No preview available
00 - CSG 21429 GAYLE MORIN SUBDIVISION STORMWATER REPORT - 05-18-22Civil Site Group, PC 4931 West 35th Street Suite 200 St. Louis Park Minnesota 55416 www.CivilSiteGroup.com (612) 615-0060 Stormwater Management Report Owner: Gayle Morin 1441 Lake Lucy Rd. Chanhassen, MN 55317 Project: Gayle Morin Subdivision 1441 Lake Lucy Rd. Chanhassen, MN 55317 Engineer’s Certification: All plans and supporting Documentation contained in this report have been reviewed by me and it is hereby certified that to the best of my knowledge the plans comply with the requirements of the ordinance. I hereby certify that this report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of Minnesota. _________________ Matthew R. Pavek P.E. Registration Number: 44263 Date: 05-13-2022 Civil Site Group, PC 4931 West 35th Street Suite 200 St. Louis Park Minnesota 55416 www.CivilSiteGroup.com (612) 615-0060 Table of Contents: 1.0 Cover Sheet, Engineer’s Certification 2.0 Summary Analysis / Narrative 2.1 Introduction 2.2 Existing Site Conditions 2.3 Proposed Site Conditions 2.4 Stormwater Requirements – City 2.5 Stormwater Requirements – Watershed District 2.6 Stormwater Requirements – MPCA / NPDES 3.0 Stormwater Calculations 3.1 Proposed Stormwater Management Strategy & Facilities Description 3.2 Rate Control 3.3 Volume Control 3.4 Water Quality 3.5 Wetland Buffer 3.6 Wetland Bounce, and Inundation 4.0 Conclusions Figures: Figure 1 – Existing Conditions Drainage Area map Figure 2 – Proposed Conditions Drainage Area Map Appendices: Drainage Calculations Summary Table MIDS Results HydroCAD Existing Conditions HydroCAD Modeling Proposed Conditions HydroCAD Modeling Geotech Report MnRAM Results Engineer’s Probable Opinion of Probable Cost Civil Site Group, PC 4931 West 35th Street Suite 200 St. Louis Park Minnesota 55416 www.CivilSiteGroup.com (612) 615-0060 2.0 Summary Analysis / Narrative: 2.1 Introduction: This stormwater management report accompanies the Civil Engineering Plans prepared by Civil Site Group for the subject project dated 01/28/2022 (Resubmitted 05/17/2022). This report includes a summary of the existing and proposed site conditions, the stormwater requirements of relevant regulatory agencies, proposed design calculations, and data to meet the requirements. 2.2 Existing Site Conditions : Site Description: The existing site is an existing home with driveway. Below is the existing surface area tabulation. Existing Soils: The existing soil borings show primarily sandy lean clay and clayey sand under a layer of topsoil. These soil types have a soil group of D which was used in the modeling. Groundwater: Groundwater was not observed at the time of soil boring. After discussion with the geotechnical engineer, they explained in the clay type soil and high blow out counts the only water they would expect to encounter would be perched or water trapped in sand veins. Infiltration testing was not able to be completed during the planning stage due to frozen soils. 2.3 Proposed Site Conditions: Site Description: The proposed site is a lot split with the addition of a home with associated parking, drive entrances, landscaping, and stormwater improvements. The proposed site surface coverage areas are shown in the table below: Area [SF] CN Value Area [SF] CN Value Area [SF] CN Value EX1A 3245 98 0 84 3245 98 EX1B 7290 98 55517 84 62807 86 EX1C 0 98 4200 84 4200 84 WETLAND A 0 99 9788 84 9788 84 OFFSITE A 8875 98 40698 84 49573 87 OFFSITE B 6076 98 68789 84 74865 85 EX2 2278 98 3302 84 5580 90 UNDISTURBED 0 98 125400 84 125400 84 Existing Conditions Total AreaImpervious AreaDrainage Area Pervious Area Area [SF] CN Value Area [SF] CN Value Area [SF] CN Value PR1A 3245 98 0 84 3245 98 PR1B 7290 98 21877 84 29167 87 PR1C 0 98 5573 84 5573 84 PR1D 6135 98 28982 84 35117 86 OFFSITE A 8875 98 40698 84 49573 87 OFFSITE B 6076 98 68789 84 74865 85 PR2 2313 98 323 84 2636 96 UNDISTURBED 0 98 125400 84 125400 84 Pervious Area Total Area Proposed Conditions Drainage Area Impervious Area Civil Site Group, PC 4931 West 35th Street Suite 200 St. Louis Park Minnesota 55416 www.CivilSiteGroup.com (612) 615-0060 2.4 Stormwater Requirements City (Chanhassen): The city of Chanhassen’s stormwater requirements defers to watershed. 2.5 Stormwater Requirements Watershed District – (Riley Purgatory Bluff Creek Watershed District (RPBCWD)) Requirement threshold – Alteration or removal of 5,000 square feet or more of land-surface area or vegetation. Rate Control – Peak runoff rate may not exceed existing conditions for the 2-yr, 10-yr, 100-yr 24- hour rainfall events, and a 100-year frequency, 10-day snowmelt event. Utilize Atlas 14 rainfall data Water Quality – 60% annual removal efficiency of total phosphorus (TP) and 90% annual removal of total suspended solids (TSS) or provide required abstraction volume. Volume Control – Provide for the abstraction of 1.1” of runoff from the new impervious surface area of the parcel. Wetland Buffers – A buffer area must be crated or maintained around a wetland disturbed by wetland-disturbing activity. Wetland Bounce and Inundation – No activity may alter a site that increases the bounce in water level, duration of inundation, for any wetland receiving discharge directly from the site beyond the limits specified. 2.6 Stormwater Requirements - Minnesota Pollution Control Agency – NPPDES permit (MPCA): Requirement threshold - A permit is required for projects with a disturbed area over 1 acre in size, Stormwater management is required for a project adding 1-acre of more of NEW impervious surface (reconstructed impervious is not included). Rate Control – No specific regulation, may not degrade downstream facilities. Water Quality – Stormwater water quality treatment volume must be provided equal to 1.0” over all new impervious surfaces (includes all newly constructed impervious surfaces only, re-constructed impervious surfaces are not included). Volume Control – Must consider volume reduction if feasible and not prohibited on site. The required infiltration volume is equal to the water quality volume described above. 3.0 Stormwater Calculations: 3.1 Proposed Stormwater Management Strategy & Facilities Description This project is disturbing 0.5 acres of land. This project triggers the stormwater requirements of Riley Purgatory Bluff Creek Watershed District, and their rules will be used as a basis for the design requirements for this project. The proposed stormwater strategy for this project is directing the project stormwater runoff via surface drainage to a surface biofiltration basin and underground rock section. This basin and underground rock section are designed to provide water quality treatment, volume reduction, and rate control requirements. 3.2 Rate Control Rate control is provided by live storage within the proposed biofiltration basin. This information was derived using HydroCAD stormwater modeling software. The existing and proposed runoff rates are shown in the summary table below. Civil Site Group, PC 4931 West 35th Street Suite 200 St. Louis Park Minnesota 55416 www.CivilSiteGroup.com (612) 615-0060 Runoff rates have been maintained or reduced to all discharge points. The proposed runoff rates in aggregate are less than the existing peak runoff rates – REQUIREMENT SATISFIED 3.3 Volume Control Per Rule J 2.3, because this project will disturb less than 50% of existing impervious and increase impervious by less than 50% of existing, Section 3 (a. Rate, b. Volume, and c. Quality) will only apply to the disturbed areas an additional impervious surface on the project parcel. Volume control requirements are met through abstraction of 1.1 inch from the new impervious surfaces within the biofiltration basin and rock section on site. The following table calculates the required 1.1” abstraction volume. The MIDS calculator was used to estimate the abstraction volume provided by the proposed biofiltration basin and rock section with results appended to this report. 2-YR [2.94"] 10-YR [4.47"] 100-YR [7.81"] SNOWMELT [7.20"] DA1 - EAST 0.32 0.48 0.78 0.01 DA2 - WETLAND A 8.71 16.03 30.18 0.62 DA3 - WETLAND B 7.38 14.97 30.31 0.85 TOTAL 16.41 31.48 61.27 1.48 2-YR [2.94"] 10-YR [4.47"] 100-YR [7.81"] SNOWMELT [7.20"] DA1 - EAST 0.32 0.48 0.78 0.01 DA2 - WETLAND A 6.93 14.45 28.65 0.56 DA3 - WETLAND B 6.28 13.02 28.83 0.78 TOTAL 13.53 27.95 58.26 1.35 Overall Stormwater Rate Summary 2-Year Event 16.41 13.53 10-Year Event 31.48 27.95 100-Year Event 61.27 58.26 Snowmelt 1.48 1.35 Stormwater Rate Summary Existing Rate (cfs) Existing Rate (cfs) Existing Conditions Rate (cfs) Proposed Conditions Rate (cfs) Drainage Area Drainage Area Stormwater Water Quality Summary New Impv. Area (sf) Required Volume (cf) PR1D 6135 562 TOTAL 6135 562 Biofiltration Basin 1* 660 TOTAL 660 *per MIDS calculator Abstraction Volume = 1.1"*Dist. Impv. Area Provided Vol (cf)Proposed BMP Area Drainage Area Required Infiltration Vol. Summary Civil Site Group, PC 4931 West 35th Street Suite 200 St. Louis Park Minnesota 55416 www.CivilSiteGroup.com (612) 615-0060 The provided abstraction volume is greater than the required volume – REQUIREMENT SATISFIED 3.4 Water Quality Water quality requirements are met by abstraction within the biofiltration basin and underground rock section. Because volume abstraction is provided for 1.1 inches over the regulated impervious surface (per Rule J, 3.b.i.) water quality Rule J, 3.c.i is met. In addition, all regulated impervious is directed into the biofiltration basin meeting the volume abstraction requirement prior to discharge into wetland A. – REQUIREMENT SATISFIED 3.5 Wetland Buffer The wetlands onsite were delineated by Jacobson Environmental, PLLC in a report dated October 11, 2021, including MnRAM assessments. Per RPBCWD Rule D, Appendix D1 both onsite wetlands are considered a “Medium value wetlands” due to a medium rating category for Wildlife Habitat. Therefore the wetlands require a 40-foot average, minimum 20-foot buffer “on that portion of the edge of a wetland that is downgradient from land-disturbing activity regulated by the District”. 1,578 linear feet of Wetland A are downgradient of land disturbing activity and require buffer construction. The remainder of the edge of Wetland A and the entire onsite edge of Wetland B are not downgradient of land disturbing activity and will remain undisturbed to preserve vegetation consistent with the Policy of Rule D. The onsite area footprint for a 40-foot buffer required is 7,033 sqft. The proposed buffer to be created has an area of 8,552 sqft with a minimum width of 20-feet and a typical width of 50-feet. Because of spatial limitation onsite the buffer area will extend into the biofiltration BMP which will also be planted with native vegetation per Rule D 3.3.– WETLAND BUFFER REQUIREMENT SATISFIED 3.6 Wetland Bounce and Inundation The wetlands onsite were reviewed for changes in bounce and inundation due to proposed site activity. The table below summarizes the existing and proposed wetland conditions, change (if any), and allowable change based on Table J1. The project does not cause an increased bounce, volume tributary, or increase the high water level for either wetland beyond the permissible limit - REQUIREMENT SATISFIED Wetland Bounce & Innundation Calculations Wetland A - Medium Value 10-yr HWL Inundation 1-yr (hrs) Inundation 2-yr (hrs) Inundation 10-yr (hrs) Runout Elevation Existing Conditions 970.15 28.4 28.6 28.4 969.62 Proposed Conditions 970.08 35 35.8 36.2 969.62 Difference 0.07 6.6 7.2 7.8 0 Permissable Limit EX +/- 1.0 feet EX + 2 days EX + 2 days EX + 14 days EX + 1.0 feet Wetland B - Medium Value 10-yr HWL Inundation 1-yr (hrs) Inundation 2-yr (hrs) Inundation 10-yr (hrs) Runout Elevation Existing Conditions 961.61 22.8 23.2 22.8 960.82 Proposed Conditions 961.61 26.4 27.6 27.8 960.82 Difference 0.00 3.6 4.4 5 0 Permissable Limit EX +/- 1.0 feet EX + 2 days EX + 2 days EX + 14 days EX + 1.0 feet Civil Site Group, PC 4931 West 35th Street Suite 200 St. Louis Park Minnesota 55416 www.CivilSiteGroup.com (612) 615-0060 4.0 Conclusions: To the best of our knowledge, this project meets all State, City and Watershed District stormwater management requirements to the best of its ability. S88°03'48"E 180.08S00°10'43"W 1131.8 +/-N00°10'43"E 1220.1 +/-33.0233.021161.341081.20N88°03'48"W 308.34 980990100098099010001020101010201010103097097097096096010301030103410349809809901000100210001002104010361036APPROX. EXISTINGCB LOCATION, TYP.APPROX.EXISTING CBLOCATION,TYP.WETLAND BLAKELUCYWETLANDAEX 2EX IMPV = 2,278 SFEX PERV = 3,302 SFTOTAL = 5,580 SFEX 1BEX IMPV = 7,290 SFEX PERV = 55,517 SFTOTAL = 62,807 SFOFFSITE BEX IMPV = 6,076 SFEX PERV = 68,789 SFTOTAL = 74,865 SFEX 1AEX IMPV = 3,245 SFEX PERV = 0 SFTOTAL = 3,245 SFWETLAND ATOTAL = 9,788 SFUNDISTURBEDEX IMPV = 0 SFEX PERV = 125,400 SFTOTAL = 125,400 SFOFFSITE AEX IMPV = 8,875 SFEX PERV = 40,698 SFTOTAL = 49,573 SFEX 1CEX IMPV = 0 SFEX PERV = 4,200 SFTOTAL = 4,200 SFProject Number:Issue Date:Revision Number:Revision Date:5000 Glenwood AveGolden Valley, MN 55422952.250.2003 / 763.213.394www.CivilSiteGroup.comGAYLE MORIN1441 LUCY LAKE RD, CHANHASSEN, MN 55317DA12142904/29/2022..01" = 100'-0"100'-0"50'-0"NEXISTING DRAINAGE MAP S88°03'48"E 180.08S00°10'43"W 1131.8 +/-N00°10'43"E 1220.1 +/-33.0233.021161.341081.20N88°03'48"W 308.34 2 4 . 5 48.01 3 . 88.48.58 . 5 2.33 . 4 40.45 9 . 4 24.93 2 . 54.572.798099010009809901000102010101020101097097097010301030980980990WETLANDAEX 2EX IMPV = 2,278 SFEX PERV = 3,302 SFTOTAL = 5,580 SFEX 1BEX IMPV = 7,290 SFEX PERV = 55,517 SFTOTAL = 62,807 SFOFFSITE BEX IMPV = 6,076 SFEX PERV = 68,789 SFTOTAL = 74,865 SFEX 1AEX IMPV = 3,245 SFEX PERV = 0 SFTOTAL = 3,245 SFWETLAND ATOTAL = 9,788 SFOFFSITE AEX IMPV = 8,875 SFEX PERV = 40,698 SFTOTAL = 49,573 SFEX 1CEX IMPV = 0 SFEX PERV = 4,200 SFTOTAL = 4,200 SFProject Number:Issue Date:Revision Number:Revision Date:5000 Glenwood AveGolden Valley, MN 55422952.250.2003 / 763.213.394www.CivilSiteGroup.comGAYLE MORIN1441 LUCY LAKE RD, CHANHASSEN, MN 55317DA12142904/29/2022..01" = 50'-0"50'-0"25'-0"NEXISTING DRAINAGE MAP-BLOWUP 21N88°03'48"W 308.34 WETLAND BLAKELUCYWETLANDAUNDISTURBEDPR IMPV = 0 SFPR PERV = 125,400 SFTOTAL =125,400 SFAPPROX. EXISTINGCB LOCATION, TYP.APPROX. EXISTINGCB LOCATION, TYP.PR 1BPR IMPV = 7,290 SFPR PERV = 21,877 SFTOTAL = 29,167 SFPR 1APR IMPV = 3,245 SFPR PERV = 0 SFTOTAL = 3,245 SFWETLAND AONSITE TOTAL = 9,792 SFDELINEATED TOTAL = 11,587 SFPR 2PR IMPV = 2,313 SFPR PERV = 323 SFTOTAL = 2,636 SFPR 1CPR IMPV = 0 SFPR PERV = 5,573 SFTOTAL = 5,573 SFOFFSITE BPR IMPV = 6,076 SFPR PERV = 68,789 SFTOTAL = 74,865 SFOFFSITE APR IMPV = 8,875 SFPR PERV = 40,698 SFTOTAL = 49,573 SFPR 1DPR IMPV = 6,135 SFPR PERV = 28,982 SFTOTAL = 35,117 SFProject Number:Issue Date:Revision Number:Revision Date:5000 Glenwood AveGolden Valley, MN 55422952.250.2003 / 763.213.394www.CivilSiteGroup.comGAYLE MORIN1441 LUCY LAKE RD, CHANHASSEN, MN 55317DA22142904/29/2022..01" = 100'-0"100'-0"50'-0"NPROPOSED DRAINAGE MAP 21S88°03'48"E 180.08S00°10'43"W 1131.8 +/-N00°10'43"E 1220.1 +/-33.0233.021161.341081.20N88°03'48"W 308.34 WETLANDAPR 1BPR IMPV = 7,290 SFPR PERV = 21,877 SFTOTAL = 29,167 SFPR 1APR IMPV = 3,245 SFPR PERV = 0 SFTOTAL = 3,245 SFWETLAND AONSITE TOTAL = 9,792 SFDELINEATED TOTAL = 11,587 SFPR 2PR IMPV = 2,313 SFPR PERV = 323 SFTOTAL = 2,636 SFPR 1CPR IMPV = 0 SFPR PERV = 5,573 SFTOTAL = 5,573 SFOFFSITE BPR IMPV = 6,076 SFPR PERV = 68,789 SFTOTAL = 74,865 SFOFFSITE APR IMPV = 8,875 SFPR PERV = 40,698 SFTOTAL = 49,573 SFPR 1DPR IMPV = 6,135 SFPR PERV = 28,982 SFTOTAL = 35,117 SFProject Number:Issue Date:Revision Number:Revision Date:5000 Glenwood AveGolden Valley, MN 55422952.250.2003 / 763.213.394www.CivilSiteGroup.comGAYLE MORIN1441 LUCY LAKE RD, CHANHASSEN, MN 55317DA22142904/29/2022..01" = 50'-0"50'-0"25'-0"NPROPOSED DRAINAGE MAP- BLOWUP Civil Site Group - Stormwater Calculations Area [SF] CN Value Area [SF] CN Value Area [SF] CN Value EX1A 3245 98 0 84 3245 98 EX1B 7290 98 55517 84 62807 86 EX1C 0 98 4200 84 4200 84 OFFSITE A 8875 98 40698 84 49573 87 OFFSITE B 6076 98 68789 84 74865 85 EX2 2278 98 3302 84 5580 90 UNDISTURBED 0 98 125400 84 125400 84 Area [SF] CN Value Area [SF] CN Value Area [SF] CN Value PR1A 3245 98 0 84 3245 98 PR1B 7290 98 21877 84 29167 87 PR1C 0 98 5573 84 5573 84 PR1D 6135 98 28982 84 35117 86 OFFSITE A 8875 98 40698 84 49573 87 OFFSITE B 6076 98 68789 84 74865 85 PR2 2313 98 323 84 2636 96 UNDISTURBED 0 98 125400 84 125400 84 Impervious [SF] Impervious [AC] Pervious [SF] Pervious [AC] Total [SF] Total [AC] Existing Site 12813 0.29 188419 4.33 201232 4.62 Existing Site & Offsite 27764 0.64 297906 6.84 325670 7.48 Proposed Site 18983 0.44 182155 4.18 201138 4.62 Proposed Site & Offsite 33934 0.78 291642 6.70 325576 7.47 2-YR [2.94"] 10-YR [4.47"] 100-YR [7.81"] SNOWMELT [7.20"] DA1 - EAST 0.32 0.48 0.78 0.01 DA2 - WETLAND A 8.71 16.03 30.18 0.62 DA3 - WETLAND B 7.38 14.97 30.31 0.85 TOTAL 16.41 31.48 61.27 1.48 2-YR [2.94"]10-YR [4.47"]100-YR [7.81"]SNOWMELT [7.20"] DA1 - EAST 0.32 0.48 0.78 0.01 DA2 - WETLAND A 6.93 14.45 28.65 0.56 DA3 - WETLAND B 6.28 13.02 28.83 0.78 TOTAL 13.53 27.95 58.26 1.35 Overall Stormwater Rate Summary 2-Year Event 16.41 13.53 10-Year Event 31.48 27.95 100-Year Event 61.27 58.26 Snowmelt 1.48 1.35 Stormwater Water Quality Summary New Impv. Area (sf) Required Volume (cf) PR1D 6135 562 TOTAL 6135 562 Biofiltration Basin 1*660 TOTAL 660 *per MIDS calculator Wetland Bounce & Innundation Calculations Wetland A - Medium Value 10-yr HWL Inundation 1-yr (hrs) Inundation 2-yr (hrs) Inundation 10-yr (hrs) Runout Elevation Existing Conditions 970.15 28.4 28.6 28.4 969.62 Proposed Conditions 970.08 35 35.8 36.2 969.62 Difference 0.07 6.6 7.2 7.8 0 Permissable Limit EX +/- 1.0 feet EX + 2 days EX + 2 days EX + 14 days EX + 1.0 feet Wetland B - Medium Value 10-yr HWL Inundation 1-yr (hrs) Inundation 2-yr (hrs) Inundation 10-yr (hrs) Runout Elevation Existing Conditions 961.61 22.8 23.2 22.8 960.82 Proposed Conditions 961.61 26.4 27.6 27.8 960.82 Difference 0.00 3.6 4.4 5 0 Permissable Limit EX +/- 1.0 feet EX + 2 days EX + 2 days EX + 14 days EX + 1.0 feet Abstraction Volume = 1.1"*Dist. Impv. Area Stormwater Rate Summary Existing Rate (cfs) Existing Rate (cfs) Existing Conditions Rate (cfs) Proposed Conditions Rate (cfs) Drainage Area Drainage Area Provided Vol (cf)Proposed BMP Area Site Area Summary 1441 Lucy Lake Road Pervious Area Total Area Existing Conditions Proposed Conditions Drainage Area Impervious Area Total AreaImpervious AreaDrainage Area Pervious Area Drainage Area Required Infiltration Vol. Summary Project Information Calculator Version:Version 4: July 2020 Project Name:Gayle Morin Lot Split User Name / Company Name: Civil Site Group - Mike Sheehan Date:May 13, 2022 Project Description:Lot split. MIDS used for abstraction calculations. Construction Permit?:No Site Information Retention Requirement (inches):1.1 Site's Zip Code:55317 Annual Rainfall (inches):29.9 Phosphorus EMC (mg/l):0.3 TSS EMC (mg/l):54.5 Total Site Area Land Cover A Soils (acres) B Soils (acres) C Soils (acres) D Soils (acres) Total (acres) Forest/Open Space -Undisturbed, protected forest/open space or reforested land 0.665 0.665 Managed Turf -disturbed, graded for yards or other turf to be mowed/managed 0 Impervious Area (acres) 0.145 Total Area (acres) 0.81 Site Areas Routed to BMPs Land Cover A Soils (acres) B Soils (acres) C Soils (acres) D Soils (acres) Total (acres) Forest/Open Space -Undisturbed, protected forest/open space or reforested land 0.665 0.665 Managed Turf -disturbed, graded for yards or other turf to be mowed/managed 0 Impervious Area (acres) 0.145 Total Area (acres) 0.81 Summary Information Performance Goal Requirement Performance goal volume retention requirement: 579 ft3 Volume removed by BMPs towards performance goal: 579 ft³ Percent volume removed towards performance goal 100 % Annual Volume and Pollutant Load Reductions Post development annual runoff volume 0.3835 acre-ft Annual runoff volume removed by BMPs: 0.109 acre-ft Percent annual runoff volume removed: 28 % Post development annual particulate P load:0.1721 lbs Annual particulate P removed by BMPs: 0.148 lbs Post development annual dissolved P load: 0.141 lbs Annual dissolved P removed by BMPs: 0.06 lbs Total P removed by BMPs 0.208 lbs Percent annual total phosphorus removed: 66 % Post development annual TSS load: 56.8 lbs Annual TSS removed by BMPs:48.7 lbs Percent annual TSS removed: 86 % BMP Summary Performance Goal Summary BMP Name BMP Volume Capacity (ft3) Volume Recieved (ft3) Volume Retained (ft3) Volume Outflow (ft3) Percent Retained (%) 1 - Bioretention basin (with underdrain)660 579 579 0 100 Annual Volume Summary BMP Name Volume From Direct Watershed (acre-ft) Volume From Upstream BMPs (acre-ft) Volume Retained (acre-ft) Volume outflow (acre-ft) Percent Retained (%) 1 - Bioretention basin (with underdrain)0.3835 0 0.109 0.2745 28 Particulate Phosphorus Summary BMP Name Load From Direct Watershed (lbs) Load From Upstream BMPs (lbs) Load Retained (lbs) Outflow Load (lbs) Percent Retained (%) 1 - Bioretention basin (with underdrain)0.1721 0 0.1475 0.0246 86 Dissolved Phosphorus Summary BMP Name Load From Direct Watershed (lbs) Load From Upstream BMPs (lbs) Load Retained (lbs) Outflow Load (lbs) Percent Retained (%) 1 - Bioretention basin (with underdrain)0.1408 0 0.0602 0.0806 43 Total Phosphorus Summary BMP Name Load From Direct Watershed (lbs) Load From Upstream BMPs (lbs) Load Retained (lbs) Outflow Load (lbs) Percent Retained (%) 1 - Bioretention basin (with underdrain)0.3129 0 0.2077 0.1052 64 TSS Summary BMP Name Load From Direct Watershed (lbs) Load From Upstream BMPs (lbs) Load Retained (lbs) Outflow Load (lbs) Percent Retained (%) 1 - Bioretention basin (with underdrain)56.85 0 48.71 8.14 86 BMP Schematic 6S UNDISTURBED 7S OFFSITE WETLAND B WATERSHED EX1A EX1A - DRAINS EAST DOWN LAKE LUCY ROAD EX1B EX1B - DRAINS SOUTH TO WETLAND A EX1C EX1C - DRAINS SOUTH TO WETLAND A EX2 EX2 - DRAINS SOUTH TO WETLAND B OFFSITE A OFFSITE A - DRAINS SOUTH TO WETLAND B OFFSITE B OFFSITE B- DRAINS SOUTH TO WETLAND A DA2 DA2 - TOTAL FLOW TO WETLAND A DA3 DA3 - TOTAL FLOW TO WETLAND B 1P WETLAND A 5P Wetland B Routing Diagram for 21429- EXISTING Prepared by {enter your company name here}, Printed 5/13/2022 HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Subcat Reach Pond Link 21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 2HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Area Listing (all nodes) Area (acres) CN Description (subcatchment-numbers) 6.839 84 (6S, EX1B, EX1C, EX2, OFFSITE A, OFFSITE B) 3.921 84 1/2 acre lots, 25% imp, HSG B (7S) 0.637 98 Paved parking, HSG C (EX1A, EX1B, EX2, OFFSITE A, OFFSITE B) 1.547 98 Unconnected roofs, HSG B (7S) 12.944 86 TOTAL AREA 21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 3HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Soil Listing (all nodes) Area (acres) Soil Group Subcatchment Numbers 0.000 HSG A 5.468 HSG B 7S 0.637 HSG C EX1A, EX1B, EX2, OFFSITE A, OFFSITE B 0.000 HSG D 6.839 Other 6S, EX1B, EX1C, EX2, OFFSITE A, OFFSITE B 12.944 TOTAL AREA 21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 4HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Ground Covers (all nodes) HSG-A (acres) HSG-B (acres) HSG-C (acres) HSG-D (acres) Other (acres) Total (acres) Ground Cover Subcatchment Numbers 0.000 0.000 0.000 0.000 6.839 6.839 6S, EX1B, EX1C, EX2, OFFSITE A, OFFSITE B 0.000 3.921 0.000 0.000 0.000 3.921 1/2 acre lots, 25% imp 7S 0.000 0.000 0.637 0.000 0.000 0.637 Paved parking EX1A, EX1B, EX2, OFFSITE A, OFFSITE B 0.000 1.547 0.000 0.000 0.000 1.547 Unconnected roofs 7S 0.000 5.468 0.637 0.000 6.839 12.944 TOTAL AREA MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 5HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Time span=0.00-240.00 hrs, dt=0.01 hrs, 24001 points Runoff by SCS TR-20 method, UH=SCS, Weighted-Q Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Runoff Area=125,400 sf 0.00% Impervious Runoff Depth=1.12"Subcatchment 6S: UNDISTURBED Tc=6.0 min CN=84 Runoff=5.69 cfs 0.268 af Runoff Area=238,192 sf 46.22% Impervious Runoff Depth=1.44"Subcatchment 7S: OFFSITE WETLAND B Flow Length=1,100' Slope=0.1500 '/' Tc=13.4 min CN=WQ Runoff=9.63 cfs 0.657 af Runoff Area=3,245 sf 100.00% Impervious Runoff Depth=2.27"Subcatchment EX1A: EX1A - DRAINS Tc=6.0 min CN=WQ Runoff=0.27 cfs 0.014 af Runoff Area=62,807 sf 11.61% Impervious Runoff Depth=1.25"Subcatchment EX1B: EX1B - DRAINS Tc=6.0 min CN=WQ Runoff=3.13 cfs 0.150 af Runoff Area=4,200 sf 0.00% Impervious Runoff Depth=1.12"Subcatchment EX1C: EX1C - DRAINS Tc=6.0 min CN=WQ Runoff=0.19 cfs 0.009 af Runoff Area=5,580 sf 40.82% Impervious Runoff Depth=1.59"Subcatchment EX2: EX2 - DRAINS SOUTH Tc=6.0 min CN=WQ Runoff=0.34 cfs 0.017 af Runoff Area=49,573 sf 17.90% Impervious Runoff Depth=1.32"Subcatchment OFFSITE A: OFFSITE A - Tc=6.0 min CN=WQ Runoff=2.59 cfs 0.125 af Runoff Area=74,865 sf 8.12% Impervious Runoff Depth=1.21"Subcatchment OFFSITE B: OFFSITE B- Tc=6.0 min CN=WQ Runoff=3.63 cfs 0.173 af Inflow=6.95 cfs 0.332 afReach DA2: DA2 - TOTAL FLOW TO WETLAND A Outflow=6.95 cfs 0.332 af Inflow=5.68 cfs 0.475 afReach DA3: DA3 - TOTAL FLOW TO WETLAND B Outflow=5.68 cfs 0.475 af Peak Elev=969.90' Storage=3,265 cf Inflow=6.95 cfs 0.332 afPond 1P: WETLAND A Outflow=3.64 cfs 0.332 af Peak Elev=961.61' Storage=894 cf Inflow=18.97 cfs 1.400 afPond 5P: Wetland B Outflow=18.85 cfs 1.400 af Total Runoff Area = 12.944 ac Runoff Volume = 1.414 af Average Runoff Depth = 1.31" 75.55% Pervious = 9.780 ac 24.45% Impervious = 3.165 ac MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 6HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment 6S: UNDISTURBED Runoff = 5.69 cfs @ 12.09 hrs, Volume= 0.268 af, Depth= 1.12" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50" Area (sf) CN Description * 125,400 84 125,400 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment 6S: UNDISTURBED Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)6 5 4 3 2 1 0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50" Runoff Area=125,400 sf Runoff Volume=0.268 af Runoff Depth=1.12" Tc=6.0 min CN=84 5.69 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 7HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 6S: UNDISTURBED Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.12 0.00 0.00 10.00 0.38 0.00 0.00 15.00 2.21 0.90 0.20 20.00 2.40 1.04 0.05 25.00 2.50 1.12 0.00 30.00 2.50 1.12 0.00 35.00 2.50 1.12 0.00 40.00 2.50 1.12 0.00 45.00 2.50 1.12 0.00 50.00 2.50 1.12 0.00 55.00 2.50 1.12 0.00 60.00 2.50 1.12 0.00 65.00 2.50 1.12 0.00 70.00 2.50 1.12 0.00 75.00 2.50 1.12 0.00 80.00 2.50 1.12 0.00 85.00 2.50 1.12 0.00 90.00 2.50 1.12 0.00 95.00 2.50 1.12 0.00 100.00 2.50 1.12 0.00 105.00 2.50 1.12 0.00 110.00 2.50 1.12 0.00 115.00 2.50 1.12 0.00 120.00 2.50 1.12 0.00 125.00 2.50 1.12 0.00 130.00 2.50 1.12 0.00 135.00 2.50 1.12 0.00 140.00 2.50 1.12 0.00 145.00 2.50 1.12 0.00 150.00 2.50 1.12 0.00 155.00 2.50 1.12 0.00 160.00 2.50 1.12 0.00 165.00 2.50 1.12 0.00 170.00 2.50 1.12 0.00 175.00 2.50 1.12 0.00 180.00 2.50 1.12 0.00 185.00 2.50 1.12 0.00 190.00 2.50 1.12 0.00 195.00 2.50 1.12 0.00 200.00 2.50 1.12 0.00 205.00 2.50 1.12 0.00 210.00 2.50 1.12 0.00 215.00 2.50 1.12 0.00 220.00 2.50 1.12 0.00 225.00 2.50 1.12 0.00 230.00 2.50 1.12 0.00 235.00 2.50 1.12 0.00 240.00 2.50 1.12 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 8HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment 7S: OFFSITE WETLAND B WATERSHED Runoff = 9.63 cfs @ 12.18 hrs, Volume= 0.657 af, Depth= 1.44" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50" Area (sf) CN Description 67,393 98 Unconnected roofs, HSG B * 170,799 84 1/2 acre lots, 25% imp, HSG B 238,192 Weighted Average 128,099 53.78% Pervious Area 110,093 46.22% Impervious Area 67,393 61.21% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.9 200 0.1500 0.42 Sheet Flow, Grass: Short n= 0.150 P2= 2.94" 5.5 900 0.1500 2.71 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 13.4 1,100 Total Subcatchment 7S: OFFSITE WETLAND B WATERSHED Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)10 9 8 7 6 5 4 3 2 1 0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50" Runoff Area=238,192 sf Runoff Volume=0.657 af Runoff Depth=1.44" Flow Length=1,100' Slope=0.1500 '/' Tc=13.4 min CN=WQ 9.63 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 9HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 7S: OFFSITE WETLAND B WATERSHED Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.12 0.00 0.02 10.00 0.38 0.01 0.12 15.00 2.21 1.14 0.42 20.00 2.40 1.30 0.11 25.00 2.50 1.38 0.00 30.00 2.50 1.38 0.00 35.00 2.50 1.38 0.00 40.00 2.50 1.38 0.00 45.00 2.50 1.38 0.00 50.00 2.50 1.38 0.00 55.00 2.50 1.38 0.00 60.00 2.50 1.38 0.00 65.00 2.50 1.38 0.00 70.00 2.50 1.38 0.00 75.00 2.50 1.38 0.00 80.00 2.50 1.38 0.00 85.00 2.50 1.38 0.00 90.00 2.50 1.38 0.00 95.00 2.50 1.38 0.00 100.00 2.50 1.38 0.00 105.00 2.50 1.38 0.00 110.00 2.50 1.38 0.00 115.00 2.50 1.38 0.00 120.00 2.50 1.38 0.00 125.00 2.50 1.38 0.00 130.00 2.50 1.38 0.00 135.00 2.50 1.38 0.00 140.00 2.50 1.38 0.00 145.00 2.50 1.38 0.00 150.00 2.50 1.38 0.00 155.00 2.50 1.38 0.00 160.00 2.50 1.38 0.00 165.00 2.50 1.38 0.00 170.00 2.50 1.38 0.00 175.00 2.50 1.38 0.00 180.00 2.50 1.38 0.00 185.00 2.50 1.38 0.00 190.00 2.50 1.38 0.00 195.00 2.50 1.38 0.00 200.00 2.50 1.38 0.00 205.00 2.50 1.38 0.00 210.00 2.50 1.38 0.00 215.00 2.50 1.38 0.00 220.00 2.50 1.38 0.00 225.00 2.50 1.38 0.00 230.00 2.50 1.38 0.00 235.00 2.50 1.38 0.00 240.00 2.50 1.38 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 10HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment EX1A: EX1A - DRAINS EAST DOWN LAKE LUCY ROAD Runoff = 0.27 cfs @ 12.08 hrs, Volume= 0.014 af, Depth= 2.27" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50" Area (sf) CN Description 3,245 98 Paved parking, HSG C * 0 84 3,245 Weighted Average 3,245 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment EX1A: EX1A - DRAINS EAST DOWN LAKE LUCY ROAD Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.3 0.28 0.26 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50" Runoff Area=3,245 sf Runoff Volume=0.014 af Runoff Depth=2.27" Tc=6.0 min CN=WQ 0.27 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 11HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment EX1A: EX1A - DRAINS EAST DOWN LAKE LUCY ROAD Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.12 0.02 0.00 10.00 0.38 0.21 0.01 15.00 2.21 1.99 0.01 20.00 2.40 2.17 0.00 25.00 2.50 2.27 0.00 30.00 2.50 2.27 0.00 35.00 2.50 2.27 0.00 40.00 2.50 2.27 0.00 45.00 2.50 2.27 0.00 50.00 2.50 2.27 0.00 55.00 2.50 2.27 0.00 60.00 2.50 2.27 0.00 65.00 2.50 2.27 0.00 70.00 2.50 2.27 0.00 75.00 2.50 2.27 0.00 80.00 2.50 2.27 0.00 85.00 2.50 2.27 0.00 90.00 2.50 2.27 0.00 95.00 2.50 2.27 0.00 100.00 2.50 2.27 0.00 105.00 2.50 2.27 0.00 110.00 2.50 2.27 0.00 115.00 2.50 2.27 0.00 120.00 2.50 2.27 0.00 125.00 2.50 2.27 0.00 130.00 2.50 2.27 0.00 135.00 2.50 2.27 0.00 140.00 2.50 2.27 0.00 145.00 2.50 2.27 0.00 150.00 2.50 2.27 0.00 155.00 2.50 2.27 0.00 160.00 2.50 2.27 0.00 165.00 2.50 2.27 0.00 170.00 2.50 2.27 0.00 175.00 2.50 2.27 0.00 180.00 2.50 2.27 0.00 185.00 2.50 2.27 0.00 190.00 2.50 2.27 0.00 195.00 2.50 2.27 0.00 200.00 2.50 2.27 0.00 205.00 2.50 2.27 0.00 210.00 2.50 2.27 0.00 215.00 2.50 2.27 0.00 220.00 2.50 2.27 0.00 225.00 2.50 2.27 0.00 230.00 2.50 2.27 0.00 235.00 2.50 2.27 0.00 240.00 2.50 2.27 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 12HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment EX1B: EX1B - DRAINS SOUTH TO WETLAND A Runoff = 3.13 cfs @ 12.09 hrs, Volume= 0.150 af, Depth= 1.25" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50" Area (sf) CN Description 7,290 98 Paved parking, HSG C 55,517 84 62,807 Weighted Average 55,517 88.39% Pervious Area 7,290 11.61% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment EX1B: EX1B - DRAINS SOUTH TO WETLAND A Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)3 2 1 0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50" Runoff Area=62,807 sf Runoff Volume=0.150 af Runoff Depth=1.25" Tc=6.0 min CN=WQ 3.13 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 13HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment EX1B: EX1B - DRAINS SOUTH TO WETLAND A Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.12 0.00 0.00 10.00 0.38 0.00 0.01 15.00 2.21 1.01 0.10 20.00 2.40 1.16 0.03 25.00 2.50 1.24 0.00 30.00 2.50 1.24 0.00 35.00 2.50 1.24 0.00 40.00 2.50 1.24 0.00 45.00 2.50 1.24 0.00 50.00 2.50 1.24 0.00 55.00 2.50 1.24 0.00 60.00 2.50 1.24 0.00 65.00 2.50 1.24 0.00 70.00 2.50 1.24 0.00 75.00 2.50 1.24 0.00 80.00 2.50 1.24 0.00 85.00 2.50 1.24 0.00 90.00 2.50 1.24 0.00 95.00 2.50 1.24 0.00 100.00 2.50 1.24 0.00 105.00 2.50 1.24 0.00 110.00 2.50 1.24 0.00 115.00 2.50 1.24 0.00 120.00 2.50 1.24 0.00 125.00 2.50 1.24 0.00 130.00 2.50 1.24 0.00 135.00 2.50 1.24 0.00 140.00 2.50 1.24 0.00 145.00 2.50 1.24 0.00 150.00 2.50 1.24 0.00 155.00 2.50 1.24 0.00 160.00 2.50 1.24 0.00 165.00 2.50 1.24 0.00 170.00 2.50 1.24 0.00 175.00 2.50 1.24 0.00 180.00 2.50 1.24 0.00 185.00 2.50 1.24 0.00 190.00 2.50 1.24 0.00 195.00 2.50 1.24 0.00 200.00 2.50 1.24 0.00 205.00 2.50 1.24 0.00 210.00 2.50 1.24 0.00 215.00 2.50 1.24 0.00 220.00 2.50 1.24 0.00 225.00 2.50 1.24 0.00 230.00 2.50 1.24 0.00 235.00 2.50 1.24 0.00 240.00 2.50 1.24 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 14HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment EX1C: EX1C - DRAINS SOUTH TO WETLAND A Runoff = 0.19 cfs @ 12.09 hrs, Volume= 0.009 af, Depth= 1.12" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50" Area (sf) CN Description 0 98 Paved parking, HSG C * 4,200 84 4,200 Weighted Average 4,200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment EX1C: EX1C - DRAINS SOUTH TO WETLAND A Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.21 0.2 0.19 0.18 0.17 0.16 0.15 0.14 0.13 0.12 0.11 0.1 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50" Runoff Area=4,200 sf Runoff Volume=0.009 af Runoff Depth=1.12" Tc=6.0 min CN=WQ 0.19 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 15HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment EX1C: EX1C - DRAINS SOUTH TO WETLAND A Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.12 0.00 0.00 10.00 0.38 0.00 0.00 15.00 2.21 0.90 0.01 20.00 2.40 1.04 0.00 25.00 2.50 1.12 0.00 30.00 2.50 1.12 0.00 35.00 2.50 1.12 0.00 40.00 2.50 1.12 0.00 45.00 2.50 1.12 0.00 50.00 2.50 1.12 0.00 55.00 2.50 1.12 0.00 60.00 2.50 1.12 0.00 65.00 2.50 1.12 0.00 70.00 2.50 1.12 0.00 75.00 2.50 1.12 0.00 80.00 2.50 1.12 0.00 85.00 2.50 1.12 0.00 90.00 2.50 1.12 0.00 95.00 2.50 1.12 0.00 100.00 2.50 1.12 0.00 105.00 2.50 1.12 0.00 110.00 2.50 1.12 0.00 115.00 2.50 1.12 0.00 120.00 2.50 1.12 0.00 125.00 2.50 1.12 0.00 130.00 2.50 1.12 0.00 135.00 2.50 1.12 0.00 140.00 2.50 1.12 0.00 145.00 2.50 1.12 0.00 150.00 2.50 1.12 0.00 155.00 2.50 1.12 0.00 160.00 2.50 1.12 0.00 165.00 2.50 1.12 0.00 170.00 2.50 1.12 0.00 175.00 2.50 1.12 0.00 180.00 2.50 1.12 0.00 185.00 2.50 1.12 0.00 190.00 2.50 1.12 0.00 195.00 2.50 1.12 0.00 200.00 2.50 1.12 0.00 205.00 2.50 1.12 0.00 210.00 2.50 1.12 0.00 215.00 2.50 1.12 0.00 220.00 2.50 1.12 0.00 225.00 2.50 1.12 0.00 230.00 2.50 1.12 0.00 235.00 2.50 1.12 0.00 240.00 2.50 1.12 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 16HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment EX2: EX2 - DRAINS SOUTH TO WETLAND B Runoff = 0.34 cfs @ 12.09 hrs, Volume= 0.017 af, Depth= 1.59" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50" Area (sf) CN Description 2,278 98 Paved parking, HSG C * 3,302 84 5,580 Weighted Average 3,302 59.18% Pervious Area 2,278 40.82% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment EX2: EX2 - DRAINS SOUTH TO WETLAND B Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.38 0.36 0.34 0.32 0.3 0.28 0.26 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50" Runoff Area=5,580 sf Runoff Volume=0.017 af Runoff Depth=1.59" Tc=6.0 min CN=WQ 0.34 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 17HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment EX2: EX2 - DRAINS SOUTH TO WETLAND B Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.12 0.00 0.00 10.00 0.38 0.02 0.00 15.00 2.21 1.28 0.01 20.00 2.40 1.44 0.00 25.00 2.50 1.53 0.00 30.00 2.50 1.53 0.00 35.00 2.50 1.53 0.00 40.00 2.50 1.53 0.00 45.00 2.50 1.53 0.00 50.00 2.50 1.53 0.00 55.00 2.50 1.53 0.00 60.00 2.50 1.53 0.00 65.00 2.50 1.53 0.00 70.00 2.50 1.53 0.00 75.00 2.50 1.53 0.00 80.00 2.50 1.53 0.00 85.00 2.50 1.53 0.00 90.00 2.50 1.53 0.00 95.00 2.50 1.53 0.00 100.00 2.50 1.53 0.00 105.00 2.50 1.53 0.00 110.00 2.50 1.53 0.00 115.00 2.50 1.53 0.00 120.00 2.50 1.53 0.00 125.00 2.50 1.53 0.00 130.00 2.50 1.53 0.00 135.00 2.50 1.53 0.00 140.00 2.50 1.53 0.00 145.00 2.50 1.53 0.00 150.00 2.50 1.53 0.00 155.00 2.50 1.53 0.00 160.00 2.50 1.53 0.00 165.00 2.50 1.53 0.00 170.00 2.50 1.53 0.00 175.00 2.50 1.53 0.00 180.00 2.50 1.53 0.00 185.00 2.50 1.53 0.00 190.00 2.50 1.53 0.00 195.00 2.50 1.53 0.00 200.00 2.50 1.53 0.00 205.00 2.50 1.53 0.00 210.00 2.50 1.53 0.00 215.00 2.50 1.53 0.00 220.00 2.50 1.53 0.00 225.00 2.50 1.53 0.00 230.00 2.50 1.53 0.00 235.00 2.50 1.53 0.00 240.00 2.50 1.53 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 18HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment OFFSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B Runoff = 2.59 cfs @ 12.09 hrs, Volume= 0.125 af, Depth= 1.32" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50" Area (sf) CN Description 8,875 98 Paved parking, HSG C * 40,698 84 49,573 Weighted Average 40,698 82.10% Pervious Area 8,875 17.90% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment OFFSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)2 1 0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50" Runoff Area=49,573 sf Runoff Volume=0.125 af Runoff Depth=1.32" Tc=6.0 min CN=WQ 2.59 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 19HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment OFFSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.12 0.00 0.00 10.00 0.38 0.00 0.02 15.00 2.21 1.08 0.08 20.00 2.40 1.23 0.02 25.00 2.50 1.31 0.00 30.00 2.50 1.31 0.00 35.00 2.50 1.31 0.00 40.00 2.50 1.31 0.00 45.00 2.50 1.31 0.00 50.00 2.50 1.31 0.00 55.00 2.50 1.31 0.00 60.00 2.50 1.31 0.00 65.00 2.50 1.31 0.00 70.00 2.50 1.31 0.00 75.00 2.50 1.31 0.00 80.00 2.50 1.31 0.00 85.00 2.50 1.31 0.00 90.00 2.50 1.31 0.00 95.00 2.50 1.31 0.00 100.00 2.50 1.31 0.00 105.00 2.50 1.31 0.00 110.00 2.50 1.31 0.00 115.00 2.50 1.31 0.00 120.00 2.50 1.31 0.00 125.00 2.50 1.31 0.00 130.00 2.50 1.31 0.00 135.00 2.50 1.31 0.00 140.00 2.50 1.31 0.00 145.00 2.50 1.31 0.00 150.00 2.50 1.31 0.00 155.00 2.50 1.31 0.00 160.00 2.50 1.31 0.00 165.00 2.50 1.31 0.00 170.00 2.50 1.31 0.00 175.00 2.50 1.31 0.00 180.00 2.50 1.31 0.00 185.00 2.50 1.31 0.00 190.00 2.50 1.31 0.00 195.00 2.50 1.31 0.00 200.00 2.50 1.31 0.00 205.00 2.50 1.31 0.00 210.00 2.50 1.31 0.00 215.00 2.50 1.31 0.00 220.00 2.50 1.31 0.00 225.00 2.50 1.31 0.00 230.00 2.50 1.31 0.00 235.00 2.50 1.31 0.00 240.00 2.50 1.31 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 20HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment OFFSITE B: OFFSITE B- DRAINS SOUTH TO WETLAND A Runoff = 3.63 cfs @ 12.09 hrs, Volume= 0.173 af, Depth= 1.21" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50" Area (sf) CN Description 6,076 98 Paved parking, HSG C * 68,789 84 74,865 Weighted Average 68,789 91.88% Pervious Area 6,076 8.12% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment OFFSITE B: OFFSITE B- DRAINS SOUTH TO WETLAND A Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)4 3 2 1 0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50" Runoff Area=74,865 sf Runoff Volume=0.173 af Runoff Depth=1.21" Tc=6.0 min CN=WQ 3.63 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 21HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment OFFSITE B: OFFSITE B- DRAINS SOUTH TO WETLAND A Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.12 0.00 0.00 10.00 0.38 0.00 0.01 15.00 2.21 0.96 0.12 20.00 2.40 1.10 0.03 25.00 2.50 1.18 0.00 30.00 2.50 1.18 0.00 35.00 2.50 1.18 0.00 40.00 2.50 1.18 0.00 45.00 2.50 1.18 0.00 50.00 2.50 1.18 0.00 55.00 2.50 1.18 0.00 60.00 2.50 1.18 0.00 65.00 2.50 1.18 0.00 70.00 2.50 1.18 0.00 75.00 2.50 1.18 0.00 80.00 2.50 1.18 0.00 85.00 2.50 1.18 0.00 90.00 2.50 1.18 0.00 95.00 2.50 1.18 0.00 100.00 2.50 1.18 0.00 105.00 2.50 1.18 0.00 110.00 2.50 1.18 0.00 115.00 2.50 1.18 0.00 120.00 2.50 1.18 0.00 125.00 2.50 1.18 0.00 130.00 2.50 1.18 0.00 135.00 2.50 1.18 0.00 140.00 2.50 1.18 0.00 145.00 2.50 1.18 0.00 150.00 2.50 1.18 0.00 155.00 2.50 1.18 0.00 160.00 2.50 1.18 0.00 165.00 2.50 1.18 0.00 170.00 2.50 1.18 0.00 175.00 2.50 1.18 0.00 180.00 2.50 1.18 0.00 185.00 2.50 1.18 0.00 190.00 2.50 1.18 0.00 195.00 2.50 1.18 0.00 200.00 2.50 1.18 0.00 205.00 2.50 1.18 0.00 210.00 2.50 1.18 0.00 215.00 2.50 1.18 0.00 220.00 2.50 1.18 0.00 225.00 2.50 1.18 0.00 230.00 2.50 1.18 0.00 235.00 2.50 1.18 0.00 240.00 2.50 1.18 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 22HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 3.257 ac, 9.42% Impervious, Inflow Depth = 1.22" for 1y 24hr event Inflow = 6.95 cfs @ 12.09 hrs, Volume= 0.332 af Outflow = 6.95 cfs @ 12.09 hrs, Volume= 0.332 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Reach DA2: DA2 - TOTAL FLOW TO WETLAND A Inflow Outflow Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)7 6 5 4 3 2 1 0 Inflow Area=3.257 ac 6.95 cfs 6.95 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 23HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A Time (hours) Inflow (cfs) Elevation (feet) Outflow (cfs) 0.00 0.00 0.00 5.00 0.00 0.00 10.00 0.02 0.02 15.00 0.23 0.23 20.00 0.06 0.06 25.00 0.00 0.00 30.00 0.00 0.00 35.00 0.00 0.00 40.00 0.00 0.00 45.00 0.00 0.00 50.00 0.00 0.00 55.00 0.00 0.00 60.00 0.00 0.00 65.00 0.00 0.00 70.00 0.00 0.00 75.00 0.00 0.00 80.00 0.00 0.00 85.00 0.00 0.00 90.00 0.00 0.00 95.00 0.00 0.00 100.00 0.00 0.00 105.00 0.00 0.00 110.00 0.00 0.00 115.00 0.00 0.00 120.00 0.00 0.00 125.00 0.00 0.00 130.00 0.00 0.00 135.00 0.00 0.00 140.00 0.00 0.00 145.00 0.00 0.00 150.00 0.00 0.00 155.00 0.00 0.00 160.00 0.00 0.00 165.00 0.00 0.00 170.00 0.00 0.00 175.00 0.00 0.00 180.00 0.00 0.00 185.00 0.00 0.00 190.00 0.00 0.00 195.00 0.00 0.00 200.00 0.00 0.00 205.00 0.00 0.00 210.00 0.00 0.00 215.00 0.00 0.00 220.00 0.00 0.00 225.00 0.00 0.00 230.00 0.00 0.00 235.00 0.00 0.00 240.00 0.00 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 24HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 4.523 ac, 12.44% Impervious, Inflow Depth = 1.26" for 1y 24hr event Inflow = 5.68 cfs @ 12.12 hrs, Volume= 0.475 af Outflow = 5.68 cfs @ 12.12 hrs, Volume= 0.475 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Reach DA3: DA3 - TOTAL FLOW TO WETLAND B Inflow Outflow Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)6 5 4 3 2 1 0 Inflow Area=4.523 ac 5.68 cfs 5.68 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 25HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B Time (hours) Inflow (cfs) Elevation (feet) Outflow (cfs) 0.00 0.00 0.00 5.00 0.01 0.01 10.00 0.04 0.04 15.00 0.33 0.33 20.00 0.09 0.09 25.00 0.02 0.02 30.00 0.00 0.00 35.00 0.00 0.00 40.00 0.00 0.00 45.00 0.00 0.00 50.00 0.00 0.00 55.00 0.00 0.00 60.00 0.00 0.00 65.00 0.00 0.00 70.00 0.00 0.00 75.00 0.00 0.00 80.00 0.00 0.00 85.00 0.00 0.00 90.00 0.00 0.00 95.00 0.00 0.00 100.00 0.00 0.00 105.00 0.00 0.00 110.00 0.00 0.00 115.00 0.00 0.00 120.00 0.00 0.00 125.00 0.00 0.00 130.00 0.00 0.00 135.00 0.00 0.00 140.00 0.00 0.00 145.00 0.00 0.00 150.00 0.00 0.00 155.00 0.00 0.00 160.00 0.00 0.00 165.00 0.00 0.00 170.00 0.00 0.00 175.00 0.00 0.00 180.00 0.00 0.00 185.00 0.00 0.00 190.00 0.00 0.00 195.00 0.00 0.00 200.00 0.00 0.00 205.00 0.00 0.00 210.00 0.00 0.00 215.00 0.00 0.00 220.00 0.00 0.00 225.00 0.00 0.00 230.00 0.00 0.00 235.00 0.00 0.00 240.00 0.00 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 26HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Pond 1P: WETLAND A Inflow Area = 3.257 ac, 9.42% Impervious, Inflow Depth = 1.22" for 1y 24hr event Inflow = 6.95 cfs @ 12.09 hrs, Volume= 0.332 af Outflow = 3.64 cfs @ 12.19 hrs, Volume= 0.332 af, Atten= 48%, Lag= 6.1 min Primary = 3.64 cfs @ 12.19 hrs, Volume= 0.332 af Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Peak Elev= 969.90' @ 12.19 hrs Surf.Area= 12,254 sf Storage= 3,265 cf Plug-Flow detention time= 28.8 min calculated for 0.332 af (100% of inflow) Center-of-Mass det. time= 28.9 min ( 843.0 - 814.2 ) Volume Invert Avail.Storage Storage Description #1 969.62' 18,824 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 969.62 11,466 0 0 970.00 12,553 4,564 4,564 971.00 15,967 14,260 18,824 Device Routing Invert Outlet Devices #1 Primary 969.62'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=3.63 cfs @ 12.19 hrs HW=969.90' (Free Discharge) 1=Broad-Crested Rectangular Weir (Weir Controls 3.63 cfs @ 1.32 fps) MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 27HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Pond 1P: WETLAND A Inflow Primary Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)7 6 5 4 3 2 1 0 Inflow Area=3.257 ac Peak Elev=969.90' Storage=3,265 cf 6.95 cfs 3.64 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 28HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Pond 1P: WETLAND A Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Primary (cfs) 0.00 0.00 0 969.62 0.00 5.00 0.00 11 969.62 0.00 10.00 0.02 70 969.63 0.02 15.00 0.23 518 969.66 0.24 20.00 0.06 212 969.64 0.07 25.00 0.00 89 969.63 0.02 30.00 0.00 1 969.62 0.00 35.00 0.00 0 969.62 0.00 40.00 0.00 0 969.62 0.00 45.00 0.00 0 969.62 0.00 50.00 0.00 0 969.62 0.00 55.00 0.00 0 969.62 0.00 60.00 0.00 0 969.62 0.00 65.00 0.00 0 969.62 0.00 70.00 0.00 0 969.62 0.00 75.00 0.00 0 969.62 0.00 80.00 0.00 0 969.62 0.00 85.00 0.00 0 969.62 0.00 90.00 0.00 0 969.62 0.00 95.00 0.00 0 969.62 0.00 100.00 0.00 0 969.62 0.00 105.00 0.00 0 969.62 0.00 110.00 0.00 0 969.62 0.00 115.00 0.00 0 969.62 0.00 120.00 0.00 0 969.62 0.00 125.00 0.00 0 969.62 0.00 130.00 0.00 0 969.62 0.00 135.00 0.00 0 969.62 0.00 140.00 0.00 0 969.62 0.00 145.00 0.00 0 969.62 0.00 150.00 0.00 0 969.62 0.00 155.00 0.00 0 969.62 0.00 160.00 0.00 0 969.62 0.00 165.00 0.00 0 969.62 0.00 170.00 0.00 0 969.62 0.00 175.00 0.00 0 969.62 0.00 180.00 0.00 0 969.62 0.00 185.00 0.00 0 969.62 0.00 190.00 0.00 0 969.62 0.00 195.00 0.00 0 969.62 0.00 200.00 0.00 0 969.62 0.00 205.00 0.00 0 969.62 0.00 210.00 0.00 0 969.62 0.00 215.00 0.00 0 969.62 0.00 220.00 0.00 0 969.62 0.00 225.00 0.00 0 969.62 0.00 230.00 0.00 0 969.62 0.00 235.00 0.00 0 969.62 0.00 240.00 0.00 0 969.62 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 29HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Stage-Discharge for Pond 1P: WETLAND A Elevation (feet) Primary (cfs) 969.62 0.00 969.63 0.02 969.64 0.07 969.65 0.13 969.66 0.20 969.67 0.28 969.68 0.37 969.69 0.46 969.70 0.56 969.71 0.67 969.72 0.79 969.73 0.91 969.74 1.04 969.75 1.17 969.76 1.30 969.77 1.45 969.78 1.59 969.79 1.75 969.80 1.90 969.81 2.06 969.82 2.23 969.83 2.40 969.84 2.58 969.85 2.76 969.86 2.94 969.87 3.13 969.88 3.33 969.89 3.53 969.90 3.73 969.91 3.94 969.92 4.15 969.93 4.36 969.94 4.58 969.95 4.81 969.96 5.03 969.97 5.26 969.98 5.50 969.99 5.74 970.00 5.98 970.01 6.23 970.02 6.48 970.03 6.74 970.04 7.01 970.05 7.28 970.06 7.55 970.07 7.83 970.08 8.12 970.09 8.41 970.10 8.70 970.11 9.00 970.12 9.30 970.13 9.60 Elevation (feet) Primary (cfs) 970.14 9.91 970.15 10.23 970.16 10.55 970.17 10.87 970.18 11.20 970.19 11.53 970.20 11.86 970.21 12.20 970.22 12.55 970.23 12.86 970.24 13.18 970.25 13.49 970.26 13.81 970.27 14.14 970.28 14.46 970.29 14.79 970.30 15.12 970.31 15.45 970.32 15.78 970.33 16.12 970.34 16.46 970.35 16.80 970.36 17.14 970.37 17.49 970.38 17.84 970.39 18.19 970.40 18.54 970.41 18.89 970.42 19.25 970.43 19.61 970.44 19.97 970.45 20.33 970.46 20.69 970.47 21.06 970.48 21.43 970.49 21.80 970.50 22.17 970.51 22.55 970.52 22.92 970.53 23.30 970.54 23.68 970.55 24.07 970.56 24.45 970.57 24.84 970.58 25.23 970.59 25.62 970.60 26.01 970.61 26.40 970.62 26.80 970.63 27.21 970.64 