Loading...
Approval Letter ♦ T Y 0 CITY OF CHANHASSEN L � N H A S Chanhassen is a Community for Life-Providing for Today and Planning for Tomorrow November 9, 2021 David& Sharon Gatto 9631 Foxford Road Chanhassen, MN 55317 Re: Interim Use Permit 2021-24 Dear Mr. & Mrs. Gatto: This letter is to confirm that on November 8, 2021, the Chanhassen City Council approved the Interim Use Permit for grading in excess of 1,000 cubic yards for the construction of a berm on the property, subject to the following conditions: Building 1. Any proposed grading shall not negatively impact or allow water to drain towards existing septic system or a secondary septic sites on the property. 2. Existing septic site and secondary septic site are to be marked and protected to ensure soil treatment areas do not get compacted from construction activity. Engineering 1. The applicant shall provide an existing conditions survey, or update the Grading& Erosion Control Plans, dated 3/9/2021, prepared by James R. Hill, Inc.,to include surveyed existing topography, for review and approval prior to issuance of the Interim Use Permit. 2. The applicant shall update the Grading& Erosion Control Plans to include the following notes: a. Prior to commencement of any grading activities, contact the City's Water Resources Department, Ryan Pinkalla at 952-227-1173,to schedule an initial erosion control inspection. b. All temporary erosion control BMPs must be removed after final stabilization has occurred and prior to release of any securities. This includes, but is not limited to, the temporary construction entrance and all its appurtenances. c. Any construction of retaining walls over 4 feet in height require a City permit and shall be designed by a registered professional engineer. d. Permitted hours of operation will be 7:00 a.m. to 6:00 p.m., Monday through Friday, and 9:00 a.m. to 5:00 p.m. on Saturday with no work permitted on Sunday or public holidays. PH 952.227.1100 • www.ci.chanhassen.mn.us • FX 952.227.1110 7700 MARKET BOULEVARD • PO BOX 147 •CHANHASSEN • MINNESOTA 55317 David& Sharon Gatto November 9, 2021 Page 2 e. Vehicular traffic on Foxford Road must be free flowing and unobstructed at all times during construction activities. f. Staging or impacts to Carver County right-of-way requires County approval. 3. All erosion control reviewed and approved in conjunction with Condition 1 shall be installed prior to the initiation of any site grading. Inspection and approval by the City of the installed erosion control measures must be had prior to commencement of grading operations. Erosion control measures require a double row of silt fence up-gradient from the wetland. 4. The applicant shall supply a cash escrow or letter of credit in the amount of$5,718.75 prior to grading operations. 5. The Interim Use Permit shall be approved for a period of one(1) year from the date of City Council approval. The applicant will need to request a formal extension 60 days prior to the expiration date of the Interim Use Permit. 6. The applicant shall apply for and obtain permits from the appropriate regulatory agencies, as necessary, i.e. Riley Purgatory Bluff Creek Watershed District, Carver County, Minnesota Pollution Control Agency, Minnesota Department of Natural Resources, Army Corps of Engineers, etc. and comply with their conditions of approval. Prior to beginning grading operations, please submit the required revisions of the plan as well as the restoration plan for staff review. Erosion control must be installed prior to beginning grading operations. Please contact Ryan Pinkalla at (952) 227-1173 or rpinkalla@ci.chanhassen.mn.us to inspect the erosion control; the City will then issue you authorization to proceed. The project shall be completed and the Interim Use Permit shall expire on November 7, 2022. If you have any questions or need additional information, please contact Erik Henricksen at (952) 227-1165 or ehenricksen@ci.chanhassen.mn.us. Respectfully Robert Generous, AICP Senior Planner ec: Kate Aanenson, Community Development Director Erik Henricksen, Project Engineer Laurie Hokkanen, City Manager Charlie Howley, City Engineering/Public Works Director Ryan Pinkalla, Water Resources Technician Jill Sinclair, Environmental Resource Specialist Eric Tessman, Building Official g:\plan12021 planning cases 12 1-24 9631 foxford road iup for grading\approval letter.docx