Loading...
PC SUM 2005 08 02 CHANHASSEN PLANNING COMMISSION REGULAR MEETING SUMMARY MINUTES AUGUST 2, 2005 Chairman Sacchet called the meeting to order at 7:00 p.m. MEMBERS PRESENT: Uli Sacchet, Jerry McDonald, Debbie Larson, Deborah Zorn, Kurt Papke, and Mark Undestad MEMBERS ABSENT: Dan Keefe STAFF PRESENT: Kate Aanenson, Community Development Director; Lori Haak, Water Resource Coordinator; Don Asleson, Natural Resources Technician; and Sharmeen Al-Jaff, Senior Planner PUBLIC PRESENT FOR ALL ITEMS: Janet Paulsen 7305 Laredo Drive PUBLIC HEARING: REQUEST FOR WETLAND ALTERATION PERMIT TO CONSTRUCT WALKWAY AND DOCK ON PROPERTY LOCATED AT 6440 FOX PATH, MARIANNE McCORD & DAVID SANFORD, PLANNING CASE 05-22. Public Present: Name Address Marianne McCord and David Sanford 6440 Fox Path Tom Meier 695 Pleasant View Road Jahn Dyvik 610 Pleasant View Road Lori Haak presented the staff report on this item. Commissioner McDonald asked for clarification on the depth of the lake in this area, dredging of the channel and placement of the dock. Commissioner Larson asked for further clarification on placement of the dock. Commissioner Papke asked staff to explain what responsibility and authority the Planning Commission has in regards to the conservation easement and if there is precedence of the Planning Commission over riding a conservation easement in granting a dock like this. Chairman Sacchet asked why Lot 9 was not included in the community dock and clarification on the city and state regulations for docks. The applicant, David Sanford, 6440 Fox Path provided background information and his wife, Marianne McCord presented more detailed information of their request. Commissioner McDonald asked the applicants to explain what their understanding was when they purchased their home and their definition of open water. Chairman Sacchet opened the public hearing. Tom Meier, 695 Pleasant View Road provided historical background on this neighborhood having lived for 9 years at 6410 Fox Path, which is Lot 6, and now living Planning Commission Summary – August 2, 2005 at the property with the dock directly adjacent to where this dock is proposed to go. He showed pictures and reviewed the letter he submitted to the commission stating his opposition to this request. Chairman Sacchet closed the public hearing. After commission discussion the following motion was made. McDonald moved, Papke seconded that the Planning Commission recommends denial of the Wetland Alteration Permit #05-22 for a boardwalk across the wetlands at 6440 Fox Path, based upon the Findings of Fact in the staff report. All voted in favor, except Larson who opposed, and the motion carried with a vote of 5 to 1. PUBLIC HEARING: REQUEST FOR REZONING OF PROPERTY FROM A2 TO PUD-R, SUBDIVISION WITH VARIANCES OF APPROXIMATELY 36.01 ACRES INTO 30 LOTS, 1 OUTLOT AND PUBLIC RIGHT-OF-WAY; CONDITIONAL USE PERMIT FOR GRADING IN THE BLUFF CREEK OVERLAY DISTRICT; AND SITE PLAN APPROVAL FOR 138 TOWNHOUSES. THE PROPERTY IS LOCATED EAST OF AUDUBON ROAD AND NORTH OF PIONEER TRAIL (1500 PIONEER TRAIL), LIBERTY AT CREEKSIDE, TOWN AND COUNTRY HOMES, PLANNING CASE NO. 05-24. Public Present: Name Address Kevin Clark Town & Country Homes Rick Janssen Town & Country Homes Ed Hasek Westwood Professional Services Kate Aanenson presented the staff report, noting that staff is recommending tabling of this item. Commissioner Papke asked for clarification of the sight line elevations from the Peterson Bluff neighborhood stating a desire to better understand the transition process. Commissioner McDonald asked to see more clarification on the road system in the area. Chairman Sacchet asked for clarification on grading, retaining walls, housing types, access to the wetland mitigation areas, and tree inventory. Commissioner Papke asked for clarification of the parking plan. Kevin Clark, Director of Land Development for Town and Country Homes introduced his team of Rick Janssen, Vice President of Acquisition and Ed Hasek, Senior Landscape Architect with Westwood Professional Services. He thanked city staff for their assistance and reviewed their proposal. Chairman Sacchet asked for a clearer understanding of why they were choosing to go with only one housing type and clarification of the X’s on the tree survey. Chairman Sacchet opened the public hearing. Janet Paulsen, 7305 Laredo Drive asked why the item was noticed with variances when no variances were being requested and clarification of the difference between public street, private streets and private drives. Chairman Sacchet closed the public hearing. The commission directed staff and the developer to address the items listed in the staff report along with the following items: show the location of the trail along Bluff Creek, look at the gathering areas to perhaps include playground equipment, look at an additional housing product, and additional off street parking. 