PC Staff Report 2-7-06 [!] February 7. 2006 PC DATE: February 27. 2006 REVIEW DEADLINE: March 7, 2006 CASE #: 06-03 BY: RG, LH, JS, MS. ST CC DATE: CITY OF CHANHASSEN STAFF REPORT Request for an interim use permit to permit over 1,000 cubic yards of grading. PROPOSAL: (Highway 41) d~ Hazeltine Boulevard Minnetonka Public Schools 5621 County Road 101 Minnetonka, MN 55345 (952) 401-5039 6421 LOCATION: APPLICANT: ~ Z < U ~ ~ ~ ~ < 01 District, Office & Institutional PRESENT ZONING: Public/Semi-Public 2020 LAND USE PLAN: N/A SUMMARY OF REQUEST: Request for an interim use permit to permit grading of approximately 3,400 cubic yards for the creation of a storm water infiltration basin. LEVEL OF CITY DISCRETION IN DECISION-MAKING: The City has limited discretion in approving or denying interim use permits, based on whether or not the proposal meets the use standards outlined in the Zoning Ordinance. If the City finds that all the applicable use standards are met, the permit must be approved. This is a quasi judicial decision. DENSITY: Approximately 40 ACREAGE: < ~ < ~ ~ ~ ~ 00. Location Map Minnetonka Middle School West Interim Use Permit Planning Case No. 06-03 6421 Hazeltine Boulevard City of Chanhassen Herman Reid Park \ \ \ \ Minnewashla Regional Pal'll; / ~ i lake Minnewashta I I / / / / i i ; ( (-", ,J / !UP West Planning Commission Minnetonka Middle School Planning Case No. 06-03 February 7, 2006 Page 2 of 5 PROPOSAL The Minnetonka School District is requesting an interim use permit to grade approximately 3,400 cubic yards of material to construct an infiltration basin on the Minnetonka Middle School West property to reduce downstream erosion and sedimentation along Highway 41. interim use permit subject to the conditions of the staff report. Staff is recommending approval of the APPLICABLE REGUA TIONS Chapter 7, Article III, Excavating, Mining, Filling and Grading Chapter 20, Article IV, Division 2, Conditional Use Permits Chapter 20, Article IV, Division 5, Interim Use Permits BACKGROUND On June 9,2003, City Council approved Interim Use Permit #2003-2 to permit grading in excess of 1,000 cubic yards to install a storm water pond and reconfigure the bus circulation route and parking area on the north side of the school ANALYSIS GRADINGillRAINAGE/EROSION CONTROL The applicant is requesting an interim use permit to grade approximately 3,400 cubic yards of material to construct an infiltration basin on the existing school property to reduce downstream erosion and sedimentation along Highway 41 The site drains from east to west, via an existing swale and two storm sewer lines, toward the existing ditch along Highway 41. The swale is proposed to be filled and the 125-foot long existing southern storm sewer will be removed. The plans show a proposed infiltration basin with three rows of 4-inch draintile. The infiltration basin will receive drainage from the east side of the site and the existing building's roof and discharge to the Highway 41 ditch through an 8-inch PVC pipe. The applicant must verify that the existing 24-inch culvert along Highway 41 has sufficient capacity before replacing the private drive entrance. The applicant should be aware that if the fill is coming from and/or going to another site in Chanhassen a separate grading permit will be required for the other property. Staff has not yet received a proposed haul route as required. Staff is recommending that the applicant provide a proposed haul route for review and approval. The hauling operation is