Loading...
PC Staff Report 03-01-22Planning Commission Item March 1, 2022 Item Degler Farm: Consider a Request to Amend Interim Use Permit #2021-13 to Extend the Termination Date of the Permit File No.Planning Case No. 2021-13A Item No: C.1 Agenda Section PUBLIC HEARINGS Prepared By Bob Generous, Senior Planner Applicant Todd Degler 112131 Haering Lane Chaska, MN 55318 Present Zoning Agricultural Estate District (A2) Land Use Office/Industrial Acerage 63.65 acres Density Applicable Regulations Chapter 20, Article IV, Division 3, Standards for Agricultural and Residential Districts Chapter 20, Article IV, Div. 5. Interim Use Permits Chapter 20, Article X, Agricultural Estate District, A2 SUGGESTED ACTION "The Chanhassen Planning Commission recommends the City Council approve an amendment to Interim Use Permit #2021-13 regarding Agritourism at 9111 Audubon Road to extend the termination date to 50 years; and adopt the Findings of Fact and Recommendation." SUMMARY The applicant is requesting an amendment to the termination date for the interim use permit for the Agritourism use of the property. 3 BACKGROUND The applicant currently farms their property. The agritourism use began last September of 2021. They would like to extend the termination date for the Agritourism use as part of their farming operation. On August 9, 2021, the City Council approved: "The ordinance amending sections 1-2, 20-252, and 20-576 regarding Agritourism; and an Interim Use Permit (IUP) for an Agritourism Use at 9111 Audubon Road with a termination date of five (5) years." DISCUSSION The IUP was originally approved for a period of five (5) years from the date of City Council approval. This timeframe was intended to allow for the use to get established on the site and the City to evaluate the impact of the use on the community. During the last half year of operation, the City has not received any complaints. Even with the extension of the time frame for termination of the use, there are other mechanisms to end the use due to violation of the conditions of the permit, changes in City zoning regulations, or subdivision of the property. RECOMMENDATION Staff recommends that the Planning Commission recommend approval of the amendment for a fifty (50) year termination date to the Interim Use Permit to permit the Agritourism use on the property, and restates the other existing conditions; and adopt the Findings of Fact and Recommendation. ATTACHMENTS Staff Report Findings of Fact and Recommendation Development Review Application Interim Use Permit 2021-13 4 CITY OF CHANHASSEN PC DATE: March 1, 2022 CC DATE: March 21, 2022 REVIEW DEADLINE: March 29, 2022 CASE #: 2021-13A BY: RG, EH, DN, JR, JS, ET, MU SUMMARY OF REQUEST: Consider a request to amend the termination date of an Interim Use Permit in the Agricultural Estate District for an Agritourism Use. LOCATION:9111 Audubon Road APPLICANT:Applicant: Todd Degler 112131 Haering Lane Chaska, MN 55318 Property Owner: Gayle Degler 541 Pine View Court Chanhassen, MN 55317 PRESENT ZONING:Agricultural Estate District (A-2) 2040 LAND USE PLAN:Office Industrial ACREAGE:63.67 acres LEVEL OF CITY DISCRETION IN DECISION- MAKING: The City has limited discretion in approving or denying interim use permits, based on whether or not the proposal meets the use standards outlined in the Zoning Ordinance. If the City finds that all the applicable use standards are met, the permit must be approved. This is a quasi-judicial decision. Notice of this public hearing has been mailed to all property owners within 500 feet. PROPOSED MOTION: “The Chanhassen Planning Commission recommends City Council approve an amendment to Interim Use Permit #2021-13 regarding Agritourism at 9111 Audubon Road to extend the termination date to 50 years; And Adopts the Findings of Fact and Recommendation.” 5 Degler Farm IUP Amendment March 1, 2022 Page 2 PROPOSAL/SUMMARY The applicant is requesting an amendment to the termination date of the Interim Use Permit #2021- 13 to perpetuity. The Degler’s were concerned that the five-year termination date was a major problem for their operation. They felt that the City could deny an extension of the Degler Farm IUP without cause. An acceptable time would provide a longer term horizon for the recouping of Agritourism attraction costs. Additionally, it would allow them to determine when the Agirtourism ended at some interim time. APPLICABLE REGULATIONS Chapter 20, Article IV, Division 3, Standards for Agricultural and Residential Districts Chapter 20, Article IV, Div. 5. Interim Use Permits Chapter 20, Article X, Agricultural Estate District, A-2 BACKGROUND The applicant currently farms their property. They would like to extend the termination date for the Agritourism use as part of their farming operation. On August 