2 Planning Commission Summary – August 2, 2005 Zorn moved, Larson seconded that the Planning Commission recommends tabling the request for rezoning from A2 to PUD-R, site plan review with subdivision for the following reasons: 1. Allow staff the opportunity to work with the developer’s engineer to attempt to reduce the number and height of the proposed retaining walls; and 2. Significant changes to the grading plan that may result from #1 may change the site plan; and 3. Work to create greater neighborhood identity and housing design. The applicant shall work with staff to incorporate the following conditions prior to the next submittal: Park and Recreation Recommended Conditions of Approval. 1. Park fees in lieu of land dedication as a condition of this subdivision. 2. Additional pedestrian trails, sidewalks and trail connectors also need to be incorporated into the project as required. The planning and construction and financing of these pedestrian improvements are the responsibility of the applicant. The City will reimburse Town and Country Homes the cost of construction materials only for the ten-foot wide Bluff Creek trail. Water Resources Subdivision Recommended Conditions of Approval. 1. The applicant shall work with staff to address comments on Liberty on Bluff Creek’s wetland mitigation that are received from the reviewing agencies. The wetland mitigation for Liberty on Bluff Creek shall be constructed prior to or concurrent with wetland impacts on the Liberty on Bluff Creek project. Wetland replacement shall occur in a manner consistent with the Minnesota Wetland Conservation Act (MR 8420) and the conditions of the Wetland Alteration Permit for Liberty on Bluff Creek. 2. Wetland buffers 16.5 to 20 feet in width (with a minimum average of 16.5 feet) shall be maintained around Wetlands A and B and the constructed wetland mitigation areas. Wetland buffer areas shall be preserved, surveyed and staked in accordance with the City’s wetland ordinance. The applicant shall install wetland buffer edge signs, under the direction of city staff before construction begins and must pay the City $20 per sign. 3. All structures shall maintain a minimum 40 foot setback from the edge of the wetland buffer. 4. The plans shall be revised to show bluff areas (i.e. slope greater than or equal to 30% and a rise in slope of at least 25 feet above the toe). All bluff areas shall be preserved. In addition, all structures shall maintain a minimum 30 foot setback from the bluff and no grading shall occur within the bluff impact zone (i.e. the bluff and land located within 20 feet from the top of the bluff). 3 Planning Commission Summary – August 2, 2005 5. All structures shall maintain a minimum 40 foot setback from the primary corridor. No alterations shall occur within the primary corridor or within the first 20 feet of the setback from the primary corridor. The grading plan shall be revised to eliminate alterations within the primary corridor or within the first 20 feet of the setback from the primary corridor. 6. The applicant shall submit a plan for the revegetation of the area south of Bluff Creek that incorporates native plants and is consistent with the City’s Bluff Creek Natural Resources Management Plan. Special attention shall be paid to areas with steep slopes (greater than 3:1). 7. The applicant shall determine whether impacts are proposed within the mapped FEMA Unnumbered A Zone and shall either submit a Letter of Map Amendment (LOMA) showing that this area is not floodplain or obtain a conditional use permit for alterations within the floodplain if impacts are proposed. 8. A storm water pollution prevention plan (SWPPP) is needed for the development and shall be completed prior to applying for the National Pollutant Discharge Elimination System permit. The SWPPP shall be submitted to the City and the Carver Soil and Water Conservation District (CSWCD) for review prior to final approval. 9. A stable emergency overflow (EOF) for the proposed pond shall be shown on the plans. A typical detail shall be included with the plan. 10. The plans shall show paths of access to both wetland mitigation areas as well as all erosion controls and restoration practices. 