Loading...
PC Staff Report 10-19-21Planning Commission Item October 19, 2021 Item Consider a Request for an Amendment to Interim Use Permit (IUP) 2021-03 to Amend the Completion Deadline, Haul Route and Storage Area, Black Cherry Development, LLC (Erhart) File No.Planning Case No. 2021-03 Item No: B.2 Agenda Section PUBLIC HEARINGS Prepared By Bob Generous, Senior Planner Applicant Black Cherry Development, LLC Tim and Dawne Erhart 14500 Martin Drive, Ste. 3000 9611 Meadowlark Lane Eden Prairie, MN 55344 Chanhassen, MN 55317 Present Zoning Agricultural Estate District (A2) Land Use Residential Low Density Acerage 112 acres Density NA Applicable Regulations Chapter 7, Article III, Excavating, Mining, Filling and Grading Chapter 20, Article IV, Division 5, Interim Use Permits Chapter 20, Article VI, Wetland Protection PROPOSED MOTION The Chanhassen Planning Commission recommends that the City Council approve the amendment to the Interim Use Permit to allow site grading by extending the completion deadline to July 25, 2022, and the haul route and stockpile location subject to the Conditions of Approval and adopts the Findings of Fact and Recommendation. SUMMARY The applicant is requesting an amendment to the IUP permitting the removal of organic soils from the 29 wetland and the stockpiling of soil on the property to extend the completion date to July 25, 2022, from January 25, 2021, and to revise the haul route and stockpile site on the properties. The grading plan for the wetland area has not changed. BACKGROUND On January 25, 2021, the Chanhassen City Council approved the Interim Use Permit to allow site grading for the wetland and a haul route and stockpile area on the southern portion of the properties. DISCUSSION See attached staff report. RECOMMENDATION Staff recommends that the Planning Commission approve the amended Interim Use Permit to permit a revised haul route and stockpile area as shown on the plans prepared by Alliant Engineering, Inc., dated September 27, 2021, subject to the following conditions and adopt the attached Findings of Fact and Recommendation: Engineering 1. The Interim Use Permit shall be approved for a period of one (1) year from the date of City Council approval. The applicant will need to request a formal extension 60 days prior to the expiration date of the Interim Use Permit. 2. A survey of the proposed stockpile location shall be provided before grading operations and after grading operations to delineate the total area and volume of material stockpiled in conjunction with this Interim Use Permit. 3. The applicant and their Engineer shall work with City staff in amending the Grading and Erosion and Sediment Control Plans dated October 1, 2021, prepared by Mark Rausch, PE with Alliant Engineering, Inc., in the event that the Erhart Farms grading permit is not approved on October 25, 2021. 4. The applicant shall supply an additional cash escrow or letter of credit in the amount of $13,500.00 prior to grading operations. 5. Permitted hours of operation will be 7:00 a.m. to 6:00 p.m., Monday through Friday, and 9:00 a.m. to 5:00 p.m. on Saturday with no work permitted on Sunday or public holidays. 6. All erosion and sediment control BMPs shall be installed prior to the initiation of any site grading. Inspection and approval by the City of the installed erosion and sediment control measures must be had prior to grading operations. 7. The applicant shall apply for and obtain permits from the appropriate regulatory agencies, as necessary, i.e. Riley Purgatory Bluff Creek Watershed District, Carver County, Minnesota Pollution Control Agency, Minnesota Department of Natural Resources, Army Corps of Engineers, etc. and comply with their conditions of approval. No vegetation within the upland or wetland buffer areas of the city property shall be removed. Environmental Resources 1. No vegetation within the upland or wetland buffer areas of the City property shall be removed. 2. No access to the project site shall be allowed through City property. 3. The applicant is required to submit a restoration plan that includes the replacement of trees within 30 the buffer area and the haul route for the original haul route. The quantity shall be determined to match the existing density occurring in the forest outside of the construction limits. 4. Soil compaction tests shall be taken and levels documented post construction for the original haul route. If soil bulk density exceeds limits to plant growth (1.0g/cc), then appropriate restoration methods shall be employed such as aeration as directed by the City. Water Resources 1. The applicant must limit all grading to the wetland boundary. No grading or vegetation removal is allowed beyond the wetland into the upland. 2. The wetland boundary must be completely flagged and walked with the City’s Water Resources Coordinator before any construction activities can begin. 3. Erosion and sediment control measures must be adequately in place before construction begins. 4. No grading is permitted in the Type 3 portion of Wetland 2 (see plans for further details). Area of non-disturbance must be flagged prior to construction and approved by the City’s Water Resources Coordinator. 5. The applicant shall apply for and obtain permits through the Riley Purgatory Bluff Creek Overlay District, including dredging, floodplain. ATTACHMENTS Staff Report Findings of Fact and Recommendation Extension Request Grading Plan/Wetland Alteration Update Affidavit of Mailing 31 CITY OF CHANHASSEN PC DATE: October 19, 2021 CC DATE: October 25, 2021 REVIEW DEADLINE:November 16, 2021 CASE #: 2021-03 BY: RG, EH, JS, MU SUMMARY OF REQUEST: The developer is requesting an amendment to the Interim Use Permit (IUP) for excavation of the existing wetland along with excavated borrow being placed on a location within the parcel. LOCATION:Outlot A, Butternut Ridge Addition, (PID 25.1550022) and Outlot E, Foxwood (PID 25.2990510, city-owned) and 9197 Eagle Ridge Road (PID 25.0240811) APPLICANT:Black Cherry Development, LLC Tim and Dawne Erhart 14500 Martin Drive, Ste.3000 9611 Meadowlark Lane Eden Prairie, MN 55344 Chanhassen, MN 55317 terhart@riekor.com PRESENT ZONING: Agricultural Estate District (A2) PROPOSED MOTION: “The Chanhassen Planning Commission recommends that City Council approve an amendment to the Interim Use Permit to allow site grading by extending the completion deadline to July 25, 2022, and the haul route and stockpile location subject to the Conditions of Approval and adopts the Findings of Fact and Recommendation.” 