=0.00 cfs 0.000 af Outflow=0.06 cfs 0.153 af
Peak Elev=920.06' Storage=550 cf Inflow=0.51 cfs 0.025afPond7P: INFILTRATION BASIN
Discarded=0.02 cfs 0.025 af Primary=0.00 cfs 0.000 af Outflow=0.02 cfs 0.025 af
Total Runoff Area = 0.864 ac Runoff Volume = 0.200 af Average Runoff Depth = 2.77"
34.37% Pervious = 0.297 ac 65.63% Impervious = 0.567 ac
Type II 24-hr 10-Year Rainfall=4.20"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page21HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: C-DA-1
Runoff = 0.13 cfs @ 12.06 hrs, Volume= 0.008 af, Depth= 2.73"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Type II 24-hr 10-Year Rainfall=4.20"
Area (ac) CN Description
0.011 61 >75% Grass cover, Good, HSG B
0.024 98 Paved parking, HSG B
0.035 86 Weighted Average
0.011 31.43% Pervious Area
0.024 68.57% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
14.0 145 0.0200 0.17 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 1S: C-DA-1
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
14 0.
13 0.
12 0.
11 0.
1 0.
09 0.
08 0.
07 0.
06 0.
05 0.
04 0.
03 0.
02 0.
01
0 Type II 24-
hr 10-Year Rainfall=4.
20"Runoff Area=0.035
ac Runoff Volume=0.008
af Runoff Depth=2.
73"Flow Length=
145'Slope=0.
0200 '/'Tc=14.0
min CN=
86 0.13
Type II 24-hr 10-Year Rainfall=4.20"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page22HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 2S: C-DA-2
Runoff = 0.07 cfs @ 12.07 hrs, Volume= 0.005 af, Depth= 0.97"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Type II 24-hr 10-Year Rainfall=4.20"
Area (ac) CN Description
0.059 61 >75% Grass cover, Good, HSG B
0.001 98 Paved parking, HSG B
0.060 62 Weighted Average
0.059 98.33% Pervious Area
0.001 1.67% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
13.6 140 0.0200 0.17 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 2S: C-DA-2
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
075 0.
07 0.
065 0.
06 0.
055 0.
05 0.
045 0.
04 0.
035 0.
03 0.
025 0.
02 0.
015 0.
01 0.
005
0 Type II 24-
hr 10-Year Rainfall=4.
20"Runoff Area=0.060
ac Runoff Volume=0.005
af Runoff Depth=0.
97"Flow Length=
140'Slope=0.
0200 '/'Tc=13.6
min CN=
62 0.07
Type II 24-hr 10-Year Rainfall=4.20"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page23HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 3S: C-DA-3
Runoff = 0.51 cfs @ 11.99 hrs, Volume= 0.025 af, Depth= 2.05"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Type II 24-hr 10-Year Rainfall=4.20"
Area (ac) CN Description
0.081 61 >75% Grass cover, Good, HSG B
0.066 98 Roofs, HSG B
0.147 78 Weighted Average
0.081 55.10% Pervious Area
0.066 44.90% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.0 Direct Entry,
Subcatchment 3S: C-DA-3
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
55 0.
5 0.
45 0.
4 0.
35 0.
3 0.
25 0.
2 0.
15 0.
1 0.
05
0 Type II 24-
hr 10-Year Rainfall=4.
20"Runoff Area=0.147
ac Runoff Volume=0.025
af Runoff Depth=2.
05"Tc=7.0
min CN=
78 0.51
Type II 24-hr 10-Year Rainfall=4.20"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page24HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 7S: C-DA-4
Runoff = 2.85 cfs @ 11.98 hrs, Volume= 0.153 af, Depth= 3.41"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Type II 24-hr 10-Year Rainfall=4.20"
Area (ac) CN Description
0.073 61 >75% Grass cover, Good, HSG B
0.465 98 Paved parking, HSG B
0.538 93 Weighted Average
0.073 13.57% Pervious Area
0.465 86.43% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.0 Direct Entry,
Subcatchment 7S: C-DA-4
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)
3
2
1
0 Type II 24-
hr 10-Year Rainfall=4.
20"Runoff Area=0.538
ac Runoff Volume=0.153
af Runoff Depth=3.
41"Tc=7.0
min CN=
93 2.85
Type II 24-hr 10-Year Rainfall=4.20"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page25HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 8S: C-DA-6
Runoff = 0.08 cfs @ 12.00 hrs, Volume= 0.004 af, Depth= 0.92"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Type II 24-hr 10-Year Rainfall=4.20"
Area (ac) CN Description
0.053 61 >75% Grass cover, Good, HSG B
0.053 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.0 Direct Entry,
Subcatchment 8S: C-DA-6
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
085 0.
08 0.
075 0.
07 0.
065 0.
06 0.
055 0.
05 0.
045 0.
04 0.
035 0.
03 0.
025 0.
02 0.
015 0.
01 0.
005
0 Type II 24-
hr 10-Year Rainfall=4.
20"Runoff Area=0.053
ac Runoff Volume=0.004
af Runoff Depth=0.
92"Tc=7.0
min CN=
61 0.08
Type II 24-hr 10-Year Rainfall=4.20"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page26HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 9S: C-DA-5
Runoff = 0.09 cfs @ 11.99 hrs, Volume= 0.005 af, Depth= 1.74"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Type II 24-hr 10-Year Rainfall=4.20"
Area (ac) CN Description
0.011 98 Paved parking, HSG B
0.020 61 >75% Grass cover, Good, HSG B
0.031 74 Weighted Average
0.020 64.52% Pervious Area
0.011 35.48% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.0 Direct Entry,
Subcatchment 9S: C-DA-5
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
1 0.
095 0.
09 0.
085 0.
08 0.
075 0.
07 0.
065 0.
06 0.
055 0.
05 0.
045 0.
04 0.
035 0.
03 0.
025 0.
02 0.
015 0.
01 0.
005
0 Type II 24-
hr 10-Year Rainfall=4.
20"Runoff Area=0.031
ac Runoff Volume=0.005
af Runoff Depth=1.
74"Tc=7.0
min CN=
74 0.09
Type II 24-hr 10-Year Rainfall=4.20"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page27HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 8R: EX ONSITE INLET
40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 0.053 ac, 0.00% Impervious, Inflow Depth = 0.92" for 10-Year event
Inflow = 0.08 cfs @ 12.00 hrs, Volume= 0.004 af
Outflow = 0.08 cfs @ 12.00 hrs, Volume= 0.004 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Reach 8R: EX ONSITE INLET
Inflow
Outflow
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
085 0.
08 0.
075 0.
07 0.
065 0.
06 0.
055 0.
05 0.
045 0.
04 0.
035 0.
03 0.
025 0.
02 0.
015 0.
01 0.
005
0 Inflow Area=0.053
ac 0.08
cfs 0.08
Type II 24-hr 10-Year Rainfall=4.20"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page28HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 10R: TOTAL SITE
40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 0.864 ac, 65.63% Impervious, Inflow Depth = 0.30" for 10-Year event
Inflow = 0.34 cfs @ 12.02 hrs, Volume= 0.021 af
Outflow = 0.34 cfs @ 12.02 hrs, Volume= 0.021 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Reach 10R: TOTAL SITE
Inflow
Outflow
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
36 0.
34 0.
32 0.
3 0.
28 0.
26 0.
24 0.
22 0.
2 0.
18 0.
16 0.
14 0.
12 0.
1 0.
08 0.
06 0.
04 0.
02
0 Inflow Area=0.864
ac 0.34
cfs 0.34
Type II 24-hr 10-Year Rainfall=4.20"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page29HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 6P: U/G 36" INFILTRATION
Inflow Area = 0.538 ac, 86.43% Impervious, Inflow Depth = 3.41" for 10-Year event
Inflow = 2.85 cfs @ 11.98 hrs, Volume= 0.153 af
Outflow = 0.06 cfs @ 10.20 hrs, Volume= 0.153 af, Atten= 98%, Lag= 0.0 min
Discarded = 0.06 cfs @ 10.20 hrs, Volume= 0.153 af
Primary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 af
Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Peak Elev= 917.71' @ 15.61 hrs Surf.Area= 3,154 sf Storage= 3,978 cf
Plug-Flow detention time= 636.6 min calculated for 0.153 af (100% of inflow)
Center-of-Mass det. time= 636.8 min ( 1,418.1 - 781.3 )
Volume Invert Avail.Storage Storage Description
1A 915.40' 3,692 cf 38.00'W x 83.00'L x 4.50'H Field A
14,193 cf Overall - 4,962 cf Embedded = 9,231 cf x 40.0% Voids
2A 915.90' 3,976 cf ADS N-12 36" x 28 Inside #1
Inside= 36.1"W x 36.1"H => 7.10 sf x 20.00'L = 142.0 cf
Outside= 42.0"W x 42.0"H => 8.86 sf x 20.00'L = 177.2 cf
7 Rows of 4 Chambers
7,668 cf Total Available Storage
Storage Group A created with Chamber Wizard
Device Routing Invert Outlet Devices
1 Discarded 915.40'0.800 in/hr Exfiltration over Surface area
2 Device 3 918.50'4.0' long x 0.5' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00
Coef. (English) 2.80 2.92 3.08 3.30 3.32
3 Primary 915.40'12.0" Round Culvert L= 50.0' Ke= 0.100
Inlet / Outlet Invert= 915.40' / 915.05' S= 0.0070 '/' Cc= 0.900
n= 0.011 Concrete pipe, straight & clean, Flow Area= 0.79 sf
Discarded OutFlow Max=0.06 cfs @ 10.20 hrs HW=915.45' (Free Discharge)
1=Exfiltration (Exfiltration Controls 0.06 cfs)
Primary OutFlow Max=0.00 cfs @ 1.00 hrs HW=915.40' (Free Discharge)
3=Culvert ( Controls 0.00 cfs)
2=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Type II 24-hr 10-Year Rainfall=4.20"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page30HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Pond 6P: U/G 36" INFILTRATION - Chamber Wizard Field A
Chamber Model = ADS N-12 36" (ADS N-12® Pipe)
Inside= 36.1"W x 36.1"H => 7.10 sf x 20.00'L = 142.0 cf
Outside= 42.0"W x 42.0"H => 8.86 sf x 20.00'L = 177.2 cf
42.0" Wide + 21.0" Spacing = 63.0" C-C Row Spacing
4 Chambers/Row x 20.00' Long = 80.00' Row Length +18.0" End Stone x 2 = 83.00' Base Length
7 Rows x 42.0" Wide + 21.0" Spacing x 6 + 18.0" Side Stone x 2 = 38.00' Base Width
6.0" Base + 42.0" Chamber Height + 6.0" Cover = 4.50' Field Height
28 Chambers x 142.0 cf = 3,976.0 cf Chamber Storage
28 Chambers x 177.2 cf = 4,962.2 cf Displacement
14,193.0 cf Field - 4,962.2 cf Chambers = 9,230.8 cf Stone x 40.0% Voids = 3,692.3 cf Stone Storage
Chamber Storage + Stone Storage = 7,668.3 cf = 0.176 af
Overall Storage Efficiency = 54.0%
Overall System Size = 83.00' x 38.00' x 4.50'
28 Chambers
525.7 cy Field
341.9 cy Stone
Type II 24-hr 10-Year Rainfall=4.20"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page31HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Pond 6P: U/G 36" INFILTRATION
Inflow
Outflow
Discarded
Primary
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)
3
2
1
0 Inflow Area=0.538
ac Peak Elev=917.
71'Storage=3,978
cf 2.85
cfs 0.06
cfs 0.06
cfs 0.00
Type II 24-hr 10-Year Rainfall=4.20"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page32HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 7P: INFILTRATION BASIN
Inflow Area = 0.147 ac, 44.90% Impervious, Inflow Depth = 2.05" for 10-Year event
Inflow = 0.51 cfs @ 11.99 hrs, Volume= 0.025 af
Outflow = 0.02 cfs @ 13.59 hrs, Volume= 0.025 af, Atten= 96%, Lag= 96.0 min
Discarded = 0.02 cfs @ 13.59 hrs, Volume= 0.025 af
Primary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 af
Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Peak Elev= 920.06' @ 13.59 hrs Surf.Area= 1,199 sf Storage= 550 cf
Plug-Flow detention time= 273.8 min calculated for 0.025 af (100% of inflow)
Center-of-Mass det. time= 273.7 min ( 1,106.6 - 832.9 )
Volume Invert Avail.Storage Storage Description
1 919.50' 3,159 cf BASIN WEST (Irregular) Listed below (Recalc)
Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area
feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
919.50 790 255.4 0 0 790
920.50 1,584 274.3 1,164 1,164 1,630
921.50 2,436 293.2 1,995 3,159 2,529
Device Routing Invert Outlet Devices
1 Discarded 919.50'0.800 in/hr Exfiltration over Surface area
2 Device 3 921.20'24.0" Horiz. Orifice/Grate C= 0.600
Limited to weir flow at low heads
3 Primary 918.00'12.0" Round Culvert L= 25.0' Ke= 0.100
Inlet / Outlet Invert= 918.00' / 917.50' S= 0.0200 '/' Cc= 0.900
n= 0.012 Corrugated PP, smooth interior, Flow Area= 0.79 sf
Discarded OutFlow Max=0.02 cfs @ 13.59 hrs HW=920.06' (Free Discharge)
1=Exfiltration (Exfiltration Controls 0.02 cfs)
Primary OutFlow Max=0.00 cfs @ 1.00 hrs HW=919.50' (Free Discharge)
3=Culvert (Passes 0.00 cfs of 4.74 cfs potential flow)
2=Orifice/Grate ( Controls 0.00 cfs)
Type II 24-hr 10-Year Rainfall=4.20"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page33HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Pond 7P: INFILTRATION BASIN
Inflow
Outflow
Discarded
Primary
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
55 0.
5 0.
45 0.
4 0.
35 0.
3 0.
25 0.
2 0.
15 0.
1 0.
05
0 Inflow Area=0.147
ac Peak Elev=920.
06'Storage=550
cf 0.51
cfs 0.02
cfs 0.02
cfs 0.00
Type II 24-hr 100-Year Rainfall=5.95"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page34HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Time span=1.00-72.00 hrs, dt=0.05 hrs, 1421 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=0.035 ac 68.57% Impervious Runoff Depth=4.36"Subcatchment 1S: C-DA-1
Flow Length=145' Slope=0.0200 '/' Tc=14.0 min CN=86 Runoff=0.20 cfs 0.013 af
Runoff Area=0.060 ac 1.67% Impervious Runoff Depth=2.06"Subcatchment 2S: C-DA-2
Flow Length=140' Slope=0.0200 '/' Tc=13.6 min CN=62 Runoff=0.16 cfs 0.010 af
Runoff Area=0.147 ac 44.90% Impervious Runoff Depth=3.53"Subcatchment 3S: C-DA-3
Tc=7.0 min CN=78 Runoff=0.87 cfs 0.043 af
Runoff Area=0.538 ac 86.43% Impervious Runoff Depth=5.13"Subcatchment 7S: C-DA-4
Tc=7.0 min CN=93 Runoff=4.18 cfs 0.230 af
Runoff Area=0.053 ac 0.00% Impervious Runoff Depth=1.97"Subcatchment 8S: C-DA-6
Tc=7.0 min CN=61 Runoff=0.18 cfs 0.009 af
Runoff Area=0.031 ac 35.48% Impervious Runoff Depth=3.14"Subcatchment 9S: C-DA-5
Tc=7.0 min CN=74 Runoff=0.16 cfs 0.008 af
Inflow=0.18 cfs 0.009afReach8R: EX ONSITE INLET
Outflow=0.18 cfs 0.009 af
Inflow=0.65 cfs 0.061afReach10R: TOTAL SITE
Outflow=0.65 cfs 0.061 af
Peak Elev=918.56' Storage=5,780 cf Inflow=4.18 cfs 0.230afPond6P: U/G 36" INFILTRATION
Discarded=0.06 cfs 0.209 af Primary=0.15 cfs 0.021 af Outflow=0.21 cfs 0.230 af
Peak Elev=920.43' Storage=1,054 cf Inflow=0.87 cfs 0.043afPond7P: INFILTRATION BASIN
Discarded=0.03 cfs 0.043 af Primary=0.00 cfs 0.000 af Outflow=0.03 cfs 0.043 af
Total Runoff Area = 0.864 ac Runoff Volume = 0.313 af Average Runoff Depth = 4.35"
34.37% Pervious = 0.297 ac 65.63% Impervious = 0.567 ac
Type II 24-hr 100-Year Rainfall=5.95"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page35HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: C-DA-1
Runoff = 0.20 cfs @ 12.05 hrs, Volume= 0.013 af, Depth= 4.36"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Type II 24-hr 100-Year Rainfall=5.95"
Area (ac) CN Description
0.011 61 >75% Grass cover, Good, HSG B
0.024 98 Paved parking, HSG B
0.035 86 Weighted Average
0.011 31.43% Pervious Area
0.024 68.57% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
14.0 145 0.0200 0.17 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 1S: C-DA-1
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
22 0.
21 0.
2 0.
19 0.
18 0.
17 0.
16 0.
15 0.
14 0.
13 0.
12 0.
11 0.
1 0.
09 0.
08 0.
07 0.
06 0.
05 0.
04 0.
03 0.
02 0.
01
0 Type II 24-
hr 100-Year Rainfall=5.
95"Runoff Area=0.035
ac Runoff Volume=0.013
af Runoff Depth=4.
36"Flow Length=
145'Slope=0.
0200 '/'Tc=14.0
min CN=
86 0.20
Type II 24-hr 100-Year Rainfall=5.95"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page36HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 2S: C-DA-2
Runoff = 0.16 cfs @ 12.06 hrs, Volume= 0.010 af, Depth= 2.06"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Type II 24-hr 100-Year Rainfall=5.95"
Area (ac) CN Description
0.059 61 >75% Grass cover, Good, HSG B
0.001 98 Paved parking, HSG B
0.060 62 Weighted Average
0.059 98.33% Pervious Area
0.001 1.67% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
13.6 140 0.0200 0.17 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 2S: C-DA-2
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
18 0.
17 0.
16 0.
15 0.
14 0.
13 0.
12 0.
11 0.
1 0.
09 0.
08 0.
07 0.
06 0.
05 0.
04 0.
03 0.
02 0.
01
0 Type II 24-
hr 100-Year Rainfall=5.
95"Runoff Area=0.060
ac Runoff Volume=0.010
af Runoff Depth=2.
06"Flow Length=
140'Slope=0.
0200 '/'Tc=13.6
min CN=
62 0.16
Type II 24-hr 100-Year Rainfall=5.95"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page37HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 3S: C-DA-3
Runoff = 0.87 cfs @ 11.98 hrs, Volume= 0.043 af, Depth= 3.53"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Type II 24-hr 100-Year Rainfall=5.95"
Area (ac) CN Description
0.081 61 >75% Grass cover, Good, HSG B
0.066 98 Roofs, HSG B
0.147 78 Weighted Average
0.081 55.10% Pervious Area
0.066 44.90% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.0 Direct Entry,
Subcatchment 3S: C-DA-3
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
95 0.
9 0.
85 0.
8 0.
75 0.
7 0.
65 0.
6 0.
55 0.
5 0.
45 0.
4 0.
35 0.
3 0.
25 0.
2 0.
15 0.
1 0.
05
0 Type II 24-
hr 100-Year Rainfall=5.
95"Runoff Area=0.147
ac Runoff Volume=0.043
af Runoff Depth=3.
53"Tc=7.0
min CN=
78 0.87
Type II 24-hr 100-Year Rainfall=5.95"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page38HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 7S: C-DA-4
Runoff = 4.18 cfs @ 11.98 hrs, Volume= 0.230 af, Depth= 5.13"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Type II 24-hr 100-Year Rainfall=5.95"
Area (ac) CN Description
0.073 61 >75% Grass cover, Good, HSG B
0.465 98 Paved parking, HSG B
0.538 93 Weighted Average
0.073 13.57% Pervious Area
0.465 86.43% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.0 Direct Entry,
Subcatchment 7S: C-DA-4
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)
4
3
2
1
0 Type II 24-
hr 100-Year Rainfall=5.
95"Runoff Area=0.538
ac Runoff Volume=0.230
af Runoff Depth=5.
13"Tc=7.0
min CN=
93 4.18
Type II 24-hr 100-Year Rainfall=5.95"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page39HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 8S: C-DA-6
Runoff = 0.18 cfs @ 11.99 hrs, Volume= 0.009 af, Depth= 1.97"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Type II 24-hr 100-Year Rainfall=5.95"
Area (ac) CN Description
0.053 61 >75% Grass cover, Good, HSG B
0.053 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.0 Direct Entry,
Subcatchment 8S: C-DA-6
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
19 0.