27.62 970.65 28.03 Elevation (feet) Primary (cfs) 970.66 28.45 970.67 28.86 970.68 29.28 970.69 29.70 970.70 30.12 970.71 30.55 970.72 30.98 970.73 31.41 970.74 31.84 970.75 32.27 970.76 32.71 970.77 33.14 970.78 33.58 970.79 34.02 970.80 34.47 970.81 34.91 970.82 35.36 970.83 35.79 970.84 36.22 970.85 36.65 970.86 37.09 970.87 37.52 970.88 37.96 970.89 38.40 970.90 38.84 970.91 39.28 970.92 39.72 970.93 40.17 970.94 40.61 970.95 41.06 970.96 41.51 970.97 41.96 970.98 42.41 970.99 42.86 971.00 43.32 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 30HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Pond 5P: Wetland B [44] Hint: Outlet device #1 is below defined storage [95] Warning: Outlet Device #1 rise exceeded Inflow Area = 12.870 ac, 24.01% Impervious, Inflow Depth = 1.31" for 1y 24hr event Inflow = 18.97 cfs @ 12.13 hrs, Volume= 1.400 af Outflow = 18.85 cfs @ 12.15 hrs, Volume= 1.400 af, Atten= 1%, Lag= 0.9 min Primary = 18.85 cfs @ 12.15 hrs, Volume= 1.400 af Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Peak Elev= 961.61' @ 12.15 hrs Surf.Area= 149,068 sf Storage= 894 cf Plug-Flow detention time= 0.8 min calculated for 1.400 af (100% of inflow) Center-of-Mass det. time= 0.8 min ( 817.8 - 817.0 ) Volume Invert Avail.Storage Storage Description #1 961.60' 841,104 cf Custom Stage Data (Conic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (cubic-feet) (cubic-feet) (sq-ft) 961.60 149,000 0 0 149,000 962.00 153,597 60,517 60,517 153,630 964.00 201,325 353,847 414,364 201,451 966.00 225,646 426,740 841,104 225,991 Device Routing Invert Outlet Devices #1 Primary 960.82'Asymmetrical Weir, C= 3.27 Offset (feet) -70.00 -41.00 0.00 49.00 87.00 Height (feet) 0.35 0.09 0.00 0.09 0.35 Primary OutFlow Max=133.92 cfs @ 12.15 hrs HW=961.61' (Free Discharge) 1=Asymmetrical Weir (Weir Controls 133.92 cfs @ 2.74 fps) MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 31HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Pond 5P: Wetland B Inflow Primary Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Inflow Area=12.870 ac Peak Elev=961.61' Storage=894 cf 18.97 cfs 18.85 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 32HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Pond 5P: Wetland B Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Primary (cfs) 0.00 0.00 0 961.60 0.00 5.00 0.02 1 961.60 0.02 10.00 0.16 8 961.60 0.16 15.00 0.95 45 961.60 0.95 20.00 0.26 12 961.60 0.26 25.00 0.02 1 961.60 0.02 30.00 0.00 0 961.60 0.00 35.00 0.00 0 961.60 0.00 40.00 0.00 0 961.60 0.00 45.00 0.00 0 961.60 0.00 50.00 0.00 0 961.60 0.00 55.00 0.00 0 961.60 0.00 60.00 0.00 0 961.60 0.00 65.00 0.00 0 961.60 0.00 70.00 0.00 0 961.60 0.00 75.00 0.00 0 961.60 0.00 80.00 0.00 0 961.60 0.00 85.00 0.00 0 961.60 0.00 90.00 0.00 0 961.60 0.00 95.00 0.00 0 961.60 0.00 100.00 0.00 0 961.60 0.00 105.00 0.00 0 961.60 0.00 110.00 0.00 0 961.60 0.00 115.00 0.00 0 961.60 0.00 120.00 0.00 0 961.60 0.00 125.00 0.00 0 961.60 0.00 130.00 0.00 0 961.60 0.00 135.00 0.00 0 961.60 0.00 140.00 0.00 0 961.60 0.00 145.00 0.00 0 961.60 0.00 150.00 0.00 0 961.60 0.00 155.00 0.00 0 961.60 0.00 160.00 0.00 0 961.60 0.00 165.00 0.00 0 961.60 0.00 170.00 0.00 0 961.60 0.00 175.00 0.00 0 961.60 0.00 180.00 0.00 0 961.60 0.00 185.00 0.00 0 961.60 0.00 190.00 0.00 0 961.60 0.00 195.00 0.00 0 961.60 0.00 200.00 0.00 0 961.60 0.00 205.00 0.00 0 961.60 0.00 210.00 0.00 0 961.60 0.00 215.00 0.00 0 961.60 0.00 220.00 0.00 0 961.60 0.00 225.00 0.00 0 961.60 0.00 230.00 0.00 0 961.60 0.00 235.00 0.00 0 961.60 0.00 240.00 0.00 0 961.60 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 33HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Stage-Discharge for Pond 5P: Wetland B Elevation (feet) Primary (cfs) 961.60 0.00 961.65 139.02 961.70 144.59 961.75 149.95 961.80 155.13 961.85 160.13 961.90 164.98 961.95 169.69 962.00 174.28 962.05 178.74 962.10 183.09 962.15 187.35 962.20 191.51 962.25 195.57 962.30 199.56 962.35 203.47 962.40 207.30 962.45 211.06 962.50 214.76 962.55 218.40 962.60 221.97 962.65 225.49 962.70 228.95 962.75 232.36 962.80 235.73 962.85 239.04 962.90 242.31 962.95 245.54 963.00 248.72 963.05 251.87 963.10 254.97 963.15 258.04 963.20 261.07 963.25 264.07 963.30 267.03 963.35 269.96 963.40 272.86 963.45 275.73 963.50 278.56 963.55 281.37 963.60 284.16 963.65 286.91 963.70 289.64 963.75 292.34 963.80 295.02 963.85 297.68 963.90 300.31 963.95 302.92 964.00 305.50 964.05 308.07 964.10 310.61 964.15 313.13 Elevation (feet) Primary (cfs) 964.20 315.63 964.25 318.12 964.30 320.58 964.35 323.02 964.40 325.45 964.45 327.86 964.50 330.25 964.55 332.62 964.60 334.98 964.65 337.32 964.70 339.64 964.75 341.95 964.80 344.24 964.85 346.52 964.90 348.78 964.95 351.03 965.00 353.26 965.05 355.48 965.10 357.69 965.15 359.88 965.20 362.06 965.25 364.23 965.30 366.38 965.35 368.52 965.40 370.65 965.45 372.76 965.50 374.87 965.55 376.96 965.60 379.04 965.65 381.11 965.70 383.17 965.75 385.22 965.80 387.25 965.85 389.28 965.90 391.29 965.95 393.30 966.00 395.29 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 34HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Time span=0.00-240.00 hrs, dt=0.01 hrs, 24001 points Runoff by SCS TR-20 method, UH=SCS, Weighted-Q Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Runoff Area=125,400 sf 0.00% Impervious Runoff Depth=1.41"Subcatchment 6S: UNDISTURBED Tc=6.0 min CN=84 Runoff=7.23 cfs 0.338 af Runoff Area=238,192 sf 46.22% Impervious Runoff Depth=1.76"Subcatchment 7S: OFFSITE WETLAND B Flow Length=1,100' Slope=0.1500 '/' Tc=13.4 min CN=WQ Runoff=11.78 cfs 0.801 af Runoff Area=3,245 sf 100.00% Impervious Runoff Depth=2.64"Subcatchment EX1A: EX1A - DRAINS Tc=6.0 min CN=WQ Runoff=0.32 cfs 0.016 af Runoff Area=62,807 sf 11.61% Impervious Runoff Depth=1.55"Subcatchment EX1B: EX1B - DRAINS Tc=6.0 min CN=WQ Runoff=3.91 cfs 0.187 af Runoff Area=4,200 sf 0.00% Impervious Runoff Depth=1.41"Subcatchment EX1C: EX1C - DRAINS Tc=6.0 min CN=WQ Runoff=0.24 cfs 0.011 af Runoff Area=5,580 sf 40.82% Impervious Runoff Depth=1.91"Subcatchment EX2: EX2 - DRAINS SOUTH Tc=6.0 min CN=WQ Runoff=0.41 cfs 0.020 af Runoff Area=49,573 sf 17.90% Impervious Runoff Depth=1.63"Subcatchment OFFSITE A: OFFSITE A - Tc=6.0 min CN=WQ Runoff=3.21 cfs 0.155 af Runoff Area=74,865 sf 8.12% Impervious Runoff Depth=1.51"Subcatchment OFFSITE B: OFFSITE B- Tc=6.0 min CN=WQ Runoff=4.56 cfs 0.216 af Inflow=8.71 cfs 0.414 afReach DA2: DA2 - TOTAL FLOW TO WETLAND A Outflow=8.71 cfs 0.414 af Inflow=7.38 cfs 0.589 afReach DA3: DA3 - TOTAL FLOW TO WETLAND B Outflow=7.38 cfs 0.589 af Peak Elev=969.95' Storage=3,933 cf Inflow=8.71 cfs 0.414 afPond 1P: WETLAND A Outflow=4.80 cfs 0.414 af Peak Elev=961.61' Storage=1,124 cf Inflow=23.85 cfs 1.728 afPond 5P: Wetland B Outflow=23.70 cfs 1.728 af Total Runoff Area = 12.944 ac Runoff Volume = 1.745 af Average Runoff Depth = 1.62" 75.55% Pervious = 9.780 ac 24.45% Impervious = 3.165 ac MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 35HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment 6S: UNDISTURBED Runoff = 7.23 cfs @ 12.09 hrs, Volume= 0.338 af, Depth= 1.41" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87" Area (sf) CN Description * 125,400 84 125,400 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment 6S: UNDISTURBED Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)8 7 6 5 4 3 2 1 0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87" Runoff Area=125,400 sf Runoff Volume=0.338 af Runoff Depth=1.41" Tc=6.0 min CN=84 7.23 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 36HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 6S: UNDISTURBED Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.14 0.00 0.00 10.00 0.43 0.00 0.01 15.00 2.54 1.15 0.24 20.00 2.76 1.32 0.07 25.00 2.87 1.41 0.00 30.00 2.87 1.41 0.00 35.00 2.87 1.41 0.00 40.00 2.87 1.41 0.00 45.00 2.87 1.41 0.00 50.00 2.87 1.41 0.00 55.00 2.87 1.41 0.00 60.00 2.87 1.41 0.00 65.00 2.87 1.41 0.00 70.00 2.87 1.41 0.00 75.00 2.87 1.41 0.00 80.00 2.87 1.41 0.00 85.00 2.87 1.41 0.00 90.00 2.87 1.41 0.00 95.00 2.87 1.41 0.00 100.00 2.87 1.41 0.00 105.00 2.87 1.41 0.00 110.00 2.87 1.41 0.00 115.00 2.87 1.41 0.00 120.00 2.87 1.41 0.00 125.00 2.87 1.41 0.00 130.00 2.87 1.41 0.00 135.00 2.87 1.41 0.00 140.00 2.87 1.41 0.00 145.00 2.87 1.41 0.00 150.00 2.87 1.41 0.00 155.00 2.87 1.41 0.00 160.00 2.87 1.41 0.00 165.00 2.87 1.41 0.00 170.00 2.87 1.41 0.00 175.00 2.87 1.41 0.00 180.00 2.87 1.41 0.00 185.00 2.87 1.41 0.00 190.00 2.87 1.41 0.00 195.00 2.87 1.41 0.00 200.00 2.87 1.41 0.00 205.00 2.87 1.41 0.00 210.00 2.87 1.41 0.00 215.00 2.87 1.41 0.00 220.00 2.87 1.41 0.00 225.00 2.87 1.41 0.00 230.00 2.87 1.41 0.00 235.00 2.87 1.41 0.00 240.00 2.87 1.41 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 37HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment 7S: OFFSITE WETLAND B WATERSHED Runoff = 11.78 cfs @ 12.18 hrs, Volume= 0.801 af, Depth= 1.76" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87" Area (sf) CN Description 67,393 98 Unconnected roofs, HSG B * 170,799 84 1/2 acre lots, 25% imp, HSG B 238,192 Weighted Average 128,099 53.78% Pervious Area 110,093 46.22% Impervious Area 67,393 61.21% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.9 200 0.1500 0.42 Sheet Flow, Grass: Short n= 0.150 P2= 2.94" 5.5 900 0.1500 2.71 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 13.4 1,100 Total Subcatchment 7S: OFFSITE WETLAND B WATERSHED Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)13 12 11 10 9 8 7 6 5 4 3 2 1 0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87" Runoff Area=238,192 sf Runoff Volume=0.801 af Runoff Depth=1.76" Flow Length=1,100' Slope=0.1500 '/' Tc=13.4 min CN=WQ 11.78 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 38HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 7S: OFFSITE WETLAND B WATERSHED Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.14 0.00 0.02 10.00 0.43 0.02 0.16 15.00 2.54 1.42 0.50 20.00 2.76 1.60 0.13 25.00 2.87 1.70 0.00 30.00 2.87 1.70 0.00 35.00 2.87 1.70 0.00 40.00 2.87 1.70 0.00 45.00 2.87 1.70 0.00 50.00 2.87 1.70 0.00 55.00 2.87 1.70 0.00 60.00 2.87 1.70 0.00 65.00 2.87 1.70 0.00 70.00 2.87 1.70 0.00 75.00 2.87 1.70 0.00 80.00 2.87 1.70 0.00 85.00 2.87 1.70 0.00 90.00 2.87 1.70 0.00 95.00 2.87 1.70 0.00 100.00 2.87 1.70 0.00 105.00 2.87 1.70 0.00 110.00 2.87 1.70 0.00 115.00 2.87 1.70 0.00 120.00 2.87 1.70 0.00 125.00 2.87 1.70 0.00 130.00 2.87 1.70 0.00 135.00 2.87 1.70 0.00 140.00 2.87 1.70 0.00 145.00 2.87 1.70 0.00 150.00 2.87 1.70 0.00 155.00 2.87 1.70 0.00 160.00 2.87 1.70 0.00 165.00 2.87 1.70 0.00 170.00 2.87 1.70 0.00 175.00 2.87 1.70 0.00 180.00 2.87 1.70 0.00 185.00 2.87 1.70 0.00 190.00 2.87 1.70 0.00 195.00 2.87 1.70 0.00 200.00 2.87 1.70 0.00 205.00 2.87 1.70 0.00 210.00 2.87 1.70 0.00 215.00 2.87 1.70 0.00 220.00 2.87 1.70 0.00 225.00 2.87 1.70 0.00 230.00 2.87 1.70 0.00 235.00 2.87 1.70 0.00 240.00 2.87 1.70 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 39HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment EX1A: EX1A - DRAINS EAST DOWN LAKE LUCY ROAD Runoff = 0.32 cfs @ 12.08 hrs, Volume= 0.016 af, Depth= 2.64" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87" Area (sf) CN Description 3,245 98 Paved parking, HSG C * 0 84 3,245 Weighted Average 3,245 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment EX1A: EX1A - DRAINS EAST DOWN LAKE LUCY ROAD Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.34 0.32 0.3 0.28 0.26 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87" Runoff Area=3,245 sf Runoff Volume=0.016 af Runoff Depth=2.64" Tc=6.0 min CN=WQ 0.32 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 40HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment EX1A: EX1A - DRAINS EAST DOWN LAKE LUCY ROAD Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.14 0.03 0.00 10.00 0.43 0.26 0.01 15.00 2.54 2.31 0.01 20.00 2.76 2.53 0.00 25.00 2.87 2.64 0.00 30.00 2.87 2.64 0.00 35.00 2.87 2.64 0.00 40.00 2.87 2.64 0.00 45.00 2.87 2.64 0.00 50.00 2.87 2.64 0.00 55.00 2.87 2.64 0.00 60.00 2.87 2.64 0.00 65.00 2.87 2.64 0.00 70.00 2.87 2.64 0.00 75.00 2.87 2.64 0.00 80.00 2.87 2.64 0.00 85.00 2.87 2.64 0.00 90.00 2.87 2.64 0.00 95.00 2.87 2.64 0.00 100.00 2.87 2.64 0.00 105.00 2.87 2.64 0.00 110.00 2.87 2.64 0.00 115.00 2.87 2.64 0.00 120.00 2.87 2.64 0.00 125.00 2.87 2.64 0.00 130.00 2.87 2.64 0.00 135.00 2.87 2.64 0.00 140.00 2.87 2.64 0.00 145.00 2.87 2.64 0.00 150.00 2.87 2.64 0.00 155.00 2.87 2.64 0.00 160.00 2.87 2.64 0.00 165.00 2.87 2.64 0.00 170.00 2.87 2.64 0.00 175.00 2.87 2.64 0.00 180.00 2.87 2.64 0.00 185.00 2.87 2.64 0.00 190.00 2.87 2.64 0.00 195.00 2.87 2.64 0.00 200.00 2.87 2.64 0.00 205.00 2.87 2.64 0.00 210.00 2.87 2.64 0.00 215.00 2.87 2.64 0.00 220.00 2.87 2.64 0.00 225.00 2.87 2.64 0.00 230.00 2.87 2.64 0.00 235.00 2.87 2.64 0.00 240.00 2.87 2.64 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 41HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment EX1B: EX1B - DRAINS SOUTH TO WETLAND A Runoff = 3.91 cfs @ 12.09 hrs, Volume= 0.187 af, Depth= 1.55" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87" Area (sf) CN Description 7,290 98 Paved parking, HSG C 55,517 84 62,807 Weighted Average 55,517 88.39% Pervious Area 7,290 11.61% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment EX1B: EX1B - DRAINS SOUTH TO WETLAND A Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)4 3 2 1 0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87" Runoff Area=62,807 sf Runoff Volume=0.187 af Runoff Depth=1.55" Tc=6.0 min CN=WQ 3.91 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 42HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment EX1B: EX1B - DRAINS SOUTH TO WETLAND A Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.14 0.00 0.00 10.00 0.43 0.01 0.02 15.00 2.54 1.28 0.13 20.00 2.76 1.46 0.03 25.00 2.87 1.55 0.00 30.00 2.87 1.55 0.00 35.00 2.87 1.55 0.00 40.00 2.87 1.55 0.00 45.00 2.87 1.55 0.00 50.00 2.87 1.55 0.00 55.00 2.87 1.55 0.00 60.00 2.87 1.55 0.00 65.00 2.87 1.55 0.00 70.00 2.87 1.55 0.00 75.00 2.87 1.55 0.00 80.00 2.87 1.55 0.00 85.00 2.87 1.55 0.00 90.00 2.87 1.55 0.00 95.00 2.87 1.55 0.00 100.00 2.87 1.55 0.00 105.00 2.87 1.55 0.00 110.00 2.87 1.55 0.00 115.00 2.87 1.55 0.00 120.00 2.87 1.55 0.00 125.00 2.87 1.55 0.00 130.00 2.87 1.55 0.00 135.00 2.87 1.55 0.00 140.00 2.87 1.55 0.00 145.00 2.87 1.55 0.00 150.00 2.87 1.55 0.00 155.00 2.87 1.55 0.00 160.00 2.87 1.55 0.00 165.00 2.87 1.55 0.00 170.00 2.87 1.55 0.00 175.00 2.87 1.55 0.00 180.00 2.87 1.55 0.00 185.00 2.87 1.55 0.00 190.00 2.87 1.55 0.00 195.00 2.87 1.55 0.00 200.00 2.87 1.55 0.00 205.00 2.87 1.55 0.00 210.00 2.87 1.55 0.00 215.00 2.87 1.55 0.00 220.00 2.87 1.55 0.00 225.00 2.87 1.55 0.00 230.00 2.87 1.55 0.00 235.00 2.87 1.55 0.00 240.00 2.87 1.55 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 43HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment EX1C: EX1C - DRAINS SOUTH TO WETLAND A Runoff = 0.24 cfs @ 12.09 hrs, Volume= 0.011 af, Depth= 1.41" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87" Area (sf) CN Description 0 98 Paved parking, HSG C * 4,200 84 4,200 Weighted Average 4,200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment EX1C: EX1C - DRAINS SOUTH TO WETLAND A Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.26 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87" Runoff Area=4,200 sf Runoff Volume=0.011 af Runoff Depth=1.41" Tc=6.0 min CN=WQ 0.24 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 44HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment EX1C: EX1C - DRAINS SOUTH TO WETLAND A Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.14 0.00 0.00 10.00 0.43 0.00 0.00 15.00 2.54 1.15 0.01 20.00 2.76 1.32 0.00 25.00 2.87 1.41 0.00 30.00 2.87 1.41 0.00 35.00 2.87 1.41 0.00 40.00 2.87 1.41 0.00 45.00 2.87 1.41 0.00 50.00 2.87 1.41 0.00 55.00 2.87 1.41 0.00 60.00 2.87 1.41 0.00 65.00 2.87 1.41 0.00 70.00 2.87 1.41 0.00 75.00 2.87 1.41 0.00 80.00 2.87 1.41 0.00 85.00 2.87 1.41 0.00 90.00 2.87 1.41 0.00 95.00 2.87 1.41 0.00 100.00 2.87 1.41 0.00 105.00 2.87 1.41 0.00 110.00 2.87 1.41 0.00 115.00 2.87 1.41 0.00 120.00 2.87 1.41 0.00 125.00 2.87 1.41 0.00 130.00 2.87 1.41 0.00 135.00 2.87 1.41 0.00 140.00 2.87 1.41 0.00 145.00 2.87 1.41 0.00 150.00 2.87 1.41 0.00 155.00 2.87 1.41 0.00 160.00 2.87 1.41 0.00 165.00 2.87 1.41 0.00 170.00 2.87 1.41 0.00 175.00 2.87 1.41 0.00 180.00 2.87 1.41 0.00 185.00 2.87 1.41 0.00 190.00 2.87 1.41 0.00 195.00 2.87 1.41 0.00 200.00 2.87 1.41 0.00 205.00 2.87 1.41 0.00 210.00 2.87 1.41 0.00 215.00 2.87 1.41 0.00 220.00 2.87 1.41 0.00 225.00 2.87 1.41 0.00 230.00 2.87 1.41 0.00 235.00 2.87 1.41 0.00 240.00 2.87 1.41 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 45HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment EX2: EX2 - DRAINS SOUTH TO WETLAND B Runoff = 0.41 cfs @ 12.09 hrs, Volume= 0.020 af, Depth= 1.91" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87" Area (sf) CN Description 2,278 98 Paved parking, HSG C * 3,302 84 5,580 Weighted Average 3,302 59.18% Pervious Area 2,278 40.82% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment EX2: EX2 - DRAINS SOUTH TO WETLAND B Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.46 0.44 0.42 0.4 0.38 0.36 0.34 0.32 0.3 0.28 0.26 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87" Runoff Area=5,580 sf Runoff Volume=0.020 af Runoff Depth=1.91" Tc=6.0 min CN=WQ 0.41 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 46HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment EX2: EX2 - DRAINS SOUTH TO WETLAND B Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.14 0.00 0.00 10.00 0.43 0.03 0.01 15.00 2.54 1.57 0.01 20.00 2.76 1.76 0.00 25.00 2.87 1.87 0.00 30.00 2.87 1.87 0.00 35.00 2.87 1.87 0.00 40.00 2.87 1.87 0.00 45.00 2.87 1.87 0.00 50.00 2.87 1.87 0.00 55.00 2.87 1.87 0.00 60.00 2.87 1.87 0.00 65.00 2.87 1.87 0.00 70.00 2.87 1.87 0.00 75.00 2.87 1.87 0.00 80.00 2.87 1.87 0.00 85.00 2.87 1.87 0.00 90.00 2.87 1.87 0.00 95.00 2.87 1.87 0.00 100.00 2.87 1.87 0.00 105.00 2.87 1.87 0.00 110.00 2.87 1.87 0.00 115.00 2.87 1.87 0.00 120.00 2.87 1.87 0.00 125.00 2.87 1.87 0.00 130.00 2.87 1.87 0.00 135.00 2.87 1.87 0.00 140.00 2.87 1.87 0.00 145.00 2.87 1.87 0.00 150.00 2.87 1.87 0.00 155.00 2.87 1.87 0.00 160.00 2.87 1.87 0.00 165.00 2.87 1.87 0.00 170.00 2.87 1.87 0.00 175.00 2.87 1.87 0.00 180.00 2.87 1.87 0.00 185.00 2.87 1.87 0.00 190.00 2.87 1.87 0.00 195.00 2.87 1.87 0.00 200.00 2.87 1.87 0.00 205.00 2.87 1.87 0.00 210.00 2.87 1.87 0.00 215.00 2.87 1.87 0.00 220.00 2.87 1.87 0.00 225.00 2.87 1.87 0.00 230.00 2.87 1.87 0.00 235.00 2.87 1.87 0.00 240.00 2.87 1.87 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 47HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment OFFSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B Runoff = 3.21 cfs @ 12.09 hrs, Volume= 0.155 af, Depth= 1.63" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87" Area (sf) CN Description 8,875 98 Paved parking, HSG C * 40,698 84 49,573 Weighted Average 40,698 82.10% Pervious Area 8,875 17.90% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment OFFSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)3 2 1 0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87" Runoff Area=49,573 sf Runoff Volume=0.155 af Runoff Depth=1.63" Tc=6.0 min CN=WQ 3.21 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 48HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment OFFSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.14 0.00 0.00 10.00 0.43 0.01 0.02 15.00 2.54 1.35 0.10 20.00 2.76 1.53 0.03 25.00 2.87 1.63 0.00 30.00 2.87 1.63 0.00 35.00 2.87 1.63 0.00 40.00 2.87 1.63 0.00 45.00 2.87 1.63 0.00 50.00 2.87 1.63 0.00 55.00 2.87 1.63 0.00 60.00 2.87 1.63 0.00 65.00 2.87 1.63 0.00 70.00 2.87 1.63 0.00 75.00 2.87 1.63 0.00 80.00 2.87 1.63 0.00 85.00 2.87 1.63 0.00 90.00 2.87 1.63 0.00 95.00 2.87 1.63 0.00 100.00 2.87 1.63 0.00 105.00 2.87 1.63 0.00 110.00 2.87 1.63 0.00 115.00 2.87 1.63 0.00 120.00 2.87 1.63 0.00 125.00 2.87 1.63 0.00 130.00 2.87 1.63 0.00 135.00 2.87 1.63 0.00 140.00 2.87 1.63 0.00 145.00 2.87 1.63 0.00 150.00 2.87 1.63 0.00 155.00 2.87 1.63 0.00 160.00 2.87 1.63 0.00 165.00 2.87 1.63 0.00 170.00 2.87 1.63 0.00 175.00 2.87 1.63 0.00 180.00 2.87 1.63 0.00 185.00 2.87 1.63 0.00 190.00 2.87 1.63 0.00 195.00 2.87 1.63 0.00 200.00 2.87 1.63 0.00 205.00 2.87 1.63 0.00 210.00 2.87 1.63 0.00 215.00 2.87 1.63 0.00 220.00 2.87 1.63 0.00 225.00 2.87 1.63 0.00 230.00 2.87 1.63 0.00 235.00 2.87 1.63 0.00 240.00 2.87 1.63 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 49HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment OFFSITE B: OFFSITE B- DRAINS SOUTH TO WETLAND A Runoff = 4.56 cfs @ 12.09 hrs, Volume= 0.216 af, Depth= 1.51" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87" Area (sf) CN Description 6,076 98 Paved parking, HSG C * 68,789 84 74,865 Weighted Average 68,789 91.88% Pervious Area 6,076 8.12% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment OFFSITE B: OFFSITE B- DRAINS SOUTH TO WETLAND A Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)5 4 3 2 1 0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87" Runoff Area=74,865 sf Runoff Volume=0.216 af Runoff Depth=1.51" Tc=6.0 min CN=WQ 4.56 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 50HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment OFFSITE B: OFFSITE B- DRAINS SOUTH TO WETLAND A Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.14 0.00 0.00 10.00 0.43 0.00 0.02 15.00 2.54 1.21 0.15 20.00 2.76 1.39 0.04 25.00 2.87 1.48 0.00 30.00 2.87 1.48 0.00 35.00 2.87 1.48 0.00 40.00 2.87 1.48 0.00 45.00 2.87 1.48 0.00 50.00 2.87 1.48 0.00 55.00 2.87 1.48 0.00 60.00 2.87 1.48 0.00 65.00 2.87 1.48 0.00 70.00 2.87 1.48 0.00 75.00 2.87 1.48 0.00 80.00 2.87 1.48 0.00 85.00 2.87 1.48 0.00 90.00 2.87 1.48 0.00 95.00 2.87 1.48 0.00 100.00 2.87 1.48 0.00 105.00 2.87 1.48 0.00 110.00 2.87 1.48 0.00 115.00 2.87 1.48 0.00 120.00 2.87 1.48 0.00 125.00 2.87 1.48 0.00 130.00 2.87 1.48 0.00 135.00 2.87 1.48 0.00 140.00 2.87 1.48 0.00 145.00 2.87 1.48 0.00 150.00 2.87 1.48 0.00 155.00 2.87 1.48 0.00 160.00 2.87 1.48 0.00 165.00 2.87 1.48 0.00 170.00 2.87 1.48 0.00 175.00 2.87 1.48 0.00 180.00 2.87 1.48 0.00 185.00 2.87 1.48 0.00 190.00 2.87 1.48 0.00 195.00 2.87 1.48 0.00 200.00 2.87 1.48 0.00 205.00 2.87 1.48 0.00 210.00 2.87 1.48 0.00 215.00 2.87 1.48 0.00 220.00 2.87 1.48 0.00 225.00 2.87 1.48 0.00 230.00 2.87 1.48 0.00 235.00 2.87 1.48 0.00 240.00 2.87 1.48 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 51HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 3.257 ac, 9.42% Impervious, Inflow Depth = 1.53" for 2y 24hr event Inflow = 8.71 cfs @ 12.09 hrs, Volume= 0.414 af Outflow = 8.71 cfs @ 12.09 hrs, Volume= 0.414 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Reach DA2: DA2 - TOTAL FLOW TO WETLAND A Inflow Outflow Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)9 8 7 6 5 4 3 2 1 0 Inflow Area=3.257 ac 8.71 cfs 8.71 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 52HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A Time (hours) Inflow (cfs) Elevation (feet) Outflow (cfs) 0.00 0.00 0.00 5.00 0.00 0.00 10.00 0.04 0.04 15.00 0.28 0.28 20.00 0.08 0.08 25.00 0.00 0.00 30.00 0.00 0.00 35.00 0.00 0.00 40.00 0.00 0.00 45.00 0.00 0.00 50.00 0.00 0.00 55.00 0.00 0.00 60.00 0.00 0.00 65.00 0.00 0.00 70.00 0.00 0.00 75.00 0.00 0.00 80.00 0.00 0.00 85.00 0.00 0.00 90.00 0.00 0.00 95.00 0.00 0.00 100.00 0.00 0.00 105.00 0.00 0.00 110.00 0.00 0.00 115.00 0.00 0.00 120.00 0.00 0.00 125.00 0.00 0.00 130.00 0.00 0.00 135.00 0.00 0.00 140.00 0.00 0.00 145.00 0.00 0.00 150.00 0.00 0.00 155.00 0.00 0.00 160.00 0.00 0.00 165.00 0.00 0.00 170.00 0.00 0.00 175.00 0.00 0.00 180.00 0.00 0.00 185.00 0.00 0.00 190.00 0.00 0.00 195.00 0.00 0.00 200.00 0.00 0.00 205.00 0.00 0.00 210.00 0.00 0.00 215.00 0.00 0.00 220.00 0.00 0.00 225.00 0.00 0.00 230.00 0.00 0.00 235.00 0.00 0.00 240.00 0.00 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 53HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 4.523 ac, 12.44% Impervious, Inflow Depth = 1.56" for 2y 24hr event Inflow = 7.38 cfs @ 12.12 hrs, Volume= 0.589 af Outflow = 7.38 cfs @ 12.12 hrs, Volume= 0.589 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Reach DA3: DA3 - TOTAL FLOW TO WETLAND B Inflow Outflow Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)8 7 6 5 4 3 2 1 0 Inflow Area=4.523 ac 7.38 cfs 7.38 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 54HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B Time (hours) Inflow (cfs) Elevation (feet) Outflow (cfs) 0.00 0.00 0.00 5.00 0.01 0.01 10.00 0.05 0.05 15.00 0.40 0.40 20.00 0.11 0.11 25.00 0.02 0.02 30.00 0.00 0.00 35.00 0.00 0.00 40.00 0.00 0.00 45.00 0.00 0.00 50.00 0.00 0.00 55.00 0.00 0.00 60.00 0.00 0.00 65.00 0.00 0.00 70.00 0.00 0.00 75.00 0.00 0.00 80.00 0.00 0.00 85.00 0.00 0.00 90.00 0.00 0.00 95.00 0.00 0.00 100.00 0.00 0.00 105.00 0.00 0.00 110.00 0.00 0.00 115.00 0.00 0.00 120.00 0.00 0.00 125.00 0.00 0.00 130.00 0.00 0.00 135.00 0.00 0.00 140.00 0.00 0.00 145.00 0.00 0.00 150.00 0.00 0.00 155.00 0.00 0.00 160.00 0.00 0.00 165.00 0.00 0.00 170.00 0.00 0.00 175.00 0.00 0.00 180.00 0.00 0.00 185.00 0.00 0.00 190.00 0.00 0.00 195.00 0.00 0.00 200.00 0.00 0.00 205.00 0.00 0.00 210.00 0.00 0.00 215.00 0.00 0.00 220.00 0.00 0.00 225.00 0.00 0.00 230.00 0.00 0.00 235.00 0.00 0.00 240.00 0.00 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 55HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Pond 1P: WETLAND A Inflow Area = 3.257 ac, 9.42% Impervious, Inflow Depth = 1.53" for 2y 24hr event Inflow = 8.71 cfs @ 12.09 hrs, Volume= 0.414 af Outflow = 4.80 cfs @ 12.18 hrs, Volume= 0.414 af, Atten= 45%, Lag= 5.6 min Primary = 4.80 cfs @ 12.18 hrs, Volume= 0.414 af Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Peak Elev= 969.95' @ 12.18 hrs Surf.Area= 12,408 sf Storage= 3,933 cf Plug-Flow detention time= 26.8 min calculated for 0.414 af (100% of inflow) Center-of-Mass det. time= 26.9 min ( 836.7 - 809.8 ) Volume Invert Avail.Storage Storage Description #1 969.62' 18,824 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 969.62 11,466 0 0 970.00 12,553 4,564 4,564 971.00 15,967 14,260 18,824 Device Routing Invert Outlet Devices #1 Primary 969.62'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=4.79 cfs @ 12.18 hrs HW=969.95' (Free Discharge) 1=Broad-Crested Rectangular Weir (Weir Controls 4.79 cfs @ 1.46 fps) MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 56HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Pond 1P: WETLAND A Inflow Primary Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)9 8 7 6 5 4 3 2 1 0 Inflow Area=3.257 ac Peak Elev=969.95' Storage=3,933 cf 8.71 cfs 4.80 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 57HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Pond 1P: WETLAND A Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Primary (cfs) 0.00 0.00 0 969.62 0.00 5.00 0.00 14 969.62 0.00 10.00 0.04 93 969.63 0.02 15.00 0.28 585 969.67 0.29 20.00 0.08 239 969.64 0.08 25.00 0.00 98 969.63 0.02 30.00 0.00 1 969.62 0.00 35.00 0.00 0 969.62 0.00 40.00 0.00 0 969.62 0.00 45.00 0.00 0 969.62 0.00 50.00 0.00 0 969.62 0.00 55.00 0.00 0 969.62 0.00 60.00 0.00 0 969.62 0.00 65.00 0.00 0 969.62 0.00 70.00 0.00 0 969.62 0.00 75.00 0.00 0 969.62 0.00 80.00 0.00 0 969.62 0.00 85.00 0.00 0 969.62 0.00 90.00 0.00 0 969.62 0.00 95.00 0.00 0 969.62 0.00 100.00 0.00 0 969.62 0.00 105.00 0.00 0 969.62 0.00 110.00 0.00 0 969.62 0.00 115.00 0.00 0 969.62 0.00 120.00 0.00 0 969.62 0.00 125.00 0.00 0 969.62 0.00 130.00 0.00 0 969.62 0.00 135.00 0.00 0 969.62 0.00 140.00 0.00 0 969.62 0.00 145.00 0.00 0 969.62 0.00 150.00 0.00 0 969.62 0.00 155.00 0.00 0 969.62 0.00 160.00 0.00 0 969.62 0.00 165.00 0.00 0 969.62 0.00 170.00 0.00 0 969.62 0.00 175.00 0.00 0 969.62 0.00 180.00 0.00 0 969.62 0.00 185.00 0.00 0 969.62 0.00 190.00 0.00 0 969.62 0.00 195.00 0.00 0 969.62 0.00 200.00 0.00 0 969.62 0.00 205.00 0.00 0 969.62 0.00 210.00 0.00 0 969.62 0.00 215.00 0.00 0 969.62 0.00 220.00 0.00 0 969.62 0.00 225.00 0.00 0 969.62 0.00 230.00 0.00 0 969.62 0.00 235.00 0.00 0 969.62 0.00 240.00 0.00 0 969.62 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 58HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Stage-Discharge for Pond 1P: WETLAND A Elevation (feet) Primary (cfs) 969.62 0.00 969.63 0.02 969.64 0.07 969.65 0.13 969.66 0.20 969.67 0.28 969.68 0.37 969.69 0.46 969.70 0.56 969.71 0.67 969.72 0.79 969.73 0.91 969.74 1.04 969.75 1.17 969.76 1.30 969.77 1.45 969.78 1.59 969.79 1.75 969.80 1.90 969.81 2.06 969.82 2.23 969.83 2.40 969.84 2.58 969.85 2.76 969.86 2.94 969.87 3.13 969.88 3.33 969.89 3.53 969.90 3.73 969.91 3.94 969.92 4.15 969.93 4.36 969.94 4.58 969.95 4.81 969.96 5.03 969.97 5.26 969.98 5.50 969.99 5.74 970.00 5.98 970.01 6.23 970.02 6.48 970.03 6.74 970.04 7.01 970.05 7.28 970.06 7.55 970.07 7.83 970.08 8.12 970.09 8.41 970.10 8.70 970.11 9.00 970.12 9.30 970.13 9.60 Elevation (feet) Primary (cfs) 970.14 9.91 970.15 10.23 970.16 10.55 970.17 10.87 970.18 11.20 970.19 11.53 970.20 11.86 970.21 12.20 970.22 12.55 970.23 12.86 970.24 13.18 970.25 13.49 970.26 13.81 970.27 14.14 970.28 14.46 970.29 14.79 970.30 15.12 970.31 15.45 970.32 15.78 970.33 16.12 970.34 16.46 970.35 16.80 970.36 17.14 970.37 17.49 970.38 17.84 970.39 18.19 970.40 18.54 970.41 18.89 970.42 19.25 970.43 19.61 970.44 19.97 970.45 20.33 970.46 20.69 970.47 21.06 970.48 21.43 970.49 21.80 970.50 22.17 970.51 22.55 970.52 22.92 970.53 23.30 970.54 23.68 970.55 24.07 970.56 24.45 970.57 24.84 970.58 25.23 970.59 25.62 970.60 26.01 970.61 26.40 970.62 26.80 970.63 27.21 970.64 27.62 970.65 28.03 Elevation (feet) Primary (cfs) 970.66 28.45 970.67 28.86 970.68 29.28 970.69 29.70 970.70 30.12 970.71 30.55 970.72 30.98 970.73 31.41 970.74 31.84 970.75 32.27 970.76 32.71 970.77 33.14 970.78 33.58 970.79 34.02 970.80 34.47 970.81 34.91 970.82 35.36 970.83 35.79 970.84 36.22 970.85 36.65 970.86 37.09 970.87 37.52 970.88 37.96 970.89 38.40 970.90 38.84 970.91 39.28 970.92 39.72 970.93 40.17 970.94 40.61 970.95 41.06 970.96 41.51 970.97 41.96 970.98 42.41 970.99 42.86 971.00 43.32 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 59HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Pond 5P: Wetland B [44] Hint: Outlet device #1 is below defined storage [95] Warning: Outlet Device #1 rise exceeded Inflow Area = 12.870 ac, 24.01% Impervious, Inflow Depth = 1.61" for 2y 24hr event Inflow = 23.85 cfs @ 12.13 hrs, Volume= 1.728 af Outflow = 23.70 cfs @ 12.14 hrs, Volume= 1.728 af, Atten= 1%, Lag= 0.9 min Primary = 23.70 cfs @ 12.14 hrs, Volume= 1.728 af Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Peak Elev= 961.61' @ 12.14 hrs Surf.Area= 149,086 sf Storage= 1,124 cf Plug-Flow detention time= 0.8 min calculated for 1.728 af (100% of inflow) Center-of-Mass det. time= 0.8 min ( 813.6 - 812.8 ) Volume Invert Avail.Storage Storage Description #1 961.60' 841,104 cf Custom Stage Data (Conic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (cubic-feet) (cubic-feet) (sq-ft) 961.60 149,000 0 0 149,000 962.00 153,597 60,517 60,517 153,630 964.00 201,325 353,847 414,364 201,451 966.00 225,646 426,740 841,104 225,991 Device Routing Invert Outlet Devices #1 Primary 960.82'Asymmetrical Weir, C= 3.27 Offset (feet) -70.00 -41.00 0.00 49.00 87.00 Height (feet) 0.35 0.09 0.00 0.09 0.35 Primary OutFlow Max=134.10 cfs @ 12.14 hrs HW=961.61' (Free Discharge) 1=Asymmetrical Weir (Weir Controls 134.10 cfs @ 2.74 fps) MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 60HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Pond 5P: Wetland B Inflow Primary Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=12.870 ac Peak Elev=961.61' Storage=1,124 cf 23.85 cfs 23.70 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 61HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Pond 5P: Wetland B Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Primary (cfs) 0.00 0.00 0 961.60 0.00 5.00 0.03 1 961.60 0.03 10.00 0.23 11 961.60 0.22 15.00 1.14 54 961.60 1.14 20.00 0.31 15 961.60 0.31 25.00 0.02 1 961.60 0.03 30.00 0.00 0 961.60 0.00 35.00 0.00 0 961.60 0.00 40.00 0.00 0 961.60 0.00 45.00 0.00 0 961.60 0.00 50.00 0.00 0 961.60 0.00 55.00 0.00 0 961.60 0.00 60.00 0.00 0 961.60 0.00 65.00 0.00 0 961.60 0.00 70.00 0.00 0 961.60 0.00 75.00 0.00 0 961.60 0.00 80.00 0.00 0 961.60 0.00 85.00 0.00 0 961.60 0.00 90.00 0.00 0 961.60 0.00 95.00 0.00 0 961.60 0.00 100.00 0.00 0 961.60 0.00 105.00 0.00 0 961.60 0.00 110.00 0.00 0 961.60 0.00 115.00 0.00 0 961.60 0.00 120.00 0.00 0 961.60 0.00 125.00 0.00 0 961.60 0.00 130.00 0.00 0 961.60 0.00 135.00 0.00 0 961.60 0.00 140.00 0.00 0 961.60 0.00 145.00 0.00 0 961.60 0.00 150.00 0.00 0 961.60 0.00 155.00 0.00 0 961.60 0.00 160.00 0.00 0 961.60 0.00 165.00 0.00 0 961.60 0.00 170.00 0.00 0 961.60 0.00 175.00 0.00 0 961.60 0.00 180.00 0.00 0 961.60 0.00 185.00 0.00 0 961.60 0.00 190.00 0.00 0 961.60 0.00 195.00 0.00 0 961.60 0.00 200.00 0.00 0 961.60 0.00 205.00 0.00 0 961.60 0.00 210.00 0.00 0 961.60 0.00 215.00 0.00 0 961.60 0.00 220.00 0.00 0 961.60 0.00 225.00 0.00 0 961.60 0.00 230.00 0.00 0 961.60 0.00 235.00 0.00 0 961.60 0.00 240.00 0.00 0 961.60 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 62HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Stage-Discharge for Pond 5P: Wetland B Elevation (feet) Primary (cfs) 961.60 0.00 961.65 139.02 961.70 144.59 961.75 149.95 961.80 155.13 961.85 160.13 961.90 164.98 961.95 169.69 962.00 174.28 962.05 178.74 962.10 183.09 962.15 187.35 962.20 191.51 962.25 195.57 962.30 199.56 962.35 203.47 962.40 207.30 962.45 211.06 962.50 214.76 962.55 218.40 962.60 221.97 962.65 225.49 962.70 228.95 962.75 232.36 962.80 235.73 962.85 239.04 962.90 242.31 962.95 245.54 963.00 248.72 963.05 251.87 963.10 254.97 963.15 258.04 963.20 261.07 963.25 264.07 963.30 267.03 963.35 269.96 963.40 272.86 963.45 275.73 963.50 278.56 963.55 281.37 963.60 284.16 963.65 286.91 963.70 289.64 963.75 292.34 963.80 295.02 963.85 297.68 963.90 300.31 963.95 302.92 964.00 305.50 964.05 308.07 964.10 310.61 964.15 313.13 Elevation (feet) Primary (cfs) 964.20 315.63 964.25 318.12 964.30 320.58 964.35 323.02 964.40 325.45 964.45 327.86 964.50 330.25 964.55 332.62 964.60 334.98 964.65 337.32 964.70 339.64 964.75 341.95 964.80 344.24 964.85 346.52 964.90 348.78 964.95 351.03 965.00 353.26 965.05 355.48 965.10 357.69 965.15 359.88 965.20 362.06 965.25 364.23 965.30 366.38 965.35 368.52 965.40 370.65 965.45 372.76 965.50 374.87 965.55 376.96 965.60 379.04 965.65 381.11 965.70 383.17 965.75 385.22 965.80 387.25 965.85 389.28 965.90 391.29 965.95 393.30 966.00 395.29 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 63HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Time span=0.00-240.00 hrs, dt=0.01 hrs, 24001 points Runoff by SCS TR-20 method, UH=SCS, Weighted-Q Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Runoff Area=125,400 sf 0.00% Impervious Runoff Depth=2.61"Subcatchment 6S: UNDISTURBED Tc=6.0 min CN=84 Runoff=13.69 cfs 0.626 af Runoff Area=238,192 sf 46.22% Impervious Runoff Depth=3.01"Subcatchment 7S: OFFSITE WETLAND B Flow Length=1,100' Slope=0.1500 '/' Tc=13.4 min CN=WQ Runoff=20.68 cfs 1.373 af Runoff Area=3,245 sf 100.00% Impervious Runoff Depth=4.03"Subcatchment EX1A: EX1A - DRAINS Tc=6.0 min CN=WQ Runoff=0.48 cfs 0.025 af Runoff Area=62,807 sf 11.61% Impervious Runoff Depth=2.78"Subcatchment EX1B: EX1B - DRAINS Tc=6.0 min CN=WQ Runoff=7.15 cfs 0.334 af Runoff Area=4,200 sf 0.00% Impervious Runoff Depth=2.61"Subcatchment EX1C: EX1C - DRAINS Tc=6.0 min CN=WQ Runoff=0.46 cfs 0.021 af Runoff Area=5,580 sf 40.82% Impervious Runoff Depth=3.19"Subcatchment EX2: EX2 - DRAINS SOUTH Tc=6.0 min CN=WQ Runoff=0.70 cfs 0.034 af Runoff Area=49,573 sf 17.90% Impervious Runoff Depth=2.87"Subcatchment OFFSITE A: OFFSITE A - Tc=6.0 min CN=WQ Runoff=5.77 cfs 0.272 af Runoff Area=74,865 sf 8.12% Impervious Runoff Depth=2.73"Subcatchment OFFSITE B: OFFSITE B- Tc=6.0 min CN=WQ Runoff=8.42 cfs 0.390 af Inflow=16.03 cfs 0.745 afReach DA2: DA2 - TOTAL FLOW TO WETLAND A Outflow=16.03 cfs 0.745 af Inflow=14.97 cfs 1.051 afReach DA3: DA3 - TOTAL FLOW TO WETLAND B Outflow=14.97 cfs 1.051 af Peak Elev=970.15' Storage=6,422 cf Inflow=16.03 cfs 0.745 afPond 1P: WETLAND A Outflow=10.08 cfs 0.745 af Peak Elev=961.61' Storage=2,106 cf Inflow=44.74 cfs 3.050 afPond 5P: Wetland B Outflow=44.41 cfs 3.050 af Total Runoff Area = 12.944 ac Runoff Volume = 3.075 af Average Runoff Depth = 2.85" 75.55% Pervious = 9.780 ac 24.45% Impervious = 3.165 ac MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 64HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment 6S: UNDISTURBED Runoff = 13.69 cfs @ 12.09 hrs, Volume= 0.626 af, Depth= 2.61" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27" Area (sf) CN Description * 125,400 84 125,400 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment 6S: UNDISTURBED Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27" Runoff Area=125,400 sf Runoff Volume=0.626 af Runoff Depth=2.61" Tc=6.0 min CN=84 13.69 cfs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 65HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 6S: UNDISTURBED Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.12 0.00 0.00 10.00 0.55 0.01 0.07 15.00 3.89 2.27 0.43 20.00 4.17 2.52 0.06 25.00 4.27 2.61 0.00 30.00 4.27 2.61 0.00 35.00 4.27 2.61 0.00 40.00 4.27 2.61 0.00 45.00 4.27 2.61 0.00 50.00 4.27 2.61 0.00 55.00 4.27 2.61 0.00 60.00 4.27 2.61 0.00 65.00 4.27 2.61 0.00 70.00 4.27 2.61 0.00 75.00 4.27 2.61 0.00 80.00 4.27 2.61 0.00 85.00 4.27 2.61 0.00 90.00 4.27 2.61 0.00 95.00 4.27 2.61 0.00 100.00 4.27 2.61 0.00 105.00 4.27 2.61 0.00 110.00 4.27 2.61 0.00 115.00 4.27 2.61 0.00 120.00 4.27 2.61 0.00 125.00 4.27 2.61 0.00 130.00 4.27 2.61 0.00 135.00 4.27 2.61 0.00 140.00 4.27 2.61 0.00 145.00 4.27 2.61 0.00 150.00 4.27 2.61 0.00 155.00 4.27 2.61 0.00 160.00 4.27 2.61 0.00 165.00 4.27 2.61 0.00 170.00 4.27 2.61 0.00 175.00 4.27 2.61 0.00 180.00 4.27 2.61 0.00 185.00 4.27 2.61 0.00 190.00 4.27 2.61 0.00 195.00 4.27 2.61 0.00 200.00 4.27 2.61 0.00 205.00 4.27 2.61 0.00 210.00 4.27 2.61 0.00 215.00 4.27 2.61 0.00 220.00 4.27 2.61 0.00 225.00 4.27 2.61 0.00 230.00 4.27 2.61 0.00 235.00 4.27 2.61 0.00 240.00 4.27 2.61 0.00 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 66HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment 7S: OFFSITE WETLAND B WATERSHED Runoff = 20.68 cfs @ 12.18 hrs, Volume= 1.373 af, Depth= 3.01" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27" Area (sf) CN Description 67,393 98 Unconnected roofs, HSG B * 170,799 84 1/2 acre lots, 25% imp, HSG B 238,192 Weighted Average 128,099 53.78% Pervious Area 110,093 46.22% Impervious Area 67,393 61.21% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.9 200 0.1500 0.42 Sheet Flow, Grass: Short n= 0.150 P2= 2.94" 5.5 900 0.1500 2.71 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 13.4 1,100 Total Subcatchment 7S: OFFSITE WETLAND B WATERSHED Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27" Runoff Area=238,192 sf Runoff Volume=1.373 af Runoff Depth=3.01" Flow Length=1,100' Slope=0.1500 '/' Tc=13.4 min CN=WQ 20.68 cfs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 67HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 7S: OFFSITE WETLAND B WATERSHED Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.12 0.00 0.02 10.00 0.55 0.05 0.33 15.00 3.89 2.63 0.85 20.00 4.17 2.89 0.13 25.00 4.27 2.98 0.00 30.00 4.27 2.98 0.00 35.00 4.27 2.98 0.00 40.00 4.27 2.98 0.00 45.00 4.27 2.98 0.00 50.00 4.27 2.98 0.00 55.00 4.27 2.98 0.00 60.00 4.27 2.98 0.00 65.00 4.27 2.98 0.00 70.00 4.27 2.98 0.00 75.00 4.27 2.98 0.00 80.00 4.27 2.98 0.00 85.00 4.27 2.98 0.00 90.00 4.27 2.98 0.00 95.00 4.27 2.98 0.00 100.00 4.27 2.98 0.00 105.00 4.27 2.98 0.00 110.00 4.27 2.98 0.00 115.00 4.27 2.98 0.00 120.00 4.27 2.98 0.00 125.00 4.27 2.98 0.00 130.00 4.27 2.98 0.00 135.00 4.27 2.98 0.00 140.00 4.27 2.98 0.00 145.00 4.27 2.98 0.00 150.00 4.27 2.98 0.00 155.00 4.27 2.98 0.00 160.00 4.27 2.98 0.00 165.00 4.27 2.98 0.00 170.00 4.27 2.98 0.00 175.00 4.27 2.98 0.00 180.00 4.27 2.98 0.00 185.00 4.27 2.98 0.00 190.00 4.27 2.98 0.00 195.00 4.27 2.98 0.00 200.00 4.27 2.98 0.00 205.00 4.27 2.98 0.00 210.00 4.27 2.98 0.00 215.00 4.27 2.98 0.00 220.00 4.27 2.98 0.00 225.00 4.27 2.98 0.00 230.00 4.27 2.98 0.00 235.00 4.27 2.98 0.00 240.00 4.27 2.98 0.00 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 68HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment EX1A: EX1A - DRAINS EAST DOWN LAKE LUCY ROAD Runoff = 0.48 cfs @ 12.08 hrs, Volume= 0.025 af, Depth= 4.03" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27" Area (sf) CN Description 3,245 98 Paved parking, HSG C * 0 84 3,245 Weighted Average 3,245 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment EX1A: EX1A - DRAINS EAST DOWN LAKE LUCY ROAD Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.5 0.45 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27" Runoff Area=3,245 sf Runoff Volume=0.025 af Runoff Depth=4.03" Tc=6.0 min CN=WQ 0.48 cfs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 69HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment EX1A: EX1A - DRAINS EAST DOWN LAKE LUCY ROAD Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.12 0.02 0.00 10.00 0.55 0.36 0.01 15.00 3.89 3.65 0.01 20.00 4.17 3.93 0.00 25.00 4.27 4.03 0.00 30.00 4.27 4.03 0.00 35.00 4.27 4.03 0.00 40.00 4.27 4.03 0.00 45.00 4.27 4.03 0.00 50.00 4.27 4.03 0.00 55.00 4.27 4.03 0.00 60.00 4.27 4.03 0.00 65.00 4.27 4.03 0.00 70.00 4.27 4.03 0.00 75.00 4.27 4.03 0.00 80.00 4.27 4.03 0.00 85.00 4.27 4.03 0.00 90.00 4.27 4.03 0.00 95.00 4.27 4.03 0.00 100.00 4.27 4.03 0.00 105.00 4.27 4.03 0.00 110.00 4.27 4.03 0.00 115.00 4.27 4.03 0.00 120.00 4.27 4.03 0.00 125.00 4.27 4.03 0.00 130.00 4.27 4.03 0.00 135.00 4.27 4.03 0.00 140.00 4.27 4.03 0.00 145.00 4.27 4.03 0.00 150.00 4.27 4.03 0.00 155.00 4.27 4.03 0.00 160.00 4.27 4.03 0.00 165.00 4.27 4.03 0.00 170.00 4.27 4.03 0.00 175.00 4.27 4.03 0.00 180.00 4.27 4.03 0.00 185.00 4.27 4.03 0.00 190.00 4.27 4.03 0.00 195.00 4.27 4.03 0.00 200.00 4.27 4.03 0.00 205.00 4.27 4.03 0.00 210.00 4.27 4.03 0.00 215.00 4.27 4.03 0.00 220.00 4.27 4.03 0.00 225.00 4.27 4.03 0.00 230.00 4.27 4.03 0.00 235.00 4.27 4.03 0.00 240.00 4.27 4.03 0.00 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 70HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment EX1B: EX1B - DRAINS SOUTH TO WETLAND A Runoff = 7.15 cfs @ 12.09 hrs, Volume= 0.334 af, Depth= 2.78" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27" Area (sf) CN Description 7,290 98 Paved parking, HSG C 55,517 84 62,807 Weighted Average 55,517 88.39% Pervious Area 7,290 11.61% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment EX1B: EX1B - DRAINS SOUTH TO WETLAND A Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)8 7 6 5 4 3 2 1 0 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27" Runoff Area=62,807 sf Runoff Volume=0.334 af Runoff Depth=2.78" Tc=6.0 min CN=WQ 7.15 cfs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 71HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment EX1B: EX1B - DRAINS SOUTH TO WETLAND A Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.12 0.00 0.00 10.00 0.55 0.03 0.06 15.00 3.89 2.45 0.22 20.00 4.17 2.70 0.03 25.00 4.27 2.79 0.00 30.00 4.27 2.79 0.00 35.00 4.27 2.79 0.00 40.00 4.27 2.79 0.00 45.00 4.27 2.79 0.00 50.00 4.27 2.79 0.00 55.00 4.27 2.79 0.00 60.00 4.27 2.79 0.00 65.00 4.27 2.79 0.00 70.00 4.27 2.79 0.00 75.00 4.27 2.79 0.00 80.00 4.27 2.79 0.00 85.00 4.27 2.79 0.00 90.00 4.27 2.79 0.00 95.00 4.27 2.79 0.00 100.00 4.27 2.79 0.00 105.00 4.27 2.79 0.00 110.00 4.27 2.79 0.00 115.00 4.27 2.79 0.00 120.00 4.27 2.79 0.00 125.00 4.27 2.79 0.00 130.00 4.27 2.79 0.00 135.00 4.27 2.79 0.00 140.00 4.27 2.79 0.00 145.00 4.27 2.79 0.00 150.00 4.27 2.79 0.00 155.00 4.27 2.79 0.00 160.00 4.27 2.79 0.00 165.00 4.27 2.79 0.00 170.00 4.27 2.79 0.00 175.00 4.27 2.79 0.00 180.00 4.27 2.79 0.00 185.00 4.27 2.79 0.00 190.00 4.27 2.79 0.00 195.00 4.27 2.79 0.00 200.00 4.27 2.79 0.00 205.00 4.27 2.79 0.00 210.00 4.27 2.79 0.00 215.00 4.27 2.79 0.00 220.00 4.27 2.79 0.00 225.00 4.27 2.79 0.00 230.00 4.27 2.79 0.00 235.00 4.27 2.79 0.00 240.00 4.27 2.79 0.00 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 72HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment EX1C: EX1C - DRAINS SOUTH TO WETLAND A Runoff = 0.46 cfs @ 12.09 hrs, Volume= 0.021 af, Depth= 2.61" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27" Area (sf) CN Description 0 98 Paved parking, HSG C * 4,200 84 4,200 Weighted Average 4,200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment EX1C: EX1C - DRAINS SOUTH TO WETLAND A Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.5 0.48 0.46 0.44 0.42 0.4 0.38 0.36 0.34 0.32 0.3 0.28 0.26 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 0 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27" Runoff Area=4,200 sf Runoff Volume=0.021 af Runoff Depth=2.61" Tc=6.0 min CN=WQ 0.46 cfs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 73HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment EX1C: EX1C - DRAINS SOUTH TO WETLAND A Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.12 0.00 0.00 10.00 0.55 0.01 0.00 15.00 3.89 2.27 0.01 20.00 4.17 2.52 0.00 25.00 4.27 2.61 0.00 30.00 4.27 2.61 0.00 35.00 4.27 2.61 0.00 40.00 4.27 2.61 0.00 45.00 4.27 2.61 0.00 50.00 4.27 2.61 0.00 55.00 4.27 2.61 0.00 60.00 4.27 2.61 0.00 65.00 4.27 2.61 0.00 70.00 4.27 2.61 0.00 75.00 4.27 2.61 0.00 80.00 4.27 2.61 0.00 85.00 4.27 2.61 0.00 90.00 4.27 2.61 0.00 95.00 4.27 2.61 0.00 100.00 4.27 2.61 0.00 105.00 4.27 2.61 0.00 110.00 4.27 2.61 0.00 115.00 4.27 2.61 0.00 120.00 4.27 2.61 0.00 125.00 4.27 2.61 0.00 130.00 4.27 2.61 0.00 135.00 4.27 2.61 0.00 140.00 4.27 2.61 0.00 145.00 4.27 2.61 0.00 150.00 4.27 2.61 0.00 155.00 4.27 2.61 0.00 160.00 4.27 2.61 0.00 165.00 4.27 2.61 0.00 170.00 4.27 2.61 0.00 175.00 4.27 2.61 0.00 180.00 4.27 2.61 0.00 185.00 4.27 2.61 0.00 190.00 4.27 2.61 0.00 195.00 4.27 2.61 0.00 200.00 4.27 2.61 0.00 205.00 4.27 2.61 0.00 210.00 4.27 2.61 0.00 215.00 4.27 2.61 0.00 220.00 4.27 2.61 0.00 225.00 4.27 2.61 0.00 230.00 4.27 2.61 0.00 235.00 4.27 2.61 0.00 240.00 4.27 2.61 0.00 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 74HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment EX2: EX2 - DRAINS SOUTH TO WETLAND B Runoff = 0.70 cfs @ 12.08 hrs, Volume= 0.034 af, Depth= 3.19" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27" Area (sf) CN Description 2,278 98 Paved parking, HSG C * 3,302 84 5,580 Weighted Average 3,302 59.18% Pervious Area 2,278 40.82% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment EX2: EX2 - DRAINS SOUTH TO WETLAND B Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.75 0.7 0.65 0.6 0.55 0.5 0.45 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27" Runoff Area=5,580 sf Runoff Volume=0.034 af Runoff Depth=3.19" Tc=6.0 min CN=WQ 0.70 cfs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 75HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment EX2: EX2 - DRAINS SOUTH TO WETLAND B Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.12 0.00 0.00 10.00 0.55 0.07 0.01 15.00 3.89 2.81 0.02 20.00 4.17 3.08 0.00 25.00 4.27 3.18 0.00 30.00 4.27 3.18 0.00 35.00 4.27 3.18 0.00 40.00 4.27 3.18 0.00 45.00 4.27 3.18 0.00 50.00 4.27 3.18 0.00 55.00 4.27 3.18 0.00 60.00 4.27 3.18 0.00 65.00 4.27 3.18 0.00 70.00 4.27 3.18 0.00 75.00 4.27 3.18 0.00 80.00 4.27 3.18 0.00 85.00 4.27 3.18 0.00 90.00 4.27 3.18 0.00 95.00 4.27 3.18 0.00 100.00 4.27 3.18 0.00 105.00 4.27 3.18 0.00 110.00 4.27 3.18 0.00 115.00 4.27 3.18 0.00 120.00 4.27 3.18 0.00 125.00 4.27 3.18 0.00 130.00 4.27 3.18 0.00 135.00 4.27 3.18 0.00 140.00 4.27 3.18 0.00 145.00 4.27 3.18 0.00 150.00 4.27 3.18 0.00 155.00 4.27 3.18 0.00 160.00 4.27 3.18 0.00 165.00 4.27 3.18 0.00 170.00 4.27 3.18 0.00 175.00 4.27 3.18 0.00 180.00 4.27 3.18 0.00 185.00 4.27 3.18 0.00 190.00 4.27 3.18 0.00 195.00 4.27 3.18 0.00 200.00 4.27 3.18 0.00 205.00 4.27 3.18 0.00 210.00 4.27 3.18 0.00 215.00 4.27 3.18 0.00 220.00 4.27 3.18 0.00 225.00 4.27 3.18 0.00 230.00 4.27 3.18 0.00 235.00 4.27 3.18 0.00 240.00 4.27 3.18 0.00 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 76HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment OFFSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B Runoff = 5.77 cfs @ 