11. Additional erosion control notes shall be provided on the plan to address the extension of storm sewer outside the perimeter controls; erosion control blanket shall be installed as needed in this area within 24 hours of storm sewer installation. 12. Erosion control blanket shall be installed on all slopes greater than or equal to 3:1. All exposed soil areas shall have temporary erosion protection or permanent cover year round, according to the following table of slopes and time frames: Type of Slope Time (Maximum time an area can Steeper than 3:1 7 days remain open when the area 10:1 to 3:1 14 days is not actively being worked.) Flatter than 10:1 21 days These areas include constructed storm water management pond side slopes and any exposed soil areas with a positive slope to a storm water conveyance system, such as a curb and gutter system, storm sewer inlet, temporary or permanent drainage ditch or other natural or man made systems that discharge to a surface water. 4 Planning Commission Summary – August 2, 2005 13. Street cleaning of soil tracked onto public streets shall include daily street scraping and street sweeping as needed. 14. The silt fence proposed for the north side of the property shall be moved to be consistent with the Bluff Creek Overlay District Grading Limit Line, as shown on Sheet 5 of 10. 15. Wimco-type inlet controls shall be used along curbs and installed within 24 hours of installation. 16. Typical building lot controls shall be shown on the plan. These controls shall include perimeter controls (silt fence), rock driveways, street sweeping, inlet control and temporary mulch after final grade and prior to issuing the certificates of occupancy. 17. The proposed storm water pond shall be used as a temporary sediment basin during mass grading. The pond shall be excavated prior to disturbing up gradient areas. Diversion berms or ditches shall be used to divert water to the pond and a temporary pond outlet should be installed. A detail shall be provided for the temporary pond outlet. Additional temporary sediment basins shall be constructed if necessary during construction. 18. The ultimate outlet from the site to Bluff Creek shall be adjusted to discharge water parallel to the creek flow. The outlet shall be turned to the southeast to align with the creek. 19. Storm sewer plans shall be revised in two locations so storm sewer is not located beneath retaining walls. Plans for the storm sewer shall be submitted. 20. Drainage and utility easements (minimum 20 feet in width) shall be provided over all existing wetlands, wetland mitigations areas, buffer areas used as Public Value Credit (PVC) and storm water ponds. An easement adequate to provide access to the pond for maintenance purposes is needed and shall be shown on the plan. 21. At this time the estimated total SWMP fee, due payable to the City at the time of final plan recording, is $221,678.00. 22. The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g. Riley-Purgatory-Bluff Creek Watershed District, Minnesota Pollution Control Agency (NPDES Phase II Construction Permit), Minnesota Department of Natural Resources (for dewatering), Army Corps of Engineers, Minnesota Department of Health, Minnesota Department of Transportation, and comply with their conditions of approval. Forestry Recommended Conditions of Approval. 1. Tree protection fencing shall be installed prior to construction around all areas designated for preservation. 2. Silt fence or tree protection fencing shall be installed at the edge of grading around both wetland mitigation areas. 5 Planning Commission Summary – August 2, 2005 3. A fenced access road will lead from the east mitigation area to the west mitigation area. This will be the only access allowed to the western site. Fencing shall be placed on either side of the access lane. 4. Additional landscaping will be required behind the units on Lot 7, Block 1 to increase privacy and minimize headlight glare. A minimum of 6 evergreens and 3 ornamentals shall be strategically located behind the units. 5. A walk through inspection of the silt/tree preservation fence shall be required prior to construction. Fire Marshal Recommended Conditions of Approval. 1. No burning permits will be issued for trees to be removed. Trees and shrubs must either be removed from the site or chipped. 2. Temporary Street signs shall be installed on street intersections once construction of the new roadway allows passage of vehicles. Pursuant to 2002 Minnesota Fire Code Section 501.4. 3. A fire apparatus access road shall be designed and maintained to support the imposed load of fire apparatus and shall be serviced so as to provide all weather driving capabilities. Pursuant to Minnesota Fire Code Section 503.2.3. 