Approval Letter 12-12-06
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone: 952.227.1100
Fax: 952.227,1110
Building Inspections
Phone: 952.227.1180
Fax: 952,227.1190
Engineering
Phone: 952.227.1160
Fax: 952.227.1170
Finance
Phone: 952.227.1140
Fax: 952,227.1110
Park & Recreation
Phone: 952.227.1120
Fax: 952.227.1110
Recreation Center
2310 Coulter Boulevard
Phone: 952.227.1400
Fax: 952.227.1404
Planning &
Natural Resources
Phone: 952.227.1130
Fax: 952.227.1110
Public Works
1591 Park Road
Phone: 952.227.1300
Fax: 952.227.1310
Senior Center
Phone: 952.227.1125
Fax: 952.227.1110
Web Site
WNW, ci, chan hassen ,mn. us
December 12, 2006
Mr. Adam McLane
Cities Edge Architects
900 American Boulevard East
Suite 101
Bloomington, MN 55420
Re:
Custom Fab Solutions - Planning Case 06-36
Dear Mr. McLane:
This letter is to formally notify you that on December 11,2006, the City Council
adopted the following motion:
The City Council approves the site plan for the construction of a 7,002 square-
foot office warehouse building expansion for Planning Case 06-36 for Custom
Fab Solutions as shown in plans dated received October 20, 2006, and revised on
October 26, 2006, subject to the following conditions:
1. All trees and shrubs shown to remain on plans dated 1012012006 shall be
protected during all construction activities with tree protection fencing. Any
trees or shrubs lost due to construction damage will be replaced after the
construction has been completed.
2. Foundation plantings for the expansion will be 3 pink spire crabapples and 24
Japanese white spirea.
3. The applicant shall submit an erosion and sediment control plan to the City
and receive staff approval of the erosion and sediment control plan prior to
commencing work on-site.
4. Building Official Conditions:
a. The building addition is required to have an automatic fire extinguishing
system.
b. All plans must be prepared and signed by design professionals licensed in
the State of Minnesota.
c. Detailed occupancy and building area related code requirements cannot be
reviewed until further information is provided.
d. The owner and/or their representative shall meet with the Inspections
Division as soon as possible to discuss plan review and permit procedures.
5. The roof drainage must be discharged on the north side of the building to the
maximum extent practicable to increase the time of concentration to the
existing storm sewer system.
The City of Chanhassen · A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play.
Mr. Adam McLane
Custom Fab Solutions
December 12, 2006
Page 2
6. A building permit will be required for any retaining wall four feet tall or higher.
7. The applicant shall enter into a site plan agreement with the city and provide the necessary
financial securities as required for landscaping.
8. All areas disturbed as a result of construction activities shall be immediately restored with seed
and disc-mulched or wood-fiber blanket or sod within two weeks of completion of each activity
in accordance with the City's Best Management Practice Handbook.
9. Concurrent with the building permit, a detailed lighting plan meeting city standards shall be
submitted.
10. All rooftop equipment must be screened.
A Site Plan Agreement must be prepared which will be done by our offices; however, we need
an estimate on the cost of improvements for the site (erosion control, landscaping, etc.). A
building permit cannot be issued until the Site Plan Agreement has been executed and recorded
at Carver County and financial guarantees submitted to the City. Should you have any questions,
please call me at 952-227-1134 or e-mail atsaliaff@ci.chanhassen.mn.us.
Sincerely,
~
../
~
Sharmeen AI-Jaff
Senior Planner