9, 2021, City Council approved: The ordinance amending sections 1-2, 20-252, and 20-576 regarding Agritourism; and An Interim Use Permit (IUP) for Agritourism Use at 9111 Audubon Road with a termination date of five (5) years. SITE CONSTRAINTS Bluff Creek Corridor This property is located within the Bluff Creek Overlay District (BCOD). The City of Chanhassen established the Bluff Creek Overlay District (BCOD) by ordinance in 1998 to protect the Bluff Creek Corridor, wetlands, bluffs and significant stands of mature trees through the use of careful site design and other low-impact practices. This parcel is partially encumbered by the BCOD. Section 20-1255 of the Chanhassen City Code requires a conditional use permit for all development within the Bluff Creek Corridor. The Bluff Creek Corridor primary zone is located on the property. The Primary Corridor is designated open space. All structures must meet a 40-foot structural setback from the Primary Corridor boundary as required by Chanhassen City Code. In addition, no grading is allowed within the first 20 feet of the Primary Corridor. 6 Degler Farm IUP Amendment March 1, 2022 Page 3 The proposed development shall not impact the BCOD. No grading or vegetative alterations shall be permitted in the BCOD Primary Zone. Wetland Protection There is a wetland located on the property. The proposed development should not impact this wetland. Bluff Protection There are bluffs on the property. The proposed development should not impact the bluffs. Shoreland Management The property is located within a shoreland protection district. Floodplain Overlay This property is not within a floodplain. SURROUNDING ZONING AND USES The property to the west is in the city of Chaska. Two single-family homes are located to the west of the site. The Preserve at Bluff Creek is located to the east across Bluff Creek. Liberty at Bluff Creek is located to the south of the site. The Bluff Creek Primary Corridor wraps around the southern and eastern portions of the property. INTERIM USE PERMIT The applicant is requesting an amendment to the termination date for the interim use permit for the Agritourism use of the property. City Code: Sec 20-323 Termination An interim use permit shall terminate on the happening of any of the following events, whichever first occurs: 1. The date stated in the permit; 2. Upon violation of conditions under which the permit was issued; 3. Upon change in the City's zoning regulations which renders the use nonconforming; 4. Upon the subdivision of the property or the alteration of the lot lines of the property. State Statute: 394.303 INTERIM USES. Subdivision 1.Definition. An "interim use" is a temporary use of property until a particular date, until the occurrence of a particular event, or until zoning regulations no longer permit it. The date or event that will terminate the use can be identified with certainty. 7 Degler Farm IUP Amendment March 1, 2022 Page 4 Agritourism Operation: 8 Degler Farm IUP Amendment March 1, 2022 Page 5 ACCESS Access to the property is from Audubon Road (County Road 15). All conditions set forth by Carver County shall be addressed by the applicant, and all permits required shall be obtained prior to the commencement of and during operation of the Agritourism operations. ANALYSIS This area guided for office industrial uses with the Bluff Creek primary corridor guided for permanent open space. As such continuation of the use in perpetuity is inconsistent with the City’s Comprehensive Plan. Interim Use Permits, pursuant to City Code and State Statute, require a termination date. MISCELLANEOUS The IUP was originally approved for a period of five (5) years from the date of City Council approval. This timeframe was intended to allow for the use to get established on the site and the City to evaluate the impact of the use on the community. Even with the extension of the time frame for termination of the use, there are other mechanisms to end the use due to violation of the conditions of the permit, changes in City zoning regulations, or subdivision of the property. Any change in use of the current buildings on site, including the barn, will require it to come up to building and fire codes. This will invoke MN Statute 1306, which will require the buildings to be fitted with a Fire Suppression System and Fire Alarm System to monitor the Suppression System. They would also need to address egress, exit and emergency lighting, door hardware, fire-rated construction, and many other fire code-related items when it comes to change in use and access to the general public. This includes bringing people through or any public access to a building, or the construction or use of an observation tower. A tower will need to be built to current Building Code. Safety concerns