anticipated to begin as soon as permit approval is obtained. Permitted hours of operation will be 7:00 a.m. to 6:00 p.m., Monday through Friday, and 9:00 a.m. to 5:00 p.m. on Saturday with no work permitted on Sunday or legal holidays. The applicant should be aware that any off-site grading will require an easement from the appropriate property owner. Staff Erosion control has been shown on the plan in accordance with the City's Standard Detail Plates recommends that an erosion control blanket be installed on the sides of the infiltration basin. All !UP West Planning Commission Minnetonka Middle School Planning Case No. 06-03 February 7, 2006 Page 3 of 5 of construction are required to be sodded or reseeded and mulched within two disturbed areas as a result weeks of site grading. An interim use permit expires one year from the date of approval from the City Council. The permit may be renewed, however, on an annual basis subject to City Council approval. The applicant will need to request a formal extension 45 days prior to the expiration date. Financial security to guarantee restoration and erosion control measures will be required with the permit. STORM WATER MANAGEMENT The applicant should provide a cross section for the filtration area showing the elevation of the draintile and the trenches, as well as a cross section of the trench and details of the material used. The drain tile trenches should be lined with drainage fabric (4% to 6% open space) and filled with pea rock at a depth of at least 18 inches and 3 feet wide. The bottom of the entire filtration basin should be backfilled with a mixture of 50% coarse clean sand, 25% compost, 25% loamy topsoil for a minimum depth of 6 inches (from approximately 1034.5 to 1035.0). The rest of the area should be top-dressed with native topsoil. CB-l should be revised to be an open beehive inlet at an approximate elevation of 1037 for handling large storm event runoff if the calculations for rate control work out to avoid overwhelming the filtration area and having long periods (greater than 72 hours) of ponding. EROSION AND SEDIMENT CONTROL Erosion control blanket/turf reinforcement mat (MnDOT Category 5) should be used for restoration of the exposed slope from the emergency overflow to the ditch along Highway 41 within 7 days of final grade. The blanket should be specified and a detail provided. Erosion control blanket will also be needed for any exposed soils south of the private drive within 24 hours of final grade. A seed mix for shaded, wooded areas is needed. A seed mix should be specified in the plan with the rate of application A seed mix for the filtration area and slopes will also be needed. The rip rap at the flared-end section at the south end of the 24-inch pipe south of the private drive should be replaced. Runoff from the storm sewer system from the school should be controlled during construction. The water should be conveyed through a non-erosive means to the Highway 41 ditch through the job site. A temporary slope drain or bypass pipe may be an option. (This could be a flexible temporary pipe placed down the slope to the ditch with energy dissipation at the discharge point.) Erosion control blanket category 2 or 3 is needed for the filtration area within 24 hours of connecting the 18-inch PVC to the basin. The blanket must be applied following a seeding. Remaining exposed soils on site must be mulched and seeded or sodded within 14 days of final grade. 