Loading...
PC SUM 2005 11 15 CHANHASSEN PLANNING COMMISSION REGULAR MEETING SUMMARY MINUTES NOVEMBER 15, 2005 Chairman Sacchet called the meeting to order at 7:00 p.m. MEMBERS PRESENT: Deborah Zorn, Debbie Larson, Kurt Papke, Dan Keefe, Uli Sacchet and Jerry McDonald MEMBERS ABSENT: Mark Undestad STAFF PRESENT: Bob Generous, Senior Planner; Sharmeen Al-Jaff, Senior Planner; and Alyson Morris, Assistant City Engineer PUBLIC HEARING: GALPIN CROSSING. REQUEST FOR CONCEPT PLANNED UNIT DEVELOPMENT APPROVAL FOR A 10- UNIT TWIN HOME PROJECT AND A 66,000 SQUARE FOOT OFFICE DEVELOPMENT LOCATED ON THE NORTHWEST CORNER OF GALPIN BOULEVARD AND HIGHWAY 5. APPLICANT, EPIC DEVELOPMENT, PLANNING CASE NO. 05-38. Public Present: Name Address Mark Scholle 568 Summerfield Drive Rich Ragatz Eden Prairie Perry Ryan Orono Gerald Wolfe 7755 Vasserman Trail Mike Shields 7759 Vasserman Trail Charles Gelino 7729 Vasserman Trail Larry & Michaele Martin 7725 Vasserman Trail Dianne & Lance Erickson 7735 Vasserman Trail Tom Kraus 7744 Vasserman Trail Andy Mital 7750 Vasserman Trail Maureen & Mark Magnuson 7715 Vasserman Trail Jeff Weyandt 7626 Ridgeview Way Bob Generous presented the staff report on this item. Commissioner Keefe asked for clarification on the approval process for the PUD and market study. Commissioner Larson asked about the statement regarding range of housing opportunities. Commission Zorn asked for clarification on the primary and secondary corridor boundaries. Commissioner McDonald asked for clarification on the approval process, roadway system layout, private street, uses on the property and the market study. Commissioner Papke asked for further clarification on the traffic th study and traffic flow in the area of Galpin and West 78 Street and the criteria that will be used Planning Commission Summary – November 15, 2005 to determine the amount of office/commercial use on the site. Chairman Sacchet asked about permitted uses and size of buildings on the site, the Bluff Creek corridor boundary and the condition requiring soil borings. The developer, Rich Ragatz addressed the commission’s comments regarding the proposed uses on the site. He also stated they were looking for input th from the commission on possible uses on the north side of West 78 such as if the city is looking at concentrating the density and providing more open space or more buffer to the existing wetland. They even thought it’d be a logical place for a daycare. Chairman Sacchet opened the public hearing. Andy Mital, 7750 Vasserman Trail stated his only concern was the traffic situation of people making U turns out of the Kwik Trip and CVS site. Larry Martin, 7725 Vasserman Trail was also concerned with the operation of the intersection, concern with maintenance and look of a private street, buffering the commercial businesses, the need for a connection to the trail system from this development, setbacks from the wetland and power easements, and storm water retention and runoff concerns. Charles Gelino, 7729 Vasserman Trail expressed concern with the elevation of this property in relation to the retention pond. Jeff Weyandt, 7626 Ridgeview Way had concern with drainage, and lighting from the commercial buildings. Tom Kraus, 7744 Vasserman Trail stated his concern was with the amount of vacant commercial property in the vicinity of this development and the time line of development of the buildings. Chairman Sacchet closed the public hearing. He summarized the concerns of the th residents being traffic, concern with the use of the private street, the proximity to West 78 Street, the need for berming, the concern about the lowness of the ground near the twin homes, that drainage issues be studied further, a lighting plan and concern about the demand for commercial. After commission discussion the following motion was made. McDonald moved, Papke seconded that the Planning Commission recommends concept planned unit development approval for a twin home and office development project located at the northwest corner of Highway 5 and Galpin Boulevard subject to addressing the following issues as part of the next phase of development review: 1.Development will require a land use amendment from residential to office for the southern eight acres, conditional use permit for development within the Bluff Creek Overlay District, preliminary Planned Unit Development, site plan review, and subdivision review with a variance for the private street. 