32 Planning Commission Amendment to IUP – Planning Case 2021-03 October 19, 2021 Page 2 of 10 2020 LAND USE PLAN: Residential Low Density ACREAGE:Approximately 112 acres DENSITY:NA LEVEL OF CITY DISCRETION IN DECISION-MAKING: The City has limited discretion in approving or denying IUPs, based on whether or not the proposal meets the standards outlined in the Zoning Ordinance and excavating, mining, filling and grading regulations. If the City finds that all the applicable standards are met, the Permit must be approved. This is a quasi-judicial decision. Notice of this public hearing has been mailed to all property owners within 500 feet. PROPOSAL/SUMMARY The applicant is requesting an amendment to the IUP permitting the removal of organic soils from the wetland and the stockpiling of soil on the property to extend the completion date to July 25, 2022, from January 25, 2021, and to revise the haul route and stockpile site on the properties. The grading plan for the wetland area has not changed. Since there is no net loss of wetland, City Code does not require a Wetland Alteration Permit. APPLICABLE REGULATIONS Chapter 7, Article III, Excavating, Mining, Filling and Grading Chapter 20, Article IV, Division 5, Interim Use Permits Chapter 20, Article VI, Wetland Protection BACKGROUND On January 25, 2021, the Chanhassen City Council approved the IUP to allow site grading for the wetland and a haul route and stockpile area on the southern portion of the property. On August 9, 2021, the Chanhassen City Council approved: a. The ordinance rezoning the development from Agricultural Estate District (A2) to Single- Family Residential District (RSF) (Blocks 1 and 2); b. Preliminary plat with variances ANALYSIS This project started last winter and the sudden warm up forced the applicant to stop work with it only half completed. They intend to complete the work during this winter's frozen season. 33 Planning Commission Amendment to IUP – Planning Case 2021-03 October 19, 2021 Page 3 of 10 The IUP expires January 25, 2022. The applicant needs another month to assure completion and then some time in spring to get everything re-established. They are simultaneously working on a grading permit for the Erhart Farm property, but the wetland excavation work is separate from the development grading proposed. The applicant requested a six-month extension of the IUP to July 25, 2022. Staff is recommending a one-year extension until October 25, 2022. Revised Haul Route and Stockpile Area 34 Planning Commission Amendment to IUP – Planning Case 2021-03 October 19, 2021 Page 4 of 10 Erosion and Sediment Control The Engineering Department has reviewed the Amendment to the IUP submittal for extending the completion deadline, amending the haul route, and amending the wetland spoil stockpile area associated with IUP #2021-03. These comments are divided into two categories: General Comments and Proposed Conditions. General Comments are informational points to guide the applicant in the proper planning of grading and erosion control requirements for this project, to inform the applicant of possible extraordinary issues and/or to provide the basis for findings. Proposed Conditions are requirements that Engineering recommends be formally imposed on the applicant in the final decision. Note that references to the “City Standards” herein refer to the City of Chanhassen Standard Specifications and Detail Plates. 35 Planning Commission Amendment to IUP – Planning Case 2021-03 October 19, 2021 Page 5 of 10 General Comments/Findings 1. Any and all grading, erosion control, utility and transportation plans submitted with this application have been reviewed only for the purpose of determining the feasibility of the project in accordance with City Standards. A recommendation of IUP approval does not constitute final approval of details, including but not limited to alignments, materials and points of access, connection or discharge, that are depicted or suggested in the application. The City of Chanhassen Engineering and Public Works Departments will review plans, in detail, when they are submitted and approved, rejected or require modifications to the plans or drawings based upon conformance with City Standards, the Chanhassen Code of Ordinances and the professional engineering judgment of the City Engineer. 2. It is the opinion of the Engineering Department that the proposed IUP amendment application can be developed in accordance with the requirements of the Chanhassen Code of Ordinances (as it pertains to Engineering and Public Works requirements) and City Standards, provided it fully addresses the comments and conditions contained herein, and can be approved. 3. The applicant proposed to excavate approximately 21,200 cubic yards of material from an existing wetland along with placing the excavated wetland spoils on a portion of parcel 25155022 (the applicant’s 114.54 acre property) with the originally approved IUP (IUP #2021-03) dated January 26, 2021. The proposed request was to complete the excavation of an existing wetland (Wetland 2) during winter months of 2020/2021 to create a basin for a permanent water storage area along with the enhancement of the visual aesthetic of the existing wetland. The plans provided proposed no net increase or decrease in the size or footprint of the wetland. However, due to weather conditions the work was not completed as dredging of the wetland required frozen ground conditions. As such the applicant is proposing an extension to IUP #2021-03, until July 25, 2022. See proposed Condition 1. 