12.09 hrs, Volume= 0.272 af, Depth= 2.87" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27" Area (sf) CN Description 8,875 98 Paved parking, HSG C * 40,698 84 49,573 Weighted Average 40,698 82.10% Pervious Area 8,875 17.90% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment OFFSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)6 5 4 3 2 1 0 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27" Runoff Area=49,573 sf Runoff Volume=0.272 af Runoff Depth=2.87" Tc=6.0 min CN=WQ 5.77 cfs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 77HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment OFFSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.12 0.00 0.00 10.00 0.55 0.04 0.05 15.00 3.89 2.54 0.17 20.00 4.17 2.79 0.03 25.00 4.27 2.89 0.00 30.00 4.27 2.89 0.00 35.00 4.27 2.89 0.00 40.00 4.27 2.89 0.00 45.00 4.27 2.89 0.00 50.00 4.27 2.89 0.00 55.00 4.27 2.89 0.00 60.00 4.27 2.89 0.00 65.00 4.27 2.89 0.00 70.00 4.27 2.89 0.00 75.00 4.27 2.89 0.00 80.00 4.27 2.89 0.00 85.00 4.27 2.89 0.00 90.00 4.27 2.89 0.00 95.00 4.27 2.89 0.00 100.00 4.27 2.89 0.00 105.00 4.27 2.89 0.00 110.00 4.27 2.89 0.00 115.00 4.27 2.89 0.00 120.00 4.27 2.89 0.00 125.00 4.27 2.89 0.00 130.00 4.27 2.89 0.00 135.00 4.27 2.89 0.00 140.00 4.27 2.89 0.00 145.00 4.27 2.89 0.00 150.00 4.27 2.89 0.00 155.00 4.27 2.89 0.00 160.00 4.27 2.89 0.00 165.00 4.27 2.89 0.00 170.00 4.27 2.89 0.00 175.00 4.27 2.89 0.00 180.00 4.27 2.89 0.00 185.00 4.27 2.89 0.00 190.00 4.27 2.89 0.00 195.00 4.27 2.89 0.00 200.00 4.27 2.89 0.00 205.00 4.27 2.89 0.00 210.00 4.27 2.89 0.00 215.00 4.27 2.89 0.00 220.00 4.27 2.89 0.00 225.00 4.27 2.89 0.00 230.00 4.27 2.89 0.00 235.00 4.27 2.89 0.00 240.00 4.27 2.89 0.00 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 78HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment OFFSITE B: OFFSITE B- DRAINS SOUTH TO WETLAND A Runoff = 8.42 cfs @ 12.09 hrs, Volume= 0.390 af, Depth= 2.73" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27" Area (sf) CN Description 6,076 98 Paved parking, HSG C * 68,789 84 74,865 Weighted Average 68,789 91.88% Pervious Area 6,076 8.12% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment OFFSITE B: OFFSITE B- DRAINS SOUTH TO WETLAND A Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)9 8 7 6 5 4 3 2 1 0 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27" Runoff Area=74,865 sf Runoff Volume=0.390 af Runoff Depth=2.73" Tc=6.0 min CN=WQ 8.42 cfs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 79HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment OFFSITE B: OFFSITE B- DRAINS SOUTH TO WETLAND A Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.12 0.00 0.00 10.00 0.55 0.02 0.06 15.00 3.89 2.36 0.26 20.00 4.17 2.61 0.04 25.00 4.27 2.70 0.00 30.00 4.27 2.70 0.00 35.00 4.27 2.70 0.00 40.00 4.27 2.70 0.00 45.00 4.27 2.70 0.00 50.00 4.27 2.70 0.00 55.00 4.27 2.70 0.00 60.00 4.27 2.70 0.00 65.00 4.27 2.70 0.00 70.00 4.27 2.70 0.00 75.00 4.27 2.70 0.00 80.00 4.27 2.70 0.00 85.00 4.27 2.70 0.00 90.00 4.27 2.70 0.00 95.00 4.27 2.70 0.00 100.00 4.27 2.70 0.00 105.00 4.27 2.70 0.00 110.00 4.27 2.70 0.00 115.00 4.27 2.70 0.00 120.00 4.27 2.70 0.00 125.00 4.27 2.70 0.00 130.00 4.27 2.70 0.00 135.00 4.27 2.70 0.00 140.00 4.27 2.70 0.00 145.00 4.27 2.70 0.00 150.00 4.27 2.70 0.00 155.00 4.27 2.70 0.00 160.00 4.27 2.70 0.00 165.00 4.27 2.70 0.00 170.00 4.27 2.70 0.00 175.00 4.27 2.70 0.00 180.00 4.27 2.70 0.00 185.00 4.27 2.70 0.00 190.00 4.27 2.70 0.00 195.00 4.27 2.70 0.00 200.00 4.27 2.70 0.00 205.00 4.27 2.70 0.00 210.00 4.27 2.70 0.00 215.00 4.27 2.70 0.00 220.00 4.27 2.70 0.00 225.00 4.27 2.70 0.00 230.00 4.27 2.70 0.00 235.00 4.27 2.70 0.00 240.00 4.27 2.70 0.00 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 80HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 3.257 ac, 9.42% Impervious, Inflow Depth = 2.74" for 10y 24hr event Inflow = 16.03 cfs @ 12.09 hrs, Volume= 0.745 af Outflow = 16.03 cfs @ 12.09 hrs, Volume= 0.745 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Reach DA2: DA2 - TOTAL FLOW TO WETLAND A Inflow Outflow Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Inflow Area=3.257 ac 16.03 cfs 16.03 cfs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 81HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A Time (hours) Inflow (cfs) Elevation (feet) Outflow (cfs) 0.00 0.00 0.00 5.00 0.00 0.00 10.00 0.12 0.12 15.00 0.49 0.49 20.00 0.07 0.07 25.00 0.00 0.00 30.00 0.00 0.00 35.00 0.00 0.00 40.00 0.00 0.00 45.00 0.00 0.00 50.00 0.00 0.00 55.00 0.00 0.00 60.00 0.00 0.00 65.00 0.00 0.00 70.00 0.00 0.00 75.00 0.00 0.00 80.00 0.00 0.00 85.00 0.00 0.00 90.00 0.00 0.00 95.00 0.00 0.00 100.00 0.00 0.00 105.00 0.00 0.00 110.00 0.00 0.00 115.00 0.00 0.00 120.00 0.00 0.00 125.00 0.00 0.00 130.00 0.00 0.00 135.00 0.00 0.00 140.00 0.00 0.00 145.00 0.00 0.00 150.00 0.00 0.00 155.00 0.00 0.00 160.00 0.00 0.00 165.00 0.00 0.00 170.00 0.00 0.00 175.00 0.00 0.00 180.00 0.00 0.00 185.00 0.00 0.00 190.00 0.00 0.00 195.00 0.00 0.00 200.00 0.00 0.00 205.00 0.00 0.00 210.00 0.00 0.00 215.00 0.00 0.00 220.00 0.00 0.00 225.00 0.00 0.00 230.00 0.00 0.00 235.00 0.00 0.00 240.00 0.00 0.00 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 82HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 4.523 ac, 12.44% Impervious, Inflow Depth = 2.79" for 10y 24hr event Inflow = 14.97 cfs @ 12.12 hrs, Volume= 1.051 af Outflow = 14.97 cfs @ 12.12 hrs, Volume= 1.051 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Reach DA3: DA3 - TOTAL FLOW TO WETLAND B Inflow Outflow Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Inflow Area=4.523 ac 14.97 cfs 14.97 cfs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 83HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B Time (hours) Inflow (cfs) Elevation (feet) Outflow (cfs) 0.00 0.00 0.00 5.00 0.01 0.01 10.00 0.13 0.13 15.00 0.69 0.69 20.00 0.11 0.11 25.00 0.02 0.02 30.00 0.00 0.00 35.00 0.00 0.00 40.00 0.00 0.00 45.00 0.00 0.00 50.00 0.00 0.00 55.00 0.00 0.00 60.00 0.00 0.00 65.00 0.00 0.00 70.00 0.00 0.00 75.00 0.00 0.00 80.00 0.00 0.00 85.00 0.00 0.00 90.00 0.00 0.00 95.00 0.00 0.00 100.00 0.00 0.00 105.00 0.00 0.00 110.00 0.00 0.00 115.00 0.00 0.00 120.00 0.00 0.00 125.00 0.00 0.00 130.00 0.00 0.00 135.00 0.00 0.00 140.00 0.00 0.00 145.00 0.00 0.00 150.00 0.00 0.00 155.00 0.00 0.00 160.00 0.00 0.00 165.00 0.00 0.00 170.00 0.00 0.00 175.00 0.00 0.00 180.00 0.00 0.00 185.00 0.00 0.00 190.00 0.00 0.00 195.00 0.00 0.00 200.00 0.00 0.00 205.00 0.00 0.00 210.00 0.00 0.00 215.00 0.00 0.00 220.00 0.00 0.00 225.00 0.00 0.00 230.00 0.00 0.00 235.00 0.00 0.00 240.00 0.00 0.00 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 84HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Pond 1P: WETLAND A Inflow Area = 3.257 ac, 9.42% Impervious, Inflow Depth = 2.74" for 10y 24hr event Inflow = 16.03 cfs @ 12.09 hrs, Volume= 0.745 af Outflow = 10.08 cfs @ 12.16 hrs, Volume= 0.745 af, Atten= 37%, Lag= 4.5 min Primary = 10.08 cfs @ 12.16 hrs, Volume= 0.745 af Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Peak Elev= 970.15' @ 12.16 hrs Surf.Area= 13,049 sf Storage= 6,422 cf Plug-Flow detention time= 21.3 min calculated for 0.745 af (100% of inflow) Center-of-Mass det. time= 21.3 min ( 805.4 - 784.1 ) Volume Invert Avail.Storage Storage Description #1 969.62' 18,824 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 969.62 11,466 0 0 970.00 12,553 4,564 4,564 971.00 15,967 14,260 18,824 Device Routing Invert Outlet Devices #1 Primary 969.62'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=10.07 cfs @ 12.16 hrs HW=970.15' (Free Discharge) 1=Broad-Crested Rectangular Weir (Weir Controls 10.07 cfs @ 1.92 fps) MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 85HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Pond 1P: WETLAND A Inflow Primary Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Inflow Area=3.257 ac Peak Elev=970.15' Storage=6,422 cf 16.03 cfs 10.08 cfs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 86HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Pond 1P: WETLAND A Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Primary (cfs) 0.00 0.00 0 969.62 0.00 5.00 0.00 11 969.62 0.00 10.00 0.12 222 969.64 0.07 15.00 0.49 851 969.69 0.50 20.00 0.07 240 969.64 0.08 25.00 0.00 96 969.63 0.02 30.00 0.00 1 969.62 0.00 35.00 0.00 0 969.62 0.00 40.00 0.00 0 969.62 0.00 45.00 0.00 0 969.62 0.00 50.00 0.00 0 969.62 0.00 55.00 0.00 0 969.62 0.00 60.00 0.00 0 969.62 0.00 65.00 0.00 0 969.62 0.00 70.00 0.00 0 969.62 0.00 75.00 0.00 0 969.62 0.00 80.00 0.00 0 969.62 0.00 85.00 0.00 0 969.62 0.00 90.00 0.00 0 969.62 0.00 95.00 0.00 0 969.62 0.00 100.00 0.00 0 969.62 0.00 105.00 0.00 0 969.62 0.00 110.00 0.00 0 969.62 0.00 115.00 0.00 0 969.62 0.00 120.00 0.00 0 969.62 0.00 125.00 0.00 0 969.62 0.00 130.00 0.00 0 969.62 0.00 135.00 0.00 0 969.62 0.00 140.00 0.00 0 969.62 0.00 145.00 0.00 0 969.62 0.00 150.00 0.00 0 969.62 0.00 155.00 0.00 0 969.62 0.00 160.00 0.00 0 969.62 0.00 165.00 0.00 0 969.62 0.00 170.00 0.00 0 969.62 0.00 175.00 0.00 0 969.62 0.00 180.00 0.00 0 969.62 0.00 185.00 0.00 0 969.62 0.00 190.00 0.00 0 969.62 0.00 195.00 0.00 0 969.62 0.00 200.00 0.00 0 969.62 0.00 205.00 0.00 0 969.62 0.00 210.00 0.00 0 969.62 0.00 215.00 0.00 0 969.62 0.00 220.00 0.00 0 969.62 0.00 225.00 0.00 0 969.62 0.00 230.00 0.00 0 969.62 0.00 235.00 0.00 0 969.62 0.00 240.00 0.00 0 969.62 0.00 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 87HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Stage-Discharge for Pond 1P: WETLAND A Elevation (feet) Primary (cfs) 969.62 0.00 969.63 0.02 969.64 0.07 969.65 0.13 969.66 0.20 969.67 0.28 969.68 0.37 969.69 0.46 969.70 0.56 969.71 0.67 969.72 0.79 969.73 0.91 969.74 1.04 969.75 1.17 969.76 1.30 969.77 1.45 969.78 1.59 969.79 1.75 969.80 1.90 969.81 2.06 969.82 2.23 969.83 2.40 969.84 2.58 969.85 2.76 969.86 2.94 969.87 3.13 969.88 3.33 969.89 3.53 969.90 3.73 969.91 3.94 969.92 4.15 969.93 4.36 969.94 4.58 969.95 4.81 969.96 5.03 969.97 5.26 969.98 5.50 969.99 5.74 970.00 5.98 970.01 6.23 970.02 6.48 970.03 6.74 970.04 7.01 970.05 7.28 970.06 7.55 970.07 7.83 970.08 8.12 970.09 8.41 970.10 8.70 970.11 9.00 970.12 9.30 970.13 9.60 Elevation (feet) Primary (cfs) 970.14 9.91 970.15 10.23 970.16 10.55 970.17 10.87 970.18 11.20 970.19 11.53 970.20 11.86 970.21 12.20 970.22 12.55 970.23 12.86 970.24 13.18 970.25 13.49 970.26 13.81 970.27 14.14 970.28 14.46 970.29 14.79 970.30 15.12 970.31 15.45 970.32 15.78 970.33 16.12 970.34 16.46 970.35 16.80 970.36 17.14 970.37 17.49 970.38 17.84 970.39 18.19 970.40 18.54 970.41 18.89 970.42 19.25 970.43 19.61 970.44 19.97 970.45 20.33 970.46 20.69 970.47 21.06 970.48 21.43 970.49 21.80 970.50 22.17 970.51 22.55 970.52 22.92 970.53 23.30 970.54 23.68 970.55 24.07 970.56 24.45 970.57 24.84 970.58 25.23 970.59 25.62 970.60 26.01 970.61 26.40 970.62 26.80 970.63 27.21 970.64 27.62 970.65 28.03 Elevation (feet) Primary (cfs) 970.66 28.45 970.67 28.86 970.68 29.28 970.69 29.70 970.70 30.12 970.71 30.55 970.72 30.98 970.73 31.41 970.74 31.84 970.75 32.27 970.76 32.71 970.77 33.14 970.78 33.58 970.79 34.02 970.80 34.47 970.81 34.91 970.82 35.36 970.83 35.79 970.84 36.22 970.85 36.65 970.86 37.09 970.87 37.52 970.88 37.96 970.89 38.40 970.90 38.84 970.91 39.28 970.92 39.72 970.93 40.17 970.94 40.61 970.95 41.06 970.96 41.51 970.97 41.96 970.98 42.41 970.99 42.86 971.00 43.32 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 88HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Pond 5P: Wetland B [44] Hint: Outlet device #1 is below defined storage [95] Warning: Outlet Device #1 rise exceeded Inflow Area = 12.870 ac, 24.01% Impervious, Inflow Depth = 2.84" for 10y 24hr event Inflow = 44.74 cfs @ 12.12 hrs, Volume= 3.050 af Outflow = 44.41 cfs @ 12.14 hrs, Volume= 3.050 af, Atten= 1%, Lag= 0.9 min Primary = 44.41 cfs @ 12.14 hrs, Volume= 3.050 af Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Peak Elev= 961.61' @ 12.14 hrs Surf.Area= 149,161 sf Storage= 2,106 cf Plug-Flow detention time= 0.8 min calculated for 3.050 af (100% of inflow) Center-of-Mass det. time= 0.8 min ( 789.1 - 788.3 ) Volume Invert Avail.Storage Storage Description #1 961.60' 841,104 cf Custom Stage Data (Conic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (cubic-feet) (cubic-feet) (sq-ft) 961.60 149,000 0 0 149,000 962.00 153,597 60,517 60,517 153,630 964.00 201,325 353,847 414,364 201,451 966.00 225,646 426,740 841,104 225,991 Device Routing Invert Outlet Devices #1 Primary 960.82'Asymmetrical Weir, C= 3.27 Offset (feet) -70.00 -41.00 0.00 49.00 87.00 Height (feet) 0.35 0.09 0.00 0.09 0.35 Primary OutFlow Max=134.87 cfs @ 12.14 hrs HW=961.61' (Free Discharge) 1=Asymmetrical Weir (Weir Controls 134.87 cfs @ 2.76 fps) MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 89HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Pond 5P: Wetland B Inflow Primary Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=12.870 ac Peak Elev=961.61' Storage=2,106 cf 44.74 cfs 44.41 cfs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 90HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Pond 5P: Wetland B Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Primary (cfs) 0.00 0.00 0 961.60 0.00 5.00 0.02 1 961.60 0.02 10.00 0.53 25 961.60 0.53 15.00 1.98 94 961.60 1.98 20.00 0.30 14 961.60 0.30 25.00 0.02 1 961.60 0.02 30.00 0.00 0 961.60 0.00 35.00 0.00 0 961.60 0.00 40.00 0.00 0 961.60 0.00 45.00 0.00 0 961.60 0.00 50.00 0.00 0 961.60 0.00 55.00 0.00 0 961.60 0.00 60.00 0.00 0 961.60 0.00 65.00 0.00 0 961.60 0.00 70.00 0.00 0 961.60 0.00 75.00 0.00 0 961.60 0.00 80.00 0.00 0 961.60 0.00 85.00 0.00 0 961.60 0.00 90.00 0.00 0 961.60 0.00 95.00 0.00 0 961.60 0.00 100.00 0.00 0 961.60 0.00 105.00 0.00 0 961.60 0.00 110.00 0.00 0 961.60 0.00 115.00 0.00 0 961.60 0.00 120.00 0.00 0 961.60 0.00 125.00 0.00 0 961.60 0.00 130.00 0.00 0 961.60 0.00 135.00 0.00 0 961.60 0.00 140.00 0.00 0 961.60 0.00 145.00 0.00 0 961.60 0.00 150.00 0.00 0 961.60 0.00 155.00 0.00 0 961.60 0.00 160.00 0.00 0 961.60 0.00 165.00 0.00 0 961.60 0.00 170.00 0.00 0 961.60 0.00 175.00 0.00 0 961.60 0.00 180.00 0.00 0 961.60 0.00 185.00 0.00 0 961.60 0.00 190.00 0.00 0 961.60 0.00 195.00 0.00 0 961.60 0.00 200.00 0.00 0 961.60 0.00 205.00 0.00 0 961.60 0.00 210.00 0.00 0 961.60 0.00 215.00 0.00 0 961.60 0.00 220.00 0.00 0 961.60 0.00 225.00 0.00 0 961.60 0.00 230.00 0.00 0 961.60 0.00 235.00 0.00 0 961.60 0.00 240.00 0.00 0 961.60 0.00 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 91HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Stage-Discharge for Pond 5P: Wetland B Elevation (feet) Primary (cfs) 961.60 0.00 961.65 139.02 961.70 144.59 961.75 149.95 961.80 155.13 961.85 160.13 961.90 164.98 961.95 169.69 962.00 174.28 962.05 178.74 962.10 183.09 962.15 187.35 962.20 191.51 962.25 195.57 962.30 199.56 962.35 203.47 962.40 207.30 962.45 211.06 962.50 214.76 962.55 218.40 962.60 221.97 962.65 225.49 962.70 228.95 962.75 232.36 962.80 235.73 962.85 239.04 962.90 242.31 962.95 245.54 963.00 248.72 963.05 251.87 963.10 254.97 963.15 258.04 963.20 261.07 963.25 264.07 963.30 267.03 963.35 269.96 963.40 272.86 963.45 275.73 963.50 278.56 963.55 281.37 963.60 284.16 963.65 286.91 963.70 289.64 963.75 292.34 963.80 295.02 963.85 297.68 963.90 300.31 963.95 302.92 964.00 305.50 964.05 308.07 964.10 310.61 964.15 313.13 Elevation (feet) Primary (cfs) 964.20 315.63 964.25 318.12 964.30 320.58 964.35 323.02 964.40 325.45 964.45 327.86 964.50 330.25 964.55 332.62 964.60 334.98 964.65 337.32 964.70 339.64 964.75 341.95 964.80 344.24 964.85 346.52 964.90 348.78 964.95 351.03 965.00 353.26 965.05 355.48 965.10 357.69 965.15 359.88 965.20 362.06 965.25 364.23 965.30 366.38 965.35 368.52 965.40 370.65 965.45 372.76 965.50 374.87 965.55 376.96 965.60 379.04 965.65 381.11 965.70 383.17 965.75 385.22 965.80 387.25 965.85 389.28 965.90 391.29 965.95 393.30 966.00 395.29 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 92HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Time span=0.00-240.00 hrs, dt=0.01 hrs, 24001 points Runoff by SCS TR-20 method, UH=SCS, Weighted-Q Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Runoff Area=125,400 sf 0.00% Impervious Runoff Depth=5.53"Subcatchment 6S: UNDISTURBED Tc=6.0 min CN=84 Runoff=26.30 cfs 1.327 af Runoff Area=238,192 sf 46.22% Impervious Runoff Depth=5.99"Subcatchment 7S: OFFSITE WETLAND B Flow Length=1,100' Slope=0.1500 '/' Tc=13.4 min CN=WQ Runoff=37.78 cfs 2.732 af Runoff Area=3,245 sf 100.00% Impervious Runoff Depth=7.17"Subcatchment EX1A: EX1A - DRAINS Tc=6.0 min CN=WQ Runoff=0.78 cfs 0.045 af Runoff Area=62,807 sf 11.61% Impervious Runoff Depth=5.72"Subcatchment EX1B: EX1B - DRAINS Tc=6.0 min CN=WQ Runoff=13.41 cfs 0.687 af Runoff Area=4,200 sf 0.00% Impervious Runoff Depth=5.53"Subcatchment EX1C: EX1C - DRAINS Tc=6.0 min CN=WQ Runoff=0.88 cfs 0.044 af Runoff Area=5,580 sf 40.82% Impervious Runoff Depth=6.20"Subcatchment EX2: EX2 - DRAINS SOUTH Tc=6.0 min CN=WQ Runoff=1.24 cfs 0.066 af Runoff Area=49,573 sf 17.90% Impervious Runoff Depth=5.82"Subcatchment OFFSITE A: OFFSITE A - Tc=6.0 min CN=WQ Runoff=10.68 cfs 0.552 af Runoff Area=74,865 sf 8.12% Impervious Runoff Depth=5.66"Subcatchment OFFSITE B: OFFSITE B- Tc=6.0 min CN=WQ Runoff=15.90 cfs 0.811 af Inflow=30.18 cfs 1.543 afReach DA2: DA2 - TOTAL FLOW TO WETLAND A Outflow=30.18 cfs 1.543 af Inflow=30.31 cfs 2.161 afReach DA3: DA3 - TOTAL FLOW TO WETLAND B Outflow=30.31 cfs 2.161 af Peak Elev=970.46' Storage=10,705 cf Inflow=30.18 cfs 1.543 afPond 1P: WETLAND A Outflow=20.71 cfs 1.543 af Peak Elev=961.63' Storage=4,047 cf Inflow=85.95 cfs 6.220 afPond 5P: Wetland B Outflow=85.29 cfs 6.220 af Total Runoff Area = 12.944 ac Runoff Volume = 6.264 af Average Runoff Depth = 5.81" 75.55% Pervious = 9.780 ac 24.45% Impervious = 3.165 ac MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 93HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment 6S: UNDISTURBED Runoff = 26.30 cfs @ 12.08 hrs, Volume= 1.327 af, Depth= 5.53" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41" Area (sf) CN Description * 125,400 84 125,400 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment 6S: UNDISTURBED Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41" Runoff Area=125,400 sf Runoff Volume=1.327 af Runoff Depth=5.53" Tc=6.0 min CN=84 26.30 cfs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 94HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 6S: UNDISTURBED Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.15 0.00 0.00 10.00 0.79 0.07 0.30 15.00 6.96 5.11 0.94 20.00 7.29 5.41 0.09 25.00 7.41 5.53 0.00 30.00 7.41 5.53 0.00 35.00 7.41 5.53 0.00 40.00 7.41 5.53 0.00 45.00 7.41 5.53 0.00 50.00 7.41 5.53 0.00 55.00 7.41 5.53 0.00 60.00 7.41 5.53 0.00 65.00 7.41 5.53 0.00 70.00 7.41 5.53 0.00 75.00 7.41 5.53 0.00 80.00 7.41 5.53 0.00 85.00 7.41 5.53 0.00 90.00 7.41 5.53 0.00 95.00 7.41 5.53 0.00 100.00 7.41 5.53 0.00 105.00 7.41 5.53 0.00 110.00 7.41 5.53 0.00 115.00 7.41 5.53 0.00 120.00 7.41 5.53 0.00 125.00 7.41 5.53 0.00 130.00 7.41 5.53 0.00 135.00 7.41 5.53 0.00 140.00 7.41 5.53 0.00 145.00 7.41 5.53 0.00 150.00 7.41 5.53 0.00 155.00 7.41 5.53 0.00 160.00 7.41 5.53 0.00 165.00 7.41 5.53 0.00 170.00 7.41 5.53 0.00 175.00 7.41 5.53 0.00 180.00 7.41 5.53 0.00 185.00 7.41 5.53 0.00 190.00 7.41 5.53 0.00 195.00 7.41 5.53 0.00 200.00 7.41 5.53 0.00 205.00 7.41 5.53 0.00 210.00 7.41 5.53 0.00 215.00 7.41 5.53 0.00 220.00 7.41 5.53 0.00 225.00 7.41 5.53 0.00 230.00 7.41 5.53 0.00 235.00 7.41 5.53 0.00 240.00 7.41 5.53 0.00 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 95HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment 7S: OFFSITE WETLAND B WATERSHED Runoff = 37.78 cfs @ 12.17 hrs, Volume= 2.732 af, Depth= 5.99" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41" Area (sf) CN Description 67,393 98 Unconnected roofs, HSG B * 170,799 84 1/2 acre lots, 25% imp, HSG B 238,192 Weighted Average 128,099 53.78% Pervious Area 110,093 46.22% Impervious Area 67,393 61.21% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.9 200 0.1500 0.42 Sheet Flow, Grass: Short n= 0.150 P2= 2.94" 5.5 900 0.1500 2.71 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 13.4 1,100 Total Subcatchment 7S: OFFSITE WETLAND B WATERSHED Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41" Runoff Area=238,192 sf Runoff Volume=2.732 af Runoff Depth=5.99" Flow Length=1,100' Slope=0.1500 '/' Tc=13.4 min CN=WQ 37.78 cfs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 96HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 7S: OFFSITE WETLAND B WATERSHED Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.15 0.00 0.03 10.00 0.79 0.14 0.87 15.00 6.96 5.56 1.80 20.00 7.29 5.87 0.16 25.00 7.41 5.99 0.00 30.00 7.41 5.99 0.00 35.00 7.41 5.99 0.00 40.00 7.41 5.99 0.00 45.00 7.41 5.99 0.00 50.00 7.41 5.99 0.00 55.00 7.41 5.99 0.00 60.00 7.41 5.99 0.00 65.00 7.41 5.99 0.00 70.00 7.41 5.99 0.00 75.00 7.41 5.99 0.00 80.00 7.41 5.99 0.00 85.00 7.41 5.99 0.00 90.00 7.41 5.99 0.00 95.00 7.41 5.99 0.00 100.00 7.41 5.99 0.00 105.00 7.41 5.99 0.00 110.00 7.41 5.99 0.00 115.00 7.41 5.99 0.00 120.00 7.41 5.99 0.00 125.00 7.41 5.99 0.00 130.00 7.41 5.99 0.00 135.00 7.41 5.99 0.00 140.00 7.41 5.99 0.00 145.00 7.41 5.99 0.00 150.00 7.41 5.99 0.00 155.00 7.41 5.99 0.00 160.00 7.41 5.99 0.00 165.00 7.41 5.99 0.00 170.00 7.41 5.99 0.00 175.00 7.41 5.99 0.00 180.00 7.41 5.99 0.00 185.00 7.41 5.99 0.00 190.00 7.41 5.99 0.00 195.00 7.41 5.99 0.00 200.00 7.41 5.99 0.00 205.00 7.41 5.99 0.00 210.00 7.41 5.99 0.00 215.00 7.41 5.99 0.00 220.00 7.41 5.99 0.00 225.00 7.41 5.99 0.00 230.00 7.41 5.99 0.00 235.00 7.41 5.99 0.00 240.00 7.41 5.99 0.00 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 97HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment EX1A: EX1A - DRAINS EAST DOWN LAKE LUCY ROAD Runoff = 0.78 cfs @ 12.08 hrs, Volume= 0.045 af, Depth= 7.17" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41" Area (sf) CN Description 3,245 98 Paved parking, HSG C * 0 84 3,245 Weighted Average 3,245 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment EX1A: EX1A - DRAINS EAST DOWN LAKE LUCY ROAD Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.85 0.8 0.75 0.7 0.65 0.6 0.55 0.5 0.45 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41" Runoff Area=3,245 sf Runoff Volume=0.045 af Runoff Depth=7.17" Tc=6.0 min CN=WQ 0.78 cfs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 98HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment EX1A: EX1A - DRAINS EAST DOWN LAKE LUCY ROAD Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.15 0.04 0.00 10.00 0.79 0.58 0.02 15.00 6.96 6.72 0.03 20.00 7.29 7.05 0.00 25.00 7.41 7.17 0.00 30.00 7.41 7.17 0.00 35.00 7.41 7.17 0.00 40.00 7.41 7.17 0.00 45.00 7.41 7.17 0.00 50.00 7.41 7.17 0.00 55.00 7.41 7.17 0.00 60.00 7.41 7.17 0.00 65.00 7.41 7.17 0.00 70.00 7.41 7.17 0.00 75.00 7.41 7.17 0.00 80.00 7.41 7.17 0.00 85.00 7.41 7.17 0.00 90.00 7.41 7.17 0.00 95.00 7.41 7.17 0.00 100.00 7.41 7.17 0.00 105.00 7.41 7.17 0.00 110.00 7.41 7.17 0.00 115.00 7.41 7.17 0.00 120.00 7.41 7.17 0.00 125.00 7.41 7.17 0.00 130.00 7.41 7.17 0.00 135.00 7.41 7.17 0.00 140.00 7.41 7.17 0.00 145.00 7.41 7.17 0.00 150.00 7.41 7.17 0.00 155.00 7.41 7.17 0.00 160.00 7.41 7.17 0.00 165.00 7.41 7.17 0.00 170.00 7.41 7.17 0.00 175.00 7.41 7.17 0.00 180.00 7.41 7.17 0.00 185.00 7.41 7.17 0.00 190.00 7.41 7.17 0.00 195.00 7.41 7.17 0.00 200.00 7.41 7.17 0.00 205.00 7.41 7.17 0.00 210.00 7.41 7.17 0.00 215.00 7.41 7.17 0.00 220.00 7.41 7.17 0.00 225.00 7.41 7.17 0.00 230.00 7.41 7.17 0.00 235.00 7.41 7.17 0.00 240.00 7.41 7.17 0.00 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 99HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment EX1B: EX1B - DRAINS SOUTH TO WETLAND A Runoff = 13.41 cfs @ 12.08 hrs, Volume= 0.687 af, Depth= 5.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41" Area (sf) CN Description 7,290 98 Paved parking, HSG C 55,517 84 62,807 Weighted Average 55,517 88.39% Pervious Area 7,290 11.61% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment EX1B: EX1B - DRAINS SOUTH TO WETLAND A Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41" Runoff Area=62,807 sf Runoff Volume=0.687 af Runoff Depth=5.72" Tc=6.0 min CN=WQ 13.41 cfs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 100HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment EX1B: EX1B - DRAINS SOUTH TO WETLAND A Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.15 0.00 0.00 10.00 0.79 0.10 0.19 15.00 6.96 5.33 0.47 20.00 7.29 5.64 0.04 25.00 7.41 5.76 0.00 30.00 7.41 5.76 0.00 35.00 7.41 5.76 0.00 40.00 7.41 5.76 0.00 45.00 7.41 5.76 0.00 50.00 7.41 5.76 0.00 55.00 7.41 5.76 0.00 60.00 7.41 5.76 0.00 65.00 7.41 5.76 0.00 70.00 7.41 5.76 0.00 75.00 7.41 5.76 0.00 80.00 7.41 5.76 0.00 85.00 7.41 5.76 0.00 90.00 7.41 5.76 0.00 95.00 7.41 5.76 0.00 100.00 7.41 5.76 0.00 105.00 7.41 5.76 0.00 110.00 7.41 5.76 0.00 115.00 7.41 5.76 0.00 120.00 7.41 5.76 0.00 125.00 7.41 5.76 0.00 130.00 7.41 5.76 0.00 135.00 7.41 5.76 0.00 140.00 7.41 5.76 0.00 145.00 7.41 5.76 0.00 150.00 7.41 5.76 0.00 155.00 7.41 5.76 0.00 160.00 7.41 5.76 0.00 165.00 7.41 5.76 0.00 170.00 7.41 5.76 0.00 175.00 7.41 5.76 0.00 180.00 7.41 5.76 0.00 185.00 7.41 5.76 0.00 190.00 7.41 5.76 0.00 195.00 7.41 5.76 0.00 200.00 7.41 5.76 0.00 205.00 7.41 5.76 0.00 210.00 7.41 5.76 0.00 215.00 7.41 5.76 0.00 220.00 7.41 5.76 0.00 225.00 7.41 5.76 0.00 230.00 7.41 5.76 0.00 235.00 7.41 5.76 0.00 240.00 7.41 5.76 0.00 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 101HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment EX1C: EX1C - DRAINS SOUTH TO WETLAND A Runoff = 0.88 cfs @ 12.08 hrs, Volume= 0.044 af, Depth= 5.53" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41" Area (sf) CN Description 0 98 Paved parking, HSG C * 4,200 84 4,200 Weighted Average 4,200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment EX1C: EX1C - DRAINS SOUTH TO WETLAND A Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.95 0.9 0.85 0.8 0.75 0.7 0.65 0.6 0.55 0.5 0.45 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41" Runoff Area=4,200 sf Runoff Volume=0.044 af Runoff Depth=5.53" Tc=6.0 min CN=WQ 0.88 cfs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 102HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment EX1C: EX1C - DRAINS SOUTH TO WETLAND A Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.15 0.00 0.00 10.00 0.79 0.07 0.01 15.00 6.96 5.11 0.03 20.00 7.29 5.41 0.00 25.00 7.41 5.53 0.00 30.00 7.41 5.53 0.00 35.00 7.41 5.53 0.00 40.00 7.41 5.53 0.00 45.00 7.41 5.53 0.00 50.00 7.41 5.53 0.00 55.00 7.41 5.53 0.00 60.00 7.41 5.53 0.00 65.00 7.41 5.53 0.00 70.00 7.41 5.53 0.00 75.00 7.41 5.53 0.00 80.00 7.41 5.53 0.00 85.00 7.41 5.53 0.00 90.00 7.41 5.53 0.00 95.00 7.41 5.53 0.00 100.00 7.41 5.53 0.00 105.00 7.41 5.53 0.00 110.00 7.41 5.53 0.00 115.00 7.41 5.53 0.00 120.00 7.41 5.53 0.00 125.00 7.41 5.53 0.00 130.00 7.41 5.53 0.00 135.00 7.41 5.53 0.00 140.00 7.41 5.53 0.00 145.00 7.41 5.53 0.00 150.00 7.41 5.53 0.00 155.00 7.41 5.53 0.00 160.00 7.41 5.53 0.00 165.00 7.41 5.53 0.00 170.00 7.41 5.53 0.00 175.00 7.41 5.53 0.00 180.00 7.41 5.53 0.00 185.00 7.41 5.53 0.00 190.00 7.41 5.53 0.00 195.00 7.41 5.53 0.00 200.00 7.41 5.53 0.00 205.00 7.41 5.53 0.00 210.00 7.41 5.53 0.00 215.00 7.41 5.53 0.00 220.00 7.41 5.53 0.00 225.00 7.41 5.53 0.00 230.00 7.41 5.53 0.00 235.00 7.41 5.53 0.00 240.00 7.41 5.53 0.00 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 103HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment EX2: EX2 - DRAINS SOUTH TO WETLAND B Runoff = 1.24 cfs @ 12.08 hrs, Volume= 0.066 af, Depth= 6.20" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41" Area (sf) CN Description 2,278 98 Paved parking, HSG C * 3,302 84 5,580 Weighted Average 3,302 59.18% Pervious Area 2,278 40.82% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment EX2: EX2 - DRAINS SOUTH TO WETLAND B Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)1 0 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41" Runoff Area=5,580 sf Runoff Volume=0.066 af Runoff Depth=6.20" Tc=6.0 min CN=WQ 1.24 cfs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 104HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment EX2: EX2 - DRAINS SOUTH TO WETLAND B Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.15 0.00 0.00 10.00 0.79 0.19 0.02 15.00 6.96 5.79 0.04 20.00 7.29 6.10 0.00 25.00 7.41 6.23 0.00 30.00 7.41 6.23 0.00 35.00 7.41 6.23 0.00 40.00 7.41 6.23 0.00 45.00 7.41 6.23 0.00 50.00 7.41 6.23 0.00 55.00 7.41 6.23 0.00 60.00 7.41 6.23 0.00 65.00 7.41 6.23 0.00 70.00 7.41 6.23 0.00 75.00 7.41 6.23 0.00 80.00 7.41 6.23 0.00 85.00 7.41 6.23 0.00 90.00 7.41 6.23 0.00 95.00 7.41 6.23 0.00 100.00 7.41 6.23 0.00 105.00 7.41 6.23 0.00 110.00 7.41 6.23 0.00 115.00 7.41 6.23 0.00 120.00 7.41 6.23 0.00 125.00 7.41 6.23 0.00 130.00 7.41 6.23 0.00 135.00 7.41 6.23 0.00 140.00 7.41 6.23 0.00 145.00 7.41 6.23 0.00 150.00 7.41 6.23 0.00 155.00 7.41 6.23 0.00 160.00 7.41 6.23 0.00 165.00 7.41 6.23 0.00 170.00 7.41 6.23 0.00 175.00 7.41 6.23 0.00 180.00 7.41 6.23 0.00 185.00 7.41 6.23 0.00 190.00 7.41 6.23 0.00 195.00 7.41 6.23 0.00 200.00 7.41 6.23 0.00 205.00 7.41 6.23 0.00 210.00 7.41 6.23 0.00 215.00 7.41 6.23 0.00 220.00 7.41 6.23 0.00 225.00 7.41 6.23 0.00 230.00 7.41 6.23 0.00 235.00 7.41 6.23 0.00 240.00 7.41 6.23 0.00 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 105HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment OFFSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B Runoff = 10.68 cfs @ 12.08 hrs, Volume= 0.552 af, Depth= 5.82" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41" Area (sf) CN Description 8,875 98 Paved parking, HSG C * 40,698 84 49,573 Weighted Average 40,698 82.10% Pervious Area 8,875 17.90% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment OFFSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)11 10 9 8 7 6 5 4 3 2 1 0 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41" Runoff Area=49,573 sf Runoff Volume=0.552 af Runoff Depth=5.82" Tc=6.0 min CN=WQ 10.68 cfs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 106HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment OFFSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.15 0.00 0.00 10.00 0.79 0.12 0.16 15.00 6.96 5.44 0.37 20.00 7.29 5.76 0.03 25.00 7.41 5.88 0.00 30.00 7.41 5.88 0.00 35.00 7.41 5.88 0.00 40.00 7.41 5.88 0.00 45.00 7.41 5.88 0.00 50.00 7.41 5.88 0.00 55.00 7.41 5.88 0.00 60.00 7.41 5.88 0.00 65.00 7.41 5.88 0.00 70.00 7.41 5.88 0.00 75.00 7.41 5.88 0.00 80.00 7.41 5.88 0.00 85.00 7.41 5.88 0.00 90.00 7.41 5.88 0.00 95.00 7.41 5.88 0.00 100.00 7.41 5.88 0.00 105.00 7.41 5.88 0.00 110.00 7.41 5.88 0.00 115.00 7.41 5.88 0.00 120.00 7.41 5.88 0.00 125.00 7.41 5.88 0.00 130.00 7.41 5.88 0.00 135.00 7.41 5.88 0.00 140.00 7.41 5.88 0.00 145.00 7.41 5.88 0.00 150.00 7.41 5.88 0.00 155.00 7.41 5.88 0.00 160.00 7.41 5.88 0.00 165.00 7.41 5.88 0.00 170.00 7.41 5.88 0.00 175.00 7.41 5.88 0.00 180.00 7.41 5.88 0.00 185.00 7.41 5.88 0.00 190.00 7.41 5.88 0.00 195.00 7.41 5.88 0.00 200.00 7.41 5.88 0.00 205.00 7.41 5.88 0.00 210.00 7.41 5.88 0.00 215.00 7.41 5.88 0.00 220.00 7.41 5.88 0.00 225.00 7.41 5.88 0.00 230.00 7.41 5.88 0.00 235.00 7.41 5.88 0.00 240.00 7.41 5.88 0.00 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 107HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment OFFSITE B: OFFSITE B- DRAINS SOUTH TO WETLAND A Runoff = 15.90 cfs @ 12.08 hrs, Volume= 0.811 af, Depth= 5.66" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41" Area (sf) CN Description 6,076 98 Paved parking, HSG C * 68,789 84 74,865 Weighted Average 68,789 91.88% Pervious Area 6,076 8.12% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment OFFSITE B: OFFSITE B- DRAINS SOUTH TO WETLAND A Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41" Runoff Area=74,865 sf Runoff Volume=0.811 af Runoff Depth=5.66" Tc=6.0 min CN=WQ 15.90 cfs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 108HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment OFFSITE B: OFFSITE B- DRAINS SOUTH TO WETLAND A Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.15 0.00 0.00 10.00 0.79 0.09 0.21 15.00 6.96 5.22 0.56 20.00 7.29 5.53 0.05 25.00 7.41 5.65 0.00 30.00 7.41 5.65 0.00 35.00 7.41 5.65 0.00 40.00 7.41 5.65 0.00 45.00 7.41 5.65 0.00 50.00 7.41 5.65 0.00 55.00 7.41 5.65 0.00 60.00 7.41 5.65 0.00 65.00 7.41 5.65 0.00 70.00 7.41 5.65 0.00 75.00 7.41 5.65 0.00 80.00 7.41 5.65 0.00 85.00 7.41 5.65 0.00 90.00 7.41 5.65 0.00 95.00 7.41 5.65 0.00 100.00 7.41 5.65 0.00 105.00 7.41 5.65 0.00 110.00 7.41 5.65 0.00 115.00 7.41 5.65 0.00 120.00 7.41 5.65 0.00 125.00 7.41 5.65 0.00 130.00 7.41 5.65 0.00 135.00 7.41 5.65 0.00 140.00 7.41 5.65 0.00 145.00 7.41 5.65 0.00 150.00 7.41 5.65 0.00 155.00 7.41 5.65 0.00 160.00 7.41 5.65 0.00 165.00 7.41 5.65 0.00 170.00 7.41 5.65 0.00 175.00 7.41 5.65 0.00 180.00 7.41 5.65 0.00 185.00 7.41 5.65 0.00 190.00 7.41 5.65 0.00 195.00 7.41 5.65 0.00 200.00 7.41 5.65 0.00 205.00 7.41 5.65 0.00 210.00 7.41 5.65 0.00 215.00 7.41 5.65 0.00 220.00 7.41 5.65 0.00 225.00 7.41 5.65 0.00 230.00 7.41 5.65 0.00 235.00 7.41 5.65 0.00 240.00 7.41 5.65 0.00 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 109HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 3.257 ac, 9.42% Impervious, Inflow Depth = 5.68" for 100y 24hr event Inflow = 30.18 cfs @ 12.08 hrs, Volume= 1.543 af Outflow = 30.18 cfs @ 12.08 hrs, Volume= 1.543 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Reach DA2: DA2 - TOTAL FLOW TO WETLAND A Inflow Outflow Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=3.257 ac 30.18 cfs 30.18 cfs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 110HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A Time (hours) Inflow (cfs) Elevation (feet) Outflow (cfs) 0.00 0.00 0.00 5.00 0.01 0.01 10.00 0.40 0.40 15.00 1.06 1.06 20.00 0.10 0.10 25.00 0.00 0.00 30.00 0.00 0.00 35.00 0.00 0.00 40.00 0.00 0.00 45.00 0.00 0.00 50.00 0.00 0.00 55.00 0.00 0.00 60.00 0.00 0.00 65.00 0.00 0.00 70.00 0.00 0.00 75.00 0.00 0.00 80.00 0.00 0.00 85.00 0.00 0.00 90.00 0.00 0.00 95.00 0.00 0.00 100.00 0.00 0.00 105.00 0.00 0.00 110.00 0.00 0.00 115.00 0.00 0.00 120.00 0.00 0.00 125.00 0.00 0.00 130.00 0.00 0.00 135.00 0.00 0.00 140.00 0.00 0.00 145.00 0.00 0.00 150.00 0.00 0.00 155.00 0.00 0.00 160.00 0.00 0.00 165.00 0.00 0.00 170.00 0.00 0.00 175.00 0.00 0.00 180.00 0.00 0.00 185.00 0.00 0.00 190.00 0.00 0.00 195.00 0.00 0.00 200.00 0.00 0.00 205.00 0.00 0.00 210.00 0.00 0.00 215.00 0.00 0.00 220.00 0.00 0.00 225.00 0.00 0.00 230.00 0.00 0.00 235.00 0.00 0.00 240.00 0.00 0.00 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 111HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 4.523 ac, 12.44% Impervious, Inflow Depth = 5.73" for 100y 24hr event Inflow = 30.31 cfs @ 12.11 hrs, Volume= 2.161 af Outflow = 30.31 cfs @ 12.11 hrs, Volume= 2.161 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Reach DA3: DA3 - TOTAL FLOW TO WETLAND B Inflow Outflow Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=4.523 ac 30.31 cfs 30.31 cfs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 112HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B Time (hours) Inflow (cfs) Elevation (feet) Outflow (cfs) 0.00 0.00 0.00 5.00 0.01 0.01 10.00 0.47 0.47 15.00 1.48 1.48 20.00 0.14 0.14 25.00 0.03 0.03 30.00 0.00 0.00 35.00 0.00 0.00 40.00 0.00 0.00 45.00 0.00 0.00 50.00 0.00 0.00 55.00 0.00 0.00 60.00 0.00 0.00 65.00 0.00 0.00 70.00 0.00 0.00 75.00 0.00 0.00 80.00 0.00 0.00 85.00 0.00 0.00 90.00 0.00 0.00 95.00 0.00 0.00 100.00 0.00 0.00 105.00 0.00 0.00 110.00 0.00 0.00 115.00 0.00 0.00 120.00 0.00 0.00 125.00 0.00 0.00 130.00 0.00 0.00 135.00 0.00 0.00 140.00 0.00 0.00 145.00 0.00 0.00 150.00 0.00 0.00 155.00 0.00 0.00 160.00 0.00 0.00 165.00 0.00 0.00 170.00 0.00 0.00 175.00 0.00 0.00 180.00 0.00 0.00 185.00 0.00 0.00 190.00 0.00 0.00 195.00 0.00 0.00 200.00 0.00 0.00 205.00 0.00 0.00 210.00 0.00 0.00 215.00 0.00 0.00 220.00 0.00 0.00 225.00 0.00 0.00 230.00 0.00 0.00 235.00 0.00 0.00 240.00 0.00 0.00 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 113HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Pond 1P: WETLAND A Inflow Area = 3.257 ac, 9.42% Impervious, Inflow Depth = 5.68" for 100y 24hr event Inflow = 30.18 cfs @ 12.08 hrs, Volume= 1.543 af Outflow = 20.71 cfs @ 12.15 hrs, Volume= 1.543 af, Atten= 31%, Lag= 3.8 min Primary = 20.71 cfs @ 12.15 hrs, Volume= 1.543 af Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Peak Elev= 970.46' @ 12.15 hrs Surf.Area= 14,125 sf Storage= 10,705 cf Plug-Flow detention time= 16.4 min calculated for 1.543 af (100% of inflow) Center-of-Mass det. time= 16.4 min ( 780.9 - 764.5 ) Volume Invert Avail.Storage Storage Description #1 969.62' 18,824 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 969.62 11,466 0 0 970.00 12,553 4,564 4,564 971.00 15,967 14,260 18,824 Device Routing Invert Outlet Devices #1 Primary 969.62'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=20.69 cfs @ 12.15 hrs HW=970.46' (Free Discharge) 1=Broad-Crested Rectangular Weir (Weir Controls 20.69 cfs @ 2.46 fps) MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 114HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Pond 1P: WETLAND A Inflow Primary Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=3.257 ac Peak Elev=970.46' Storage=10,705 cf 30.18 cfs 20.71 cfs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 115HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Pond 1P: WETLAND A Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Primary (cfs) 0.00 0.00 0 969.62 0.00 5.00 0.01 17 969.62 0.00 10.00 0.40 585 969.67 0.29 15.00 1.06 1,424 969.74 1.07 20.00 0.10 290 969.65 0.10 25.00 0.00 112 969.63 0.03 30.00 0.00 1 969.62 0.00 35.00 0.00 0 969.62 0.00 40.00 0.00 0 969.62 0.00 45.00 0.00 0 969.62 0.00 50.00 0.00 0 969.62 0.00 55.00 0.00 0 969.62 0.00 60.00 0.00 0 969.62 0.00 65.00 0.00 0 969.62 0.00 70.00 0.00 0 969.62 0.00 75.00 0.00 0 969.62 0.00 80.00 0.00 0 969.62 0.00 85.00 0.00 0 969.62 0.00 90.00 0.00 0 969.62 0.00 95.00 0.00 0 969.62 0.00 100.00 0.00 0 969.62 0.00 105.00 0.00 0 969.62 0.00 110.00 0.00 0 969.62 0.00 115.00 0.00 0 969.62 0.00 120.00 0.00 0 969.62 0.00 125.00 0.00 0 969.62 0.00 130.00 0.00 0 969.62 0.00 135.00 0.00 0 969.62 0.00 140.00 0.00 0 969.62 0.00 145.00 0.00 0 969.62 0.00 150.00 0.00 0 969.62 0.00 155.00 0.00 0 969.62 0.00 160.00 0.00 0 969.62 0.00 165.00 0.00 0 969.62 0.00 170.00 0.00 0 969.62 0.00 175.00 0.00 0 969.62 0.00 180.00 0.00 0 969.62 0.00 185.00 0.00 0 969.62 0.00 190.00 0.00 0 969.62 0.00 195.00 0.00 0 969.62 0.00 200.00 0.00 0 969.62 0.00 205.00 0.00 0 969.62 0.00 210.00 0.00 0 969.62 0.00 215.00 0.00 0 969.62 0.00 220.00 0.00 0 969.62 0.00 225.00 0.00 0 969.62 0.00 230.00 0.00 0 969.62 0.00 235.00 0.00 0 969.62 0.00 240.00 0.00 0 969.62 0.00 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 116HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Stage-Discharge for Pond 1P: WETLAND A Elevation (feet) Primary (cfs) 969.62 0.00 969.63 0.02 969.64 0.07 969.65 0.13 969.66 0.20 969.67 0.28 969.68 0.37 969.69 0.46 969.70 0.56 969.71 0.67 969.72 0.79 969.73 0.91 969.74 1.04 969.75 1.17 969.76 1.30 969.77 1.45 969.78 1.59 969.79 1.75 969.80 1.90 969.81 2.06 969.82 2.23 969.83 2.40 969.84 2.58 969.85 2.76 969.86 2.94 969.87 3.13 969.88 3.33 969.89 3.53 969.90 3.73 969.91 3.94 969.92 4.15 969.93 4.36 969.94 4.58 969.95 4.81 969.96 5.03 969.97 5.26 969.98 5.50 969.99 5.74 970.00 5.98 970.01 6.23 970.02 6.48 970.03 6.74 970.04 7.01 970.05 7.28 970.06 7.55 970.07 7.83 970.08 8.12 970.09 8.41 970.10 8.70 970.11 9.00 970.12 9.30 970.13 9.60 Elevation (feet) Primary (cfs) 970.14 9.91 970.15 10.23 970.16 10.55 970.17 10.87 970.18 11.20 970.19 11.53 970.20 11.86 970.21 12.20 970.22 12.55 970.23 12.86 970.24 13.18 970.25 13.49 970.26 13.81 970.27 14.14 970.28 14.46 970.29 14.79 970.30 15.12 970.31 15.45 970.32 15.78 970.33 16.12 970.34 16.46 970.35 16.80 970.36 17.14 970.37 17.49 970.38 17.84 970.39 18.19 970.40 18.54 970.41 18.89 970.42 19.25 970.43 19.61 970.44 19.97 970.45 20.33 970.46 20.69 970.47 21.06 970.48 21.43 970.49 21.80 970.50 22.17 970.51 22.55 970.52 22.92 970.53 23.30 970.54 23.68 970.55 24.07 970.56 24.45 970.57 24.84 970.58 25.23 970.59 25.62 970.60 26.01 970.61 26.40 970.62 26.80 970.63 27.21 970.64 27.62 970.65 28.03 Elevation (feet) Primary (cfs) 970.66 28.45 970.67 28.86 970.68 29.28 970.69 29.70 970.70 30.12 970.71 30.55 970.72 30.98 970.73 31.41 970.74 31.84 970.75 32.27 970.76 32.71 970.77 33.14 970.78 33.58 970.79 34.02 970.80 34.47 970.81 34.91 970.82 35.36 970.83 35.79 970.84 36.22 970.85 36.65 970.86 37.09 970.87 37.52 970.88 37.96 970.89 38.40 970.90 38.84 970.91 39.28 970.92 39.72 970.93 40.17 970.94 40.61 970.95 41.06 970.96 41.51 970.97 41.96 970.98 42.41 970.99 42.86 971.00 43.32 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 117HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Pond 5P: Wetland B [44] Hint: Outlet device #1 is below defined storage [95] Warning: Outlet Device #1 rise exceeded Inflow Area = 12.870 ac, 24.01% Impervious, Inflow Depth = 5.80" for 100y 24hr event Inflow = 85.95 cfs @ 12.12 hrs, Volume= 6.220 af Outflow = 85.29 cfs @ 12.13 hrs, Volume= 6.220 af, Atten= 1%, Lag= 0.9 min Primary = 85.29 cfs @ 12.13 hrs, Volume= 6.220 af Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Peak Elev= 961.63' @ 12.13 hrs Surf.Area= 149,310 sf Storage= 4,047 cf Plug-Flow detention time= (not calculated: outflow precedes inflow) Center-of-Mass det. time= 0.8 min ( 769.9 - 769.1 ) Volume Invert Avail.Storage Storage Description #1 961.60' 841,104 cf Custom Stage Data (Conic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (cubic-feet) (cubic-feet) (sq-ft) 961.60 149,000 0 0 149,000 962.00 153,597 60,517 60,517 153,630 964.00 201,325 353,847 414,364 201,451 966.00 225,646 426,740 841,104 225,991 Device Routing Invert Outlet Devices #1 Primary 960.82'Asymmetrical Weir, C= 3.27 Offset (feet) -70.00 -41.00 0.00 49.00 87.00 Height (feet) 0.35 0.09 0.00 0.09 0.35 Primary OutFlow Max=136.39 cfs @ 12.13 hrs HW=961.63' (Free Discharge) 1=Asymmetrical Weir (Weir Controls 136.39 cfs @ 2.79 fps) MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 118HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Pond 5P: Wetland B Inflow Primary Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)95 90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Inflow Area=12.870 ac Peak Elev=961.63' Storage=4,047 cf 85.95 cfs 85.29 cfs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 119HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Pond 5P: Wetland B Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Primary (cfs) 0.00 0.00 0 961.60 0.00 5.00 0.04 2 961.60 0.04 10.00 1.64 77 961.60 1.63 15.00 4.22 200 961.60 4.22 20.00 0.39 19 961.60 0.39 25.00 0.03 1 961.60 0.03 30.00 0.00 0 961.60 0.00 35.00 0.00 0 961.60 0.00 40.00 0.00 0 961.60 0.00 45.00 0.00 0 961.60 0.00 50.00 0.00 0 961.60 0.00 55.00 0.00 0 961.60 0.00 60.00 0.00 0 961.60 0.00 65.00 0.00 0 961.60 0.00 70.00 0.00 0 961.60 0.00 75.00 0.00 0 961.60 0.00 80.00 0.00 0 961.60 0.00 85.00 0.00 0 961.60 0.00 90.00 0.00 0 961.60 0.00 95.00 0.00 0 961.60 0.00 100.00 0.00 0 961.60 0.00 105.00 0.00 0 961.60 0.00 110.00 0.00 0 961.60 0.00 115.00 0.00 0 961.60 0.00 120.00 0.00 0 961.60 0.00 125.00 0.00 0 961.60 0.00 130.00 0.00 0 961.60 0.00 135.00 0.00 0 961.60 0.00 140.00 0.00 0 961.60 0.00 145.00 0.00 0 961.60 0.00 150.00 0.00 0 961.60 0.00 155.00 0.00 0 961.60 0.00 160.00 0.00 0 961.60 0.00 165.00 0.00 0 961.60 0.00 170.00 0.00 0 961.60 0.00 175.00 0.00 0 961.60 0.00 180.00 0.00 0 961.60 0.00 185.00 0.00 0 961.60 0.00 190.00 0.00 0 961.60 0.00 195.00 0.00 0 961.60 0.00 200.00 0.00 0 961.60 0.00 205.00 0.00 0 961.60 0.00 210.00 0.00 0 961.60 0.00 215.00 0.00 0 961.60 0.00 220.00 0.00 0 961.60 0.00 225.00 0.00 0 961.60 0.00 230.00 0.00 0 961.60 0.00 235.00 0.00 0 961.60 0.00 240.00 0.00 0 961.60 0.00 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING Printed 5/13/2022Prepared by {enter your company name here} Page 120HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Stage-Discharge for Pond 5P: Wetland B Elevation (feet) Primary (cfs) 961.60 0.00 961.65 139.02 961.70 144.59 961.75 149.95 961.80 155.13 961.85 160.13 961.90 164.98 961.95 169.69 962.00 174.28 962.05 178.74 962.10 183.09 962.15 187.35 962.20 191.51 962.25 195.57 962.30 199.56 962.35 203.47 962.40 207.30 962.45 211.06 962.50 214.76 962.55 218.40 962.60 221.97 962.65 225.49 962.70 228.95 962.75 232.36 962.80 235.73 962.85 239.04 962.90 242.31 962.95 245.54 963.00 248.72 963.05 251.87 963.10 254.97 963.15 258.04 963.20 261.07 963.25 264.07 963.30 267.03 963.35 269.96 963.40 272.86 963.45 275.73 963.50 278.56 963.55 281.37 963.60 284.16 963.65 286.91 963.70 289.64 963.75 292.34 963.80 295.02 963.85 297.68 963.90 300.31 963.95 302.92 964.00 305.50 964.05 308.07 964.10 310.61 964.15 313.13 Elevation (feet) Primary (cfs) 964.20 315.63 964.25 318.12 964.30 320.58 964.35 323.02 964.40 325.45 964.45 327.86 964.50 330.25 964.55 332.62 964.60 334.98 964.65 337.32 964.70 339.64 964.75 341.95 964.80 344.24 964.85 346.52 964.90 348.78 964.95 351.03 965.00 353.26 965.05 355.48 965.10 357.69 965.15 359.88 965.20 362.06 965.25 364.23 965.30 366.38 965.35 368.52 965.40 370.65 965.45 372.76 965.50 374.87 965.55 376.96 965.60 379.04 965.65 381.11 965.70 383.17 965.75 385.22 965.80 387.25 965.85 389.28 965.90 391.29 965.95 393.30 966.00 395.29 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST Printed 5/13/2022Prepared by {enter your company name here} Page 121HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Time span=0.00-240.00 hrs, dt=0.01 hrs, 24001 points Runoff by SCS TR-20 method, UH=SCS, Weighted-Q Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Runoff Area=125,400 sf 0.00% Impervious Runoff Depth>6.96"Subcatchment 6S: UNDISTURBED Tc=6.0 min AMC Adjusted CN=98 Runoff=0.55 cfs 1.670 af Runoff Area=238,192 sf 46.22% Impervious Runoff Depth>6.96"Subcatchment 7S: OFFSITE WETLAND B Flow Length=1,100' Slope=0.1500 '/' Tc=13.4 min AMC Adjusted CN=WQ Runoff=1.04 cfs 3.171 af Runoff Area=3,245 sf 100.00% Impervious Runoff Depth>6.96"Subcatchment EX1A: EX1A - DRAINS Tc=6.0 min CN=WQ Runoff=0.01 cfs 0.043 af Runoff Area=62,807 sf 11.61% Impervious Runoff Depth>6.96"Subcatchment EX1B: EX1B - DRAINS Tc=6.0 min AMC Adjusted CN=WQ Runoff=0.28 cfs 0.836 af Runoff Area=4,200 sf 0.00% Impervious Runoff Depth>6.96"Subcatchment EX1C: EX1C - DRAINS Tc=6.0 min AMC Adjusted CN=WQ Runoff=0.02 cfs 0.056 af Runoff Area=5,580 sf 40.82% Impervious Runoff Depth>6.96"Subcatchment EX2: EX2 - DRAINS SOUTH Tc=6.0 min AMC Adjusted CN=WQ Runoff=0.02 cfs 0.074 af Runoff Area=49,573 sf 17.90% Impervious Runoff Depth>6.96"Subcatchment OFFSITE A: OFFSITE A - Tc=6.0 min AMC Adjusted CN=WQ Runoff=0.22 cfs 0.660 af Runoff Area=74,865 sf 8.12% Impervious Runoff Depth>6.96"Subcatchment OFFSITE B: OFFSITE B- Tc=6.0 min AMC Adjusted CN=WQ Runoff=0.33 cfs 0.997 af Inflow=0.62 cfs 1.889 afReach DA2: DA2 - TOTAL FLOW TO WETLAND A Outflow=0.62 cfs 1.889 af Inflow=0.85 cfs 2.620 afReach DA3: DA3 - TOTAL FLOW TO WETLAND B Outflow=0.85 cfs 2.620 af Peak Elev=969.70' Storage=981 cf Inflow=0.62 cfs 1.889 afPond 1P: WETLAND A Outflow=0.61 cfs 1.885 af Peak Elev=961.60' Storage=116 cf Inflow=2.45 cfs 7.460 afPond 5P: Wetland B Outflow=2.44 cfs 7.460 af Total Runoff Area = 12.944 ac Runoff Volume = 7.507 af Average Runoff Depth = 6.96" 75.55% Pervious = 9.780 ac 24.45% Impervious = 3.165 ac MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST Printed 5/13/2022Prepared by {enter your company name here} Page 122HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment 6S: UNDISTURBED Runoff = 0.55 cfs @ 121.26 hrs, Volume= 1.670 af, Depth> 6.96" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=4 Area (sf) CN Adj Description * 125,400 84 98 125,400 Weighted Average 125,400 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment 6S: UNDISTURBED Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.6 0.55 0.5 0.45 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20" AMC=4 Runoff Area=125,400 sf Runoff Volume=1.670 af Runoff Depth>6.96" Tc=6.0 min AMC Adjusted CN=98 0.55 cfs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST Printed 5/13/2022Prepared by {enter your company name here} Page 123HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 6S: UNDISTURBED Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.04 0.00 0.00 10.00 0.12 0.02 0.02 15.00 0.20 0.07 0.03 20.00 0.28 0.13 0.04 25.00 0.37 0.21 0.04 30.00 0.46 0.29 0.05 35.00 0.56 0.37 0.05 40.00 0.66 0.46 0.05 45.00 0.76 0.56 0.06 50.00 0.86 0.66 0.06 55.00 0.97 0.76 0.06 60.00 1.08 0.87 0.06 65.00 1.19 0.98 0.07 70.00 1.31 1.10 0.07 75.00 1.44 1.22 0.07 80.00 1.57 1.35 0.08 85.00 1.71 1.49 0.08 90.00 1.86 1.64 0.09 95.00 2.03 1.80 0.10 100.00 2.20 1.97 0.10 105.00 2.40 2.17 0.13 110.00 2.65 2.42 0.15 115.00 2.94 2.70 0.20 120.00 3.53 3.29 0.51 125.00 4.27 4.03 0.28 130.00 4.62 4.39 0.17 135.00 4.87 4.63 0.13 140.00 5.06 4.83 0.10 145.00 5.23 4.99 0.09 150.00 5.39 5.15 0.09 155.00 5.53 5.30 0.08 160.00 5.67 5.43 0.08 165.00 5.80 5.56 0.07 170.00 5.92 5.68 0.07 175.00 6.03 5.80 0.06 180.00 6.14 5.91 0.06 185.00 6.25 6.01 0.06 190.00 6.36 6.12 0.06 195.00 6.46 6.22 0.06 200.00 6.55 6.32 0.06 205.00 6.65 6.41 0.05 210.00 6.74 6.50 0.05 215.00 6.82 6.58 0.05 220.00 6.91 6.67 0.05 225.00 6.98 6.75 0.05 230.00 7.06 6.82 0.04 235.00 7.13 6.89 0.04 240.00 7.20 6.96 0.04 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST Printed 5/13/2022Prepared by {enter your company name here} Page 124HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment 7S: OFFSITE WETLAND B WATERSHED Runoff = 1.04 cfs @ 121.33 hrs, Volume= 3.171 af, Depth> 6.96" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=4 Area (sf) CN Adj Description 67,393 98 98 Unconnected roofs, HSG B * 170,799 84 98 1/2 acre lots, 25% imp, HSG B 238,192 Weighted Average 128,099 53.78% Pervious Area 110,093 46.22% Impervious Area 67,393 61.21% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.9 200 0.1500 0.42 Sheet Flow, Grass: Short n= 0.150 P2= 2.94" 5.5 900 0.1500 2.71 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 13.4 1,100 Total Subcatchment 7S: OFFSITE WETLAND B WATERSHED Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)1 0 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20" AMC=4 Runoff Area=238,192 sf Runoff Volume=3.171 af Runoff Depth>6.96" Flow Length=1,100' Slope=0.1500 '/' Tc=13.4 min AMC Adjusted CN=WQ 1.04 cfs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST Printed 5/13/2022Prepared by {enter your company name here} Page 125HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 7S: OFFSITE WETLAND B WATERSHED Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.04 0.00 0.00 10.00 0.12 0.02 0.04 15.00 0.20 0.07 0.06 20.00 0.28 0.13 0.08 25.00 0.37 0.21 0.08 30.00 0.46 0.29 0.09 35.00 0.56 0.37 0.10 40.00 0.66 0.46 0.10 45.00 0.76 0.56 0.11 50.00 0.86 0.66 0.11 55.00 0.97 0.76 0.12 60.00 1.08 0.87 0.12 65.00 1.19 0.98 0.12 70.00 1.31 1.10 0.13 75.00 1.44 1.22 0.14 80.00 1.57 1.35 0.15 85.00 1.71 1.49 0.16 90.00 1.86 1.64 0.17 95.00 2.03 1.80 0.19 100.00 2.20 1.97 0.19 105.00 2.40 2.17 0.24 110.00 2.65 2.42 0.28 115.00 2.94 2.70 0.37 120.00 3.53 3.29 0.95 125.00 4.27 4.03 0.55 130.00 4.62 4.39 0.32 135.00 4.87 4.63 0.24 140.00 5.06 4.83 0.20 145.00 5.23 4.99 0.18 150.00 5.39 5.15 0.17 155.00 5.53 5.30 0.16 160.00 5.67 5.43 0.15 165.00 5.80 5.56 0.14 170.00 5.92 5.68 0.13 175.00 6.03 5.80 0.12 180.00 6.14 5.91 0.12 185.00 6.25 6.01 0.12 190.00 6.36 6.12 0.11 195.00 6.46 6.22 0.11 200.00 6.55 6.32 0.11 205.00 6.65 6.41 0.10 210.00 6.74 6.50 0.10 215.00 6.82 6.58 0.09 220.00 6.91 6.67 0.09 225.00 6.98 6.75 0.09 230.00 7.06 6.82 0.08 235.00 7.13 6.89 0.08 240.00 7.20 6.96 0.07 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST Printed 5/13/2022Prepared by {enter your company name here} Page 126HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment EX1A: EX1A - DRAINS EAST DOWN LAKE LUCY ROAD Runoff = 0.01 cfs @ 121.26 hrs, Volume= 0.043 af, Depth> 6.96" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=4 Area (sf) CN Description 3,245 98 Paved parking, HSG C * 0 84 3,245 Weighted Average 3,245 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment EX1A: EX1A - DRAINS EAST DOWN LAKE LUCY ROAD Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.015 0.014 0.013 0.012 0.011 0.01 0.009 0.008 0.007 0.006 0.005 0.004 0.003 0.002 0.001 0 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20" AMC=4 Runoff Area=3,245 sf Runoff Volume=0.043 af Runoff Depth>6.96" Tc=6.0 min CN=WQ 0.01 cfs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST Printed 5/13/2022Prepared by {enter your company name here} Page 127HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment EX1A: EX1A - DRAINS EAST DOWN LAKE LUCY ROAD Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.04 0.00 0.00 10.00 0.12 0.02 0.00 15.00 0.20 0.07 0.00 20.00 0.28 0.13 0.00 25.00 0.37 0.21 0.00 30.00 0.46 0.29 0.00 35.00 0.56 0.37 0.00 40.00 0.66 0.46 0.00 45.00 0.76 0.56 0.00 50.00 0.86 0.66 0.00 55.00 0.97 0.76 0.00 60.00 1.08 0.87 0.00 65.00 1.19 0.98 0.00 70.00 1.31 1.10 0.00 75.00 1.44 1.22 0.00 80.00 1.57 1.35 0.00 85.00 1.71 1.49 0.00 90.00 1.86 1.64 0.00 95.00 2.03 1.80 0.00 100.00 2.20 1.97 0.00 105.00 2.40 2.17 0.00 110.00 2.65 2.42 0.00 115.00 2.94 2.70 0.01 120.00 3.53 3.29 0.01 125.00 4.27 4.03 0.01 130.00 4.62 4.39 0.00 135.00 4.87 4.63 0.00 140.00 5.06 4.83 0.00 145.00 5.23 4.99 0.00 150.00 5.39 5.15 0.00 155.00 5.53 5.30 0.00 160.00 5.67 5.43 0.00 165.00 5.80 5.56 0.00 170.00 5.92 5.68 0.00 175.00 6.03 5.80 0.00 180.00 6.14 5.91 0.00 185.00 6.25 6.01 0.00 190.00 6.36 6.12 0.00 195.00 6.46 6.22 0.00 200.00 6.55 6.32 0.00 205.00 6.65 6.41 0.00 210.00 6.74 6.50 0.00 215.00 6.82 6.58 0.00 220.00 6.91 6.67 0.00 225.00 6.98 6.75 0.00 230.00 7.06 6.82 0.00 235.00 7.13 6.89 0.00 240.00 7.20 6.96 0.00 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST Printed 5/13/2022Prepared by {enter your company name here} Page 128HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment EX1B: EX1B - DRAINS SOUTH TO WETLAND A Runoff = 0.28 cfs @ 121.26 hrs, Volume= 0.836 af, Depth> 6.96" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=4 Area (sf) CN Adj Description 7,290 98 98 Paved parking, HSG C 55,517 84 98 62,807 Weighted Average 55,517 88.39% Pervious Area 7,290 11.61% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment EX1B: EX1B - DRAINS SOUTH TO WETLAND A Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.3 0.28 0.26 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 0 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20" AMC=4 Runoff Area=62,807 sf Runoff Volume=0.836 af Runoff Depth>6.96" Tc=6.0 min AMC Adjusted CN=WQ 0.28 cfs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST Printed 5/13/2022Prepared by {enter your company name here} Page 129HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment EX1B: EX1B - DRAINS SOUTH TO WETLAND A Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.04 0.00 0.00 10.00 0.12 0.02 0.01 15.00 0.20 0.07 0.02 20.00 0.28 0.13 0.02 25.00 0.37 0.21 0.02 30.00 0.46 0.29 0.02 35.00 0.56 0.37 0.03 40.00 0.66 0.46 0.03 45.00 0.76 0.56 0.03 50.00 0.86 0.66 0.03 55.00 0.97 0.76 0.03 60.00 1.08 0.87 0.03 65.00 1.19 0.98 0.03 70.00 1.31 1.10 0.03 75.00 1.44 1.22 0.04 80.00 1.57 1.35 0.04 85.00 1.71 1.49 0.04 90.00 1.86 1.64 0.05 95.00 2.03 1.80 0.05 100.00 2.20 1.97 0.05 105.00 2.40 2.17 0.06 110.00 2.65 2.42 0.08 115.00 2.94 2.70 0.10 120.00 3.53 3.29 0.25 125.00 4.27 4.03 0.14 130.00 4.62 4.39 0.08 135.00 4.87 4.63 0.06 140.00 5.06 4.83 0.05 145.00 5.23 4.99 0.05 150.00 5.39 5.15 0.04 155.00 5.53 5.30 0.04 160.00 5.67 5.43 0.04 165.00 5.80 5.56 0.04 170.00 5.92 5.68 0.03 175.00 6.03 5.80 0.03 180.00 6.14 5.91 0.03 185.00 6.25 6.01 0.03 190.00 6.36 6.12 0.03 195.00 6.46 6.22 0.03 200.00 6.55 6.32 0.03 205.00 6.65 6.41 0.03 210.00 6.74 6.50 0.03 215.00 6.82 6.58 0.02 220.00 6.91 6.67 0.02 225.00 6.98 6.75 0.02 230.00 7.06 6.82 0.02 235.00 7.13 6.89 0.02 240.00 7.20 6.96 0.02 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST Printed 5/13/2022Prepared by {enter your company name here} Page 130HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment EX1C: EX1C - DRAINS SOUTH TO WETLAND A Runoff = 0.02 cfs @ 121.26 hrs, Volume= 0.056 af, Depth> 6.96" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=4 Area (sf) CN Adj Description 0 98 98 Paved parking, HSG C * 4,200 84 98 4,200 Weighted Average 4,200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment EX1C: EX1C - DRAINS SOUTH TO WETLAND A Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.02 0.019 0.018 0.017 0.016 0.015 0.014 0.013 0.012 0.011 0.01 0.009 0.008 0.007 0.006 0.005 0.004 0.003 0.002 0.001 0 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20" AMC=4 Runoff Area=4,200 sf Runoff Volume=0.056 af Runoff Depth>6.96" Tc=6.0 min AMC Adjusted CN=WQ 0.02 cfs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST Printed 5/13/2022Prepared by {enter your company name here} Page 131HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment EX1C: EX1C - DRAINS SOUTH TO WETLAND A Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.04 0.00 0.00 10.00 0.12 0.02 0.00 15.00 0.20 0.07 0.00 20.00 0.28 0.13 0.00 25.00 0.37 0.21 0.00 30.00 0.46 0.29 0.00 35.00 0.56 0.37 0.00 40.00 0.66 0.46 0.00 45.00 0.76 0.56 0.00 50.00 0.86 0.66 0.00 55.00 0.97 0.76 0.00 60.00 1.08 0.87 0.00 65.00 1.19 0.98 0.00 70.00 1.31 1.10 0.00 75.00 1.44 1.22 0.00 80.00 1.57 1.35 0.00 85.00 1.71 1.49 0.00 90.00 1.86 1.64 0.00 95.00 2.03 1.80 0.00 100.00 2.20 1.97 0.00 105.00 2.40 2.17 0.00 110.00 2.65 2.42 0.01 115.00 2.94 2.70 0.01 120.00 3.53 3.29 0.02 125.00 4.27 4.03 0.01 130.00 4.62 4.39 0.01 135.00 4.87 4.63 0.00 140.00 5.06 4.83 0.00 145.00 5.23 4.99 0.00 150.00 5.39 5.15 0.00 155.00 5.53 5.30 0.00 160.00 5.67 5.43 0.00 165.00 5.80 5.56 0.00 170.00 5.92 5.68 0.00 175.00 6.03 5.80 0.00 180.00 6.14 5.91 0.00 185.00 6.25 6.01 0.00 190.00 6.36 6.12 0.00 195.00 6.46 6.22 0.00 200.00 6.55 6.32 0.00 205.00 6.65 6.41 0.00 210.00 6.74 6.50 0.00 215.00 6.82 6.58 0.00 220.00 6.91 6.67 0.00 225.00 6.98 6.75 0.00 230.00 7.06 6.82 0.00 235.00 7.13 6.89 0.00 240.00 7.20 6.96 0.00 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST Printed 5/13/2022Prepared by {enter your company name here} Page 132HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment EX2: EX2 - DRAINS SOUTH TO WETLAND B Runoff = 0.02 cfs @ 121.26 hrs, Volume= 0.074 af, Depth> 6.96" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=4 Area (sf) CN Adj Description 2,278 98 98 Paved parking, HSG C * 3,302 84 98 5,580 Weighted Average 3,302 59.18% Pervious Area 2,278 40.82% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment EX2: EX2 - DRAINS SOUTH TO WETLAND B Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.026 0.024 0.022 0.02 0.018 0.016 0.014 0.012 0.01 0.008 0.006 0.004 0.002 0 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20" AMC=4 Runoff Area=5,580 sf Runoff Volume=0.074 af Runoff Depth>6.96" Tc=6.0 min AMC Adjusted CN=WQ 0.02 cfs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST Printed 5/13/2022Prepared by {enter your company name here} Page 133HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment EX2: EX2 - DRAINS SOUTH TO WETLAND B Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.04 0.00 0.00 10.00 0.12 0.02 0.00 15.00 0.20 0.07 0.00 20.00 0.28 0.13 0.00 25.00 0.37 0.21 0.00 30.00 0.46 0.29 0.00 35.00 0.56 0.37 0.00 40.00 0.66 0.46 0.00 45.00 0.76 0.56 0.00 50.00 0.86 0.66 0.00 55.00 0.97 0.76 0.00 60.00 1.08 0.87 0.00 65.00 1.19 0.98 0.00 70.00 1.31 1.10 0.00 75.00 1.44 1.22 0.00 80.00 1.57 1.35 0.00 85.00 1.71 1.49 0.00 90.00 1.86 1.64 0.00 95.00 2.03 1.80 0.00 100.00 2.20 1.97 0.00 105.00 2.40 2.17 0.01 110.00 2.65 2.42 0.01 115.00 2.94 2.70 0.01 120.00 3.53 3.29 0.02 125.00 4.27 4.03 0.01 130.00 4.62 4.39 0.01 135.00 4.87 4.63 0.01 140.00 5.06 4.83 0.00 145.00 5.23 4.99 0.00 150.00 5.39 5.15 0.00 155.00 5.53 5.30 0.00 160.00 5.67 5.43 0.00 165.00 5.80 5.56 0.00 170.00 5.92 5.68 0.00 175.00 6.03 5.80 0.00 180.00 6.14 5.91 0.00 185.00 6.25 6.01 0.00 190.00 6.36 6.12 0.00 195.00 6.46 6.22 0.00 200.00 6.55 6.32 0.00 205.00 6.65 6.41 0.00 210.00 6.74 6.50 0.00 215.00 6.82 6.58 0.00 220.00 6.91 6.67 0.00 225.00 6.98 6.75 0.00 230.00 7.06 6.82 0.00 235.00 7.13 6.89 0.00 240.00 7.20 6.96 0.00 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST Printed 5/13/2022Prepared by {enter your company name here} Page 134HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment OFFSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B Runoff = 0.22 cfs @ 121.26 hrs, Volume= 0.660 af, Depth> 6.96" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=4 Area (sf) CN Adj Description 8,875 98 98 Paved parking, HSG C * 40,698 84 98 49,573 Weighted Average 40,698 82.10% Pervious Area 8,875 17.90% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment OFFSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.24 0.23 0.22 0.21 0.2 0.19 0.18 0.17 0.16 0.15 0.14 0.13 0.12 0.11 0.1 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20" AMC=4 Runoff Area=49,573 sf Runoff Volume=0.660 af Runoff Depth>6.96" Tc=6.0 min AMC Adjusted CN=WQ 0.22 cfs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST Printed 5/13/2022Prepared by {enter your company name here} Page 135HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment OFFSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.04 0.00 0.00 10.00 0.12 0.02 0.01 15.00 0.20 0.07 0.01 20.00 0.28 0.13 0.02 25.00 0.37 0.21 0.02 30.00 0.46 0.29 0.02 35.00 0.56 0.37 0.02 40.00 0.66 0.46 0.02 45.00 0.76 0.56 0.02 50.00 0.86 0.66 0.02 55.00 0.97 0.76 0.02 60.00 1.08 0.87 0.03 65.00 1.19 0.98 0.03 70.00 1.31 1.10 0.03 75.00 1.44 1.22 0.03 80.00 1.57 1.35 0.03 85.00 1.71 1.49 0.03 90.00 1.86 1.64 0.04 95.00 2.03 1.80 0.04 100.00 2.20 1.97 0.04 105.00 2.40 2.17 0.05 110.00 2.65 2.42 0.06 115.00 2.94 2.70 0.08 120.00 3.53 3.29 0.20 125.00 4.27 4.03 0.11 130.00 4.62 4.39 0.07 135.00 4.87 4.63 0.05 140.00 5.06 4.83 0.04 145.00 5.23 4.99 0.04 150.00 5.39 5.15 0.03 155.00 5.53 5.30 0.03 160.00 5.67 5.43 0.03 165.00 5.80 5.56 0.03 170.00 5.92 5.68 0.03 175.00 6.03 5.80 0.03 180.00 6.14 5.91 0.02 185.00 6.25 6.01 0.02 190.00 6.36 6.12 0.02 195.00 6.46 6.22 0.02 200.00 6.55 6.32 0.02 205.00 6.65 6.41 0.02 210.00 6.74 6.50 0.02 215.00 6.82 6.58 0.02 220.00 6.91 6.67 0.02 225.00 6.98 6.75 0.02 230.00 7.06 6.82 0.02 235.00 7.13 6.89 0.02 240.00 7.20 6.96 0.01 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST Printed 5/13/2022Prepared by {enter your company name here} Page 136HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment OFFSITE B: OFFSITE B- DRAINS SOUTH TO WETLAND A Runoff = 0.33 cfs @ 121.26 hrs, Volume= 0.997 af, Depth> 6.96" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=4 Area (sf) CN Adj Description 6,076 98 98 Paved parking, HSG C * 68,789 84 98 74,865 Weighted Average 68,789 91.88% Pervious Area 6,076 8.12% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment OFFSITE B: OFFSITE B- DRAINS SOUTH TO WETLAND A Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.36 0.34 0.32 0.3 0.28 0.26 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 0 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20" AMC=4 Runoff Area=74,865 sf Runoff Volume=0.997 af Runoff Depth>6.96" Tc=6.0 min AMC Adjusted CN=WQ 0.33 cfs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST Printed 5/13/2022Prepared by {enter your company name here} Page 137HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment OFFSITE B: OFFSITE B- DRAINS SOUTH TO WETLAND A Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.04 0.00 0.00 10.00 0.12 0.02 0.01 15.00 0.20 0.07 0.02 20.00 0.28 0.13 0.02 25.00 0.37 0.21 0.03 30.00 0.46 0.29 0.03 35.00 0.56 0.37 0.03 40.00 0.66 0.46 0.03 45.00 0.76 0.56 0.03 50.00 0.86 0.66 0.04 55.00 0.97 0.76 0.04 60.00 1.08 0.87 0.04 65.00 1.19 0.98 0.04 70.00 1.31 1.10 0.04 75.00 1.44 1.22 0.04 80.00 1.57 1.35 0.05 85.00 1.71 1.49 0.05 90.00 1.86 1.64 0.05 95.00 2.03 1.80 0.06 100.00 2.20 1.97 0.06 105.00 2.40 2.17 0.08 110.00 2.65 2.42 0.09 115.00 2.94 2.70 0.12 120.00 3.53 3.29 0.30 125.00 4.27 4.03 0.17 130.00 4.62 4.39 0.10 135.00 4.87 4.63 0.08 140.00 5.06 4.83 0.06 145.00 5.23 4.99 0.06 150.00 5.39 5.15 0.05 155.00 5.53 5.30 0.05 160.00 5.67 5.43 0.05 165.00 5.80 5.56 0.04 170.00 5.92 5.68 0.04 175.00 6.03 5.80 0.04 180.00 6.14 5.91 0.04 185.00 6.25 6.01 0.04 190.00 6.36 6.12 0.04 195.00 6.46 6.22 0.03 200.00 6.55 6.32 0.03 205.00 6.65 6.41 0.03 210.00 6.74 6.50 0.03 215.00 6.82 6.58 0.03 220.00 6.91 6.67 0.03 225.00 6.98 6.75 0.03 230.00 7.06 6.82 0.03 235.00 7.13 6.89 0.02 240.00 7.20 6.96 0.02 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST Printed 5/13/2022Prepared by {enter your company name here} Page 138HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 3.257 ac, 9.42% Impervious, Inflow Depth > 6.96" for Snowmelt 100yr 10d event Inflow = 0.62 cfs @ 121.26 hrs, Volume= 1.889 af Outflow = 0.62 cfs @ 121.26 hrs, Volume= 1.889 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Reach DA2: DA2 - TOTAL FLOW TO WETLAND A Inflow Outflow Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.65 0.6 0.55 0.5 0.45 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 Inflow Area=3.257 ac 0.62 cfs 0.62 cfs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST Printed 5/13/2022Prepared by {enter your company name here} Page 139HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A Time (hours) Inflow (cfs) Elevation (feet) Outflow (cfs) 0.00 0.00 0.00 5.00 0.00 0.00 10.00 0.02 0.02 15.00 0.04 0.04 20.00 0.05 0.05 25.00 0.05 0.05 30.00 0.05 0.05 35.00 0.06 0.06 40.00 0.06 0.06 45.00 0.06 0.06 50.00 0.07 0.07 55.00 0.07 0.07 60.00 0.07 0.07 65.00 0.07 0.07 70.00 0.08 0.08 75.00 0.08 0.08 80.00 0.09 0.09 85.00 0.09 0.09 90.00 0.10 0.10 95.00 0.11 0.11 100.00 0.12 0.12 105.00 0.14 0.14 110.00 0.17 0.17 115.00 0.22 0.22 120.00 0.57 0.57 125.00 0.32 0.32 130.00 0.19 0.19 135.00 0.14 0.14 140.00 0.12 0.12 145.00 0.11 0.11 150.00 0.10 0.10 155.00 0.09 0.09 160.00 0.09 0.09 165.00 0.08 0.08 170.00 0.08 0.08 175.00 0.07 0.07 180.00 0.07 0.07 185.00 0.07 0.07 190.00 0.07 0.07 195.00 0.06 0.06 200.00 0.06 0.06 205.00 0.06 0.06 210.00 0.06 0.06 215.00 0.06 0.06 220.00 0.05 0.05 225.00 0.05 0.05 230.00 0.05 0.05 235.00 0.05 0.05 240.00 0.04 0.04 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST Printed 5/13/2022Prepared by {enter your company name here} Page 140HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 4.523 ac, 12.44% Impervious, Inflow Depth > 6.95" for Snowmelt 100yr 10d event Inflow = 0.85 cfs @ 121.30 hrs, Volume= 2.620 af Outflow = 0.85 cfs @ 121.30 hrs, Volume= 2.620 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Reach DA3: DA3 - TOTAL FLOW TO WETLAND B Inflow Outflow Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.95 0.9 0.85 0.8 0.75 0.7 0.65 0.6 0.55 0.5 0.45 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 Inflow Area=4.523 ac 0.85 cfs 0.85 cfs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST Printed 5/13/2022Prepared by {enter your company name here} Page 141HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B Time (hours) Inflow (cfs) Elevation (feet) Outflow (cfs) 0.00 0.00 0.00 5.00 0.00 0.00 10.00 0.03 0.03 15.00 0.05 0.05 20.00 0.06 0.06 25.00 0.07 0.07 30.00 0.08 0.08 35.00 0.08 0.08 40.00 0.08 0.08 45.00 0.09 0.09 50.00 0.09 0.09 55.00 0.10 0.10 60.00 0.10 0.10 65.00 0.10 0.10 70.00 0.11 0.11 75.00 0.11 0.11 80.00 0.12 0.12 85.00 0.13 0.13 90.00 0.14 0.14 95.00 0.15 0.15 100.00 0.16 0.16 105.00 0.20 0.20 110.00 0.23 0.23 115.00 0.30 0.30 120.00 0.78 0.78 125.00 0.46 0.46 130.00 0.27 0.27 135.00 0.20 0.20 140.00 0.16 0.16 145.00 0.15 0.15 150.00 0.14 0.14 155.00 0.13 0.13 160.00 0.12 0.12 165.00 0.12 0.12 170.00 0.11 0.11 175.00 0.10 0.10 180.00 0.10 0.10 185.00 0.10 0.10 190.00 0.09 0.09 195.00 0.09 0.09 200.00 0.09 0.09 205.00 0.08 0.08 210.00 0.08 0.08 215.00 0.08 0.08 220.00 0.07 0.07 225.00 0.07 0.07 230.00 0.07 0.07 235.00 0.06 0.06 240.00 0.06 0.06 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST Printed 5/13/2022Prepared by {enter your company name here} Page 142HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Pond 1P: WETLAND A Inflow Area = 3.257 ac, 9.42% Impervious, Inflow Depth > 6.96" for Snowmelt 100yr 10d event Inflow = 0.62 cfs @ 121.26 hrs, Volume= 1.889 af Outflow = 0.61 cfs @ 121.38 hrs, Volume= 1.885 af, Atten= 1%, Lag= 7.6 min Primary = 0.61 cfs @ 121.38 hrs, Volume= 1.885 af Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Peak Elev= 969.70' @ 121.38 hrs Surf.Area= 11,708 sf Storage= 981 cf Plug-Flow detention time= 45.5 min calculated for 1.885 af (100% of inflow) Center-of-Mass det. time= 31.8 min ( 7,412.6 - 7,380.8 ) Volume Invert Avail.Storage Storage Description #1 969.62' 18,824 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 969.62 11,466 0 0 970.00 12,553 4,564 4,564 971.00 15,967 14,260 18,824 Device Routing Invert Outlet Devices #1 Primary 969.62'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.61 cfs @ 121.38 hrs HW=969.70' (Free Discharge) 1=Broad-Crested Rectangular Weir (Weir Controls 0.61 cfs @ 0.72 fps) MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST Printed 5/13/2022Prepared by {enter your company name here} Page 143HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Pond 1P: WETLAND A Inflow Primary Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.65 0.6 0.55 0.5 0.45 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 Inflow Area=3.257 ac Peak Elev=969.70' Storage=981 cf 0.62 cfs 0.61 cfs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST Printed 5/13/2022Prepared by {enter your company name here} Page 144HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Pond 1P: WETLAND A Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Primary (cfs) 0.00 0.00 0 969.62 0.00 5.00 0.00 0 969.62 0.00 10.00 0.02 78 969.63 0.02 15.00 0.04 137 969.63 0.03 20.00 0.05 167 969.63 0.04 25.00 0.05 179 969.64 0.05 30.00 0.05 189 969.64 0.05 35.00 0.06 197 969.64 0.06 40.00 0.06 202 969.64 0.06 45.00 0.06 207 969.64 0.06 50.00 0.07 215 969.64 0.07 55.00 0.07 221 969.64 0.07 60.00 0.07 226 969.64 0.07 65.00 0.07 231 969.64 0.07 70.00 0.08 241 969.64 0.08 75.00 0.08 248 969.64 0.08 80.00 0.09 257 969.64 0.09 85.00 0.09 273 969.64 0.09 90.00 0.10 291 969.65 0.10 95.00 0.11 309 969.65 0.11 100.00 0.12 318 969.65 0.11 105.00 0.14 365 969.65 0.14 110.00 0.17 407 969.66 0.17 115.00 0.22 483 969.66 0.21 120.00 0.57 921 969.70 0.56 125.00 0.32 656 969.68 0.34 130.00 0.19 450 969.66 0.19 135.00 0.14 370 969.65 0.15 140.00 0.12 326 969.65 0.12 145.00 0.11 301 969.65 0.11 150.00 0.10 287 969.64 0.10 155.00 0.09 274 969.64 0.09 160.00 0.09 260 969.64 0.09 165.00 0.08 251 969.64 0.08 170.00 0.08 238 969.64 0.08 175.00 0.07 230 969.64 0.07 180.00 0.07 225 969.64 0.07 185.00 0.07 223 969.64 0.07 190.00 0.07 218 969.64 0.07 195.00 0.06 212 969.64 0.06 200.00 0.06 207 969.64 0.06 205.00 0.06 201 969.64 0.06 210.00 0.06 196 969.64 0.06 215.00 0.06 191 969.64 0.06 220.00 0.05 187 969.64 0.05 225.00 0.05 182 969.64 0.05 230.00 0.05 177 969.64 0.05 235.00 0.05 171 969.63 0.05 240.00 0.04 161 969.63 0.04 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST Printed 5/13/2022Prepared by {enter your company name here} Page 145HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Stage-Discharge for Pond 1P: WETLAND A Elevation (feet) Primary (cfs) 969.62 0.00 969.63 0.02 969.64 0.07 969.65 0.13 969.66 0.20 969.67 0.28 969.68 0.37 969.69 0.46 969.70 0.56 969.71 0.67 969.72 0.79 969.73 0.91 969.74 1.04 969.75 1.17 969.76 1.30 969.77 1.45 969.78 1.59 969.79 1.75 969.80 1.90 969.81 2.06 969.82 2.23 969.83 2.40 969.84 2.58 969.85 2.76 969.86 2.94 969.87 3.13 969.88 3.33 969.89 3.53 969.90 3.73 969.91 3.94 969.92 4.15 969.93 4.36 969.94 4.58 969.95 4.81 969.96 5.03 969.97 5.26 969.98 5.50 969.99 5.74 970.00 5.98 970.01 6.23 970.02 6.48 970.03 6.74 970.04 7.01 970.05 7.28 970.06 7.55 970.07 7.83 970.08 8.12 970.09 8.41 970.10 8.70 970.11 9.00 970.12 9.30 970.13 9.60 Elevation (feet) Primary (cfs) 970.14 9.91 970.15 10.23 970.16 10.55 970.17 10.87 970.18 11.20 970.19 11.53 970.20 11.86 970.21 12.20 970.22 12.55 970.23 12.86 970.24 13.18 970.25 13.49 970.26 13.81 970.27 14.14 970.28 14.46 970.29 14.79 970.30 15.12 970.31 15.45 970.32 15.78 970.33 16.12 970.34 16.46 970.35 16.80 970.36 17.14 970.37 17.49 970.38 17.84 970.39 18.19 970.40 18.54 970.41 18.89 970.42 19.25 970.43 19.61 970.44 19.97 970.45 20.33 970.46 20.69 970.47 21.06 970.48 21.43 970.49 21.80 970.50 22.17 970.51 22.55 970.52 22.92 970.53 23.30 970.54 23.68 970.55 24.07 970.56 24.45 970.57 24.84 970.58 25.23 970.59 25.62 970.60 26.01 970.61 26.40 970.62 26.80 970.63 27.21 970.64 27.62 970.65 28.03 Elevation (feet) Primary (cfs) 970.66 28.45 970.67 28.86 970.68 29.28 970.69 29.70 970.70 30.12 970.71 30.55 970.72 30.98 970.73 31.41 970.74 31.84 970.75 32.27 970.76 32.71 970.77 33.14 970.78 33.58 970.79 34.02 970.80 34.47 970.81 34.91 970.82 35.36 970.83 35.79 970.84 36.22 970.85 36.65 970.86 37.09 970.87 37.52 970.88 37.96 970.89 38.40 970.90 38.84 970.91 39.28 970.92 39.72 970.93 40.17 970.94 40.61 970.95 41.06 970.96 41.51 970.97 41.96 970.98 42.41 970.99 42.86 971.00 43.32 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST Printed 5/13/2022Prepared by {enter your company name here} Page 146HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Pond 5P: Wetland B [44] Hint: Outlet device #1 is below defined storage [95] Warning: Outlet Device #1 rise exceeded Inflow Area = 12.870 ac, 24.01% Impervious, Inflow Depth > 6.96" for Snowmelt 100yr 10d event Inflow = 2.45 cfs @ 121.30 hrs, Volume= 7.460 af Outflow = 2.44 cfs @ 121.31 hrs, Volume= 7.460 af, Atten= 0%, Lag= 0.5 min Primary = 2.44 cfs @ 121.31 hrs, Volume= 7.460 af Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Peak Elev= 961.60' @ 121.31 hrs Surf.Area= 149,009 sf Storage= 116 cf Plug-Flow detention time= 0.8 min calculated for 7.459 af (100% of inflow) Center-of-Mass det. time= 0.6 min ( 7,391.8 - 7,391.2 ) Volume Invert Avail.Storage Storage Description #1 961.60' 841,104 cf Custom Stage Data (Conic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (cubic-feet) (cubic-feet) (sq-ft) 961.60 149,000 0 0 149,000 962.00 153,597 60,517 60,517 153,630 964.00 201,325 353,847 414,364 201,451 966.00 225,646 426,740 841,104 225,991 Device Routing Invert Outlet Devices #1 Primary 960.82'Asymmetrical Weir, C= 3.27 Offset (feet) -70.00 -41.00 0.00 49.00 87.00 Height (feet) 0.35 0.09 0.00 0.09 0.35 Primary OutFlow Max=133.30 cfs @ 121.31 hrs HW=961.60' (Free Discharge) 1=Asymmetrical Weir (Weir Controls 133.30 cfs @ 2.72 fps) MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST Printed 5/13/2022Prepared by {enter your company name here} Page 147HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Pond 5P: Wetland B Inflow Primary Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)2 1 0 Inflow Area=12.870 ac Peak Elev=961.60' Storage=116 cf 2.45 cfs 2.44 cfs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST Printed 5/13/2022Prepared by {enter your company name here} Page 148HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Pond 5P: Wetland B Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Primary (cfs) 0.00 0.00 0 961.60 0.00 5.00 0.00 0 961.60 0.00 10.00 0.09 4 961.60 0.09 15.00 0.14 7 961.60 0.14 20.00 0.18 8 961.60 0.18 25.00 0.20 9 961.60 0.20 30.00 0.22 10 961.60 0.22 35.00 0.23 11 961.60 0.23 40.00 0.24 11 961.60 0.24 45.00 0.25 12 961.60 0.25 50.00 0.26 13 961.60 0.26 55.00 0.27 13 961.60 0.27 60.00 0.28 13 961.60 0.28 65.00 0.29 14 961.60 0.29 70.00 0.31 15 961.60 0.31 75.00 0.33 15 961.60 0.32 80.00 0.34 16 961.60 0.34 85.00 0.37 18 961.60 0.37 90.00 0.41 19 961.60 0.41 95.00 0.44 21 961.60 0.44 100.00 0.46 22 961.60 0.46 105.00 0.57 27 961.60 0.57 110.00 0.67 32 961.60 0.67 115.00 0.87 41 961.60 0.86 120.00 2.24 106 961.60 2.24 125.00 1.29 61 961.60 1.29 130.00 0.75 36 961.60 0.75 135.00 0.57 27 961.60 0.57 140.00 0.46 22 961.60 0.46 145.00 0.42 20 961.60 0.42 150.00 0.39 19 961.60 0.39 155.00 0.37 18 961.60 0.37 160.00 0.34 16 961.60 0.34 165.00 0.33 16 961.60 0.33 170.00 0.30 14 961.60 0.30 175.00 0.29 14 961.60 0.29 180.00 0.28 13 961.60 0.28 185.00 0.28 13 961.60 0.28 190.00 0.27 13 961.60 0.27 195.00 0.26 12 961.60 0.26 200.00 0.25 12 961.60 0.25 205.00 0.24 11 961.60 0.24 210.00 0.23 11 961.60 0.23 215.00 0.22 10 961.60 0.22 220.00 0.21 10 961.60 0.21 225.00 0.20 10 961.60 0.20 230.00 0.19 9 961.60 0.19 235.00 0.18 9 961.60 0.18 240.00 0.16 8 961.60 0.16 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST Printed 5/13/2022Prepared by {enter your company name here} Page 149HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Stage-Discharge for Pond 5P: Wetland B Elevation (feet) Primary (cfs) 961.60 0.00 961.65 139.02 961.70 144.59 961.75 149.95 961.80 155.13 961.85 160.13 961.90 164.98 961.95 169.69 962.00 174.28 962.05 178.74 962.10 183.09 962.15 187.35 962.20 191.51 962.25 195.57 962.30 199.56 962.35 203.47 962.40 207.30 962.45 211.06 962.50 214.76 962.55 218.40 962.60 221.97 962.65 225.49 962.70 228.95 962.75 232.36 962.80 235.73 962.85 239.04 962.90 242.31 962.95 245.54 963.00 248.72 963.05 251.87 963.10 254.97 963.15 258.04 963.20 261.07 963.25 264.07 963.30 267.03 963.35 269.96 963.40 272.86 963.45 275.73 963.50 278.56 963.55 281.37 963.60 284.16 963.65 286.91 963.70 289.64 963.75 292.34 963.80 295.02 963.85 297.68 963.90 300.31 963.95 302.92 964.00 305.50 964.05 308.07 964.10 310.61 964.15 313.13 Elevation (feet) Primary (cfs) 964.20 315.63 964.25 318.12 964.30 320.58 964.35 323.02 964.40 325.45 964.45 327.86 964.50 330.25 964.55 332.62 964.60 334.98 964.65 337.32 964.70 339.64 964.75 341.95 964.80 344.24 964.85 346.52 964.90 348.78 964.95 351.03 965.00 353.26 965.05 355.48 965.10 357.69 965.15 359.88 965.20 362.06 965.25 364.23 965.30 366.38 965.35 368.52 965.40 370.65 965.45 372.76 965.50 374.87 965.55 376.96 965.60 379.04 965.65 381.11 965.70 383.17 965.75 385.22 965.80 387.25 965.85 389.28 965.90 391.29 965.95 393.30 966.00 395.29 6S UNDISTURBED 7S OFFSITE WETLAND B WATERSHED OFFSITE B OFFSITE B - DRAINS SOUTH TO WETLAND OUTSITE A OFFSITE A - DRAINS SOUTH TO WETLAND B PR1A PR1A - DRAINS EAST ALONG STREET PR1B PR1B - DRAINS SOUTH TO WETLAND A PR1C PR1C - DRAINS NORTH TO WETLAND A PR1D PR1D - DRAINS SOUTH TO RAIN GARDEN PR2 PR2 - DRAINS SOUTH TO WETLAND B DA2 DA2 - TOTAL FLOW TO WETLAND A DA3 DA3 - TOTAL FLOW TO WETLAND B 1P FILTRATION BASIN 1 4P WETLAND A 5P Wetland B Routing Diagram for 21429- PROPOSED Prepared by {enter your company name here}, Printed 5/17/2022 HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Subcat Reach Pond Link 21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 2HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Area Listing (all nodes) Area (acres) CN Description (subcatchment-numbers) 6.695 84 (6S, OFFSITE B, OUTSITE A, PR1B, PR1C, PR1D, PR2) 3.921 84 1/2 acre lots, 25% imp, HSG B (7S) 0.779 98 Paved parking, HSG C (OFFSITE B, OUTSITE A, PR1A, PR1B, PR1D, PR2) 1.547 98 Unconnected roofs, HSG B (7S) 12.942 87 TOTAL AREA 21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 3HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Soil Listing (all nodes) Area (acres) Soil Group Subcatchment Numbers 0.000 HSG A 5.468 HSG B 7S 0.779 HSG C OFFSITE B, OUTSITE A, PR1A, PR1B, PR1D, PR2 0.000 HSG D 6.695 Other 6S, OFFSITE B, OUTSITE A, PR1B, PR1C, PR1D, PR2 12.942 TOTAL AREA 21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 4HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Ground Covers (all nodes) HSG-A (acres) HSG-B (acres) HSG-C (acres) HSG-D (acres) Other (acres) Total (acres) Ground Cover Subcatchment Numbers 0.000 0.000 0.000 0.000 6.695 6.695 6S, OFFSITE B, OUTSITE A, PR1B, PR1C, PR1D, PR2 0.000 3.921 0.000 0.000 0.000 3.921 1/2 acre lots, 25% imp 7S 0.000 0.000 0.779 0.000 0.000 0.779 Paved parking OFFSITE B, OUTSITE A, PR1A, PR1B, PR1D, PR2 0.000 1.547 0.000 0.000 0.000 1.547 Unconnected roofs 7S 0.000 5.468 0.779 0.000 6.695 12.942 TOTAL AREA 21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 5HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Pipe Listing (all nodes) Line# Node Number In-Invert (feet) Out-Invert (feet) Length (feet) Slope (ft/ft) n Diam/Width (inches) Height (inches) Inside-Fill (inches) 1 1P 971.50 971.50 23.0 0.0000 0.012 12.0 0.0 0.0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 6HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Time span=0.00-240.00 hrs, dt=0.01 hrs, 24001 points Runoff by SCS TR-20 method, UH=SCS, Weighted-Q Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Runoff Area=125,400 sf 0.00% Impervious Runoff Depth=1.12"Subcatchment 6S: UNDISTURBED Tc=6.0 min CN=84 Runoff=5.69 cfs 0.268 af Runoff Area=238,192 sf 46.22% Impervious Runoff Depth=1.44"Subcatchment 7S: OFFSITE WETLAND B Flow Length=1,100' Slope=0.1500 '/' Tc=13.4 min CN=WQ Runoff=9.63 cfs 0.657 af Runoff Area=74,865 sf 8.12% Impervious Runoff Depth=1.21"Subcatchment OFFSITE B: OFFSITE B - Tc=6.0 min CN=WQ Runoff=3.63 cfs 0.173 af Runoff Area=49,573 sf 17.90% Impervious Runoff Depth=1.32"Subcatchment OUTSITE A: OFFSITE A - Tc=6.0 min CN=WQ Runoff=2.59 cfs 0.125 af Runoff Area=3,245 sf 100.00% Impervious Runoff Depth=2.27"Subcatchment PR1A: PR1A - DRAINS Tc=6.0 min CN=WQ Runoff=0.27 cfs 0.014 af Runoff Area=29,167 sf 24.99% Impervious Runoff Depth=1.40"Subcatchment PR1B: PR1B - DRAINS Tc=6.0 min CN=WQ Runoff=1.61 cfs 0.078 af Runoff Area=5,573 sf 0.00% Impervious Runoff Depth=1.12"Subcatchment PR1C: PR1C - DRAINS Tc=6.0 min CN=WQ Runoff=0.25 cfs 0.012 af Runoff Area=35,117 sf 17.47% Impervious Runoff Depth=1.32"Subcatchment PR1D: PR1D - DRAINS Tc=6.0 min CN=WQ Runoff=1.83 cfs 0.089 af Runoff Area=2,636 sf 87.75% Impervious Runoff Depth=2.13"Subcatchment PR2: PR2 - DRAINS SOUTH Tc=6.0 min CN=WQ Runoff=0.21 cfs 0.011 af Inflow=5.56 cfs 0.352 afReach DA2: DA2 - TOTAL FLOW TO WETLAND A Outflow=5.56 cfs 0.352 af Inflow=4.90 cfs 0.488 afReach DA3: DA3 - TOTAL FLOW TO WETLAND B Outflow=4.90 cfs 0.488 af Peak Elev=974.01' Storage=2,020 cf Inflow=1.83 cfs 0.089 afPond 1P: FILTRATION BASIN 1 Discarded=0.00 cfs 0.000 af Primary=0.10 cfs 0.089 af Secondary=0.00 cfs 0.000 af Outflow=0.10 cfs 0.089 af Peak Elev=969.85' Storage=2,771 cf Inflow=5.56 cfs 0.352 afPond 4P: WETLAND A Outflow=2.85 cfs 0.352 af Peak Elev=961.61' Storage=855 cf Inflow=18.14 cfs 1.413 afPond 5P: Wetland B Outflow=18.03 cfs 1.413 af Total Runoff Area = 12.942 ac Runoff Volume = 1.427 af Average Runoff Depth = 1.32" 74.45% Pervious = 9.636 ac 25.55% Impervious = 3.306 ac MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 7HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment 6S: UNDISTURBED Runoff = 5.69 cfs @ 12.09 hrs, Volume= 0.268 af, Depth= 1.12" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50" Area (sf) CN Description * 125,400 84 125,400 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment 6S: UNDISTURBED Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)6 5 4 3 2 1 0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50" Runoff Area=125,400 sf Runoff Volume=0.268 af Runoff Depth=1.12" Tc=6.0 min CN=84 5.69 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 8HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 6S: UNDISTURBED Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.12 0.00 0.00 10.00 0.38 0.00 0.00 15.00 2.21 0.90 0.20 20.00 2.40 1.04 0.05 25.00 2.50 1.12 0.00 30.00 2.50 1.12 0.00 35.00 2.50 1.12 0.00 40.00 2.50 1.12 0.00 45.00 2.50 1.12 0.00 50.00 2.50 1.12 0.00 55.00 2.50 1.12 0.00 60.00 2.50 1.12 0.00 65.00 2.50 1.12 0.00 70.00 2.50 1.12 0.00 75.00 2.50 1.12 0.00 80.00 2.50 1.12 0.00 85.00 2.50 1.12 0.00 90.00 2.50 1.12 0.00 95.00 2.50 1.12 0.00 100.00 2.50 1.12 0.00 105.00 2.50 1.12 0.00 110.00 2.50 1.12 0.00 115.00 2.50 1.12 0.00 120.00 2.50 1.12 0.00 125.00 2.50 1.12 0.00 130.00 2.50 1.12 0.00 135.00 2.50 1.12 0.00 140.00 2.50 1.12 0.00 145.00 2.50 1.12 0.00 150.00 2.50 1.12 0.00 155.00 2.50 1.12 0.00 160.00 2.50 1.12 0.00 165.00 2.50 1.12 0.00 170.00 2.50 1.12 0.00 175.00 2.50 1.12 0.00 180.00 2.50 1.12 0.00 185.00 2.50 1.12 0.00 190.00 2.50 1.12 0.00 195.00 2.50 1.12 0.00 200.00 2.50 1.12 0.00 205.00 2.50 1.12 0.00 210.00 2.50 1.12 0.00 215.00 2.50 1.12 0.00 220.00 2.50 1.12 0.00 225.00 2.50 1.12 0.00 230.00 2.50 1.12 0.00 235.00 2.50 1.12 0.00 240.00 2.50 1.12 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 9HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment 7S: OFFSITE WETLAND B WATERSHED Runoff = 9.63 cfs @ 12.18 hrs, Volume= 0.657 af, Depth= 1.44" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50" Area (sf) CN Description 67,393 98 Unconnected roofs, HSG B * 170,799 84 1/2 acre lots, 25% imp, HSG B 238,192 Weighted Average 128,099 53.78% Pervious Area 110,093 46.22% Impervious Area 67,393 61.21% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.9 200 0.1500 0.42 Sheet Flow, Grass: Short n= 0.150 P2= 2.94" 5.5 900 0.1500 2.71 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 13.4 1,100 Total Subcatchment 7S: OFFSITE WETLAND B WATERSHED Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)10 9 8 7 6 5 4 3 2 1 0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50" Runoff Area=238,192 sf Runoff Volume=0.657 af Runoff Depth=1.44" Flow Length=1,100' Slope=0.1500 '/' Tc=13.4 min CN=WQ 9.63 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 10HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 7S: OFFSITE WETLAND B WATERSHED Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.12 0.00 0.02 10.00 0.38 0.01 0.12 15.00 2.21 1.14 0.42 20.00 2.40 1.30 0.11 25.00 2.50 1.38 0.00 30.00 2.50 1.38 0.00 35.00 2.50 1.38 0.00 40.00 2.50 1.38 0.00 45.00 2.50 1.38 0.00 50.00 2.50 1.38 0.00 55.00 2.50 1.38 0.00 60.00 2.50 1.38 0.00 65.00 2.50 1.38 0.00 70.00 2.50 1.38 0.00 75.00 2.50 1.38 0.00 80.00 2.50 1.38 0.00 85.00 2.50 1.38 0.00 90.00 2.50 1.38 0.00 95.00 2.50 1.38 0.00 100.00 2.50 1.38 0.00 105.00 2.50 1.38 0.00 110.00 2.50 1.38 0.00 115.00 2.50 1.38 0.00 120.00 2.50 1.38 0.00 125.00 2.50 1.38 0.00 130.00 2.50 1.38 0.00 135.00 2.50 1.38 0.00 140.00 2.50 1.38 0.00 145.00 2.50 1.38 0.00 150.00 2.50 1.38 0.00 155.00 2.50 1.38 0.00 160.00 2.50 1.38 0.00 165.00 2.50 1.38 0.00 170.00 2.50 1.38 0.00 175.00 2.50 1.38 0.00 180.00 2.50 1.38 0.00 185.00 2.50 1.38 0.00 190.00 2.50 1.38 0.00 195.00 2.50 1.38 0.00 200.00 2.50 1.38 0.00 205.00 2.50 1.38 0.00 210.00 2.50 1.38 0.00 215.00 2.50 1.38 0.00 220.00 2.50 1.38 0.00 225.00 2.50 1.38 0.00 230.00 2.50 1.38 0.00 235.00 2.50 1.38 0.00 240.00 2.50 1.38 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 11HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment OFFSITE B: OFFSITE B - DRAINS SOUTH TO WETLAND Runoff = 3.63 cfs @ 12.09 hrs, Volume= 0.173 af, Depth= 1.21" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50" Area (sf) CN Description 6,076 98 Paved parking, HSG C * 68,789 84 74,865 Weighted Average 68,789 91.88% Pervious Area 6,076 8.12% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment OFFSITE B: OFFSITE B - DRAINS SOUTH TO WETLAND Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)4 3 2 1 0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50" Runoff Area=74,865 sf Runoff Volume=0.173 af Runoff Depth=1.21" Tc=6.0 min CN=WQ 3.63 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 12HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment OFFSITE B: OFFSITE B - DRAINS SOUTH TO WETLAND Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.12 0.00 0.00 10.00 0.38 0.00 0.01 15.00 2.21 0.96 0.12 20.00 2.40 1.10 0.03 25.00 2.50 1.18 0.00 30.00 2.50 1.18 0.00 35.00 2.50 1.18 0.00 40.00 2.50 1.18 0.00 45.00 2.50 1.18 0.00 50.00 2.50 1.18 0.00 55.00 2.50 1.18 0.00 60.00 2.50 1.18 0.00 65.00 2.50 1.18 0.00 70.00 2.50 1.18 0.00 75.00 2.50 1.18 0.00 80.00 2.50 1.18 0.00 85.00 2.50 1.18 0.00 90.00 2.50 1.18 0.00 95.00 2.50 1.18 0.00 100.00 2.50 1.18 0.00 105.00 2.50 1.18 0.00 110.00 2.50 1.18 0.00 115.00 2.50 1.18 0.00 120.00 2.50 1.18 0.00 125.00 2.50 1.18 0.00 130.00 2.50 1.18 0.00 135.00 2.50 1.18 0.00 140.00 2.50 1.18 0.00 145.00 2.50 1.18 0.00 150.00 2.50 1.18 0.00 155.00 2.50 1.18 0.00 160.00 2.50 1.18 0.00 165.00 2.50 1.18 0.00 170.00 2.50 1.18 0.00 175.00 2.50 1.18 0.00 180.00 2.50 1.18 0.00 185.00 2.50 1.18 0.00 190.00 2.50 1.18 0.00 195.00 2.50 1.18 0.00 200.00 2.50 1.18 0.00 205.00 2.50 1.18 0.00 210.00 2.50 1.18 0.00 215.00 2.50 1.18 0.00 220.00 2.50 1.18 0.00 225.00 2.50 1.18 0.00 230.00 2.50 1.18 0.00 235.00 2.50 1.18 0.00 240.00 2.50 1.18 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 13HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment OUTSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B Runoff = 2.59 cfs @ 12.09 hrs, Volume= 0.125 af, Depth= 1.32" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50" Area (sf) CN Description 8,875 98 Paved parking, HSG C * 40,698 84 49,573 Weighted Average 40,698 82.10% Pervious Area 8,875 17.90% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment OUTSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)2 1 0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50" Runoff Area=49,573 sf Runoff Volume=0.125 af Runoff Depth=1.32" Tc=6.0 min CN=WQ 2.59 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 14HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment OUTSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.12 0.00 0.00 10.00 0.38 0.00 0.02 15.00 2.21 1.08 0.08 20.00 2.40 1.23 0.02 25.00 2.50 1.31 0.00 30.00 2.50 1.31 0.00 35.00 2.50 1.31 0.00 40.00 2.50 1.31 0.00 45.00 2.50 1.31 0.00 50.00 2.50 1.31 0.00 55.00 2.50 1.31 0.00 60.00 2.50 1.31 0.00 65.00 2.50 1.31 0.00 70.00 2.50 1.31 0.00 75.00 2.50 1.31 0.00 80.00 2.50 1.31 0.00 85.00 2.50 1.31 0.00 90.00 2.50 1.31 0.00 95.00 2.50 1.31 0.00 100.00 2.50 1.31 0.00 105.00 2.50 1.31 0.00 110.00 2.50 1.31 0.00 115.00 2.50 1.31 0.00 120.00 2.50 1.31 0.00 125.00 2.50 1.31 0.00 130.00 2.50 1.31 0.00 135.00 2.50 1.31 0.00 140.00 2.50 1.31 0.00 145.00 2.50 1.31 0.00 150.00 2.50 1.31 0.00 155.00 2.50 1.31 0.00 160.00 2.50 1.31 0.00 165.00 2.50 1.31 0.00 170.00 2.50 1.31 0.00 175.00 2.50 1.31 0.00 180.00 2.50 1.31 0.00 185.00 2.50 1.31 0.00 190.00 2.50 1.31 0.00 195.00 2.50 1.31 0.00 200.00 2.50 1.31 0.00 205.00 2.50 1.31 0.00 210.00 2.50 1.31 0.00 215.00 2.50 1.31 0.00 220.00 2.50 1.31 0.00 225.00 2.50 1.31 0.00 230.00 2.50 1.31 0.00 235.00 2.50 1.31 0.00 240.00 2.50 1.31 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 15HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment PR1A: PR1A - DRAINS EAST ALONG STREET Runoff = 0.27 cfs @ 12.08 hrs, Volume= 0.014 af, Depth= 2.27" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50" Area (sf) CN Description 3,245 98 Paved parking, HSG C * 0 84 3,245 Weighted Average 3,245 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment PR1A: PR1A - DRAINS EAST ALONG STREET Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.3 0.28 0.26 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50" Runoff Area=3,245 sf Runoff Volume=0.014 af Runoff Depth=2.27" Tc=6.0 min CN=WQ 0.27 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 16HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment PR1A: PR1A - DRAINS EAST ALONG STREET Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.12 0.02 0.00 10.00 0.38 0.21 0.01 15.00 2.21 1.99 0.01 20.00 2.40 2.17 0.00 25.00 2.50 2.27 0.00 30.00 2.50 2.27 0.00 35.00 2.50 2.27 0.00 40.00 2.50 2.27 0.00 45.00 2.50 2.27 0.00 50.00 2.50 2.27 0.00 55.00 2.50 2.27 0.00 60.00 2.50 2.27 0.00 65.00 2.50 2.27 0.00 70.00 2.50 2.27 0.00 75.00 2.50 2.27 0.00 80.00 2.50 2.27 0.00 85.00 2.50 2.27 0.00 90.00 2.50 2.27 0.00 95.00 2.50 2.27 0.00 100.00 2.50 2.27 0.00 105.00 2.50 2.27 0.00 110.00 2.50 2.27 0.00 115.00 2.50 2.27 0.00 120.00 2.50 2.27 0.00 125.00 2.50 2.27 0.00 130.00 2.50 2.27 0.00 135.00 2.50 2.27 0.00 140.00 2.50 2.27 0.00 145.00 2.50 2.27 0.00 150.00 2.50 2.27 0.00 155.00 2.50 2.27 0.00 160.00 2.50 2.27 0.00 165.00 2.50 2.27 0.00 170.00 2.50 2.27 0.00 175.00 2.50 2.27 0.00 180.00 2.50 2.27 0.00 185.00 2.50 2.27 0.00 190.00 2.50 2.27 0.00 195.00 2.50 2.27 0.00 200.00 2.50 2.27 0.00 205.00 2.50 2.27 0.00 210.00 2.50 2.27 0.00 215.00 2.50 2.27 0.00 220.00 2.50 2.27 0.00 225.00 2.50 2.27 0.00 230.00 2.50 2.27 0.00 235.00 2.50 2.27 0.00 240.00 2.50 2.27 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 17HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment PR1B: PR1B - DRAINS SOUTH TO WETLAND A Runoff = 1.61 cfs @ 12.09 hrs, Volume= 0.078 af, Depth= 1.40" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50" Area (sf) CN Description 7,290 98 Paved parking, HSG C * 21,877 84 29,167 Weighted Average 21,877 75.01% Pervious Area 7,290 24.99% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment PR1B: PR1B - DRAINS SOUTH TO WETLAND A Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)1 0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50" Runoff Area=29,167 sf Runoff Volume=0.078 af Runoff Depth=1.40" Tc=6.0 min CN=WQ 1.61 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 18HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment PR1B: PR1B - DRAINS SOUTH TO WETLAND A Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.12 0.00 0.00 10.00 0.38 0.00 0.01 15.00 2.21 1.08 0.05 20.00 2.40 1.23 0.01 25.00 2.50 1.31 0.00 30.00 2.50 1.31 0.00 35.00 2.50 1.31 0.00 40.00 2.50 1.31 0.00 45.00 2.50 1.31 0.00 50.00 2.50 1.31 0.00 55.00 2.50 1.31 0.00 60.00 2.50 1.31 0.00 65.00 2.50 1.31 0.00 70.00 2.50 1.31 0.00 75.00 2.50 1.31 0.00 80.00 2.50 1.31 0.00 85.00 2.50 1.31 0.00 90.00 2.50 1.31 0.00 95.00 2.50 1.31 0.00 100.00 2.50 1.31 0.00 105.00 2.50 1.31 0.00 110.00 2.50 1.31 0.00 115.00 2.50 1.31 0.00 120.00 2.50 1.31 0.00 125.00 2.50 1.31 0.00 130.00 2.50 1.31 0.00 135.00 2.50 1.31 0.00 140.00 2.50 1.31 0.00 145.00 2.50 1.31 0.00 150.00 2.50 1.31 0.00 155.00 2.50 1.31 0.00 160.00 2.50 1.31 0.00 165.00 2.50 1.31 0.00 170.00 2.50 1.31 0.00 175.00 2.50 1.31 0.00 180.00 2.50 1.31 0.00 185.00 2.50 1.31 0.00 190.00 2.50 1.31 0.00 195.00 2.50 1.31 0.00 200.00 2.50 1.31 0.00 205.00 2.50 1.31 0.00 210.00 2.50 1.31 0.00 215.00 2.50 1.31 0.00 220.00 2.50 1.31 0.00 225.00 2.50 1.31 0.00 230.00 2.50 1.31 0.00 235.00 2.50 1.31 0.00 240.00 2.50 1.31 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 19HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment PR1C: PR1C - DRAINS NORTH TO WETLAND A Runoff = 0.25 cfs @ 12.09 hrs, Volume= 0.012 af, Depth= 1.12" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50" Area (sf) CN Description 0 98 Paved parking, HSG C * 5,573 84 5,573 Weighted Average 5,573 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment PR1C: PR1C - DRAINS NORTH TO WETLAND A Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.28 0.26 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50" Runoff Area=5,573 sf Runoff Volume=0.012 af Runoff Depth=1.12" Tc=6.0 min CN=WQ 0.25 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 20HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment PR1C: PR1C - DRAINS NORTH TO WETLAND A Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.12 0.00 0.00 10.00 0.38 0.00 0.00 15.00 2.21 0.90 0.01 20.00 2.40 1.04 0.00 25.00 2.50 1.12 0.00 30.00 2.50 1.12 0.00 35.00 2.50 1.12 0.00 40.00 2.50 1.12 0.00 45.00 2.50 1.12 0.00 50.00 2.50 1.12 0.00 55.00 2.50 1.12 0.00 60.00 2.50 1.12 0.00 65.00 2.50 1.12 0.00 70.00 2.50 1.12 0.00 75.00 2.50 1.12 0.00 80.00 2.50 1.12 0.00 85.00 2.50 1.12 0.00 90.00 2.50 1.12 0.00 95.00 2.50 1.12 0.00 100.00 2.50 1.12 0.00 105.00 2.50 1.12 0.00 110.00 2.50 1.12 0.00 115.00 2.50 1.12 0.00 120.00 2.50 1.12 0.00 125.00 2.50 1.12 0.00 130.00 2.50 1.12 0.00 135.00 2.50 1.12 0.00 140.00 2.50 1.12 0.00 145.00 2.50 1.12 0.00 150.00 2.50 1.12 0.00 155.00 2.50 1.12 0.00 160.00 2.50 1.12 0.00 165.00 2.50 1.12 0.00 170.00 2.50 1.12 0.00 175.00 2.50 1.12 0.00 180.00 2.50 1.12 0.00 185.00 2.50 1.12 0.00 190.00 2.50 1.12 0.00 195.00 2.50 1.12 0.00 200.00 2.50 1.12 0.00 205.00 2.50 1.12 0.00 210.00 2.50 1.12 0.00 215.00 2.50 1.12 0.00 220.00 2.50 1.12 0.00 225.00 2.50 1.12 0.00 230.00 2.50 1.12 0.00 235.00 2.50 1.12 0.00 240.00 2.50 1.12 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 21HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment PR1D: PR1D - DRAINS SOUTH TO RAIN GARDEN Runoff = 1.83 cfs @ 12.09 hrs, Volume= 0.089 af, Depth= 1.32" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50" Area (sf) CN Description 6,135 98 Paved parking, HSG C * 28,982 84 35,117 Weighted Average 28,982 82.53% Pervious Area 6,135 17.47% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment PR1D: PR1D - DRAINS SOUTH TO RAIN GARDEN Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)2 