1. ~ I j ~ l......"'" " A <vl.k Street !UP West Planning Commission Minnetonka Middle School Planning Case No. 06-03 February 7, 2006 Page 4 of 5 RECOMMENDA TION Staff recommends that the Planning Commission adopt the following motion "The Planning Commission recommends approval of Interim Use Permit #06-03 to permit the grading of approximately 3,400 cubic yards for a infiltration basin and drainage swales, plans prepared by Larson Engineering of Minnesota, dated December 19, 2005 subject to the following conditions The applicant shall provide the City with a cash escrow or letter of credit in the amount of $5,600.00 to guarantee erosion control measures and site restoration and compliance with the interim use permit. 1 Verify the existing 24-inch culvert has sufficient capacity before replacing the private drive entrance 2 be provide a proposed haul route for review and approval If fill is coming from and/or going to another site in Chanhassen. a separate grading permit will required for the other property. must The applicant 3 4 two All disturbed areas as a result of construction are required to be reseeded and mulched within weeks of site grading. 5 disturbed two weeks An erosion control blanket must be installed on all sides around the infiltration basin. All areas as a result of construction are required to be sodded or reseeded and mulched within 6 of site grading. size drainage area map. a full Submit 7 and 5302. Plate No. 5301. The applicant shall construct and Access to the site shall be restricted to this access 3102,3103.5300,5301 Show rock construction entrance per Detail maintain a rock construction access to the site 3101 Nos Plates Add City Detail 8 9 requirements of the Watershed District and permi t obtain and comply with all point only. 10. The applicant shall MnDOT. plans to match 12. The applicant shall supply the City with a mylar as-built survey prepared by a professional engineer upon completion of filling and/or excavation to verify the grading plan has been performed in compliance with the proposed plan sewer flow direction in all the existing storm Revise 11 sewer pIpmg. 14. The applicant shall provide a cross section for the filtration area showing the elevation of the draintile and the trenches, as well as a cross section of the trench and details of the material used. The draintile A plumbing permit must be obtained before installing the storm 13 !UP West Planning Commission Minnetonka Middle School Planning Case No. 06-03 February 7, 2006 Page 5 of 5 trenches shall be lined with drainage fabric (4% to 6% open space) and filled with pea rock at a depth of at least 18 inches and 3 feet wide. The bottom of the entire filtration basin shall be backfilled with a mixture of 50% coarse clean sand, 25% compost, 25% loamy topsoil for a minimum depth of 6 inches (from approximately 1034.5 to 1035.0). The rest of the area shall be top-dressed with native topsoil. CB-l shall be revised to be an open beehive inlet at an approximate elevation of 1037 for handling large storm event runoff if the calculations for rate control work out to avoid overwhelming the filtration area and having long periods (greater than 72 hours) of ponding. 15. Erosion control blanket/turf reinforcement mat (MnDOT Category 5) shall be used for restoration of the exposed slope from the emergency overflow to the ditch along Highway 41 within 7 days of final grade. The blanket shall be specified and a detail provided. Erosion control blanket shall be installed on any exposed soils south of the private drive within 24 hours of final grade. 