Loading...
Erhart Farm TIS 03-09-2022Erhart Farm  Traffic Impact Study  Chanhassen, MN  Prepared For:  Black Cherry Development, LLC  14500 Martin Drive, Suite 3000  Eden Prairie, MN 55344  Prepared By:  Michael Kondziolka, PE, PTOE  Alliant Engineering, Inc.  733 Marquette Ave, Suite 700  Minneapolis, MN 55402  March 9, 2022  Traffic Impact Study Erhart Farm i Alliant No. 220-0090.1 March 9, 2022 Table of Contents List of Figures ................................................................................................................................ ii List of Tables ................................................................................................................................. ii 1.0 Introduction ........................................................................................................................1  2.0 Existing Conditions ............................................................................................................1  2.1 STUDY AREA INTERSECTIONS .......................................................................................... 1  2.2 DATA COLLECTION .......................................................................................................... 1  2.2.1 Alternative Travel Modes ....................................................................................................................... 1  2.2.2 Traffic Volumes ...................................................................................................................................... 1  2.2.3 Roadway/Intersection Characteristics ................................................................................................... 3  2.3 TRAFFIC OPERATIONS ANALYSIS – EXISTING CONDITIONS ............................................. 3  3.0 Future Build Conditions ....................................................................................................6  3.1 BACKGROUND TRAFFIC GROWTH .................................................................................... 6  3.2 POTENTIAL ROADWAY INFRASTRUCTURE IMPROVEMENTS .............................................. 7  4.0 Proposed Development ......................................................................................................8  4.1 PHASE 1 DEVELOPMENT .................................................................................................. 8  4.2 PHASE 2 DEVELOPMENT .................................................................................................... 8  4.2.1 Phase 2 Development – Office Scenario ................................................................................................ 8  4.2.2 Phase 2 Development – Apartment Scenario ........................................................................................ 8  4.3 TRIP GENERATION ......................................................................................................... 10  5.0 Build Conditions Traffic Operations Analysis ..............................................................19  5.1 TRAFFIC OPERATIONS ANALYSIS – 2023 PHASE 1 BUILD CONDITIONS ......................... 19  5.2 TRAFFIC OPERATIONS ANALYSIS – 2033 PHASE 2 (OFFICE SCENARIO) BUILD CONDITIONS ............................................................................................................................... 19  5.3 TRAFFIC OPERATIONS ANALYSIS – 2033 PHASE 2 (APARTMENT SCENARIO) BUILD CONDITIONS ............................................................................................................................... 20  5.4 TRAFFIC OPERATIONS CONCLUSIONS ............................................................................ 20  6.0 Site Review ........................................................................................................................21  7.0 Conclusions and Recommendations ...............................................................................21  Appendix A – Detailed Operations and Queuing Analysis Results .......................................... A  Traffic Impact Study Erhart Farm ii List of Figures Figure 1 – Project Location ............................................................................................................. 2  Figure 2 – Existing Conditions ....................................................................................................... 4  Figure 3 – Study Area Historical AADT Volumes ......................................................................... 6  Figure 4 – Proposed Site Plan ......................................................................................................... 9  Figure 5 – Site Trip Directional Distribution ................................................................................ 12  Figure 6 – 2023 Phase 1 Build Conditions Site Trip Assignment ................................................ 13  Figure 7 – 2033 Phase 2 (Office Scenario) Build Conditions Site Trip Assignment ................... 14  Figure 8 – 2033 Phase 2 (Apartment Scenario) Build Conditions Site Trip Assignment ............ 15  Figure 9 – 2023 Phase 1 Build Conditions ................................................................................... 16  Figure 10 – 2033 Phase 2 (Office Scenario) Build Conditions .................................................... 17  Figure 11 – 2033 Phase 2 (Apartment Scenario) Build Conditions .............................................. 18  List of Tables Table 1 – Roadway Characteristics ................................................................................................. 3  Table 2 – Intersection Characteristics ............................................................................................. 3  Table 3 – Level of Service Criteria ................................................................................................. 5  Table 4 – Existing Conditions Traffic Operations Analysis ........................................................... 5  Table 5 – Proposed Development Trip Generation Estimates ...................................................... 10  Table 6 – 2023 Phase 1 Build Conditions Traffic Operations Analysis ....................................... 19  Table 7 – 2033 Phase 2 (Office Scenario) Build Conditions Traffic Operations Analysis .......... 