Loading...
PC Staff Report 11-21-06 PC DATE: November 21, 2006 CC DATE: December 11, 2006 CITY OF CHANHASSEN REVIEW DEADLINE: December 19, 2006 CASE #: 06-34 BY: AF, RG, LH, ML, JM, JS STAFF REPORT PROPOSAL: Rezoning Request for of the western portion of the site from Agricultural Estate District, Conditional Use Permit A2, to Industrial Office Park, IOP; for development within the Bluff Creek Conditional Use PermitSite Plan Approval Corridor; for multiple buildings (up to 14) on one parcel; APPLICANT for 12 buildings (one clubhouse/museum building and 11 storage buildings totaling approximately Variance 177,000 square feet of building area); and a to locate the storm water pond within the Bluff Creek primary zone. LOCATION: West of Audubon Road and north of the Twin Cities and Western Railroad APPLICANT: Bruno J. Silikowski G.E. Osmonics 3615 Zircon Lane North 5951 Clearwater Drive Plymouth, MN 55446 Minnetonka, MN 55343 (612) 850-8398 (952) 988-6543 PRESENT ZONING: Agricultural Estate District, A2, and Industrial Office Park, IOP 2020 LAND USE PLAN: Office/Industrial and Parks and Open Space ACREAGE:DENSITY: 38.7 acres F.A.R. 0.10 SUMMARY OF REQUEST: The developer is requesting approval to develop an automobile aficionado storage facility and membership club. SITE DATA LEVEL OF CITY DISCRETION IN DECISION-MAKING: The City has a relatively high level of discretion in approving rezonings because the City is acting in its legislative or policy making capacity. A rezoning must be consistent with the City’s Comprehensive Plan. The City’s discretion in approving or denying a site plan is limited to whether or not the proposed project complies with Zoning Ordinance requirements. If it meets these standards, the City must then approve the site plan. This is a quasi-judicial decision. The City’s discretion in approving or denying a variance is limited to whether or not the proposed project meets the standards in the Zoning Ordinance for a variance. The City has a relatively high level of discretion with a variance because the applicant is seeking a deviation from established standards. This is a quasi judicial decision. The City has limited discretion in approving or denying conditional use permits, based on whether or not the proposal meets the conditional use permit standards outlined in the Zoning Ordinance. If the City finds that all the applicable conditional use permit standards are met, the permit must be approved. This is a quasi judicial decision. Autobahn Motorplex - Planning Case 06-34 November 21, 2006 Page 2 of 16 PROPOSAL/SUMMARY The site is bounded to the north by General Mills, to the east by Audubon Road and the City’s Public Works facility, to the south by the Twin Cities and Western Railroad and Chanhassen Business Park and to the west by Bluff Creek and Creekside, a single-family residential subdivision. The clubhouse will be approximately a quarter mile from the nearest single-family home in Creekside. The nearest storage building is 520 feet to the western property line plus approximately 200 feet from the property line to the nearest home. The developer is requesting approval for the construction of a condominium-style storage facility for automobile enthusiasts and collectors, which will also have a clubhouse and museum building for members to meet and showcase automobiles. Site plan review is being performed for a total of 12 buildings consisting of 11 storage buildings with a total square footage of approximately 162,000 square feet and the clubhouse and museum building of approximately 15,000 square feet, including a small office area above the clubhouse. The entrance to the facility will be gated and a fence will be installed around the storage building facilities. Fencing will consist of aluminum or steel construction and be wrought iron in appearance. Maximum fence height is eight feet. Fencing shall also be installed at the extreme western edge of the property across the old farm access at Bluff Creek. The proposed hours of general operation of the facility is from 7:00 a.m. to 8:00 p.m. daily, which includes access to the clubhouse, communal washing facilities and the assisted car maintenance for owners. The general public will not have access to the site. The owners will have access to their storage units at any time. Car shows or manufacturers’ displays, club meetings, e.g. Porsche Club, BMW Club, etc., and corporate meetings would occur occasionally, but be limited to the normal business hours. The intention of the facility is to permit high-end car owners to be able to store, work on and be around other car enthusiasts. However, the majority of the cars will be street legal. Due to the hours of operation and the type of proposed site uses, noise is not anticipated to be an issue. Two building pads are proposed near the entrance to the site off Audubon Road. At this time, the City is not performing site plan review for these sites. Prior to their development, a separate site plan review process will be required. The uses of the buildings would be as allowed in the IOP zoning district. The proposed development will be developed on one parcel, rather than being subdivided. The individual storage units will be owned individually. However, all “members” will own the land in common. This parcel is partially encumbered by the Bluff Creek Overlay District. Section 20-1255 of the Chanhassen City Code requires a conditional use permit for all development within the Bluff Creek Corridor. Staff has reviewed the mapped primary zone boundary and adjusted the boundary based on site conditions. The applicant has proposed the location of the stormwater pond adjacent to and encroaching in the primary zone. The encroachment into the primary zone requires the approval of a conditional use permit. The project was originally noticed with a Wetland Alteration Permit. Upon review of the data, the City, as LGU for the Minnesota Wetland Conservation Act, has determined Wetland Area A Autobahn Motorplex - Planning Case 06-34 November 21, 2006 Page 3 of 16 and Wetland Area B to be incidental wetlands because the wetland characteristics developed as a result of a change in hydrology that was not intended to create wetlands. The impacts proposed to Wetland Area A and Wetland Area B are exempt under the Wetland Conservation Act. Staff is recommending approval of the proposed development. APPLICABLE REGUATIONS Chapter 20, Article II, Division 2, Amendments Chapter 20, Article II, Division 3, Variances Chapter 20, Article II, Division 6, Site Plan Review Chapter 20, Article XXII, “IOP” Industrial Office Park District Chapter 20, Article IV, Conditional Use Permits Chapter 20, Article VI, Wetland Protection Chapter 20, Article XXIII, Division 7, Design Standards for Commercial, Industrial and Office- Institutional Developments Chapter 20, Article XXXI, Bluff Creek Overlay District BACKGROUND On June 13, 1988, the Chanhassen City Council approved a land use plan amendment to add 12.2 acres of the site to the Metropolitan Urban Service Area (MUSA) (this represents the eastern portion of the site) and to change the land use designation from agricultural to industrial (Land Use Plan Amendment #88-2). The City Council also approved the first reading of the rezoning request from A2, Agricultural Estate District, to IOP, Industrial Office Park (Rezoning #88-2) for the southern part (5.6 acres) of the eastern portion of the site, and the preliminary plat for five lots and two outlots (Subdivision #88-9). On March 22, 1989, the Chanhassen City Council approved the final plat for Audubon Court, which permitted the grading of the eastern portion of the property. The plat was never filed. On April 10, 1989, the Chanhassen City Council approved the second and final reading of the rezoning of the parcel from A2, Agricultural Estate District, to IOP, Industrial Office Park (Rezoning #88-2). REZONING The property is guided for office/industrial and parks and open space. Currently, only the eastern half of the site is zoned IOP. The proposed rezoning of the property to Office Industrial Park is consistent with the land use designation. The western portion of the property was not rezoned to IOP in 1989 because, at that time, it was not located within the MUSA. SITE PLAN REVIEW The developer is requesting approval for the construction of a condominium style storage facility consisting of 11 storage buildings and one clubhouse and museum building. Autobahn Motorplex - Planning Case 06-34 November 21, 2006 Page 4 of 16 GRADING, DRAINAGE AND EROSION CONTROL The site topography is challenging due to the 40-foot drop in elevation from the existing curb cut on Audubon to wetlands; the site also drops more than 20 feet from the railroad to the wetland. The grading plan shows that all of the proposed building pads will be mass graded. Staff examined the feasibility of extending a common drive between the buildings, eliminating the need for the access along the eastern half of the southern-most driveway. However, the developer has indicated that the proposed buildings cannot be designed to have a grade drop within them. The developer proposes to install storm sewer throughout the site to convey runoff to the proposed pond. This storm sewer shall be city owned and maintained. The proposed pond is designed to treat runoff from the site according to NURP standards. The pond is designed to provide rate control for the 2-, 10-, 100- and two (back-to-back) 100-year rainfall events. The grading plan must be revised to show proposed pavement grades for the driveway access to the northern office/warehouse. The grading plan must show proposed pavement grades. Pavement grades must not exceed 10%. The private streets within the development must be constructed to a nine-ton design. An additional spot elevation must be shown on the south end of the storage building immediately west of the northern office/warehouse to ensure positive drainage. Note the proposed rim and invert elevation of the storm sewer located at the driveway intersection south of bore hole location #3. RETAINING WALLS Due to the site topography the developer proposes to construct retaining walls at the following locations, as shown on Sheet SP: LocationLength Maximum Height (approximate)(approximate) South of the pond 120 feet 8 feet East of the pond 190 feet 14 feet North of the clubhouse 200 feet 6 feet North of the northern storage facilities (2 locations) 50 feet (each) 4 feet (both) West of the northern office/industrial building, near 170 feet 4 feet the northern property line West of northern office/industrial building 500 feet 15 feet Near entrance gate 80 feet 4 feet Retaining walls four feet or higher require a building permit and must be designed by an Engineer registered in the State of Minnesota. Autobahn Motorplex - Planning Case 06-34 November 21, 2006 Page 5 of 16 STREETS AND SITE CIRCULATION The developer proposes to access the site from the existing curb cut at Audubon Road. This access location was approved with the Audubon Court final plat in 1989; however, this plat was never recorded. This access is approximately 280 feet south of Park Road. The access spacing guideline for this segment of Audubon Road is 660 feet. The applicant submitted a site plan where the access aligns with Park Road. This alignment was not pursued since the height of the retaining wall west of the northern office/warehouse building would be between 16 feet to 22 feet in order to accommodate this alignment. A private street will extend west to the site, with a gate proposed west of the eyebrow located in the southwest of the southern office/industrial building. The developer must provide a drainage and utility easement over the pavement section that will be used to access the pond for maintenance purposes. The developer must coordinate with City staff to ensure that pond maintenance and emergency vehicles will be able to access the gated area. The width of the drive aisle between southeast of the pond must be minimum 26 feet wide in addition to the proposed parallel parking stalls. The remaining drive aisles within the development meet or exceed the minimum standards. UTILITIES The developer proposes to loop privately owned and maintained eight-inch watermain from the existing trunk watermain on the west side of Audubon Road. If fire code permits, staff recommends that the private watermain be six inch diameter for water quality purposes. Due to the site topography, all buildings within the storage facility will be served by a privately owned and maintained forcemain, which will connect to the proposed eight-inch privately owned and maintained sanitary sewer between the two office/warehouse buildings. The City’s construction observer shall be present for all sanitary sewer and watermain testing to ensure that the proposed connections to the City facilities are in conformance with engineering standards. The developer shall pay for the inspection bills and submit a $5,000.00 security to ensure payment of these bills. WETLANDS Three Ag/Urban wetland basins exist on-site. Kjolhaug Environmental Services Company, Inc. delineated the wetlands in September 2006. Wetland 1 is a large Type 4 wetland located in the northwest portion of the site. It contains several forested upland areas, which provide a diversity of habitat. The wetland is dominated by cattail and reed canary grass. A portion of Wetland 1 that is separated from the body of Wetland 1 by a small, narrow upland area is highly disturbed and only appears in aerial photography after site grading occurred in the early 1990s. The City, as Local Government Unit (LGU) for the Minnesota Wetland Conservation Act, has determined that that portion of Wetland 1 is incidental wetland because the wetland characteristics developed as a result of excavation and other disturbances that were not intended to create wetland. The impacts proposed to this part of Autobahn Motorplex - Planning Case 06-34 November 21, 2006 Page 6 of 16 Wetland 1 are exempt under the Wetland Conservation Act. No other impacts are proposed for Wetland 1. The site also contains two areas that have been determined to be jurisdictional wetland, although they appear to function primarily as water conveyances. In the wetland delineation report, they are called Wetland Area A (to the west) and Wetland Area B (to the east). Both are located in the south-central portion of the property. They convey water from the adjacent railroad ditches to Wetland 1. The historical aerial photography for the area shows that the ditches existed prior to the grading for the cul-de-sac that occurred in the early 1990s. However, it is unlikely that the ditches supported wetland hydrology and hydrophytic vegetation historically due to the relatively steep grades from the railroad embankment to Wetland 1. When the grading for the cul-de-sac occurred, it altered the drainage patterns between the railroad and Wetland 1. This appears to have caused wetland hydrology and hydrophytic vegetation to develop in both Wetland Area A and Wetland Area B. The City, as LGU for the Minnesota Wetland Conservation Act, has determined that Wetland Area A and Wetland Area B to be incidental wetlands because the wetland characteristics developed as a result of a change in hydrology that was not intended to create wetlands. The impacts proposed to Wetland Area A and Wetland Area B are exempt under the Wetland Conservation Act; however, existing drainage patterns should be preserved. The water from Wetland Area A is accommodated, but the plans should be revised to show how the water routed through Wetland Area B will be conveyed to the proposed stormwater pond. The plans should be revised to show only non-exempt wetlands. Wetland buffer areas at least 16.5 feet in width should be preserved, surveyed and staked in accordance with the City’s wetland ordinance prior to grading commencing. All wetlands and wetland buffer areas to be preserved should be protected by silt fence during grading. All structures should be set back at least 40 feet