Loading...
CC Staff Report 05-10-21CITY COUNCIL STAFF REPORT Monday, May 10, 2021 Subject Approve Final Plat, Plans and Specifications and Development Contract for Deer Haven Subdivision Section CONSENT AGENDA Item No: D.6. Prepared By Bob Generous, Senior Planner File No:  PROPOSED MOTION “The City Council approves: Final Plat for four, single­family lots and one outlot with a variance for the use of a private street to provide direct access to the four lots and a variance to use the 33­foot right­of­way and 24­foot street section subject to the conditions of approval; Development Contract for Deer Haven; and Plans and Specifications for Deer Haven .” Approval requires a Simple Majority Vote of members present. SUMMARY The applicant is requesting final plat approval for four lots and one outlot for a single­family subdivision as well as approval of the development contract and project construction plans and specifications . BACKGROUND On January 11, 2021, the Chanhassen City Council approved: A.    The ordinance rezoning the property from Rural Residential District (RR) to Single­Family Residential (RSF) contingent on final plat approval; and B.Preliminary plat approval to create four lots and one outlot with a variance for the use of a private street to provide direct access to the four lots and a variance to use the 33­foot right­of­way and 24­foot street section. DISCUSSION The applicant is requesting subdivision review to create a four­lot, single­family residential development.  Access will be a public street within existing city right­of­way out to Yosemite and a private street from this street into the development accessing the individual home sites. Subject to compliance with the conditions of approval, the proposed development meets zoning and subdivision regulations and requirements and is consistent with the Comprehensive Plan. CITY COUNCIL STAFF REPORTMonday, May 10, 2021SubjectApprove Final Plat, Plans and Specifications and Development Contract for Deer HavenSubdivisionSectionCONSENT AGENDA Item No: D.6.Prepared By Bob Generous, Senior Planner File No: PROPOSED MOTION“The City Council approves:Final Plat for four, single­family lots and one outlot with a variance for the use of a private street to providedirect access to the four lots and a variance to use the 33­foot right­of­way and 24­foot street section subjectto the conditions of approval;Development Contract for Deer Haven; andPlans and Specifications for Deer Haven .”Approval requires a Simple Majority Vote of members present.SUMMARYThe applicant is requesting final plat approval for four lots and one outlot for a single­family subdivision as well asapproval of the development contract and project construction plans and specifications .BACKGROUNDOn January 11, 2021, the Chanhassen City Council approved:A.    The ordinance rezoning the property from Rural Residential District (RR) to Single­Family Residential(RSF) contingent on final plat approval; andB.Preliminary plat approval to create four lots and one outlot with a variance for the use of a private street toprovide direct access to the four lots and a variance to use the 33­foot right­of­way and 24­foot street section.DISCUSSIONThe applicant is requesting subdivision review to create a four­lot, single­family residential development.  Access willbe a public street within existing city right­of­way out to Yosemite and a private street from this street into thedevelopment accessing the individual home sites. Subject to compliance with the conditions of approval, the proposed development meets zoning and subdivision regulations and requirements and is consistent with the Comprehensive Plan. RECOMMENDATION Staff recommends approval of the final plat subject to the conditions of approval in the staff report, the development contract, and construction plans and specifications. ATTACHMENTS: Staff Report Final Plat Construction Plans Development Contract CITY OF CIIANIIASSBI'I Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow MEMORANDUM TO Laurie Hokkanen, City Manager Bob Generous, Senior Planner May 10,2021 FROM: DATE: SUBJ:Deer Haven - Final Plat; Plans and Specifications; and Development Conract Planning Case #2020-22 The applicant is requesting final plat approval for four lots and one outlot for a single-family subdivision as well as approval ofthe development contract and project construction plans and specifications. BACKGROI,]I\D On January 11,2021, the Chanhassen City Council approved: A. The ordinance rezoning the property from Rural Residential District (RR) to Single- Family Residentiat (RSF) contingent on final plat approval; and B. Preliminary plat approval to create four lots and one outlot with a variance for the use of a private street to provide direct access to the four lots and a variance to use the 33-foot right-of-way and 24-foot street section. PH 952.227.1100. www.ci.chanhassen.mn.us. FX 952.227.1110 PROPOSED MOTION: "The Chanhassen City Council approves: o Final Plat for four single-family lots and one outlot with a variance for the use ofa private street to provide direct access to the four lots and a variance to use the 33-foot right-of-way and 24-foot street section subject to the conditions ofapproval;r Development Contracl for Deer Haven; and r Plans and Specifications for Deer Haven." 11OO IYARKET BOIJLEVARD .PO BOX I47. CHANHASSEN . MINNESOTA 55317 EXECTITIVE SUMMARY Laurie Hokkanen, City Manager Deer Haven Final Plat, Development Contract, and Plans & Specifications May 10,2021 Page2 SUBD IVISION REVIEW GRADING The applicant is requesting suMivision review to create a four lot, single-family residential development. Access will be a public street within existing city right-of-way out to Yosemite and a privatc street from this street into the development accessing the individual home sites. E,XISTING CONDITIONS The site is 2.81 acres and currently has an existing single-family residence that is being proposed to remain with the development of the subdivision. The applicant has provided an existing conditions survey which is used to supplement all construction plans and designs that is generally in conformance with the requirements of Sec. I 8-40. The applicant also provided an iccurate soil report indicating soil conditions and other requirements of Sec. 1 840.(2)h.. The soil report included boring logs for key areas including along the proposed alignment ofthe public and private streets and near areas proposed for stormwater infiltration. .\--.7':- 2 5 $ I -v Erosion Prevention and Sediment Control I Laurie Hokkanen, City Manager Deer Haven Final Plat, Development Contact, and Plans & Specifications May 10,2021 Page 3 The proposed development will exceed one (l) acre of disturbance and will, therefore, be subject to the General Permit Authorization to Discharge Stormwater Associated with Construction Activiry Under the National Pollution Discharge Elimination/State Disposal System (NPDES Construction Permit). The applicant shall submit the full SWPPP document to the city for review prior to grading on site. No earth-disturbing activities may occur until the SWPPP is updated with all required information. This SWPPP shall be a standalone document consistent with the NPDES Construction Permit and shall contain all required elements as listed in Parts III and IV of the permit. STREETS The property being proposed to be subdivided (6480 Yosemite Avenue) is currently served by an approximate lo-foot wide private driveway had from Yosemite Avenue which extends through unimproved right-of-way (Tacoma Trail). The applicant is proposing to remove the driveway and eitend a public street from Yosemite Avenue within the unimproved Tacoma Trail right-of- way and then construct a private street from the public street extension to serve all four lots within the proposed subdivision. A small rectangle ofpublic roadway easement is required to be obtained from the property owner due north of this subdivision in order to construct the public street (see image below). Obtaining this easement is a requirement of the applicant, and a draft qrsement document has been created and reviewed by the City Attomey. The property owner to the north has been engaged and had their own attorney review the easement. Official recording of this easement is a subject condition of the final plat. Laurie Hokkanen, City Manager Deer Haven Final Plat, Development Contract, and Plans & Specifications May 10,2021 Page 4 , t_ 6 $ -a_---. I a I l_l- I III ! t , -'lrlill) ..1 $ & \. I Illt lt I I Ii a !,i I \ Rcquircd public roadway aasdnr]l h ordrr to construcl pr$lic slraat - ]-*r1 i a Staff finds that the use of a private street is in general accordance with city's Code of Ordinances (Ordinances), Sec. I 8-57. While public right-of-way is abutting and adjacent to the property being developed, the prevailing development pattem makes it unfeasible to construct a standard width public street in accordance with current Ordinances due to the inadequate existing width of the unimproved right-of-way (33 feet wide). Conversely, if the applicant was to extend the public stieet from the end of Wood Duck Lane, which does have adequate right-of-way width, it would fiyther exacerbate a non-conforming cul-de-sac lenglh which is already approximately 1100 feet in lenglh. As such, the applicant is requesting a variance from the standard right-of- way and street width outlined in Sec. I 8-57. The variance request is to build a 24-foot wide public street within the existing 33-foot wide right-of-way. Additionally, as there are no other properties that take direct access to the proposed street, coupled with the street width variance, it is proposed to adopt a resolution prohibiting parking along fiis portion ofthe proposed public striet. Engineering and Public Works staff have evaluated the alternatives and finds that the proposed variance to extend a public street within the unimproved po(ion Tacoma Trail right-of- way is the most practicable and adequate altemative due to the existing constraints. The applicant supplied with the final plat submittal cross-section details for the public street, has N a t I I Laurie Hokkanen, City Manager Deer Haven Final Plat, Development Contract, and Plans & Specifications May 10,2021 Page 5 accounted for drainage of the street, and has designed an adequate tum-around. Lastly, updated construction plans have shown the locations of proposed street lights in accordance with Sec. l8- 78.(bX7). ..+ -i'-.* LEGEND Tacoma Trl Extenslon Existing Wood Duck Ln (-1100') Wood Duck Ln Extenslon Prlvate Street Extenslon Proposed Subdivision As the proposed development will have common sections of the private sreet that will serve two units oi more with a density of less than four units per acre, the private street shall: be built to a seven-ton design, paved to be a width of20 feet, utilize a maximum grade often percent, and provide a tumaround area acceptable to the fire marshal based upon guidelines provided by applicable fire codes and Ordinances. It is recommended that a Homeowners Association be formed and the declarations address the maintenance responsibilities and associated costs of repairs for the private street. N o t a lt :-l .1r It \' -J !lr-7 ,I \_'o, ilt-*r}t'1.t I .; . i5l!- 6-}- $" -.f I _IT7: _T \:: I 'l \\ltt' J L- L*e r-ucy nd Laurie Hokkanen, City Manager Deer Haven Final Plat, Development Contract, and Plans & Specifications May 10,2021 Page 6 GRADING AND DRAIN E The portion ofthe site which accommodates the three new homes slopes gradually to the north, whili the portion of the site with the existing home proposed to remain has steep slopes with gradient to the south. Grading for the development is being proposed over two phases; the first phase will grade areas associated with the public and private streets, the public utilities, the itormwater basins and the area where sanitary sewer will be extended from the west through unimproved right-of-way; the second phase was shown on to illustrate feasibility and provides custom graded walkout lots. It appears drainage will be routed away from building pads and through backyards ofthe future lots via a swale which then directs overland flow towards a propoied stormwater basin on the most northem lot (Lot 1), while the front yards and road will ih"it d*in to the stormwater basin on the east side of the private street (northeast comer of Outlot A). Drainage arrows provided on the plans further illustrate these drainage pattems' Lastly, all recommendations from the geotechnical report shall be adhered to, and a geotechnical engineering firm shall be on-site during grading operations as required to ensure the city's StanaarO Specifications and Detail Plates are adhered to along with any Minnesota Building Code requiiements. If groundwater is encountered during grading the grades shall be adjusted to maintain a three-foot separation from the bottom floor elevation and adhering to the recommendations of the soil engineer on site. Changes to grades shall be submitted to the city for review and approval. RE TAINING WALLS The applicant is proposing three retaining walls within the subdivision to accommodate potential walkout designs lorihe custom graded lots, as discussed above in "Grading and Drainage" . The height of anyretaining wall is measured from the top of the wall to the bottom of the footing (not to th. top ofgrade). As proposed, one retaining wall will have a height greater than four (4) feet. Walls over four feet in height shall be constructed in accordance with plans prepared by a DRAINAGE AND UTILITY EASEMENTS The final plat provided illustrates mostly typical public drainage and utility easements (D&U) along the proposed subdivision's lot lines with five-foot D&U along the side lot lines and 10- foot b&U along the front and rear lot lines. There is a portion of D&U abutting the front lot lines oflots 1 and 2 along with the northeast comer oflot 3 that extends seven additional feet (a total of 1 7 feet wide) in order to provide proper widths to maintain the sanitary sewer. The applicant has proposed the creation of Outlot A to cover the private street along with portions of untevelopable land abutting the street to the east. D&U within outlot A has been proposed only over portions required to maintain the public portion of the water main and services' Lastly, an encroachment agreement for all existing and proposed structures within public D&U or right-of- way shall be filed concurrently with the recording of the final plat. Based on the plans, this inciudes an existing retaining wall on Lot 4 and a proposed private storm sewer pipe north ofLot t. Laurie Hokkanen, City Manager Deer Haven Final Plat, Development Contract, and Plans & Specifications May 10,2021 Page 7 As proposed it appears the development will not exceed one (1) acre ofland disturbance and will, therefore, not be subject to the General Permit Authorization to Discharge Stormwater Associated with Construction Activity Under the National Pollution Discharge Elimination/State Disposal System (NPDES Construction Permit). As such, an Erosion and Sediment Control Plan (ESCP) in accordance with Ordinances is required for the grading operations ofthe subdivision as more than 5,000 square feet of land is being disturbed. The applicant provided an ESCP along with a Stormwater Pollution Prevention Plan (SWPPP), and overall the plans appear feasible and in accordance with Sec. 19-145. SANITARY S EWERAND WATER MAINS The proposed subdivision has access to a 6" DIP public water main that is located within abutting unimproved right-of-way north of the property (Wood Duck Lane), however no public sanitary sewer main abuts the development. As such, the developer will be required to extend the sanitary sewer main located 150 feet west (Wood Duck Lane cul-de-sac) of the development's northwest property comer in order to serve the site' Based on the plans, the applicant is proposing to extend both ofthese public utilities into the subdivision to serve the newly created lots, as seen below. \ & $r' I LEGE{O E t{EW SANTARY rAfl a- 1{Ew WATER llAl}t Wood Duck Lane l registered engineer and shall be constructed of a durable material (smooth face concrete, masonry/mortared, railroad ties and timber are prohibited). EROSION PREVENTION AND SEDIMENT CONTROL I I I I STORMWATER MAN AGEMENT The proposed alignments of the extended public utilities are in general conformance with city Staniard Specifiiations. However, it appears sanitary service lateral depths for Lots 2 and 3 will not meet city standards as proposed. The applicant shall lower proposed MH 04-133 to attain the required minimum nine-foot depth of sanitary lateral at the property line per Detail #2001' All newly installed public utilities will be required to adhere to the City of Chanhassen's Standard Specifications and Detail Plates, which will be the goveming specifications for said improvements. Upon acceptance by City Council, the sanitary sewer and water mains will become publicly owned and maintained. The existing home's water service lateral is proposed to remain and not be tied into the newly proposed water main, which may have been beneficial to the water quality for the subdivision as ihe newly created extension dead ends. The existing home's sanitary sewer service is proposed to remain as well. Lastly, prior to commencement of any utility work, a copy of all required permits from the appropriate regulatory agencies shall be provided to the city which shall include but is not limitea to the Minnesota Department of Health, Metropolitan Council Environmental Services, and the Minnesota Pollution Control Agency' Article VII, Chapter 19 of City Code describes the required stornwater management development standards. Section 19-141 states that "these development standards shall be reflectid in plans prepared by developers and/or project proposers in the design and layout of site plans, subdivisions and water managemenl featues." These standards include abstraction of I .0 inch of runoff from the new impervious surfaces created by the project and water quality treatment resulting in the removal of90% total suspended solids (TSS) and 60% total phosphorous (TP). The applicant will need to work with Minnehaha Creek Watershed District (MCWD) and the city in order to meet all the requirements' The proposed site generally consists of reconstructing the existing driveway to a road, preparing three pads for future houses and associated utilities and stormwater treatment. The backyards of future lots will have a swale directed towards a bioretention basin within the north lot. The front yards and road sheet drain to a bioretention basin on the east side ofthe road. Both basins outflo*s are directed to the wetland on the north side ofthe site. The south existing lot has a biofiltration basin in the front to capture additional runoffgoing to the south. The expanded driveway to be road width within the city right-of-way (ROW) will have curb and be captured in y Avenue, which is directed to regional treatrnent. The modeling was done for the full build out, even though Phase one grading for the road only is currently being done. All proposed rates meet or reduce rates from existing conditions. All runoff generally maintains the same pattem in each direction and rates are met in each direction for the proposed property, some ofthe city ROW street project may not meet rates as the city plans to treat downstream of the site. Almost Laurie Hokkanen, City Manager Deer Haven Final Plat, Development Contract, and Plans & Specifications May 10,2021 Page 8 Laurie Hokkanen, City Manager Deer Haven Final Plat, Development Contract, and Plans & Specifications May 10,2021 Page 9 all the new impervious areas are captured and treated before leaving the site. Each lot has an assumed impervious area of 4,050 sf. Overall, the proposed Stormwater Management Plan for the Deer Haven project provides an improved solution for the conveyance of stormwater on this site. The infiltration basin will captue runoff and provide additional rate control, volume control, and water quality treatment on the site. STORMWATER UTILITY CONNECTION CHARG ES Section 4-30 of City Code sets out the fees associated with surface water management. A water quality and water quantity fee are collected with a suMivision. These fees are based on land use type and are intended to reflect the fact that the more intense the development type, the greater the degradation of surface water. This fee will be applied to the new lots of record being created. The fees will be assessed at the rate in effect at that time; 2021 rutes are $8,660.00 per acre. ASSESSMENTS Water and sewer partial hookups are due at the time of final plat. The partial hookup fees will be assessed at the rate in effect at that time; 2021 rates for partial hookup fees are $691 .00 per unit for sanitary sewer and $2,476.00 per unit for water. The remaining partial hookups fees are due with the building permit. Fees Based on the proposal the following fees would be collected with the development contract: a) Administration Fee: The improvement costs are $168,637.00 and are less than $500,000' thus 3% of the improvement costs: $5,059.11 b) Surface Water Management Fee ($8,660.00/ac re): $9,257 .54 WETLANDS AI{D BUFFERS One wetland was identified and delineated on and near the property. The wetland is classified as Type l, seasonally flooded basin. 