20  Table 8 – 2033 Phase 2 (Apartment Scenario) Build Conditions Traffic Operations Analysis ... 20  Alliant No. 220-0090.1 March 9, 2022 Traffic Impact Study Erhart Farm 1 1.0 Introduction Alliant Engineering has completed a traffic impact study for the proposed Erhart Farm development in Chanhassen, MN. The proposed development is located within the area bounded by Pioneer Trail (CSAH 14) to the south, Powers Boulevard (CSAH 17) to the west, Great Plains Boulevard (CSAH 101) to the east, and TH 212 to the north (see Figure 1). The main objectives of this study are to evaluate existing traffic operations, identify potential traffic impacts to the adjacent roadway network due to proposed development trips, and recommend improvements to address any identified issues. The study assumptions, analysis, and conclusions/recommendations are presented herein. 2.0 Existing Conditions The existing conditions were reviewed to establish a baseline for identifying any future impacts associated with the proposed development. The evaluation of existing conditions includes intersection turning movement counts, field observations, and an intersection operations analysis. 2.1 Study Area Intersections In consultation with Carver County staff, the following study intersections were identified: Powers Boulevard & Eagle Ridge Road (Future Intersection) Great Plains Boulevard & W 96th Street Great Plains Boulevard & Eagle Ridge Road 2.2 Data Collection 2.2.1 Alternative Travel Modes Currently, multiuse trails run along both sides of Powers Boulevard and Great Plains Boulevard within the study area. There is also sidewalk present within the existing residential neighborhood on Eagle Ridge Road. The SouthWest Village Park & Ride is located to the northeast of the development site at the TH 212 & Great Plains Boulevard interchange, providing access to SW Transit Express Routes 600, 695, 698, and 699. These bus routes provide weekday service between Chaska and either downtown Minneapolis or the University of Minnesota campus. 2.2.2 Traffic Volumes To document existing conditions, weekday turning movement counts were collected at the study intersections by Alliant Engineering on February 8th, 2022, over the following peak periods: 7:00-9:00 a.m. & 4:00-6:00 p.m. Additionally, study area historical annual average daily traffic (AADT) volumes were collected via the Minnesota Department of Transportation’s (MnDOT) online traffic mapping application. Alliant No. 220-0090.1 March 9, 2022 Erhart Farm TIS Figure 1Project Location Source: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community ¯ Lyman Blvd. Gre a t P l a i n s Blvd . £¤212 ")61 ")101 ")17 PioneerTrl. Shakopee Chanhassen ")10 ")14 DevelopmentLocation ¬«5 ")18 Chaska Eden Prairie Hennepin Wright McLeod Sibley Scott Carver PowersBlvd. ProjectArea 0 0.5 10.25 Miles ¬«41 ")15 Traffic Impact Study Erhart Farm 3 2.2.3 Roadway/Intersection Characteristics Field observations were completed to identify study area roadway/intersection characteristics (i.e., geometry, speed limits, and traffic controls), which are summarized in Table 1 and Table 2. Table 1 – Roadway Characteristics Roadway Cross‐Section Speed Limit Functional Classification (1)  Powers Boulevard 4‐Lane Divided (2) 50 mph A‐Minor Arterial  Great Plains Boulevard 4‐Lane Divided (3) 40 mph A‐Minor Arterial  mph = miles per hour  (1)Functional classification designation per the Metropolitan Council Metro‐wide Functional Classification Map. (2)Four‐lane cross‐section with a 20‐foot grass median, left and right turn lanes, and a multi‐use trail in each travel direction. (3)Four‐lane cross‐section with a 15‐20 foot raised concrete median, left and right turn lanes, and a multi‐use trail in each travel direction. Table 2 – Intersection Characteristics Intersection Traffic  Control  Lane Designations by Approach (1)  NB SB EB WB  Powers Boulevard & Eagle Ridge Road (2) Through/Stop L/T/T/R L/T/T/R ‐  ‐  Great Plains Boulevard & Eagle Ridge Road Through/Stop L/T/T/R L/T/T/R LTR L/TR  Great Plains Boulevard & W 96th Street Traffic Signal L/T/T T/T/R L/R ‐  (1)L=Left‐Turn, T=Through, R=Right‐Turn (2)Future Intersection The existing conditions, including the observed weekday a.m. and p.m. peak hour traffic volumes, are shown in Figure 2. It should be noted that the following weekday peak hours were observed during the data collection period: AM Peak Hour: 7:15-8:15 a.m. PM Peak Hour: 4:30-5:30 p.m. 2.3 Traffic Operations Analysis – Existing Conditions An existing conditions traffic operations analysis was completed to establish a baseline condition to which future traffic operations could be compared. Traffic operations analysis results identify a Level of Service (LOS) which indicates the quality of traffic flow through an intersection. The LOS results are based on average delay per vehicle, which correspond to the delay threshold values presented in Table 3. Intersections are given a ranking from LOS A through LOS F. LOS A indicates the best traffic operations, with vehicles experiencing minimal delays. LOS F indicates an intersection where demand exceeds capacity, or a breakdown of traffic flow. The LOS D/E threshold is often used as an indicator for congestion in an urban area. For through/stop-controlled intersections, a key measure of operational effectiveness is the side-street LOS. Long delays and poor LOS can occur on side-street approaches even if the overall intersection is functioning well, making side-street LOS a valuable design criterion. Alliant No. 220-0090.1 March 9, 2022 Erhart Farm TIS Figure 2Existing Conditions Source: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community Lyman Blvd.Powers Blvd. Gre a t P l a i n s B l v d . £¤212 ")14 ")101 ")17 Pioneer Trl.(313) 444 - TãT - 167 (446)(22) 23 - L (0) 0 - T (4) 11 - R (6) 9 - L(337) 417 - T>T - 2 (0) L - 2 (4) R - 0 (3) > =ãT - 216 (435)L - 3 (7)R - 18 (16)(8) 0 - R>=(4) 9 - L (2) 2 - R (1) 1 - L(347) 396 - T >ã=ãT - 224 (428)R - 7 (12)ãããããã>=ããPOP!< !< !<9,7004,550 6,400Legend ¯!