with the items on site such as: pumpkin canons, pumpkin catapult, zip lines, swings, etc. Department of Labor and Industry is responsible for overseeing licensing for these items, which are regulated by Minnesota Statutes Chapter 184B, Amusement Rides. Corn/Straw Mazes – Any and all ignition sources will need to be a great distance away, including open flame (recreational fire pits). Corn/straw mazes are highly combustible and can trap people inside if a fire develops. Some research into history of corn maze fires states all vehicle parking and any sources of ignition, such as campfires and smoking, be at least 75 feet away at all times. Emergency Responder access – Will need to maintain emergency vehicle access to all areas on site and entrance and egress. Will require proper road surface for emergency and fire vehicles. Possible vehicle turnaround area depending on distances. A fire hydrant will be required to be placed on site. 9 Degler Farm IUP Amendment March 1, 2022 Page 6 Sec 20-27 Revocation, Modification, Etc., Of Permits, Authorizations, Etc. The city manager may issue an order to the owner or occupant of any premises to cease and desist the use of such premises immediately, when such premises are being used in a manner creating substantial hazard to the public health, safety or welfare, or in violation of any permit issued pursuant hereto. The city manager shall have the power to prevent unlawful erection, construction, reconstruction, alteration, repair, conversion, maintenance, or use of lands or structures within the city and to restrain, correct or abate such violations, or to prevent the occupancy of buildings, structures or lands, or prevent any illegal act, conduct, business, or use on or about said premises and may use the city attorney, police and other personnel in accomplishing these duties. Accessory agriculture buildings used for Agritourism Events must meet existing Building Code. Existing buildings will more than likely change in occupancy type for this type of business, which will require both the Fire Marshal and Building Official to confirm use, occupancy type, and applicable codes for public use. A full architectural analysis would be required into items such as: fire safety, egress, structural integrity, use and occupancy type, as well as many other applicable codes. Special permission may not be given to leave existing buildings “as is” for use in Agritourism. One of the conditions of approval of the Interim Use Permit is an annual report of the activities proposed for the upcoming year and an updated site plan with the parking location for the year shall be submitted to the City by May 1st each year. As a follow-up to this report, site inspections shall be performed prior to beginning the years activities. PERMITS Permits from the appropriate regulatory agencies must be obtained; including but not limited to the Minnesota Department of Labor and Industry, Minnesota Agricultural Department, Minnesota Pollution Control Agency, Riley Purgatory Bluff Creek Watershed District and Carver County. UTILITIES City utilities are available to the property. Water is located in Audubon Road. Sewer is located in Lyman Boulevard and at the northeast corner of the property. However, none have been extended into the interior of the site. Sanitary facilities shall be provided for use of the visitors to the site. Such use shall comply with Building Code or meet the requirements for chemical toilets spelled out in the Agritourism Standards. RECOMMENDATION Staff recommends that the Planning Commission recommend approval of the amendment for a fifty (50) year termination date to the Interim Use Permit to permit the Agritourism use on the property and restates the other existing conditions: 10 Degler Farm IUP Amendment March 1, 2022 Page 7 Interim Use Permit Building: 1. Accessible parking shall be located on an improved, centralized, permanent surface and shall be based on the maximum parking provided based on the rotational parking plan. Engineering: 1. All conditions set forth by Carver County shall be addressed by the applicant, and all permits required shall be obtained prior to the commencement of Agritainment operations. 2. Parking capacity shall be based on city standard parking lot layout. 3. Corn rows are acceptable screening for parking lots. Fire: 1. Corn mazes and straw maze shall be at least 75 feet away from all vehicular parking and all ignition sources, including open flame (recreational fire pits). 2. Will require a fire hydrant to be placed on site. Planning: 1. The Interim Use Permit shall terminate fifty (50)years from the date of City Council approval. 2. Buildings and use areas shall be as shown on approved Exhibit B. Additional buildings shall require an amendment to the Interim Use Permit. 