18 0.
17 0.
16 0.
15 0.
14 0.
13 0.
12 0.
11 0.
1 0.
09 0.
08 0.
07 0.
06 0.
05 0.
04 0.
03 0.
02 0.
01
0 Type II 24-
hr 100-Year Rainfall=5.
95"Runoff Area=0.053
ac Runoff Volume=0.009
af Runoff Depth=1.
97"Tc=7.0
min CN=
61 0.18
Type II 24-hr 100-Year Rainfall=5.95"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page40HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 9S: C-DA-5
Runoff = 0.16 cfs @ 11.98 hrs, Volume= 0.008 af, Depth= 3.14"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Type II 24-hr 100-Year Rainfall=5.95"
Area (ac) CN Description
0.011 98 Paved parking, HSG B
0.020 61 >75% Grass cover, Good, HSG B
0.031 74 Weighted Average
0.020 64.52% Pervious Area
0.011 35.48% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.0 Direct Entry,
Subcatchment 9S: C-DA-5
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
18 0.
17 0.
16 0.
15 0.
14 0.
13 0.
12 0.
11 0.
1 0.
09 0.
08 0.
07 0.
06 0.
05 0.
04 0.
03 0.
02 0.
01
0 Type II 24-
hr 100-Year Rainfall=5.
95"Runoff Area=0.031
ac Runoff Volume=0.008
af Runoff Depth=3.
14"Tc=7.0
min CN=
74 0.16
Type II 24-hr 100-Year Rainfall=5.95"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page41HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 8R: EX ONSITE INLET
40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 0.053 ac, 0.00% Impervious, Inflow Depth = 1.97" for 100-Year event
Inflow = 0.18 cfs @ 11.99 hrs, Volume= 0.009 af
Outflow = 0.18 cfs @ 11.99 hrs, Volume= 0.009 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Reach 8R: EX ONSITE INLET
Inflow
Outflow
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
19 0.
18 0.
17 0.
16 0.
15 0.
14 0.
13 0.
12 0.
11 0.
1 0.
09 0.
08 0.
07 0.
06 0.
05 0.
04 0.
03 0.
02 0.
01
0 Inflow Area=0.053
ac 0.18
cfs 0.18
Type II 24-hr 100-Year Rainfall=5.95"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page42HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 10R: TOTAL SITE
40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 0.864 ac, 65.63% Impervious, Inflow Depth = 0.85" for 100-Year event
Inflow = 0.65 cfs @ 12.01 hrs, Volume= 0.061 af
Outflow = 0.65 cfs @ 12.01 hrs, Volume= 0.061 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Reach 10R: TOTAL SITE
Inflow
Outflow
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
7 0.
65 0.
6 0.
55 0.
5 0.
45 0.
4 0.
35 0.
3 0.
25 0.
2 0.
15 0.
1 0.
05
0 Inflow Area=0.864
ac 0.65
cfs 0.65
Type II 24-hr 100-Year Rainfall=5.95"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page43HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 6P: U/G 36" INFILTRATION
Inflow Area = 0.538 ac, 86.43% Impervious, Inflow Depth = 5.13" for 100-Year event
Inflow = 4.18 cfs @ 11.98 hrs, Volume= 0.230 af
Outflow = 0.21 cfs @ 13.03 hrs, Volume= 0.230 af, Atten= 95%, Lag= 63.1 min
Discarded = 0.06 cfs @ 8.75 hrs, Volume= 0.209 af
Primary = 0.15 cfs @ 13.03 hrs, Volume= 0.021 af
Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Peak Elev= 918.56' @ 13.03 hrs Surf.Area= 3,154 sf Storage= 5,780 cf
Plug-Flow detention time= 816.9 min calculated for 0.230 af (100% of inflow)
Center-of-Mass det. time= 817.4 min ( 1,588.0 - 770.6 )
Volume Invert Avail.Storage Storage Description
1A 915.40' 3,692 cf 38.00'W x 83.00'L x 4.50'H Field A
14,193 cf Overall - 4,962 cf Embedded = 9,231 cf x 40.0% Voids
2A 915.90' 3,976 cf ADS N-12 36" x 28 Inside #1
Inside= 36.1"W x 36.1"H => 7.10 sf x 20.00'L = 142.0 cf
Outside= 42.0"W x 42.0"H => 8.86 sf x 20.00'L = 177.2 cf
7 Rows of 4 Chambers
7,668 cf Total Available Storage
Storage Group A created with Chamber Wizard
Device Routing Invert Outlet Devices
1 Discarded 915.40'0.800 in/hr Exfiltration over Surface area
2 Device 3 918.50'4.0' long x 0.5' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00
Coef. (English) 2.80 2.92 3.08 3.30 3.32
3 Primary 915.40'12.0" Round Culvert L= 50.0' Ke= 0.100
Inlet / Outlet Invert= 915.40' / 915.05' S= 0.0070 '/' Cc= 0.900
n= 0.011 Concrete pipe, straight & clean, Flow Area= 0.79 sf
Discarded OutFlow Max=0.06 cfs @ 8.75 hrs HW=915.45' (Free Discharge)
1=Exfiltration (Exfiltration Controls 0.06 cfs)
Primary OutFlow Max=0.15 cfs @ 13.03 hrs HW=918.56' (Free Discharge)
3=Culvert (Passes 0.15 cfs of 6.69 cfs potential flow)
2=Broad-Crested Rectangular Weir (Weir Controls 0.15 cfs @ 0.66 fps)
Type II 24-hr 100-Year Rainfall=5.95"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page44HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Pond 6P: U/G 36" INFILTRATION - Chamber Wizard Field A
Chamber Model = ADS N-12 36" (ADS N-12® Pipe)
Inside= 36.1"W x 36.1"H => 7.10 sf x 20.00'L = 142.0 cf
Outside= 42.0"W x 42.0"H => 8.86 sf x 20.00'L = 177.2 cf
42.0" Wide + 21.0" Spacing = 63.0" C-C Row Spacing
4 Chambers/Row x 20.00' Long = 80.00' Row Length +18.0" End Stone x 2 = 83.00' Base Length
7 Rows x 42.0" Wide + 21.0" Spacing x 6 + 18.0" Side Stone x 2 = 38.00' Base Width
6.0" Base + 42.0" Chamber Height + 6.0" Cover = 4.50' Field Height
28 Chambers x 142.0 cf = 3,976.0 cf Chamber Storage
28 Chambers x 177.2 cf = 4,962.2 cf Displacement
14,193.0 cf Field - 4,962.2 cf Chambers = 9,230.8 cf Stone x 40.0% Voids = 3,692.3 cf Stone Storage
Chamber Storage + Stone Storage = 7,668.3 cf = 0.176 af
Overall Storage Efficiency = 54.0%
Overall System Size = 83.00' x 38.00' x 4.50'
28 Chambers
525.7 cy Field
341.9 cy Stone
Type II 24-hr 100-Year Rainfall=5.95"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page45HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Pond 6P: U/G 36" INFILTRATION
Inflow
Outflow
Discarded
Primary
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)
4
3
2
1
0 Inflow Area=0.538
ac Peak Elev=918.
56'Storage=5,780
cf 4.18
cfs 0.21
cfs 0.06
cfs 0.15
Type II 24-hr 100-Year Rainfall=5.95"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page46HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 7P: INFILTRATION BASIN
Inflow Area = 0.147 ac, 44.90% Impervious, Inflow Depth = 3.53" for 100-Year event
Inflow = 0.87 cfs @ 11.98 hrs, Volume= 0.043 af
Outflow = 0.03 cfs @ 14.07 hrs, Volume= 0.043 af, Atten= 97%, Lag= 125.4 min
Discarded = 0.03 cfs @ 14.07 hrs, Volume= 0.043 af
Primary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 af
Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Peak Elev= 920.43' @ 14.07 hrs Surf.Area= 1,519 sf Storage= 1,054 cf
Plug-Flow detention time= 428.7 min calculated for 0.043 af (100% of inflow)
Center-of-Mass det. time= 428.8 min ( 1,246.2 - 817.3 )
Volume Invert Avail.Storage Storage Description
1 919.50' 3,159 cf BASIN WEST (Irregular) Listed below (Recalc)
Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area
feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
919.50 790 255.4 0 0 790
920.50 1,584 274.3 1,164 1,164 1,630
921.50 2,436 293.2 1,995 3,159 2,529
Device Routing Invert Outlet Devices
1 Discarded 919.50'0.800 in/hr Exfiltration over Surface area
2 Device 3 921.20'24.0" Horiz. Orifice/Grate C= 0.600
Limited to weir flow at low heads
3 Primary 918.00'12.0" Round Culvert L= 25.0' Ke= 0.100
Inlet / Outlet Invert= 918.00' / 917.50' S= 0.0200 '/' Cc= 0.900
n= 0.012 Corrugated PP, smooth interior, Flow Area= 0.79 sf
Discarded OutFlow Max=0.03 cfs @ 14.07 hrs HW=920.43' (Free Discharge)
1=Exfiltration (Exfiltration Controls 0.03 cfs)
Primary OutFlow Max=0.00 cfs @ 1.00 hrs HW=919.50' (Free Discharge)
3=Culvert (Passes 0.00 cfs of 4.74 cfs potential flow)
2=Orifice/Grate ( Controls 0.00 cfs)
Type II 24-hr 100-Year Rainfall=5.95"CBA Chanhassen Pr Cond_TP-40_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page47HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Pond 7P: INFILTRATION BASIN
Inflow
Outflow
Discarded
Primary
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
95 0.
9 0.
85 0.
8 0.
75 0.
7 0.
65 0.
6 0.
55 0.
5 0.
45 0.
4 0.
35 0.
3 0.
25 0.
2 0.
15 0.
1 0.
05
0 Inflow Area=0.147
ac Peak Elev=920.
43'Storage=1,054
cf 0.87
cfs 0.03
cfs 0.03
cfs 0.00
1S
C-DA-1
2S
C-DA-2
3S
C-DA-3
7S
C-DA-4
8S
C-DA-6
9S
C-DA-5
8R
EX ONSITE INLET
10R
TOTAL SITE
6P
U/G 36" INFILTRATION
7P
INFILTRATION BASIN
Routing Diagram for CBA Chanhassen Pr Cond_TP-40_10 Day Snow Melt
Prepared by Kimley-Horn and Associates, Printed 10/25/2020
HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Subcat Reach Pond Link
CBA Chanhassen Pr Cond_TP-40_10 Day Snow Melt
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page2HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Area Listing (all nodes)
Area
acres)
CN Description
subcatchment-numbers)
0.297 100 >75% Grass cover, Good, HSG B (1S, 2S, 3S, 7S, 8S, 9S)
0.501 98 Paved parking, HSG B (1S, 2S, 7S, 9S)
0.066 98 Roofs, HSG B (3S)
0.864 99 TOTAL AREA
CBA Chanhassen Pr Cond_TP-40_10 Day Snow Melt
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page3HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Soil Listing (all nodes)
Area
acres)
Soil
Group
Subcatchment
Numbers
0.000 HSG A
0.864 HSG B 1S, 2S, 3S, 7S, 8S, 9S
0.000 HSG C
0.000 HSG D
0.000 Other
0.864 TOTAL AREA
CBA Chanhassen Pr Cond_TP-40_10 Day Snow Melt
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page4HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Ground Covers (all nodes)
HSG-A
acres)
HSG-B
acres)
HSG-C
acres)
HSG-D
acres)
Other
acres)
Total
acres)
Ground
Cover
Subcatchment
Numbers
0.000 0.297 0.000 0.000 0.000 0.297 >75% Grass cover, Good 1S, 2S,
3S, 7S,
8S, 9S
0.000 0.501 0.000 0.000 0.000 0.501 Paved parking 1S, 2S,
7S, 9S
0.000 0.066 0.000 0.000 0.000 0.066 Roofs 3S
0.000 0.864 0.000 0.000 0.000 0.864 TOTAL AREA
CBA Chanhassen Pr Cond_TP-40_10 Day Snow Melt
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page5HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Pipe Listing (all nodes)
Line# Node
Number
In-Invert
feet)
Out-Invert
feet)
Length
feet)
Slope
ft/ft)
n Diam/Width
inches)
Height
inches)
Inside-Fill
inches)
1 6P 915.40 915.05 50.0 0.0070 0.011 12.0 0.0 0.0
2 7P 918.00 917.50 25.0 0.0200 0.012 12.0 0.0 0.0
Type II 24-hr 240.00 hrs Custom Rainfall=5.95", AMC=4CBAChanhassenPrCond_TP-40_10
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page6HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Time span=1.00-240.00 hrs, dt=0.01 hrs, 23901 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=0.035 ac 100.00% Impervious Runoff Depth>5.83"Subcatchment 1S: C-DA-1
Flow Length=145' Slope=0.0200 '/' Tc=14.0 min CN=99 Runoff=0.03 cfs 0.017 af
Runoff Area=0.060 ac 100.00% Impervious Runoff Depth>5.94"Subcatchment 2S: C-DA-2
Flow Length=140' Slope=0.0200 '/' Tc=13.6 min CN=100 Runoff=0.06 cfs 0.030 af
Runoff Area=0.147 ac 100.00% Impervious Runoff Depth>5.83"Subcatchment 3S: C-DA-3
Tc=7.0 min CN=99 Runoff=0.15 cfs 0.071 af
Runoff Area=0.538 ac 100.00% Impervious Runoff Depth>5.71"Subcatchment 7S: C-DA-4
Tc=7.0 min CN=98 Runoff=0.54 cfs 0.256 af
Runoff Area=0.053 ac 100.00% Impervious Runoff Depth>5.94"Subcatchment 8S: C-DA-6
Tc=7.0 min CN=100 Runoff=0.05 cfs 0.026 af
Runoff Area=0.031 ac 100.00% Impervious Runoff Depth>5.83"Subcatchment 9S: C-DA-5
Tc=7.0 min CN=99 Runoff=0.03 cfs 0.015 af
Inflow=0.05 cfs 0.026afReach8R: EX ONSITE INLET
Outflow=0.05 cfs 0.026 af
Inflow=0.18 cfs 0.088afReach10R: TOTAL SITE
Outflow=0.18 cfs 0.088 af
Peak Elev=917.46' Storage=3,409 cf Inflow=0.54 cfs 0.256afPond6P: U/G 36" INFILTRATION
Discarded=0.06 cfs 0.256 af Primary=0.00 cfs 0.000 af Outflow=0.06 cfs 0.256 af
Peak Elev=920.31' Storage=878 cf Inflow=0.15 cfs 0.071afPond7P: INFILTRATION BASIN
Discarded=0.03 cfs 0.071 af Primary=0.00 cfs 0.000 af Outflow=0.03 cfs 0.071 af
Total Runoff Area = 0.864 ac Runoff Volume = 0.416 af Average Runoff Depth = 5.77"
0.00% Pervious = 0.000 ac 100.00% Impervious = 0.864 ac
Type II 24-hr 240.00 hrs Custom Rainfall=5.95", AMC=4CBAChanhassenPrCond_TP-40_10
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page7HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: C-DA-1
Runoff = 0.03 cfs @ 119.17 hrs, Volume= 0.017 af, Depth> 5.83"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-240.00 hrs, dt= 0.01 hrs
Type II 24-hr 240.00 hrs Custom Rainfall=5.95", AMC=4
Area (ac) CN Description
0.011 100 >75% Grass cover, Good, HSG B
0.024 98 Paved parking, HSG B
0.035 99 Weighted Average
0.035 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
14.0 145 0.0200 0.17 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 1S: C-DA-1
Runoff
Hydrograph
Time (hours)
240230220210200190180170160150140130120110100908070605040302010Flow (
cfs)0.
038 0.
036 0.
034 0.
032 0.
03 0.
028 0.
026 0.
024 0.
022 0.
02 0.
018 0.
016 0.
014 0.
012 0.
01 0.
008 0.
006 0.
004 0.
002
0 Type II 24-hr 240.00
hrs Custom Rainfall=5.
95"AMC=
4 Runoff Area=0.035
ac Runoff Volume=0.017
af Runoff Depth>5.
83"Flow Length=
145'Slope=0.
0200 '/'Tc=14.0
min CN=
99 0.03
Type II 24-hr 240.00 hrs Custom Rainfall=5.95", AMC=4CBAChanhassenPrCond_TP-40_10
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page8HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 2S: C-DA-2
Runoff = 0.06 cfs @ 119.15 hrs, Volume= 0.030 af, Depth> 5.94"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-240.00 hrs, dt= 0.01 hrs
Type II 24-hr 240.00 hrs Custom Rainfall=5.95", AMC=4
Area (ac) CN Description
0.059 100 >75% Grass cover, Good, HSG B
0.001 98 Paved parking, HSG B
0.060 100 Weighted Average
0.060 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
13.6 140 0.0200 0.17 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 2S: C-DA-2
Runoff
Hydrograph
Time (hours)
240230220210200190180170160150140130120110100908070605040302010Flow (
cfs)0.
065 0.
06 0.
055 0.
05 0.
045 0.
04 0.
035 0.
03 0.
025 0.
02 0.
015 0.
01 0.
005
0 Type II 24-hr 240.00
hrs Custom Rainfall=5.
95"AMC=
4 Runoff Area=0.060
ac Runoff Volume=0.030
af Runoff Depth>5.
94"Flow Length=
140'Slope=0.
0200 '/'Tc=13.6
min CN=
100 0.06
Type II 24-hr 240.00 hrs Custom Rainfall=5.95", AMC=4CBAChanhassenPrCond_TP-40_10
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page9HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 3S: C-DA-3
Runoff = 0.15 cfs @ 119.09 hrs, Volume= 0.071 af, Depth> 5.83"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-240.00 hrs, dt= 0.01 hrs
Type II 24-hr 240.00 hrs Custom Rainfall=5.95", AMC=4
Area (ac) CN Description
0.081 100 >75% Grass cover, Good, HSG B
0.066 98 Roofs, HSG B
0.147 99 Weighted Average
0.147 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.0 Direct Entry,
Subcatchment 3S: C-DA-3
Runoff
Hydrograph
Time (hours)
240230220210200190180170160150140130120110100908070605040302010Flow (
cfs)0.
16 0.
15 0.
14 0.
13 0.
12 0.
11 0.
1 0.
09 0.
08 0.
07 0.
06 0.
05 0.
04 0.
03 0.
02 0.
01
0 Type II 24-hr 240.00
hrs Custom Rainfall=5.
95"AMC=
4 Runoff Area=0.147
ac Runoff Volume=0.071
af Runoff Depth>5.
83"Tc=7.0
min CN=
99 0.15
Type II 24-hr 240.00 hrs Custom Rainfall=5.95", AMC=4CBAChanhassenPrCond_TP-40_10
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page10HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 7S: C-DA-4
Runoff = 0.54 cfs @ 119.09 hrs, Volume= 0.256 af, Depth> 5.71"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-240.00 hrs, dt= 0.01 hrs
Type II 24-hr 240.00 hrs Custom Rainfall=5.95", AMC=4
Area (ac) CN Description
0.073 100 >75% Grass cover, Good, HSG B
0.465 98 Paved parking, HSG B
0.538 98 Weighted Average
0.538 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.0 Direct Entry,
Subcatchment 7S: C-DA-4
Runoff
Hydrograph
Time (hours)
240230220210200190180170160150140130120110100908070605040302010Flow (
cfs)0.
6 0.
55 0.
5 0.
45 0.
4 0.
35 0.
3 0.
25 0.
2 0.
15 0.
1 0.
05
0 Type II 24-hr 240.00
hrs Custom Rainfall=5.
95"AMC=
4 Runoff Area=0.538
ac Runoff Volume=0.256
af Runoff Depth>5.
71"Tc=7.0
min CN=
98 0.54
Type II 24-hr 240.00 hrs Custom Rainfall=5.95", AMC=4CBAChanhassenPrCond_TP-40_10
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page11HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 8S: C-DA-6
Runoff = 0.05 cfs @ 119.09 hrs, Volume= 0.026 af, Depth> 5.94"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-240.00 hrs, dt= 0.01 hrs
Type II 24-hr 240.00 hrs Custom Rainfall=5.95", AMC=4
Area (ac) CN Description
0.053 100 >75% Grass cover, Good, HSG B
0.053 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.0 Direct Entry,
Subcatchment 8S: C-DA-6
Runoff
Hydrograph
Time (hours)
240230220210200190180170160150140130120110100908070605040302010Flow (
cfs)0.
055 0.
05 0.
045 0.
04 0.
035 0.
03 0.
025 0.
02 0.
015 0.
01 0.
005
0 Type II 24-hr 240.00
hrs Custom Rainfall=5.
95"AMC=
4 Runoff Area=0.053
ac Runoff Volume=0.026
af Runoff Depth>5.
