Loading...
PC Staff Report 1-2-07 PC DATE: January 2, 2007 2 CC DATE: January 22, 2007 CITY OF CHANHASSEN REVIEW DEADLINE: January 30, 2007 CASE #: 07-02 BY: AF, RG, LH, ML, JM, JS STAFF REPORT PROPOSAL: Request for Rezoning from RR, Rural Residential, to RSF, Single Family Residential; Comprehensive Land Use Map Amendment from Residential-Large Lot to Residential-Low Density on the APPLICANT westerly portion of Lot ; Subdivision of approximately 20 acres into 22 lots and 3 outlots; Variances and Vacation THE ARBORS of existing right-of-way – . LOCATION: 7537 and 7570 Dogwood Road. Lots 1 and 2, Block 1, Zimmerman Farm 1st Addition APPLICANT: Carlson Custom Homes, Inc. Peter and Dee Brandt 1440 Bavarian Shores Dr. 7570 Dogwood Road Chaska, MN 55318 Chanhassen, MN 55317 (952) 475-8045 PRESENT ZONING: Rural Residential District, RR 2020 LAND USE PLAN: Residential – Large Lot and Residential – Low Density ACREAGE:DENSITY: gross: 1.10 units per acre; net: 1.36 units per acre SUMMARY OF REQUEST: The developer is proposing a 22 lot single-family residential subdivision. SITE DATA LEVEL OF CITY DISCRETION IN DECISION-MAKING: The City has a relatively high level of discretion in approving rezonings because the City is acting in its legislative or policy making capacity. A rezoning must be consistent with the City’s Comprehensive Plan. The City’s discretion in approving or denying a preliminary plat is limited to whether or not the proposed plat meets the standards outlined in the Subdivision Regulations and Zoning Ordinance. If it meets these standards, the City must approve the preliminary plat. This is a quasi judicial decision. The City’s discretion in approving or denying a variance is limited to whether or not the proposed project meets the standards in the Zoning Ordinance for a variance. The City has a relatively high level of discretion with a variance because the applicant is seeking a deviation from established standards. This is a quasi judicial decision. The Arbors Planning Case 07-02 January 2, 2007 Page 2 of 18 PROPOSAL/SUMMARY The site currently contains two single-family homes on lots platted as part of the Zimmerman Farm Addition in 1990. The applicant is proposing a 22 lot single-family residential development on approximately 20 acres. The two existing homes on the properties will remain. The primary access to the site will be th via an extension of West 78 Street. The property to the north and east is zoned Office and Institutional District, OI, and is part of the Westwood Community Church site. The property to the south is zoned Rural Residential, RR, and is part of the Minnesota Landscape Arboretum. The property to the west is zoned Single-family Residential District, RSF, and includes single-family homes within the Sunset Hill on Lake Minnewashta Addition. Water and sewer service as well as an upgrade to Dogwood Road is proposed as part of a City project. The proposed development of the site is contingent on the City undertaking those public improvements. Without the City utilities, this project is premature. Dogwood Road is proposed to be realigned with the utility easement to minimize the amount of tree loss due to road construction. The site varies from gentle grass slopes on the east side to steeper wooded slopes on the west side. The high point of the property lies on the east side at an elevation of 1039. The site slopes down to Lake Minnewashta which has an ordinary high water (OHW) elevation of 944.5. The northwest corner and western portion of the site, approximately one-third of the property, is wooded with the balance of the site in open field. Location Map The Arbors Planning Case No. 07-02 City of Chanhassen / / lake Minnewashta Il>V~ H 5 Arboretum Boulevard The Arbors Planning Case 07-02 January 2, 2007 Page 3 of 18 The project approval includes a land use amendment from Residential - Large Lot to Residential - Low Density for the home site west of Dogwood, a rezoning from Rural Residential, RR, to Single- Family Residential, RSF and preliminary plat approval for 22 lots, 3 outlots and right-of-way for public streets. The proposed lots are all in excess of the minimum requirements of the RSF district. Staff is recommending approval of the development, subject to the conditions of the staff report. APPLICABLE REGUA TIONS Chapter 18, Subdivisions Chapter 20, Article II, Division 2, Amendments Chapter 20, Article II, Division 3, Variances Chapter 20, Article VI, Wetland Protection Chapter 20, Article VII, Shoreland Management District Chapter 20, Article XII, RSF Single-Family Residential District BACKGROUND In 2005, Westwood Community Church extended West 78th Street from Highway 41 to their driveway to permit the expansion of their campus. Additionally, Westwood dedicated the right-of- way for the extension of West 78th Street to the western property line to permit the future extension of the street. In 2002, project #2002-5 for Timber Lake, a residential subdivision of the property was submitted for the site. Ultimately, the application was withdrawn due to the lack of public infrastructure. On June 4, 1990, the City of Chanhassen approved the final plat for Zimmerman Farm creating the two lots being subdivided as part of the current development proposal. In January 1990, the subdivision of these parcels, consisting of 20 acres, was reviewed by the Planning Commission. The issue of access to the property was the primary area of discussion. At that time, staff was recommending that right-of-way be dedicated from the end of Dogwood Road to Crimson Bay Road. Sometime between June 1989 and January 1990, the 100 acres was split into an 80-acre parcel and a 20-acre parcel. State statutes define these types of splits as exempt from the subdivision review requirements without requiring Planning Commission or City Council approval. On June 21, 1989, the Planning Commission reviewed a preliminary plat to subdivide 100 acres into three single-family lots of ten, five and five acres and one 80-acre outlot. The primary issue of discussion was the locations of trail easements and the extent of improvements to the existing road. The Planning Commission tabled the item. Van Doren-Hazard-Stallings, Inc. prepared a feasibility study for Tanadoona Drive and Dogwood Road in June 1988. The study looked at four alternatives for providing access to Highway 41, improving both Dogwood Road and Tanadoona Drive. However, a connection to Crimson Bay was The Arbors Planning Case 07-02 January 2, 2007 Page 4 of 18 not evaluated as part of the study. The residents withdrew their request for public street improvements after reviewing the feasibility cost estimates. In 1987, the City Council approved a preliminary plat for this property. The major issue that surfaced during the development review was the provision of road access to the lots. On July 6, 1987, the City Council approved the preliminary subdivision with the following conditions: 1. The applicant shall be required to install a cul-de-sac into Lot 3, at the end of Dogwood; however, the applicant may be allowed to put in a driveway as approved by City Staff. 2. No development shall occur on either five-acre lots until completion of a feasibility study and the plans for that road are determined. 3. A feasibility study shall be initiated to evaluate the alternatives to improving Dogwood Road and Tanadoona Drive, as well as evaluating the connection to the Worm property (Crimson Bay) to the south. 4. The developer shall be required to enter into a development agreement guaranteeing the installation of the improvements and provide financial sureties as required. 5. Dedication of a 20-foot trail easement along the south and east property lines. The proposed subdivision was not pursued further and no development took place. LAND USE AMENDMENT In 2001, City staff initiated a proposed land use map amendment for the properties along Dogwood. Planning Staff held an open house at the Chanhassen Recreation Center on Tuesday, January 23,2001, to discuss land use and zoning inconsistencies. These properties were some of the properties that were discussed as being up for change. Staff processed amendments to the Comprehensive Plan and Zoning map to ensure they were consistent and this will be one of the changes that was processed. The recommendation was to re-guide the property from large lot residential to low density residential, which is consistent with the RSF zoning except for the portion west of the southerly extension of Dogwood Road of Zimmerman Farm 151 Addition, which is currently zoned Rural Residential, RR. At that time, the Planning Commission tabled the amendment to address the issue of the provision of urban services to this area. Now that City utilities are being proposed, one of the properties is in for development review. A land use amendment is necessary to permit the subdivision of the property on the west side of Dogwood. The rest of the properties west of Dogwood are subdivided in to lots of less than 2.5 acres. The Arbors Planning Case 07-02 January 2, 2007 Page 5 of 18 Lot, and Subdivision Address Lot Area Frontage (square feet) (feet) 1, Sunset Hill on Lake Minnewashta 7301 Dogwood 36,426 108 2, Sunset Hill on Lake Minnewashta 7311 Dogwood 48,908 171 3, Sunset Hill on Lake Minnewashta 7321 Dogwood 42,540 149 4, Sunset Hill on Lake Minnewashta 7331 Dogwood 37,896 126 5, Sunset Hill on Lake Minnewashta 7341 Dogwood 31,535 102 6, Sunset Hill on Lake Minnewashta 7401 Dogwood 40,966 102 7, Sunset Hill on Lake Minnewashta (formerly lots 7 7431 Dogwood 120,001 372 -10), consisting of three amended parcels. 