Mech serv letterTo whom it may concern:
Re: River Valley Industrial Center
Summary of the proposed mechanical system for the River Valley Industrial Center.
!. The potable water shall be supplied by a new well located ouside the south
side of the building. The water service shall enter the building below the frost
line to a water service room. The room would house the service entry, water
pump and pressure tank. Pipe dimensions and pressure requiirements will be
determined at the time of system design for construction. It will be designed for
eleven restroom locations and service sinks inside the building.
2. The sanitary sewer shall serve the 11 locations of two toilet room, service sinks
and two floor drains at each location.The sanitary sewer will leave the building
at one location at the center of the west side of the building. The sanitary sewer
will go to septic tanks and be pumped to sanitary field drains.
3. The roof drainage system shall consist of one storm sewer roof drain to an
interior roof drain pipe system and one over flow roof drain for every 7,500
square feet of the building. The roof drainage system shall exit the building at
three locations on the west side of the buiilding.
4. The natural gas line shall come from the gas main located at either Audubon
Road or Stoughton Avenue. The natural gas line shall serve unit heaters to heat
the warehouse and by roof top units serving the tenant office spaces.
If there are any questions regarding the mechanical systems proposed please
call Bill Karges, PE. Karges and Assoc., 612-599-7268.
Bill Karges
Karges & Assoc.
proposed:
River Valley Industrial Center
near 2100 Stoughton Avenue
Cfhanhassen, MN
August 27, 2021