16. A seed mix for shaded, wooded areas shall be specified in the plan, along with the proposed rate of application. A seed mix for the filtration area and slopes shall also be specified. 17. The rip rap at the flared-end section at the south end of the 24-inch pipe south of the private drive shall be replaced. The water shall be controlled during construction. Highway 41 ditch through the job site. Runoff from the storm sewer system from the school shall be conveyed through a non-erosive means to the 18 19. Erosion control blanket category 2 or 3 shall be installed within the filtration area within 24 hours of > 18-inch PVC to the basin. The blanket shall be applied following a seeding. Remaining m site shall be mulched and seeded or sodded within 14 days of final grade. connecting the exposed soils 20. The silt fence used shall be a City of Chanhassen type 1 silt fence; monofilament silt fence with metal T-posts, 6 foot maximum spacing and 3 plastic zip ties in the top 8 inches ofthe fabric. The silt fence specified for the filtration area shall be labeled as "Installed after drain tile installation" the bituminous edge 40 to 50 feet long into the job be installed from pad shall A rock construction exit site. 21 be tracked upon paved surfaces. if be completed within 24 hours should soil 23. Catch basin inlet control shall be provided for the catch basins adjacent to the school building tracking of soil becomes a problem on the paved surfaces" 22. Street sweeping shall middle school west.doc iup\staff report mtka ATTACHMENTS Findings of Fact and Recommendation Development Review Application. Reduced Copy Topographic Survey. Reduced Copy Grading and Erosion Control Plan Reduced Copy Utility Plan. g:\plan\2006 planning cases\06-03 minnetonka middle school wes 1. 2. 3. 4. 5. CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA FINDINGS OF FACT AND RECOMMENDATION INRE: Application of Minnetonka School District for an Interim Use Permit to permit the grading of approximately 3,400 cubic yards for the creation of a storm water retention pond - Planning Case No. 06-03. On February 7, 2006, the Chanhassen Planning Commission met at its regularly scheduled meeting to consider the application of Minnetonka School District for an interim use permit for the property located at 6421 Hazeltine Boulevard (Highway 41). The Planning Commission conducted a public hearing on the proposed interim use which was preceded by published and mailed notice. The Planning Commission heard testimony from all interested persons wishing to speak and now makes the following: FINDINGS OF FACT 1 The property is currently zoned Office & Institutional District, 01. 2 The property is guided by the Land Use Plan for Public/Semi-Public use. 3 The legal description of the property is: Part of the SW 1,4 of the NW 1,4 of Section 3, Township 116, Range 23, Carver County, Minnesota. 4 When approving an interim use permit the City follows the standards for conditional use permits. The City must determine the capability of a proposed development with existing and proposed uses. The city makes the following findings: a. The proposed use will not be detrimental to the public health, safety, comfort, convenience or general welfare of the neighborhood or the city, but will enhance drainage and erosion issues in the area. b. The proposed use will be consistent with the objectives of the city's comprehensive plan and the Chanhassen City Code. 1 c. The proposed use will be designed, constructed, operated