3. Liberty at Creekside
~
~
u
~
~
~
~
<
<
~
<
~
~
~
~
00
PC DATE: March 21, 2006
IT]
CC DATE: April 10, 2006
CITY OF CHANHASSEN
REVIEW DEADLINE: May 8, 2006
CASE #: 05-24
BY: AF, RG, LH, ML, JS, ST
STAFF REPORT
PROPOSAL:
Request for Rezoning of property from A-2 to PUD-R; Subdivision of approximately
36.01 acres into 29 lots, 5 outlots, and public right-of-way; Site Plan Approval for 146
townhouses; Conditional Use Permit for alterations within the flood plain and
development within the Bluff Creek Overlay District - LIBERTY AT CREEKSIDE.
LOCATION:
East of Audubon Road, north of Pioneer Trail and northwest of future Highway 312
(1500 Pioneer Trail)
APPLICANT:
o!~
Town & Country Homes
7615 Smetana Lane, Suite 180
Eden Prairie, MN 55344
(952) 944-3455
PRESENT ZONING: Agricultural Estate District, A2
2020 LAND USE PLAN: Residential- Medium Density (net density range 4.0 - 8.0 units/acre)
ACREAGE: 36.01 gross acres 30.09 net acres
DENSITY: 4.05 units/acre gross; 4.78 units/acre net
SUMMARY OF REQUEST: The applicant is requesting a rezoning to PUD, subdivision and site plan
approval to build 146 town homes with a conditional use permit for development within the Bluff Creek
Overlay District as well as grading within the floodplain.
LEVEL OF CITY DISCRETION IN DECISION-MAKING: The City has a relatively high level
of discretion in approving rezonings, PUD's, and amendments to PUD's because the City is acting in
its legislative or policy making capacity. A rezoning or PUD, and amendment thereto, must be
consistent with the City's Comprehensive Plan.
The City's discretion in approving or denying a preliminary plat is limited to whether or not the
proposed plat meets the standards outlined in the Subdivision Regulations and Zoning Ordinance. If it
meets these standards, the City must approve the preliminary plat. This is a quasi judicial decision.
The City's discretion in approving or denying a site plan is limited to whether or not the proposed
project complies with Zoning Ordinance requirements. If it meets these standards, the City must then
approve the site plan. This is a quasi-judicial decision.
The City has limited discretion in approving or denying conditional use permits, based on whether or not
the proposal meets the conditional use permit standards outlined in the Zoning Ordinance. If the City
finds that all the applicable conditional use permit standards are met, the permit must be approved. This
is a quasi judicial decision.
Location Map
Liberty at Creekside
Planning Case No. 05-24
1500 Pioneer Trail
City of Chanhassen
.:;./
~
o
a::
c:
o
I .g
"'0
:J
<(
rr.;J~'(."'O~
Liberty at Creekside
March 21, 2006
Page 2 of 23
PROPOSAL~~ARY
The developer is requesting the rezoning of property from Agricultural Estate District, A-2, to
Planned Unit Development - Residential, PUD-R, to permit a 146-unit townhouse development on
land guided for residential- medium density uses (net density range 4.0 - 8.0 units per acre); a
subdivision of approximately 36.01 acres into 29 lots, 3 outlots, and public right-of-way; site plan
approval for 146 townhouses consisting of 98 Premier units and 48 Concord units; and conditional
use permits for alterations within the flood plain and development within the Bluff Creek Overlay
District.
The site has a high point of 940 elevation located at the north property line. The site has a low
point of 866 elevation adjacent to Bluff Creek which separates the northern and southern halves
of the property. The land south of Bluff Creek is located entirely with the Bluff Creek Overlay
District Primary Corridor and is proposed as an area for wetland mitigation and to be preserved
as open space.
To the north of the property is a wooded hill on the Fox parcel that is included in the Bluff Creek
Primary Corridor which is intended to be preserved. To the northeast is a ponding and wetland
mitigation area for MnDOT and the Highway 312 project. To the south is a future developable
area that is guided for residential - medium density and office/industrial use. The parcel to the
south will gain access via Pioneer Trail. The property to the west is being proposed for an 81-10t
single-family subdivision. As part of that development, the Bluff Creek Corridor is also being
preserved.
The initial access to the site will be from the northwest. This roadway crosses two other parcels
and, therefore, must be coordinated with the development of those sites. As part of this
development, we are also requiring that the developer establish a second means of access to the
site. The most logical location is in the vicinity of the current farm road which runs to the north
of the property just on the edge of the wooded hill. The developer will need to coordinate with
MnDOT the design of this road. The developer will provide a security for the construction of the
road, since it cannot be completed until the Fox parcel to the north develops. At that time, the
road will be linked to the 2005 MUSA east-west collector road.
The development consists of two housing types: 4 and 6-unit Premiers and 6-unit Concords.
Within each housing type are four alternative living configurations. A color and material pallet
will be established for each of the 29 buildings.
Staff is recommending that Liberty at Creekside be approved.
BACKGROUND
On December 8,2003, the City approved the 2005 MUSA Alternate Urban Areawide Review
(AUAR). This document was intended to review and provide mitigation measures for all
development within the 2005 MUSA area. At the time of development review, each property
within the 2005 MUSA area is required to reimburse the city for their propositional share, based
on the land area, of the costs for completion of the AUAR. This property is responsible for
$6,285.00 as its portion of the 2005 AUAR.
Liberty at Creekside
March 21, 2006
Page 3 of 23
APPLICABLE REGUA TIONS
Chapter 18, Subdivisions
Chapter 20, Article n, Division 2, Amendments
Chapter 20, Article n, Division 6, Site Plan Review
Chapter 20, Article IV, Conditional Use Permits
Chapter 20, Article V, Floodplain Overlay District
Chapter 20, Article VI, Wetland Protection
Chapter 20, Article vn, Planned Unit Development District
Chapter 20, Article XXTII, Division 9, Design Standards for Multifamily Developments
Chapter 20, Article XXXI, Bluff Creek Overlay District
REZONING
The property is guided in the Comprehensive Plan for Residential - Medium Density as well as
parks and open space over the Bluff Creek corridor. Appropriate zonings for this land use
designation include Planned Unit Development - Residential (POO-R), Mixed Low Density
Residential, if twin homes (R4), Mixed Medium Density Residential (R8) or Low and Medium
Density Residential (RLM).
The applicant is requesting to rezone approximately 36 acres from A2 to POO-R, Planned Unit
Development-R. The project consists of 146 townhouse units in 29 structures. The review
criteria are taken from the intent section of the POO Ordinance.
Section 20-501. Intent
Planned unit developments offer enhanced flexibility to develop a site through the relaxation of
most normal zoning district standards. The use of the POO in this instance is to permit density
clustering for development within the Bluff Creek Overlay District. The use of the POO zoning
also allows for an internal transfer of density. In exchange for this enhanced flexibility, the City
has the expectation that the development plan will result in a significantly higher quality and
more sensitive proposal than would have been the case with the other more standard zoning
districts. The proposed development provides a compatible development with the surrounding
development and preserves the Bluff Creek corridor subject to the recommended modifications
to the plan.
The proposed rezoning assists in the furtherance of the following land use goals of the City of
Chanhassen Comprehensive Plan:
. Development will be encouraged within the MUSA line.
. The plan should seek to establish sufficient land to provide a full range of housing
opportunities.
. The city will seek opportunities to provide transitions between different uses of different
types.
. Development should be phased in accordance with the ability of the city to provide services.
Liberty at Creekside
March 21, 2006
Page 4 of 23
The proposed rezoning assists in the furtherance of the following housing goals of the City of
Chanhassen Comprehensive Plan:
. A balanced housing supply with housing available for people of all income levels.
. A variety of housing types for people in all stages of the life-cycle.
. Housing development that respects the natural environment of the community while striving
to accommodate the need for a variety of housing types and costs.
Staff is proposing the following development standards govern the development of the property.
DEVELOPMENT DESIGN STANDARDS
Liberty at Creekside Development Standards
a. Intent
The purpose of this zone is to create a PUD for a townhouse development. The use of the PUD
zone is to allow for more flexible design standards while creating a higher quality and more
sensitive proposal. The PUD requires that the development demonstrate a higher quality of
architectural standards and site design. Ancillary uses may be permitted as listed below once a
primary use has occupied the site.
b. Permitted Uses
The permitted uses in this zone shall be limited to townhouses and their ancillary uses. If there is a
question as to whether or not a use meets the definition, the Planning Director shall make that
interpretation. The type of uses to be provided on common area Outlots shall be low intensity
neighborhood oriented accessory structures to meet daily needs of residents. Such uses may
include bus shelter, development signage, garden, gazebo, maintenance shed, picnic shelter or
playground equipment.
c. Setbacks
The PUD ordinance requires setbacks from roadways and exterior property lines. The following
table displays those setbacks.
Setback Standards
Highway 212 50 feet
Exterior (Perimeter) Lot Lines 50 feet
Front Yard 10 feet
Side Yard (end units) 10 feet #
Rear Yard 10 feet #
Minimum Driveway length (to back of curb, trail or sidewalk) 20 feet
Hard Surface Coverage 30 % *
Wetland: Buffer and buffer setback 16.5 feet and 40 feet
Bluff Creek Primary zone boundary 40 feet with the first 20 feet
as buffer
Liberty at Creekside
March 21, 2006
Page 5 of 23
# Decks, patios, porches, and stoops may project up to seven (7) feet in to the required yard.
* The entire development, including the public and private streets and Outlots, may not exceed
30 percent hard coverage. Individual lots will exceed the 30 percent site coverage.
d. Building Materials and Design
. Building height shall be limited to 35 feet
. Building exterior material shall be a combination of vinyl siding or shake and brick,
cut-face block or stone.
. No two adjacent structures shall be of the same color scheme.
. Colors used shall be varied across color tones.
. All units shall utilize minimum timberline 25-year shingles.
. Each unit shall have a minimum of one overstory tree within its front landscape yard.
. All mechanical equipment shall be screened with material compatible to the building,
landscaping or decorative fencing.
. Garage doors shall be decorative and have windows.
SUBDIVISION REVIEW
The applicant is proposing a 29-lot subdivision with two common lots. Because this project is a
PUD, there is not a minimum lot area. The overriding restriction is that the development
complies with the density requirement of the comprehensive plan (4.0 - 8.0 units per acre),
which it does at 5.21 units per acre. This plat configuration creates condominium units of each
building. However, the applicant may final plat the lots for individual units rather than by
structures, creating up to 146 lots. Preliminary discussions with the developer indicate that they
may create individual lots for units in the Premier buildings. Staff is recommending that the
common lots be platted as separate outlots and that the Bluff Creek Primary corridor south of the
buildings be made in to a separate outlot.
BLUFF CREEK OVERLAY DISTRICT
The City of Chanhassen established the Bluff Creek Overlay District by ordinance in 1998 to
protect the Bluff Creek Corridor, wetlands, bluffs and significant stands of mature trees through
the use of careful site design and other low-impact practices. This parcel is partially encumbered
by the Bluff Creek Overlay District. Bluff Creek runs through the southern third of this property.
All structures must maintain a minimum 40-foot setback from the primary corridor. No
alterations are allowed within the primary corridor or within the first 20 feet of the setback from
the primary corridor. The area within the Bluff Creek Overlay District south of Bluff Creek has
been historically used for agricultural purposes. The applicant should submit a plan for the
revegetation of this area that incorporates native plants and is consistent with the City's Bluff
Creek Natural Resources Management Plan Appendix C. Special attention should be paid to
areas with steep slopes (greater than 3:1).
Liberty at Creekside
March 21, 2006
Page 6 of 23
FLOODPLAIN
Alterations appear to be proposed within a mapped FEMA unnumbered A Zone (IOO-year
floodplain). In lieu of a Letter of Map Amendment, LOMA, the applicant will be required to
obtain a conditional use permit for alterations within the floodplain.
GRADING, DRAINAGE AND EROSION CONTROL
Bluff Creek runs through the southwest comer of the 36-acre site. Trees are along the north and
south sides of the creek. The area lying south of the creek contains some steep slopes and
wetland areas on the west and east side. The northern quarter of the property is a steep,
vegetated area. The remainder of the property is a vegetated area with gentle slopes.
The property lies within the 2005 MUSA Expansion study area. Kimley-Horn completed a study
on the 2005 MUSA area which included street system analysis and proposed trunk utility
alignments. Access to the proposed development will be from a local street that will extend the
east-west collector identified in the report. The northern portion of this street lies outside of the
plat boundary; therefore, the developer must coordinate the location and elevation of the western
street connection with the Pioneer Pass development to the west.
The developer proposes to develop the area north of the creek. Due to the 70-foot drop in
elevation from the northern plat boundary to the edge of the Bluff Creek Overlay District Line,
the entire area north of the Overlay District Line will be mass graded, with the exception of the
portion of the property in the extreme northwest comer of the site.
The proposed grading plan identifies a storm water pond on the east side of the property, berms
in the southeast comer and retaining walls at the north property line (two-tiered), within
Common Lot 18, Block 2 (a portion of which is two-tiered), south of Street A, north of Lot 12,
Block 1, and south of Lots 5 and 6, Block 1. Staff will work with the developer's engineer to
limit the number and height of retaining walls within the site.
The grading plan must show the proposed top and bottom of wall elevations for all retaining
walls. Building permits are required for all retaining walls four feet tall or higher and must be
designed by a Structural Engineer registered in the State of Minnesota.
The developer proposes to install storm sewer throughout the site to convey runoff from the
development to the proposed pond. Staff will review hydrology calculations prior to final plat
approval.
The style of home and lowest floor elevation must be noted on the grading plan. Typical
sections for each housing style must be shown on the final grading plan.
The final grading plan must be 50 scale so that staff can complete a full review of the proposed
grading.
Bluff Creek runs through the southern third of this property. Protection of Bluff Creek from
erosion and sediment discharge during all phases of construction is essential.
Liberty at Creekside
March 21, 2006
Page 7 of 23
STORM WATER POLLUTION PREVENTION PLAN
A storm water pollution prevention plan (SWPPP) is needed for the development and must be
completed prior to applying for the National Pollutant Discharge Elimination System permit. It
is recommended the SWPPP be submitted to the City and the Carver Soil and Water
Conservation District (CSWCD) for review prior to final approval.
Erosion Control
A stable emergency overflow (BOF) is needed for the proposed pond. The EOF could consist of
riprap and geotextile fabric or a turf re-enforcement mat (a permanent erosion control blanket).
A typical detail should be included the plan.
It is unclear how the contractor will gain access to and between wetland mitigation areas. A
temporary creek crossing may be needed unless access can be gained from the west or south.
The plans should show paths of access to both wetland mitigation areas as well as all erosion
controls and restoration practices.