1, Getsch Addition 7460 Dogwood 44,506 101 2, Getsch Addition 7480 Dogwood 61,369 125 3, Getsch Addition 7530 Dogwood 53,282 141 4, Getsch Addition 7550 Dogwood 54,955 100 5, Getsch Addition 7560 Dogwood 55,065 124 1, Zimmerman Farms 1st Addition 7570 Dogwood 438,788 30 On December 7, 2006, the City submitted the proposed land use map amendment to all the adjacent governmental jurisdictions for their review and comment. Upon City Council review, the proposed amendment must be submitted to the Metropolitan Council for their review and determination of compliance with the regional plan. The proposed amendment would permit the development of the property as proposed as well as be consistent with the existing uses of the properties north of the site on the west side of Dogwood and compatible with the Office Institutional uses to the north and east. Staff is recommending approval of the land use map amendment for the 2.57 acres of the development west of the Dogwood extension contingent on Metropolitan Council review. REZONING The proposed rezoning is consistent with the Residential - Low Density land use designation of the property which permits net densities of 1.2 - 4.0 units per acre. The Single Family Residential District, RSF, is consistent with this land use category and is the typical zoning for single-family residential developments in the City. Other zoning districts that would be consistent with the Residential - Low Density designation include Mixed Low Density Residential District, R4, Low and Medium Density Residential District, RLM, and Planned Unit Development - Residential, PUD-R. Staff is recommending approval of the rezoning subject to approval of the land use map amendment and final plat approval. The Arbors Planning Case 07-02 January 2, 2007 Page 6 of 18 SUBDIVISION REVIEW RIGHT-OF-WAY The proposed development was platted as Zimmerman Farm 1st Addition in 1991 and included a 30-foot wide right-of-way for Zimmerman Road. This street was never constructed and is not needed due to the proposed West 78th Street extension; therefore, this right-of-way will be vacated in conjunction with the final plat. GRADING AND DRAINAGE The developer proposes to mass grade the majority of the site. Lots 1 through 3, Block 1 are proposed custom-grade lots. In order to meet the 10% maximum allowable driveway grade on these lots, the builder may have to put steps in the garage to accommodate the grade change. The plans do not show proposed grading on Lots 1 through 3, Block 3 since the owner of the existing home within proposed Lot 1, Block 3 intends to retain ownership of the area encompassed by these proposed three lots and final plat at a later date. A pond is proposed in the southwest comer of Block 2. The pond is to treat runoff from the majority of the lots within the development, the new portion of West 78th Street within the plat, and approximately 440 feet of the proposed Dogwood Road extension. Based on the hydrology calculations submitted, the dead pool volume of the pond needs to be increased by 360 cubic feet to meet the MPCA Phase IT requirements. The proposed 1036-foot contour on Lots 12 and 14, Block 1 must be shifted so that the backyard grade is minimum 2%. The proposed major contours must be a different line weight or type. Basedon the grading plan, the home on Lot 5, Block 1 will be a walkout, not a full basement. RET AINING WALLS The developer proposes to construct a tiered retaining wall system on the south side of Lot 4, Block 1, south of the existing home. The top and bottom elevations of the wall must be shown on the grading plan; it appears that each tier will be a maximum of four feet high. EROSION AND SEDIMENT CONTROL A NPDES Phase II Construction Site Storm Water Permit will be required from the Minnesota Pollution Control Agency (MPCA) for this site. A Storm Water Pollution Prevention Plan (SWPPP) will be required in conjunction with this application. The SWPPP should be provided to the City so it can be reviewed by the Carver Soil and Water Conservation District prior to the preconstruction meeting for the project. The Arbors Planning Case 07-02 January 2, 2007 Page 7 of 18 The proposed storm water pond should be constructed prior to disturbing upgradient areas and used as a temporary sediment basin during mass grading. Diversion berms/ditches may be needed to divert water to the pond and a temporary pond outlet should be provided. The outlet could be a temporary perforated standpipe and rock cone. The plans should be revised to include a detail for the temporary pond outlet. It should be noted on the SWPPP that all areas that will not be permanently stabilized within the timeframe required by the NPDES permit should be temporary mulched and seeded. A note shall be included in the dewatering section of the SWPPP that states: "If construction of the proposed temporary/permanent sediment pond is not completed prior to dewatering, the City's on-site construction observer must approve proposed dewatering methods prior to beginning dewatering." The plans should be revised to incorporate Chanhassen' s standard details for erosion and sediment control, including 5302A and 5302D. Proposed erosion and sediment controls for individual lots should include perimeter controls (silt fence), rock driveways, street sweeping, inlet control and temporary mulch after final grade and prior to issuing the Certificate of Occupancy. The applicant shall provide erosion and sediment control along the south and east property lines to prevent discharge of sediment onto adjacent properties. All silt fence that is not laid parallel to the contours should have J Hooks installed every 50 -75 feet. This should be noted on the plans and discussed at the preconstruction meeting. Energy dissipation should be provided at the inlet to the proposed pond and at the end of the discharge pipe that outlets to the wetland within 24 hours of pipe installation. The discharge location for the outlet of the proposed pond should be evaluated to ensure that the proposed discharge will not cause erosion issues. Reinforced erosion control matting may be required. A stable emergency overflow (BOp) for the stormwater pond should be provided. The EOF could consist of riprap and geotextile fabric or a turf reinforcement mat (a permanent erosion control blanket). A typical detail should be included in the plan. The overland route from the EOF to Lake Minnewashta should be shown on the plans and should be encumbered by a drainage and utility easement. Erosion control blanket shall be installed on all slopes greater than or equal to 3: 1. All exposed soil areas shall have temporary erosion protection or permanent cover year round, according to the following table of slopes and time frames: Type of Slope Time (Maximum time an area can Steeper than 3: 1 7 days remain open when the area 10:1 to 3:1 14 daysis not actively being worked.) Flatter than 10: 1 21 days These areas include constructed storm water management pond side slopes, and any exposed soil areas with a positive slope to a storm water conveyance system, such as a curb and gutter system, The Arbors Planning Case 07-02 January 2, 2007 Page 8 of 18 storm sewer inlet, temporary or permanent drainage ditch or other natural or man made systems that discharge to a surface water. Inlet protection may be needed prior to installation of the castings for the curbside catch basins. In that case, all storm sewer inlets should be protected by at least fabric draped over the manhole with a steel plate holding the fabric in place. The plans should be revised to show a rock construction entrance (minimum 75 feet in length) wherever construction traffic will access the site. The rock construction entrance should be constructed in accordance with Chanhassen's Standard Detail 5301. Street cleaning of soil tracked onto public streets shall include daily street scraping and street sweeping as needed. SURFACE WATER MANAGEMENT PLAN (SWMP) CONNECTION CHARGES Water Quality Fees Because of the impervious surface associated with this development, the water quality fees for this proposed development are based on rural residential development rates of $1,900/acre. Therefore, the water quality fees associated with this project are $33,478. Water Quantity Fees The SWMP has established a connection charge for the different land uses based on an average citywide rate for the installation of water quantity systems. This cost includes land acquisition, proposed SWMP culverts, open channels, and storm water ponding areas for runoff storage. Single- family residential developments have a connection charge of $3,100 per developable acre. This results in a water quantity fee of approximately $54,622 for the proposed development. SWMP Credits This project proposes the construction of one NURP pond. The applicant will be credited for 50% of the water quality charge for each acre draining to the NURP pond on-site. At this time, the estimated total SWMP fee, due payable to the City at the time of final plat recording, is $74,570.50. UTILITIES Lateral sanitary sewer and watermain to serve the proposed development are proposed to be constructed in conjunction with City Project 06-06, DogwoodlTanadoona Street and Utilities. City Council ordered the preparation of the feasibility study for Project 06-06 on November 27, 2006. In January, 2007, staff expects that the City Council will consider accepting the feasibility report and ordering the preparation of plans and specifications. Portions of the project costs for Project 06-06 are proposed to be assessed to the existing residents along Dogwood Road and the proposed units within The Arbors plat. Staff has met with the The Arbors Planning Case 07-02 January 2, 2007 Page 9 of 18 residents several times throughout the past 18 months to discuss Project 06-06; the neighborhood is generally supportive of the project. Under Project 06-06, eight-inch gravity sanitary sewer will extend from the intersection of the Dogwood RoadlWest 78th Street intersection to the lift station located near the southeast comer of Dogwood Road and Tanadoona Drive. Lift station and forcemain upgrades are also proposed with Project 06-06. The remainder of lateral sanitary sewer to serve the proposed development will be installed and paid for by the developer. Based on the information provided, lots within the preliminary plat will not require an ejector pump. In