0.03 acres ofthe wetland exist on the subject property, however initial plans show that none of this area is anticipated to be impacted by the project. If any wetland impacts are proposed going forward a wetland replacement plan would need to be approved through the Wetland Conservation Act permitting process. On additional area was investigated as part ofthe wetland delineation. The area, in the southeast comer of the lot, was determined to be upland. The on-site TEP review concurred with this determination. Laurie Hokkanen, City Manager Deer Haven Final Plat, Development Contract, and Plans & Specifications May 10,2021 Page l0 c) A portion ofthe water hook-up charge ($2,392.00/unit): $7'428.00 d) A portion ofthe sanitary sewer hook-up charge ($691.O0/unit): $2'073.00 e) Park Dedication Fee ($5,800/dwelling): $17,400.00 f) GIS Fees ($100 for the plat plus $30 per parcel): $190.00 g) Street Lighting charge ($300flight): $300.00 h) Final plat process (review and recording ofPlat and DC): $450'00 DEVELOPMENT CONTRACT The developer of the property is Schaefco Development. The owner of the property is Ken Ashfeld and Barbara Bersie-Ashfeld Fees Based on the proposal the following fees would be collected with the development contract: a) Administration Fee: The improvement costs are $168,637'00 and are less than $500,000, thus 3% ofthe improvement costs: $5,059.1 I b) Surface Water Management Fee ($8,660.00/acre): $9,257 .54 c) A portion ofthe water hook-up charge ($2,392'00/rmit): $7,428.00 d) A portion ofthe sanitary sewer hook-up charge ($691.O0/unit): $2'073.00 e) Park Dedication Fee ($5,800/dwelling): $17,400.00 f) GIS Fees ($ 100 for the plat plus $30 per parcel): $ 190.00 g) Street Lighting charge ($300/light): $300.00 h) Final plat process (review and recording of Plat and DC): $450.00 & SPECIFICATIONS REVIEW CO NDITIONS OF PROVAL Building: PLANS The applicant has also submitted detailed construction plans and specifications for staff review and Clty Council approval. Staff has reviewed the plans and specifications and finds the plans still need some minor modifications. Staff requests that the City Council grant staffthe flexibility to administratively approve the plans after working with the applicant's engineer to modifu the plans accordingly. The plans and specifications are available for review in the Engineering Department. Building plans must provide sufficient information to verifr that proposed building meets all requirements of the Minnesota State Building Code; additional comments or requircments may be required after plan review. Laurie Hokkanen, City Manager Deer Haven Final Plat, Development Contract, and Plans & Specifications May 10,2021 Page I I *This condition still applies. 2. A building permit must be obtained before beginning any construction. *This condition still applies. 3. Retaining walls more than four feet high must be designed by a professional engineer and a building permit must be obtained prior to construction. *This condition still applies. 4. If any soil corrections are done on the property, a final grading plan and soil report must be submitted to the Inspections Division before permits will be issued. *This condition still applies. Engineering: 1. The applicant shall provide an updated existing conditions survey in conformance with the requirements of Sec. 18-40, which shall include (but is not limited to): location of buildings and easements to a distance 150 feet beyond the suMivision boundaries; topographic data 100 feet beyond the property boundary, with associated contours; boundary lines of adjoining platted or subdivided land, within 150 feet, identified by name and ownership, etc. *This condition has been met. 2. An accurate geotechnical report indicating soil conditions, permeability and slope shall be provided upon submittal offinal plat (Sec. 1840.(2)h.). The soil report shall include boring logs for key areas including along the proposed alignment of the private sreet and near areas proposed for stormwater infiltration. +This condition has been met 3. A roadway easement from PID 254150012 is required in order to construct the public street. The easement shall be reviewed and approved by the city and shall be recorded either prior to or concurrently with the final plat. *This condition still applies 4. The applicant shall supply cross-section details and plans for the public street, account for public drainage, and the design ofan adequate tum-around at the end ofthe public street. *This condition has been met. Laurie Hokkanen, City Manager Deer Haven Final Plat, Development Contract, and Plans & Specifications May 10,2021 Page 12 5 . The applicant shall provide the locations of proposed street lights for review and approval by the City Engineer. *This condition has been met. 6. The applicant shall update the final plat to include drainage and utility easements within Outlot A only over the public utilities (not the entire Outlot) as required for adequate maintemnce, repair and replacement. 7. Drainage arrows throughout the construction limits shall be shown upon submittal of final plat and final construction plans. *This condition has been met. 8. The applicant shall provide updated grading ptans in conformance with the requirements of Sec. 1840.(4)d. which shall include (but is not limited to): the appropriate scale, lowest floor elevations ofbuildings (proposed and existing), emergency overflow routes, stockpile locations, etc. 9. The applicant shall update the erosion and sediment control plan in conformance with the requirements listed rmder Sec. 19-145.(a)(2) and resubmitted for review and approval with the submission of the final construction plans. *This condition has been met. 10. If a 6" main will supply adequate fire flows and pressures to the newly formed suMivisiorl the main shall be downsized accordingly. *This condition has been met. I 1. Upon acceptance by City Council, the sanitary sewer and water mains will become publicly owned and maintained. *This condition still applies. 12. As the preliminary plans indicate that the existing home's sanitary sewer service, which extends to the west between 1671 and 1681 Pintail Circle, may be located outside the prescribed easements, the applicant will be required to either expand the easement area to encompass the lateral in ie entirety, or, verifo that the existing alignment is in fact within the *This condition has been met. +This condition has been met. Laurie Hokkanen, City Manager Deer Haven Final Plat, Development Contract, and Plans & Specifications May 10,2021 Page 13 easement, or, connect the existing home to the newly extend sanitary sewer. Updated plans shall be provided illustrating the approach taken for review and approval by the city' I . The applicant shall lower proposed MH 04- l 33 to attain the required minimum nine-foot depth of sanitary lateral at the property line per Detait #2001. 2. The private street shall b€ owned and maintained by the benefiting properties 3. The newly installed stormwater facilities and appurtenances shall be owned and maintained by the benefiting properties. 4. Encroachment agreements for all existing and proposed structures within public D&U or ROW shall be filed concunently with the recording ofthe final plat' 5. The applicant shall apply for and obtain permits from the appropriate regulatory agencies, as necessary, i.e. Mirmehaha Creek Watershed District, Carver County, Minnesota Pollution Control Agency, Minnesota Department of Natural Resources, Army Corps of Engineers, etc. and comply with their conditions of approval. 6. The applicant shall enter into a Development Contract with the city and pay all the applicable fees and securities prior to recording of final plat' 7. The applicant and their engineer shall work with city staff in amending the construction plans, dated May 3, 2021 prepared by Todd Mclouth, PE with Loucks to frrlly satis! staff concerns. Final construction plans will be subject to review and approval by staff. 8. A geotechnical engineering firm shall be on-site during grading operations as required to ensure conformance to city Standards and Specifications and all Minnesota Building Codes. 9. The applicant shall provide an operation and maintenance plan (O&M) for the private stormwater BMPs. The O&M of private stormwater BMPs is required in perpetuity and must be approved by the Water Resources Coordinator, or their designee, to be recorded against the benefiting properties. It is recommended that a Homeowners Association be formed and the declarations address the maintenance responsibilities and associated costs of *This condition has been met. 13. The applicant shall provide updated utility plans upon submittal of the final plat and final construction plans that include profile views for review and approval by the city' *This condition has been met. Based on review of the final plat documents, staff recommends the following conditions be added: Laurie Hokkanen, City Manager Deer Haven Final Plat, Development Contract, and Plans & Specifications May 10,2021 Page 14 repain and maintenance of the private stormwater facilities. All conditions, comments, and applicable permits required by Minnehaha Creek Watershed District shall be adhered to. Environmental Resources: l. The applicant shall verifi tree removal within the grading limits and revise tree preservation calculations before final approval. Trees shown within grading limits may not be counted as preserved. *This condition has been met. 2. Tree preservation fencing must be installed at the edge of grading limits prior to any grading activities. *This condition still applies. 3. RectiS discrepancy of trees 26-28 on plan sheets C1-2 (demolition) and L1-1 (tree canopy). I . The road width proposed of 24 feet would require No Parking Fire Lane signs on both sides. *This condition still applies. 2. The private road will need to follow City of Chanhassen Code for Private Roads, including a tumaround for emergency vehicles. *This condition has been met. 3. The applicant shall submit a street name for the private strect for city review and approval. *This condition has been met (Yosemile tane). Parks: Full park fees in lieu of parkland dedication and/or trail construction shall be collected. The park fees shall be collected in full at the rate in force upon final plat submission and approval. *This condition shall be modified as follows: Parks fees of$17,400.00 (3 x $5,800) forthe three new lots shall be paid prior to recording the final plat. Fire: Laurie Hokkanen, City Manager Deer Haven Final Plat, Development Contract, and Plans & Specifications May 10,2021 Page 15 Planning: I . The front lot line for tnts l, 2 and 3 shall be the easterly property line. *This condition still applies. 2. An access and maintenance agr€ement for the private street shall be recorded with the plat. *This condition still applies. CO MPLIANCE TABLE Setbacks: Front - 30 ft., side - l0 ft., rear - 30 ft. Hard Coverage: 25% R-ECO MMENDATION Staff recommends approval ofthe final plat subject to the following conditions of approval and the development contract and construction plans and specifications: Building: l. Building plans must provide suffrcient information to verif that proposed building meets all requirements of the Minnesota State Building Code; additional comments or requirements may be required after plan review. 2. A building permit must be obtained before beginning any construction' Area (sq. fr.) Frontrge (ft.) Depth (fr.) Coverage sq.Ft.Notes Code (RSF)15,000 100 *125 3,750 Lot 1, Block 1 r 6,45 5 121 178 4,114 0.38 acres comer lot Lot 2, Block I 15,079 100 151 3,770 0.35 acres Lot 3, Block 1 15,044 107 t37 3,761 0.35 acres Lot 4, Block I 49,504 259 194 12,376 1.14 acres; existing house Outlot A 0.6 acres, private street ROW 0 Total 122,379 2.81 acres 26,297 Laurie Hokkanen, City Manager Deer Haven Final Plat, Development Contract, and Plans & Specifications May 10,2021 Page 16 3. Retaining walls more than four feet high mus be desigred by a professional engineer and a building permit must be obtained prior to construction. 4. If any soil corrections are done on the property, a final grading plan and soil report must be submitted to the Inspections Division before permits will be issued. Engineerin gA ater Resources: 1. A roadway easement from PID 254150012 is required in order to construct the public street The easement shall be reviewed and approved by the city and shall be recorded either prior to or concurrently with the final plat. 2. Upon acceptance by city council, the sanitary sewer and water mains will become publicly owned and maintained. 3. The applicant shall lower proposed MH 04-133 to attain the required minimum nine-foot depth of sanitary lateral at the property line per Detail #2001' 4. The private street shall be owned and maintained by the benefiting properties. 5. The newly installed stormwater facilities and appurtenances shall be owned and maintained by the benefiting properties. 6. Encroachment agreements for all existing and proposed structures within public D&U or right-oGway @OW) shall be filed concunently with the recording of the final plat. 7. The applicant shall apply for and obtain permits from the appropriate regulatory agencies, as necessary, i.e. Minnehaha Creek Watershed District, Carver Comty, Minnesota Pollution Control Agency, Minnesota Deparunent ofNatural Resources, Army Corps of Engineers, etc. and comply with their conditions of approval. 8. The appticant shall enter into a Development Contract with the city and pay all the applicable fees and securities prior to recording of final plat. 9. The applicant and their engineer shall work with city staff in amending the construction plans, dated May 3, 2021, prepared by Todd Mclouth, PE with loucks to frrlly satisfu staff concems. Final construction plans will be subject to review and approval by staff. 10. A geotechnical engineering firm shall be on-site during grading operations as required to ensure conformance to city Standards and Specifications and all Minnesota Building Codes. 1 1 . The applicant shall provide an operation and maintenance plan (O&M) for the private stormwater BMPs. The O&M of private stormwater BMPs is required in perpetuity and must be approved by the Water Resources Coordinator, or their designee, to be recorded Laurie Hokkanen, City Manager Deer Haven Final Plat, Development Contract, and Plans & Specifications May 10,2021 Page 17 against the benefiting properties. It is recommended that a Homeowners Association be formed and the declarations address the maintenance responsibilities and associated costs of repairs and maintenance of the private stormwater facilities. All conditions, comments, and applicable permits required by Minnehaha Creek Watershed District shall be adhered to. Environmental Resources : 1 Tree preservation fencing must be installed at the edge of grading limits prior to any grading activitles 2. Recti$ discrepancy of rees 26 - 28 on plan sheets Cl-2 (demolition) and Ll-l (nee canopy). Fire I The road width proposed of24 feet would require No Parking Fire Lane signs on both sides. l. Park fees of $17,400.00 (3 x $5,800) for the three new lots shall be paid prior to recording the final plat. g:\plan\2020 plaming casesuo-22 6480 yos€mite avenue (deer haven) subvinal pl.t\deer haven final plat dc and plans and specs rpt.docx Parks: Plenning: l. The front lot line for Lots l, 2 and 3 shall be the easterly property line. 2. An access and maintenance agreement for the private street shall be recorded with the plat. ATTACHMENTS l. Final Plat 2. Construction Plans 3. DevelopmentContract LOUCKS BEING 5 FEET IN WIDTH, UNLESS OTHERWISE INDICATED AND ADJOINING LOT LINES, AND BEING 10 FEET IN WIDTH, UNLESS OTHERWISE INDICATED, AND ADJOINING RIGHT-OF-WAY LINES, AS SHOWN ON THE PLAT. DRAINAGE AND UTILITY EASEMENTS ARE SHOWN THUS: (NOT TO SCALE) THE EAST LINE OF THE SE 1/4 OF THE NE 1/4 OF SEC. 3, TWP. 116, RGE. 23, HAS A BEARING OF S01°40'27"W. DENOTES 1/2 INCH IRON MONUMENT FOUND, UNLESS OTHERWISE SHOWN DENOTES FOUND CARVER COUNTY CAST IRON MONUMENT DENOTES 1/2 INCH X 14 INCH IRON MONUMENT SET, MARKED "LS 48988" SECTION 03, TOWNSHIP 116, RANGE 23, CARVER COUNTY, MINNESOTA WOOD SITEVICINITY MAP N NOT TO SCALE C.R. DOC. NO. PLAT FILE NO. SCALE IN FEET 0 40 N DUCK LANE YOSEMITEAVEKNOW ALL PERSONS BY THESE PRESENTS: That Kenneth Ashfeld and Barbara Bersie-Ashfeld, husband and wife, owners of the following described property situated in the County of Carver, State of Minnesota, to wit: That part of the Southeast Quarter of the Northeast Quarter of Section 3, Township 116, Range 23, Carver County, Minnesota, described as follows: Beginning at the Northeast corner of said Southeast Quarter of the Northeast Quarter; thence Southerly along the East line of said Southeast Quarter of the Northeast Quarter to a point 660.00 feet North of the Southeast corner of said Southeast Quarter of the Northeast Quarter; thence Westerly parallel with the South line Southeast Quarter of the Northeast Quarter a distance of 281.07 feet; thence Northeasterly to a point on the North line of said Southeast Quarter of the Northeast Quarter distance 198.00 feet Westerly from the point of beginning; thence Easterly along said North line 198.00 feet to the point of beginning, except the North 50.00 feet thereof. Have caused the same to be surveyed and platted as DEER HAVEN, and does hereby dedicate to the public for public use the he drainage and utility easements as created by this plat. In witness whereof said Kenneth Ashfeld and Barbara Bersie-Ashfeld, husband and wife, have hereunto set their hands this _______ day of _________________________, 20______. ______________________________________ ______________________________________________ Kenneth Ashfeld Barbara Bersie-Ashfeld STATE OF MINNESOTA COUNTY OF ____________________ The foregoing instrument was acknowledged before me this _______ day of _________________________, 2020, by Kenneth Ashfeld and Barbara Bersie-Ashfeld. ______________________________________ ______________________________________________ Signature Printed Name, Notary Notary Public, ____________________ County, ___________________ My Commission Expires ________________________ SURVEYORS CERTIFICATION I, Max Stanislowski, do hereby certify that this plat was prepared by me or under my direct supervision; that I am a duly Licensed Land Surveyor in the State of Minnesota; that this plat is a correct representation of the boundary survey; that all mathematical data and labels are correctly designated on this plat; that all monuments depicted on this plat have been, or will be correctly set within one year; that all water boundaries and wet lands, as defined in Minnesota Statutes, Section 505.01, Subd. 3, as of the date of this certificate are shown and labeled on this Plat; and all public ways are shown and labeled on this plat. Dated this _______ day of _________________________, 20______. ______________________________________________ Max Stanislowski, Licensed Land Surveyor, Minnesota License No. 48988 STATE OF MINNESOTA COUNTY OF HENNEPIN The foregoing instrument was acknowledged before me this _______ day of _________________________, 20______, by Max Stanislowski, a Licensed Land Surveyor. ______________________________ ______________________________________________ Signature Printed Name, Notary Notary Public, Hennepin County, Minnesota My Commission Expires ____________, 20___ CHANHASSEN, MINNESOTA This plat of DEER HAVEN was approved and accepted by the City Council of Chanhassen, Minnesota, at a regular meeting thereof held this _______ day of _________________________, 20______. If applicable, the written comments and recommendations of the Commissioner of Transportation and the County Highway Engineer have been received by the City or the prescribed 30-day period has elapsed without receipt of such comments and recommendations, as provided by Minnesota Statutes, Section 505.03, Subdivision 2. City Council, Chanhassen, Minnesota By: _________________________________, Mayor By: ___________________________________, Clerk COUNTY SURVEYOR, Carver County, Minnesota Pursuant to Chapter 395, Minnesota Laws of 1971, this plat has been approved this _______ day of _________________________, 20______. By: ______________________________________ Brian Praske, Carver County Surveyor COUNTY AUDITOR, Carver County, Minnesota I hereby certify that taxes payable in 20 and prior years have been paid for land described on this plat, dated this _______ day of _________________________, 20______. By: ______________________________________ Crystal Campos , County Auditor COUNTY RECORDER, Carver County, Minnesota I hereby certify that the within plat of DEER HAVEN was recorded in this office this _______ day of _________________________, 20______, at ______ o'clock _____.M. as Document No. ____________________. By: ______________________________________ Kaaren Lewis County Recorder CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL 7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com Plotted: 05 /03 / 2021 7:52 AMW:\2020\20327\CADD DATA\CIVIL\_dwg Sheet Files\C0-1 - COVER SHEETOUCKSL QUALITY CONTROL PROFESSIONAL SIGNATURE SUBMITTAL/REVISIONS