from the wetland buffer edge. ARCHITECTURAL COMPLIANCE A carriage-house look is being created that will have a continuity of architectural theme with a variety of trim detail and colors. Size Portion Placement Building differentiation will be through the use of different colored accent colors. Building articulation is accomplished through the use of gable roof projections, cupolas and faux barn doors to simulate a barn and hayloft. Material and Detail Features shall include roof cupolas, cross-buck style decorative doors and loft doors, enhanced door and window trims and gable louvers. Building materials consist of painted, fibrous cement board siding (James Hardie siding) or stucco hardi-plank cement siding. Façade areas of buildings will have wainscots which consist of stone or brick in natural color tones. The entrance for the clubhouse is projected out from the rest of the building and has a gabled roof above as well as on the ends of the building. The clubhouse building will also incorporate multi- paned windows throughout the eastern elevation of the building. The roof pattern is repeated on the storage buildings. Accents are provided through the use of different colored trim. Cupolas Autobahn Motorplex - Planning Case 06-34 November 21, 2006 Page 7 of 16 are proposed in the middle and at the end of the building. The cupola above the clubhouse will be larger and have windows to provide natural lighting into the building. Weather vanes and lighting rods will be used on top of the cupolas. The roof material is metal standing seam. Color The primary building color is either putty-white or light taupe. The stone is Prairie Bluff – Yuma, which has browns and tans and is natural in appearance. Accents will be provided through the use of a range of color including light gray, gray, brown, red, maroon and forest green. The metal roof is forest green. Height and Roof Design Building height is 30 feet 6 inches at the top of the roof above the clubhouse. The buildings will have gabled roofs, the roof pitches will range from 3/12 pitch to 8/12. The storage buildings shall have a peak height of roof of 27 feet 8 inches. Substantial eave and gable overhangs shall be incorporated into each building design with highlighted fascia features. Roof articulation is provided through the use of cupolas. A green standing seam metal roof is proposed throughout the motorplex complex. Mechanical equipment is screened through landscaping and placement on the site. Facade Transparency Due to the type of buildings 50 percent of the first floor elevation that is viewed by the public includes overhead doors. Other areas shall include landscaping material and architectural detailing and articulation. The clubhouse building is the only building that will include doors and windows. Additional windows must be incorporated in the eastern building elevation to comply with the 50 percent transparency. Site Furnishing Community features include a plaza area in front of the clubhouse and museum. Loading areas, refuse area, etc. Refuse will be stored internally until the date of pick-up. Lighting/Signage Only wall-mounted lighting units are proposed for the development. The lighting must be shielded to prevent off-site glare. A monument sign may be located at the entrance on Audubon Road. The monument sign shall not exceed eighty (80) square feet in sign display area nor be greater than eight (8) feet in height. Wall signage must comply with City Code requirements for the IOP district. A separate sign permit application is require for all signage. Autobahn Motorplex - Planning Case 06-34 November 21, 2006 Page 8 of 16 LANDSCAPING Minimum requirements for landscaping include 20,376 square feet of landscaped area around the parking lot, 24 landscape islands or peninsulas, 82 trees for the parking lot, and buffer yard plantings along the north, east and west property lines. The applicant’s proposed as compared to the requirements for landscape area and parking lot trees is shown in the following table. Required Proposed Vehicular use landscape area 20,376 sq. ft. >20,376 sq. ft. Trees/ parking lot 82 over story trees 62 over story trees Islands/parking lot 34 islands or peninsulas 34 islands/peninsulas Applicant does not meet minimum requirements for trees in the parking lot area. Staff recommends that the applicant increase the number of trees in the parking lot to meet minimum landscape requirements. Required plantings Proposed plantings North property line – Buffer 8 over story trees 18 over story trees yard B, 1042’ length 15 under story trees 8 under story trees 15 shrubs 64 shrubs Northwest property line - 23 over story trees 1,100’+ wetland and natural Buffer yard D,1094’ length 45 under story trees area 68 shrubs 14 over story trees 0 under story trees 69 shrubs Audubon road, east property 14 over story trees 14 over story trees line - Buffer yard C, 740’ 35 under story trees 40 under story trees 35 shrubs 44 shrubs Applicant meets minimum requirements for buffer yard plantings along Audubon Road. Proposed quantities for buffer yard plantings along the north and northwest property lines are less than the recommended amounts. The distance, however, between the proposed development and the adjacent land uses is significant and staff proposes that the overstory tree requirement for the northwest buffer yard be met since the size of the trees at maturity will have a long-term effect. The buffering affect of shrubs across that distance is negligible. The quantity of under- and overstory trees along the north property is satisfactory. Staff recommends that plant selections for the landscaping are made primarily from native species. The applicant should focus on incorporating appropriate natives along the perimeter of the development as well as using them in interior plantings. Staff also recommends that the quantities of ash trees be reduced in response to the looming threat of Emerald ash borer. MISCELLANEOUS The building is required to have an automatic fire extinguishing system. The plans must be prepared and signed by design professionals licensed in the State of Minnesota. Detailed occupancy related requirements will be addressed when complete plans are submitted for Autobahn Motorplex - Planning Case 06-34 November 21, 2006 Page 9 of 16 building permit review. The owner and or their representative shall meet with the Inspections Division as soon as possible to discuss plan review and permit procedures. OTHER AGENCIES The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g., Riley-Purgatory-Bluff Creek Watershed District, Minnesota Pollution Control Agency) and comply with their conditions of approval. COMPLIANCE TABLE IOP Autobahn Motorplex Building Height 4 stories 2story 50 feet 30 feet Building Setback N - 10' E - 30' N - 23' E - 195' W - 50' S - 0' W - 520' S – 53’ Parking Stalls 92 stalls 104 stalls* Parking Setback N - 10' E - 30' N - 10' E - 160' W - 50' S - 0' W - 470' S - 10' Hard Surface Coverage 70% 47% Lot Area 1 acre 38.8 acres *The applicant is proposing that only the 24 stalls adjacent to the clubhouse and museum be striped at this time and that the remainder of the stalls be shown as proof of parking. Subject to the revisions to the plans to assure that a 26-foot drive aisle is provided, staff supports the use of proof of parking. Section 20-1124 (2) w. permits the City to approve a reduction in the number of parking spaces for warehouse uses. CONDITIONAL USE PERMITS BLUFF CREEK OVERLAY DISTRICT The City of Chanhassen established the Bluff Creek Overlay District by ordinance in 1998 to protect the Bluff Creek Corridor, wetlands, bluffs and significant stands of mature trees through the use of careful site design and other low-impact practices. This parcel is partially encumbered by the Bluff Creek Overlay District. Section 20-1255 of the Chanhassen City Code requires a conditional use permit for all development within the Bluff Creek Corridor. The Bluff Creek Corridor primary zone is located on the western portion of the property. The Primary Corridor is designated open space. All structures must meet a 40-foot structural setback from the Primary Corridor boundary as required by Chanhassen City Code. In addition, no grading is allowed within the first 20 feet of the Primary Corridor. The current plans propose Autobahn Motorplex - Planning Case 06-34 November 21, 2006 Page 10 of 16 grading within the Primary Corridor for a storm water pond. A variance is necessary to permit the encroachment in to the primary zone. Bluff Creek is entirely within the City of Chanhassen. It provides a unique blend of habitat, vegetation and recreational opportunities through the center of the City. In December 1996, the City of Chanhassen adopted the Bluff Creek Watershed Natural Resources Management Plan (BCWNRMP). The plan was the culmination of several years of study and planning focused on protecting the natural and recreational resources provided by the Bluff Creek corridor. The BCWNRMP recommended the establishment of a primary zone (the creek, riparian wetlands, associated steep slopes, native vegetation) and a secondary zone (other undeveloped portions of the watershed) as a tool to help protect the creek’s natural resources. The primary and secondary zones were mapped at that time using aerial photography to provide staff and the public with a general idea of where the zones would lie. Generally, properties within the Bluff Creek Overlay District are subject to the following requirements: 1.A conditional use permit (CUP) is required prior to all subdivision, site plans, land alteration and building within the Bluff Creek Overlay District. 2.Bluffs must be preserved as set forth in Article XXVIII of City Code. 3.Density transfer can be used to cluster development in areas where the location of the primary zone makes portions of the site unsuitable for development. 4.Natural habitat areas within the primary zone must be preserved as open space. 5.The primary zone must be 100 percent open space. 6.All structures must be set back at least 40 feet from the primary zone. 7.The first 20 feet of the setback from the primary zone cannot be disturbed. Staff has reviewed the mapped primary zone boundary and adjusted the boundary based on site conditions. Generally, the Bluff Creek primary corridor can be demarcated on the subject property by the 908 contour, excepting the portion of Wetland 1 that is incidental. In addition to the land below the 908 contour, the primary corridor includes a small upland area located behind the proposed clubhouse. Due to the significant stand of trees and close proximity to the creek, the primary corridor also includes the wooded knoll in the southwest corner of the property that is bounded by the 908 contour and the railroad tracks. The plans should be revised to show the correct primary zone boundary. Additionally, the primary zone boundary should be terminated at the property lines for the subject property because the above description of the primary zone boundary is not an accurate description of the primary zone on adjacent properties. Signage for the Bluff Creek Overlay District should be posted at least every 300 feet along the primary zone boundary. The applicant is proposing alteration within the primary zone of the Bluff Creek Overlay District and within the 20-foot buffer area adjacent to the primary zone. The grading is for the Autobahn Motorplex - Planning Case 06-34 November 21, 2006 Page 11 of 16 construction of the stormwater pond and to accommodate buildings and drive areas adjacent to the primary zone. VARIANCE The Primary Corridor is designated open space. All structures must meet a 40-foot structural setback from the Primary Corridor boundary as required by Chanhassen City Code. In addition, no grading is allowed within the first 20 feet of the Primary Corridor. The plans propose grading for a stormwater pond within the Primary Corridor. This is the only feasible location for a stormwater pond due to the site topography. A variance is necessary to permit the encroachment into the primary zone. It is reasonable to grant this variance. As a condition of approval, the applicant will be required to develop a re-vegetation plan for the Primary Corridor. MULTIPLE BUILDINGS ON ONE PARCEL Section 20-902 of the Chanhassen City Code permits the groupings of buildings on a single parcel through the conditional use permit process. Development layout and building design intent is for creating a sense of community amongst the association members. One aspect of accomplishing this is by dividing the building square footage into 14 relatively small buildings that fit in and follow the lot contours as opposed to 2 or 3 large sprawling buildings. RECOMMENDATION Staff recommends that the Planning Commission adopt the following four motions and adoption of the attached findings of fact and recommendation: A. “ Rezoning The Chanhassen Planning Commissionrecommends approval of the of the western portion of the site from Agricultural Estate District, A2, to Industrial Office Park, IOP.” B. “ Conditional Use Permit The Chanhassen Planning Commissionrecommends approval of the Variance for development within the Bluff Creek Corridor with a to locate the storm water pond within the Bluff Creek primary zone, in conformance with the grading plans prepared by Sathre- Bergquist, Inc., dated 10-19-2006, subject to the following conditions: 1.The plans shall be revised to show the correct Bluff Creek Overlay District primary zone boundary. Additionally, the primary zone boundary shall be terminated at the property lines for the subject property because the above description of the primary zone boundary is not an accurate description of the primary zone on adjacent properties. Signage for the Bluff Creek Overlay District shall be posted at least every 300 feet along the primary zone boundary. 2.The applicant shall develop a restoration plan for the upland areas within the primary zone that includes native plants for the Bluff Creek Overlay District. The plant species shall be selected from the Bluff Creek Management Plan Appendix C. The final plan shall be reviewed and approved by the City before installation. Autobahn Motorplex - Planning Case 06-34 November 21, 2006 Page 12 of 16 3.The property owner shall dedicate a conservation easement and a drainage and utility easement over the primary zone of the Bluff Creek Overlay District. 4.Chanhassen Type II silt fence shall be provided adjacent to all areas to be preserved as buffer. The silt fence shall be installed in overlapping “J-hooks” to break up the sections and provide additional water and sediment retaining capacity. 5.Erosion control blanket shall be installed on all slopes on site steeper than 3:1. The plans shall be revised to depict blanket locations and shall provide a detail for blanket installation. 6.Street cleaning of soil tracked onto public streets shall include daily street scraping and street sweeping as needed.” C. “ Conditional Use Permit The Chanhassen Planning Commissionrecommends approval of the for multiple buildings (up to 14) on one parcel subject to the following conditions: 1.Development of the two buildings immediately adjacent to Audubon Road shall require a separate site plan review.” D. “ Site Plan The Chanhassen Planning Commissionrecommends approval of the for 12 buildings (one clubhouse/museum building and 11 storage buildings totaling approximately 177,000 square feet of building area), plans prepared by Sathre-Bergquist, Inc., dated 10-19-2006, subject to the following conditions: 1.Additional windows or doors must be incorporated in the clubhouse eastern building elevation to comply with the 50 percent transparency requirement. 