<Thru-Stop Intersection Daily Volume (AADT)* XX (XX)AM (PM) Turning Movement Volume X,XXX *AADT volume from MnDOT Traffic Mapping ApplicationOPApproach Lane Geometry 0 0.50.25 Miles 96th St.Eagle Ridge Rd. Traffic Impact Study Erhart Farm 5 Table 3 – Level of Service Criteria After LOS, the second component of the traffic operations analysis is a study of vehicular queuing, or the lineup of vehicles waiting to pass through an intersection. An intersection can operate with an acceptable LOS, but if queues from the intersection block entrances to turn lanes or adjacent driveways, unsafe operating conditions could result. The 95th percentile queue, or the length of queue with only a five percent probability of being exceeded during an analysis period, is considered the standard for design purposes. The traffic operations analysis was performed at the study intersections for the observed weekday a.m. and p.m. peak hours using Synchro/SimTraffic software. The intersections adjacent to the study intersections on Powers Boulevard and Great Plains Boulevard were also included in the traffic models to accurately reflect vehicle arrivals produced by the stop- and signal-controlled movements at these nearby intersections. The results of the existing traffic operations analysis presented in Table 4 indicate that all study intersections currently operate at overall LOS A during the weekday a.m. and p.m. peak hours. Additionally, no significant side-street delay or queuing issues were observed in the field or in traffic simulations. Detailed operations and queuing analysis results are presented in Appendix A. Table 4 – Existing Conditions Traffic Operations Analysis Great Plains  Blvd & Eagle Ridge Rd A / B 1.8 / 10.3 A / A 1.9 / 8.0 Great Plains  Blvd & 96th St A / A 1.5 / 5.9 A / A 1.8 / 6.6 Powers  Blvd & Eagle Ridge Rd A / A 0.7 / 0.8 A / A 1.1 / 1.4 Level  of Service  (LOS) Results: Overall  Intersection  / Worst Approach Delay Results: Overall  Intersection / Worst Approach Weekday PM Peak Hour LOS Delay (s)Intersection Weekday AM Peak Hour LOS Delay (s) Alliant No. 220-0090.1 March 9, 2022 Traffic Impact Study Erhart Farm 6 3.0 Future Build Conditions 3.1 Background Traffic Growth A review of expected traffic volume growth in the development area was conducted to identify the expected rate of traffic growth on the study roadways. A background growth rate was developed based on existing and forecast 2040 annual average daily traffic (AADT) volumes from the City of Chanhassen 2040 Comprehensive Plan. Additionally, historical AADT volumes on the study roadways from MnDOT’s Traffic Mapping Application were recorded and used to develop an annual growth rate. The study area has experienced significant population growth over the last several decades. Within the Chanhassen study area, population growth has also translated to significant traffic growth, as indicated by the historical AADT volumes on the roads surrounding the development site shown in Figure 3. Considering further population growth is expected over the next several decades, the City of Chanhassen 2040 Comprehensive Plan as well as historical AADT volumes from MnDOT’s Traffic Mapping Application were referenced to determine an appropriate background traffic growth rate within the study area. Given traffic projections within these planning documents and considering the portion of forecast traffic volumes that the proposed development would account for, a three percent annual traffic growth rate was chosen to estimate future background traffic growth independent of trips generated by the proposed development. Figure 3 – Study Area Historical AADT Volumes Alliant No. 220-0090.1 March 9, 2022 Traffic Impact Study Erhart Farm 7 The selected annual background traffic growth rate is expected to account for future adjacent development trips through the year 2033. The chosen three (3) percent annual background traffic growth rate was applied to the existing weekday a.m. and p.m. peak hour volumes to forecast the background growth (not accounting for site-generated traffic) for the anticipated Phase 1 development opening year of 2023 and the anticipated Phase 2 development opening year of 2033. 3.2 Potential Roadway Infrastructure Improvements It should be noted that no near-term roadway infrastructure improvements are currently planned or proposed that would significantly impact traffic volumes within the study area. A recent project to realign Great Plains Boulevard between Pioneer Trail and Flying Cloud Drive began in 2020 and will be complete in 2022. The City of Chanhassen 2040 Comprehensive Plan mentions that Pioneer Trail will require expansion to a four-lane design to accommodate project traffic volumes; however, no funding for this project is currently planned. Alliant No. 220-0090.1 March 9, 2022 Traffic Impact Study Erhart Farm 8 4.0 Proposed Development The proposed site plan, including proposed land uses for both phases of development, is provided in Figure 4. 4.1 Phase 1 Development Phase 1 of the proposed development includes 21 single-family homes to be constructed along an extension of Eagle Ridge Road on the east side of the site by the year 2023. The extension would connect the existing portion of Eagle Ridge Road to the existing 96th Street roadway. The Phase 1 development trips would have access to Great Plains Boulevard via the existing intersections at Eagle Ridge Road and at 96th Street. 4.2 Phase 2 Development Two potential land use options for the western parcel of the site were analyzed for Phase 2 of site development: one that includes office buildings and a small retail use, and another that includes apartment buildings and a small retail use. Both options would also include additional single-family residential development within the center of the site. The proposed Phase 2 residential development was assumed at the maximum allowed density of four (4) units/acre for low-density residential land use, as specified in the 2040 Land Use Map in the City of Chanhassen 2040 Comprehensive Plan. With approximately 44 acres of land designated for low-density residential development in Phase 2, this would equate to 176 homes. An additional extension of Eagle Ridge Road would be constructed in Phase 2 to provide a connection to Powers Boulevard. 4.2.1 Phase 2 Development – Office Scenario The western parcel of the development site is currently designated as office in the 2040 Land Use Map in the City of Chanhassen 2040 Comprehensive Plan. This would include three office buildings, each assumed to be three stories tall with a per-story gross floor area (GFA) of 20,000 square feet. A bank with three drive-through lanes was assumed for the retail portion of the parcel. 