1 0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50" Runoff Area=35,117 sf Runoff Volume=0.089 af Runoff Depth=1.32" Tc=6.0 min CN=WQ 1.83 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 22HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment PR1D: PR1D - DRAINS SOUTH TO RAIN GARDEN Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.12 0.00 0.00 10.00 0.38 0.00 0.01 15.00 2.21 1.01 0.06 20.00 2.40 1.16 0.02 25.00 2.50 1.24 0.00 30.00 2.50 1.24 0.00 35.00 2.50 1.24 0.00 40.00 2.50 1.24 0.00 45.00 2.50 1.24 0.00 50.00 2.50 1.24 0.00 55.00 2.50 1.24 0.00 60.00 2.50 1.24 0.00 65.00 2.50 1.24 0.00 70.00 2.50 1.24 0.00 75.00 2.50 1.24 0.00 80.00 2.50 1.24 0.00 85.00 2.50 1.24 0.00 90.00 2.50 1.24 0.00 95.00 2.50 1.24 0.00 100.00 2.50 1.24 0.00 105.00 2.50 1.24 0.00 110.00 2.50 1.24 0.00 115.00 2.50 1.24 0.00 120.00 2.50 1.24 0.00 125.00 2.50 1.24 0.00 130.00 2.50 1.24 0.00 135.00 2.50 1.24 0.00 140.00 2.50 1.24 0.00 145.00 2.50 1.24 0.00 150.00 2.50 1.24 0.00 155.00 2.50 1.24 0.00 160.00 2.50 1.24 0.00 165.00 2.50 1.24 0.00 170.00 2.50 1.24 0.00 175.00 2.50 1.24 0.00 180.00 2.50 1.24 0.00 185.00 2.50 1.24 0.00 190.00 2.50 1.24 0.00 195.00 2.50 1.24 0.00 200.00 2.50 1.24 0.00 205.00 2.50 1.24 0.00 210.00 2.50 1.24 0.00 215.00 2.50 1.24 0.00 220.00 2.50 1.24 0.00 225.00 2.50 1.24 0.00 230.00 2.50 1.24 0.00 235.00 2.50 1.24 0.00 240.00 2.50 1.24 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 23HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment PR2: PR2 - DRAINS SOUTH TO WETLAND B Runoff = 0.21 cfs @ 12.08 hrs, Volume= 0.011 af, Depth= 2.13" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50" Area (sf) CN Description 2,313 98 Paved parking, HSG C * 323 84 2,636 Weighted Average 323 12.25% Pervious Area 2,313 87.75% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment PR2: PR2 - DRAINS SOUTH TO WETLAND B Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.23 0.22 0.21 0.2 0.19 0.18 0.17 0.16 0.15 0.14 0.13 0.12 0.11 0.1 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50" Runoff Area=2,636 sf Runoff Volume=0.011 af Runoff Depth=2.13" Tc=6.0 min CN=WQ 0.21 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 24HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment PR2: PR2 - DRAINS SOUTH TO WETLAND B Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.12 0.00 0.00 10.00 0.38 0.12 0.00 15.00 2.21 1.78 0.01 20.00 2.40 1.97 0.00 25.00 2.50 2.06 0.00 30.00 2.50 2.06 0.00 35.00 2.50 2.06 0.00 40.00 2.50 2.06 0.00 45.00 2.50 2.06 0.00 50.00 2.50 2.06 0.00 55.00 2.50 2.06 0.00 60.00 2.50 2.06 0.00 65.00 2.50 2.06 0.00 70.00 2.50 2.06 0.00 75.00 2.50 2.06 0.00 80.00 2.50 2.06 0.00 85.00 2.50 2.06 0.00 90.00 2.50 2.06 0.00 95.00 2.50 2.06 0.00 100.00 2.50 2.06 0.00 105.00 2.50 2.06 0.00 110.00 2.50 2.06 0.00 115.00 2.50 2.06 0.00 120.00 2.50 2.06 0.00 125.00 2.50 2.06 0.00 130.00 2.50 2.06 0.00 135.00 2.50 2.06 0.00 140.00 2.50 2.06 0.00 145.00 2.50 2.06 0.00 150.00 2.50 2.06 0.00 155.00 2.50 2.06 0.00 160.00 2.50 2.06 0.00 165.00 2.50 2.06 0.00 170.00 2.50 2.06 0.00 175.00 2.50 2.06 0.00 180.00 2.50 2.06 0.00 185.00 2.50 2.06 0.00 190.00 2.50 2.06 0.00 195.00 2.50 2.06 0.00 200.00 2.50 2.06 0.00 205.00 2.50 2.06 0.00 210.00 2.50 2.06 0.00 215.00 2.50 2.06 0.00 220.00 2.50 2.06 0.00 225.00 2.50 2.06 0.00 230.00 2.50 2.06 0.00 235.00 2.50 2.06 0.00 240.00 2.50 2.06 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 25HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 3.322 ac, 13.47% Impervious, Inflow Depth = 1.27" for 1y 24hr event Inflow = 5.56 cfs @ 12.09 hrs, Volume= 0.352 af Outflow = 5.56 cfs @ 12.09 hrs, Volume= 0.352 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Reach DA2: DA2 - TOTAL FLOW TO WETLAND A Inflow Outflow Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)6 5 4 3 2 1 0 Inflow Area=3.322 ac 5.56 cfs 5.56 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 26HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A Time (hours) Inflow (cfs) Elevation (feet) Outflow (cfs) 0.00 0.00 0.00 5.00 0.01 0.01 10.00 0.04 0.04 15.00 0.27 0.27 20.00 0.12 0.12 25.00 0.00 0.00 30.00 0.00 0.00 35.00 0.00 0.00 40.00 0.00 0.00 45.00 0.00 0.00 50.00 0.00 0.00 55.00 0.00 0.00 60.00 0.00 0.00 65.00 0.00 0.00 70.00 0.00 0.00 75.00 0.00 0.00 80.00 0.00 0.00 85.00 0.00 0.00 90.00 0.00 0.00 95.00 0.00 0.00 100.00 0.00 0.00 105.00 0.00 0.00 110.00 0.00 0.00 115.00 0.00 0.00 120.00 0.00 0.00 125.00 0.00 0.00 130.00 0.00 0.00 135.00 0.00 0.00 140.00 0.00 0.00 145.00 0.00 0.00 150.00 0.00 0.00 155.00 0.00 0.00 160.00 0.00 0.00 165.00 0.00 0.00 170.00 0.00 0.00 175.00 0.00 0.00 180.00 0.00 0.00 185.00 0.00 0.00 190.00 0.00 0.00 195.00 0.00 0.00 200.00 0.00 0.00 205.00 0.00 0.00 210.00 0.00 0.00 215.00 0.00 0.00 220.00 0.00 0.00 225.00 0.00 0.00 230.00 0.00 0.00 235.00 0.00 0.00 240.00 0.00 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 27HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 4.521 ac, 15.58% Impervious, Inflow Depth = 1.30" for 1y 24hr event Inflow = 4.90 cfs @ 12.11 hrs, Volume= 0.488 af Outflow = 4.90 cfs @ 12.11 hrs, Volume= 0.488 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Reach DA3: DA3 - TOTAL FLOW TO WETLAND B Inflow Outflow Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)5 4 3 2 1 0 Inflow Area=4.521 ac 4.90 cfs 4.90 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 28HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B Time (hours) Inflow (cfs) Elevation (feet) Outflow (cfs) 0.00 0.00 0.00 5.00 0.01 0.01 10.00 0.05 0.05 15.00 0.36 0.36 20.00 0.15 0.15 25.00 0.04 0.04 30.00 0.00 0.00 35.00 0.00 0.00 40.00 0.00 0.00 45.00 0.00 0.00 50.00 0.00 0.00 55.00 0.00 0.00 60.00 0.00 0.00 65.00 0.00 0.00 70.00 0.00 0.00 75.00 0.00 0.00 80.00 0.00 0.00 85.00 0.00 0.00 90.00 0.00 0.00 95.00 0.00 0.00 100.00 0.00 0.00 105.00 0.00 0.00 110.00 0.00 0.00 115.00 0.00 0.00 120.00 0.00 0.00 125.00 0.00 0.00 130.00 0.00 0.00 135.00 0.00 0.00 140.00 0.00 0.00 145.00 0.00 0.00 150.00 0.00 0.00 155.00 0.00 0.00 160.00 0.00 0.00 165.00 0.00 0.00 170.00 0.00 0.00 175.00 0.00 0.00 180.00 0.00 0.00 185.00 0.00 0.00 190.00 0.00 0.00 195.00 0.00 0.00 200.00 0.00 0.00 205.00 0.00 0.00 210.00 0.00 0.00 215.00 0.00 0.00 220.00 0.00 0.00 225.00 0.00 0.00 230.00 0.00 0.00 235.00 0.00 0.00 240.00 0.00 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 29HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Pond 1P: FILTRATION BASIN 1 Inflow Area = 0.806 ac, 17.47% Impervious, Inflow Depth = 1.32" for 1y 24hr event Inflow = 1.83 cfs @ 12.09 hrs, Volume= 0.089 af Outflow = 0.10 cfs @ 13.54 hrs, Volume= 0.089 af, Atten= 95%, Lag= 87.3 min Discarded = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Primary = 0.10 cfs @ 13.54 hrs, Volume= 0.089 af Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Peak Elev= 974.01' @ 13.54 hrs Surf.Area= 2,324 sf Storage= 2,020 cf Plug-Flow detention time= 228.5 min calculated for 0.089 af (100% of inflow) Center-of-Mass det. time= 228.5 min ( 1,034.4 - 805.8 ) Volume Invert Avail.Storage Storage Description #1 973.00' 5,291 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 973.00 1,624 0 0 973.50 2,040 916 916 974.00 2,320 1,090 2,006 974.50 2,686 1,252 3,258 975.10 3,068 1,726 4,984 975.20 3,068 307 5,291 Device Routing Invert Outlet Devices #1 Primary 971.50'12.0" Round OUTLET PIPE L= 23.0' CMP, mitered to conform to fill, Ke= 0.700 Inlet / Outlet Invert= 971.50' / 971.50' S= 0.0000 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 0.79 sf #2 Device 1 974.00'24.0" Horiz. RIM- Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Secondary 975.10'10.0' long x 10.0' breadth EOF Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 #4 Device 5 973.00'1.600 in/hr Exfiltration over Surface area above 970.50' Excluded Surface area = 0 sf #5 Device 1 971.50'6.0" Vert. Orifice 6" draintile C= 0.600 #6 Discarded 973.00'0.600 in/hr Exfiltration-Infiltration into Rock over Surface area from 970.00' - 970.50' Excluded Surface area = 0 sf MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 30HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Discarded OutFlow Max=0.00 cfs @ 0.00 hrs HW=973.00' (Free Discharge) 6=Exfiltration-Infiltration into Rock ( Controls 0.00 cfs) Primary OutFlow Max=0.10 cfs @ 13.54 hrs HW=974.01' (Free Discharge) 1=OUTLET PIPE (Passes 0.10 cfs of 4.73 cfs potential flow) 2=RIM- Orifice/Grate (Weir Controls 0.01 cfs @ 0.25 fps) 5=Orifice 6" draintile (Passes 0.09 cfs of 1.42 cfs potential flow) 4=Exfiltration (Exfiltration Controls 0.09 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=973.00' (Free Discharge) 3=EOF ( Controls 0.00 cfs) Pond 1P: FILTRATION BASIN 1 Inflow Outflow Discarded Primary Secondary Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)2 1 0 Inflow Area=0.806 ac Peak Elev=974.01' Storage=2,020 cf 1.83 cfs 0.10 cfs 0.00 cfs0.10 cfs 0.00 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 31HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Pond 1P: FILTRATION BASIN 1 Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Outflow (cfs) Discarded (cfs) Primary (cfs) Secondary (cfs) 0.00 0.00 0 973.00 0.00 0.00 0.00 0.00 5.00 0.00 1 973.00 0.00 0.00 0.00 0.00 10.00 0.01 7 973.00 0.01 0.00 0.01 0.00 15.00 0.06 1,883 973.95 0.08 0.00 0.08 0.00 20.00 0.02 888 973.49 0.08 0.00 0.08 0.00 25.00 0.00 1 973.00 0.00 0.00 0.00 0.00 30.00 0.00 0 973.00 0.00 0.00 0.00 0.00 35.00 0.00 0 973.00 0.00 0.00 0.00 0.00 40.00 0.00 0 973.00 0.00 0.00 0.00 0.00 45.00 0.00 0 973.00 0.00 0.00 0.00 0.00 50.00 0.00 0 973.00 0.00 0.00 0.00 0.00 55.00 0.00 0 973.00 0.00 0.00 0.00 0.00 60.00 0.00 0 973.00 0.00 0.00 0.00 0.00 65.00 0.00 0 973.00 0.00 0.00 0.00 0.00 70.00 0.00 0 973.00 0.00 0.00 0.00 0.00 75.00 0.00 0 973.00 0.00 0.00 0.00 0.00 80.00 0.00 0 973.00 0.00 0.00 0.00 0.00 85.00 0.00 0 973.00 0.00 0.00 0.00 0.00 90.00 0.00 0 973.00 0.00 0.00 0.00 0.00 95.00 0.00 0 973.00 0.00 0.00 0.00 0.00 100.00 0.00 0 973.00 0.00 0.00 0.00 0.00 105.00 0.00 0 973.00 0.00 0.00 0.00 0.00 110.00 0.00 0 973.00 0.00 0.00 0.00 0.00 115.00 0.00 0 973.00 0.00 0.00 0.00 0.00 120.00 0.00 0 973.00 0.00 0.00 0.00 0.00 125.00 0.00 0 973.00 0.00 0.00 0.00 0.00 130.00 0.00 0 973.00 0.00 0.00 0.00 0.00 135.00 0.00 0 973.00 0.00 0.00 0.00 0.00 140.00 0.00 0 973.00 0.00 0.00 0.00 0.00 145.00 0.00 0 973.00 0.00 0.00 0.00 0.00 150.00 0.00 0 973.00 0.00 0.00 0.00 0.00 155.00 0.00 0 973.00 0.00 0.00 0.00 0.00 160.00 0.00 0 973.00 0.00 0.00 0.00 0.00 165.00 0.00 0 973.00 0.00 0.00 0.00 0.00 170.00 0.00 0 973.00 0.00 0.00 0.00 0.00 175.00 0.00 0 973.00 0.00 0.00 0.00 0.00 180.00 0.00 0 973.00 0.00 0.00 0.00 0.00 185.00 0.00 0 973.00 0.00 0.00 0.00 0.00 190.00 0.00 0 973.00 0.00 0.00 0.00 0.00 195.00 0.00 0 973.00 0.00 0.00 0.00 0.00 200.00 0.00 0 973.00 0.00 0.00 0.00 0.00 205.00 0.00 0 973.00 0.00 0.00 0.00 0.00 210.00 0.00 0 973.00 0.00 0.00 0.00 0.00 215.00 0.00 0 973.00 0.00 0.00 0.00 0.00 220.00 0.00 0 973.00 0.00 0.00 0.00 0.00 225.00 0.00 0 973.00 0.00 0.00 0.00 0.00 230.00 0.00 0 973.00 0.00 0.00 0.00 0.00 235.00 0.00 0 973.00 0.00 0.00 0.00 0.00 240.00 0.00 0 973.00 0.00 0.00 0.00 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 32HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Stage-Discharge for Pond 1P: FILTRATION BASIN 1 Elevation (feet) Discharge (cfs) Discarded (cfs) Primary (cfs) Secondary (cfs) 973.00 0.00 0.00 0.00 0.00 973.05 0.06 0.00 0.06 0.00 973.10 0.06 0.00 0.06 0.00 973.15 0.06 0.00 0.06 0.00 973.20 0.07 0.00 0.07 0.00 973.25 0.07 0.00 0.07 0.00 973.30 0.07 0.00 0.07 0.00 973.35 0.07 0.00 0.07 0.00 973.40 0.07 0.00 0.07 0.00 973.45 0.07 0.00 0.07 0.00 973.50 0.08 0.00 0.08 0.00 973.55 0.08 0.00 0.08 0.00 973.60 0.08 0.00 0.08 0.00 973.65 0.08 0.00 0.08 0.00 973.70 0.08 0.00 0.08 0.00 973.75 0.08 0.00 0.08 0.00 973.80 0.08 0.00 0.08 0.00 973.85 0.08 0.00 0.08 0.00 973.90 0.08 0.00 0.08 0.00 973.95 0.08 0.00 0.08 0.00 974.00 0.09 0.00 0.09 0.00 974.05 0.32 0.00 0.32 0.00 974.10 0.74 0.00 0.74 0.00 974.15 1.28 0.00 1.28 0.00 974.20 1.93 0.00 1.93 0.00 974.25 2.66 0.00 2.66 0.00 974.30 3.47 0.00 3.47 0.00 974.35 4.35 0.00 4.35 0.00 974.40 5.17 0.00 5.17 0.00 974.45 5.22 0.00 5.22 0.00 974.50 5.28 0.00 5.28 0.00 974.55 5.33 0.00 5.33 0.00 974.60 5.38 0.00 5.38 0.00 974.65 5.43 0.00 5.43 0.00 974.70 5.48 0.00 5.48 0.00 974.75 5.53 0.00 5.53 0.00 974.80 5.58 0.00 5.58 0.00 974.85 5.63 0.00 5.63 0.00 974.90 5.68 0.00 5.68 0.00 974.95 5.73 0.00 5.73 0.00 975.00 5.78 0.00 5.78 0.00 975.05 5.83 0.00 5.83 0.00 975.10 5.87 0.00 5.87 0.00 975.15 6.20 0.00 5.92 0.28 975.20 6.76 0.00 5.97 0.79 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 33HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Pond 4P: WETLAND A Inflow Area = 3.322 ac, 13.47% Impervious, Inflow Depth = 1.27" for 1y 24hr event Inflow = 5.56 cfs @ 12.09 hrs, Volume= 0.352 af Outflow = 2.85 cfs @ 12.19 hrs, Volume= 0.352 af, Atten= 49%, Lag= 6.4 min Primary = 2.85 cfs @ 12.19 hrs, Volume= 0.352 af Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Peak Elev= 969.85' @ 12.19 hrs Surf.Area= 12,138 sf Storage= 2,771 cf Plug-Flow detention time= 31.2 min calculated for 0.352 af (100% of inflow) Center-of-Mass det. time= 31.3 min ( 898.6 - 867.3 ) Volume Invert Avail.Storage Storage Description #1 969.62' 18,824 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 969.62 11,466 0 0 970.00 12,553 4,564 4,564 971.00 15,967 14,260 18,824 Device Routing Invert Outlet Devices #1 Primary 969.62'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=2.85 cfs @ 12.19 hrs HW=969.85' (Free Discharge) 1=Broad-Crested Rectangular Weir (Weir Controls 2.85 cfs @ 1.21 fps) MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 34HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Pond 4P: WETLAND A Inflow Primary Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)6 5 4 3 2 1 0 Inflow Area=3.322 ac Peak Elev=969.85' Storage=2,771 cf 5.56 cfs 2.85 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 35HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Pond 4P: WETLAND A Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Primary (cfs) 0.00 0.00 0 969.62 0.00 5.00 0.01 15 969.62 0.00 10.00 0.04 101 969.63 0.03 15.00 0.27 564 969.67 0.27 20.00 0.12 337 969.65 0.13 25.00 0.00 166 969.63 0.04 30.00 0.00 2 969.62 0.00 35.00 0.00 0 969.62 0.00 40.00 0.00 0 969.62 0.00 45.00 0.00 0 969.62 0.00 50.00 0.00 0 969.62 0.00 55.00 0.00 0 969.62 0.00 60.00 0.00 0 969.62 0.00 65.00 0.00 0 969.62 0.00 70.00 0.00 0 969.62 0.00 75.00 0.00 0 969.62 0.00 80.00 0.00 0 969.62 0.00 85.00 0.00 0 969.62 0.00 90.00 0.00 0 969.62 0.00 95.00 0.00 0 969.62 0.00 100.00 0.00 0 969.62 0.00 105.00 0.00 0 969.62 0.00 110.00 0.00 0 969.62 0.00 115.00 0.00 0 969.62 0.00 120.00 0.00 0 969.62 0.00 125.00 0.00 0 969.62 0.00 130.00 0.00 0 969.62 0.00 135.00 0.00 0 969.62 0.00 140.00 0.00 0 969.62 0.00 145.00 0.00 0 969.62 0.00 150.00 0.00 0 969.62 0.00 155.00 0.00 0 969.62 0.00 160.00 0.00 0 969.62 0.00 165.00 0.00 0 969.62 0.00 170.00 0.00 0 969.62 0.00 175.00 0.00 0 969.62 0.00 180.00 0.00 0 969.62 0.00 185.00 0.00 0 969.62 0.00 190.00 0.00 0 969.62 0.00 195.00 0.00 0 969.62 0.00 200.00 0.00 0 969.62 0.00 205.00 0.00 0 969.62 0.00 210.00 0.00 0 969.62 0.00 215.00 0.00 0 969.62 0.00 220.00 0.00 0 969.62 0.00 225.00 0.00 0 969.62 0.00 230.00 0.00 0 969.62 0.00 235.00 0.00 0 969.62 0.00 240.00 0.00 0 969.62 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 36HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Stage-Discharge for Pond 4P: WETLAND A Elevation (feet) Primary (cfs) 969.62 0.00 969.63 0.02 969.64 0.07 969.65 0.13 969.66 0.20 969.67 0.28 969.68 0.37 969.69 0.46 969.70 0.56 969.71 0.67 969.72 0.79 969.73 0.91 969.74 1.04 969.75 1.17 969.76 1.30 969.77 1.45 969.78 1.59 969.79 1.75 969.80 1.90 969.81 2.06 969.82 2.23 969.83 2.40 969.84 2.58 969.85 2.76 969.86 2.94 969.87 3.13 969.88 3.33 969.89 3.53 969.90 3.73 969.91 3.94 969.92 4.15 969.93 4.36 969.94 4.58 969.95 4.81 969.96 5.03 969.97 5.26 969.98 5.50 969.99 5.74 970.00 5.98 970.01 6.23 970.02 6.48 970.03 6.74 970.04 7.01 970.05 7.28 970.06 7.55 970.07 7.83 970.08 8.12 970.09 8.41 970.10 8.70 970.11 9.00 970.12 9.30 970.13 9.60 970.14 9.91 Elevation (feet) Primary (cfs) 970.15 10.23 970.16 10.55 970.17 10.87 970.18 11.20 970.19 11.53 970.20 11.86 970.21 12.20 970.22 12.55 970.23 12.86 970.24 13.18 970.25 13.49 970.26 13.81 970.27 14.14 970.28 14.46 970.29 14.79 970.30 15.12 970.31 15.45 970.32 15.78 970.33 16.12 970.34 16.46 970.35 16.80 970.36 17.14 970.37 17.49 970.38 17.84 970.39 18.19 970.40 18.54 970.41 18.89 970.42 19.25 970.43 19.61 970.44 19.97 970.45 20.33 970.46 20.69 970.47 21.06 970.48 21.43 970.49 21.80 970.50 22.17 970.51 22.55 970.52 22.92 970.53 23.30 970.54 23.68 970.55 24.07 970.56 24.45 970.57 24.84 970.58 25.23 970.59 25.62 970.60 26.01 970.61 26.40 970.62 26.80 970.63 27.21 970.64 27.62 970.65 28.03 970.66 28.45 970.67 28.86 Elevation (feet) Primary (cfs) 970.68 29.28 970.69 29.70 970.70 30.12 970.71 30.55 970.72 30.98 970.73 31.41 970.74 31.84 970.75 32.27 970.76 32.71 970.77 33.14 970.78 33.58 970.79 34.02 970.80 34.47 970.81 34.91 970.82 35.36 970.83 35.79 970.84 36.22 970.85 36.65 970.86 37.09 970.87 37.52 970.88 37.96 970.89 38.40 970.90 38.84 970.91 39.28 970.92 39.72 970.93 40.17 970.94 40.61 970.95 41.06 970.96 41.51 970.97 41.96 970.98 42.41 970.99 42.86 971.00 43.32 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 37HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Pond 5P: Wetland B [44] Hint: Outlet device #1 is below defined storage [95] Warning: Outlet Device #1 rise exceeded Inflow Area = 12.868 ac, 25.12% Impervious, Inflow Depth = 1.32" for 1y 24hr event Inflow = 18.14 cfs @ 12.13 hrs, Volume= 1.413 af Outflow = 18.03 cfs @ 12.14 hrs, Volume= 1.413 af, Atten= 1%, Lag= 0.9 min Primary = 18.03 cfs @ 12.14 hrs, Volume= 1.413 af Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Peak Elev= 961.61' @ 12.14 hrs Surf.Area= 149,065 sf Storage= 855 cf Plug-Flow detention time= 0.8 min calculated for 1.413 af (100% of inflow) Center-of-Mass det. time= 0.8 min ( 831.9 - 831.1 ) Volume Invert Avail.Storage Storage Description #1 961.60' 841,104 cf Custom Stage Data (Conic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (cubic-feet) (cubic-feet) (sq-ft) 961.60 149,000 0 0 149,000 962.00 153,597 60,517 60,517 153,630 964.00 201,325 353,847 414,364 201,451 966.00 225,646 426,740 841,104 225,991 Device Routing Invert Outlet Devices #1 Primary 960.82'Asymmetrical Weir, C= 3.27 Offset (feet) -70.00 -41.00 0.00 49.00 87.00 Height (feet) 0.35 0.09 0.00 0.09 0.35 Primary OutFlow Max=133.89 cfs @ 12.14 hrs HW=961.61' (Free Discharge) 1=Asymmetrical Weir (Weir Controls 133.89 cfs @ 2.74 fps) MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 38HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Pond 5P: Wetland B Inflow Primary Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Inflow Area=12.868 ac Peak Elev=961.61' Storage=855 cf 18.14 cfs 18.03 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 39HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Pond 5P: Wetland B Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Primary (cfs) 0.00 0.00 0 961.60 0.00 5.00 0.02 1 961.60 0.02 10.00 0.17 8 961.60 0.17 15.00 0.98 46 961.60 0.98 20.00 0.32 15 961.60 0.32 25.00 0.04 2 961.60 0.04 30.00 0.00 0 961.60 0.00 35.00 0.00 0 961.60 0.00 40.00 0.00 0 961.60 0.00 45.00 0.00 0 961.60 0.00 50.00 0.00 0 961.60 0.00 55.00 0.00 0 961.60 0.00 60.00 0.00 0 961.60 0.00 65.00 0.00 0 961.60 0.00 70.00 0.00 0 961.60 0.00 75.00 0.00 0 961.60 0.00 80.00 0.00 0 961.60 0.00 85.00 0.00 0 961.60 0.00 90.00 0.00 0 961.60 0.00 95.00 0.00 0 961.60 0.00 100.00 0.00 0 961.60 0.00 105.00 0.00 0 961.60 0.00 110.00 0.00 0 961.60 0.00 115.00 0.00 0 961.60 0.00 120.00 0.00 0 961.60 0.00 125.00 0.00 0 961.60 0.00 130.00 0.00 0 961.60 0.00 135.00 0.00 0 961.60 0.00 140.00 0.00 0 961.60 0.00 145.00 0.00 0 961.60 0.00 150.00 0.00 0 961.60 0.00 155.00 0.00 0 961.60 0.00 160.00 0.00 0 961.60 0.00 165.00 0.00 0 961.60 0.00 170.00 0.00 0 961.60 0.00 175.00 0.00 0 961.60 0.00 180.00 0.00 0 961.60 0.00 185.00 0.00 0 961.60 0.00 190.00 0.00 0 961.60 0.00 195.00 0.00 0 961.60 0.00 200.00 0.00 0 961.60 0.00 205.00 0.00 0 961.60 0.00 210.00 0.00 0 961.60 0.00 215.00 0.00 0 961.60 0.00 220.00 0.00 0 961.60 0.00 225.00 0.00 0 961.60 0.00 230.00 0.00 0 961.60 0.00 235.00 0.00 0 961.60 0.00 240.00 0.00 0 961.60 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 40HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Stage-Discharge for Pond 5P: Wetland B Elevation (feet) Primary (cfs) 961.60 0.00 961.65 139.02 961.70 144.59 961.75 149.95 961.80 155.13 961.85 160.13 961.90 164.98 961.95 169.69 962.00 174.28 962.05 178.74 962.10 183.09 962.15 187.35 962.20 191.51 962.25 195.57 962.30 199.56 962.35 203.47 962.40 207.30 962.45 211.06 962.50 214.76 962.55 218.40 962.60 221.97 962.65 225.49 962.70 228.95 962.75 232.36 962.80 235.73 962.85 239.04 962.90 242.31 962.95 245.54 963.00 248.72 963.05 251.87 963.10 254.97 963.15 258.04 963.20 261.07 963.25 264.07 963.30 267.03 963.35 269.96 963.40 272.86 963.45 275.73 963.50 278.56 963.55 281.37 963.60 284.16 963.65 286.91 963.70 289.64 963.75 292.34 963.80 295.02 963.85 297.68 963.90 300.31 963.95 302.92 964.00 305.50 964.05 308.07 964.10 310.61 964.15 313.13 964.20 315.63 Elevation (feet) Primary (cfs) 964.25 318.12 964.30 320.58 964.35 323.02 964.40 325.45 964.45 327.86 964.50 330.25 964.55 332.62 964.60 334.98 964.65 337.32 964.70 339.64 964.75 341.95 964.80 344.24 964.85 346.52 964.90 348.78 964.95 351.03 965.00 353.26 965.05 355.48 965.10 357.69 965.15 359.88 965.20 362.06 965.25 364.23 965.30 366.38 965.35 368.52 965.40 370.65 965.45 372.76 965.50 374.87 965.55 376.96 965.60 379.04 965.65 381.11 965.70 383.17 965.75 385.22 965.80 387.25 965.85 389.28 965.90 391.29 965.95 393.30 966.00 395.29 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 41HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Time span=0.00-240.00 hrs, dt=0.01 hrs, 24001 points Runoff by SCS TR-20 method, UH=SCS, Weighted-Q Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Runoff Area=125,400 sf 0.00% Impervious Runoff Depth=1.41"Subcatchment 6S: UNDISTURBED Tc=6.0 min CN=84 Runoff=7.23 cfs 0.338 af Runoff Area=238,192 sf 46.22% Impervious Runoff Depth=1.76"Subcatchment 7S: OFFSITE WETLAND B Flow Length=1,100' Slope=0.1500 '/' Tc=13.4 min CN=WQ Runoff=11.78 cfs 0.801 af Runoff Area=74,865 sf 8.12% Impervious Runoff Depth=1.51"Subcatchment OFFSITE B: OFFSITE B - Tc=6.0 min CN=WQ Runoff=4.56 cfs 0.216 af Runoff Area=49,573 sf 17.90% Impervious Runoff Depth=1.63"Subcatchment OUTSITE A: OFFSITE A - Tc=6.0 min CN=WQ Runoff=3.21 cfs 0.155 af Runoff Area=3,245 sf 100.00% Impervious Runoff Depth=2.64"Subcatchment PR1A: PR1A - DRAINS Tc=6.0 min CN=WQ Runoff=0.32 cfs 0.016 af Runoff Area=29,167 sf 24.99% Impervious Runoff Depth=1.72"Subcatchment PR1B: PR1B - DRAINS Tc=6.0 min CN=WQ Runoff=1.97 cfs 0.096 af Runoff Area=5,573 sf 0.00% Impervious Runoff Depth=1.41"Subcatchment PR1C: PR1C - DRAINS Tc=6.0 min CN=WQ Runoff=0.32 cfs 0.015 af Runoff Area=35,117 sf 17.47% Impervious Runoff Depth=1.62"Subcatchment PR1D: PR1D - DRAINS Tc=6.0 min CN=WQ Runoff=2.27 cfs 0.109 af Runoff Area=2,636 sf 87.75% Impervious Runoff Depth=2.49"Subcatchment PR2: PR2 - DRAINS SOUTH Tc=6.0 min CN=WQ Runoff=0.24 cfs 0.013 af Inflow=6.93 cfs 0.436 afReach DA2: DA2 - TOTAL FLOW TO WETLAND A Outflow=6.93 cfs 0.436 af Inflow=6.28 cfs 0.603 afReach DA3: DA3 - TOTAL FLOW TO WETLAND B Outflow=6.28 cfs 0.603 af Peak Elev=974.06' Storage=2,144 cf Inflow=2.27 cfs 0.109 afPond 1P: FILTRATION BASIN 1 Discarded=0.00 cfs 0.000 af Primary=0.38 cfs 0.109 af Secondary=0.00 cfs 0.000 af Outflow=0.38 cfs 0.109 af Peak Elev=969.90' Storage=3,313 cf Inflow=6.93 cfs 0.436 afPond 4P: WETLAND A Outflow=3.72 cfs 0.436 af Peak Elev=961.61' Storage=1,069 cf Inflow=22.70 cfs 1.743 afPond 5P: Wetland B Outflow=22.56 cfs 1.743 af Total Runoff Area = 12.942 ac Runoff Volume = 1.759 af Average Runoff Depth = 1.63" 74.45% Pervious = 9.636 ac 25.55% Impervious = 3.306 ac MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 42HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment 6S: UNDISTURBED Runoff = 7.23 cfs @ 12.09 hrs, Volume= 0.338 af, Depth= 1.41" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87" Area (sf) CN Description * 125,400 84 125,400 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment 6S: UNDISTURBED Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)8 7 6 5 4 3 2 1 0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87" Runoff Area=125,400 sf Runoff Volume=0.338 af Runoff Depth=1.41" Tc=6.0 min CN=84 7.23 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 43HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 6S: UNDISTURBED Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.14 0.00 0.00 10.00 0.43 0.00 0.01 15.00 2.54 1.15 0.24 20.00 2.76 1.32 0.07 25.00 2.87 1.41 0.00 30.00 2.87 1.41 0.00 35.00 2.87 1.41 0.00 40.00 2.87 1.41 0.00 45.00 2.87 1.41 0.00 50.00 2.87 1.41 0.00 55.00 2.87 1.41 0.00 60.00 2.87 1.41 0.00 65.00 2.87 1.41 0.00 70.00 2.87 1.41 0.00 75.00 2.87 1.41 0.00 80.00 2.87 1.41 0.00 85.00 2.87 1.41 0.00 90.00 2.87 1.41 0.00 95.00 2.87 1.41 0.00 100.00 2.87 1.41 0.00 105.00 2.87 1.41 0.00 110.00 2.87 1.41 0.00 115.00 2.87 1.41 0.00 120.00 2.87 1.41 0.00 125.00 2.87 1.41 0.00 130.00 2.87 1.41 0.00 135.00 2.87 1.41 0.00 140.00 2.87 1.41 0.00 145.00 2.87 1.41 0.00 150.00 2.87 1.41 0.00 155.00 2.87 1.41 0.00 160.00 2.87 1.41 0.00 165.00 2.87 1.41 0.00 170.00 2.87 1.41 0.00 175.00 2.87 1.41 0.00 180.00 2.87 1.41 0.00 185.00 2.87 1.41 0.00 190.00 2.87 1.41 0.00 195.00 2.87 1.41 0.00 200.00 2.87 1.41 0.00 205.00 2.87 1.41 0.00 210.00 2.87 1.41 0.00 215.00 2.87 1.41 0.00 220.00 2.87 1.41 0.00 225.00 2.87 1.41 0.00 230.00 2.87 1.41 0.00 235.00 2.87 1.41 0.00 240.00 2.87 1.41 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 44HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment 7S: OFFSITE WETLAND B WATERSHED Runoff = 11.78 cfs @ 12.18 hrs, Volume= 0.801 af, Depth= 1.76" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87" Area (sf) CN Description 67,393 98 Unconnected roofs, HSG B * 170,799 84 1/2 acre lots, 25% imp, HSG B 238,192 Weighted Average 128,099 53.78% Pervious Area 110,093 46.22% Impervious Area 67,393 61.21% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.9 200 0.1500 0.42 Sheet Flow, Grass: Short n= 0.150 P2= 2.94" 5.5 900 0.1500 2.71 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 13.4 1,100 Total Subcatchment 7S: OFFSITE WETLAND B WATERSHED Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)13 12 11 10 9 8 7 6 5 4 3 2 1 0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87" Runoff Area=238,192 sf Runoff Volume=0.801 af Runoff Depth=1.76" Flow Length=1,100' Slope=0.1500 '/' Tc=13.4 min CN=WQ 11.78 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 45HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 7S: OFFSITE WETLAND B WATERSHED Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.14 0.00 0.02 10.00 0.43 0.02 0.16 15.00 2.54 1.42 0.50 20.00 2.76 1.60 0.13 25.00 2.87 1.70 0.00 30.00 2.87 1.70 0.00 35.00 2.87 1.70 0.00 40.00 2.87 1.70 0.00 45.00 2.87 1.70 0.00 50.00 2.87 1.70 0.00 55.00 2.87 1.70 0.00 60.00 2.87 1.70 0.00 65.00 2.87 1.70 0.00 70.00 2.87 1.70 0.00 75.00 2.87 1.70 0.00 80.00 2.87 1.70 0.00 85.00 2.87 1.70 0.00 90.00 2.87 1.70 0.00 95.00 2.87 1.70 0.00 100.00 2.87 1.70 0.00 105.00 2.87 1.70 0.00 110.00 2.87 1.70 0.00 115.00 2.87 1.70 0.00 120.00 2.87 1.70 0.00 125.00 2.87 1.70 0.00 130.00 2.87 1.70 0.00 135.00 2.87 1.70 0.00 140.00 2.87 1.70 0.00 145.00 2.87 1.70 0.00 150.00 2.87 1.70 0.00 155.00 2.87 1.70 0.00 160.00 2.87 1.70 0.00 165.00 2.87 1.70 0.00 170.00 2.87 1.70 0.00 175.00 2.87 1.70 0.00 180.00 2.87 1.70 0.00 185.00 2.87 1.70 0.00 190.00 2.87 1.70 0.00 195.00 2.87 1.70 0.00 200.00 2.87 1.70 0.00 205.00 2.87 1.70 0.00 210.00 2.87 1.70 0.00 215.00 2.87 1.70 0.00 220.00 2.87 1.70 0.00 225.00 2.87 1.70 0.00 230.00 2.87 1.70 0.00 235.00 2.87 1.70 0.00 240.00 2.87 1.70 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 46HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment OFFSITE B: OFFSITE B - DRAINS SOUTH TO WETLAND Runoff = 4.56 cfs @ 12.09 hrs, Volume= 0.216 af, Depth= 1.51" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87" Area (sf) CN Description 6,076 98 Paved parking, HSG C * 68,789 84 74,865 Weighted Average 68,789 91.88% Pervious Area 6,076 8.12% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment OFFSITE B: OFFSITE B - DRAINS SOUTH TO WETLAND Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)5 4 3 2 1 0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87" Runoff Area=74,865 sf Runoff Volume=0.216 af Runoff Depth=1.51" Tc=6.0 min CN=WQ 4.56 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 47HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment OFFSITE B: OFFSITE B - DRAINS SOUTH TO WETLAND Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.14 0.00 0.00 10.00 0.43 0.00 0.02 15.00 2.54 1.21 0.15 20.00 2.76 1.39 0.04 25.00 2.87 1.48 0.00 30.00 2.87 1.48 0.00 35.00 2.87 1.48 0.00 40.00 2.87 1.48 0.00 45.00 2.87 1.48 0.00 50.00 2.87 1.48 0.00 55.00 2.87 1.48 0.00 60.00 2.87 1.48 0.00 65.00 2.87 1.48 0.00 70.00 2.87 1.48 0.00 75.00 2.87 1.48 0.00 80.00 2.87 1.48 0.00 85.00 2.87 1.48 0.00 90.00 2.87 1.48 0.00 95.00 2.87 1.48 0.00 100.00 2.87 1.48 0.00 105.00 2.87 1.48 0.00 110.00 2.87 1.48 0.00 115.00 2.87 1.48 0.00 120.00 2.87 1.48 0.00 125.00 2.87 1.48 0.00 130.00 2.87 1.48 0.00 135.00 2.87 1.48 0.00 140.00 2.87 1.48 0.00 145.00 2.87 1.48 0.00 150.00 2.87 1.48 0.00 155.00 2.87 1.48 0.00 160.00 2.87 1.48 0.00 165.00 2.87 1.48 0.00 170.00 2.87 1.48 0.00 175.00 2.87 1.48 0.00 180.00 2.87 1.48 0.00 185.00 2.87 1.48 0.00 190.00 2.87 1.48 0.00 195.00 2.87 1.48 0.00 200.00 2.87 1.48 0.00 205.00 2.87 1.48 0.00 210.00 2.87 1.48 0.00 215.00 2.87 1.48 0.00 220.00 2.87 1.48 0.00 225.00 2.87 1.48 0.00 230.00 2.87 1.48 0.00 235.00 2.87 1.48 0.00 240.00 2.87 1.48 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 48HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment OUTSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B Runoff = 3.21 cfs @ 12.09 hrs, Volume= 0.155 af, Depth= 1.63" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87" Area (sf) CN Description 8,875 98 Paved parking, HSG C * 40,698 84 49,573 Weighted Average 40,698 82.10% Pervious Area 8,875 17.90% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment OUTSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)3 2 1 0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87" Runoff Area=49,573 sf Runoff Volume=0.155 af Runoff Depth=1.63" Tc=6.0 min CN=WQ 3.21 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 49HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment OUTSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.14 0.00 0.00 10.00 0.43 0.01 0.02 15.00 2.54 1.35 0.10 20.00 2.76 1.53 0.03 25.00 2.87 1.63 0.00 30.00 2.87 1.63 0.00 35.00 2.87 1.63 0.00 40.00 2.87 1.63 0.00 45.00 2.87 1.63 0.00 50.00 2.87 1.63 0.00 55.00 2.87 1.63 0.00 60.00 2.87 1.63 0.00 65.00 2.87 1.63 0.00 70.00 2.87 1.63 0.00 75.00 2.87 1.63 0.00 80.00 2.87 1.63 0.00 85.00 2.87 1.63 0.00 90.00 2.87 1.63 0.00 95.00 2.87 1.63 0.00 100.00 2.87 1.63 0.00 105.00 2.87 1.63 0.00 110.00 2.87 1.63 0.00 115.00 2.87 1.63 0.00 120.00 2.87 1.63 0.00 125.00 2.87 1.63 0.00 130.00 2.87 1.63 0.00 135.00 2.87 1.63 0.00 140.00 2.87 1.63 0.00 145.00 2.87 1.63 0.00 150.00 2.87 1.63 0.00 155.00 2.87 1.63 0.00 160.00 2.87 1.63 0.00 165.00 2.87 1.63 0.00 170.00 2.87 1.63 0.00 175.00 2.87 1.63 0.00 180.00 2.87 1.63 0.00 185.00 2.87 1.63 0.00 190.00 2.87 1.63 0.00 195.00 2.87 1.63 0.00 200.00 2.87 1.63 0.00 205.00 2.87 1.63 0.00 210.00 2.87 1.63 0.00 215.00 2.87 1.63 0.00 220.00 2.87 1.63 0.00 225.00 2.87 1.63 0.00 230.00 2.87 1.63 0.00 235.00 2.87 1.63 0.00 240.00 2.87 1.63 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 50HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment PR1A: PR1A - DRAINS EAST ALONG STREET Runoff = 0.32 cfs @ 12.08 hrs, Volume= 0.016 af, Depth= 2.64" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87" Area (sf) CN Description 3,245 98 Paved parking, HSG C * 0 84 3,245 Weighted Average 3,245 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment PR1A: PR1A - DRAINS EAST ALONG STREET Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.34 0.32 0.3 0.28 0.26 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87" Runoff Area=3,245 sf Runoff Volume=0.016 af Runoff Depth=2.64" Tc=6.0 min CN=WQ 0.32 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 51HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment PR1A: PR1A - DRAINS EAST ALONG STREET Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.14 0.03 0.00 10.00 0.43 0.26 0.01 15.00 2.54 2.31 0.01 20.00 2.76 2.53 0.00 25.00 2.87 2.64 0.00 30.00 2.87 2.64 0.00 35.00 2.87 2.64 0.00 40.00 2.87 2.64 0.00 45.00 2.87 2.64 0.00 50.00 2.87 2.64 0.00 55.00 2.87 2.64 0.00 60.00 2.87 2.64 0.00 65.00 2.87 2.64 0.00 70.00 2.87 2.64 0.00 75.00 2.87 2.64 0.00 80.00 2.87 2.64 0.00 85.00 2.87 2.64 0.00 90.00 2.87 2.64 0.00 95.00 2.87 2.64 0.00 100.00 2.87 2.64 0.00 105.00 2.87 2.64 0.00 110.00 2.87 2.64 0.00 115.00 2.87 2.64 0.00 120.00 2.87 2.64 0.00 125.00 2.87 2.64 0.00 130.00 2.87 2.64 0.00 135.00 2.87 2.64 0.00 140.00 2.87 2.64 0.00 145.00 2.87 2.64 0.00 150.00 2.87 2.64 0.00 155.00 2.87 2.64 0.00 160.00 2.87 2.64 0.00 165.00 2.87 2.64 0.00 170.00 2.87 2.64 0.00 175.00 2.87 2.64 0.00 180.00 2.87 2.64 0.00 185.00 2.87 2.64 0.00 190.00 2.87 2.64 0.00 195.00 2.87 2.64 0.00 200.00 2.87 2.64 0.00 205.00 2.87 2.64 0.00 210.00 2.87 2.64 0.00 215.00 2.87 2.64 0.00 220.00 2.87 2.64 0.00 225.00 2.87 2.64 0.00 230.00 2.87 2.64 0.00 235.00 2.87 2.64 0.00 240.00 2.87 2.64 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 52HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment PR1B: PR1B - DRAINS SOUTH TO WETLAND A Runoff = 1.97 cfs @ 12.09 hrs, Volume= 0.096 af, Depth= 1.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87" Area (sf) CN Description 7,290 98 Paved parking, HSG C * 21,877 84 29,167 Weighted Average 21,877 75.01% Pervious Area 7,290 24.99% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment PR1B: PR1B - DRAINS SOUTH TO WETLAND A Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)2 1 0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87" Runoff Area=29,167 sf Runoff Volume=0.096 af Runoff Depth=1.72" Tc=6.0 min CN=WQ 1.97 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 53HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment PR1B: PR1B - DRAINS SOUTH TO WETLAND A Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.14 0.00 0.00 10.00 0.43 0.01 0.02 15.00 2.54 1.35 0.06 20.00 2.76 1.53 0.02 25.00 2.87 1.63 0.00 30.00 2.87 1.63 0.00 35.00 2.87 1.63 0.00 40.00 2.87 1.63 0.00 45.00 2.87 1.63 0.00 50.00 2.87 1.63 0.00 55.00 2.87 1.63 0.00 60.00 2.87 1.63 0.00 65.00 2.87 1.63 0.00 70.00 2.87 1.63 0.00 75.00 2.87 1.63 0.00 80.00 2.87 1.63 0.00 85.00 2.87 1.63 0.00 90.00 2.87 1.63 0.00 95.00 2.87 1.63 0.00 100.00 2.87 1.63 0.00 105.00 2.87 1.63 0.00 110.00 2.87 1.63 0.00 115.00 2.87 1.63 0.00 120.00 2.87 1.63 0.00 125.00 2.87 1.63 0.00 130.00 2.87 1.63 0.00 135.00 2.87 1.63 0.00 140.00 2.87 1.63 0.00 145.00 2.87 1.63 0.00 150.00 2.87 1.63 0.00 155.00 2.87 1.63 0.00 160.00 2.87 1.63 0.00 165.00 2.87 1.63 0.00 170.00 2.87 1.63 0.00 175.00 2.87 1.63 0.00 180.00 2.87 1.63 0.00 185.00 2.87 1.63 0.00 190.00 2.87 1.63 0.00 195.00 2.87 1.63 0.00 200.00 2.87 1.63 0.00 205.00 2.87 1.63 0.00 210.00 2.87 1.63 0.00 215.00 2.87 1.63 0.00 220.00 2.87 1.63 0.00 225.00 2.87 1.63 0.00 230.00 2.87 1.63 0.00 235.00 2.87 1.63 0.00 240.00 2.87 1.63 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 54HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment PR1C: PR1C - DRAINS NORTH TO WETLAND A Runoff = 0.32 cfs @ 12.09 hrs, Volume= 0.015 af, Depth= 1.41" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87" Area (sf) CN Description 0 98 Paved parking, HSG C * 5,573 84 5,573 Weighted Average 5,573 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment PR1C: PR1C - DRAINS NORTH TO WETLAND A Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.34 0.32 0.3 0.28 0.26 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87" Runoff Area=5,573 sf Runoff Volume=0.015 af Runoff Depth=1.41" Tc=6.0 min CN=WQ 0.32 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 55HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment PR1C: PR1C - DRAINS NORTH TO WETLAND A Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.14 0.00 0.00 10.00 0.43 0.00 0.00 15.00 2.54 1.15 0.01 20.00 2.76 1.32 0.00 25.00 2.87 1.41 0.00 30.00 2.87 1.41 0.00 35.00 2.87 1.41 0.00 40.00 2.87 1.41 0.00 45.00 2.87 1.41 0.00 50.00 2.87 1.41 0.00 55.00 2.87 1.41 0.00 60.00 2.87 1.41 0.00 65.00 2.87 1.41 0.00 70.00 2.87 1.41 0.00 75.00 2.87 1.41 0.00 80.00 2.87 1.41 0.00 85.00 2.87 1.41 0.00 90.00 2.87 1.41 0.00 95.00 2.87 1.41 0.00 100.00 2.87 1.41 0.00 105.00 2.87 1.41 0.00 110.00 2.87 1.41 0.00 115.00 2.87 1.41 0.00 120.00 2.87 1.41 0.00 125.00 2.87 1.41 0.00 130.00 2.87 1.41 0.00 135.00 2.87 1.41 0.00 140.00 2.87 1.41 0.00 145.00 2.87 1.41 0.00 150.00 2.87 1.41 0.00 155.00 2.87 1.41 0.00 160.00 2.87 1.41 0.00 165.00 2.87 1.41 0.00 170.00 2.87 1.41 0.00 175.00 2.87 1.41 0.00 180.00 2.87 1.41 0.00 185.00 2.87 1.41 0.00 190.00 2.87 1.41 0.00 195.00 2.87 1.41 0.00 200.00 2.87 1.41 0.00 205.00 2.87 1.41 0.00 210.00 2.87 1.41 0.00 215.00 2.87 1.41 0.00 220.00 2.87 1.41 0.00 225.00 2.87 1.41 0.00 230.00 2.87 1.41 0.00 235.00 2.87 1.41 0.00 240.00 2.87 1.41 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 56HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment PR1D: PR1D - DRAINS SOUTH TO RAIN GARDEN Runoff = 2.27 cfs @ 12.09 hrs, Volume= 0.109 af, Depth= 1.62" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87" Area (sf) CN Description 6,135 98 Paved parking, HSG C * 28,982 84 35,117 Weighted Average 28,982 82.53% Pervious Area 6,135 17.47% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment PR1D: PR1D - DRAINS SOUTH TO RAIN GARDEN Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)2 1 0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87" Runoff Area=35,117 sf Runoff Volume=0.109 af Runoff Depth=1.62" Tc=6.0 min CN=WQ 2.27 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 57HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment PR1D: PR1D - DRAINS SOUTH TO RAIN GARDEN Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.14 0.00 0.00 10.00 0.43 0.01 0.02 15.00 2.54 1.28 0.07 20.00 2.76 1.46 0.02 25.00 2.87 1.55 0.00 30.00 2.87 1.55 0.00 35.00 2.87 1.55 0.00 40.00 2.87 1.55 0.00 45.00 2.87 1.55 0.00 50.00 2.87 1.55 0.00 55.00 2.87 1.55 0.00 60.00 2.87 1.55 0.00 65.00 2.87 1.55 0.00 70.00 2.87 1.55 0.00 75.00 2.87 1.55 0.00 80.00 2.87 1.55 0.00 85.00 2.87 1.55 0.00 90.00 2.87 1.55 0.00 95.00 2.87 1.55 0.00 100.00 2.87 1.55 0.00 105.00 2.87 1.55 0.00 110.00 2.87 1.55 0.00 115.00 2.87 1.55 0.00 120.00 2.87 1.55 0.00 125.00 2.87 1.55 0.00 130.00 2.87 1.55 0.00 135.00 2.87 1.55 0.00 140.00 2.87 1.55 0.00 145.00 2.87 1.55 0.00 150.00 2.87 1.55 0.00 155.00 2.87 1.55 0.00 160.00 2.87 1.55 0.00 165.00 2.87 1.55 0.00 170.00 2.87 1.55 0.00 175.00 2.87 1.55 0.00 180.00 2.87 1.55 0.00 185.00 2.87 1.55 0.00 190.00 2.87 1.55 0.00 195.00 2.87 1.55 0.00 200.00 2.87 1.55 0.00 205.00 2.87 1.55 0.00 210.00 2.87 1.55 0.00 215.00 2.87 1.55 0.00 220.00 2.87 1.55 0.00 225.00 2.87 1.55 0.00 230.00 2.87 1.55 0.00 235.00 2.87 1.55 0.00 240.00 2.87 1.55 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 58HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment PR2: PR2 - DRAINS SOUTH TO WETLAND B Runoff = 0.24 cfs @ 12.08 hrs, Volume= 0.013 af, Depth= 2.49" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87" Area (sf) CN Description 2,313 98 Paved parking, HSG C * 323 84 2,636 Weighted Average 323 12.25% Pervious Area 2,313 87.75% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment PR2: PR2 - DRAINS SOUTH TO WETLAND B Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.26 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 0 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87" Runoff Area=2,636 sf Runoff Volume=0.013 af Runoff Depth=2.49" Tc=6.0 min CN=WQ 0.24 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 59HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment PR2: PR2 - DRAINS SOUTH TO WETLAND B Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.14 0.01 0.00 10.00 0.43 0.16 0.01 15.00 2.54 2.10 0.01 20.00 2.76 2.31 0.00 25.00 2.87 2.42 0.00 30.00 2.87 2.42 0.00 35.00 2.87 2.42 0.00 40.00 2.87 2.42 0.00 45.00 2.87 2.42 0.00 50.00 2.87 2.42 0.00 55.00 2.87 2.42 0.00 60.00 2.87 2.42 0.00 65.00 2.87 2.42 0.00 70.00 2.87 2.42 0.00 75.00 2.87 2.42 0.00 80.00 2.87 2.42 0.00 85.00 2.87 2.42 0.00 90.00 2.87 2.42 0.00 95.00 2.87 2.42 0.00 100.00 2.87 2.42 0.00 105.00 2.87 2.42 0.00 110.00 2.87 2.42 0.00 115.00 2.87 2.42 0.00 120.00 2.87 2.42 0.00 125.00 2.87 2.42 0.00 130.00 2.87 2.42 0.00 135.00 2.87 2.42 0.00 140.00 2.87 2.42 0.00 145.00 2.87 2.42 0.00 150.00 2.87 2.42 0.00 155.00 2.87 2.42 0.00 160.00 2.87 2.42 0.00 165.00 2.87 2.42 0.00 170.00 2.87 2.42 0.00 175.00 2.87 2.42 0.00 180.00 2.87 2.42 0.00 185.00 2.87 2.42 0.00 190.00 2.87 2.42 0.00 195.00 2.87 2.42 0.00 200.00 2.87 2.42 0.00 205.00 2.87 2.42 0.00 210.00 2.87 2.42 0.00 215.00 2.87 2.42 0.00 220.00 2.87 2.42 0.00 225.00 2.87 2.42 0.00 230.00 2.87 2.42 0.00 235.00 2.87 2.42 0.00 240.00 2.87 2.42 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 60HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 3.322 ac, 13.47% Impervious, Inflow Depth = 1.58" for 2y 24hr event Inflow = 6.93 cfs @ 12.09 hrs, Volume= 0.436 af Outflow = 6.93 cfs @ 12.09 hrs, Volume= 0.436 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Reach DA2: DA2 - TOTAL FLOW TO WETLAND A Inflow Outflow Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)7 6 5 4 3 2 1 0 Inflow Area=3.322 ac 6.93 cfs 6.93 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 61HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A Time (hours) Inflow (cfs) Elevation (feet) Outflow (cfs) 0.00 0.00 0.00 5.00 0.01 0.01 10.00 0.05 0.05 15.00 0.30 0.30 20.00 0.14 0.14 25.00 0.06 0.06 30.00 0.00 0.00 35.00 0.00 0.00 40.00 0.00 0.00 45.00 0.00 0.00 50.00 0.00 0.00 55.00 0.00 0.00 60.00 0.00 0.00 65.00 0.00 0.00 70.00 0.00 0.00 75.00 0.00 0.00 80.00 0.00 0.00 85.00 0.00 0.00 90.00 0.00 0.00 95.00 0.00 0.00 100.00 0.00 0.00 105.00 0.00 0.00 110.00 0.00 0.00 115.00 0.00 0.00 120.00 0.00 0.00 125.00 0.00 0.00 130.00 0.00 0.00 135.00 0.00 0.00 140.00 0.00 0.00 145.00 0.00 0.00 150.00 0.00 0.00 155.00 0.00 0.00 160.00 0.00 0.00 165.00 0.00 0.00 170.00 0.00 0.00 175.00 0.00 0.00 180.00 0.00 0.00 185.00 0.00 0.00 190.00 0.00 0.00 195.00 0.00 0.00 200.00 0.00 0.00 205.00 0.00 0.00 210.00 0.00 0.00 215.00 0.00 0.00 220.00 0.00 0.00 225.00 0.00 0.00 230.00 0.00 0.00 235.00 0.00 0.00 240.00 0.00 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 62HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 4.521 ac, 15.58% Impervious, Inflow Depth = 1.60" for 2y 24hr event Inflow = 6.28 cfs @ 12.11 hrs, Volume= 0.603 af Outflow = 6.28 cfs @ 12.11 hrs, Volume= 0.603 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Reach DA3: DA3 - TOTAL FLOW TO WETLAND B Inflow Outflow Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)7 6 5 4 3 2 1 0 Inflow Area=4.521 ac 6.28 cfs 6.28 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 63HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B Time (hours) Inflow (cfs) Elevation (feet) Outflow (cfs) 0.00 0.00 0.00 5.00 0.01 0.01 10.00 0.06 0.06 15.00 0.42 0.42 20.00 0.17 0.17 25.00 0.08 0.08 30.00 0.00 0.00 35.00 0.00 0.00 40.00 0.00 0.00 45.00 0.00 0.00 50.00 0.00 0.00 55.00 0.00 0.00 60.00 0.00 0.00 65.00 0.00 0.00 70.00 0.00 0.00 75.00 0.00 0.00 80.00 0.00 0.00 85.00 0.00 0.00 90.00 0.00 0.00 95.00 0.00 0.00 100.00 0.00 0.00 105.00 0.00 0.00 110.00 0.00 0.00 115.00 0.00 0.00 120.00 0.00 0.00 125.00 0.00 0.00 130.00 0.00 0.00 135.00 0.00 0.00 140.00 0.00 0.00 145.00 0.00 0.00 150.00 0.00 0.00 155.00 0.00 0.00 160.00 0.00 0.00 165.00 0.00 0.00 170.00 0.00 0.00 175.00 0.00 0.00 180.00 0.00 0.00 185.00 0.00 0.00 190.00 0.00 0.00 195.00 0.00 0.00 200.00 0.00 0.00 205.00 0.00 0.00 210.00 0.00 0.00 215.00 0.00 0.00 220.00 0.00 0.00 225.00 0.00 0.00 230.00 0.00 0.00 235.00 0.00 0.00 240.00 0.00 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 64HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Pond 1P: FILTRATION BASIN 1 Inflow Area = 0.806 ac, 17.47% Impervious, Inflow Depth = 1.62" for 2y 24hr event Inflow = 2.27 cfs @ 12.09 hrs, Volume= 0.109 af Outflow = 0.38 cfs @ 12.54 hrs, Volume= 0.109 af, Atten= 83%, Lag= 27.4 min Discarded = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Primary = 0.38 cfs @ 12.54 hrs, Volume= 0.109 af Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Peak Elev= 974.06' @ 12.54 hrs Surf.Area= 2,363 sf Storage= 2,144 cf Plug-Flow detention time= 206.2 min calculated for 0.109 af (100% of inflow) Center-of-Mass det. time= 206.2 min ( 1,008.4 - 802.2 ) Volume Invert Avail.Storage Storage Description #1 973.00' 5,291 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 973.00 1,624 0 0 973.50 2,040 916 916 974.00 2,320 1,090 2,006 974.50 2,686 1,252 3,258 975.10 3,068 1,726 4,984 975.20 3,068 307 5,291 Device Routing Invert Outlet Devices #1 Primary 971.50'12.0" Round OUTLET PIPE L= 23.0' CMP, mitered to conform to fill, Ke= 0.700 Inlet / Outlet Invert= 971.50' / 971.50' S= 0.0000 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 0.79 sf #2 Device 1 974.00'24.0" Horiz. RIM- Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Secondary 975.10'10.0' long x 10.0' breadth EOF Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 #4 Device 5 973.00'1.600 in/hr Exfiltration over Surface area above 970.50' Excluded Surface area = 0 sf #5 Device 1 971.50'6.0" Vert. Orifice 6" draintile C= 0.600 #6 Discarded 973.00'0.600 in/hr Exfiltration-Infiltration into Rock over Surface area from 970.00' - 970.50' Excluded Surface area = 0 sf MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 65HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Discarded OutFlow Max=0.00 cfs @ 0.00 hrs HW=973.00' (Free Discharge) 6=Exfiltration-Infiltration into Rock ( Controls 0.00 cfs) Primary OutFlow Max=0.38 cfs @ 12.54 hrs HW=974.06' (Free Discharge) 1=OUTLET PIPE (Passes 0.38 cfs of 4.79 cfs potential flow) 2=RIM- Orifice/Grate (Weir Controls 0.29 cfs @ 0.79 fps) 5=Orifice 6" draintile (Passes 0.09 cfs of 1.44 cfs potential flow) 4=Exfiltration (Exfiltration Controls 0.09 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=973.00' (Free Discharge) 3=EOF ( Controls 0.00 cfs) Pond 1P: FILTRATION BASIN 1 Inflow Outflow Discarded Primary Secondary Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)2 1 0 Inflow Area=0.806 ac Peak Elev=974.06' Storage=2,144 cf 2.27 cfs 0.38 cfs 0.00 cfs 0.38 cfs 0.00 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 66HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Pond 1P: FILTRATION BASIN 1 Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Outflow (cfs) Discarded (cfs) Primary (cfs) Secondary (cfs) 0.00 0.00 0 973.00 0.00 0.00 0.00 0.00 5.00 0.00 1 973.00 0.00 0.00 0.00 0.00 10.00 0.02 9 973.01 0.02 0.00 0.02 0.00 15.00 0.07 1,948 973.97 0.09 0.00 0.09 0.00 20.00 0.02 1,022 973.55 0.08 0.00 0.08 0.00 25.00 0.00 53 973.03 0.06 0.00 0.06 0.00 30.00 0.00 0 973.00 0.00 0.00 0.00 0.00 35.00 0.00 0 973.00 0.00 0.00 0.00 0.00 40.00 0.00 0 973.00 0.00 0.00 0.00 0.00 45.00 0.00 0 973.00 0.00 0.00 0.00 0.00 50.00 0.00 0 973.00 0.00 0.00 0.00 0.00 55.00 0.00 0 973.00 0.00 0.00 0.00 0.00 60.00 0.00 0 973.00 0.00 0.00 0.00 0.00 65.00 0.00 0 973.00 0.00 0.00 0.00 0.00 70.00 0.00 0 973.00 0.00 0.00 0.00 0.00 75.00 0.00 0 973.00 0.00 0.00 0.00 0.00 80.00 0.00 0 973.00 0.00 0.00 0.00 0.00 85.00 0.00 0 973.00 0.00 0.00 0.00 0.00 90.00 0.00 0 973.00 0.00 0.00 0.00 0.00 95.00 0.00 0 973.00 0.00 0.00 0.00 0.00 100.00 0.00 0 973.00 0.00 0.00 0.00 0.00 105.00 0.00 0 973.00 0.00 0.00 0.00 0.00 110.00 0.00 0 973.00 0.00 0.00 0.00 0.00 115.00 0.00 0 973.00 0.00 0.00 0.00 0.00 120.00 0.00 0 973.00 0.00 0.00 0.00 0.00 125.00 0.00 0 973.00 0.00 0.00 0.00 0.00 130.00 0.00 0 973.00 0.00 0.00 0.00 0.00 135.00 0.00 0 973.00 0.00 0.00 0.00 0.00 140.00 0.00 0 973.00 0.00 0.00 0.00 0.00 145.00 