4. Fire apparatus access road and water supplies for fire protection is required to be installed. Such protection shall be installed and made serviceable prior to and during the time of construction except when approved alternate methods of protection are provided. Building Recommended Conditions of Approval. 1. Accessibility will have to be provided to all portions of the development and a percentage of the units may also be required to be accessible or adaptable in accordance with Minnesota State Building Code Chapter 1341. Further information is needed to determine these requirements. 2. The buildings are required to be protected with an automatic sprinkler system if they are over 8,500 square feet in floor area. For the purposes of this requirement property lines do not constitute separate buildings and the area of basements and garages is included in the floor area threshold. 3. The buildings will be required to be designed by an architect and engineer as determined by the Building Official. 4. The developer must submit a list of proposed street names and an addressing plan for review and approval prior to final plat of the property. 6 Planning Commission Summary – August 2, 2005 5. Demolition permits must be obtained before demolishing any structures on the site. 6. A final grading plan and soils report must be submitted to the Inspections Division before permits can be issued. 7. Walls and projections within three feet of property lines are required to be of one-hour fire resistive construction. 8. Retaining walls over four feet high require a permit and must be designed by a professional engineer. 9. Each lot must be provided with separate sewer and water services. 10. The developer and/or their agent shall meet with the Inspections Division as early as possible to discuss plan review and permit procedures. All voted in favor and the motion carried unanimously with a vote of 6 to 0. PUBLIC HEARING: REQUEST FOR SUBDIVISION WITH VARIANCES ON PROPERTY ZONED PUD-R LOCATED AT 6560 MINNEWASHTA PARKWAY, MINNEWASHTA CREEK HILLS, APPLICANT ROBERT RICK (FOR PROPERTY OWNERS TIM & MARY COLLERAN), PLANNING CASE NO. 05-25. Public Present: Name Address Steve Larson 3861 Leslee Curve Tim Colleran 6560 Minnewashta Parkway Kevin Mattson 8566 Drake Court Robert Rick 4700 Otter Lake Road, White Bear Lake Connie Villari 1257 Winslow, West St. Paul Mr. & Mrs. Gil Laurent 24760 Cedar Point Road Ruth Menten 6630 Minnewashta Parkway Mary Knutson Rogers 3851 Leslee Curve Julie Ann Terpstra 6581 Joshua Circle Marcia Ortner 3920 Linden Circle Michael J. Barnes 3840 Linden Circle Brian L. Windschitl 6591 Joshua Circle Jim Markham 6500 Kirkwood Circle Greg Greenwood 6501 Kirkwood Circle R.W. Hueffmeier 6551 Kirkwood Circle Anthony Farina 6590 Joshua Circle 7 Planning Commission Summary – August 2, 2005 Sharmeen Al-Jaff presented the staff report on this item. Commissioner McDonald asked for clarification on the grades and slope of the access to the site. Chairman Sacchet asked for clarification on the right-of-way of Minnewashta Parkway and hard surface requirements. The applicant, Robert Rick stated that through the entire process they kept in mind trying to minimize the impact on the current lot. Chairman Sacchet opened the public hearing. The owner, Tim Colleran stated his thanks to the neighbors for coming out in support of the development and that he was looking forward to their comments. Ruth Menten, 6630 Minnewashta Parkway, having lived on Minnewashta Parkway since the 1970’s, stated this house is a historical landmark and expressed concern with traffic coming out across the trail. Jim Markham, President of the Minnewashta Creek Homeowners Association stated their beachlot is across the street from this property and right now the Colleran’s have access to an easement to walk across their beach. Their concern is if all 3 homes are now going to have that same easement. Sharmeen Al-Jaff stated in speaking with the City Attorney, he noted that the issue is a private matter between the homeowners association and the Colleran’s. Brian Windschitl, 6591 Joshua Circle questioned the accuracy of the tree survey, the number of trees being lost, and clarification of building height requirements. Anthony Farina, 6590 Joshua Circle asked what the neighbors are getting from this development. He had concern with tearing down a house built in the 1850’s and the height of the new homes being built. Commissioner Papke asked staff to comment on the historical status of the home. Sharmeen Al-Jaff stated it is not on the National Historical Registry. Larry