94"Tc=7.0
min CN=
100 0.05
Type II 24-hr 240.00 hrs Custom Rainfall=5.95", AMC=4CBAChanhassenPrCond_TP-40_10
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page12HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 9S: C-DA-5
Runoff = 0.03 cfs @ 119.09 hrs, Volume= 0.015 af, Depth> 5.83"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-240.00 hrs, dt= 0.01 hrs
Type II 24-hr 240.00 hrs Custom Rainfall=5.95", AMC=4
Area (ac) CN Description
0.011 98 Paved parking, HSG B
0.020 100 >75% Grass cover, Good, HSG B
0.031 99 Weighted Average
0.031 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.0 Direct Entry,
Subcatchment 9S: C-DA-5
Runoff
Hydrograph
Time (hours)
240230220210200190180170160150140130120110100908070605040302010Flow (
cfs)0.
034 0.
032 0.
03 0.
028 0.
026 0.
024 0.
022 0.
02 0.
018 0.
016 0.
014 0.
012 0.
01 0.
008 0.
006 0.
004 0.
002
0 Type II 24-hr 240.00
hrs Custom Rainfall=5.
95"AMC=
4 Runoff Area=0.031
ac Runoff Volume=0.015
af Runoff Depth>5.
83"Tc=7.0
min CN=
99 0.03
Type II 24-hr 240.00 hrs Custom Rainfall=5.95", AMC=4CBAChanhassenPrCond_TP-40_10
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page13HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 8R: EX ONSITE INLET
40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 0.053 ac,100.00% Impervious, Inflow Depth > 5.94" for Custom event
Inflow = 0.05 cfs @ 119.09 hrs, Volume= 0.026 af
Outflow = 0.05 cfs @ 119.09 hrs, Volume= 0.026 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-240.00 hrs, dt= 0.01 hrs
Reach 8R: EX ONSITE INLET
Inflow
Outflow
Hydrograph
Time (hours)
240230220210200190180170160150140130120110100908070605040302010Flow (
cfs)0.
055 0.
05 0.
045 0.
04 0.
035 0.
03 0.
025 0.
02 0.
015 0.
01 0.
005
0 Inflow Area=0.053
ac 0.05
cfs 0.05
Type II 24-hr 240.00 hrs Custom Rainfall=5.95", AMC=4CBAChanhassenPrCond_TP-40_10
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page14HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 10R: TOTAL SITE
40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 0.864 ac,100.00% Impervious, Inflow Depth > 1.22" for Custom event
Inflow = 0.18 cfs @ 119.10 hrs, Volume= 0.088 af
Outflow = 0.18 cfs @ 119.10 hrs, Volume= 0.088 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-240.00 hrs, dt= 0.01 hrs
Reach 10R: TOTAL SITE
Inflow
Outflow
Hydrograph
Time (hours)
240230220210200190180170160150140130120110100908070605040302010Flow (
cfs)0.
19 0.
18 0.
17 0.
16 0.
15 0.
14 0.
13 0.
12 0.
11 0.
1 0.
09 0.
08 0.
07 0.
06 0.
05 0.
04 0.
03 0.
02 0.
01
0 Inflow Area=0.864
ac 0.18
cfs 0.18
Type II 24-hr 240.00 hrs Custom Rainfall=5.95", AMC=4CBAChanhassenPrCond_TP-40_10
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page15HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 6P: U/G 36" INFILTRATION
Inflow Area = 0.538 ac,100.00% Impervious, Inflow Depth > 5.71" for Custom event
Inflow = 0.54 cfs @ 119.09 hrs, Volume= 0.256 af
Outflow = 0.06 cfs @ 115.61 hrs, Volume= 0.256 af, Atten= 89%, Lag= 0.0 min
Discarded = 0.06 cfs @ 115.61 hrs, Volume= 0.256 af
Primary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 af
Routing by Stor-Ind method, Time Span= 1.00-240.00 hrs, dt= 0.01 hrs
Peak Elev= 917.46' @ 120.97 hrs Surf.Area= 3,154 sf Storage= 3,409 cf
Plug-Flow detention time= 320.2 min calculated for 0.256 af (100% of inflow)
Center-of-Mass det. time= 318.0 min ( 7,679.2 - 7,361.2 )
Volume Invert Avail.Storage Storage Description
1A 915.40' 3,692 cf 38.00'W x 83.00'L x 4.50'H Field A
14,193 cf Overall - 4,962 cf Embedded = 9,231 cf x 40.0% Voids
2A 915.90' 3,976 cf ADS N-12 36" x 28 Inside #1
Inside= 36.1"W x 36.1"H => 7.10 sf x 20.00'L = 142.0 cf
Outside= 42.0"W x 42.0"H => 8.86 sf x 20.00'L = 177.2 cf
7 Rows of 4 Chambers
7,668 cf Total Available Storage
Storage Group A created with Chamber Wizard
Device Routing Invert Outlet Devices
1 Discarded 915.40'0.800 in/hr Exfiltration over Surface area
2 Device 3 918.50'4.0' long x 0.5' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00
Coef. (English) 2.80 2.92 3.08 3.30 3.32
3 Primary 915.40'12.0" Round Culvert L= 50.0' Ke= 0.100
Inlet / Outlet Invert= 915.40' / 915.05' S= 0.0070 '/' Cc= 0.900
n= 0.011 Concrete pipe, straight & clean, Flow Area= 0.79 sf
Discarded OutFlow Max=0.06 cfs @ 115.61 hrs HW=915.45' (Free Discharge)
1=Exfiltration (Exfiltration Controls 0.06 cfs)
Primary OutFlow Max=0.00 cfs @ 1.00 hrs HW=915.40' (Free Discharge)
3=Culvert ( Controls 0.00 cfs)
2=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Type II 24-hr 240.00 hrs Custom Rainfall=5.95", AMC=4CBAChanhassenPrCond_TP-40_10
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page16HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Pond 6P: U/G 36" INFILTRATION - Chamber Wizard Field A
Chamber Model = ADS N-12 36" (ADS N-12® Pipe)
Inside= 36.1"W x 36.1"H => 7.10 sf x 20.00'L = 142.0 cf
Outside= 42.0"W x 42.0"H => 8.86 sf x 20.00'L = 177.2 cf
42.0" Wide + 21.0" Spacing = 63.0" C-C Row Spacing
4 Chambers/Row x 20.00' Long = 80.00' Row Length +18.0" End Stone x 2 = 83.00' Base Length
7 Rows x 42.0" Wide + 21.0" Spacing x 6 + 18.0" Side Stone x 2 = 38.00' Base Width
6.0" Base + 42.0" Chamber Height + 6.0" Cover = 4.50' Field Height
28 Chambers x 142.0 cf = 3,976.0 cf Chamber Storage
28 Chambers x 177.2 cf = 4,962.2 cf Displacement
14,193.0 cf Field - 4,962.2 cf Chambers = 9,230.8 cf Stone x 40.0% Voids = 3,692.3 cf Stone Storage
Chamber Storage + Stone Storage = 7,668.3 cf = 0.176 af
Overall Storage Efficiency = 54.0%
Overall System Size = 83.00' x 38.00' x 4.50'
28 Chambers
525.7 cy Field
341.9 cy Stone
Type II 24-hr 240.00 hrs Custom Rainfall=5.95", AMC=4CBAChanhassenPrCond_TP-40_10
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page17HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Pond 6P: U/G 36" INFILTRATION
Inflow
Outflow
Discarded
Primary
Hydrograph
Time (hours)
240230220210200190180170160150140130120110100908070605040302010Flow (
cfs)0.
6 0.
55 0.
5 0.
45 0.
4 0.
35 0.
3 0.
25 0.
2 0.
15 0.
1 0.
05
0 Inflow Area=0.538
ac Peak Elev=917.
46'Storage=3,409
cf 0.54
cfs 0.06
cfs 0.06
cfs 0.00
Type II 24-hr 240.00 hrs Custom Rainfall=5.95", AMC=4CBAChanhassenPrCond_TP-40_10
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page18HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 7P: INFILTRATION BASIN
Inflow Area = 0.147 ac,100.00% Impervious, Inflow Depth > 5.83" for Custom event
Inflow = 0.15 cfs @ 119.09 hrs, Volume= 0.071 af
Outflow = 0.03 cfs @ 120.05 hrs, Volume= 0.071 af, Atten= 82%, Lag= 57.6 min
Discarded = 0.03 cfs @ 120.05 hrs, Volume= 0.071 af
Primary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 af
Routing by Stor-Ind method, Time Span= 1.00-240.00 hrs, dt= 0.01 hrs
Peak Elev= 920.31' @ 120.05 hrs Surf.Area= 1,411 sf Storage= 878 cf
Plug-Flow detention time= 193.1 min calculated for 0.071 af (100% of inflow)
Center-of-Mass det. time= 190.7 min ( 7,465.4 - 7,274.8 )
Volume Invert Avail.Storage Storage Description
1 919.50' 3,159 cf BASIN WEST (Irregular) Listed below (Recalc)
Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area
feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
919.50 790 255.4 0 0 790
920.50 1,584 274.3 1,164 1,164 1,630
921.50 2,436 293.2 1,995 3,159 2,529
Device Routing Invert Outlet Devices
1 Discarded 919.50'0.800 in/hr Exfiltration over Surface area
2 Device 3 921.20'24.0" Horiz. Orifice/Grate C= 0.600
Limited to weir flow at low heads
3 Primary 918.00'12.0" Round Culvert L= 25.0' Ke= 0.100
Inlet / Outlet Invert= 918.00' / 917.50' S= 0.0200 '/' Cc= 0.900
n= 0.012 Corrugated PP, smooth interior, Flow Area= 0.79 sf
Discarded OutFlow Max=0.03 cfs @ 120.05 hrs HW=920.31' (Free Discharge)
1=Exfiltration (Exfiltration Controls 0.03 cfs)
Primary OutFlow Max=0.00 cfs @ 1.00 hrs HW=919.50' (Free Discharge)
3=Culvert (Passes 0.00 cfs of 4.74 cfs potential flow)
2=Orifice/Grate ( Controls 0.00 cfs)
Type II 24-hr 240.00 hrs Custom Rainfall=5.95", AMC=4CBAChanhassenPrCond_TP-40_10
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page19HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Pond 7P: INFILTRATION BASIN
Inflow
Outflow
Discarded
Primary
Hydrograph
Time (hours)
240230220210200190180170160150140130120110100908070605040302010Flow (
cfs)0.
16 0.
15 0.
14 0.
13 0.
12 0.
11 0.
1 0.
09 0.
08 0.
07 0.
06 0.
05 0.
04 0.
03 0.
02 0.
01
0 Inflow Area=0.147
ac Peak Elev=920.
31'Storage=878
cf 0.15
cfs 0.03
cfs 0.03
cfs 0.00
Christian Brothers Automotive - Stormwater Report Page 15
Chanhassen, MN
Appendix 4. Post-Development
HydroCAD Model Analysis (Atlas-14)
1S
C-DA-1
2S
C-DA-2
3S
C-DA-3
7S
C-DA-4
8S
C-DA-6
9S
C-DA-5
8R
EX ONSITE INLET
10R
TOTAL SITE
6P
U/G 36" INFILTRATION
7P
INFILTRATION BASIN
Routing Diagram for CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Prepared by Kimley-Horn and Associates, Printed 10/25/2020
HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Subcat Reach Pond Link
CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page2HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Area Listing (all nodes)
Area
acres)
CN Description
subcatchment-numbers)
0.297 61 >75% Grass cover, Good, HSG B (1S, 2S, 3S, 7S, 8S, 9S)
0.501 98 Paved parking, HSG B (1S, 2S, 7S, 9S)
0.066 98 Roofs, HSG B (3S)
0.864 85 TOTAL AREA
CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page3HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Soil Listing (all nodes)
Area
acres)
Soil
Group
Subcatchment
Numbers
0.000 HSG A
0.864 HSG B 1S, 2S, 3S, 7S, 8S, 9S
0.000 HSG C
0.000 HSG D
0.000 Other
0.864 TOTAL AREA
CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page4HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Ground Covers (all nodes)
HSG-A
acres)
HSG-B
acres)
HSG-C
acres)
HSG-D
acres)
Other
acres)
Total
acres)
Ground
Cover
Subcatchment
Numbers
0.000 0.297 0.000 0.000 0.000 0.297 >75% Grass cover, Good 1S, 2S,
3S, 7S,
8S, 9S
0.000 0.501 0.000 0.000 0.000 0.501 Paved parking 1S, 2S,
7S, 9S
0.000 0.066 0.000 0.000 0.000 0.066 Roofs 3S
0.000 0.864 0.000 0.000 0.000 0.864 TOTAL AREA
CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page5HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Pipe Listing (all nodes)
Line# Node
Number
In-Invert
feet)
Out-Invert
feet)
Length
feet)
Slope
ft/ft)
n Diam/Width
inches)
Height
inches)
Inside-Fill
inches)
1 6P 915.40 915.05 50.0 0.0070 0.011 12.0 0.0 0.0
2 7P 918.00 917.50 25.0 0.0200 0.012 12.0 0.0 0.0
MSE 24-hr 3 2-Year Rainfall=2.84"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page6HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Time span=1.00-72.00 hrs, dt=0.05 hrs, 1421 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=0.035 ac 68.57% Impervious Runoff Depth=1.53"Subcatchment 1S: C-DA-1
Flow Length=145' Slope=0.0200 '/' Tc=14.0 min CN=86 Runoff=0.07 cfs 0.004 af
Runoff Area=0.060 ac 1.67% Impervious Runoff Depth=0.34"Subcatchment 2S: C-DA-2
Flow Length=140' Slope=0.0200 '/' Tc=13.6 min CN=62 Runoff=0.02 cfs 0.002 af
Runoff Area=0.147 ac 44.90% Impervious Runoff Depth=1.02"Subcatchment 3S: C-DA-3
Tc=7.0 min CN=78 Runoff=0.26 cfs 0.012 af
Runoff Area=0.538 ac 86.43% Impervious Runoff Depth=2.10"Subcatchment 7S: C-DA-4
Tc=7.0 min CN=93 Runoff=1.87 cfs 0.094 af
Runoff Area=0.053 ac 0.00% Impervious Runoff Depth=0.31"Subcatchment 8S: C-DA-6
Tc=7.0 min CN=61 Runoff=0.02 cfs 0.001 af
Runoff Area=0.031 ac 35.48% Impervious Runoff Depth=0.81"Subcatchment 9S: C-DA-5
Tc=7.0 min CN=74 Runoff=0.04 cfs 0.002 af
Inflow=0.02 cfs 0.001afReach8R: EX ONSITE INLET
Outflow=0.02 cfs 0.001 af
Inflow=0.13 cfs 0.010afReach10R: TOTAL SITE
Outflow=0.13 cfs 0.010 af
Peak Elev=917.06' Storage=2,547 cf Inflow=1.87 cfs 0.094afPond6P: U/G 36" INFILTRATION
Discarded=0.06 cfs 0.094 af Primary=0.00 cfs 0.000 af Outflow=0.06 cfs 0.094 af
Peak Elev=919.80' Storage=269 cf Inflow=0.26 cfs 0.012afPond7P: INFILTRATION BASIN
Discarded=0.02 cfs 0.012 af Primary=0.00 cfs 0.000 af Outflow=0.02 cfs 0.012 af
Total Runoff Area = 0.864 ac Runoff Volume = 0.116 af Average Runoff Depth = 1.61"
34.37% Pervious = 0.297 ac 65.63% Impervious = 0.567 ac
MSE 24-hr 3 2-Year Rainfall=2.84"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page7HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: C-DA-1
Runoff = 0.07 cfs @ 12.22 hrs, Volume= 0.004 af, Depth= 1.53"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
MSE 24-hr 3 2-Year Rainfall=2.84"
Area (ac) CN Description
0.011 61 >75% Grass cover, Good, HSG B
0.024 98 Paved parking, HSG B
0.035 86 Weighted Average
0.011 31.43% Pervious Area
0.024 68.57% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
14.0 145 0.0200 0.17 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 1S: C-DA-1
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
075 0.
07 0.
065 0.
06 0.
055 0.
05 0.
045 0.
04 0.
035 0.
03 0.
025 0.
02 0.
015 0.
01 0.
005
0 MSE 24-hr
3 2-Year Rainfall=2.
84"Runoff Area=0.035
ac Runoff Volume=0.004
af Runoff Depth=1.
53"Flow Length=
145'Slope=0.
0200 '/'Tc=14.0
min CN=
86 0.07
MSE 24-hr 3 2-Year Rainfall=2.84"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page8HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 2S: C-DA-2
Runoff = 0.02 cfs @ 12.28 hrs, Volume= 0.002 af, Depth= 0.34"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
MSE 24-hr 3 2-Year Rainfall=2.84"
Area (ac) CN Description
0.059 61 >75% Grass cover, Good, HSG B
0.001 98 Paved parking, HSG B
0.060 62 Weighted Average
0.059 98.33% Pervious Area
0.001 1.67% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
13.6 140 0.0200 0.17 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 2S: C-DA-2
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
018 0.
017 0.
016 0.
015 0.
014 0.
013 0.
012 0.
011 0.
01 0.
009 0.
008 0.
007 0.
006 0.
005 0.
004 0.
003 0.
002 0.
001
0 MSE 24-hr
3 2-Year Rainfall=2.
84"Runoff Area=0.060
ac Runoff Volume=0.002
af Runoff Depth=0.
34"Flow Length=
140'Slope=0.
0200 '/'Tc=13.6
min CN=
62 0.02
MSE 24-hr 3 2-Year Rainfall=2.84"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page9HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 3S: C-DA-3
Runoff = 0.26 cfs @ 12.15 hrs, Volume= 0.012 af, Depth= 1.02"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
MSE 24-hr 3 2-Year Rainfall=2.84"
Area (ac) CN Description
0.081 61 >75% Grass cover, Good, HSG B
0.066 98 Roofs, HSG B
0.147 78 Weighted Average
0.081 55.10% Pervious Area
0.066 44.90% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.0 Direct Entry,
Subcatchment 3S: C-DA-3
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
28 0.
26 0.
24 0.
22 0.
2 0.
18 0.
16 0.
14 0.
12 0.
1 0.
08 0.
06 0.
04 0.
02
0 MSE 24-hr
3 2-Year Rainfall=2.
84"Runoff Area=0.147
ac Runoff Volume=0.012
af Runoff Depth=1.
02"Tc=7.0
min CN=
78 0.26
MSE 24-hr 3 2-Year Rainfall=2.84"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page10HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 7S: C-DA-4
Runoff = 1.87 cfs @ 12.14 hrs, Volume= 0.094 af, Depth= 2.10"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
MSE 24-hr 3 2-Year Rainfall=2.84"
Area (ac) CN Description
0.073 61 >75% Grass cover, Good, HSG B
0.465 98 Paved parking, HSG B
0.538 93 Weighted Average
0.073 13.57% Pervious Area
0.465 86.43% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.0 Direct Entry,
Subcatchment 7S: C-DA-4
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)
2
1
0 MSE 24-hr
3 2-Year Rainfall=2.
84"Runoff Area=0.538
ac Runoff Volume=0.094
af Runoff Depth=2.
10"Tc=7.0
min CN=
93 1.87
MSE 24-hr 3 2-Year Rainfall=2.84"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page11HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 8S: C-DA-6
Runoff = 0.02 cfs @ 12.18 hrs, Volume= 0.001 af, Depth= 0.31"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
MSE 24-hr 3 2-Year Rainfall=2.84"
Area (ac) CN Description
0.053 61 >75% Grass cover, Good, HSG B
0.053 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.0 Direct Entry,
Subcatchment 8S: C-DA-6
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
018 0.
017 0.
016 0.
015 0.
014 0.
013 0.
012 0.
011 0.
01 0.
009 0.
008 0.
007 0.
006 0.
005 0.
004 0.
003 0.
002 0.
001
0 MSE 24-hr
3 2-Year Rainfall=2.
84"Runoff Area=0.053
ac Runoff Volume=0.001
af Runoff Depth=0.
31"Tc=7.0
min CN=
61 0.02
MSE 24-hr 3 2-Year Rainfall=2.84"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page12HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 9S: C-DA-5
Runoff = 0.04 cfs @ 12.15 hrs, Volume= 0.002 af, Depth= 0.81"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
MSE 24-hr 3 2-Year Rainfall=2.84"
Area (ac) CN Description
0.011 98 Paved parking, HSG B
0.020 61 >75% Grass cover, Good, HSG B
0.031 74 Weighted Average
0.020 64.52% Pervious Area
0.011 35.48% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.0 Direct Entry,
Subcatchment 9S: C-DA-5
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
046 0.
044 0.
042 0.
04 0.
038 0.
036 0.
034 0.