2.Water Resource Coordinator conditions: a.The plans shall be revised to show how the water routed through Wetland Area B will be conveyed to the proposed stormwater pond. b.The plans shall be revised to show only non-exempt wetlands. Wetland buffer areas at least 16.5 feet in width shall be preserved, surveyed and staked in accordance with the City’s wetland ordinance prior to grading commencing. All wetlands and wetland buffer areas to be preserved shall be protected by silt fence during grading. All structures shall be set back at least 40 feet from the wetland buffer edge. c.The plans shall be revised to show the correct primary zone boundary. Additionally, the primary zone boundary shall be terminated at the property lines for the subject property because the above description of the primary zone boundary is not an accurate description of the primary zone on adjacent properties. Signage for the Bluff Creek Overlay District shall be posted at least every 300 feet along the primary zone boundary. d.A conditional use permit and variance shall be obtained prior to alteration within the Bluff Creek Overlay District primary zone. Autobahn Motorplex - Planning Case 06-34 November 21, 2006 Page 13 of 16 e.Drainage and utility easements over the stormwater pond and areas necessary for pond access (including an easement over the main drive aisle through the site from Audubon Road to the pond) shall be dedicated to the City prior to recording the site plan. The parking areas and drive aisles shall be swept each spring to prevent sand from leaving the site. Documentation of sweeping activity shall be submitted to the City annually. f.The plans shall be revised to include Chanhassen’s standard details for stormwater infrastructure and erosion and sediment control, including 3107, 3108, 3109, 5300, 5301 and 5302A. A detail for the proposed temporary perforated riser pipe shall also be included in the plans. g.A temporary perforated riser and stable emergency overflow (EOF) is needed; a detail shall be included in the plan. The basin shall be properly sized for the watershed area, according to NPDES requirements (i.e., the basins shall provide storage below the outlet pipe for a calculated volume of runoff from at least a 2-year, 24-hour storm from each acre drained to the basin, except that in no case shall the basin provide less than 1800 cubic feet of storage below the outlet pipe from each acre drained to the basin). The outlet pipe shall discharge upstream from the edge of the receiving wetland and shall be stabilized with riprap. h.Chanhassen Type II silt fence shall be provided adjacent to all areas to be preserved as buffer. The silt fence shall be installed in overlapping “J-hooks” to break up the sections and provide additional water and sediment retaining capacity. i.Erosion control blanket shall be installed on all slopes on site steeper than 3:1. The plans shall be revised to depict blanket locations and shall provide a detail for blanket installation. j.Street cleaning of soil tracked onto public streets shall include daily street scraping and street sweeping as needed. k.The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g., Riley-Purgatory-Bluff Creek Watershed District, Minnesota Pollution Control Agency) and comply with their conditions of approval. l.A Storm Water Pollution Prevention Plan (SWPPP) shall be developed for the site and approved by City staff prior to issuing a permit. The SWPPP shall include a provision that requires temporary seeding of stockpiles if left exposed for more than 14 days. m.The plans shall be revised to include energy dissipation on all inlets and outlets within 24 hours of installation. n.The plans shall be revised to replace hay bale curbside inlet controls with Wimco-type inlet controls. A detail shall be provided. The controls shall be installed within 24 hours of installation of the inlets. o.All perimeter controls shall follow the City’s specifications. The perimeter controls shall be inspected by the City and the SWCD prior to grading. Autobahn Motorplex - Planning Case 06-34 November 21, 2006 Page 14 of 16 3.Fire Marshal conditions: a.Additional fire hydrants will be required. Please contact the Chanhassen Fire Marshal for exact location of additional hydrants. b.A 10-foot clear space must be maintained around fire hydrants, i.e., street lamps, trees, shrubs, bushes, Xcel Energy, Qwest, cable TV and transformer boxes. This is to ensure that fire hydrants can be quickly located and safely operated by firefighters. Pursuant to Chanhassen city Ordinance #9-1. c.Yellow curbing and no parking fire lane signs will be required. Contact Chanhassen Fire Marshal for exact location of yellow curbing and signs to be installed. d.No burning permits shall be issued for trees to be removed. Trees and shrubs must either be removed from site or chipped. e.Fire apparatus access roads shall be designed and maintained to support the imposed load of fire apparatus and shall be serviced so as to provide all-weather driving capabilities. Pursuant to Minnesota State Fire Code Section 503.2.3. f.Submit radius turn dimensions to City engineer and Chanhassen Fire Marshal for review and approval. Pursuant to Minnesota State Fire Code Section 503.2.4. 4.Building Official Conditons: a.The buildings are required to have automatic fire extinguishing systems. b.Building plans must be prepared and signed by design professionals licensed in the State of Minnesota. c.Retaining walls over four high must be designed by a professional engineer and a permit must be obtained prior to construction. d.Every building containing any plumbing fixtures and/or receptors, must have its own independent connection with a public or private sewer, except that a group of buildings may be connected to one or more manholes which are constructed on the premises and connected to a public or private sewer (MSPC 4715.310). No building sewer shall be less than 4 inches in diameter (MSPC 4715.2310). Building drain must be by gravity (MSPC 4715.2430). The distance between cleanouts in horizontal piping shall not exceed 50 feet for 3-inch or less in size and not over 100 feet for 4-inch and over in size (MSPC 4715.1010. 5.Forester conditions: a.All existing boulevard trees along Audubon Road shall be preserved and protected with tree preservation fencing during construction. Any City boulevard tree that dies or is removed will be required to be replaced. Autobahn Motorplex - Planning Case 06-34 November 21, 2006 Page 15 of 16 b.The applicant shall revise the landscape plan to show a total of 82 overstory trees within the vehicular use area. c.The applicant shall revise the landscape plan to show a total of 23 overstory trees along the northwest property line buffer yard. d.The slope along the Bluff Creek primary zone shall be seeded with an approved native seed mix. e.Plant selections for landscape requirements shall incorporate native species for buffer yard and parking lot landscaping 6.Engineering Conditions: a.The grading plan must be revised to show proposed pavement grades for the driveway access to the northern office/warehouse. b.The grading plan must show proposed pavement grades. c.Pavement grades must not exceed 10%. d.The private streets within the development must be constructed to a nine-ton design. e.An additional spot elevation must be shown on the south end of the storage building immediately west of the northern office/warehouse to ensure positive drainage. f.Note the proposed rim and invert elevation of the storm sewer located at the driveway intersection south of bore hole location #3. g.The developer must coordinate with City staff to ensure that pond maintenance and emergency vehicles will be able to access the gated area. h.The width of the drive aisle southeast of the pond must be minimum 26 feet wide in addition to the proposed parallel parking stalls. i.If fire code permits, staff recommends that the private watermain be six-inch diameter for water quality purposes. j.The City’s construction observer shall be present for all sanitary sewer and watermain testing to ensure that the proposed connections to the City facilities are in conformance with engineering standards. k.The developer shall pay for the inspection bills and submit a $5,000.00 security to ensure payment of these bills.” Autobahn Motorplex - Planning Case 06-34 November 21, 2006 Page 16 of 16 ATTACHMENTS 1.Findings of Fact and Recommendations. 2.Development Review Application. 3.Autobahn MotorPlex Project Narrative dated 10/20/2006. 4.Autobahn MotorPlex Architectural Narrative. 5.Memo to Lori Haak from Bruno Silikowski, Re: Variance Justification. 6.Private Entry Road . 7.Reduced Copy Site Plan Dated 10/19/06. 8.Reduced Copy Grading Plan dated 10/19/06. 9.Reduced Copy of Landscaping Plan Sheet L1 dated received 10/27/06. 10.Reduced Copy of Landscaping Plan Sheet L2. 11.Reduced Copy Existing Conditions Survey dated 9/26/06, sheets 1-3. 12.Reduced Copy Tree Inventory dated 9/26/06. 13.Reduced Copy Clubhouse Building Elevations. 14.Reduced Copy Typical Façade Elevations. 15.Reduced Copy Clubhouse Floor Plan. 16.Reduced Copy Storage Building Floor Plan. 17.Alternate Access Schematic. 18.Reduced Copy Cross Section from Creekside. 19.Email from Jon Day to Bob Generous dated 10/25/06. 20.Email from Brian Guthrie to Bob Generous dated 11/10/06. 21.Email from Jon Day to Bob Generous dated 11/10/06. 22.Letter from Chip Hentges to Robert Generous dated 11/21/06. 23.Public Hearing Notice and Affidavit of Mailing. g:\plan\2006 planning cases\06-34 autobahn motorplex\staff report autobahn motorplex.doc Planning Case No. 00 -- ~/f CITY OF CHANHASSEN 7700 Market Boulevard - P.O. Box 147 Chanhassen, MN 55317 - (952) 227-1100 DEVELOPMENT REVIEW APPLICATION PLEASE PRINT Ap licant Name and Address: Rt>~ o.J. eli_I K.ou.-:'s J::-\ :3.615' 'l!. {(~(olo-..l u~,wc No<f..::...'n.\ '"v L Y MO cTTi.-\' hi N5St./ L{ '-~ Contact: . Phone: L, IJ... 95D 9:.!;'1BFax: Email: A9LI J<olU.5l((@ A(;""'~H--.) \,,^c.~rc(2l1..E'x, (OJ..-'-..- Owner Name and Address: c--I: 0.5/J)tnliC-5 .595/ Clt:illltJ{(i~/~("I,;e.J VY1/nt1fk-nJ.t't /h rJ b-:'?'31-3 Contact: 9~- c:X ' c/tfB - t.....b-~3 Jo C. Phone: Fax: ~elJ Email: / '~ ; NOTE: Consultation with City staff is required prior to submittal, including review of development plans X Escrow for Filing Fees/Attorney Cost" .. $50 CUP/SPRNACNARfWAP/Metes & Bounds - $450 Minor SUB I c)) TOTAL FEE $ L. J d- '75 .- pel c t:..:#=.. 503'7 An additional fee of $3.00 per address within the public hearing notification area will be invoiced to the applicant prior to the public hearing. Comprehensive Plan Amendment X Conditional Use Permit (CUP) X d.. ZED Interim Use Permit (IUP) Non-conforming Use Permit Planned Unit Development* x: Rezoning s.o Sign Permits Sign Plan Review X Site Plan Review (SPR)* ISo ,OCO S:jf+ 5CO+ I'SCO Subdivision* Temporary Sales Permit Vacation of Right-of-Way/Easements (VAG) X Variance (VAR) ;;J.oo X Wetland Alteration Permit (WAP) d'7S Zoning Appeal Zoning Ordinance Amendment x:. Notification Sign - $200 (City to install and remove) *Sixteen (16) full-size folded copies of the plans must be submitted, including an 8%" X 11" reduced copy for each plan sheet along with a digital copy in TIFF-Group 4 (*.tif) format. **Escrow will be required for other applications through the development contract. Building material samples must be submitted with site plan reviews, NOTE: When multiple applications are processed, the appropriate fee shall be charged for each application. PROJECT NAME: A lTfjO (~?1H ~ nflorog f'cEX LOCATION: {.iU~ T 51.vE' DF Av DL!!bo~-" RD5x:JLfTJ-1 (~>-.J:0 LL\:-:~T D y:- , LEGAL DESCRIPTION: SEe 8c'iJ~:\)e.Y ,5~) ,-'lEY (AilACt-U~;J) . TOTAL ACREAGE: 3g,7 f\cru:.-~) WETLANDS PRESENT: X YES NO PRESENT ZONING: WDTSfQL/<'D,'IR-/ "A 1." 6~\CL.>Lr..;'(;;;.l..L 6!Jil'l-T'[;, REQUESTED ZONING: ":[0 r" IN O\-Js,-rr<:'t l\L OrFtC e T~lK. PRESENT LAND USE DESIGNATION: D Ff' I c.r;' II .u\'),)~CR( AL- REQUESTED LAND USE DESIGNATION: t)F'P I Ci;-/r:J b',lj-.<"(Z-I....., '- REASON FOR REQUEST: This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information and plans required by applicable City Ordinance provisions. Before filing this application, you should confer with the Planning Department to determine the specific ordinance and procedural requirements applicable to your application. A determination of completeness of the application shall be made within 15 business days of application submittal. A written notice of application deficiencies shall be mailed to the applicant within 15 business days of application, This is to certify that I am making application for the described action by the City and that I am responsible for complying with all City requirements with regard to this request. This application should be processed in my name and I am the party whom the City should contact regarding any matter pertaining to this application. I have attached a copy of proof of ownership (either copy of Owner's Duplicate Certificate of Title, Abstract of Title or purchase agreement), or I am the authorized person to make this application and the fee owner has also signed this application. I will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees. feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. The documents and information I have submitted are true and correct to the best of my knowledge. A I{{ ~ / .~ h,~ 6; . ~,,0. Signature of A?i a t -. --7 /___-:~._..___.-----__.=~7 .. .~.--- . / --- c:::-----"/ ---...--- .' ..~.'~ .' / ..' " ....- ,./ Signature of Fee Owner /C-7/W /0 (;, . Dati It) /2 '-I /00 . Date' G:\pLAN\forms\Dcvclopmcnt Review Application.DOC Rev. 12/05 Autobahn MotorPlex Project Narrative Planned use of property: .id:10 DNINNV1d N3SS"HN'fH~ 9002 L 6 180 03^'303l;j 1 O/20/2006-:!sS'1HNVHO;:lO Al\O The facility consists 0 f appro ximately 38 acres with ~ 13.5 being used for building. The facility will consist of multiple buildings with the frontage road, Audubon Rd, having two 2 acre lots that will be developed as office/warehouse units. The road entering into the property will be a private road and will serve as the only entrance into the property campus. The elevation drops significantly from the road level (approximately 30 feet) which will shelter the storage condominiums from public view. The emphasis in the complex is on aesthetics, quality construction, privacy and security. The planned use will primarily be high-end storage condominiums and will be built in phases, starting with the Club-House and buildings surrounding the Club-House. We are building in phases so to give our individual customers what they need in amount and configuration of storage space. The site will consist of multiple buildings, each with sprinkler frre protection and digital security cameras as well as individual unit web-cam security access through the facilities website. Different and better than any other site built or being built, these buildings will have significantly upgraded amenities that will not only set it apart but will aid in the projects success. We are well fmanced and our customers/members tend to be people with high-end vehicles looking for a safe, secure and upscale place to keep the vehicles and share their passion with other like minded individuals. Our use is extremely clean and environmentally friendly that values the natural beauty that the location brings. The major differences between Autobahn MotorPlex (AMP) and any other storage facility in the area is the quality and location. AMP Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes <15 min In-floor heat Sprinkled building Web cam security in unit Wash down bay Club House Motorsport Events thru-out yr Museum Bathroom Mechanics on-site Concierge desk and website Time from downtown Minneapolis Competition No No No No No No No No No No 40 minutes Additionally, their buildings are steel sided plain structures and ours will have a significantly upscale fmish to them (see club house option which will carry the theme to all of the buildings). The Club House will also be used as an automotive museum and a warehouse showroom serving the needs of the condominium owners. There is a growing trend throughout the United States and in fact internationally for the kind of facility that I am building. The following link is a Forbes article regarding the trend and what I