Loading...
Approval Letter 12-12-06 CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227,1110 Building Inspections Phone: 952.227.1180 Fax: 952,227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952,227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site WNW, ci, chan hassen ,mn. us December 12, 2006 Mr. Adam McLane Cities Edge Architects 900 American Boulevard East Suite 101 Bloomington, MN 55420 Re: Custom Fab Solutions - Planning Case 06-36 Dear Mr. McLane: This letter is to formally notify you that on December 11,2006, the City Council adopted the following motion: The City Council approves the site plan for the construction of a 7,002 square- foot office warehouse building expansion for Planning Case 06-36 for Custom Fab Solutions as shown in plans dated received October 20, 2006, and revised on October 26, 2006, subject to the following conditions: 1. All trees and shrubs shown to remain on plans dated 1012012006 shall be protected during all construction activities with tree protection fencing. Any trees or shrubs lost due to construction damage will be replaced after the construction has been completed. 2. Foundation plantings for the expansion will be 3 pink spire crabapples and 24 Japanese white spirea. 3. The applicant shall submit an erosion and sediment control plan to the City and receive staff approval of the erosion and sediment control plan prior to commencing work on-site. 4. Building Official Conditions: a. The building addition is required to have an automatic fire extinguishing system. b. All plans must be prepared and signed by design professionals licensed in the State of Minnesota. c. Detailed occupancy and building area related code requirements cannot be reviewed until further information is provided. d. The owner and/or their representative shall meet with the Inspections Division as soon as possible to discuss plan review and permit procedures. 5. The roof drainage must be discharged on the north side of the building to the maximum extent practicable to increase the time of concentration to the existing storm sewer system. The City of Chanhassen · A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play. Mr. Adam McLane Custom Fab Solutions December 12, 2006 Page 2 6. A building permit will be required for any retaining wall four feet tall or higher. 7. The applicant shall enter into a site plan agreement with the city and provide the necessary financial securities as required for landscaping. 8. All areas disturbed as a result of construction activities shall be immediately restored with seed and disc-mulched or wood-fiber blanket or sod within two weeks of completion of each activity in accordance with the City's Best Management Practice Handbook. 9. Concurrent with the building permit, a detailed lighting plan meeting city standards shall be submitted. 10. All rooftop equipment must be screened. A Site Plan Agreement must be prepared which will be done by our offices; however, we need an estimate on the cost of improvements for the site (erosion control, landscaping, etc.). A building permit cannot be issued until the Site Plan Agreement has been executed and recorded at Carver County and financial guarantees submitted to the City. Should you have any questions, please call me at 952-227-1134 or e-mail atsaliaff@ci.chanhassen.mn.us. Sincerely, ~ ../ ~ Sharmeen AI-Jaff Senior Planner c: Alyson Fauske, Assistant City Engineer Jerry Mohn, Building Official G:\PLAN\2006 Planning Cases\06-36 Custom Fab Solutions\Approval Letter.doc