and maintained so to be compatible in appearance with the existing or intended character of the general vicinity and will not change the essential character of that area. d. The proposed use will not be hazardous or disturbing to existing or planned neighboring uses. e. The proposed use will be served adequately by essential public facilities and services, including streets, police and fire protection, drainage structures, refuse disposal, water and sewer systems and schools; or will be served adequately by such facilities and services provided by the persons or agencies responsible for the establishment of the proposed use. f. The proposed use will not create excessive requirements for public facilities and services and will not be detrimental to the economic welfare of the community. g. The proposed use will not involve uses, activities, processes, materials, equipment and conditions of operation that will be detrimental to any persons, property or the general welfare because of excessive production of traffic, noise, smoke, fumes, glare, odors, rodents, or trash. h. The proposed use will have vehicular approaches to the property which do not create traffic congestion or interfere with traffic or surrounding public thoroughfares. 1. The proposed use will not result in the destruction, loss or damage of solar access, natural, scenic or historic features of major significance. J. The proposed use will be aesthetically compatible with the area. k. The proposed use will not depreciate surrounding property values. I. The proposed use will meet standards prescribed for certain uses as provided in the City Code. 5. The planning report #06-03 dated February 7. 2006. prepared by Robert Generous, et al is incorporated herein 2 RECOMMENDATION The Planning Commission recommends that the City Council approve the interim use permit. ADOPTED by the Chanhassen Planning Commission this ih day of February, 2006. CHANHASSEN PLANNING COMMISSION BY: Its Chairman 3 Planning Case No. CITY OF CHANHASSEN RECEIVED CITY OF CHANHASSEN 7700 Market Boulevard - P.O. Box 147 Chanhassen, MN 55317 - (952) 227-1100 JAN 1 0 2006 CHANHASSEN PLANNING DEPT Name and Address DEVELOPMENT REVIEW APPLICATION Fax: Owner Contact: Phone: Email: 1.-6 PLEASE PRINT Applicant Name and Address Ue:. ~ h 0 required prior to submittal. including review of development Consultation with City staff is NOTE plans Temporary Sales Permit Comprehensive Plan Amendment Right-of-Way/Easements (V AC) Vacation of (CUP) Conditional Use Permit 1 Variance (VAR) nterim Use Permit (IUP) (WAP) Wetland Alteration Permit Non-conforming Use Permit Zoning Appeal Development* Planned Unit Zoning Ordinance Amendment Rezoning E~W for Filing Fees/Attorney Cost** - 50 UP/SPRNACNARlWAP/Metes & Bounds - , 0 Minor SUB pd '-{ 26" (j(, q 02-12.. TOTAL FEE $ t!;il!!. &/7S ~I 2-00 cJ:.. q 021 , , pd -:;{') ex.... 'io,q'j the public hearing notification area will be invoiced to the applicant Notification Sign - $200 (City to install and remove) x:. . Sign Permits x Sign Plan Review Site Plan Review (SPR)* An additional fee of $3.00 per address within prior to the public hearing Subdivision* *Sixteen (16) full-size folded copies of the plans must be submitted, including an 8%" X 11" reduced copy for each plan sheet along with a diqital co in TIFF-Group 4 (*.tif) format. the development contract. be required for other applications through **Escrow wi be charged for CCAtltlED reviews the appropriate fee sha be submitted with site plan NOTE: When multiple