4.2.2 Phase 2 Development – Apartment Scenario An alternative development scenario for the western parcel of the site was explored assuming apartments rather than office buildings. The average allowable density for high-density residential land use outlined in the 2040 Land Use Map in the City of Chanhassen 2040 Comprehensive Plan was used to develop the assumed number of units for the development. Based on an approximated developable area of 14 acres and using a density of 12 units/acre, 168 apartment units were estimated for this land use scenario. Consistent with the office scenario, a bank with three drive-through lanes was assumed for the retail portion of the parcel. Alliant No. 220-0090.1 March 9, 2022 Erhart Farm TIS Figure 4Proposed Site Plan Source: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community Lyman Blvd.Powers Blvd. Gre a t P l a i n s B l v d . £¤212 ")14 ")101")17 Pioneer Trl. !< !< !< Phase 2Single Family Residential Homes(44 acres, about 176 units) Phase 1Single Family Residential Homes(21 units) Phase 2Retail & Office/ApartmentDevelopment Space Office or Apartment Buidlings(3 Buildings) ¯!<Thru-Stop Intersection Proposed New Roadway 0 0.50.25 Miles Legend 96th St.Eagle Ridge Rd. Traffic Impact Study Erhart Farm 10 4.3 Trip Generation Trip generation estimates for the proposed development were completed for the weekday a.m. and p.m. peak hours as well as on a daily basis by utilizing applicable trip generation rates from the Institute of Transportation Engineers Trip Generation Manual, 11th Edition (ITE TGM). A five (5) percent internal capture reduction was applied for the Phase 2 scenarios to account for internal trips between the residential, retail, and office (in the office scenario) land uses that would not generate new external trips to the site. The trip generation estimates are provided in Table 5. Table 5 – Proposed Development Trip Generation Estimates Trips In Trips Out Total   Trips Trips In Trips Out Total   Trips Single‐Family Detached Housing (210) Dwe lling Units 21 4 11 15 12 8 20 198 4111512 820198 Trips In Trips Out Total   Trips Trips In Trips Out Total   Trips Single‐Family Detached Housing (210) Dwe lling Units 21 4 11 15 12 8 20 198 Single‐Family Detached Housing (210) Dwe lling Units 176 (2)32 91 123 104 61 165 1,660 Office (710)1,000 ft2 GFA 180 241 33 274 44 215 259 1,950 Drive ‐in Bank (912) Drive ‐in Lanes 3 16 10 26 40 41 81 376 293 145 438 200 325 525 4,184 ‐15 ‐7 ‐22 ‐10 ‐16 ‐26 ‐210 278 138 416 190 309 499 3,974 Trips In Trips Out Total   Trips Trips In Trips Out Total  Trips Single‐Family Detached Housing (210) Dwe lling Units 21 4 11 15 12 8 20 198 Single‐Family Detached Housing (210) Dwe lling Units 176 (2)32 91 123 104 61 165 1,660 Apartment (220)Units 168 (3)16 51 67 54 32 86 1,132 Drive ‐in Bank (912)Drive ‐in Lanes 3 16 10 26 40 41 81 376 68 163 231 210 142 352 3,366 ‐3 ‐8 ‐11 ‐11 ‐7 ‐18 ‐168 65 155 220 199 135 334 3,198 (1)Peak hour of the adjacent roadway network (2)Estimated  using 4 unit/acre density for  low‐density residential  land use (3)Estimated using 12 unit/acre density for high‐density residential  land use Total  Trips Source: Institute of Transportation Engineers  Trip  Generation Manual, 11th Edition Total  Trips Phase 2: 2033 Apartment Scenario Land Use (ITE Code) Units Size AM Peak Hour Trips (1)PM Peak Hour Trips (1) Daily Trips Internal Capture (5%) Net New External  Trips Net New External  Trips Internal Capture (5%) Phase  1: 2023 Residential Phase 2: 2033 Office Scenario Land Use (ITE Code) Units Size AM Peak Hour Trips (1)PM Peak Hour Trips (1) Daily Trips Total  Trips Land Use (ITE Code) Units Size AM Peak Hour Trips (1)PM Peak Hour Trips (1) Daily Trips Alliant No. 220-0090.1 March 9, 2022 Traffic Impact Study Erhart Farm 11 The distribution of development trips for both proposed phases of development, shown in Figure 5, was created based on the existing distribution of traffic volumes on the surrounding roadway network, the proposed land uses on the site, and on engineering judgement. The directional distributions were applied to the estimated trip generation for the proposed land uses to produce the associated trip assignments for Phase 1, Phase 2 (Office Scenario), and Phase 2 (Apartment Scenario); these site trips are shown in Figure 6, Figure 7, and Figure 8, respectively. The projected total traffic volumes reflecting both background traffic growth and trips generated by the proposed 2023 Phase 1 Build Conditions, 2033 Phase 2 (Office Scenario) Build Conditions, and Phase 2 (Apartment Scenario) Build Conditions are shown in Figure 9, Figure 10, and Figure 11, respectively. Alliant No. 220-0090.1 March 9, 2022 Erhart Farm TIS Figure 5Site Trip Directional Distribution Source: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community Lyman Blvd.Powers Blvd. Gre a t P l a i n s B l v d . £¤212 ")14 ")101 ")17 Pioneer Trl.>==>>>=>==!< !< !<>=Legend ¯!<Thru-Stop Intersection XX%Phase 1 Trip DistributionOPTurning Movement Phase 2 Trip Distribution(Office/Apartment/Retail) Phase 2 Trip Distribution(Single Family Residential)XX% XX%R -40%10%L -10%15% - L45%15%- R5%5%- L5%5%- L40%25%- R25%15%- L25%10%R -15%5%Proposed New Roadway 0 0.50.25 Miles L -40%85%R -45%85%- R15%15%96th St.Eagle Ridge Rd. Erhart Farm TIS Figure 62023 Phase 1 Build Conditions Trip Assignment Source: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community Lyman Blvd.Powers Blvd. Gre a t P l a i n s B l v d . £¤212 ")14 ")101 ")17 Pioneer Trl.(1) 0 - L >>=(2) 3 - L (2) 3 - R (4) 1 - L >=R - 1 (2)!< !< !<>=(4) 4 - L (0) 1 - R Legend ¯!<Thru-Stop Intersection XX (XX)AM (PM) Site TripsOPTurning Movements ­0 0.50.25 Miles (1) 0 - T­T - 1 (0)­(2) 3 - T=R - 2 (5)­T - 1 (2)Eagle Ridge Rd.96th St. Erhart Farm TIS Figure 72033 Phase 2 (Office Scenario)Build Conditions Site Trip Assignment Source: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community Lyman Blvd.Powers Blvd. Gre a t P l a i n s B l v d . £¤212 ")14 ")101 ")17 Pioneer Trl.>=L - 16 (43)R - 79 (236) =>L - 220 (112)(29) 42 - R !< !< !< Legend ¯!<Thru-Stop Intersection XX (XX)AM (PM) Site TripsOPTurning Movements 0 0.50.25 Miles (5) 2 - L >>=(7) 10 - L (10) 14 - R (28) 9 - L >=R - 2 (5)>=(10) 14 - L (3) 5 - R ­(5) 2 - T­T - 3 (5)­(7) 10 - T=R - 3 (11)­T - 2 (5)Eagle Ridge Rd.96th St. Erhart Farm TIS Figure 82033 Phase 2 (Apartment Scenario)Build Conditions Site Trip Assignment Source: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community Lyman Blvd.Powers Blvd. Gre a t P l a i n s B l v d . £¤212 ")14 ")101 ")17 Pioneer Trl.