conjunction with Project 06-06, eight-inch lateral watermain will extend from the Dogwood RoadlWest 78th Street intersection to the existing stub within Tanadoona Drive, which is approximately 1100 feet east of the Dogwood RoadfTanadoona Drive intersection. The remainder of the lateral watermain to serve the development will be installed and paid for by the developer. Eight-inch lateral sanitary sewer and watermain will be stubbed south of the Dogwood RoadfTanadoona Drive intersection to service Lots 1 through 3, Block 3 when they are final platted, and to provide service to the residences on Crimson Bay Road to the south. A pressure reducing station will likely be required for the Crimson Bay residents. Due to a significant drop in grade from the Dogwood RoadlWest 78th Street intersection to Crimson Bay, sanitary sewer service for Crimson Bay will likely require a lift station and forcemain. Due to the timing of The Arbors and Project 06-06, Staff anticipates that grading and utility installation for The Arbors would be done simultaneously with the construction of Project 06-06. Preliminary plat approval shall be contingent upon the approval and construction of Project 06-06. Watermain must be minimum 18 inches above or below the sanitary sewer. STREETS Access to the proposed development will be from West 78th Street and Dogwood Road. Dogwood Road is proposed to be constructed with Project 06-06. The final cross section of Dogwood Road has not yet been determined. The developer will extend West 78th Street from its current terminus within the Westwood Church property within the existing roadway, drainage and utility easement. West 78th Street will be a 31- foot wide urban section. Access for Lots 2 and 3, Block 3 will be addressed and constructed when those lots are final platted. The property owner on Lots 1 through 3, Block 3 has requested that the gravel driveway and turnaround area within the Dogwood Road right-of-way south of West 78th Street remain, with the portion of the turnaround within Lot 1, Block 2 being removed. This gravel drive and turnaround will require an Encroachment Agreement which would be filed with the final plat. The drive and turnaround will be removed when Dogwood Road is extended in the future. The Arbors Planning Case 07-02 January 2, 2007 Page 10 of 18 LANDSCAPING AND TREE PRESERVATION Tree canopy coverage and preservation calculations have been submitted for The Arbors development. They are as follows: Total upland area (excluding wetlands, bluff, park) Baseline canopy coverage Minimum canopy coverage required Proposed tree preservation 20 ac. 36.7% or 319,770 SF 30 % or 261,360 SF 22.5% or 195,791 SF The developer does not meet minimum canopy coverage allowed; therefore, the difference between the baseline and proposed tree preservation is multiplied by 1.2 to calculate the required replacement plantings. Difference in canopy coverage Multiplier Total replacement Total number of trees to be planted 65,569 SF 1.2 78,683 SF 72 trees The total number of trees required for the development is 72. The applicant has proposed a total of 60 trees. There are no bufferyard requirements for this development. The applicant has proposed a conservation easement over parts of Lots 1-3,5, and 8-9, Block 1. The existing woods are of high value and consist primarily of sugar maple. The applicant has protected a reasonable amount of the wooded area on Lots 1 through 3, but staff recommends that the easement be enlarged on Lots 5, 8 and 9 to cover more of the wooded area because of its high quality. PARKS AND RECREATION Parks This property is located within an area of the City not currently served by a neighborhood park. However, there is an abundance of parkland and open space in the vicinity of The Arbors. The property shares its southern border with the Minnesota Landscape Arboretum. This particular portion of the Arboretum, consisting of research fields, is not open to the public. Minnewashta Regional Park is located approximately one-half mile north of the site off of State Highway 41. This 340-acre regional park facility is operated by Carver County and features a swimming beach, bathhouse, concession stand, picnic shelters, volleyball courts, playground, trails and fishing pier. The City owns ten acres of wooded open space at the intersection of Tanadoona Drive and State Highway 41. No additional parkland acquisition is being recommended as a condition of this subdivision. The Arbors Planning Case 07-02 January 2, 2007 Page 11 of 18 TRAILS The subject site has convenient access to the West 78th Street pedestrian trail. The applicant should be required to connect The Arbors neighborhood to this trail with a sidewalk connection along the entire north side of the new section of West 78th Street. No additional trail construction is being recommended as a condition of this subdivision. The two existing homes paid park and trail fees. Therefore, only 20 additional dwelling units will be required to pay park fees. . Based on 2007 park fees, the total fees payable at the time of final plat approval would be $116,000.00. WETLANDS Existing Wetlands Two natural wetlands exist on-site. Kjolhaug Environmental Services delineated the wetlands in May 2001. The wetland boundaries were reevaluated in November 2006 and are consistent with those delineated in 2001. Wetland 1 is a Type 3 wetland adjacent to Lake Minnewashta in the southwest corner of the property. The wetland is dominated by reed canary grass, cattail, red osier dogwood and sedges. This project does not propose to impact Wetland 1. Wetland 1 is classified as a Preserve wetland by the City Wetland Inventory. Wetland 1 is approximately 17,965 square feet on the site. Wetland 2 is a forested Type 1 wetland in the north center portion of the property. The wetland is dominated by American elm, black ash, box elder and sedges. This project does not propose to impact Wetland 2. Wetland 2 is not included in the City Wetland Inventory. The applicant should classify Wetland 2 using the results from the Minnesota Routine Assessment Method for Evaluating Wetland Functions (MnRAM Version 3.0). An electronic version of the completed MnRAM evaluation should be submitted to and approved by the city to establish the classification of Wetland 2 so the appropriate wetland buffer and setback requirements can be determined. Wetland 2 is approximately 6,920 square feet. A wetland buffer 50 in width and a 50 foot setback from the wetland buffer must be maintained around Wetland 1. Wetland buffer areas should be preserved, surveyed and staked in accordance with the City's wetland ordinance. The applicant must install wetland buffer edge signs, under the direction of City staff, before construction begins and must pay the City $20 per sign. Wetland buffer and setback requirements for Wetland 2 are contingent upon review and approval of the MnRAM for that wetland. The proposed driveways and structures on Lots 1 and 2, Block 1 appear to be within the wetland setback for Wetland 2. The applicant should submit house plans that will meet the required setbacks on Lots 1 and 2, Block 1. The proposed conservation easement should be revised to envelop Wetland 2 and the required wetland buffer. The Arbors Planning Case 07-02 January 2, 2007 Page 12 of 18 LAKES The proposed project is within 1,000 feet of the ordinary high water level (OHW) of Lake Minnewashta and is therefore within the lake's shoreland management district. The Minnesota Department of Natural Resources (DNR) classifies Lake Minnewashta as a recreational development lake. The ordinary high water (OHW) elevation from Lake Minnewashta is 944.5. COMPLIANCE TABLE Area (SQ. ft.) Frontage (ft.) Depth (ft.) Notes Code 15,000 non-riparian 90 125 20,000 riparian L1 B1 35,715 154 367 Wetland 2, net lot area 28,795 sq. ft. L2B1 31,452 111 332 Wetland 2 L3B1 31,169 118 299 UBI 46,867 186 214 Comer lot L5B1 37,940 144 269 L6B1 25,071 120 208 Comer lot L7B1 18,360 130 177 L8B1 53,860 71 * 310 *98' width at bldg setback L9B1 31,623 72 * 236 *97' width at bldg setback LlO B1 30,238 72 * 217 * 102' width at bldg setback L11 B1 35,371 80 * 236 *101' width at bldg setback L12 B1 28,797 112 251 L13 B1 24,302 116 182 Comer lot L14 B1 28,220 156 208 L1 B2 21,645 144 140 Comer lot L2B2 21,845 170 160 L3B2 19,826 118 151 UB2 25,309 122 188 L5B2 18,964 130 142 L1 B3 39,730 92 353 Lakeshore & wetland 1, net lot area 34,485 sq. ft. L2B3 36,495 100 380 Lakeshore & wetland 1, net lot area 31,195 sq. ft. L3B3 35,865 100 379 Lakeshore & wetland 1, net lot area 28,445 sq. ft. Outlot A 3,372 Landscape island Outlot B 9,520 Signage/gazebo Outlot C 39,268 Storm water pond ROW 132,850 3.05 acres Total 863,674 19.83 acres including 0.57 acres of wetland The Arbors Planning Case 07-02 January 2, 2007 Page 13 of 18 SETBACKS Setback (ft.) Front 30 Sides 10 Rear 30 Lakeshore (OHW) 75 Wetland 1 50 (plus 50 foot buffer) Wetland 2 To be determined based on MnRAM evaluation OTHER AGENCIES The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g., Minnesota Pollution Control Agency, Minnesota Department of Natural Resources (for dewatering)) and comply with their conditions of approval. RECOMMENDA TION Staff recommends that the Planning Commission adopt the following three motions and adoption of the attached findings of fact and recommendation: A. "The Chanhassen Planning Commission recommends that the City Council approve Comprehensive Land Use Map Amendment from Residential-Large Lot to Residential-Low Density for Lots 1 through 3, Block 3, of the preliminary plat of The Arbors contingent on Metropolitan Council review." B. "The Chanhassen Planning Commission recommends that the City Council approve the Rezoning from RR, Rural Residential, to RSF, Single Family Residential for the land within the plat of The Arbors subject to final plat approval for The Arbors." C. "The Chanhassen Planning Commission recommends that the City Council approve the preliminary plat for the Arbors creating 22 lots. 3 outlots and public right-of-way, plans prepared by Otto Associates, dated October 31, 2006, subject to the following conditions: 1. The house designs, locations and driveway configurations for Lots 1 and 2, Block 1, must be revised to maintain the required wetland setback. 