0.00 0 973.00 0.00 0.00 0.00 0.00 150.00 0.00 0 973.00 0.00 0.00 0.00 0.00 155.00 0.00 0 973.00 0.00 0.00 0.00 0.00 160.00 0.00 0 973.00 0.00 0.00 0.00 0.00 165.00 0.00 0 973.00 0.00 0.00 0.00 0.00 170.00 0.00 0 973.00 0.00 0.00 0.00 0.00 175.00 0.00 0 973.00 0.00 0.00 0.00 0.00 180.00 0.00 0 973.00 0.00 0.00 0.00 0.00 185.00 0.00 0 973.00 0.00 0.00 0.00 0.00 190.00 0.00 0 973.00 0.00 0.00 0.00 0.00 195.00 0.00 0 973.00 0.00 0.00 0.00 0.00 200.00 0.00 0 973.00 0.00 0.00 0.00 0.00 205.00 0.00 0 973.00 0.00 0.00 0.00 0.00 210.00 0.00 0 973.00 0.00 0.00 0.00 0.00 215.00 0.00 0 973.00 0.00 0.00 0.00 0.00 220.00 0.00 0 973.00 0.00 0.00 0.00 0.00 225.00 0.00 0 973.00 0.00 0.00 0.00 0.00 230.00 0.00 0 973.00 0.00 0.00 0.00 0.00 235.00 0.00 0 973.00 0.00 0.00 0.00 0.00 240.00 0.00 0 973.00 0.00 0.00 0.00 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 67HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Stage-Discharge for Pond 1P: FILTRATION BASIN 1 Elevation (feet) Discharge (cfs) Discarded (cfs) Primary (cfs) Secondary (cfs) 973.00 0.00 0.00 0.00 0.00 973.05 0.06 0.00 0.06 0.00 973.10 0.06 0.00 0.06 0.00 973.15 0.06 0.00 0.06 0.00 973.20 0.07 0.00 0.07 0.00 973.25 0.07 0.00 0.07 0.00 973.30 0.07 0.00 0.07 0.00 973.35 0.07 0.00 0.07 0.00 973.40 0.07 0.00 0.07 0.00 973.45 0.07 0.00 0.07 0.00 973.50 0.08 0.00 0.08 0.00 973.55 0.08 0.00 0.08 0.00 973.60 0.08 0.00 0.08 0.00 973.65 0.08 0.00 0.08 0.00 973.70 0.08 0.00 0.08 0.00 973.75 0.08 0.00 0.08 0.00 973.80 0.08 0.00 0.08 0.00 973.85 0.08 0.00 0.08 0.00 973.90 0.08 0.00 0.08 0.00 973.95 0.08 0.00 0.08 0.00 974.00 0.09 0.00 0.09 0.00 974.05 0.32 0.00 0.32 0.00 974.10 0.74 0.00 0.74 0.00 974.15 1.28 0.00 1.28 0.00 974.20 1.93 0.00 1.93 0.00 974.25 2.66 0.00 2.66 0.00 974.30 3.47 0.00 3.47 0.00 974.35 4.35 0.00 4.35 0.00 974.40 5.17 0.00 5.17 0.00 974.45 5.22 0.00 5.22 0.00 974.50 5.28 0.00 5.28 0.00 974.55 5.33 0.00 5.33 0.00 974.60 5.38 0.00 5.38 0.00 974.65 5.43 0.00 5.43 0.00 974.70 5.48 0.00 5.48 0.00 974.75 5.53 0.00 5.53 0.00 974.80 5.58 0.00 5.58 0.00 974.85 5.63 0.00 5.63 0.00 974.90 5.68 0.00 5.68 0.00 974.95 5.73 0.00 5.73 0.00 975.00 5.78 0.00 5.78 0.00 975.05 5.83 0.00 5.83 0.00 975.10 5.87 0.00 5.87 0.00 975.15 6.20 0.00 5.92 0.28 975.20 6.76 0.00 5.97 0.79 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 68HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Pond 4P: WETLAND A Inflow Area = 3.322 ac, 13.47% Impervious, Inflow Depth = 1.58" for 2y 24hr event Inflow = 6.93 cfs @ 12.09 hrs, Volume= 0.436 af Outflow = 3.72 cfs @ 12.19 hrs, Volume= 0.436 af, Atten= 46%, Lag= 5.9 min Primary = 3.72 cfs @ 12.19 hrs, Volume= 0.436 af Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Peak Elev= 969.90' @ 12.19 hrs Surf.Area= 12,265 sf Storage= 3,313 cf Plug-Flow detention time= 29.0 min calculated for 0.436 af (100% of inflow) Center-of-Mass det. time= 29.0 min ( 886.5 - 857.5 ) Volume Invert Avail.Storage Storage Description #1 969.62' 18,824 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 969.62 11,466 0 0 970.00 12,553 4,564 4,564 971.00 15,967 14,260 18,824 Device Routing Invert Outlet Devices #1 Primary 969.62'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=3.71 cfs @ 12.19 hrs HW=969.90' (Free Discharge) 1=Broad-Crested Rectangular Weir (Weir Controls 3.71 cfs @ 1.33 fps) MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 69HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Pond 4P: WETLAND A Inflow Primary Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)7 6 5 4 3 2 1 0 Inflow Area=3.322 ac Peak Elev=969.90' Storage=3,313 cf 6.93 cfs 3.72 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 70HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Pond 4P: WETLAND A Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Primary (cfs) 0.00 0.00 0 969.62 0.00 5.00 0.01 20 969.62 0.01 10.00 0.05 128 969.63 0.03 15.00 0.30 618 969.67 0.31 20.00 0.14 356 969.65 0.14 25.00 0.06 235 969.64 0.08 30.00 0.00 3 969.62 0.00 35.00 0.00 0 969.62 0.00 40.00 0.00 0 969.62 0.00 45.00 0.00 0 969.62 0.00 50.00 0.00 0 969.62 0.00 55.00 0.00 0 969.62 0.00 60.00 0.00 0 969.62 0.00 65.00 0.00 0 969.62 0.00 70.00 0.00 0 969.62 0.00 75.00 0.00 0 969.62 0.00 80.00 0.00 0 969.62 0.00 85.00 0.00 0 969.62 0.00 90.00 0.00 0 969.62 0.00 95.00 0.00 0 969.62 0.00 100.00 0.00 0 969.62 0.00 105.00 0.00 0 969.62 0.00 110.00 0.00 0 969.62 0.00 115.00 0.00 0 969.62 0.00 120.00 0.00 0 969.62 0.00 125.00 0.00 0 969.62 0.00 130.00 0.00 0 969.62 0.00 135.00 0.00 0 969.62 0.00 140.00 0.00 0 969.62 0.00 145.00 0.00 0 969.62 0.00 150.00 0.00 0 969.62 0.00 155.00 0.00 0 969.62 0.00 160.00 0.00 0 969.62 0.00 165.00 0.00 0 969.62 0.00 170.00 0.00 0 969.62 0.00 175.00 0.00 0 969.62 0.00 180.00 0.00 0 969.62 0.00 185.00 0.00 0 969.62 0.00 190.00 0.00 0 969.62 0.00 195.00 0.00 0 969.62 0.00 200.00 0.00 0 969.62 0.00 205.00 0.00 0 969.62 0.00 210.00 0.00 0 969.62 0.00 215.00 0.00 0 969.62 0.00 220.00 0.00 0 969.62 0.00 225.00 0.00 0 969.62 0.00 230.00 0.00 0 969.62 0.00 235.00 0.00 0 969.62 0.00 240.00 0.00 0 969.62 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 71HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Stage-Discharge for Pond 4P: WETLAND A Elevation (feet) Primary (cfs) 969.62 0.00 969.63 0.02 969.64 0.07 969.65 0.13 969.66 0.20 969.67 0.28 969.68 0.37 969.69 0.46 969.70 0.56 969.71 0.67 969.72 0.79 969.73 0.91 969.74 1.04 969.75 1.17 969.76 1.30 969.77 1.45 969.78 1.59 969.79 1.75 969.80 1.90 969.81 2.06 969.82 2.23 969.83 2.40 969.84 2.58 969.85 2.76 969.86 2.94 969.87 3.13 969.88 3.33 969.89 3.53 969.90 3.73 969.91 3.94 969.92 4.15 969.93 4.36 969.94 4.58 969.95 4.81 969.96 5.03 969.97 5.26 969.98 5.50 969.99 5.74 970.00 5.98 970.01 6.23 970.02 6.48 970.03 6.74 970.04 7.01 970.05 7.28 970.06 7.55 970.07 7.83 970.08 8.12 970.09 8.41 970.10 8.70 970.11 9.00 970.12 9.30 970.13 9.60 970.14 9.91 Elevation (feet) Primary (cfs) 970.15 10.23 970.16 10.55 970.17 10.87 970.18 11.20 970.19 11.53 970.20 11.86 970.21 12.20 970.22 12.55 970.23 12.86 970.24 13.18 970.25 13.49 970.26 13.81 970.27 14.14 970.28 14.46 970.29 14.79 970.30 15.12 970.31 15.45 970.32 15.78 970.33 16.12 970.34 16.46 970.35 16.80 970.36 17.14 970.37 17.49 970.38 17.84 970.39 18.19 970.40 18.54 970.41 18.89 970.42 19.25 970.43 19.61 970.44 19.97 970.45 20.33 970.46 20.69 970.47 21.06 970.48 21.43 970.49 21.80 970.50 22.17 970.51 22.55 970.52 22.92 970.53 23.30 970.54 23.68 970.55 24.07 970.56 24.45 970.57 24.84 970.58 25.23 970.59 25.62 970.60 26.01 970.61 26.40 970.62 26.80 970.63 27.21 970.64 27.62 970.65 28.03 970.66 28.45 970.67 28.86 Elevation (feet) Primary (cfs) 970.68 29.28 970.69 29.70 970.70 30.12 970.71 30.55 970.72 30.98 970.73 31.41 970.74 31.84 970.75 32.27 970.76 32.71 970.77 33.14 970.78 33.58 970.79 34.02 970.80 34.47 970.81 34.91 970.82 35.36 970.83 35.79 970.84 36.22 970.85 36.65 970.86 37.09 970.87 37.52 970.88 37.96 970.89 38.40 970.90 38.84 970.91 39.28 970.92 39.72 970.93 40.17 970.94 40.61 970.95 41.06 970.96 41.51 970.97 41.96 970.98 42.41 970.99 42.86 971.00 43.32 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 72HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Pond 5P: Wetland B [44] Hint: Outlet device #1 is below defined storage [95] Warning: Outlet Device #1 rise exceeded Inflow Area = 12.868 ac, 25.12% Impervious, Inflow Depth = 1.63" for 2y 24hr event Inflow = 22.70 cfs @ 12.13 hrs, Volume= 1.743 af Outflow = 22.56 cfs @ 12.14 hrs, Volume= 1.743 af, Atten= 1%, Lag= 0.9 min Primary = 22.56 cfs @ 12.14 hrs, Volume= 1.743 af Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Peak Elev= 961.61' @ 12.14 hrs Surf.Area= 149,082 sf Storage= 1,069 cf Plug-Flow detention time= 0.8 min calculated for 1.742 af (100% of inflow) Center-of-Mass det. time= 0.8 min ( 826.3 - 825.5 ) Volume Invert Avail.Storage Storage Description #1 961.60' 841,104 cf Custom Stage Data (Conic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (cubic-feet) (cubic-feet) (sq-ft) 961.60 149,000 0 0 149,000 962.00 153,597 60,517 60,517 153,630 964.00 201,325 353,847 414,364 201,451 966.00 225,646 426,740 841,104 225,991 Device Routing Invert Outlet Devices #1 Primary 960.82'Asymmetrical Weir, C= 3.27 Offset (feet) -70.00 -41.00 0.00 49.00 87.00 Height (feet) 0.35 0.09 0.00 0.09 0.35 Primary OutFlow Max=134.06 cfs @ 12.14 hrs HW=961.61' (Free Discharge) 1=Asymmetrical Weir (Weir Controls 134.06 cfs @ 2.74 fps) MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 73HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Pond 5P: Wetland B Inflow Primary Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Inflow Area=12.868 ac Peak Elev=961.61' Storage=1,069 cf 22.70 cfs 22.56 cfs MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 74HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Pond 5P: Wetland B Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Primary (cfs) 0.00 0.00 0 961.60 0.00 5.00 0.03 2 961.60 0.03 10.00 0.23 11 961.60 0.23 15.00 1.15 55 961.60 1.15 20.00 0.36 17 961.60 0.36 25.00 0.08 4 961.60 0.08 30.00 0.00 0 961.60 0.00 35.00 0.00 0 961.60 0.00 40.00 0.00 0 961.60 0.00 45.00 0.00 0 961.60 0.00 50.00 0.00 0 961.60 0.00 55.00 0.00 0 961.60 0.00 60.00 0.00 0 961.60 0.00 65.00 0.00 0 961.60 0.00 70.00 0.00 0 961.60 0.00 75.00 0.00 0 961.60 0.00 80.00 0.00 0 961.60 0.00 85.00 0.00 0 961.60 0.00 90.00 0.00 0 961.60 0.00 95.00 0.00 0 961.60 0.00 100.00 0.00 0 961.60 0.00 105.00 0.00 0 961.60 0.00 110.00 0.00 0 961.60 0.00 115.00 0.00 0 961.60 0.00 120.00 0.00 0 961.60 0.00 125.00 0.00 0 961.60 0.00 130.00 0.00 0 961.60 0.00 135.00 0.00 0 961.60 0.00 140.00 0.00 0 961.60 0.00 145.00 0.00 0 961.60 0.00 150.00 0.00 0 961.60 0.00 155.00 0.00 0 961.60 0.00 160.00 0.00 0 961.60 0.00 165.00 0.00 0 961.60 0.00 170.00 0.00 0 961.60 0.00 175.00 0.00 0 961.60 0.00 180.00 0.00 0 961.60 0.00 185.00 0.00 0 961.60 0.00 190.00 0.00 0 961.60 0.00 195.00 0.00 0 961.60 0.00 200.00 0.00 0 961.60 0.00 205.00 0.00 0 961.60 0.00 210.00 0.00 0 961.60 0.00 215.00 0.00 0 961.60 0.00 220.00 0.00 0 961.60 0.00 225.00 0.00 0 961.60 0.00 230.00 0.00 0 961.60 0.00 235.00 0.00 0 961.60 0.00 240.00 0.00 0 961.60 0.00 MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 75HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Stage-Discharge for Pond 5P: Wetland B Elevation (feet) Primary (cfs) 961.60 0.00 961.65 139.02 961.70 144.59 961.75 149.95 961.80 155.13 961.85 160.13 961.90 164.98 961.95 169.69 962.00 174.28 962.05 178.74 962.10 183.09 962.15 187.35 962.20 191.51 962.25 195.57 962.30 199.56 962.35 203.47 962.40 207.30 962.45 211.06 962.50 214.76 962.55 218.40 962.60 221.97 962.65 225.49 962.70 228.95 962.75 232.36 962.80 235.73 962.85 239.04 962.90 242.31 962.95 245.54 963.00 248.72 963.05 251.87 963.10 254.97 963.15 258.04 963.20 261.07 963.25 264.07 963.30 267.03 963.35 269.96 963.40 272.86 963.45 275.73 963.50 278.56 963.55 281.37 963.60 284.16 963.65 286.91 963.70 289.64 963.75 292.34 963.80 295.02 963.85 297.68 963.90 300.31 963.95 302.92 964.00 305.50 964.05 308.07 964.10 310.61 964.15 313.13 964.20 315.63 Elevation (feet) Primary (cfs) 964.25 318.12 964.30 320.58 964.35 323.02 964.40 325.45 964.45 327.86 964.50 330.25 964.55 332.62 964.60 334.98 964.65 337.32 964.70 339.64 964.75 341.95 964.80 344.24 964.85 346.52 964.90 348.78 964.95 351.03 965.00 353.26 965.05 355.48 965.10 357.69 965.15 359.88 965.20 362.06 965.25 364.23 965.30 366.38 965.35 368.52 965.40 370.65 965.45 372.76 965.50 374.87 965.55 376.96 965.60 379.04 965.65 381.11 965.70 383.17 965.75 385.22 965.80 387.25 965.85 389.28 965.90 391.29 965.95 393.30 966.00 395.29 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 76HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Time span=0.00-240.00 hrs, dt=0.01 hrs, 24001 points Runoff by SCS TR-20 method, UH=SCS, Weighted-Q Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Runoff Area=125,400 sf 0.00% Impervious Runoff Depth=2.61"Subcatchment 6S: UNDISTURBED Tc=6.0 min CN=84 Runoff=13.69 cfs 0.626 af Runoff Area=238,192 sf 46.22% Impervious Runoff Depth=3.01"Subcatchment 7S: OFFSITE WETLAND B Flow Length=1,100' Slope=0.1500 '/' Tc=13.4 min CN=WQ Runoff=20.68 cfs 1.373 af Runoff Area=74,865 sf 8.12% Impervious Runoff Depth=2.73"Subcatchment OFFSITE B: OFFSITE B - Tc=6.0 min CN=WQ Runoff=8.42 cfs 0.390 af Runoff Area=49,573 sf 17.90% Impervious Runoff Depth=2.87"Subcatchment OUTSITE A: OFFSITE A - Tc=6.0 min CN=WQ Runoff=5.77 cfs 0.272 af Runoff Area=3,245 sf 100.00% Impervious Runoff Depth=4.03"Subcatchment PR1A: PR1A - DRAINS Tc=6.0 min CN=WQ Runoff=0.48 cfs 0.025 af Runoff Area=29,167 sf 24.99% Impervious Runoff Depth=2.97"Subcatchment PR1B: PR1B - DRAINS Tc=6.0 min CN=WQ Runoff=3.48 cfs 0.166 af Runoff Area=5,573 sf 0.00% Impervious Runoff Depth=2.61"Subcatchment PR1C: PR1C - DRAINS Tc=6.0 min CN=WQ Runoff=0.61 cfs 0.028 af Runoff Area=35,117 sf 17.47% Impervious Runoff Depth=2.86"Subcatchment PR1D: PR1D - DRAINS Tc=6.0 min CN=WQ Runoff=4.08 cfs 0.192 af Runoff Area=2,636 sf 87.75% Impervious Runoff Depth=3.86"Subcatchment PR2: PR2 - DRAINS SOUTH Tc=6.0 min CN=WQ Runoff=0.38 cfs 0.019 af Inflow=13.79 cfs 0.776 afReach DA2: DA2 - TOTAL FLOW TO WETLAND A Outflow=13.79 cfs 0.776 af Inflow=12.81 cfs 1.067 afReach DA3: DA3 - TOTAL FLOW TO WETLAND B Outflow=12.81 cfs 1.067 af Peak Elev=974.25' Storage=2,618 cf Inflow=4.08 cfs 0.192 afPond 1P: FILTRATION BASIN 1 Discarded=0.00 cfs 0.000 af Primary=2.72 cfs 0.192 af Secondary=0.00 cfs 0.000 af Outflow=2.72 cfs 0.192 af Peak Elev=970.11' Storage=5,905 cf Inflow=13.79 cfs 0.776 afPond 4P: WETLAND A Outflow=8.86 cfs 0.776 af Peak Elev=961.61' Storage=2,008 cf Inflow=42.60 cfs 3.066 afPond 5P: Wetland B Outflow=42.34 cfs 3.066 af Total Runoff Area = 12.942 ac Runoff Volume = 3.092 af Average Runoff Depth = 2.87" 74.45% Pervious = 9.636 ac 25.55% Impervious = 3.306 ac MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 77HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment 6S: UNDISTURBED Runoff = 13.69 cfs @ 12.09 hrs, Volume= 0.626 af, Depth= 2.61" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27" Area (sf) CN Description * 125,400 84 125,400 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment 6S: UNDISTURBED Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27" Runoff Area=125,400 sf Runoff Volume=0.626 af Runoff Depth=2.61" Tc=6.0 min CN=84 13.69 cfs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 78HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 6S: UNDISTURBED Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.12 0.00 0.00 10.00 0.55 0.01 0.07 15.00 3.89 2.27 0.43 20.00 4.17 2.52 0.06 25.00 4.27 2.61 0.00 30.00 4.27 2.61 0.00 35.00 4.27 2.61 0.00 40.00 4.27 2.61 0.00 45.00 4.27 2.61 0.00 50.00 4.27 2.61 0.00 55.00 4.27 2.61 0.00 60.00 4.27 2.61 0.00 65.00 4.27 2.61 0.00 70.00 4.27 2.61 0.00 75.00 4.27 2.61 0.00 80.00 4.27 2.61 0.00 85.00 4.27 2.61 0.00 90.00 4.27 2.61 0.00 95.00 4.27 2.61 0.00 100.00 4.27 2.61 0.00 105.00 4.27 2.61 0.00 110.00 4.27 2.61 0.00 115.00 4.27 2.61 0.00 120.00 4.27 2.61 0.00 125.00 4.27 2.61 0.00 130.00 4.27 2.61 0.00 135.00 4.27 2.61 0.00 140.00 4.27 2.61 0.00 145.00 4.27 2.61 0.00 150.00 4.27 2.61 0.00 155.00 4.27 2.61 0.00 160.00 4.27 2.61 0.00 165.00 4.27 2.61 0.00 170.00 4.27 2.61 0.00 175.00 4.27 2.61 0.00 180.00 4.27 2.61 0.00 185.00 4.27 2.61 0.00 190.00 4.27 2.61 0.00 195.00 4.27 2.61 0.00 200.00 4.27 2.61 0.00 205.00 4.27 2.61 0.00 210.00 4.27 2.61 0.00 215.00 4.27 2.61 0.00 220.00 4.27 2.61 0.00 225.00 4.27 2.61 0.00 230.00 4.27 2.61 0.00 235.00 4.27 2.61 0.00 240.00 4.27 2.61 0.00 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 79HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment 7S: OFFSITE WETLAND B WATERSHED Runoff = 20.68 cfs @ 12.18 hrs, Volume= 1.373 af, Depth= 3.01" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27" Area (sf) CN Description 67,393 98 Unconnected roofs, HSG B * 170,799 84 1/2 acre lots, 25% imp, HSG B 238,192 Weighted Average 128,099 53.78% Pervious Area 110,093 46.22% Impervious Area 67,393 61.21% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.9 200 0.1500 0.42 Sheet Flow, Grass: Short n= 0.150 P2= 2.94" 5.5 900 0.1500 2.71 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 13.4 1,100 Total Subcatchment 7S: OFFSITE WETLAND B WATERSHED Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27" Runoff Area=238,192 sf Runoff Volume=1.373 af Runoff Depth=3.01" Flow Length=1,100' Slope=0.1500 '/' Tc=13.4 min CN=WQ 20.68 cfs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 80HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 7S: OFFSITE WETLAND B WATERSHED Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.12 0.00 0.02 10.00 0.55 0.05 0.33 15.00 3.89 2.63 0.85 20.00 4.17 2.89 0.13 25.00 4.27 2.98 0.00 30.00 4.27 2.98 0.00 35.00 4.27 2.98 0.00 40.00 4.27 2.98 0.00 45.00 4.27 2.98 0.00 50.00 4.27 2.98 0.00 55.00 4.27 2.98 0.00 60.00 4.27 2.98 0.00 65.00 4.27 2.98 0.00 70.00 4.27 2.98 0.00 75.00 4.27 2.98 0.00 80.00 4.27 2.98 0.00 85.00 4.27 2.98 0.00 90.00 4.27 2.98 0.00 95.00 4.27 2.98 0.00 100.00 4.27 2.98 0.00 105.00 4.27 2.98 0.00 110.00 4.27 2.98 0.00 115.00 4.27 2.98 0.00 120.00 4.27 2.98 0.00 125.00 4.27 2.98 0.00 130.00 4.27 2.98 0.00 135.00 4.27 2.98 0.00 140.00 4.27 2.98 0.00 145.00 4.27 2.98 0.00 150.00 4.27 2.98 0.00 155.00 4.27 2.98 0.00 160.00 4.27 2.98 0.00 165.00 4.27 2.98 0.00 170.00 4.27 2.98 0.00 175.00 4.27 2.98 0.00 180.00 4.27 2.98 0.00 185.00 4.27 2.98 0.00 190.00 4.27 2.98 0.00 195.00 4.27 2.98 0.00 200.00 4.27 2.98 0.00 205.00 4.27 2.98 0.00 210.00 4.27 2.98 0.00 215.00 4.27 2.98 0.00 220.00 4.27 2.98 0.00 225.00 4.27 2.98 0.00 230.00 4.27 2.98 0.00 235.00 4.27 2.98 0.00 240.00 4.27 2.98 0.00 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 81HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment OFFSITE B: OFFSITE B - DRAINS SOUTH TO WETLAND Runoff = 8.42 cfs @ 12.09 hrs, Volume= 0.390 af, Depth= 2.73" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27" Area (sf) CN Description 6,076 98 Paved parking, HSG C * 68,789 84 74,865 Weighted Average 68,789 91.88% Pervious Area 6,076 8.12% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment OFFSITE B: OFFSITE B - DRAINS SOUTH TO WETLAND Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)9 8 7 6 5 4 3 2 1 0 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27" Runoff Area=74,865 sf Runoff Volume=0.390 af Runoff Depth=2.73" Tc=6.0 min CN=WQ 8.42 cfs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 82HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment OFFSITE B: OFFSITE B - DRAINS SOUTH TO WETLAND Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.12 0.00 0.00 10.00 0.55 0.02 0.06 15.00 3.89 2.36 0.26 20.00 4.17 2.61 0.04 25.00 4.27 2.70 0.00 30.00 4.27 2.70 0.00 35.00 4.27 2.70 0.00 40.00 4.27 2.70 0.00 45.00 4.27 2.70 0.00 50.00 4.27 2.70 0.00 55.00 4.27 2.70 0.00 60.00 4.27 2.70 0.00 65.00 4.27 2.70 0.00 70.00 4.27 2.70 0.00 75.00 4.27 2.70 0.00 80.00 4.27 2.70 0.00 85.00 4.27 2.70 0.00 90.00 4.27 2.70 0.00 95.00 4.27 2.70 0.00 100.00 4.27 2.70 0.00 105.00 4.27 2.70 0.00 110.00 4.27 2.70 0.00 115.00 4.27 2.70 0.00 120.00 4.27 2.70 0.00 125.00 4.27 2.70 0.00 130.00 4.27 2.70 0.00 135.00 4.27 2.70 0.00 140.00 4.27 2.70 0.00 145.00 4.27 2.70 0.00 150.00 4.27 2.70 0.00 155.00 4.27 2.70 0.00 160.00 4.27 2.70 0.00 165.00 4.27 2.70 0.00 170.00 4.27 2.70 0.00 175.00 4.27 2.70 0.00 180.00 4.27 2.70 0.00 185.00 4.27 2.70 0.00 190.00 4.27 2.70 0.00 195.00 4.27 2.70 0.00 200.00 4.27 2.70 0.00 205.00 4.27 2.70 0.00 210.00 4.27 2.70 0.00 215.00 4.27 2.70 0.00 220.00 4.27 2.70 0.00 225.00 4.27 2.70 0.00 230.00 4.27 2.70 0.00 235.00 4.27 2.70 0.00 240.00 4.27 2.70 0.00 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 83HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment OUTSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B Runoff = 5.77 cfs @ 12.09 hrs, Volume= 0.272 af, Depth= 2.87" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27" Area (sf) CN Description 8,875 98 Paved parking, HSG C * 40,698 84 49,573 Weighted Average 40,698 82.10% Pervious Area 8,875 17.90% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment OUTSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)6 5 4 3 2 1 0 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27" Runoff Area=49,573 sf Runoff Volume=0.272 af Runoff Depth=2.87" Tc=6.0 min CN=WQ 5.77 cfs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 84HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment OUTSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.12 0.00 0.00 10.00 0.55 0.04 0.05 15.00 3.89 2.54 0.17 20.00 4.17 2.79 0.03 25.00 4.27 2.89 0.00 30.00 4.27 2.89 0.00 35.00 4.27 2.89 0.00 40.00 4.27 2.89 0.00 45.00 4.27 2.89 0.00 50.00 4.27 2.89 0.00 55.00 4.27 2.89 0.00 60.00 4.27 2.89 0.00 65.00 4.27 2.89 0.00 70.00 4.27 2.89 0.00 75.00 4.27 2.89 0.00 80.00 4.27 2.89 0.00 85.00 4.27 2.89 0.00 90.00 4.27 2.89 0.00 95.00 4.27 2.89 0.00 100.00 4.27 2.89 0.00 105.00 4.27 2.89 0.00 110.00 4.27 2.89 0.00 115.00 4.27 2.89 0.00 120.00 4.27 2.89 0.00 125.00 4.27 2.89 0.00 130.00 4.27 2.89 0.00 135.00 4.27 2.89 0.00 140.00 4.27 2.89 0.00 145.00 4.27 2.89 0.00 150.00 4.27 2.89 0.00 155.00 4.27 2.89 0.00 160.00 4.27 2.89 0.00 165.00 4.27 2.89 0.00 170.00 4.27 2.89 0.00 175.00 4.27 2.89 0.00 180.00 4.27 2.89 0.00 185.00 4.27 2.89 0.00 190.00 4.27 2.89 0.00 195.00 4.27 2.89 0.00 200.00 4.27 2.89 0.00 205.00 4.27 2.89 0.00 210.00 4.27 2.89 0.00 215.00 4.27 2.89 0.00 220.00 4.27 2.89 0.00 225.00 4.27 2.89 0.00 230.00 4.27 2.89 0.00 235.00 4.27 2.89 0.00 240.00 4.27 2.89 0.00 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 85HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment PR1A: PR1A - DRAINS EAST ALONG STREET Runoff = 0.48 cfs @ 12.08 hrs, Volume= 0.025 af, Depth= 4.03" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27" Area (sf) CN Description 3,245 98 Paved parking, HSG C * 0 84 3,245 Weighted Average 3,245 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment PR1A: PR1A - DRAINS EAST ALONG STREET Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.5 0.45 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27" Runoff Area=3,245 sf Runoff Volume=0.025 af Runoff Depth=4.03" Tc=6.0 min CN=WQ 0.48 cfs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 86HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment PR1A: PR1A - DRAINS EAST ALONG STREET Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.12 0.02 0.00 10.00 0.55 0.36 0.01 15.00 3.89 3.65 0.01 20.00 4.17 3.93 0.00 25.00 4.27 4.03 0.00 30.00 4.27 4.03 0.00 35.00 4.27 4.03 0.00 40.00 4.27 4.03 0.00 45.00 4.27 4.03 0.00 50.00 4.27 4.03 0.00 55.00 4.27 4.03 0.00 60.00 4.27 4.03 0.00 65.00 4.27 4.03 0.00 70.00 4.27 4.03 0.00 75.00 4.27 4.03 0.00 80.00 4.27 4.03 0.00 85.00 4.27 4.03 0.00 90.00 4.27 4.03 0.00 95.00 4.27 4.03 0.00 100.00 4.27 4.03 0.00 105.00 4.27 4.03 0.00 110.00 4.27 4.03 0.00 115.00 4.27 4.03 0.00 120.00 4.27 4.03 0.00 125.00 4.27 4.03 0.00 130.00 4.27 4.03 0.00 135.00 4.27 4.03 0.00 140.00 4.27 4.03 0.00 145.00 4.27 4.03 0.00 150.00 4.27 4.03 0.00 155.00 4.27 4.03 0.00 160.00 4.27 4.03 0.00 165.00 4.27 4.03 0.00 170.00 4.27 4.03 0.00 175.00 4.27 4.03 0.00 180.00 4.27 4.03 0.00 185.00 4.27 4.03 0.00 190.00 4.27 4.03 0.00 195.00 4.27 4.03 0.00 200.00 4.27 4.03 0.00 205.00 4.27 4.03 0.00 210.00 4.27 4.03 0.00 215.00 4.27 4.03 0.00 220.00 4.27 4.03 0.00 225.00 4.27 4.03 0.00 230.00 4.27 4.03 0.00 235.00 4.27 4.03 0.00 240.00 4.27 4.03 0.00 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 87HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment PR1B: PR1B - DRAINS SOUTH TO WETLAND A Runoff = 3.48 cfs @ 12.08 hrs, Volume= 0.166 af, Depth= 2.97" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27" Area (sf) CN Description 7,290 98 Paved parking, HSG C * 21,877 84 29,167 Weighted Average 21,877 75.01% Pervious Area 7,290 24.99% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment PR1B: PR1B - DRAINS SOUTH TO WETLAND A Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)3 2 1 0 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27" Runoff Area=29,167 sf Runoff Volume=0.166 af Runoff Depth=2.97" Tc=6.0 min CN=WQ 3.48 cfs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 88HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment PR1B: PR1B - DRAINS SOUTH TO WETLAND A Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.12 0.00 0.00 10.00 0.55 0.04 0.04 15.00 3.89 2.54 0.10 20.00 4.17 2.79 0.02 25.00 4.27 2.89 0.00 30.00 4.27 2.89 0.00 35.00 4.27 2.89 0.00 40.00 4.27 2.89 0.00 45.00 4.27 2.89 0.00 50.00 4.27 2.89 0.00 55.00 4.27 2.89 0.00 60.00 4.27 2.89 0.00 65.00 4.27 2.89 0.00 70.00 4.27 2.89 0.00 75.00 4.27 2.89 0.00 80.00 4.27 2.89 0.00 85.00 4.27 2.89 0.00 90.00 4.27 2.89 0.00 95.00 4.27 2.89 0.00 100.00 4.27 2.89 0.00 105.00 4.27 2.89 0.00 110.00 4.27 2.89 0.00 115.00 4.27 2.89 0.00 120.00 4.27 2.89 0.00 125.00 4.27 2.89 0.00 130.00 4.27 2.89 0.00 135.00 4.27 2.89 0.00 140.00 4.27 2.89 0.00 145.00 4.27 2.89 0.00 150.00 4.27 2.89 0.00 155.00 4.27 2.89 0.00 160.00 4.27 2.89 0.00 165.00 4.27 2.89 0.00 170.00 4.27 2.89 0.00 175.00 4.27 2.89 0.00 180.00 4.27 2.89 0.00 185.00 4.27 2.89 0.00 190.00 4.27 2.89 0.00 195.00 4.27 2.89 0.00 200.00 4.27 2.89 0.00 205.00 4.27 2.89 0.00 210.00 4.27 2.89 0.00 215.00 4.27 2.89 0.00 220.00 4.27 2.89 0.00 225.00 4.27 2.89 0.00 230.00 4.27 2.89 0.00 235.00 4.27 2.89 0.00 240.00 4.27 2.89 0.00 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 89HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment PR1C: PR1C - DRAINS NORTH TO WETLAND A Runoff = 0.61 cfs @ 12.09 hrs, Volume= 0.028 af, Depth= 2.61" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27" Area (sf) CN Description 0 98 Paved parking, HSG C * 5,573 84 5,573 Weighted Average 5,573 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment PR1C: PR1C - DRAINS NORTH TO WETLAND A Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.65 0.6 0.55 0.5 0.45 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27" Runoff Area=5,573 sf Runoff Volume=0.028 af Runoff Depth=2.61" Tc=6.0 min CN=WQ 0.61 cfs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 90HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment PR1C: PR1C - DRAINS NORTH TO WETLAND A Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.12 0.00 0.00 10.00 0.55 0.01 0.00 15.00 3.89 2.27 0.02 20.00 4.17 2.52 0.00 25.00 4.27 2.61 0.00 30.00 4.27 2.61 0.00 35.00 4.27 2.61 0.00 40.00 4.27 2.61 0.00 45.00 4.27 2.61 0.00 50.00 4.27 2.61 0.00 55.00 4.27 2.61 0.00 60.00 4.27 2.61 0.00 65.00 4.27 2.61 0.00 70.00 4.27 2.61 0.00 75.00 4.27 2.61 0.00 80.00 4.27 2.61 0.00 85.00 4.27 2.61 0.00 90.00 4.27 2.61 0.00 95.00 4.27 2.61 0.00 100.00 4.27 2.61 0.00 105.00 4.27 2.61 0.00 110.00 4.27 2.61 0.00 115.00 4.27 2.61 0.00 120.00 4.27 2.61 0.00 125.00 4.27 2.61 0.00 130.00 4.27 2.61 0.00 135.00 4.27 2.61 0.00 140.00 4.27 2.61 0.00 145.00 4.27 2.61 0.00 150.00 4.27 2.61 0.00 155.00 4.27 2.61 0.00 160.00 4.27 2.61 0.00 165.00 4.27 2.61 0.00 170.00 4.27 2.61 0.00 175.00 4.27 2.61 0.00 180.00 4.27 2.61 0.00 185.00 4.27 2.61 0.00 190.00 4.27 2.61 0.00 195.00 4.27 2.61 0.00 200.00 4.27 2.61 0.00 205.00 4.27 2.61 0.00 210.00 4.27 2.61 0.00 215.00 4.27 2.61 0.00 220.00 4.27 2.61 0.00 225.00 4.27 2.61 0.00 230.00 4.27 2.61 0.00 235.00 4.27 2.61 0.00 240.00 4.27 2.61 0.00 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 91HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment PR1D: PR1D - DRAINS SOUTH TO RAIN GARDEN Runoff = 4.08 cfs @ 12.09 hrs, Volume= 0.192 af, Depth= 2.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27" Area (sf) CN Description 6,135 98 Paved parking, HSG C * 28,982 84 35,117 Weighted Average 28,982 82.53% Pervious Area 6,135 17.47% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment PR1D: PR1D - DRAINS SOUTH TO RAIN GARDEN Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)4 3 2 1 0 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27" Runoff Area=35,117 sf Runoff Volume=0.192 af Runoff Depth=2.86" Tc=6.0 min CN=WQ 4.08 cfs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 92HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment PR1D: PR1D - DRAINS SOUTH TO RAIN GARDEN Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.12 0.00 0.00 10.00 0.55 0.03 0.04 15.00 3.89 2.45 0.12 20.00 4.17 2.70 0.02 25.00 4.27 2.79 0.00 30.00 4.27 2.79 0.00 35.00 4.27 2.79 0.00 40.00 4.27 2.79 0.00 45.00 4.27 2.79 0.00 50.00 4.27 2.79 0.00 55.00 4.27 2.79 0.00 60.00 4.27 2.79 0.00 65.00 4.27 2.79 0.00 70.00 4.27 2.79 0.00 75.00 4.27 2.79 0.00 80.00 4.27 2.79 0.00 85.00 4.27 2.79 0.00 90.00 4.27 2.79 0.00 95.00 4.27 2.79 0.00 100.00 4.27 2.79 0.00 105.00 4.27 2.79 0.00 110.00 4.27 2.79 0.00 115.00 4.27 2.79 0.00 120.00 4.27 2.79 0.00 125.00 4.27 2.79 0.00 130.00 4.27 2.79 0.00 135.00 4.27 2.79 0.00 140.00 4.27 2.79 0.00 145.00 4.27 2.79 0.00 150.00 4.27 2.79 0.00 155.00 4.27 2.79 0.00 160.00 4.27 2.79 0.00 165.00 4.27 2.79 0.00 170.00 4.27 2.79 0.00 175.00 4.27 2.79 0.00 180.00 4.27 2.79 0.00 185.00 4.27 2.79 0.00 190.00 4.27 2.79 0.00 195.00 4.27 2.79 0.00 200.00 4.27 2.79 0.00 205.00 4.27 2.79 0.00 210.00 4.27 2.79 0.00 215.00 4.27 2.79 0.00 220.00 4.27 2.79 0.00 225.00 4.27 2.79 0.00 230.00 4.27 2.79 0.00 235.00 4.27 2.79 0.00 240.00 4.27 2.79 0.00 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 93HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment PR2: PR2 - DRAINS SOUTH TO WETLAND B Runoff = 0.38 cfs @ 12.08 hrs, Volume= 0.019 af, Depth= 3.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27" Area (sf) CN Description 2,313 98 Paved parking, HSG C * 323 84 2,636 Weighted Average 323 12.25% Pervious Area 2,313 87.75% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment PR2: PR2 - DRAINS SOUTH TO WETLAND B Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.42 0.4 0.38 0.36 0.34 0.32 0.3 0.28 0.26 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 0 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27" Runoff Area=2,636 sf Runoff Volume=0.019 af Runoff Depth=3.86" Tc=6.0 min CN=WQ 0.38 cfs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 94HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment PR2: PR2 - DRAINS SOUTH TO WETLAND B Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.12 0.00 0.00 10.00 0.55 0.25 0.01 15.00 3.89 3.43 0.01 20.00 4.17 3.71 0.00 25.00 4.27 3.81 0.00 30.00 4.27 3.81 0.00 35.00 4.27 3.81 0.00 40.00 4.27 3.81 0.00 45.00 4.27 3.81 0.00 50.00 4.27 3.81 0.00 55.00 4.27 3.81 0.00 60.00 4.27 3.81 0.00 65.00 4.27 3.81 0.00 70.00 4.27 3.81 0.00 75.00 4.27 3.81 0.00 80.00 4.27 3.81 0.00 85.00 4.27 3.81 0.00 90.00 4.27 3.81 0.00 95.00 4.27 3.81 0.00 100.00 4.27 3.81 0.00 105.00 4.27 3.81 0.00 110.00 4.27 3.81 0.00 115.00 4.27 3.81 0.00 120.00 4.27 3.81 0.00 125.00 4.27 3.81 0.00 130.00 4.27 3.81 0.00 135.00 4.27 3.81 0.00 140.00 4.27 3.81 0.00 145.00 4.27 3.81 0.00 150.00 4.27 3.81 0.00 155.00 4.27 3.81 0.00 160.00 4.27 3.81 0.00 165.00 4.27 3.81 0.00 170.00 4.27 3.81 0.00 175.00 4.27 3.81 0.00 180.00 4.27 3.81 0.00 185.00 4.27 3.81 0.00 190.00 4.27 3.81 0.00 195.00 4.27 3.81 0.00 200.00 4.27 3.81 0.00 205.00 4.27 3.81 0.00 210.00 4.27 3.81 0.00 215.00 4.27 3.81 0.00 220.00 4.27 3.81 0.00 225.00 4.27 3.81 0.00 230.00 4.27 3.81 0.00 235.00 4.27 3.81 0.00 240.00 4.27 3.81 0.00 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 95HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 3.322 ac, 13.47% Impervious, Inflow Depth = 2.80" for 10y 24hr event Inflow = 13.79 cfs @ 12.10 hrs, Volume= 0.776 af Outflow = 13.79 cfs @ 12.10 hrs, Volume= 0.776 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Reach DA2: DA2 - TOTAL FLOW TO WETLAND A Inflow Outflow Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Inflow Area=3.322 ac 13.79 cfs 13.79 cfs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 96HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A Time (hours) Inflow (cfs) Elevation (feet) Outflow (cfs) 0.00 0.00 0.00 5.00 0.01 0.01 10.00 0.14 0.14 15.00 0.51 0.51 20.00 0.14 0.14 25.00 0.06 0.06 30.00 0.00 0.00 35.00 0.00 0.00 40.00 0.00 0.00 45.00 0.00 0.00 50.00 0.00 0.00 55.00 0.00 0.00 60.00 0.00 0.00 65.00 0.00 0.00 70.00 0.00 0.00 75.00 0.00 0.00 80.00 0.00 0.00 85.00 0.00 0.00 90.00 0.00 0.00 95.00 0.00 0.00 100.00 0.00 0.00 105.00 0.00 0.00 110.00 0.00 0.00 115.00 0.00 0.00 120.00 0.00 0.00 125.00 0.00 0.00 130.00 0.00 0.00 135.00 0.00 0.00 140.00 0.00 0.00 145.00 0.00 0.00 150.00 0.00 0.00 155.00 0.00 0.00 160.00 0.00 0.00 165.00 0.00 0.00 170.00 0.00 0.00 175.00 0.00 0.00 180.00 0.00 0.00 185.00 0.00 0.00 190.00 0.00 0.00 195.00 0.00 0.00 200.00 0.00 0.00 205.00 0.00 0.00 210.00 0.00 0.00 215.00 0.00 0.00 220.00 0.00 0.00 225.00 0.00 0.00 230.00 0.00 0.00 235.00 0.00 0.00 240.00 0.00 0.00 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 97HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 4.521 ac, 15.58% Impervious, Inflow Depth = 2.83" for 10y 24hr event Inflow = 12.81 cfs @ 12.13 hrs, Volume= 1.067 af Outflow = 12.81 cfs @ 12.13 hrs, Volume= 1.067 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Reach DA3: DA3 - TOTAL FLOW TO WETLAND B Inflow Outflow Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Inflow Area=4.521 ac 12.81 cfs 12.81 cfs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 98HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B Time (hours) Inflow (cfs) Elevation (feet) Outflow (cfs) 0.00 0.00 0.00 5.00 0.01 0.01 10.00 0.15 0.15 15.00 0.70 0.70 20.00 0.17 0.17 25.00 0.08 0.08 30.00 0.00 0.00 35.00 0.00 0.00 40.00 0.00 0.00 45.00 0.00 0.00 50.00 0.00 0.00 55.00 0.00 0.00 60.00 0.00 0.00 65.00 0.00 0.00 70.00 0.00 0.00 75.00 0.00 0.00 80.00 0.00 0.00 85.00 0.00 0.00 90.00 0.00 0.00 95.00 0.00 0.00 100.00 0.00 0.00 105.00 0.00 0.00 110.00 0.00 0.00 115.00 0.00 0.00 120.00 0.00 0.00 125.00 0.00 0.00 130.00 0.00 0.00 135.00 0.00 0.00 140.00 0.00 0.00 145.00 0.00 0.00 150.00 0.00 0.00 155.00 0.00 0.00 160.00 0.00 0.00 165.00 0.00 0.00 170.00 0.00 0.00 175.00 0.00 0.00 180.00 0.00 0.00 185.00 0.00 0.00 190.00 0.00 0.00 195.00 0.00 0.00 200.00 0.00 0.00 205.00 0.00 0.00 210.00 0.00 0.00 215.00 0.00 0.00 220.00 0.00 0.00 225.00 0.00 0.00 230.00 0.00 0.00 235.00 0.00 0.00 240.00 0.00 0.00 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 99HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Pond 1P: FILTRATION BASIN 1 Inflow Area = 0.806 ac, 17.47% Impervious, Inflow Depth = 2.86" for 10y 24hr event Inflow = 4.08 cfs @ 12.09 hrs, Volume= 0.192 af Outflow = 2.72 cfs @ 12.15 hrs, Volume= 0.192 af, Atten= 33%, Lag= 4.1 min Discarded = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Primary = 2.72 cfs @ 12.15 hrs, Volume= 0.192 af Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Peak Elev= 974.25' @ 12.15 hrs Surf.Area= 2,506 sf Storage= 2,618 cf Plug-Flow detention time= 140.2 min calculated for 0.192 af (100% of inflow) Center-of-Mass det. time= 140.2 min ( 919.6 - 779.4 ) Volume Invert Avail.Storage Storage Description #1 973.00' 5,291 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 973.00 1,624 0 0 973.50 2,040 916 916 974.00 2,320 1,090 2,006 974.50 2,686 1,252 3,258 975.10 3,068 1,726 4,984 975.20 3,068 307 5,291 Device Routing Invert Outlet Devices #1 Primary 971.50'12.0" Round OUTLET PIPE L= 23.0' CMP, mitered to conform to fill, Ke= 0.700 Inlet / Outlet Invert= 971.50' / 971.50' S= 0.0000 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 0.79 sf #2 Device 1 974.00'24.0" Horiz. RIM- Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Secondary 975.10'10.0' long x 10.0' breadth EOF Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 #4 Device 5 973.00'1.600 in/hr Exfiltration over Surface area above 970.50' Excluded Surface area = 0 sf #5 Device 1 971.50'6.0" Vert. Orifice 6" draintile C= 0.600 #6 Discarded 973.00'0.600 in/hr Exfiltration-Infiltration into Rock over Surface area from 970.00' - 970.50' Excluded Surface area = 0 sf MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 100HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Discarded OutFlow Max=0.00 cfs @ 0.00 hrs HW=973.00' (Free Discharge) 6=Exfiltration-Infiltration into Rock ( Controls 0.00 cfs) Primary OutFlow Max=2.71 cfs @ 12.15 hrs HW=974.25' (Free Discharge) 1=OUTLET PIPE (Passes 2.71 cfs of 5.01 cfs potential flow) 2=RIM- Orifice/Grate (Weir Controls 2.62 cfs @ 1.65 fps) 5=Orifice 6" draintile (Passes 0.09 cfs of 1.50 cfs potential flow) 4=Exfiltration (Exfiltration Controls 0.09 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=973.00' (Free Discharge) 3=EOF ( Controls 0.00 cfs) Pond 1P: FILTRATION BASIN 1 Inflow Outflow Discarded Primary Secondary Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)4 3 2 1 0 Inflow Area=0.806 ac Peak Elev=974.25' Storage=2,618 cf 4.08 cfs 2.72 cfs 0.00 cfs 2.72 cfs 0.00 cfs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 101HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Pond 1P: FILTRATION BASIN 1 Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Outflow (cfs) Discarded (cfs) Primary (cfs) Secondary (cfs) 0.00 0.00 0 973.00 0.00 0.00 0.00 0.00 5.00 0.00 1 973.00 0.00 0.00 0.00 0.00 10.00 0.04 21 973.01 0.04 0.00 0.04 0.00 15.00 0.12 2,039 974.01 0.12 0.00 0.12 0.00 20.00 0.02 1,291 973.68 0.08 0.00 0.08 0.00 25.00 0.00 250 973.15 0.06 0.00 0.06 0.00 30.00 0.00 0 973.00 0.00 0.00 0.00 0.00 35.00 0.00 0 973.00 0.00 0.00 0.00 0.00 40.00 0.00 0 973.00 0.00 0.00 0.00 0.00 45.00 0.00 0 973.00 0.00 0.00 0.00 0.00 50.00 0.00 0 973.00 0.00 0.00 0.00 0.00 55.00 0.00 0 973.00 0.00 0.00 0.00 0.00 60.00 0.00 0 973.00 0.00 0.00 0.00 0.00 65.00 0.00 0 973.00 0.00 0.00 0.00 0.00 70.00 0.00 0 973.00 0.00 0.00 0.00 0.00 75.00 0.00 0 973.00 0.00 0.00 0.00 0.00 80.00 0.00 0 973.00 0.00 0.00 0.00 0.00 85.00 0.00 0 973.00 0.00 0.00 0.00 0.00 90.00 0.00 0 973.00 0.00 0.00 0.00 0.00 95.00 0.00 0 973.00 0.00 0.00 0.00 0.00 100.00 0.00 0 973.00 0.00 0.00 0.00 0.00 105.00 0.00 0 973.00 0.00 0.00 0.00 0.00 110.00 0.00 0 973.00 0.00 0.00 0.00 0.00 115.00 0.00 0 973.00 0.00 0.00 0.00 0.00 120.00 0.00 0 973.00 0.00 0.00 0.00 0.00 125.00 0.00 0 973.00 0.00 0.00 0.00 0.00 130.00 0.00 0 973.00 0.00 0.00 0.00 0.00 135.00 0.00 0 973.00 0.00 0.00 0.00 0.00 140.00 0.00 0 973.00 0.00 0.00 0.00 0.00 145.00 0.00 0 973.00 0.00 0.00 0.00 0.00 150.00 0.00 0 973.00 0.00 0.00 0.00 0.00 155.00 0.00 0 973.00 0.00 0.00 0.00 0.00 160.00 0.00 0 973.00 0.00 0.00 0.00 0.00 165.00 0.00 0 973.00 0.00 0.00 0.00 0.00 170.00 0.00 0 973.00 0.00 0.00 0.00 0.00 175.00 0.00 0 973.00 0.00 0.00 0.00 0.00 180.00 0.00 0 973.00 0.00 0.00 0.00 0.00 185.00 0.00 0 973.00 0.00 0.00 0.00 0.00 190.00 0.00 0 973.00 0.00 0.00 0.00 0.00 195.00 0.00 0 973.00 0.00 0.00 0.00 0.00 200.00 0.00 0 973.00 0.00 0.00 0.00 0.00 205.00 0.00 0 973.00 0.00 0.00 0.00 0.00 210.00 0.00 0 973.00 0.00 0.00 0.00 0.00 215.00 0.00 0 973.00 0.00 0.00 0.00 0.00 220.00 0.00 0 973.00 0.00 0.00 0.00 0.00 225.00 0.00 0 973.00 0.00 0.00 0.00 0.00 230.00 0.00 0 973.00 0.00 0.00 0.00 0.00 235.00 0.00 0 973.00 0.00 0.00 0.00 0.00 240.00 0.00 0 973.00 0.00 0.00 0.00 0.00 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 102HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Stage-Discharge for Pond 1P: FILTRATION BASIN 1 Elevation (feet) Discharge (cfs) Discarded (cfs) Primary (cfs) Secondary (cfs) 973.00 0.00 0.00 0.00 0.00 973.05 0.06 0.00 0.06 0.00 973.10 0.06 0.00 0.06 0.00 973.15 0.06 0.00 0.06 0.00 973.20 0.07 0.00 0.07 0.00 973.25 0.07 0.00 0.07 0.00 973.30 0.07 0.00 0.07 0.00 973.35 0.07 0.00 0.07 0.00 973.40 0.07 0.00 0.07 0.00 973.45 0.07 0.00 0.07 0.00 973.50 0.08 0.00 0.08 0.00 973.55 0.08 0.00 0.08 0.00 973.60 0.08 0.00 0.08 0.00 973.65 0.08 0.00 0.08 0.00 973.70 0.08 0.00 0.08 0.00 973.75 0.08 0.00 0.08 0.00 973.80 0.08 0.00 0.08 0.00 973.85 0.08 0.00 0.08 0.00 973.90 0.08 0.00 0.08 0.00 973.95 0.08 0.00 0.08 0.00 974.00 0.09 0.00 0.09 0.00 974.05 0.32 0.00 0.32 0.00 974.10 0.74 0.00 0.74 0.00 974.15 1.28 0.00 1.28 0.00 974.20 1.93 0.00 1.93 0.00 974.25 2.66 0.00 2.66 0.00 974.30 3.47 0.00 3.47 0.00 974.35 4.35 0.00 4.35 0.00 974.40 5.17 0.00 5.17 0.00 974.45 5.22 0.00 5.22 0.00 974.50 5.28 0.00 5.28 0.00 974.55 5.33 0.00 5.33 0.00 974.60 5.38 0.00 5.38 0.00 974.65 5.43 0.00 5.43 0.00 974.70 5.48 0.00 5.48 0.00 974.75 5.53 0.00 5.53 0.00 974.80 5.58 0.00 5.58 0.00 974.85 5.63 0.00 5.63 0.00 974.90 5.68 0.00 5.68 0.00 974.95 5.73 0.00 5.73 0.00 975.00 5.78 0.00 5.78 0.00 975.05 5.83 0.00 5.83 0.00 975.10 5.87 0.00 5.87 0.00 975.15 6.20 0.00 5.92 0.28 975.20 6.76 0.00 5.97 0.79 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 103HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Pond 4P: WETLAND A Inflow Area = 3.322 ac, 13.47% Impervious, Inflow Depth = 2.80" for 10y 24hr event Inflow = 13.79 cfs @ 12.10 hrs, Volume= 0.776 af Outflow = 8.86 cfs @ 12.19 hrs, Volume= 0.776 af, Atten= 36%, Lag= 5.3 min Primary = 8.86 cfs @ 12.19 hrs, Volume= 0.776 af Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Peak Elev= 970.11' @ 12.19 hrs Surf.Area= 12,913 sf Storage= 5,905 cf Plug-Flow detention time= 22.7 min calculated for 0.776 af (100% of inflow) Center-of-Mass det. time= 22.7 min ( 839.1 - 816.4 ) Volume Invert Avail.Storage Storage Description #1 969.62' 18,824 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 969.62 11,466 0 0 970.00 12,553 4,564 4,564 971.00 15,967 14,260 18,824 Device Routing Invert Outlet Devices #1 Primary 969.62'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=8.85 cfs @ 12.19 hrs HW=970.11' (Free Discharge) 1=Broad-Crested Rectangular Weir (Weir Controls 8.85 cfs @ 1.82 fps) MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 104HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Pond 4P: WETLAND A Inflow Primary Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Inflow Area=3.322 ac Peak Elev=970.11' Storage=5,905 cf 13.79 cfs 8.86 cfs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 105HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Pond 4P: WETLAND A Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Primary (cfs) 0.00 0.00 0 969.62 0.00 5.00 0.01 16 969.62 0.00 10.00 0.14 261 969.64 0.09 15.00 0.51 867 969.69 0.51 20.00 0.14 359 969.65 0.14 25.00 0.06 241 969.64 0.08 30.00 0.00 6 969.62 0.00 35.00 0.00 0 969.62 0.00 40.00 0.00 0 969.62 0.00 45.00 0.00 0 969.62 0.00 50.00 0.00 0 969.62 0.00 55.00 0.00 0 969.62 0.00 60.00 0.00 0 969.62 0.00 65.00 0.00 0 969.62 0.00 70.00 0.00 0 969.62 0.00 75.00 0.00 0 969.62 0.00 80.00 0.00 0 969.62 0.00 85.00 0.00 0 969.62 0.00 90.00 0.00 0 969.62 0.00 95.00 0.00 0 969.62 0.00 100.00 0.00 0 969.62 0.00 105.00 0.00 0 969.62 0.00 110.00 0.00 0 969.62 0.00 115.00 0.00 0 969.62 0.00 120.00 0.00 0 969.62 0.00 125.00 0.00 0 969.62 0.00 130.00 0.00 0 969.62 0.00 135.00 0.00 0 969.62 0.00 140.00 0.00 0 969.62 0.00 145.00 0.00 0 969.62 0.00 150.00 0.00 0 969.62 0.00 155.00 0.00 0 969.62 0.00 160.00 0.00 0 969.62 0.00 165.00 0.00 0 969.62 0.00 170.00 0.00 0 969.62 0.00 175.00 0.00 0 969.62 0.00 180.00 0.00 0 969.62 0.00 185.00 0.00 0 969.62 0.00 190.00 0.00 0 969.62 0.00 195.00 0.00 0 969.62 0.00 200.00 0.00 0 969.62 0.00 205.00 0.00 0 969.62 0.00 210.00 0.00 0 969.62 0.00 215.00 0.00 0 969.62 0.00 220.00 0.00 0 969.62 0.00 225.00 0.00 0 969.62 0.00 230.00 0.00 0 969.62 0.00 235.00 0.00 0 969.62 0.00 240.00 0.00 0 969.62 0.00 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 106HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Stage-Discharge for Pond 4P: WETLAND A Elevation (feet) Primary (cfs) 969.62 0.00 969.63 0.02 969.64 0.07 969.65 0.13 969.66 0.20 969.67 0.28 969.68 0.37 969.69 0.46 969.70 0.56 969.71 0.67 969.72 0.79 969.73 0.91 969.74 1.04 969.75 1.17 969.76 1.30 969.77 1.45 969.78 1.59 969.79 1.75 969.80 1.90 969.81 2.06 969.82 2.23 969.83 2.40 969.84 2.58 969.85 2.76 969.86 2.94 969.87 3.13 969.88 3.33 969.89 3.53 969.90 3.73 969.91 3.94 969.92 4.15 969.93 4.36 969.94 4.58 969.95 4.81 969.96 5.03 969.97 5.26 969.98 5.50 969.99 5.74 970.00 5.98 970.01 6.23 970.02 6.48 970.03 6.74 970.04 7.01 970.05 7.28 970.06 7.55 970.07 7.83 970.08 8.12 970.09 8.41 970.10 8.70 970.11 9.00 970.12 9.30 970.13 9.60 970.14 9.91 Elevation (feet) Primary (cfs) 970.15 10.23 970.16 10.55 970.17 10.87 970.18 11.20 970.19 11.53 970.20 11.86 970.21 12.20 970.22 12.55 970.23 12.86 970.24 13.18 970.25 13.49 970.26 13.81 970.27 14.14 970.28 14.46 970.29 14.79 970.30 15.12 970.31 15.45 970.32 15.78 970.33 16.12 970.34 16.46 970.35 16.80 970.36 17.14 970.37 17.49 970.38 17.84 970.39 18.19 970.40 18.54 970.41 18.89 970.42 19.25 970.43 19.61 970.44 19.97 970.45 20.33 970.46 20.69 970.47 21.06 970.48 21.43 970.49 21.80 970.50 22.17 970.51 22.55 970.52 22.92 970.53 23.30 970.54 23.68 970.55 24.07 970.56 24.45 970.57 24.84 970.58 25.23 970.59 25.62 970.60 26.01 970.61 26.40 970.62 26.80 970.63 27.21 970.64 27.62 970.65 28.03 970.66 28.45 970.67 28.86 Elevation (feet) Primary (cfs) 970.68 29.28 970.69 29.70 970.70 30.12 970.71 30.55 970.72 30.98 970.73 31.41 970.74 31.84 970.75 32.27 970.76 32.71 970.77 33.14 970.78 33.58 970.79 34.02 970.80 34.47 970.81 34.91 970.82 35.36 970.83 35.79 970.84 36.22 970.85 36.65 970.86 37.09 970.87 37.52 970.88 37.96 970.89 38.40 970.90 38.84 970.91 39.28 970.92 39.72 970.93 40.17 970.94 40.61 970.95 41.06 970.96 41.51 970.97 41.96 970.98 42.41 970.99 42.86 971.00 43.32 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 107HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Pond 5P: Wetland B [44] Hint: Outlet device #1 is below defined storage [95] Warning: Outlet Device #1 rise exceeded Inflow Area = 12.868 ac, 25.12% Impervious, Inflow Depth = 2.86" for 10y 24hr event Inflow = 42.60 cfs @ 12.13 hrs, Volume= 3.066 af Outflow = 42.34 cfs @ 12.14 hrs, Volume= 3.066 af, Atten= 1%, Lag= 0.9 min Primary = 42.34 cfs @ 12.14 hrs, Volume= 3.066 af Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Peak Elev= 961.61' @ 12.14 hrs Surf.Area= 149,154 sf Storage= 2,008 cf Plug-Flow detention time= 0.8 min calculated for 3.066 af (100% of inflow) Center-of-Mass det. time= 0.8 min ( 797.7 - 797.0 ) Volume Invert Avail.Storage Storage Description #1 961.60' 841,104 cf Custom Stage Data (Conic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (cubic-feet) (cubic-feet) (sq-ft) 961.60 149,000 0 0 149,000 962.00 153,597 60,517 60,517 153,630 964.00 201,325 353,847 414,364 201,451 966.00 225,646 426,740 841,104 225,991 Device Routing Invert Outlet Devices #1 Primary 960.82'Asymmetrical Weir, C= 3.27 Offset (feet) -70.00 -41.00 0.00 49.00 87.00 Height (feet) 0.35 0.09 0.00 0.09 0.35 Primary OutFlow Max=134.80 cfs @ 12.14 hrs HW=961.61' (Free Discharge) 1=Asymmetrical Weir (Weir Controls 134.80 cfs @ 2.76 fps) MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 108HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Pond 5P: Wetland B Inflow Primary Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=12.868 ac Peak Elev=961.61' Storage=2,008 cf 42.60 cfs 42.34 cfs MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 109HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Pond 5P: Wetland B Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Primary (cfs) 0.00 0.00 0 961.60 0.00 5.00 0.03 1 961.60 0.03 10.00 0.55 26 961.60 0.54 15.00 1.98 94 961.60 1.98 20.00 0.36 17 961.60 0.36 25.00 0.08 4 961.60 0.08 30.00 0.00 0 961.60 0.00 35.00 0.00 0 961.60 0.00 40.00 0.00 0 961.60 0.00 45.00 0.00 0 961.60 0.00 50.00 0.00 0 961.60 0.00 55.00 0.00 0 961.60 0.00 60.00 0.00 0 961.60 0.00 65.00 0.00 0 961.60 0.00 70.00 0.00 0 961.60 0.00 75.00 0.00 0 961.60 0.00 80.00 0.00 0 961.60 0.00 85.00 0.00 0 961.60 0.00 90.00 0.00 0 961.60 0.00 95.00 0.00 0 961.60 0.00 100.00 0.00 0 961.60 0.00 105.00 0.00 0 961.60 0.00 110.00 0.00 0 961.60 0.00 115.00 0.00 0 961.60 0.00 120.00 0.00 0 961.60 0.00 125.00 0.00 0 961.60 0.00 130.00 0.00 0 961.60 0.00 135.00 0.00 0 961.60 0.00 140.00 0.00 0 961.60 0.00 145.00 0.00 0 961.60 0.00 150.00 0.00 0 961.60 0.00 155.00 0.00 0 961.60 0.00 160.00 0.00 0 961.60 0.00 165.00 0.00 0 961.60 0.00 170.00 0.00 0 961.60 0.00 175.00 0.00 0 961.60 0.00 180.00 0.00 0 961.60 0.00 185.00 0.00 0 961.60 0.00 190.00 0.00 0 961.60 0.00 195.00 0.00 0 961.60 0.00 200.00 0.00 0 961.60 0.00 205.00 0.00 0 961.60 0.00 210.00 0.00 0 961.60 0.00 215.00 0.00 0 961.60 0.00 220.00 0.00 0 961.60 0.00 225.00 0.00 0 961.60 0.00 230.00 0.00 0 961.60 0.00 235.00 0.00 0 961.60 0.00 240.00 0.00 0 961.60 0.00 MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 110HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Stage-Discharge for Pond 5P: Wetland B Elevation (feet) Primary (cfs) 