4. The property is currently in the process of a formal subdivision review (Erhart Farms), and plans associated with Erhart Farms will require that the current wetland spoil stockpile area be relocated to a different area of the property owner’s parcel. The need of relocating the stockpile, along with other plan recommendations as the property was eventually intended to develop, were addressed by staff in the review of the original IUP submittal. The previous review by staff, dated December 18, 2020, commented: “Based on several pre-application meetings had regarding possible future development of parcel 25155022, staff has concerns regarding the location of the wetland spoils stockpile and haul route. While the haul route is feasible, it is recommended that the alignment and location be reconsidered in conjunction with the future build-out of the area (future wetland buffers, potential rear yard areas, future street connections, etc.). Ultimately, the proposed haul route is adjacent to wetlands and preventative measures to assure minimal compaction should be pursued to promote the long-term health of the surrounding natural environment (i.e. a restoration plan, preventative compaction measures such as ground protection mats over wood mulch, etc.). Additionally, while the location of the wetland spoil stockpile is ultimately the purview of the applicant, it currently is being placed within the path of a potential public road extension. As wetland soils, or hydric soils, are anticipated to be the predominately excavated material and are typically high in organic materials, they do not lend themselves to suitable road subgrades. It is the understanding of staff that the location of the wetland spoil stockpile is temporary, and as such, the proposed stockpile area will need to be surveyed before and after placement to delineate the boundary of material placed. This will ensure that once the material 36 Planning Commission Amendment to IUP – Planning Case 2021-03 October 19, 2021 Page 6 of 10 is relocated it will not serve as subgrade to future road extensions within the parcel. See proposed condition 4.” Condition 4 was to provide a survey of the proposed stockpile location before and after grading operations in order to delineate the total area and volume of wetland spoils stockpiled. This would have assured that the location of the wetland spoils was documented and all wetland spoils not suitable for engineering fill could be removed and/or relocated in conjunction with the future development. The applicant will be submitting another set of plans in pursuit of a mass grading permit for the Erhart Farms subdivision currently under review which will require that the current stockpile location be relocated. However, the same condition will be required of the newly relocated stockpile area as the newly proposed location is again within the proximity of a potential future road and other possible public improvements. See proposed Condition 2. 5. The applicant has provided updated erosion control plans (ESCP) in general conformance with Sec. 19-145 as required by City Ordinance. While the ESCP incorporates areas outside the limits of the proposed grading and haul route associated with the IUP amendment, it is understood that the applicant will be supplying the City with updated grading plans associated with mass grading of the Erhart Farms subdivision currently under review with the intent of both grading permits being issued simultaneously (October 25, 2021 City Council meeting). Thus, the ultimate ESCP illustrated on the plan set dated October 1, 2021 would adequately account for grading on the entire site (both for the IUP amendment and the Erhart Farms subdivision’s mass grading). However, if the grading permit associated with the Erhart Farms subdivision is not approved, the applicant will be required to amend the grading, ESCP and restoration plans to only account for areas associated with the grading operations necessary for IUP #2021-03. See proposed Condition 3. 6. The original erosion control plans provided with IUP #2021-03 dated December 4, 2020 had an estimated of 3.669± acres of disturbance associated with the proposed grading activities. To guarantee compliance with the original plans and related remedial work, a cash escrow was furnished to the City. In accordance with sec. 19-145.(d), the security was calculated based on the allowable, per parcel, amount of $7,500.00 per acre. Based on the disturbed area, this equated to $27,517.50. The updated plans will have a total of approximately 5.5 acres of disturbance, or an approximate difference of 1.8 acres. This equates to an additional cash escrow of $13,500.00 to guarantee compliance with the additional disturbance associated with the updated plans. See proposed Condition 4. 7. The proposed wetland where excavation is to occur is adjacent to single-family homes, thus staff recommends permitted hours of operation to be in accordance with Sec. 13-52.(c) particular to “Construction activities in conjunction with new developments…”. See proposed Condition 5. 8. As the extents of the project have increased due to the relocation of the wetland spoils stockpile and the construction of a new haul route to access the stockpile location, the applicant must ensure all newly proposed erosion control measures are installed prior to grading operations recommencing. See proposed Condition 6. 9. The proposed development will exceed one (1) acre of disturbance and will, therefore, be subject to the Minnesota Pollution Control Agency’s (MPCA) General Permit Authorization to Discharge Stormwater Associated with Construction Activity Under the National Pollution Discharge Elimination/State Disposal System (NPDES Construction Permit). Along with the 37 Planning Commission Amendment to IUP – Planning Case 2021-03 October 19, 2021 Page 7 of 10 MPCA’s NPDES Construction Permit, other jurisdictional authorities’ rules may be triggered requiring additional permitting. See proposed Condition 7. 10. It is recommended that as the nature of the updated wetland dredging plans have not significantly altered from the previously approved plans, that all previous conditions associated with Environmental Resources and Water Resources reviews remain with the amended IUP. WETLAND On November 19, 2020, the applicant submitted a No-Loss Application for wetland excavation through the Wetland Conservation Act (WCA) process. A Notice of Application was sent to the TEP on November 24, 2020. The proposed wetland excavation was discussed during a Technical Evaluation Panel (TEP) meeting on December 8, 2020. Based on the information provided, the proposed activity appears to be unregulated based upon WCA 8420.0105 Scope. Subpart 1., which states the following: “Scope; generally. Wetlands must not be impacted unless replaced by restoring or creating wetland areas of at least equal public value. This chapter regulates the draining or filling of wetlands, wholly or partially, and excavation in the permanently and semi-permanently flooded areas of Type 