032 0.
03 0.
028 0.
026 0.
024 0.
022 0.
02 0.
018 0.
016 0.
014 0.
012 0.
01 0.
008 0.
006 0.
004 0.
002
0 MSE 24-hr
3 2-Year Rainfall=2.
84"Runoff Area=0.031
ac Runoff Volume=0.002
af Runoff Depth=0.
81"Tc=7.0
min CN=
74 0.04
MSE 24-hr 3 2-Year Rainfall=2.84"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page13HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 8R: EX ONSITE INLET
40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 0.053 ac, 0.00% Impervious, Inflow Depth = 0.31" for 2-Year event
Inflow = 0.02 cfs @ 12.18 hrs, Volume= 0.001 af
Outflow = 0.02 cfs @ 12.18 hrs, Volume= 0.001 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Reach 8R: EX ONSITE INLET
Inflow
Outflow
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
018 0.
017 0.
016 0.
015 0.
014 0.
013 0.
012 0.
011 0.
01 0.
009 0.
008 0.
007 0.
006 0.
005 0.
004 0.
003 0.
002 0.
001
0 Inflow Area=0.053
ac 0.02
cfs 0.02
MSE 24-hr 3 2-Year Rainfall=2.84"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page14HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 10R: TOTAL SITE
40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 0.864 ac, 65.63% Impervious, Inflow Depth = 0.13" for 2-Year event
Inflow = 0.13 cfs @ 12.20 hrs, Volume= 0.010 af
Outflow = 0.13 cfs @ 12.20 hrs, Volume= 0.010 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Reach 10R: TOTAL SITE
Inflow
Outflow
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
14 0.
13 0.
12 0.
11 0.
1 0.
09 0.
08 0.
07 0.
06 0.
05 0.
04 0.
03 0.
02 0.
01
0 Inflow Area=0.864
ac 0.13
cfs 0.13
MSE 24-hr 3 2-Year Rainfall=2.84"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page15HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 6P: U/G 36" INFILTRATION
Inflow Area = 0.538 ac, 86.43% Impervious, Inflow Depth = 2.10" for 2-Year event
Inflow = 1.87 cfs @ 12.14 hrs, Volume= 0.094 af
Outflow = 0.06 cfs @ 11.10 hrs, Volume= 0.094 af, Atten= 97%, Lag= 0.0 min
Discarded = 0.06 cfs @ 11.10 hrs, Volume= 0.094 af
Primary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 af
Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Peak Elev= 917.06' @ 13.69 hrs Surf.Area= 3,154 sf Storage= 2,547 cf
Plug-Flow detention time= 407.3 min calculated for 0.094 af (100% of inflow)
Center-of-Mass det. time= 407.3 min ( 1,190.2 - 782.9 )
Volume Invert Avail.Storage Storage Description
1A 915.40' 3,692 cf 38.00'W x 83.00'L x 4.50'H Field A
14,193 cf Overall - 4,962 cf Embedded = 9,231 cf x 40.0% Voids
2A 915.90' 3,976 cf ADS N-12 36" x 28 Inside #1
Inside= 36.1"W x 36.1"H => 7.10 sf x 20.00'L = 142.0 cf
Outside= 42.0"W x 42.0"H => 8.86 sf x 20.00'L = 177.2 cf
7 Rows of 4 Chambers
7,668 cf Total Available Storage
Storage Group A created with Chamber Wizard
Device Routing Invert Outlet Devices
1 Discarded 915.40'0.800 in/hr Exfiltration over Surface area
2 Device 3 918.50'4.0' long x 0.5' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00
Coef. (English) 2.80 2.92 3.08 3.30 3.32
3 Primary 915.40'12.0" Round Culvert L= 50.0' Ke= 0.100
Inlet / Outlet Invert= 915.40' / 915.05' S= 0.0070 '/' Cc= 0.900
n= 0.011 Concrete pipe, straight & clean, Flow Area= 0.79 sf
Discarded OutFlow Max=0.06 cfs @ 11.10 hrs HW=915.45' (Free Discharge)
1=Exfiltration (Exfiltration Controls 0.06 cfs)
Primary OutFlow Max=0.00 cfs @ 1.00 hrs HW=915.40' (Free Discharge)
3=Culvert ( Controls 0.00 cfs)
2=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
MSE 24-hr 3 2-Year Rainfall=2.84"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page16HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Pond 6P: U/G 36" INFILTRATION - Chamber Wizard Field A
Chamber Model = ADS N-12 36" (ADS N-12® Pipe)
Inside= 36.1"W x 36.1"H => 7.10 sf x 20.00'L = 142.0 cf
Outside= 42.0"W x 42.0"H => 8.86 sf x 20.00'L = 177.2 cf
42.0" Wide + 21.0" Spacing = 63.0" C-C Row Spacing
4 Chambers/Row x 20.00' Long = 80.00' Row Length +18.0" End Stone x 2 = 83.00' Base Length
7 Rows x 42.0" Wide + 21.0" Spacing x 6 + 18.0" Side Stone x 2 = 38.00' Base Width
6.0" Base + 42.0" Chamber Height + 6.0" Cover = 4.50' Field Height
28 Chambers x 142.0 cf = 3,976.0 cf Chamber Storage
28 Chambers x 177.2 cf = 4,962.2 cf Displacement
14,193.0 cf Field - 4,962.2 cf Chambers = 9,230.8 cf Stone x 40.0% Voids = 3,692.3 cf Stone Storage
Chamber Storage + Stone Storage = 7,668.3 cf = 0.176 af
Overall Storage Efficiency = 54.0%
Overall System Size = 83.00' x 38.00' x 4.50'
28 Chambers
525.7 cy Field
341.9 cy Stone
MSE 24-hr 3 2-Year Rainfall=2.84"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page17HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Pond 6P: U/G 36" INFILTRATION
Inflow
Outflow
Discarded
Primary
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)
2
1
0 Inflow Area=0.538
ac Peak Elev=917.
06'Storage=2,547
cf 1.87
cfs 0.06
cfs 0.06
cfs 0.00
MSE 24-hr 3 2-Year Rainfall=2.84"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page18HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 7P: INFILTRATION BASIN
Inflow Area = 0.147 ac, 44.90% Impervious, Inflow Depth = 1.02" for 2-Year event
Inflow = 0.26 cfs @ 12.15 hrs, Volume= 0.012 af
Outflow = 0.02 cfs @ 13.39 hrs, Volume= 0.012 af, Atten= 93%, Lag= 74.5 min
Discarded = 0.02 cfs @ 13.39 hrs, Volume= 0.012 af
Primary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 af
Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Peak Elev= 919.80' @ 13.39 hrs Surf.Area= 1,001 sf Storage= 269 cf
Plug-Flow detention time= 145.7 min calculated for 0.012 af (100% of inflow)
Center-of-Mass det. time= 145.6 min ( 970.4 - 824.8 )
Volume Invert Avail.Storage Storage Description
1 919.50' 3,159 cf BASIN WEST (Irregular) Listed below (Recalc)
Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area
feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
919.50 790 255.4 0 0 790
920.50 1,584 274.3 1,164 1,164 1,630
921.50 2,436 293.2 1,995 3,159 2,529
Device Routing Invert Outlet Devices
1 Discarded 919.50'0.800 in/hr Exfiltration over Surface area
2 Device 3 921.20'24.0" Horiz. Orifice/Grate C= 0.600
Limited to weir flow at low heads
3 Primary 918.00'12.0" Round Culvert L= 25.0' Ke= 0.100
Inlet / Outlet Invert= 918.00' / 917.50' S= 0.0200 '/' Cc= 0.900
n= 0.012 Corrugated PP, smooth interior, Flow Area= 0.79 sf
Discarded OutFlow Max=0.02 cfs @ 13.39 hrs HW=919.80' (Free Discharge)
1=Exfiltration (Exfiltration Controls 0.02 cfs)
Primary OutFlow Max=0.00 cfs @ 1.00 hrs HW=919.50' (Free Discharge)
3=Culvert (Passes 0.00 cfs of 4.74 cfs potential flow)
2=Orifice/Grate ( Controls 0.00 cfs)
MSE 24-hr 3 2-Year Rainfall=2.84"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page19HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Pond 7P: INFILTRATION BASIN
Inflow
Outflow
Discarded
Primary
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
28 0.
26 0.
24 0.
22 0.
2 0.
18 0.
16 0.
14 0.
12 0.
1 0.
08 0.
06 0.
04 0.
02
0 Inflow Area=0.147
ac Peak Elev=919.
80'Storage=269
cf 0.26
cfs 0.02
cfs 0.02
cfs 0.00
MSE 24-hr 3 10-Year Rainfall=4.20"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page20HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Time span=1.00-72.00 hrs, dt=0.05 hrs, 1421 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=0.035 ac 68.57% Impervious Runoff Depth=2.73"Subcatchment 1S: C-DA-1
Flow Length=145' Slope=0.0200 '/' Tc=14.0 min CN=86 Runoff=0.13 cfs 0.008 af
Runoff Area=0.060 ac 1.67% Impervious Runoff Depth=0.97"Subcatchment 2S: C-DA-2
Flow Length=140' Slope=0.0200 '/' Tc=13.6 min CN=62 Runoff=0.07 cfs 0.005 af
Runoff Area=0.147 ac 44.90% Impervious Runoff Depth=2.05"Subcatchment 3S: C-DA-3
Tc=7.0 min CN=78 Runoff=0.52 cfs 0.025 af
Runoff Area=0.538 ac 86.43% Impervious Runoff Depth=3.41"Subcatchment 7S: C-DA-4
Tc=7.0 min CN=93 Runoff=2.95 cfs 0.153 af
Runoff Area=0.053 ac 0.00% Impervious Runoff Depth=0.92"Subcatchment 8S: C-DA-6
Tc=7.0 min CN=61 Runoff=0.08 cfs 0.004 af
Runoff Area=0.031 ac 35.48% Impervious Runoff Depth=1.74"Subcatchment 9S: C-DA-5
Tc=7.0 min CN=74 Runoff=0.09 cfs 0.005 af
Inflow=0.08 cfs 0.004afReach8R: EX ONSITE INLET
Outflow=0.08 cfs 0.004 af
Inflow=0.33 cfs 0.021afReach10R: TOTAL SITE
Outflow=0.33 cfs 0.021 af
Peak Elev=917.97' Storage=4,552 cf Inflow=2.95 cfs 0.153afPond6P: U/G 36" INFILTRATION
Discarded=0.06 cfs 0.153 af Primary=0.00 cfs 0.000 af Outflow=0.06 cfs 0.153 af
Peak Elev=920.13' Storage=645 cf Inflow=0.52 cfs 0.025afPond7P: INFILTRATION BASIN
Discarded=0.02 cfs 0.025 af Primary=0.00 cfs 0.000 af Outflow=0.02 cfs 0.025 af
Total Runoff Area = 0.864 ac Runoff Volume = 0.200 af Average Runoff Depth = 2.77"
34.37% Pervious = 0.297 ac 65.63% Impervious = 0.567 ac
MSE 24-hr 3 10-Year Rainfall=4.20"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page21HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: C-DA-1
Runoff = 0.13 cfs @ 12.22 hrs, Volume= 0.008 af, Depth= 2.73"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
MSE 24-hr 3 10-Year Rainfall=4.20"
Area (ac) CN Description
0.011 61 >75% Grass cover, Good, HSG B
0.024 98 Paved parking, HSG B
0.035 86 Weighted Average
0.011 31.43% Pervious Area
0.024 68.57% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
14.0 145 0.0200 0.17 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 1S: C-DA-1
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
14 0.
13 0.
12 0.
11 0.
1 0.
09 0.
08 0.
07 0.
06 0.
05 0.
04 0.
03 0.
02 0.
01
0 MSE 24-hr
3 10-Year Rainfall=4.
20"Runoff Area=0.035
ac Runoff Volume=0.008
af Runoff Depth=2.
73"Flow Length=
145'Slope=0.
0200 '/'Tc=14.0
min CN=
86 0.13
MSE 24-hr 3 10-Year Rainfall=4.20"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page22HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 2S: C-DA-2
Runoff = 0.07 cfs @ 12.24 hrs, Volume= 0.005 af, Depth= 0.97"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
MSE 24-hr 3 10-Year Rainfall=4.20"
Area (ac) CN Description
0.059 61 >75% Grass cover, Good, HSG B
0.001 98 Paved parking, HSG B
0.060 62 Weighted Average
0.059 98.33% Pervious Area
0.001 1.67% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
13.6 140 0.0200 0.17 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 2S: C-DA-2
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
075 0.
07 0.
065 0.
06 0.
055 0.
05 0.
045 0.
04 0.
035 0.
03 0.
025 0.
02 0.
015 0.
01 0.
005
0 MSE 24-hr
3 10-Year Rainfall=4.
20"Runoff Area=0.060
ac Runoff Volume=0.005
af Runoff Depth=0.
97"Flow Length=
140'Slope=0.
0200 '/'Tc=13.6
min CN=
62 0.07
MSE 24-hr 3 10-Year Rainfall=4.20"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page23HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 3S: C-DA-3
Runoff = 0.52 cfs @ 12.15 hrs, Volume= 0.025 af, Depth= 2.05"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
MSE 24-hr 3 10-Year Rainfall=4.20"
Area (ac) CN Description
0.081 61 >75% Grass cover, Good, HSG B
0.066 98 Roofs, HSG B
0.147 78 Weighted Average
0.081 55.10% Pervious Area
0.066 44.90% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.0 Direct Entry,
Subcatchment 3S: C-DA-3
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
55 0.
5 0.
45 0.
4 0.
35 0.
3 0.
25 0.
2 0.
15 0.
1 0.
05
0 MSE 24-hr
3 10-Year Rainfall=4.
20"Runoff Area=0.147
ac Runoff Volume=0.025
af Runoff Depth=2.
05"Tc=7.0
min CN=
78 0.52
MSE 24-hr 3 10-Year Rainfall=4.20"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page24HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 7S: C-DA-4
Runoff = 2.95 cfs @ 12.14 hrs, Volume= 0.153 af, Depth= 3.41"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
MSE 24-hr 3 10-Year Rainfall=4.20"
Area (ac) CN Description
0.073 61 >75% Grass cover, Good, HSG B
0.465 98 Paved parking, HSG B
0.538 93 Weighted Average
0.073 13.57% Pervious Area
0.465 86.43% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.0 Direct Entry,
Subcatchment 7S: C-DA-4
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)
3
2
1
0 MSE 24-hr
3 10-Year Rainfall=4.
20"Runoff Area=0.538
ac Runoff Volume=0.153
af Runoff Depth=3.
41"Tc=7.0
min CN=
93 2.95
MSE 24-hr 3 10-Year Rainfall=4.20"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page25HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 8S: C-DA-6
Runoff = 0.08 cfs @ 12.16 hrs, Volume= 0.004 af, Depth= 0.92"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
MSE 24-hr 3 10-Year Rainfall=4.20"
Area (ac) CN Description
0.053 61 >75% Grass cover, Good, HSG B
0.053 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.0 Direct Entry,
Subcatchment 8S: C-DA-6
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
085 0.
08 0.
075 0.
07 0.
065 0.
06 0.
055 0.
05 0.
045 0.
04 0.
035 0.
03 0.
025 0.
02 0.
015 0.
01 0.
005
0 MSE 24-hr
3 10-Year Rainfall=4.
20"Runoff Area=0.053
ac Runoff Volume=0.004
af Runoff Depth=0.
92"Tc=7.0
min CN=
61 0.08
MSE 24-hr 3 10-Year Rainfall=4.20"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page26HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 9S: C-DA-5
Runoff = 0.09 cfs @ 12.15 hrs, Volume= 0.005 af, Depth= 1.74"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
MSE 24-hr 3 10-Year Rainfall=4.20"
Area (ac) CN Description
0.011 98 Paved parking, HSG B
0.020 61 >75% Grass cover, Good, HSG B
0.031 74 Weighted Average
0.020 64.52% Pervious Area
0.011 35.48% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.0 Direct Entry,
Subcatchment 9S: C-DA-5
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
105 0.
1 0.
095 0.
09 0.
085 0.
08 0.
075 0.
07 0.
065 0.
06 0.
055 0.
05 0.
045 0.
04 0.
035 0.
03 0.
025 0.
02 0.
015 0.
01 0.
005
0 MSE 24-hr
3 10-Year Rainfall=4.
20"Runoff Area=0.031
ac Runoff Volume=0.005
af Runoff Depth=1.
74"Tc=7.0
min CN=
74 0.09
MSE 24-hr 3 10-Year Rainfall=4.20"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page27HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 8R: EX ONSITE INLET
40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 0.053 ac, 0.00% Impervious, Inflow Depth = 0.92" for 10-Year event
Inflow = 0.08 cfs @ 12.16 hrs, Volume= 0.004 af
Outflow = 0.08 cfs @ 12.16 hrs, Volume= 0.004 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Reach 8R: EX ONSITE INLET
Inflow
Outflow
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
085 0.
08 0.
075 0.
07 0.
065 0.
06 0.
055 0.
05 0.
045 0.
04 0.
035 0.
03 0.
025 0.
02 0.
015 0.
01 0.
005
0 Inflow Area=0.053
ac 0.08
cfs 0.08
MSE 24-hr 3 10-Year Rainfall=4.20"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page28HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 10R: TOTAL SITE
40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 0.864 ac, 65.63% Impervious, Inflow Depth = 0.30" for 10-Year event
Inflow = 0.33 cfs @ 12.18 hrs, Volume= 0.021 af
Outflow = 0.33 cfs @ 12.18 hrs, Volume= 0.021 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Reach 10R: TOTAL SITE
Inflow
Outflow
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
36 0.
34 0.
32 0.
3 0.
28 0.
26 0.
24 0.
22 0.
2 0.
18 0.
16 0.
14 0.
12 0.
1 0.
08 0.
06 0.
04 0.
02
0 Inflow Area=0.864
ac 0.33
cfs 0.33
MSE 24-hr 3 10-Year Rainfall=4.20"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page29HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 6P: U/G 36" INFILTRATION
Inflow Area = 0.538 ac, 86.43% Impervious, Inflow Depth = 3.41" for 10-Year event
Inflow = 2.95 cfs @ 12.14 hrs, Volume= 0.153 af
Outflow = 0.06 cfs @ 10.70 hrs, Volume= 0.153 af, Atten= 98%, Lag= 0.0 min
Discarded = 0.06 cfs @ 10.70 hrs, Volume= 0.153 af
Primary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 af
Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Peak Elev= 917.97' @ 15.10 hrs Surf.Area= 3,154 sf Storage= 4,552 cf
Plug-Flow detention time= 713.8 min calculated for 0.153 af (100% of inflow)
Center-of-Mass det. time= 714.0 min ( 1,487.4 - 773.3 )
Volume Invert Avail.Storage Storage Description
1A 915.40' 3,692 cf 38.00'W x 83.00'L x 4.50'H Field A
14,193 cf Overall - 4,962 cf Embedded = 9,231 cf x 40.0% Voids
2A 915.90' 3,976 cf ADS N-12 36" x 28 Inside #1
Inside= 36.1"W x 36.1"H => 7.10 sf x 20.00'L = 142.0 cf
Outside= 42.0"W x 42.0"H => 8.86 sf x 20.00'L = 177.2 cf
7 Rows of 4 Chambers
7,668 cf Total Available Storage
Storage Group A created with Chamber Wizard
Device Routing Invert Outlet Devices
1 Discarded 915.40'0.800 in/hr Exfiltration over Surface area
2 Device 3 918.50'4.0' long x 0.5' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00
Coef. (English) 2.80 2.92 3.08 3.30 3.32
3 Primary 915.40'12.0" Round Culvert L= 50.0' Ke= 0.100
Inlet / Outlet Invert= 915.40' / 915.05' S= 0.0070 '/' Cc= 0.900
n= 0.011 Concrete pipe, straight & clean, Flow Area= 0.79 sf
Discarded OutFlow Max=0.06 cfs @ 10.70 hrs HW=915.45' (Free Discharge)
1=Exfiltration (Exfiltration Controls 0.06 cfs)
Primary OutFlow Max=0.00 cfs @ 1.00 hrs HW=915.40' (Free Discharge)
3=Culvert ( Controls 0.00 cfs)
2=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
MSE 24-hr 3 10-Year Rainfall=4.20"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page30HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Pond 6P: U/G 36" INFILTRATION - Chamber Wizard Field A
Chamber Model = ADS N-12 36" (ADS N-12® Pipe)
Inside= 36.1"W x 36.1"H => 7.10 sf x 20.00'L = 142.0 cf
Outside= 42.0"W x 42.0"H => 8.86 sf x 20.00'L = 177.2 cf
42.0" Wide + 21.0" Spacing = 63.0" C-C Row Spacing
4 Chambers/Row x 20.00' Long = 80.00' Row Length +18.0" End Stone x 2 = 83.00' Base Length
7 Rows x 42.0" Wide + 21.0" Spacing x 6 + 18.0" Side Stone x 2 = 38.00' Base Width
6.0" Base + 42.0" Chamber Height + 6.0" Cover = 4.50' Field Height
28 Chambers x 142.0 cf = 3,976.0 cf Chamber Storage
28 Chambers x 177.2 cf = 4,962.2 cf Displacement
14,193.0 cf Field - 4,962.2 cf Chambers = 9,230.8 cf Stone x 40.0% Voids = 3,692.3 cf Stone Storage
Chamber Storage + Stone Storage = 7,668.3 cf = 0.176 af
Overall Storage Efficiency = 54.0%
Overall System Size = 83.00' x 38.00' x 4.50'
28 Chambers
525.7 cy Field
341.9 cy Stone
MSE 24-hr 3 10-Year Rainfall=4.20"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page31HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Pond 6P: U/G 36" INFILTRATION
Inflow
Outflow
Discarded
Primary
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)
3
2
1
0 Inflow Area=0.538
ac Peak Elev=917.