>=L - 19 (17)R - 93 (88) =>L - 39 (120)(30) 10 - R !< !< !< Legend ¯!<Thru-Stop Intersection XX (XX)AM (PM) Site TripsOPTurning Movements 0 0.50.25 Miles (5) 2 - L >>=(7) 10 - L (10) 14 - R (28) 9 - L >=R - 2 (5)>=(10) 14 - L (3) 5 - R ­(5) 2 - T­T - 3 (5)­(7) 10 - T=R - 3 (11)­T - 2 (5)Eagle Ridge Rd.96th St. Erhart Farm TIS Figure 92023 Phase 1 Build Conditions Source: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community Lyman Blvd.Powers Blvd. Gre a t P l a i n s B l v d . £¤212 ")14 ")101 ")17 Pioneer Trl.(323) 457 - TãT - 171 (461)(26) 27 - L (0) 0 - T (4) 12 - R (7) 9 - L(349) 432 - T>T - 2 (0) L - 2 (4) R - 0 (3) > =ãT - 224 (449)L - 3 (7)R - 20 (21)(8) 0 - R>=(6) 12 - L (4) 5 - R (5) 2 - L(359) 408 - T >ã=ãT - 233 (440)R - 8 (14)ãããããã>=ããPOP!< !< !<Eagle Ridge Rd.96th St. Legend ¯!<Thru-Stop Intersection Daily Volume (AADT)* XX (XX)AM (PM) Turning Movement Volume X,XXX *Calculated from daily site trip estimatesOPApproach Lane Geometry 0 0.50.25 Miles 200 Erhart Farm TIS Figure 102033 Phase 2 (Office Scenario) Build Conditions Source: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community Lyman Blvd.Powers Blvd. Gre a t P l a i n s B l v d . £¤212 ")14 ")101 ")17 Pioneer Trl.(434) 615 - T>=L - 16 (43)R - 79 (236) =ã>T - 247 (661)L - 220 (112)(29) 42 - Rããã!< !< !< (40) 46 - L (0) 0 - T (8) 21 - R (13) 14 - L(474) 588 - T>T - 2 (0) L - 2 (6) R - 0 (3) > =ãT - 301 (607)L - 4 (10)R - 29 (33)(11) 0 - R>=(12) 23 - L (12) 16 - R (29) 10 - L(486) 549 - T >ã=ãT - 313 (598)R - 12 (22)ããã>=ããPOPEagle Ridge Rd.96th St.5801,6603,240 Legend ¯!<Thru-Stop Intersection Daily Volume (AADT)* XX (XX)AM (PM) Turning Movement Volume X,XXX *Calculated from daily site trip estimatesOPApproach Lane Geometry 0 0.50.25 Miles Erhart Farm TIS Figure 112033 Phase 2 (Apartment Scenario) Build Conditions Source: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community Lyman Blvd.Powers Blvd. Gre a t P l a i n s B l v d . £¤212 ")14 ")101 ")17 Pioneer Trl.(434) 615 - T>=L - 19 (17)R - 93 (88) =ã>T - 250 (635)L - 39 (120)(30) 10 - R (40) 46 - L (0) 0 - T (8) 21 - R (13) 14 - L(474) 588 - T>T - 2 (0) L - 2 (6) R - 0 (3) > =ãT - 301 (607)L - 4 (10)R - 29 (33)(11) 0 - R>=(12) 23 - L (12) 16 - R (29) 10 - L(486) 549 - T >ã=ãT - 313 (598)R - 12 (22)ãããããã>=ããPOP!< !< !<Eagle Ridge Rd.96th St.5801,6602,420 Legend ¯!<Thru-Stop Intersection Daily Volume (AADT)* XX (XX)AM (PM) Turning Movement Volume X,XXX *Calculated from daily site trip estimatesOPApproach Lane Geometry 0 0.50.25 Miles Traffic Impact Study Erhart Farm 19 5.0 Build Conditions Traffic Operations Analysis To determine impacts associated with proposed development trips, an analysis was completed for the forecast 2023 and 2033 Build Conditions (i.e., opening year of Phase 1 development and 10 years later) under the existing roadway geometry and intersection traffic control. 5.1 Traffic Operations Analysis – 2023 Phase 1 Build Conditions The year 2023 Phase 1 Build Conditions traffic operations analysis was performed at the study intersections for the weekday a.m. and p.m. peak hours using Synchro/SimTraffic software. Results of the 2023 Phase 1 Build Conditions traffic operations analysis, presented in Table 6, indicate that all study intersections are expected to operate at overall LOS A during the weekday a.m. and p.m. peak hours. Additionally, no significant side-street delay or queuing issues were observed in the traffic simulations. These results closely reflect Existing Conditions, as the 21 homes in Phase 1 of development do not represent a substantial change in traffic generation. Detailed operations and queuing analysis results are presented in Appendix A. Table 6 – 2023 Phase 1 Build Conditions Traffic Operations Analysis 5.2 Traffic Operations Analysis – 2033 Phase 2 (Office Scenario) Build Conditions The 2033 Phase 2 (Office Scenario) Build Conditions traffic operations analysis was also performed at the study intersections for the weekday a.m. and p.m. peak hours using Synchro/SimTraffic software. Results of this analysis are presented in Table 7. All study intersections are expected to continue operating at overall LOS A during the weekday a.m. and p.m. peak hours. The westbound approach of the Powers Boulevard/Eagle Ridge Road intersection should be built to include separate left- and right-turn lanes to accommodate the expected site traffic associated with the office scenario for Phase 2 development. This approach would be expected to experience significant delay and queueing without separate lanes due to a lack of gaps in the northbound through, southbound through, and southbound left-turning traffic streams. This would result in westbound left-turning vehicles exiting the site experiencing long delays and blocking exiting right-turning vehicles. Detailed operations and queuing analysis results are presented in Appendix A. Great Plains Blvd & Eagle Ridge Rd A / A 2.0 / 6.8 A / A 2.0 / 9.3 Great Plains Blvd & 96th St A / A 1.6 / 6.3 A / A 2.0 / 6.0 Powers Blvd & Eagle Ridge Rd A / A 0.8 / 1.0 A / A 1.0 / 1.3 Level  of Service (LOS) Results: Overall  Intersection / Worst Approach Delay Results: Overall Intersection / Worst Approach Intersection Weekday AM  Peak Hour Weekday PM Peak Hour LOS Delay (s) LOS Delay (s) Alliant No. 220-0090.1 March 9, 2022 Traffic Impact Study Erhart Farm 20 Table 7 – 2033 Phase 2 (Office Scenario) Build Conditions Traffic Operations Analysis 5.3 Traffic Operations Analysis – 2033 Phase 2 (Apartment Scenario) Build Conditions The 2033 Phase 2 (Apartment Scenario) Build Conditions traffic operations analysis was also performed at the study intersections for the weekday a.m. and p.m. peak hours using Synchro/SimTraffic software. Results of this analysis are presented in Table 8. All study intersections are expected to continue operating at overall LOS A during the weekday a.m. and p.m. peak hours. Additionally, no significant side-street delay or queuing issues were observed in the traffic simulations. Detailed operations and queuing analysis results are presented in Appendix A. Table 8 – 2033 Phase 2 (Apartment Scenario) Build Conditions Traffic Operations Analysis 5.4 Traffic Operations Conclusions Results of the