applications are processed each application Building material samples must PROJECT NAME: LOCATION NO / YES WETLANDS PRESENT: PRESENT ZONING: REQUESTED ZONING PRESENT LAND USE DESIGNATION This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information and plans required by applicable City Ordinance provisions. Before filing this application, you should confer with the Planning Department to determine the specific ordinance and procedural requirements applicable to your application. REQUESTED LAND USE DESIGNATION A written A determination of completeness of the application shall be made within 15 business days of application submittal notice of application deficiencies shall be mailed to the applicant within 15 business days of application. This is to certify that I am making application for the described action by the City and that I am responsible for complying with all City requirements with regard to this request. This application should be processed in my name and I am the party whom the City should contact regarding any matter pertaining to this application. I have attached a copy of proof of ownership (either copy of Owner's Duplicate Certificate of Title, Abstract of Title or purchase agreement), or I am the authorized person to make this application and the fee owner has also signed this application. I will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. The documents and information I have submitted are true and correct to the best of my knowledge. 2/05 nCAlltlED Rev. Date Signature of Fee Owner G:\pLAN\forms\Development Review Application.DOC "r'H( ." ! 9 I 1}"'.1.5 EXISTING BUILDING " "".,..""" . ' "ci',' ( \ ,j f: ;t;' \, >CLLU/z:aLY.at:uLZUUI=La",vLza"uh'" I . << <<_<<11'$15 jCAICHIlASlN (<~ . :'~~~~i~j.:' ~~'':-l~f~~2;J , " _<t -.'OfJ.,..,......_. EXISTING BUILDING " -,' . " ._<t " -,' 18"".<:.(( D ,tf"" ,~j ,........-. i/,Y- '/ '/ ,,--.-.'- ... . ~~il!~ ~.. ~., -.' _"' S .~i~I~~~~~~- _.~ Pq/t " " " i-,<:il. <0 CERTifiCATION: I '-'t!ry """"thll IN. "'.................. =~:~;u:::~:~~=: :;;@.a;.liif;;.;,;;..., 1m. o.o....tl~ << LEGEND: << BENCHMARKS: HEVATlO~ IAS€O ON TOPOGRAPHIC SURVEY IV (LAllI( ENGlNHIlINC OAno Aue. '4. 1'1'16. THE 11.11,1 !lEVATlONQI THE CATCH .....SINS AS SHOWN ON THE SUllvrvwtll.E USED"S IENCHMARKS. DENOTES fOONO I/Z"IIl.QHPlPE . OUfOTES SET 1,2"II{OOPlI'( IS) Will : ~~~~N'tSlN .11 .....nll. VAlVU SK;N' UTIliTY POU :'l llGHTPOU 3_ go~:'H~l~::u o MANHOlE -1_ ~M~~EIl -CURR W C.ONCII.(TE << SURVEY NOTES: THE OIUENTATlON OF THIS lEARING SYSTEM ISMSUMEO o NORTH FIELDWORK WAS PErOll.t.lEO MAY, 7. 200S TOPOGIIAPHIC rEATUIIES WEllE SHOT TO THE lEST OF CUll AlllTTlES DESPITE THICK rOUAGE. A COPHEII STAre ONE CAll VTIUTY OESIGN lOCATE WAS INITIATED ON THIS SITE. THE UTILITIES SHOWN HEREON WEllE rlHD lOCATE P1:11 VlSlllE SHUCT1JIIE AND GOPHEIl STATE ONE CAll MAIIIC1NCS WHEIIE I'OSSlllE. cm ANOUTlllTY AS-IUllT PlANS WEllE IlEUEO 0"1 rof!. OTHEII. INrQIIMATlON. ADOtTlONAlllTllTTlU or WHICH WE A/IE UNAWAlI.l MAY EXIST, << EXISTING LEGAL DESCRIPTION: rAIIT or TI-lE SW 114 or THE NW 1/4 or SlCTlOO J. TI16.II.H. CA"VEI! COUHTY,MN ~ (AU IfrO~E YOO DIG' Gopher State One Call 9" TWIHCrTYl\UA'IS'_4S4_0007 TOI.lUEE: 1-IOO.lSl_1151 hfi....J I rOOT CONTOU" IHTEIIVAl lIU.l....'NQlllOO. OHg(:Qt<OrrIO"l!l.'lOU.llll Y'f"'1l111'f '''I COO<ftllltfOO\ IUllIOl CO"'fOJ(:''''' '" I{IIIII' z f I~~' o tjll" Iii j! u. . ~ o ~ ~ C c :ii o ~ c: co · 0'2 JI (/) t !3 ....5 ~J j.