2.The development needs to comply with the design standards for commercial, industrial and office institutional developments. Additional building detail needs to be provided to ascertain the quality of the proposed development. 3.Planned Unit Developments require that development design standards be developed for the project. 4.The following building and parking setbacks will be incorporated in the design standards: 70 feet from Highway 5, 50 feet from West 78th Street and Galpin Boulevard, 25 feet from private streets, 30 feet from the western property line, 50 feet from Bluff Creek, 40 feet from the Bluff Creek Overlay district primary zone boundary and 40 feet from the wetland buffer edge. 2 Planning Commission Summary – November 15, 2005 5.Reduce the number of building sites proposed on parcel B. 6.Verify that all buildings would comply with the proposed and required setbacks. 7.The goals set forth in the Bluff Creek Watershed Resources Management Plan (BCWNRMP) for the Lowlands Region are to be incorporated in the further development of the plan. 8.Drainage and utility easements shall be provided over all existing wetlands, wetland mitigation areas, buffer areas used as PVC and storm water ponds. 9.A preliminary grading plan must be prepared. 10.A preliminary utility plan must be prepared. 11.The applicant must provide storm water calculations for any proposed subdivision. The development will need to provide storm water ponding on site for treatment prior to discharge into the wetlands or creek. The development must meet pre-development runoff rates for the 10 year and 100 year storm. On site storm water ponding must be sufficient to meet all city water quality and quantity standards. 12.Erosion and sediment control measures will be required in accordance with Chanhassen City Code and the Minnesota Pollution Control Agency’s (MPCA) National Pollutant Discharge Elimination System (NPDES) Phase II Construction Permit. Type II silt fence shall be provided adjacent to all wetland fill areas, areas to be preserved as buffer or if no buffer is to be preserved, at the delineated wetland edge. 13.This project will be subject to Surface Water Management Plan (SWMP) connection charges for water quality and water quantity. 14.A MnDOT and Carver County permit will be required for access to the site. 15.The applicant will need to submit a survey showing existing trees and woodlands along with canopy coverage calculations and proposed reforestation. 16.The applicant will be required to pay park fees pursuant to city ordinance. 17.The applicant will need to provide pedestrian connections internally between the buildings and from the site to adjacent trails and sidewalks. 18.A wetland buffer 16.5 feet in width must be maintained around the wetland basin. Wetland buffer areas shall be preserved, surveyed and staked in accordance with the city’s wetland ordinance. The applicant must install wetland buffer edge signs, under the direction of city staff, before construction begins and must pay the city $20 per sign. All structures shall maintain a 40 foot setback from the edge of the wetland buffer. The grading and erosion control plan shall show the actual wetland buffer widths proposed to meet the minimum average buffer width requirements as well as the 40 foot wetland buffer setback. 3 Planning Commission Summary – November 15, 2005 19.The Bluff Creek corridor primary zone boundary and required buffer and setback will need to be incorporated on the plans. 20.All of the Bluff Creek Overlay District primary zone should be included as an Outlot. 21.The Bluff Creek corridor primary zone boundary and the required setback shall be indicated on the grading plan. 22.The development will require a landscaping plan. Staff recommends that significant landscape screening and berming be incorporated along Highway 5 as well as West 78th Street. 23.The developer will need to locate all significant trees on the site and provide a calculation of existing canopy coverage as well as proposed tree removal. 