CADD QUALIFICATION DEER HAVEN CHANHASSEN, MN KEN ASHFELD 6480 YOSEMITE AVE. CHANHASSEN, MN 55331 11-09-20 PRELIMINARY SUBMITTAL 01-08-21 LOT LINES & GRADING 02-05-21 CONST DOCUMENTS 04/05/21 CITY COMMENTS 04/15/21 ADDED BASIN 3 05/03/21 CITY COMMENTS C0-1 COVER SHEET C1-1 EXISTING CONDITIONS PLAN C1-2 DEMOLITION PLAN C2-1 SITE PLAN C3-1 GRADING & DRAINAGE PLAN C3-2 SWPP PLAN C3-3 SWPP NOTES C4-1 UTILITY PLAN C4-2 - C4-3 S&W PLAN & PROFILE C5-1 - C5-3 STREET PLAN & PROFILE C8-1 - C8-3 DETAIL SHEETS L1-1 TREE CANOPY PLAN L2-1 LANDSCAPE PLAN Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Todd W. McLouth - PE Project Lead Drawn By Checked By Loucks Project No. 20383 20327 TWM TRG TWM 05/03/21 02/05/21 L3-1 LANDSCAPE DETAILS COVER SHEET C0-1 CHANHASSEN, MN SWPP PLAN EXISTING CONDITIONS PLAN SHEET INDEX C0-1 COVER SHEET C1-1 C1-2 C3-2 CONSTRUCTION PLANS FOR: OWNER CHANHASSEN, MN 55331 6480 YOSEMITE AVE. KEN ASHFELD MAPLE GROVE, MN 55369 CONTACTS CIVIL ENGINEER LOUCKS 7200 HEMLOCK LANE SUITE 300 TEL: 763-424-5505 TODD MCLOUTH, PE PROJECT AREA DEER HAVEN SITE, GRADING, SANITARY SEWER, WATERMAIN, STORM SEWER, STREET, & LANDSCAPE PLANS SWPP NOTESC3-3 DEMOLITION PLAN C2-1 SITE PLAN C3-1 GRADING PLAN YOSEMITE AVE ANTHEM PL.W. 63RD ST.NUTILITY PLANC4-1 DETAIL SHEETSC8-1,3 TREE CANOPY PLANL1-1 LANDSCAPE PLANL2-1 LANDSCAPE DETAILSL3-1 SANITARY SEWER PLAN & PROFILEC4-2 GOVERNING SPECIFICATIONS SPECIFICATIONS & DETAILS CITY OF CHANHASSEN STANDARDWOOD DU C K L AN E SANITARY SEWER PLAN & PROFILEC4-3 STREET PLAN & PROFILEC5-1 STREET PLAN & PROFILEC5-2 INTERSECTION DETAILSC5-3 NSCALE IN FEET 0 50 100 CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL 7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com Plotted: 05 /03 / 2021 9:25 AMW:\2020\20327\CADD DATA\CIVIL\_dwg Sheet Files\C1-1 - EXISTING CONDITIONS PLANOUCKSL QUALITY CONTROL PROFESSIONAL SIGNATURE SUBMITTAL/REVISIONS CADD QUALIFICATION DEER HAVEN CHANHASSEN, MN KEN ASHFELD 6480 YOSEMITE AVE. CHANHASSEN, MN 55331 11-09-20 PRELIMINARY SUBMITTAL 01-08-21 LOT LINES & GRADING 02-05-21 CONST DOCUMENTS 04/05/21 CITY COMMENTS 04/15/21 ADDED BASIN 3 05/03/21 CITY COMMENTS C0-1 COVER SHEET C1-1 EXISTING CONDITIONS PLAN C1-2 DEMOLITION PLAN C2-1 SITE PLAN C3-1 GRADING & DRAINAGE PLAN C3-2 SWPP PLAN C3-3 SWPP NOTES C4-1 UTILITY PLAN C4-2 - C4-3 S&W PLAN & PROFILE C5-1 - C5-3 STREET PLAN & PROFILE C8-1 - C8-3 DETAIL SHEETS L1-1 TREE CANOPY PLAN L2-1 LANDSCAPE PLAN Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Todd W. McLouth - PE Project Lead Drawn By Checked By Loucks Project No. 20383 20327 TWM TRG TWM 05/03/21 02/05/21 L3-1 LANDSCAPE DETAILS EXISTING CONDITIONS PLAN C1-1 DESCRIPTION OF PROPERTY SURVEYED (Per Schedule A of the herein referenced Title Commitment File No: 2164018-14405) That part of the Southeast Quarter of the Northeast Quarter of Section 3, Township 116, Range 23, Carver County, Minnesota, described as follows: Beginning at the Northeast corner of said Southeast Quarter of the Northeast Quarter; thence Southerly along the East line of said Southeast Quarter of the Northeast Quarter to a point 660 feet North of the Southeast corner of said Southeast Quarter of the Northeast Quarter; thence Westerly parallel with the South line Southeast Quarter of the Northeast Quarter a distance of 281.07 feet; thence Northeasterly to a point on the North line of said Southeast Quarter of the Northeast Quarter distance 198.0 feet Westerly from the point of beginning; thence Easterly along siad North line 198.0 feet to the point of beginning, except the North 50.0 feet thereof, Carver County, Minnesota. Records of Carver County, Minnesota. TOLL FREE: 1-800-252-1166 TWIN CITY AREA: 651-454-0002 Gopher State One Call CALL BEFORE YOU DIG! WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. SURVEY REPORT 1.The address, if disclosed in documents provided to or obtained by the surveyor, or observed while conducting the fieldwork is 6840 Yosemite Ave. 2.The Gross land area is 122,379 +/- square feet or 2.81 +/- acres. 3.The bearings for this survey are based on the Carver County Coordinate System NAD 83 (1986 Adjust). 4.Benchmark: MnDOT GALPIN MNDT RESET Elevation = 951.47 (NAVD88) Site Benchmark: T.N.H. on the east side of Yosemite Ave and 150.0± feet south of the driveway entrance to the subject property. Elevation = 1027.88 (NAVD88) 5.We have shown underground utilities on and/or serving the surveyed property per Gopher State One-Call Ticket Nos. 202402368, 202402364. The following utilities and municipalities were notified: City of Chanhassen (952) 227-1300 Centurylink (800) 778-9140 Mediacom (952) 443-2840 Center Point Energy (612) 321-4421 Xcel Energy (800) 895-4999 6.Trees shown hereon are 8 inch diameter at breast height or greater. Other trees, less than 8 inches, may be on site but are not shown hereon. 7.The field work was completed on September 15, 2020. Survey Drawing Dated 10/13/20. LEGEND CATCH BASIN STORM SEWER SANITARY SEWER WATERMAIN STORM MANHOLE SANITARY MANHOLE HYDRANT GATE VALVE SPOT ELEVATION LIGHT POLE POWER POLE CONTOUR CONCRETE CURB UNDERGROUND ELECTRIC CONCRETE TELEPHONE PEDESTAL UNDERGROUND TELEPHONE UNDERGROUND GAS OVERHEAD UTILITY CHAIN LINK FENCE EXISTING BUILDING RETAINING WALL ELECTRIC METER GAS METER CONIFEROUS TREE PINE DECIDUOUS TREE GUY WIRE ADDRESS POST ELM BOXELDER APPLE HACKBERRY WALNUT ELEV @ THRESHOLD RECORD DOCUMENT SET 1/2 INCH X 14 INCH IRON MONUMENT, MARKED "LS 48988" FOUND OPEN IRON MONUMENT FOUND CAST IRON MONUMENT FOUND STONE TOP NUT HYDRANT SERVICE CLEANOUT WOOD FENCE UNLESS SHOWN OTHERWISE BITUMINOUS ASH MAPLE HAND HOLE SPRUCE CURB STOP MAPPED SANITARY SEWER MAPPED WATERMAIN MAPPED UNDERGROUND FIBER OPTIC MAPPED UNDERGROUND ELECTRIC MAPPED UNDERGROUND TELEPHONE MAPPED UNDERGROUND GAS NOTE: DEVELOPER & CONTRACTOR SHALL COORDINATE PORTION OF NEIGHBOR ENCROACHMENTS INTO RIGHT OF WAY DURING CONSTRUCTION. RECLAIM EXISTING DRIVEWAY REMOVE EXISTING TREE, TYP. REPLACE EX. PAVEMENT FOR UTILITY INSTALLATION (SEE DETAIL) REPLACE EX. CURB FOR UTILITY INSTALLATION (SEE DETAIL) EX. RETAINING WALL TO REMAIN UTILITY COMPANIES TO REMOVE & RELOCATE EX. UTILITIES CONTRACTOR SHALL PROVIDE ACCESS TO EX. DRIVEWAY EX. OVERHEAD ELECTRIC & STREET LIGHT TO REMAIN REMOVE & RELOCATE PORTION OF EX. FENCE REMOVE & RELOCATE EX. FENCE - COORDINATE WITH OWNER REMOVE PORTION OF CONCRETE CURB, VALLEY GUTTER & 2 FEET OF BITUMINOUS PAVEMENT SAW-CUT EX. BITUMINOUS REMOVE EXISTING POWER POLE TREE PROTECTION FENCE EX. POWER POLE TO REMAIN RELOCATE POST REMOVE & RELOCATE POWER POLE & TELEPHONE PEDISTAL EX. SHED TO REMAIN EX. PINE TREES TO REMAIN. CONTRACTOR SHALL TRIM BRANCHES AS NECESSARY WHICH MY HINDER CONSTRUCTION WITHIN RIGHT OF WAY EX. PINE TREES TO REMAIN. CONTRACTOR SHALL TRIM BRANCHES AS NECESSARY WHICH MY HINDER CONSTRUCTION WITHIN RIGHT OF WAY NSCALE IN FEET 0 30 60 CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL 7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com Plotted: 05 /03 / 2021 9:26 AMW:\2020\20327\CADD DATA\CIVIL\_dwg Sheet Files\C1-2 - DEMOLITION PLANOUCKSL QUALITY CONTROL PROFESSIONAL SIGNATURE SUBMITTAL/REVISIONS CADD QUALIFICATION DEER HAVEN CHANHASSEN, MN KEN ASHFELD 6480 YOSEMITE AVE. CHANHASSEN, MN 55331 11-09-20 PRELIMINARY SUBMITTAL 01-08-21 LOT LINES & GRADING 02-05-21 CONST DOCUMENTS 04/05/21 CITY COMMENTS 04/15/21 ADDED BASIN 3 05/03/21 CITY COMMENTS C0-1 COVER SHEET C1-1 EXISTING CONDITIONS PLAN C1-2 DEMOLITION PLAN C2-1 SITE PLAN C3-1 GRADING & DRAINAGE PLAN C3-2 SWPP PLAN C3-3 SWPP NOTES C4-1 UTILITY PLAN C4-2 - C4-3 S&W PLAN & PROFILE C5-1 - C5-3 STREET PLAN & PROFILE C8-1 - C8-3 DETAIL SHEETS L1-1 TREE CANOPY PLAN L2-1 LANDSCAPE PLAN Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Todd W. McLouth - PE Project Lead Drawn By Checked By Loucks Project No. 20383 20327 TWM TRG TWM 05/03/21 02/05/21 L3-1 LANDSCAPE DETAILS DEMOLITION PLAN C1-2 TOLL FREE: 1-800-252-1166 TWIN CITY AREA: 651-454-0002 Gopher State One Call CALL BEFORE YOU DIG! WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. DEMOLITION LEGEND REMOVE EXISTING CURB & GUTTER, RETAINING WALLS, PAVEMENT MARKINGS, WOOD FENCE, BILLBOARDS, ETC. REMOVE EXISTING GRAVEL SURFACE REMOVE EXISTING STORM, SEWER, OR WATER STRUCTURE. REMOVE EXISTING TREE 1.CONTRACTOR SHALL REMOVE AND/OR RELOCATE EXISTING PRIVATE UTILITIES AS NECESSARY. CONTRACTOR TO COORDINATE ACTIVITIES WITH UTILITY COMPANIES. 2.CONTRACTOR SHALL PROTECT SURFACE AND SUBSURFACE FEATURES NOT NOTED FOR REMOVAL. 3.CONTRACTOR TO CLEAR AND GRUB EXISTING VEGETATION WITHIN CONSTRUCTION LIMITS, STRIP TOP SOIL, AND STOCKPILE ON-SITE. REFER TO GRADING PLAN AND SWPPP FOR SEDIMENT AND EROSION CONTROL REQUIREMENTS. 4.CLEAR AND GRUB AND REMOVE ALL TREES, VEGETATION AND SITE DEBRIS PRIOR TO GRADING. ALL REMOVED MATERIAL SHALL BE HAULED FROM THE SITE DAILY. EROSION CONTROL MEASURES SHALL BE IMMEDIATELY ESTABLISHED UPON REMOVAL. SEE THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP). 5.CONTRACTOR SHALL REMOVE ALL SITE SURFACE FEATURES WITHIN REMOVAL LIMITS UNLESS OTHERWISE NOTED. 6.BITUMINOUS PAVEMENT REMOVALS ARE TO BE MADE TO A VERTICAL SAW CUT OR TO A NEAT MILLED EDGE. 7.CONCRETE PAVEMENT, SIDEWALK, CURB & GUTTER AND OTHER POURED CONCRETE ITEMS ARE TO BE REMOVED TO AN EXISTING EXPANSION OR CONTRACTION JOINT. SAW CUT AS NECESSARY FOR A NEAT EDGE OF REMOVAL. 8.ALL REMOVAL ITEMS SHALL BECOME THE PROPERTY OF THE CONTRACTOR UNLESS SPECIFIED OTHERWISE AND SHALL BE DISPOSED OF OFF-SITE IN A MANNER MEETING ALL APPLICABLE REGULATIONS. 9.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL AND REPLACEMENT OF ALL SIGNS, MAILBOXES, ETC. 10.ANY DAMAGE TO ITEMS NOT NOTED TO BE REMOVED SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE REPAIRED OR REPLACED TO ORIGINAL CONDITION WITH NO ADDITIONAL COMPENSATION. 11.CONTRACTOR SHALL PROVIDE TRAFFIC CONTROL NECESSARY FOR DRIVEWAY ACCESS TO ALL PROPERTIES. COORDINATE ANY CLOSURES WITH PROPERTY OWNERS. SITE DEMOLITION SPECIFICATIONS RECLAIM EXISTING BITUMINOUS PAVEMENT. RECLAIMED MATERIAL TO BE STOCKPILED FOR REUSE WITHIN PRIVATE ROAD. TREE PROTECTION FENCE 1047.0 1039.0 1047.0 1042.5 FBWO 1042.5 1034.5 FBWO FBWO 1036.7 1036.7 1028.7 0+001+002+003+000+00 1+00 2+00 3+00 3+53.68 2+44.413+004+005+006+000+00REPLACE EX. PAVEMENT & CURB FOR SANITARY SEWER CONNECTION (SEE DETAIL) 20.0 30.0 5.0 10.030.0 60.0 60.0 20.0 30.0 50.0 PRIVATE BITUMINOUS DRIVE R28' R26' R28' R40' R15' 24.0 60.1 BOUNDARY LINE EDGE OF BITUMINOUS PAVEMENT EASEMENT LINE 16' WIDE 20' LONG TURN AROUND 24.0 RELOCATED STREET LIGHT BASIN 1 BOTTOM-1024.0 HWL-1026.62 NWL-DRY BASIN 2 BOTTOM-1024.0 HWL-1025.66 NWL-DRY 30.0 121' 100' 105' PUBLIC STREET NAME & STOP SIGN NO PARKING SIGN NO PARKING SIGN EX. POWER POLE TO REMAIN CONTRACTOR SHALL PROVIDE ACCESS TO EX. DRIVEWAY R62' R26' R10' ROAD SHALL HAVE 2' CLEARANCE FROM EXISTING POLE TO EDGE OF BITUMINOUS LANDSCAPE WALL TO REMAIN MATCH EX. DRIVEWAY 1027.0 EOF UTILITY EASEMENT DRAINAGE & UTILITY EASEMENT 41.5 R20'R15' R38' SURMOUNTABLE CURB 3' TRANSITION TO B612 CURB FUTURE ROAD ALIGNMENT MATCH EXISTING CURB & GUTTER MATCH EXISTING CURB & GUTTER PRIVATE STREET NAME SIGN STREET LIGHT 3' TRANSITION TO B612 CURB 2 - TYPE III BARRICADES WITH FUTURE STREET EXTENSIONS SIGN 10' FROM CURB B612 CURB & GUTTER BASIN 3 BOTTOM-1040.0 HWL-1040.49 NWL-DRY RIPRAP FOR DISSIPATION RELOCATE EX. UTILITIES. PROPOSED POWER POLE SHALL HAVE 2' CLEARANCE FROM BACK OF CURB. COORDINATE WITH UTILITY COMPANY. NO OUTLET SIGN 24.0 TYP. VALLEY GUTTER NSCALE IN FEET 0 30 60 CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL 7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com Plotted: 05 /03 / 2021 9:29 AMW:\2020\20327\CADD DATA\CIVIL\_dwg Sheet Files\C2-1 - SITE PLANOUCKSL QUALITY CONTROL PROFESSIONAL SIGNATURE SUBMITTAL/REVISIONS CADD QUALIFICATION DEER HAVEN CHANHASSEN, MN KEN ASHFELD 6480 YOSEMITE AVE. CHANHASSEN, MN 55331 11-09-20 PRELIMINARY SUBMITTAL 01-08-21 LOT LINES & GRADING 02-05-21 CONST DOCUMENTS 04/05/21 CITY COMMENTS 04/15/21 ADDED BASIN 3 05/03/21 CITY COMMENTS C0-1 COVER SHEET C1-1 EXISTING CONDITIONS PLAN C1-2 DEMOLITION PLAN C2-1 SITE PLAN C3-1 GRADING & DRAINAGE PLAN C3-2 SWPP PLAN C3-3 SWPP NOTES C4-1 UTILITY PLAN C4-2 - C4-3 S&W PLAN & PROFILE C5-1 - C5-3 STREET PLAN & PROFILE C8-1 - C8-3 DETAIL SHEETS L1-1 TREE CANOPY PLAN L2-1 LANDSCAPE PLAN Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Todd W. McLouth - PE Project Lead Drawn By Checked By Loucks Project No. 20383 20327 TWM TRG TWM 05/03/21 02/05/21 L3-1 LANDSCAPE DETAILS SITE PLAN C2-1 TOLL FREE: 1-800-252-1166 TWIN CITY AREA: 651-454-0002 Gopher State One Call CALL BEFORE YOU DIG! WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. 1.MINNESOTA STATE STATUTE REQUIRES NOTIFICATION PER "GOPHER STATE ONE CALL" PRIOR TO COMMENCING ANY GRADING, EXCAVATION OR UNDERGROUND WORK. 2.THE CONTRACTOR SHALL FIELD VERIFY LOCATIONS AND ELEVATIONS OF EXISTING UTILITIES AND TOPOGRAPHIC FEATURES PRIOR TO COMMENCEMENT OF CONSTRUCTION ACTIVITY. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES OR VARIATIONS FROM THE PLANS. 3.THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT PROPERTIES DURING THE CONSTRUCTION PHASE OF THIS PROJECT. THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR ANY DAMAGES TO ADJACENT PROPERTIES OCCURRING DURING THE CONSTRUCTION PHASE OF THIS PROJECT. 4.THE CONTRACTOR WILL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING TRAFFIC CONTROL DEVICES SUCH AS BARRICADES, WARNING SIGNS, DIRECTIONAL SIGNS, FLAGMEN AND LIGHTS TO CONTROL THE MOVEMENT OF TRAFFIC WHERE NECESSARY. PLACEMENT OF THESE DEVICES SHALL BE APPROVED BY THE ENGINEER PRIOR TO PLACEMENT. TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE APPROPRIATE MINNESOTA DEPARTMENT OF TRANSPORTATION STANDARDS. 5.IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS ON THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. 6.THE DUTY OF THE ENGINEER OR THE DEVELOPER TO CONDUCT CONSTRUCTION REVIEW OF THE CONTRACTORS PERFORMANCE IS NOT INTENDED TO INCLUDE REVIEW OF THE ADEQUACY OF THE CONTRACTORS SAFETY MEASURES IN, OR NEAR THE CONSTRUCTION SITE. 7.BEFORE BEGINNING CONSTRUCTION THE CONTRACTOR SHALL INSTALL EROSION AND SEDIMENTATION CONTROL MEASURES IN ACCORDANCE WITH NPDES PERMIT REQUIREMENTS, BEST MANAGEMENT PRACTICES, STATE AND CITY OF CHANHASSEN REQUIREMENTS AND THE DETAILS SHOWN ON THE DETAIL SHEET(S) OF THE PROJECT PLANS. 8.ALL CONSTRUCTION PERMITS, APPLICATIONS AND FEES ARE THE RESPONSIBILITY OF THE CONTRACTOR. 9.ALL ENTRANCES AND CONNECTIONS TO CITY STREETS SHALL BE CONSTRUCTED PER THE REQUIREMENTS OF THE STATE AND CITY OF CHANHASSEN JURISDICTIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITS AND NOTIFICATIONS AS REQUIRED. 10.ALL STREET REPAIRS AND PATCHING SHALL BE PERFORMED PER THE REQUIREMENTS OF THE CITY. ALL TRAFFIC CONTROL SHALL BE PROVIDED BY THE CONTRACTOR AND SHALL BE ESTABLISHED PER THE REQUIREMENTS OF THE MINNESOTA MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AND THE CITY. THIS SHALL INCLUDE ALL SIGNAGE, BARRICADES, FLASHERS AND FLAGGERS AS NEEDED. ALL PUBLIC STREETS SHALL BE OPEN TO TRAFFIC AT ALL TIMES. 11.ADJUST ALL EXISTING STRUCTURES, BOTH PUBLIC AND PRIVATE TO THE PROPOSED GRADES WHERE DISTURBED AND COMPLY WITH ALL REQUIREMENTS OF THE UTILITY OWNERS. STRUCTURES BEING RESET TO PAVED AREAS MUST MEET OWNERS REQUIREMENTS FOR TRAFFIC LOADING. 12.EXISTING TOPOGRAPHY PROVIDED BY LOUCKS ASSOCIATES, TOPOGRAPHIC SURVEY DATED 10/13/20. FIELD WORK COMPLETED ON 9/15/20. GENERAL NOTES SITE PLAN LEGEND BITUMINOUS PAVEMENT - UNLESS NOTED, BASEMENT FLOOR ELEVATION FOR FULL BASEMENT IS 8.0 FEET BELOW THE GARAGE FLOOR ELEVATION. - MINIMUM BASEMENT ELEVATION REFLECTS LOWEST FLOOR ELEVATIONS STREET NOTES: SETBACK REQUIREMENTS CONSTRUCTED HOUSE PAD LIMITS 10 SIDE YARD 30' REAR HOUSE LOT NUMBER 30' FRONT GARAGE FLOOR ELEVATION CURB OR EDGE OF PAVEMENT CATCH BASIN STREETLOT CORNER BLOCK NUMBER 913.0 917.0 GRADE AT REAR OF HOUSE PAD (LOWEST OPENING) LOT EASEMENTS 5' MIN. SIDE/REAR HOUSE 10' MIN. FRONT 1019.47 EX. 1021.28 EX. 1021.451021.84 1022.591022.98 1023.571024.0310301040102 610281032103410361038104210441044104210441046103010301 0 3 0 103010241024102610261028102810281 0 2 8 1032103210341 0 3 4 1024 1026 1028 8881047.0 1039.0 1047.0 1042.5 FBWO 1042.5 1034.5 FBWO FBWO 1036.7 1036.7 1028.7 1026.70 EOF 1040 1032103410361038 1 0 4 2 1042 1027.0 EOF 5.2%1026.65 1026.951042.501044.50 1043.801044.50 1045.00 1044.50 7.1%5.7%1042.0 1035.5 1026102810281041.0 0+001+002+003+000+00 1+00 2+00 3+00 3+53.68 2+44.413+004+005+006+0010221024 1026.80 8 1040.4 EOF 104010400+00BASIN 1 BOTTOM-1024.0 HWL-1026.62 NWL-DRY BASIN 2 BOTTOM-1024.0 HWL-1025.66 NWL-DRY PHASE 1 GRADING LIMITS, TYP. PHASE 2 GRADING FUTURE 12" OVERFLOW CULVERT BASIN 3 BOTTOM-1040.0 HWL-1040.49 NWL-DRY NSCALE IN FEET 0 30 60 CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL 7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com Plotted: 05 /03 / 2021 9:31 AMW:\2020\20327\CADD DATA\CIVIL\_dwg Sheet Files\C3-1 - GRADING & DRAINAGE PLANOUCKSL QUALITY CONTROL PROFESSIONAL SIGNATURE SUBMITTAL/REVISIONS CADD QUALIFICATION DEER HAVEN CHANHASSEN, MN KEN ASHFELD 6480 YOSEMITE AVE. CHANHASSEN, MN 55331 11-09-20 PRELIMINARY SUBMITTAL 01-08-21 LOT LINES & GRADING 02-05-21 CONST DOCUMENTS 04/05/21 CITY COMMENTS 04/15/21 ADDED BASIN 3 05/03/21 CITY COMMENTS C0-1 COVER SHEET C1-1 EXISTING CONDITIONS PLAN C1-2 DEMOLITION PLAN C2-1 SITE PLAN C3-1 GRADING & DRAINAGE PLAN C3-2 SWPP PLAN C3-3 SWPP NOTES C4-1 UTILITY PLAN C4-2 - C4-3 S&W PLAN & PROFILE C5-1 - C5-3 STREET PLAN & PROFILE C8-1 - C8-3 DETAIL SHEETS L1-1 TREE CANOPY PLAN L2-1 LANDSCAPE PLAN Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Todd W. McLouth - PE Project Lead Drawn By Checked By Loucks Project No. 20383 20327 TWM TRG TWM 05/03/21 02/05/21 L3-1 LANDSCAPE DETAILS GRADING & DRAINAGE PLAN C3-1 TOLL FREE: 1-800-252-1166 TWIN CITY AREA: 651-454-0002 Gopher State One Call CALL BEFORE YOU DIG! WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. GRADING, DRAINAGE & EROSION CONTROL NOTES 1.SPOT ELEVATIONS REPRESENT FINISHED SURFACE GRADES, GUTTER/FLOW LINE, FACE OF BUILDING, OR EDGE OF PAVEMENT UNLESS OTHERWISE NOTED. 2.ALL DISTURBED UNPAVED AREAS ARE TO RECEIVE MINIMUM OF 6 INCHES OF TOP SOIL AND SEED/MULCH OR SOD. THESE AREAS SHALL BE WATERED/MAINTAINED BY THE CONTRACTOR UNTIL VEGETATION IS ESTABLISHED. 3.STREETS MUST BE CLEANED AND SWEPT THROUGHOUT THE DURATION OF CONSTRUCTION, WITHIN 24 HOURS, WHENEVER TRACKING OF SEDIMENTS OCCURS AND BEFORE SITES ARE LEFT IDLE FOR WEEKENDS AND HOLIDAYS. A REGULAR SWEEPING SCHEDULE MUST BE ESTABLISHED. 4.DUST MUST BE ADEQUATELY CONTROLLED. 5.SEE SWPPP FOR ADDITIONAL EROSION CONTROL NOTES AND REQUIREMENTS. 6.SEE UTILITY PLANS FOR WATER, STORM AND SANITARY SEWER INFORMATION. GRADING LEGEND PHASE 1 MINOR CONTOUR PHASE 1 MAJOR CONTOUR PHASE 2 MINOR CONTOUR PHASE 2 MAJOR CONTOUR - UNLESS NOTED, BASEMENT FLOOR ELEVATION FOR FULL BASEMENT IS 8.0 FEET BELOW THE GARAGE FLOOR ELEVATION. - MINIMUM BASEMENT ELEVATION REFLECTS LOWEST FLOOR ELEVATIONS STREET NOTES: SETBACK REQUIREMENTS CONSTRUCTED HOUSE PAD LIMITS 10 SIDE YARD 30' REAR HOUSE LOT NUMBER 30' FRONT GARAGE FLOOR ELEVATION CURB OR EDGE OF PAVEMENT CATCH BASIN STREETLOT CORNER BLOCK NUMBER 913.0 917.0 GRADE AT REAR OF HOUSE PAD (LOWEST OPENING) LOT EASEMENTS 5' MIN. SIDE/REAR HOUSE 10' MIN. FRONT PARKING STALL COUNT ACCESSIBLE PARKING STALL 2 LEGEND CATCH BASIN STORM SEWER SANITARY SEWER WATERMAIN STORM MANHOLE SANITARY MANHOLE HYDRANT GATE VALVE SPOT ELEVATION SIGN LIGHT POLE POWER POLE WATER MANHOLE / WELL CONTOUR CONCRETE CURB UNDERGROUND ELECTRIC CONCRETE TELEPHONE PEDESTAL UNDERGROUND TELEPHONE UNDERGROUND GAS OVERHEAD UTILITY CHAIN LINK FENCE BUILDING RETAINING WALL NO PARKING UNDERGROUND FIBER OPTIC SANITARY SEWER SERVICE WATER SERVICE ELECTRIC METER GAS METER TREE LINE EXISTING PROPOSED 972 DRAINTILE FORCEMAIN 373PARKING SETBACK LINE BUILDING SETBACK LINE 2 FENCE FLARED END SECTION POST INDICATOR VALVE BENCHMARK SOIL BORING 3DIRECTION OF FLOW 1.0% 972.5 LOOSEN SOILS IN TOP 18-INCHES, MIX SAND INTO LOOSENED SOIL(80/20) BEFORE SEEDING FFE: 1041.5 GFE: 1040.5 4444444444 4 4 4 4 4 4 1019.47 EX. 1021.28 EX. 1021.451021.84 1022.591022.98 1023.571024.0310301040102610281032103410361038104210441044104210441046103010301 0 3 0 103010241024102610261028102810281 0 2 8 1032103210341 0 3 4 1024 1026 1028 8881047.0 1039.0 1047.0 1042.5 FBWO 1042.5 1034.5 FBWO FBWO 1036.7 1036.7 1028.7 1026.70 EOF 1040 1032103410361038 1 0 4 2 1042 1027.0 EOF 5.2%1026.65 1026.951042.501044.50 1043.801044.50 1045.00 1044.50 7.1%5.7%1042.0 1035.5 1026102810281041.0 0+001+002+003+000+00 1+00 2+00 3+00 3+53.68 2+44.413+004+005+006+0010221024 1026.80 8 1040.4 EOF 104010400+00SILT FENCE 1' INSIDE PROPERTY LINE SILT FENCE ROCK CONSTRUCTION ENTRANCE PAD INLET PROTECTION INLET PROTECTION INLET PROTECTION 2 ROWS OF SILT FENCE ALONG ADJACENT WETLAND 5' SEPARATION PHASE 1 SILT FENCE 2' INSIDE PROPERTY LINE TREE FENCE PHASE 1 STAGING AREA BITUMINOUS RECLAIM MATERIAL STOCKPILE SURROUND WITH SILT FENCE INLET PROTECTION TEMP. SEEDING AS NEEDED NSCALE IN FEET 0 30 60 CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL 7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com Plotted: 05 /03 / 2021 9:34 AMW:\2020\20327\CADD DATA\CIVIL\_dwg Sheet Files\C3-2 - SWPP PLANOUCKSL QUALITY CONTROL PROFESSIONAL SIGNATURE SUBMITTAL/REVISIONS CADD QUALIFICATION DEER HAVEN CHANHASSEN, MN KEN ASHFELD 6480 YOSEMITE AVE. CHANHASSEN, MN 55331 11-09-20 PRELIMINARY SUBMITTAL 01-08-21 LOT LINES & GRADING 02-05-21 CONST DOCUMENTS 04/05/21 CITY COMMENTS 04/15/21 ADDED BASIN 3 05/03/21 CITY COMMENTS C0-1 COVER SHEET C1-1 EXISTING CONDITIONS PLAN C1-2 DEMOLITION PLAN C2-1 SITE PLAN C3-1 GRADING & DRAINAGE PLAN C3-2 SWPP PLAN C3-3 SWPP NOTES C4-1 UTILITY PLAN C4-2 - C4-3 S&W PLAN & PROFILE C5-1 - C5-3 STREET PLAN & PROFILE C8-1 - C8-3 DETAIL SHEETS L1-1 TREE CANOPY PLAN L2-1 LANDSCAPE PLAN Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Todd W. McLouth - PE Project Lead Drawn By Checked By Loucks Project No. 20383 20327 TWM TRG TWM 05/03/21 02/05/21 L3-1 LANDSCAPE DETAILS STORM WATER POLLUTION PREVENTION PLAN C3-2 TOLL FREE: 1-800-252-1166 TWIN CITY AREA: 651-454-0002 Gopher State One Call CALL BEFORE YOU DIG! WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. INLET PROTECTION SILT FENCE - PHASE 1 EROSION CONTROL BLANKET (ON ALL 3:1 SLOPES) ROCK CONSTRUCTION ENTRANCE SWPPP LEGEND 1.SEE SHEET C3-3 FOR SWPPP NOTES AND SEE SHEETS C8-1 THROUGH C8-3 DETAILS. 