am doing (I am mentioned in the latter part of the article). When you read the article, you will notice that it's focused on "driving track country clubs"; while we are building a storage location in Chanhassen, it is linked to what I am doing in another location in the State. This is the link and I've also cut and pasted the article at the end of this document for your convenience. http://www.forbesautos.com/news/ features/2006/racing_ clubs. html Facility description: The facility consists of approximately 38 acres with ~ 13.5 being used for building. The facility will consist of multiple buildings with the frontage road, Audubon Rd, having two 2 acre lots that will be developed as office/warehouse units. The road entering into the property will be a private road and will serve as the only entrance into the property campus. The elevation drops significantly from the road level (approximately 30 feet) which will shelter the storage condominiums from public view. The emphasis in the complex is on aesthetics, quality construction, privacy and security. The complex will have multiple buildings with approximately 150,000 sq ft under roof It will be gated and fenced with the planned look as follows: " · i I -~ And fence design being of aluminum or steel construction and looking close to this: Access to the campus will be regulated by gated checkpoint using both remote controls and a permanent keypad. Both the Fire Department and Police Department will be given controllers and access codes for entry into the facilities. The facility will be manned during normal business hours. As stated earlier the facility will have multiple buildings with the following approximate architectural themes: III:J~ .... I~ .... .... _J ~ I The facility will have significant restrictive covenants that will restrict/limit the owners from being able to store hazardous and flammable items as well as limit any outside parking. The restrictive covenants and contract are currently being drafted by an experienced storage condominium attorney. Description of operation The facility is primarily, secured private garage condominiums which allow the owners access at any time. However, the Club-House will only be open during normal business hrs (i.e. 7am till 8pm). The Club-House will primarily be for the convenience of the owners, but will occasionally be used for meeting (i.e. Porsche Club, BMW Club, and Corporate Meetings). The Club-House is designed in a Museum display setting for prominent automobiles. The plan is for the ability to display 16 vehicles in the museum portion of the Club-House. This museum is not open to the public and is for the enjoyment of the club members. Additional planned amenities are a dedicated common "vehicle wash down" bay for use by our members, thus avoiding the need for drains in each of the units. Parkin2 I am applying for proof of parking. Given that the entire idea of this facility is to store your vehicles, we do not anticipate much need for parking. In the site plan drawings submitted, you will fmd a greater number of parking spaces identified than is required by the City. My request is that we simply do not stripe the parking spots except for around the Club-House. Car News and Reviews Published on 08/01/2006 How to Drive More than 100 mph and Not Get Busted by Andrius Mikonis ForbesAutos.com " . CHICAGO - Do you have a fast car but nowhere to take it out and see what it will do? A driving country club may be coming to a metropolitan area near you. Think golf-country-club amenities but with a racetrack instead of links. It's a place close to home where members can go to exercise their cars and driving abilities in a safe environment without worrying about speed traps. Most importantly, this is not professional racing, but somewhere to drive as fast as you'd like, as often as you'd like. A vintage Porsche races on the Autobahn Country Club's South Circuit. The idea has evolved over the last few years, with four clubs already open and more on the way. Established clubs are attracting everyone from professional drivers and race-car builders to car enthusiasts. The only qualifications mem bers need are a fast car, driving certification to be determined by the facility and, of course, you have to pay to play. The key here is the club component, setting these businesses apart from the traditional racetrack venue by offering regular on-track driving opportunities without having to join a sanctioning body or wait for special events. This most often takes the form of a country-club model, where members pay an initiation fee and annual dues for track access as well as use of a clubhouse and related facilities. " I " . " I A prime example is the Autobahn Country Club (ACC), which opened in spring 2005 in Joliet, 111., and is a one-hour drive from downtown Chicago. "It's the first purpose-built club of its kind," said founder and president Mark Basso. 'We're getting a lot of interest from around the country." i The carefully landscaped 3.57-mile road course winds around 320 acres. Construction on a larger clubhouse with a car museum starts in April to supplement the Autobahn's current building. Members can also lease trackside lots to build their own garages and spectator buildings. This feature is in its third phase, with some 36 already leased in the first two. Each one is fancier than the last, with "pool tables, custom kitchens, even art collections," according to Basso. II:..' .... - · , Autobahn Country Club I I view Driving C6utitry Club :.' slideshow ~ And men aren't the only ones having all the fun at these clubs. Three primary members are women. Steve Wagner, one of the four founders of the ACC, says there are several members' wives, almost a dozen by his estimate, who come out and drive on a regular basis. Developer Matt Page, who is breaking ground in July on a 1 ,600-acre site near Dallas, says his Racers Ranch country club will feature a combination of Old English architecture and "the look of a Kentucky horse farm." Even garage facilities will resemble stables. There will be an actual equestrian center and 40 five-acre home sites for a true country-ranch-Iiving experience. Page wants the club to feel more like an exclusive and relaxing retreat than a racetrack. Truck access to the paddock will be through a separate entrance to keep the operations behind the scenes. A high level of service, including a concierge, will be this club's hallmark. A quite different club idea is the Miller Motorsports Park, which opened this spring near Salt Lake City. Alan Wilson, who designed Autobahn and many other tracks worldwide, said this setup is based on drivers' clubs at the Goodwood and Silverstone tracks in England and the Sports Car Club of South Africa - which he says are "great social places where at any time you could bump into Formula One drivers." Clubs in Operation: Autobahn Country Club Joliet, Ill. Annual Fee: $3,000 I Contact: 815/722-2223 autobahnmb@comcast. net Miller ~otorsports Park Tooele, Utah Annual Fee: $1,600 to $3,500, depending Of/level I of membership '.: Contact: 801/563-4175 bmiller @millermotorportspark. com Motorsport Ranch I Cresson, Texas Annual Fee: $1,158 LCont~~~:. 8~~/512-3162 The Miller Motorsports Park track holds sanctioned races - several organizations have already signed on - and also has a private club with a core membership. It will also be open to credentialed members of the visiting race. Home club members not only have ample track use but also free spectator access during races, where they are able to meet and socialize with the incoming group. "The idea is to mix and match elements of motorsports," explained Wilson. Autobahn management feels that opening the private club to car shows is important for business, and hence plans to allow public access to its car museum. "It adds to the excitement of the racetrack atmosphere, but the members will always have a private area to retreat to," Basso said. !- irifo@mot~;sport~anch.com ! VIRginia International ~ Raceway Motorsport Country Club Alton, Va. Annual Fee: $2,1:00for Virginia/North Caroiina · residents; $1,200 all other state residents Contact: 434/822-7700 - -------~ The annual fees differ between each club. Racers can expect to spend $3,000 annually at the Autobahn Country Club; $100 to $175 per month at the VIRginia International Raceway (VIR); and $50 to $75 per month at Motorsport Ranch. Also, the VIR and Motorsport Ranch have additional charges for usage by day or half hour, respectively, while the ACC does not. Most of the clubs in development have pricing posted to pre-sell memberships. "Members are on their own as far as insurance coverage if they wreck their cars, but they are covered as participants under the club's liability insurance," Basso said. The main attraction at all these clubs is a road-racing course, though some of the clubs will offer other driving venues such as kart tracks, skid pads and, less commonly, drag strips and off-road trails. Autobahn is putting the finishing touches on its Wilson-designed half-mile kart track this spring; it's 30 feet wide, so it's also suitable for autocross events. Though driver certification is required by all, typically these tracks are designed with safety in mind, because a wide variety of skill levels will be accommodated. This means ample room to run off the track without hitting anything as well as limiting speeds by keeping the length of the straightaways relatively short. Matt Page, who has also brought Alan Wilson on board, says he wants to have a longer straightaway on one of the courses for only the most competent drivers, as this will be useful for manufacturers that might rent the track for testing. "Everything will be built to Sports Car Club of America standards," Page said. "Safety is first. " I --. - .,..,.-............ - -.1 I Clubs tp Watch: Alpine Motorsports Club Saylorsburg, Pa. Contact: 800/795-2638 dsmith@l usa. com ~ Look for it: Construction ~ begins in 2007. ! I Autobahn Motorplex t__ _ w . __ ____--~--.--..tI Another feature nearly all of these clubs possess is a track with multiple configurations, allowing club members to drive simultaneously and independently while another group can rent another part of the track. You'll see anything from street cars to vintage race cars to motorcycles. Page said he wants to "celebrate all kinds of motorized vehicles," and he wants to make room for "gearheads with muscle cars, even Model Ts." All of these racing clubs run in much the same way, by grouping similar vehicles and drivers together to go out on the track for a predetermined length of time, then the next group goes out. Occasionally, there might be timed racing. Rental customers include car clubs looking for track time; sanctioned organizations holding races; manufacturers for testing, consumer events or training employees; and corporate clients looking for an activity. "We sold out every weekend and 60 percent of the weekdays," Basso said of the first season. "It takes the burden off the members to have to cover all the operating costs." Location is an important consideration. Back in 2000, the scenic 3.27- mile road course of the Virginia International Raceway was resurrected after a long hiatus and reopened as America's first driving country club. However, it is billed as a resort destination catering to both in- state and out-of-state members. The advantage of a club like the Autobahn is its proximity to a major city - the club is 49 miles from Chicago. "You can leave the office at noon, get an afternoon of driving in and still be home for dinner," Basso said. Metro Minneapolis Contact: Bruno Silikowski ; bsilikowski II I ~'I' @autobahnmoto.rplex.com Look for it: Construction ~ date TBA ::: I I I Club Motorsports ~ Tam worth, NH Contact: 603/437-3278 Look for it: Construction date TBA New Jersey Motorsports Park , Millville, NJ. ~ Look for it: Spring 2007 Racers Ranch Dallas area Contact: 214/718-1247 straight811c@hotmail.com'l Look for it: Construction began July 11, 2006. ~ . ----I The future Alpine Motorsports Club may have one of the best locations, situated 75 miles from ,both New York City and Philadelphia. The 360-acre site in the Pocono Mountains will feature a four-mile course with 220 feet of elevation changes. Alan Wilson designed the circuit with nine different configurations. All the ingredients for a perfect driving country club are there; one novel idea is encouraging members to form "driving groups" who can rent a section of the track to race amongst themselves. Already years into the planning, Alpine will break ground early next year. Bruno Silikowski found a different approach to the proximity problem. His Autobahn Motorplex, located 15 minutes from downtown Minneapolis, is a 37-acre site that will not have a track, but will have a clubhouse as well as secure, heated storage condos that members can purchase - and depreciate - to garage their racing and other special cars. Silikowski is scouting some potential track locations further out of town, but in the meantime members will have use of on-site facilities for car maintenance, with techs both ~n-~taff and visiting, as well as a concierge to help make arrangements. They will host events like car shows and SCCA meetings, and they will offer a place for like-minded enthusiasts to mingle and watch televised races. "It will be the mecca of motorsports in Minneapolis," said Silikowski. Alan Wilson thinks noise is the biggest problem with getting a new club built in a populated area these days. "The noise issue doesn't have to be a necessity," he said, pointing out that most recreational drivers won't see any difference driving a car on the track with a muffed exhaust. "These clubs will evolve, and without the noise will no longer be a negative to the surrounding area. Then they will be more socially acceptable." The demand is there. Autobahn has sold out individual memberships and has started a waiting list. Only six corporate memberships remain available. 