traffic operations analyses indicate the proposed development is expected to have limited impact on study area traffic operations. No geometric changes or traffic control improvement needs would be anticipated resulting from proposed development trips. The analysis results indicate that the new westbound approach at Eagle Ridge Road & Powers Boulevard constructed for Phase 2 development should include separate left- and right-turn lanes to allow right-turning vehicles to bypass queued left-turning vehicles and continue through the intersection. This would be needed for acceptable approach operations under the office development scenario for Phase 2 only, but would also provide a benefit for the Phase 2 apartment development scenario. Great Plains  Blvd & Eagle Ridge Rd A / A 2.6 / 9.6 A / B 2.6 / 12.1 Great Plains  Blvd & 96th St A / A 2.0 / 6.0 A / A 2.7 / 8.4 Powers  Blvd & Eagle Ridge Rd(1)A / C 5.0 / 15.8 A / A 3.6 / 9.9 Level  of Service  (LOS) Results: Overall  Intersection  / Worst Approach Delay Results: Overall  Intersection / Worst Approach Intersection Weekday AM Peak Hour Weekday PM Peak Hour LOS Delay (s) LOS Delay (s) Great Plains Blvd & Eagle Ridge Rd A / B 2.7 / 10.2 A / B 2.7 / 11.6 Great Plains Blvd & 96th St A / A 2.0 / 6.8 A / A 2.8 / 7.7 Powers Blvd & Eagle Ridge Rd A / A 2.4 / 9.9 A / A 2.6 / 9.7 Level  of Service (LOS) Results: Overall  Intersection / Worst Approach Delay Results: Overall Intersection / Worst Approach Intersection Weekday AM  Peak Hour Weekday PM Peak Hour LOS Delay (s) LOS Delay (s) Alliant No. 220-0090.1 March 9, 2022 Traffic Impact Study Erhart Farm 21 6.0 Site Review A review of the proposed site plan was completed to identify any issues and recommended potential improvements regarding vehicle ingress/egress, internal traffic circulation, and pedestrian/bicycle connectivity. The following key points are offered for consideration: The proposed new Eagle Ridge Road & Powers Boulevard westbound approach roadway on the west side of the proposed development in Phase 2 should be constructed to include separate left- and right-turn lanes. Ensure turning movements of internal roadways adequately accommodate design vehicles such as garbage/recycling trucks. Establish appropriate traffic control (e.g., through/stop control) at internal roadway intersections to minimize driver confusion and potential conflicts. Sidewalks and/or trails within the proposed development should be extended to meet the existing sidewalks along Powers Boulevard and Eagle Ridge Road. 7.0 Conclusions and Recommendations The following study conclusions and recommendations are offered for consideration: Results of the existing traffic operations analysis indicate that all study intersections currently operate at overall LOS A during the weekday a.m. and p.m. peak hours. Additionally, no significant side-street delay or queuing issues were observed in the field or in traffic simulations. Phase 1 of the proposed development would include 21 single-family houses on the eastern side of the site near Great Plains Boulevard between Eagle Ridge Road and 96th Street. The proposed development is expected to be completed in 2023. Access to the development would be provided at the existing intersections on Great Plains Boulevard at Eagle Ridge Road and at 96th Street. o The proposed development is expected to generate approximately 15 a.m. peak hour trips, 20 p.m. peak hour trips, and 198 daily trips. Results of the 2023 Phase 1 Build Conditions traffic operations analysis indicate that all study intersections are expected to operate at overall LOS A during the weekday a.m. and p.m. peak hours. Additionally, no significant side-street delay or queuing issues were observed in the traffic simulations. Two land use scenarios for the western portion of the site were analyzed for Phase 2 of the proposed development: one including office buildings (180,000 ft2 GFA) and retail (assumed as a 3-lane drive through bank), and one including apartment buildings (168 units) and retail (assumed as a 3-lane drive through bank). Phase 2 would also include approximately 176 single-family homes in either the office or apartment scenarios. Alliant No. 220-0090.1 March 9, 2022 Traffic Impact Study Erhart Farm 22 Access to the western side of the development site would be provided at the Powers Boulevard and Eagle Ridge Road intersection. Phase 2 of development was assumed to be completed in 2033—10 years after Phase 1 of development is completed. o The total development site (including the houses constructed in Phase 1) would be expected to generate approximately 416 a.m. peak hour trips, 499 p.m. peak hour trips, and 3,974 daily trips for the office scenario for Phase 2 development. o The total development site (including the houses constructed in Phase 1) would be expected to generate approximately 220 a.m. peak hour trips, 334 p.m. peak hour trips, and 3,198 daily trips for the apartment scenario for Phase 2 development. Results of the 2033 Phase 2 (Office Scenario) Build Conditions traffic operations analysis indicate that all study intersections are expected to continue operating at overall LOS A during the weekday a.m. and p.m. peak hours. The new westbound approach at Eagle Ridge Road & Powers Boulevard constructed for Phase 2 development should include separate left- and right- turn lanes to provide acceptable approach operations. Results of the 2033 Phase 2 (Apartment Scenario) Build Conditions traffic operations analysis indicate that all study intersections and approaches are expected to operate at overall LOS A or better during the weekday a.m. and p.m. peak hours. Additionally, no significant side-street delay or queuing issues were observed in the traffic simulations. No geometric changes or traffic control improvements to the existing roadway network are required resulting from anticipated site-generated traffic. Alliant No. 220-0090.1 March 9, 2022 Traffic Impact Study Erhart Farm Alliant No. 220-0090.1 A1 Appendix A – Detailed Operations and Queuing Analysis Results Erhart Farm TIS Detailed Operations and Queuing Analysis Existing Conditions - Weekday AM Peak Hour EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Movement Delay (sec/veh) 7.7 0.0 2.7 10.1 10.5 0.0 3.5 1.7 0.0 4.3 1.2 0.9 1.8 Movement LOS A A A B B A A A A A A A A Movement 95th Queue (ft) 45 45 45 13 10 10 13 0 