2.PHASE 2 SILT FENCE WILL BE DONE WITH INDIVIDUAL LOT GRADING. GENERAL NOTES TREE FENCE TEMPORARY SEEDING - ALL DISTURBED AREAS (MNDOT MIX 22-111) CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL 7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com Plotted: 05 /03 / 2021 8:6 AMW:\2020\20327\CADD DATA\CIVIL\_dwg Sheet Files\C3-3 - SWPPP NOTES & DETAILSOUCKSL QUALITY CONTROL PROFESSIONAL SIGNATURE SUBMITTAL/REVISIONS CADD QUALIFICATION DEER HAVEN CHANHASSEN, MN KEN ASHFELD 6480 YOSEMITE AVE. CHANHASSEN, MN 55331 11-09-20 PRELIMINARY SUBMITTAL 01-08-21 LOT LINES & GRADING 02-05-21 CONST DOCUMENTS 04/05/21 CITY COMMENTS 04/15/21 ADDED BASIN 3 05/03/21 CITY COMMENTS C0-1 COVER SHEET C1-1 EXISTING CONDITIONS PLAN C1-2 DEMOLITION PLAN C2-1 SITE PLAN C3-1 GRADING & DRAINAGE PLAN C3-2 SWPP PLAN C3-3 SWPP NOTES C4-1 UTILITY PLAN C4-2 - C4-3 S&W PLAN & PROFILE C5-1 - C5-3 STREET PLAN & PROFILE C8-1 - C8-3 DETAIL SHEETS L1-1 TREE CANOPY PLAN L2-1 LANDSCAPE PLAN Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Todd W. McLouth - PE Project Lead Drawn By Checked By Loucks Project No. 20383 20327 TWM TRG TWM 05/03/21 02/05/21 L3-1 LANDSCAPE DETAILS STORM WATER POLLUTION PREVENTION NOTES C3-3 1.THE NATURE OF THIS PROJECT WILL CONSIST OF CONSTRUCTING A PUBLIC ROAD EXTENSION, A PRIVATE ROAD TO SERVE FOUR LOTS, UTILITIES, AND STORMWATER TREATMENT. 2.THE INTENDED SEQUENCING OF MAJOR CONSTRUCTION ACTIVITIES ARE AS FOLLOWS: 1.INSTALL VEHICLE TRACKING BMP 2.INSTALL SILT FENCE AROUND SITE 3.INSTALL TREE PROTECTION FENCE 4.INSTALL PROTECTIVE FENCE AROUND FILTRATION AREAS 5.CLEAR AND GRUB SITE 6.STRIP AND STOCKPILE TOPSOIL 7.REMOVE PAVEMENTS 8.ROUGH GRADE SITE 9.IMPORT CLEAN FILL FOR REPLACEMENT AND BALANCE 10.INSTALL UTILITIES 7.INSTALL PAVEMENTS 8.FINAL GRADE SITE 7.CONSTRUCT STORMWATER MANAGEMENT BASINS 8.INSTALL SILT FENCE AROUND BASINS 9.REMOVE ACCUMULATED SEDIMENT FROM BASINS 10.CONSTRUCT FILTRATION TRENCHES 11.SEED AND MULCH 12.WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS STABILIZED, REMOVE SILT FENCE AND RESEED ANY AREAS DISTURBED BY THE REMOVAL. 3.SITE DATA: AREA OF DISTURBANCE:1.3± AC PRE-CONSTRUCTION IMPERVIOUS AREA:0.34 AC POST-CONSTRUCTION IMPERVIOUS AREA:0.80 AC GENERAL SOIL TYPE:SEE GEOTECHNICAL REPORT 4.THE LOCATION OF AREAS NOT TO BE DISTURBED MUST BE IDENTIFIED WITH FLAGS, STAKES, SIGNS, SILT FENCE, ETC. BEFORE CONSTRUCTION BEGINS. 5.ALL DISTURBED GROUND LEFT INACTIVE FOR SEVEN (7) OR MORE DAYS SHALL BE STABILIZED BY SEEDING OR SODDING (ONLY AVAILABLE PRIOR TO SEPTEMBER 15) OR BY MULCHING OR COVERING OR OTHER EQUIVALENT CONTROL MEASURE. 6.ON SLOPES 3:1 OR GREATER MAINTAIN SHEET FLOW AND MINIMIZE RILLS AND/OR GULLIES, SLOPE LENGTHS CAN NOT BE GREATER THAN 75 FEET. DENOTES SLOPES GREATER THAN 3:1. ALL 3:1 SLOPES TO BE STABILIZED WITH EROSION CONTROL BLANKET 7.ALL STORM DRAINS AND INLETS MUST BE PROTECTED UNTIL ALL SOURCES OF POTENTIAL DISCHARGE ARE STABILIZED. 8.STOCKPILES MUST HAVE EFFECTIVE SEDIMENT CONTROL AND CAN NOT BE PLACED IN SURFACE WATERS OR STORM WATER CONVEYANCE SYSTEMS. 9.SEDIMENT LADEN WATER MUST BE DISCHARGED TO A SEDIMENTATION BASIN WHENEVER POSSIBLE. IF NOT POSSIBLE, IT MUST BE TREATED WITH THE APPROPRIATE BMPs. BMPs INCLUDE, BUT ARE NOT LIMITED TO SEDIMENT TRAP, SANDBAG BARRIER, AND CHECK DAM. 10.SOLID WASTE MUST BE DISPOSED OF PROPERLY AND MUST COMPLY WITH MPCA DISPOSAL REQUIREMENTS. 11.EXTERNAL WASHING OF CONSTRUCTION VEHICLES MUST BE LIMITED TO A DEFINED AREA OF THE SITE, RUNOFF MUST BE PROPERLY CONTAINED. 12.NO ENGINE DEGREASING IS ALLOWED ON SITE. 13.THE OWNER WHO SIGNS THE NPDES PERMIT APPLICATION IS A PERMITTEE AND IS RESPONSIBLE FOR COMPLIANCE WITH ALL TERMS AND CONDITIONS OF THE PERMIT. THE OPERATOR (CONTRACTOR) WHO SIGNS THE NPDES PERMIT APPLICATION IS A PERMITTEE FOR ALL APPLICABLE CONSTRUCTION ACTIVITY REQUIREMENTS FOUND IN SECTIONS 3, 4, 6-24 OF THE NPDES PERMIT AND IS JOINTLY RESPONSIBLE WITH THE OWNER FOR COMPLIANCE WITH THOSE PORTIONS OF THE PERMIT. 14.TERMINATION OF COVERAGE-PERMITTEE(S) WISHING TO TERMINATE COVERAGE MUST SUBMIT A NOTICE OF TERMINATION (NOT) TO THE MPCA. ALL PERMITTEE(S) MUST SUBMIT A NOT WITHIN 30 DAYS AFTER ONE OR MORE OF THE FOLLOWING CONDITIONS HAVE BEEN MET: A.FINAL STABILIZATION, PER NPDES PERMIT SECTION 13 HAS BEEN ACHIEVED ON ALL PORTIONS OF THE SITE FOR WHICH THE PERMITTEE IS RESPONSIBLE. B.TRANSFER OF OWNERSHIP AS DESCRIBED IN THE PERMIT. 15. INSPECTIONS A.INITIAL INSPECTION FOLLOWING SILT FENCE INSTALLATION BY CITY REPRESENTATIVE IS REQUIRED PRIOR TO GRADING OPERATIONS. CONTACT THE CITY WATER RESOURCES TECHNICIAN AT 952-221-1173. B.EXPOSED SOIL AREAS: ONCE EVERY 7 DAYS AND WITHIN 24 HOURS FOLLOWING A 0.5" OVER 24 HOUR RAIN EVENT. C.STABILIZED AREAS: ONCE EVERY 30 DAYS D.FROZEN GROUND: AS SOON AS RUNOFF OCCURS OR PRIOR TO RESUMING CONSTRUCTION. E.INSPECTION AND MAINTENANCE RECORDS MUST BE RETAINED FOR 3 YEARS AFTER FILING OF THE NOTICE OF TERMINATION AND MUST INCLUDE: DATE AND TIME OF ACTION, NAME OF PERSON(S) CONDUCTING WORK, FINDING OF INSPECTIONS AND RECOMMENDATIONS FOR CORRECTIVE ACTION, DATE AND AMOUNT OF RAINFALL EVENTS GREATER THAN 0.5 INCHES IN A 24 HOUR PERIOD. 16. MINIMUM MAINTENANCE A.SILT FENCE TO BE REPAIRED, REPLACED, SUPPLEMENTED WHEN NONFUNCTIONAL, OR 1/3 FULL; WITHIN 24 HOURS B.SEDIMENT BASINS DRAINED AND SEDIMENT REMOVED WHEN REACHES 1/2 STORAGE VOLUME. REMOVAL MUST BE COMPLETE WITHIN 72 HOURS OF DISCOVERY. C.SEDIMENT REMOVED FROM SURFACE WATERS WITHIN (7)SEVEN DAYS D.CONSTRUCTION SITE EXITS INSPECTED, TRACKED SEDIMENT REMOVED AS SOON AS POSSIBLE, BUT NOT LATER THAN 24 HOURS AFTER DISCOVERY. E.PROVIDE COPIES OF EROSION INSPECTION RESULTS TO WATER RESOURCES TECHNICIAN FOR ALL EVENTS GREATER THAN 12" IN 24 HOURS 17.THE SWPPP, INCLUDING ALL CHANGES TO IT, AND INSPECTIONS AND MAINTENANCE RECORDS MUST BE KEPT AT THE SITE DURING CONSTRUCTION ACTIVITY BY THE PERMITTEE(S) WHO HAVE OPERATIONAL CONTROL OF THE SITE. 18.OWNER MUST KEEP RECORDS OF ALL PERMITS REQUIRED FOR THE PROJECT, THE SWPPP, ALL INSPECTIONS AND MAINTENANCE, PERMANENT OPERATION AND MAINTENANCE AGREEMENTS, AND REQUIRED CALCULATIONS FOR TEMPORARY AND PERMANENT STORM WATER MANAGEMENT SYSTEMS. THESE RECORDS MUST BE RETAINED FOR THREE YEARS AFTER FILING NPDES NOTICE OF TERMINATION. 19.SWPPP MUST BE AMENDED WHEN: A.THERE IS A CHANGE IN DESIGN, OPERATION, MAINTENANCE, WEATHER OR SEASONAL CONDITIONS THAT HAS A SIGNIFICANT EFFECT ON DISCHARGE B.INSPECTIONS INDICATE THAT THE SWPPP IS NOT EFFECTIVE AND DISCHARGE IS EXCEEDING WATER QUALITY STANDARDS. C.THE BMP'S IN THE SWPPP ARE NOT CONTROLLING POLLUTANTS IN DISCHARGES OR IS NOT CONSISTENT WITH THE TERMS AND CONDITIONS OF THE PERMIT. 20.CONCRETE WASHOUT AREA A.CONCRETE WASH-OUT IS NOT ALLOWED ON-SITE. 21.IN THE EVENT OF ENCOUNTERING A WELL, DRAINTILE, OR SPRING DURING CONSTRUCTION CONTRACTOR TO CEASE CONSTRUCTION ACTIVITY AND NOTIFY ENGINEER AND CITY ENGINEER. 22.PIPE OUTLETS MUST BE PROVIDED WITH TEMPORARY OR PERMANENT ENERGY DISSIPATION WITHIN 24 HOURS AFTER CONNECTION TO A SURFACE WATER. 23.FINAL STABILIZATION FINAL STABILIZATION REQUIRES THAT ALL SOIL DISTURBING ACTIVITIES HAVE BEEN COMPLETED AND THAT DISTURBED AREAS ARE STABILIZED BY A UNIFORM PERENNIAL VEGETATIVE COVER WITH 70% OF THE EXPECTED FINAL DENSITY, AND THAT ALL PERMANENT PAVEMENTS HAVE BEEN INSTALLED. ALL TEMPORARY BMP'S SHALL BE REMOVED, DITCHES STABILIZED, AND SEDIMENT SHALL BE REMOVED FROM PERMANENT CONVEYANCES AND SEDIMENTATION BASINS IN ORDER TO RETURN THE POND TO DESIGN CAPACITY. 24. TEMPORARY SEDIMENTATION BASINS A.THE TEMPORARY SEDIMENTATION BASINS SHALL BE CONSTRUCTED AND MADE OPERATIONAL PRIOR TO DISTURBANCE OF 10 OR MORE ACRES DRAINING TO A COMMON LOCATION. B.TEMPORARY SEDIMENTATION BASINS ARE REQUIRED PRIOR TO RUNOFF LEAVING THE CONSTRUCTION SITE OR ENTERING SURFACE WATERS WHEN 10 OR MORE ACRES OF DISTURBED SOILS DRAIN TO A COMMON LOCATION. THE BASIN MUST PROVIDE 3,600 CUBIC FEET OF STORAGE BELOW THE OUTLET PER ACRE DRAINED. IF HYDRAULIC CALCULATIONS ARE AVAILABLE, THE TEMPORARY SEDIMENTATION BASIN MUST PROVIDE A STORAGE VOLUME EQUIVALENT TO THE 2-YEAR, 24-HOUR STORM, BUT IN NO CASE LESS THAN 1800 CUBIC FEET PER ACRE DRAINED. THE TEMPORARY SEDIMENTATION BASIN MUST BE CONSTRUCTED AND MADE OPERATIONAL CONCURRENT WITH THE START OF SOIL DISTURBANCE UP GRADIENT OF THE POND. THE TEMPORARY SEDIMENTATION BASIN SHALL BE DESIGNED TO PREVENT SHORT CIRCUITING. THE OUTFALL SHALL BE DESIGNED TO REMOVE FLOATABLE DEBRIS, ALLOW FOR COMPLETE DRAWDOWN OF THE POND FOR MAINTENANCE ACTIVITIES, AND HAVE ENERGY DISSIPATION. THE EMERGENCY SPILLWAY SHALL BE STABILIZED. C.TEMPORARY SEDIMENTATION BASINS SHALL BE SITUATED OUTSIDE OF SURFACE WATERS AND ANY REQUIRED BUFFER ZONE, AND MUST BE DESIGNED TO AVOID DRAINING WETLANDS, UNLESS THE IMPACT IS IN COMPLIANCE WITH THE REQUIREMENTS OF THIS PERMIT. D.EXCESSIVE SEDIMENT-LADEN WATER THAT IS NOT PROPERLY FILTERED WILL NOT BE PERMITTED TO DISCHARGE FROM SITE. 25.DEWATERING AND BASIN DRAINING A.ALL DEWATERING PLANS SHALL BE REVIEWED AND APPROVED BY CITY WATER RESOURCES COORDINATOR. B.TURBID OR SEDIMENT-LADEN WATERS RELATED TO DEWATERING OR BASIN DRAINING SHALL BE DISCHARGED TO A TEMPORARY OR PERMANENT SEDIMENTATION BASIN ON THE PROJECT SITE UNLESS INFEASIBLE. THE TEMPORARY OR PERMANENT BASIN MAY DISCHARGE TO SURFACE WATERS IF THE BASIN WATER HAS BEEN VISUALLY CHECKED TO ENSURE ADEQUATE TREATMENT HAS BEEN OBTAINED IN THE BASIN AND THAT THE NUISANCE CONDITIONS WILL NOT RESULT FROM THE DISCHARGE. DISCHARGE POINTS SHALL BE ADEQUATELY PROTECTED FROM EROSION AND PROPER VELOCITY DISSIPATION PROVIDED. C.ALL WATER FROM DEWATERING OR BASIN-DRAINING ACTIVITIES MUST BE DISCHARGED IN A MANNER THAT DOES NOT CAUSE NUISANCE CONDITIONS, EROSION IN THE RECEIVING CHANNELS OR ON DOWN SLOPE PROPERTIES, OR INUNDATION IN WETLANDS CAUSING SIGNIFICANT ADVERSE IMPACTS TO THE WETLAND. D.IF FILTERS WITH BACKWASH WATERS ARE USED, THE BACKWASH WATER SHALL BE HAULED AWAY FOR DISPOSAL, RETURNED TO THE BEGINNING OF THE TREATMENT PROCESS, OR INCORPORATED INTO SITE IN A MANNER THAT DOES NOT CAUSE EROSION. BACKWASH WATER MAY NOT BE DISCHARGED TO SANITARY SEWER. 26.POLLUTION PREVENTION A.BUILDING PRODUCTS THAT HAVE THE POTENTIAL TO LEACH POLLUTANTS MUST BE UNDER COVER TO PREVENT DISCHARGE OR PROTECTED BY AN EFFECTIVE MEANS DESIGNED TO MINIMIZE CONTACT WITH STORMWATER. B.PESTICIDES, HERBICIDES, INSECTICIDES, FERTILIZERS, TREATMENT CHEMICALS, AND LANDSCAPE MATERIALS MUST BE UNDER COVER. C.HAZARDOUS MATERIALS AND TOXIC WASTE MUST BE PROTECTED TO PREVENT VANDALISM. D.SOLID WASTE MUST BE STORED, COLLECTED AND DISPOSED OF IN COMPLIANCE WITH MINN. R. CH 7035. E.PORTABLE TOILETS MUST BE POSITIONED SO THAT THEY ARE SECURE AND WILL NOT BE TIPPED OR KNOCKED OVER. SANITARY WASTE MUST BE DISPOSED OF PROPERLY IN ACCORDANCE WITH MINN. R. CH 7041. F.DISCHARGE OF SPILLED OR LEAKED CHEMICALS, INCLUDING FUEL, FROM ANY AREA WHERE CHEMICALS OR FUEL WILL BE LOADED OR UNLOADED SHALL BE PREVENTED USING DRIP PANS OR ABSORBENTS. SUPPLIES SHALL BE AVAILABLE AT ALL TIMES TO CLEAN UP DISCHARGED MATERIALS AND THAT AN APPROPRIATE DISPOSAL METHOD MUST BE AVAILABLE FOR RECOVERED SPILLED MATERIALS. 27. DESIGN CALCULATIONS TEMPORARY & PERMANENT STORMWATER TREATMENT ARE DESIGNED TO MEET MPCA GENERAL & SPECIAL WATER REQUIREMENTS. CALCULATIONS ARE PART OF THE HYDROLOGY REPORT, WHICH IS TO BE CONSIDERED PART OF THE SWPP DOCUMENTS. SEE HYDROLOGY REPORT FOR ADDITIONAL INFORMATION. 28.GENERAL STORMWATER DISCHARGE REQUIREMENTS ALL REQUIREMENTS LISTED IN SECTIONS 5-7, 14, 16-19, 21, 24 OF THE PERMIT FOR DESIGN OF THE PERMANENT STORMWATER MANAGEMENT SYSTEM AND DISCHARGE HAVE BEEN INCLUDED IN THE PREPARATION OF THIS SWPP. THESE INCLUDE BUT ARE NOT LIMITED TO: A.THE EXPECTED AMOUNT, FREQUENCY, INTENSITY, AND DURATION PRECIPITATION. B.THE NATURE OF STORMWATER RUNOFF AND RUN-ON AT THE SITE. C.PEAK FLOW RATES AND STORMWATER VOLUMES TO MINIMIZE EROSION AT OUTLETS AND DOWNSTREAM CHANNEL AND STREAM BANK EROSION. D.THE RANGE OF SOIL PARTICLE SIZES EXPECTED TO BE PRESENT ON THE SITE, SEE GEOTECHNICAL REPORT. 29.CONSTRUCTION OF FILTRATION BASINS A.NO HEAVY TRAFFIC ON FILTRATION AREAS. CONSTRUCTION TO BE DONE WITH MINIMAL COMPACTION TO FILTRATION AREAS. IF COMPACTION IS ENCOUNTERED, SCARIFY BASIN TO LOOSEN THE SOIL. B.INFILTRATION SYSTEMS MUST NOT BE EXCAVATED TO FINAL GRADE UNTIL THE CONTRIBUTING DRAINAGE AREA HAD BEEN CONSTRUCTED AND FULLY STABILIZED UNLESS RIGOROUS EROSION PREVENTION AND SEDIMENT CONTROLS ARE PROVIDED( SECTION 16.4). C.WHEN AN INFILTRATION SYSTEM IS EXCAVATED TO FINAL GRADE (OR WITHIN THREE (3) FEET OF FINAL GRADE), THE PERMITTEE(S) MUST EMPLOY RIGOROUS EROSION PREVENTION AND SEDIMENT CONTROLS (E.G., DIVERSION BERMS) TO KEEP SEDIMENT AND RUNOFF COMPLETELY AWAY FROM THE INFILTRATION AREA. THE AREA MUST BE STAKED OFF AND MARKED SO THAT HEAVY CONSTRUCTION VEHICLES OR EQUIPMENT WILL NOT COMPACT THE SOIL IN THE PROPOSED INFILTRATION AREA. D.TO PREVENT CLOGGING OF THE INFILTRATION OR FILTRATION SYSTEM, THE PERMITTEE(S) MUST USE A PRETREATMENT DEVICE SUCH AS A VEGETATED FILTER STRIP, SMALL SEDIMENTATION BASIN, OR WATER QUALITY INLET (E.G., GRIT CHAMBER) TO SETTLE PARTICULATES BEFORE THE STORMWATER DISCHARGES INTO THE INFILTRATION OF FILTRATION SYSTEM. 30.POST CONSTRUCTION THE WATER QUALITY VOLUME THAT MUST BE RETAINED ON SITE BY THE PROJECT'S PERMANENT STORMWATER MANAGEMENT SYSTEM DESCRIBED IN SECTION 15. SEE SECTION 15 FOR RULES, SEE HYDROLOGY REPORT AND PLAN SHEETS FOR STORMWATER DESIGN AND WATER QUALITY VOLUME INFORMATION. FOR MORE INFORMATION ON INFILTRATION DESIGN, PROHIBITIONS AND APPROPRIATE SITE CONDITIONS. 31.RESPONSIBILITIES A.THE OWNER MUST IDENTIFY A CONTRACTOR WHO WILL OVERSEE THE SWPPP IMPLEMENTATION AND THE PERSON RESPONSIBLE FOR INSPECTION AND MAINTENANCE: B.THE OWNER MUST IDENTIFY THE PERSON WHO WILL BE RESPONSIBLE FOR LONG TERM OPERATIONS AND MAINTENANCE OF THE PERMANENT STORMWATER MANAGEMENT SYSTEM: 32.TRAINING REQUIREMENTS THE PERMITTES(S) SHALL ENSURE THE FOLLOWING INDIVIDUALS IDENTIFIED IN THIS PART HAVE BEEN TRAINED IN ACCORDANCE WITH THIS PERMIT'S TRAINING REQUIREMENTS. 1. WHO MUST BE TRAINED: A. INDIVIDUAL(S) PREPARING THE SWPPP FOR THE PROJECT B. INDIVIDUAL(S) OVERSEEING IMPLEMENTATION OF, REVISING, AND/OR AMENDING THE SWPPP AND INDIVIDUALS(S) PERFORMING INSPECTIONS FOR THE PROJECT. ONE OF THESE INDIVIDUAL(S) MUST BE AVAILABLE FOR AN ONSITE INSPECTION WITHIN 72 HOURS UPON REQUEST BY THE MPCA. C.INDIVIDUAL(S) PERFORMING OR SUPERVISING THE INSTALLATION, MAINTENANCE AND REPAIR OF BMPS. AT LEAST ONE INDIVIDUAL ON A PROJECT MUST BE TRAINED IN THESE JOB DUTIES. 2.TRAINING CONTENT: THE CONTENT AND EXTENT OF TRAINING MUST BE COMMENSURATE WITH THE INDIVIDUAL'S JOB DUTIES AND RESPONSIBILITIES WITH REGARD TO ACTIVITIES COVERED UNDER THIS PERMIT FOR THE PROJECT. AT LEAST ONE INDIVIDUAL PRESENT ON THE PERMITTED PROJECT SITE (OR AVAILABLE TO THE PROJECT SITE IN 72 HOURS) MUST BE TRAINED IN THE JOB DUTIES DESCRIBED IN SECTION 21.2B AND SECTION 21.2C. 33.THE PERMITTEE(S) SHALL ENSURE THAT THE INDIVIDUALS ARE TRAINED BY LOCAL, STATE, FEDERAL AGENCIES, PROFESSIONAL OR OTHER ENTITIES WITH EXPERTISE IN EROSION PREVENTION, SEDIMENT CONTROL, PERMANENT STORMWATER MANAGEMENT AND THE MINNESOTA NPDES/SDS CONSTRUCTION STORMWATER PERMIT. AN UPDATE REFRESHER-TRAINING MUST BE ATTENDED EVERY THREE (3) YEARS STARTING THREE (3) YEARS FROM THE ISSUANCE DATE OF THIS PERMIT. 33.LIST OF CONTACTS * MPCA 24HR. HAZARDOUS SPILL HOTLINE: 651-649-5457 OR 800-422-0798 DESCRIPTION UNIT TEMPORARY ROCK CONSTRUCTION ENTRANCE EA PREFABRICATED CONCRETE WASHOUT EA SILT FENCE (STANDARD)LF EROSION CONTROL BLANKET SY INLET PROTECTION EA QUANTITY 1 NOT ALLOWED 2,810 550 3 SEEDING AC 1.3± NAME OF WATER BODY TYPE OF WATER BODY SPECIAL WATER IMPAIRED WATER TYPE OF SPECIAL WATER CHRISTMAS LAKE LAKE NO NO TITLE NAME OWNER KEN ASHFELD COMPANY PHONE NUMBER PROJECT MANAGER TODD MCLOUTH LOUCKS 763-496-6742 ENGINEER SWPPP VAL ANDERSON 763-496-6728LOUCKS CONTRACTOR SITE MANGER PENDING SWPPP NOTES ESTIMATED QUANTITIES RECEIVING WATERS CERTIFICATION SPECIAL AND IMPAIRED WATERS SITE * LAKE LUCY LAKE NO NO 4444444444 4 4 4 4 4 44448 881047.0 1039.0 1047.0 1042.5 FBWO 1042.5 1034.5 FBWO FBWO 1036.7 1036.7 1028.7 0+001+002+003+000+00 1+00 2+00 3+00 3+53.68 2+44.413+004+005+006+004 4 8 0+00CB 101 RIM: 1025.90 INV: 1022.0 FES INV: 1021.25 53'-15" RCP CL V @ 0.6% STMH 100 RIM: 1029.0 INV: 1021.58 60'-10" PVC SDR 35 @ 0.7% 57'-10" PVC SDR 35 @ 0.8% CB 102 RIM: 1025.30 INV: 1021.98 CONNECT TO EX. SANI. MH 04-110 SANI. MH 04-131 SANI. MH 04-132 SANI. MH 04-133 CONTRACTOR TO COORDINATE RELOCATION OF TELEPHONE & ELECTRIC AS NECESSARY HYDRANT W/GATE VALVE 6" PVC C900 WATERMAIN 6"x6" CUT IN TEE CONNECTION W/6" SLEEVE & 6" GATE VALVE BASIN 1 BOTTOM: 1024.0 HWL: 1026.62 BASIN 2 BOTTOM: 1024.0 HWL: 1025.66 147'-6" PERF. PVC DRAINTILE @ 0% 6"-CLEANOUT RIM: 1025.5 INV: 1022.1 55'-6" PERF. PVC DRAINTILE @ 0% 6"-CLEANOUT RIM: 1025.5 INV: 1022.1 S.1035.0 S.1030.5 S.1024.7 6" PVC BENDS 8.0 CY CL 3 RIP-RAP 4"-CLEANOUT RIM: 1021.20 INV: 1018.20 CORE DRILL 4" DRAINTILE INTO EXISTING CB INV=1017.90 (FIELD VERIFY) 4" NON-PERF PVC SCH 40 DRAINTILE 4" PERF PVC SDR 35 DRAINTILE FUTURE 15" OVERFLOW CULVERT FUTURE FES WITH RIP RAP INV=1024.0 FUTURE FES INV=1027.0BASIN 3 BOTTOM: 1040.0 HWL: 1040.36 CB 105 (NYLOPLAST 15") RIM: 1040.20 INV: 1037.0 14'-6" PVC @ 1.0% ATRIUM GRATE CAP 6" GATE VALVE NSCALE IN FEET 0 30 60 CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL 7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com Plotted: 05 /03 / 2021 9:37 AMW:\2020\20327\CADD DATA\CIVIL\_dwg Sheet Files\C4-1 - UTILITY PLANOUCKSL QUALITY CONTROL PROFESSIONAL SIGNATURE SUBMITTAL/REVISIONS CADD QUALIFICATION DEER HAVEN CHANHASSEN, MN KEN ASHFELD 6480 YOSEMITE AVE. CHANHASSEN, MN 55331 11-09-20 PRELIMINARY SUBMITTAL 01-08-21 LOT LINES & GRADING 02-05-21 CONST DOCUMENTS 04/05/21 CITY COMMENTS 04/15/21 ADDED BASIN 3 05/03/21 CITY COMMENTS C0-1 COVER SHEET C1-1 EXISTING CONDITIONS PLAN C1-2 DEMOLITION PLAN C2-1 SITE PLAN C3-1 GRADING & DRAINAGE PLAN C3-2 SWPP PLAN C3-3 SWPP NOTES C4-1 UTILITY PLAN C4-2 - C4-3 S&W PLAN & PROFILE C5-1 - C5-3 STREET PLAN & PROFILE C8-1 - C8-3 DETAIL SHEETS L1-1 TREE CANOPY PLAN L2-1 LANDSCAPE PLAN Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Todd W. McLouth - PE Project Lead Drawn By Checked By Loucks Project No. 20383 20327 TWM TRG TWM 05/03/21 02/05/21 L3-1 LANDSCAPE DETAILS UTILITY PLAN C4-1 TOLL FREE: 1-800-252-1166 TWIN CITY AREA: 651-454-0002 Gopher State One Call CALL BEFORE YOU DIG! WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. UTILITY NOTES 1.STATIONING FOR SANITARY & WATER SERVICES REFER TO DISTANCE FROM DOWNSTREAM MANHOLES. 2.WATER SERVICES MAY BE INSTALLED IN THE SAME TRENCH PARALLEL WITH THE 6" PVC SANITARY SERVICES ON A BENCH A MINIMUM OF 18 INCHES ABOVE THE TOP OF SANITARY SEWER SERVICES. 3.WATERMAIN SHALL HAVE TRACER WIRE INSTALLED. 4.CONTACT CITY UTILITIES DEPARTMENT AT 952-227-1300 48 HOURS PRIOR TO OPERATING VALVES. ONLY CITY PERSONNEL SHALL OPERATE VALVES. NAME TYPE SIZE RIM BUILD CASTING 100 STMH 48"1029.0 7.42 R-1642 101 CB 30"1026.05 4.05 102 CB 30"1025.30 3.32 R-4342 R-4342 105 NYLOPLAST 15"1040.20 3.20 1501DI STORM SEWER STRUCTURE SCHEDULE 1000 1005 1010 1015 1020 1025 1030 1035 1040 1045 1050 1000 1005 1010 1015 1020 1025 1030 1035 1040 1045 1050 -0+501020.451020.50+001021.471021.51022.181022.21+001022.721022.71022.911022.92+001022.771022.81025.081025.13+001024.241024.21024.951025.04+001026.091026.11026.951027.05+001031.891031.91033.621033.66+001032.171032.21030.491030.57+007+50 2.77% 1.15% 5.64 % HORIZONTAL: 1"=30' VERTICAL: 1"=5'MH 04-132STA=0+22.3RIM=1028.87INV=1023.86 (8") SINV=1023.76 (8") W233 LF 8" PVC SDR 35 @ 0.50%MH 04-131STA=5+49.0RIM=1033.39INV=1022.60 (8") EINV=1022.50 (8") SW80 LF 8" PVC SDR 35 @ 0.50% CORE-DRILL & INSTALL BOOT CONNECT TO EX. MH INV=1022.10 (FIELD VERIFY) @ 0.50% EX. 6" DIP WATERM A I N EXISTING CL GRADE PROPOSED CL GRADE FUTURE CL GRADE CUT IN 6" TEE CONNECTION INTO EXISTING 6" WATERMAIN 15" STORM SEWER 8'x8' INSULATION SAN.MATCH EXISTINGYOSEMITE AVESTA. 0+00PRIVATE ROAD CENTERLINEYOSEMITE LANESTA. 