2. Full park fees in lieu of parkland dedication and/or trail construction shall be collected as a condition of approval for The Arbors. The park fees shall be collected in full at the rate in force upon final plat submission and approval. 3. Fire Marshal's Conditions: The Arbors Planning Case 07 -02 January 2, 2007 Page 14 of 18 a. A lO-foot clear space must be maintained around fire hydrants, i.e., street lamps, trees, shrubs, bushes, Xcel Energy, Qwest, cable TV and transformer boxes. This is to ensure that fire hydrants can be quickly located and safely operated by firefighters. Pursuant to Chanhassen City Ordinance #9-1. b. Fire apparatus access roads and water supply for fire protection is required to be installed. Such protection shall be installed and made serviceable prior to and during the time of construction except when approved alternate methods of protection are provided. c. Temporary street signs shall be installed at street intersections once construction of the new roadway allows passage of vehicles. Pursuant to 2002 Minnesota Fire Code Section 501.4. d. Fire apparatus access roads shall be designed and maintained to support the imposed load of fire apparatus and shall be serviced so as to provide all-weather driving capabilities. Pursuant to Minnesota State Fire Code Section 503.2.3. e. Submit proposed cul-de-sac name to Chanhassen Building Official and Chanhassen Fire Marshal for review and approval. f. No burning permits shall be issued for trees to be removed. Trees and shrubs must either be removed from site or chipped. 4. Building Official Conditions: a. A final grading plan and soils report must be submitted to the Inspections Division before building permits will be issued. b. Demolition permits must be obtained prior to demolishing any structures on the site. c. Existing wells and on-site sewage treatment systems on the site must be abandoned in accordance with State Law and City Code. d. The developer must submit a list of proposed street names for review and approval prior to final plat of the property. e. Retaining walls more than four feet high must be designed by a professional engineer and a building permit must be obtained prior to construction. f. Separate sewer and water services must be provided each lot. 5. City Forester's Conditions: a. Tree preservation fence shall be installed at the edge of the grading limits prior to any construction. Fencing shall be in place and maintained until all construction is completed. The Arbors Planning Case 07 -02 January 2,2007 Page 15 of 18 b. Any trees removed in excess of proposed tree preservation plans, dated 10/31/06, will be replaced at a ratio of 2: 1 diameter inches. c. A minimum of two trees shall be planted on each lot. d. Tree conservation easements on Lots 5,8, and 9, Block 1 shall be enlarged beyond what is shown on plans dated 10/31/06. e. Tree conservation easements shall be located on Lots 1-3,5,8-9, Block 1. f. The applicant shall replace Colorado spruce shown on landscape plan with concolor fir or Norway spruce. 6. City Engineer's Conditions: a. In order to meet the 10% maximum allowable driveway grade on Lots 1 through 3, Block 1, the builder may have to put steps in the garage to accommodate the grade change. b. The dead pool volume of the pond needs to be increased by 360 cubic feet to meet the MPCA Phase II requirements. c. The proposed 1036 foot contour on Lots 12 and 14, Block 1 must be shifted so that the backyard grade is minimum 2%. d. The proposed major contours must be a different line weight or type. e. Based on the grading plan, the home on Lot 5, Block 1 will be a walkout, not a full basement. f. The top and bottom of wall elevations of the wall must be shown on the grading plan. g. Preliminary plat approval shall be contingent upon the approval and construction of Project 06-06. h. Watermain must be minimum 18 inches above or below the sanitary sewer. 1. Access for Lots 2 and 3, Block 3 will be addressed and constructed when those lots are final platted. J. An encroachment agreement is required for the gravel drive and turnaround within the Dogwood Road right of way south of West 78th Street. 7. Water Resources Coordinator's Conditions: The Arbors Planning Case 07-02 January 2, 2007 Page 16 of 18 a. The applicant shall classify Wetland 2 using the results from the Minnesota Routine Assessment Method for Evaluating Wetland Functions (MnRAM Version 3.0). An electronic version of the completed MnRAM evaluation shall be submitted to and approved by the city to establish the classification of Wetland 2 so the appropriate wetland buffer and setback requirements can be determined. b. A wetland buffer 50 in width and a 50 foot setback from the wetland buffer must be maintained around Wetland 1. Wetland buffer areas shall be preserved, surveyed and staked in accordance with the City's wetland ordinance. The applicant must install wetland buffer edge signs, under the direction of City staff, before construction begins and must pay the City $20 per sign. Wetland buffer and setback requirements for Wetland 2 are contingent upon review and approval of the MnRAM for that wetland. c. The proposed driveways and structures on Lots 1 and 2, Block 1 appear to be within the wetland setback for Wetland 2. The applicant shall submit house plans that will meet the required setbacks on Lots 1 and 2, Block 1. d. The proposed conservation easement shall be revised to envelop Wetland 2 and the required wetland buffer. e. A NPDES Phase II Construction Site Storm Water Permit will be required from the Minnesota Pollution Control Agency (MPCA) for this site. A Storm Water Pollution Prevention Plan (SWPPP) will be required in conjunction with this application. The SWPPP shall be provided to the City so it can be reviewed by the Carver Soil and Water Conservation District prior to the preconstruction meeting for the project. f. The proposed storm water pond shall be constructed prior to disturbing upgradient areas and used as a temporary sediment basin during mass grading. Diversion berms/ditches may be needed to divert water to the pond and a temporary pond outlet shall be provided. The outlet could be a temporary perforated standpipe and rock cone. The plans shall be revised to include a detail for the temporary pond outlet. g. It shall be noted on the SWPPP that all areas that will not be permanently stabilized within the timeframe required by the NPDES permit shall be temporary mulched and seeded. A note shall be included in the dewatering section of the SWPPP that states: "If construction of the proposed temporary/permanent sediment pond is not completed prior to dewatering, the City's on-site construction observer must approve proposed dewatering methods prior to beginning dewatering." h. The plans shall be revised to incorporate Chanhassen's standard details for erosion and sediment control, including 5302A and 5302D. Proposed erosion and sediment controls for individual lots shall include perimeter controls (silt fence), rock driveways, street sweeping, inlet control and temporary mulch after final grade and prior to issuing the Certificate of Occupancy. The Arbors Planning Case 07-02 January 2, 2007 Page 17 of 18 1. The applicant shall provide erosion and sediment control along the south and east property lines to prevent discharge of sediment onto adjacent properties. J. All silt fence that is not laid parallel to the contours shall have J Hooks installed every 50 -75 feet. This shall be noted on the plans and discussed at the preconstruction meeting. k. Energy dissipation shall be provided at the inlet to the proposed pond and at the end of the discharge pipe that outlets to the wetland within 24 hours of pipe installation. The discharge location for the outlet of the proposed pond shall be evaluated to ensure that the proposed discharge will not cause erosion issues. Reinforced erosion control matting may be required. 1. A stable emergency overflow (EOF) for the stormwater pond shall be provided. The EOF could consist of riprap and geotextile fabric or a turf reinforcement mat (a permanent erosion control blanket). A typical detail shall be included in the plan. The overland route from the EOF to Lake Minnewashta shall be shown on the plans and shall be encumbered by a drainage and utility easement. m. Erosion control blanket shall be installed on all slopes greater than or equal to 3:1. All exposed soil areas shall have temporary erosion protection or permanent cover year round, according to the following table of slopes and time frames: Type of Slope Steeper than 3:1 10:1 to 3:1 Flatter than 10: 1 Time 7 days 14 days 21 days (Maximum time an area can remain open when the area is not actively being worked.) n. These areas include constructed storm water management pond side slopes, and any exposed soil areas with a positive slope to a storm water conveyance system, such as a curb and gutter system, storm sewer inlet, temporary or permanent drainage ditch or other natural or man made systems that discharge to a surface water. o. Inlet protection may be needed prior to installation of the castings for the curbside catch basins. In that case, all storm sewer inlets shall be protected by at least fabric draped over the manhole with a steel plate holding the fabric in place. p. The plans shall be revised to show a rock construction entrance (minimum 75 feet in length) wherever construction traffic will access the site. The rock construction entrance shall be constructed in accordance with Chanhassen's Standard Detail 5301. Street cleaning of soil tracked onto public streets shall include daily street scraping and street sweeping as needed. q. At this time, the estimated total SWMP fee, due payable to the City at the time of final plat recording, is $74,570.50. The Arbors Planning Case 07-02 January 2, 2007 Page 18 of 18 r. The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g., Minnesota Pollution Control Agency, Minnesota Department of Natural Resources (for dewatering)) and comply with their conditions of approval." A TT ACHMENTS 1. Findings of Fact and Recommendation 2. Development Review Application 3. Reduced Copy Preliminary Plat 4. Reduced Copy Preliminary Utility Plan 5. Reduced Copy Preliminary Street Plan 6. Reduced Copy Preliminary Grading Plan 7. Reduced Copy Existing Tree Inventory 8. Reduced Copy Tree Inventory (After Primary Construction) 9. Reduced Copy Tree Inventory (After Secondary Construction) 10. Reduced Copy Site Landscape Plan 11. Park & Trail Map (partial) 12. Letter from Steven Von Bargen (Center Point Energy) to Robert Generous dated 12/19/06. 