Erosion control blanket shall be installed on all slopes greater than or equal to 3:1. All exposed
soil areas shall have temporary erosion protection or permanent cover year round, according to
the following table of slopes and time frames:
Type of Slope
Steeper than 3:1
10:1 to 3:1
Flatter than 10: 1
Time
7 days
14 days
21 days
(Maximum time an area can
remain open when the area
is not actively being worked.)
These areas include constructed storm water management pond side slopes, and any exposed soil
areas with a positive slope to a storm water conveyance system, such as a curb and gutter system,
storm sewer inlet, temporary or permanent drainage ditch or other natural or man made systems
that discharge to a surface water.
Street cleaning of soil tracked onto public streets shall include daily street scraping and street
sweeping as needed.
Sediment Control
Curbside inlet control details are needed. Wimco-type inlet controls should be used and installed
within 24 hours of installation.
Typical building lot controls should be shown on the plan. These controls should include
perimeter controls (silt fence), rock driveways, street sweeping, inlet control and temporary
mulch after final grade and prior to issuing the certificates of occupancy.
The proposed storm water pond should be used as a temporary sediment basin during mass
grading. The pond should be excavated prior to disturbing up gradient areas. Diversion berms
or ditches may be needed to divert water to the pond and a temporary pond outlet is needed. The
outlet could be a temporary perforated standpipe and rock cone. A detail is needed for the
Liberty at Creekside
March 21, 2006
Page 8 of 23
temporary pond outlet. Additional temporary sediment basins may be needed or an alternate
location may be needed depending upon site conditions during rough grading.
Storm Water Management
It is recommended that the ultimate outlet from the site to Bluff Creek be adjusted to discharge
water parallel to the creek flow; presently the outlet is shown to discharge water perpendicular to
the flow and could increase bank erosion of the creek. The outlet should be turned to the
southeast to align with the creek.
Drainage and utility easements (minimum 20 feet in width) should be provided over all existing
wetlands, wetland mitigation areas, buffer areas used as PVC and storm water ponds. An
easement adequate to provide access to the pond for maintenance purposes is needed and should
be shown on the plan.
SURFACE WATER MANAGEMENT FEES
Water Quality Fees
Because of the impervious surface associated with this development, the water quality fees for
this proposed development are based on townhome development rates of $3,100/acre. Based on
the proposed developed area of approximately 35.58 acres, the water quality fees associated with
this project are $110,298.
Water Quantity Fees
The SWMP has established a connection charge for the different land uses based on an average
citywide rate for the installation of water quantity systems. This cost includes land acquisition,
proposed SWMP culverts, open channels, and storm water ponding areas for runoff storage.
Medium density residential developments have a connection charge of $4,400 per developable
acre. This results in a water quantity fee of approximately $156,552 for the proposed
development.
SWMP Credits
This project proposes the construction of one NURP pond. The applicant will be credited for
water quality where NURP basins are provided to treat runoff from the site. This will be
determined upon review of the ponding and storm sewer calculations. Credits may also be
applied to the applicant's SWMP fees for oversizing in accordance with the SWMP or the
provision of outlet structures. No credit will be given for temporary pond areas.
At this time, the estimated total SWMP fee, due payable to the City at the time of final plat
recording, is $266,850.
Other Agencies
The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g.,
Riley-Purgatory-Bluff Creek Watershed District, Minnesota Pollution Control Agency (NPDES
Liberty at Creekside
March 21, 2006
Page 9 of 23
Phase II Construction Permit), Minnesota Department of Natural Resources (for dewatering),
Minnesota Department of Health, Minnesota Department of Transportation) and comply with
their conditions of approval.
WETLANDS
Existing Wetlands
Two AglUrban wetlands exist on site. Westwood Professional Services, Inc. delineated the
wetlands in May 2004.
Wetland A is a Type 2/3 wetland located in the southwest comer ofthe property. The wetland is
dominated by reed canary grass. No wetland impact is proposed.
Wetland B is a Type 1/2 wetland adjacent to Bluff Creek that runs through the southern half of
the property. The wetland is dominated by reed canary grass and box elder. No wetland impact
is proposed.
On May 12, 2004, City staff conducted an on-site review of the wetland delineation. The
wetland boundary shown on the plans is consistent with staff recommendation.
Wetland Creation
Plans for Liberty on Bluff Creek, a nearby project proposed by the applicant for this project, rely
upon the construction of two wetland mitigation areas on this site. The wetland mitigation for
Liberty on Bluff Creek must be constructed prior to or concurrent with wetland impacts on the
Liberty on Bluff Creek project. Wetland replacement must occur in a manner consistent with the
Minnesota Wetland Conservation Act (MR 8420) and the conditions of the Wetland Alteration
Permit for Liberty on Bluff Creek.
Wetland buffers 16.5 to 20 feet in width (with a minimum average of 16.5 feet) must be
maintained around Wetlands A and B and the constructed wetland mitigation areas. Wetland
buffer areas should be preserved, surveyed and staked in accordance with the City's wetland
ordinance. The applicant must install wetland buffer edge signs, under the direction of City staff,
before construction begins and must pay the City $20 per sign. All structures shall maintain a
minimum 40-foot setback from the edge of the wetland buffer.
Wetland Issues
The applicant has proposed a secondary access through the MnDOT Right-Of-Way (ROW) to
the north in the northeast portion of the property. This connection will impact the wetland
mitigation that MnDOT intends to create within their ROW in this area, especially the mitigation
of Type 7 wetlands. The applicant will be responsible for creating or securing sufficient wetland
mitigation for MnDOT that will meet all conditions imposed on MnDOT and will be responsible
for any and all fees associated with the redesign of the wetland mitigation areas in MnDOT
ROW. The applicant should work closely with the City and MnDOT to ensure all conditions are
met.
Liberty at Creekside
March 21, 2006
Page 10 of 23
BLUFFS
Several areas on the property have been identified as areas with steep slopes (slopes greater than
or equal to 30%). The plans should be revised to show bluff areas (i.e., slope greater than or
equal to 30% and a rise in slope of at least 25 feet above the toe). All bluff areas must be
preserved. In addition, all structures must maintain a minimum 30-foot setback from the bluff
and no grading may occur within the bluff impact zone (i.e., the bluff and land located within 20
feet from the top of a bluft).
LANDSCAPING AND TREE PRESERVATION
Tree canopy coverage and preservation calculations for the Liberty at Creekside development are
as follows:
Total upland area (excluding wetlands and bluffs)
Total canopy area (excluding wetlands and bluffs)
Baseline canopy coverage
Minimum canopy coverage allowed
Proposed tree preservation
30.87 acres
5.40 acres
17.5 %
20 % or 6.2 acres
14.2% or 4.39 acres
Developer does not meet minimum canopy coverage allowed; therefore the difference is
multiplied by 1.2 to calculate the required replacement plantings.
Difference in canopy coverage (5.4-4.39) 1.01 acres
Multiplier 1.2
Total replacement area 1.21 acre or 52,795 SF
Total number of trees to be planted 48 trees
Replacement required to meet 20 % cover 32 trees
(6.2-5.4)/1089 SF)
A total of 80 trees are required for reforestation in the development. Applicant is proposing a
total of 260 trees as a part of the landscaping plan.
Additional landscaping required for the development includes buffer yard plantings along the
east property line. The following table summarizes the minimum requirements:
Required Proposed
East property line - 4 overs tory 13 overstory
bufferyard B, 495' 8 understory 21 understory
30' width 12 shrubs 32 shrubs
East property line - 14 overs tory 14 overs tory
bufferyard B, 707' 28 understory 28 understory
15' width 42 shrubs 42 shrubs
Applicant meets minimum requirements for the bufferyard landscaping.
Liberty at Creekside
March 21, 2006
Page 11 of 23
Additional comments concerning landscaping and tree preservation include the need to extend
fencing around the entire wetland mitigation areas that will be constructed on the south side.
This fencing will protect the adjacent wooded areas. Fencing shall also be installed on either
side of a single designated access road connecting the two mitigation areas so that during the
construction of the ponds disturbance to the existing wetland is kept to one access road.
The applicant will implement a restoration plan for the Bluff Creek Overlay District. The plan
previously submitted to city staff for approval, dated 9/29/05 and titled 'Preliminary Offsite
Upland Planting Plan' includes 75 bare-root trees including basswood, sugar maple, and red oak
and MNDOT seed mixes 325 and 350. All trees shall be installed with tree tubes and mesh
covers and mulched. The applicant shall submit full-sized plans with the final plat.
UTILITIES
Trunk sanitary sewer and watermain to serve the proposed development will be constructed with the
2005 MUSA Expansion Improvements, City Project 04-05. The proposed lateral watermain and
sanitary sewer within the site cannot be extended until the trunk utilities have been installed.
Lateral watermain will be stubbed to the northern stub of Street B and will be extended to the north
when the Fox property develops.
Each new lot is subject to the sanitary sewer and water hookup charges and the SAC charge at the
time of building permit. The 2006 trunk hookup charge is $1,575.00/unit for sanitary sewer and
$4,078.00/unit for watermain. The SAC charge is $1,625.00/unit. Sanitary sewer and watermain
hookup fees may be specially assessed against the parcel at the time of building permit issuance.
All of these charges are based on the number of SAC units assigned by the Met Council and are due
at the time of building permit issuance.
STREETS
The site plan identifies two road connections to the development: one from the Pioneer Pass
property to the west and one from the Fox property to the north. The developer's engineer must
coordinate the site design for Liberty at Creekside with the preliminary design of Pioneer Pass, as
shown on the drawings.
Staff does not support the northern street connection to the Fox property. This access must be
shifted to the east to the MNDOT right-of-way parcel and shall extend to the north property line of
the MNDOT right of way parcel.
The developer proposes to construct the following public streets:
. Street A, an east-west, 31-foot wide local street within a 60-foot wide right-of-way, and
. Street B, a north-south, 31-foot wide local street within a 60-foot wide right-of-way.
The site plan includes a 24-foot wide private street to serve Lots 5-10, Block 1. A 31-foot wide
private cu-de-sac is proposed to serve Lots 1-9, Block 2. The proposed private cul-de-sac will be 91
feet in diameter, which meets the City's minimum standard for a cul-de-sac. The proposed private
cul-de-sac is 500 feet long, which meets the ordinance requirements.
Liberty at Creekside
March 21, 2006
Page 12 of 23
Private stub streets will be constructed to serve Lots 10-17, Block 2. The developer has indicated
that Lots 13 and 14 will be reoriented so that the front of the units will face north and south. The
final plans must show the new orientation.
The developer proposes to construct five-foot wide concrete sidewalks on the north side of Street A
and the west side of Street B. A lO-foot wide bituminous trail will be constructed along the north
side of the creek. The site plan and final grading plan must identify this trail.
PARKS AND RECREATION
Parks
The proposed Liberty at Creekside subdivision is located within the 2005 MUSA area at the edge
of Bluff Creek and is proposed to be developed into 146 residential town homes. The city's
Comprehensive Park Plan calls for one acre of usable park space to be set aside for every 75
residents. Liberty at Creekside, as proposed, will result in an estimated 292 new residents
moving into Chanhassen. Therefore, this subdivision generates the need for 3.89 acres of new
parkland. However, the Comprehensive Plan also recognizes that building a small park in every
residential subdivision is undesirable and would result in an unmanageable municipal park
system. To this end, the plan calls for neighborhood parks to be centrally located within housing
regions with a maximum distance of one mile between neighborhood parks.
This pooling of resources and land in order to centrally locate parks in specific park service areas
results in the efficient use of limited capital and long-term maintenance dollars. In the case of
the Liberty at Creekside proposal, the City is planning to provide neighborhood park amenities at
a location approximately one-half mile to the west and south. Therefore, the City will be seeking
park fees in lieu of land dedication as a condition of this subdivision.
Trails
A variety of pedestrian improvements should be incorporated into the proposed Liberty at
Creekside plat. Foremost is a ten-foot wide asphalt trail to be constructed adjacent to and
paralleling the Bluff Creek Corridor. This important trail will need to be constructed on the
north side of Bluff Creek at this location. This trail is currently not reflected in the plans
submitted by the applicant. A rough sketch depicting the alignment for the creek trail was faxed
to the applicant on February 9,2006. Below is the applicant's preferred alignment. Additional
pedestrian trails, sidewalks, and trail connectors also need to be incorporated into the project as
required, including a sidewalk connection through the end of private street B. Design,
engineering, installation and testing costs associated with these pedestrian improvements are the
responsibility of the applicant. The city will reimburse the applicant for the cost of construction
materials only for the ten-foot wide Bluff Creek Trail. This reimbursement payment shall be
made upon completion and acceptance of the Bluff Creek Trail and receipt of an invoice
documenting the actual costs for the construction materials utilized in construction of this trail
segment.
Liberty at Creekside
March 21, 2006
Page 13 of 23
Preferred Trail Alignment
LOT INFORMA TION TABLE
Area (sq. ft.) Width (ft.) Depth (ft.) Housin~ Type
Ll Bl 10,811 130 85 Premier 4-unit
L2Bl 10,958 132 86 Premier 4-unit
L3 Bl 11,263 136 88 Premier 4-unit
UBI 10,623 124 86 Premier 4-unit
L5 Bl 10,624 126 85 Premier 4-unit
L6Bl 10,447 126 85 Premier 4-unit
L7Bl 10,577 120 83 Premier 4-unit
L8 Bl 14,365 173 83 Premier 6-unit
L9Bl 13,458 130 85 Premier 4-unit
LlO Bl 13,126 132 85 Premier 4-unit
Lll Bl 14,568 176 83 Premier 6-unit
L12 Bl 14,484 175 83 Premier 6-unit
Common Lot 13 853,879 (19.6 ac.)
Ll B2 10,306 124 83 Premier 4-unit
L2B2 14,709 152 84 Premier 6-unit
L3B2 14,919 180 83 Premier 6-unit
UB2 10,382 118 83 Premier 4-unit
L5B2 10,647 122 88 Premier 4-unit
L6B2 11,869 147 88 Premier 4-unit
L7B2 14,526 185 83 Premier 6-unit
L8B2 14,448 154 84 Premier 6-unit
Liberty at Creekside
March 21, 2006
Page 14 of 23
Area (SQ. ft.) Width (ft.) Depth (ft.) Housin2 Type
L9B2 10,968 132 83 Premier 4-unit
LlO B2 10,821 173 63 Concord 6-unit
Lll B2 10,821 173 63 Concord 6-unit
L12 B2 10,821 173 63 Concord 6
L13 B2 10,821 173 63 Concord 6
L14 B2 10,821 173 63 Concord 6
L15 B2 10,821 173 63 Concord 6
L16 B2 10,821 173 63 Concord 6
L17 B2 10,821 173 63 Concord 6
Common Lot 18 220,278 (5.06 ac.)
Outlot A 18,814 (0.43 ac.)
ROW 106,286 (2.44 ac.)