2+93.21PROPOSED GRADE OVER SANITARY SEWER 6" GATE VALVE44444444444444448881042.51042.51034.5FBWOFBWO1036.71036.71028.70+001+002+00 3+00 0+001+002+002+44.413+004+00 5+00 6+00 7+007+08.134480+00 SCALE IN FEET 0 30 60 CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL 7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com Plotted: 05 /03 / 2021 11:17 AMW:\2020\20327\CADD DATA\CIVIL\_dwg Sheet Files\C4-3 - SANITARY SEWER PLAN & PROFILEOUCKSL QUALITY CONTROL PROFESSIONAL SIGNATURE SUBMITTAL/REVISIONS CADD QUALIFICATION DEER HAVEN CHANHASSEN, MN KEN ASHFELD 6480 YOSEMITE AVE. CHANHASSEN, MN 55331 11-09-20 PRELIMINARY SUBMITTAL 01-08-21 LOT LINES & GRADING 02-05-21 CONST DOCUMENTS 04/05/21 CITY COMMENTS 04/15/21 ADDED BASIN 3 05/03/21 CITY COMMENTS C0-1 COVER SHEET C1-1 EXISTING CONDITIONS PLAN C1-2 DEMOLITION PLAN C2-1 SITE PLAN C3-1 GRADING & DRAINAGE PLAN C3-2 SWPP PLAN C3-3 SWPP NOTES C4-1 UTILITY PLAN C4-2 - C4-3 S&W PLAN & PROFILE C5-1 - C5-3 STREET PLAN & PROFILE C8-1 - C8-3 DETAIL SHEETS L1-1 TREE CANOPY PLAN L2-1 LANDSCAPE PLAN Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Todd W. McLouth - PE Project Lead Drawn By Checked By Loucks Project No. 20383 20327 TWM TRG TWM 05/03/21 02/05/21 L3-1 LANDSCAPE DETAILS SANITARY SEWER PLAN & PROFILE C4-2 TOLL FREE: 1-800-252-1166 TWIN CITY AREA: 651-454-0002 Gopher State One Call CALL BEFORE YOU DIG! WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. SANI. MH 04-132 SANI. MH 04-131 EX. MH 04-110 EX.DRIVEWAY PROVIDE ACCESS TO EXISTING DRIVEWAY DURING CONSTRUCTION. SAW-CUT & REMOVE EX. BIT. & CURB AS NECESSARY RESTORE STREET (SEE DETAIL 5202A) MATCH EX. CURB & GUTTER 1.STATIONING FOR SANITARY & WATER SERVICES REFER TO DISTANCE FROM DOWNSTREAM MANHOLES. 2.WATER SERVICES MAY BE INSTALLED IN THE SAME TRENCH PARALLEL WITH THE 6" PVC SANITARY SERVICES ON A BENCH A MINIMUM OF 18 INCHES ABOVE THE TOP OF SANITARY SEWER SERVICES. 3.WATERMAIN SHALL HAVE TRACER WIRE INSTALLED. 4.CONTACT CITY UTILITIES DEPARTMENT AT 952-227-1300 48 HOURS PRIOR TO OPERATING VALVES. ONLY CITY PERSONNEL SHALL OPERATE VALVES. NOTES PUBLIC ROAD WOOD DUCK LANE/TAKOMA TRAIL N 6" RESILIENT WEDGE GATE VALVE CUT IN 6" TEE CONNECTION SAN. 1+92 S-1024.7 6" RESILIENT WEDGE GATE VALVE CONTRACTOR SHALL REPAIR EX. CASTING WITH I&I BARRIER (SEE DETAIL 2109) 1010 1015 1020 1025 1030 1035 1040 1045 1050 1055 1060 1010 1015 1020 1025 1030 1035 1040 1045 1050 1055 1060 -0+501026.001025.10+001027.721026.61031.461032.01+001035.701035.31039.731038.72+001042.321042.51043.481044.93+001044.431044.44+00 3.00% 8.4 7 % 1.90% HORIZONTAL: 1"=30' VERTICAL: 1"=5' EXISTING GRADE PROPOSED CL GRADE MH 04-132STA=0+22.3RIM=1028.87INV=1023.86 (8") SINV=1023.76 (8") WMH 04-133STA=2+61.7RIM=1042.60INV=1032.60 (8") NINV=1034.30 (6") SW239 LF 8 " P V C S D R 3 5 @ 3.65 % 30 5 L F 6 " P V C C 9 0 0 W A T E R M A I N CUT IN 6" TEE CONNECTION INTO EXISTING 6" WATERMAIN 6" GATE VALVE FIRE HYDRANT & GATE VALVE 7.5' TO TOP OF WATERMAIN 10" STORM SEWER8'x8' INSULATION SAN.8'x8' INSULATION WATERMAIN PUBLIC ROADCENTERLINEWOOD DUCK LANETAKOMA TRAILSTA. 0+00PRIVATE ROADEDGE OF BITUMINOUSSTA. 3+53.68PROPOSED GRADE OVER SANITARY SEWER INSULATE SANITARY SEWER 4444444 4 4 4 4 4 44448 881047.0 1039.0 1047.0 1042.5 FBWO 1042.5 1034.5 FBWO FBWO 1036.7 1036.7 1028.7 3+000+00 1+00 2+00 3+00 3+53.68 2+44.413+004+005+004 4 8 CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL 7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com Plotted: 05 /03 / 2021 11:18 AMW:\2020\20327\CADD DATA\CIVIL\_dwg Sheet Files\C4-3 - SANITARY SEWER PLAN & PROFILEOUCKSL QUALITY CONTROL PROFESSIONAL SIGNATURE SUBMITTAL/REVISIONS CADD QUALIFICATION DEER HAVEN CHANHASSEN, MN KEN ASHFELD 6480 YOSEMITE AVE. CHANHASSEN, MN 55331 11-09-20 PRELIMINARY SUBMITTAL 01-08-21 LOT LINES & GRADING 02-05-21 CONST DOCUMENTS 04/05/21 CITY COMMENTS 04/15/21 ADDED BASIN 3 05/03/21 CITY COMMENTS C0-1 COVER SHEET C1-1 EXISTING CONDITIONS PLAN C1-2 DEMOLITION PLAN C2-1 SITE PLAN C3-1 GRADING & DRAINAGE PLAN C3-2 SWPP PLAN C3-3 SWPP NOTES C4-1 UTILITY PLAN C4-2 - C4-3 S&W PLAN & PROFILE C5-1 - C5-3 STREET PLAN & PROFILE C8-1 - C8-3 DETAIL SHEETS L1-1 TREE CANOPY PLAN L2-1 LANDSCAPE PLAN Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Todd W. McLouth - PE Project Lead Drawn By Checked By Loucks Project No. 20383 20327 TWM TRG TWM 05/03/21 02/05/21 L3-1 LANDSCAPE DETAILS SANITARY SEWER PLAN & PROFILE C4-3NSCALE IN FEET 0 30 60 TOLL FREE: 1-800-252-1166 TWIN CITY AREA: 651-454-0002 Gopher State One Call CALL BEFORE YOU DIG! WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. SANI. MH 04-133 SANI. MH 04-132 WATER 0+66 S & W 1+58 S-1030.5 S & W 2+39 S-1035.0 1.STATIONING FOR SANITARY & WATER SERVICES REFER TO DISTANCE FROM DOWNSTREAM MANHOLES. 2.WATER SERVICES MAY BE INSTALLED IN THE SAME TRENCH PARALLEL WITH THE 6" PVC SANITARY SERVICES ON A BENCH A MINIMUM OF 18 INCHES ABOVE THE TOP OF SANITARY SEWER SERVICES. 3.WATERMAIN SHALL HAVE TRACER WIRE INSTALLED. 4.CONTACT CITY UTILITIES DEPARTMENT AT 952-227-1300 48 HOURS PRIOR TO OPERATING VALVES. ONLY CITY PERSONNEL SHALL OPERATE VALVES. NOTES PRIVATE ROAD YOSEMITE LANE 1000 1005 1010 1015 1020 1025 1030 1035 1040 1045 1050 1000 1005 1010 1015 1020 1025 1030 1035 1040 1045 1050 -0+501020.451020.50+001021.471021.51022.181022.21+001022.721022.71022.911022.92+001022.771022.81025.081025.13+001024.241024.21024.951025.04+001026.091026.11026.951027.05+001031.891031.91033.621033.66+001032.171032.21030.491030.57+007+50 PVI STA = 2+44.42 PVI ELEV = 1023.25 LOW PT. STA=2+19.42 LOW PT. ELEV=1022.96 A.D. = 4.49 K = 11.1 50' VC BVCS: 2+19.42BVCE: 1022.96EVCS: 2+69.42EVCE: 1024.662.77% 1.15% 5.64 %PVI: 0+00.00EL: 1020.45PVI: 6+50.06EL: 1032.00PVI STA = 6+00.06 PVI ELEV = 1034.50 HIGH PT. STA=5+85.71 HIGH PT. ELEV=1033.61 A.D. = 7.77 K = 12.9 100' VC BVCS: 5+50.06BVCE: 1033.11EVCS: 6+50.06EVCE: 1032.00PVI STA = 2+93.21 PVI ELEV = 1026.00 HIGH PT. STA=3+13.21 HIGH PT. ELEV=1026.55 A.D. = 2.87 K = 14.0 40' VC BVCS: 2+73.21BVCE: 1024.87EVCS: 3+13.21EVCE: 1026.55HORIZONTAL: 1"=30' VERTICAL: 1"=5' EXISTING CL GRADE PROPOSED CL GRADE FUTURE CL GRADE MATCH EXISTINGYOSEMITE AVESTA. 0+00PRIVATE ROAD CENTERLINEYOSEMITE LANESTA. 2+93.2144444444444441019.47 EX. 1021.28 EX. 1021.45 1021.84 1022.59 1022.98 1023.57 1024.03 1 0 3 0 1 0 2 6 1 0 2 8 1 0 3 2 1 0 3 4 103 0 1030 10301030 1024 1024 10 2 6 1026 1 0 2 8 1028 1028 10281032 10 3 2 1 0 3 41034 102410261028888 FBWO1036.71036.71028.71026.70EOF1032 1027.0EOF1026.65 1026.95 1026 1028 1028 0+001+002+00 3+00 0+001+002+44.413+004+00 5+00 6+00 7+007+08.1310 2 21024 1026.80 4480+00 24.0 SCALE IN FEET 0 30 60 CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL 7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com Plotted: 05 /03 / 2021 9:44 AMW:\2020\20327\CADD DATA\CIVIL\_dwg Sheet Files\C2-2 - STREET PLAN & PROFILEOUCKSL QUALITY CONTROL PROFESSIONAL SIGNATURE SUBMITTAL/REVISIONS CADD QUALIFICATION DEER HAVEN CHANHASSEN, MN KEN ASHFELD 6480 YOSEMITE AVE. CHANHASSEN, MN 55331 11-09-20 PRELIMINARY SUBMITTAL 01-08-21 LOT LINES & GRADING 02-05-21 CONST DOCUMENTS 04/05/21 CITY COMMENTS 04/15/21 ADDED BASIN 3 05/03/21 CITY COMMENTS C0-1 COVER SHEET C1-1 EXISTING CONDITIONS PLAN C1-2 DEMOLITION PLAN C2-1 SITE PLAN C3-1 GRADING & DRAINAGE PLAN C3-2 SWPP PLAN C3-3 SWPP NOTES C4-1 UTILITY PLAN C4-2 - C4-3 S&W PLAN & PROFILE C5-1 - C5-3 STREET PLAN & PROFILE C8-1 - C8-3 DETAIL SHEETS L1-1 TREE CANOPY PLAN L2-1 LANDSCAPE PLAN Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Todd W. McLouth - PE Project Lead Drawn By Checked By Loucks Project No. 20383 20327 TWM TRG TWM 05/03/21 02/05/21 L3-1 LANDSCAPE DETAILS STREET PLAN & PROFILE C5-1 TOLL FREE: 1-800-252-1166 TWIN CITY AREA: 651-454-0002 Gopher State One Call CALL BEFORE YOU DIG! WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. N PUBLIC ROAD WOOD DUCK LANE/TAKOMA TRAIL NO SMALL UTILITIES OR IRRIGATION PIPES SHALL BE PLACED IN THE ROADWAY STRUCTURAL SECTION. R/W (SOUTH) PUBLIC ROAD SECTION 12'12' DETAIL A MINIMUM SECTION DETAIL A 2" BIT. WEAR COURSE MN/DOT 2360 (SPWEA340C) 2357 TACK COAT 2" BIT. NON-WEAR COURSE MN/DOT 2360 (SPNWB330C) 12" AGG. BASE, CLASS 5 MN/DOT 3138 12" SELECT GRANULAR BORROW MN/DOT 3149.2B (NORTH)R/W VARIES 3:1 MAX 33' VARIES 2.00% APPROVED SUBGRADE 1' SURMOUNTABLE CURB (SEE CITY DETAIL 5203) DRAINTILE (SEE CITY DETAIL 5232) 1010 1015 1020 1025 1030 1035 1040 1045 1050 1055 1060 1010 1015 1020 1025 1030 1035 1040 1045 1050 1055 1060 -0+501026.001025.10+001027.721026.61031.461032.01+001035.701035.31039.731038.72+001042.321042.51043.481044.93+001044.431044.44+00 PVI STA = 0+55.00 PVI ELEV = 1027.65 LOW PT. STA=0+30.00 LOW PT. ELEV=1026.90 A.D. = 5.47 K = 9.1 50' VC BVCS: 0+30.00BVCE: 1026.90EVCS: 0+80.00EVCE: 1029.773.00% 8.4 7 % 1.90%PVI: 0+00.00EL: 1026.00PVI: 3+53.68EL: 1044.50PVI STA = 2+25.00 PVI ELEV = 1042.05 HIGH PT. STA=2+75.00 HIGH PT. ELEV=1043.00 A.D. = 6.57 K = 15.2 100' VC BVCS: 1+75.00BVCE: 1037.81EVCS: 2+75.00EVCE: 1043.00HORIZONTAL: 1"=30' VERTICAL: 1"=5' EXISTING GRADE PROPOSED CL GRADE PUBLIC ROADCENTERLINEWOOD DUCK LANETAKOMA TRAILSTA. 0+00PRIVATE ROADEDGE OF BITUMINOUSSTA. 3+53.684444444 4 4 4 4 4 4 1023.571024.0310301040102610281032103410361038104210441044104210441046103010301 0 3 0 103010241024102610261028102810281 0 2 8 1032103210341 0 3 444 41024 1026 1028 8881047.0 1039.0 1047.0 1042.5 FBWO 1042.5 1034.5 FBWO FBWO 1036.7 1036.7 1028.7 1026.70 EOF 1040 1032103410361038 1 0 4 2 1042 1027.0 EOF 1026.65 1026.951042.501044.50 1043.801044.50 1045.00 1044.50 1042.0 1035.5 1026102810281041.0 3+000+00 1+00 2+00 3+00 3+53.68 2+44.413+004+005+001024 1026.80 4 4 8 1040.4 EOF 1040104020.0CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL 7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com Plotted: 05 /03 / 2021 9:46 AMW:\2020\20327\CADD DATA\CIVIL\_dwg Sheet Files\C2-2 - STREET PLAN & PROFILEOUCKSL QUALITY CONTROL PROFESSIONAL SIGNATURE SUBMITTAL/REVISIONS CADD QUALIFICATION DEER HAVEN CHANHASSEN, MN KEN ASHFELD 6480 YOSEMITE AVE. CHANHASSEN, MN 55331 11-09-20 PRELIMINARY SUBMITTAL 01-08-21 LOT LINES & GRADING 02-05-21 CONST DOCUMENTS 04/05/21 CITY COMMENTS 04/15/21 ADDED BASIN 3 05/03/21 CITY COMMENTS C0-1 COVER SHEET C1-1 EXISTING CONDITIONS PLAN C1-2 DEMOLITION PLAN C2-1 SITE PLAN C3-1 GRADING & DRAINAGE PLAN C3-2 SWPP PLAN C3-3 SWPP NOTES C4-1 UTILITY PLAN C4-2 - C4-3 S&W PLAN & PROFILE C5-1 - C5-3 STREET PLAN & PROFILE C8-1 - C8-3 DETAIL SHEETS L1-1 TREE CANOPY PLAN L2-1 LANDSCAPE PLAN Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Todd W. McLouth - PE Project Lead Drawn By Checked By Loucks Project No. 20383 20327 TWM TRG TWM 05/03/21 02/05/21 L3-1 LANDSCAPE DETAILS SCALE IN FEET 0 30 60 STREET PLAN & PROFILE C5-2TOLL FREE: 1-800-252-1166 TWIN CITY AREA: 651-454-0002 Gopher State One Call CALL BEFORE YOU DIG! WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER.NPRIVATE ROAD YOSEMITE LANE NO SMALL UTILITIES OR IRRIGATION PIPES SHALL BE PLACED IN THE ROADWAY STRUCTURAL SECTION. R/W (WEST) PRIVATE ROAD SECTION 10'10' 3.0% DETAIL A SECTION DETAIL A 3.5" BIT. WEAR COURSE MN/DOT 2360 (SPWEA340C) 7" AGG. BASE, CLASS 5 MN/DOT 3138 APPROVED SUBGRADE 3:1 MAX 15' 5' 4444441 0 2 6 103 0 1 0 2 8 10 3 2 1 0 3 41034 888888888 3+00 0+002+44.41 3+00 10241026.80 1026.65 1026.40 1 0 2 4 . 2 0 1024.031 0 2 3 . 5 7 1026.951026.021024.66 R40' R15' R38' R62'1.0%1. 0 % 4.1% 1.1%1025.401026.201 0 2 7 . 2 0 0+000+00 1021.221020.831019.47 EX.1 0 2 1 . 2 8 E X .1020.891020.503.1%R15' R20' 3.3%CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL 7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com Plotted: 05 /03 / 2021 11:5 AMW:\2020\20327\CADD DATA\CIVIL\_dwg Sheet Files\C2-2 - STREET PLAN & PROFILEOUCKSL QUALITY CONTROL PROFESSIONAL SIGNATURE SUBMITTAL/REVISIONS CADD QUALIFICATION DEER HAVEN CHANHASSEN, MN KEN ASHFELD 6480 YOSEMITE AVE. CHANHASSEN, MN 55331 11-09-20 PRELIMINARY SUBMITTAL 01-08-21 LOT LINES & GRADING 02-05-21 CONST DOCUMENTS 04/05/21 CITY COMMENTS 04/15/21 ADDED BASIN 3 05/03/21 CITY COMMENTS C0-1 COVER SHEET C1-1 EXISTING CONDITIONS PLAN C1-2 DEMOLITION PLAN C2-1 SITE PLAN C3-1 GRADING & DRAINAGE PLAN C3-2 SWPP PLAN C3-3 SWPP NOTES C4-1 UTILITY PLAN C4-2 - C4-3 S&W PLAN & PROFILE C5-1 - C5-3 STREET PLAN & PROFILE C8-1 - C8-3 DETAIL SHEETS L1-1 TREE CANOPY PLAN L2-1 LANDSCAPE PLAN Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Todd W. McLouth - PE Project Lead Drawn By Checked By Loucks Project No. 20383 20327 TWM TRG TWM 05/03/21 02/05/21 L3-1 LANDSCAPE DETAILS SCALE IN FEET 0 10 20 INTERSECTION DETAILS C5-3TOLL FREE: 1-800-252-1166 TWIN CITY AREA: 651-454-0002 Gopher State One Call CALL BEFORE YOU DIG! WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. CURB TRANSITION FROM SURMOUNTABLE TO B612 - STA. 2+41 N PRIVATE ROAD INTERSECTION SCALE IN FEET 0 10 20 N PUBLIC ROAD INTERSECTION CONCRETE VALLEY GUTTER 2' BITUMINOUS PAVEMENT REPLACEMENT 2.0% DRAINAGE SLOPE DRAINAGE DIRECTION LEGEND 2.0% DRAINAGE SLOPE DRAINAGE DIRECTION LEGEND BERM SLIGHTLY HIGHER THAN TOP OF CURB CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL 7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com Plotted: 05 /03 / 2021 8:7 AMW:\2020\20327\CADD DATA\CIVIL\_dwg Sheet Files\C8-1 - CIVIL DETAILSOUCKSL QUALITY CONTROL PROFESSIONAL SIGNATURE SUBMITTAL/REVISIONS CADD QUALIFICATION DEER HAVEN CHANHASSEN, MN KEN ASHFELD 6480 YOSEMITE AVE. CHANHASSEN, MN 55331 11-09-20 PRELIMINARY SUBMITTAL 01-08-21 LOT LINES & GRADING 02-05-21 CONST DOCUMENTS 04/05/21 CITY COMMENTS 04/15/21 ADDED BASIN 3 05/03/21 CITY COMMENTS C0-1 COVER SHEET C1-1 EXISTING CONDITIONS PLAN C1-2 DEMOLITION PLAN C2-1 SITE PLAN C3-1 GRADING & DRAINAGE PLAN C3-2 SWPP PLAN C3-3 SWPP NOTES C4-1 UTILITY PLAN C4-2 - C4-3 S&W PLAN & PROFILE C5-1 - C5-3 STREET PLAN & PROFILE C8-1 - C8-3 DETAIL SHEETS L1-1 TREE CANOPY PLAN L2-1 LANDSCAPE PLAN Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Todd W. McLouth - PE Project Lead Drawn By Checked By Loucks Project No. 20383 20327 TWM TRG TWM 05/03/21 02/05/21 L3-1 LANDSCAPE DETAILS CIVIL DETAILS C8-1 CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL 7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com Plotted: 05 /03 / 2021 8:8 AMW:\2020\20327\CADD DATA\CIVIL\_dwg Sheet Files\C8-1 - CIVIL DETAILSOUCKSL QUALITY CONTROL PROFESSIONAL SIGNATURE SUBMITTAL/REVISIONS CADD QUALIFICATION DEER HAVEN CHANHASSEN, MN KEN ASHFELD 6480 YOSEMITE AVE. CHANHASSEN, MN 55331 11-09-20 PRELIMINARY SUBMITTAL 01-08-21 LOT LINES & GRADING 02-05-21 CONST DOCUMENTS 04/05/21 CITY COMMENTS 04/15/21 ADDED BASIN 3 05/03/21 CITY COMMENTS C0-1 COVER SHEET C1-1 EXISTING CONDITIONS PLAN C1-2 DEMOLITION PLAN C2-1 SITE PLAN C3-1 GRADING & DRAINAGE PLAN C3-2 SWPP PLAN C3-3 SWPP NOTES C4-1 UTILITY PLAN C4-2 - C4-3 S&W PLAN & PROFILE C5-1 - C5-3 STREET PLAN & PROFILE C8-1 - C8-3 DETAIL SHEETS L1-1 TREE CANOPY PLAN L2-1 LANDSCAPE PLAN Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Todd W. McLouth - PE Project Lead Drawn By Checked By Loucks Project No. 20383 20327 TWM TRG TWM 05/03/21 02/05/21 L3-1 LANDSCAPE DETAILS CIVIL DETAILS C8-2 CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL 7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com Plotted: 05 /03 / 2021 11:28 AMW:\2020\20327\CADD DATA\CIVIL\_dwg Sheet Files\C8-1 - CIVIL DETAILSOUCKSL QUALITY CONTROL PROFESSIONAL SIGNATURE SUBMITTAL/REVISIONS CADD QUALIFICATION DEER HAVEN CHANHASSEN, MN KEN ASHFELD 6480 YOSEMITE AVE. CHANHASSEN, MN 55331 11-09-20 PRELIMINARY SUBMITTAL 01-08-21 LOT LINES & GRADING 02-05-21 CONST DOCUMENTS 04/05/21 CITY COMMENTS 04/15/21 ADDED BASIN 3 05/03/21 CITY COMMENTS C0-1 COVER SHEET C1-1 EXISTING CONDITIONS PLAN C1-2 DEMOLITION PLAN C2-1 SITE PLAN C3-1 GRADING & DRAINAGE PLAN C3-2 SWPP PLAN C3-3 SWPP NOTES C4-1 UTILITY PLAN C4-2 - C4-3 S&W PLAN & PROFILE C5-1 - C5-3 STREET PLAN & PROFILE C8-1 - C8-3 DETAIL SHEETS L1-1 TREE CANOPY PLAN L2-1 LANDSCAPE PLAN Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Todd W. McLouth - PE Project Lead Drawn By Checked By Loucks Project No. 20383 20327 TWM TRG TWM 05/03/21 02/05/21 L3-1 LANDSCAPE DETAILS CIVIL DETAILS C8-3 GRASS PRE-TREATMENT STRIP UNDISTURBED, INSITU SOIL SUGGESTED MIN. PLANTING MEDIUM DEPTH 24" WITH A WELL BLENDED MIXTURE (BY VOLUME): 85-90% HOMOGENOUS CONSTRUCTION SAND 10-15% NATIVE TOPSOIL PLANT MATERIAL TOLERANT OF INUNDATION AND DROUGHT. NATIVE PLANTS RECOMMENDED. 3H:1L MAX.24"DDEPTH REQUIRED TO DRAIN PRACTICE IN 48 HOURS OR LESS, NOT TO EXCEED 18". PAVEMENT BIORETENTION BASIN WITH UNDERDRAIN SUGGESTED CONSTRUCTION SEQUENCING (NOTE TO DESIGNER: EDIT AS NEEDED TO MEET PROJECT REQUIREMENTS) 1.INSTALL APPROPRIATE TEMPORARY EROSION CONTROL DEVICES TO PREVENT SEDIMENT FROM LEAVING OR ENTERING THE PRACTICE DURING CONSTRUCTION. 2.ALL DOWN-GRADIENT PERIMETER SEDIMENT CONTROL BMP'S MUST BE IN PLACE BEFORE ANY UP GRADIENT LAND DISTURBING ACTIVITY BEGINS. 3.PERFORM CONTINUOUS INSPECTIONS OF EROSION CONTROL PRACTICES, ESPECIALLY AFTER EACH RAINFALL EVENT. 4.INSTALL ALL UTILITIES (WATER, SANITARY SEWER, ELECTRIC, NATURAL GAS, PHONE, FIBER OPTIC, ETC) PRIOR TO SETTING FINAL GRADE OF BIORETENTION DEVICE. 5.ROUGH GRADE THE SITE. IF BIORETENTION AREAS ARE BEING USED AS TEMPORARY SEDIMENT BASINS DURING CONSTRUCTION, LEAVE A MINIMUM OF 1 FEET OF COVER OVER THE PRACTICE TO PROTECT THE UNDERLYING SOILS FROM CLOGGING. 6.COMPLETE, STABILIZE, AND VEGETATE ALL OTHER SITE IMPROVEMENTS. 7.CONSTRUCT AND VEGETATE BIORETENTION DEVICE FOLLOWING STABILIZATION OF CONTRIBUTING DRAINAGE AREA. ENSURE THAT CRITICAL ELEVATIONS, SUCH AS UNDERDRAIN INVERT, TOP OF MEDIA, TOP OF MULCH, AND INVERT OF OVERFLOW STRUCTURE (IF PRESENT) ARE CORRECT. 8.REMOVE TEMPORARY EROSION CONTROL DEVICES AFTER THE CONTRIBUTING DRAINAGE AREA IS ADEQUATELY VEGETATED. GENERAL NOTES (NOTE TO DESIGNER: EDIT AS NEEDED TO MEET PROJECT REQUIREMENTS) 1.IN THE EVENT THAT SEDIMENT IS INTRODUCED INTO THE BMP DURING OR IMMEDIATELY FOLLOWING EXCAVATION, THIS MATERIAL SHALL BE REMOVED FROM THE PRACTICE PRIOR TO CONTINUING CONSTRUCTION. 6" PERFORATED SDR 35 DRAINTILE GEOTEXTILE FABRIC SHALLOW SANITARY SEWER INSULATION PLASTIC PIPE 6" MIN. 24" MIN. 24"4"4" 4" 48" FLAT SHEET STYROFOAM INSULATION TYPE SM OR APPROVED EQUAL. OVERLAP INSULATION JOINTS. DRAWN 2/2016 LOUCKS PLATE NO. 4010LOUCKS 1026102810280+001+002+003+000+003+22.932+44.363+004+005+006+0010221024 CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL 7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com Plotted: 04 /05 / 2021 2:44 PMW:\2020\20327\CADD DATA\LANDSCAPE\_dwg Sheet Files\L20327 L1-1 Landscape PlanOUCKSL QUALITY CONTROL PROFESSIONAL SIGNATURE SUBMITTAL/REVISIONS CADD QUALIFICATION DEER HAVEN CHANHASSEN, MN KEN ASHFELD 6480 YOSEMITE AVE. CHANHASSEN, MN 55331 11-09-20 PRELIMINARY SUBMITTAL 01-08-21 LOT LINES & GRADING 02-05-21 CONST DOCUMENTS 04/05/21 CITY COMMENTS C0-1 COVER SHEET C1-1 EXISTING CONDITIONS PLAN C1-2 DEMOLITION PLAN C2-1 SITE PLAN C2-2 STREET PLAN & PROFILE C3-1 GRADING & DRAINAGE PLAN C3-2 SWPP PLAN C3-3 SWPP NOTES C4-1 UTILITY PLAN C4-2 SANI. SEWER PLAN & PROFILE C8-1 - C8-3 DETAIL SHEETS L1-1 TREE CANOPY PLAN L2-1 LANDSCAPE PLAN Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Landscape Architect under the laws of the State of Minnesota. Gregory A. Johnson - LA Project Lead Drawn By Checked By Loucks Project No. 24610 20327 TWM GAJ TWM 02/05/21 02/05/21 L3-1 LANDSCAPE DETAILSNSCALE IN FEET 0 30 60 TREE CANOPY PLAN L1-1 TREE CANOPY COVERAGE TREE CANOPY LEGEND EXISTING CANOPY COVERAGE TO REMAIN SITE BO U N D A R Y SITE BOUNDARY SITE BOUNDARYSITE BOUNDARY1 2 3 4 5 6 7 8 9 11 10 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 31 32 30 33 34 35 36 37 38 39 4540 44 41 46 48 50 47 49 42 43 51 52 53 58 34 54 56 5955 57 SIGNIFICANT TREE TABLE DISPOSITIONSPECIESDIAM / HT 2 TREE # MAPLE 1 ELM 3 4 5 6 7 8 23" 9 BOXELDER 10 12 15" 11 15" 13 14 19" 15 16 17 15" 18 19 20 22 21 23 24 25 26 27 28 29 30 SPRUCE PINE 16" PINE ASH ASH ASH ASH ASH ASH ASH ASH ASH ASH ASH ASH MAPLE MAPLE MAPLE MAPLE APPLE WALNUT WALNUT WALNUT WALNUT WALNUT SAVED SAVED REMOVED REMOVED REMOVED REMOVED SAVED REMOVED REMOVED REMOVED REMOVED REMOVED REMOVED REMOVED REMOVED REMOVED REMOVED REMOVED REMOVED REMOVED REMOVED 21.5" 17.5" 19.5" 11" 19" 17.5" 17.5" 17.5" 13" 18.5" 10" 10" 12" 12" 13.5" 13.5" 13.5" 15.5" 11.5" 11.5" 17" 25" 21" 29" REMOVED REMOVED REMOVED REMOVED REMOVED SAVED SAVED SAVED EXISTING CANOPY COVERAGE TO BE REMOVED 60 - 79 60 - 79 BOXELDER BOXELDER TREE PROTECTION FENCE - SEE 1/L1-1 TREE PROTECTION LOUCKS SCALE: 1/4" = 1'-0"Tree Protection.dwg4'-0"EXISTING GRADE TREE PROTECTION NOTE: INSTALL SNOW FENCE AROUND EACH TREE TO BE PROTECTED PRIOR TO GRADING. FENCE SHALL BE PLACED AT THE DRIP EDGE OR CRITICAL ROOT ZONES OF THE TREES. FENCING SHALL BE NO CLOSER THAN 6' TO THE TRUNK OF ANY TREE TO BE PROTECTED. THE PERIMETERS FOR TREES BEING PROTECTED SHALL BE DESIGNATED AT ALL TIMES DURING CONSTRUCTION ACTIVITY AND SIGNAGE SHALL BE INSTALLED AT ALL TREE PROTECTION AREAS THAT INSTRUCTS WORKERS TO STAY OUT. CONTRACTOR SHALL AVOID ALL AREAS WITHIN TREE PROTECTION FENCE. SOIL SHOULD BE PROTECTED FROM EROSION AND CHANGES IN CHEMISTRY FROM CONCRETE OR TOXIC MATERIALS SUCH AS FUELS AND PAINTS. THE CONTRACTOR SHALL HAVE "TREE PAINT" ON SITE AT ALL TIMES. IF AN OAK IS WOUNDED DURING CONSTRUCTION, THE CONTRACTOR MUST IMMEDIATELY APPLY PAINT TO THE WOUND IN ORDER TO PREVENT OAK WILT. ALL DAMAGE TO TREES TO BE PROTECTED SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER AND LANDSCAPE ARCHITECT.DRIP EDGE OF TREE2" X 4" WOOD STAKE, POSITIONED AS NOTED. STRING 4' HIGH, ORANGE POLYETHYLENE LAMINAR SAFETY NETTING BETWEEN WOOD STAKES PLACED 5' ON CENTER AND PLACED BETWEEN TREE PROTECTION AND DISTURBED AREAS.DRIP EDGE OF TREEEXISTING TREE TO REMAIN 1 DISPOSITIONSPECIESDIAM / HTTREE # 34 35 36 37 38 39 40 42 41 43 44 45 46 47 48 49 50 52 51 53 54 55 56 57 58 59 ASH ASH ASH ASH ASH ASH ASH ASH ASH ASH ASH BOXELDER BOXELDER BOXELDER ELM WALNUT PINE PINE PINE PINE PINE PINE PINE PINE PINE PINE SAVED SAVED SAVED SAVED SAVED SAVED SAVED SAVED SAVED SAVED SAVED SAVED REMOVED REMOVED REMOVED REMOVED REMOVED REMOVED REMOVED REMOVED REMOVED REMOVED REMOVED REMOVED REMOVED REMOVED 17.5" 13" 13" 13" 10" 10" 10" 12" 13.5" 15.5" 15.5" 17" 17" 25" 25" 11" 14" 12.5" 16.5" 22" 15.5" 11" 10.5" 14" 20" 19" 60-79 MISC *SAVED20x15" *TREES 60 - 79 ARE VARIOUS SPECIES AND SIZES LOCATED IN THE SOUTHERN PORTION OF THE PROPERTY. SINCE THEY WERE NOT INCLUDED IN THE SURVEY THEY ARE COUNTED AS A GROUP AND SIZED PER THE AVERAGE SIGNIFICANT TREE CALIPER ON THE PROPERTY. 