[H Il:f) >- W > ~ ::> III U i: .. ~ Cl o .. o I- ZI-'" Ql3~ ~ :(~I-~::l 55~~~ ~~~~~ :tuc::>o wUJ..JOUl o:womw o:.JowZ wOxz25 ;:9u;::::! w::!lIl..J 1Il~~~~ ~~~:t5 ~I-Z'l"'W IIlWW~U "z:t..~ oZc ~:i25 ~ Will{ KSlI "E~:~[:~ /l/ /, '" ~ !~'WJ, fir '/ lir;~ ~' I_~ /1/ ' t/: , '1! 1i&.G / : ,/ ! i/ "~: iJ ; : ~.Hl, "I i </'(<0", ,~ ' ': t:. '.., ,"'~~. [C" '~ : :/:: ~;'; I, \ '.'i,. I I r, '" ; " I ,.. ,I \~. 'If; \ ~\', I k ,I :\~., \ '\ '\\, I : : : : \ \n::~ . , '\i~ \\'\ J : : : : : 'I ,',,, :, n'" , ; : : ; ; : '\ " '<t:,., " 1\ \ '\ '\ ..<t(., _ _ .. _ . ' I I' \ ,'(\' t..,....., \" .. . , . , , . , " ",..". I "" _ ' I, \ 'r \ \ . ',., . 'II,~"'" "l"'''" \ \ ",. I' _ , : \:,; ",J" '. \~,;,', /~. '\ \, '" f...... ,i. .. .' , , "", '. , I ' .~. \:, "1' '\<. ','-:'i \ 1'<\ \ '@' ,'~ ..... ' , : '. '.' ", "'.",' Y" \ '. ( -'-", "" . ..' C.C , I.~ ""'..', "", ". '."\';"\' ~'.\.'". ".' <.'f.~ .".0'" , ",." '. . J : "", " ... .... ". '", " \: . C"'.' "l....:i --'''. ... 7:".1. '.. ""'~ " : \;\ \ '" \'\\\/'" ':.'.:~~:\H:~j~~,J[~~~~~~~~~~;,:.~~it:f ~'"" I 1 I", ',., . . . · ,. '...." __"" __ .. '''" ""t'T. "F I,i'" :nt"":~,.!,.,;j : \ i: n, ';... ... \ \);'I'1S.;,"~y.:~C\~\,:::,~. . O'I~ ::',/.~.r;--/..//rl'" -/0- 1 'li,\'j.Cli/-t t-(~-.~~,'~:' /'''''''.-- -"".. --- '__'-.....,... "'<,..,..._. '. '. ,,,,,,,::,1,, r ~ , . '.... ", " ", "'''. , " , , """ , ", , '.., ..C'.... . ~" ':,.... r ,.'.':"" "'" , ,I,,', , ": , : :.1. . . , ! ' 1 .' '0\ " C,"" '.' ;,~'i..!OO'a'~;~~'~'~! 0t~:'fA' ;~/::;'if:':: i fi::<\iilf: i ::'1';'// / ,/.,. . \ \"~" : l ~ :.J::(7 :::1..9::,'/".:', ~< ~~",.'~".I'" ,$~. ..:. ::!k~~' 1:"1 ,'.. 't,',:' , ." \. ffi" \ "".., f ""="L~,L/.;ZY""", ~!", i::';',"):;i,/, :;. .Jf 'h' :,1,.. ""-;.,., ',,,,, ,'"" !'" _ ".. _"_'" . -,...;~ l't."..., 'f. .}., ~~ ~, . ~/' I~- .,. 'I' \ "1 \.. " ... "'" '" I I, ". ~ " " ", . '-<1; ;''",'':':'/:,'}f:/'/f'""",d.['' i....:; i,'/';" 'I " ... ""'-'--""'C"'=-r'.,,,,,.,, " . """'" "f: "",:" ", '^ ", . '"'" I, , _ ..,..., _''''''~''_'' "...... '" "" ...., '., ,,' ., ""'" .",.. . cr~---+--:""- ,- 1(~Cli3' :.... ~ ". '"'''''''' "I"',,,,,, "''''''''.. . "',: _ L.I, ""<'~"", ...::..____ __~ V) I "f':r." ~ 1}I:"J~'I@' '-1""'''''''''','' " " , '. . -L___~._ ..' ' ':....,1....,.*;\'.),.0\"",\1,..,,\,... .:...." .... .~"_. ..... "..... I ''''''''" """"""" . ,'. ,.. , ~ .' _._ . . "'~""""""""''''''.' ". '-'-- / ',.- ---.- ' ""''''''''''''''''''''~'. . - .~' ------ . ',. ""."...." I' , , 'I, " ' , "'"'''' , : 'fE[;' _ . r. () \. ''',' , " " \ " \ , \ 'I \ "'" ",,' , . ~'\ _, ". . I'" Ill.... \',\ ','.', ,. \ , ',1, " " , \. ", "',..". ..:.. " , , " .ij ...., ". ''''" "" '''' " . ~. . . ' '. ...,.. , ""''''',. ';' " ". \ ..' '" "",,,.. " ., ~, " .. . U I ""'",, ~ \.. ,'\ 1\ j' \ \ \ ,II , \ \ ~""\"~ ~ ~, ',,' .. .__. ~~~;-;II~DA;r~~{r{o~ I ',,~-~,:,;,;:\ \ \1\ \ '. " \" .. " ')\ \ .. \ I:M " '~,~,_,_, "~~ h"~ '~"' :::..r':.... .n,,,,,,,,,, I "/'l""'''~ " """'M: ".,' ! \ ," '"'' "1 ' " ""'",: _. ..~ '", --. . .,-....", '" "'", """!, ~ .."...,.~~ .. f ! ~~~~\W\:~~::::[:~:'\(r~'.::vt,Js;~~,€~:~,;,~~tf{!i~~54;i~~,,:=::_,__"_ C',-'.-' 0'..' }- I P(1ICI\{~_~~y \1'1"'.'.'"~,,,\\ \!.'<'<.,...~.:....._>,--:o. .'_ _. ~ -x'''''''''''- '",. "\ \ _ _ . . \ ',,':' ~,', \ ' , . ,'"",,,.,. I "; " \\." \ I! \, '> \ J / H{Ws"n...<;s 5 OlU~!jlll.lES'()f{ BAS(Aq;R{CArt I ../ """, "" """01''''''''. "'''''::';;';~'::'i.,:"'::..,,. tl{lT{, O(l'(~INGS~~;OSlSlllrH"ll(s.OR .~""'-'. SILli.'b%Cci'ETAIL INSTALL I'fOITOSCAU: PAVEMENT 3" BITUMINO~~ON DETAIL CONSTRUC @ HOITOSCAlE ~ .-.~f.lt II Jlo~.. ~~ ~ ~hi ~~i.. ~I.