3. Sanitary facilities shall be provided for site visitors. 4. The use of the subject property must be in general conformance with the attached Exhibit B. An annual report of the activities proposed for the upcoming year and an updated site plan with the parking location for the year shall be submitted to the City by May 1st each year. Water Resources: 1. The applicant shall incorporate Bluff Creek Overlay District (BCOD) Conservation Area signage within the BCOD portion of the site. These signposts would not impede the applicant’s ability to use the site for agriculture. Precise amount and location of signage must be approved by the City’s Water Resources Engineer. And Adopt the Findings of Fact and Recommendation. ATTACHMENTS 1. Findings of Fact and Recommendation 11 Degler Farm IUP Amendment March 1, 2022 Page 8 2. Development Review Application 3. Interim Use Permit #2021-13 g:\plan\2021 planning cases\21-13a degler farm center iup amendment\staff report degler farm iup amend.docx 12 1 CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA FINDINGS OF FACT AND RECOMMENDATION IN RE: Application of Todd Degler and Gayle Degler for an amendment to Interim Use Permit #2021-13 to operate an Agritourism business. On March 1, 2022, the Chanhassen Planning Commission met at its regularly scheduled meeting to consider the application of Todd Degler and Gayle Degler for an amendment of the termination time frame for the Interim Use Permit for the property located at 9111 Audubon Road (County Road 15). The Planning Commission conducted a public hearing on the proposed conditional use and was preceded by published and mailed notice. The Planning Commission heard testimony from all interested persons wishing to speak and now makes the following: FINDINGS OF FACT 1.The property is currently zoned Agricultural Estate District, A-2. 2.The property is guided by the Land Use Plan for Office Industrial use. 3.The legal description of the property is: See Exhibit A. 4.Section 20-232: a. The proposed use will not be detrimental to but will enhance the public health, safety, comfort, convenience or general welfare of the neighborhood or the city by providing a unique experience. b. The proposed use will be consistent with the objectives of the City's Comprehensive Plan and the zoning ordinance by meeting the standards of each. c. The proposed use will be designed, constructed, operated and maintained so to be compatible in appearance with the existing or intended character of the general vicinity and will not change the essential character of that area. The use will be buffered from adjacent properties and will preserve the Bluff Creek Primary Zone. d. The proposed use will not be hazardous or disturbing to existing or planned neighboring uses. e. The proposed use will be served adequately by essential public facilities and services, including streets, police and fire protection, drainage structures, refuse disposal, water and sewer systems and schools; or will be served adequately by such facilities and services provided by the persons or agencies responsible for the establishment of the proposed use. f. The proposed use will not create excessive requirements for public facilities and services and will not be detrimental to the economic welfare of the community. g. The proposed use will not involve uses, activities, processes, materials, equipment and conditions of operation that will be detrimental to any persons, property or the general welfare because of excessive production of traffic, noise, smoke, fumes, glare, odors, rodents, or trash. 13 2 h. The proposed use will have vehicular approaches to the property which do not create traffic congestion or interfere with traffic or surrounding public thoroughfares. i. The proposed use will not result in the destruction, loss or damage of solar access, natural, scenic or historic features of major significance. j. The proposed use will be aesthetically compatible with the area. k. The proposed use will not depreciate surrounding property values. l. The proposed use will meet standards prescribed for certain uses as provided in Chapter 20, Article IV of the City Code. 5.The Planning Commission shall recommend an Interim Use Permit and the City Council shall issue interim permits only if it finds, based on the proposed location, that: a. The use meets the standards of a conditional use permit set forth in Section 20-232 of the City Code. b. The use conforms to the zoning regulations. c. The use is allowed as an interim use in the zoning district. d. The date or event that will terminate the use can be identified with certainty. e. The use will not impose additional costs on the public if it is necessary for the public to take the property in the future. f. The user agrees to any conditions that