32 31 33 ASH WALNUT ELM REMOVED REMOVED REMOVED 10" 11.5" 25" REMOVED NET SITE AREA OUTLOT 'A' AND PRIVATE ROAD EXISTING CANOPY COVERAGE REQUIRED MINIMUM CANOPY COVERAGE (LOW DENSITY RESIDENTIAL) PROPOSED CANOPY COVERAGE TO REMAIN DIFFERENCE BETWEEN PROPOSED CANOPY COVERAGE AND REQUIRED CANOPY COVERAGE =D-C A B C D E DESCRIPTION %SQUARE FEET ACRES TREE CANOPY CALCULATION 59,932 100% 1.38 46,501 122,379 27,878 0.64 2.81 40% 30% TOTAL AREA 150,257 3.45 45,077 1.03 30.9%1.07 1,424 ADDITIONAL CANOPY REQUIRED - 0 1026102810280+001+002+003+000+003+22.932+44.363+004+005+006+0010221024 1 AB 1 AB 1 AB DECIDUOUS TREES QTY COMMON NAME BOTANICAL NAME SIZE CONTAINER AB 3 AUTUMN BLAZE MAPLE Acer freemanii `Autumn Blaze`B & B 2.5"Cal PLANT SCHEDULE GENERAL NOTES CONTRACTOR SHALL VISIT SITE PRIOR TO SUBMITTING BID. HE SHALL INSPECT SITE AND BECOME FAMILIAR WITH EXISTING CONDITIONS RELATING TO THE NATURE AND SCOPE OF WORK. VERIFY LAYOUT AND ANY DIMENSIONS SHOWN AND BRING TO THE ATTENTION OF THE LANDSCAPE ARCHITECT ANY DISCREPANCIES WHICH MAY COMPROMISE THE DESIGN AND/OR INTENT OF THE PROJECT'S LAYOUT. ASSURE COMPLIANCE WITH ALL APPLICABLE CODES AND REGULATIONS GOVERNING THE WORK OR MATERIALS SUPPLIED. CONTRACTOR SHALL PROTECT ALL EXISTING ROADS, CURBS/GUTTERS, TRAILS, TREES, LAWNS AND SITE ELEMENTS DURING PLANTING OPERATIONS. ANY DAMAGE TO SAME SHALL BE REPAIRED AT NO COST TO THE OWNER. CONTRACTOR SHALL VERIFY ALIGNMENT AND LOCATION OF ALL UNDERGROUND AND ABOVE GRADE UTILITIES AND PROVIDE THE NECESSARY PROTECTION FOR SAME BEFORE CONSTRUCTION / MATERIAL INSTALLATION BEGINS (MINIMUM 10' - 0" CLEARANCE). ALL UNDERGROUND UTILITIES SHALL BE LAID SO THAT TRENCHES DO NOT CUT THROUGH ROOT SYSTEMS OF ANY EXISTING TREES TO REMAIN. EXISTING CONTOURS, TRAILS, VEGETATION, CURB/GUTTER AND OTHER EXISTING ELEMENTS BASED UPON INFORMATION SUPPLIED TO LANDSCAPE ARCHITECT BY OTHERS. CONTRACTOR SHALL VERIFY ANY AND ALL DISCREPANCIES PRIOR TO CONSTRUCTION AND NOTIFY LANDSCAPE ARCHITECT OF SAME. THE ALIGNMENT AND GRADES OF THE PROPOSED WALKS, TRAILS AND/OR ROADWAYS ARE SUBJECT TO FIELD ADJUSTMENT REQUIRED TO CONFORM TO LOCALIZED TOPOGRAPHIC CONDITIONS AND TO MINIMIZE TREE REMOVAL AND GRADING. ANY CHANGE IN ALIGNMENT MUST BE APPROVED BY LANDSCAPE ARCHITECT. LANDSCAPE INSTALLATION COORDINATE THE PHASES OF CONSTRUCTION AND PLANTING INSTALLATION WITH OTHER CONTRACTORS WORKING ON SITE. NO PLANTING WILL BE INSTALLED UNTIL COMPLETE GRADING AND CONSTRUCTION HAS BEEN COMPLETED IN THE IMMEDIATE AREA. WHERE SEED ABUTS PAVED SURFACES, FINISHED GRADE OF SEED SHALL BE HELD 1" BELOW SURFACE ELEVATION OF TRAIL, SLAB, CURB, ETC. SEED ALL AREAS DISTURBED DUE TO GRADING. MULCH FOR TURF SEEDED AREAS SHALL BE TYPE 5 WOOD FIBER HYDROMULCH CONFORMING WITH MNDOT 3884. MULCH FOR SEEDED AREAS WITH SLOPES 15% OR GREATER SHALL BE MNDOT CATEGORY 1, STRAW RD 1S BLANKET CONFORMING WITH MNDOT 3885. ALL PLANT MATERIAL SHALL COMPLY WITH THE LATEST EDITION OF THE AMERICAN STANDARD FOR NURSERY STOCK, AMERICAN ASSOCIATION OF NURSERYMEN. UNLESS NOTED OTHERWISE, ALL SHRUBS SHALL HAVE AT LEAST 5 CANES AT THE SPECIFIED MINIMUM SHRUB HEIGHT OR WIDTH. ORNAMENTAL TREES SHALL HAVE NO V-CROTCHES AND SHALL BEGIN BRANCHING NO LOWER THAN 3' ABOVE ROOT BALL. STREET AND BOULEVARD TREES SHALL BEGIN BRANCHING NO LOWER THAN 5' ABOVE FINISHED GRADE. PLAN TAKES PRECEDENCE OVER PLANT SCHEDULE IF DISCREPANCIES IN QUANTITIES EXIST. SPECIFICATIONS TAKE PRECEDENCE OVER NOTES. NO PLANT MATERIAL SUBSTITUTIONS WILL BE ACCEPTED UNLESS APPROVAL IS REQUESTED OF THE LANDSCAPE ARCHITECT BY THE LANDSCAPE CONTRACTOR PRIOR TO THE SUBMISSION OF A BID AND/OR QUOTATION. ALL PROPOSED PLANTS SHALL BE LOCATED AND STAKED AS SHOWN ON PLAN. ADJUSTMENTS IN LOCATION OF PROPOSED PLANT MATERIALS MAY BE NEEDED IN FIELD. SHOULD AN ADJUSTMENT BE ADVISED, THE LANDSCAPE ARCHITECT MUST BE NOTIFIED. ALL PLANT MATERIALS SHALL BE FERTILIZED UPON INSTALLATION WITH A 27-3-3 SLOW RELEASE FERTILIZER MIXED IN WITH THE PLANTING SOIL PER THE MANUFACTURER'S INSTRUCTIONS. PLANTS MAY BE TREATED FOR SUMMER AND FALL INSTALLATION WITH AN APPLICATION OF GRANULAR 27-3-3 AT 6 OZ PER 2.5" CALIPER PER TREE AND 3 OZ PER SHRUB WITH AN ADDITIONAL APPLICATION OF 27-3-3 THE FOLLOWING SPRING IN THE TREE SAUCER. ALL PLANTS TO BE INSTALLED AS PER PLANTING DETAILS. REMOVE ALL FLAGGING AND LABELS FROM PLANTS. WRAPPING MATERIAL SHALL BE CORRUGATED PVC PIPING 1" GREATER IN CALIPER THAN THE TREE BEING PROTECTED OR QUALITY, HEAVY, WATERPROOF CREPE PAPER MANUFACTURED FOR THIS PURPOSE. WRAP ALL DECIDUOUS TREES PLANTED IN THE FALL PRIOR TO 12-1 AND REMOVE ALL WRAPPING AFTER 5-1. MULCH SHALL BE CLEAN SHREDDED HARDWOOD MULCH WITH UNIFORM PIECE SIZE. ALL TREES NOT IN PLANTING BEDS TO RECEIVE 4" DEEP MULCH WITH NO MULCH IN DIRECT CONTACT WITH TREE TRUNK. SPREAD GRANULAR PRE EMERGENT HERBICIDE (PREEN OR EQUAL) PER MANUFACTURER'S RECOMMENDATIONS UNDER ALL MULCHED AREAS. IF THE LANDSCAPE CONTRACTOR IS CONCERNED OR PERCEIVES ANY DEFICIENCIES IN THE PLANT SELECTIONS, SOIL CONDITIONS OR ANY OTHER SITE CONDITION WHICH MIGHT NEGATIVELY AFFECT PLANT ESTABLISHMENT, SURVIVAL OR GUARANTEE, HE MUST BRING THESE DEFICIENCIES TO THE ATTENTION OF THE LANDSCAPE ARCHITECT PRIOR TO PROCUREMENT AND/OR INSTALLATION. CONTRACTOR SHALL SUBMIT A WRITTEN REQUEST FOR THE OWNER ACCEPTANCE INSPECTION OF ALL LANDSCAPE AND SITE IMPROVEMENTS. CONTRACTOR IS RESPONSIBLE FOR ON-GOING MAINTENANCE OF ALL NEWLY INSTALLED MATERIALS UNTIL TIME OF OWNER ACCEPTANCE. ANY ACTS OF VANDALISM OR DAMAGE WHICH MAY OCCUR PRIOR TO OWNER ACCEPTANCE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR SHALL PROVIDE THE OWNER WITH A MAINTENANCE PROGRAM INCLUDING, BUT NOT NECESSARILY LIMITED TO, PRUNING, FERTILIZATION AND DISEASE/PEST CONTROL. CONTRACTOR SHALL GUARANTEE NEW PLANT MATERIAL THROUGH ONE CALENDAR YEAR BEGINNING ON THE DATE OF ACCEPTANCE BY THE LANDSCAPE ARCHITECT AFTER THE COMPLETION OF PLANTING OF ALL LANDSCAPE MATERIALS. NO PARTIAL ACCEPTANCE WILL BE CONSIDERED. UNLESS NOTED OTHERWISE THE APPROPRIATE DATES FOR SPRING PLANT MATERIAL INSTALLATION AND SEED/SOD PLACEMENT IS FROM THE TIME GROUND HAS THAWED TO JUNE 15. FALL SEEDING FROM AUGUST 15 - SEPTEMBER 15; DORMANT SEEDING IN THE FALL SHALL NOT OCCUR PRIOR TO NOVEMBER 1. FALL CONIFEROUS PLANTING MAY OCCUR FROM AUGUST 15 - OCTOBER 1 AND DECIDUOUS PLANTING FROM THE FIRST FROST UNTIL NOVEMBER 15. PLANTING OUTSIDE THESE DATES IS NOT RECOMMENDED. ANY ADJUSTMENT MUST BE APPROVED IN WRITING BY THE LANDSCAPE ARCHITECT. PROTECT ALL EXISTING OAKS ON SITE SCHEDULED TO REMAIN. IF EXISTING OAKS ARE DAMAGED IN ANY MANNER, ABOVE OR BELOW GROUND IN THE ROOT SYSTEM, AN ASPHALTIC TREE PRUNING PAINT SHOULD BE APPLIED IMMEDIATELY AFTER WOUNDING. OAKS ARE NOT TO BE PRUNED, REMOVED OR TRANSPLANTED BETWEEN APRIL 15 AND JULY 1. NOTIFY LANDSCAPE ARCHITECT IF THESE DATES ARE UNAVOIDABLE. LANDSCAPE CONTRACTOR SHALL ESTABLISH TO HIS SATISFACTION THAT SOIL AND COMPACTION CONDITIONS ARE ADEQUATE TO ALLOW FOR PROPER DRAINAGE AT AND AROUND THE BUILDING SITE. CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL 7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com Plotted: 04 /05 / 2021 2:45 PMW:\2020\20327\CADD DATA\LANDSCAPE\_dwg Sheet Files\L20327 L1-1 Landscape PlanOUCKSL QUALITY CONTROL PROFESSIONAL SIGNATURE SUBMITTAL/REVISIONS CADD QUALIFICATION DEER HAVEN CHANHASSEN, MN KEN ASHFELD 6480 YOSEMITE AVE. CHANHASSEN, MN 55331 11-09-20 PRELIMINARY SUBMITTAL 01-08-21 LOT LINES & GRADING 02-05-21 CONST DOCUMENTS 04/05/21 CITY COMMENTS C0-1 COVER SHEET C1-1 EXISTING CONDITIONS PLAN C1-2 DEMOLITION PLAN C2-1 SITE PLAN C2-2 STREET PLAN & PROFILE C3-1 GRADING & DRAINAGE PLAN C3-2 SWPP PLAN C3-3 SWPP NOTES C4-1 UTILITY PLAN C4-2 SANI. SEWER PLAN & PROFILE C8-1 - C8-3 DETAIL SHEETS L1-1 TREE CANOPY PLAN L2-1 LANDSCAPE PLAN Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Landscape Architect under the laws of the State of Minnesota. Gregory A. Johnson - LA Project Lead Drawn By Checked By Loucks Project No. 24610 20327 TWM GAJ TWM 02/05/21 02/05/21 L3-1 LANDSCAPE DETAILS LANDSCAPE PLAN L2-1 Gopher State One Call THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. WARNING SITE BO U N D A R Y SITE BOUNDARYSITE BOUNDARYNSCALE IN FEET 0 30 60 LANDSCAPE PLAN GROUNDCOVER LEGEND MNDOT NATIVE SEED MIX 33-261 STORMWATER MNDOT SEED MIX 25-131 LOW MAINTENANCE TURF LOUCKS Deciduous Tree Planting.dwgSCALE: 1/2" = 1'-0" 2x ROOT BALL WIDTH CONTRACTOR IS RESPONSIBLE FOR TESTING PERCOLATION RATES PRIOR TO PLANTING. NOTIFY LANDSCAPE ARCHITECT IMMEDIATELY IF POOR DRAINAGE EXISTS. SET PLANT ON UNDISTURBED NATIVE SOIL SCARIFY BOTTOM AND SIDES OF HOLE PRIOR TO PLANTING EDGE VARIES - SEE PLAN WOOD STAKE (OPTIONAL) MULCH - 4" DEEP. NO MULCH IN CONTACT WITH TRUNK - SEE NOTES OR SPECS. ROOT FLARE EVEN WITH OR JUST ABOVE GRADE. SAFETY FLAGGING - ONE PER WIRE TREE WRAP TO FIRST BRANCH 16"x2" POLYPROPYLENE OR POLYETHYLENE STRAP WATER TREE THOROUGHLY DURING PLANTING OPERATIONS. PLACE BACKFILL IN 8-12" LIFTS AND SATURATE SOIL WITH WATER. DO NOT COMPACT MORE THAN NECESSARY TO MAINTAIN PLUMB. CUT BACK WIRE BASKET PRUNE DAMAGED AND CROSSING BRANCHES AFTER PLANTING IS COMPLETE. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL TREES IN A PLUMB POSITION THROUGH THE WARRANTY PERIOD. STAKING IS SUGGESTED, BUT NOT REQUIRED. ANY STAKING MUST CONFORM WITH PRACTICES AS DEFINED IN A.N.A. GUIDELINES FOR STANDARD PRACTICES BACKFILL WITH IN SITU TOPSOIL DECIDUOUS TREE PLANTING1 CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DEER HAVEN DEVELOPMENT CONTRACT (Developer Installed Improvements) i TABLE OF CONTENTS SPECIAL PROVISIONS PAGE 1. REQUEST FOR PLAT APPROVAL............................................................................SP-1 2. CONDITIONS OF PLAT APPROVAL........................................................................SP-1 3. DEVELOPMENT PLANS ............................................................................................SP-1 4. IMPROVEMENTS........................................................................................................SP-2 5. TIME OF PERFORMANCE.........................................................................................SP-2 6. SECURITY....................................................................................................................SP-2 7. NOTICE.........................................................................................................................SP-3 8. OTHER SPECIAL CONDITIONS................................................................................SP-3 9. GENERAL CONDITIONS............................................................................................SP-5 GENERAL CONDITIONS 1. RIGHT TO PROCEED.................................................................................................GC-1 2. PHASED DEVELOPMENT.........................................................................................GC-1 3. PRELIMINARY PLAT STATUS................................................................................GC-1 4. CHANGES IN OFFICIAL CONTROLS .....................................................................GC-1 5. IMPROVEMENTS.......................................................................................................GC-1 6. IRON MONUMENTS..................................................................................................GC-2 7. LICENSE......................................................................................................................GC-2 8. SITE EROSION AND SEDIMENT CONTROL.........................................................GC-2 8A. EROSION CONTROL DURING CONSTRUCTION OF A DWELLING OR OTHER BUILDING.........................................................................................GC-2 9. CLEAN UP...................................................................................................................GC-3 10. ACCEPTANCE AND OWNERSHIP OF IMPROVEMENTS....................................GC-3 11. CLAIMS .......................................................................................................................GC-3 12. PARK DEDICATION..................................................................................................GC-3 13. LANDSCAPING ..........................................................................................................GC-3 14. WARRANTY................................................................................................................GC-4 15. LOT PLANS.................................................................................................................GC-4 16. EXISTING ASSESSMENTS .......................................................................................GC-4 17. HOOK-UP CHARGES.................................................................................................GC-4 18. PUBLIC STREET LIGHTING.....................................................................................GC-4 19. SIGNAGE.....................................................................................................................GC-5 20. HOUSE PADS..............................................................................................................GC-5 21. RESPONSIBILITY FOR COSTS ................................................................................GC-5 22. DEVELOPER'S DEFAULT.........................................................................................GC-6 22. MISCELLANEOUS A. Construction Trailers.........................................................................................GC-6 B. Postal Service....................................................................................................GC-7 C. Third Parties......................................................................................................GC-7 D. Breach of Contract............................................................................................GC-7 E. Severability.......................................................................................................GC-7 ii F. Building Permits ...............................................................................................GC-7 G. Waivers/Amendments.......................................................................................GC-7 H. Release..............................................................................................................GC-7 I. Insurance...........................................................................................................GC-7 J. Remedies...........................................................................................................GC-8 K. Assignability.....................................................................................................GC-8 L. Construction Hours...........................................................................................GC-8 M. Noise Amplification..........................................................................................GC-8 N. Access...............................................................................................................GC-8 O. Street Maintenance............................................................................................GC-8 P. Storm Sewer Maintenance................................................................................GC-9 Q. Soil Treatment Systems ....................................................................................GC-9 R. Variances...........................................................................................................GC-9 S. Compliance with Laws, Ordinances, and Regulations .....................................GC-9 T. Proof of Title.....................................................................................................GC-9 U. Soil Conditions................................................................................................GC-10 V. Soil Correction................................................................................................GC-10 W. Haul Routes...........................................................................................................GC-10 X. Development Signs...............................................................................................GC-10 Y. Construction Plans................................................................................................GC-10 Z. As-Built Lot Surveys............................................................................................GC-11 SP-1 CITY OF CHANHASSEN DEVELOPMENT CONTRACT (Developer Installed Improvements) DEER HAVEN SPECIAL PROVISIONS AGREEMENT dated May 10, 2021 by and between the CITY OF CHANHASSEN, a Minnesota municipal corporation (the "City"), SCHAEFCO DEVELOPMENT, LLC, a Minnesota limited liability company (the "Developer"). 1. Request for Plat Approval. The Developer has asked the City to approve a plat for Deer Haven (referred to in this Contract as the "plat"). The land is legally described on the attached Exhibit "A". 2. Conditions of Plat Approval. The City hereby approves the plat on condition that the Developer enter into this Contract, furnish the security required by it, and record the plat with the County Recorder or Registrar of Titles within 30 days after the City Council approves the plat. 3. Development Plans. The plat shall be developed in accordance with the following plans. The plans shall not be attached to this Contract. With the exception of Plan A, the plans may be prepared, subject to City approval, after entering the Contract, but before commencement of any work in the plat. If the plans vary from the written terms of this Contract, the written terms shall control. The plans are: Plan A: Final plat approved May 3, 2021, prepared by Loucks. Plan B: Grading, Drainage and Erosion Control Plan dated May 3, 2021, prepared by Loucks. Plan C: Plans and Specifications for Improvements dated May 3, 20201, prepared by Loucks. Plan D: Landscape Plan dated April 5, 2021, prepared by Loucks. SP-2 4. Improvements. The Developer shall install and pay for the following: A. Sanitary Sewer System B. Water System C. Storm Water Drainage System D. Streets E. Concrete Curb and Gutter F. Street Lights G. Site Grading/Restoration H. Underground Utilities (e.g. gas, electric, telephone, CATV) I. Setting of Lot and Block Monuments J. Surveying and Staking K. Landscaping L. Erosion Control 5. Time of Performance. The Developer shall install all required improvements except for the wear course on public streets by November 15, 2021. The Developer may, however, request an extension of time from the City Engineer. If an extension is granted, it shall be conditioned upon updating the security posted by the Developer to reflect cost increases and the extended completion date. 6. Security. To guarantee compliance with the terms of this Contract, payment of special assessments, payment of the costs of all public improvements, and construction of all public improvements, the Developer shall furnish the City with a letter of credit in the form attached hereto, from a bank acceptable to the City, or cash escrow ("security") for $202,195.76. The amount of the security was calculated as 110% of the following: Site Grading/Erosion Control/Restoration $ 14,524.00 Sanitary Sewer $ 53,802.00 Watermain $ 25,536.00 Streets (including street signs and light)$ 74,775.00 Sub-total, Construction Costs $ 168,637.00 Engineering, surveying, and inspection (7% of construction costs)$ 11,804.59 Landscaping (2% of construction costs)$ 3,372.74 Sub-total, Other Costs $ 15,177.33 TOTAL COST OF PUBLIC IMPROVEMENTS $ 183,814.33 SECURITY AMOUNT (110% of 183,814.33)$ 202,195.76 This breakdown is for historical reference; it is not a restriction on the use of the security. The security shall be subject to the approval of the City. The City may draw down the security, without notice, for any violation of the terms of this Contract. If the required public improvements are not completed at SP-3 least thirty (30) days prior to the expiration of the security, the City may also draw it down. If the security is drawn down, the draw shall be used to cure the default. With City approval, the security may be reduced from time to time as financial obligations are paid, but in no case shall the security be reduced to a point less than 10% of the original amount until (1) all improvements have been completed, (2) iron monuments for lot corners have been installed, (3) all financial obligations to the City satisfied, (4) the required “record” plans have been received by the City, (5) a warranty security is provided, and (6) the public improvements are accepted by the City. 7. Notice. Required notices to the Developer shall be in writing, and shall be either hand delivered to the Developer, its employees or agents, or mailed to the Developer by registered mail at the following address: Tim Brown Schaefco Development, LLC PO BOX 219 Victoria, MN 55386 Phone: 612-802-6948 Email: tim@schaefco.com Notices to the City shall be in writing and shall be either hand delivered to the City Manager, or mailed to the City by certified mail in care of the City Manager at the following address: Chanhassen City Hall, 7700 Market Boulevard, P.O. Box 147, Chanhassen, Minnesota 55317, Telephone (952) 227-1100. 