13. Public Hearing Notice and Mailing List g:\plan\2007 planning cases\07-02 the arbors\staff report the arbors.doc CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA FINDINGS OF FACT AND RECOMMENDATION INRE: Application the Carlson Custom Homes, Inc. request for a land use amendment from Comprehensive Land Use Map Amendment from Residential-Large Lot to Residential-Low Density on the westerly portion of Lot 1, Block 1, Zimmerman Farm 1st Addition; Rezoning from RR, Rural Residential, to RSF, Single Family Residential; and the Subdivision of approximately 20 acres into 22 lots, 3 outlots and public right-of-way for THE ARBORS. On January 2,2007, the Chanhassen Planning Commission met at its regularly scheduled meeting to consider the application. The Planning Commission conducted a public hearing on the proposed amendment and rezoning preceded by published and mailed notice. The Planning Commission heard testimony from all interested persons wishing to speak and now makes the following: FINDINGS OF FACT 1. The property is currently zoned Rural Residential, RR. 2. The property is guided in the Chanhassen Comprehensive Plan for Residential- Large Lot (the westerly 2.57 acres) and Residential- Low Density uses. 3. The legal description of the property is: Lots 1 and 2, Block 1, Zimmerman Farms 1 sl Addition. 4. The Zoning Ordinance directs the Planning Commission to consider six (6) possible adverse affects of the proposed amendment. The six (6) affects and our findings regarding them are: a. The proposed action has been considered in relation to the specific policies and provisions of and has been found to be consistent with the official City Comprehensive Plan. b. The proposed use is or will be compatible with the present and future land uses of the area. c. The proposed use conforms with all performance standards contained in the Zoning Ordinance. d. The proposed use will not tend to or actually depreciate the area in which it is proposed. 1 e. The proposed use can be accommodated with existing public services and will not overburden the city's service capacity. f. Traffic generation by the proposed use is within capabilities of streets serving the property. 5. The Subdivision Ordinance, City Code section 18-39, directs consideration of seven standards in considering approval of a subdivision. The City Council finds that all applicable standards have been met. The seven standards and our findings regarding them are: a. The proposed subdivision is consistent with the zoning ordinance, specifically the Single-Family Residential District standards; b. The proposed subdivision is consistent with all applicable city, county and regional plans including but not limited to the city's comprehensive plan; c. The physical characteristics of the site, including but not limited to topography, soils, vegetation, susceptibility to erosion and siltation, susceptibility to flooding, and storm water drainage are suitable for the proposed development; d. The proposed subdivision makes adequate provision for water supply, storm drainage, sewage disposal, streets, erosion control and all other improvements required by this chapter upon construction of Public Project #06-06. e. The proposed subdivision will not cause significant environmental damage; f. The proposed subdivision will not conflict with easements of record; and g. The proposed subdivision is not premature. The subdivision has upon construction of Public Project #06-06: 1) adequate storm water drainage. 2) adequate roads. 3) adequate sanitary sewer systems. 4) adequate off-site public improvements or support systems. 6. The planning report #07-02, dated January 2,2007, prepared by Robert Generous, et aI, is incorporated herein. 2 RECOMMENDA TION The Planning Commission recommends that the City Council approve a Comprehensive Land Use Map Amendment from Residential-Large Lot to Residential-Low Density on the westerly portion of Lot 1, Block 1, Zimmerman Farm 151 Addition; Rezoning from RR, Rural Residential, to RSF, Single Family Residential; and the preliminary plat approval of approximately 20 acres into 22 lots, 3 outlots and public right-of-way for THE ARBORS. ADOPTED by the Chanhassen Planning Commission this 2nd day of January, 2007. CHANHASSEN PLANNING COMMISSION BY: Its Chairman 3 Planning Case No. Ol-O~ CITY OF CHANHASSEN 7700 Market Boulevard - P.O. Box 147 Chanhassen, MN 55317 - (952) 227-1100 CITY OF CHANHASSEN RECEIVED DEe 0 1'2006 DEVELOPMENT REVIEW APPLICATION PLEASE PRINT Applicant Name and Address: c1k~ty; l??rc~ c: qr /5 c l2- CC4 5/Ci /Jj )10/11 e 5, / Ij) G , 7' IJ [) ga Ii AOo,il ~4~;rc;;;: V r; J/f'. G L1 -;, A: ~ 1 iV/if :5:3 '5 J q Contact: ..(76Jl Pe,I-PY5DI), 1Y,ylj~Z-/ Ali:M,~er- Phone:-1'.?..7 1./15- goLj3' Fax: Pj5Z tj15-~ol() Email: c/o)'l~/d [JeTer 60 C;O!7lCCt5/" tveT. , CHANHASSEN PLANNING DEPT Owner Name and Address: Parcel il );/.eHY ClJ14 P~Q.lill~ rYYand'; 7578 17 oq ;zrocd f{ it:fld (.:;" .A4)1 ;)a'$.5ffJ J ftl /t/ 5:7717 Gontact: LJ to aJ]f1CA. j:h"aA c! r Phone: '152 LJ 7'tJ - ClCJ-t bFax: Email: NOTE: Consultation with City staff is required prior to submittal, including review of development Plany ;J . //~'4)-:5-:j,) V Comprehensive Plan Amendment ~ L:- J Conditional Use Permit (CUP) Interim Use Permit (IUP) Non-conforming Use Permit Planned Unit Development* / Rezoning ~0--C (L-~' r: <?p) Sign Permits Sign Plan Review Site Plan Review (SPR)* / Ai'oJ'....J- "" 'if, , " / " . t: 1-;5 Subdivision* bOo';' I:; I 'JJ. I . 'J :-- '1"70 Temporary Sales Permit Ii Vacation of Right-of-Way/Easements (VAC) .000 v Variance (VAR) Wetland Alteration Permit (WAP) Zoning Appeal Zoning Ordinance Amendment ~Otification Sign - $200 (City to install and remove) X Escrow for Filing Fees/Attorney Cost** - $50 CUP/SPRNACNARlWAP/Metes & Bounds - $450 Minor SUB TOTAL FEE $ 1/ ;;2.5. "3 () (~~66 ::l,/"c-Ps) An additional fee of $3.00 per address within the public hearing notification area will be invoiced to the applicant prior to the public hearing. *Sixteen (16) full-size folded copies of the plans must be submitted, including an 8~" X 11" reduced, copy for each plan sheet along with a di~ital copy in TIFF-Group 4 (* .tif) format. **Escrow will be required for other applications through the development contract. Building material samples must be submitted with site plan reviews. SCANNED NOTE: When multiple applications are processed, the appropriate fee shall be charged for each application. n v PROJECT NAME: -rAe. ;/rboY5 . LOCATION:.vo;JVOOc! /(C;Cl(..-j) t:u'C.:;.1 tit"'! 7t!7"1 ~-eel LEGAL DESCRIPTI~N: /t:; I / a J Lo;-;Z J ~ /ooA / / z: -' /17 /IJ &Ymctfl ~y /Jt5 , /sTfidd/'i/o') . TOTAL ACREAGE; '." / tf.L: 4Cl't.5 WETLANDS PRESENT: X YES / . 7 N,? PRESENT ZONING: /'?UjN!f,! /CYls/c/en1;tlj Kf1 REQUESTED ZONING: R $-F" j(-e5J;){),JJ;;J c;j(79/e hluft P~ESENT LAND USE DESIGNATION: ~cjJ~pff;r;) '71v;;~;14;ti:ai tJ7L{/O~ /1t~ );~e j.;t j1J ~~ REQUESTED LAND USE DESIGNATION: ~ :f$ : eI~1/1'</ Aw' de)7~rry j . REASON FOR REQUEST: c1.- St{b~I/I'~/oj/7 1'.1/ WtJOtcyea'ft' /075 ;)11; f ?? J{'5r 1t7f5;. t:u'.c/:? cu7h/5 f'ur ;;('",;'17trac'1;u)~ C; I ~lJ /J/ew/ r -e 7/ 4 eic/l~ /Jell! e'7 a /A4i~. tJ e;r; c,71 M A?~e:f'. I This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information and plans required by applicable City Ordinance provisions. Before filing this application, you should confer with the Planning Department to determine the specific ordinance and procedural requirements applicable to your application. A determination of completeness of the application shall be made within 15 business days of application submittal. A written . notice of application deficiencies shall be mailed to the applicant within 15 business days of application. This is to certify that I am making application for the described action by the City and that I am responsible for complying with all City requirements with regard to this request. This application should be processed in my name and I am the party whom the City should contact regarding any matter pertaining to this application. I have attached a copy of proof of ownership (either copy of Owner's Duplicate Certificate of Title, Abstract of Title or purchase agreement), or I am the authorized person to make this application and the fee owner has also signed this application. I will keep myself informed of the deadlines for' submission of material and the progress of this application. I further understand that additional fees may be charged for .consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. The documents and information' have submitted are true and correct to the best of my knOWled/tJ,.;e. ~ -Ii ~ //y; -00 Si nature of Applicant' q!'.c)P/~~.f~:"'. pr. /p-.7 //jPlac..l./ Date SCANNED 4. / <;/ A 44/JI (.IJ) . Signa~ure of Fee Owner C<Jv/j (j?r, /~T !. ,Cry~ ~i/fl4).r;!/' /)!~f1 I~ T tV4't:I;7iCfi 4 11.~q. 010 Date G:\pLAN\fonns\Development Review Application.DOC Rev. 12/05 ::. , ~~3 0 , ~~~ , o. , ~~ "--' o~9 I' I In i; gog ,- ~o gg ~ ~~~ =~~ ~~ ~ E~~ ~~~ ~a ~~ I ~u~ ~ -~~ oi ~ i n i . ! . ! . ! t . \ ! \ ,I ! I 'I / . . k ~ -", '- ,/ i . z p: UJ CJ) c.c " CJ) = CJ <t:o = (!' IW "-l 2: CI) z> Z w cn~z <t:- .