the City Council deems appropriate for permission of the use. 6.The planning report #2021-13A dated March 1, 2022, prepared by Robert Generous, et al, is incorporated herein. RECOMMENDATION The Planning Commission recommends that the City Council approve the amendment to Interim Use Permit #2021-13 regarding Agritourism at 9111 Audubon Road to extend the termination date to 50 years subject to the conditions of the staff report. ADOPTED by the Chanhassen Planning Commission this 1st day of March, 2022. CHANHASSEN PLANNING COMMISSION BY: Mark von Oven, Chairman 14 3 EXHIBIT A To the following described Real Estate situated in Carver County, Minnesota. (A)The Northwest Quarter of the Southeast Quarter (NW¼ of SE¼ of Section 22, Township 116, Range 23, containing 40 acres of land, more or less. (B)Also, beginning at the post in South line of Northwest Quarter of Southeast Quarter (NW¼ of SE¼) Section 22, Township 116, Range 23, One (1) chain West from the Southeast (SE) Corner of said Northwest quarter of Southeast quarter (NW¼ of SE¼); thence South 38½ dgs. West 2.38 chains; thence South 73 dgs. West 4.35 chains; thence South 36½ dgs. West 1.90 chains; thence South 17½ dge. West 3.70 chains; thence North 82 dgs. West 1.50 chains to a point in North and South middle line of Southwest quarter of Southeast quarter (SW¼ of SE¼); thence North along said middle line 8.00 chains to a post in South line of Northwest Quarter of Southeast Quarter (NW¼ of SE¼); thence East 10.00 chains to place of beginning, situated in East Half (E½) of Southwest Quarter of Southeast Quarter (SW¼ of SE¼), Section 22, Township 116, Range 23, containing 3.60 acres. (C)Also, Commencing at a post on center line of Section 22, Township 116, Range 23, which post bears South 4.20 chains from center post of said Sec. 22; thence South 15.32 chains to Quarter Quarter post; thence North 44½ dgs. West 27.90 chains; thence East 15.32 chains; thence South 4.28 chains; thence East 4.28 chains to place of beginning, situated in Lot 2, Sec. 22, Township 116, Range 23 and containing 17.37 acres, more or less. (D)Also, Beginning at the Quarter Section post on South line of Section 22, Township 116, Range 23, running thence North along center line of said Section 20.00 chains to middle line of Southeast quarter (SE¼) of said Section; thence East along said middle line 10.00 chains; thence South parallel with first mentioned line 15.75 chains to a point in the center of a creek; thence Southerly along center of said creek to South line of said Section; thence West 7.00 chains to place of beginning, containing 19 acres of land more or less, situated in West half of Southwest quarter of Southeast quarter (W½ of SW¼ of SE¼) of Section 22, Township 116, Range 23. 15 DEVELOPCOMMUNITY on-7700MENTlevardDEPARTMENT CITY OF CHANHASSENPlanningDivision — 7700 Markel Boulevard Mailing Address — P.O. Box 147, Chanhassen, MN 55317 Phone: (952) 227-1100 / Fax: (952) 227-1110 APPLICATION FOR DEVELOPMENT REVIEW Submittal Date: PC Date: CC Data: 60-Day Review Date: Refer fo the appropriate Application Checklist forrequired suhmiffal information that must accompany this application) Comprehensive Plan Amendment ......................... $600 Minor MUSA line for falling on -site sewers..... $100 Aw" LVS Conditional Use Permit (CUP) ISingle-Family Residence ... ............................. 325 All Others......................................................... 425 Interim Use Permit (IUP) In conjunction with Single -Family Residence.. 325 All Others......................................................... 425 Rezoning (REZ) Planned Unit Development(PUD)..................$750 Minor Amendment to existing PUD .................$100 All Others ............ ........................... .................. 500 Sign Plan Review............ ....................................... $150 Site Plan Review (SPR) Administrative ............................ ...................... $100 Commercial/Industrial Districts*......................$500 Plus $10 per 1,000 square feet of building area: thousand square feet) Include number of axis fina employees- Include number of new employees: Residential Districts ..... ........................ ............ $500 Plus $5 per dwelling unit (_ units) Subdivision (SUB) El Create 3 lots or less ....................... ................. $300 Create over 3 lots.......................$600 i $15 per lot lots) Metes & Bounds (2 lots) .... ..................... ......... $300 Consolidate Lots..............................................$150 Lot Line Adjustment. ............... ........ ........ ...... $150 Final Plat .................................. ........ ......$700 Includes $450 escrow for attorney costs)' Atldibonal escrow may be required for other applications through the development contract Vacation of Easements/Right-of-way (VAC) ........ 