Nelson, 3860 Linden Circle asked why Chanhassen doesn’t have a preservation association in the city and clarification of the beachlot issue. Mary Knutson Rogers, 3851 Leslee Curve questioned the width of the driveway. Ruth Menten reiterated her concern with sight lines coming out onto Minnewashta Parkway. Mike Barnes, 3840 Linden Circle expressed concern with drainage from the property. Janet Paulsen, 7305 Laredo Drive stated a concern with parking since you are not allowed to park on a private street and room for turning around. Jerry Paulsen, 7305 Laredo Drive expressed concern with the height of homes that have been built in the city. Connie Villari with Cornerstone Land Surveying clarified that she’s a licensed surveyor and not an engineer. She addressed the issues of safe access to the property, drainage, private drive and turn around, and accuracy of the tree survey. Greg Greenwood, 6501 Kirkwood Circle expressed concern with parking and pedestrian safety. Chairman Sacchet closed the public hearing. After commission discussion the following motion was made. McDonald moved, Larson seconded that the Planning Commission recommend approval of the preliminary plat for Planning Case 05-25 for Minnewashta Creek Hill for three lots and a variance to allow a private street as shown on the plans received July 20, 2005, subject to the following conditions: 1.Environmental Resources Specialist Conditions: a.Tree preservation fencing shall be installed at the edge of grading limits prior to any construction. Fencing shall be maintained until construction is completed. b.Any preserved trees removed will be replaced at a rate of 2:1 diameter inches. 2.Park and Recreation Conditions: 8 Planning Commission Summary – August 2, 2005 a.In lieu of any land dedication, full park fees shall be collected at the time of platting. With the one existing home, the total park fee for Minnewashta Creek Hill will be $8,000. b.Additional trail construction is not required as a part of this project; however during demolition and construction, the existing pedestrian trail shall be protected and remain open. No construction equipment shall be parked on or use the trail as a staging area during construction. In addition, all match points encountered on the trail for demolition and/or construction shall be professionally constructed. 3.Detailed grading, drainage, tree removal and erosion control plans must be submitted with the building permit for each lot. 4.The driveway grade must be adjusted so that runoff from the driveway will sheet drain to the east. The grades east of the proposed private drive must be adjusted to provide a drainage swale along the east side of the driveway to the proposed catch basin. 5.Any proposed retaining wall over four feet high requires a building permit and must be designed by a Professional Engineer registered in the State of Minnesota. 6.Tree preservation fencing must be installed at the limits of tree removal. All disturbed areas, as a result of construction, shall be seeded and mulched or sodded immediately after grading to minimize erosion. 7.A 75-foot minimum rock construction entrance must be added to the entrance that will be accessed during construction. 8.If importing or exporting material for development of the site is necessary, the applicant will be required to supply the City with a detailed haul route and traffic control plan. 9.The developer shall also extend storm sewer from the existing storm sewer manhole within Minnewashta Parkway at the south end of the property. The upstream storm sewer structure shall have a catch basin cover and a three-foot sump. 10.The lateral sanitary sewer and watermain connections to the existing trunk utilities must be north of the proposed private drive. The developer shall extend 8-inch lateral sanitary sewer from the existing manhole (top elevation 951.23’). 11.A manhole must be installed wherever a bend is proposed in the sanitary sewer. Individual sanitary sewer services must be 6-inch diameter. 12.Six-inch lateral watermain shall be wet tapped from the existing trunk utility. 13.A gate valve must be installed immediately west of the wet tap. 14.A hydrant is required at the end of the proposed watermain for flushing purposes. 9 Planning Commission Summary – August 2, 2005 15.Additional drainage and utility easements may be required based on the revised utility plan. Easements shall be minimum 20-feet wide centered over each utility. 