24.The following landscape and tree preservation issues are applicable to the Galpin Crossings site: Parcel A Show Bluff Creek Primary Zone and setbacks. ? Habitat restoration/enhancement around wetland and Bluff Creek. ? Tree preservation calculations and landscape plan including reforestation and ? bufferyard plantings. Show existing trees outside of Primary Zone on landscape plan. ? Parcel B No overstory trees allowed under overhead utility lines. ? Show overhead utility lines on landscape plan. ? Tree preservation calculations and landscape plan including reforestation and ? bufferyard plantings. Meet parking lot landscape requirements. ? Meet bufferyard landscape requirements. ? Show existing boulevard trees along West 78th Street on landscape plan. ? 25.Galpin Crossing shall pay full park dedication fees at the rate in force upon final platting. 26.The commercial buildings are required to have an automatic fire extinguishing system. 27.The plans must be prepared and signed by design professionals licensed in the State of Minnesota. 28.A demolition permit must be obtained before beginning demolition of any existing structures. 29.The location of property lines will have an impact on the code requirements for the proposed buildings, including but not limited to; allowable size and fire-resistive construction. The 4 Planning Commission Summary – November 15, 2005 plans as submitted do not have the information necessary to determine compliance at this time. 30.The owner and or their representative shall meet with the Inspections Division as soon as possible to discuss property line issues as well as plan review and permit procedures. 31.The developer shall have soil borings made to determine the suitability of the site for development. 32.A traffic study be completed for the proposed development.” All voted in favor and the motion carried unanimously with a vote of 6 to 0. PUBLIC HEARING: CHANHASSEN ELECTRIC SUBSTATION: DETERMINE THE SCOPE OF AN ENVIRONMENTAL ASSESSMENT, REQUEST FOR A CONDITIONAL USE PERMIT WITH VARIANCES AND A SITE PLAN REVIEW APPLICATION TO CONSTRUCT A LOCAL ELECTRIC DISTRIBUTION SUBSTATION ON PROPERTY ZONED INDUSTRIAL OFFICE PARK, LOCATED EAST OF THE GEDNEY PICKLE PLANT, NORTH OF STOUGHTON AVENUE AND SOUTH OF FLYING CLOUD DRIVE. APPLICANT MINNESOTA VALLEY ELECTRIC COOPERATIVE, PLANNING CASE NO. 05-30. Public Present: Name Address Carole Schmidt Roseville th Dennis Wolf 4291 200 Street W., Jordan Ronald Jabs 217 Juergens Court, Jordan Dan Faulkner 2380 Shadow Lane Jay Molnau St. John’s, Chaska Sharmeen Al-Jaff presented the staff report on this item. Commissioner McDonald questioned the city’s timeline for approval. Sharmeen Al-Jaff explained that the applicant has already waived their 120 day timeline. Commissioner Papke asked for clarification on the health and human safety issue looking at the impact of the electric and magnetic fields. Chairman Sacchet asked for clarification on the possibility of new high tension wires being strung and the status of the city being the legal responsible governing unit for the study. The applicant Ron Jabs, representing Minnesota Valley Electric Cooperative, stated they agree with the staff report and explained they have met with neighboring property owners and managers and have received no negative responses. Commissioner McDonald asked the applicant to clarify the use and scope of the project on the site. Commissioner Papke asked for clarification on the scope of the environmental assessment taking into account any potential subterranean discoveries that might be encountered when the Xcel Energy site is removed. Chairman Sacchet opened the public hearing. No one spoke and the public hearing was closed. Chairman Sacchet asked for clarification on staff’s recommendation for a motion. 5 Planning Commission Summary – November 15, 2005 Papke moved, McDonald seconded that the Planning Commission approves the Environmental Assessment Scoping, directs staff to prepare the EA consistent with the scoping, tables further proceedings on the Conditional Use Permit, Site Plan, and Variance until such time when the EA is completed and submitted to the Planning Commission. All voted in favor and the motion carried unanimously with a vote of 6 to 0. APPROVAL OF MINUTES: Commissioner Larson noted the verbatim and summary minutes of the Planning Commission meeting dated November 1, 2005 as presented. COMMISSION PRESENTATIONS: None. Chairman Sacchet adjourned the Planning Commission meeting at 8:35 p.m. Submitted by Kate Aanenson Community Development Director Prepared by Nann Opheim 6