961.60 0.00 961.65 139.02 961.70 144.59 961.75 149.95 961.80 155.13 961.85 160.13 961.90 164.98 961.95 169.69 962.00 174.28 962.05 178.74 962.10 183.09 962.15 187.35 962.20 191.51 962.25 195.57 962.30 199.56 962.35 203.47 962.40 207.30 962.45 211.06 962.50 214.76 962.55 218.40 962.60 221.97 962.65 225.49 962.70 228.95 962.75 232.36 962.80 235.73 962.85 239.04 962.90 242.31 962.95 245.54 963.00 248.72 963.05 251.87 963.10 254.97 963.15 258.04 963.20 261.07 963.25 264.07 963.30 267.03 963.35 269.96 963.40 272.86 963.45 275.73 963.50 278.56 963.55 281.37 963.60 284.16 963.65 286.91 963.70 289.64 963.75 292.34 963.80 295.02 963.85 297.68 963.90 300.31 963.95 302.92 964.00 305.50 964.05 308.07 964.10 310.61 964.15 313.13 964.20 315.63 Elevation (feet) Primary (cfs) 964.25 318.12 964.30 320.58 964.35 323.02 964.40 325.45 964.45 327.86 964.50 330.25 964.55 332.62 964.60 334.98 964.65 337.32 964.70 339.64 964.75 341.95 964.80 344.24 964.85 346.52 964.90 348.78 964.95 351.03 965.00 353.26 965.05 355.48 965.10 357.69 965.15 359.88 965.20 362.06 965.25 364.23 965.30 366.38 965.35 368.52 965.40 370.65 965.45 372.76 965.50 374.87 965.55 376.96 965.60 379.04 965.65 381.11 965.70 383.17 965.75 385.22 965.80 387.25 965.85 389.28 965.90 391.29 965.95 393.30 966.00 395.29 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 111HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Time span=0.00-240.00 hrs, dt=0.01 hrs, 24001 points Runoff by SCS TR-20 method, UH=SCS, Weighted-Q Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Runoff Area=125,400 sf 0.00% Impervious Runoff Depth=5.53"Subcatchment 6S: UNDISTURBED Tc=6.0 min CN=84 Runoff=26.30 cfs 1.327 af Runoff Area=238,192 sf 46.22% Impervious Runoff Depth=5.99"Subcatchment 7S: OFFSITE WETLAND B Flow Length=1,100' Slope=0.1500 '/' Tc=13.4 min CN=WQ Runoff=37.78 cfs 2.732 af Runoff Area=74,865 sf 8.12% Impervious Runoff Depth=5.66"Subcatchment OFFSITE B: OFFSITE B - Tc=6.0 min CN=WQ Runoff=15.90 cfs 0.811 af Runoff Area=49,573 sf 17.90% Impervious Runoff Depth=5.82"Subcatchment OUTSITE A: OFFSITE A - Tc=6.0 min CN=WQ Runoff=10.68 cfs 0.552 af Runoff Area=3,245 sf 100.00% Impervious Runoff Depth=7.17"Subcatchment PR1A: PR1A - DRAINS Tc=6.0 min CN=WQ Runoff=0.78 cfs 0.045 af Runoff Area=29,167 sf 24.99% Impervious Runoff Depth=5.94"Subcatchment PR1B: PR1B - DRAINS Tc=6.0 min CN=WQ Runoff=6.35 cfs 0.331 af Runoff Area=5,573 sf 0.00% Impervious Runoff Depth=5.53"Subcatchment PR1C: PR1C - DRAINS Tc=6.0 min CN=WQ Runoff=1.17 cfs 0.059 af Runoff Area=35,117 sf 17.47% Impervious Runoff Depth=5.82"Subcatchment PR1D: PR1D - DRAINS Tc=6.0 min CN=WQ Runoff=7.56 cfs 0.391 af Runoff Area=2,636 sf 87.75% Impervious Runoff Depth=6.97"Subcatchment PR2: PR2 - DRAINS SOUTH Tc=6.0 min CN=WQ Runoff=0.63 cfs 0.035 af Inflow=28.65 cfs 1.592 afReach DA2: DA2 - TOTAL FLOW TO WETLAND A Outflow=28.65 cfs 1.592 af Inflow=28.83 cfs 2.180 afReach DA3: DA3 - TOTAL FLOW TO WETLAND B Outflow=28.83 cfs 2.180 af Peak Elev=974.57' Storage=3,439 cf Inflow=7.56 cfs 0.391 afPond 1P: FILTRATION BASIN 1 Discarded=0.00 cfs 0.000 af Primary=5.35 cfs 0.391 af Secondary=0.00 cfs 0.000 af Outflow=5.35 cfs 0.391 af Peak Elev=970.44' Storage=10,462 cf Inflow=28.65 cfs 1.592 afPond 4P: WETLAND A Outflow=20.08 cfs 1.592 af Peak Elev=961.63' Storage=3,980 cf Inflow=84.50 cfs 6.238 afPond 5P: Wetland B Outflow=83.88 cfs 6.238 af Total Runoff Area = 12.942 ac Runoff Volume = 6.283 af Average Runoff Depth = 5.83" 74.45% Pervious = 9.636 ac 25.55% Impervious = 3.306 ac MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 112HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment 6S: UNDISTURBED Runoff = 26.30 cfs @ 12.08 hrs, Volume= 1.327 af, Depth= 5.53" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41" Area (sf) CN Description * 125,400 84 125,400 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment 6S: UNDISTURBED Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41" Runoff Area=125,400 sf Runoff Volume=1.327 af Runoff Depth=5.53" Tc=6.0 min CN=84 26.30 cfs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 113HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 6S: UNDISTURBED Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.15 0.00 0.00 10.00 0.79 0.07 0.30 15.00 6.96 5.11 0.94 20.00 7.29 5.41 0.09 25.00 7.41 5.53 0.00 30.00 7.41 5.53 0.00 35.00 7.41 5.53 0.00 40.00 7.41 5.53 0.00 45.00 7.41 5.53 0.00 50.00 7.41 5.53 0.00 55.00 7.41 5.53 0.00 60.00 7.41 5.53 0.00 65.00 7.41 5.53 0.00 70.00 7.41 5.53 0.00 75.00 7.41 5.53 0.00 80.00 7.41 5.53 0.00 85.00 7.41 5.53 0.00 90.00 7.41 5.53 0.00 95.00 7.41 5.53 0.00 100.00 7.41 5.53 0.00 105.00 7.41 5.53 0.00 110.00 7.41 5.53 0.00 115.00 7.41 5.53 0.00 120.00 7.41 5.53 0.00 125.00 7.41 5.53 0.00 130.00 7.41 5.53 0.00 135.00 7.41 5.53 0.00 140.00 7.41 5.53 0.00 145.00 7.41 5.53 0.00 150.00 7.41 5.53 0.00 155.00 7.41 5.53 0.00 160.00 7.41 5.53 0.00 165.00 7.41 5.53 0.00 170.00 7.41 5.53 0.00 175.00 7.41 5.53 0.00 180.00 7.41 5.53 0.00 185.00 7.41 5.53 0.00 190.00 7.41 5.53 0.00 195.00 7.41 5.53 0.00 200.00 7.41 5.53 0.00 205.00 7.41 5.53 0.00 210.00 7.41 5.53 0.00 215.00 7.41 5.53 0.00 220.00 7.41 5.53 0.00 225.00 7.41 5.53 0.00 230.00 7.41 5.53 0.00 235.00 7.41 5.53 0.00 240.00 7.41 5.53 0.00 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 114HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment 7S: OFFSITE WETLAND B WATERSHED Runoff = 37.78 cfs @ 12.17 hrs, Volume= 2.732 af, Depth= 5.99" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41" Area (sf) CN Description 67,393 98 Unconnected roofs, HSG B * 170,799 84 1/2 acre lots, 25% imp, HSG B 238,192 Weighted Average 128,099 53.78% Pervious Area 110,093 46.22% Impervious Area 67,393 61.21% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.9 200 0.1500 0.42 Sheet Flow, Grass: Short n= 0.150 P2= 2.94" 5.5 900 0.1500 2.71 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 13.4 1,100 Total Subcatchment 7S: OFFSITE WETLAND B WATERSHED Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41" Runoff Area=238,192 sf Runoff Volume=2.732 af Runoff Depth=5.99" Flow Length=1,100' Slope=0.1500 '/' Tc=13.4 min CN=WQ 37.78 cfs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 115HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 7S: OFFSITE WETLAND B WATERSHED Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.15 0.00 0.03 10.00 0.79 0.14 0.87 15.00 6.96 5.56 1.80 20.00 7.29 5.87 0.16 25.00 7.41 5.99 0.00 30.00 7.41 5.99 0.00 35.00 7.41 5.99 0.00 40.00 7.41 5.99 0.00 45.00 7.41 5.99 0.00 50.00 7.41 5.99 0.00 55.00 7.41 5.99 0.00 60.00 7.41 5.99 0.00 65.00 7.41 5.99 0.00 70.00 7.41 5.99 0.00 75.00 7.41 5.99 0.00 80.00 7.41 5.99 0.00 85.00 7.41 5.99 0.00 90.00 7.41 5.99 0.00 95.00 7.41 5.99 0.00 100.00 7.41 5.99 0.00 105.00 7.41 5.99 0.00 110.00 7.41 5.99 0.00 115.00 7.41 5.99 0.00 120.00 7.41 5.99 0.00 125.00 7.41 5.99 0.00 130.00 7.41 5.99 0.00 135.00 7.41 5.99 0.00 140.00 7.41 5.99 0.00 145.00 7.41 5.99 0.00 150.00 7.41 5.99 0.00 155.00 7.41 5.99 0.00 160.00 7.41 5.99 0.00 165.00 7.41 5.99 0.00 170.00 7.41 5.99 0.00 175.00 7.41 5.99 0.00 180.00 7.41 5.99 0.00 185.00 7.41 5.99 0.00 190.00 7.41 5.99 0.00 195.00 7.41 5.99 0.00 200.00 7.41 5.99 0.00 205.00 7.41 5.99 0.00 210.00 7.41 5.99 0.00 215.00 7.41 5.99 0.00 220.00 7.41 5.99 0.00 225.00 7.41 5.99 0.00 230.00 7.41 5.99 0.00 235.00 7.41 5.99 0.00 240.00 7.41 5.99 0.00 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 116HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment OFFSITE B: OFFSITE B - DRAINS SOUTH TO WETLAND Runoff = 15.90 cfs @ 12.08 hrs, Volume= 0.811 af, Depth= 5.66" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41" Area (sf) CN Description 6,076 98 Paved parking, HSG C * 68,789 84 74,865 Weighted Average 68,789 91.88% Pervious Area 6,076 8.12% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment OFFSITE B: OFFSITE B - DRAINS SOUTH TO WETLAND Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41" Runoff Area=74,865 sf Runoff Volume=0.811 af Runoff Depth=5.66" Tc=6.0 min CN=WQ 15.90 cfs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 117HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment OFFSITE B: OFFSITE B - DRAINS SOUTH TO WETLAND Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.15 0.00 0.00 10.00 0.79 0.09 0.21 15.00 6.96 5.22 0.56 20.00 7.29 5.53 0.05 25.00 7.41 5.65 0.00 30.00 7.41 5.65 0.00 35.00 7.41 5.65 0.00 40.00 7.41 5.65 0.00 45.00 7.41 5.65 0.00 50.00 7.41 5.65 0.00 55.00 7.41 5.65 0.00 60.00 7.41 5.65 0.00 65.00 7.41 5.65 0.00 70.00 7.41 5.65 0.00 75.00 7.41 5.65 0.00 80.00 7.41 5.65 0.00 85.00 7.41 5.65 0.00 90.00 7.41 5.65 0.00 95.00 7.41 5.65 0.00 100.00 7.41 5.65 0.00 105.00 7.41 5.65 0.00 110.00 7.41 5.65 0.00 115.00 7.41 5.65 0.00 120.00 7.41 5.65 0.00 125.00 7.41 5.65 0.00 130.00 7.41 5.65 0.00 135.00 7.41 5.65 0.00 140.00 7.41 5.65 0.00 145.00 7.41 5.65 0.00 150.00 7.41 5.65 0.00 155.00 7.41 5.65 0.00 160.00 7.41 5.65 0.00 165.00 7.41 5.65 0.00 170.00 7.41 5.65 0.00 175.00 7.41 5.65 0.00 180.00 7.41 5.65 0.00 185.00 7.41 5.65 0.00 190.00 7.41 5.65 0.00 195.00 7.41 5.65 0.00 200.00 7.41 5.65 0.00 205.00 7.41 5.65 0.00 210.00 7.41 5.65 0.00 215.00 7.41 5.65 0.00 220.00 7.41 5.65 0.00 225.00 7.41 5.65 0.00 230.00 7.41 5.65 0.00 235.00 7.41 5.65 0.00 240.00 7.41 5.65 0.00 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 118HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment OUTSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B Runoff = 10.68 cfs @ 12.08 hrs, Volume= 0.552 af, Depth= 5.82" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41" Area (sf) CN Description 8,875 98 Paved parking, HSG C * 40,698 84 49,573 Weighted Average 40,698 82.10% Pervious Area 8,875 17.90% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment OUTSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)11 10 9 8 7 6 5 4 3 2 1 0 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41" Runoff Area=49,573 sf Runoff Volume=0.552 af Runoff Depth=5.82" Tc=6.0 min CN=WQ 10.68 cfs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 119HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment OUTSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.15 0.00 0.00 10.00 0.79 0.12 0.16 15.00 6.96 5.44 0.37 20.00 7.29 5.76 0.03 25.00 7.41 5.88 0.00 30.00 7.41 5.88 0.00 35.00 7.41 5.88 0.00 40.00 7.41 5.88 0.00 45.00 7.41 5.88 0.00 50.00 7.41 5.88 0.00 55.00 7.41 5.88 0.00 60.00 7.41 5.88 0.00 65.00 7.41 5.88 0.00 70.00 7.41 5.88 0.00 75.00 7.41 5.88 0.00 80.00 7.41 5.88 0.00 85.00 7.41 5.88 0.00 90.00 7.41 5.88 0.00 95.00 7.41 5.88 0.00 100.00 7.41 5.88 0.00 105.00 7.41 5.88 0.00 110.00 7.41 5.88 0.00 115.00 7.41 5.88 0.00 120.00 7.41 5.88 0.00 125.00 7.41 5.88 0.00 130.00 7.41 5.88 0.00 135.00 7.41 5.88 0.00 140.00 7.41 5.88 0.00 145.00 7.41 5.88 0.00 150.00 7.41 5.88 0.00 155.00 7.41 5.88 0.00 160.00 7.41 5.88 0.00 165.00 7.41 5.88 0.00 170.00 7.41 5.88 0.00 175.00 7.41 5.88 0.00 180.00 7.41 5.88 0.00 185.00 7.41 5.88 0.00 190.00 7.41 5.88 0.00 195.00 7.41 5.88 0.00 200.00 7.41 5.88 0.00 205.00 7.41 5.88 0.00 210.00 7.41 5.88 0.00 215.00 7.41 5.88 0.00 220.00 7.41 5.88 0.00 225.00 7.41 5.88 0.00 230.00 7.41 5.88 0.00 235.00 7.41 5.88 0.00 240.00 7.41 5.88 0.00 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 120HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment PR1A: PR1A - DRAINS EAST ALONG STREET Runoff = 0.78 cfs @ 12.08 hrs, Volume= 0.045 af, Depth= 7.17" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41" Area (sf) CN Description 3,245 98 Paved parking, HSG C * 0 84 3,245 Weighted Average 3,245 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment PR1A: PR1A - DRAINS EAST ALONG STREET Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.85 0.8 0.75 0.7 0.65 0.6 0.55 0.5 0.45 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41" Runoff Area=3,245 sf Runoff Volume=0.045 af Runoff Depth=7.17" Tc=6.0 min CN=WQ 0.78 cfs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 121HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment PR1A: PR1A - DRAINS EAST ALONG STREET Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.15 0.04 0.00 10.00 0.79 0.58 0.02 15.00 6.96 6.72 0.03 20.00 7.29 7.05 0.00 25.00 7.41 7.17 0.00 30.00 7.41 7.17 0.00 35.00 7.41 7.17 0.00 40.00 7.41 7.17 0.00 45.00 7.41 7.17 0.00 50.00 7.41 7.17 0.00 55.00 7.41 7.17 0.00 60.00 7.41 7.17 0.00 65.00 7.41 7.17 0.00 70.00 7.41 7.17 0.00 75.00 7.41 7.17 0.00 80.00 7.41 7.17 0.00 85.00 7.41 7.17 0.00 90.00 7.41 7.17 0.00 95.00 7.41 7.17 0.00 100.00 7.41 7.17 0.00 105.00 7.41 7.17 0.00 110.00 7.41 7.17 0.00 115.00 7.41 7.17 0.00 120.00 7.41 7.17 0.00 125.00 7.41 7.17 0.00 130.00 7.41 7.17 0.00 135.00 7.41 7.17 0.00 140.00 7.41 7.17 0.00 145.00 7.41 7.17 0.00 150.00 7.41 7.17 0.00 155.00 7.41 7.17 0.00 160.00 7.41 7.17 0.00 165.00 7.41 7.17 0.00 170.00 7.41 7.17 0.00 175.00 7.41 7.17 0.00 180.00 7.41 7.17 0.00 185.00 7.41 7.17 0.00 190.00 7.41 7.17 0.00 195.00 7.41 7.17 0.00 200.00 7.41 7.17 0.00 205.00 7.41 7.17 0.00 210.00 7.41 7.17 0.00 215.00 7.41 7.17 0.00 220.00 7.41 7.17 0.00 225.00 7.41 7.17 0.00 230.00 7.41 7.17 0.00 235.00 7.41 7.17 0.00 240.00 7.41 7.17 0.00 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 122HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment PR1B: PR1B - DRAINS SOUTH TO WETLAND A Runoff = 6.35 cfs @ 12.08 hrs, Volume= 0.331 af, Depth= 5.94" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41" Area (sf) CN Description 7,290 98 Paved parking, HSG C * 21,877 84 29,167 Weighted Average 21,877 75.01% Pervious Area 7,290 24.99% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment PR1B: PR1B - DRAINS SOUTH TO WETLAND A Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)7 6 5 4 3 2 1 0 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41" Runoff Area=29,167 sf Runoff Volume=0.331 af Runoff Depth=5.94" Tc=6.0 min CN=WQ 6.35 cfs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 123HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment PR1B: PR1B - DRAINS SOUTH TO WETLAND A Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.15 0.00 0.00 10.00 0.79 0.12 0.11 15.00 6.96 5.44 0.22 20.00 7.29 5.76 0.02 25.00 7.41 5.88 0.00 30.00 7.41 5.88 0.00 35.00 7.41 5.88 0.00 40.00 7.41 5.88 0.00 45.00 7.41 5.88 0.00 50.00 7.41 5.88 0.00 55.00 7.41 5.88 0.00 60.00 7.41 5.88 0.00 65.00 7.41 5.88 0.00 70.00 7.41 5.88 0.00 75.00 7.41 5.88 0.00 80.00 7.41 5.88 0.00 85.00 7.41 5.88 0.00 90.00 7.41 5.88 0.00 95.00 7.41 5.88 0.00 100.00 7.41 5.88 0.00 105.00 7.41 5.88 0.00 110.00 7.41 5.88 0.00 115.00 7.41 5.88 0.00 120.00 7.41 5.88 0.00 125.00 7.41 5.88 0.00 130.00 7.41 5.88 0.00 135.00 7.41 5.88 0.00 140.00 7.41 5.88 0.00 145.00 7.41 5.88 0.00 150.00 7.41 5.88 0.00 155.00 7.41 5.88 0.00 160.00 7.41 5.88 0.00 165.00 7.41 5.88 0.00 170.00 7.41 5.88 0.00 175.00 7.41 5.88 0.00 180.00 7.41 5.88 0.00 185.00 7.41 5.88 0.00 190.00 7.41 5.88 0.00 195.00 7.41 5.88 0.00 200.00 7.41 5.88 0.00 205.00 7.41 5.88 0.00 210.00 7.41 5.88 0.00 215.00 7.41 5.88 0.00 220.00 7.41 5.88 0.00 225.00 7.41 5.88 0.00 230.00 7.41 5.88 0.00 235.00 7.41 5.88 0.00 240.00 7.41 5.88 0.00 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 124HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment PR1C: PR1C - DRAINS NORTH TO WETLAND A Runoff = 1.17 cfs @ 12.08 hrs, Volume= 0.059 af, Depth= 5.53" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41" Area (sf) CN Description 0 98 Paved parking, HSG C * 5,573 84 5,573 Weighted Average 5,573 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment PR1C: PR1C - DRAINS NORTH TO WETLAND A Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)1 0 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41" Runoff Area=5,573 sf Runoff Volume=0.059 af Runoff Depth=5.53" Tc=6.0 min CN=WQ 1.17 cfs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 125HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment PR1C: PR1C - DRAINS NORTH TO WETLAND A Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.15 0.00 0.00 10.00 0.79 0.07 0.01 15.00 6.96 5.11 0.04 20.00 7.29 5.41 0.00 25.00 7.41 5.53 0.00 30.00 7.41 5.53 0.00 35.00 7.41 5.53 0.00 40.00 7.41 5.53 0.00 45.00 7.41 5.53 0.00 50.00 7.41 5.53 0.00 55.00 7.41 5.53 0.00 60.00 7.41 5.53 0.00 65.00 7.41 5.53 0.00 70.00 7.41 5.53 0.00 75.00 7.41 5.53 0.00 80.00 7.41 5.53 0.00 85.00 7.41 5.53 0.00 90.00 7.41 5.53 0.00 95.00 7.41 5.53 0.00 100.00 7.41 5.53 0.00 105.00 7.41 5.53 0.00 110.00 7.41 5.53 0.00 115.00 7.41 5.53 0.00 120.00 7.41 5.53 0.00 125.00 7.41 5.53 0.00 130.00 7.41 5.53 0.00 135.00 7.41 5.53 0.00 140.00 7.41 5.53 0.00 145.00 7.41 5.53 0.00 150.00 7.41 5.53 0.00 155.00 7.41 5.53 0.00 160.00 7.41 5.53 0.00 165.00 7.41 5.53 0.00 170.00 7.41 5.53 0.00 175.00 7.41 5.53 0.00 180.00 7.41 5.53 0.00 185.00 7.41 5.53 0.00 190.00 7.41 5.53 0.00 195.00 7.41 5.53 0.00 200.00 7.41 5.53 0.00 205.00 7.41 5.53 0.00 210.00 7.41 5.53 0.00 215.00 7.41 5.53 0.00 220.00 7.41 5.53 0.00 225.00 7.41 5.53 0.00 230.00 7.41 5.53 0.00 235.00 7.41 5.53 0.00 240.00 7.41 5.53 0.00 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 126HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment PR1D: PR1D - DRAINS SOUTH TO RAIN GARDEN Runoff = 7.56 cfs @ 12.08 hrs, Volume= 0.391 af, Depth= 5.82" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41" Area (sf) CN Description 6,135 98 Paved parking, HSG C * 28,982 84 35,117 Weighted Average 28,982 82.53% Pervious Area 6,135 17.47% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment PR1D: PR1D - DRAINS SOUTH TO RAIN GARDEN Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)8 7 6 5 4 3 2 1 0 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41" Runoff Area=35,117 sf Runoff Volume=0.391 af Runoff Depth=5.82" Tc=6.0 min CN=WQ 7.56 cfs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 127HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment PR1D: PR1D - DRAINS SOUTH TO RAIN GARDEN Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.15 0.00 0.00 10.00 0.79 0.10 0.11 15.00 6.96 5.33 0.26 20.00 7.29 5.64 0.02 25.00 7.41 5.76 0.00 30.00 7.41 5.76 0.00 35.00 7.41 5.76 0.00 40.00 7.41 5.76 0.00 45.00 7.41 5.76 0.00 50.00 7.41 5.76 0.00 55.00 7.41 5.76 0.00 60.00 7.41 5.76 0.00 65.00 7.41 5.76 0.00 70.00 7.41 5.76 0.00 75.00 7.41 5.76 0.00 80.00 7.41 5.76 0.00 85.00 7.41 5.76 0.00 90.00 7.41 5.76 0.00 95.00 7.41 5.76 0.00 100.00 7.41 5.76 0.00 105.00 7.41 5.76 0.00 110.00 7.41 5.76 0.00 115.00 7.41 5.76 0.00 120.00 7.41 5.76 0.00 125.00 7.41 5.76 0.00 130.00 7.41 5.76 0.00 135.00 7.41 5.76 0.00 140.00 7.41 5.76 0.00 145.00 7.41 5.76 0.00 150.00 7.41 5.76 0.00 155.00 7.41 5.76 0.00 160.00 7.41 5.76 0.00 165.00 7.41 5.76 0.00 170.00 7.41 5.76 0.00 175.00 7.41 5.76 0.00 180.00 7.41 5.76 0.00 185.00 7.41 5.76 0.00 190.00 7.41 5.76 0.00 195.00 7.41 5.76 0.00 200.00 7.41 5.76 0.00 205.00 7.41 5.76 0.00 210.00 7.41 5.76 0.00 215.00 7.41 5.76 0.00 220.00 7.41 5.76 0.00 225.00 7.41 5.76 0.00 230.00 7.41 5.76 0.00 235.00 7.41 5.76 0.00 240.00 7.41 5.76 0.00 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 128HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment PR2: PR2 - DRAINS SOUTH TO WETLAND B Runoff = 0.63 cfs @ 12.08 hrs, Volume= 0.035 af, Depth= 6.97" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41" Area (sf) CN Description 2,313 98 Paved parking, HSG C * 323 84 2,636 Weighted Average 323 12.25% Pervious Area 2,313 87.75% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment PR2: PR2 - DRAINS SOUTH TO WETLAND B Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.7 0.65 0.6 0.55 0.5 0.45 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41" Runoff Area=2,636 sf Runoff Volume=0.035 af Runoff Depth=6.97" Tc=6.0 min CN=WQ 0.63 cfs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 129HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment PR2: PR2 - DRAINS SOUTH TO WETLAND B Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.15 0.01 0.00 10.00 0.79 0.44 0.02 15.00 6.96 6.49 0.02 20.00 7.29 6.81 0.00 25.00 7.41 6.93 0.00 30.00 7.41 6.93 0.00 35.00 7.41 6.93 0.00 40.00 7.41 6.93 0.00 45.00 7.41 6.93 0.00 50.00 7.41 6.93 0.00 55.00 7.41 6.93 0.00 60.00 7.41 6.93 0.00 65.00 7.41 6.93 0.00 70.00 7.41 6.93 0.00 75.00 7.41 6.93 0.00 80.00 7.41 6.93 0.00 85.00 7.41 6.93 0.00 90.00 7.41 6.93 0.00 95.00 7.41 6.93 0.00 100.00 7.41 6.93 0.00 105.00 7.41 6.93 0.00 110.00 7.41 6.93 0.00 115.00 7.41 6.93 0.00 120.00 7.41 6.93 0.00 125.00 7.41 6.93 0.00 130.00 7.41 6.93 0.00 135.00 7.41 6.93 0.00 140.00 7.41 6.93 0.00 145.00 7.41 6.93 0.00 150.00 7.41 6.93 0.00 155.00 7.41 6.93 0.00 160.00 7.41 6.93 0.00 165.00 7.41 6.93 0.00 170.00 7.41 6.93 0.00 175.00 7.41 6.93 0.00 180.00 7.41 6.93 0.00 185.00 7.41 6.93 0.00 190.00 7.41 6.93 0.00 195.00 7.41 6.93 0.00 200.00 7.41 6.93 0.00 205.00 7.41 6.93 0.00 210.00 7.41 6.93 0.00 215.00 7.41 6.93 0.00 220.00 7.41 6.93 0.00 225.00 7.41 6.93 0.00 230.00 7.41 6.93 0.00 235.00 7.41 6.93 0.00 240.00 7.41 6.93 0.00 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 130HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 3.322 ac, 13.47% Impervious, Inflow Depth = 5.75" for 100y 24hr event Inflow = 28.65 cfs @ 12.08 hrs, Volume= 1.592 af Outflow = 28.65 cfs @ 12.08 hrs, Volume= 1.592 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Reach DA2: DA2 - TOTAL FLOW TO WETLAND A Inflow Outflow Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=3.322 ac 28.65 cfs 28.65 cfs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 131HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A Time (hours) Inflow (cfs) Elevation (feet) Outflow (cfs) 0.00 0.00 0.00 5.00 0.01 0.01 10.00 0.39 0.39 15.00 1.09 1.09 20.00 0.16 0.16 25.00 0.07 0.07 30.00 0.00 0.00 35.00 0.00 0.00 40.00 0.00 0.00 45.00 0.00 0.00 50.00 0.00 0.00 55.00 0.00 0.00 60.00 0.00 0.00 65.00 0.00 0.00 70.00 0.00 0.00 75.00 0.00 0.00 80.00 0.00 0.00 85.00 0.00 0.00 90.00 0.00 0.00 95.00 0.00 0.00 100.00 0.00 0.00 105.00 0.00 0.00 110.00 0.00 0.00 115.00 0.00 0.00 120.00 0.00 0.00 125.00 0.00 0.00 130.00 0.00 0.00 135.00 0.00 0.00 140.00 0.00 0.00 145.00 0.00 0.00 150.00 0.00 0.00 155.00 0.00 0.00 160.00 0.00 0.00 165.00 0.00 0.00 170.00 0.00 0.00 175.00 0.00 0.00 180.00 0.00 0.00 185.00 0.00 0.00 190.00 0.00 0.00 195.00 0.00 0.00 200.00 0.00 0.00 205.00 0.00 0.00 210.00 0.00 0.00 215.00 0.00 0.00 220.00 0.00 0.00 225.00 0.00 0.00 230.00 0.00 0.00 235.00 0.00 0.00 240.00 0.00 0.00 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 132HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 4.521 ac, 15.58% Impervious, Inflow Depth = 5.79" for 100y 24hr event Inflow = 28.83 cfs @ 12.12 hrs, Volume= 2.180 af Outflow = 28.83 cfs @ 12.12 hrs, Volume= 2.180 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Reach DA3: DA3 - TOTAL FLOW TO WETLAND B Inflow Outflow Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=4.521 ac 28.83 cfs 28.83 cfs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 133HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B Time (hours) Inflow (cfs) Elevation (feet) Outflow (cfs) 0.00 0.00 0.00 5.00 0.01 0.01 10.00 0.47 0.47 15.00 1.48 1.48 20.00 0.19 0.19 25.00 0.08 0.08 30.00 0.00 0.00 35.00 0.00 0.00 40.00 0.00 0.00 45.00 0.00 0.00 50.00 0.00 0.00 55.00 0.00 0.00 60.00 0.00 0.00 65.00 0.00 0.00 70.00 0.00 0.00 75.00 0.00 0.00 80.00 0.00 0.00 85.00 0.00 0.00 90.00 0.00 0.00 95.00 0.00 0.00 100.00 0.00 0.00 105.00 0.00 0.00 110.00 0.00 0.00 115.00 0.00 0.00 120.00 0.00 0.00 125.00 0.00 0.00 130.00 0.00 0.00 135.00 0.00 0.00 140.00 0.00 0.00 145.00 0.00 0.00 150.00 0.00 0.00 155.00 0.00 0.00 160.00 0.00 0.00 165.00 0.00 0.00 170.00 0.00 0.00 175.00 0.00 0.00 180.00 0.00 0.00 185.00 0.00 0.00 190.00 0.00 0.00 195.00 0.00 0.00 200.00 0.00 0.00 205.00 0.00 0.00 210.00 0.00 0.00 215.00 0.00 0.00 220.00 0.00 0.00 225.00 0.00 0.00 230.00 0.00 0.00 235.00 0.00 0.00 240.00 0.00 0.00 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 134HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Pond 1P: FILTRATION BASIN 1 Inflow Area = 0.806 ac, 17.47% Impervious, Inflow Depth = 5.82" for 100y 24hr event Inflow = 7.56 cfs @ 12.08 hrs, Volume= 0.391 af Outflow = 5.35 cfs @ 12.14 hrs, Volume= 0.391 af, Atten= 29%, Lag= 3.6 min Discarded = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Primary = 5.35 cfs @ 12.14 hrs, Volume= 0.391 af Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Peak Elev= 974.57' @ 12.14 hrs Surf.Area= 2,729 sf Storage= 3,439 cf Plug-Flow detention time= 81.7 min calculated for 0.391 af (100% of inflow) Center-of-Mass det. time= 81.7 min ( 843.3 - 761.6 ) Volume Invert Avail.Storage Storage Description #1 973.00' 5,291 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 973.00 1,624 0 0 973.50 2,040 916 916 974.00 2,320 1,090 2,006 974.50 2,686 1,252 3,258 975.10 3,068 1,726 4,984 975.20 3,068 307 5,291 Device Routing Invert Outlet Devices #1 Primary 971.50'12.0" Round OUTLET PIPE L= 23.0' CMP, mitered to conform to fill, Ke= 0.700 Inlet / Outlet Invert= 971.50' / 971.50' S= 0.0000 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 0.79 sf #2 Device 1 974.00'24.0" Horiz. RIM- Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Secondary 975.10'10.0' long x 10.0' breadth EOF Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 #4 Device 5 973.00'1.600 in/hr Exfiltration over Surface area above 970.50' Excluded Surface area = 0 sf #5 Device 1 971.50'6.0" Vert. Orifice 6" draintile C= 0.600 #6 Discarded 973.00'0.600 in/hr Exfiltration-Infiltration into Rock over Surface area from 970.00' - 970.50' Excluded Surface area = 0 sf MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 135HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Discarded OutFlow Max=0.00 cfs @ 0.00 hrs HW=973.00' (Free Discharge) 6=Exfiltration-Infiltration into Rock ( Controls 0.00 cfs) Primary OutFlow Max=5.35 cfs @ 12.14 hrs HW=974.57' (Free Discharge) 1=OUTLET PIPE (Inlet Controls 5.35 cfs @ 6.81 fps) 2=RIM- Orifice/Grate (Passes < 8.75 cfs potential flow) 5=Orifice 6" draintile (Passes < 1.59 cfs potential flow) 4=Exfiltration (Passes < 0.10 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=973.00' (Free Discharge) 3=EOF ( Controls 0.00 cfs) Pond 1P: FILTRATION BASIN 1 Inflow Outflow Discarded Primary Secondary Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)8 7 6 5 4 3 2 1 0 Inflow Area=0.806 ac Peak Elev=974.57' Storage=3,439 cf 7.56 cfs 5.35 cfs 0.00 cfs 5.35 cfs 0.00 cfs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 136HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Pond 1P: FILTRATION BASIN 1 Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Outflow (cfs) Discarded (cfs) Primary (cfs) Secondary (cfs) 0.00 0.00 0 973.00 0.00 0.00 0.00 0.00 5.00 0.00 1 973.00 0.00 0.00 0.00 0.00 10.00 0.11 116 973.07 0.06 0.00 0.06 0.00 15.00 0.26 2,103 974.04 0.26 0.00 0.26 0.00 20.00 0.02 1,446 973.75 0.08 0.00 0.08 0.00 25.00 0.00 445 973.26 0.07 0.00 0.07 0.00 30.00 0.00 0 973.00 0.00 0.00 0.00 0.00 35.00 0.00 0 973.00 0.00 0.00 0.00 0.00 40.00 0.00 0 973.00 0.00 0.00 0.00 0.00 45.00 0.00 0 973.00 0.00 0.00 0.00 0.00 50.00 0.00 0 973.00 0.00 0.00 0.00 0.00 55.00 0.00 0 973.00 0.00 0.00 0.00 0.00 60.00 0.00 0 973.00 0.00 0.00 0.00 0.00 65.00 0.00 0 973.00 0.00 0.00 0.00 0.00 70.00 0.00 0 973.00 0.00 0.00 0.00 0.00 75.00 0.00 0 973.00 0.00 0.00 0.00 0.00 80.00 0.00 0 973.00 0.00 0.00 0.00 0.00 85.00 0.00 0 973.00 0.00 0.00 0.00 0.00 90.00 0.00 0 973.00 0.00 0.00 0.00 0.00 95.00 0.00 0 973.00 0.00 0.00 0.00 0.00 100.00 0.00 0 973.00 0.00 0.00 0.00 0.00 105.00 0.00 0 973.00 0.00 0.00 0.00 0.00 110.00 0.00 0 973.00 0.00 0.00 0.00 0.00 115.00 0.00 0 973.00 0.00 0.00 0.00 0.00 120.00 0.00 0 973.00 0.00 0.00 0.00 0.00 125.00 0.00 0 973.00 0.00 0.00 0.00 0.00 130.00 0.00 0 973.00 0.00 0.00 0.00 0.00 135.00 0.00 0 973.00 0.00 0.00 0.00 0.00 140.00 0.00 0 973.00 0.00 0.00 0.00 0.00 145.00 0.00 0 973.00 0.00 0.00 0.00 0.00 150.00 0.00 0 973.00 0.00 0.00 0.00 0.00 155.00 0.00 0 973.00 0.00 0.00 0.00 0.00 160.00 0.00 0 973.00 0.00 0.00 0.00 0.00 165.00 0.00 0 973.00 0.00 0.00 0.00 0.00 170.00 0.00 0 973.00 0.00 0.00 0.00 0.00 175.00 0.00 0 973.00 0.00 0.00 0.00 0.00 180.00 0.00 0 973.00 0.00 0.00 0.00 0.00 185.00 0.00 0 973.00 0.00 0.00 0.00 0.00 190.00 0.00 0 973.00 0.00 0.00 0.00 0.00 195.00 0.00 0 973.00 0.00 0.00 0.00 0.00 200.00 0.00 0 973.00 0.00 0.00 0.00 0.00 205.00 0.00 0 973.00 0.00 0.00 0.00 0.00 210.00 0.00 0 973.00 0.00 0.00 0.00 0.00 215.00 0.00 0 973.00 0.00 0.00 0.00 0.00 220.00 0.00 0 973.00 0.00 0.00 0.00 0.00 225.00 0.00 0 973.00 0.00 0.00 0.00 0.00 230.00 0.00 0 973.00 0.00 0.00 0.00 0.00 235.00 0.00 0 973.00 0.00 0.00 0.00 0.00 240.00 0.00 0 973.00 0.00 0.00 0.00 0.00 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 137HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Stage-Discharge for Pond 1P: FILTRATION BASIN 1 Elevation (feet) Discharge (cfs) Discarded (cfs) Primary (cfs) Secondary (cfs) 973.00 0.00 0.00 0.00 0.00 973.05 0.06 0.00 0.06 0.00 973.10 0.06 0.00 0.06 0.00 973.15 0.06 0.00 0.06 0.00 973.20 0.07 0.00 0.07 0.00 973.25 0.07 0.00 0.07 0.00 973.30 0.07 0.00 0.07 0.00 973.35 0.07 0.00 0.07 0.00 973.40 0.07 0.00 0.07 0.00 973.45 0.07 0.00 0.07 0.00 973.50 0.08 0.00 0.08 0.00 973.55 0.08 0.00 0.08 0.00 973.60 0.08 0.00 0.08 0.00 973.65 0.08 0.00 0.08 0.00 973.70 0.08 0.00 0.08 0.00 973.75 0.08 0.00 0.08 0.00 973.80 0.08 0.00 0.08 0.00 973.85 0.08 0.00 0.08 0.00 973.90 0.08 0.00 0.08 0.00 973.95 0.08 0.00 0.08 0.00 974.00 0.09 0.00 0.09 0.00 974.05 0.32 0.00 0.32 0.00 974.10 0.74 0.00 0.74 0.00 974.15 1.28 0.00 1.28 0.00 974.20 1.93 0.00 1.93 0.00 974.25 2.66 0.00 2.66 0.00 974.30 3.47 0.00 3.47 0.00 974.35 4.35 0.00 4.35 0.00 974.40 5.17 0.00 5.17 0.00 974.45 5.22 0.00 5.22 0.00 974.50 5.28 0.00 5.28 0.00 974.55 5.33 0.00 5.33 0.00 974.60 5.38 0.00 5.38 0.00 974.65 5.43 0.00 5.43 0.00 974.70 5.48 0.00 5.48 0.00 974.75 5.53 0.00 5.53 0.00 974.80 5.58 0.00 5.58 0.00 974.85 5.63 0.00 5.63 0.00 974.90 5.68 0.00 5.68 0.00 974.95 5.73 0.00 5.73 0.00 975.00 5.78 0.00 5.78 0.00 975.05 5.83 0.00 5.83 0.00 975.10 5.87 0.00 5.87 0.00 975.15 6.20 0.00 5.92 0.28 975.20 6.76 0.00 5.97 0.79 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 138HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Pond 4P: WETLAND A Inflow Area = 3.322 ac, 13.47% Impervious, Inflow Depth = 5.75" for 100y 24hr event Inflow = 28.65 cfs @ 12.08 hrs, Volume= 1.592 af Outflow = 20.08 cfs @ 12.16 hrs, Volume= 1.592 af, Atten= 30%, Lag= 4.3 min Primary = 20.08 cfs @ 12.16 hrs, Volume= 1.592 af Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Peak Elev= 970.44' @ 12.16 hrs Surf.Area= 14,066 sf Storage= 10,462 cf Plug-Flow detention time= 17.1 min calculated for 1.592 af (100% of inflow) Center-of-Mass det. time= 17.0 min ( 800.1 - 783.1 ) Volume Invert Avail.Storage Storage Description #1 969.62' 18,824 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 969.62 11,466 0 0 970.00 12,553 4,564 4,564 971.00 15,967 14,260 18,824 Device Routing Invert Outlet Devices #1 Primary 969.62'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=20.07 cfs @ 12.16 hrs HW=970.44' (Free Discharge) 1=Broad-Crested Rectangular Weir (Weir Controls 20.07 cfs @ 2.44 fps) MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 139HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Pond 4P: WETLAND A Inflow Primary Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=3.322 ac Peak Elev=970.44' Storage=10,462 cf 28.65 cfs 20.08 cfs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 140HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Pond 4P: WETLAND A Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Primary (cfs) 0.00 0.00 0 969.62 0.00 5.00 0.01 25 969.62 0.01 10.00 0.39 592 969.67 0.29 15.00 1.09 1,446 969.74 1.09 20.00 0.16 392 969.65 0.16 25.00 0.07 254 969.64 0.08 30.00 0.00 12 969.62 0.00 35.00 0.00 0 969.62 0.00 40.00 0.00 0 969.62 0.00 45.00 0.00 0 969.62 0.00 50.00 0.00 0 969.62 0.00 55.00 0.00 0 969.62 0.00 60.00 0.00 0 969.62 0.00 65.00 0.00 0 969.62 0.00 70.00 0.00 0 969.62 0.00 75.00 0.00 0 969.62 0.00 80.00 0.00 0 969.62 0.00 85.00 0.00 0 969.62 0.00 90.00 0.00 0 969.62 0.00 95.00 0.00 0 969.62 0.00 100.00 0.00 0 969.62 0.00 105.00 0.00 0 969.62 0.00 110.00 0.00 0 969.62 0.00 115.00 0.00 0 969.62 0.00 120.00 0.00 0 969.62 0.00 125.00 0.00 0 969.62 0.00 130.00 0.00 0 969.62 0.00 135.00 0.00 0 969.62 0.00 140.00 0.00 0 969.62 0.00 145.00 0.00 0 969.62 0.00 150.00 0.00 0 969.62 0.00 155.00 0.00 0 969.62 0.00 160.00 0.00 0 969.62 0.00 165.00 0.00 0 969.62 0.00 170.00 0.00 0 969.62 0.00 175.00 0.00 0 969.62 0.00 180.00 0.00 0 969.62 0.00 185.00 0.00 0 969.62 0.00 190.00 0.00 0 969.62 0.00 195.00 0.00 0 969.62 0.00 200.00 0.00 0 969.62 0.00 205.00 0.00 0 969.62 0.00 210.00 0.00 0 969.62 0.00 215.00 0.00 0 969.62 0.00 220.00 0.00 0 969.62 0.00 225.00 0.00 0 969.62 0.00 230.00 0.00 0 969.62 0.00 235.00 0.00 0 969.62 0.00 240.00 0.00 0 969.62 0.00 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 141HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Stage-Discharge for Pond 4P: WETLAND A Elevation (feet) Primary (cfs) 969.62 0.00 969.63 0.02 969.64 0.07 969.65 0.13 969.66 0.20 969.67 0.28 969.68 0.37 969.69 0.46 969.70 0.56 969.71 0.67 969.72 0.79 969.73 0.91 969.74 1.04 969.75 1.17 969.76 1.30 969.77 1.45 969.78 1.59 969.79 1.75 969.80 1.90 969.81 2.06 969.82 2.23 969.83 2.40 969.84 2.58 969.85 2.76 969.86 2.94 969.87 3.13 969.88 3.33 969.89 3.53 969.90 3.73 969.91 3.94 969.92 4.15 969.93 4.36 969.94 4.58 969.95 4.81 969.96 5.03 969.97 5.26 969.98 5.50 969.99 5.74 970.00 5.98 970.01 6.23 970.02 6.48 970.03 6.74 970.04 7.01 970.05 7.28 970.06 7.55 970.07 7.83 970.08 8.12 970.09 8.41 970.10 8.70 970.11 9.00 970.12 9.30 970.13 9.60 970.14 9.91 Elevation (feet) Primary (cfs) 970.15 10.23 970.16 10.55 970.17 10.87 970.18 11.20 970.19 11.53 970.20 11.86 970.21 12.20 970.22 12.55 970.23 12.86 970.24 13.18 970.25 13.49 970.26 13.81 970.27 14.14 970.28 14.46 970.29 14.79 970.30 15.12 970.31 15.45 970.32 15.78 970.33 16.12 970.34 16.46 970.35 16.80 970.36 17.14 970.37 17.49 970.38 17.84 970.39 18.19 970.40 18.54 970.41 18.89 970.42 19.25 970.43 19.61 970.44 19.97 970.45 20.33 970.46 20.69 970.47 21.06 970.48 21.43 970.49 21.80 970.50 22.17 970.51 22.55 970.52 22.92 970.53 23.30 970.54 23.68 970.55 24.07 970.56 24.45 970.57 24.84 970.58 25.23 970.59 25.62 970.60 26.01 970.61 26.40 970.62 26.80 970.63 27.21 970.64 27.62 970.65 28.03 970.66 28.45 970.67 28.86 Elevation (feet) Primary (cfs) 970.68 29.28 970.69 29.70 970.70 30.12 970.71 30.55 970.72 30.98 970.73 31.41 970.74 31.84 970.75 32.27 970.76 32.71 970.77 33.14 970.78 33.58 970.79 34.02 970.80 34.47 970.81 34.91 970.82 35.36 970.83 35.79 970.84 36.22 970.85 36.65 970.86 37.09 970.87 37.52 970.88 37.96 970.89 38.40 970.90 38.84 970.91 39.28 970.92 39.72 970.93 40.17 970.94 40.61 970.95 41.06 970.96 41.51 970.97 41.96 970.98 42.41 970.99 42.86 971.00 43.32 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 142HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Pond 5P: Wetland B [44] Hint: Outlet device #1 is below defined storage [95] Warning: Outlet Device #1 rise exceeded Inflow Area = 12.868 ac, 25.12% Impervious, Inflow Depth = 5.82" for 100y 24hr event Inflow = 84.50 cfs @ 12.12 hrs, Volume= 6.238 af Outflow = 83.88 cfs @ 12.13 hrs, Volume= 6.238 af, Atten= 1%, Lag= 0.9 min Primary = 83.88 cfs @ 12.13 hrs, Volume= 6.238 af Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Peak Elev= 961.63' @ 12.13 hrs Surf.Area= 149,304 sf Storage= 3,980 cf Plug-Flow detention time= (not calculated: outflow precedes inflow) Center-of-Mass det. time= 0.8 min ( 774.9 - 774.1 ) Volume Invert Avail.Storage Storage Description #1 961.60' 841,104 cf Custom Stage Data (Conic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (cubic-feet) (cubic-feet) (sq-ft) 961.60 149,000 0 0 149,000 962.00 153,597 60,517 60,517 153,630 964.00 201,325 353,847 414,364 201,451 966.00 225,646 426,740 841,104 225,991 Device Routing Invert Outlet Devices #1 Primary 960.82'Asymmetrical Weir, C= 3.27 Offset (feet) -70.00 -41.00 0.00 49.00 87.00 Height (feet) 0.35 0.09 0.00 0.09 0.35 Primary OutFlow Max=136.34 cfs @ 12.13 hrs HW=961.63' (Free Discharge) 1=Asymmetrical Weir (Weir Controls 136.34 cfs @ 2.79 fps) MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 143HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Pond 5P: Wetland B Inflow Primary Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Inflow Area=12.868 ac Peak Elev=961.63' Storage=3,980 cf 84.50 cfs 83.88 cfs MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 144HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Pond 5P: Wetland B Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Primary (cfs) 0.00 0.00 0 961.60 0.00 5.00 0.04 2 961.60 0.04 10.00 1.64 77 961.60 1.63 15.00 4.22 200 961.60 4.22 20.00 0.45 21 961.60 0.45 25.00 0.08 4 961.60 0.09 30.00 0.00 0 961.60 0.00 35.00 0.00 0 961.60 0.00 40.00 0.00 0 961.60 0.00 45.00 0.00 0 961.60 0.00 50.00 0.00 0 961.60 0.00 55.00 0.00 0 961.60 0.00 60.00 0.00 0 961.60 0.00 65.00 0.00 0 961.60 0.00 70.00 0.00 0 961.60 0.00 75.00 0.00 0 961.60 0.00 80.00 0.00 0 961.60 0.00 85.00 0.00 0 961.60 0.00 90.00 0.00 0 961.60 0.00 95.00 0.00 0 961.60 0.00 100.00 0.00 0 961.60 0.00 105.00 0.00 0 961.60 0.00 110.00 0.00 0 961.60 0.00 115.00 0.00 0 961.60 0.00 120.00 0.00 0 961.60 0.00 125.00 0.00 0 961.60 0.00 130.00 0.00 0 961.60 0.00 135.00 0.00 0 961.60 0.00 140.00 0.00 0 961.60 0.00 145.00 0.00 0 961.60 0.00 150.00 0.00 0 961.60 0.00 155.00 0.00 0 961.60 0.00 160.00 0.00 0 961.60 0.00 165.00 0.00 0 961.60 0.00 170.00 0.00 0 961.60 0.00 175.00 0.00 0 961.60 0.00 180.00 0.00 0 961.60 0.00 185.00 0.00 0 961.60 0.00 190.00 0.00 0 961.60 0.00 195.00 0.00 0 961.60 0.00 200.00 0.00 0 961.60 0.00 205.00 0.00 0 961.60 0.00 210.00 0.00 0 961.60 0.00 215.00 0.00 0 961.60 0.00 220.00 0.00 0 961.60 0.00 225.00 0.00 0 961.60 0.00 230.00 0.00 0 961.60 0.00 235.00 0.00 0 961.60 0.00 240.00 0.00 0 961.60 0.00 MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED Printed 5/17/2022Prepared by {enter your company name here} Page 145HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Stage-Discharge for Pond 5P: Wetland B Elevation (feet) Primary (cfs) 961.60 0.00 961.65 139.02 961.70 144.59 961.75 149.95 961.80 155.13 961.85 160.13 961.90 164.98 961.95 169.69 962.00 174.28 962.05 178.74 962.10 183.09 962.15 187.35 962.20 191.51 962.25 195.57 962.30 199.56 962.35 203.47 962.40 207.30 962.45 211.06 962.50 214.76 962.55 218.40 962.60 221.97 962.65 225.49 962.70 228.95 962.75 232.36 962.80 235.73 962.85 239.04 962.90 242.31 962.95 245.54 963.00 248.72 963.05 251.87 963.10 254.97 963.15 258.04 963.20 261.07 963.25 264.07 963.30 267.03 963.35 269.96 963.40 272.86 963.45 275.73 963.50 278.56 963.55 281.37 963.60 284.16 963.65 286.91 963.70 289.64 963.75 292.34 963.80 295.02 963.85 297.68 963.90 300.31 963.95 302.92 964.00 305.50 964.05 308.07 964.10 310.61 964.15 313.13 964.20 315.63 Elevation (feet) Primary (cfs) 964.25 318.12 964.30 320.58 964.35 323.02 964.40 325.45 964.45 327.86 964.50 330.25 964.55 332.62 964.60 334.98 964.65 337.32 964.70 339.64 964.75 341.95 964.80 344.24 964.85 346.52 964.90 348.78 964.95 351.03 965.00 353.26 965.05 355.48 965.10 357.69 965.15 359.88 965.20 362.06 965.25 364.23 965.30 366.38 965.35 368.52 965.40 370.65 965.45 372.76 965.50 374.87 965.55 376.96 965.60 379.04 965.65 381.11 965.70 383.17 965.75 385.22 965.80 387.25 965.85 389.28 965.90 391.29 965.95 393.30 966.00 395.29 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 146HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Time span=0.00-240.00 hrs, dt=0.01 hrs, 24001 points Runoff by SCS TR-20 method, UH=SCS, Weighted-Q Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Runoff Area=125,400 sf 0.00% Impervious Runoff Depth>6.96"Subcatchment 6S: UNDISTURBED Tc=6.0 min AMC Adjusted CN=98 Runoff=0.55 cfs 1.670 af Runoff Area=238,192 sf 46.22% Impervious Runoff Depth>6.96"Subcatchment 7S: OFFSITE WETLAND B Flow Length=1,100' Slope=0.1500 '/' Tc=13.4 min AMC Adjusted CN=WQ Runoff=1.04 cfs 3.171 af Runoff Area=74,865 sf 8.12% Impervious Runoff Depth>6.96"Subcatchment OFFSITE B: OFFSITE B - Tc=6.0 min AMC Adjusted CN=WQ Runoff=0.33 cfs 0.997 af Runoff Area=49,573 sf 17.90% Impervious Runoff Depth>6.96"Subcatchment OUTSITE A: OFFSITE A - Tc=6.0 min AMC Adjusted CN=WQ Runoff=0.22 cfs 0.660 af Runoff Area=3,245 sf 100.00% Impervious Runoff Depth>6.96"Subcatchment PR1A: PR1A - DRAINS Tc=6.0 min CN=WQ Runoff=0.01 cfs 0.043 af Runoff Area=29,167 sf 24.99% Impervious Runoff Depth>6.96"Subcatchment PR1B: PR1B - DRAINS Tc=6.0 min AMC Adjusted CN=WQ Runoff=0.13 cfs 0.388 af Runoff Area=5,573 sf 0.00% Impervious Runoff Depth>6.96"Subcatchment PR1C: PR1C - DRAINS Tc=6.0 min AMC Adjusted CN=WQ Runoff=0.02 cfs 0.074 af Runoff Area=35,117 sf 17.47% Impervious Runoff Depth>6.96"Subcatchment PR1D: PR1D - DRAINS Tc=6.0 min AMC Adjusted CN=WQ Runoff=0.15 cfs 0.468 af Runoff Area=2,636 sf 87.75% Impervious Runoff Depth>6.96"Subcatchment PR2: PR2 - DRAINS SOUTH Tc=6.0 min AMC Adjusted CN=WQ Runoff=0.01 cfs 0.035 af Inflow=0.56 cfs 1.927 afReach DA2: DA2 - TOTAL FLOW TO WETLAND A Outflow=0.56 cfs 1.927 af Inflow=0.78 cfs 2.618 afReach DA3: DA3 - TOTAL FLOW TO WETLAND B Outflow=0.78 cfs 2.618 af Peak Elev=973.72' Storage=1,388 cf Inflow=0.15 cfs 0.468 afPond 1P: FILTRATION BASIN 1 Discarded=0.00 cfs 0.000 af Primary=0.08 cfs 0.467 af Secondary=0.00 cfs 0.000 af Outflow=0.08 cfs 0.467 af Peak Elev=969.70' Storage=909 cf Inflow=0.56 cfs 1.927 afPond 4P: WETLAND A Outflow=0.55 cfs 1.923 af Peak Elev=961.60' Storage=112 cf Inflow=2.37 cfs 7.458 afPond 5P: Wetland B Outflow=2.37 cfs 7.458 af Total Runoff Area = 12.942 ac Runoff Volume = 7.506 af Average Runoff Depth = 6.96" 74.45% Pervious = 9.636 ac 25.55% Impervious = 3.306 ac MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 147HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment 6S: UNDISTURBED Runoff = 0.55 cfs @ 121.26 hrs, Volume= 1.670 af, Depth> 6.96" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=4 Area (sf) CN Adj Description * 125,400 84 98 125,400 Weighted Average 125,400 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment 6S: UNDISTURBED Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.6 0.55 0.5 0.45 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20" AMC=4 Runoff Area=125,400 sf Runoff Volume=1.670 af Runoff Depth>6.96" Tc=6.0 min AMC Adjusted CN=98 0.55 cfs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 148HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 6S: UNDISTURBED Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.04 0.00 0.00 10.00 0.12 0.02 0.02 15.00 0.20 0.07 0.03 20.00 0.28 0.13 0.04 25.00 0.37 0.21 0.04 30.00 0.46 0.29 0.05 35.00 0.56 0.37 0.05 40.00 0.66 0.46 0.05 45.00 0.76 0.56 0.06 50.00 0.86 0.66 0.06 55.00 0.97 0.76 0.06 60.00 1.08 0.87 0.06 65.00 1.19 0.98 0.07 70.00 1.31 1.10 0.07 75.00 1.44 1.22 0.07 80.00 1.57 1.35 0.08 85.00 1.71 1.49 0.08 90.00 1.86 1.64 0.09 95.00 2.03 1.80 0.10 100.00 2.20 1.97 0.10 105.00 2.40 2.17 0.13 110.00 2.65 2.42 0.15 115.00 2.94 2.70 0.20 120.00 3.53 3.29 0.51 125.00 4.27 4.03 0.28 130.00 4.62 4.39 0.17 135.00 4.87 4.63 0.13 140.00 5.06 4.83 0.10 145.00 5.23 4.99 0.09 150.00 5.39 5.15 0.09 155.00 5.53 5.30 0.08 160.00 5.67 5.43 0.08 165.00 5.80 5.56 0.07 170.00 5.92 5.68 0.07 175.00 6.03 5.80 0.06 180.00 6.14 5.91 0.06 185.00 6.25 6.01 0.06 190.00 6.36 6.12 0.06 195.00 6.46 6.22 0.06 200.00 6.55 6.32 0.06 205.00 6.65 6.41 0.05 210.00 6.74 6.50 0.05 215.00 6.82 6.58 0.05 220.00 6.91 6.67 0.05 225.00 6.98 6.75 0.05 230.00 7.06 6.82 0.04 235.00 7.13 6.89 0.04 240.00 7.20 6.96 0.04 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 149HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment 7S: OFFSITE WETLAND B WATERSHED Runoff = 1.04 cfs @ 121.33 hrs, Volume= 3.171 af, Depth> 6.96" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=4 Area (sf) CN Adj Description 67,393 98 98 Unconnected roofs, HSG B * 170,799 84 98 1/2 acre lots, 25% imp, HSG B 238,192 Weighted Average 128,099 53.78% Pervious Area 110,093 46.22% Impervious Area 67,393 61.21% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.9 200 0.1500 0.42 Sheet Flow, Grass: Short n= 0.150 P2= 2.94" 5.5 900 0.1500 2.71 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 13.4 1,100 Total Subcatchment 7S: OFFSITE WETLAND B WATERSHED Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)1 0 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20" AMC=4 Runoff Area=238,192 sf Runoff Volume=3.171 af Runoff Depth>6.96" Flow Length=1,100' Slope=0.1500 '/' Tc=13.4 min AMC Adjusted CN=WQ 1.04 cfs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 150HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 7S: OFFSITE WETLAND B WATERSHED Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.04 0.00 0.00 10.00 0.12 0.02 0.04 15.00 0.20 0.07 0.06 20.00 0.28 0.13 0.08 25.00 0.37 0.21 0.08 30.00 0.46 0.29 0.09 35.00 0.56 0.37 0.10 40.00 0.66 0.46 0.10 45.00 0.76 0.56 0.11 50.00 0.86 0.66 0.11 55.00 0.97 0.76 0.12 60.00 1.08 0.87 0.12 65.00 1.19 0.98 0.12 70.00 1.31 1.10 0.13 75.00 1.44 1.22 0.14 80.00 1.57 1.35 0.15 85.00 1.71 1.49 0.16 90.00 1.86 1.64 0.17 95.00 2.03 1.80 0.19 100.00 2.20 1.97 0.19 105.00 2.40 2.17 0.24 110.00 2.65 2.42 0.28 115.00 2.94 2.70 0.37 120.00 3.53 3.29 0.95 125.00 4.27 4.03 0.55 130.00 4.62 4.39 0.32 135.00 4.87 4.63 0.24 140.00 5.06 4.83 0.20 145.00 5.23 4.99 0.18 150.00 5.39 5.15 0.17 155.00 5.53 5.30 0.16 160.00 5.67 5.43 0.15 165.00 5.80 5.56 0.14 170.00 5.92 5.68 0.13 175.00 6.03 5.80 0.12 180.00 6.14 5.91 0.12 185.00 6.25 6.01 0.12 190.00 6.36 6.12 0.11 195.00 6.46 6.22 0.11 200.00 6.55 6.32 0.11 205.00 6.65 6.41 0.10 210.00 6.74 6.50 0.10 215.00 6.82 6.58 0.09 220.00 6.91 6.67 0.09 225.00 6.98 6.75 0.09 230.00 7.06 6.82 0.08 235.00 7.13 6.89 0.08 240.00 7.20 6.96 0.07 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 151HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment OFFSITE B: OFFSITE B - DRAINS SOUTH TO WETLAND Runoff = 0.33 cfs @ 121.26 hrs, Volume= 0.997 af, Depth> 6.96" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=4 Area (sf) CN Adj Description 6,076 98 98 Paved parking, HSG C * 68,789 84 98 74,865 Weighted Average 68,789 91.88% Pervious Area 6,076 8.12% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment OFFSITE B: OFFSITE B - DRAINS SOUTH TO WETLAND Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.36 0.34 0.32 0.3 0.28 0.26 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 0 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20" AMC=4 Runoff Area=74,865 sf Runoff Volume=0.997 af Runoff Depth>6.96" Tc=6.0 min AMC Adjusted CN=WQ 0.33 cfs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 152HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment OFFSITE B: OFFSITE B - DRAINS SOUTH TO WETLAND Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.04 0.00 0.00 10.00 0.12 0.02 0.01 15.00 0.20 0.07 0.02 20.00 0.28 0.13 0.02 25.00 0.37 0.21 0.03 30.00 0.46 0.29 0.03 35.00 0.56 0.37 0.03 40.00 0.66 0.46 0.03 45.00 0.76 0.56 0.03 50.00 0.86 0.66 0.04 55.00 0.97 0.76 0.04 60.00 1.08 0.87 0.04 65.00 1.19 0.98 0.04 70.00 1.31 1.10 0.04 75.00 1.44 1.22 0.04 80.00 1.57 1.35 0.05 85.00 1.71 1.49 0.05 90.00 1.86 1.64 0.05 95.00 2.03 1.80 0.06 100.00 2.20 1.97 0.06 105.00 2.40 2.17 0.08 110.00 2.65 2.42 0.09 115.00 2.94 2.70 0.12 120.00 3.53 3.29 0.30 125.00 4.27 4.03 0.17 130.00 4.62 4.39 0.10 135.00 4.87 4.63 0.08 140.00 5.06 4.83 0.06 145.00 5.23 4.99 0.06 150.00 5.39 5.15 0.05 155.00 5.53 5.30 0.05 160.00 5.67 5.43 0.05 165.00 5.80 5.56 0.04 170.00 5.92 5.68 0.04 175.00 6.03 5.80 0.04 180.00 6.14 5.91 0.04 185.00 6.25 6.01 0.04 190.00 6.36 6.12 0.04 195.00 6.46 6.22 0.03 200.00 6.55 6.32 0.03 205.00 6.65 6.41 0.03 210.00 6.74 6.50 0.03 215.00 6.82 6.58 0.03 220.00 6.91 6.67 0.03 225.00 6.98 6.75 0.03 230.00 7.06 6.82 0.03 235.00 7.13 6.89 0.02 240.00 7.20 6.96 0.02 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 153HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment OUTSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B Runoff = 0.22 cfs @ 121.26 hrs, Volume= 0.660 af, Depth> 6.96" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=4 Area (sf) CN Adj Description 8,875 98 98 Paved parking, HSG C * 40,698 84 98 49,573 Weighted Average 40,698 82.10% Pervious Area 8,875 17.90% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment OUTSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.24 0.23 0.22 0.21 0.2 0.19 0.18 0.17 0.16 0.15 