97'Storage=4,552
cf 2.95
cfs 0.06
cfs 0.06
cfs 0.00
MSE 24-hr 3 10-Year Rainfall=4.20"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page32HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 7P: INFILTRATION BASIN
Inflow Area = 0.147 ac, 44.90% Impervious, Inflow Depth = 2.05" for 10-Year event
Inflow = 0.52 cfs @ 12.15 hrs, Volume= 0.025 af
Outflow = 0.02 cfs @ 13.60 hrs, Volume= 0.025 af, Atten= 96%, Lag= 87.3 min
Discarded = 0.02 cfs @ 13.60 hrs, Volume= 0.025 af
Primary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 af
Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Peak Elev= 920.13' @ 13.60 hrs Surf.Area= 1,262 sf Storage= 645 cf
Plug-Flow detention time= 302.2 min calculated for 0.025 af (100% of inflow)
Center-of-Mass det. time= 302.1 min ( 1,112.0 - 809.9 )
Volume Invert Avail.Storage Storage Description
1 919.50' 3,159 cf BASIN WEST (Irregular) Listed below (Recalc)
Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area
feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
919.50 790 255.4 0 0 790
920.50 1,584 274.3 1,164 1,164 1,630
921.50 2,436 293.2 1,995 3,159 2,529
Device Routing Invert Outlet Devices
1 Discarded 919.50'0.800 in/hr Exfiltration over Surface area
2 Device 3 921.20'24.0" Horiz. Orifice/Grate C= 0.600
Limited to weir flow at low heads
3 Primary 918.00'12.0" Round Culvert L= 25.0' Ke= 0.100
Inlet / Outlet Invert= 918.00' / 917.50' S= 0.0200 '/' Cc= 0.900
n= 0.012 Corrugated PP, smooth interior, Flow Area= 0.79 sf
Discarded OutFlow Max=0.02 cfs @ 13.60 hrs HW=920.13' (Free Discharge)
1=Exfiltration (Exfiltration Controls 0.02 cfs)
Primary OutFlow Max=0.00 cfs @ 1.00 hrs HW=919.50' (Free Discharge)
3=Culvert (Passes 0.00 cfs of 4.74 cfs potential flow)
2=Orifice/Grate ( Controls 0.00 cfs)
MSE 24-hr 3 10-Year Rainfall=4.20"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page33HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Pond 7P: INFILTRATION BASIN
Inflow
Outflow
Discarded
Primary
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
55 0.
5 0.
45 0.
4 0.
35 0.
3 0.
25 0.
2 0.
15 0.
1 0.
05
0 Inflow Area=0.147
ac Peak Elev=920.
13'Storage=645
cf 0.52
cfs 0.02
cfs 0.02
cfs 0.00
MSE 24-hr 3 100-Year Rainfall=7.18"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page34HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Time span=1.00-72.00 hrs, dt=0.05 hrs, 1421 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=0.035 ac 68.57% Impervious Runoff Depth=5.54"Subcatchment 1S: C-DA-1
Flow Length=145' Slope=0.0200 '/' Tc=14.0 min CN=86 Runoff=0.25 cfs 0.016 af
Runoff Area=0.060 ac 1.67% Impervious Runoff Depth=2.93"Subcatchment 2S: C-DA-2
Flow Length=140' Slope=0.0200 '/' Tc=13.6 min CN=62 Runoff=0.23 cfs 0.015 af
Runoff Area=0.147 ac 44.90% Impervious Runoff Depth=4.64"Subcatchment 3S: C-DA-3
Tc=7.0 min CN=78 Runoff=1.16 cfs 0.057 af
Runoff Area=0.538 ac 86.43% Impervious Runoff Depth=6.35"Subcatchment 7S: C-DA-4
Tc=7.0 min CN=93 Runoff=5.28 cfs 0.285 af
Runoff Area=0.053 ac 0.00% Impervious Runoff Depth=2.83"Subcatchment 8S: C-DA-6
Tc=7.0 min CN=61 Runoff=0.26 cfs 0.013 af
Runoff Area=0.031 ac 35.48% Impervious Runoff Depth=4.20"Subcatchment 9S: C-DA-5
Tc=7.0 min CN=74 Runoff=0.22 cfs 0.011 af
Inflow=0.26 cfs 0.013afReach8R: EX ONSITE INLET
Outflow=0.26 cfs 0.013 af
Inflow=2.41 cfs 0.139afReach10R: TOTAL SITE
Outflow=2.41 cfs 0.139 af
Peak Elev=918.80' Storage=6,238 cf Inflow=5.28 cfs 0.285afPond6P: U/G 36" INFILTRATION
Discarded=0.06 cfs 0.200 af Primary=1.84 cfs 0.084 af Outflow=1.90 cfs 0.285 af
Peak Elev=920.78' Storage=1,645 cf Inflow=1.16 cfs 0.057afPond7P: INFILTRATION BASIN
Discarded=0.03 cfs 0.057 af Primary=0.00 cfs 0.000 af Outflow=0.03 cfs 0.057 af
Total Runoff Area = 0.864 ac Runoff Volume = 0.396 af Average Runoff Depth = 5.50"
34.37% Pervious = 0.297 ac 65.63% Impervious = 0.567 ac
MSE 24-hr 3 100-Year Rainfall=7.18"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page35HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: C-DA-1
Runoff = 0.25 cfs @ 12.22 hrs, Volume= 0.016 af, Depth= 5.54"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
MSE 24-hr 3 100-Year Rainfall=7.18"
Area (ac) CN Description
0.011 61 >75% Grass cover, Good, HSG B
0.024 98 Paved parking, HSG B
0.035 86 Weighted Average
0.011 31.43% Pervious Area
0.024 68.57% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
14.0 145 0.0200 0.17 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 1S: C-DA-1
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
26 0.
24 0.
22 0.
2 0.
18 0.
16 0.
14 0.
12 0.
1 0.
08 0.
06 0.
04 0.
02
0 MSE 24-hr
3 100-Year Rainfall=7.
18"Runoff Area=0.035
ac Runoff Volume=0.016
af Runoff Depth=5.
54"Flow Length=
145'Slope=0.
0200 '/'Tc=14.0
min CN=
86 0.25
MSE 24-hr 3 100-Year Rainfall=7.18"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page36HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 2S: C-DA-2
Runoff = 0.23 cfs @ 12.23 hrs, Volume= 0.015 af, Depth= 2.93"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
MSE 24-hr 3 100-Year Rainfall=7.18"
Area (ac) CN Description
0.059 61 >75% Grass cover, Good, HSG B
0.001 98 Paved parking, HSG B
0.060 62 Weighted Average
0.059 98.33% Pervious Area
0.001 1.67% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
13.6 140 0.0200 0.17 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 2S: C-DA-2
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
26 0.
25 0.
24 0.
23 0.
22 0.
21 0.
2 0.
19 0.
18 0.
17 0.
16 0.
15 0.
14 0.
13 0.
12 0.
11 0.
1 0.
09 0.
08 0.
07 0.
06 0.
05 0.
04 0.
03 0.
02 0.
01
0 MSE 24-hr
3 100-Year Rainfall=7.
18"Runoff Area=0.060
ac Runoff Volume=0.015
af Runoff Depth=2.
93"Flow Length=
140'Slope=0.
0200 '/'Tc=13.6
min CN=
62 0.23
MSE 24-hr 3 100-Year Rainfall=7.18"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page37HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 3S: C-DA-3
Runoff = 1.16 cfs @ 12.14 hrs, Volume= 0.057 af, Depth= 4.64"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
MSE 24-hr 3 100-Year Rainfall=7.18"
Area (ac) CN Description
0.081 61 >75% Grass cover, Good, HSG B
0.066 98 Roofs, HSG B
0.147 78 Weighted Average
0.081 55.10% Pervious Area
0.066 44.90% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.0 Direct Entry,
Subcatchment 3S: C-DA-3
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)
1
0 MSE 24-hr
3 100-Year Rainfall=7.
18"Runoff Area=0.147
ac Runoff Volume=0.057
af Runoff Depth=4.
64"Tc=7.0
min CN=
78 1.16
MSE 24-hr 3 100-Year Rainfall=7.18"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page38HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 7S: C-DA-4
Runoff = 5.28 cfs @ 12.14 hrs, Volume= 0.285 af, Depth= 6.35"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
MSE 24-hr 3 100-Year Rainfall=7.18"
Area (ac) CN Description
0.073 61 >75% Grass cover, Good, HSG B
0.465 98 Paved parking, HSG B
0.538 93 Weighted Average
0.073 13.57% Pervious Area
0.465 86.43% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.0 Direct Entry,
Subcatchment 7S: C-DA-4
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)
5
4
3
2
1
0 MSE 24-hr
3 100-Year Rainfall=7.
18"Runoff Area=0.538
ac Runoff Volume=0.285
af Runoff Depth=6.
35"Tc=7.0
min CN=
93 5.28
MSE 24-hr 3 100-Year Rainfall=7.18"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page39HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 8S: C-DA-6
Runoff = 0.26 cfs @ 12.15 hrs, Volume= 0.013 af, Depth= 2.83"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
MSE 24-hr 3 100-Year Rainfall=7.18"
Area (ac) CN Description
0.053 61 >75% Grass cover, Good, HSG B
0.053 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.0 Direct Entry,
Subcatchment 8S: C-DA-6
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
28 0.
26 0.
24 0.
22 0.
2 0.
18 0.
16 0.
14 0.
12 0.
1 0.
08 0.
06 0.
04 0.
02
0 MSE 24-hr
3 100-Year Rainfall=7.
18"Runoff Area=0.053
ac Runoff Volume=0.013
af Runoff Depth=2.
83"Tc=7.0
min CN=
61 0.26
MSE 24-hr 3 100-Year Rainfall=7.18"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page40HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 9S: C-DA-5
Runoff = 0.22 cfs @ 12.14 hrs, Volume= 0.011 af, Depth= 4.20"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
MSE 24-hr 3 100-Year Rainfall=7.18"
Area (ac) CN Description
0.011 98 Paved parking, HSG B
0.020 61 >75% Grass cover, Good, HSG B
0.031 74 Weighted Average
0.020 64.52% Pervious Area
0.011 35.48% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.0 Direct Entry,
Subcatchment 9S: C-DA-5
Runoff
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
25 0.
24 0.
23 0.
22 0.
21 0.
2 0.
19 0.
18 0.
17 0.
16 0.
15 0.
14 0.
13 0.
12 0.
11 0.
1 0.
09 0.
08 0.
07 0.
06 0.
05 0.
04 0.
03 0.
02 0.
01
0 MSE 24-hr
3 100-Year Rainfall=7.
18"Runoff Area=0.031
ac Runoff Volume=0.011
af Runoff Depth=4.
20"Tc=7.0
min CN=
74 0.22
MSE 24-hr 3 100-Year Rainfall=7.18"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page41HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 8R: EX ONSITE INLET
40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 0.053 ac, 0.00% Impervious, Inflow Depth = 2.83" for 100-Year event
Inflow = 0.26 cfs @ 12.15 hrs, Volume= 0.013 af
Outflow = 0.26 cfs @ 12.15 hrs, Volume= 0.013 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Reach 8R: EX ONSITE INLET
Inflow
Outflow
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)0.
28 0.
26 0.
24 0.
22 0.
2 0.
18 0.
16 0.
14 0.
12 0.
1 0.
08 0.
06 0.
04 0.
02
0 Inflow Area=0.053
ac 0.26
cfs 0.26
MSE 24-hr 3 100-Year Rainfall=7.18"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page42HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 10R: TOTAL SITE
40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 0.864 ac, 65.63% Impervious, Inflow Depth = 1.92" for 100-Year event
Inflow = 2.41 cfs @ 12.30 hrs, Volume= 0.139 af
Outflow = 2.41 cfs @ 12.30 hrs, Volume= 0.139 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Reach 10R: TOTAL SITE
Inflow
Outflow
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)
2
1
0 Inflow Area=0.864
ac 2.41
cfs 2.41
MSE 24-hr 3 100-Year Rainfall=7.18"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page43HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 6P: U/G 36" INFILTRATION
Inflow Area = 0.538 ac, 86.43% Impervious, Inflow Depth = 6.35" for 100-Year event
Inflow = 5.28 cfs @ 12.14 hrs, Volume= 0.285 af
Outflow = 1.90 cfs @ 12.31 hrs, Volume= 0.285 af, Atten= 64%, Lag= 10.4 min
Discarded = 0.06 cfs @ 9.20 hrs, Volume= 0.200 af
Primary = 1.84 cfs @ 12.31 hrs, Volume= 0.084 af
Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Peak Elev= 918.80' @ 12.31 hrs Surf.Area= 3,154 sf Storage= 6,238 cf
Plug-Flow detention time= 637.5 min calculated for 0.285 af (100% of inflow)
Center-of-Mass det. time= 637.3 min ( 1,399.2 - 761.8 )
Volume Invert Avail.Storage Storage Description
1A 915.40' 3,692 cf 38.00'W x 83.00'L x 4.50'H Field A
14,193 cf Overall - 4,962 cf Embedded = 9,231 cf x 40.0% Voids
2A 915.90' 3,976 cf ADS N-12 36" x 28 Inside #1
Inside= 36.1"W x 36.1"H => 7.10 sf x 20.00'L = 142.0 cf
Outside= 42.0"W x 42.0"H => 8.86 sf x 20.00'L = 177.2 cf
7 Rows of 4 Chambers
7,668 cf Total Available Storage
Storage Group A created with Chamber Wizard
Device Routing Invert Outlet Devices
1 Discarded 915.40'0.800 in/hr Exfiltration over Surface area
2 Device 3 918.50'4.0' long x 0.5' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00
Coef. (English) 2.80 2.92 3.08 3.30 3.32
3 Primary 915.40'12.0" Round Culvert L= 50.0' Ke= 0.100
Inlet / Outlet Invert= 915.40' / 915.05' S= 0.0070 '/' Cc= 0.900
n= 0.011 Concrete pipe, straight & clean, Flow Area= 0.79 sf
Discarded OutFlow Max=0.06 cfs @ 9.20 hrs HW=915.45' (Free Discharge)
1=Exfiltration (Exfiltration Controls 0.06 cfs)
Primary OutFlow Max=1.78 cfs @ 12.31 hrs HW=918.79' (Free Discharge)
3=Culvert (Passes 1.78 cfs of 7.00 cfs potential flow)
2=Broad-Crested Rectangular Weir (Weir Controls 1.78 cfs @ 1.54 fps)
MSE 24-hr 3 100-Year Rainfall=7.18"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page44HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Pond 6P: U/G 36" INFILTRATION - Chamber Wizard Field A
Chamber Model = ADS N-12 36" (ADS N-12® Pipe)
Inside= 36.1"W x 36.1"H => 7.10 sf x 20.00'L = 142.0 cf
Outside= 42.0"W x 42.0"H => 8.86 sf x 20.00'L = 177.2 cf
42.0" Wide + 21.0" Spacing = 63.0" C-C Row Spacing
4 Chambers/Row x 20.00' Long = 80.00' Row Length +18.0" End Stone x 2 = 83.00' Base Length
7 Rows x 42.0" Wide + 21.0" Spacing x 6 + 18.0" Side Stone x 2 = 38.00' Base Width
6.0" Base + 42.0" Chamber Height + 6.0" Cover = 4.50' Field Height
28 Chambers x 142.0 cf = 3,976.0 cf Chamber Storage
28 Chambers x 177.2 cf = 4,962.2 cf Displacement
14,193.0 cf Field - 4,962.2 cf Chambers = 9,230.8 cf Stone x 40.0% Voids = 3,692.3 cf Stone Storage
Chamber Storage + Stone Storage = 7,668.3 cf = 0.176 af
Overall Storage Efficiency = 54.0%
Overall System Size = 83.00' x 38.00' x 4.50'
28 Chambers
525.7 cy Field
341.9 cy Stone
MSE 24-hr 3 100-Year Rainfall=7.18"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page45HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Pond 6P: U/G 36" INFILTRATION
Inflow
Outflow
Discarded
Primary
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)
5
4
3
2
1
0 Inflow Area=0.538
ac Peak Elev=918.
80'Storage=6,238
cf 5.28
cfs 1.90
cfs 0.06
cfs 1.84
MSE 24-hr 3 100-Year Rainfall=7.18"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page46HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 7P: INFILTRATION BASIN
Inflow Area = 0.147 ac, 44.90% Impervious, Inflow Depth = 4.64" for 100-Year event
Inflow = 1.16 cfs @ 12.14 hrs, Volume= 0.057 af
Outflow = 0.03 cfs @ 14.40 hrs, Volume= 0.057 af, Atten= 97%, Lag= 135.8 min
Discarded = 0.03 cfs @ 14.40 hrs, Volume= 0.057 af
Primary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 af
Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs
Peak Elev= 920.78' @ 14.40 hrs Surf.Area= 1,807 sf Storage= 1,645 cf
Plug-Flow detention time= 556.0 min calculated for 0.057 af (100% of inflow)
Center-of-Mass det. time= 556.2 min ( 1,349.6 - 793.4 )
Volume Invert Avail.Storage Storage Description
1 919.50' 3,159 cf BASIN WEST (Irregular) Listed below (Recalc)
Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area
feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
919.50 790 255.4 0 0 790
920.50 1,584 274.3 1,164 1,164 1,630
921.50 2,436 293.2 1,995 3,159 2,529
Device Routing Invert Outlet Devices
1 Discarded 919.50'0.800 in/hr Exfiltration over Surface area
2 Device 3 921.20'24.0" Horiz. Orifice/Grate C= 0.600
Limited to weir flow at low heads
3 Primary 918.00'12.0" Round Culvert L= 25.0' Ke= 0.100
Inlet / Outlet Invert= 918.00' / 917.50' S= 0.0200 '/' Cc= 0.900
n= 0.012 Corrugated PP, smooth interior, Flow Area= 0.79 sf
Discarded OutFlow Max=0.03 cfs @ 14.40 hrs HW=920.78' (Free Discharge)
1=Exfiltration (Exfiltration Controls 0.03 cfs)
Primary OutFlow Max=0.00 cfs @ 1.00 hrs HW=919.50' (Free Discharge)
3=Culvert (Passes 0.00 cfs of 4.74 cfs potential flow)
2=Orifice/Grate ( Controls 0.00 cfs)
MSE 24-hr 3 100-Year Rainfall=7.18"CBA Chanhassen Pr Cond_Atlas 14_Rainfall
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page47HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Pond 7P: INFILTRATION BASIN
Inflow
Outflow
Discarded
Primary
Hydrograph
Time (hours)
72706866646260585654525048464442403836343230282624222018161412108642Flow (
cfs)
1
0 Inflow Area=0.147
ac Peak Elev=920.