-l 2: :rW ~ c:: J: ::;: 00 0 0::;. LLW z mOZ oU: t-W U W c:: CI) (I) ~ LL.J CJ) <{a~ CJ) 0 a ~ wtj~ :r: z ::c CI) <( ~ 1-~5 :J: () 0 o~. ~~~< ~..~ '~~I i~i' ~~ ~ ~. ~ !!?I:i ~ ::~e~ ~~~~ ~i~~ t ~g~~ ~ ~~<(15 !~~~ ~ ~ tl ~ ~ ~~ ~ ~ ~~ ~~ :~~~~ 8 ~~ ~~~ ~Z~~Z i <~~ ~ ~~. ;jE~\'!~ g :~~ ;Ia~&~ ~s~~~~ ~ ~~~ ~~~ift ~~~~:~ ~~i~1 ~z~g~ ~x~5~g F~ .F ~~tW 4~~~~O g~~w~ :!i<~m :;{:< wo~,.:~j;ViFZ ~ffiili~ ~ iii ~:i'i~~~ ~u ~~8 ~i'itl@~ ~~ffi.~;~~5~~~ ~~~~g~ ~1Ii"a~.wffi~.~ ~~~~~a ~~~~~~:~~~.: ~~~~~~a~~~~w.'I@~I~ ~;I~~~.8~~~~~~~~~~~~ ...~~ ~:,-:~~~~~~g~B~~ ,... .0 Gi ~ ~ ~, 1 1 I' mIl .j I , ! , I ! , j ~ I j I t C/) w ~5z u...:C ;:;; 0;:;;- ",,02 ......_ W a: C/)U) <( => U) uc{ WZ:r: 02 :c C/)C{ 1-~5 u III - .-/ '-. I- U OW W-' 1-0 W~ ....]0.. 0.. ::;:>- O!::: UU W~ (J)W o 02 \ Z I- UJ 0.. (/) co w (/) C) Cl <(0 C) (!) IW C'J Z Z> Z <(- M Z IW :s U() 0 0.. u.W z 00: U UJ en E; W en C) <( 0 ~ 0 I : f!! ~ ; :.f i i ;~ i I (/) z h: !t{!'if z I:;j w :5 en (0 ~ 1. :;!J w en I c:::> a1 .~~1i n. Ul <CO c:::> (!) I :~I"I lu ~ :r:W '" z · "11 w z> Z ~l i~ I'i ... a: <C- ,...., ;Z I- "- :r:W ~ ~:;i 'I.! r en 0 00 ~ "w1fl "11 >- u.W c:::> .....~1... a ~ CO ~ ~!IH.I!iP 00: u ,. -.Il' ~ 0 r: l.1..J C/) lU!:IH It~- C/) ::; Z (3 a ~ ~~.<~"Pli!i w .t :::::: :~ !3! a: I:;j g n. w I (/) lD I \" \ ~ """" ~'i I i 1 j ! en w CI) 15z ~:I::; 0::;;- .....oz LLI I- W ~enen <(6~ w~~ J:~<l: I-~G u J~ ~~~g f~~~ ~I' ~ ~. ~ i ~~.~ ~ ~~o~ ~~I:. ~i~~ j tf;>)o,~ r ~~~~ ~m """" Ii /" ~ '" ~ ~~~ ~ :J:~~;;~ ~~~~8 ~i3g~~,": & z~~<C~ ~ ;~i~~ cu<_Oa. . ~. ~ ~ ~ e ~ ~ ; ~ & . ~ !~ ~ ' ~ ~ :: i!. e ;~; ~. ~ ~ ~. i ~~ ~;; llll! hi; i ~M ~nh~ · ~~i ~~ i~h~. e H~~~~~;~~ig ~ ti)!!O~!:::J~~t!~D~ ~~~j!5~~~ig~~i ~'hmmU~~ ::;i5 N Pi "'!del ... III ~. ~ ",I? 3:0.... ~ ~~. 'i; · ~, ~ ~ ~~~ g.. ; ~~ ~~h ..~.!~~ ,,;~ ~ t.!.~ .~. f~ i:~:l ~~g~~~; .~=h :~ .,,~~. 1 ~ih ~ ii ~ ~i i~ !i~1 ~h~!~ ~~~g. ~~ ~I~me l' :",~ ~ .~'.'. ~~ ~.~ ~ ~'~'w!~ ~~:~~ ~ F U~:~ ~ !;~~ ~ ;I I h ~~ H ~i ~i~ ~ ~m~m; '.!i;~ : :~ m!~5i >i ~i~ ~ · " :~ ~~ ~. S~ H ~ ~;:;~~~~~J ; ,I:! ! ,j '!h, I. Ill! i,l.! !, 'i ,~.; ,!, I, '!l!,!.!!; ~~b~ > '. i~~~~ ~~ ~..~ ~~~~. !~ ~_ ~.~! "~>~. ','o8<~'"ii ~&~!i ~ ~l ~"~ . .. 's.. ~.~" ~ ~ i!~ ~" g ~~..~." !iil!! i !! 111:1 ii ill; iili! Ii! hi i:!! l d !h!:;il!!!i ~~~~~. ~ ~" ;~~;; ~! Ui~ ~~M~s~ .,,~ ~~ ~~ ~~!.~ ~;~~:=~.~s ~~g~~: i I~~ ~sd; .'. .~~~I~.h~M~ ~~~ ~j i~ 'I-~~ h M~~M;. h~..". >\l ii".> , ~< i-< 8 a~~~ ii, ~ ~~ ~..~ '~.8..ii~. ~~~ ~~ ~~~~~ 'i~~i ~i ii'~'~hL '~ii S'~~";. ~. ia iT.~~~:= i;!!,; ji .I! l!:;. I!, !!Il:!j:;lllh I!! I! ,! l!ll: !l.!l!,!!, Sa~~i ,~~~~ h:~~ ~~~~~"~~hHhh:l'h.~;;~ ~~~ ,i .;L;nb! '~I~;~ -.h~ ~;'~~_~..h!i", . .. oil.:.,; _ . , " ~.. ~"P ...._. .".."~. . "~ h~ .~.=. ._..._'0 , . It-.l .'0.' ." ./ il I '- ~ 11 51 ~~;l ""J-./ ~~i I ." . . L: \ II I J: \ . \! / ,~ . l It) CD OJ 0 ~ 8 cO !:1 ~ q ~ U N ~ l/l 2 t;:; :5 w !L 0- :r W Cl l/l Z Cl 2 ~ W CO (!) is en c::> ~ ~ ~O c::> ~ "" :z Cl 0 IW :z & ~ Z> ....-l ::i c:(- Cl. <0: IW 0 :z 2 0 ~ at) w ::; z LLW U ~ W t;:; 00: W <( a:: :r: 0- w ~ Cl :r: ~ l/l U U ~ ! - !.- tI J . ! it} !hiil i(~i I f; d,- '11'.. , " II ./ ~ II II~, II ~ ~~ ~i . , 8m;;! j; i!~ ~... ~ ~~ i · in ~ ' "'........ ii ~ "I ~ I I . \ i \ " \ . k l Il . , C/1--~ " UJ w C/)~2 a::::I:li 0::;;- 02 '"" o-W .... UJ U) a:::::> ::! <t: ~:r: w02 I~~ I-~U u \ J ."1 a~ \ ! hl~ I I ..d ! J ~!I ~i e~rn ~~~~ f:z",z ~I~~ "- "- ~j~~ ~~~: ~~~~ I tl!im.... ~~CI:~ ~~~ '" ~:~i J~ !:i ~2 ~ ~ ~d is ~ lilc.; ~> or;.......... g as ~ " '-.... . --. J w w "'~ ~ ;~ tt ~~ ~ ~~ R ll:::?: .... 00 ~ t&.~ ~ B~ .... m~ ~ ~~u' 8 XB:?: ~ ~~vi ~u ;;~; o"u ~ ~~~ ~ ~~~ ~ *~~ z ~ ~ B ~ ~ '"- '"- '"- C\l '"- (\") '"- U/ lJr......H.,~ 110 II/III v.....".;;rHI..,J/YIYI" l D~ I I I 1 , ! 1 ..-/1 .-' WASHTA LAKE MINNE ~81,.to! ~G-!H.DG.~.':!t19) DO"-OI'f/lI~';R-"g+4.:;O ::~I.""~ ! d 'i 1 1 1 I I I j 1 1 ! ! i I ! k. 1 \ 1 j ! I t I 1 I ! ! j I ! 1 ! 1 ! I ! I I I ! 1 1 I ! 1 ! '" M ., 0 ~ cb '" <;> 0 N ~ lI) ~ ti fu w z 0 :r: l- ll) UJ co 0 z (/) ~ ~ w > ~ CJ) ~ ;?; <!o N Z W LL J:W z w 0 z> -' ~ a: <!- I- ;: J:W ~ Cl uU 2: z ci LLW UJ i= z ocr: c..:> ~ en W X ti ~ <! w Cl ~ w (3 :r: lI) en w CJ)~z O::I~ 0::;;- m~ffi ,.., en en u.. ::> en <CO<( z:l: woz Ien<( ..J:!: I-~U o 11 iUl II !fh J ~!J j~h I I \ J -=~ o~ ~o~< ~~2~ ~~~~ :e~Q~ ~~@~ lfIb~a ~~o~ ~~~~ ~i;~ 1 ~~~:; e: ~!~ i~ ~ ~~ C>~ ~ ~ ~ LO '" <0 0 Q tl> ~ 0 ~ N ZVl Qt;:; t-W U:c >-1i1 Vl Ii I a:: t- '" 0(1) ~ ! t-Z Z w 1 Z 0 LL W to Cl ~U 0 en Cl (!) ~ 1 ~~ N en Cl z T- I w< ~ <(0 N Z l:!;;; c5 :r:LU z 1 z> ..-l S T- t-ll:z <(- I :r:LU Cl. T- ffit;:; uU 0 z C'\I I w t;:w LLLU Q m T- 1 <~ 00: W <( I ~ 0 x I 0 ~ (V') I :J: T- o ~ II I j ! I ! I i , (I) ! l1J I cn~z ! I 0::: I::;: ! 0::;- I a:l ~m ! I o:::"'(/) ! :>(/) <(0< i ZI I LUOZ I~~ I ~~U i I 0 I I l I ! I ! i I ! ! C'\I i I I I I"~I f Ullj . ~!I jcdJ I 1 I, J o~ ioe. ~'~a ~~ij 'h ~ ~.i~ ..,1:; ~ ~ ~~o~ ~;I~ .i ~S~~ ~;;~~ ~:!i ~~ Ja ii d !:i g~ Su ~~ !~ ~ ~ :;, m z ,., 0 ~ ! ~ . 0 ~g~ u . .u i ~o=> C!3.~ bd~~ &' o Ou C> ~~~ z ii' ;;;~~ is a!. II ~ * ~~~ ~ ~5.... 08< U"'''' '" ~~: m 12 :<",\l! In 0*8 '" "'u>- ~ ~~~ In ~ ~~~ 0 muo z ()::E~ '" 0 Z=>o F:::l;(L 0 ~~~ ...".. "- '.", I - J I I l ~ ! ~ a~ ~~ I _....-/ TA NNEWASH ..", LAKE MI g40f.~ ,..t (N-G.~~\I_o. 1,:9' "'...I..(JrO........:~~_H..R.......-~,..t T:.~jCI ~ ! I ! ! ! I ! ! ~ ! j ! f 1 I I 1 i I j [ 1 l f l l l ! ! j l -V- i "I 1 1 I U) w CJ)~z C:::to ::;: Q::!;i [O~LU c:: ~l:l <(0<( z:C woz I~~ I-~U o ~ """ "'"- z o ~ ~ 8 1< <'i 15 ~ 1<'1<' I<' .....q 10 ~c E. z o F <.> ~ 8 >- ~ :> il' g " 5 ~ i3 '" ~ ::. o C) ~ 1;} ~ U) ~ ~g ~ ~ 6 I';. "l ri .... ~ ~~ ~ ~ ~ t=:8~~l..cn U- ~~~g;~ ~ 08 <r: 1l1-..... ~ .~:~~ ~~ l:1 ~g~ir~g ~ u~u<5o ~ ~~~~~~ ~ l:j~ji;l~~ ~ mUo~<8 ~ ~~~S ~5 ~o ~~~~ ~~ ~ ~ :io..a,. u ('I') "'"- lO ~ w ~ ~ ~ 01 ., -.-"l. '"" .) \ I .i~1 II lib. ~!f I EB=II I I \ ! = -~- i J _/ A ,~ ASHT 1129)82') ,.....,. NNEW ,..t (N.G.;~...,p. I LAKE M~/"fltI~~:'-,o"" 1fGCO/'"................. T;:~ z lli ~O :rW Z> <l:- :rW uU l1..W 00:: ~ U ~ h ~S ~ co c:J c:J C'-J T-f o U l.LJ a fu Cl (!) ;2 z ;2 it z w ~ 1 ~ u ~ ~._I III III r f ..I Iii !! ! III .. III III .i~I'I;! I~ ~~ III I ~ ~I~: i III ~'E ~ III Il.!lil~! III ~ " III ~ i I II . 'f ~ II ~ > PlfilW~ I ... 1!IIIHvl ~ IJ\ \ 1 I r m-dd - III III =-=0 ,- ~} J ~ I ~. ,., ..... ... "..~ ,. <J/;" ,. . 1 Ifh\ III l 1""'1$ /~I I t !/~" '\~Jo!;L T~~II If I" ~~1~Dd/~11 I ," ~., '/- '~!/wiL(~J~/ II I /TFff( tt:~ r=-''" .. I II L~-1~lJJt/~ I ,,"'."', _, ~~u "".."",1/ I 7 ,I. /lk/(&: fj{r:n/~ ffl./I~~_~ II wr--~ ~ ~ I -----41 ~. I !I! I ri::! /!I,-J~".~~/!ii;J II II Uf( \/ ~ //ff::::~1 \ I ~..". ".. \.. . ... ". "" "" L~jt ~ 71" I liJfJI )1~1t~~ ~L%Pfil /f i III ';~1Lt-i~~~'~f~W/I.~\ It8~r~~r H I '" '.,".-,- .~=-- ~ "-~~ic~~f~ III: III II' ~;- ~-. hl\\.:r.l~! \Ii II I I - ~--~ rkJ!\~ j 01 III I In 111111111 m I I . I ~l~ II 5'-'!li\l\ ~ " ~\ I] I I ~IIIIIIIIIIIIIIII iH j~ln!H H!ni! n I II \~ l-/JrJ I I ~~~II~Uii!!~ii!i!I~~t;i I ~~I I. I~ ffiffiffi filii s~ ~~ "~~e ~ =:;8 . =10 ~':~ q I I ~) I ':i--r- "ti t n~~~u ~H~J,i I ~ " l' ~~~1~""'-1 I ~1!ldjiU'~.l~:;t II ~nHii!~~Mt~~~ihH~~H~~, , '~_. I .~~B:~ II !~iUi!i~H~jHH~H~~i~~Hi~ I I \'-. N~ 'uasse4ue4::> JoqJv elll Ntrld 3dtf:JSONtrI 3115 ~ z fh at) UJ co 0 ~. If) = " LL ~fii ~ ~ en ~m N ~ .~. 00 T"""'I z Ii; LLW C,.) ~ ~ ocr: w ~ ~ Cl 2 u :IE u . 15 'U 5 ~g .--ou ~a~ ~m~- u. 0: t.i (1)(0 CD m ~~: .1 ~~~ ~ ~ ~.~ i 5 It) R~d:LL. .fiG) .~.~ tD'~-a 1r~'"'i t:o~~a, a:; ~ ~a:::~..-: ~f8. 8~~13';;; ~ ~~ ~~~-~~ 9aiij lii88~e 6m f o >.5-01 com.... !! g"f2 ~-~... "it~' t;: ii ~~lrm~ .t?~-'~~~ mE'" .0: ." eo 010 ~-;a .~-~~' ~ "'-NIC !~l~l ~I I I ./ J?Li?-,pe c;,/ ~ Glencfa;e-- ks Dr ~ >trr~;!~~/ ~cn L tV ......., .~ .:t:~~ o ~.~~ 8 "J:JO ~ Q:; .~ ..s & Z,' Immerman Road Minnesota Landscape Arboretum )/ D D Minnesota Landscape Arboretum G CenterPoint@ Energy 700 West Linden Avenue PO Box 1165 Minneapolis, MN 55440-1165 December 19, 2006 Robert Generous Senior Planner City of Chanhassen 690 City Center Drive, P.O. Box 147 Chanhassen, MN. 55317 RE: Preliminary Plat of The Arbors Dear Mr. Generous: With reference to the preliminary plat of The Arbors, CenterPoint Energy currently has two easements crossing this plat. A drawing is enclosed for reference. CenterPoint Energy pipelines are operated and maintained in accordance with the Code of Federal Regulations, Part 192, Title 49, "Transportation of Natural and Other Gasses by Pipeline: Minimum Federal Safety Standards. CenterPoint Energy's easement number 1992-60 and 1992-61. The easements are recorded with the Carver County Registrar of Titles as document number T74942 and as document number T74943. To aid in an acceptable development in the easement area, I have enclosed a copy of CenterPoint Energy's Guidelines for Construction and/or Encroachment within Gas Pipeline Easements. . Please instruct the developer to use these Guidelines when making the necessary changes to their plans in the easement area. Additionally these easements are not referenced on the plat and must be included. Subsequent to the changes mentioned above, please send a set of the final plans to me at the address below for approval. Respectfully, CENTERPOINT ENERGY S~ v~6-y-- Steven Von Bargen Right-of-Way Administrator pc: Cherie Monson, Sales Consultant Andrew Balgobin, Administration Engineer CENTERPOINT ENERGY RESOURCES CORP., D.B.A. CENTERPOINT ENERGY MINNESOTA GAS GUIDELINES FOR CONSTRUCTION AND/OR ENCROACHMENT WITHIN GAS PIPELINE EASEMENTS The following are general requirements only. CenterPoint Energy must inspect the area and review construction plans. Final construction olans must be reviewed and aooroved. in writing. by Center Point Energy Engineering orior to the start of any construction within Center Point Energy's easement. Grading and utility olans showing CenterPoint Energy's aooroval must be on site and available to CenterPoint Energy oersonnel during construction within the easement. 