0 9 0 0 Storage Bay Distance (ft) 0 0 0 100 0 0 235 0 0 275 0 0 Approach Delay (sec/veh) Approach LOS EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Movement Delay (sec/veh) 6.4 0.0 3.0 0.0 0.0 0.0 1.3 1.8 0.0 0.0 0.9 0.8 1.5 Movement LOS A A A A A A A A A A A A A Movement 95th Queue (ft) 32 0 13 0 0 0 3 0 0 0 0 0 Storage Bay Distance (ft) 0 0 105 0 0 0 255 0 200 0 0 0 Approach Delay (sec/veh) Approach LOS EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Movement Delay (sec/veh) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.7 0.0 0.0 0.8 0.0 0.7 Movement LOS A A A A A A A A A A A A A Movement 95th Queue (ft) 0 0 0 0 0 0 0 0 0 0 0 0 Storage Bay Distance (ft) 0 0 0 0 0 0 0 0 0 0 0 0 Approach Delay (sec/veh) Approach LOS Existing Conditions - Weekday PM Peak Hour EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Movement Delay (sec/veh) 8.7 0.0 4.0 6.6 0.0 2.9 3.3 1.5 1.7 3.9 1.8 1.5 1.9 Movement LOS A A A A A A A A A A A A A Movement 95th Queue (ft) 42 42 42 16 14 14 12 0 2 12 0 0 Storage Bay Distance (ft) 0 0 0 100 0 0 235 0 195 275 0 0 Approach Delay (sec/veh) Approach LOS EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Movement Delay (sec/veh) 8.4 0.0 3.0 0.0 0.0 0.0 4.1 1.7 0.0 0.0 1.9 1.2 1.8 Movement LOS A A A A A A A A A A A A A Movement 95th Queue (ft) 18 0 14 0 0 0 5 0 0 0 0 0 Storage Bay Distance (ft) 0 0 105 0 0 0 255 0 200 0 0 0 Approach Delay (sec/veh) Approach LOS EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Movement Delay (sec/veh) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.0 0.0 1.4 0.0 1.1 Movement LOS A A A A A A A A A A A A A Movement 95th Queue (ft) 0 0 0 0 0 0 0 0 0 0 0 0 Storage Bay Distance (ft) 0 0 0 0 0 0 0 0 200 0 0 0 Approach Delay (sec/veh) Approach LOS Traffic Control Intersection MOE Eastbound Approach Westbound Approach Northbound Approach Southbound Approach Intersection Total A AA Northbound Approach Southbound Approach Intersection Total Through/Stop Great Plains Blvd & Eagle Ridge Rd 5.9 10.3 1.7 Traffic Control Intersection MOE Eastbound Approach Westbound Approach 1.2 A B A A Through/Stop Great Plains Blvd & 96th St 5.9 0.0 1.8 0.9 A A A A Traffic Control Intersection MOE Eastbound Approach Westbound Approach Northbound Approach Southbound Approach Intersection Total A 0.0 0.0 0.7 0.8 Through/Stop Powers Blvd & Eagle Ridge Rd Intersection Total Through/Stop Great Plains Blvd & Eagle Ridge Rd 8.0 5.0 1.5 1.8 A A A A Traffic Control Intersection MOE Eastbound Approach Westbound Approach Northbound Approach Southbound Approach Westbound Approach Northbound Approach Southbound Approach Intersection TotalTraffic Control Intersection MOE Eastbound Approach 1.7 1.9 A A A A Through/Stop Great Plains Blvd & 96th St 6.6 0.0 Westbound Approach Northbound Approach Southbound Approach Intersection TotalTraffic Control Intersection MOE Eastbound Approach 0.6 1.40.0 0.0 Through/Stop Powers Blvd & Eagle Ridge Rd A A A A Erhart Farm TIS Detailed Operations and Queuing Analysis 2023 Phase 1 Build Conditions - Weekday AM Peak Hour EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Movement Delay (sec/veh) 8.2 0.0 3.2 6.6 6.9 0.0 3.3 1.8 0.0 4.5 1.4 1.2 2.0 Movement LOS A A A A A A A A A A A A A Movement 95th Queue (ft) 46 46 46 11 9 9 13 0 0 9 0 0 Storage Bay Distance (ft) 0 0 0 100 0 0 235 0 0 275 0 0 Approach Delay (sec/veh) Approach LOS EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Movement Delay (sec/veh) 7.9 0.0 2.6 0.0 0.0 0.0 3.9 1.8 0.0 0.0 0.9 0.7 1.6 Movement LOS A A A A A A A A A A A A A Movement 95th Queue (ft) 35 0 21 0 0 0 6 0 0 0 0 0 Storage Bay Distance (ft) 0 0 105 0 0 0 255 0 200 0 0 0 Approach Delay (sec/veh) Approach LOS EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Movement Delay (sec/veh) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.7 0.0 0.0 1.0 0.0 0.8 Movement LOS A A A A A A A A A A A A A Movement 95th Queue (ft) 0 0 0 0 0 0 0 0 0 0 0 0 Storage Bay Distance (ft) 0 0 0 0 0 0 0 0 0 0 0 0 Approach Delay (sec/veh) Approach LOS 2023 Phase 1 Build Conditions - Weekday PM Peak Hour EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Movement Delay (sec/veh) 10.4 0.0 4.5 10.0 0.0 2.9 4.0 1.5 2.0 4.9 1.8 1.6 2.0 Movement LOS B A A A A A A A A A A A A Movement 95th Queue (ft) 49 49 49 16 12 12 13 0 1 15 0 0 Storage Bay Distance (ft) 0 0 0 100 0 0 235 0 195 275 0 0 Approach Delay (sec/veh) Approach LOS EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Movement Delay (sec/veh) 8.8 0.0 3.2 0.0 0.0 0.0 4.7 1.8 0.0 0.0 2.0 1.6 2.0 Movement LOS A A A A A A A A A A A A A Movement 95th Queue (ft) 24 0 21 0 0 0 14 0 0 0 0 0 Storage Bay Distance (ft) 0 0 105 0 0 0 255 0 200 0 0 0 Approach Delay (sec/veh) Approach LOS EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Movement Delay (sec/veh) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.0 0.0 1.3 0.0 1.0 Movement LOS A A A A A A A A A A A A A Movement 95th Queue (ft) 0 0 0 0 0 0 0 0 0 0 0 0 Storage Bay Distance (ft) 0 0 0 0 0 0 0 0 0 0 0 0 Approach Delay (sec/veh) Approach LOS Northbound Approach Southbound Approach Intersection Total Through/Stop Great Plains Blvd & Eagle Ridge Rd 6.5 6.8 1.8 Traffic Control Intersection MOE Eastbound Approach Westbound Approach Intersection Total Through/Stop Great Plains Blvd & 96th St 6.3 0.0 1.4 A A A A Traffic Control Intersection MOE Eastbound Approach 1.8 0.9 A A A A Westbound Approach Intersection Total Through/Stop Powers Blvd & Eagle Ridge Rd 0.0 0.0 0.7 Traffic Control Intersection MOE Eastbound Approach Westbound Approach Northbound Approach Southbound Approach Northbound Approach Southbound Approach 1.0 A A A A Intersection Total Through/Stop Great Plains Blvd & Eagle Ridge Rd 9.3 7.0 Traffic Control Intersection MOE Eastbound Approach 1.6 Northbound Approach Southbound ApproachWestbound Approach 1.8 A A A A Intersection Total Through/Stop Great Plains Blvd & 96th St 6.0 0.0 1.8 Traffic Control Intersection MOE Eastbound Approach Westbound Approach Northbound Approach Southbound Approach 2.0 A A A A Traffic Control Intersection MOE Eastbound Approach 0.6 Intersection Total Through/Stop Powers Blvd & Eagle Ridge Rd 0.0 1.3 Northbound Approach Southbound Approach A A A A Westbound Approach 0.0 Erhart Farm TIS Detailed Operations and Queuing Analysis 2033 Phase 2 Office Build Conditions - Weekday AM Peak Hour EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Movement