Total 1,568,596 (36.01 ac.)
GENERAL SITE PLAN/ARCHITECTURE
The developer is proposing two housing products: Concord and Premier.
The Concord product comes in four housing types ranging in size from 1,675 to 2,365 square
feet. Each building consists of six units. The Concord is proposed as a lookout structure. Each
unit has a two-car, rear-loaded garage. Each unit has a front stoop connected to a sidewalk
system. There are eight Concord Buildings being proposed.
The Premier product also comes in four housing types each with three levels of living area and
ranging in size from 1,550 to 1,795 square feet. Buildings come in four and six-unit
configurations. The Premier is proposed as either a full basement or walkout structure. There
are a total of 21 Premier Buildings being proposed - 14 four-unit and 7 six-unit structures.
Sec. 20-1088. Architectural style.
. Architectural style shall not be restricted. Evaluation of the appearance of a project shall
be based on the quality of its design and in relationship to its surroundings, guided by the
provisions of this section. Site characteristics to be evaluated for this purpose include
building and landscaping, colors, textures, shapes, massing of rhythms of building
components and detail, height of roof line, setback and orientation. Designs that are
incompatible with their surroundings or intentionally bizarre or exotic are not acceptable.
. Monotony of design, both within projects and between adjacent projects and its
surroundings, is prohibited. Variation in detail, form, and sighting shall provide visual
interest. Site characteristics that may be used for this purpose include building and
landscaping, colors, textures, shapes, massing of rhythms of building components and
detail, height of roof line, setback and orientation.
Liberty at Creekside
March 21, 2006
Page 15 of 23
. All building shall have a minimum of 20 percent of accent material. Accent material may
include brick, stone cut face block or shakes. The use of any EFIS shall not be on the first
story of any building or one story in height.
Finding: The proposed development has been well sited within the site. It attempts to fit into the
environment in which it is located including incorporating the site topography in building
layouts, terracing down to Bluff Creek. The buildings offer much variety including colors,
finishes, roof lines and materials. The buildings are oriented in multiple vectors to provide
varying site lines and building elevations.
Sec. 20-1089. Land use.
All development shall create a unified design of internal order that provides desirable
environments for site uses, visitors and the community. The following design elements shall be
incorporated into a project:
. The project shall create a unique neighborhood identity.
. Creation of interconnecting neighborhoods in collaboration with adjoining landowners
(street, walkways, preservation of natural features, parks and gathering places).
. Each neighborhood has a focal point or gathering place including parks, greens, squares,
entrance monuments, historic structures (siloslbams) or public furniture (gazebos,
benches, pergolas). Community features may include: landscaping, lighting, benches,
tables
. Recreation facilities (playgrounds, tot lots, swimming pools and gardens).
. Diversity of product type and design to accommodate different age groups and
individuals in different socio-economics circumstances.
. Broad variety of housing choices--twin homes, row houses, town homes, flats above
garages, apartments over shops, garden apartments, senior living opportunities and
condominiums.
Findings: The project creates its own little unique enclave. Tucked away within the Bluff Creek
Corridor with preserved natural areas on its north, south and west, this neighborhood is isolated,
yet connected through roads and trails, to the rest of the community. Common areas around
private street B and between Lots 6 and 7, Block 2 provide opportunities for focal points or
gathering places. There are potentially up to 16 different living area configurations within the
project, providing diversity in housing types to accommodate many different individuals.
Sec. 20-1090. Curb appeal.
To encourage roadway image or curb appeal projects shall create a variety of building orientation
along the roadways; attractive streetscape and architectural detail. All projects shall incorporate
two or more of the following design elements:
. Orientation to the street or access road:
· Setbacks
· Spacing between buildings and view sheds.
Liberty at Creekside
March 21, 2006
Page 16 of 23
. Architectural detail/decorative features.
· Windows.
· Flower boxes.
· Porches, balconies, private spaces.
· Location and treatment of entryway.
· Surface materials, finish and texture.
· Roof pitch.
· Building height and orientation.
. Location of garages.
. Landscaping including fencing and berming.
. Street lighting.
. Screening of parking, especially in apartment and condominium developments.
. Variations/differentiations in units including, but not limited to, color, material,
articulation etc.
Findings: The proposed development has been well sited within the site. It attempts to fit into
the environment in which it is located including incorporating the site topography in building
layouts, terracing down to Bluff Creek. The buildings offer much variety including colors,
finishes, roof lines and materials. The buildings are oriented in multiple vectors to provide
varying site lines and building elevations.
Sec. 20-1091. Transportation diversity.
All developments shall be incorporate multi-modal transportation including two or more of the
following elements:
. Streets with trails incorporated.
. Off road trials and bike paths.
. Provisions for mass transit with bus stops and shelters incorporated into the
developments.
. Sidewalk connecting internal developments.
· Undulating sidewalks. Use of pavers or stamped concrete.
· On-street parking and use of roundabouts.
· Landscaped boulevards or medians.
Findings: The proposed development offers two directions of access to the site as well as
walking and biking opportunities in both sidewalks and its connection to the Bluff Creek Trail
system.
Sec. 20-1092. Integration of parks, open space, natural historic or cultural resources.
. Integrate nature and wildlife with urban environment.
· Trails and sidewalks.
· Vistas.
· Historic features.
. Preservation of natural features that support wildlife and native plants (slopes, trees,
wetlands).
Liberty at Creekside
March 21, 2006
Page 17 of 23
Findings: The proposed development is preserving the Bluff Creek Overlay District in the
southern half of the site. In addition, trail connections to the Bluff Creek Trail system are
proposed. The units in Lot 14, Block 2, as well as individuals on the sidewalk will have an
overlook into the Bluff Creek Corridor. The terracing of the site provides additional
opportunities for residents to overlook the Bluff Creek Corridor.
RECOMMENDA TION
Staff recommends that the Planning Commission adopt the following four motions and adoption
of the attached findings of fact and recommendation:
A. "The Chanhassen Planning Commission recommends approval of the Rezoning of the
property located within the Liberty at Creekside development with the exception of Outlot A
and the Bluff Creek Overlay District Primary Zone, from Agricultural Estate District (A-2) to
Planned Unit Development - Residential (pUD - R) incorporating the development design
standards contained within this staff report."
B. "The Chanhassen Planning Commission recommends approval of the Preliminary Plat for
Liberty at Creekside, plans prepared by Westwood Professional Services, Inc., dated June 17, .
2005, revised February 3, 2006, subject to the following conditions:
1. The applicant shall prepare a noise analysis for noise that will be generated by traffic on
Highway 312. The analysis shall identify appropriate noise mitigation measures to meet
noise standards for residential homes.
2. The developer shall provide a design plan that shows the color and architectural detail for
each unit on the site for final plat approval.
3. The developer shall pay $6,285.00 as their portion of the 2005 AUAR.
4. The developer shall designate Common Lots 13 and 18 as Outlots.
5. The developer shall establish a separate outlot(s) for the land within the Bluff Creek Overlay
District primary zone.
6. Dedication of the Bluff Creek Overlay District primary zone shall be made to the city or a
conservation easement shall be established over said outlot(s).
7. The wetland mitigation for Liberty on Bluff Creek shall be constructed prior to or concurrent
with wetland impacts on the Liberty on Bluff Creek project.
8. Wetland replacement shall occur in a manner consistent with the Minnesota Wetland
Conservation Act (MR 8420) and the conditions of the Wetland Alteration Permit for Liberty
on Bluff Creek.
Liberty at Creekside
March 21, 2006
Page 18 of 23
9. Wetland buffers 16.5 to 20 feet in width (with a minimum average of 16.5 feet) shall be
maintained around Wetlands A and B and the constructed wetland mitigation areas. Wetland
buffer areas shall be preserved, surveyed and staked in accordance with the City's wetland
ordinance. The applicant shall install wetland buffer edge signs, under the direction of City
staff, before construction begins and must pay the City $20 per sign. All structures shall
maintain a minimum 40-foot setback from the edge of the wetland buffer.
10. Due to a secondary access through the MnDOT right-of-way (ROW) to the north in the
northeast portion of the property, the applicant will be responsible for creating or securing
sufficient wetland mitigation for MnDOT that will meet all conditions imposed on MnDOT
and will be responsible for any and all fees associated with the redesign of the wetland
mitigation areas in MnDOT ROW. Final plat approval shall not be granted until the wetland
mitigation plan has been received and approved by the City and MnDOT.
11. The plans shall be revised to show bluff areas (i.e., slope greater than or equal to 30% and a
rise in slope of at least 25 feet above the toe). All bluff areas shall be preserved. In addition,
all structures shall maintain a minimum 30-foot setback from the bluff and no grading shall
occur within the bluff impact zone (i.e., the bluff and land located within 20 feet from the top
of a bluff).
12. All structures shall maintain a minimum 40-foot setback from the primary corridor. No
alterations shall occur within the primary corridor or within the first 20 feet of the setback
from the primary corridor.
13. The applicant shall submit a plan for the revegetation of the farmed area south of Bluff Creek
that incorporates native plants and is consistent with the City's Bluff Creek Natural
Resources Management Plan Appendix C. Special attention shall be paid to areas with steep
slopes (greater than 3: 1).
14. Alterations appear to be proposed within a mapped FEMA unnumbered A Zone (lOO-year
floodplain). In lieu of a LOMA, the applicant shall obtain a conditional use permit for
alterations within the floodplain.
15. A storm water pollution prevention plan (SWPPP) shall be developed for the development
and shall be completed prior to applying for the National Pollutant Discharge Elimination
System permit.
16. A stable emergency overflow (EOF) shall be provided for the proposed pond. The EOF
could consist of riprap and geotextile fabric or a turf re-enforcement mat (a permanent
erosion control blanket). A typical detail shall be included the plan.
17. The plans shall show paths of access to both wetland mitigation areas as well as all erosion
controls and restoration practices.
18. Erosion control blanket shall be installed on all slopes greater than or equal to 3:1. All
exposed soil areas shall have temporary erosion protection or permanent cover year round,
according to the following table of slopes and time frames:
Liberty at Creekside
March 21, 2006
Page 19 of 23
Type of Slope
Steeper than 3: 1
10:1 to 3:1
Flatter than 10: 1
Time
7 days
14 days
21 days
(Maximum time an area can
remain open when the area
is not actively being worked.)
These areas include constructed storm water management pond side slopes, and any exposed
soil areas with a positive slope to a storm water conveyance system, such as a curb and gutter
system, storm sewer inlet, temporary or permanent drainage ditch or other natural or man
made systems that discharge to a surface water.
19. Street cleaning of soil tracked onto public streets shall include daily street scraping and street
sweeping as-needed.
20. The applicant shall provide details for curbside inlet control. Wimco-type inlet controls shall
be used and installed within 24 hours of installation.
21. Typical building lot controls shall be shown on the plan. These controls may include
perimeter controls (silt fence), rock driveways, street sweeping, inlet control and temporary
mulch after final grade and prior to issuing the certificates of occupancy.
22. The proposed storm water pond shall be used as a temporary sediment basin during mass
grading. The pond shall be excavated prior to disturbing up gradient areas. Diversion berms
or ditches may be needed to divert water to the pond and a temporary pond outlet is needed.
The outlet could be a temporary perforated standpipe and rock cone. A detail for the
temporary pond outlet shall be included in the plans. Additional temporary sediment basins
may be needed or an alternate location may be needed depending upon site conditions during
rough grading.
23. The ultimate outlet from the site to Bluff Creek shall be turned to the southeast to align with
the creek.
24. Drainage and utility easements (minimum 20 feet in width) should be provided over all
existing wetlands, wetland mitigation areas, buffer areas used as PVC and storm water ponds.
An easement adequate to provide access to the pond for maintenance purposes is needed and
should be shown on the plan.
25. At this time, the estimated total SWMP fee, due payable to the City at the time of final plat
recording, is $266,850.
26. The applicant shall apply for and obtain permits from the appropriate regulatory agencies
(e.g., Riley-Purgatory-Bluff Creek Watershed District, Minnesota Pollution Control Agency
(NPDES Phase II Construction Permit), Minnesota Department of Natural Resources (for
dewatering), Minnesota Department of Health, Minnesota Department of Transportation) and
comply with their conditions of approval.
27. Tree protection fencing shall be installed prior to construction around all areas designated for
preservation and/or at the edge of proposed grading limits.
Liberty at Creekside
March 21, 2006
Page 20 of 23
28. Silt fence or tree protection fencing shall be installed at the edge of grading around both
wetland mitigation areas.
29. A fenced access road will lead from the east mitigation area to the west mitigation area. This
will be the only access allowed to the western site. Fencing shall be placed on either side of
the access lane. After construction, the access lane shall be restored according to the
'Preliminary Offsite Upland Planting Plan'.
30. A walk-through inspection of the silt/tree preservation fence shall be required prior to
construction.
31. No burning permits shall be issued for tree removal. All trees removed on site shall be
chipped and used on site or hauled off.
32. The applicant shall implement the 'Preliminary Offsite Upland Planting Plan' dated 9/29/05
for restoration within the Bluff Creek Overlay District.
33. The applicant shall submit a full sized 'Preliminary Offsite Upland Planting Plan' with final
plat submittal.
34. A turf plan shall be submitted to the city indicating the location of sod and seeding areas.
35. The developer shall pay full park dedication fees at the rate in force upon final plat approval
in lieu of parkland dedication.
36. The applicant shall provide all design, engineering, construction and testing services required
of the "Bluff Creek Trail." All construction documents shall be delivered to the Park and
Recreation Director for approval prior to the initiation of each phase of construction. The
trail shall be ten feet in width, surfaced with bituminous material and constructed to meet all
City specifications. The applicant shall be reimbursed for the actual cost of construction
materials for the Bluff Creek Trail. This reimbursement payment shall be made upon
completion and acceptance of the trail and receipt of an invoice documenting the actual costs
for the construction materials utilized in its construction.
37. The developer shall provide a sidewalk connection to the Bluff Creek trail through private
street B.
38. The developer must coordinate the location and elevation of the western street connection
with the Pioneer Pass (Peterson Property) and Degler property developments to the west and
northwest.
39. The height and length of retaining walls must be reduced to the maximum extent possible.
40. The top and bottom of wall elevations must be shown on the final grading plan.
41. A building permit is required for any retaining walls four feet high or taller. These walls
must be designed by a Structural Engineer registered in the State of Minnesota.
Liberty at Creekside
March 21, 2006
Page 21 of 23
42. The style of home and lowest floor elevation must be noted on the grading plan.
43. Typical sections for each housing style must be shown on the final grading plan.
44. The final grading plan must be 50 scale so that staff can complete a full review of the
proposed grading.
45. The developer must verify the invert elevation of the sanitary sewer connection that will be
constructed with the 2005 MUSA Improvement Project.
46. The development may not proceed until the Phase II 2005 MUSA utility extension project
has been awarded.
47. Each new lot is subject to the sanitary sewer and water hookup charges and the SAC charge
at the time of building permit. The 2006 trunk hookup charge is $1,575.00/unit for sanitary
sewer and $4,078.00/unit for watermain. The SAC charge is $1,625.00/unit. Sanitary sewer
and watermain hookup fees may be specially assessed against the parcel at the time of
building permit issuance. All of these charges are based on the number of SAC units
assigned by the Met Council and are due at the time of building permit issuance.
48. The northern access (currently shown to the Fox property) must be shifted to the east to the
MNDOT right-of-way parcel.
49. The Arterial Collector Fee shall be paid with the final plat. The 2006 fee is
$2,400/developable acre.
50. The final plans must show the new orientation for Lots 13 and 14, Block 2.
51. The site plan and final grading plan must identify the proposed lO-foot wide bituminous trail.
C. "The Chanhassen Planning Commission recommends approval of Site Plan for 146
townhouses, plans prepared by Westwood Professional Services, Inc., dated June 17, 2005,
revised February 3, 2006, subject to the following conditions:
1. The developer shall enter into a site plan agreement with the City and provide the necessary
security to guarantee erosion control, site restoration and landscaping.
2. The developer shall provide a design plan that shows the color and architectural detail for
each unit on the site for final plat approval.
3. Walls and projections within 3 feet of property lines are required to be of one-hour fire-
resistive construction.
4. A final grading plan and soils report must be submitted to the Inspections Division before
permits can be issued.
Liberty at Creekside
March 21, 2006
Page 22 of 23
5. No burning permits will be issued for trees to be removed. Trees and shrubs must either be
removed from site or chipped.
6. Temporary street signs shall be installed on street intersections once construction of the new
roadway allows passage of vehicles. Pursuant to 2002 Minnesota Fire code Section 501.4.
7. A fire apparatus access road shall be designed and maintained to support the imposed load of
fire apparatus and shall be serviced so as to provide all-weather driving capabilities.
Pursuant to Minnesota Fire Code Section 503.2.3.
8. Fire apparatus access road and water supplies for fire protection is required to be installed.
Such protection shall be installed and made serviceable prior to and during the time of
construction except when approved alternate methods of protection are provided.
9. A lO-foot clear space must be maintained around fire hydrants, i.e., street lamps, trees,
shrubs, bushes, Xcel Energy, Qwest, Cable TV and transformer boxes. This is to ensure that
fire hydrants can be quickly located and safely operated by firefighters. Pursuant to
Chanhassen City Ordinance #9-1.
10. Submit street names to Chanhassen Building Official and Chanhassen Fire Marshal for
review and approval.
11. "No Parking Fire Lane" signs will be required on the private streets. Contact Chanhassen
Fire Marshal for exact location of sign. Pursuant to Chanhassen Fire Department/Fire
Prevention Policy #06-1991.
D. "The Chanhassen Planning Commission recommends approval of Conditional Use Permit
for alterations within the flood plain and development within the Bluff Creek Overlay District
subject to the following conditions:
1. The applicant shall implement the 'Preliminary Offsite Upland Planting Plan' dated 9/29/05
for restoration within the Bluff Creek Overlay District.
2. The applicant shall submit a full-sized 'Preliminary Offsite Upland Planting Plan' with final
plat submittal.
3. The wetland mitigation for Liberty on Bluff Creek shall be constructed prior to or concurrent
with wetland impacts on the Liberty on Bluff Creek project.
4. Wetland replacement shall occur in a manner consistent with the Minnesota Wetland
Conservation Act (MR 8420) and the conditions of the Wetland Alteration Permit for Liberty
on Bluff Creek.
Liberty at Creekside
March 21, 2006
Page 23 of 23
5. Wetland buffers 16.5 to 20 feet in width (with a minimum average of 16.5 feet) shall be
maintained around Wetlands A and B and the constructed wetland mitigation areas. Wetland
buffer areas shall be preserved, surveyed and staked in accordance with the City's wetland
ordinance. The applicant shall install wetland buffer edge signs, under the direction of City
staff, before construction begins and must pay the City $20 per sign. All structures shall
maintain a minimum 40-foot setback from the edge of the wetland buffer.
ATTACHMENTS
1. Findings of Fact and Recommendation.
2. Development Review Application.
3. Extension Letter from Shawn Siders to Bob Generous dated January 9,2006.
4. Reduced Copy Preliminary Plat.
5. Reduced Copy Site Plan.
6. Concord Collection Product Elements.
7. Concord Elevation.
8. Premier Collection Product Elements.
9. Premier Building Elevations.
10. Revised Preliminary Plat Submission for Liberty at Creekside dated 6/14/05.
11. Northern Street Connection Schematic.
12. Liberty at Creekside Site Section.
13. Letter from Aaron Mlynek, SWCD, to Kate Aanenson dated 2/23/06.
14. Memo from Mark Littfin to Robert Generous dated 2/23/06.
15. Letter from Juanita Voigt, MnDOT, to Bob Generous dated 7/27/05.
16. Public Hearing Notice and Mailing List.
g:\plan\2005 planning cases\05-24 liberty at creekside\staff report revised pud.doc
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
FINDINGS OF FACT
AND RECOMMENDATION
INRE:
Application of Town & Country Homes:
Rezoning of property from A-2 to PUD-R; Subdivision of approximately 36.01 acres into 29 lots,
5 outlots, and public right-of-way; Site Plan Approval for 146 townhouses; and Conditional Use
Permit for alterations within the flood plain and development within the Bluff Creek Overlay
District. The property is located east of Audubon Road, north of Pioneer Trail and northwest of
future Highway 312 (1500 Pioneer Trail) - LIBERTY AT CREEKSIDE.
On March 21, 2006, the Chanhassen Planning Commission met at its regularly scheduled
meeting to consider the application of Town & Country Homes for a townhouse project. The
Planning Commission conducted a public hearing on the proposed Planned Unit Development
preceded by published and mailed notice. The Planning Commission heard testimony from all
interested persons wishing to speak and now makes the following:
FINDINGS OF FACT
1. The property is currently zoned Agricultural Estate District, A2.
2. The property is guided in the Land Use Plan for Residential- Medium Density uses.
3. The legal description ofthe property is: (See attached Exhibit A).
4. The Zoning Ordinance directs the Planning Commission to consider six (6) possible
adverse affects of the proposed amendment. The six (6) affects and our findings
regarding them are:
a) The proposed action has been considered in relation to the specific policies and
provisions of and has been found to be consistent with the official City
Comprehensive Plan.
b) The proposed use is or will be compatible with the present and future land uses of
the area.
c) The proposed use conforms with all performance standards contained in the
Zoning Ordinance.
d) The proposed use will not tend to or actually depreciate the area in which it is
proposed.
1
e) The proposed use can be accommodated with existing public services and will not
overburden the city's service capacity.
f) Traffic generation by the proposed use is within capabilities of streets serving the
property.
5. The Subdivision Ordinance directs the Planning Commission to consider seven possible
adverse effects of the proposed subdivision. The seven (7) effects and our findings
regarding them are:
a. The proposed subdivision is consistent with the zoning ordinance;
b. The proposed subdivision is consistent with all applicable city, county and regional
plans including but not limited to the city's comprehensive plan;
c. The physical characteristics of the site, including but not limited to topography,
soils, vegetation, susceptibility to erosion and siltation, susceptibility to flooding,
and storm water drainage are suitable for the proposed development;
d. The proposed subdivision makes adequate provision for water supply, storm
drainage, sewage disposal, streets, erosion control and all other improvements
required by this chapter;
e. The proposed subdivision will not cause significant adverse environmental damage;
f. The proposed subdivision will not conflict with easements of record; and
g. The proposed subdivision is not premature. A subdivision is premature if any of the
following exists:
(1) Lack of adequate storm water drainage.
(2) Lack of adequate roads.
(3) Lack of adequate sanitary sewer systems.
(4) Lack of adequate off-site public improvements or support systems.
6. When approving a conditional use permit, the City must determine the capability of a
proposed development with existing and proposed uses. The general issuance standards of
the conditional use Section 20-232, include the following 12 items:
a. The proposed development will not be detrimental to or endanger the public health,
safety, comfort, convenience or general welfare ofthe neighborhood or the city.
b. The proposed development will be consistent with the objectives ofthe city's
comprehensive plan and this chapter.
2
c. The proposed development will be designed, constructed, operated and maintained so to
be compatible in appearance with the existing or intended character of the general
vicinity and will not change the essential character of that area.
d. The proposed development will not be hazardous or disturbing to existing or planned
neighboring uses.
e. The proposed development will be served adequately by essential public facilities and
services, including streets, police and fire protection, drainage structures, refuse
disposal, water and sewer systems and schools; or will be served adequately by such
facilities and services provided by the persons or agencies responsible for the
establishment of the proposed use.
f. The proposed development will not create excessive requirements for public facilities
and services and will not be detrimental to the economic welfare ofthe community.
g. The proposed development will not involve uses, activities, processes, materials,
equipment and conditions of operation that will be detrimental to any persons, property
or the general welfare because of excessive production of traffic, noise, smoke, fumes,
glare, odors, rodents, or trash.
h. The proposed development will have vehicular approaches to the property which do not
create traffic congestion or interfere with traffic or surrounding public thoroughfares.
1. The proposed development will not result in the destruction, loss or damage of solar
access, natural, scenic or historic features of major significance.
J. The proposed development will be aesthetically compatible with the area.
k. The proposed development will not depreciate surrounding property values.
1. The proposed development will meet standards prescribed for certain uses as provided
in Chapter 20, Articles IV, V and VI of the Chanhassen City Code.
7. Site Plan Review requires that the proposed development:
a. Is consistent with the elements and objectives ofthe City's development guides,
including the comprehensive plan, official road mapping, and other plans that may be
adopted;
b. Is consistent with Chapter 20, Article II, Division 6, Site Plan Review of the
Chanhassen City Code;
c. Preserves the site in its natural state to the extent practicable by minimizing tree and
soil removal and designing grade changes to be in keeping with the general
appearance of the neighboring developed or developing areas;
3
d. Creates a harmonious relationship of building and open space with natural site
features and with existing and future buildings having a visual relationship to the
development;
e. Creates a functional and harmonious design for structures and site features, with
special attention to the following:
(1) An internal sense of order for the buildings and use on the site and provision of a
desirable environment for occupants, visitors and general community;
(2) The amount and location of open space and landscaping;
(3) Materials, textures, colors and details of construction as an expression of the
design concept and the compatibility of the same with adjacent and neighboring
structures and uses; and
(4) Vehicular and pedestrian circulation, including walkways, interior drives and
parking in terms oflocation and number of access points to the public streets,
width of interior drives and access points, general interior circulation, separation
of pedestrian and vehicular traffic and arrangement and amount of parking.
f. Protects adjacent and neighboring properties through reasonable provision for surface
water drainage, sound and sight buffers, preservation of views, light and air and those
aspects of design not adequately covered by other regulations which may have
substantial effects on neighboring land uses.
8. The planning report #05-24 dated March 21,2006, prepared by Robert Generous, et aI, is
incorporated herein.
RECOMMENDATION
The Planning Commission recommends that the City Council approve the Rezoning of
property from Agricultural Estate District, A-2, to Planned Unit Development - Residential, PUD-
R; Subdivision of approximately 36.01 acres into 29 lots, 5 outlots, and public right-of-way; Site
Plan Approval for 146 townhouses; and Conditional Use Permit for alterations within the flood
plain and development within the Bluff Creek Overlay District.
ADOPTED by the Chanhassen Planning Commission this 21 8t day of March, 2006.
CHANHASSEN PLANNING COMMISSION
BY:
Its Chairman
4
Planning Case No. 05 - ~ '-/
CITY OF CHANHASSEN
7700 Market Boulevard - P.O. Box 147
Chanhassen, MN 55317 - (952) 227-1100
CITY OF CHANHASSEN
RECEIVED
JUN 1 7 2005
DEVELOPMENT REVIEW APPLICATION
CHANHASSEN PLANNING om
Owner Name and Address:
i
X- t:;
Contact: ~VlS-ht. 1Jt~ ~ (
Phone:t}S-Z -1..t;?'~Oi.J14 Fax: qS-l. - ql.ft.{-34S)"
Email: \LYlW fl- CI<~-nWVItltt.~ ~UYl1n1IAmlUm",
ct'h-
Contact:
Phone:
Email:
Fax:
Comprehensive Plan Amendment
Temporary Sales Permit
Conditional Use Permit
Vacation of Right-of-Way/Easements
Interim Use Permit
Variance
Non-conforming Use Permit
Wetland Alteration Permit
X Planned Unit Development* '7.sD
t
-X- Rezoning
Zoning Appeal
Zoning Ordinance Amendment
Sign Permits
x
Notification Sign** - $75 + $100 Damage Deposit
Sign Plan Review
x
Site Plan Review* 1"2. 10
r 500~ 5 ~ 1'4-'2.)
x
Escrow for Filing Fees/Attorney Cost***
- $50 CUP/SPRNACNARIWAP/Metes & Bounds
- $450 Minor SUB
Subdivision*
TOTAL FEE $
f( An additional fee of $3.00 per address within the public hearing notification area will be invoiced to the applicant prior to
the public hearing.
* Twenty-six (26) full-size folded copies of the plans must be submitted, including an 8%" X 11" reduced copy for each plan sheet
along with a diqital copy in TIFF-Group 4 (*.tit) format.
** Applicant to obtain notification sign from City of Chanhassen Public Works at 1591 Park Road and install upon submittal of
completed application. $100 damage deposit to be refunded to applicant when sign is returned following City Council approval.
*** Escrow will be required for other applications through the development contract.
Building material samples must be submitted with site plan reviews.
NOTE: When multiple applications are processed, the appropriate fee shall be charged for each application.
SCANNEO
,
PROJECT NAME: L?
LOCATION: t:-tl ~ t ~ Au
LEGAL DESCRIPTION: _pl.e/(~
l-I' VlU+ YD
~Mh 'v6
Isoa ?iO'C\eerlra.,\
~t2-
?;ro. ~{g t
WETLANDS PRESENT: ~ YES NO
PRESENT ZONING: tZ-~I'x~I'iU'lA. CpAiL5I~.{~;~ !f~ -.!l1r-
REQUESTEDZONING:5UD -11Ap..;\. ~~\~ ~ '
PRESENT LAND USE DESIGNATION: J!1-cAt' Lt4vL j)tL191~ 1'-tc 9t'<?la-"!,',J2
REQUESTED LAND USE DESIGNATION:
REASON FOR REQUEST: .?\ {...fA 5l
TOTAL ACREAGE:
Q"t ~~A. A1tl,;~ ~ -P-r
r g'71JYL( ~ rl-4tfUf '
This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information
and plans required by applicable City Ordinance provisions. Before filing this application, you should confer with the
Planning Department to determine the specific ordinance and procedural requirements applicable to your application.
A determination of completeness of the application shall be made within 15 business days of application submittal. A written
notice of application deficiencies shall be mailed to the applicant within 15 business days of application.
This is to certify that I am making application for the described action by the City and that I am responsible for complying with
all City requirements with regard to this request. This application should be processed in my name and I am the party whom
the City should contact regarding any matter pertaining to this application. I have attached a copy of proof of ownership
(either copy of Owner's Duplicate Certificate of Title, Abstract of Title or purchase agreement), or I am the authorized person
to make this application and the fee owner has also signed this application.
I will keep myself informed of the deadlines for submission of material and the progress of this application. I further
understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any
authorization to proceed with the study. The documents and information I have submitted are true and correct to the best of
~ {P/JD~{OfJ
Signature of Fee Owner
Date
G:\plan\forms\Development Review Application.DOC
Rev. 4/05
SCANNED
~
TOWN &: COUNTRY HOMES
a K Hovnanian. Company
January 9, 2006
Mr. Bob Generous
Senior Planner
City of Chanhassen
7700 Market Boulevard
p.o. Box 147
Chanhassen, MN 55317
RECEIVED
JAN 11 2006
CITY OF CHANHASSEN
RE: Liberty at Creekside
Dear Mr. Generous:
As a follow up to our recent conversation, I am sending this letter requesting an extension for
preliminary plat review for the Liberty at Creekside project. Town & Country Homes
submitted those plans on June 17, 2005. By copy of this letter, I would request that you consider
an extension of the city review period of the preliminary plat for an additional 63 days from
February 3,2006 to May 8,2006.
Thank you for your consideration of this request. If you have any questions or concerns, please
do not hesitate to contact me at 952-253-0460.
hawn Siders
Community Planning Manager
Town & Country Homes
a. K. Hovnanian Company
cc: Kevin Clark, Vice President of Land Development
~,
7615 Smetana Lane, Suite 180 . Eden Prairie, Minnesota 55344 . Phone 952-944-3455 . Fax 952-944-3437 . www.townandcountryhomesmn.com
Minnesota Builder #20539403 & #20543466
i
~
n ~ ! ~~ Ii h ~
:: ~ :; ll:l~n 8
~~ t i i ll~~~~ 8
~ ~ ~ i.. l~le~~ ':;l
~~ U I ~ !~ .~! U
i" l I idl~A e.
.iJj {:;'
III ~ i .. 'Ii
;3 ~ i~ Ii
~ )1 I I ~ ~ J s i~ 11
El I ] I~ !!il~ ! ~~ i!! j: ~
~ !Hr'li' rPl UiIHI~llh~3 I j i t
d iifH~ii:i;if~I]iHi~iHUllni~j:!
~
jH
l~i'
iH '"
Eli :
gh~..~ne;~~1i
~<ij~~Sgg~g~Sg
~i";;~ SR~~~~8l:tf::
st -.: Q: Q: Qo ~.dd~ ..:~1rStd
{
g% %
~~ ~
...~ ~
~i!
iH
~.!.!
t!t::t!ttc:!t!~
2~2~~2~
~
I~
!~~i~
l:(~~~& ...
~~~~ Q
I!;!:l:t o-l
"lr~'~:C ~
:W) l~i
~~hU ~
It
]
~
~
~
'8
z
'\-....<'~~---
....... ~ ---
'~o""'" --- I
/
/
/
J
/
'~~~~_../.. _------, .D~~ ,,,/'
--- ,--~~----------'
::l
~ ~
t- ~
B-8
0<
5<
oz
ss
. <
,..,--....>< ......---
~~~
~~
'>
~~"
..'
I
./
./
/,/
/ tt"LDa
/
/
/
Sl"tOCH
-
M.9t .rOo8llN
I
I
I
~ ! ~
l e
~ ~ ~ ..
~ J
z I~
~ ~
X b ~
~ .... (U
a
iI llS"'tS I
....
. . ,e.. CJ)
H ~~ 1
-9 ~
~ ~tJ
I':
j III
I z fu
w "" '"
I <J) =
<J) "
I -<0 = Z
IW '"" Z
~;?: .... z
:5
IW = Q.
I uU z
I u..W 0: w
Oll: '"
I ~ Cl: '"
::;; ~
0 z <:!
I g
I --
I -- t
-- E!
I (
I
I I .\>J
.. .~
:)
~ Jl
I
-
JllJ
1
!
I
II
tll.
;,' 'I
HI
I!-
III . i
111
IlL
!li
J
ftl.UlI'
Jd I
u Iii
rt]
p
In.... .:>01"'" wtt;>n'r;I ~VTIl~'m;:>llll.7\CAD\IJIII~'"
.~
..o~!!
i~~~
i ~~
J~ 2.t
i"' h
::. f5 ......
~ if 6~
~8!!
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
'--- - -
I
I
I
I
I
I
I
I
I
I
I
I
I
"
""'-
""'-
""'-
""'-
""'-
""'-
""'-
""'-
""'-
""'-
""'-
""'-
""'-
""'-
""'-
""'-
""'-
,,--
--"
---
,,"
,.;;.~'
,,"
,,"
",,"
I
I
I
I
I
I
I
I
I
I
I
I
I
~~
~h
~ e
~ .
~ .
: J
&
~ !!
~
b !
3!lii
l/)jC
"..,. .
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
l
..........
..........
']
l
.... G.I
ttl -0 I
....
tOO..
]1
;:l cl
z t
"' co lU
(f) 0 a
(f) '"
10 0 z
?i~ '" z
...... z
:rW ~
oU <::>
...w z
ocr a:: lU
(f)
i':: c::( (f)
::;; ~
0 ~
u
~I
1~
1
I
Illl
II
t
111 I
Hi
----- .".
\ t!"
,II ~
"'- ,1'
tfl
"\ !JI ,
-
.
I ·
II! iii.
JII I
II liS
,
t.i
....1
J.S~ Md It'6O't 9002/2/2 8av10JdS"D12'OC2\~1l0tlOOl\'d
~
r;i';
III
'dll
~r =i
fTl
PJ
~
~
.,
s
~
~
"
~
~
~p
"g
~{~
t,~
9
r~ ;~;
ii m
~~~
.'
i~
9
~,;ll
'1'1Il
'Q
~~ ~
G
::.
<,rTl =i
r
m
r;:
~
\$"> 1;!
C c,
z
-I
.cD
l~
CJ
Z I!
~
~
<0
"
~
~
~
, I
I
I I
il'l!! !
~;~~;
..;; ;.; ~~ ;"
~&Z~~
1~~ ~
~ :;;
i _
.
I'
~~ ~ I ~;.~l!~~ ~~;m:
. ~ . 5;i;1; ,~~;1-~
Q;~I"'}}: :~~ j ,,~i
< !'.;'.' ,'~i' .
'~i""';..:?ii:~ I
1 ~lih: .!;,~a
~ ~!i:; m~;'
a >
~ ~
~~~ TOWN & CO~NTRY HOMES
I~ Chanhassen. Minnesota
16 UNITS A - B - E
"">:::....
.l, ~ \,
ill, Oc I'
~.i~~ nz
p;, :C;'"
,,".. "'0
~~~~ ~::
:;':t, Cho.(m
i ~
,
~
~
~ ~
lnd
~~~~
~~~II ~ '10
. ;o~
i rrl~11 - oi
-' ,~II ":z
; rrlXII ~ ~~
; ~~H= b "
. rrlVl '-
-jJ:11 ,x z
fTl~ '"
O'ill "
z--< ~f2
..
"'tJ
:D II
~~
-II
mil
:DII
II
I
II ...
II
II
II
If
II
lL
II
.,
""
"
-"C
-~
>-
""
PREMIER COLLECTION
~LOCA1lOIl
LIBERTY AT CREEKSIDE
! CHANHASSEN, MN
"'-""" """""'''' UBERTY AT CREEKSIDE
~
TOWN & COUNTRY HOMES
7615 Smetana Lane Suite 180, Ede. Prairie, MN 55344
Phooe:(9S2)944-34SS Fax:(952)944-3437
<
Revised Preliminary Plat Submission for:
I
at creekside
CITY OF CHANHASSEN
RECEIVED
Submitted By
JUN 1 7 2005
CHANHASSEN PLANNING DEPT
~ ~:;v~'anian.COIllPanY
LiIJat\' ilt Creekside
Revised Preliminary Plat Submittal June 14.2005
Community Name
Liberty at Creekside
'~~-IIi":",~ JIb_
:~~..~r ....
Legal Description
Legal Description
NW1/4 NW1/4 26-116-23-TRACT A
ALSO COMM AT SW CORN 23-116-23
TH N ON SECT LINE 30' TH IN A
STRAIGHT LINE TO A PT ON S
SECT LINE OF SECTION 30' E OF
Section: 23 Township: 116 Range: 023
Lihl:'r!\' at Crel:'ksidl:'
Revised Preliminary Plat Submittal ./une 14. ::W05
Contact Information
LANDOWNER
NDI Minnesota, LLC
C/O Hovstone Properties MN, LLC
7516 Smetana Lane, Suite 180
Eden Prairie, MN 55344
Contact: Krista Novack ph. (952) 253-0448 fax (952) 944-3437
DEVELOPER/APPLICANT
Town and Country Homes - a K. Hovnanian Company
7516 Smetana Lane, Suite 180
Eden Prairie, MN 55344
Contact: Krista Novack ph. (952) 253-0448 fax (952) 944-3437
SITE PLANNING, ENGINEERING
Westwood Professional Services
7599 Anagram Drive
Eden Prairie, MN 55344
Contact: Chris Moerhl ph.(952) 906-7443 fax (952) 937-5822
Planning
PUD
Current Zoning:
Proposed Zoning:
Total Gross Acreage:
Slopes:
Existing Wetlands:
Mitigated Wetlands:
Total Net Acreage:
A-2, Agricultural Preservation
PUD/~ediu_m Density Residential
36.01 Acres
1.47 Acres
0.90 Acres
2.77 Acres
30.87 Acres
ROW:
Oulots:
3.55 Acres
0.43 Acres
Total Homes:
138 Homes (Premier Collection)
Gross Density:
Net Density:
-,
3.83 Homes per AC
I
~.47 Homes per AC
(*Medium Density Residential allows for
8 Homes per AC Maximum Net Density)
Lihert\' at Creekside
Revised Preliminary Plat Submittal June 14.2005
Street, Roadways & Drives:
,.,......,..... -
Public Street 32ft. B-B; 60ft. RO'^ll
(Including Parking on One Side)
Private Streets 32ft. B-B
Private Drives 20ft. & 25ft. B-B
- ---
Setbacks (Minimums):
Public ROW
Private Street
Private Drive
Abutting Property
Wetland Buffer
Building to Building
25ft. w/walk, 15ft.w/out walk
25ft. back of curb
20m back to curb
I
50ft.
40f1-
20m
Liberty at Creekside is currently zoned Agricultural and guided for Medium
Density Residential. Town and Country Homes is proposing a PUD/Medium
Density Residential community for Liberty at Creekside. This enables us to be
creative with our site layout and design, and allows for more opportunity for
preservation, community character, and density clustering. The site planning for
Liberty at Creekside has taken into consideration the Bluff Creek Overlay District
boundary lines and buffering requirements, as well as the information deriving
from the AUAR conducted for the 2005 MUSA Expansion Area.
Access is a difficult obstacle in planning this community. We are proposing road
access at the NW corner of the site just south of a slope area. We feel that this is
the least obtrusive option in providing street access to the community from the
major collector road planned for the area. Another difficulty with this site is the
topography. Basement products and creative street layouts help us to work with
the steep slopes. We have gone through a number of various concepts for this
site and are confident that we have shaped a plan that uses the site's natural
features to its advantage.
Architecture
Liberty at Creekside will feature our Premier Collection, which is our basement
style townhome.
Base Price:
Mid 200's
Sq. Footaqe:
1400-1800s.f.
Number of Homes: 142
Hiqhlights:
Lihert\' at Creekside
Revised Preliminary Plat Submittal June 14. 2005
Provides a plan with the Master on the Main Floor
Walk-Out Basements
Bright and Filled with Windows
Stvle: Scenic, Cozy, Relaxed, Luxurious, and Private
Community Placement: Takes advantage of Preservation/Steep Slope areas in
the community by bringing the focus to the back of the homes with balconies and
walkout basements. This Collection also boasts a more Natural Setting and
provides yet another housing style for the life cycles within the "Liberty"
communities and Chanhassen.
Market: Empty Nesters, Move-Up Townhome Buyers, and Families.
Since Town & Country Homes first proposed the Premier homes for Liberty on
Bluff Creek (which is the larger site to the West along Audubon), we have
upgraded the look of the homes to integrate an even more traditional flare, and to
customize the homes special for the City of Chanhassen.
Woodlands, ponds, wetlands and the
highly regarded Bluff Creek Overlay
district surround Liberty at Creekside. In
planning this community, our best efforts
were focused on preserving as much of
the site's natural integrity as possible.
Product selection and layout plays an
enormous role in optimizing all the site
has to offer. Site walks and discussion
with city staff has lead us to the attractive Liberty at Creekside plan we have
today. The "Liberty" communities will truly offer something special to homebuyers
by surpassing normal levels of green space preservation, outdoor activity
possibilities, and desirable locations.
Quality of Life
Homeowners Association:
Lihert\' at Creekside
Revised Preliminary Plat Submittal June 14.2005
A Homeowners Association will maintain all common areas, private streets, and
amenities - including the community pool. Town & Country Homes is proficient
and experienced in HOA creation and management. We take pride in the
management companies we hire and expect a high level of standards and
performance. This guarantees that the community will be meticulously
maintained, and will retain a high value for years to come.
Noteworthy News:
Very recently, a well-known and successful national homebuilder just entering
into the Minnesota market place, K. Hovnanian, has acquired Town & Country
Homes. This is an exciting turning point for Town & Country Homes because we
will now be backed with even more ability to venture into unique and innovative
opportunities. K. Hovnanian is a publicly held company, yet still maintains strong
family values and ownership, which was important to Town & Country Homes
and the Ryan family. Town & Country Homes will keep its name, and current
office location. We look forward to expanding on our success in the homebuilding
community.
To learn more about K. Hovnanian, visit their website at www.khov.com.
(!f}oYoo:;a::S)A Family o( Builders
. -
Lihert\' ilt Creekside
Revised Preliminary Plat Submittal June 14.2(0)
'- ,/
" / I I~ "
" / x ) \U
\ co w
I --J \0 ) I I 0'
I i1' '" w ! I <'" \0
\ / \0
X /'" / W -"
\ ! ..,
'- , ,.,-,,-/ I ,
-, i
I
/-- \ \
-, \
J "
..~
r:i
__J
.----'
',,- ..-//
.../- ...................
/
/
'.........
\
co
co
, 0)
\ X"
I
'"'-,
/-
<s!,
d.:
/'
z~
No~e('"
-s-h-ee.t
C L...-" 31z}oV.>
()V\ v1e-a-i~t/~
",
,.,.~ -^
~:~
.....-
()
,'4>
(I)
,.~
'Uj
:z
"'
<n
en
~6J
~~
:z:w
uo
,,-w
oa:
>-
I-
o
o
oJ
Z
Z
..
o
..
co
CO>
CO>
'"
.."
<::>
CO
Lu
lL.
8;
<>
'"
I
~
rlj
en
en
~
g
~\t\g Ctl~
G~ ~
fIJ 1946 lOt
~ ClG
O""ty S\(C
219 East Frontage Road
VVaconia,~ 55387
Phone: 952-442-5101
Fax: 952-442-5497
CDNSERVAr'DII DISrRlCr
http://www.co.carver.mn.us/SWCD/SWCDmain.html
Mission Statement: To provide leadership in conservation and teach stewardship of the soil, water, and related
resources throuJ!h a balanced, cooperative proJ!ram that protects, restores, and improves those resources.
February 23, 2006
Kate Aanenson
City of Chanhassen
7700 Market Boulevard
Chanhassen, MN 55317
Re: Liberty at Creekside
Ms. Aanenson:
The SWCD has taken the opportunity to review the Liberty at Creekside development. The plan
reviewed is dated with a revision on 02/03/06. Please review and consider the following
comments and suggestions regarding the SWPPP and erosion control and sediment controls.
SWPPP
A SWPPP is needed for the development and must be completed prior to applying for the
NPDES permit. It is recommended the SWPPP be submitted to the City and SWCD for review
prior to final approval.
Erosion Control
1. A stable EOF for the pond is needed. The EOF could consist of riprap and geotextile
fabric or a turfre-enforcement mat (a permanent erosion control blanket). A typical
detail is needed on the plan.
2. It is unclear how access to wetland mitigation areas will be done. It appears that a
temporary creek crossing may be needed unless access can be gained from the west or
south. The access and all erosion controls / restoration should be noted on the plan.
3. The storm sewer extension is planned outside of perimeter controls. Additional erosion
control notes are needed on the plan; erosion control blanket will be needed within 24
hours of installation.
4. Energy dissipation is needed at the FES inlet to Pond A and the outlet FES to the Creek
within 24 hours of installation.
5. It is assumed the grading occurring north ofthe site along Street A and Street B will be
done by others and erosion control blanket will be applied following seeding within 7
days of final grade.
Sediment Control
1. Curbside inlet control details are needed. Wimco-type inlet controls should be used and
installed within 24 hours of installation of inlets.
AN EQUAL OPPORTUNITY EMPLOYER
2. Typical building lot controls should be shown on the plan in a typical detail. These
controls should include perimeter controls (silt fence), rock driveways, street sweeping,
inlet control and temporary mulch after final grade and prior to issuing the CO.
3. The proposed storm water pond should be used as a temporary sediment basin during
mass grading. The pond should be excavated prior to disturbing up gradient areas.
Diversion berms / ditches may be needed to divert water to the pond and a temporary
pond outlet is needed. The outlet could be a temporary perforated standpipe and rock
cone. A detail is needed. An additional temporary sediment trap or basin may be needed
near future lot 3, Block 1 during rough grading as it appears nearly 10 acres of disturbed
area or more is shedding water to the creek in this area.
4. Silt fence adjustment will be needed once the inlet is installed to Pond A. The silt fence
will have to be installed up and around the FES so the discharge to the pond is not
impeded by the SF and cause erosion of the bank.
Stormwater Mangement
1. An adequate easement for pond access for maintenance purposes is needed and should be
shown on the plan.
2. It is recommended that the ultimate outlet from the site to Bluff Creek be adjusted to
discharge water parallel to the creek flow; presently the outlet is shown to discharge
water perpendicular to the flow and could increase bank erosion of the creek. The FES
should be turned to the SE to align with the creek.
3. It is assumed the pond located in the NW corner ofthe site is going to be done by others.
A outlet location should be shown on the plan.
Ifthere are any questions or if! can be of further assistance please contact the SWCD office.
Sincerely,
Aaron Mlynek, CPESC
Urban Conservation Technician
c. Lori Haak, City of Chanhassen (email)
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone: 952.227.1100
Fax: 952.227.1110
Building Inspections
Phone: 952.227.1180
Fax: 952.227.1190
Engineering
Phone: 952.227.1160
Fax: 952.227.1170
Finance
Phone: 952.227.1140
Fax: 952.227.1110
Park & Recreation
Phone: 952.227.1120
Fax: 952.227.1110
Recreation Center
2310 Coulter Boulevard
Phone: 952.227.1400
Fax: 952.227.1404
Planning &
Natural Resources
Phone: 952.227.1130
Fax: 952.227.1110
Public Works
1591 Park Road
Phone: 952.227.1300
Fax: 952.227.1310
Senior Center
Phone: 952.227.1125
Fax: 952.227.1110
Web Site
www.ci.chanhassen.mn.us
MEMORANDUM
TO:
Robert Generous AICP, Senior Planner
FROM:
Mark Littfin, Fire Marshal
DATE:
February 23,2006
SUBJ:
Request for rezoning of property from A-2 to PUD-R, Subdivision
with variances of approximately 36.01 acres into 30 lots, one outlot
and public right of ways, and site plan approval for 138 townhouses.
The property is located east of Audubon Road and north of Pioneer
Trail (1500 Pioneer Trail).
Planning Case: 05-24 Liberty at Creekside
I have reviewed the request for rezoning of the above project. In order to comply with
the Chanhassen Fire DepartmentlFire Prevention Division, I have the following fire
code or city ordinance/policy requirements. The plan review is based upon available
information submitted at this time. If additional plans or changes are submitted, the
appropriate code or policy items will be addressed.
1. No burning permits will be issued for trees to be removed. Trees and shrubs
must either be removed from site or chipped.
2. Temporary street signs shall be installed on street intersections once
construction ofthe new roadway allows passage of vehicles. Pursuant to 2002
Minnesota Fire code Section 501.4.
3. A fire apparatus access road shall be designed and maintained to support the
imposed load of fire apparatus and shall be serviced so as to provide all weather
driving capabilities. Pursuant to Minnesota Fire Code Section 503.2.3.
4. Fire apparatus access road and water supplies for fire protection is required to be
installed. Such protection shall be installed and made serviceable prior to and
during the time of construction except when approved alternate methods of
protection are provided.
The City ot Chanhassen · A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play.
Mr. Robert Generous AICP, Senior Planner
February 23, 2006
Page 2
5. A 10-foot clear space must be maintained around fire hydrants, i.e., street lamps,
trees, shrubs, bushes, Xcel Energy, Qwest, Cable TV and transformer boxes.
This is to ensure that fire hydrants can be quickly located and safely operated by
firefighters. Pursuant to Chanhassen City Ordinance #9-1.
6. Submit street names to Chanhassen Building Official and Chanhassen Fire
Marshal for review and approval.
7. "No Parking Fire Lane" signs will be required on the private streets. Contact
Chanhassen Fire Marshal for exact location of sign. Pursuant to Chanhassen
Fire Department/Fire Prevention Policy #06-1991. Copy enclosed.
g: \safety\ml\p Irev05- 24
CHANHASSEN FIRE DEPARTMENT
FIRE PREVENTION BUREAU
7700 MARKET BLVD. PO BOX 147
CHANHASSEN, MN 55317
(952) 227 - 1150
FAX: (952) 227-1190
CHANHASSEN FIRE DEPARTMENT POLICY # 06-1991
REQUIREMENTS FOR FIRE LANE SIGNAGE
1. Signs to be a minimum of 12" x 18".
NO
PARKING
FIRE
LANE
2. Red on white is preferred.
3. 3M or equal engineer's grade reflective
sheeting on aluminum is preferred.
4. Wording shall be: NO PARKING
FIRE LANE
5. Signs shall be posted at each end ofthe fire
'0" lane and at least at 100 foot intervals along the
fire lane.
6. All signs shall be double sided facing the
direction of travel.
7. Post shall be set back a minimum of 12" but
not more than 36" from the curb.
(NOT TO
SCALE)
G
E
8. A fire lane shall be required in front of fire dept.
connections extending 5 feet on each side and
along all areas designated by the Fire Chief.
ANY DEVIATION FROM THE ABOVE PROCEDURES SHALL BE
SUBMITTED IN WRITING, WITH A SITE PLAN, FOR APPROVAL BY THE
FIRE CHIEF. IT IS THE INTENTION OF THE FIRE DEPARTMENT TO
ENSURE CONTINUITY THROUGHOUT THE CITY BY PROVIDING THESE
PROCEDURES FOR MARKING OF FIRE LANES.
Revisions
6/1 0/02
3/22/05
Fire Lane Instillation 06-1991
Page 1 of 1
I
(T'\
~S.lPl
~ OF T1lP.~
Minnesota Department of Transportation
Metropolitan District
Waters Edge
1500 West County Road B-2
Roseville MN 55113-3174
July 27,2005
Bob Generous, Senior Planner
City of Chanhassen
7700 Market Boulevard
P.O. Box 147
Chanhassen, MN 55317
ftECE'VED
JUL 2 8 2.005
CiTY QF CHANHASSEN
SUBJECT: Liberty at Creekside
Mn/DOT Review P05-080
North of New TH 212, East of Audubon Road
Chanhassen, Carver County
Control Section 1017
Dear Mr. Generous:
The Minnesota Department of Transportation (MnlDOT) has reviewed the above
referenced plat in compliance with Minnesota Statute 505.03, subdivision 2, Plats.
Before any further development, please address the following issues:
Access Control:
· The access shown on this layout at TH 212 Right of Way has been eliminated.
It is our understanding that although the location map submitted from the city
shows an access onto Pioneer Trail (CSAR 14), that there will be no southerly
access from this site. Rather, the access will be provided via a new east -
west collector to the north of the site that connects from Audubon Road to
proposed Powers Blvd (alignment not yet finalized.) In the future, please
include access information with submittals. Please direct questions regarding
this issue to Lynn Clarkowski, MnlDOT's Area Engineer, at 651-634-2103, or
Mary Lacho, MnlDOT's TH 212 Design Engineer, at 952-368-5610 or
mary .1acho@dot.state.mn.us
Drainage:
· A drainage permit will be required for this project. No additional runoffto
MnlDOT R/W will be allowed and all drainage patterns must be maintained.
Please provide the following:
1) A Grading Plan of the existing & proposed project, showing topography,
with MnlDOT's right of way clearly marked.
2) Drainage area maps for the proposed project showing both existing and
proposed drainage areas and flows (with flow arrows).
3) Storm sewer plans and pond plans, with flow arrows for all overland and
conveyed water.
An equal opportunity employer
.
4) Hydraulic computations/modeling for both existing and proposed
conditions (i.e., Hydro-CAD input assumptions, calibration data, results
for 10 and 100 year storm events).
Please submit any further documentation electronically as Adobe Acrobat
(.pdt), and HydroCAD (.hc) files. Ifplans change, you must resubmit for
review. The electronic model and pdf file can be emailed to
iulie.whitcher@dot.state.mn.us. Please direct questions concerning these
issues to Julie Whitcher (651-634-2080) ofMnlDOT's Water Resources
Engineering section.
Permits:
· Any use of or work within or affecting MnlDOT right of way requires a
permit. Permit forms are available from MnlDOT's utility website at
www.dot.state.mn.us/tecsup/militv. Please direct any questions regarding
permit requirements to Buck Craig (651-582-1447) ofMnlDOT's Metro
Permits Section.
Right of Way / Surveys:
· The "Existing MnlDOT R1W" needs to be clearly labeled, and the existing
access control needs to be shown (and have symbol shown in legend). Please
direct any questions regarding this issue to Bruce Wetherbee ofMnlDOT's
Metro West Surveys at 763-797-3110.
Electronic Document Request:
· As a final request, could you please send an electronic .pdffile copy of your
plan submittal for our record keeping purposes to
iuanita.voigt(G),dot.state.mn.us Please refer to Mn/DOT Review #P05-080 /
Liberty at Creekside / CHN when emailing the .pdf file. Thank you for your
consideration in this matter.
As a reminder, please address all initial future correspondence for development
activity such as plats and site plans to:
Development Reviews Coordinator
MnlDOT - Metro Division
Waters Edge
1500 West County Road B-2
Roseville, Minnesota 55113
MnlDOT document submittal guidelines require three (3) complete copies of plats
and two (2) copies of other review documents including site plans. Failure to
provide three (3) copies of a plat and/or two (2) copies of other review documents
will make a submittal incomplete and delay MnlDOT's review and response to
development proposals. We appreciate your anticipated cooperation in providing
.
the necessary number of copies, as this will prevent us from having to delay
and/or return incomplete submittals.
If you have any questions concerning this review please feel free to contact me at
(651) 634-2083.
iht;e
Juanita Voigt
Transportation Planner
Copy: Roger Gustafson / Carver County Engineer
John Freemyer / Carver County Surveyor
Westwood Professional Services
Town and Country Homes
CITY OF CHANHASSEN
AFFIDA VIT OF MAILING NOTICE
STATE OF MINNESOTA)
) ss.
COUNTY OF CARVER )
I, Karen J. Engelhardt, being first duly sworn, on oath deposes that she is and was on
February 23, 2006, the duly qualified and acting Deputy Clerk of the City of Chanhassen,
Minnesota; that on said date she caused to be mailed a copy of the attached notice of Public
Hearing for Liberty at Creekside - Planning Case No. 05-24 to the persons named on
attached Exhibit "A", by enclosing a copy of said notice in an envelope addressed to such owner,
and depositing the envelopes addressed to all such owners in the United States mail with postage
fully prepaid thereon; that the names and addresses of such owners were those appearing as such
by the records of the County Treasurer, Carver County, Minnesota, and by other appropriate
records.
Subscribed and sworn to before me
this~ day of '1-LlllL{fl~' 2006.
~~T~'M~~-'
'--"Notary Pu .
tn
I:
:;:
Q)
Q)
:i:
tnS
1:.-
.- U)
... U)
CO._
Q) E
::J:E
.!:! 0
:cO
jtn
D.I:
-'-
o I:
I:
Q) CO
u-
:;:D.
o I:
ZQ)
U)
U)
CO
J:
I:
CO
J:
o
tn
I:
:;:
Q)
Q)
:i:
I:
tno
1:'-
._ U)
Ca'~
Q) E
::J:E
.!:! 0
:cO
jtn
D. .=
-I:
o I:
Q) CO
u-
.- D.
-
o I:
ZQ)
U)
U)
CO
J:
I:
CO
J:
o
5$ Q) >- 13 ~ >-
~g~1: ~ S .0 ~ - III
's:'5Q)'ca .... a>'8~ 00 a.>-e-_ g. "C
~o~~ t .s:::.o- a> octlo.~~ UQ)~
.g~~'8 ~. =5~-g ~ ~g:E ~-g ~~.E
(j)a3:8~ c Q)o.o~ ~ U oo:2:-a>ooa>>-~
. - - 0 U .Q,~ .g -5, = ~ 00 ctl '5.... o.s:::. 0 ~ Q)
a: 0) - a> '1:: a.. '0 ~ 'Q)- .:; '0 ~ '6 a> ~ 0 0 - - e.. E J:
6C\1~s~ ~ 1:5c~ ....u C ~~.o~a>s=Q)-
:J S ~ .E: 0 .s:::. III >- a> ctl ~ 'o~ ,ooQ ...;: a. ctl C') :g >-':;:: - ~
-oa..c.....s:::.~ t - .s:::. ~ ~oa>~oa._-I:~
> -O~ctl J:_~S" a>e.. 00 ,_--c~.s:::.ou~~'_-=
-co 000_ 3:-.:: 0 - '-' 00 U'- '"' 0'- wJ:'"
-a>- a> c _OEa> oa>-E a>~ C\lU - ~-
C\I....-oo O~o.s:::.oo"~.s:::..o-E a>~a> _a>(j)-Q)-
m.u>co> ~ ... ~ EoE~5c ....~Q)
~~ctlOO ctl Q)-~-o.O-:Jo -OC\l-O o~Q)
.... .- 0 "C 0 _ - _Q) ~ I: a." a>' LO..... - .~ E
ctl E ~ .... ~ ~ ,..,..- - - 0) 00 ~ 0 a> '-' E 00 _ a> 0,_ ""':
. 0 a. ~ a> ...... III ~ C a> a>.s:::._. 0 0) - > c .... .~ _
E "'" 0 . a. a> a> -C\I 00 0..- - 00 .s:::. ... .- 0.... ...
0::: .... c.o C Q) .- c - ~'.s:::. C -.s:::. a> ltl - - ..u - ..... 0
cio-C')c~~ o~CIlO)-a>~-ltlE- ....o~ctl!.s:::.a>a>a.o.~
0>- .u'-'w .oC')....cca>~-- -0 0 oo~ Q) v.
o t >- I: ....:t= C :J >- Q) ';::.- E i:5 0 a. 0 c - 0 ctl:J . 0 E .... ,.. CIl
q~!~~S~~ -octl>ctlSa>=3:E~ctl B~~o~~a>~~~
~~e~Q)~E-~~ ~l~~~sS~~ii OO~.s:::.~co.S~~E
ctla>o.~~.....s:::.W ~9!~00)~fuQ)~CIl ~:J~Q)~~~Q)~o
c.o.o~o(j)Q)-Woo_I_~;~_>e..~g ~~3:~oo.s:::.a>J:~o
gE~e..~a..~~Ea>~a>I::Jc5.s:::.0-a>u a>Q):Jt.s:::.ctl~u~_~
ctl o.ctlQ).s:::....., ....oo.ctlOO)C=....CIl oa> c ....c'
C\I_.s:::. .5 ctl 3: CIl.'!: J- 0 ~.a CIl _ :J ctl 3: a>'- S.g >-.0 c ~ ctl . - .-
.....uc_~~3:-I=2~Eoo~ea>-c....O)c Q):t=_Octl~>CIllI:
.s:::._ooo--c~~ctl_^-Q)u.s:::.>ltlctl- o-a:.s:::._-o~Q)1:
uN_.ltl ~ ....O~_:Ja>-- 00.... a>_. QCctlClll:1lI
PcQ)Q)-.s:::.--Q) -c~_ltlocr'o--O)._g~ctla> OO~>---a> CIl -
- a: "'E - E ~... O~ctluuE~-~a..
ctl:J U .2>.2 ;:; a: :J a> 00 a> ~ .... c = a. a>.s:::. . - .... -0 S @ E ...
:2:8~~""~5Woa>ll::gooo.~3:~Eu13E~~cooE~EO!
~ --~"C~COuc.s:::.oo.~~a>- E=a>ctl ~O:Joa>oQ)-
ctl~W~~5~~~~6~5~S.s:::.~~0-g'e3:~.s:::.~e~Eu~s
iI~>o.O-o",,"cocuo.~'5~(j)~Ua..a:JIgCll~a>~a>~....
a>~cr€-o-o-o~3:o-o~Q)~o~ O~ectlQ)Ea.S~~
:J-Q)-CCCLOOLOC .s:::.o.'O:J.... >--.s:::.~~""a>o>~
~ua:~ctlctlctlO~~ctlC~ctlctlo.~C\lC')",," ~U_o..o3:-o_IlI~
Gi
E ..
j::1:
~~
S ~
~.3
~
u:
g~
I: .~
~~
a..c
CIl~
I: I:
Q).-
a.-
a.Q)
III Q)
:E::::E
-Q)
1lIJ:
J:-
3:iii
~..
III $
I: I:
OQ)
;E
m E
:J 0
00
7a
CIl
o
a.
o
....
a..
>-1:
t::o
Q);
a. III
o U
.... 0
a....J
5$ ~ CIl
-o~c a> >- ~ a> >-
~~a>~ ~ _-00 a> s.o - ~ ~
>000- ~ .s:::.~o.s:::._ 00 a.~e__ 0 .A
._:J a. r- 0 w 0.'- .- U -
EL05-o m ~~-o ~ w-oCll~E a>~5
:J~-EO Q) .:JOctl 00 a>25E.-g :Q=J:
(j)a3:8~ c Q)o.o~ :J oo:2:-a>ooa>>-~
. - - 0 a> u .Q.~ .g -5, = 13 ~ ctl -.... 0 .s:::. 0 ~ Q)
a: 0) - .s:::. '1:: a.. 'O:J 'Q5 ':;:: a> '6 a> ~ 5 0 - - e.. E J:
6C\1~-~ ~ I:oc~ ~ti ~~.o~a>S=Q)-
:J .8 ~ .E: 0 .s:::. III >- a> ctl a. .~ 25 - a. ctl C') :g >-':;:: - ~
~ a...E: ~:e ~ t :t:_- ~ S ~ -0 e "00 g> 0 ~ ~ 0 g. _ .;;; I: ~
-COOCll-3:-.:: 0 - '-' a>ooo.u'~ ~C')o......s:::.U~-=1:
- a> -ltl 00 a> c - SEa> .. 0 a>'- E ~ ~ a> C\I u a> (j)- € ~ ;
m~u>cO> ~ oco.s:::.OO - EoE~:Joc ....~Q)
~~ctlOO ctl Q)-~-o.g.S-gE -OC\l>-O 0~Q)
. ~ Eo~ a.....1li~ ~ ~.8'5 cil"* e..C 0.8 a> E' OOLO~ a> o,::<<! E
E"'" -~ ......-CIlCll c Oa> S .00) >C....CDI:
0::: e cO a. a> a> C C\I Q) .- g-~ 0) a> oo.s:::. a> a> ltl - Cii . ctl ~ 0..... 0
ci 0 - C') C 'li:l 0 0 ~ CIl 0).- a> c.s:::. c - .s:::. .... 0 ~ OO.s:::. a> a. c:i .-
oO>->-I:...._w .oC')....cca>~=ltlE- oo~oo:Joa>Q) CIl
o t- a5 ~ ~ 0 '5 9 :J >- Q) .;:: 'ca E 0 0 ~ 0 -g -. . - :J c: - E .... "": CIl
.. . - ~ _... - - .... -0 g;! > ctl _ a> = ~ _ ....... B co 0 e E -:; a> :t: CDO 'E-
..... ~ ctl ... - co VI :J;;> Q) a>.o.s:::. 0 ;;> c - w - - ~ III
-~eEQ)~a>~ <.s:::......s:::.O_-~a>-o-o ~~.s:::.~g~S~~E
ctla>o.~~.....s:::.ww ~9!g.8cO)~C:~~~ ctl:J~Q)ooa>~Q)~O
c.o.o~o(j)Q)- oo_I_.o___a>,-~o ~~3:~oo.s:::._J:~=o
OE .....-a..ca:a>!!l~,_:J~c~.s:::.>oo.u-u ctloo~....
o...~o.>- -"Ew~'" ~ a>a>:Jt.s:::.-U~J:~
C\I.s:::.Wl:o.ctlQ)S"'" a>50o.ctloO) =a> OQ) c I:
u~ctl~~~J-O-SCll~~_.~~_3:....~ S~>-~~~~c:iii~
~ o~- _<cI=--.s:::.a> - ~g> a>o~,..,..s:::.S~~Q)1:
.s:::. .-u N 9 ~ c ~ .". ~ -0 Q. = :J ~ S a>> cltl ctl._ a> ....... Q C ctl 00 _ III
U Q)0_ a> ~1- - ~ 00.... OO~____ 00"'-
.... c Q) .s:::. I: E - - '" 0 cr.- 0)'5> u _ ctl 0 C Cil u u E~ c.- = a..
ctl:Ja:ug~~a:~m~Ea>~eE_=ca> -~-oS@ =EI:Q)
:2: 0 .... I: '- - 5 W 0 Q) 3: I: 00 00 a..... = a. a>.s:::. . - :J.c C 00 E cEo J:
_US~g~~coUc.s:::.oR~~m3:~E~13~~~o:Joa> Q)_
~~wm-g5~~~~5~5~S.s:::.~a>E~'~3:~.s:::.~e~E8ns
-o~a>> ,,_ ~u_u_.s:::.O:J,- I~ a> tQ)1lI
oo~:J o.....,-o~cocu~=:J=(j)l-ua..Q:J :JOOcQ)ctl =....
a> .". 5l:5 ~ ~ ~ ~ 3: 0 -0.2 a> a. 0.0 g,.?=- e ~ ~ E o.S ltl.2
:J~~-CCCLOOLOC .s:::.o..o:J - ~~""a> >~
l-ua:~ctlctlctlOI-~ctlCl-ctlctlo.~NM~ ~oSo..o3:-oSIlIQ
ai
E
j:: I:
~g
s B
~.3
~
u: ..
g~
I: .~
~~
a..c
CIl~
I: I:
Q).-
a.-
a.Q)
ltl Q)
::I::::E
- Q)
1lI.s:::.
J:-
3:iii
~..
CIl$
I: I:
o Q)
;E
m E
::J 0
00
'iii
CIl
o
a.
o
....
a..
>-1:
t:: 0
Q);
a.ltl
o u
.... 0
a....J
en CD -'0 01 ~
C r:. 0 t:: .S;: Q) y.t
~ .... g~ro 25 .... ~ m ~r:.
ro 0 -.;::;.~ a. OJ - c >>0- a. Q) ctJ ,g
Q5G>'O C\1c;CtI 0:0 <<scg> .Q5 c:J::c:
::5<1> -gQ)CJ) 2 g<C:.c 0>;: Q).~o
<CQ)E Q)>ca ~o a.""'" ~Q) ~::-.;::;
~~~ E~~CtI~~ il& 'O.~ ~g~
~ .8 Q) g e 8.~ t ~ cJ ~ a.!: $ ~ ~ ~:g
Q)rnD ~~ern~'(ij"E-gc 5- (I)-C
~.~B '- a.E'-E(I)~oQ) ~ S~Q)
u) (ij !? C'lJ ~ Q) '0 0 CD -6 ~ .9 ~ i-~ ~ g;;
~!~ -g.~5~~a~~E~ ~~ ~~g
~oo ctJ_SEr:.Emm-Cl> (1)> 0'0
E="~ C:3:o2?;"(ij"o~:50 =:'" c5>.Q)
~~~ g=i.~~ctJQ5'OE~ ~g c~E
.sCow (\1cu.::L...c::CG>Eo-o- -Cij rJ)()~
~mQ) ~~~;o~Ew!~ o~ ~!c
'O~5 0 -a.(J)E-o.~~ctJ S:e "0-0
~.~o ~~~~~~~~~o: gg ~s~
- Cl> - "c a; - .!'! E Q) - ?; Q) Q) U 00 c: t::: a
rn,-Q)g>Q)Q)o'O,-E(ij'O~5 ro. ~o
5 (I) ~ ~ .5: E:B '0 tE u ~ Q) g.r:. Q) (ij 8 g-1ij
;g~8 ~ '55 c 5.~ ro..a5~ ~ ~~ ~ ~ ~;nU)
c: E U) E c..~ Q) Ol 5l E"(ij U E ~ e g. u =: Q
8~~!~~5.~~:~~>-g c.~ Q)c~
~~j;~~~~~~EQ)~~ B.~ 5~~
~ <( >- ai -g 0:;; ~ ~~ g ~ ~~ -g:5 g>~ 0:
'5mi~~O~:B~cS-Eo ~Ol 'c~!
Q)'Uo. COQJ:;, C'Ocrno.r;. .....5 rac:_
a: 0 0 0 .-.5 0. 0.= Q) Q) c: (.) (/J :J U Q) .- ~
c:O~-~c:oQ)g(/JE8~~ 8~ ~Q)u
~~~~=~~=5~~~~~ri~~ g~E
~mm'5c~_Q)OcQ)~ g~~~ ~.~o
.! J!! ~.5 8 Q):S; U) >-~ E 2:.9 ~ 1i3 .- "C 0. (.)
"-c.- m~>..Q- _mmQ)o.Q)Q)O Q)CG>
~m~~g=E~~8Q)=~!E~B 58~
~EQ)>-~<Q)=Q)cU)m _-m~ mQ)
~~=i~.~~~~:J~~~~~B ~ga
~Q)Q)0.~~!e~2~.~~~:J~~ .~2:~
~Egi~~~.~~~~~~e8~"~~~~~
g<m~~u~"~ga:"C~g~>-Qc:~gQ)~
Q)c"5Q):J!oE~.C c. -!Q)O~~~
a> ~"E Q) (/J ~+:; E 0 g m ~ ~ ~ ~ c: 5 ~ .~ o~
o~O~Q)D~OO~~~ ~Q)o~Q)E~-
~~~'-~~cO~~.s-~e5~~c.E"E~
c.u;~~eD~Q)~CCll)om~2i~~ O~"C
~~~ .<~~E~(l)~2~w~S~i~O~~
~Q)~~ '0>0 .5E!-~=g~E!gQ):J
.gc!.u;gc.m(.)(/Joo-~~.E~8. 's:!.cou
~ia..~E!!!~-U~W~o~(/JE.5c:C.5
8~EE~mmmg5!~2c~Q)"c"C>-~~(l)
~ oE ~~"C~~(/JQ)m~c~OQ)c~cD
~~OoEQ)~cc.m~_~~"-~BomQ)oo
:: ~ cnO c ~8.~ g-g.Q"g m.~~"C 0 ~E 5 g.~
~~.~g8!!o'~~~~~5~i~8~~~~
>.~c'-~o.Q)QQ)EEOQ)(/JC:(/Jocu:Jo-
~uo~~=(/J!~oE c~~:J~Q)(l)muQ)
~~~2:~~Q)Q)uo~.~~~~C!"~~~~
~wa:~mw~55~UU~~a.~<ma.mm(/J
0.. ...
~ 0 0> ~
C Q) '0 .5 Q) en C'tJ
o 5 g~i c~ U) ~ u~
~ 0 "- (l) a. i::: ~ ~"~ a. Q) @ E
~ ~ ~ {g'~: ~ ~ ~ <{ "~ ~ i e -5i c:
<{ - i>oC'tJ ~~ ~""E ~Q) ~'~8
"C ~ ~ E (ij - > a..! C'tJ U.:;: ~:J ~
@~g E~U)m~~ C'tJ~~ eQ) (l)O~
'"'Q) D ~ 0 e 8.~ @ 'g ~ ~ ~.:::: .! ~ (ij ~:g
0> ~ ~ e C'tJ a."roE -", 0 cQ) 0 - (/J - C
3:cS ~",c.E~E",,,,uE -Q) Q)'Q)
~~~ ~(l)~-g~(l)~~E~ ~~ ~~5
U)~(/J c.~-m~a~:J(/Ja "G~ ~~~
~~:J! ~i~li~~!i~ Z~ c5~iE
- ~=co"a;~mQ)"CEg o!:!2 ;<3m
~~~ ~S~5~~~g~~ ~: Q)Q)c
u!5 ~~2i~ESo"S~~ g~ ~55
@"S'O ~g~B~~~~~~ 5S ~E~
cu 5f - en ~ 1i> - .~ E Q) = :: Q) ~ u w 5 to ~
c~(l)CQ)Q).~U"~EC'tJ"C~- co :::
oJ!!~~.~E~-g~~~~S5 ~~ 8~m
~ fi5 8 Q) ~ c ~ cu cu.. (l) (l) ~ i;'"~ ':;: 0 >- ~ U5
cEU)Ec.~Q)Ol~EiuE~ eg. B=:~
8~~~~~s'~~:!K~~ a.~ Q)e"~
~~j;~~~~~~Em~~ g~ 5~~
~ <{ ~ ~ -g 0:; ~ ~-6.g ~~:g -g 5 g~ a:
.:;:Q)i~uU~~~c~-E~ ~o .~~m
~ "8 g. ~ "~ g ~ ~= ~ ~ ~ 8 ~ ~ :5 ~ .~ ::
cO~-~~omgooEg,~en B~ ~Q)~
~~~~5~~55~~~~~rnfi5~ g~~
~mcu.:;:c~_mocQ)~ g.~(/J~ ~.~o
.! J!! !.5 ~ Q) ~ U) >-~ E 2:E ~ 1i3 ,- U a. (,)
.-c'- cu.r::.:>..Q..... .mmQ)~Q)mo meQ)
~ID~'~"~=E~BooID=~IDE~B ~8~
enEQ)>-a<ID~IDgU)~uS-~~ -~(l)
C u ~ 15 a. "-=::: ~.c :J ~ 00 ~ "G C .8 ~ .~ 0
Q)~~a.~~~e~2-g.~.~~5~~ .~~~
KEgi~~~'~~Q)~~~~8~.~~.r::.m~
B<~~~rr~"~ga:~~g5~gc~~~~
~~~~~!.QE~~@maE~~!g"~-~
Q)~o2Q)~~EO.Qen~~$U~-~._gs
~ m >-,~ 5 Q) 1? 8 >. cu g ~ ID"- ~ ~:e c. E ~ c
'c"~~~c~Q)Q)~-g"~ll)E~~Q)~u~~.-
..:J ~U~ o~ E~~ (l) 22~~.E 5i"1i>"* ()~-g
~"Cm~ ~rnE~~EID~ Orn~mIDrn~U
~~~~~8.~8~~~'::::E~~~8.E~"~~~
~Ca.U)~~Q)!(l)-U~wmo~U)Ecc:c~
8~E"~.~m~cugg!~$1?~~U"C'~~~ID
~ OE (/Joo~~~enQ)mmc~O(l)c~cD
c.. ~ 0 o'~ ! t:: C Q.g.c = U5 ~:c ~ ~ ~ m Q) 8. E
:t g 000 c rn 8. m g c.Q g cu"~"~"C 0 :;:€ S U). g
.~ :~ g> g8 ~! "E"~ ~.~ ~ ~:5 ~ @ ~ 8 ~ ~ ~:e
~ :5 "g "~.~ a. ~ ~ ~ E E () ~ ~ ~ ~ .2> fi5 ~ ~ 8 "tV
c::: D N C c..::: Q) 0 E ~ c'~ ~..... (l) "- u ~ E
~~~~~~~5~~8<3~~~~~~K~@g
0.. ...
Disclaimer
This map is neither a legally recorded map nor a sUlvey and is not intended to be used as one. This
map is a compiiation of records, information and data located in various city, county, state and federal
oHices and other sources regarding the area shown, and is to be used for reference purposes only.
The City does not warrant that the Geographic Information System (GIS) Data used to prepare this
map are error free, and the City does not represent that the GIS Data can be used for navigational,
tracking or any other purpose requiring exacting measurement of distance or direction or precision in
the depiction of geographic features. If errors or discrepancies are found please contact 952-227-1107.
The preceding disclaimer is provided pursuant to Minnesota Statutes ~466.03, Subd. 21 (2000), and
the user of this map acknowledges that the City shall not be liable for any damages, and expressiy
waives all claims, and agrees to defend, indemnify, and hold harmless the City from any and all claims
brought by User, its employees or agents, or third parties which arise out of the use~s access or use of
data provided.
Disclaimer
This map is neither a legally recorded map nor a survey and is not intended to be used as one. This
map is a compilation of records, information and data located in various city, county, state and federal
oHices and other sources regarding the area shown, and is to be used for reference purposes only.
The City does not warrant that the Geographic Information System (GIS) Data used to prepare this
map are error free, and the City does not represent that the GIS Data can be used for navigational,
tracking or any other purpose requiring exacting measurement of distance or direction or precision in
the depiction of geographic features. If errors or discrepancies are found please contact 952-227-1107.
The preceding disclaimer is provided pursuant to Minnesota Statutes ~466.03, Subd. 21 (2000), and
the user of this map acknowledges that the City shall not be liable for any damages, and expressly
waives all claims, and agrees to defend, indemnify, and hold harmless the City from any and all claims
brought by User, its employees or agents, or third parties which arise out of the use~s access or use of
data provided.
GAYLE 0 & LOIS J DEGLER
TRUSTEES OF TRUSTS
1630 LYMAN BLVD
CHANHASSEN , MN 55317 -9402
FOX PROPERTIES LP
27990 SMITHTOWN RD
EXCELSIOR. MN 55331 -7911
STATE OF MINNESOTA - DOT
395 JOHN IRELAND BLVD
631 TRANSPORTATION BLDG
ST PAUL. MN 55155 -1801
PETERSON.JACQUES FARM LAND CO
C/O SEVERIN H PETERSON JR
15900 FLYING CLOUD DR
EDEN PRAIRIE. MN 55347 -4047
NDI MINNESOTA LLC
C/O HOVSTONE PROPERTIES MN LLC
7615 SMETANA LN
SUITE 160
EDEN PRAIRIE. MN 55346 -4700
G&M LAURENT FAMILY LTD PTRSHP
24760 CEDAR POINT RD
NEW PRAGUE. MN 56071 -4056
ARTHUR B JOHNSON
17448 FRONDELL CT
EDEN PRAIRIE. MN 55347 -3416
Public Hearing Notification Area (500 feet)
Liberty at Creekside
Planning Case No. 05-24
1500 Pioneer Trail
City of Chanhassen
CITY OF CHANHASSEN
AFFIDA VIT OF MAILING NOTICE
STATE OF MINNESOTA)
) ss.
COUNTY OF CARVER )
I, Karen J. Engelhardt, being first duly sworn, on oath deposes that she is and was on
March 1, 2006, the duly qualified and acting Deputy Clerk of the City of Chanhassen,
Minnesota; that on said date she caused to be mailed a copy of the attached notice of Public
Hearing for Liberty at Creekside - Planning Case No. 05-24 to the persons named on
attached Exhibit "A", by enclosing a copy of said notice in an envelope addressed to such owner,
and depositing the envelopes addressed to all such owners in the United States mail with postage
fully prepaid thereon; that the names and addresses of such owners were those appearing as such
by the records of the County Treasurer, Carver County, Minnesota, and by other appropriate
records.
Subscribed and sworn to before me
this bd: day of m Clrch , 2006.
~~,~~~
\ Notary P .
CITY OF CHANHASSEN
PLANNING COMMISSION
NOTICE OF RESCHEDULED PUBLIC HEARING
Dear Property Owner:
On February 23, 2006, the City of Chanhassen mailed a public hearing notice to you regarding the
following proposal:
. LIBERTY AT CREEKSIDE: Request for Rezoning of property from A-2 to PUD-R; Subdivision
with Variances of approximately 36.01 acres into 29 lots, 5 outlots, and public right-of-way; Site Plan
Approval for 146 townhouses; and Conditional Use Permit for alterations within the flood plain and
development within the Bluff Creek Overlay District on property located at 1500 Pioneer Trail (east of
Audubon Road, north of Pioneer Trail and northwest of future Highway 312 - see location map on
reverse side of this notice) - Planning Case No. 05-24. Applicant: Town & Country Homes
The public hearing has been RESCHEDULED for Tuesday. March 21. 2006 in the City Hall
Council Chambers. The meeting will begin at 7:00 p.m. This hearing may not start until later in the
evening, depending on the order of the agenda.
If you have questions regarding this proposal, contact Robert Generous at 952-227-1131 or by email:
bqenerous@cLchanhassen.mn.us, or visit the City's NEW projects web page at
www.ci.chanhassen.mn.us/serv/proiects.html
CITY OF CHANHASSEN
PLANNING COMMISSION
NOTICE OF RESCHEDULED PUBLIC HEARING
Dear Property Owner:
On February 23, 2006, the City of Chanhassen mailed a public hearing notice to you regarding the
following proposal:
. LIBERTY AT CREEKSIDE: Request for Rezoning of property from A-2 to PUD-R; Subdivision
with Variances of approximately 36.01 acres into 29 lots, 5 outlots, and public right-of-way; Site Plan
Approval for 146 townhouses; and Conditional Use Permit for alterations within the flood plain and
development within the Bluff Creek Overlay District on property located at 1500 Pioneer Trail (east of
Audubon Road, north of Pioneer Trail and northwest of future Highway 312 - see location map on
reverse side of this notice) - Planning Case No. 05-24. Applicant: Town & Country Homes
The public hearing has been RESCHEDULED for Tuesday. March 21, 2006 in the City Hall
Council Chambers. The meeting will begin at 7:00 p.m. This hearing may not start until later in the
evening, depending on the order of the agenda.
If you have questions regarding this proposal, contact Robert Generous at 952-227-1131 or by email:
bqenerous@cLchanhassen.mn.us, or visit the City's NEW projects web page at
www.ci.chanhassen.mn.us/serv/proiects.html
Disclaimer
This map is neither a legally recorded map nor a survey and is not intended to be used as one. This
map is a compilation of records, information and data located in various city, county, state and federal
offices and other sources regarding the area shown, and is to be used for reference purposes only.
The City does not warrant that the Geographic Information System (GIS) Data used to prepare this
map are error free, and the City does not represent that the GIS Data can be used for navigational,
tracking or any other purpose requiring exacting measurement of distance or direction or precision in
the depiction of geographic features. If errors or discrepancies are found please contact 952-227-1107.
The preceding disclaimer is provided pursuant to Minnesota Statutes ~466.03, Subd. 21 (2000), and
the user of this map acknowledges that the City shall not be liable for any damages, and expressly
waives all claims, and agrees to defend, indemnify, and hold harmless the City from any and all claims
brought by User, its employees or agents, orthird parties which arise out of the use~s access or use of
data provided.
Disclaimer
This map is neither a legally recorded map nor a survey and is not intended to be used as one. This
map is a compilation of records, information and data located in various city, county, state and federal
offices and other sources regarding the area shown, and is to be used for reference purposes only.
The City does not warrant that the Geographic Information System (GIS) Data used to prepare this
map are error free, and the City does not represent that the GIS Data can be used for navigational,
tracking or any other purpose requiring exacting measurement of distance or direction or precision in
the depiction of geographic features. If errors or discrepancies are found please contact 952-227-1107.
The preceding disclaimer is provided pursuant to Minnesota Statutes ~466.03, Subd. 21 (2000), and
the user of this map acknowledges that the City shall not be liable for any damages, and expressly
waives all claims, and agrees to defend, indemnify, and hold harmless the City from any and all claims
brought by User, its employees or agents, or third parties which arise out of the use~s access or use of
data provided.
,
Impression antibourrage et a sechage rapi~e
Utilisez Ie gabarit 5160@ :
GAYLE 0 & LOIS J DEGLER
TRUSTEES OF TRUSTS
1630 LYMAN BLVD
CHANHASSEN . MN 55317 -\2--~
PETERSON-JACQUES FARM LAND CO
C/O SEVERIN H PETERSON JR
15900 FLYING CLOUD DR
EDEN PRAIRIE. MN 55347 -4047
ARTHUR B JOHNSON
17448 FRONDELL CT
EDEN PRAIRIE. MN 55347 -3416
@09~S. @AlI3J\V ~
-
www.avery.com
1~800-GO-AVERY
@ AVERV@ 5160@
-
FOX PROPERTIES LP
27990 SMITHTOWN RD
" EXCELSIOR. MN 55331-7911
i'
NDI MINNESOTA LLC
C/O HOVSTONE PROPERTIES MN LLC
7615 SMETANA LN
SUITE 160
EDEN PRAIRIE. MN 55346 -4700
, .
i!
i ' ~
, I
; I,
, ,
, .
! ;
Ii
I:
!
,
, .
. i
I'
I
AH:I^"-09-008-~
WO)'AJaAe'MMM
-
-
STATE OF MINNESOTA - DOT
395 JOHN IRELAND BLVD
I 631 TRANSPORTATION BLDG
I ST PAUL. MN 55155 -1801
i.
G&M LAURENT FAMILY L TO PTRSHP
24760 CEDAR POINT RD
NEW PRAGUE. MN 56071 -4056
I,
I
I
I
I!
, I
i!
@09~sn,,",dwn @AJaA""aSn
6UI1UIJA aaJ-I a6Dnwc;: Due wet .
Public Hearing Notification Area (500 feet)
Liberty at Creekside
Planning Case No. 05-24
1500 Pioneer Trail
City of Chanhassen