3, 4 or 5 wetlands, and in all wetland types if the excavation results in filling, draining, or conversion to nonwetlands.” Because the applicant is proposing only excavation in Type 1/2/6 wetlands on the property, and that the excavation will not exceed a depth of 6.5 feet, this activity is not regulated by the WCA. This means that this project is not anticipated to result in a net loss of wetland function or value, and as such, no wetland replacement or mitigation is necessary. The Notice of Decision with this determination was sent on December 22, 2020. Section 20-417. – Exemptions and no loss determinations. of the City Code states: “Activities exempted by Minnesota Rules Chapter 8420.0122 or determined to result in no net loss of wetlands shall be exempted from the provisions of this article. However, certificates of exemption or no loss must be obtained from the city prior to starting work.” This means that activities that result in no net loss of wetlands are exempt from the City’s Wetland Protection Article and thus exempt from the Wetland Alteration Permit process. This project qualifies for this exemption. This section of the City Code also states the following: “A person conducting an activity in a wetland under an exemption shall ensure that: 1. Appropriate erosion and sediment control measures are taken to prevent sediment discharges from the site; 2. The activity does not block fish activity; and 3. The activity is conducted in compliance with all other applicable federal, state, and local requirements, including best management practices as listed in Minnesota Rules Chapter 8420.0112, and water resource protection requirements established under M.S. § 103H. 38 Planning Commission Amendment to IUP –Planning Case 2021-03 October 19, 2021 Page 8 of 10 Numbers 1 and 3 listed above are listed under the Water Resources conditions below. Number 2 listed above is not anticipated to apply to this project as the current wetland is not fish habitat and no proposed activities are anticipated to block fish activity. Wetland Alteration Area LANDSCAPING AND TREE PRESERVATION The applicant has provided plans including a tree inventory with grading limits. The proposed amended project utilizes property that will be included in future development and therefore 39 Planning Commission Amendment to IUP – Planning Case 2021-03 October 19, 2021 Page 9 of 10 causes no further degradation to the existing forested areas of the property, provided that the haul route and stockpile locations do not deviate from the proposed plans. RECOMMENDATION Staff recommends that the Planning Commission approve the amended Interim Use Permit to permit as shown on the plans prepared by Alliant Engineering, Inc., dated September 27, 2021, subject to the following Conditions and adopt the attached Findings of Fact and Recommendation: Engineering 1. The Interim Use Permit shall be approved for a period of one (1) year from the date of City Council approval. The applicant will need to request a formal extension 60 days prior to the expiration date of the Interim Use Permit. 2. A survey of the proposed stockpile location shall be provided before grading operations and after grading operations to delineate the total area and volume of material stockpiled in conjunction with this Interim Use Permit. 3. The applicant and their engineer shall work with City staff in amending the Grading and Erosion and Sediment Control Plans dated October 1, 2021, prepared by Mark Rausch, PE with Alliant Engineering, Inc. in the event that the Erhart Farms grading permit is not approved on October 25, 2021. 4. The applicant shall supply an additional cash escrow or letter of credit in the amount of $13,500.00 prior to grading operations. 5. Permitted hours of operation will be 7:00 a.m. to 6:00 p.m., Monday through Friday, and 9:00 a.m. to 5:00 p.m. on Saturday with no work permitted on Sunday or public holidays. 6. All erosion and sediment control BMPs shall be installed prior to the initiation of any site grading. Inspection and approval by the City of the installed erosion and sediment control measures must be had prior to grading operations. 7. The applicant shall apply for and obtain permits from the appropriate regulatory agencies, as necessary, i.e. Riley Purgatory Bluff Creek Watershed District, Carver County, Minnesota Pollution Control Agency, Minnesota Department of Natural Resources, Army Corps of Engineers, etc. and comply with their conditions of approval. Environmental Resources 1. No vegetation within the upland or wetland buffer areas of the City property shall be removed. 2. No access to the project site shall be allowed through City property. 40 Planning Commission Amendment to IUP – Planning Case 2021-03 October 19, 2021 Page 10 of 10 3. The applicant is required to submit a restoration plan that includes the replacement of trees within the buffer area and the haul route for the original haul route. The quantity shall be determined to match the existing density occurring in the forest outside of the construction limits. 4. Soil compaction tests shall be taken and levels documented post construction for the original haul route. If soil bulk density exceeds limits to plant growth (1.0g/cc), then appropriate restoration methods shall be employed such as aeration as directed by the City. Water Resources 1. The applicant must limit all grading to the wetland boundary. No grading or vegetation removal is allowed beyond the wetland into the upland. 2. The wetland boundary must be completely flagged and walked with the City’s Water Resources Coordinator before any construction activities can begin. 3. Erosion and sediment control measures must be adequately in place before construction begins. 4. No grading is permitted in the Type 3 portion of Wetland 2 (see plans for further details). Area of non-disturbance must be flagged prior to construction and approved by the City’s Water Resources Coordinator. 