300 Additional recording fees may apply) Variance (VAR) .................... ............ .................... 200 Wetland Alteration Permit(WAP) Single -Family Residence...............................$150 All Others .......................................................$275 Zoning Appeal ................................... ................... 100 Zoning Ordinance Amendment (ZOA)................. 500 NOTE: When multiple applications are processed concurrently, the appropriate fee shall be charged for each application. ff—Notification Sign (City to install and rem ... ove)............................................................................................ I ..................... . $200 L[I /Property OwnersList within 500' (city to generate after p.ppll.tum meemlg).................................................. $3 per address addresses) Escrow for Recording Documents (check all that apply) ......................................... ...... El. $ 90 per document Conditional Use Permit Interim Use Permit [3 Site Plan A AgreementVacation Variance Wetland Alteration Permit Metes & Bounds Subdivision (3 docs.) Easements (_ easements) Deeds i( TOTAL FEE: el Drof Proposal: Property Address or Location: _ Parcel #: Z5_0 Z7_0 $C4i Total Acreage: &!P. us Present Zoning: Select One Present Land Use Designation: S tyto rS Legal Description: ,/ Wetlands Present? IeJT res Q'Qo { A- Z_ Requested Zoning: Select One WoLCqeLwr Requested Land Use Designation: Select One Existing Use of Property: (.x (i O—C'C`^ Check box if separate narrative is attached. 16 Section2l Property Owner and Applicant Information APPLICANT OTHER THAN PROPERTY OWNER: In signing this application, I, as applicant, represent to have obtained authorization from the property owner to file this application. I agree to be bound by conditions of approval, subject only to the right to object at the hearings on the application or during the appeal period. If this application has not been signed by the property owner, I have attached separate documentation of full legal capacity to file the application. This application should be processed in my name and I am the party whom the City should contact regarding any matter pertaining to this application. I will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees maybe charged for consulting fees, feasibility studies, etc- with an estimate prior to any authorization to proceed with the study, I certify that the information and exhibits submitted are true and correct. Name: Contact: Address: "e Phone: G'7 SZ-' Z Z City/State0p: 'VNl '3 g Cell: Email:4'MA^ - Fax: Signature: Date: I1Z94, - PROPERTY OWNER: In signing t is application, I, as property owner, have full legal capacity to, and hereby do, authorize the filing of this application. I understand that conditions of approval are binding and agree to be bound by those conditions, subject only to the right to object at the hearings or during the appeal periods. I will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. Icertifi/ that the information and exhibits submitted are true and correct. Name: C--77W L Contact: Address: ' I 6A ` Phone: cjSZ - q03 - City/ State/Zip:_ Lit4 - G53l1--7 Cell: Email: x-r I Q— Fax: Signature- Date: ,[/TB/ZZ This application must be completed in full and must be accompanied by all information and plans required by applicable City Ordinance provisions. Before filing this application, refer to the appropriate Application Checklist and confer with the Planning Department to determine the specific ordinance and applicable procedural requirements and fees. A determination of completeness of the application shall be made within 15 business days of application submittal. A written notice of application deficiencies shall be mailed to the applicant within 15 business days of application. PROJECT ENGINEER (it applicable) Name: Contact: Address: Phone: City/ State/Zip: Cell: Email: Fax: Section 4: Notification Information Wh should receive copies of staff reports? 'Other Contact Information: roperty Owner Via: frnail Mailed Paper Copy Name: Applicant Via: [v7Email Mailed Paper Copy Address: Engineer Via: Email Mailed Paper Copy City/State/zip: Other" Via: Email Mailed Paper Copy Email: INSTRUCTIONS TO APPLICANT: Complete all necessary fern fields, than select SAVE FORM to save a copy to your device. PRINT FORM and deliver to city along with required documents and payment. SUBMIT FORM to send a digital copy to the city for processing. SAVE FORM PRINT FORK BUBMR FORM 17 CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES INTERIM USE PERMIT#2021-13 1. Permit. Subject to the terms and conditions set forth herein,the City of Chanhassen hereby grants an interim use for an