'We're growing like crazy," said Basso. i I j Autobahn MotorPlex Architectural narrative This document is an addendum to the project narrative. The entire platted lot area of this development is 1,648,253 Sq. Ft. with a 50' elevation drop from Audubon Road to the wetlands. The development proposal is for 175,763 Sq. Ft. of building area and 275,632 Sq Ft of paved area. The hard surface coverage of the upland.area is 47%, with the balance being green space & natural areas. Development layout & building design intent is for creating a sense of community amongst the association members. One aspect of accomplishing this is by dividing the building square footage into 14 relatively small buildings that fit in & follow the lot contours as opposed to 2 or 3 large sprawling buildings. A carriage house look is being created that will have a continuity of purpose and architectural theme (see attached drawings) but with a variety of trim detail and colors that will create uniqueness. The buildings will have gabled roofs, the roof pitches will range from 3/12 pitch to 8/12. Substantial eave & gable overhangs shall be incorporated into each building design with highlighted fascia features. Walls and roofs are to be highlighted to create a European village feel. Features shall include roof cupolas, cross buck style decorative doors and loft doors, enhanced door and window trims and gable louvers. Fa<;ade areas of buildings will have wainscots which consist of stone or brick in natural color tones (see samples). Roof finishes shall be of pre painted steel, steel to be commercial quality with a minimum thickness of .019". Paint finish to be Kynar 500/Hylar 5000 brand with a 35 year warranty (see samples). Wall finishes will be painted, fibrous cement board siding (James Hardi siding) or stucco (see samples). Architectural variety will be achieved by varying roof pitches, fascia highlight features, cupola style variation and by varying door, window, louver and loft door size and quantity. Architectural variety will be enhanced by building placement on property; floor elevations of buildings vary as much as 25' with some buildings tucked into hill sides to enhance variety. MEMO To: Lori Haak, City of Chanhassen From: Bruno Silikowski, Mutual Investments LLC RE: Variance Justification - Autobahn MotorPlex Site This memo supports our appeal for a change or variance to the City suggested Bluff Creek Overlay Line (BCOL). The only change that we are requesting is that instead of using the 908 foot contour elevation we use the 906 elevation. This change results in an extremely little difference in land within the BCOL (see elevation contour map) throughout the General Mills site and our land but does allow low land on our site to be used for ponding. Additionally, there is no impact on the wetland boundaries on either site. The low area on our land includes an incidental wetland. It is man-made and its genesis is a result of grading that was done on the site back in 1988-1989 timeframe (Sathre owned the site at that time, so we know this to be fact). If the appeal is agreed upon, we will only use the difference in the land for ponding purposes and it will, within 2-3 years, take on similar characteristics as the pond/wetland to the north. This area is by far the most reasonable location to place the ponding; it is the lowest point that can be used and this is where the water naturally flows. This ponding point is also the closest natural location that would allow the water coming from the railroad track to be channeled, in fact that water also flow to the area requested. This memo also demonstrates that the best place for the pond is where the incidental wetland is located, adjacent to the main wetland basin. There are many reasons but the most important are a natural water flow, better water quality entering the Bluff Creek, higher quality pond aesthetics, and significantly increased expenses for engineering work, excavating, grading, build ability, and piping. In summary, changing the BCOL from the 908 to 906 elevation is the most reasonable solution for ponding on this site. The only use for the land difference will be for ponding. Additional improvements to the BCOL could also be gifted, such as but not limited to additional plantings adjacent to existing wetland complex within the BCOL. We would coordinate with an Environmental Engineer to determine appropriate improvements to the wetland boundaries and upland to expand or enhance the existing wildlife habitat. We would propose to do this in cooperation with General Mills to provide a more comprehensive improvement plan. Sec. 20-58 General conditions for granting a variance - (I) There is undue hardship; it is not being able to use the area ofthe property where the storm water naturally flows. Reason being the area is currently within the BCOL primary line, and ponding is not allowed within the BCOL. Additional undue hardship is; that the next most logical place to put a storm water pond is along western upland slopes. This is not only a poor place to put the pond from the standpoint of water flow but also from an engineering standpoint (least structurally sound - being placed on a slope) and the storm water won't be filtered as much through the wetland before flowing into the Bluff Creek. Also, flow from existing gullies will not be able to be treated prior to it entering the BCOL. (2) The topography of this parcel makes this property quite different than the surrounding properties, bowl shaped. The overland flow on the site is largely from the east towards the west/northwest lowest. Currently, much of the flow is being directly to the incidental wetland area by actively eroding gullies. This incidental wetland area is where we are requesting a pond to be placed. (3) The variance is requested because it is the most reasonable solution to storm water ponding on this site. It would be the most structurally stable pond location, provide maximum filtering ofthe storm water and be in the place where the water is naturally flowing. (4) As stated above, the topography of this parcel makes for a natural storm water ponding location. (5) The opposite would occur, placing the ponding on this location will provide maximum filtering for the storm water thus improving the water quality entering the Bluff Creek. (6) If anything, the approval of this variance will enhance the quality of life for the surrounding neighbors, ecology and wildlife. Variance Justification on the 8200 Audubon Road Property. Storm water ponding is always a necessary challenge as a part of the development to protect downstream waterbodies and is somewhat of a peculiar problem on this site. The main body of the site slopes mostly from the east towards the West, however there is a higher area in the western portion of the site that drains back to the East creating a bowl shape where the storm water naturally settles in the lowest part ofthe property. In fact, this presents a natural place where the storm water ponding begs to be. Unfortunately, -25% of the needed storm water ponding falls within the Bluff Creek Overlay, but is still outside the defined wetland boundary, thus requiring a variance for the proposed solution. Striving to create a ponding area that provides the best rate and quality control for all runoff from this site prior to reaching the wetlands abutting Bluff Creek while using the existing topography of the land we worked with City staff and have researched three options for dealing with the storm water ponding; 1. West most pond site; engineering wise it is a volatile structure and least structurally sound because of being built on the side of a hill. Of the options, due to it's proximity to the creek it will also provide the least amount of filtering of the on site storm water discharge from the pond through the wetland before entering Bluff Creek. This pond would provide no treatment or control for the existing off site runoff from the railroad property to the South which is currently eroding two gullies across our site and into the wetland. 2. Moving the proposed ponding site as far out of the Bluff Creek Overlay as possible pushes the pond uphill constraining the available storage volume and yields less in positive control of storm water runoff rate and volume. The pond is proposed to be excavated as deep as possible given the water table of the wetland. This plan which reduces the available storage volume would require us to divert the existing water coming from the two points of the railroad property south of us directly into the wetland, hence not treating or controlling this storm water runoff prior to being dumped into the wetland. This is less than a good plan. 3. The best and most reasonable plan is to allow the storm water pond to be built at the lowest point on the property; this is where the majority of the on site water along with considerable water from the South currently flows. This proposed location uses the existing topography adjacent to the wetland to create a pond of a size that would meet the City and Watershed requirements for quality and rate control, Additionally, this would allow the water coming from the railroad property through the two existing gullies to be directed, treated, and controlled in the proposed pond before discharging to the wetland and Bluff Creek. In this proposal-75% of the pond will be located outside the BCOL. We are requesting a variance for the remaining portion of the pond that is proposed within the BCOL. We believe that within a couple of years that this pond would look like and take on the characteristics of the existing wetland/pond area directly adjacent to this same wetland complex to the North. Private entry road This site has prior approval on the entry to the property shown in the sketches and by the physical "curb cut" on the property. We examined the option of moving the entry of the road to coincide with intersection at the North end of the property. This is not a feasible location due to the high degree of sloping on that North section ofthe property, shown in the attached engineering drawing. The road plan as submitted utilizing the existing curb cut is what our plan is based on. ,PARK <"ROAD ---....,.-- ,---- \ I \ I \ I \ I \ f \ I . I I I I I I I I I I ! I I I I I h '10 : / I 'I !!SO !SO I '" // I Ul~ I 11-7'/ ./' .- ! I >3 ~.O h? ~ /'" : '! ~~~~ /(o"/ I \ I / V o"/ , j Y I ''t / \ ! I '" I / / /E>() , I I / '}:.... \ ~>/.-~~ I ~ / I ~ //;'/ ,; I . ' ~ C~"''''''/ I I .~ V~ / 1 I I ' ~ r^'_ 0 I A I (b ~~~/~ """ -,,~V4! , I, /<\ ',(JV 1 I I / \ "I -:a, V o"/o" \ ", I I " ~~ /, ',I I "'v~// \ ....,': I ~~'" \ 5 .....,,~ 50 50 I ~~ /// " "./ I I /o" " ",/'" I r o"<" , ,,/ I I V~// \ \ /",/: I ~,,:/r \ 4 \ ,/ I ~~;// \ ,/......-~" ,//",/ : ';7 /, I \ // I .../ \ 1 / \/ I t!.. ~/'\ \ ,/ ~/ I I or.,. / \ " ~~" <'6 /1 'I .,~+-:"o"/ \ ~ ~ ~...'" \ 3 \ //0/ //--......., I V< , \""" \ 6 I ~ ...,J1t// \ \ ~\ //"_~ //" \ : .,. ~ "t6'" \ , >",/ ~",/ \ I 'rt"'/~- \ \ // / \ I // \ 2 \ /,,'" \ \ I ~ /5 \ \ (/// G /-...... ~ ' \ I I '0'" / " // 0 '" \, 7 \ I "," \ \ ;" / '\' " /o"/ \ f \ \ \ \ I ' /'" '\ I \ , \ \_------/ I ///'\, \', //"\_,__---/1 " \ " ..................--- _ _ -CIL-l ._---------,- I I I I I I I i I I I , I I I I I I I : I HEREBY CERTIFY THAT I HIS PLAN OR SPECIFICATlON WAS PREPARED BY ME OR UNDER MY L ~~R~:~~~RT~~I~~ A~ TH';~~:~~~UL Y REGISTERED PROFESSIONAL ENGINEER UNDER ~- DATE OCTOBER19,2006 REG.NO /5.:;..8/ / PARK /'" ./ /' ~ ./ / ./ / ,;/ / \ f---- : 1 5 ,I --- ..~ ~uu ~ ~'f o 11 --- NOKI'H 100 50 ~ DEVELOPER: Mutual Investments, LLC Attn: Bruno Silikowski 3615 Zircon Lane North Plymouth, MN 55446 Ph 612-850-8398 LOCATION MAP PROPOSED ZONING - lOP - INDUSTRIAL OFFICE PARK DISTRICT PLAN SET - SP - SITE PLAN PP - PRELIMINARY PLAT PU - PRELIMINARY UTILITY PLAN GP - GRADING, DRAINAGE, & EROSION CONTROL PLAN BOUNDARY SURVEY I EXISTING CONDITIONS PLAN TS - TREE SURVEY REVISIONS BY cjg ~~ ~~ We;; 5~ O~ (!)$ c:=~ W~ OJ>- I ~ We a::~ J:~ f-~ <(g Cf.)~ s~~ "'1-~ II) ~ ~~ D~'El' >< 0 UJ ~ ..J -J C- O -J 0:: Cf) en 0 w t- Z Z z f- z w ::i 0 - ~ ~ t- a. ~ z~ w Z t- W > en :r: ~ ~ ~ <( -J CO I <( 0 Z ::> f- <( t- I ::> ::J 0 :E < DRAWN R.S.M. CHECl<EO R.E.P. DATE 1 0.19.2006 SCAlE AS SHOWN JOB NO 630HlOl ILE: BASE AMP 101706.DWG SHEET SP OF SP SHEETS CONSTRUCTION SEQUENCING ~.~~~~L;:L~::~~~~'~: ~~S:"~^;~~~NG AT GRllD!N311LAlTS.1\S REQUIRED BY 2. THE WATER QUlllITY PONO MUST BE EXCAVATED AT THE BEGf.'1NlNG OF GRI\O\NG OPERATIONS TO PROVIDE TELlPORARY STORM WATER DETENTION DUR.-~ CONSTRUCTlON. SM'O ANO SILT I.IUST BE REIAOVEO FROI.I THE POND AS NECESSARY DURING CONSTRUCTlON AND AT THE COIolPt.E'TlON OF THE PROJECT (INOOENTlAL TO POND EXCAVA nON). PARK // ~ 3 BEGIN GRAIlt~. INSTAll PERFORATED RISER PIPE III PONDS WHEN POND GRADING IS CC>w.'lETE TElIPORARY DRAINAGE PIPE SHALL BE USED FOR t'lTERIoCEDCI\TE ORAI'Io'oGE 0U!l\'IG THE CONSTRUCTION PERIOD AS NECESSARY AND DIRECTED BY mE EHG:.'ljEER. INSTAll SILT FENCE AROU~O EXCAVATED PONDS .. FINISH GRAOING WHILE INSPECTING PONDS. S!L T FENCE. A"'O RAINFAlL CONOITIONS I\S REQUIRED BY THE NPDES PERIAlT AND THE CITY OF ~N GRAl1.."lG PERMlT. ,/ ~~~~6~'1:;;:OO FIBER BLANKETS (IF ANY) AS NOTED ON THE GRAOING PlAN AND COW'lETE 6 REMOVE PERFORATED RISER PIPE WHEN STORM SEWER M'O ounET STRJ.K;TIJRE FOR POHOS ARE INSTAlLED 1 5 ~, ........ '~\o~ ( I I I I I I I I I I I I I I I I I !!OI II ~~" '.0 ~?,(' ... , I 'V ;' U' . ;~/ ~ /'./ 'l-'O~ r /.// ( I ~~~ I IL I ~l s'J I ~ I I ~.-1' '-'oil t.1 ..... ,,~-_... --~------... /"''; .......... ~ ; / I I I / Y' \.'. "/" \ \. \\\. .. \ ~ \. \ \ ' \ \ 1 ~ \ \ I \ \ /' I \ \ I I ~ . \ J \ \ " \ \ , \ '1./ 011/ J/ I~ /'h I I 1/ /~ // 5 4 1 3 6 2 A~ 11 ~~~_LO<"~ ,. It ott7fI'JI,TlU ,....c ....y . t.-s>UClPJt lt4 MCIQl 10 ~, w.3AA ,.,., Of ,to<< \.NBII.WIC3 --. eno 1 'HI MOCa etOJVIitCl' ItiW -.o.tt'tI'lI!,,~ otrn( ()III ,tfl NtIO /II. ........... a.a.lJI'-t1. STANDARD DETAIlS ROCK ENTRANCE BERM ~_l"''''_~ --- "'~- ..I!I!liUl''''' f ~ TLnrDs:... SilT FENCE DETAil STANDARD DETAILS ~~~~~t~~ SYMBOL LEGEND DESCRIPTION PROPOSED EXISTING ~ ~ FUTURE --- --- --- --- --- --- . .. ... -.............- . - . . -. -...........- . ... -...........- 'lNIEDEJC)SECTIOl__ _ _ ... __ .. SAM'TARY &TlJCT\JiE lAEEl. SAMTARY SEWER I.WIHO.E lD 3 . W 5 . ________- -,w.-r.--,- e G TREEPRESERVAllONFBCE. - - - - - ~OR~ -'-'-OR~ T'T'r.;<~ . .... . .... . -- x) cu. x) ~ 100 50 ~ I HEREBY CERTIFY THAT THIS PLAN OR SPECIFICATION WAS PREPARED BY "IE OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER ~~ OF T~~AnNESOTA U~ ~ DATE OCTOBER 19.2006 REG. NO /5" -:L8 / -1 REVISIONS BY t)2 Z~ ~~ cn~ 5~ O~ (!)~ o::~ LU~ (Q>- wi o::~ :C~ 1-5 <(~ cn~ ~-l.Op.s 4 l s~~ 1-"'4- ~ en It. ~ 1-/ ~1v3 0) ~ ~~ D~~\ z X 0 (j) W ~ 0 0 ..J --.J a.. 0 ...J 0:: en WZO:: CJ) W t- 06:50 z z cia. I- z w (!)...JO ~ ~ t- <( 0 ::E Z CJ) ~o::Z w w ~~:r: CJ) > CJ) ~ o 0 ~ <( ...J ~ 0 al J: <( (!) 0 Z :J ~ I- <( t- O ::> J: :J ~ <( 0 ~ (!) * e. DRAWN --, R.S.M. CHECKED R.E.P. DATE 10-19-2006 SCALE AS SHOWN JOB NO. 6307-001 ILE; BASE AMP 101706.DWG SHEET GP1 OF GP3 SHEETS GENERAL NOTES: ,. L.:Jndsc(l~~ Conuactu shell vi~il the Site prier 10 submltt~9 bid to beceme fomiliar lIJith site ccnditi.e.t\s.. 2. 11 I.s the r.spensbi:i1y ef tn. CO!'Itrcclc.t' to 1d~ti!)I all uncergrQOJ!"ld eobi!!lJ,. cc-r,duib. wires. etc, ~ the prCP~1- 3. No plo!"lt~g ..ill be inrtalJ~ ut,till uti gr,)djt'!g and ~rtructOoo hue bun c:omplelle:i in imlT.e:.li::lle m~ .c.. if there is 0 ditcrepQr.c)' between the number of pl:sntt snown en the plen C1id the number ~f pl\Jnls. an.:!.., in the piont list, tlie number or plants show^ M the plon\ V1r~1 b:Ce pre.:dern:e. 5. AU plCfll. sholl be of q:eeimetl q\'u:llity. Plonh ahal: tla..e norMal, .<llI-devd.epe4 brcnch s:ptems, 0 ltl~ous fbreus roel ..,.stem; thoy shdl be scund, heall.'1y-. vigorcus plonts fnHl frM1 def.:;ls, dfsfiquring knots. 5.!l'\$COId in)J~. ot-rasions of tt,e bOTI(. plant di~eose.s. insect eg;$., bOfer3. Clnd 0:1 forms of ir.fest:.tion.s. Ail pl""ts mo!1 be r'lcn:er-y gr?..n. 6. Repair 411 dcm~e k:I property trom planting operoti.:lns at no cost to owner'". 7. The londsuJpe conlrac1o')t chtlll tei'llcu at no chorQl!;. 01'1)1 tree. e'vef~feen. ()l' o;jfouodcolJer whit.n fo.ls L:) live IhtOugh the fir&t ea!enda )leQl' from the time 0' fltlal acceplance b)" the O\flllf'lel'". AH plor.tA Wloll be at;"'" end In l'I(!.(MoJ .lOt1tfodcry yrewif"l9 eOll.:lit;on .:It th. .tld cf lh~ gUQrlIf"lt_ reriod. a Ttvee ineh de~ atuedded hlYd...ood bot\{ mule" .i11 be installed unCet all treel d..d ahrub.c Ihot ere lselcted from ground COWl' arsO!: ClrId general founootlon plantinqs. 9. ,., three men layer of l..~t (Ii". buff rock muld\ a\olef' lands.:.ape weed b",rrter shall be IfIst",Uea in 011 ahr:.b fouf\&:Jtian 4r~. '0. Tree 90>,1'19 in all Q1'eos .nllll be eptiond. The IMdacape cOfltrac:lllt m.all be responsib.le (or m!linto~nio9 trMS in Q ItrGight u:=right condition fOf Q period of t.alvtl months to.:lOVrlng lnltcUaticn. 11. All perenniol/oMuol plonlings sholl be mulched ...;th a 2- layer of ~hredde.:l tlork "Hh no hmdscope w~d tlorrier. 12. "u poly edger sholl be cobra "")11 edging or ~a1. 1J. I\jl per-ennl.Jljal'lnu<JI pl<Jnting areas 111'1011 recleve (I minimum of an 8- der>th of pl.Jlltln; s~i1 (1-''':1) mixture, 14. Wfoppir!l~ moleriol :!lhcll be first quality, heavy. 'Waterproof l:;rep~ pape:r manufo:ldured for this purpcse. Trees ahQU be wropp~d pr,or to 12/1 ond removad oiter 5/1. 15. All plMt locations, sp~eies. quantities ol'ld sizes Sllbjeet to aj1~ condilionf., seilG ond ovailcllility. 16. Landsc,:)pe Conttcc1.:>r tll 1:l~Ci}me fomO,ar wHh ':In.:! Go2m.ply with 011 pel~ies ood pr"Glldur~ of Owner'c S~PP (Storm Woler Pollution Prevention Pllln), 17. All chrubc to be Installed Q ",Initro,urn ,:lis;.tanGl!l of 24" (rt:lM t..... fou.l\dation 01 ony bulldlnc;. 