8. Other Special Conditions. A. FEES 1. Prior to release of the plat for recording and prior to scheduling a pre-construction meeting, Developer shall submit to the City $42,157.65 for the following City fees: *Administration fee (based on estimated construction cost of $168,637.00, 3.0% as costs are less than $500,000.00 $ 5,059.11 GIS fee:3 parcels @ $30/parcel + $100 for the plat $ 190.00 Partial payment of City sewer and water hookup fees: 3 units @ $691/unit (sewer) + $2,476/unit (water)$ 9,501.00 Street light operating fee: 1 light @ $300/light $ 300.00 Attorney Fee for Review and Recording of Plat and DC $ 450.00 Park Fee $17,400.00 Surface Water Management Fee $ 9,257.54 Total $42,157.65 SP-4 B. CONDITIONS OF APPROVAL Building: 1. Building plans must provide sufficient information to verify that proposed building meets all requirements of the Minnesota State Building Code; additional comments or requirements may be required after plan review. 2. A building permit must be obtained before beginning any construction. 3. Retaining walls more than four feet high must be designed by a professional engineer and a building permit must be obtained prior to construction. 4. If any soil corrections are done on the property, a final grading plan and soil report must be submitted to the Inspections Division before permits will be issued. Engineering/Water Resources: 1. A roadway easement from PID 254150012 is required in order to construct the public street. The easement shall be reviewed and approved by the city and shall be recorded either prior to or concurrently with the final plat. 2. Upon acceptance by City Council, the sanitary sewer and water mains will become publicly owned and maintained. 3. The applicant shall lower proposed MH 04-133 to attain the required minimum 9 foot depth of sanitary lateral at the property line per Detail #2001. 4. The private street shall be owned and maintained by the benefiting properties. 5. The newly installed stormwater facilities and appurtenances shall be owned and maintained by the benefiting properties. 6. Encroachment agreements for all existing and proposed structures within public DUE or right-of-way shall be filed concurrently with the recording of the final plat. 7. The applicant shall apply for and obtain permits from the appropriate regulatory agencies, as necessary, i.e. Minnehaha Creek Watershed District, Carver County, Minnesota Pollution Control Agency, Minnesota Department of Natural Resources, Army Corps of Engineers, etc. and comply with their conditions of approval. 8. The applicant shall enter into a Development Contract with the City and pay all the applicable fees and securities prior to recording of final plat. SP-5 9. The applicant and their Engineer shall work with City staff in amending the construction plans, dated May 3, 2021 prepared by Todd McLouth, PE with Loucks to fully satisfy staff concerns. Final construction plans will be subject to review and approval by staff. 10. A geotechnical engineering firm shall be on-site during grading operations as required to ensure conformance to City Standards and Specifications and all Minnesota Building Codes. 11. The applicant shall provide an operation and maintenance plan (O&M) for the private stormwater BMPs. The O&M of private stormwater BMPs is required in perpetuity and must be approved by the Water Resources Coordinator, or their designee, to be recorded against the benefiting properties. It is recommended that a Homeowners Association be formed and the declarations address the maintenance responsibilities and associated costs of repairs and maintenance of the private stormwater facilities. All conditions, comments, and applicable permits required by Minnehaha Creek Watershed District shall be adhered to. Environmental Resources: 1. Tree preservation fencing must be installed at the edge of grading limits prior to any grading activities. 2. Rectify discrepancy of trees 26 – 28 on plan sheets C1-2 (demolition) and L1-1 (tree canopy). Fire: 1. The road width proposed of 24 feet would require No Parking Fire Lane signs on both sides. Parks: 1. Park fees of $17,400.00 (3 x $5,800) for the three new lots shall be paid prior to recording the final plat. Planning: 1. The front lot line for Lots 1, 2 and 3 shall be the easterly property line. An access and maintenance agreement for the private street shall be recorded with the plat. 9. General Conditions. The general conditions of this Contract are attached as Exhibit "B" and incorporated herein. SP-6 CITY OF CHANHASSEN BY: Elise Ryan, Mayor (SEAL) AND: Laurie Hokkanen, City Manager STATE OF MINNESOTA) (ss. COUNTY OF CARVER ) The foregoing instrument was acknowledged before me this day of , 20__, by Elise Ryan, Mayor, and by Todd Gerhardt, City Manager, of the City of Chanhassen, a Minnesota municipal corporation, on behalf of the corporation and pursuant to the authority granted by its City Council. NOTARY PUBLIC SP-7 SCHAEFCO DEVELOPMENT, LLC: BY: Tim Brown, Partner and Vice President STATE OF MINNESOTA ) ( ss. COUNTY OF ) The foregoing instrument was acknowledged before me this day of , 20__, by Tim Brown, Partner and Vice President of Schaefco Development, LLC, a Minnesota limited liability company, on behalf of the company. NOTARY PUBLIC DRAFTED BY: City of Chanhassen 7700 Market Boulevard P.O. Box 147 Chanhassen, MN 55317 (952) 227-1100 EXHIBIT "A" TO DEVELOPMENT CONTRACT LEGAL DESCRIPTION OF SUBJECT PROPERTY: That part of the Southeast Quarter of the Northeast Quarter of Section 3, Township 116, Range 23, Carver County, Minnesota, described as follows: Beginning at the Northeast corner of said Southeast Quarter of the Northeast Quarter; thence Southerly along the East line of said Southeast Quarter of the Northeast Quarter to a point 660.00 feet North of the Southeast corner of said Southeast Quarter of the Northeast Quarter; thence Westerly parallel with the South line Southeast Quarter of the Northeast Quarter a distance of 281.07 feet; thence Northeasterly to a point on the North line of said Southeast Quarter of the Northeast Quarter distance 198.00 feet Westerly from the point of beginning; thence Easterly along said North line 198.00 feet to the point of beginning, except the North 50.00 feet thereof. MORTGAGE HOLDER CONSENT TO DEVELOPMENT CONTRACT MIN 100853701038975545 MORTGAGE ELECTRONIC REGISTRATION SYSTEMS, INC., a Delaware corporation, as nominee for the Lender LOANDEPOT.COM, LLC, a Delaware limited liability company, its successors and assigns, which holds a mortgage dated, October 31, 2020, filed November 13, 2020, as Document No. A710173 with the office of the Carver County Recorder, on the subject property, the development of which is governed by the foregoing Development Contract, agrees that the Development Contract shall remain in full force and effect even if it forecloses on its mortgage. Dated this day of , 2021. MORTGAGE ELECTRONIC REGISTRATION SYSTEMS, INC. By _________________________ [print name] Its ______________________ [title] STATE OF _____________ ) ) ss. COUNTY OF ____________ ) The foregoing instrument was acknowledged before me this _________________ day of ______________________________, 2021, by _____________________________________ the __________________________________of MORTGAGE ELECTRONIC REGISTRATION SYSTEMS, INC., a Delaware corporation, on behalf of the entity. ________________________________________ Notary Public DRAFTED BY: City of Chanhassen 7700 Market Boulevard P.O. Box 147 Chanhassen, MN 55317 (952) 227-1100 FEE OWNER CONSENT TO DEVELOPMENT CONTRACT KENNETH ASHFELD AND BARBARA BERSIE-ASHFELD, husband and wife, fee owners of all or part of the subject property, the development of which is governed by the foregoing Development Contract, affirm and consent to the provisions thereof and agree to be bound by the provisions as the same may apply to that portion of the subject property owned by them. Dated this day of , 2021. Kenneth Ashfeld Barbara Bersie-Ashfeld STATE OF MINNESOTA ) ( ss. COUNTY OF ) The foregoing instrument was acknowledged before me this day of , 2021, by Kenneth Ashfeld and Barbara Bersie-Ashfeld, husband and wife. NOTARY PUBLIC DRAFTED BY: City of Chanhassen 7700 Market Boulevard P.O. Box 147 Chanhassen, MN 55317 (952) 227-1100 IRREVOCABLE LETTER OF CREDIT No. ___________________ Date: _________________ TO: City of Chanhassen 7700 Market Boulevard, Box 147 Chanhassen, Minnesota 55317 Dear Sir or Madam: We hereby issue, for the account of (Name of Developer) and in your favor, our Irrevocable Letter of Credit in the amount of $____________, available to you by your draft drawn on sight on the undersigned bank. The draft must: a) Bear the clause, "Drawn under Letter of Credit No. __________, dated ________________, 2______, of (Name of Bank) "; b) Be signed by the Mayor or City Manager of the City of Chanhassen. c) Be presented for payment at (Address of Bank) , on or before 4:00 p.m. on November 30, 2______. This Letter of Credit shall automatically renew for successive one-year terms unless, at least forty- five (45) days prior to the next annual renewal date (which shall be November 30 of each year), the Bank delivers written notice to the Chanhassen City Manager that it intends to modify the terms of, or cancel, this Letter of Credit. Written notice is effective if sent by certified mail, postage prepaid, and deposited in the U.S. Mail, at least forty-five (45) days prior to the next annual renewal date addressed as follows: Chanhassen City Manager, Chanhassen City Hall, 7700 Market Boulevard, P.O. Box 147, Chanhassen, MN 55317, and is actually received by the City Manager at least thirty (30) days prior to the renewal date. This Letter of Credit sets forth in full our understanding which shall not in any way be modified, amended, amplified, or limited by reference to any document, instrument, or agreement, whether or not referred to herein. This Letter of Credit is not assignable. This is not a Notation Letter of Credit. More than one draw may be made under this Letter of Credit. This Letter of Credit shall be governed by the most recent revision of the Uniform Customs and Practice for Documentary Credits, International Chamber of Commerce Publication No. 600. We hereby agree that a draft drawn under and in compliance with this Letter of Credit shall be duly honored upon presentation. BY: ____________________________________ Its ______________________________ GC-1 CITY OF CHANHASSEN DEVELOPMENT CONTRACT (Developer Installed Improvements) EXHIBIT "B" GENERAL CONDITIONS 1. Right to Proceed. Within the plat or land to be platted, the Developer may not grade or otherwise disturb the earth, remove trees, construct sewer lines, water lines, streets, utilities, public or private improvements, or any buildings until all the following conditions have been satisfied: 1) this agreement has been fully executed by both parties and filed with the City Clerk, 2) the necessary security and fees have been received by the City, 3) the plat has been recorded with the County Recorder's Office or Registrar of Title’s Office of the County where the plat is located, and 4) the City Engineer has issued a letter that the foregoing conditions have been satisfied and then the Developer may proceed. 2. Phased Development. If the plat is a phase of a multiphased preliminary plat, the City may refuse to approve final plats of subsequent phases if the Developer has breached this Contract and the breach has not been remedied. Development of subsequent phases may not proceed until Development Contracts for such phases are approved by the City. Park charges and area charges for sewer and water referred to in this Contract are not being imposed on outlots, if any, in the plat that are designated in an approved preliminary plat for future subdivision into lots and blocks. Such charges will be calculated and imposed when the outlots are final platted into lots and blocks. 3. Preliminary Plat Status. If the plat is a phase of a multi-phased preliminary plat, the preliminary plat approval for all phases not final platted shall lapse and be void unless final platted into lots and blocks, not outlots, within two (2) years after preliminary plat approval. 4. Changes in Official Controls. For two (2) years from the date of this Contract, no amendments to the City's Comprehensive Plan, except an amendment placing the plat in the current urban service area, or official controls shall apply to or affect the use, development density, lot size, lot layout or dedications of the approved plat unless required by state or federal law or agreed to in writing by the City and the Developer. Thereafter, notwithstanding anything in this Contract to the contrary, to the full extent permitted by state law the City may require compliance with any amendments to the City's Comprehensive Plan, official controls, platting or dedication requirements enacted after the date of this Contract. 5. Improvements. The improvements specified in the Special Provisions of this Contract shall be installed in accordance with City standards, ordinances, and plans and specifications which have been prepared and signed by a competent registered professional engineer furnished to the City and approved by the City Engineer. The Developer shall obtain all necessary permits from the Metropolitan Council Environmental Services and other pertinent agencies before proceeding GC-2 with construction. The City will, at the Developer's expense, have one or more construction inspectors and a soil engineer inspect the work on a full or part-time basis. The Developer shall also provide a qualified inspector to perform site inspections on a daily basis. Inspector qualifications shall be submitted in writing to the City Engineer. The Developer shall instruct its project engineer/inspector to respond to questions from the City Inspector(s) and to make periodic site visits to satisfy that the construction is being performed to an acceptable level of quality in accordance with the engineer's design. The Developer or his engineer shall schedule a preconstruction meeting at a mutually agreeable time at the City Council chambers with all parties concerned, including the City staff, to review the program for the construction work. 6. Iron Monuments. Before the security for the completion of utilities is released, all monuments must be correctly placed in the ground in accordance with Minn. Stat. § 505.02, Subd. 1. The Developer's surveyor shall submit a written notice to the City certifying that the monuments have been installed. 7. License. The Developer hereby grants the City, its agents, employees, officers and contractors a license to enter the plat to perform all work and inspections deemed appropriate by the City in conjunction with plat development. 8. Site Erosion and Sediment Control. Before the site is rough graded, and before any utility construction is commenced or building permits are issued, the erosion and sediment control plan, Plan B, shall be implemented, inspected, and approved by the City. The City may impose additional erosion and sediment control requirements if they would be beneficial. All areas disturbed by the excavation and backfilling operations shall be reseeded forthwith after the completion of the work in that area. Except as otherwise provided in the erosion and sediment control plan, seed shall be certified seed to provide a temporary ground cover as rapidly as possible. All seeded areas shall be fertilized, mulched, and disc anchored as necessary for seed retention. The parties recognize that time is of the essence in controlling erosion and sediment transport. If the Developer does not comply with the erosion and sediment control plan and schedule of supplementary instructions received from the City, the City may take such action as it deems appropriate to control erosion and sediment transport at the Developer's expense. The City will endeavor to notify the Developer in advance of any proposed action, but failure of the City to do so will not affect the Developer's and City's rights or obligations hereunder. No development will be allowed and no building permits will be issued unless the plat is in full compliance with the erosion and sediment control requirements. Erosion and sediment control needs to be maintained until vegetative cover has been restored, even if construction has been completed and accepted. After the site has been stabilized to where, in the opinion of the City, there is no longer a need for erosion and sediment control, the City will authorize the removal of the erosion and sediment control, i.e. hay bales and silt fence. The Developer shall remove and dispose of the erosion and sediment control measures. 8a. Erosion Control During Construction of a Dwelling or Other Building. Before a building permit is issued for construction of a dwelling or other building on a lot, a $500.00 cash escrow or letter of credit per lot shall also be furnished to the City to guarantee compliance with City Code § 7-22. GC-3 9. Clean up. The Developer shall maintain a neat and orderly work site and shall daily clean, on and off site, dirt and debris, including blowables, from streets and the surrounding area that has resulted from construction work by the Developer, its agents or assigns. 10. Acceptance and Ownership of Improvements. Upon completion and acceptance by the City of the work and construction required by this Contract, the improvements lying within public easements shall become City property. After completion of the improvements, a representative of the contractor, and a representative of the Developer's engineer will make a final inspection of the work with the City Engineer. Before the City accepts the improvements, the City Engineer shall be satisfied that all work is satisfactorily completed in accordance with the approved plans and specifications and the Developer and his engineer shall submit a written statement to the City Engineer certifying that the project has been completed in accordance with the approved plans and specifications. The appropriate contractor waivers shall also be provided. Final acceptance of the public improvements shall be by City Council resolution. 11. Claims. In the event that the City receives claims from laborers, materialmen, or others that work required by this Contract has been performed, the sums due them have not been paid, and the laborers, materialmen, or others are seeking payment out of the financial guarantees posted with the City, and if the claims are not resolved at least ninety (90) days before the security required by this Contract will expire, the Developer hereby authorizes the City to commence an Interpleader action pursuant to Rule 22, Minnesota Rules of Civil Procedure for the District Courts, to draw upon the letters of credit in an amount up to 125% of the claim(s) and deposit the funds in compliance with the Rule, and upon such deposit, the Developer shall release, discharge, and dismiss the City from any further proceedings as it pertains to the letters of credit deposited with the District Court, except that the Court shall retain jurisdiction to determine attorneys' fees. 12. Park Dedication. The Developer shall pay full park dedication fees in conjunction with the installation of the plat improvements. The park dedication fees shall be the current amount in force at the time of final platting pursuant to Chanhassen City Ordinances and City Council resolutions. 13. Landscaping. Landscaping shall be installed in accordance with Plan D. Unless otherwise approved by the City, trees not listed in the City’s approved tree list are prohibited. The minimum tree size shall be two and one-half (2½) inches caliper, either bare root in season, or balled and burlapped. The trees may not be planted in the boulevard (area between curb and property line). In addition to any sod required as a part of the erosion and sediment control plan, Plan B, the Developer or lot purchaser shall sod the boulevard area and all drainage ways on each lot utilizing a minimum of six (6) inches of topsoil as a base. Seed or sod shall also be placed on all disturbed areas of the lot. If these improvements are not in place at the time a certificate of occupancy is requested, a financial guarantee of $750.00 in the form of cash or letter of credit shall be provided to the City. These conditions must then be complied with within two (2) months after the certificate of occupancy issued, except that if the certificate of occupancy is issued between October 1 through May 1 these conditions must be complied with by the following July 1st. Upon expiration of the time period, inspections will be conducted by City staff to verify satisfactory completion of all conditions. City staff will conduct inspections of incomplete items with a $50.00 inspection fee deducted from the GC-4 escrow fund for each inspection. After satisfactory inspection, the financial guarantee shall be returned. If the requirements are not satisfied, the City may use the security to satisfy the requirements. The City may also use the escrowed funds for maintenance of erosion control pursuant to City Code Section 7-22 or to satisfy any other requirements of this Contract or of City ordinances. These requirements supplement, but do not replace, specific landscaping conditions that may have been required by the City Council for project approval. 