1. Soil shall not be removed or placed in a manner that will result in earth or pavement cover over the pipeline of less than three feet or more than five feet unless otherwise approved. A level area of not less than six feet on each side of the pipeline shall be maintained at all times. Slope beyond 6' from the pipeline shall not be steeper than 4 to 1, unless otherwise agreed. Any amount of cut or fill, within the 4 to 1 slope area, shall increase the width of the level area on each side of the pipeline by that same footage of cut or fill. Blasting in the vicinity of any pipeline requires review and written approval by a CenterPoint Energy engineer prior to start. The pipeline must be fully accessible at all times before. during, and after the construction. 2. Landscaping over and within ten feet on each side of the pipeline is restricted to grass cover only. Beyond ten feet on each side of the pipeline. upright plantings are restricted to, and shall not exceed an eventual growth height of six (6) feet. No trees shall be planted or remain within the easement. Any trees, removed by CenterPoint Energy from within the easement, while performing maintenance activities shall not be replaced by CenterPoint Energy or the current owner. their successors or assigns. 3. Any buried utility line installed across the in-place pipeline shall be placed below the pipeline with no less than one foot of vertical separation, padded with well compacted (95% Standard Procter) and cross at an angle between 45 degrees and 90 degrees from the pipeline unless otherwise approved. 4. With prior CenterPoint Energy approval by a Senior Engineer or Right of Way Administrator, parking lots, perpendicular driveways or roadways of portland cement concrete or asphaltic concrete (or similar materials) may be placed within the easement, but shall be limited in width when crossing the easement to minimize the interference with or access to the pipeline for inspection and maintenance. Any contractor equipment movement over the pipeline shall only be at an angle greater than 45 degrees to the pipeline, and must be on a constructed haul road composed of well-graded gravel, 3 feet thick, for a minimum distance of ten feet on each side of the pipeline Permanent structures including, but not limited to, buildings, signs, screen walls, decks. tennis courts, and swimming pools are not allowed under any circumstances within the easement. Installations including, but not limited to, retaining walls and fences crossing the pipeline require approval by the CenterPoint Energy Senior Engineer or the Right of Way Administrator, before construction. All fences crossing the pipeline must have a 10-foot wide gate centered over the pipeline. All fences installed parallel with the pipeline will maintain a minimum of 10 feet of separation from the pipeline. 5. Once CenterPoint Energy and the Owner, Developer or Contractor have reached an agreement, CenterPoint Energy shall be given at least two working days advance notice of planned construction activity so arrangements can be made for CenterPoint Energy Personnel to monitor the construction. CenterPoint Energy will locate and stake the pipeline, but will not assume responsibility to expose or backfill the pipeline or to determine the actual elevation of the in-place pipeline. Excavation to expose the pipeline shall be parallel to the pipeline. CenterPoint Energy Personnel must be present during this excavation. Backfill must be free of rocks and shall be compacted to 95% Standard Procter. 6. Any subsequent damage or removals caused by CenterPoint Energy in the exercise of its easements rights, of any and all of those certain foreign constructions (landscaping, driveway, roadway, utility lines, etc.) which may be permitted within the easement area, will be permanently repaired or replaced at the owner's or contractor's (not CenterPoint Energy's) expense. 7. In accordance with Federal Department of Transportation Codes, CenterPoint Energy must place markers over transmission pipelines. These markers will be placed at all road crossings, in back of curb or at property line, at changes of direction and periodically along the pipeline. All natural gas transmission line locating markers placed by CenterPoint Energy will not be removed. If you have any questions call 612.321.5426 or 612.321.5381. January 20, 2005 GENERAL LOCATION ONLY. DO NOT USE TO LOCATE FOR EXCAVATION. CALL 1-800-252-1166 FOR ONSITE LOCATIONS AND STAKING. ~ ~ r 151D ~1S,1 U :J ~ '..,.IJ~Q .Aa l ...5 I / ~ I s /~ l-i 7tP~O / ~ I ..... . I Plotted by: gasread Plot Date: 12/19/2006 Field 1 : Field2: Scale: 1": 150 ' @ North CITY OF CHANHASSEN AFFIDAVIT OF MAILING NOTICE ST ATE OF MINNESOTA) ) ss. COUNTY OF CARVER ) I, Karen J. Engelhardt, being first duly sworn, on oath deposes that she is and was on December 21, 2006, the duly qualified and acting Deputy Clerk of the City of Chanhassen, Minnesota; that on said date she caused to be mailed a copy of the attached notice of Public Hearing for THE ARBORS - Planning Case 07-02 to the persons named on attached Exhibit "A", by enclosing a copy of said notice in an envelope addressed to such owner, and depositing the envelopes addressed to all such owners in the United States mail with postage fully prepaid thereon; that the names and addresses of such owners were those appearing as such by the records of the County Treasurer, Carver County, Minnesota, and by other appropriate records. Subscribed and sworn to before me this~day of DCI Pry, bP r , 2006. ~ - \ . 0tA!~ I ' ~ I i'" .~~i KIM T. MEUWISSEN ~.... /fi,5 Notary Public-Minnesota < .,;...' My Commission Expires Jan 31, 2010 Ol C ; 0) 0) :i: Ol5 c.- .- II) 1l- II) m._ 0) E J:E .~ 0 :cO ::IOl a.c -'c o c 0) m 0- ;0. o c ZO) II) II) m .c c m .c o Ol C ; 0) 0) :i: c 0)0 .S 'iij (ij .~ 0) E J:E .~ 0 :cO ::10) a.c -c o c 0) m 0- ._ a. - o c zO) II) II) m .c c m .c o CJ) 0:: o .a.~'-m "0 LLello$OO:: c U):E-1 iil a: C1l...!...-;:::<( E. OUl~~W g .gJ ......:J ffi C') J: .;:: a3 ~ " "0 "0 '7 tll 9 +:; C .- c :?: ~ tll ~ C ctl ~ ctl ctl .!!l ~ in .gs -1 a: $ ~ Qi .c - ..... '(ii C1l 0 0 15 .!:! I-'OQ)Q)>.....- "0 .~~a:.iij.....C\JE c EOl'" cOC\Jg CIl . "E ~ ~ C1l -1 0 .;:: ;S c..O..:::...~Q).....~ o Ol 0 a::J C1l e>.~ c '0 0-50 "'ellCll+:; Cll "cl'-- -a.-1Q)CIl "tl I'-- 0 I'-- a: E ...!... ... 'x "0 .- CilgClla:OjggQ)u gl~ 1'--'0'" EO co15 C a:l!! o c Q) 0 ~ Q) C\J '^..... Cll> 91.0 ... ell "0 _ C v, '-' o .". E - +:; .- 0 0 Q) 0 Cll C\JOl C)cCll '-Eo'- ."OellcQ)Q)c'i6 ~Cll C\J ci .s= .- "0 a: 0 u 0 0>:5 >-.~ 0 c'(ii E 'iij ea I 0 c: eo a3 '0 ~ Q) 0 .:; > E 0 0 :J> c C1la:~:c"O OO.!!! SOlOl :JO::~_... S~ I'--c. '" 0... .- C -.. 'v w LO III -,-500EC1l:JUl:JI'--E -c -ellECJ)C1l0"O >-.- - i.ii LL . - U C C S ellQiell ">-COell:;::; "OcaI ~~ C~ ea CIl I'--IlI ~= > CJo>C1l C';::;:: C')o :J E :!:: Q).!; E Q) ea ctl LO.2 I-:::>Oa:(f)<(O>O I'--c:( t tll 1ii C1l E i= ~ C1l - ea C ea Ul o a. o ... a.. +.: .. C >- C eat:: 0 .~ C1l:;:: ~ c.. ea gog <(D:-I C o :;:: ea u o -I CJ) ~ 0:: 1ii 0 "0 LLg.~l1~ ;, (f)a: :E -,l .Q ..... tll C1l~s"'" E. OUl+:;oW g.gJ ....._:J ffiC')J: .;:: a3 (ij " "0 "0 '7 tll i5 "0 +:; C .- c :?: Oltll>ceaCllellell ~~in.gs-l~$~ Qi .c - ..... '(ii C1l 0 0 15 .!:! ~~~~'~=5;jE g EOJell C C\J:Q: CIl ."E,"",~C1l-10';:: :i:_ c..o..:::...~Q).....g: o OJ 0 a::J C1l e>.~ c '0 0-50 "'ellCll+:; Cll "cl'-- -a.-1Q)CIl "tl I'-- 0 I'-- a: E . ....x "0 .- -:;::12 a:O~~Q)cSellCll w c CIl .- 'v 0 Cll 1'--'0'" EOco15 ca:l!! Oc~o~Q)C\J... "OCll> 091........ell"O_...CIl ~ E - +:; .- 0 0 Q) 0 e ":~ellc)C~C:;::E~Cll C\J r:i.s= .5 .gs a: 0 ~ 0 0>:5 >-.~ 0 c'(ii E 'iij ea I 0 c: eo a3'- ~ Q) 0':; > E 0 0 :J> g C1la:~:;:;"O OO.!!! cOl:JO::>- "'c.....l'--c. ell OJ 0 ...='E.o ell CIl LOlli -,-500 E C1l~ UlO I'--E ~c -ellE C1l "Oc: .......;: - i.ii LL . - U C C 0 ellOlellQ) "CCOell'- -g Iii ~ 5- ~ ~ .~ .!2 El I'-- 1i ~ E :!: Q).~ E Q) ~ eo f2.E I-:::>Oa:U)<(O>O I'--c:( C1l E i= ~ C1l - ea C ea Ul o a. o ... a.. - C ea u ~ <( C o :;:: ea u o -I Q)-g~ CIl .s=o..... Q) ......s="O CIl +--'-co: en :JOQ) :J .8 ~ = t) .~_ ell 0>= Q) :J '0; ~ '0' ~ "0 o C .= Q. ~ .2 >-Q)jg "0"0 CIl E .s= () Q)'" .!a ......... CIlc..cS .2EQ)"oQ)=E .!; e.s 8. g-.s -g E 0- -Q)....cc..O .....s g'i.ii c..o Q)O .!a c.. +:; 0> Q) CIl.s= Q) ~CQ)c.sc""'.s= ,-,,'- Q) .- ell E ..... 'E .!; E ~ 15 e. 0 -g ffi2Q)=~""'~ell .s=.g.s=.2Q)ffi"O"O u 0 ;, Q) .~ CIl ~ Q) = ..... c .s= Q) ~.- CIl .0 "0 .;:: ..... > c.. Q) .Q :JC:J.s=o_~u c.. ell 0 g> c = .... .!a .!a ..... 0 ell ~ Q) 0> .s ~ t5 .c Q) ceo.!; - :J Q) ..... .2= ell CIl .... ~ o g"O Ol o>,g C ffi u Q)........c=c..Q)~Q) CIl c..';:: .- c.. ~'o O_CIlCllell~ellEg~ 2-c:.c Q):::: Q) E:O.... :Jell......s=ell.s=O::JQ) c..,gs,gcnl-Oo...s Q) c.. 0 .0 .r:: c...o:J . I- ell ell c..,... C\i t'? ..; UlC) C C C1l._ 0.- a.C1l ea C1l J::E _C1l ea~ ~- 3:'i6 .8 E c J!! ..... .s=.... .0:;:- '(ii CIl 0 c ea oW 'S: .~ CIl Q) Q) ~ -g Q) :JCE.s=>'" CIl :J.o Q)..........ea~ ooc:::::.... ~ ffi ~ mE';:: ~.8 .8 l- e. t)C~Q)Q)CIl_C1l Ol E ~ ~ E ~ '0.. ~;:: ci c :EOctl..o-E8E~C ~ C\J u .s= :J 0 0 .- Q) oQ)cCll.....Q),S!.o'G) E . CIl ell 0 >-32.- ea C1l Q) t;ffi-5~g-6.!!!"E .s c: e.'cj ~ u Q.;:: ,S! C Q) ell -@OQ)-...UlO ....:0..... .s=c=o'-'- .2,,'S;;~~uo~-"Q;~ Q) Cil L '0' 0 :J Q) :::: t:: := .- .oQ)3lQ.wO>20UlE CIl~-- c>-ell(f)a..oE C,-,'CIlCll _.s= C1l ellell~:.c~-:o ....~o e. c.. c ..... 15 ,... ..... Ol:t: ;> 0 Q) ~ E S Cil C') "S .!; .s '0 c: .s=~co ;:a.a>UlC1l.5 .....Q) CIl Q).o~ . Q) Q) C1l'OC Q)..... CIl ell EI'--C\J.s= E~'" C uCllQ) I-a.ea CIl Q) ell c Q) C\J .!a Q) C1l -a.. o '~.s= 0 N .s= ..... e c Q) >-.,,:!:: ..... C ~ C1l ..... c.. ell .o~, - - 0 - c .s= E CIl en CIl 0.- C ~ ellCll 0 .......... CIl - - U :JellcQ)CIlOo ~ c'cj CIl e Q) u '-E C1l _ :J 0'- . 0 Q) Q) E c C'" o ~..... c c E ell E'- 0 >- Q) ::: == Q) ,g 0 -6 0 i: .;: :=.s ~2(9 c..u ell 0 0 C. ~.. Ul.:!l C C o C1l :;::E ~ E ~ 0 00 "OQ) .8 E ~ ~>- Q)0.s= '^:!::.s=.... = .s=o..... w CIl CIl 0 ..... eaea =€~ i ~ ~ CIl ffi ~i :J0Q) CIl Q) :J.o:JffiE~~~ .8~= ~ ~ ~ ooc.....t ~ ello>= u CIl __>-mE:!::ellOC1l1- :::l '0; ~ Q) '6 ~c.. ~ ~ g- -;;;.0_ C1l '- oe t5 ~ t5 C +-' Q) oc_ C ellQ)_"O_=~ E>- ~ jg c.. .