5. The applicant shall apply for and obtain permits through the Riley Purgatory Bluff Creek Overlay District, including dredging, floodplain. ATTACHMENTS 1. Findings of Fact and Recommendation 2. Extension Request 3. Grading Plan/Wetland Alteration Update 4. Public Hearing Notice and Mailing List g:\plan\2021 planning cases\21-03 erhart iup\amendment to iup 10-19-21\staff report black cherry development erhart iup amendment_final.docx 41 1 CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA FINDINGS OF FACT AND RECOMMENDATION IN RE: Application of Black Cherry Development LLC for an amendment to an Interim Use Permit for excavation of existing wetland along with excavated borrow being placed on a location within the parcel. On October 19, 2021, the Chanhassen Planning Commission met at its regularly scheduled meeting to consider the application of Black Cherry Development LLC for an amendment to the Interim Use Permit for the property located at Outlot A, Butternut Ridge Addition, (PID 25.1550022) and Outlot E, Foxwood (PID 25.2990510, city-owned) and 9197 Eagle Ridge Road (PID 25.0240811). The Planning Commission conducted a public hearing on the proposed interim and was preceded by published and mailed notice. The Planning Commission heard testimony from all interested persons wishing to speak and now makes the following: FINDINGS OF FACT 1.The property is currently zoned Agricultural Estate District (A2). 2.The property is guided by the Land Use Plan for Residential Low Density use. 3.The legal description of the property is: Outlot A, Butternut Ridge Addition and Outlot E, Foxwood Addition. 4.Section 20-232: a. The proposed use will not be detrimental to or enhance the public health, safety, comfort, convenience or general welfare of the neighborhood or the city. The proposed grading will enhance the aesthetics of the area. b. The proposed use will be consistent with the objectives of the City's Comprehensive Plan and the zoning ordinance by preserving and enhancing the wetland function and value. c. The proposed use will be designed, constructed, operated and maintained so to be compatible in appearance with the existing or intended character of the general vicinity and will not change the essential character of that area. The proposed pond will enhance the appearance of the area. d. The proposed use will not be hazardous or disturbing to existing or planned neighboring uses. The proposed use will enhance the planned neighboring uses. 42 2 e. The proposed use will be served adequately by essential public facilities and services, including streets, police and fire protection, drainage structures, refuse disposal, water and sewer systems and schools; or will be served adequately by such facilities and services provided by the persons or agencies responsible for the establishment of the proposed use. f. The proposed use will not create excessive requirements for public facilities and services and will not be detrimental to the economic welfare of the community. The storage capacity of the wetland will improve stormwater management for the area. g. The proposed use will not involve uses, activities, processes, materials, equipment and conditions of operation that will be detrimental to any persons, property or the general welfare because of excessive production of traffic, noise, smoke, fumes, glare, odors, rodents, or trash. h. The proposed use will have vehicular approaches to the property which do not create traffic congestion or interfere with traffic or surrounding public thoroughfares. i. The proposed use will not result in the destruction, loss or damage of solar access, natural, scenic or historic features of major significance. j. The proposed use will be aesthetically compatible with the area. k. The proposed use will not depreciate surrounding property values. l. The proposed use meets standards prescribed for certain uses as provided in Chapter 20, Article IV of the City Code. 5.The Planning Commission shall recommend an Interim Use Permit and the City Council shall issue an Interim Use Permit only if it finds, based on the proposed location, that: a. The use meets the standards of a Conditional Use Permit set forth in Section 20- 232 of the City Code. b. The use conforms to the zoning regulations. c. The use is allowed as an interim use in the zoning district. d. The date or event that will terminate the use can be identified with certainty upon completion of the grading and restoration. e. The use will not impose additional costs on the public if it is necessary for the public to take the property in the future. f. The user agrees to any conditions that the City Council deems appropriate for permission of the use. 6.The planning report #2021-03 dated October 19, 2021, prepared by Robert Generous, et al, is incorporated herein. 43 3 RECOMMENDATION The Planning Commission recommends that the City Council approve the amended Interim Use Permit to permit the excavation of the wetland and storage of soil on the property in anticipation of the eventual development of the site subject to the conditions of the staff report. ADOPTED by the Chanhassen Planning Commission this 19th day of October, 2021. CHANHASSEN PLANNING COMMISSION BY: _ Steven Weick, Chairman g:\plan\2021 planning cases\21-03 erhart iup\amendment to iup 10-19-21\findings of fact amended iup.docx 44 From:Dan Blake To:Generous, Bob Cc:Tim Erhart; Mark Rausch Subject:IUP 2021-03 Date:Thursday, September 16, 2021 10:38:55 AM CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Bob - As you are aware this project started last winter and the sudden warm up forced us to stop work with only half completed. We intend to complete the work during this winter's frozen season. The IUP expires January 25, 2022. I think we need another month to assure completion and then some time in spring to get everything re-established. We are simultaneously working on a grading permit for the Erhart Fram property, but the wetland excavation work is fairly separate from the development grading proposed. We hereby request a 6 month extension of the IUP to July 25, 2022. Thank you, Dan Blake The Pemtom Land Company 612.282.5482 45 HAWKCREST COURT HAWKCREST CIRCLEEAGLE RIDGE ROADINFILTRATION BASIN 2WETLAND 2EAGLE RIDGE WAY EAGLE RIDGE ROADT.H 101PROJECTLOCATIONWETLAND ALTERATION PERMIT 733 Marquette AvenueMinneapolis, MN 55402612.758.3080www.alliant-inc.comSuite 700ERHART WETLAND ALTERATIONCHANHASSEN, MINNESOTASUITE 700ALLIANT ENGINEERING, INC.733 MARQUETTE AVENUEMINNEAPOLIS, MN 55402CONSULTANT SURVEYOR ENGINEER PETER GOERSLICENSE NO. 44110MARK RAUSCHLICENSE NO. 43480LANDSCAPE ARCHITECTEM: mrausch@alliant-inc.comEM: pgoers@alliant-inc.comMARK KRONBECKLICENSE NO. 26222EM: mkronbeck@alliant-inc.comDEVELOPER SUITE 3000BLACK CHERRY DEVELOPMENT, LLC14500 MARTIN DRIVE,EDEN PRAIRIE, MN 