18. AU 1I.:wers, shrubs, vces Qnd .cd t... be irri9i2ted. PLANT LIST - SHEET LI ONLY OVERSTORY TREES, """ at . COMmon Name 5clenbc Name Size Cent. M 4 Ash AubJmn PurDIe Fraxlnus americana '.bmumn Pumle' 2.S.cal. BB SA 6 Ash Summit Fraxlnus oennsvtvanica 'Summit' 2.S.cal. BB SH 1 Honevlocusl Skvfine Glec:frtsla triacanthos vat. fnermls 'SkYlne' 2.S.cal. BB N.. 6 Unden American Tila amerlcana 2.S.cal. BB MJ 20 Maole. Autumn Blaze ker x freemanR 'Jeffersred' 2_S.cal. BB SM 13 Maole. Suoar ker saccharinum 2_S.cal. BB we 4 Oak:_ White Quercusafba 2.S"cal. BB ORNAMENTAL TREES: ~~ Qtv. COtIImon Name SC:lentlc Na"'e 5,ze Cont. RB 1 Birch River clumD form Betularlara 6"hl BB PC 6Crnoo~_P~~ec~mnbm Malus "Prairfire' 6"hl BB CH 10 Hawthorn CocksDUr Thornless Crataeaus cNS-oalll var. lnermis 1.S.cal BB JL 4 UIac Jaoanese Tree Svrlnna retlculata 1_S.cal BB M1 1~Maole.Amur clumDform Peer Dlonala 8"hl BB CONIFER TREES: '" Q COtIImon Name BS 10S co Black Hils CS 12 S 0 Colorado Size Cont. 6"hl BB 8"hl BB SClentlc Name Plcea laues densata ?icea ens DECIDUOUS SHRUBS: ~~ <>tv. COtII",on N.ame SClentlc Na",e 5,ze Cant. BC 79 ChokeberTv. Glossv Black Norda melanocarna etata 115 DOt RD 9 Doowood Red T_ Cornus seMcea 'Bai 115 BB DE 10 Euonvmus Owar1Winaed Euonvmus alatus 'Comoactus' 115 DOt NS 47 Solrea Noon Flash Sriraea Iaoonica 'Neon Flash' 115 not GS 4S Sumac Gro-Iow Rhus aromatica 'Gro-L.ow' 115 DOt AV 191.1bumum Arrowood V1bunum dentatum 115 DOt EVERGREEN SHRUBS, lY COIIImon Na",e 30 YM Taunton S Size Con t. 115 5c::u!:ntlc Name Taxus media 'Tauntoni' SOD & IRRIGATION ..~ ~ <---- ~ ~--L ~ .& - - - ~--- G-- ~--- S AM ~/ illl ::t-~ I LI::J /0// ~ _ ~I Yo. ~2L /~<//? ,~../ ~ //;~ /;, C." /;:::-:;::~ /"? / / /W __ ~ /// ..J / J::,~ -----'''' I..,. m ./ // ~.'" ./'~t f; IE\WOJ ,/ .///-: rj../Z'?);:'" ~ J-di -~ & / /~ <:J' ~--: ~~ / //'/f:Y//' ~ .~ .....".... ..-;/~qi-' //~q-//~:/~/~/, -/ -r ~ ill 3 / ~\ a ~J//;r: ~, ;/.;;t t -cr-;::: ~1H3 L--~ ./ q~<'" /~/ ~~;~" :',,~ · 1 *ifj - .--r:p:-- __ ;:::/;. :'1'> ~ -(~~~~ ~~~(. II' ~ _-~ '~1,yh,: ~~,0~~ //. ~ I ~ ____ __ __=_ -=z. ~ / ' .- / ~ /, . / ~~../'.A.' ',>'. '/; ~OO-I I f3\ '--' ~ ~~ / ~?;!/- ~ ,:1 I \f!./ /' ~)-/ LJf: ' /~~/ '~~ / "' OFFI, / Y ~ ,'4\ /\ ~ .//1///, ..Z', / ",4// , ' ::';': I \D ./ \...../ - / <;J>'?-"/ -----. ,0 ~m . "/ f21\ //\'-.../ ~ ~"lrl~'?-o;:.-~\if;---./ \ / ~ 1.( ~ II ~ 4> /.' > .~~~~~ ~ ~1/ / ('A~./ /1 \ ~ A1 ~~, __.' ;:%-_ I ~ "; // / ~)(I : :;...: .;:':\ \ n ~.~Jt~ ~~ %~-;~==C:I ~ 1/ / ".I~. I. POLY E:;>;=R rry') \ ~ ". 't: /1 // -;;::- ~ ~ ~6 ( / ,,- 'x ,/'/ >-;. \ e \'\"..t~ (, " ' ....... ---.;....---@ GS I // '0'/.0 I. ~~ ,.\ Wp ,,; /1 ::____), ---.... 1---- !:\ t ~~ \ /~""'~ \ \ ,. \\_{,.(, ,,0.-;.. - ,I<, ~ N2: S3~ j / ~ ~~;, I. 't /\ i1K::S. -;;:;L/~~,II ~ /"'--L.I'~ , ~ ~ ~/-- / \ \ ' -' ~ AV ' / ~ ' ~ / I. / 9 \ : " e--// ~ 5:(~ 'k --.: r2o"\ ,1 I ~'~'?~.~ ><- ~ -.,/\ I. / I. '. 4f-,L -~..'~.' ~ I ~ ~: /", :;>; 9.. / \ ~~0/. -- ..I"....v: v~;~:-r/~ ~, "- ----r----@7 LecATEe-~ :-i /:,' ' I. %.'\t / ~ "XJ//f)lO Y \'" C/ N I . ~ ~ BC pe~ / ~~ .ti~ 'I I. ..,...., rff DE /A /\.>.,/1/ ':'""J //'1z /#.l -^ '., ", \,\~/ 'I 1 ~j/7/.4 . ~ ':7) At-~ . ,v ~~ "'@ I--~/~, ~~ ///,"/,1. / .. ~ "~?II\\"" '~II-- .,,' "'~-------...~ F::::~ / Ai ~ffh.<I,_, I. %~ / ' / I. ,'€J fJf /c. V)? ~PA :-. 0 \g7 .1)/ II ~1fl',~.,.:W \ ~)/ \ ~ Q5' OULf~l'. ~ B?+J ..;. /7[\~ "@ J/ / I //j 'W/'h ~~/ . -r7 \ /~.?fR ~ \ II ~2Q' I-~ ,I/;/.,I/J ,. '~j\~~ I.:;>;~/\,,, .~.r l\f< .' .~.IOFF1ce ~ , :' __ --+---~ x "" v' ,I. 'v /)';'f 'j RcJC~IMY f it~. ' " "" -- ---- I \g7 '. (I. '-~ I. ' -0 . POf-~ ~ ; ,--: /~ ',\ ~'/ Q'lIiV,;'--... ""'--...... ~---4? .. '" "- y, ..v.. Y'l; . ,. fj; . i'-.. ~ ; . r ~ ..~':~~. 'v'<...." \.,~. ~z~Il~/;'\~ ;t~:t'{;~~~ " , / } J / J,.. I\",AA . ~ \ "" 'I ~', , '~~' . -- ': I >~/ fj ~ 'tsJ " : I j I "," k.-,~ - .- .-"'\ \.1. ~~~1. ~.'..~ ,.., ~I 1 ifr?:' '. _______ ~ ~ ~. ---J2\ <,..,.>INI/~ ~~~ ~~' '\. \,t~( 0;~~~?~~i----....~!~~ .-' . .:~ I~.'~ ,,{""1&.' dl .")l (J.~J.J.~' I! . y:i':(<"" ;;;/.9' ~ ./KB~ 'I UEM ;;;~% '\ I. ~ .U j 'i'. ~./:::;;:::-- J----....~ S <:.:;/: 1'1 l~/( ..~~~1;~~~ ~ \ \ \ \. ~~~~/";~/-') / r~ .. ,:~;-:-;:;?'/ ','- \ ~ ~ ~ ,,--" AA.~ f ~.,<~ /:::~ /,~ // i (4\ I ,7. ~ \;~ ~ \ v "f X'-,Z#' 0'/ I \V &M f'~" :-:-:--~ ~~\)\~' -., '\ ~;h// /1 I I, : ...~~~.~:-~ JJ ,.~;~\\~, A A {~. ';(<0 , .//./ l I I ,.~~~/'J 1'-..'- -""';1 /. \)~ 7,)~ ~y ,/' I I ': -:' ' / L.- " 0. ~I ~/:: ~ "4 ~ I ~:~ (, / /' .-'- "~ /. A ~/ ~'~;i-?:, ~7' ,./././ II II < fl! / ./'J r-~I'-- 't i v,,/' / / /" ~~ '.r"" ,//'l , I i ARK / / / / / 4 BS 2 AJ... 2 we 2 RD AJ... 3 RD ~ M!JdJ.Sl\ UI013dlAY'alDCIEut Shakopee.MN.sS379 Pbooa 952--934-2000 Fa: 952-934-8:221 Registration ]...".mr,.1hItdU.pla,~OI'nport _~by_or__.JdinGt~ _1b.l[_.dal.J~LadI...Ada:imat __"'L-.Gf"'SWlDof~ D.. ........- D... lOI27A:16 Drawn By ViR R.cviJiODl I. 2, 3. 4. 5. 6. ProjcctName AUTOBAHN MOTORPLEX CITY OF CHANHASSE RECEIVED OCT 2 7 2006 CHANHASSEN PLANNING DE Project Location ChanhulCD,MN Sheet Tide LANDSCAPE PLAN .. ., G NorthAnow SOW 1"=50' SbedNo. Ll T PLANT L15T - 5HEET L2 ONLY OVERSTORY TREES: I ,.a._ ,.., _.., I .....:;.1 I I -, '- 1'_ 1 1 - "- ORNAMENTAL TREES; Com1f;C~ N.i:'!il.! Sc.,l.!r,pc !i.l;';";~ !SyifKm mticuiata DECIDUOUS StJRUB5: r;:;j Ct}'. 1 Ccmn:~ ~b~e :\"S! 6Bi~;i~, Neon F!llsn !~v I ~,~;;~~,~;;,: Scwntc ~J~..e is;ira<:a pO"". 'Neon Flash' !R11US aroma~~a 'Gre-LDw' iW0;ge!a ftond.l,lnuel EVERGREEN SHRUBS: ! Uti. ! Comn:c~ N.i::il.! i 2OUun'XL Sea Green X;l.!l-:t;C li.l::;~ !~'ur::-perus CI1h1ens~ 'Sea Green' CITY REQUIREMENTS A.L'D":J60:"l ROAD - BUfFER C REOUi~D FCF :OP ZOi..a-G OS'n'"-<lCT tor ~ 100 It (jt tmnt."l\1": 1.f)e foll(Mjf)jj: 1\1 r~Uiif,ld 3 CMVP'f tJ("X~ 6lE~~~jay !fiMm ut>t,l'UOO (:!t':t.) o ~M!~':lWI t!1N5 e;.ll!'Sf Vf.dt.n is cpps-::>im~eiy so It 'idd9. .nI100'ft1 a 1l'lUlt;'i-er of a I>: 2 canr.:ry trt.'1J'J 5 l.ir:dc""1~y tll,je5- 5ahfut>$ 740 It. crn-ol'l:t:lge requ~res: 14 C:U'H'Jri' truns 36 und~r$Ot)' Ir..s 36 fihl1Jb6 V'EH:CLt.AR USE p.p.ff,.4 Pi..ANllNG b ~l\'!:-f)' 1!Xh[ Oi ~M.>.j vd~'cui:;1l L:S'" 311m. es[ Ol i<lrL'l;,.;aoiru fol mquirw. v.)A = 254.700 $[ ,. !c.J '" Z.5.rr ~.! .6 tl-! 1..1r'~;""'1.,'iI(; o.."\'~ '"' 2C.3i6 -slI'Sl{,J;(-eo: j~c<::,;;e 0}.1"Fo..."1 P;.l1l<i;1ij a:;.!'u I~,l!rt.."'$ !rln. 1 C<i:tcpy ir="tl' ptll' 250sL or rn<:-::.M;,-;J l.t"ld.!:.:.....!J:>e af~"Q 21).371) sf roq 1.ard A:,!'O : 250 = 32 e.an<Jpy tree'i Al;qulrod in tho) parkingh..-chi<a.dar Ustl ~ren. 5iE : Cent. 2.5" cal. 88 2.5" tal. 88 2.~" cal. 88 2,:;- tal. 88 2,~" cal. 88 h. tal. 88 ... ... WETLAND Si1fJ to-tal. ... ,'"- 4 1 / I / / //o~~~~ 3 M!~M 1810 13cb.AYfIIWOUIt SbUopoc. MN 55379 Pbau 952-934-2000 Fa: 952-934-8227 R..cailtrmoa I..".~..tbilpJ-.~crJlllPlld. -Jl"ll*WdbJ".__",c.:t~ _tbIItI_.cIa1y~~~ .....a.L.-~tMS'*oI~-. "- "'No._ .,... 10127106 DraWD By VjR ~ I. :L 3. 4. S, 6- ProjectNtmc AUTOBAHN MOTORPLEX Project LOCItioa CIw>hu....1dN $bcctTitle LANDSCAPE PLAN - N""" Auow soa!. I" = SO' s....No, L2 = '.)BIlNCIDo(A.B: T,. 111.... _ 01...,.................. III....................... nm-t4I.f!IlliI II.)A., ........... .....,...............117., ,................,......... MIiIIoIia.....- ..................... ~......,f1IlliI...... o.IJ...... .....,..........-..............~........ I.) lIliI.....,...............................aJili& n..........___....... ...........,..,. n._..............____rl...........1IIIiIiIioo .....--...a. n.._"1M1oIIp .........................f1I .. ..........,...-..................... L)e- OOfBD..ITAlB DNB CALI. ."I~ _.....__....."'.....p:ior. ..- J.)e---.. r- TGi.u.c c-a... ....T........PitNIL21lS4,............Jl. )016,_.........._....... ..)n.....pI'OfIrIJ'....... ........Z- c _It. ,....NItioIII...."""--...... ........ ___a-....c--,......... 27Gll5ll1OlliS ......lIolr2.If79............ ..... ......,......... Afl-fw.... 5.).v-: lJOIlTH ..... JUO,,- ..., 1,376,600S<l-1'L W/W. '7'1~~'" OIlM...~ T_ l,J7t,JJU..fL ll....-.- .....~: J7J)45~JIL ...,- w..",.. 16060!la1'L OIl"........ T_ )09,4O$SotJIL "...- I, Ill:! I. f (Ii I I, II g l~ 3 1 1 I I 1 1 1 1 1 1-.141...... 6.),-", ...................:c-c-, 7.)1fi'.......)....__Io<<->"....___fII__._.,~~...... c..,.,. ",--lS,JIlllI. ..1......__S-WIIMl.Js.w..3~c..,~_.................. I __...,.... ~.::::.':==-,.:.:-fII.........___..IlI..~.-a.I_... I~-~-- /. . - 4;:.:..-----____~~ .,.L. ----- ---~~-~~~ 'rrw'~ --- ,/ d~ ~--><:/-;, ",.,~ ~~-</ Y' ~'~'1::./, 1- '~f~- \ -r-' \. . - -.~ \; -f; \; IHI. ,- -f \. ~\ \\ ~ ,. , !-~ j~! UJ Ifg Q ll. &"i J ~. . ~aA~ f q o ....~'"lI .It ~-lI~ "'~ .,~ ~. '-"-- ~IS.,...~~..,. ~~<:: .,,~ 4cl" _'" . ~ ,~-..-==- I I I , 1 i I . I , I I I ~ I ~ 1 II Ii ;: o j':: if Q ~( TREE.O lPl...AN.J I .-...... ............ ___a ... 1#,,,,'" :...-.:..-=:: . ~'__ann 7LIlI /-- IItf'il...A-o DF.SnlPT1m1m'!r[nln:rTnOl'F.lTY D-.....:NlII..,.,..........Jllllli ......... 1M ........._fII.........Q.Mr....... .......~"'....".....oo ....."......._.....NarlfI_til.........o--. ""'f1IUl4n ................_fIl.........O--; ~ ..........."......., ___ ........._...f1I...........O--.~ r7M.ll ~..... ""-*56...... ',.....,.......... ......",.....11o?i;..... ....]] ......tz....." -..s..~"'4J _....~..... -....-..__....................... '" 1"'.16 _ .............,......,..... U ...................tl!H.SJ _........" ...... ',......U~ &-1._...... .........._.......,WJ1.... ..........3S ....18......,........IIIl.......nuIIIIr;.... ...........,.12lI~............._>>.......--.........,1"''''__.....56......''.......J4.....__~........._.__ ., I] 1...36............ 1) ..... 02 ......M ..... w.a......., lI.>>.............. " ..... 57 ......)4..... ..........,4PS.7D ............., .........1"........ J .....'......22..... .._.......,71.j1 .........._ ..fII.... .....15.......~.........O"'-........ ....." ...,..._...c.-,......~w..Jl. 1XCBI'T""*......-tJ.,...C-*...~.,_............~ c---.... ~-"'.. ......QM.wol.....IS. T.....116 NcII'lIt,....23 ...."'........................__...."'..." ....oo.....:zs..... .............Nanto _01_ ......0--.......",71...' ..........,......"'..........................11I.... 14...... S4..... ...........,11)4 _ .... ....12 ......1,....... 21 ..... IM....... ., IUI JIIl;........ .....c..... n.......... __ .,.....1_.... ....10......11 ___ M.. .......,1......... ......u.....n.....................,II.2,_.......... ...... .............. ............"I.SJ............... ,"--)4 ___IJ..... ...........""I1.J2.............I....%I.....,...... ..........fIl 14&.711_........................" ...................,11-4.11.... ....,..........."..............t%5UO.... -.-...,....... 12....... 30..... .............."..,..........22 .....ot.......-* .........nt.11............re....,........ ..-.. .............,S5.M........... 14......>>___1...... ............., 1S.14. -.-....22 ........... w................J1.S4 . -.-..... ......16....,..... ..............40.JI........... I' ......".....................f11IUO............U..... ....H___... ......... tUl. .........06 ..........11..... .............U.14 .........n...."....ss...._.--..flI U1.........._.. ~ ...,............1&..... ............................SIU1.. NlII*'-iJ",........_.,............~. ............................ -...................... tw...,......--q..wfll..........q..w....... IS. T...... JI6 ...........23........_.................... ........... ........-...... ........q..w..,.... ~~ ....._........... ......."..........~....w..........~.,_ ........Q.w.....~q..ar.~.,141.J1............ J5.... OJ ....."'..... ....~.,I..........~ YCAlI...... .....-....riPC ................2114.11.......... .....,............q..w.,.......... QIoIrtlr.........GlI....,......06............ ....-.,...........Qamlr.,..........q..w........,m.J1.......................-....~.....-.....t wpt---c...,.. AW.u.....,....11. , DoorillIl........,..__a.-....<<U4t REVISIONS ~! -~ 1-[ (/)- -m ::l. Oi C)i! c::~ W3: (0) ~I J:" ~J (/)~ ~ < ~ g~ ll:: o~8 ~ ...J~W en ;6l=~ ~ 2i ffi81~ Q... :;UJlIl t:: @ Ii; (: ~ C:< l!;!O:UJ ~ ~ z~E U" ::;~I- (!) :$ 0 ~ Z ~o:O - ~UJQ: !a :;~!lj ~ 8~ 1Il 0: u:: J ! ~ .:! u "=" """"'" ... = -.. "'''''''''' ""NO. 8M1<<l1~1CntlRF'UX "" """"""''''''''''''''''' ~;.~.1ECl1ON """""''''"''''' BOOOC '" PAGE " 8HEET 1 OF 3 "- xJ -' "('0 . u~.. ...' .........~ .... " qC' NOl.m WETLAND ('0 .u <:".;, \,. .. "..$ . .i... ~ .. \ \t'"~ It'"~\ -\ \ EXIS riNG POND ..., /// I // ~I ",/ <'.,,:<j) I ",,/ r.,v' I """,,/ ~~C;,C;, ..' I / d.~S' ...~,,, I ; ,V ('";.\\ /// ..s4t>.. <<- .pv I </ .....r .1 ~\ I "" r.,~ .~~ I (" I I ~'~ )' \. \ \. \ '\ \ - \. " \\\ ~ '\. "\ \ \- ') I t ). t' j I I --~CQ!: (ff ."..NC\ . ( ~l"';)"Ol).I.~~"""" .,-.'---' '\). -C'\ '-J~7 ...' ,.'''' ." .,. . qC' .s"- ,..:, \.. 7 . '.S , ",/' //<...... /'\..-/ ...... // // .. /// // // // ..~ // ,,<,0' // r\ \' /// ,.. V J // r /// \V / ..... // (-0' // Co <G..-....I /// :;) // ('2- / ,,< <G..- "\ - ~..~ ' (- ",' ....I 60 NOi.TH .. 10 0 '0 6(/ ICAUI.. PIIlT ~ : DIlNOTUD~moNPlPI - """""''''"''''"''"" .. DIlN<mlS...."A..~'...... I1tlII DliNOTEIlTOUIiCATCII _ DIlN<mlS.roIM.............. .....",. ,.."., w-r DIlN011iS~1DI 1M DIiNOT1lI~ ~TrJNVAll.T Sf DIIHOT1IS &AHD'AI.YIP'EI. .. DBNOl1lI IJND8IaI.OU)lDI1'ODlIIP'EI. IoU' I1nnYrwI "'D" :lIINOT1IItmUTY/lUrTPOU .. DfiNafiSViA1lII.BYDL\NT W IlNOtIlSWAl'EaMAIN IEI'~ DJIN011iIlrA1lII.VALVB ___;;.O:.;.-___=1VII'tIJ.NDDIlUNIATXlN.JILAQ ___1lN<mlS _cowrouo """""'- . """"'" <DNnX.Oa """""'..."., . OWN......... """""'..."., o ~~n=:~~~~ WoUUDn~ND..rn..::..nm /" " // // / 1'20 ~ ~~ o -0 ~ g~~ ~ ~ ~ffi~ i o F~Z i !i~ ~!1fW <! 8~~~E ! (!) -,:s1- i! z ~O~ tl 1= !:i ffi 2 ~ :o~ffi uJ 8~ ?- m 0:: u: No.a.m 100 '0 '" 100 lCAU..nn /' - - -~---------------------~------- t.' - . - i. .. I- \- \ \ \: \.- ~\ ~ , '.'\ ,- ~ ,. ') t i- f i- , 4J Q l"i v CJ b.J f( o -. -.. .... .... "- "- ....~ ~ .... o /: if (J ~( ~-- , ,," ,," I r I ,,', I ",' I I ,,".AI I ",'" 67'- I I ,,/:~~ ! ! ,," ,B>~ !! Size 001. Conation :Ce8ignation:Type i Size : Condtion 10, 7 ; ON37 ICotton . 12 l 6 10' 7 L.ON 38 iCotton 13 8 ~~ ~ :f::_:_gz~j~: ~~ ;._" ~ i... ..ON 5.,ICottOn. 0014..1_,8 ..____J. ON 41 ""ICottotl-----. ...19______ ..1:1....,,,_ r.ON 6 .JCotton.,. !__.10 "1",,,8. ..... J _ ON 42... Cotton, "r,,16 .....;. ,~_!_:.! I ON 7 lCotton . 10 i 6 r ON 43 fCotton i 12 1 8 [~~i~lIH~j~]~~l : ON 13 !Cotton . 10 f 6 ! ON 49 iCottoo i 10; 7 : [~~ji-1~a-~~~i~r=F~~U:l~~:~n!-t~r~l ~~: l~:ii ~: .f......} !"C:~ lll~;;..l ~~ ~; "CW20. jCotto,; : 16 l.... 7 i ... W2.... Will~': i 1_3"._: ...~--. . CW21 !Cotton 16 1 7 I W3 fWillow i 13 6 ON 22 : Cotton 12 i 7': W 4 IWiUow --r 10 6 cW23" ;Conon 14 '~6 'f W5 iWi1ioW 10 8 ,..g;~-_~~: .:..~-_-~ ! ~~~ i~:~. - ": .+~-_- '--r_- :u'CW 26~ lCotion ~ -11 T - "4--~~' sE" 3 -- [Elm ',cf -~ - 7 - 0/1/27 iCotton 15' 6 ! BE4 'Elm 11 6 F~~--j~E.-~~jI+~F~t~-g.Ijr~:fi=fF1~j !-~EE-1E:-: -i~rl-r rm -I'I:::E-I!':~~r CW 35 lCotton_ 14 6 I - BE 6 Boxelder 18: 5 CW 36 lCotton 14 6 1 BE 7 Boxelder 1 14 j 7 ~,L. ?F- ~~. / '''~''~~ -, / -c.;\'" '., /. ,..../",I """',"MD ,~ , . l"--"--L~~- Ii'. ., . . . . . . . .s'e-, ~.. 1'1:;0 -~~~~ ~z- .?e ~~ ---------=--....:...- /- I ~.... ) ",..' / .( - J - L ,/:::;::::-:,) ,';> t__._'"/'~'V If -1- - . -/ 1'-/' - Y<E1LW> J .' - - . \ '-:.....;..-~ - , '-, wt7LANO CAlIPER NCHES TREES SAVED .a65 ".... REMO\/ED 033 TOTAL TREES .. TREES REMO'w'ED -3,..,.. TREE lEGEND il- o e<>n-= gWl )C~. NOTES: 1. TREES WERE IDENTIFIED BY KJOLGAUG ENVIRONMENTAL SERVICES IN SEPTEMBER OF 2006. 2. TREES WERE LOCATED BY SATHRE-BERGQUIST. INC. IN SEPTEMBER OF 2008 3. ADOmoNAL TREES EXIST IN THE WETlAND AREAS AND WERE NOT LOCATED. I I ~ I ,," " .. ..." '" ,/ REVISIONS ~B -. I-l (J)- -~ ::l. O~ C!)~ a:: < UJ~ al~ ~~ :r:"' ~d (J)!! ~ 0 ...J ....I a. ....I >- . 0:: g15~1 ~ Z"~" :: ~~lI)i z Z&f~ :I: iiil:!~~ <( W......IJ!! II) ~ ~u 0 l- => => ::;: <( '";';' """"'" ... .... ..... """' U~ "'NO, S301~Al.ID08ClMTREE~ .... -"'""""- T~;.~.1lECT1QN ~"'""'" '" PAGE: " TS i :::::: 1~1':::::: I~! :::::: '~I :::::: ! 1---1. ---1.1.--1. --., :::: :i:::IE':::;: :::1 Club House West Elevation I::: ,=1::: I:'::: 1:1::: : ,...1.1...1. ...'. ..., 1::;1;:::::;;::::; :::: Club House East Elevation ~l. .... ,/ "-, .J - IF L L .cc C:II::JI:::aC ccc ccco r ~ .