78'Storage=1,645
cf 1.16
cfs 0.03
cfs 0.03
cfs 0.00
1S
C-DA-1
2S
C-DA-2
3S
C-DA-3
7S
C-DA-4
8S
C-DA-6
9S
C-DA-5
8R
EX ONSITE INLET
10R
TOTAL SITE
6P
U/G 36" INFILTRATION
7P
INFILTRATION BASIN
Routing Diagram for CBA Chanhassen Pr Cond_Atlas 14_10 Day Snow Melt
Prepared by Kimley-Horn and Associates, Printed 10/25/2020
HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Subcat Reach Pond Link
CBA Chanhassen Pr Cond_Atlas 14_10 Day Snow Melt
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page2HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Area Listing (all nodes)
Area
acres)
CN Description
subcatchment-numbers)
0.297 100 >75% Grass cover, Good, HSG B (1S, 2S, 3S, 7S, 8S, 9S)
0.501 98 Paved parking, HSG B (1S, 2S, 7S, 9S)
0.066 98 Roofs, HSG B (3S)
0.864 99 TOTAL AREA
CBA Chanhassen Pr Cond_Atlas 14_10 Day Snow Melt
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page3HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Soil Listing (all nodes)
Area
acres)
Soil
Group
Subcatchment
Numbers
0.000 HSG A
0.864 HSG B 1S, 2S, 3S, 7S, 8S, 9S
0.000 HSG C
0.000 HSG D
0.000 Other
0.864 TOTAL AREA
CBA Chanhassen Pr Cond_Atlas 14_10 Day Snow Melt
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page4HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Ground Covers (all nodes)
HSG-A
acres)
HSG-B
acres)
HSG-C
acres)
HSG-D
acres)
Other
acres)
Total
acres)
Ground
Cover
Subcatchment
Numbers
0.000 0.297 0.000 0.000 0.000 0.297 >75% Grass cover, Good 1S, 2S,
3S, 7S,
8S, 9S
0.000 0.501 0.000 0.000 0.000 0.501 Paved parking 1S, 2S,
7S, 9S
0.000 0.066 0.000 0.000 0.000 0.066 Roofs 3S
0.000 0.864 0.000 0.000 0.000 0.864 TOTAL AREA
CBA Chanhassen Pr Cond_Atlas 14_10 Day Snow Melt
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page5HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Pipe Listing (all nodes)
Line# Node
Number
In-Invert
feet)
Out-Invert
feet)
Length
feet)
Slope
ft/ft)
n Diam/Width
inches)
Height
inches)
Inside-Fill
inches)
1 6P 915.40 915.05 50.0 0.0070 0.011 12.0 0.0 0.0
2 7P 918.00 917.50 25.0 0.0200 0.012 12.0 0.0 0.0
MSE 24-hr 3 240.00 hrs Custom Rainfall=7.30", AMC=4CBAChanhassenPrCond_Atlas 14_
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page6HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Time span=1.00-240.00 hrs, dt=0.01 hrs, 23901 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=0.035 ac 100.00% Impervious Runoff Depth>7.18"Subcatchment 1S: C-DA-1
Flow Length=145' Slope=0.0200 '/' Tc=14.0 min CN=99 Runoff=0.04 cfs 0.021 af
Runoff Area=0.060 ac 100.00% Impervious Runoff Depth>7.30"Subcatchment 2S: C-DA-2
Flow Length=140' Slope=0.0200 '/' Tc=13.6 min CN=100 Runoff=0.07 cfs 0.036 af
Runoff Area=0.147 ac 100.00% Impervious Runoff Depth>7.18"Subcatchment 3S: C-DA-3
Tc=7.0 min CN=99 Runoff=0.18 cfs 0.088 af
Runoff Area=0.538 ac 100.00% Impervious Runoff Depth>7.06"Subcatchment 7S: C-DA-4
Tc=7.0 min CN=98 Runoff=0.65 cfs 0.317 af
Runoff Area=0.053 ac 100.00% Impervious Runoff Depth>7.30"Subcatchment 8S: C-DA-6
Tc=7.0 min CN=100 Runoff=0.06 cfs 0.032 af
Runoff Area=0.031 ac 100.00% Impervious Runoff Depth>7.18"Subcatchment 9S: C-DA-5
Tc=7.0 min CN=99 Runoff=0.04 cfs 0.019 af
Inflow=0.06 cfs 0.032afReach8R: EX ONSITE INLET
Outflow=0.06 cfs 0.032 af
Inflow=0.22 cfs 0.108afReach10R: TOTAL SITE
Outflow=0.22 cfs 0.108 af
Peak Elev=918.23' Storage=5,104 cf Inflow=0.65 cfs 0.317afPond6P: U/G 36" INFILTRATION
Discarded=0.06 cfs 0.317 af Primary=0.00 cfs 0.000 af Outflow=0.06 cfs 0.317 af
Peak Elev=920.52' Storage=1,202 cf Inflow=0.18 cfs 0.088afPond7P: INFILTRATION BASIN
Discarded=0.03 cfs 0.088 af Primary=0.00 cfs 0.000 af Outflow=0.03 cfs 0.088 af
Total Runoff Area = 0.864 ac Runoff Volume = 0.513 af Average Runoff Depth = 7.12"
0.00% Pervious = 0.000 ac 100.00% Impervious = 0.864 ac
MSE 24-hr 3 240.00 hrs Custom Rainfall=7.30", AMC=4CBAChanhassenPrCond_Atlas 14_
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page7HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: C-DA-1
Runoff = 0.04 cfs @ 120.82 hrs, Volume= 0.021 af, Depth> 7.18"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-240.00 hrs, dt= 0.01 hrs
MSE 24-hr 3 240.00 hrs Custom Rainfall=7.30", AMC=4
Area (ac) CN Description
0.011 100 >75% Grass cover, Good, HSG B
0.024 98 Paved parking, HSG B
0.035 99 Weighted Average
0.035 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
14.0 145 0.0200 0.17 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 1S: C-DA-1
Runoff
Hydrograph
Time (hours)
240230220210200190180170160150140130120110100908070605040302010Flow (
cfs)0.
046 0.
044 0.
042 0.
04 0.
038 0.
036 0.
034 0.
032 0.
03 0.
028 0.
026 0.
024 0.
022 0.
02 0.
018 0.
016 0.
014 0.
012 0.
01 0.
008 0.
006 0.
004 0.
002
0 MSE 24-hr 3 240.00
hrs Custom Rainfall=7.
30"AMC=
4 Runoff Area=0.035
ac Runoff Volume=0.021
af Runoff Depth>7.
18"Flow Length=
145'Slope=0.
0200 '/'Tc=14.0
min CN=
99 0.04
MSE 24-hr 3 240.00 hrs Custom Rainfall=7.30", AMC=4CBAChanhassenPrCond_Atlas 14_
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page8HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 2S: C-DA-2
Runoff = 0.07 cfs @ 120.78 hrs, Volume= 0.036 af, Depth> 7.30"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-240.00 hrs, dt= 0.01 hrs
MSE 24-hr 3 240.00 hrs Custom Rainfall=7.30", AMC=4
Area (ac) CN Description
0.059 100 >75% Grass cover, Good, HSG B
0.001 98 Paved parking, HSG B
0.060 100 Weighted Average
0.060 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
13.6 140 0.0200 0.17 Sheet Flow,
Grass: Short n= 0.150 P2= 2.84"
Subcatchment 2S: C-DA-2
Runoff
Hydrograph
Time (hours)
240230220210200190180170160150140130120110100908070605040302010Flow (
cfs)0.
08 0.
075 0.
07 0.
065 0.
06 0.
055 0.
05 0.
045 0.
04 0.
035 0.
03 0.
025 0.
02 0.
015 0.
01 0.
005
0 MSE 24-hr 3 240.00
hrs Custom Rainfall=7.
30"AMC=
4 Runoff Area=0.060
ac Runoff Volume=0.036
af Runoff Depth>7.
30"Flow Length=
140'Slope=0.
0200 '/'Tc=13.6
min CN=
100 0.07
MSE 24-hr 3 240.00 hrs Custom Rainfall=7.30", AMC=4CBAChanhassenPrCond_Atlas 14_
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page9HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 3S: C-DA-3
Runoff = 0.18 cfs @ 121.00 hrs, Volume= 0.088 af, Depth> 7.18"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-240.00 hrs, dt= 0.01 hrs
MSE 24-hr 3 240.00 hrs Custom Rainfall=7.30", AMC=4
Area (ac) CN Description
0.081 100 >75% Grass cover, Good, HSG B
0.066 98 Roofs, HSG B
0.147 99 Weighted Average
0.147 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.0 Direct Entry,
Subcatchment 3S: C-DA-3
Runoff
Hydrograph
Time (hours)
240230220210200190180170160150140130120110100908070605040302010Flow (
cfs)0.
19 0.
18 0.
17 0.
16 0.
15 0.
14 0.
13 0.
12 0.
11 0.
1 0.
09 0.
08 0.
07 0.
06 0.
05 0.
04 0.
03 0.
02 0.
01
0 MSE 24-hr 3 240.00
hrs Custom Rainfall=7.
30"AMC=
4 Runoff Area=0.147
ac Runoff Volume=0.088
af Runoff Depth>7.
18"Tc=7.0
min CN=
99 0.18
MSE 24-hr 3 240.00 hrs Custom Rainfall=7.30", AMC=4CBAChanhassenPrCond_Atlas 14_
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page10HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 7S: C-DA-4
Runoff = 0.65 cfs @ 121.00 hrs, Volume= 0.317 af, Depth> 7.06"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-240.00 hrs, dt= 0.01 hrs
MSE 24-hr 3 240.00 hrs Custom Rainfall=7.30", AMC=4
Area (ac) CN Description
0.073 100 >75% Grass cover, Good, HSG B
0.465 98 Paved parking, HSG B
0.538 98 Weighted Average
0.538 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.0 Direct Entry,
Subcatchment 7S: C-DA-4
Runoff
Hydrograph
Time (hours)
240230220210200190180170160150140130120110100908070605040302010Flow (
cfs)0.
7 0.
65 0.
6 0.
55 0.
5 0.
45 0.
4 0.
35 0.
3 0.
25 0.
2 0.
15 0.
1 0.
05
0 MSE 24-hr 3 240.00
hrs Custom Rainfall=7.
30"AMC=
4 Runoff Area=0.538
ac Runoff Volume=0.317
af Runoff Depth>7.
06"Tc=7.0
min CN=
98 0.65
MSE 24-hr 3 240.00 hrs Custom Rainfall=7.30", AMC=4CBAChanhassenPrCond_Atlas 14_
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page11HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 8S: C-DA-6
Runoff = 0.06 cfs @ 120.75 hrs, Volume= 0.032 af, Depth> 7.30"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-240.00 hrs, dt= 0.01 hrs
MSE 24-hr 3 240.00 hrs Custom Rainfall=7.30", AMC=4
Area (ac) CN Description
0.053 100 >75% Grass cover, Good, HSG B
0.053 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.0 Direct Entry,
Subcatchment 8S: C-DA-6
Runoff
Hydrograph
Time (hours)
240230220210200190180170160150140130120110100908070605040302010Flow (
cfs)0.
07 0.
065 0.
06 0.
055 0.
05 0.
045 0.
04 0.
035 0.
03 0.
025 0.
02 0.
015 0.
01 0.
005
0 MSE 24-hr 3 240.00
hrs Custom Rainfall=7.
30"AMC=
4 Runoff Area=0.053
ac Runoff Volume=0.032
af Runoff Depth>7.
30"Tc=7.0
min CN=
100 0.06
MSE 24-hr 3 240.00 hrs Custom Rainfall=7.30", AMC=4CBAChanhassenPrCond_Atlas 14_
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page12HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 9S: C-DA-5
Runoff = 0.04 cfs @ 121.00 hrs, Volume= 0.019 af, Depth> 7.18"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-240.00 hrs, dt= 0.01 hrs
MSE 24-hr 3 240.00 hrs Custom Rainfall=7.30", AMC=4
Area (ac) CN Description
0.011 98 Paved parking, HSG B
0.020 100 >75% Grass cover, Good, HSG B
0.031 99 Weighted Average
0.031 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
min) (feet) (ft/ft) (ft/sec) (cfs)
7.0 Direct Entry,
Subcatchment 9S: C-DA-5
Runoff
Hydrograph
Time (hours)
240230220210200190180170160150140130120110100908070605040302010Flow (
cfs)0.
042 0.
04 0.
038 0.
036 0.
034 0.
032 0.
03 0.
028 0.
026 0.
024 0.
022 0.
02 0.
018 0.
016 0.
014 0.
012 0.
01 0.
008 0.
006 0.
004 0.
002
0 MSE 24-hr 3 240.00
hrs Custom Rainfall=7.
30"AMC=
4 Runoff Area=0.031
ac Runoff Volume=0.019
af Runoff Depth>7.
18"Tc=7.0
min CN=
99 0.04
MSE 24-hr 3 240.00 hrs Custom Rainfall=7.30", AMC=4CBAChanhassenPrCond_Atlas 14_
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page13HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 8R: EX ONSITE INLET
40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 0.053 ac,100.00% Impervious, Inflow Depth > 7.30" for Custom event
Inflow = 0.06 cfs @ 120.75 hrs, Volume= 0.032 af
Outflow = 0.06 cfs @ 120.75 hrs, Volume= 0.032 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-240.00 hrs, dt= 0.01 hrs
Reach 8R: EX ONSITE INLET
Inflow
Outflow
Hydrograph
Time (hours)
240230220210200190180170160150140130120110100908070605040302010Flow (
cfs)0.
07 0.
065 0.
06 0.
055 0.
05 0.
045 0.
04 0.
035 0.
03 0.
025 0.
02 0.
015 0.
01 0.
005
0 Inflow Area=0.053
ac 0.06
cfs 0.06
MSE 24-hr 3 240.00 hrs Custom Rainfall=7.30", AMC=4CBAChanhassenPrCond_Atlas 14_
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page14HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 10R: TOTAL SITE
40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 0.864 ac,100.00% Impervious, Inflow Depth > 1.50" for Custom event
Inflow = 0.22 cfs @ 121.00 hrs, Volume= 0.108 af
Outflow = 0.22 cfs @ 121.00 hrs, Volume= 0.108 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-240.00 hrs, dt= 0.01 hrs
Reach 10R: TOTAL SITE
Inflow
Outflow
Hydrograph
Time (hours)
240230220210200190180170160150140130120110100908070605040302010Flow (
cfs)0.
24 0.
23 0.
22 0.
21 0.
2 0.
19 0.
18 0.
17 0.
16 0.
15 0.
14 0.
13 0.
12 0.
11 0.
1 0.
09 0.
08 0.
07 0.
06 0.
05 0.
04 0.
03 0.
02 0.
01
0 Inflow Area=0.864
ac 0.22
cfs 0.22
MSE 24-hr 3 240.00 hrs Custom Rainfall=7.30", AMC=4CBAChanhassenPrCond_Atlas 14_
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page15HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 6P: U/G 36" INFILTRATION
Inflow Area = 0.538 ac,100.00% Impervious, Inflow Depth > 7.06" for Custom event
Inflow = 0.65 cfs @ 121.00 hrs, Volume= 0.317 af
Outflow = 0.06 cfs @ 115.26 hrs, Volume= 0.317 af, Atten= 91%, Lag= 0.0 min
Discarded = 0.06 cfs @ 115.26 hrs, Volume= 0.317 af
Primary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 af
Routing by Stor-Ind method, Time Span= 1.00-240.00 hrs, dt= 0.01 hrs
Peak Elev= 918.23' @ 125.11 hrs Surf.Area= 3,154 sf Storage= 5,104 cf
Plug-Flow detention time= 570.9 min calculated for 0.317 af (100% of inflow)
Center-of-Mass det. time= 570.4 min ( 7,926.9 - 7,356.5 )
Volume Invert Avail.Storage Storage Description
1A 915.40' 3,692 cf 38.00'W x 83.00'L x 4.50'H Field A
14,193 cf Overall - 4,962 cf Embedded = 9,231 cf x 40.0% Voids
2A 915.90' 3,976 cf ADS N-12 36" x 28 Inside #1
Inside= 36.1"W x 36.1"H => 7.10 sf x 20.00'L = 142.0 cf
Outside= 42.0"W x 42.0"H => 8.86 sf x 20.00'L = 177.2 cf
7 Rows of 4 Chambers
7,668 cf Total Available Storage
Storage Group A created with Chamber Wizard
Device Routing Invert Outlet Devices
1 Discarded 915.40'0.800 in/hr Exfiltration over Surface area
2 Device 3 918.50'4.0' long x 0.5' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00
Coef. (English) 2.80 2.92 3.08 3.30 3.32
3 Primary 915.40'12.0" Round Culvert L= 50.0' Ke= 0.100
Inlet / Outlet Invert= 915.40' / 915.05' S= 0.0070 '/' Cc= 0.900
n= 0.011 Concrete pipe, straight & clean, Flow Area= 0.79 sf
Discarded OutFlow Max=0.06 cfs @ 115.26 hrs HW=915.45' (Free Discharge)
1=Exfiltration (Exfiltration Controls 0.06 cfs)
Primary OutFlow Max=0.00 cfs @ 1.00 hrs HW=915.40' (Free Discharge)
3=Culvert ( Controls 0.00 cfs)
2=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
MSE 24-hr 3 240.00 hrs Custom Rainfall=7.30", AMC=4CBAChanhassenPrCond_Atlas 14_
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page16HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Pond 6P: U/G 36" INFILTRATION - Chamber Wizard Field A
Chamber Model = ADS N-12 36" (ADS N-12® Pipe)
Inside= 36.1"W x 36.1"H => 7.10 sf x 20.00'L = 142.0 cf
Outside= 42.0"W x 42.0"H => 8.86 sf x 20.00'L = 177.2 cf
42.0" Wide + 21.0" Spacing = 63.0" C-C Row Spacing
4 Chambers/Row x 20.00' Long = 80.00' Row Length +18.0" End Stone x 2 = 83.00' Base Length
7 Rows x 42.0" Wide + 21.0" Spacing x 6 + 18.0" Side Stone x 2 = 38.00' Base Width
6.0" Base + 42.0" Chamber Height + 6.0" Cover = 4.50' Field Height
28 Chambers x 142.0 cf = 3,976.0 cf Chamber Storage
28 Chambers x 177.2 cf = 4,962.2 cf Displacement
14,193.0 cf Field - 4,962.2 cf Chambers = 9,230.8 cf Stone x 40.0% Voids = 3,692.3 cf Stone Storage
Chamber Storage + Stone Storage = 7,668.3 cf = 0.176 af
Overall Storage Efficiency = 54.0%
Overall System Size = 83.00' x 38.00' x 4.50'
28 Chambers
525.7 cy Field
341.9 cy Stone
MSE 24-hr 3 240.00 hrs Custom Rainfall=7.30", AMC=4CBAChanhassenPrCond_Atlas 14_
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page17HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Pond 6P: U/G 36" INFILTRATION
Inflow
Outflow
Discarded
Primary
Hydrograph
Time (hours)
240230220210200190180170160150140130120110100908070605040302010Flow (
cfs)0.
7 0.
65 0.
6 0.
55 0.
5 0.
45 0.
4 0.
35 0.
3 0.
25 0.
2 0.
15 0.
1 0.
05
0 Inflow Area=0.538
ac Peak Elev=918.
23'Storage=5,104
cf 0.65
cfs 0.06
cfs 0.06
cfs 0.00
MSE 24-hr 3 240.00 hrs Custom Rainfall=7.30", AMC=4CBAChanhassenPrCond_Atlas 14_
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page18HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 7P: INFILTRATION BASIN
Inflow Area = 0.147 ac,100.00% Impervious, Inflow Depth > 7.18" for Custom event
Inflow = 0.18 cfs @ 121.00 hrs, Volume= 0.088 af
Outflow = 0.03 cfs @ 123.12 hrs, Volume= 0.088 af, Atten= 83%, Lag= 127.2 min
Discarded = 0.03 cfs @ 123.12 hrs, Volume= 0.088 af
Primary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 af
Routing by Stor-Ind method, Time Span= 1.00-240.00 hrs, dt= 0.01 hrs
Peak Elev= 920.52' @ 123.12 hrs Surf.Area= 1,602 sf Storage= 1,202 cf
Plug-Flow detention time= 287.4 min calculated for 0.088 af (100% of inflow)
Center-of-Mass det. time= 286.8 min ( 7,581.1 - 7,294.3 )
Volume Invert Avail.Storage Storage Description
1 919.50' 3,159 cf BASIN WEST (Irregular) Listed below (Recalc)
Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area
feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
919.50 790 255.4 0 0 790
920.50 1,584 274.3 1,164 1,164 1,630
921.50 2,436 293.2 1,995 3,159 2,529
Device Routing Invert Outlet Devices
1 Discarded 919.50'0.800 in/hr Exfiltration over Surface area
2 Device 3 921.20'24.0" Horiz. Orifice/Grate C= 0.600
Limited to weir flow at low heads
3 Primary 918.00'12.0" Round Culvert L= 25.0' Ke= 0.100
Inlet / Outlet Invert= 918.00' / 917.50' S= 0.0200 '/' Cc= 0.900
n= 0.012 Corrugated PP, smooth interior, Flow Area= 0.79 sf
Discarded OutFlow Max=0.03 cfs @ 123.12 hrs HW=920.52' (Free Discharge)
1=Exfiltration (Exfiltration Controls 0.03 cfs)
Primary OutFlow Max=0.00 cfs @ 1.00 hrs HW=919.50' (Free Discharge)
3=Culvert (Passes 0.00 cfs of 4.74 cfs potential flow)
2=Orifice/Grate ( Controls 0.00 cfs)
MSE 24-hr 3 240.00 hrs Custom Rainfall=7.30", AMC=4CBAChanhassenPrCond_Atlas 14_
Printed 10/25/2020PreparedbyKimley-Horn and Associates
Page19HydroCAD® 10.00-22 s/n 09843 © 2018 HydroCAD Software Solutions LLC
Pond 7P: INFILTRATION BASIN
Inflow
Outflow
Discarded
Primary
Hydrograph
Time (hours)
240230220210200190180170160150140130120110100908070605040302010Flow (
cfs)0.