Agritainment use for 9111 Audubon Road. 2. Property. The permit is for the following described property("subject property") in the City of Chanhassen,Carver County,Minnesota: See Exhibit A) 3.Conditions. The permit is issued subject to the following conditions: Building: a. Accessible parking shall be located on an improved, centralized, permanent surface and shall be based on the maximum parking provided based on the rotational parking plan shown in Exhibit B. Engineering: a. All conditions set forth by Carver County shall be addressed by the applicant, and all permits required shall be obtained prior to the commencement of Agritainment operations. b. Parking capacity shall be based on city standard parking lot layout in Section 20-1118 of the Chanhassen City Code. c. Corn rows are an acceptable screening for parking lots. 1 18 Fire: a. Corn mazes and Straw Mazes shall be set back at least 75 feet from all vehicular parkin/ and all ignition sources, including open flame (recreational fire pits). b. Applicant must place a fire hydrant on site. Planning: a. The Interim Use Permit(IUP)shall terminate five (5) years from the date of City Council approval. b. Buildings and use areas shall be as shown on the approved Exhibit B. Additional buildings shall require an amendment to the Interim Use Permit. c. Sanitary facilities shall be provided for site visitors. d. The use of the subject property must be in general conformance with the attached Exhibit B. An annual report of the activities proposed for the upcoming year and an updated site plan with the parking location for the year shall be submitted to the City by May 1st each year. Water Resources: a. The applicant shall incorporate Bluff Creek Overlay District(BCOD) Conservation Area signage within the BCOD portion of the site. Precise amount and location of signage must be approved by the City's Water Resources Coordinator. 4. Termination of Permit. This Interim Use Permit shall terminate upon the occurrence of any of the following events,whichever first occurs: a. The date stated in the permit; b. Upon violation of conditions under which the permit was issued; c. Upon change in the city's zoning regulations which renders the use nonconforming; d. Upon the subdivision of the property or the alteration of the lot lines of the property. 5.Lapse. If within one year of the issuance of this permit the authorized construction has not been substantially completed or the use commenced,this permit shall lapse,unless an extension is granted in accordance with the Chanhassen Zoning Ordinance. 6.Criminal Penalty. Violation of the terms of this Interim Use Permit is a criminal misdemeanor. 2 19 Dated: August 9, 2021 CITY OF CHANHASSEN By: r(4,f0A>Elise Ryan,Mayor By: WA/Oki1A-44-0tAlLtAr Laurie Hokkanen, City Manager STATE OF MINNESOTA ) ss COUNTY OF CARVER ) The foregoing instrument was acknowledged before me this 1 gay of AUCOLC47-- 2021,by Elise Ryan, Mayor,and Laurie Hokkanen,City Manager, of the City of Chanhasle ,a Minnesota municipal corporation, on behalf of the corporation and pursuant to authority granted by its City Council. Notary P lic DRAFTED BY: City of Chanhassen 7700 Market Boulevard MEUWISSENKtMT. P.O. Box 147 Public Minnesota lL Notpiree Jar'31. 5 Chanhassen,MN 55317 r rmf c missioo 952)227-1100 20 EXHIBIT A To the following described Real Estate situated in Carver County,Minnesota. A) The Northwest Quarter of the Southeast Quarter(NW1/4 of SE'/4 of Section 22,Township 116,Range 23,containing 40 acres of land,more or less. B) Also,beginning at the post in South line of Northwest Quarter of Southeast Quarter(NW'/4 of SE'/4) Section 22,Township 116,Range 23,One(1)chain West from the Southeast(SE)Corner of said Northwest quarter of Southeast quarter(NW'/4 of SEA);thence South 381/4 dgs. West 2.38 chains;thence South 73 dgs. West 4.35 chains;thence South 361/4 dgs. West 1.90 chains;thence South 17'/2 dge. West 3.70 chains;thence North 82 dgs. West 1.50 chains to a point in North and South middle line of Southwest quarter of Southeast quarter(SW'/4 of SE'/4);thence North along said middle line 8.00 chains to a post in South line of Northwest Quarter of Southeast Quarter NW'/4 of SE'/4);thence East 10.00 chains to place of beginning, situated in East Half(E1/4)of Southwest Quarter of Southeast Quarter(SW'/4 of SE'/4), Section 22, Township 116,Range 23, containing 3.60 acres. C) Also,Commencing at a post on center line of Section 22,Township 116,Range 23,which post bears South 4.20 chains from center post of said Sec. 22;thence South 15.32 chains to Quarter Quarter post;thence North 441/4 dgs. West 27.90 chains;thence East 15.32 chains;thence South 4.28 chains;thence East 4.28 chains to place of beginning,situated in Lot 2, Sec. 22, Township 116, Range 23 and containing 17.37 acres,more or less. D) Also,Beginning at the Quarter Section post on South line of Section 22, Township 116, Range 23, running thence North along center line of said Section 20.00 chains to middle line of Southeast quarter(SE'/4)of said Section;thence East along said middle line 10.00 chains;thence South parallel with first mentioned line 15.75 chains to a point in the center of a creek;thence Southerly along center of said creek to South line of said Section;thence West 7.00 chains to place of beginning, containing 19 acres of land more or less, situated in West half of Southwest quarter of Southeast quarter(W'/z of SW'/4 of SE'/4) of Section 22,Township 116,Range 23. 