--c ..olWWW'iC ~ ~ .. CCCC 1R.:m'"~~~~~ .... ~ -~~~~~IOCCC ~~~~~ Club House North Elevation cc ccco cccc cccc cccc ccco Club House South Elevations r RE\UL HARDt PLANK LAP SIDING 1.x4- TRIM BOARD If.187 TRANSITION 'tRIM (i~1ED STONE ~ r RE\UL HARDt PLANk LAP S1D1NC 1.x4- TRIM BOARD I#'~~ 1RIM lRNERROOK"ro STONE VENEER T RE\€AL HARDl PLANK LAP SIDING 1.x4. TRtM BOARD ~17 lRANSITION lRIM (i==ro STONE VENEER 31-0" 64'-0" " -4~ ..1~ ~~ if ~ .k. 3'0"><3'0" CUPOlA VENT-A-RI .JI - E -1 1E:31 1E31 1E31 1E31 1E31 1E31 - 1E3 1E3l 1E3l 1E3l 1E::3l 1E31 1E::3l E. 1E31 ~ :. I~I I~r I~r :. I~I :. 1E31 :. I~I ~ 11::::31 I I 1E:31 I~r I~r I~I I~I I~I ~ I~I '-rt' 31-0" DGE 5- O.Go GUTTERS .,. REVEAL HAROI PLANK LAP SlDlNG -)(4- TRIM BOARD Typical Non Facade Elevation GE I L 3'6-)(3'6- CUPOLA VENT-A-RID I I I ~ ~ ~ ~ ~~ .X< ~~ ~ ~ - -1 1E31 t: ~ Il:::::::il - 1E::3 1E::::31 1E31 ~== IE: ~ 1== 1E3l = 1E3 1E::3l 1E3l :. ~ :. ~ , ~I ;:I! ~ ~~ t'I ~ ~ :. ~I ~I ~~ ~ '" J?:f [.,j .. ~ ~ ( ~ ~ ~ ~ ~I ~~~ -~ ~ r' -. " '" 5- O.G. GUTTERS .,. REVEAL HARD I PLANK LAP SIDING -)(4- 1RtM BOARD =87 lRANSIllON lRlN mACTED ST~E ~EER YER ROCK) Typical Facade Elevation 3r:: .,. REVEAL HARDI PLANK LAP SIDING 1.)(4- TRIM BOARD ~67 TRANSlllON TRIM BCONl'RACTED STONE VENEER RIVER ROCK) Typical Facade Elevation Typical Non Facade Elevation /-----------------68'---------------- / ~ ~ ~ ~ ~ ~ ~ ~ m I ~ ;! . ~ . ~ ~ . ~ '" 1l :l " 00 '",vr Y-d' \EN1B) IIlE*U. CMJltWICS ./1~SlD'''A1JOA Y-d' tot-\OntD [NDtMU. CMMMGS r w, tr SlfJI' fASaA 29'-9" 29'-9" "- ~ I >, ;! I 0 .....vr 0 o..~ 2t....I~ ~ -T ~ ",- ._ c 1I-.'!r 0 0:::> ,,-,'tr ~ >. ~ 0 .s:: 0.. ~OI '" >. tf-lttr .s:: .- tf-.~ a .~~ ~ 0 T-ft/r o..~ ,.....t!r V ",- .s::~ ~ _C ~ 0 0:::> v v ;! ;! > a. 0 "6-11+ "6-,>> v' lD ~ >. ~ 'N'i<l ;! 0 ;! ~N J/l.." I o..~ J/I"" Oi -T .!!!"c 01 0:::> c ~ I ~ .:;: 0 J/l.... -+ V ,1/'01-'- >. '- 0 ~ I 0 0.. >. >. '" J/l... -T 0 0 .II,...... a ~ 0.. ~~ ~ I '" J/l.... -T a 0:::> J/I.... ~ J/l..... -+ .111.-," ~ I >. I 0 J/l... o..~ ,gl....l -T ",- _c ~ ~ 0:::> ;! I ;! 35'-9" 35'-jI; , --1. - ~ Jt-lvr ....."r v I ~ ",E ~ 'It~,* _J.::::: o c I ! -, 0 v 0 ,- It-tf/r '-N ~ ON 2t-tvr -, V 0 01::::' I I >. c i I ~ 0 ~~ I I 0.. v- I '" ::::.V I I a > --1. _ V W-lttr I t"-ttl/r --' I I ~ c I ~ Co ......." '0 4'-tvr co ::::. ,-~ .. "6-jlot , ~ '-d' I I ~ >. I ~ I I ;! 0 I ;! I J/l.." o..~ .1/'....4 I .~.c ,- I ~ 0:::> I ~ I p.a-.. +- J/l.... ~ 0 I ~ ~ >. J/I... 0 0 ,- JII..... ~ >. o..~ ~ 0 ",- I ._ c J/l.... 0.. 0:::> ,- .11....... ~ '" ~ J/I..... a +- J/I..... ~ .s:: ~ >. I ~ 01 ~ .- 0 .s:: V o..~ I 0I.s:: Nlt-l ",- ,- J/l... Q;~ ._ c ~ 0:::> ~ .s:: 0 ., ;! ;! v a. 29'-9" 29'-9" > o. ~ ~ VlD r--b ;! >. ;! ~t') 0 0 Q; .....vr o..~ zt....1/r ~ ~ .!!!"c ~ (/l :J ....vr 0 0:::> 0 >. .....vr I ~ 0 I ~ .0 0.. :J 01 -l-- If-lvr U ....vr a >. ~ I 0 I ~ ''''vr o..~ 1...vr -T ",- ,- ~ _c ~ 0:::> ;! I I ;! "- "-4' '-d' L --1--+--1 1--+--1-- J ,.....vr '....I/r ~ ~ ~ ~ ~ l<l< ~ ~ m ;! T " ; T . ~ I ~ " :l 10 " " '" 00 I I Ii I~ ~ Ii ~~ ~ ...!! 'l~ T.... 1oJ. ". ~ 1 ~ ~ ~ ~ ~ ~ ~ ~ ~ * ~ i ~ i ~..>u / ~ z ~ .6-,16t - ~..... I I I I I I I I I - - t- - -1- - i - - t- - -1- - i - - t- - -1- - i - - , J/l t-, , ,3/...._ ~/r~.. , ~...... J/l...... ~..... ~ ~.... ~...u ~.... ~..... J/l...". ~"H ~ ~... J/l"'" ~..... ~"H J/l...p ~... ~... J/l...... ~..... .tit.., ;, J/lt-, L - - t- - -1- - -t - - t- - -1- - -t - - t- - -1- - -t - -,- J . '" I b co !; , ~ ~ ~ ~ !; ~ !; 1 ~ ~ !; i !; , Nlt-,I !; z ~ .6-,t61 NI..... "'..... .zit..'" NI.... ,JI/'''JlH J/l...... ..,...,., . <0 j.... N ..,..... J/l"'"" .... .s;: 0> 0; .s;: ~ o '" a. 0> c '0 :; m ..,..... ..,...,. .If...... b <0 ~ .... .s;: 0> 0; .s;: '" > o '" 0> ,Jt/at-$t. C .;/IOh&t ~ :; m ..,..... ..,...,. HI....... J'/la-At ,HI..... ..,..... NI....a: ,N.....ll .H''''J ;, -\ \ \ \ \ \ \ \ ~ \ \ , \ \ ~ \ II \ II ~ ~ II ~ II II ( II II II I j ! I fE~ UJIt!! ~ @"S$6'~ l~ ~\ ~O>~'D": l :..s,i ...:t ~~ ~l >< W -I a. ex: Ot: ___~ m r- I--__________ ' 0 [;) ---------- Bill ~~a Zen - '. ~ 'D ..~.':.'...'~'.".'" :c o~ A :..'.,.'.:,', A" Ct: :. ~ <-) \'\,\", !>aJ ill ~ 0 cr:. !~5 C) !~<C ~~ ~ / Sv ONYU3M! ~ ,~ ~ ,: ()) --\. / .J 2 ~!H13~~1ig~ Page 1 of 2 Generous, Bob From: Jon [jon@marketwiseagservices.com] Sent: Wednesday, October 25,200612:13 PM To: Generous, Bob Subject: Question on Proposed Development Bob, Thank you for taking a few minutes to visit with me on the phone earlier today regarding the proposed development on Audubon Road. I went to the city's website for some additional information which was very helpful. Once I read that I went to the developer's website and there was a story on their site about their plans (see below). They are a "race car" and car enthusiast organization and the target market for this type of facility is "race and specialty" cars. The website says they plan to have car shows on the site as well. Cars of that type normally have modified exhaust systems to create that loud sound from the pipes. This raises noise concerns. As you know, this proposed facility would border a natural park like area which is zoned as an agricultural area. The area is lined with homes on the entire west side and a community bike trail on the west side of the wetlands. There is nothing between this proposed site and those homes and the bike path. This proposed facility would hold hundreds of race cars which would be coming and going at all hours of day and night. Also those cars could be loaded and unloaded from trucks and trailers, etc. I am sure car shows being held on site would also contribute heavily to the noise. We all know that show cars normally have loud pipes and often loud stereo systems. Would earthen berms be required like the city required from the General Mills expansion that adjoins this site? Perhaps the berms of the same elevation, with similar plantings on top could be extended from the General Mills site south along the back of this site to block sound and try to preserve some natural look of the area. They could put the fence they have in their plans inside the berm and tree line as well. One part of the proposed facility comes a long way west along the railroad tracks. Perhaps the facility could be kept toward the east along Audubon and not come as far west down along the railroad track. This would keep the noise a little further away from the homes. Maybe a nice combination of berms and keeping the buildings a little further from residential homes would work in keeping the noise down. Thank you for your time. Jon Day bttp.:/lvywvy,c:ILJl:>mQtQLSPQIt$.c:Qm/pr~$$rQQm/iDq~X,c:fm12,C:=q~tails8.N~Wsl0==_43Z_ Bruno Silikowski found a different approach to the proximity problem. His Autobahn Motorplex, located 15 minutes from downtown Minneapolis, is a 37-acre site that will not have a track, but will have a clubhouse as well as secure, heated storage condos that members can purchase - and depreciate - to garage their racing and other special cars. "It will be the mecca of motors ports in Minneapolis," said Silikowski. Alan Wilson thinks noise is the biggest problem with getting a new club built in a populated area these days. "The noise issue doesn't have to be a necessity," he said, pointing out that most recreational drivers won't see any difference driving a car on the track with a muffed exhaust. "These clubs will 10/25/2006 Page 2 of 2 evolve, and without the noise will no longer be a negative to the surrounding area. Then they will be more socially acceptable." The demand is there. Autobahn has sold out individual memberships and has started a waiting list. Only six corporate memberships remain available. "We're growing like crazy," said Basso 10/25/2006 Page 1 of 1 Generous, Bob From: Bcheezwiz@aol.com Sent: Friday, November 10,2006 11 :34 PM To: Generous, Bob Subject: Planning Case 06-34, NO WAY! Dear Bob, I live at 8123 Stone Creek Drive. I very much enjoy the land that is currently being targeted for rezoning and wetland alteration. I am totally against this project and would like to know how to stop it. What are our rights? Who on the city council needs to be contacted? Why would we want to fill in wetlands just to store cars? This is crazy. Why doesn't Mr. Silikowski build this in Plymouth behind his own house? I am fully prepared to rally the neighbors against this. I believe this will drive the value of our house straight DOWN. This will be a huge eye sore. With all of the construction going around our area, do we really need this? Thanks for your reply Brian Guthrie 11/ 13/2006 Page 1 of 2 Generous, Bob From: Jon Don@marketwiseagservices.com) Sent: Friday, November 10, 20061:07 PM To: Generous, Bob Subject: Autobahn Motorplex Questions Follow Up Flag: Follow up Flag Status: Red Hi Bob, I was just looking at the website and had a few more questions. Is it OK for me to ask you for information about this, or is there someone else I should go to at the city? . Have you received a photograph of the proposed buildings? I have been looking on the site and have not seen them yet. . Is there any idea how much these units will sell for? What happens if they don't sell all the units? How would the city ever lOre-develop" this land if this idea fails? . How many jobs will this create in Chanhassen? . What type of tax revenue would the city gain from this project? If possible I was wondering if I could find out what the revenue for the city would be per unit. . If I wanted to look at the Planning Commissions review and conditions of the General Mills/Pillsbury , expansion that extended into this same general area behind our homes, how can I get access to that? . Finally, if you can look at the photo below. It contains an aerial photograph of the land from the Carver. County website. It shows where the current ponds are back here and the trees. Can you send us an image back that would show what trees would be destroyed and what happens to the second pond? I don't see a second pond on their drawing. 11/13/2006 Thanks, Jon Day 8229 Stone Creek Drive Chanhassen, MN 55317 11/14/2006 ~\1\g Cct~ tIJ" \ OJ 1946 .. ~ II O""ty S\(\rJ 219 East Frontage Road Waconia, MN 55387 Phone: 952-442-5101 Fax: 952-442-5497 CONSERVATIOII DISTRICT htto:/Iwww.co.carver.mn.us/SWCD/SWCDmain.html Mission Statement: To provide leadership in conservation and teach stewardship of the soil, water, and related resources throu~h a balanced, cooperative pro~ram that protects, restores, and improves those resources. April 21, 2006 Robert Generous City of Chanhassen 7700 Market Boulevard Chanhassen, MN 55317 Re: Autobahn Motorplex Mr. Generous: The SWCD has taken the opportunity to review the Autobahn Motorplex. Please review and consider the following comments and suggestions regarding the SWPPP and erosion control and sediment controls. SWPPP 1 - A Storm water pollution preventive plan (SWPPP) will need to be developed for the site and approved prior to issuing a permit. Our office would like to receive and review the SWPPP once it is developed and comment for the city. Erosion Control 1. It should be noted on the plan that energy dissipation is needed on all inlets and outlets within 24 hours of installation. Sediment Control 1. Curbside inlet control were identified on the plan, but it should be noted that other proven methods are out there that work better. (Hay bales are not a proven method) Wimco- type, or other comparable inlet controls should be used and installed within 24 hours of installation of the inlets. 2. The proposed temporary storm water ponds needs a detail showing a temporary outlet for these ponds. Also, how will water reach the storm water pond during construction - it should be noted that all areas should be positive graded to the storm water pond. 3. All perimeter controls that will be placed need to follow the cities specification in specific areas. The perimeter controls should be inspected by the city and the SWCD prior to grading. 4. Temporary seeding of stockpiles will be required ifleft exposed for more than 14 days - these requirements will need to be spelled out in the SWPPP. AN EQUAL OPPORTUNITY EMPWYER Storm water Management 1. An adequate easement for pond access for maintenance purposes is needed and should be shown on the plan. I would like to be invited to the Pre-con meeting prior to starting the project to be introduced to the players of the project. If there are any questions or if I can be of further assistance please contact the SWCD office. Sincerely, Chip Hentges Conservation Technician c. Lori Haak, City of Chanhassen (email) CITY OF CHANHASSEN CARVER & HENNEPIN COUNTIES NOTICE OF PUBLIC HEARING PLANNING CASE NO. 06-34 NOTICE IS HEREBY GIVEN that the Chanhassen Planning Commission will hold a public hearing on Tuesday, November 21, 2006, at 7:00 p.m. in the Council Chambers in Chanhassen City Hall, 7700 Market Blvd. The purpose of this hearing is to consider a request for Rezoning of the western portion of the site from Agricultural Estate District, A2, to Industrial Office Conditional Use PermitConditional Park, IOP; for development within the Bluff Creek Corridor; Use PermitSite Plan Approval for multiple buildings (up to 14) on one parcel; for 12 buildings (one clubhouse/museum building and 11 storage buildings totaling approximately 175,000 square feet of Wetland Alteration PermitVariance building area); a to fill wetlands on site; and a to locate the storm water pond within the Bluff Creek primary zone on property located on the west side of Audubon Road north of the Twin Cities and Western Railroad – AUTOBAHN MOTORPLEX. Applicant: Bruno J. Silikowski. A plan showing the location of the proposal is available for public review on the City’s web site at www.ci.chanhassen.mn.us/serv/plan/06-34.html or at City Hall during regular business hours. All interested persons are invited to attend this public hearing and express their opinions with respect to this proposal. Robert Generous, Senior Planner Email: bgenerous@ci.chanhassen.mn.us Phone: 952-227-1131 (Publish in the Chanhassen Villager on November 9, 2006) CITY OF CHANHASSEN AFFIDAVIT OF MAILING NOTICE STATE OF MINNESOTA) ) ss. COUNTY OF CARVER ) I, Karen J. Engelhardt, being first duly sworn, on oath deposes that she is and was on November 9, 2006, the duly qualified and acting Deputy Clerk of the City of Chanhassen, Minnesota; that on said date she caused to be mailed a copy of the attached notice of Public Hearing for Autobahn Motorplex - Planning Case No. 06-34 to the persons named on attached Exhibit "A", by enclosing a copy of said notice in an envelope addressed to such owner, and depositing the envelopes addressed to all such owners in the United States mail with postage fully prepaid thereon; that the names and addresses of such owners were those appearing as such by the records of the County Treasurer, Carver County, Minnesota, and by other appropriate records. Sub~ti1?Ed and sw,.o1jll to before me this~)dayof ~\leMher ,2006. ~ C) c .;: III Q) :c .~ :0 ~ a. - o Q) U +:0 o Z c,j Cll _-g 5 -Ez g~ ~ 2I >.lll ~...... 'C~~ E-5 E ._~B O1~.QO o n. () 0. .!:; ;; B I- ~'O .;: Q ll:: .2- Iii ~ Cll :J .- .... _ ::l CIl 15;;> U <( mCll 2~COO1 -;;;Ill~ Q1 Cll"E '(ii III Cll .!:; Cll 01':-::";:: ~ c.J::O Clln...c!25C:1ll1ll0 ... .!!1 Cll -0 -E Cll - '5 ~ '6 ~ > N Q)~-E >'O.2.!:;.o~'5IllIllt=- Q) c: CO c: 6 :e ..Q1 c: .0 O1"C III :E E' 0 _ 0 _ ~ .9- '6 Cll.!:; c: .~ o Cll 'E III _ =: = O1"C III .... c2 ci..!:; ~ 0:S a5 ::lE.5 ~ '5 CD 0. O"Clllo.CIlE B.o-~. UlOC:~E::l ....C\JCIl......(iial~ !!! ~ ~ (1) -g g-s :: ~ ~ c: J.... C? t::_Cil8--lii:!::0......CllO()(O s;;; 1ll"Ct-- g)B>E="C~{gll::~ E(O-=t--~ .Cll....Illc:Cllc:.2C1l OOU C\j"CCll> Ill.... III co III (,) o.!:; ~ Jg <( .... e.. l:! 01 III ;; Cll () C\J c: Cll - ...,..E Cll a..!:; 5- gz ..c ~ c: .Cll'O.....u_CIla."C >-~. ..._ ...... > E O'C'-::> = CIl - c:.!:; ... C\J Cll III Cl'(;) E_<l: ::l0<i:::E c: c ....Cll.J:: C'-~I'llc.ooo-c: c Cll..c () .- 0 e.. c I'll E o. - ';: ..!!l .0_ C Cll 0- U')_ n. III E c: ._ 0 _ Cll'- e.. ::l t-- .- "C a. Cll'- U N III CIl :!:: Cll Cll...... E c: I > li:i 5 ~ '(;) ::> -g:!:: ~ ~ ~ 8.x c 0_ 0 ....w_ 0(J) E Clle......W Q)Z..!!l()Oliil'llC)~--- Cll....J Ul >;:;:; = :: .... 5 . _ ~ 5l ~ 5 iii n. ~ III c: III CIl ~:;:: 0 .... ::l._:;:: ~ a: ..."C::lICll::l.-"CIllOXI'll 0 .... CIl ::l U 'C 'C o..J:: e .... 