55344CONTACT: TIM ERHARTCONTACT: DAN BLAKEVICINITY MAPNOT TO SCALEERHART WETLAND ALTERATION COVER1SHEET INDEX NO.COVER SHEET1EXISTING CONDITIONS2SITE PLAN3WETLAND EXCAVATION/GRADING PLAN4SPOIL PILE/GRADING PLAN5EROSION AND SEDIMENT CONTROL PLAN6EROSION AND SEDIMENT CONTROL NOTES AND DETAILS7RESTORATION PLAN8WETLAND SCIENTISTADAM CAMERONKJOLHAUG ENVIRONMENTALEM: adam@kjolhaugenv.comSERVICES COMPANYWETLAND MANAGEMENT PLAN946 1413122987653211119876BLOCK 55OUTLOT COUTLOT DOUTLOT EOUTLOT EOUTLOT CBLOCK 3BLOCK 4HAWKCREST COURT HAWKCREST CIRCLE4BLOCK 2BLOCK 512EAGLE RIDGE ROADINFILTRATION BASIN 2FL / FW / LW / LW / LW/LWW L / FSW / F W / LL / WWWW LLWWWWINFILTRATION BASIN 2BOTTOM EL 891TOP EL 891.24 HWL 895.99 HWL 918.69(GREAT PLAINS BLVD.)STATE TRUNK HWY. NO. 101WETLAND ALTERATION PERMIT 733 Marquette AvenueMinneapolis, MN 55402612.758.3080www.alliant-inc.comSuite 700ERHART WETLAND ALTERATION EXISTING CONDITIONS2EXISTING CONDITIONS LEGEND: 47 1512141316181229876532111198746BLOCK 55OUTLOT COUTLOT DOUTLOT EOUTLOT EOUTLOT CBLOCK 3BLOCK 4HAWKCREST COURT HAWKCREST CIRCLE4BLOCK 2BLOCK 1BLOCK 512OUTLOT FEAGLE RIDGE ROAD WETLAND 3WETLAND 2WETLAND 1HWL 904.6611032456789BLOCK 1OUTLOT A WETLAND 411121314OUTLOT BOUTLOT EOUTLOT BOUTLOT BB L O C K 1 EAGLE RIDGE WAY EAGLE RIDGE ROADEAGLE RIDGE ROAD EAGLE RIDGE ROAD EX HWL 876.79PR HWL 876.82EX HWL 879.45PR HWL 879.43EX HWL 895.05PR HWL 895.04UNDELINEATED WATERBODYEX HWL 897.29PR HWL 897.30FUTURE BLOCK 2 LOTSFUTURE DEVELOPMENT(GHOST PLAT)GREAT PLAINS BLVD. (TH-101)12OUTLOT ABLOCK 1WETLAND ALTERATION PERMIT 733 Marquette AvenueMinneapolis, MN 55402612.758.3080www.alliant-inc.comSuite 700SITE LEGEND: ERHART WETLAND ALTERATION SITE PLAN3 SITE DATA: 48 232111198OUTLOT DOUTLOT EOUTLOT EBLOCK 4BLOCK 512EAGLE RIDGE ROADINFILTRATION BASIN 2INFILTRATION BASIN 2BOTTOM EL 891TOP EL 891.24 HWL 895.9913245BLOCK 1OUTLOT BFILTRATION BASIN 2HWL 882.03WETLAND 2CLASSIFICATION ASSUMED:MANAGE 2 - CITY, MEDIUM - RPBCWDBUFFER REQUIREMENTS:20' MIN.,40' AVG., 80' MAX - RPBCWD20' MIN. + 30' SBK - CITYWETLAND 4OUTLOT ABLOCK 1WETLAND ALTERATION PERMIT 733 Marquette AvenueMinneapolis, MN 55402612.758.3080www.alliant-inc.comSuite 700GRADING NOTES: GRADING LEGEND: ERHART WETLAND ALTERATION WETLAND EXCAVATION/GRADING PLAN4TYPICAL GRADING CROSS SECTIONB'-B'ESTIMATED EARTHWORK: NATURAL WETLAND OUTLET CROSS SECTIONC'-C'49 106789OUTLOT A11121314OUTLOT EOUTLOT BB L O C K 1 EAGLE RIDGE WAY EAGLE RIDGE ROADEA G L E R I D G E R O A D POND AND INFILTRATION BASINEAGLE R I D G E R O A D FILTRATION BASIN 3HWL 906.08FUTURE BLOCK 2 LOTSFUTURE DEVELOPMENT(GHOST PLAT)WETLAND 3CLASSIFICATION ASSUMED:MANAGE 2 - CITY, MEDIUM - RPBCWDBUFFER REQUIREMENTS:20' MIN.,40' AVG., 80' MAX - RPBCWD20' MIN. + 30' SBK - CITYWETLAND ALTERATION PERMIT 733 Marquette AvenueMinneapolis, MN 55402612.758.3080www.alliant-inc.comSuite 700ERHART WETLAND ALTERATION SPOIL PILE GRADING PLAN5GRADING LEGEND: 50 BLOCK 3BLOCK 4HAWKCREST COURT HAWKCREST CIRCLEBLOCK 2BLOCK 5EAGLE RIDGE ROAD WETLAND 3WETLAND 2WETLAND 1HWL 904.66WETLAND 4EX HWL 876.79PR HWL 876.82EX HWL 879.45PR HWL 879.43EX HWL 895.05PR HWL 895.04WATERTOWERLOCATION AUNDELINEATED WATERBODYEX HWL 897.29PR HWL 897.30GREAT PLAINS BLVD. (TH-101)DISCHARGE POINT TO LAKERILEY VIA WETLAND(LAKE RILEY IS AN IMPAIRED WATERSWITHIN 1 MILE)WETLAND 2MANAGE 1 - CITY, MEDIUM - RPBCWDBUFFER REQUIREMENTS:20' MIN.,40' AVG., 80' MAX - RPBCWD25' MIN. + 30' SBK - CITYWETLAND ALTERATION PERMIT 733 Marquette AvenueMinneapolis, MN 55402612.758.3080www.alliant-inc.comSuite 700ERHART WETLAND ALTERATION EROSION AND SEDIMENT CONTROL PLAN6NOTE TO CONTRACTOR: ACTIVE SWPPP LEGENDVICINITY MAPNOT TO SCALENOTE: INSPECTOR:DURING CONSTRUCTION:EROSION CONTROL PARTIESIMPAIRED WATER REQUIREMENTLEGEND: DNDNOTES: DESIGNER:INSTALLER:51 ROCK CONSTRUCTION ENTRANCEWASHED ROCK ORWOOD/MULCH PERSPECIFICATIONS18" MINIMUM CUT OFF BERM TOMINIMIZE RUNOFF FROM SITENOTES:1. MnDOT 3733 TYPE 4 FILTER FABRIC SHALL BE PLACED UNDER ROCK OR MULCH TOSTOP MUD MIGRATION THROUGH MATERIAL.2. FUGITIVE ROCK OR MULCH WILL BE REMOVED FROM ADJACENT ROADWAYS DAILY OR MORE FREQUENTLY AS NECESSARY.3.CONSTRUCTION ENTRANCE MUST BE CONSTRUCTED PRIOR TO THECOMMENCEMENT OF GRADING OPERATIONS ON THE SITE.4.THE ENTRANCE MUST BE MAINTAINED IN PROPER CONDITION TO PREVENTTRACKING OF MUD OFF THE SITE. THIS MAY REQUIRE PERIODIC TOPDRESSINGWITH ADDITIONAL ROCK, WOOD/MULCH, OR REMOVAL AND REINSTALLATION OFTHE PAD.5.THIS ENTRANCE WILL BE USED BY ALL VEHICLES ENTERING OR LEAVING THEPROJECT.6.THE CONSTRUCTION ENTRANCE WILL BE REMOVED PRIOR TO THE PLACEMENT OFBITUMINOUS SURFACING.PUBLIC ROAD50' MINIMUM LENGTHROCK-6" MINIMUM DEPTHWOOD/MULCH- 12" MINIMUM DEPTH20' MINIMUM WIDTHNOTE:ALL SLOPES WITH A GRADE EQUAL TO OR STEEPER THAN 3:1REQUIRE SLOPE TRACKING. SLOPES WITH A GRADE MORE GRADUALTHAN 3:1 REQUIRE SLOPE TRACKING IF THE STABILIZATION METHODIS EROSION CONTROL BLANKET OR HYDROMULCH.UNDISTURBED VEGETATIONTRACKED EQUIPMENTTREADS CREATE GROOVESPERPENDICULAR TO SLOPEDIRECTION.SLOPESLOPE TRACKINGEROSION CONTROL BLANKETINSTALLATIONOVERLAPLONGITUDINAL JOINTSMINIMUM OF 6"OVERLAP END JOINTSMINIMUM OF 6" AND STAPLEOVERLAP AT 1.5' INTERVALS.ANCHOR TRENCH(SEE DETAIL AND NOTES BELOW)ANCHOR TRENCH1. DIG 6" X 6" TRENCH2. LAY BLANKET IN TRENCH3. STAPLE AT 1.5' INTERVALS4. BACKFILL WITH NATURAL SOIL AND COMPACT5. BLANKET LENGTH SHALL NOT EXCEED 100'WITHOUT AN ANCHOR TRENCH6"6"1' TO 3'DIRECTION OFSURFACE FLOWNOTE:SLOPE SURFACE SHALL BE FREE OF ROCKS, SOIL CLUMPS,STICKS, VEHICLE IMPRINTS, AND GRASS. BLANKETS SHALLHAVE GOOD SOIL CONTACT.STAPLE PATTERN/DENSITY SHALLFOLLOW MANUFACTURERSSPECIFICATIONSERHART WETLAND ALTERATION WETLAND ALTERATION PERMIT EROSION AND SEDIMENT CONTOL NOTES AND DETAILS 733 Marquette AvenueMinneapolis, MN 55402612.758.3080www.alliant-inc.comSuite 700EROSION CONTROL SCHEDULE:FINAL STABILIZATION:EROSION CONTROL GENERAL NOTES:POLLUTION PREVENTION MANAGEMENT MEASURES:SEDIMENT CONTROL PRACTICES:MAINTENANCE PROGRAM:EROSION AND SEDIMENT CONTROLWINTER STABLIZATION: DEWATERING: 52 BLOCK 3BLOCK 4HAWKCREST COURT BLOCK 5EAGLE RIDGE ROADINFILTRATION BASIN 2INFILTRATION BASIN 2BOTTOM EL 891TOP EL 891.24 HWL 895.99WETLAND 3WETLAND 2WETLAND 1HWL 904.66WETLAND 4EX HWL 876.79PR HWL 876.82EX HWL 879.45PR HWL 879.43EX HWL 895.05PR HWL 895.04UNDELINEATED WATERBODYOUTLOT AWETLAND ALTERATION PERMIT 733 Marquette AvenueMinneapolis, MN 55402612.758.3080www.alliant-inc.comSuite 700ERHART WETLAND