Loading...
Variance - Recorded CAMPBELL KNUTSON PROFESSIONAL4. ASSOCIATION December 28, 2021 Elliott B. Knetsch Joel J.Jamnik Andrea McDowell Poehler Ms. Jean Steckling Soren M. Mattick City of Chanhassen David S. Kendall 7700 Market Boulevard Henry A. Schaeffer,III Alina Schwartz P.O. Box 147 Shana N. Conklin Chanhassen, MN 55317 James J.Monoe, III Jerome M. Porter Leah C.M. Koch Re: Miscellaneous Recording Meagan K. Kelley Benjamin J. Colburn Dear Ms. Steckling: Jared D. Shepherd Thomas J. Campbell* Please find enclosed Variance 2021-26 for Lot 2, Block 1, Zamor Addition. Said Roger N. Knutson* document was erecorded on December 21, 2021 as Carver County Document No. *Retired A739247. Thank you. Very truly yours, CAMPBELL KNUTSON Professional Association Jean . son, Le ssistant /jmo Enclosures Grand Oak Office Center 860 Blue Gentian Road Suite 290 Eagan.Minnexxa i i 121 Main:6 51-4;2-5000 Fax:6;1-2 34-62 37 NV W.ck-law.com Document Number: A739247 Filed and/or Recorded on Dec 21, 2021 8:19 AM Office of the County Recorder/Registrar of Titles Carver County, Minnesota Kaaren Lewis, County Recorder Deputy LE Document Recording Fees $ 46.00 Document Total $ 46.00 Requesting Party: City of Chanhassen Pages: 3 CITY OF CHANHASSEN CARVER COUNTY,MINNESOTA VARIANCE 2021-26 1. Permit. Subject to the terms and conditions set forth herein, the City of Chanhassen hereby grants the following variance: The Board of Adjustments and Appeals approves a variance for a 13.4 foot setback to construct a canopy over the order stations and a variance to exceed the hard cover by 15.3 percent to expand the drive-through to two lanes on the property located at 445 W. 79th Street. 2. Property. The variance is for a property situated in the City of Chanhassen, Carver County, Minnesota,and legally described as Lot 2, Block 1, Zamor Addition, Carver County,MN. 3. Conditions.The variance approval is subject to the following conditions: a. Building 1. A building permit must be obtained before beginning any construction. 2. Building plans must be prepared and signed by design professionals licensed in the State of Minnesota. 3. Engineered plans must be prepared and signed by design professionals licensed in the State of Minnesota. 4. Building plans must provide sufficient information to verify that proposed building meets all requirements of the Minnesota State Building Code; additional comments or requirements may be required after plan review. 5. Structure proximity to property lines and other buildings will have an impact on the Code requirements for the proposed buildings, including but not limited to,allowable size,protected 1 openings and fire-resistive construction. These requirements will be addressed when complete building and site plans are submitted. 6. Retaining walls(if present)more than four feet high must be designed by a professional engineer and a building permit must be obtained prior to construction. b. Engineering 1. Any area that encroaches into a public drainage and utility easement shall require an encroachment agreement be executed and recorded prior to the commencement of any site improvements. 2. The applicant shall supply a signage and striping plan for the site for review prior to the commencement of any site improvements. 3. The grading and installation of any improvements shall meet all applicable jurisdictional requirements including, but not limited to, MnDOT and the Riley Purgatory Bluff Creek Watershed District, and all applicable permits and/or approvals shall be obtained prior to any site improvements. c. Environmental Resources 1. Any existing landscaping not noted for replacement in plans dated November 3,2021 that is damaged or removed will be required to be replaced prior to final completion. 2. The applicant shall provide security for site landscaping. d. Fire 1. If the canopy is not the proper distance from the building and fully non-combustible, a sprinkler system would be required. 2. Surmountable curbing shall be installed along the northern drive-through aisle and parking lot to permit emergency egress along the sidewalk to the parking lot. 4. Lapse. If within one (1)year of the issuance of this variance the allowed construction has not been substantially completed,this variance shall lapse. 2 Dated: December 7,2021 CITY OF CHANHASSEN /n BY: I Lt,.,tt'�--J • '-r , Elise Ryan,M4yor • AND: LOAA/11/Oralittif\ � Laurie Hokkanen, City Manager • STATE OF MINNESOTA ) (ss. COUNTY OF CARVER ) 444 The foregoing instrument was acknowledged before me this } day of 6Q. r,— 2021 by Elise Ryan, Mayor, and Laurie Hokkanen,City Manager,of the City of Chanhassen,a Minnesota municipal corporation,on behalf of the corporation and pursuant to authority granted by its City Council. NOT P BLIC `u '� KIM T. UWISSEN DRAFTED BY: `° Notary Public-Minnesota City of Chanhassen My Commission Expires 31,2025 7700 Market Boulevard P.O. Box 147 Chanhassen,MN 55317 (952) 227-1100 g:lplan12021 planning cases121-26 chick-fil-a varlvariance document 2021-26.docx 3