19 0.
18 0.
17 0.
16 0.
15 0.
14 0.
13 0.
12 0.
11 0.
1 0.
09 0.
08 0.
07 0.
06 0.
05 0.
04 0.
03 0.
02 0.
01
0 Inflow Area=0.147
ac Peak Elev=920.
52'Storage=1,202
cf 0.18
cfs 0.03
cfs 0.03
cfs 0.00
Christian Brothers Automotive - Stormwater Report Page 16
Chanhassen, MN
Appendix 5. Water Quality
Calculations (MIDS)
Project Information
Calculator Version:Version 3: January 2017
Project Name:CBA -Chanhassen, MN
User Name / Company Name:Kimley-Horn & Associates, Inc.
Date:09/17/2020
Project Description:
Construction Permit?:Yes
Site Information
Retention Requirement (inches):1.1
Site's Zip Code:55317
Annual Rainfall (inches):29.9
Phosphorus EMC (mg/l):0.3
TSS EMC (mg/l):54.5
Total Site Area
Land Cover A Soils
acres)
B Soils
acres)
C Soils
acres)
D Soils
acres)
Total
acres)
Forest/Open Space -Undisturbed, protected
forest/open space or reforested land
0
Managed Turf -disturbed, graded for yards or
other turf to be mowed/managed .
25 0.25
Impervious Area (acres).55
Total Area (acres)0.8
Site Areas Routed to BMPs
Land Cover A Soils
acres)
B Soils
acres)
C Soils
acres)
D Soils
acres)
Total
acres)
Forest/Open Space -Undisturbed, protected
forest/open space or reforested land
0
Managed Turf -disturbed, graded for yards or
other turf to be mowed/managed
0.154 0.154
Impervious Area (acres)0.531
Total Area (acres)0.685
Summary Information
Performance Goal Requirement
Performance goal volume retention requirement:2196 ft3
Volume removed by BMPs towards performance goal:2120 ft3
Percent volume removed towards performance goal 97 %
Annual Volume and Pollutant Load Reductions
Post development annual runoff volume 1.2838 acre-ft
Annual runoff volume removed by BMPs:1.2003 acre-ft
Percent annual runoff volume removed:93 %
Post development annual particulate P load:0.576 lbs
Annual particulate P removed by BMPs:0.539 lbs
Post development annual dissolved P load:0.471 lbs
Annual dissolved P removed by BMPs:0.441 lbs
Percent annual total phosphorus removed:93 %
Post development annual TSS load:190.3 lbs
Annual TSS removed by BMPs:177.9 lbs
Percent annual TSS removed:93 %
BMP Summary
Performance Goal Summary
BMP Name
BMP Volume
Capacity
ft3)
Volume
Recieved
ft3)
Volume
Retained
ft3)
Volume
Outflow
ft3)
Percent
Retained (%)
1 -Infiltration basin/Infiltration trench (aboveground)2519 264 264 0 100
1 -Underground infiltration 6300 1857 1857 0 100
Annual Volume Summary
BMP Name
Volume
From Direct
Watershed
acre-ft)
Volume
From
Upstream
BMPs
acre-ft)
Volume
Retained
acre-ft)
Volume
outflow
acre-ft)
Percent
Retained
1 -Infiltration basin/Infiltration trench (aboveground)0.1769 0 0.1769 0 100
1 -Underground infiltration 1.0234 0 1.0234 0 100
Particulate Phosphorus Summary
BMP Name
Load From
Direct
Watershed
lbs)
Load From
Upstream
BMPs
lbs)
Load
Retained
lbs)
Outflow
Load
lbs)
Percent
Retained (%)
1 -Infiltration basin/Infiltration trench (aboveground)0.0794 0 0.0794 0 100
1 -Underground infiltration 0.4593 0 0.4593 0 100
Dissolved Phosphorus Summary
BMP Name
Load From
Direct
Watershed
lbs)
Load From
Upstream
BMPs
lbs)
Load
Retained
lbs)
Outflow
Load
lbs)
Percent
Retained (%)
1 -Infiltration basin/Infiltration trench (aboveground)0.065 0 0.065 0 100
1 -Underground infiltration 0.3758 0 0.3758 0 100
TSS Summary
BMP Name
Load From
Direct
Watershed
lbs)
Load From
Upstream
BMPs
lbs)
Load
Retained
lbs)
Outflow
Load
lbs)
Percent
Retained (%)
1 -Infiltration basin/Infiltration trench (aboveground)26.23 0 26.23 0 100
1 -Underground infiltration 151.7 0 151.7 0 100
BMP Schematic
Christian Brothers Automotive - Stormwater Report Page 17
Chanhassen, MN
Appendix 6. Operations and
Maintenance Plan
Christian Brothers Automotive
Chanhassen, MN
STORMWATER MANAGEMENT OPERATION & MAINTENANCE PLAN - 1
OPERATIONS AND MAINTENANCE PLAN
8941 Crossroads Blvd.
Chanhassen, MN
Prepared for:
Christian Brothers Automotive
September 18, 2020
Prepared By:
Kimley-Horn and Associates, Inc.
767 Eustis Street, Suite 100
St. Paul, MN 55114
651) 645-4197
I hereby certify that this plan,
specification, or report was prepared by
me or under my direct supervision, and
that I am a duly Registered Professional
Engineer under the laws of the State of
Minnesota.
Brandon R. Elegert, P.E.
Date: 09/18/2020 Registration No. 50387
Christian Brothers Automotive
Chanhassen, MN
STORMWATER MANAGEMENT OPERATION & MAINTENANCE PLAN - 2
CHRISTIAN BROTHERS AUTOMOTIVE CHANHASSEN
STORMWATER MANAGEMENT
OPERATION & MAINTENANCE PLAN
Activity Frequency
Water plants As necessary during first growing season
Water plants during dry periods As needed after first growing season
Re-mulch void areas As needed
Treat diseased trees and shrubs As needed
Inspect soil and repair eroded areas Monthly
Inspect integrity of storm sewer castings
and remove accumulated debris from
grates
As needed
Remove litter and debris Monthly
Add additional mulch Once per year
Sumped Manholes Once per year or as needed
SAFL Baffle Once per year or as needed
Access
Sufficient access shall be provided to the facility to allow all necessary inspection and
maintenance activities to be completed. Maintenance of access areas shall include removal
of tree seedlings and woody vegetation, repair of eroded areas and removal of litter and
debris.
Erosion
The soil and mulch in the facility and in areas draining to the facility shall be inspected for
eroded areas. Eroded areas shall be filled with soil or mulch and vegetated.
Outlet Structure Maintenance
The Owner will be responsible for outlet structure maintenance. Periodically, the low flow
orifice may clog with debris. Debris should be removed and disposed of outside of the
facility limits.
Debris & Litter
Debris and litter should be removed on a monthly basis to maintain appearance and
functionality of the facility.
Christian Brothers Automotive
Chanhassen, MN
STORMWATER MANAGEMENT OPERATION & MAINTENANCE PLAN - 3
Plant Maintenance
The vegetation type and amount are important to ensure that the facility operates correctly.
Proper vegetation maintenance includes watering plants during dry periods, re-mulching
void areas, treating diseased trees and shrubs and mowing turf areas.
MAINTENANCE OF UNDERGROUND
ADS INFILTRATION SYSTEM
Regular inspection and maintenance are critical to the effective operation of the
underground filtration systems. It is the responsibility of the property owner to maintain
all stormwater BMPs in accordance with the minimum design standards and other
guidance provided in this manual. See Appendix A for ADS Stormtech guidelines for
additional operation and maintenance procedures.
Inspection Schedule
One inspection form shall be completed for the underground detention system on a monthly
or annual basis as specified on the checklist.
Erosion
The soil and mulch on the property shall be inspected for eroded areas. Eroded areas shall
be filled with soil or mulch and vegetated. In the event that erosion persists in a particular
area, compacted aggregate shall be used to further stabilize the slope and to mitigate future
erosion.
Sediment Accumulation & Clogging
Sediment accumulation within the facility may reduce the infiltration capacity and impair
proper performance of the facility. The facility shall be inspected for accumulation of
sediment as part of the inspection. Excessive sediment accumulation shall be removed.
Outlet Structure Maintenance
The Owner will be responsible for outlet structure maintenance. Periodically, the outlet
pipe may clog with debris. Debris should be removed and appropriately disposed of off-
site.
Standing Water/Pipe Inspection
Visual inspection of the pipe chamber system shall occur once per year until a cleaning
schedule can be established based on the amount of sediment that is left within the system.
Prior to entry into the underground system, the user shall follow all applicable OSHA and
local safety regulations.
Inspections should occur at least 2-3 days after the most recent rainfall event. The system
should be visually inspected at all manhole locations. Utilizing a sediment pole, measure
and document the amount of silt at each manhole locations. Inspect each pipe opening to
ensure that the silt level or any foreign objects are not blocking the pipes. The sediment
level should be measured and recorded during the inspection process.
Christian Brothers Automotive
Chanhassen, MN
STORMWATER MANAGEMENT OPERATION & MAINTENANCE PLAN - 4
The system should be cleaned once the available depth of sediment is 6” above the bottom
of the chambers. Cleaning of the system can be done by a vacuum truck every 3-5 years
based on actual sediment accumulation or as needed to remain below maximum sediment
volume per manufacturer’s recommendations.
If the facility has standing water more than 48 hours after a rain event, the system shall be
cleaned. To clean, remove the manhole cover at the top of the system and lower a vacuum
hose into one of the rows of the pipe system. Open the manhole at the opposite end of the
system and use sewer jetting equipment to force water in the same row from one end of the
pipe system row to the opposite side. Place the vacuum hose and the sewer jetting
equipment in the next row and repeat the process.
Inspection and Maintenance (per manufacturer recommendations)
Inspect isolator row for sediment. If sediment is at or above 3”, clean out isolator row using
the Jetvac process, vacuum structure sump as required. Replace all covers, grates, filters,
and lids; record observations and actions. Inspect and clean basins and manholes upstream
of the Stormtech system. Refer to manufacturer for complete inspection and maintenance
requirements and recommendations.
Inspect every 6 months during the first year of operation. Adjust the inspection interval
based on previous observations of sediment accumulation and high-water elevations.
Conduct jetting and vactoring annually or when inspection shows that maintenance is
necessary.
MAINTENANCE OF SUMPED
PRETREATMENT MANHOLE
Remove sediment from the manhole and pretreatment device by using a vacuum truck.
Visual inspection to ensure no pipe blockage should occur at the time of cleaning. Prior to
entry into the storm sewer manhole, the user shall follow all applicable OSHA and local
safety regulations.
The pretreatment manholes shall be inspected at least three times during the first two years
to inspect the amount accumulated sediment and screen/baffle clogging over the first two
years following installation. From the frequent inspections a structure specific
maintenance program can be developed.
Sediment shall be cleaned once one foot of sediment has accumulated in the manhole
sumps.
At a minimum the structures containing pretreatment device shall be fully cleaned once a
year.
Christian Brothers Automotive
Chanhassen, MN
STORMWATER MANAGEMENT OPERATION & MAINTENANCE PLAN - 5
INSPECTION FORM
BMP #1 Underground Infiltration System (Perf. 36” HDPE System)
Date: Time: Weather:
Inspector:
Maintenance Item Comments on Condition Actions to be Taken
As Needed
Remove Trash and debris
Stabilize tributary drainage area
when erosion is evident
Inflow and outflow at inlet and
outlet structures are clean
Catch Basins are functioning
properly and free of litter and debris
Semi Annually (Or After several storm events/extreme storm events)
Inspect inflow/outflow and pre-
treatment systems for clogging (off-
line systems) and remove any
sediment
Annually in Fall
Inspect and remove any sediment
and debris build up in pretreatment
areas
Inspect inflow points and surface
for buildup of road sand associated
with spring melt, remove as needed
Note signs of pollution, such as oil
sheens, discolored water, or
unpleasant odors.
Comments and Actions Required:
Christian Brothers Automotive
Chanhassen, MN
STORMWATER MANAGEMENT OPERATION & MAINTENANCE PLAN - 6
Appendix A
Retention/Detention System Maintenance
1
TECHNICAL NOTE
4640 TRUEMAN BLVD. HILLIARD, OH 43026. (800) 821-6710 – www.ads-pipe.com
ATN601 ©ADS 2007
TN 6.01
February 2007
This document is provided for informational purposes only and is meant only to be a guide. Individuals using this
information should make their own decisions as to suitability of this guideline for their individual projects and adjust
accordingly.
Introduction
A retention/detention system is comprised of a series of pipes and fittings that form an underground storage area,
which retains or detains storm water runoff from a given area. As sediment and debris settle out of the detained
stormwater, build up occurs that requires the system to be regularly inspected and cleaned in order for the system
to perform as originally designed. The following provides the available fittings and guidelines for inspection and
maintenance of an HDPE underground storage system.
System Accessories and Fittings
Concentric Reducers
Concentric Reducers are fittings that transition between two pipes, either in line with one another or at
perpendicular angles. The centerlines of the two pipes are at the same elevation. When a concentric reducer
is used to connect the manifold pipe to the lateral pipes, most debris will be trapped in the manifold pipe.
SIDE VIEW SECTIONVIEWSIDEVIEWSECTIONVIEW
Eccentric Reducers
Eccentric Reducers are fittings that transition between two pipes, either in line with one another or at
perpendicular angles. The inverts of the two pipes are at the same elevations. When an eccentric reducer is
used to connect the manifold pipe to the lateral pipes, most debris will follow the flow of the storm water into
the lateral pipes.
SIDE VIEW SECTION VIEW SIDE VIEW SECTION VIEW
24640TRUEMANBLVD. HILLIARD, OH 43026. (800) 821-6710 – www.ads-pipe.com
Riser
Each retention/detention system typically has risers
strategically placed for maintenance and inspection of the
system. These risers are typically 24” in diameter or larger
and are placed on the manifold fittings.
Cleanouts
Cleanout ports are usually 4-, 6-, or 8-in diameter pipe and are
placed on the manifold fittings. They are used for entrance of
a pipe from a vacuum truck or a water-jetting device.
For a complete listing of available fittings and components please refer to the ADS Fittings Manual.
Maintenance Overview of a Retention/Detention System
Maintaining a clean and obstruction-free retention/detention system helps to ensure the system performs the
intended function of the primary design. Build up of debris may obstruct flow through the laterals in a retention
system or block the entranceway of the outlet pipe in a detention system. This may result in ineffective operation
or complete failure of the system . Additionally, surrounding areas may potentially run the risk of damage due to
flooding or other similar issues.
Inspection/Maintenance Frequency
All retention/detention systems must be cleaned and maintained. Underground systems may be maintained
more cost effectively if these simple guidelines are followed. Inspection should be performed at a minimum of
once per year. Cleaning should be done at the discretion of individuals responsible to maintain proper storage
and flow. While maintenance can generally be performed year round, it should be scheduled during a relatively
dry season.
Pre-Inspection
A post-installation inspection should be performed to allow the owner to measure the invert prior to
accumulation of sediment. This survey will allow the monitoring of sediment build-up without requiring access
to the retention/detention system.
The following is the recommended procedure for pre-inspections:
1) Locate the riser section or cleanouts of the retention/detention system. The riser will typically be 24” in
diameter or larger and the cleanouts are usually 4”, 6” or 8” in diameter.
2) Remove the lid of the riser or clean outs.
3) Insert a measuring device into the opening and make note to a point of reference on the stick or string.
This is done so that sediment build up can be determined in the future without having to enter the
system.)
RISER
CROSS-SECTION VIEW
CLEANOUT
CROSS-SECTION VIEW
34640TRUEMANBLVD. HILLIARD, OH 43026. (800) 821-6710 – www.ads-pipe.com
Inspection/Maintenance
A retention/detention system should be inspected at a minimum of one time a year or after major rain events if
necessary.
The following is the recommended procedure to inspect system in service:
1) Locate the riser section of the retention/detention system. The riser will typically be 24” in diameter or
larger.
2) Remove the lid from the riser.
3) Measure the sediment buildup at each riser and cleanout location. Only certified confined space entry
personnel having appropriate equipment should be permitted to enter the retention/detention System.
4) Inspect each manifold, all laterals, and outlet pipes for sediment build up, obstructions, or other
problems. Obstructions should be removed at this time.
5) If measured sediment build up is between 5% - 20% of the pipe diameter, cleaning should be
considered; if sediment build up exceeds 20%, cleaning should be performed at the earliest
opportunity. A thorough cleaning of the system (manifolds and laterals) shall be performed by either
manual methods or by a vacuum truck.
1 :12
The purchaser agrees to hold the seller harmless against
any cause for action for damages which may occur as a
result of drilling for piers and foundations, including but not
limited to sewer, gas lines or any underground obstacles
which the purchaser or others may deem valuable.
8941 Crossroads Blvd
Chanhassen
MN 55317
Connie Keck
JW
Vx1100488-R2
07/21/20
10/16/20
This design and engineering is
submitted as our proposal, and
the right to use or exhibit in any
form, is not authorized without
written permission by Vixxo.
Address
City
State
Account Representative:
Notes
Designer
Design #
Original Date
Revision Date
All electrical scope to be completed in a U.L. approved
method and shall meet current N.E.C. standards
All electrical components shall be U.L. Listed.
Sign shall be grounded per N.E.C. Article 250.
Insulated conductors as per N.E.C. Code 310.8.
type to be used - metallic insulated sealtite.
Disconnect switch as per N.E.C. Code 600.6.
s i g n & l i g h t i n g
8941 Crossroads Blvd
Chanhassen, MN 55317
D a l l a s O f f i c e 2711 LBJ Freeway Suite 400 Farmers Branch, TX 75234 s i g n & l i g h t i n g
2 :12
The purchaser agrees to hold the seller harmless against
any cause for action for damages which may occur as a
result of drilling for piers and foundations, including but not
limited to sewer, gas lines or any underground obstacles
which the purchaser or others may deem valuable.
8941 Crossroads Blvd
Chanhassen
MN 55317
Connie Keck
JW
Vx1100488-R2
07/21/20
10/16/20
This design and engineering is
submitted as our proposal, and
the right to use or exhibit in any
form, is not authorized without
written permission by Vixxo.
Address
City
State
Account Representative:
Notes
Designer
Design #
Original Date
Revision Date
All electrical scope to be completed in a U.L. approved
method and shall meet current N.E.C. standards
All electrical components shall be U.L. Listed.
Sign shall be grounded per N.E.C. Article 250.
Insulated conductors as per N.E.C. Code 310.8.
type to be used - metallic insulated sealtite.
Disconnect switch as per N.E.C. Code 600.6.
s i g n & l i g h t i n g
SITE PLAN
S
EW
N
74.3
24
42
Proposed
SQUARE FEET CALCULATIONS
SIGN 01: Monument Sign
S IG N
3
S IG N
2
SIGN
110’ SETBACK FROM
PROPERTY LINE
SIGN 02: Exterior Front Channel Letters
SIGN 03: Exterior Rear Channel Letters
3 :12
The purchaser agrees to hold the seller harmless against
any cause for action for damages which may occur as a
result of drilling for piers and foundations, including but not
limited to sewer, gas lines or any underground obstacles
which the purchaser or others may deem valuable.
8941 Crossroads Blvd
Chanhassen
MN 55317
Connie Keck
JW
Vx1100488-R2
07/21/20
10/16/20
This design and engineering is
submitted as our proposal, and
the right to use or exhibit in any
form, is not authorized without
written permission by Vixxo.
Address
City
State
Account Representative:
Notes
Designer
Design #
Original Date
Revision Date
All electrical scope to be completed in a U.L. approved
method and shall meet current N.E.C. standards
All electrical components shall be U.L. Listed.
Sign shall be grounded per N.E.C. Article 250.
Insulated conductors as per N.E.C. Code 310.8.
type to be used - metallic insulated sealtite.
Disconnect switch as per N.E.C. Code 600.6.
s i g n & l i g h t i ng5'-
0" O.A.H.D/F MONUMENT SIGN STRUCTURE AND
F.C.