ALTERATION RESTORATION PLAN8LEGEND:SEED PLANTING NOTES: NOTES: 53 151413122987653211119876BLOCK 55OUTLOT COUTLOT DOUTLOT EOUTLOT EOUTLOT CBLOCK 3BLOCK 4HAWKCREST COURT HAWKCREST CIRCLE4BLOCK 2BLOCK 512EAGLE RIDGE ROAD WETLAND 3WETLAND 2WETLAND 1HWL 904.6611032456789BLOCK 1OUTLOT A WETLAND 4111213141516OUTLOT BOUTLOT EOUTLOT BOUTLOT BBLO C K 1 B L O C K 1 EAGLE RIDGE WAY EAGLE RIDGE ROADEAGLE RIDGE ROADOUTLOT DEAGLE R I D G E R O A D EX HWL 876.79PR HWL 876.82EX HWL 879.45PR HWL 879.43EX HWL 895.05PR HWL 895.04UNDELINEATED WATERBODYEX HWL 897.29PR HWL 897.30FUTURE BLOCK 2 LOTSFUTURE DEVELOPMENT(GHOST PLAT)GREAT PLAINS BLVD. (TH-101)12OUTLOT ABLOCK 1WETLAND ALTERATION PERMIT 733 Marquette AvenueMinneapolis, MN 55402612.758.3080www.alliant-inc.comSuite 700ERHART WETLAND ALTERATION WETLAND MANAGMENT PLAN9 WETLAND BUFFER CALCULATIONWETLAND SUMMARYWETLAND IMPACT CALCULATIONLEGEND: 54 CITY OF CHANHASSEN AFFIDAVIT OF MAILING NOTICE STATE OF MINNESOTA) )ss COUNTYOFCARVER ) I, Kim T. Meuwissen, being first duly swom, on oath deposes that she is and was on October 7,2021, the duly qualified and acting City Clerk ofthe City of Chanhassen, Minnesota; that on said date she caused to be mailed a copy of the attached notice of Public Hearing to consider a request for an amendment to Interim Use Permit (IUP) 2021-03 to amend the completion deadline, and haul route and storage area. Znned Agricultural Estate (A2). Applicant: Btack Cherry Development LLC. Ptanning Case No. 2021-03 to the persons named on attached Exhibit "A", by enclosing a copy ofsaid notice in an envelope addressed to such owner, and depositing the envelopes addressed to all such owners in the United States mail with postage fully prepaid thereon; that the names and addresses of such owners were those appearing as such by the records ofthe County Treasurer, Carver County, Minnesota, and by other appropriate records. \ Kim City Subscribed and thisTh davo f swom to before me bL/- lerk JEAITI Mf{tuy Notary Public 2021 lt Oor .adr ft,b!t,@1 55 DbclalnEr This map is neither a legally recorded map nor a survey and is not intended to be used as one. This map is a @mprlaton oI records, iniormation and data located in vadous city. county, state and federalofices and olhe{ sources regEtding the area sho*n and as to be us€d br reierence purposes only. The City does not warant that the Geographic lnbrmaton System (GlS) Data used to prepare this map are enor free and lhe City does nol represent that lhe Gls Data cen be used lor navi{latonal, lrackang or any other purpd;e requinng exactng measurement of distance or directon or preosaon in the depaclton of geographic fuatures. The Preceding disclaimer is provaded pu6uant lo Minnesota Statdes S,t66.03, SuM 21 (2000), and the user of this map acknowiedoes that the cfty shall not be liable fo. any damages, and e)Qressly vraaves all claims, and agrees to deiend, indemnfy, and hold harmless the Ciy f.om any and all claims bought by User, its employees or agents, or third parties which arise out of the use/s access or use of data Provided. (Next Record )r(TAX_NAill E)D (TAX_ADD_LlD (TAX ADD L2D Disclaimer This map is neither a legally recorded map nor a survey and is nol intended to be used as one. This map is a @mpilaton of records, intormation and data loceled in various cit, county, state and lederal offces and olhel sources regarding lhe area shown, and is to be used for reference purposes only. The City does nol wanant thal the Geographic lniormatjon System (GlS) Oata used to prepare this map are eror free. and the City does not represent that the GIS Data can be used for navigational, tracking or any other purpose requiring exacting measurement of distance ol dircclion or precision in the depiction of geographic features. The preceding discleimer is provided puBuant to Minnesota Statutes 5466.03, Subd. 21 (2000), and the user of lhis map acknowtedges that the City shall not be liable for any damages, and e)Qressly waives all claims. and agrees to defend. indemnify, and hold harmless the City trom any and all claims brought by User, its employees or agents, or third partaes which arise out of the useis acce$ or use of data provided. f,,,x :4t=.,f ) T ;1 /) I \o - I I J cTAX_NAMET (TAX_ADD_Ll)t <TAX-ADD_L2r I $+1f II 56 o p q el o c; E .E l! t E q ,9 t- E cioo t- o NoN o, q.) -oooo oE o-F E .>dl 0.) (! ooF.f.* 0)-o Eo.c,(.) oEloO (!- O N q) (5 [! E =1 .9 ol ! o)coN do o (,olo o pc([ rl) :)o b5b9L- OE12o -c)EC--= EE! lt) o! =oqo)E-o'oc 69cvbPc-op LCoo) rr(l,9eo-PU OrLNcroEC!6<-c a.l-.qr J) c C) o o c)o C)cO oo d) o(J og ID o(,E o o eo (, 6'E o o ot o Goo ooo B otE -oo. -c (o Eo,3i oO 6tsa9cL'69 CL(E d=EbOEsAoo6ee6 =o o) o).c .eE;eg !? -Ol !:i oTgEB..E 1, gfi -a$ E EEee I re E aE:E EEEE E Er P tiiEp ;; ri i E}E gE;r ;:E-b3'= 33eE g:gE;,EgsE o, 6-.9 q P.c o- o _! .:cF(DC(r(arN(9$ .!2 siE"P(I, (nr- rr -lD:-6i=o"'6EE s P&AEC.E L 9., o(D (l) '- <f.t E 9E oi sEeE u5bF 9 e =(Dqe>r;P;E* =SQoOtrE E.=:rooc=E 6 c o oForo o 9- (n d)== )X'o! l! d,HeeEP 5 aE ioo - o'= d, o6 o o, i.i9 o= o= 6* ig;eXeE = B LE= t-Not N|(,o) o It)EoEo- -o o :,i Ec o) o-caoEq'6 e a P(uc 0)o -o o o Eo -o lo C)cq)(, -oo c0 (.)ocoo o) (\, c) -o- o rl) o- _t'6 o-o't fE M E;3E€ct €9E EEo !trc <Lo (D at^-c. aFE x*o..o!b6s!eoor9-a o,a.nE Q E.=a sr' c o - J =orcq EiE=^ "qHE#o-(, q - =>'6ryg(5 i3 Peln =C o) oE ?c Ec,q) o-cc(!.cq o = = = tttoDcil)o)(U oroce'i- o ovEg EE;g 9:nEA6ooc)i= -cqo g; .(!6a>oc)oo)'oo oE c) ro.2;9lo E6 eEo< JCcEo)L O t/i =*l!xzii 5 ; 6 8 6 c _g ;gt 3 ! g$iir*t*il iEiiEigiiiiEi EgaEiiiEEIIEEE I 5 I E E Eg 9 E -a E 3 E T 6I B E,>t 5. g 3 E 6 ! E E E g E E e a 5 3 ! E a E t E E g E E E I .9 I ! E ! e !! ! _9 -! 9 n i g a; .EF c6 !) Go ! Gooao o- |ll(, e CL >tr8.9 6.GetrJ 9.; ar .=o- q: Eg eOG.C =f, d..o9EEoo a=o)E =ooo EDc oo =tDo.:ok.9oFrE -9oEo:CDo. .EEEo(!.9E OEza ot!.c t!.co Btr !,o =P5Laolllaao.=-toE=o dpE.Eot eEEo-za oooE G o o C;;o ,E = 6 E _a F E cfoo t- o Glo(\ o o-oo()o*o! ll,aF E .>dl o) o oof.-F- o) EoEo ocao(J oI (-) c\J g o IJJ 6 l=ao p o)coN do o o o oc(5g a e E=bP(L=qrF 14(5 -0)EC'=: 9E!0)^ovc =oodJ Ed_oc E8 =d) E-o!LCoq) (,t(! 9eIq(gr Lc{oo -tC!Ecol()= -)J co E o) q)o .c (E6 o o tt e q o .q. E 't o Eoo 'o TE -u)OE -g (o =o8i EO (I)to9'oE (!(g (l,=E6OE+Ao9i;9g8 o o) o) "c 9- =-d,.n1Ei E-EE Ec f eEee EreE AE:g EEEf E*AH:EEE::E.P 9HIX =EE€ g-ss€ fBEfr gEEH 3*ET E HEE *gBE sIEEFE o-or+tcF(EtrLr(,-N(Y)tt (, 0, ooo Eoo to L,^ F- = -!: =E $siE"E zA !ig#;$ Eg tg66. pFEA gEBiHEE3i ?:3bEbF9a IEgfiEIEHEiB 6EEEEIEfrEEi 3E:85leeeEPgEgBESESAE E r!