4 21 EXHIBIT B Degler Farm Narrative& Site Plan Brief Background: Degler Farm has an extensive background in farming and educational teaching. Family founded by multi- generational elementary and high school educators; Degler Farm has a passion for educating youth. Our mission is to educate local youth on the operation,economics, and future of agriculture. In this spirit,Degler Farm would like to be more community facing through the growing area of Agritourism. We want to bring our passion for education and combine it with farm friendly activities. This"outside the classroom"learning on the farm is not only instructive,but fun. We see it as another yet another way to reach our neighbors and local community. Activity: Description: Education component: Hayrides Give participants a ride on a Local farm history in Chanhassen tractor pulled wagon. Tree identification Corn/Bean Maze -Participants walk through a How corn is grown corn/bean cut maze Corn Pit Area of shelled Corn for play What shelled corn looks like— differences between sweet corn and field corn. Straw Bale Maze -Smaller kid size maze What is straw? Pumpkin Picking -Pick your own Crop rotation and plant care Antique Tractor Outdoor tractor displays Evolution of the farm tractor. Displays Snowshoeing Snowshoeing Outdoor fitness&nature etiquette, animal tracking Other activities: Hayrides,corn/bean maze,corn pit, straw bale maze,tractor displays, snowshoeing,harvest-your- own produce,hill slides,pumpkin throwers/cannons, lookout towers,zip lines,play structures,saw mill demonstrations,hay stacks,kiddie trains, animal rides,sleigh rides, snowshoeing,maple syrup harvesting,cross country skiing,animal walks,animal rides, farm implement games, sledding hills, axe throwing,outdoor music,archery stands,agricultural demonstrations are exhibited regardless of compensation. 5 22 A Hayride: Hayride path is a loop that starts at farm and 4, trirLyman Blvd Lyman.Blvd travels through the back pasture. It will start/end at the farmyard.Hayride route will e change based on crop rotation. Cross country skiing,snowshoeing,hiking,animal walks,animal rides,sleigh rides,and biking will utilize same trail. Com/bean maze Location: Location of 2020/2021 corn maze is shown pictorially. Due to rotational nature of crops, r3 corn maze location will change. et Farm ask,.O ip•' Vendor Locations: i'. +,„,,kgc Shown in the general area marked by in a z v ,. Yellow dot. 0 Chemical Toilet Locations: Marked by orange dot,this location is not able to be seen from outside the property. l 4-if J•I V oCO Sledding HilUHill Slides: Marked in Red outline/green shaded area F Zip line: Marked in Purple line Corn pit&straw bale maze General location is shown by green dot. 0-- , Other activities:(will rotate around farmyard based on field planting&parking—(8 blue dot c::" areas) e. Tractor displays,harvest-your-own produce, i {,t - " x pumpkin throwers/cannons,lookout towers, play structures,sawmill demonstrations,hay stacks,kiddie trains,maple syrup harvesting, farm implement games,axe throwing,outdoor music,archery stands,agricultural demonstrations Y 1 ,,s fJ ` Parking Size/Caoacdv/Locations: A one acre parking lot with only lanes and spaces could fit approximately 150 cars.Assuming we are going with box(90 degree)parking,the dimensions of the space required are(9 ft wide)(18 ft long+26ft travel lane.) Shown on map are approximate parking car capacities. Parking Location: The 3 lots are options shown as rotational placements of parking. Entrances/exits are from Audubon Road and marked with dotted lines. In 2020 the most cars we had on the premise was 25 cars parked at 1 time. (40 total on a Saturday)The parking plan is meant to show we have ample parking spaces. Parking Surface will be a permittable fast growing alfalfa/grass mix. In the unlikely event that erosion or dust present a problem,the affected area will be roped off and fitted with erosion barriers.(hay bales)Lots that do not survive winter freeze will be replanted. Accessible parking locations will be placed each year as needed in magenta and follow guidelines of size and quantity. 6 23