16.According to the City’s Finance Department records, the parcel was previously assessed for one sanitary sewer and water hookup, therefore sanitary sewer and water hookup charges must be paid for two lots. The 2005 trunk hookup charge is $1,458.00 for sanitary sewer and $2,955.00 for water-main. 17.Public utility improvements are required to be constructed in accordance with the City's latest edition of Standard Specifications and Detail Plates. 18.Detailed construction plans and specifications must be submitted at time of final plat. 19.The applicant is required to enter into a development contract with the City and supply the necessary financial security in the form of a letter of credit or cash escrow to guarantee installation of the improvements and the conditions of final plat approval. 20.Permits from the appropriate regulatory agencies will have to be obtained, including but not limited to the MPCA, Department of Health, MCES, and Watershed District. 21.The driveway easement must clearly stipulate that the owners of Lots 1-3, Block 1, Minnewashta Creek Hill shall own and maintain the private drive and the private storm sewer north of the private driveway. The private street must be built to a 7-ton design, 20-foot width. The developer will be required to submit inspection reports certifying this. 22.Water Resource Coordinator Conditions: a.The grading plan shall be revised to show silt fence down slope of all disturbed areas. Chanhassen’s standard detail for silt fence (Plate 5300) shall be included in the plans. b.Erosion control blanket shall be installed on all slopes greater than or equal to 3:1. All exposed soil areas shall have temporary erosion protection or permanent cover year round, according to the following table of slopes and time frames: Type of Slope Time (Maximum time an area can Steeper than 3:1 7 days remain open when the area 10:1 to 3:1 14 days is not actively being worked.) Flatter than 10:1 21 days These areas include constructed storm water management pond side slopes, and any exposed soil areas with a positive slope to a storm water conveyance system, such as a curb and gutter system, storm sewer inlet, temporary or permanent drainage ditch or other natural or man made systems that discharge to a surface water. c.Street cleaning of soil tracked onto public streets shall include daily street scraping and street sweeping as-needed. d.The estimated total SWMP fee, due payable to the City at the time of final plat recording, is $5,355. 10 Planning Commission Summary – August 2, 2005 e.The applicant shall apply for and obtain permits from the appropriate regulatory agencies as necessary (e.g., Minnesota Pollution Control Agency (NPDES Phase II Construction Site Permit), (for dewatering)) and comply with their conditions of approval. 23.Building Official Conditions: a.A final grading plan and soils report must be submitted to the Inspections Division before building permits will be issued. b.Demolition permits must be obtained prior to demolishing any structures on the site. c.Separate water and sewer services must be provided for each lot and must have a separate connection to the public sewer or to a manhole which is connected to the public sewer. d.Curb box valves cannot be located in driveways. e.Permits are required for retaining walls. Walls over four feet high must be designed by a professional engineer. f.The developer must submit a proposed name for the private drive. 24.Fire Marshal Conditions: a.The new proposed private street will need a street name. Submit name to Chanhassen Building Official and Chanhassen Fire Marshal for review and approval. b.No burning permits will be issued for trees to be removed. Trees and shrubs must either be removed from site or chipped. c.Temporary street signs shall be installed on street intersections when construction of a new roadway allows passage of vehicles. Pursuant to 2002 Minnesota Fire Code Section 501.4. d.A fire apparatus access road shall be designed and maintained to support the imposed load of fire apparatus and shall be serviced so as to provide all weather driving capabilities. Pursuant to Minnesota Fire Code Section 503.2.3.” 25. The applicant will work with staff to address the issues of safety of the private street accessing onto Minnewashta Parkway, drainage towards the lake, and providing appropriate parking and turn around areas. All voted in favor, except Papke who opposed, and the motion carried with a vote of 5 to 1. APPROVAL OF MINUTES:Commissioner Papke noted the verbatim and summary minutes of the Planning Commission meeting dated July 19, 2005 as presented. Chairman Sacchet adjourned the Planning Commission meeting at 9:30 p.m.. Submitted by Kate Aanenson Community Development Director Prepared by Nann Opheim 11