~~ ~~~~i ~~H~ ~l~tl!;( ~~m ~~:~~ "'''tU;;!;: ~~~~:1 ~ " ~ ~ " i ~ ~~ o iii~ c:g> H 0'<: !.. en ~ j3= ....E ~B j.fi~H z S .. .J o 0: .... Z o U Z o in o 0: W o Z <( CI z o ~ CI ti~ U)W~aM ~~tO:l;l LU..J~<t(ll) ~~ti~~ ouo:>o ~~i5g~ O!cjO!M~ wgcri=:l: ~::tUlU:li ~~!z~Q ~Z~:t~ aOZT"LU ~~~~~ ~~~ ::t~ " . ~~""'Ol{ rlUI,I( . COVER NWfAHR-2540.Tm:CGlIAI[ AISIM,SQ.lOtlO WINIUI)IoI(J" 2, t,l"llIl.1lJ1ol Of 5 CWCR(I[ NUJSIll[NT RWGS In! fUll 8EOlJ"UORI""9EI'II([H(AOlAHO . 4" CCU"R(lI'I n€ OlIISlO( NOSHIolS (J"ANYt.!UEAlAlAltOfl[O '"PRECASfR[lHf"OIlCEDCOIICROESlAll. $fAl..llITH28(AI)SC'KR"N_H[K. All .oNIS II NANHO.E 10 HA\{ '0' RlH(; R\Jll8(R Gf,SI([l5. ~~[ST("'-COPQ.'r'U{R'Ol"""OPn[Nf: rtASIlC'MTH1/2-Cl!A{{50SIHl ll(....alCO.IEHTOR EOOAl.l&.O_c, F'R{tAS1CCtlCR("T(SECIlQN IfWECASTSECU{HIAlCONCIl(T[ (lOCK 'OlO1'(J"~PIf'{5H"llIl(US{O .'H Silt AND O[PTH PROf9l1 THE lAElRICAIlCW(J" PlltCAstllNllS (;Il<'JIAAO.HJPF1:,.l {.1[R1~orCA1CHIl"SlH 1l"IoIINIUUlISl"91H1CkNfSS, 1l''''~t,lU'''(lI,w(l[RPIl(C'''SI CCflCREIESlAB,IlEtf"OllC(O 'IIIm'4 RtB.o.R ..- E... I / I 1 a ~ I / 1<1 /g ~7/7;77~ j / !(;: / / / ' 'r: ;; . .~"..Z:'::L(l' I! ~ /: ... II ( /: . r f(~ ~ / / !'" Q \ J ~~~;~'i ; ,~... ~. / ''/'''-' \ l-\ etd;'Ud'1~.:f~cL/L/.L. /, . /'\ \1, \ .. r< !"~\ ~''";./\ \ e 0 ,~~ If ":~l (.II'\\@"".4'/: I ,\.:.. \ \ ~ J '~ \, \ \ {'f1 i'& \ 0-'...-..\...\.._ ..,*'m~_ \ '-. \ ~ \~ $ rr..'/.. ~~.; '. '\(~'- \ i~' / //; {h ' " ' -1 i ..;,=, W'''''G '\. '. \ ,~i / .... .:,~~;~ R~I~;)iN~ -"'~,},_ "<\, ,0t;,~:: \ \-~\~::~'\-,---'<--s~~;i,;;~~1'J \ '\ \ Ifr~ ("'~J1';!;1 I \'\ \ \ i :1I \ \" If \ \ " ,,~"> "I'.".! 'I ~,LL'~.":::LZ::LLLL/.'.//L;:Z:LL/.d/L/L.:LL:~ " .,l ~":ir~LI~Z5~WN~==="C-~~\ft:==,;. ~ ~ (ii) SillIQt! CATCH BASIN MANHOLE DETAIL r.'t~r: ~r Ft!~ MOl TOSC"lE r.. '/ (, ,-.{ ;;:.;: / !r!if.:i""~,,, 1 / 1 I 0'( i }:.1}:-'~.,(' 1 ' ."" " / /. i - '-'. , __I .,~-" I 'I ""C... .~., , // : : I, t. ..t _ _ ~~; / !. ,/ : I I l' ~P"! I ,';' AOSPllt-rAfl.trBENll/ , , -">.)/ ; i~g/ W/lHRVST9LOCKlMC k /... ,f l~ .:t';~' ''''.-...f (j,' /"."'-01) iT ,:~' t .;;; !:::? i I '.... 1 ",-, l if" "I" '1 J .:t' " / :: J' [""" ~~ ::;.' j~:, ,; I': I I f J:::' i I ! ( .. 02 .:.:-:,~"~,,,,~ .': I !If}) . 1 (' ( IMY 101400 (0 / H i.---sJ!O~ f ::! i r' i~ ., ""68 (w, h.J" "1'--.,., I, ". .1' V) ",':, ~;:r --1.1' -.I !~ ~:':n~'h ' ,,, :. /". .,.- - 1.1 1~~"V'0168O(() ,'f ".f" I .,,/ .~/"'........'r:~t '''\// 1Il'., f:!;~ I !NY In2.ao(~ tr, .olt'. {1 : ~~.. "'-..... \ .I I ~i ff~.f/' -----.:;, '\"',, "Q Ii I ........, // i """<"":~ " ! I.: (~. I I. " <"" "" f ^ "'. (]b.. "'" '-.." ....., " ' .~ I 1 "; \fV ., ""OO '" '\ J I ~ il ~~ "~;,""~"[.".\I~ ", ',,_ I I I~ ; \~.. , ~ I ' I ",,_ I ! '/ / \ '\, I i I~ f I'~.. , I( .- " '\ \:<\ ,I t) ;:;) / \ f \..! ,I, ..' .. -, ~- .., L..: - - - -" ........-....-01_...._...._ \ I \~, I [l.::~___ _ _..._... ._ ::::::.':"'=.,~"''''~!C"._'''':,,~ ' ~ , " ;.\~~ ... :'l.(,:;,~"J U'''l \ - .,.-I;r_1_'o__ I ~} r - ;'-.. , , , : ." ~;;,:,:;~~;",~.", I I~c"" ^ !":':<.7 I ...........-........ .-....._....._((,_..__..~._..,.( R[lIO\l(IS'SIORUSE'II(RPIP( / I / :,:;:.::;;;.~"'-~;~"'Oz;':~=~~..=~c~""=.~=.~~~~~.'1'~"~" ru--L-...J .ot\(""I'<O..tMt_ClOND<lo:>i'<S"IOU."IIII!YI.rIlCl""~.~'~'OIII:'OOOI!COot!I'-"'::' h ~ ~ir ~~J n!W~ ~>-I-ii:lil ~~~~I .!ih "f~m~ ~~~~. ~~tlE~ ~f~~~ ;~~~~ ~ s 0 w ~ ~ ij :i - 0' t:~ ~! c h O'c I.. Ul~'3;; ...~ JB ~!m lID , , I ! S .. i ~ , -' , 1= => I ! i / ....'" Ul::l~ ~ ~~t;~::l ~(jii!~:g wO""w< >J:~-'.... ooo=>o ltUl-,OUl D.womw ;!50w~ ~90~:i1 <(:E(I)Lrlti 2:~~~Q ~z~J:~ ~~ffiN~ 8z::;;:!1;'j ('\l~c ~2: