Loading...
Approval/Denial Letter 8-29-06 ~ CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us August 29, 2006 Mr. Mike MacArthur Zumbro River Constructors 312 Lake Hazeltine Blvd., Ste. 100 Chaska, MN 55318 Re: Planning Case #06-28 Interim Use Permits for Grading at 1560 Bluff Creek Drive and south of Bluff Creek Drive and Hennepin County Regional Rail Corridor Dear Mr. MacArthur: This letter is to confirm that on August 28, 2006, the Chanhassen City Council approved the following motions: The Chanhassen City Council denied Planning Case #06-28 for Interim Use Permits to grade and fill properties identified as Site 2 in the staff report (Harold Hesse property located south of Bluff Creek Drive and Hennepin County Regional Rail Corridor). And, The Chanhassen City Council approved Planning Case #06-28forInterim Use Permits to grade and fill Site 3 (John K.lingelhutz property at 1560 Bluff Creek Drive) in conformance with the grading plans prepared by Zumbro River Constructors for the site, subject to the following conditions: 1. Overland hauling must utilize the existing creek crossing for the Bluff Creek Drive realignment. 2. No fill shall be placed within the Bluff Creek Drive right-of-way. 3. Hours of operations are 7:00 a.m. and 6:00 p.m. Monday through Friday and 9:00 a.m. and 5:00 p.m. on Saturdays, with no work allowed on holidays. 4. Each site shall be examined by a professional wetland delineator to determine whether jurisdictional wetlands exist on-site or within 150 feet of the proposed fill. Any wetlands that are identified shall be delineated, then reviewed by the City prior to any work commencing on-site. If the delineation shows the proposed project toinc1ude wetland impact, the applicant shall obtain a wetland alteration permit from the City prior to wetland impacts occurring. 5. A wetland buffer 16.5 to 20 feet in width (with a minimum average of 16.5 feet) shall be maintained around any aglurban wetlands. Wetland buffer areas shall be preserved, surveyed and staked in accordance with the City's wetland ordinance. The applicant shall install wetland buffer edge signs, under the The City ot Chanhassen · A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails. and beautiful parks. A great place to live, work, and play. Mr. Mike MacArthur August 29, 2006 Page 2 " direction of City staff, before construction begins and shall pay the City $20 per sign. All structures shall maintain a setback of at least 40 feet from aglurban wetland buffer edges. 6. Wetland replacement, if necessary, shall occur in a manner consistent with the wetland alteration permit and the Minnesota Wetland Conservation Act (MR 8420). 7. Erosion control blanket shall be installed on all slopes greater than or equal to 3: 1. All exposed soil areas shall have temporary erosion protection or permanent cover year round, according to the following table of slopes and time frames: Type of Slope Steeper than 3: 1 10:1 to 3:1 Flatter than 10: 1 Time 7 days 14 days 21 days (Maximum time an area can remain open when the area is not actively being worked.) These areas include constructed storm water management pond side slopes, and any exposed soil areas with a positive slope to a storm water conveyance system, such as a curb and gutter system, storm sewer inlet, temporary or permanent drainage ditch or other natural or man made systems that discharge to a surface water. 8. Silt fence shall be installed at the base of all proposed slopes in accordance with Chanhassen Standard Detail Plates 5300. A rock construction entrance meeting the specifications of Chanhassen Standard Detail Plate 5301 shall be installed where truck traffic will enter and exit Bluff Creek Drive. Street cleaning of soil tracked onto public streets shall include daily street scraping and street sweeping as-needed. Wimco-type inlet protection shall be installed in accordance with Chanhassen Standard Detail Plate 5302A in all catch basins within 200 feet of the proposed project sites and maintained as needed. The construction plans shall be revised to show the locations of the proposed silt fence, rock construction entrances and Wimco-type inlet protection and to include Chanhassen Standard Detail Plates 5300, 5301 and 5302A. 9. The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g., Riley-Purgatory-Bluff Creek Watershed District, Minnesota Pollution Control Agency (NPDES Phase II Construction Site Permit), Minnesota Department of Natural Resources, Minnesota Department of Transportation) and comply with their conditions of approval. Zumbro River Constructors shall apply for and receive an amendment to their existing NPDES Phase II Construction Permit for the Trunk Highway 212 project from the Minnesota Pollution Control Agency to incorporate a storm water pollution prevention plan for these sites. 10. The applicant should review proposed slopes and runoff velocities for the site and provide additional rock checks as an erosion control mechanism if needed. Rock checks proposed within the right-of-way for Bluff Creek Drive must be reviewed and approved by the City prior to installation. Mr. Mike MacArthur August 29,2006 Page 3 If you have any questions or need additional information, please contact me at (952) 227-1131 or Allyson Fauske at (952) 227-1164. Sincerely; Robert Generous, AICP Senior Planner ec: Kate Aanenson, Community Development Director Alyson Fauske, Assistant City Engineer Todd Gerhardt, City Manager Paul Oehme, City Engineer c: Harold Hesse John Klingelhutz g:\plan\2006 planning cases\06-28 zumbro river constructors 312\approve and deny letter. doc