14. Warranty. The Developer warrants all improvements required to be constructed by it pursuant to this Contract against poor material and faulty workmanship. The Developer shall submit either 1) a warranty/maintenance bond for 100% of the cost of the improvement, or 2) a letter of credit for twenty-five percent (25%) of the amount of the original cost of the improvements. A. The required warranty period for materials and workmanship for the utility contractor installing public sewer and water mains shall be two (2) years from the date of final written City acceptance of the work. B. The required warranty period for all work relating to street construction, including concrete curb and gutter, sidewalks and trails, materials and equipment shall be subject to two (2) years from the date of final written acceptance. C. The required warranty period for sod, trees, and landscaping is one full growing season following acceptance by the City. 15. Lot Plans. Prior to the issuance of building permits, an acceptable Grading, Drainage, Erosion Control including silt fences, and Tree Removal Plan shall be submitted for each lot for review and approval by the City Engineer. Each plan shall assure that drainage is maintained away from buildings and that tree removal is consistent with development plans and City Ordinance. 16. Existing Assessments. Any existing assessments against the plat will be re-spread against the plat in accordance with City standards. 17. Hook-up Charges. . At the time of final plat approval the Developer shall pay 30% of the City Sewer Hook-up charge and 30% of the City Water hook up charge for each lot in the plat in the amount specified in Special Provision, Paragraph 8, of this Development Contract. The balance of the hook-up charges is collected at the time building permits are issued are based on 70% of the rates then in effect, unless a written request is made to assess the costs over a four year term at the rates in effect at time of application. 18. Public Street Lighting. The Developer shall have installed and pay for public street lights in accordance with City standards. The public street lights shall be accepted for City ownership and maintenance at the same time that the public street is accepted for ownership and maintenance. A plan shall be submitted for the City Engineer's approval prior to the installation. Before the City signs the final plat, the Developer shall pay the City a fee of $300.00 for each street light installed in GC-5 the plat. The fee shall be used by the City for furnishing electricity and maintaining each public street light for twenty (20) months. 19. Signage. All street signs, traffic signs, and wetland monumentation required by the City as a part of the plat shall be furnished and installed by the City at the sole expense of the Developer. 20. House Pads. The Developer shall promptly furnish the City "as-built" plans indicating the amount, type and limits of fill on any house pad location. 21. Responsibility for Costs. A. The Developer shall pay an administrative fee in conjunction with the installation of the plat improvements. This fee is to cover the cost of City Staff time and overhead for items such as review of construction documents, preparation of the Development Contract, monitoring construction progress, processing pay requests, processing security reductions, and final acceptance of improvements. This fee does not cover the City's cost for construction inspections. The fee shall be calculated as follows: i) if the cost of the construction of public improvements is less than $500,000, three percent (3%) of construction costs; ii) if the cost of the construction of public improvements is between $500,000 and $1,000,000, three percent (3%) of construction costs for the first $500,000 and two percent (2%) of construction costs over $500,000; iii) if the cost of the construction of public improvements is over $1,000,000, two and one-half percent (2½%) of construction costs for the first $1,000,000 and one and one-half percent (1½%) of construction costs over $1,000,000. Before the City signs the final plat, the Developer shall deposit with the City a fee based upon construction estimates. After construction is completed, the final fee shall be determined based upon actual construction costs. The cost of public improvements is defined in paragraph 6 of the Special Provisions. B. In addition to the administrative fee, the Developer shall reimburse the City for all costs incurred by the City for providing construction and erosion and sediment control inspections. This cost will be periodically billed directly to the Developer based on the actual progress of the construction. Payment shall be due in accordance with Article 21E of this Agreement. C. The Developer shall hold the City and its officers and employees harmless from claims made by itself and third parties for damages sustained or costs incurred resulting from plat approval and development. The Developer shall indemnify the City and its officers and employees for all costs, damages, or expenses which the City may pay or incur in consequence of such claims, including attorneys' fees. GC-6 D. In addition to the administrative fee, the Developer shall reimburse the City for costs incurred in the enforcement of this Contract, including engineering and attorneys' fees. E. The Developer shall pay in full all bills submitted to it by the City for obligations incurred under this Contract within thirty (30) days after receipt. If the bills are not paid on time, the City may halt all plat development work and construction, including but not limited to the issuance of building permits for lots which the Developer may or may not have sold, until the bills are paid in full. Bills not paid within thirty (30) days shall accrue interest at the rate of 8% per year. F. In addition to the charges and special assessments referred to herein, other charges and special assessments may be imposed such as, but not limited to, sewer availability charges ("SAC"), City water connection charges, City sewer connection charges, and building permit fees. G. Private Utilities. The Developer shall have installed and pay for the installation of electrical, natural gas, telephone, and cable television service in conjunction with the overall development improvements. These services shall be provided in accordance with each of the respective franchise agreements held with the City. H. The developer shall pay the City a fee established by City Council resolution, to reimburse the City for the cost of updating the City’s base maps, GIS data base files, and converting the plat and record drawings into an electronic format. Record drawings must be submitted within four months of final acceptance of public utilities. All digital information submitted to the City shall be in the Carver County Coordinate system. 22. Developer's Default. In the event of default by the Developer as to any of the work to be performed by it hereunder, the City may, at its option, perform the work and the Developer shall promptly reimburse the City for any expense incurred by the City, provided the Developer is first given notice of the work in default, not less than four (4) days in advance. This Contract is a license for the City to act, and it shall not be necessary for the City to seek a Court order for permission to enter the land. When the City does any such work, the City may, in addition to its other remedies, assess the cost in whole or in part. 23. Miscellaneous. A. Construction Trailers. Placement of on-site construction trailers and temporary job site offices shall be approved by the City Engineer as a part of the pre-construction meeting for installation of public improvements. Trailers shall be removed from the subject property within thirty (30) days following the acceptance of the public improvements unless otherwise approved by the City Engineer. B. Postal Service. The Developer shall provide for the maintenance of postal service in accordance with the local Postmaster's request. C. Third Parties. Third parties shall have no recourse against the City under this Contract. The City is not a guarantor of the Developer’s obligations under this Contract. The City GC-7 shall have no responsibility or liability to lot purchasers or others for the City’s failure to enforce this Contract or for allowing deviations from it. D. Breach of Contract. Breach of the terms of this Contract by the Developer shall be grounds for denial of building permits, including lots sold to third parties. The City may also issue a stop work order halting all plat development until the breach has been cured and the City has received satisfactory assurance that the breach will not reoccur. E. Severability. If any portion, section, subsection, sentence, clause, paragraph, or phrase of this Contract is for any reason held invalid, such decision shall not affect the validity of the remaining portion of this Contract. F. Building Permits. Building permits will not be issued in the plat until sanitary sewer, watermain, and storm sewer have been installed, tested, and accepted by the City, and the streets needed for access have been paved with a bituminous surface and the site graded and revegetated in accordance with Plan B of the development plans. G. Waivers/Amendments. The action or inaction of the City shall not constitute a waiver or amendment to the provisions of this Contract. To be binding, amendments or waivers shall be in writing, signed by the parties and approved by written resolution of the City Council. The City's failure to promptly take legal action to enforce this Contract shall not be a waiver or release. H. Release. This Contract shall run with the land and may be recorded against the title to the property . After the Developer has completed the work required of it under this Contract, at the Developer's request the City Manager will issue a Certificate of Compliance. Prior to the issuance of such a certificate, individual lot owners may make as written request for a certificate applicable to an individual lot allowing a minimum of ten (10) days for processing. I. Insurance. Developer shall take out and maintain until six (6) months after the City has accepted the public improvements, public liability and property damage insurance covering personal injury, including death, and claims for property damage which may arise out of Developer's work or the work of its subcontractors or by one directly or indirectly employed by any of them. Limits for bodily injury and death shall be not less than $500,000 for one person and $1,000,000 for each occurrence; limits for property damage shall be not less than $500,000 for each occurrence; or a combination single limit policy of $1,000,000 or more. The City shall be named as an additional insured on the policy, and the Developer shall file with the City a certificate evidencing coverage prior to the City signing the plat. The certificate shall provide that the City must be given ten (10) days advance written notice of the cancellation of the insurance. The certificate may not contain any disclaimer for failure to give the required notice. J. Remedies. Each right, power or remedy herein conferred upon the City is cumulative and in addition to every other right, power or remedy, expressed or implied, now or hereafter arising, available to City, at law or in equity, or under any other agreement, and each and every right, power and remedy herein set forth or otherwise so existing may be exercised from time GC-8 to time as often and in such order as may be deemed expedient by the City and shall not be a waiver of the right to exercise at any time thereafter any other right, power or remedy. K. Assignability. The Developer may not assign this Contract without the written permission of the City Council. The Developer's obligation hereunder shall continue in full force and effect even if the Developer sells one or more lots, the entire plat, or any part of it. L. Construction Hours. Construction hours, including pick-up and deliveries of material and equipment and the operation of any internal combustion engine, may only occur from 7:00 a.m. to 6:00 p.m. on weekdays, from 9:00 a.m. to 5:00 p.m. on Saturdays with no such activity allowed on Sundays or on legal holidays. Contractors must require their subcontractors, agents and supplies to comply with these requirements and the Contractor is responsible for their failure to do so. Under emergency conditions, this limitation may be waived by the written consent of the City Engineer. If construction occurs outside of the permitted construction hours, the Contractor shall pay the following administrative penalties: First violation $ 500.00 Second violation $ 1,000.00 Third & subsequent violations All site development and construction must cease for seven (7) calendar days M. Noise Amplification. The use of outdoor loudspeakers, bullhorns, intercoms, and similar devices is prohibited in conjunction with the construction of homes, buildings, and the improvements required under this contract. The administrative penalty for violation of construction hours shall also apply to violation of the provisions in this paragraph. N. Access. All access to the plat prior to the City accepting the roadway improvements shall be the responsibility of the Developer regardless if the City has issued building permits or occupancy permits for lots within the plat. O. Street Maintenance. The Developer shall be responsible for all street maintenance until streets within the plat are accepted by the City. Warning signs shall be placed by the Developer when hazards develop in streets to prevent the public from traveling on same and directing attention to detours. If streets become impassable, the City may order that such streets shall be barricaded and closed. The Developer shall maintain a smooth roadway surface and provide proper surface drainage. The Developer may request, in writing, that the City plow snow on the streets prior to final acceptance of the streets. The City shall have complete discretion to approve or reject the request. The City shall not be responsible for reshaping or damage to the street base or utilities because of snow plowing operations. The provision of City snow plowing service does not constitute final acceptance of the streets by the City. P. Storm Sewer Maintenance. The Developer shall be responsible for cleaning and maintenance of the storm sewer system (including ponds, pipes, catch basins, culverts and swales) within the plat and the adjacent off-site storm sewer system that receives storm water from the plat. The Developer shall follow all instructions it receives from the City concerning the cleaning and GC-9 maintenance of the storm sewer system. The Developer's obligations under this paragraph shall end two (2) years after the public street and storm drainage improvements in the plat have been accepted by the City. Twenty percent (20%) of the storm sewer costs, shown under section 6 of the special provisions of this contract, will be held by the City for the duration of the 2-year maintenance period. Q. Soil Treatment Systems. If soil treatment systems are required, the Developer shall clearly identify in the field and protect from alteration, unless suitable alternative sites are first provided, the two soil treatment sites identified during the platting process for each lot. This shall be done prior to the issuance of a Grading Permit. Any violation/disturbance of these sites shall render them as unacceptable and replacement sites will need to be located for each violated site in order to obtain a building permit. R. Variances. By approving the plat, the Developer represents that all lots in the plat are buildable without the need for variances from the City's ordinances. S. Compliance with Laws, Ordinances, and Regulations. In the development of the plat the Developer shall comply with all laws, ordinances, and regulations of the following authorities: 1. City of Chanhassen; 2. State of Minnesota, its agencies, departments and commissions; 3. United States Army Corps of Engineers; 4. Watershed District(s); 5. Metropolitan Government, its agencies, departments and commissions. T. Proof of Title. Upon request, the Developer shall furnish the City with evidence satisfactory to the City that it has the authority of the fee owners and contract for deed purchasers to enter into this Development Contract. U. Soil Conditions. The Developer acknowledges that the City makes no representations or warranties as to the condition of the soils on the property or its fitness for construction of the improvements or any other purpose for which the Developer may make use of such property. The Developer further agrees that it will indemnify, defend, and hold harmless the City, its governing body members, officers, and employees from any claims or actions arising out of the presence, if any, of hazardous wastes or pollutants on the property, unless hazardous wastes or pollutants were caused to be there by the City. V. Soil Correction. The Developer shall be responsible for soil correction work on the property. The City makes no representation to the Developer concerning the nature of suitability of soils nor the cost of correcting any unsuitable soil conditions which may exist. On lots which have no fill material a soils report from a qualified soils engineer is not required unless the City's building inspection department determines from observation that there may be a soils problem. On lots with fill material that have been mass graded as part of a multi-lot grading project, a satisfactory soils report from a qualified soils engineer shall be provided before the City issues a building permit for the lot. On lots with fill material that have been custom graded, a satisfactory soils report from a qualified soils engineer shall be provided before the City inspects the foundation for a building on the lot. GC-10 W. Haul Routes. The Developer, the Developer’s contractors or subcontractors must submit proposed haul routes for the import or export of soil, construction material, construction equipment or construction debris, or any other purpose. All haul routes must be approved by the City Engineer X. Development Signs. The Developer shall post a six foot by eight foot development sign in accordance with City Detail Plate No. 5313 at each entrance to the project. The sign shall be in place before construction of the required improvements commences and shall be removed when the required improvements are completed, except for the final lift of asphalt on streets. The signs shall contain the following information: project name, name of developer, developer’s telephone number and designated contact person, allowed construction hours. Y. Construction Plans. Upon final plat approval, the developer shall provide the City with two complete sets of full-size construction plans and four sets of 11”x17” reduced construction plan sets and three sets of specifications. Within four months after the completion of the utility improvements and base course pavement and before the security is released, the Developer shall supply the City with the following: (1) a complete set of reproducible Mylar as-built plans, (2) two complete full-size sets of blue line/paper as-built plans, (3) two complete sets of utility tie sheets, (4) location of buried fabric used for soil stabilization, (5) location stationing and swing ties of all utility stubs including draintile cleanouts, (6) bench mark network, (7) digital file of as-built plans in both .dxf & .tif format (the .dxf file must be tied to the current county coordinate system), (8) digital file of utility tie sheets in either .doc or .tif format, and (9) a breakdown of lineal footage of all utilities installed, including the per lineal foot bid price. The Developer is required to submit the final plat in electronic format. Z. As-Built Lot Surveys. An as-built lot survey will be required on all lots prior to the Certificate of Occupancy being issued. The as-built lot survey must be prepared, signed, and dated by a Registered Land Surveyor. Sod and the bituminous driveways must be installed before the as-built survey is completed. If the weather conditions at the time of the as-built are not conducive to paving the driveway and/or installing sod, a temporary Certificate of Occupancy may be issued and the as-built escrow withheld until all work is complete.