= (!(Ol- O'x ar 0,o.c .!l rD i;l X o iitt : tilEEI;gEe o) o _9o, c;c c)q) E oE n) o c)-o c{) E fooD oo'6' o- =.o., F o.ac .9 o 6 E oc fc E a rl) oEc(o -cq'o E ui(! !E o,o)oo)oc! (D arl Eg 6E>; 9. u,6bEo.9q Pe!:Pg; -oo-9o:+cr(!p'oo 9Ad8(l)E.>.,8pEh eE lCcEo)Lo0 =9![ 3 5 3I ,E E ! €ts g ii*tuiisiiii EEiE:EE:EEEiE EEii!EiiEiiii gEIiiEBEiiiEEi Eg€!iiiEEEEEEE ! 5 I E = ;9 E 5 3 9 9 .g t E nt E f, b. g 3 E a E - dI EI q r -9a ! c 3 9 E a -q E E Eg B E E E t ! I E ,9 ! P o l!(, oJ llloo IG oo e E! >Etoo'go.o9tLJ 9i; 6' ,= ss r! .c =E ca ..o9c,coo, tD=ll,E =ooo l, oo E o oo E Eoo o GIJoJ a; Ei: 06 (, (lo 57 o o c) o o oo o ooooo o o ooooo o Q o o o oooo oo o o oooo.\r .! co Q or 01 o N c) .! o F\ L, o H .y) o o o o o o 6 6 6 6 6 6 Ot O - O 6 6 = & ;6r/) o o .{ !-r o N sr (o (o rn (n o m r^ m !-r (o u) F. oo oo .\ < \o o 6 N (Yi o,.{ = + + o ci +O O O O O O O O O o .r o O m H O ff) ..i (n r-r .n n -{ 6 m 6 - fD ct - .ri .,r .i' F,r o O 6or or o o o o o ot (o (o rn o) N Ln !n o) Ln.n.n Ln !n !a Lrl o) ln 0' !n rri o !n iri iji in L/) !n 6 5<h Or -{ .{ !-r !-r !.1 O).!.\r it (tql.\ld Or N.!N c! .{ ry l\t o Ol Ot N ..J aO e.t .\t .\i ^i r.,.i 6 (ci6ry .! (9 (9 l9 (9 Lo N o O Q ry Q O o c.,l g O O O O o O .{ O N o o F. O O O o Ci m 16 -j - ,4r c'! 9'! g',! !',! 4 !1 4ql ln ln r/r !n Lrl lrl lrl rn rn Lo rn Lrt Ln r.. L^ ur !r) !r) rn.n.i6 6 il !1 llr !/r!n =a!a!a\rNNa{Na{NNa{a{Na!a\a{a{NNa!a\a!a\|a{a{NNNNNNe.ic^,ta.lc,ta.,Ja.it 6E (,33=3==33FFFFFFF.,,t/1 .r\ th tt1 .rt .h th =rI-IIII(,FFFFFFF<(o(o(o(ororo(l)uJ(h <D o) or o) cD ol utHC)!rclr-{OOOr{Na!a')fnut(oaot\ F- F\ f.\ F\ N F- ol) I6 o do oi e ;d. t zuJJ(, (, =(9 (9E3== !===BBtsi3=3==i s h h 7 yC t tt-^ t- E k = h g H hgHTEiHEEEEEEEHE$EE .r,n o 6 h,n or or C,) o (h or .-r U,) or o ol o')H $ Q I X.r O -{ O H o r-r $ r. O 6.r c|9 rt{ ql Q Y' N r{ H .\r ^r m m sr N o.\ O r-rororro (o o 01 (o ro (o lo (.l (oo or F- crt F. r- zzzzz4 ooooo!!=.1<<<<<9E i' F F F I F = dv \h tt\ \h #>>>>>;!zYoooooXQUJIIIIIUId OOir-rO.r!/)Fr<lrOF-66)< < l'\H <) .r !r ..{ !.r N anOl .r .r !r !r el Ol !r F.sl <t.n dt r\.n .r 9iC,t N r-r.!.{.{ m m 16 qJ.o an tn.n rn rn an ltrEFFF,.$=i.EEF "FFFFF" F FFiFFFFFTFe,r @ m m m m .n m m .n .yi rn rr) (n rn m m m = .r) rn .n (n m (n m Lri = = BB il il R n h ; S n S BB g B H S 8333,^ S s B s BSB33 B $ g =z z z z z z z z i^ tn z z z z z = z z z z z z z 6 z i z z z z z z z z z z2 ^ j j :)i ii ;>l; i iiiT z ; ; iiz.24 i= ; id ii ;; ; ;)\ ; : :E e Qee e g=aaE e E iaqEQ U 3 e : QiEEe ae Q a u u Q t ='!'4 = I I I I I ; r 4 4 E r r f, r - E r r r r tr r q r r ul r r r r r r = E-,O O z z z z z z = < Z Z Z z z * Z Z Z Z z z z v Z S) z z Z Z Z Z Z z z Z dr d d + f _f _+ -f _+ = I $ s $ + f e + s + + f f f ? t E = = = = = = = = + = ;F (, (,(J(J(J u(J(J o- Ln u u (J(Jl. i O O O O OOO d O > O O > OOOO O O O (, 6o Z A e- E rP e; Ee E 5p =f E ?aE =# =EE E; " ;=E=!*= EE; x. E= gi;* u * 3 =*=:EEfrg *a=aei = ggEEEE=E=E=EEEEfiEEEEE:ggEEE*H$ESE;EEE oo t Zo<6dmFU CrFrFoo+g x e !/1cju < N 2 "1;t- a A - <l '622222 = .! gii;d;;;E E-z d 4 Z e = i i fr fr fr fr H6 i E E i e a; iti1i i6;,isi A = ii iEiEH IagEEEEEEEf =uE+EEcEEEEEE=iEsEEEEEfr i=.-=Io o o r{ .r o H.r !,i + { Fr ot 01 o uJ > <h ('r ('r or or !-.r @ (h (J ( ol o 01 >.3 3 3 3 *xoolnF.@oor,(our:'iIQrr!orro..lo.r..1 ooo..to 6 .-{ o rr c) r-t c, o.{S q q e n n n n n O qr e I e c) o C:r,-{ .r ..l .{ m rn .n @ 6 6 o = = ; - c.r 6 rn Ln ro oFdr{!-rr-rt{FrFrFr.\r(n<tln(o\o@(o(o(o(o(o(o(o@(oFF-NNr\r,\r.\F.F.F.F.F-6 58 e i 1 E E 1 3 ; il.a= = ; 5 E ; = E a E l I ; E i E ! * a e E E z 6) --lvca--{ r.c, (D (o (o (o ro (o (o (o (o (o (o (o (o (o (o (o (o (o (o ro (o (o (o (o (o (o ro (o (o (o (o rD (o i i 6 6 6 6 6 or o trr t'n trr @ u, ui l! N N fJ N \r lv ^J ^.l ^., t.. rr rr F F P E P Fd dG G EjEtr 66,b -Jton |. pO to oo c. -J ot (, ^J rr c, (o (O (o (o @ { Or (,r irF 6 I 6 6 i- b'= 5 o <, 6 i^ -r in < < n er rl u ut o o ur (o { r, o o o o o r,r ===i8Eq=E*qA a E aE E E aEaaaaaaaFEEEFafiI = = = A o ^ = = .i .! S in i ilt a x x rn ^ m m rn m m m rrl rt'r m m m m m iRb b b b X 9i9A4Ai, 9 = I B I = I p4? n a u,,ri.r rtrt o Tii ii 6 6 O € ii 6 E U O - c, m (r m m rn (, r'1 o o 6 E 6 o E E 1 I -1 I I ;aiair(Ea^,44-6ul6e?!4!,4d146)6loo6)6)6ro aliiio*o=ioo 3dEdii3cAeB3336d Ezz ooa)o.)r) oor) o a)aro.)r)oo.)rl.)o o r)o .) o .).)r) o oo o Fiii....tr-------i--...-----irr-I-9 z z z z z z z z z z z. z z z z z z z 2 z z z 2 2 2 2 2 2 2 2 2 2 2 z ========-r-===i-rr--rr------r---I!E E E E E E E E i A i E E E E E i'" "" i, a n A h i, A b, i i, i, b, i, "8 itt t, @ in ah O't a t i art a a v\ vr u1 tn a u1 ti ti tr vr tt'l m m m m rn m I! O it h m m ii m ft m m m m P |2 _2,; .2 _2 i i _; i ? ? ? ? ? ? ? -2 -2 _. _i _2 ? ? ? ? ? " " ? " " ? ? !- ======--- = = 2 z z z z 2 z z z 2 2 z z z 2 2 z z z z z z z (n ( ( ur u (n ut (,| tJ! (^ (^ (rl (, (, (n 9r (, (^ (,r (^ !, !4 Ur (,r Ur U (^ (^ (, (n (n t,l Ur (^ G 6 i,i an an (ri (n ur u! lJt G L (, (,r (^ ur (, tn ut (n (n ul (, ur u! (n ( ( (/r lr! u (,,l (,l (n ni ni ai a, 4,, ai rrr @ @ l, @ @ sr ti i, r.rJ u, ur qr tu u, rrr @ qJ (, s,) (, (^, lr, q, @ rlt lr' q' * e ei P i i F F }. P rr F ts P rr P l. P rj P PE P }i5i i rr -J -J -J -r -r -J -J { -.r'{ {'.J { { { { \.J \.r \J :J \.J :J \.J ! ! { { .\J { { { do dodo&&&66 do& i N N, t6 5666o1010r oro lao -.J \.1 !nj 666660oo @tr cj tn o o I\r (,!(,(b(^@ur(, F01 Qro s 3383 33383S S S S E SS SS9E E t - F P P reI 6 5 6 <j 6 tr ;; |- o ro ao 6 < or (,,) N l. o (9 @ @ !o o ! ot (^ otb E 6 6 d 6 6 -J L^ < n ii ur { !h Ln o o (,l (o ! 6 o o o o o "J :==I:cn=n*i=HEHHHHHHHHHHHHN=E885Ei=E=E**=f ==gd==33ecqqc3zn,n,* r-5ui 6 Z g, 9, 6 9? 6 6 6 6 6 5 6 O 3O==9O m- rnmmmmrn-=?- - ; q ; q o o ; s ; ; i i * a a z Cti-o---g-g9oogogg !!(horor FO}JOO Etr=IOzzz24--{ --{ --l -{ _iloooo,ooooo --{ --l --l --l -v-a-- I\J I! 19 IJA.)N N) N.' AJ N IJ N,, NJ N N AJ AJ N AJ I\) IV I\J iJ t.J iJ AJ A'' AJ NJ NJ P AJ AJ NG i; G i.i i,6 G i, i, (,l (n G i, i, i, G 6 i,(, !n an (^ q! (,' (, (^ (, (, (, (, (, ( (^ (n 6i 6 6 6 L ;. .6 al' oi .s' 5 ij ij ij iJ N N p N tu N,r r.r re rv I\r N o N ^r i\r N? ^? !? P; n ; i o in o p F o o d 6 6 ia {a (o (o (o @ (o @ \o @ to (D ^J @ ro (o (o (o (o (o b ir b b 6 &i 6 b b E 6 6i 6 6 6 6,5 6 6 @ to (o tD to (o (o 5 to (o to @ to (P !P556666566bb666666566OO998888888883o666ts6aOAtsP.r r\J^JDNq,uJlE=E8s8s588858888d88888883s88388333 59