~ 0 Ol E c ~ E Q) g- 3: -;;; .: .........0 ie ~ ~Q) EOell.o.suE>~ o E Q)" CIl c..cS'E- C\J u.s= ~ 0 Q) C1l 0'- - CIlOQ)= Q) OQ)C ..... -.o'G) .5 e .;; c. c...c..o EEl C/) ctS 0 >. ~.- C'CS OJ 0:: cii2 e ~ 6,0 Q) t; ffi~ ~ g-6.!!!" E .....:::lcCllc..OQ)O .s c:e.~~uQ.;::,S!c .!a c..+:; OlQ) CIl.s= Q) ell _= 0 Q)_... Ul 0 o>~i~.sc""'.s ~ ~""'~.s=c=o-- .!; c E ~ - ~ E "0 0.. 'S;; ~ ~ u 0 ~ - a; ~ eo~ oOc..oc ~Cil~"Oo:::lQ)~t:::=- Q)E~~~c~ell 'OQ)CIlQ.wo>.....oUlE .s= 0 ..... - .~ Q)"O "0 CIl 0>....... C >- ell (f) a..o E UOOlQ)~CIlQ)Q) Cell~CIlQ)-.s= C1lC1l0 =.....C.s=LQ)>CIl ellc.. .:.c c-: 0 ....~O .o"O-.....Q)....~o e. C.....'O,........Ol:t:;> :::lc~.s=6c..u~ Q)~ESCilC')"S~.s'O~ c..ellog>ca~CIl .s=~co ;:a.a>UlC1lS .!a i.ii . 0 ell ~ Q) .- ~ CIl Q) .g ~ ~ Q) Q) C1l '0 C .sQ)t).cQ)ceog' Q)t)~Q)EC\J.s=E~l-a~ _:::lQ).....>ell - CIlQ)ell C\JCIlQ) o CJ'~ Ol'- U CIl ~ ~ .s= c Q) I .- C1l ii: Q)Q)ecO>=cQ)u.8~c~>-C\J:!::.sc~ CIl .... c..';:: a c.. Q) .s= .~ ..... c.. ell .0 LO - _ 0 _ C1l O~CIlell~c..Euoc_.s=ECIlen$o~c;:: c....... .- Q) ell .- ~ ell oW U 0 :::l ..... C Q) CIl 0 ....c.s=.s==Q)E:O....~>-~CIloellQ)U- 0 :::lell..... ell.s=O:::lQ) :!::uo....Q)EcEC1l- c..,g5,g~I-Oo...s~o~"",~c ellES~ Q)c..o.o >-Q)>~Q)oE>o;_ .s= c...o :::l > (ij .s= 0"0 ... = l-ellellc..""N~"; :=.s~.....(9c..UellOO~ >-C t::o C1l:;:: a.ea o U ... 0 a..-I UlC) C C C1l._ 0.- a.C1l ea C1l J::E _C1l ea~ ~- 3:ili ~.. Ul.:!l C C o C1l :;::E ~ E ~ 0 00 Q) W ID -0 ~ ~ c :5 .o~ ._ID ~ u~ .~ 0 .~ ~ ~ ~:: c >.'~ ~ CD ~ .9 Q3(])u ~'~(lj 0::0 (Qcg>.25 c.cc ~5w "CWW 2 g<~ CD~ CD.~O <(Q)~ ~~~ ~~ a.a5~ ~.~ -@~~ 1?,E g E(ij ~ (lj;'~ fij-]? g ~ [; -;; ~g ra Q) E..o 0 Q) t:.c . Q) a...... Q).... ..... >.+= ~..o~ o....a.~rao(ij.cE- -0 cu_o Wo ~~e(lja.~E;o~ 5- m~c ~~.9 ....(lja.E~E~wuE .~ S~! ~m~ ~~!-g~~~~.9i ~~ ~~~ rn ..c Cf.) c .- ... ('(J (5 0.._ =' (f) a. U co :2: 0 0 ~uU ra~SE~~~Cf.)5ID CD> .0'0 E :.= .~ c =s: 0 2' :: (f) '0 fa 5 0 :5 cu (5 >- Q.) ._..0..0 .Q>"O.->.ra....uErn ....0 c~E ~&~ ~~~!~Q)~o_E s~ Cl)U~ ~(ljQ) ~~(lj-O~EID~~ u~ ~~c 'O~5 0 ~~~E.....o.~~ro -s_ "0-0 ~'5o ~g>~~O-E6~~a:: g~ TI.9~ (ijg<Ud>c~-.~EQ):::3:Q)~ UU) 5~c c .... Q) C Q) Q) ,2 u.= E.~ "'0 ~ - ca ~ 0 c.:::: .Q~-~.SE~-g~-gc~.s5 ~~ U!.s :6 55 8 Q) ai c 5. co - Q) ~ ~ ~ ';: 'S; 0 ~ Q) en gEl!) E ~.~ Q) g>:Jl ~'w g Ene g. (3 -::; g O~~~(ij.~5.c~Q)~~>-Q) a.~ Q)C'2 ~~j;~~~m[;~EQ)~~ s.~ 5~~ ~ <( >- a5 -g 0:; ~ ~-6 ,g ~ -a~ -g:5 @-g 0:: .5Q)t=TIU~~~cS-Eo go 'cnQ) ~ "8 ~ ~ .S g> ~ 5.:= : ffi ~ 8 ~ :; :5 m .s = cue.....~~omg~Eg.~~ 8~ ~m~ ~~~~=~~=g~~~~~rn~~ ~~c ~roro~c~=mucm~~g~~~ ~'i8 $ 2 ~.s g Q)'i ~ >..!2 Eo."'" a. Q.) .- "0 a. c m '-c'-~ro~ -..... .ctSrom mmo mo~ OOQ)~.-u-Eu5~m=~Q)E.~~ ~'-rn ~EQ.)>.li~Q)~Q)g~rou=_~~ .....rom ~u~iO'.~~~.E~~~~.O~B ~~a Q.)~~0.~~~g~2~.~.Qg~~~.~fr~ ~ E g u ~ ~ ~ '(1; :::: m.!2 ~ ~ e 8 ~'ID en ~ rn 8 o<rn2Err.~g~uQ)gs>.a.c~gmQ) ~c.S~~~cE~ .c~a. ~~Q)O'(I;=~ aJ E.! "E (u Cf) >. g E 0 g rn m g. ~ u C = ~ .~ en ~ o~OE~D~OU~~~Q)~m~~~E.~- ~.~~.~~~g~~~.~~E~~(uj"O~~~ ..=> ~() ~ DE.! E~U Q.) 2 $c75~.E 5}a;"* u g>-g ~~~~ .~.~~~~E~~ .grn~Q)~~~~ ~cQ.).Qga.~OCf)o~.....S"ES~&E$.E~U cu ~ a.~~ ~ Q) ~~..... u ~oo{g o~ ~,g.s c ~.s g~E.~.~ro~rngg~~$c~Q)"O"O>.E.!u~ ~ DE Cf)Cf)"o~~wQ)ctSctSc~aQ.)c~c ~ en() a.S ~"t c o.{g -c:= U5 oo:c ~ ~ g C'd Q) &.9 ::.~ ~() g ~8.~.~~.~ g $~.~-g o:;E:5 ~'g ~~cg~~~D~E.~gg.....~rn~8~~~:c > .~ 'E.- ~ a. m c.. IV E E () Q.) ~ c Cf) rn c U ~ a ..... ~E2~li~~~~aE>.~.~~a.IDIV.~B~~ ~~~~~~~~~~85~~~~~~K~~g C3.. ... ~ Q) -~ .~Q) ! c :5 .at ~"O~ ~ 0 .~ ~ ~ ~:: ~ >.~ ~ <D ~ .9 ffiQ)u ~'~rn ~o rncg.2= c~~ .....~Q.) "OQ)(/) Q) U<._ Q)~ Q)Cf)a ~i~ ~~~ ~~ ~~~ ~.~ ~'i~ -g S g E (G ~ ctS >.~ rn ~ g> ~ ~ Q) 5 ~ rn m E -e a Q) t.c . Q) a. I... Q) I... I... >.:0:::: :a5 ..0 ~ 8 Q) c..1tj rn.Q,]2 :5 E ~ ~ .9 ~ ::= g ~ga 0>>eEO'~~~8Q) OQ) Q)'Q) en'~ ; ~ ~ ~"O 0 <D.g ~ .9 ~ ~~ ~ g':; ~~'(I; ~.~=~~a~~Cf)[ 'O~ ~g~ =>uU ctSen5E~E~~:5w 0>> ()u E ~ .92., c ~ 0 $ 3:'iI).o ~ ~ 0 .:; ctS 15 >. 0> ._..0..0 .Q~D.->.rn~"OEC>> ~o c~E ~~~ ro~~~~Q)~o_.5 s~ Cf)()~ SctSQ) ~oom;~1tjE~~~ ~~ ~~c -g.~= ~ci~~~;8~~~ c~ ~~~ ~g~rn~.~.8.~~~~.i~i? 8U5 g~~ ~ .... Q) C 0> Q).9 "O.~ E.~ "0 ~ ..... rn ~ g 8.:::: .Q22~.SE~~~-gc~$:5 ~~ u~s :a ~ g 0> ~ ~ ~ co ~ Q) ~ ~ i;"i 'S; 0 ~ Q) (f) CEl!)E~-Q)rn:JlE~uE~ og. (3~g O"ocQ)=~~c~ctSQ)O 0 a I... .....~ U~~srn~~i~~~a.~~ a~ ~.5~ ~E.~"O~ES~~oEo>~u ~'ID ~~E.! ~ < >. ~ -g 0"0 U >.~ g ~ a~ 0>':; g-g ~ '-Q)t=-()Q)~~cCf)""'Eo rnrn 'c-O> aJ"OQ)cogo~~Erncwo~ ~c rngS a: a a. 0 .- c c.. 0.== Q) Q) C U Cf) :J U Q) ._ _ c()e-~'2oo>g~Eg.~~ 8~ ~Q)~ E.!~~2S~~Sg~~~i?~~~~ ~~c ~ctSro's;c~-<D()cQ)=-g.5wl... :J'~o 2 2 ~.s ~ Q) ~ ~ >.E.! E fr.9 I... ID '-"0 a. U '-C'-~CO~ S!...... .C'drnQ)o..Q)cvo Q)5~ ~Q)~'-.Q=E~5~0>=:J~E~~ .:;~ctS ~EQ)~a<(2==wc(l)ctS"O-:=$o (I)B~ C "0 "- a. .- ~ ~'c ~ Cf) ~ ~ U C D U ~ \oJ Q)~~~~~~~~2~.~.~g~~~.~fr~ KEg u ~ ~ ~ 'iI) ~ 0>.!2 ~ ~ e 8 ~'Qj en ~ ca 8 o <( ctS 2 "E rr '.~ g a: "0 Q) g S >. a. C ~ g <D 0> ~c.5~~~cE:J .cl...o. ~~Q)o'~S~ ~.!2"E (u Cf) >.~ E 0 5 C'd ~ ~ ~ () e':; ~ .~ o~ o[Lo-Q).c"'ou.,~. _Q)O~Q) EC- ~~~'S~~~U~~.5~~~':;~~:E~~ c'-G>'c~IDQ)Gccmoca~a.~o>oro"O .. => ~ ~ OE.! E~ 0> Q) 2 ~oo 3:.9 Cf)a;oo () g>a.> ~i~~ .~'~~~SE~2 .g~~a.>~~~~ :Jc~.Qga.ctSO~o~""'~~S=&E2'E~U ~ ~ a.~~ ~ Q) ~ ~~ U ~(f)~ o~ ~.9.S c ~.5 uo~E~'jrn~~go~~~c~a.>uu>.E.!"OB oE (I)Cf)UI...~~Q)C'drnc~oQ)c~c 0:. ~ u o.s ~ t c a. {g ~c := U5 oo:c ~ ~ g rn Q) &.9 ~ .~ ~ () 5 ~ 8. ~ .~ ~ .~ g $ ~ .~ -g 0 :; ~ :5 ~. g ~.~cg~~~o~E.~gg-~ctS~8!~~~ ~~'~'E~~~~~EE()~~~~.~~~~8ID ~g~~frE~Q)Q)8~~.5'~~E~~~~~~ _CIlOC[L"'CIl~-::;-::;~UU~:;;~w<",~m",w 0.. ... ...- ---I Disclaimer This map is neither a legally recorded map nor a survey and is not intended to be used as one. This map is a compilation of records, information and data located in various city, county, state and federal offices and other sources regarding the area shown, and is to be used for reference purposes only. The City does not warrant that the Geographic Information System (GIS) Data used to prepare this map are error free, and the City does not represent that the GIS Data can be used for navigational, tracking or any other purpose requiring exacting measurement of distance or direction or precision in the depiction of geographic features. If errors or discrepancies are found please contact 952-227.1107. The preceding disclaimer is provided pursuant to Minnesota Statutes ~466.03, Subd. 21 (2000), and the user of this map acknowledges that the City shall not be liable for any damages, and expressly waives all claims, and agrees to defend, indemnify, and hold harmless the City from any and all claims brought by User, its employees or agents, or third parties which arise out of the use(s access or use of data provided. ...- '-----~ ,::;;.------:;------... I Disclaimer This map is neither a legally recorded map nor a survey and is not intended to be used as one. This map is a compilation of records, information and data located in various city, county, state and federal offices and other sources regarding the area shown, and is to be used for reference purposes only. The City does not warrant that the Geographic Information System (GIS) Data used to prepare this map are error free, and the City does not represent that the GIS Data can be used for navigational, tracking or any other purpose requiring exacting measurement of distance or direction or precision in the depiction of geographic features. If errors or discrepancies are found please contact 952-227-1107. The preceding disclaimer is provided pursuant to Minnesota Statutes ~466.03, Subd. 21 (2000), and the user of this map acknowledges that the City shall not be liable for any damages, and expressly waives all claims, and agrees to defend, indemnify, and hold harmless the City from any and all claims brought by User, its employees or agents, or third parties which arise out of the user's access or use of data provided. r Public Hearing Notification Area (500+ feet) The Arbors Planning Case No. 07-02 City of Chanhassen Tanadoona Drive Lake Minnewashta Dogwood Rd Tanadoona Drive ) 1 4 y w H ( d v l B Dogwood Rd e n i t l SUBJECT e z a H PROPERTY Highwood Dr Century Ct W . t C . 7 m l 8 P Arboretum Vill. Ln. u t e h t g e e gra S o al l b i l V r t l r i i V A r C A rbo retu h m V i e l la g e c C e t a r C v e g m o a C t l u l i V t e m r h u o C c t n ea b L ro o r o C a A b c r h A D Village Cir Coach Pl r T e r g A r d b o a r Village Crt e it u l ml i V C a o e R g a y l l i V a B Village Lane m u n t e r o Ao r b s Village St m C ri Village Pl S r t a t tum ebore Bo ul HArev 5 a D wy rd m u t e r o b r A GETSCH CORP 1069 DORLAND RD S MAPLEWOOD, MN 55119-3576 REGENTS OF UNIV OF MINNESOTA 319 15TH AVE SE 424 DON HOWE BLDG MINNEAPOLIS, MN 55455-0118 JOHN & JOYCE FOLEY 4804 DUN BERRY LN MINNEAPOLIS, MN 55435-1537 ROGER W OAS 7301 DOGWOOD EXCELSIOR, MN 55331-8015 JANET M QUIST & 7331 DOGWOOD EXCELSIOR, MN 55331-8015 GETSCH CORP 7530 DOGWOOD RD EXCELSIOR, MN 55331-8053 PEMTOM COMPANY 7597 ANAGRAM DR EDEN PRAIRIE, MN 55344-7399 ROBERTW & MARY M HAGEMAN & 7660 CRIMSON BAY RD CHASKA, MN 55318-9603 MINNESOTA ST HORTICULTURAL U OF M RM 1 HORTICULTURE BLDG ST PAUL, MN 55108- CARLSON CUSTOM HOMES INC 1440 BAVARIAN SHORES DR CHASKA, MN 55318-1547 GRETCHEN L F STARKS 3301 TANADOONA DR EXCELSIOR, MN 55331-8048 GETSCH CORP 5404 GLENGARRY PKY EDINA, MN 55436-2006 SCOTT A VERGIN 7311 DOGWOOD EXCELSIOR, MN 55331-8015 RICHARD C LUNDELL 7341 DOGWOOD EXCELSIOR, MN 55331-8015 CHARLES & JENNIFER NEWELL 7550 DOGWOOD RD EXCELSIOR, MN 55331-8053 PAUL GREGORY & MARY S SUMNERS 7620 CRIMSON BAY RD CHASKA, MN 55318-9603 ROB M & CALI L OLSON 7700 CRIMSON BAY RD CHASKA, MN 55318-9623 WESTWOOD COMMUNITY CHURCH 3121 WESTWOOD DR EXCELSIOR, MN 55331-8044 PETERSON REVOCABLE TRUST 3301 T ANADOONA DR EXCELSIOR, MN 55331-8048 MPLS COUNCIL OF CAMPFIRE GIRLS 640 GRANT ST E MINNEAPOLIS, MN 55404-1431 L MARTIN & DONNA R JONES 7321 DOGWOOD EXCELSIOR, MN 55331-8015 ALAN H & KAREN L DIRKS 7431 DOGWOOD EXCELSIOR, MN 55331-8013 PETER T & DEANNA 0 BRANDT 7570 DOGWOOD RD EXCELSIOR, MN 55331-8053 DANIEL J & KAREN A HERBST 7640 CRIMSON BAY RD CHASKA, MN 55318-9603 RICHARD A & DARLENE J HANSON 7750 CRIMSON BAY RD CHASKA, MN 55318-9623