Delay (sec/veh) 10.4 0.0 4.2 10.4 8.7 0.0 4.2 2.4 0.0 5.6 1.5 1.5 2.6 Movement LOS B A A B A A A A A A A A A Movement 95th Queue (ft) 58 58 58 12 9 9 16 0 0 14 0 0 Storage Bay Distance (ft) 0 0 0 100 0 0 235 0 0 275 0 0 Approach Delay (sec/veh) Approach LOS EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Movement Delay (sec/veh) 8.5 0.0 2.9 0.0 0.0 0.0 4.8 2.1 0.0 0.0 1.3 1.0 2.0 Movement LOS A A A A A A A A A A A A A Movement 95th Queue (ft) 43 0 36 0 0 0 16 0 0 0 0 0 Storage Bay Distance (ft) 0 0 105 0 0 0 255 0 200 0 0 0 Approach Delay (sec/veh) Approach LOS EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Movement Delay (sec/veh) 0.0 0.0 0.0 73.5 0.0 5.3 0.0 1.7 1.0 13.8 1.8 0.0 5.0 Movement LOS A A A F A A A A A B A A A Movement 95th Queue (ft) 0 0 0 47 0 49 0 3 12 134 24 0 Storage Bay Distance (ft) 0 0 0 100 0 0 0 0 255 230 0 0 Approach Delay (sec/veh) Approach LOS 2033 Phase 2 Office Build Conditions - Weekday PM Peak Hour EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Movement Delay (sec/veh) 13.4 0.0 6.4 11.8 0.0 2.7 7.3 1.9 2.1 4.5 2.3 2.4 2.6 Movement LOS B A A B A A A A A A A A A Movement 95th Queue (ft) 59 59 59 20 11 11 22 0 0 16 0 2 Storage Bay Distance (ft) 0 0 0 100 0 0 235 0 0 275 0 180 Approach Delay (sec/veh) Approach LOS EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Movement Delay (sec/veh) 13.7 0.0 4.0 0.0 0.0 0.0 6.0 1.9 0.0 0.0 2.9 2.6 2.7 Movement LOS B A A A A A A A A A A A A Movement 95th Queue (ft) 34 0 35 0 0 0 33 0 0 0 0 3 Storage Bay Distance (ft) 0 0 105 0 0 0 255 0 200 0 0 220 Approach Delay (sec/veh) Approach LOS EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Movement Delay (sec/veh) 0.0 0.0 0.0 27.9 0.0 6.9 0.0 1.8 1.0 6.4 1.9 0.0 3.6 Movement LOS A A A D A A A A A A A A A Movement 95th Queue (ft) 0 0 0 56 0 91 0 0 3 66 0 0 Storage Bay Distance (ft) 0 0 0 100 0 0 0 0 255 230 0 0 Approach Delay (sec/veh) Approach LOS Through/Stop Powers Blvd & Eagle Ridge Rd 0.0 9.9 1.7 2.5 A A A A Traffic Control Intersection MOE Eastbound Approach Westbound Approach Northbound Approach Southbound Approach Intersection Total Intersection Total Through/Stop Great Plains Blvd & Eagle Ridge Rd 12.1 2.9 A A A A Northbound Approach Southbound Approach Intersection Total Through/Stop Great Plains Blvd & 96th St 8.4 0.0 2.1 Traffic Control Intersection MOE Eastbound Approach Westbound Approach Traffic Control Intersection MOE Eastbound Approach 2.0 2.3 Northbound Approach Southbound Approach B A A A Westbound Approach Northbound Approach Southbound Approach Northbound Approach Southbound Approach 8.8 7.4 A C A A Intersection Total Through/Stop Powers Blvd & Eagle Ridge Rd 0.0 15.8 1.7 Traffic Control Intersection MOE Eastbound Approach Westbound Approach Intersection Total Through/Stop Great Plains Blvd & 96th St 6.0 0.0 1.6 A A A A Traffic Control Intersection MOE Eastbound Approach 2.1 1.3 A A A A Westbound Approach Northbound Approach Southbound Approach Intersection Total Through/Stop Great Plains Blvd & Eagle Ridge Rd 8.3 9.6 2.4 Traffic Control Intersection MOE Eastbound Approach Westbound Approach Erhart Farm TIS Detailed Operations and Queuing Analysis 2033 Phase 2 Apartment Build Conditions - Weekday AM Peak Hour EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Movement Delay (sec/veh) 11.2 0.0 5.1 9.7 10.7 0.0 3.5 2.4 0.0 5.7 1.6 1.8 2.7 Movement LOS B A A A B A A A A A A A A Movement 95th Queue (ft) 64 64 64 13 12 12 15 2 0 16 0 0 Storage Bay Distance (ft) 0 0 0 100 0 0 235 0 0 275 0 0 Approach Delay (sec/veh) Approach LOS EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Movement Delay (sec/veh) 9.4 0.0 3.2 0.0 0.0 0.0 4.8 2.1 0.0 0.0 1.3 1.4 2.0 Movement LOS A A A A A A A A A A A A A Movement 95th Queue (ft) 42 0 37 0 0 0 20 0 0 0 0 0 Storage Bay Distance (ft) 0 0 105 0 0 0 255 0 200 0 0 0 Approach Delay (sec/veh) Approach LOS EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Movement Delay (sec/veh) 0.0 0.0 0.0 20.3 0.0 7.6 0.0 1.4 0.8 6.2 1.2 0.0 2.4 Movement LOS A A A C A A A A A A A A A Movement 95th Queue (ft) 0 0 0 76 0 76 0 0 0 42 0 0 Storage Bay Distance (ft) 0 0 0 0 0 0 0 0 255 230 0 0 Approach Delay (sec/veh) Approach LOS 2033 Phase 2 Apartment Build Conditions - Weekday PM Peak Hour EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Movement Delay (sec/veh) 12.8 0.0 4.9 10.7 0.0 4.5 5.1 2.0 1.8 5.0 2.4 2.2 2.7 Movement LOS B A A B A A A A A A A A A Movement 95th Queue (ft) 52 52 52 21 14 14 20 0 0 17 0 2 Storage Bay Distance (ft) 0 0 0 100 0 0 235 0 0 275 0 180 Approach Delay (sec/veh) Approach LOS EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Movement Delay (sec/veh) 11.9 0.0 4.1 0.0 0.0 0.0 7.3 2.0 0.0 0.0 3.0 2.3 2.8 Movement LOS B A A A A A A A A A A A A Movement 95th Queue (ft) 34 0 35 0 0 0 37 0 0 0 0 3 Storage Bay Distance (ft) 0 0 105 0 0 0 255 0 200 0 0 220 Approach Delay (sec/veh) Approach LOS EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Movement Delay (sec/veh) 0.0 0.0 0.0 21.5 0.0 7.2 0.0 1.3 0.8 5.4 1.9 0.0 2.6 Movement LOS A A A C A A A A A A A A A Movement 95th Queue (ft) 0 0 0 78 0 78 0 0 5 64 0 0 Storage Bay Distance (ft) 0 0 0 0 0 0 0 0 255 230 0 0 Approach Delay (sec/veh) Approach LOS Through/Stop Powers Blvd & Eagle Ridge Rd 0.0 9.7 1.3 2.4 A A A A Traffic Control Intersection MOE Eastbound Approach Westbound Approach Northbound Approach Southbound Approach Intersection Total Intersection Total Through/Stop Great Plains Blvd & Eagle Ridge Rd 11.6 3.0 A A A A Northbound Approach Southbound Approach Intersection Total Through/Stop Great Plains Blvd & 96th St 7.7 0.0 2.3 Traffic Control Intersection MOE Eastbound Approach Westbound Approach Traffic Control Intersection MOE Eastbound Approach 2.1 2.4 Northbound Approach Southbound Approach B A A A Westbound Approach Northbound Approach Southbound Approach Northbound Approach Southbound Approach 8.6 1.9 A A A A Intersection Total Through/Stop Powers Blvd & Eagle Ridge Rd 0.0 9.9 1.4 Traffic Control Intersection MOE Eastbound Approach Westbound Approach Intersection Total Through/Stop Great Plains Blvd & 96th St 6.8 0.0 1.7 A B A A Traffic Control Intersection MOE Eastbound Approach 2.2 1.3 A A A A Westbound Approach Northbound Approach Southbound Approach Intersection Total Through/Stop Great Plains Blvd & Eagle Ridge Rd 9.4 10.2 2.4 Traffic Control Intersection MOE Eastbound Approach Westbound Approach