O. NUMBERS 7'-
0"18"6'-9"
3'-2"3'-
5"1'-7"6"BRICK
BASE
TO MATCH BUILDING)18"
4'-1"3'-7"
4" DIA
SUPPORT PIPE UNDISTURBED SOIL 7’-2’(W) x 18”(
L) x 5”(D)4
REBAR
@12” O.C. 5” 6”
OF CONCRETE OR CRUSHED CINDER
BLOCKS PLACED IN BOTTOM OF FOUNDATIONPRIORTOMAINPOUR.
2500 PSI CONCRETE (MIN.)
TYPICAL OF ONE
PIER 5” ELECTRICAL
CONDUIT ALONG STEEL
PIPEWITHJ-BOX
S
I
G N
1 89418941
Section Detail BLACK
SIDES)THICK
LETTER FORM WHITE FACES)
NON-CORROSIVE MOUNTING
PIN
SEALED WITH SILCONE SPECIFICATIONS 1. 18” DEEP ALUMINUM CABINET FILLER PAINTED TO MATCH PMS 349
C GREEN, GLOSSY FINISH.2. ALL CABINET INTERIORS ARE
PAINTED LIGHT ENHANCEMENT WHITE.3. 1 ½” EXTRUDED ALUMINUM RETAINER SECTIONS PAINTED TO MATCH PMS 349
C GREEN, GLOSSY FINISH.4. FACES ARE FLAT TRANSLUCENT WHITE ACRYLIC WITH FIRST SURFACE VINYL OVERLAYS & WILL
SLIDE OUT FOR SERVICE.5. VINYL COLORS
ARE PER COLOR SCHEDULE.6. INTERNALLY ILLUMINATED
WITH
WHITE LED’S.7.
PAINTED TO MATCH CABINET.CABINET POWER CUTOFF SWITCH TO BE MOUNTED ON SIDE OF CABINET WITH
WEATHERPROOF FLIP-UP COVER 8. ADDRESS
NUMBERS ARE ½” WHITE ACRYLIC MOUNTED TO BASE WITH
STUD MOUNTS. (BOTH SIDES)F.
C.O. NUMBERS SPECIFICATIONS 1. ½” THICK OPAQUE
WHITE GEMINI #
5687 PLASTIC LETTER FORMS.NUMBERS HAVE WHITE FACES
WITH BLACK EDGE (SIDES)2.
LETTERS ARE NON-ILLUMINATED.3. COPY
STYLE: CLARENDON FORTUNE BOLD 4. FLUSH MOUNTED
TO MONUMENT WITH APPROPRIATE NON-CORROSIVE
MOUNTING HARDWARE
AND SEALED WITH
SILICONE.PMS 349 C
ARLON 3M #3630-
26 LOGO VINYL DETAIL WHITE #
3630-26 GREEN VINYL
72 LIGHT GRAY VINYL SCALE:
3/8”=
1’-0”SQUARE FOOTAGE:SQ.
FT. PER FACE: 24
CABINET POWER CUTOFF SWITCH TO BE MOUNTED
ON SIDE OF CABINET WITH
WEATHERPROOF FLIP-UP COVER
4 :12
The purchaser agrees to hold the seller harmless against
any cause for action for damages which may occur as a
result of drilling for piers and foundations, including but not
limited to sewer, gas lines or any underground obstacles
which the purchaser or others may deem valuable.
8941 Crossroads Blvd
Chanhassen
MN 55317
Connie Keck
JW
Vx1100488-R2
07/21/20
10/16/20
This design and engineering is
submitted as our proposal, and
the right to use or exhibit in any
form, is not authorized without
written permission by Vixxo.
Address
City
State
Account Representative:
Notes
Designer
Design #
Original Date
Revision Date
All electrical scope to be completed in a U.L. approved
method and shall meet current N.E.C. standards
All electrical components shall be U.L. Listed.
Sign shall be grounded per N.E.C. Article 250.
Insulated conductors as per N.E.C. Code 310.8.
type to be used - metallic insulated sealtite.
Disconnect switch as per N.E.C. Code 600.6.
s i g n & l i g h t i n g
S IG N
2
157’-6”
S C AL E: N.T.S.
37’-2”
24”
S CO P E O F WO R K:
1. FABRI C AT E, S H I P & IN STAL L (1) ON E N E W S E T - 22” INDI VI D UA L C H A N N E L L E T T E RS WITH BACK PA NE LS O N W IR E-WAYS.
B U I L D I N G (F R O N T) E L E VAT I O N S CAL E: 3/32”=1’-0”
LH 9) ILLUM IN AT E D 22” C H A N N E L LET TE RS W ITH B AC K PA N ELS O N W IR E-WAY S
5 :12
The purchaser agrees to hold the seller harmless against
any cause for action for damages which may occur as a
result of drilling for piers and foundations, including but not
limited to sewer, gas lines or any underground obstacles
which the purchaser or others may deem valuable.
8941 Crossroads Blvd
Chanhassen
MN 55317
Connie Keck
JW
Vx1100488-R2
07/21/20
10/16/20
This design and engineering is
submitted as our proposal, and
the right to use or exhibit in any
form, is not authorized without
written permission by Vixxo.
Address
City
State
Account Representative:
Notes
Designer
Design #
Original Date
Revision Date
All electrical scope to be completed in a U.L. approved
method and shall meet current N.E.C. standards
All electrical components shall be U.L. Listed.
Sign shall be grounded per N.E.C. Article 250.
Insulated conductors as per N.E.C. Code 310.8.
type to be used - metallic insulated sealtite.
Disconnect switch as per N.E.C. Code 600.6.
s i g n & l i g h t i n g
S IG N
2
5” FABRICATED ALUMINUM LETTER RETURNS
PAINTED BLACK
PAINT INTE RIOR WITH LIGHT ENHANCING PAINT
1” TRIM CAP
BLACK
NON-CORROSIVE INSTALLATION HARDWARE:
SEE DETAIL
3/16” THICK #7328 PLEX/POLYCARBONATE FACE
WHITE
LED DIODE M ODULE WHITE (MIN. 15’ LEADS)
WEEP HOLES (2) TWO PER LETTER
LOW VOLTAGE ELECTRONIC TRANSFORMER
LOCATED IN INTERIOR WALL AREA INSIDE A
PROTECTIVE CASE BOX
GROUNDED WALL PASS-THRU SEALED WATE R TI GHT
SHOWN AS TYPICAL / FRONT ELEVATION TO
HAVE PASS THROUGH AT TOP OF LETTER)
WATE RPROOF FLEXIBLE CONDUIT FOR WIRING
FLAT ALUMINUM BACK WELDED TO RETURNS
PAINTED BLACK
9
8
7
6
5
4
3
2
1
10
1
2
3
4
6
5
8
7
9
10
11 UL LISTED AND APPROVED 20AMP
DISCONNECT SWITCH
SP EC IFIC AT IO N S SID E SEC T IO N V IEW M O U N TIN G D ETAI L
11
12
12 2” DEEP WIRE-WAY PAINTED BLACK
13
13 1” CONTOUR .063 ALUMINUM PAINTED GLOSS BLACK
C OLOR SC H E D U LE
PMS BLACK
PMS 349 C
ARLON 3M #3630-26
BLACK
SC A LE 3/16”=1’22” LED ILLUMINATED CHANNEL LETTER SET WITH BAC K PANELS ON WIRE-WAYS
37’-2”
1’-10”2’-0”
9”9”
74.3 SQF T
6 :12
The purchaser agrees to hold the seller harmless against
any cause for action for damages which may occur as a
result of drilling for piers and foundations, including but not
limited to sewer, gas lines or any underground obstacles
which the purchaser or others may deem valuable.
8941 Crossroads Blvd
Chanhassen
MN 55317
Connie Keck
JW
Vx1100488-R2
07/21/20
10/16/20
This design and engineering is
submitted as our proposal, and
the right to use or exhibit in any
form, is not authorized without
written permission by Vixxo.
Address
City
State
Account Representative:
Notes
Designer
Design #
Original Date
Revision Date
All electrical scope to be completed in a U.L. approved
method and shall meet current N.E.C. standards
All electrical components shall be U.L. Listed.
Sign shall be grounded per N.E.C. Article 250.
Insulated conductors as per N.E.C. Code 310.8.
type to be used - metallic insulated sealtite.
Disconnect switch as per N.E.C. Code 600.6.
s i g n & l i g h t i n g
S IG N
3
S C AL E: N.T.S.
LH 9) ILLUM IN AT E D 16” C H A N N E L LET TE RS W ITH B AC K PA N ELS O N R A C E-WAYS
B U I L D I N G (R E A R ) E L E VAT I O N S CAL E: 3/32”=1’-0”
S CO P E O F WO R K:
1. FABRI C AT E, S H I P & IN STAL L (1) ON E N E W S E T - 16” INDI VI D UA L C H A N N E L L E T T E RS WITH BACK PA NE LS O N RAC E-WAYS.
28’
18”
157’-6”
7 :12
The purchaser agrees to hold the seller harmless against
any cause for action for damages which may occur as a
result of drilling for piers and foundations, including but not
limited to sewer, gas lines or any underground obstacles
which the purchaser or others may deem valuable.
8941 Crossroads Blvd
Chanhassen
MN 55317
Connie Keck
JW
Vx1100488-R2
07/21/20
10/16/20
This design and engineering is
submitted as our proposal, and
the right to use or exhibit in any
form, is not authorized without
written permission by Vixxo.
Address
City
State
Account Representative:
Notes
Designer
Design #
Original Date
Revision Date
All electrical scope to be completed in a U.L. approved
method and shall meet current N.E.C. standards
All electrical components shall be U.L. Listed.
Sign shall be grounded per N.E.C. Article 250.
Insulated conductors as per N.E.C. Code 310.8.
type to be used - metallic insulated sealtite.
Disconnect switch as per N.E.C. Code 600.6.
s i g n & l i g h t i n g
S IG N
3
16” LED ILLU MI N AT ED C H A N N EL LET T ER SE T W IT H BA C K PA N E LS O N R AC E-WAYS
9
8
7
6
5
4
3
2
1
10
5” FABRICATED ALUMINUM LETTER RETURNS
PAINTED BLAC K
PAINT INTERIOR WITH LIGHT ENHANCING PAINT
1” TRIM CAP RETAINER
BLACK
3/16” THICK PLEX/POLYCARBONATE FACE
WHITE
WEEP HOLES (2) TWO PER LE TTER
GROUNDED WALL PASS-THRU
SEALED WATER TIGHT
NON-CORROSIVE INSTALLATION HARDWARE:
SEE DETAIL
LED DIODE MODULE WHITE
THICK METAL FLAT BAR FOR
A SECURE INSTALLATIO N
LOW VOLTAGE ELECTRONIC TRANSFORME R
MOUNTED IN A 7 ¼” X 7 ¼” EXTRUDED .050
ALUM. RACEWAY SUPPORT/WIRING BOX
PAINTED BLAC K
VISIBLE CUT-OFF SWITCH WITH FLIP-UP COVER
FLAT ALUMINUM BACK WELDED TO RETURNS
11
1
2
3
4
5
8
11
9
10
7
6
1” CONTOUR .063 ALUMINUM PAINTED GLOSS BLACK12
12
SP EC IFIC AT IO N S SID E SEC T IO N V IEW M O U N TIN G D ETAI L C OLOR SC H E D U LE
PMS BLACK
PMS 349 C
ARLON 3M #3630-26
BLACK
SC A LE 1/4”=1’
28’-0”
16”18”
6 ¾”6 ¾”
42 SQ FT
8 :12
The purchaser agrees to hold the seller harmless against
any cause for action for damages which may occur as a
result of drilling for piers and foundations, including but not
limited to sewer, gas lines or any underground obstacles
which the purchaser or others may deem valuable.
8941 Crossroads Blvd
Chanhassen
MN 55317
Connie Keck
JW
Vx1100488-R2
07/21/20
10/16/20
This design and engineering is
submitted as our proposal, and
the right to use or exhibit in any
form, is not authorized without
written permission by Vixxo.
Address
City
State
Account Representative:
Notes
Designer
Design #
Original Date
Revision Date
All electrical scope to be completed in a U.L. approved
method and shall meet current N.E.C. standards
All electrical components shall be U.L. Listed.
Sign shall be grounded per N.E.C. Article 250.
Insulated conductors as per N.E.C. Code 310.8.
type to be used - metallic insulated sealtite.
Disconnect switch as per N.E.C. Code 600.6.
s i g n & l i g h t i n g
S IG N
4
A D D R E S S N U M B E R F.C.O. L E T T E R E L E VAT I O N
1) O N E SET REQ U IR E D
SCOP E OF WOR K
1. FAB R IC ATE, SH IP & INSTALL (1) O NE SE T NE W G E MI NI A D DRE S S NUM B ERS.
SP ECIF IC ATIONS
1. ½” TH IC K OPAQ U E WHITE GEM IN I #5687 PL ASTI C LET TER FO R MS.
N U MBERS H AV E WHI TE FAC ES W IT H BL ACK E DG E (SI DE S)
2. LET TERS ARE NON-ILLUM IN ATED.
3. COP Y STYL E: CLA REN DON FORTUN E BOLD
4. F LUS H MOUN T E D TO BUI LD IN G WITH APP ROP RIAT E NON-C O RRO SI V E
M O U NT ING H ARDWARE A ND S EAL E D WI TH SI LI CON E.
SC A L E: 1”=1’-0”
S Q UA R E FOOTA G E: 2.56
SCALE: 1/8”=1’-0”
89418941
3’-1”
Section Detail
BLACK SIDES)
THICK LETTER FORM
WHITE FACES)
NON-CORROSIVE MOUNTING PIN
SEALED WITH SILCONE
894110”
3’-1”
LH 9) EN D ELE VAT IO N N U M B ER FO R M S
10”
9 :12
The purchaser agrees to hold the seller harmless against
any cause for action for damages which may occur as a
result of drilling for piers and foundations, including but not
limited to sewer, gas lines or any underground obstacles
which the purchaser or others may deem valuable.
8941 Crossroads Blvd
Chanhassen
MN 55317
Connie Keck
JW
Vx1100488-R2
07/21/20
10/16/20
This design and engineering is
submitted as our proposal, and
the right to use or exhibit in any
form, is not authorized without
written permission by Vixxo.
Address
City
State
Account Representative:
Notes
Designer
Design #
Original Date
Revision Date
All electrical scope to be completed in a U.L. approved
method and shall meet current N.E.C. standards
All electrical components shall be U.L. Listed.
Sign shall be grounded per N.E.C. Article 250.
Insulated conductors as per N.E.C. Code 310.8.
type to be used - metallic insulated sealtite.
Disconnect switch as per N.E.C. Code 600.6.
s i g n & l i g h t i n g
SC A L E: 3/16”=1’-0”
SIGN
6
SIGN
5(2) 12” x 73 ½”
ETCHED VINYL STRIPS
1) 15” x 32”
ETCHED VINYL LOGO
2) 12” x 62”
ETCHED VINYL STRIPS
1) 15” x 32”
ETCHED VINYL LOGO
1) 12” x 24”
ETCHED VINYL STRIP
CHRISTIAN BROTHERS
SINCE 1982
FCO LETTERS
T-2 RECEPTION / SERVICE FLOOR PLAN
10 :12
The purchaser agrees to hold the seller harmless against
any cause for action for damages which may occur as a
result of drilling for piers and foundations, including but not
limited to sewer, gas lines or any underground obstacles
which the purchaser or others may deem valuable.
8941 Crossroads Blvd
Chanhassen
MN 55317
Connie Keck
JW
Vx1100488-R2
07/21/20
10/16/20
This design and engineering is
submitted as our proposal, and
the right to use or exhibit in any
form, is not authorized without
written permission by Vixxo.
Address
City
State
Account Representative:
Notes
Designer
Design #
Original Date
Revision Date
All electrical scope to be completed in a U.L. approved
method and shall meet current N.E.C. standards
All electrical components shall be U.L. Listed.
Sign shall be grounded per N.E.C. Article 250.
Insulated conductors as per N.E.C. Code 310.8.
type to be used - metallic insulated sealtite.
Disconnect switch as per N.E.C. Code 600.6.
s i g n & l i g h t i n g
S CAL E: 1/4”=1’-0”
COLOR SCHEDULE
07 ETCHED GLASS VINYL
GLASS ETCHED VINYL GRAPHIC
RECEPTION / WAITING
SERVICE
GLASS ETCHED VINYL
SPECIFICATIONS
1. #07 ETCHED GLASS VINYL OVERLAY.
2. OVERLAY APPLIED TO GLASS 2ND SURFACE
BACK OF GLASS)
1Since9821Since982
CENTER
ON
GLASS
CENTER
ON
GLASS
CENTER
ON
GLASS
SI GN
5
12”
12”
62”73 ½”
2) 12” x 73 ½” ETCHED VINYL STRIPS
1) 15” x 32” ETCHED VINYL LOGO
1) 12” x 24” ETCHED VINYL STRIP
2) 12” x 62” ETCHED VINYL STRIPS
1) 15” x 32” ETCHED VINYL LOGO
32”32”
24”
12”
15”
11 :12
The purchaser agrees to hold the seller harmless against
any cause for action for damages which may occur as a
result of drilling for piers and foundations, including but not
limited to sewer, gas lines or any underground obstacles
which the purchaser or others may deem valuable.
8941 Crossroads Blvd
Chanhassen
MN 55317
Connie Keck
JW
Vx1100488-R2
07/21/20
10/16/20
This design and engineering is
submitted as our proposal, and
the right to use or exhibit in any
form, is not authorized without
written permission by Vixxo.
Address
City
State
Account Representative:
Notes
Designer
Design #
Original Date
Revision Date
All electrical scope to be completed in a U.L. approved
method and shall meet current N.E.C. standards
All electrical components shall be U.L. Listed.
Sign shall be grounded per N.E.C. Article 250.
Insulated conductors as per N.E.C. Code 310.8.
type to be used - metallic insulated sealtite.
Disconnect switch as per N.E.C. Code 600.6.
s i g n & l i g h t i n g
IN T ER IO R LET T E R FO R M S
9’-0”
1 ¼”
5”
5 ½”
SC A L E: ¾”=1’-0”I N T E R I O R F L AT C U T O U T L E T T E R S E T E L E VAT I O N
1) O NE SET REQU IR ED
SCOPE O F WO RK
1. FA BRI CATE, SH IP & INSTA L L (1) O NE SE T FLAT CUT OUT LET T E RS.
SPECIFI CATI ON S
1. LETTERS: ¼” THICK SINTRA PAINTED FIRST SURFACE WHITE GLOSSY FINISH.
2. COP Y STY L E: CLA RE N D ON
3. LET TE RS MO U N TED FLUSH TO WALL WITH VHB TA PE AN D SI L ICONE.
SERVICE S C A L E: 1/4”=1’-0”
SI GN
6
1Since9821Since982
9"9"
CENTER
ON
WALL
CENTER
ON
WALL
EX A M P L E
THICK SINTRA FORM
SECT ION D E TAI L
VHB TAPE WITH SILICONE
ADHESIVE AS REQUIRED
CO LO R S C H ED U LE
W HITE
5 ½"
1Since982
12 :12
The purchaser agrees to hold the seller harmless against
any cause for action for damages which may occur as a
result of drilling for piers and foundations, including but not
limited to sewer, gas lines or any underground obstacles
which the purchaser or others may deem valuable.
8941 Crossroads Blvd
Chanhassen
MN 55317
Connie Keck
JW
Vx1100488-R2
07/21/20
10/16/20
This design and engineering is
submitted as our proposal, and
the right to use or exhibit in any
form, is not authorized without
written permission by Vixxo.
Address
City
State
Account Representative:
Notes
Designer
Design #
Original Date
Revision Date
All electrical scope to be completed in a U.L. approved
method and shall meet current N.E.C. standards
All electrical components shall be U.L. Listed.
Sign shall be grounded per N.E.C. Article 250.
Insulated conductors as per N.E.C. Code 310.8.
type to be used - metallic insulated sealtite.
Disconnect switch as per N.E.C. Code 600.6.
s i g n & l i g h t i n g
WINDOW VINYL
S IG N
7
SCALE: 1 ½”=1’-0”
COLOR SCHEDULE
07 ETCHED GLASS VINYL
WINDOW VINYL GRAPHIC ELEVATION
SATURDAYS
8AM - 2PM
20”
24”
12 ½”
24 ½”
36”
5 ¾”
1 ½”
1 ½”
1 ½”
1 ¼”
1”
1 ½”
1 ½”
SCALE: ¾”=1’-0”
Nice difference.SATURDAYS
8AM - 2PM
Nice difference.
1) ONE REQUIRED
SPECIFICATIONS
1. #07 ETCHED GLASS VINYL OVERLAY.
2. OVERLAY APPLIED TO GLASS 2ND SURFACE
INSIDE OFFICE)