1= l- e Cll t >. O"'C C .... Cll .0 0. Q) t:: 0 III ::l III :::: Cll 01 0 0 c: ::l 0.= 0 "'" J:1-'(;)()a:<(C)()OUIll<l:'(;)o:::; (,) Cti E i= ~ Q) - III o c o +:0 III U o ....I III Ul o a. o ... a. C) c .;: III Q) :c .~ :0 ~ a. - o Q) U +:0 o Z c,j Cll "C c: ..c _c 0 -z gg} ~ ElI >.Ill ~...... 'C~~ IllCll alo O1~.QO E -E E c: 0 -;. .!:; ;; B I- .~_ ? ,g Q ll::.2- Iii ~ CIl :J - _::lCll 15;;>u<( mID ~~ffiC> -ctjE: c:Cll"E CIlIll C:CllgJ,...!!!~ c..co Clln.Cll'6c:c:l?....O +:0 .!!1 Cll -E Cll -E '5 ~ '6 ~ ~ N Q) ..c .J:: "C ..... .2 .!:; .0 CIl '5 III III t=- Q) I- ~ .2: 0 ll:: :e ..Q1 ~.o O1"C III :E . 0 ~ 5 0 ~ .9- '6 Cll.!:; c: .~ c ~ g Cll 'E ~ c '3 '5 g>;g ~. a. .2 ~:5 ~ 8. '(;) Cll E.o 0.5 ~ ~ . Ul s:! C:Cll ~ c:::l E....C\J '(;)..... CIl al~ .!:!!t--;=:;0....-gg..E";: 0c:....C"? ~ ~ .E--...o;=a;oom s;;;iiiCllOClloCll.E-..... CllCllll::O t:: "Ct--Cll_> -"C....."C::lCll s;;; (0 ..; t-- ~ ~.~ ~ ~ ffi ~ c: ro CIl o 0 1:::' CIl Cll .... e.. 0 III ..!!l III o 0._ ......c 0 .... O1::l - Cll () C\J c: Cll _...,...... CIl a.C: Cll..c ~ - .Cll.o-U_CIla.'6O"CIl~-~ .......... > E 0.-.-::> - c: c: C C\J Cll III Cl ~ E _ <l: '5 0 ~ :E 'c c ....Cll..c c.-....l'llc'Ooo-c: C Cll..c () .- 0 e..Cll c I'll E o. - ';: ..!!l 'v .0_ cCll 0- U')_ n.~ lllEc: O_CIl.-e..::lt--'-"C CIl a: Cll'- '0 N III CIl :!:: CIl Cll...... E c: I ~ > li:i c: ~ '(;) ::> -g:!:: ~ >. ~ 8.x 0 c 0_ 6 ....W_ 0(J) Eliie......w ~ Q) z III () 0- 1'llC) .---- Cll....J C/)'- Ul __ _~c: liiCllIllC_n. Ul>':;:::: -::lO..:uCllEOIlla: llllllc:liiCll=::;::O....::l._:;::~ ., J:"C::lI ~::li5"C2i~~l'lll=o 0 c g) t >. O".g C 'E Cll .0 a. ~ t:: I- c: III ::l III :::: Cll 01 0 0 c: ::l 0.= 0 ~ ::l J: 1-'(;) ()a:<(C)() oUIll<l:'(;)o:::; ro (,) Q) E i= ~ Q) - III o c o +:0 III U o ....I III Ul o a. o ... a. UJ.8~ Q) 'S ~ ~== . "0 "C 0 6 _Ill~ ~CIl Ill.o Cll ~E......Clle~ ~ III ..c_ Cll 0 Cll ...... C:o 0.- .- "C () -E - >. r-:. - III CllO= CIl _ .J::.oC\JCIl=~CIl a: ..co.o Cll ~ CIlCllC\J>~E..c E =€~ i ~ ~::l~Illll:: -~ Cll .::lOCll ::l Cll eU')..c~~CIlc' '(;)CIlo.o..c n u CIl 6CllmgC/)-~:;:: Cll.~.g..c.!2l:::: Cll ~ III >.c:__ .!:!!.oCll :S:O ..., '0'''': ..., Cll .....Clllll::l ..cIllCll ~c6~m a.! c: a ~~Cll~~:'CE CIl.!:!! >. Cll = "C 0 .~ 01 E .0 5 Cll :;:::: 0 CIl C E..c- Cll.... c: _O..c..cCll--O .g oS .... - ';: CIl 0. 0 ,!!1 .- .J:: co 0. CIl Cll t:: .!:!! .- ,- - 0 E 0 Cll = E iil -oi -u ~ :;: E 0 - :: ~~~,g~ ~~t~ ~ ~~~~Jgt~i 1-~:cCll-B::;() 0.0 () Cll !250c::...CIlE CIlo.Cll..CllCllJgCll -E c:UCllCllO=.gO 'OCIl-c:..cCll-Ec:-..c Cll ..!!lCll~ECllS~C) ..c l!! 01.- - c...... III E - 0.... E gJ c: E u CIl ,." ~CIl~E~Soao-g ~CllEoC:CIln~ O>Ill~ECIl~_';:1ll ~ -~U~.cCll- c: CIl Cll.o- O1Cll c: .0 5l ':Cll c:"CI-'occ _.....cOCllc:-Cll"C"C CIl -- CIlCllIll ..., () Cll3~CIlCllCll>CllCll c: CIlnCll- ~"'a.1'll IllCll OE> ::lCll -c:.... - o.c~- o~a.~o ~ ~~~~:;:.QCIle.. a:-;; ::l-gJg'6 0_ gu E.... c:_ c: ioS CIl c: 0 0. III _..... c: = .... CIl Cll - . 0. III .- Cll.- .c o CIl_01CllIll~Cll~ -E1llC:CIl..cEEEC- ~~~:ECIlCllE-ECllcmc: CllCllCll:E~.o~EoO CIl"C - .... >Ill - Cl101i-~::lllloCll: ~::lt.....::l::l..c~uCllm CIlIllIll::;@CIlo.()Bo o <( 0 0"0 01 = C Cll 0 o...c 0 0 Cll - .- ~.....ECll~ 6=o.Cll..c _.oc:.o~-"CCllCc. us 0 C ~ _CIl n..c ~ g. E .2 ~ c ~ ~ III e 5l jg -E ~ ~ -8.g 0. C Cll - ll:: Cll E :c.: III () Cll Cll 0 - 0 _ I'll "~~~Ill~~2..co::le~~~5a5~B;ii o _ U o.,g o.'C C/) I- () n. C ::l Cll ~. Cll i2 u >..!!! == .... 5 g),2 Cll o.w III g,~ E.o::l o.o.ca ~ ro:S:<l: ~ g.;Sjg "':NM-oi := a. g iii g,g g ~~ .;.; C III .~ 0. ~ UlC) C C Q).- a.- a.Q) III Q) :c:2: - Q) lllJ: J:- :l:iU :>-c t: 0 Q)+:o a. III o U ... 0 0.....1 ::; o .0 III "CU CllO= .J::O.o CIl +-' J:: :J Q) +-' lr.... c.. CJ) ::l 0 Cll CIl o.o..c ::l 'OJ::..... U ~ III .!2l"C Cll '6 ::l Cll III 'en g, c: ..Q1 0. .!!!. 5 Cll_ "CO~'(ii E..c=s; Cll.... CIl ....-> CIlo.O'- .E E .= 0 Cll = E .!:; ,g ~ g. -E ~ E B'!:;() ....c:o.o ~ 0.0 0 .~ g- ~ en ~ en .5 CD 0).-...... c....... c: :::: .!:; ,!:; ~ S 'O..!!l E "C ....lllc:CIl o.oc: m15+= Q');:c~ co ..c 0 al c: ,!!! Cll "C "C U 0 E';: ~ CIl ~ Cll = - 0 Cll Cll._ CIl .o"C Cll= > o.Cll.Q ::lc:..coo Uu c..co............. =~cn CIl O1CllC:~'- .0 CIl .- en c:..c III Cll 01 ~ -- -5 Q) 't: ..... Q) c '- c: ::: a......::l::l..c > Illlll.c ~ I'll 0 0" 0 01'- U !!l III ::: E Cll ~ ::l :::= c: Cll Oc CIlCll...:e~8:Cll..c...: CllO 8.....~-E IllE.2U "C'- .... c:.~ ll:: E:c.~ '(ii ~ ::l Illu e ~ ~ jg 0 ::l 'e - u 0. = o.'C C/) I- 0 n. C 8Ll:! Cll 0. CIl III :s: <l: ~ g.;S jg _ . C\J C"? ~ "C III ~ '(li a: E Cll . _CIl CIlU Cll'- :s:o ~c CIl.!:!! Cll.c :;::::; ... 0'0 .!:; CIl ~~ 'OCIl ..cl!! ~CIl 0> C:CIl "C'" III CIl o.c a:- c:C 00 .;.; .. c :>- c lllt:O uQ)+:O ~ a. III q ~ g <0.....1 UlC) C C Q).- a.- a.Q) III Q) :c:2: -Q) lllJ: J:- :l:iU ~.. UlJ!! c c o Q) +:oE :g E ~ 0 00 Cll -E (j') .8 ~ Q) ~ ~= . "C 6 - Ill~ .;; CIl ~E......CllO.o Cll 0 Cll ...... 5 0.= ~ ';;E~Cll=~CIl '(ii CIl CIl C\J > ~ E ..c .;; ';:::l' III ll:: - ~ Cll e~..c~.l!!CIlc CIl ::lCllmOC/)'->'- III g,c:_= .!!!,g'Qi Cll ..... Cll Ill::l ...c I'll CIl a =~ Cll~~:'C E 01 E.o5Cll:;::::oCllc c: _O..c..cCll--O ..c;CO o.CIl Cllt::.!!!.- ~ ~n>.:;:Eoa;:: E "? lll.o .-. Cll a. _ .- (O-....CIl..cCll.-E Cll ~50c::...CIlE -E c:UCllCllO=.gO Cll ~Cll~ECllS3:C) o _....gJc:EuCll_~ ..... ~CllEoC:CIlUC Cll Clla~ u ~.c.~'i: .0 CIl _Cllc:"CI-OC (/) Ci5-00Q)CO,...:J...ca c: ::l g CIl :::: c: ~ a._ ~ ~ '0 ~ 'C :;:.2 CIl e.. E....c:~c:CIl..cCll Cll_ . o.lll:::: Cll.!!1-.c ..clllC:CIl..cEEEc- ~ Cll51:E,~.o~ E O,S Cl101Cll-U::ltllOCll... CIl 2i tll ::; @ CIl 0.0.= 0 ..co Ocll -'- B.oc:.o~-"CCllC~ -ClllllllloCllCll..cO- ~~-5Cllli:i~-E-C;~~ ~~.t3 5 a5~B-;;;~i ::lCll~'CllFiU>.Cll-'" o .~ E ..c ::l 0. 'o.'iij ::l >.e o_ooo>.c :=0. CIlIll>'UUI'llI- ~.. UlJ!! c c o Q) +:oE :g E ~ 0 00 W ID 00 rn ~ c .c . t .~ Q) (J) ,Q - g~rn C.c 00 ~ u.c tu 0 .- ID 0. ;a:: c ~.~ a. Q) ;a .9 ~ :5 -g ~.~ ro a: ~ ~ <( .~ ~> i c: .c: c: <( - ~Q)o~~ ~a ~.E ~ig u~~ E - ~> o.$rn ~.~ ~~~ c.Eg Eca~('l]~~ rn~~ eQ) Q)O~ ~ ~ ~ 8 ~ ~~ ~:Q.~ E E ~ 2 ~ : ~g 3:g>.g ~~a.E""E~~8E 5; (]) 'Q) ~ 'n;Q)- .~ ro Q) CD -g ~ Q) -5 ~ .9 1:: i- ~ ~ g == ~~(J) -g.~Sro~a.5~(J)~ '5~ ~~g ~ 0 rnrn~E.c:E~(J)~Q) m> U E.9 Q) c:::: 0 Q) :: '00'0 >. 25 0 .c ro c5 >. ~ .-~E g:~~~ro~~E~ ~~ c~E ~~~ ~!9~:E:g~~~~'c ti~ ~~~ uQ).c: ~~&~ESo.5~;a S~ ~:Eg 5'~=0 ~rn(J)~""2u.c:Q)a: crn ~u-B~ 'vu .=~o~ocS~(J)Q) 0_ Q) -Q>-c>>cQ>-'-EQ)-;>Q>.c O(f) 5toc g....(l)c(l)IDou....Erou~_ rn = o~S~.5E~-g~-g~~~5 ~~ 8gm ;a ~ 8 Q) ai c a co ro. Q) ~ ~ ~.~ 0 ..?:-_; ~ cEwE~.QIDO)~E.~<.>E~ .~~ U=~c Oucm=~~~~~IDe <.> ~- ~i~5~.~~~~~~~~! o~ ID.~'~ WE.5U~EoIDIDOEOJQ)x<.> ='~Q)- 5u~ :: >c -~"'<.>o.c_u '-" -ID- ID<{>-m-g8~<'>~u-=oo."5 ~5 g>-ga.. '~~i~~O)cQ)~E~~c;~~ ~O) 'cTI~ a: 0 ~ .9 := .~ a. 0.:= m Q) 5 <.> C/) g ~ m .~ ::: cU~ ~COOJgC/)E='~C/) <.>~ ~~~ ~~~j5~~5g~~.~~m~~g =-E ~~~'5Ca-OJUcOJ- g.~C/)~ ~~8 .S? ~ ~.~ ~ OJ ~ ~ >..!!! E 2:.9 a. Q) .- u a. C Q) ~~'~.~.~~E~B~:~~Q)~~~ ~g~ C/)EID~a<{OJ:=OJg>C/)rn~5-ro~ -~ID E~~ro~~~::~~~C/)~~'UEB ~g~ IDmQ)a._C/)~5~2~.~.Qg~~~.~2:~ KEg u g ~ ~ .~::: ID ~ ~ <U e 8 ~ 'OJ en .c ro Q ~<ro~Err'~~~uQ).g5 nc~gQ)~ IDc.~~~~gE~ .C~a ~~IDo'~5~ [; ~ "E (i) UJ >.+:: E 0 g rn ~ ~ ~ u C 5 ~ .~ OJ ~ Oao~~~~oU=~~Q)~ID~~~E,5- ~~~'--~cU~~.~-Ec5~~uEE.5 c'~~~C.cIDID~cc~oro~n~Q)orn~ ..::lc <l:O.!!lE.r:: Q)22C1)::.f!wa;Uj()2'Q) ~i~~ .~'~~~~E~2 .g~~Q)~~"'~ ~cQ).QOJ~rou~o~_S"EO.-&EID'2~U ~ ~ a. ~ ~ ~ Q) ~ ~ - u g. (f) {g ~ ~ UJ.9.S c c.5 g~E'~'~rn~~g5~~$c~Q)~~>.~~ID ~ oE C/)UJ~~=UJIDrnrnc~oIDca..C.c ~~Uo.5~tca.rn~~m~'-~B~rnIDo.9 :r: 5 enU c ~&~ ~-g.Q g rn.~~u (;~:€:5 5rg .S! :~ ~ ~~ ~ ~ o'~ ~ .~ 5 g:5 ;: ~ ~ 8 ;: ~ ~:E ~ :6 'g 'c.~ a. ~ ~ ~ E E U ~ ~ 5 ~ .2> a5 ~ ~ 8 ID ~~~~a~~IDOJ8~~.~'~~~~~'~~~E ~(f)a:a..~(f)~:5:5~UU~;:a.~<{roa.roro~ C3.. ... en OJ 0'0 0) ~ c ~ t .5ID C/) ~ .Q - g;:rn c~ C/) (i) U 1U 0 .- ID a. ~:: c ~~ a. ID ~ .9 ~ .s ~ {g .~: ~ ~ ~ <{ ,5 ~ ~ c -5i c: <{ C>rn IDE ~,E >> ~'5~ ~~~ IDo 5> IDrn IDID ~~mu c.E g ~ (ij ~ (lj ~~ ~~ ~ ~.~ ID 0:+= ~ ID ID 0.0 0 ~ t::.;::....; ID n... ID ~ ~:;:-:g ~~~ ~~ern~.~:s;~~ 8; cn-C >c_ -roa.E~EC/)C/)uE ,~ ~~~ ~.~~ ~OJ!~~~~~.9t ~rn 5E~ C/) ~ C/) c '5:: ro =0 o.~ ~ ~ [ 'U ~ ~ 0 0 ~uu rn_~E~ErnC/)-ID ID> U E = ID c:= 0 Q) ;:'~'o >. 5 0 ~ m <5 >.-g .;:: -g E ~! ~ .~ ~ rn ~ {g E g> ~ ~ c: .~ E ~~~ m:S~:5~~~g~'~ u~ ~~~ ~~~ (;~~~ESo.5~~ s= ~5g c'So ~O)OO~~~U~ID~ 5E ~.9~ ~ g _ . ~ ~ .9 .~ 0 ffi .9 j ~ ~ U (f) ~ 1::0 ~ ~~ID~IDIDU~~E(iju~_ ~ on~ o~2~.5E~~~~~~S~ ~~ UID~ ;-ga58ID~C:oarnca..ID~~~'3: . 0 >.~m cE~E~-Q)rnIE~uE~ ~fr B~gc OUCID=~~.~~rnIDe u o.~ ~~~~rn.~~~~~~o.~~ 00. ID~'~ ~E'i~~ES~~8~2~~ ;'~ ~i~ .~-:;~~.28-gg~-g-;.9~"S ~~ g-g~ [;nQ)rogO)~-gErn~C/)o~ ~g '~~5 a: 8 g..9 :=.5 a. o.~ ID ID g ~ {/) 5 E ~ 'Q)- t> c ~ roCOIDcC/)E=.-{/) u~ u.cm ~~~j:5~~~5~~.~~~0)a5g ~2~ ~::'~~a..a~U~IDa.9~~.~~ ~~u ~~,~'-~~~g~~~~ID~mIDO o.c:w ~ID~~.2::E~~wID=~IDE~B ~g~ C/)EID~a<{ID~OJ~C/)rnU5~mo -~ID E~~~~~~~~'2~C/)~~GE.c ~~~ IDIDIDo._C/)~5~2~.~gg~~~,~2:~ KEgi~~~'~~ID~~1Ue8~'Oj~~rn8 ~<{~~Err~.~gocu~g~>.~C:~~~ID IDC:'_ID~~oE~.C nE~~IDo'~-- a; ~"E (i) {/) >.'~ E 0 g rn ~ ~ ID () c:5 ~ .~ O>~ o~oc~.o~O()=~~ID~ID~~~E.~- _ ID >,.- _ ID C U >.~ c ...- E c ~ ~ ~ E u c: .~ .~ B ~ c:C IDE ID B c .~ ~ 0 rn:: ~ 3: ~ 0 ~ :; .. ~ c <{ 0 ~ ~ Q) ID 2 $ (f) ~.E C/) ID ~ u g' Q.) ~i~c: .~~~~5E~2 ,gO)~ID~~~~ ~cQ.).Q~nmu{/)o~-g~S~RES~~TI ~~~.~E~~@~-ug(f)~s~C/).9,~ca5~ g~EE~~rnrng~~~$crnIDuu>,~u2 ~en8Ecm~~~~~~~~.5~g&~~50 C - 0'- ....... 0 (13 OJ U 0'0 w ~ C/) -E ~ ~ .c a.:: ~,Q&ugaa.t.5a5'~CSE'~~0~~-~~, ~.~cg~~~o~E'~5~->rn~8;:~~E t~'g'2~n~g~EEu~m5~.~~~~8~ ~~~~~~~~ID8~~.s~~~~~'~~~~ ~(f)a:~~(f)~~5~UU~;:a.~<{~a.wrnC/) <3.. ... Disclaimer This map is neither a legally recorded map nor a survey and is not intended to be used as one. This map is a compilation of records, information and data located in various city, county, state and federal offices and other sources regarding the area shown, and is to be used for reference purposes only. The City does not warrant that the Geographic Information System (GIS) Data used to prepare this map are error free, and the City does not represent that the GIS Data can be used for navigational, tracking or any other purpose requiring exacting measurement of distance or direction or precision in the depiction of geographic features. If errors or discrepancies are found please contact 952.227.1107. The preceding disclaimer is provided pursuant to Minnesota Statutes 9466.03, Subd. 21 (2000), and the user of this map acknowledges that the City shall not be liable for any damages, and expressly waives all claims, and agrees to defend, indemnify, and hold harmless the City from any and all claims ~rought by, U~er, its employees or agents, or third parties which arise out of the user's access or use of Disclaimer This map is neither a legally recorded map nor a survey and is not intended to be used as one. This map is a compilation of records, information and data located in various city, county, state and federal offices and other sources regarding the area shown, and is to be used for reference purposes only. The City does not warrant that the Geographic Information System (GIS) Data used to prepare this map are error free, and the City does not represent that the GIS Data can be used for navigational, tracking or any other purpose requiring exacting measurement of distance or direction or precision in the depiction of geographic features. If errors or discrepancies are found please contact 952-227-1107. The preceding disclaimer is provided pursuant to Minnesota Statutes 9466.03, Subd. 21 (2000), and the user of this map acknowledges that the City shall not be liable for any damages, and expressly waives all claims, and agrees to defend, indemnify, and hold harmless the City from any and all claims ~rought by. U~er, its employees or agents, or third parties which arise out of the user's access or use of Public Hearing Notification Area (500+ feet) Autobahn Motorplex Planning Case No. 06-34 City of Chanhassen SCANNED ALAN M & TERESA Y JOHNSON 8286 STONE CREEK DR CHANHASSEN, MN 55317-7414 ANDREW T & CARRIE J SEUBERT 8108 STONE CREEK DR CHANHASSEN, MN 55317-7416 BRUCE M & KANDREA D JELLE 1927 CREEKVIEW CT CHANHASSEN, MN 55317-7418 CHAD J & LAURA LAWRENCE 8162 STONE CREEK DR CHANHASSEN, MN 55317-7416 CHRISTOPHER M VERNIER & 8090 STONE CREEK DR CHANHASSEN, MN 55317-7419 CLYDE H STEPHENS III 8348 STONE CREEK DR CHANHASSEN, MN 55317-7417 DANIEL L TROST & 8151 STONE CREEK DR CHANHASSEN, MN 55317-7416 DAVID A STOCKDALE 7210 GALPIN BLVD EXCELSIOR, MN 55331-8058 ELIZABETH JEAN CARLSON 1947 CREEKVIEW CT CHANHASSEN, MN 55317-7418 GREG D & BETH M MEISEL 8141 STONE CREEK DR CHANHASSEN, MN 55317-7416 ALFRED A IVERSEN 1500 PARK RD CHANHASSEN, MN 55317-8200 BRENSHELL HOMES INC 4052 OAKLAN D ST ST BONIFACIUS, MN 55375-4538 BUILDING MANAGEMENT GROUP LLC 1724 LAKE DR W CHANHASSEN, MN 55317-8580 CHAN CONGR JEHOVAHS WITNESSES 7227 BREN LN EDEN PRAIRIE, MN 55344-4134 CHRISTOPHER N & PAIGE M GILES 8180 STONE CREEK DR CHANHASSEN, MN 55317-7416 DANIEL E & KAREN K TRUE 8091 STONE CREEK DR CHANHASSEN, MN 55317-7419 DANIEL N & JULIE L PFEIFFER 1950 BLUFF VIEW CT CHANHASSEN, MN 55317-7421 DAVID L OBEE 2060 MAJESTIC WAY CHANHASSEN, MN 55317-9352 GERALD P CORNELL 8345 STONE CREEK DR CHANHASSEN, MN 55317-7417 HADI ANBARGHALAMI & 8381 STONE CREEK DR CHANHASSEN, MN 55317-7417 ANDREW M & STACEY A LAUSENG 8117 STONE CREEK DR CHANHASSEN, MN 55317-7416 BRIAN D & ELIZABETH J GUTHRIE 8123 STONE CREEK DR CHANHASSEN, MN 55317-7416 CHAD E & LINDA SNELSON 8135 STONE CREEK DR CHANHASSEN, MN 55317-7416 CHRISTOPHER A RASMUSSEN & 1929 BLUFF VIEW CT CHANHASSEN, MN 55317-7421 CHRISTOPHER T & BRENDA M BERG 8269 STONE CREEK DR CHANHASSEN, MN55317-7414 DANIEL J & GWEN M MICHAEL 1944 CREEKVIEW CT CHANHASSEN, MN 55317-7418 DANIEL R & DONNA L HERNANDEZ 8289 STONE CREEK DR CHANHASSEN, MN 55317-7414 DOROTHY M SUTTER 1913 CREEKVIEW CT CHANHASSEN, MN 55317-7418 GLEN P & REBECCA A GAUERKE 8181 STONE CREEK DR CHANHASSEN, MN 55317-7416 HARLEY E & ELIZABETH L BERGREN 3330 EDINBOROUGH WAY APT 1611 MINNEAPOLIS, MN 55435-5919 HAROLD E & BEVARD M SCHRUM 8297 STONE CREEK DR CHANHASSEN, MN 55317-7414 JEFFREY W & LYNN S T HEITNER 8161 STONE CREEK DR CHANHASSEN, MN 55317-7416 LOW PROPERTIES LLC 1340 PARK RD CHANHASSEN, MN 55317-9527 MATTHEW WRIGHT & 8126 STONE CREEK DR CHANHASSEN, MN 55317-7416 MICHAEL HALEY 13147MARIGOLD ST NW COON RAPIDS, MN 55448-1092 PARK AVENUE LOFTS LLC 510 1ST AVE N #500 MINNEAPOLIS, MN 55403-1623 PETER J & ANNE BAKER 1910 BLUFF VIEW CT CHANHASSEN, MN 55317-7421 RETAIL TECH LLC 1501 PARK RD CHANHASSEN, MN 55317-9520 ROBERT C & PAMELA J DEDIC 8377 STONE CREEK DR CHANHASSEN, MN 55317-7417 STEVEN B & PENNY J STORO 8244 STONE CREEK DR CHANHASSEN, MN 55317-7414 HERAKLES LLC 8345 COMMERCE DR CHANHASSEN, MN 55317-8427 JON S & LORI A DAY 8229 STONE CREEK DR CHANHASSEN, MN 55317-7414 MARK J CARLSON & 8330 COMMERCE DR CHANHASSEN, MN 55317-8426 MCGLYNN BAKERIES INC #366 PO BOX 1113 MINNEAPOLIS, MN 55440-1113 MICHAEL J & DARLENE M LEONARD 8129 STONE CREEK DR CHANHASSEN, MN 55317-7416 PAUL E & BARBARA 0 BOWMAN 8272 STONE CREEK DR CHANHASSEN, MN 55317-7414 RANDAL B TOFTELAND & 8325 STONE CREEK DR CHANHASSEN, MN 55317-7417 RICHARD C & LISA N HART 8249 STONE CREEK DR CHANHASSEN, MN 55317-7414 SANDRA J HOUCK 8372 STONE CREEK DR CHANHASSEN, MN 55317-7417 STEVEN D & SUZANNE R KLOOS PO BOX 6027 SCHENECTADY, NY 12301-6027 JAY & KATHLEEN PETERSON 8216 STONE CREEK DR CHANHASSEN, MN 55317-7414 JURGEN W & CAROL A SEEMANN 8401 STONE CREEK DR CHANHASSEN, MN 55317-7422 MARK L & TIFFANY H ZITZEWITZ 1930 BLUFF VIEW CT CHANHASSEN, MN 55317-7421 MICHAEL 0 & LAURA F WOELFEL 1924 CREEKVIEW CT CHANHASSEN, MN 55317-7418 OSMONICS INC 5951 CLEARWATER DR HOPKINS, MN 55343-8995 PETER & LEAH SWARTZBAUGH 8369 STONE CREEK DR CHANHASSEN, MN 55317-7417 RANDY & KATE MORONEY 8384 STONE CREEK DR CHANHASSEN, MN 55317-7417 RICHARD M GORRA 8201 STONE CREEK DR CHANHASSEN, MN 55317-7414 SCOTT ALAN JESSE & 8198 STONE CREEK DR CHANHASSEN, MN 55317-7416 THE PILLSBURY COMPANY PO BOX 1113 MINNEAPOLIS, MN 55440-1113 THOMAS P & SANDRA J OPHEIM 8305 STONE CREEK DR CHANHASSEN, MN 55317-7417 TODD T & CARRIE L TRAXLER 8230 STONE CREEK DR CHANHASSEN, MN 55317-7414 TOWNHOMES AT CREEKSIDE ASSN PO BOX 36 CHANHASSEN, MN 55317-0036