0.14 0.13 0.12 0.11 0.1 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20" AMC=4 Runoff Area=49,573 sf Runoff Volume=0.660 af Runoff Depth>6.96" Tc=6.0 min AMC Adjusted CN=WQ 0.22 cfs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 154HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment OUTSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.04 0.00 0.00 10.00 0.12 0.02 0.01 15.00 0.20 0.07 0.01 20.00 0.28 0.13 0.02 25.00 0.37 0.21 0.02 30.00 0.46 0.29 0.02 35.00 0.56 0.37 0.02 40.00 0.66 0.46 0.02 45.00 0.76 0.56 0.02 50.00 0.86 0.66 0.02 55.00 0.97 0.76 0.02 60.00 1.08 0.87 0.03 65.00 1.19 0.98 0.03 70.00 1.31 1.10 0.03 75.00 1.44 1.22 0.03 80.00 1.57 1.35 0.03 85.00 1.71 1.49 0.03 90.00 1.86 1.64 0.04 95.00 2.03 1.80 0.04 100.00 2.20 1.97 0.04 105.00 2.40 2.17 0.05 110.00 2.65 2.42 0.06 115.00 2.94 2.70 0.08 120.00 3.53 3.29 0.20 125.00 4.27 4.03 0.11 130.00 4.62 4.39 0.07 135.00 4.87 4.63 0.05 140.00 5.06 4.83 0.04 145.00 5.23 4.99 0.04 150.00 5.39 5.15 0.03 155.00 5.53 5.30 0.03 160.00 5.67 5.43 0.03 165.00 5.80 5.56 0.03 170.00 5.92 5.68 0.03 175.00 6.03 5.80 0.03 180.00 6.14 5.91 0.02 185.00 6.25 6.01 0.02 190.00 6.36 6.12 0.02 195.00 6.46 6.22 0.02 200.00 6.55 6.32 0.02 205.00 6.65 6.41 0.02 210.00 6.74 6.50 0.02 215.00 6.82 6.58 0.02 220.00 6.91 6.67 0.02 225.00 6.98 6.75 0.02 230.00 7.06 6.82 0.02 235.00 7.13 6.89 0.02 240.00 7.20 6.96 0.01 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 155HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment PR1A: PR1A - DRAINS EAST ALONG STREET Runoff = 0.01 cfs @ 121.26 hrs, Volume= 0.043 af, Depth> 6.96" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=4 Area (sf) CN Description 3,245 98 Paved parking, HSG C * 0 84 3,245 Weighted Average 3,245 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment PR1A: PR1A - DRAINS EAST ALONG STREET Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.015 0.014 0.013 0.012 0.011 0.01 0.009 0.008 0.007 0.006 0.005 0.004 0.003 0.002 0.001 0 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20" AMC=4 Runoff Area=3,245 sf Runoff Volume=0.043 af Runoff Depth>6.96" Tc=6.0 min CN=WQ 0.01 cfs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 156HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment PR1A: PR1A - DRAINS EAST ALONG STREET Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.04 0.00 0.00 10.00 0.12 0.02 0.00 15.00 0.20 0.07 0.00 20.00 0.28 0.13 0.00 25.00 0.37 0.21 0.00 30.00 0.46 0.29 0.00 35.00 0.56 0.37 0.00 40.00 0.66 0.46 0.00 45.00 0.76 0.56 0.00 50.00 0.86 0.66 0.00 55.00 0.97 0.76 0.00 60.00 1.08 0.87 0.00 65.00 1.19 0.98 0.00 70.00 1.31 1.10 0.00 75.00 1.44 1.22 0.00 80.00 1.57 1.35 0.00 85.00 1.71 1.49 0.00 90.00 1.86 1.64 0.00 95.00 2.03 1.80 0.00 100.00 2.20 1.97 0.00 105.00 2.40 2.17 0.00 110.00 2.65 2.42 0.00 115.00 2.94 2.70 0.01 120.00 3.53 3.29 0.01 125.00 4.27 4.03 0.01 130.00 4.62 4.39 0.00 135.00 4.87 4.63 0.00 140.00 5.06 4.83 0.00 145.00 5.23 4.99 0.00 150.00 5.39 5.15 0.00 155.00 5.53 5.30 0.00 160.00 5.67 5.43 0.00 165.00 5.80 5.56 0.00 170.00 5.92 5.68 0.00 175.00 6.03 5.80 0.00 180.00 6.14 5.91 0.00 185.00 6.25 6.01 0.00 190.00 6.36 6.12 0.00 195.00 6.46 6.22 0.00 200.00 6.55 6.32 0.00 205.00 6.65 6.41 0.00 210.00 6.74 6.50 0.00 215.00 6.82 6.58 0.00 220.00 6.91 6.67 0.00 225.00 6.98 6.75 0.00 230.00 7.06 6.82 0.00 235.00 7.13 6.89 0.00 240.00 7.20 6.96 0.00 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 157HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment PR1B: PR1B - DRAINS SOUTH TO WETLAND A Runoff = 0.13 cfs @ 121.26 hrs, Volume= 0.388 af, Depth> 6.96" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=4 Area (sf) CN Adj Description 7,290 98 98 Paved parking, HSG C * 21,877 84 98 29,167 Weighted Average 21,877 75.01% Pervious Area 7,290 24.99% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment PR1B: PR1B - DRAINS SOUTH TO WETLAND A Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.14 0.13 0.12 0.11 0.1 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20" AMC=4 Runoff Area=29,167 sf Runoff Volume=0.388 af Runoff Depth>6.96" Tc=6.0 min AMC Adjusted CN=WQ 0.13 cfs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 158HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment PR1B: PR1B - DRAINS SOUTH TO WETLAND A Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.04 0.00 0.00 10.00 0.12 0.02 0.01 15.00 0.20 0.07 0.01 20.00 0.28 0.13 0.01 25.00 0.37 0.21 0.01 30.00 0.46 0.29 0.01 35.00 0.56 0.37 0.01 40.00 0.66 0.46 0.01 45.00 0.76 0.56 0.01 50.00 0.86 0.66 0.01 55.00 0.97 0.76 0.01 60.00 1.08 0.87 0.01 65.00 1.19 0.98 0.02 70.00 1.31 1.10 0.02 75.00 1.44 1.22 0.02 80.00 1.57 1.35 0.02 85.00 1.71 1.49 0.02 90.00 1.86 1.64 0.02 95.00 2.03 1.80 0.02 100.00 2.20 1.97 0.02 105.00 2.40 2.17 0.03 110.00 2.65 2.42 0.03 115.00 2.94 2.70 0.05 120.00 3.53 3.29 0.12 125.00 4.27 4.03 0.07 130.00 4.62 4.39 0.04 135.00 4.87 4.63 0.03 140.00 5.06 4.83 0.02 145.00 5.23 4.99 0.02 150.00 5.39 5.15 0.02 155.00 5.53 5.30 0.02 160.00 5.67 5.43 0.02 165.00 5.80 5.56 0.02 170.00 5.92 5.68 0.02 175.00 6.03 5.80 0.02 180.00 6.14 5.91 0.01 185.00 6.25 6.01 0.01 190.00 6.36 6.12 0.01 195.00 6.46 6.22 0.01 200.00 6.55 6.32 0.01 205.00 6.65 6.41 0.01 210.00 6.74 6.50 0.01 215.00 6.82 6.58 0.01 220.00 6.91 6.67 0.01 225.00 6.98 6.75 0.01 230.00 7.06 6.82 0.01 235.00 7.13 6.89 0.01 240.00 7.20 6.96 0.01 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 159HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment PR1C: PR1C - DRAINS NORTH TO WETLAND A Runoff = 0.02 cfs @ 121.26 hrs, Volume= 0.074 af, Depth> 6.96" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=4 Area (sf) CN Adj Description 0 98 98 Paved parking, HSG C * 5,573 84 98 5,573 Weighted Average 5,573 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment PR1C: PR1C - DRAINS NORTH TO WETLAND A Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.026 0.024 0.022 0.02 0.018 0.016 0.014 0.012 0.01 0.008 0.006 0.004 0.002 0 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20" AMC=4 Runoff Area=5,573 sf Runoff Volume=0.074 af Runoff Depth>6.96" Tc=6.0 min AMC Adjusted CN=WQ 0.02 cfs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 160HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment PR1C: PR1C - DRAINS NORTH TO WETLAND A Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.04 0.00 0.00 10.00 0.12 0.02 0.00 15.00 0.20 0.07 0.00 20.00 0.28 0.13 0.00 25.00 0.37 0.21 0.00 30.00 0.46 0.29 0.00 35.00 0.56 0.37 0.00 40.00 0.66 0.46 0.00 45.00 0.76 0.56 0.00 50.00 0.86 0.66 0.00 55.00 0.97 0.76 0.00 60.00 1.08 0.87 0.00 65.00 1.19 0.98 0.00 70.00 1.31 1.10 0.00 75.00 1.44 1.22 0.00 80.00 1.57 1.35 0.00 85.00 1.71 1.49 0.00 90.00 1.86 1.64 0.00 95.00 2.03 1.80 0.00 100.00 2.20 1.97 0.00 105.00 2.40 2.17 0.01 110.00 2.65 2.42 0.01 115.00 2.94 2.70 0.01 120.00 3.53 3.29 0.02 125.00 4.27 4.03 0.01 130.00 4.62 4.39 0.01 135.00 4.87 4.63 0.01 140.00 5.06 4.83 0.00 145.00 5.23 4.99 0.00 150.00 5.39 5.15 0.00 155.00 5.53 5.30 0.00 160.00 5.67 5.43 0.00 165.00 5.80 5.56 0.00 170.00 5.92 5.68 0.00 175.00 6.03 5.80 0.00 180.00 6.14 5.91 0.00 185.00 6.25 6.01 0.00 190.00 6.36 6.12 0.00 195.00 6.46 6.22 0.00 200.00 6.55 6.32 0.00 205.00 6.65 6.41 0.00 210.00 6.74 6.50 0.00 215.00 6.82 6.58 0.00 220.00 6.91 6.67 0.00 225.00 6.98 6.75 0.00 230.00 7.06 6.82 0.00 235.00 7.13 6.89 0.00 240.00 7.20 6.96 0.00 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 161HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment PR1D: PR1D - DRAINS SOUTH TO RAIN GARDEN Runoff = 0.15 cfs @ 121.26 hrs, Volume= 0.468 af, Depth> 6.96" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=4 Area (sf) CN Adj Description 6,135 98 98 Paved parking, HSG C * 28,982 84 98 35,117 Weighted Average 28,982 82.53% Pervious Area 6,135 17.47% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment PR1D: PR1D - DRAINS SOUTH TO RAIN GARDEN Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.17 0.16 0.15 0.14 0.13 0.12 0.11 0.1 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20" AMC=4 Runoff Area=35,117 sf Runoff Volume=0.468 af Runoff Depth>6.96" Tc=6.0 min AMC Adjusted CN=WQ 0.15 cfs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 162HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment PR1D: PR1D - DRAINS SOUTH TO RAIN GARDEN Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.04 0.00 0.00 10.00 0.12 0.02 0.01 15.00 0.20 0.07 0.01 20.00 0.28 0.13 0.01 25.00 0.37 0.21 0.01 30.00 0.46 0.29 0.01 35.00 0.56 0.37 0.01 40.00 0.66 0.46 0.02 45.00 0.76 0.56 0.02 50.00 0.86 0.66 0.02 55.00 0.97 0.76 0.02 60.00 1.08 0.87 0.02 65.00 1.19 0.98 0.02 70.00 1.31 1.10 0.02 75.00 1.44 1.22 0.02 80.00 1.57 1.35 0.02 85.00 1.71 1.49 0.02 90.00 1.86 1.64 0.03 95.00 2.03 1.80 0.03 100.00 2.20 1.97 0.03 105.00 2.40 2.17 0.04 110.00 2.65 2.42 0.04 115.00 2.94 2.70 0.05 120.00 3.53 3.29 0.14 125.00 4.27 4.03 0.08 130.00 4.62 4.39 0.05 135.00 4.87 4.63 0.04 140.00 5.06 4.83 0.03 145.00 5.23 4.99 0.03 150.00 5.39 5.15 0.02 155.00 5.53 5.30 0.02 160.00 5.67 5.43 0.02 165.00 5.80 5.56 0.02 170.00 5.92 5.68 0.02 175.00 6.03 5.80 0.02 180.00 6.14 5.91 0.02 185.00 6.25 6.01 0.02 190.00 6.36 6.12 0.02 195.00 6.46 6.22 0.02 200.00 6.55 6.32 0.02 205.00 6.65 6.41 0.01 210.00 6.74 6.50 0.01 215.00 6.82 6.58 0.01 220.00 6.91 6.67 0.01 225.00 6.98 6.75 0.01 230.00 7.06 6.82 0.01 235.00 7.13 6.89 0.01 240.00 7.20 6.96 0.01 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 163HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Subcatchment PR2: PR2 - DRAINS SOUTH TO WETLAND B Runoff = 0.01 cfs @ 121.26 hrs, Volume= 0.035 af, Depth> 6.96" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=4 Area (sf) CN Adj Description 2,313 98 98 Paved parking, HSG C * 323 84 98 2,636 Weighted Average 323 12.25% Pervious Area 2,313 87.75% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment PR2: PR2 - DRAINS SOUTH TO WETLAND B Runoff Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.013 0.012 0.011 0.011 0.01 0.01 0.009 0.009 0.008 0.008 0.007 0.007 0.006 0.006 0.005 0.005 0.004 0.004 0.003 0.003 0.002 0.002 0.001 0.001 0.000 0 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20" AMC=4 Runoff Area=2,636 sf Runoff Volume=0.035 af Runoff Depth>6.96" Tc=6.0 min AMC Adjusted CN=WQ 0.01 cfs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 164HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Subcatchment PR2: PR2 - DRAINS SOUTH TO WETLAND B Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 5.00 0.04 0.00 0.00 10.00 0.12 0.02 0.00 15.00 0.20 0.07 0.00 20.00 0.28 0.13 0.00 25.00 0.37 0.21 0.00 30.00 0.46 0.29 0.00 35.00 0.56 0.37 0.00 40.00 0.66 0.46 0.00 45.00 0.76 0.56 0.00 50.00 0.86 0.66 0.00 55.00 0.97 0.76 0.00 60.00 1.08 0.87 0.00 65.00 1.19 0.98 0.00 70.00 1.31 1.10 0.00 75.00 1.44 1.22 0.00 80.00 1.57 1.35 0.00 85.00 1.71 1.49 0.00 90.00 1.86 1.64 0.00 95.00 2.03 1.80 0.00 100.00 2.20 1.97 0.00 105.00 2.40 2.17 0.00 110.00 2.65 2.42 0.00 115.00 2.94 2.70 0.00 120.00 3.53 3.29 0.01 125.00 4.27 4.03 0.01 130.00 4.62 4.39 0.00 135.00 4.87 4.63 0.00 140.00 5.06 4.83 0.00 145.00 5.23 4.99 0.00 150.00 5.39 5.15 0.00 155.00 5.53 5.30 0.00 160.00 5.67 5.43 0.00 165.00 5.80 5.56 0.00 170.00 5.92 5.68 0.00 175.00 6.03 5.80 0.00 180.00 6.14 5.91 0.00 185.00 6.25 6.01 0.00 190.00 6.36 6.12 0.00 195.00 6.46 6.22 0.00 200.00 6.55 6.32 0.00 205.00 6.65 6.41 0.00 210.00 6.74 6.50 0.00 215.00 6.82 6.58 0.00 220.00 6.91 6.67 0.00 225.00 6.98 6.75 0.00 230.00 7.06 6.82 0.00 235.00 7.13 6.89 0.00 240.00 7.20 6.96 0.00 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 165HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 3.322 ac, 13.47% Impervious, Inflow Depth > 6.96" for Snowmelt 100yr 10d event Inflow = 0.56 cfs @ 121.26 hrs, Volume= 1.927 af Outflow = 0.56 cfs @ 121.26 hrs, Volume= 1.927 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Reach DA2: DA2 - TOTAL FLOW TO WETLAND A Inflow Outflow Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.6 0.55 0.5 0.45 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 Inflow Area=3.322 ac 0.56 cfs 0.56 cfs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 166HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A Time (hours) Inflow (cfs) Elevation (feet) Outflow (cfs) 0.00 0.00 0.00 5.00 0.00 0.00 10.00 0.02 0.02 15.00 0.04 0.04 20.00 0.05 0.05 25.00 0.05 0.05 30.00 0.06 0.06 35.00 0.06 0.06 40.00 0.06 0.06 45.00 0.06 0.06 50.00 0.07 0.07 55.00 0.07 0.07 60.00 0.07 0.07 65.00 0.08 0.08 70.00 0.08 0.08 75.00 0.08 0.08 80.00 0.09 0.09 85.00 0.10 0.10 90.00 0.10 0.10 95.00 0.11 0.11 100.00 0.12 0.12 105.00 0.15 0.15 110.00 0.17 0.17 115.00 0.23 0.23 120.00 0.51 0.51 125.00 0.33 0.33 130.00 0.22 0.22 135.00 0.18 0.18 140.00 0.12 0.12 145.00 0.11 0.11 150.00 0.10 0.10 155.00 0.09 0.09 160.00 0.09 0.09 165.00 0.08 0.08 170.00 0.08 0.08 175.00 0.07 0.07 180.00 0.07 0.07 185.00 0.07 0.07 190.00 0.07 0.07 195.00 0.07 0.07 200.00 0.06 0.06 205.00 0.06 0.06 210.00 0.06 0.06 215.00 0.06 0.06 220.00 0.05 0.05 225.00 0.05 0.05 230.00 0.05 0.05 235.00 0.05 0.05 240.00 0.04 0.04 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 167HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 4.521 ac, 15.58% Impervious, Inflow Depth > 6.95" for Snowmelt 100yr 10d event Inflow = 0.78 cfs @ 121.30 hrs, Volume= 2.618 af Outflow = 0.78 cfs @ 121.30 hrs, Volume= 2.618 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Reach DA3: DA3 - TOTAL FLOW TO WETLAND B Inflow Outflow Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.85 0.8 0.75 0.7 0.65 0.6 0.55 0.5 0.45 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 Inflow Area=4.521 ac 0.78 cfs 0.78 cfs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 168HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B Time (hours) Inflow (cfs) Elevation (feet) Outflow (cfs) 0.00 0.00 0.00 5.00 0.00 0.00 10.00 0.03 0.03 15.00 0.05 0.05 20.00 0.06 0.06 25.00 0.07 0.07 30.00 0.08 0.08 35.00 0.08 0.08 40.00 0.08 0.08 45.00 0.09 0.09 50.00 0.09 0.09 55.00 0.10 0.10 60.00 0.10 0.10 65.00 0.10 0.10 70.00 0.11 0.11 75.00 0.11 0.11 80.00 0.12 0.12 85.00 0.13 0.13 90.00 0.14 0.14 95.00 0.15 0.15 100.00 0.16 0.16 105.00 0.20 0.20 110.00 0.23 0.23 115.00 0.30 0.30 120.00 0.71 0.71 125.00 0.46 0.46 130.00 0.29 0.29 135.00 0.23 0.23 140.00 0.17 0.17 145.00 0.15 0.15 150.00 0.14 0.14 155.00 0.13 0.13 160.00 0.12 0.12 165.00 0.12 0.12 170.00 0.11 0.11 175.00 0.10 0.10 180.00 0.10 0.10 185.00 0.10 0.10 190.00 0.09 0.09 195.00 0.09 0.09 200.00 0.09 0.09 205.00 0.08 0.08 210.00 0.08 0.08 215.00 0.08 0.08 220.00 0.07 0.07 225.00 0.07 0.07 230.00 0.07 0.07 235.00 0.06 0.06 240.00 0.06 0.06 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 169HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Pond 1P: FILTRATION BASIN 1 Inflow Area = 0.806 ac, 17.47% Impervious, Inflow Depth > 6.96" for Snowmelt 100yr 10d event Inflow = 0.15 cfs @ 121.26 hrs, Volume= 0.468 af Outflow = 0.08 cfs @ 124.91 hrs, Volume= 0.467 af, Atten= 48%, Lag= 219.0 min Discarded = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Primary = 0.08 cfs @ 124.91 hrs, Volume= 0.467 af Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Peak Elev= 973.72' @ 124.91 hrs Surf.Area= 2,166 sf Storage= 1,388 cf Plug-Flow detention time= 57.7 min calculated for 0.467 af (100% of inflow) Center-of-Mass det. time= 55.6 min ( 7,436.4 - 7,380.8 ) Volume Invert Avail.Storage Storage Description #1 973.00' 5,291 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 973.00 1,624 0 0 973.50 2,040 916 916 974.00 2,320 1,090 2,006 974.50 2,686 1,252 3,258 975.10 3,068 1,726 4,984 975.20 3,068 307 5,291 Device Routing Invert Outlet Devices #1 Primary 971.50'12.0" Round OUTLET PIPE L= 23.0' CMP, mitered to conform to fill, Ke= 0.700 Inlet / Outlet Invert= 971.50' / 971.50' S= 0.0000 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 0.79 sf #2 Device 1 974.00'24.0" Horiz. RIM- Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Secondary 975.10'10.0' long x 10.0' breadth EOF Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 #4 Device 5 973.00'1.600 in/hr Exfiltration over Surface area above 970.50' Excluded Surface area = 0 sf #5 Device 1 971.50'6.0" Vert. Orifice 6" draintile C= 0.600 #6 Discarded 973.00'0.600 in/hr Exfiltration-Infiltration into Rock over Surface area from 970.00' - 970.50' Excluded Surface area = 0 sf MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 170HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Discarded OutFlow Max=0.00 cfs @ 0.00 hrs HW=973.00' (Free Discharge) 6=Exfiltration-Infiltration into Rock ( Controls 0.00 cfs) Primary OutFlow Max=0.08 cfs @ 124.91 hrs HW=973.72' (Free Discharge) 1=OUTLET PIPE (Passes 0.08 cfs of 4.38 cfs potential flow) 2=RIM- Orifice/Grate ( Controls 0.00 cfs) 5=Orifice 6" draintile (Passes 0.08 cfs of 1.33 cfs potential flow) 4=Exfiltration (Exfiltration Controls 0.08 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=973.00' (Free Discharge) 3=EOF ( Controls 0.00 cfs) Pond 1P: FILTRATION BASIN 1 Inflow Outflow Discarded Primary Secondary Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.17 0.16 0.15 0.14 0.13 0.12 0.11 0.1 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0 Inflow Area=0.806 ac Peak Elev=973.72' Storage=1,388 cf 0.15 cfs 0.08 cfs 0.00 cfs 0.08 cfs 0.00 cfs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 171HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Pond 1P: FILTRATION BASIN 1 Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Outflow (cfs) Discarded (cfs) Primary (cfs) Secondary (cfs) 0.00 0.00 0 973.00 0.00 0.00 0.00 0.00 5.00 0.00 0 973.00 0.00 0.00 0.00 0.00 10.00 0.01 3 973.00 0.01 0.00 0.01 0.00 15.00 0.01 5 973.00 0.01 0.00 0.01 0.00 20.00 0.01 7 973.00 0.01 0.00 0.01 0.00 25.00 0.01 7 973.00 0.01 0.00 0.01 0.00 30.00 0.01 8 973.00 0.01 0.00 0.01 0.00 35.00 0.01 9 973.01 0.01 0.00 0.01 0.00 40.00 0.02 9 973.01 0.02 0.00 0.02 0.00 45.00 0.02 9 973.01 0.02 0.00 0.02 0.00 50.00 0.02 10 973.01 0.02 0.00 0.02 0.00 55.00 0.02 10 973.01 0.02 0.00 0.02 0.00 60.00 0.02 11 973.01 0.02 0.00 0.02 0.00 65.00 0.02 11 973.01 0.02 0.00 0.02 0.00 70.00 0.02 11 973.01 0.02 0.00 0.02 0.00 75.00 0.02 12 973.01 0.02 0.00 0.02 0.00 80.00 0.02 13 973.01 0.02 0.00 0.02 0.00 85.00 0.02 14 973.01 0.02 0.00 0.02 0.00 90.00 0.03 15 973.01 0.03 0.00 0.03 0.00 95.00 0.03 16 973.01 0.03 0.00 0.03 0.00 100.00 0.03 17 973.01 0.03 0.00 0.03 0.00 105.00 0.04 21 973.01 0.04 0.00 0.04 0.00 110.00 0.04 25 973.02 0.04 0.00 0.04 0.00 115.00 0.05 32 973.02 0.05 0.00 0.05 0.00 120.00 0.14 599 973.34 0.07 0.00 0.07 0.00 125.00 0.08 1,388 973.72 0.08 0.00 0.08 0.00 130.00 0.05 1,017 973.55 0.08 0.00 0.08 0.00 135.00 0.04 433 973.25 0.07 0.00 0.07 0.00 140.00 0.03 17 973.01 0.03 0.00 0.03 0.00 145.00 0.03 15 973.01 0.03 0.00 0.03 0.00 150.00 0.02 15 973.01 0.02 0.00 0.02 0.00 155.00 0.02 14 973.01 0.02 0.00 0.02 0.00 160.00 0.02 13 973.01 0.02 0.00 0.02 0.00 165.00 0.02 12 973.01 0.02 0.00 0.02 0.00 170.00 0.02 11 973.01 0.02 0.00 0.02 0.00 175.00 0.02 11 973.01 0.02 0.00 0.02 0.00 180.00 0.02 10 973.01 0.02 0.00 0.02 0.00 185.00 0.02 10 973.01 0.02 0.00 0.02 0.00 190.00 0.02 10 973.01 0.02 0.00 0.02 0.00 195.00 0.02 9 973.01 0.02 0.00 0.02 0.00 200.00 0.02 9 973.01 0.02 0.00 0.02 0.00 205.00 0.01 9 973.01 0.01 0.00 0.01 0.00 210.00 0.01 8 973.01 0.01 0.00 0.01 0.00 215.00 0.01 8 973.00 0.01 0.00 0.01 0.00 220.00 0.01 8 973.00 0.01 0.00 0.01 0.00 225.00 0.01 7 973.00 0.01 0.00 0.01 0.00 230.00 0.01 7 973.00 0.01 0.00 0.01 0.00 235.00 0.01 7 973.00 0.01 0.00 0.01 0.00 240.00 0.01 6 973.00 0.01 0.00 0.01 0.00 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 172HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Stage-Discharge for Pond 1P: FILTRATION BASIN 1 Elevation (feet) Discharge (cfs) Discarded (cfs) Primary (cfs) Secondary (cfs) 973.00 0.00 0.00 0.00 0.00 973.05 0.06 0.00 0.06 0.00 973.10 0.06 0.00 0.06 0.00 973.15 0.06 0.00 0.06 0.00 973.20 0.07 0.00 0.07 0.00 973.25 0.07 0.00 0.07 0.00 973.30 0.07 0.00 0.07 0.00 973.35 0.07 0.00 0.07 0.00 973.40 0.07 0.00 0.07 0.00 973.45 0.07 0.00 0.07 0.00 973.50 0.08 0.00 0.08 0.00 973.55 0.08 0.00 0.08 0.00 973.60 0.08 0.00 0.08 0.00 973.65 0.08 0.00 0.08 0.00 973.70 0.08 0.00 0.08 0.00 973.75 0.08 0.00 0.08 0.00 973.80 0.08 0.00 0.08 0.00 973.85 0.08 0.00 0.08 0.00 973.90 0.08 0.00 0.08 0.00 973.95 0.08 0.00 0.08 0.00 974.00 0.09 0.00 0.09 0.00 974.05 0.32 0.00 0.32 0.00 974.10 0.74 0.00 0.74 0.00 974.15 1.28 0.00 1.28 0.00 974.20 1.93 0.00 1.93 0.00 974.25 2.66 0.00 2.66 0.00 974.30 3.47 0.00 3.47 0.00 974.35 4.35 0.00 4.35 0.00 974.40 5.17 0.00 5.17 0.00 974.45 5.22 0.00 5.22 0.00 974.50 5.28 0.00 5.28 0.00 974.55 5.33 0.00 5.33 0.00 974.60 5.38 0.00 5.38 0.00 974.65 5.43 0.00 5.43 0.00 974.70 5.48 0.00 5.48 0.00 974.75 5.53 0.00 5.53 0.00 974.80 5.58 0.00 5.58 0.00 974.85 5.63 0.00 5.63 0.00 974.90 5.68 0.00 5.68 0.00 974.95 5.73 0.00 5.73 0.00 975.00 5.78 0.00 5.78 0.00 975.05 5.83 0.00 5.83 0.00 975.10 5.87 0.00 5.87 0.00 975.15 6.20 0.00 5.92 0.28 975.20 6.76 0.00 5.97 0.79 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 173HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Pond 4P: WETLAND A Inflow Area = 3.322 ac, 13.47% Impervious, Inflow Depth > 6.96" for Snowmelt 100yr 10d event Inflow = 0.56 cfs @ 121.26 hrs, Volume= 1.927 af Outflow = 0.55 cfs @ 121.41 hrs, Volume= 1.923 af, Atten= 1%, Lag= 8.8 min Primary = 0.55 cfs @ 121.41 hrs, Volume= 1.923 af Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Peak Elev= 969.70' @ 121.41 hrs Surf.Area= 11,691 sf Storage= 909 cf Plug-Flow detention time= 45.3 min calculated for 1.923 af (100% of inflow) Center-of-Mass det. time= 31.8 min ( 7,426.1 - 7,394.3 ) Volume Invert Avail.Storage Storage Description #1 969.62' 18,824 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 969.62 11,466 0 0 970.00 12,553 4,564 4,564 971.00 15,967 14,260 18,824 Device Routing Invert Outlet Devices #1 Primary 969.62'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.55 cfs @ 121.41 hrs HW=969.70' (Free Discharge) 1=Broad-Crested Rectangular Weir (Weir Controls 0.55 cfs @ 0.70 fps) MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 174HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Pond 4P: WETLAND A Inflow Primary Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.6 0.55 0.5 0.45 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 Inflow Area=3.322 ac Peak Elev=969.70' Storage=909 cf 0.56 cfs 0.55 cfs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 175HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Pond 4P: WETLAND A Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Primary (cfs) 0.00 0.00 0 969.62 0.00 5.00 0.00 0 969.62 0.00 10.00 0.02 79 969.63 0.02 15.00 0.04 140 969.63 0.04 20.00 0.05 169 969.63 0.05 25.00 0.05 181 969.64 0.05 30.00 0.06 191 969.64 0.06 35.00 0.06 199 969.64 0.06 40.00 0.06 205 969.64 0.06 45.00 0.06 210 969.64 0.06 50.00 0.07 218 969.64 0.07 55.00 0.07 224 969.64 0.07 60.00 0.07 229 969.64 0.07 65.00 0.08 234 969.64 0.08 70.00 0.08 244 969.64 0.08 75.00 0.08 251 969.64 0.08 80.00 0.09 261 969.64 0.09 85.00 0.10 277 969.64 0.10 90.00 0.10 296 969.65 0.10 95.00 0.11 314 969.65 0.11 100.00 0.12 322 969.65 0.12 105.00 0.15 369 969.65 0.15 110.00 0.17 412 969.66 0.17 115.00 0.23 488 969.66 0.22 120.00 0.51 855 969.69 0.50 125.00 0.33 660 969.68 0.34 130.00 0.22 500 969.66 0.23 135.00 0.18 430 969.66 0.18 140.00 0.12 333 969.65 0.12 145.00 0.11 305 969.65 0.11 150.00 0.10 292 969.65 0.10 155.00 0.09 278 969.64 0.10 160.00 0.09 264 969.64 0.09 165.00 0.08 254 969.64 0.08 170.00 0.08 241 969.64 0.08 175.00 0.07 233 969.64 0.07 180.00 0.07 228 969.64 0.07 185.00 0.07 226 969.64 0.07 190.00 0.07 221 969.64 0.07 195.00 0.07 214 969.64 0.07 200.00 0.06 210 969.64 0.06 205.00 0.06 203 969.64 0.06 210.00 0.06 198 969.64 0.06 215.00 0.06 194 969.64 0.06 220.00 0.05 189 969.64 0.05 225.00 0.05 185 969.64 0.05 230.00 0.05 179 969.64 0.05 235.00 0.05 173 969.64 0.05 240.00 0.04 163 969.63 0.04 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 176HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Stage-Discharge for Pond 4P: WETLAND A Elevation (feet) Primary (cfs) 969.62 0.00 969.63 0.02 969.64 0.07 969.65 0.13 969.66 0.20 969.67 0.28 969.68 0.37 969.69 0.46 969.70 0.56 969.71 0.67 969.72 0.79 969.73 0.91 969.74 1.04 969.75 1.17 969.76 1.30 969.77 1.45 969.78 1.59 969.79 1.75 969.80 1.90 969.81 2.06 969.82 2.23 969.83 2.40 969.84 2.58 969.85 2.76 969.86 2.94 969.87 3.13 969.88 3.33 969.89 3.53 969.90 3.73 969.91 3.94 969.92 4.15 969.93 4.36 969.94 4.58 969.95 4.81 969.96 5.03 969.97 5.26 969.98 5.50 969.99 5.74 970.00 5.98 970.01 6.23 970.02 6.48 970.03 6.74 970.04 7.01 970.05 7.28 970.06 7.55 970.07 7.83 970.08 8.12 970.09 8.41 970.10 8.70 970.11 9.00 970.12 9.30 970.13 9.60 970.14 9.91 Elevation (feet) Primary (cfs) 970.15 10.23 970.16 10.55 970.17 10.87 970.18 11.20 970.19 11.53 970.20 11.86 970.21 12.20 970.22 12.55 970.23 12.86 970.24 13.18 970.25 13.49 970.26 13.81 970.27 14.14 970.28 14.46 970.29 14.79 970.30 15.12 970.31 15.45 970.32 15.78 970.33 16.12 970.34 16.46 970.35 16.80 970.36 17.14 970.37 17.49 970.38 17.84 970.39 18.19 970.40 18.54 970.41 18.89 970.42 19.25 970.43 19.61 970.44 19.97 970.45 20.33 970.46 20.69 970.47 21.06 970.48 21.43 970.49 21.80 970.50 22.17 970.51 22.55 970.52 22.92 970.53 23.30 970.54 23.68 970.55 24.07 970.56 24.45 970.57 24.84 970.58 25.23 970.59 25.62 970.60 26.01 970.61 26.40 970.62 26.80 970.63 27.21 970.64 27.62 970.65 28.03 970.66 28.45 970.67 28.86 Elevation (feet) Primary (cfs) 970.68 29.28 970.69 29.70 970.70 30.12 970.71 30.55 970.72 30.98 970.73 31.41 970.74 31.84 970.75 32.27 970.76 32.71 970.77 33.14 970.78 33.58 970.79 34.02 970.80 34.47 970.81 34.91 970.82 35.36 970.83 35.79 970.84 36.22 970.85 36.65 970.86 37.09 970.87 37.52 970.88 37.96 970.89 38.40 970.90 38.84 970.91 39.28 970.92 39.72 970.93 40.17 970.94 40.61 970.95 41.06 970.96 41.51 970.97 41.96 970.98 42.41 970.99 42.86 971.00 43.32 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 177HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Summary for Pond 5P: Wetland B [44] Hint: Outlet device #1 is below defined storage [95] Warning: Outlet Device #1 rise exceeded Inflow Area = 12.868 ac, 25.12% Impervious, Inflow Depth > 6.96" for Snowmelt 100yr 10d event Inflow = 2.37 cfs @ 121.30 hrs, Volume= 7.458 af Outflow = 2.37 cfs @ 121.31 hrs, Volume= 7.458 af, Atten= 0%, Lag= 0.5 min Primary = 2.37 cfs @ 121.31 hrs, Volume= 7.458 af Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Peak Elev= 961.60' @ 121.31 hrs Surf.Area= 149,009 sf Storage= 112 cf Plug-Flow detention time= 0.8 min calculated for 7.458 af (100% of inflow) Center-of-Mass det. time= 0.6 min ( 7,395.4 - 7,394.8 ) Volume Invert Avail.Storage Storage Description #1 961.60' 841,104 cf Custom Stage Data (Conic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (cubic-feet) (cubic-feet) (sq-ft) 961.60 149,000 0 0 149,000 962.00 153,597 60,517 60,517 153,630 964.00 201,325 353,847 414,364 201,451 966.00 225,646 426,740 841,104 225,991 Device Routing Invert Outlet Devices #1 Primary 960.82'Asymmetrical Weir, C= 3.27 Offset (feet) -70.00 -41.00 0.00 49.00 87.00 Height (feet) 0.35 0.09 0.00 0.09 0.35 Primary OutFlow Max=133.30 cfs @ 121.31 hrs HW=961.60' (Free Discharge) 1=Asymmetrical Weir (Weir Controls 133.30 cfs @ 2.72 fps) MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 178HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Pond 5P: Wetland B Inflow Primary Hydrograph Time (hours) 2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)2 1 0 Inflow Area=12.868 ac Peak Elev=961.60' Storage=112 cf 2.37 cfs 2.37 cfs MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 179HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Hydrograph for Pond 5P: Wetland B Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Primary (cfs) 0.00 0.00 0 961.60 0.00 5.00 0.00 0 961.60 0.00 10.00 0.09 4 961.60 0.09 15.00 0.14 7 961.60 0.14 20.00 0.18 8 961.60 0.18 25.00 0.20 9 961.60 0.20 30.00 0.22 10 961.60 0.22 35.00 0.23 11 961.60 0.23 40.00 0.24 11 961.60 0.24 45.00 0.25 12 961.60 0.25 50.00 0.26 13 961.60 0.26 55.00 0.27 13 961.60 0.27 60.00 0.28 13 961.60 0.28 65.00 0.29 14 961.60 0.29 70.00 0.31 15 961.60 0.31 75.00 0.32 15 961.60 0.32 80.00 0.34 16 961.60 0.34 85.00 0.37 18 961.60 0.37 90.00 0.41 19 961.60 0.41 95.00 0.44 21 961.60 0.44 100.00 0.46 22 961.60 0.46 105.00 0.57 27 961.60 0.57 110.00 0.67 32 961.60 0.67 115.00 0.86 41 961.60 0.86 120.00 2.17 103 961.60 2.17 125.00 1.29 61 961.60 1.29 130.00 0.78 37 961.60 0.78 135.00 0.60 29 961.60 0.60 140.00 0.47 22 961.60 0.47 145.00 0.42 20 961.60 0.42 150.00 0.39 19 961.60 0.39 155.00 0.37 18 961.60 0.37 160.00 0.34 16 961.60 0.34 165.00 0.33 16 961.60 0.33 170.00 0.30 14 961.60 0.30 175.00 0.29 14 961.60 0.29 180.00 0.28 13 961.60 0.28 185.00 0.28 13 961.60 0.28 190.00 0.27 13 961.60 0.27 195.00 0.26 12 961.60 0.26 200.00 0.25 12 961.60 0.25 205.00 0.24 11 961.60 0.24 210.00 0.23 11 961.60 0.23 215.00 0.22 10 961.60 0.22 220.00 0.21 10 961.60 0.21 225.00 0.20 10 961.60 0.20 230.00 0.19 9 961.60 0.19 235.00 0.18 9 961.60 0.18 240.00 0.16 8 961.60 0.16 MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR Printed 5/17/2022Prepared by {enter your company name here} Page 180HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC Stage-Discharge for Pond 5P: Wetland B Elevation (feet) Primary (cfs) 961.60 0.00 961.65 139.02 961.70 144.59 961.75 149.95 961.80 155.13 961.85 160.13 961.90 164.98 961.95 169.69 962.00 174.28 962.05 178.74 962.10 183.09 962.15 187.35 962.20 191.51 962.25 195.57 962.30 199.56 962.35 203.47 962.40 207.30 962.45 211.06 962.50 214.76 962.55 218.40 962.60 221.97 962.65 225.49 962.70 228.95 962.75 232.36 962.80 235.73 962.85 239.04 962.90 242.31 962.95 245.54 963.00 248.72 963.05 251.87 963.10 254.97 963.15 258.04 963.20 261.07 963.25 264.07 963.30 267.03 963.35 269.96 963.40 272.86 963.45 275.73 963.50 278.56 963.55 281.37 963.60 284.16 963.65 286.91 963.70 289.64 963.75 292.34 963.80 295.02 963.85 297.68 963.90 300.31 963.95 302.92 964.00 305.50 964.05 308.07 964.10 310.61 964.15 313.13 964.20 315.63 Elevation (feet) Primary (cfs) 964.25 318.12 964.30 320.58 964.35 323.02 964.40 325.45 964.45 327.86 964.50 330.25 964.55 332.62 964.60 334.98 964.65 337.32 964.70 339.64 964.75 341.95 964.80 344.24 964.85 346.52 964.90 348.78 964.95 351.03 965.00 353.26 965.05 355.48 965.10 357.69 965.15 359.88 965.20 362.06 965.25 364.23 965.30 366.38 965.35 368.52 965.40 370.65 965.45 372.76 965.50 374.87 965.55 376.96 965.60 379.04 965.65 381.11 965.70 383.17 965.75 385.22 965.80 387.25 965.85 389.28 965.90 391.29 965.95 393.30 966.00 395.29 February 21, 2022 HGTS Project Number: 21-1312 Ms. Gayle Morin 1441 Lake Lucy Road Chanhassen, MN Re: Geotechnical Exploration Report, Proposed Single-Family Homes, 1441 Lake Lucy Road, Chanhassen, Minnesota. Dear Ms. Morin: We have completed the geotechnical exploration report for the proposed homes at 1441 Lake Lucy Road in Chanhassen, Minnesota. A brief summary of our results and recommendations is presented below. Specific details regarding our procedures, results and recommendations follow in the attached geotechnical exploration report. Four (4) soil borings were completed for this project that encountered about 1 foot of topsoil underlain by sandy lean clay and clayey sand glacial till deposits that extended to the termination depths of the borings. Groundwater was not encountered in the soil borings while drilling and sampling or after removal of the auger from the boreholes. The vegetation and topsoil are not suitable for foundation support and will need to be removed and replaced as needed with suitable compacted engineered fill. It is our opinion that the underlying native glacial till soils are suitable for foundation support. With the building pad prepared as recommended it is our opinion that the foundations for the proposed building can be designed for a net allowable soil bearing capacity up to 2,000 pounds per square foot. Thank you for the opportunity to assist you on this project. If you have any questions or need additional information, please contact Paul Gionfriddo at 612-729-2959. Sincerely, Haugo GeoTechnical Services Jesse Miller, E.I.T. Paul Gionfriddo, P.E. Staff Engineer Senior Engineer GEOTECHNICAL EXPLORATION REPORT PROJECT: Proposed Single-Family Homes 1441 Lake Lucy Road Chanhassen, Minnesota PREPARED FOR: Ms. Gayle Morin 1441 Lake Lucy Road Chanhassen, MN PREPARED BY: Haugo GeoTechnical Services 2825 Cedar Avenue South Minneapolis, Minnesota 55407 Haugo GeoTechnical Services Project: 21-1312 February 21, 2022 I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of Minnesota. Paul Gionfriddo, P.E. Senior Engineer License Number: 23093 Table of Contents 1.0 INTRODUCTION 1 1.1 Project Description 1 1.2 Purpose 1 1.3 Site Description 1 1.4 Scope of Services 1 1.5 Documents Provided 2 1.6 Locations and Elevations 2 2.0 FIELD PROCEDURES 2 3.0 RESULTS 3 3.1 Soil Conditions 3 3.2 Groundwater 3 3.3 Laboratory Testing 4 3.4 OSHA Soil Classification 4 4.0 DISCUSSION AND RECOMMENDATIONS 4 4.1 Proposed Construction 4 4.2 Discussion 5 4.3 Site Grading Recommendations 5 4.4 Dewatering 6 4.5 Groundwater Separation Distances 7 4.6 Interior Slabs 7 4.7 Below Grade Walls 7 4.8 Exterior Slabs 8 4.9 Site Grading and Drainage 9 4.10 Utilities 9 4.11 Ponds 9 5.0 CONSTRUCTION CONSIDERATIONS 10 5.1 Excavation 10 5.2 Observations 10 5.3 Backfill and Fills 10 5.4 Testing 10 5.5 Winter Construction 10 6.0 PROCEDURES 11 6.1 Soil Classification 11 6.2 Groundwater Observations 11 7.0 GENERAL 11 7.1 Subsurface Variations 11 7.2 Review of Design 11 7.3 Groundwater Fluctuations 11 7.4 Use of Report 12 7.5 Level of Care 12 APPENDIX Boring Location Sketch Soil Boring Logs, SB-1 thru SB-4 Descriptive Terminology 1 1.0 INTRODUCTION 1.1 Project Description Ms. Gayle Morin in conjunction with her civil engineering consultants, Civil Site Group, is preparing to split the property at 1441 Lake Lucy Road in Chanhassen, Minnesota and potentially construct 2 new homes on the newly spit parcels. Haugo GeoTechnical Services (HGTS) was retained to perform a geotechnical exploration to evaluate the suitability of site soil conditions to support the proposed homes. 1.2 Purpose The purpose of this geotechnical exploration was to characterize subsurface soil and groundwater conditions and provide recommendations for foundation design and construction of the proposed residences. 1.3 Site Description The project site is a residential lot which carries the mailing address of 1441 Lake Lucy Road in Chanhassen, Minnesota. We understand the existing lot was or will be split into 3 lots and new homes will be built on 2 of the newly split lots. A home with an attached garage and bituminous driveway existed on the northern portion of the overall property. Areas surrounding the home were generally wooded. The remaining portions of the property contained wooded areas and ponds and wetlands. Site topography varied significantly and ranged from about elevation 1020 along Lake Lucy Road to about elevation 960 near Lake Lucy on the south end of the property. Ground surface elevations at the soil boring locations ranged from about 968 to 978 feet above mean sea level (MSL). 1.4 Scope of Services Our services were performed in accordance with the Haugo GeoTechnical Services proposal 21-1312 dated December 21, 2021. Our scope of services was performed under the terms of our General Conditions and limited to the following tasks:  Completing two (4) standard penetration test (SPT) borings, extending each to nominal depths of 20 feet.  Sealing the boreholes in accordance with MDH requirements.  Visually/manually classifying samples recovered from the soil borings.  Obtaining ground surface elevations and GPS coordinates at the soil boring locations.  Performing laboratory tests on select soil samples.  Preparing soil boring logs describing the materials encountered and the results of groundwater level measurements.  Preparing an engineering report describing soil and groundwater conditions, and providing recommendations for foundation support. 2 1.5 Documents Provided To aid in our evaluation, we were provided with an untitled, single-page plan sheet that we assume was prepared by Civil Site Group. The plan sheet showed a layout of the existing property, the proposed property boundaries, hand-drawn annotations showing the proposed soil boring locations, proposed home outlines, infiltration basin outlines, and utility details overlain onto and aerial photograph. The map did not include a signature or date. We were also provided with a document titled “Easement Agreement” from the Office of County Recorder – Carver County Minnesota, dated February 4, 1999. The document listed details including, but not limited to: Creation of Easement Rights, Construction Reconstruction, Maintenance and Repair, and Miscellaneous Provisions. The document was drafted by Bruce A. Boeder of Lambert & Boeder, P.L.L.P. Except for the documents described above specific architectural, structural or civil engineering plans were not provided. 1.6 Locations and Elevations The soil boring locations were selected by Civil Site Group. The approximate locations of the soil borings are shown on the plan sheet in the Appendix. The sketch is the plan sheet that was prepared and provided by Civil Site Group. We attempted to obtain the ground surface elevations and coordinates at the soil boring locations using GPS equipment but the GPS unit could not capture a signal which we assume was due to tree cover. We therefore estimated the ground surface elevations at the boring locations based on topographic information from the plan sheet provided. 2.0 FIELD PROCEDURES Four (4) standard penetration test borings were advanced on February 15, 2022 by HGTS with a rotary drilling rig, using continuous flight augers to advance the boreholes. Representative samples were obtained from the borings, using the split-barrel sampling procedures in general accordance with ASTM Specification D-1586. In the split-barrel sampling procedure, a 2-inch O.D. split-barrel spoon is driven into the ground with a 140-pound hammer falling 30 inches. The number of blows required to drive the sampling spoon the last 12 inches of an 18-inch penetration is recorded as the standard penetration resistance value, or "N" value. The results of the standard penetration tests are indicated on the boring logs. The samples were sealed in containers and provided to HGTS for testing and soil classification. Field log of each boring was prepared by HGTS. The logs contain visual classifications of the soil materials encountered during drilling, as well as the driller's interpretation of the subsurface conditions between samples and water observation notes. The final boring logs included with this report represent an interpretation of the field logs and include modifications based on visual/manual method observation of the samples. The soil boring logs, general terminology for soil description and identification, and classification of soils for engineering purposes are also included in the appendix. The soil 3 boring logs identify and describe the materials encountered, the relative density or consistency based on the Standard Penetration resistance (N-value, “blows per foot”) and groundwater observations. The strata changes were inferred from the changes in the samples and auger cuttings. The depths shown as changes between strata are only approximate. The changes are likely transitions, variations can occur beyond the location of the borings. 3.0 RESULTS 3.1 Soil Conditions It should be noted that soils were frozen to a depth of about 2 to 3 feet below the ground surface at the time of drilling . At the surface, the soil borings encountered about 1 foot of topsoil consisting of silty clayey sand, silty clay, and sandy lean clay that were black and dark brown in color and contained traces of roots. The topsoil was underlain by glacial till deposits that extended to the termination depths of the soil borings. The glacial till consisted of sandy lean clay and clayey sand that were brown and gray in color and contained varying amounts of gravel. A sand seam within clayey glacial till was noted at a depth of about 10 feet in soil boring SB-2. Penetration resistance values (N-Values), shown as blows per foot (bpf) on the boring logs, within the sandy lean clay glacial till ranged from 6 to 22 bpf, indicating a medium to very stiff consistency. N-Values within the clayey sand glacial till was 6 bpf, indicating a loose relative density or medium consistency. 3.2 Groundwater Groundwater was not encountered in the soil borings while drilling and sampling or after removal of the auger from the boreholes. Groundwater appears to be below the depths explored by our borings. We do not anticipate that groundwater will be encountered during construction. Water levels were measured on the dates as noted on the boring logs and the period of water level observations was relatively short. Given the cohesive nature of soils encountered, it is possible that insufficient time was available for groundwater to seep into the borings and rise to its hydrostatic level. Groundwater monitoring wells or piezometers would be required to more accurately determine water levels. Seasonal and annual fluctuations in the groundwater levels should be expected. 4 3.3 Laboratory Testing Laboratory moisture content and P-200 content tests were performed on selected samples recovered from the soil borings. Moisture contents ranged from about 19 to 25 ½ percent. These values indicate the soils were likely above their assumed optimum soil moisture content. The P-200 content is a measure of the silt and clay sized particles (fines) in the soils which can affect soil infiltration rates. In general. the greater the P-200 content of a sample the less permeable the soils will be. Table 1 below summarizes the results of the laboratory tests. Results of the moisture content tests and P-200 tests are also shown on the boring logs adjacent to the sample tested. Table 1. Summary of Laboratory Tests Boring Number Sample Number Depth (feet) Moisture Content (%) * P-200 Content (%) * SB-1 SS-6 5 21 - SB-2 SS-2 5 17 ½ 52 SB-3 SS-14 5 25 ½ 47 ½ SB-3 SS-15 10 20 ½ 55 ½ SB-4 SS-10 5 19 - *Moisture and P-200 content values rounded to the nearest ½ percent. 3.4 OSHA Soil Classification At the anticipated excavation depths, the soil borings encountered sandy lean clay and clayey sand, corresponding to the ASTM Classifications CL and SC, respectively. Soils identified as CL will generally be Type B soils under Department of Labor Occupational Safety and Health Administration (OSHA) guidelines while soils identified as SC will generally be Type C soils. An OSHA-approved qualified person should review the soil classification in the field. Excavations must comply with the requirements of OSHA 29 CFR, Part 1926, Subpart P, “Excavations and Trenches.” This document states excavation safety is the responsibility of the contractor. The project specifications should reference these OSHA requirements. 4.0 DISCUSSION AND RECOMMENDATIONS 4.1 Proposed Construction Specific architectural, structural or civil engineering or construction plans were not provided. For the purposes of this evaluation, we assume the new homes will have walkout or lookout style foundations with one or two stories above grade. We anticipate the main floors will bear slightly above existing grades with the basement floors bearing about 10 feet below the main floor level. The new homes are assumed to consist of cast-in-place concrete foundation walls supported on concrete spread footings with above grade construction consisting of wood framing, a pitched roof and asphalt shingles. Based on the assumed construction we estimate wall 5 loadings will range from about 2 to 3 kips (2,000 to 3,000 pounds) per lineal foot and column loads, if any will be less than 75 kips (75,000 pounds). If the proposed loads exceed these values, the proposed grades differ by more than 2 feet from the assumed values or if the design or location of the proposed building changes, we should be informed. Additional analyses and revised recommendations may be necessary. 4.2 Discussion The vegetation and topsoil are compressible and are not suitable for foundation support. These materials will need to be removed from below the building and oversize areas and replaced as needed with suitable compacted engineered fill. It is our opinion that the underlying native glacial soils are suitable for foundation support and based on the borings we do not anticipate that soil corrections in excess of stripping the topsoil will be required. Groundwater was not encountered in the borings while drilling and sampling or after removal of the auger from the boreholes. We generally do not anticipate that groundwater will be encountered during construction and do not anticipate that dewatering will be required. With the building pad prepared as recommended, it is our opinion the footings can be designed for a net allowable bearing pressure up to 2,000 pounds per square foot (psf). The following sections provide recommendations for foundation design and construction. 4.3 Site Grading Recommendations Excavation We recommend that all vegetation, topsoil and any soft or otherwise unsuitable soils, if encountered, be removed from below the proposed building and oversize areas. Table 2 below summarizes the anticipated excavation depths at the soil boring locations. Excavation depths may vary and could be deeper. Table 2. Anticipated Excavation Depths Boring Number Estimated Surface Elevation (feet) Anticipated Excavation Depth (feet)* Anticipated Excavation Elevation (feet)* Approximate Groundwater Elevation (feet)* SB-1 Estimated 978 1 Estimated 977 NE SB-2 Estimated 972 Pond – Cut to Grade Cut to Grade NE SB-3 Estimated 970 Pond – Cut to Grade Cut to Grade NE SSB-4 Estimated 968 1 Estimated 967 NE * = Excavation and groundwater elevations were rounded to nearest ½ foot. NE = Not Encountered Oversizing In areas where the excavations extend below the proposed footing elevations, the excavations require oversizing. We recommend the perimeter of the excavation be extended a foot outside the proposed footprint for every foot below footing grade (1H:1V oversizing). The purpose of the oversizing is to provide lateral support of the foundation. 6 Fill Material Fill required to attain site grades may consist of any debris-free, non-organic mineral soil. Except we recommend that fill or backfill placed in wet excavations or within 2 feet of the groundwater table, if encountered, consist of granular soil (sand) with less than 5 percent passing the number 200 sieve and at least 50 percent retained on the number 40 sieve. The clayey glacial till soils, excavated during foundation construction appear to be generally suitable for reuse as structural fill or backfill. However, moisture contents ranged from about 19 to 25 ½ percent, indicating the soils were likely above their assumed optimum soil moisture contents based on the standard Proctor test. Soils that will be reused as fill or backfill could require some moisture conditioning (drying) to meet the recommend compaction levels. Summer months are typically more favorable for drying wet soils. Topsoil, organic soils or soils that are black in color are not suitable for reuse as structural fill or backfill. Backfilling We recommend that backfill placed to attain site grades be compacted to a minimum of 95 percent of its standard Proctor density (ASTM D 698). Granular fill classified as SP or SP-SM should be placed within 65 percent to 105 percent of its optimum moisture content as determined by the standard Proctor. Other fill soils should be placed within 3 percentage points above and 1 percentage point below its optimum moisture content as determined by the standard Proctor. All fill should be placed in thin lifts and be compacted with a large self-propelled vibratory compactor operating in vibratory mode. Foundations We recommend the perimeter footings bear a minimum of 42 inches below the exterior grade for frost protection. Interior footings may be placed immediately below the slab provided construction does not occur during below freezing weather conditions. Foundation elements in unheated areas (i.e., deck or porch footings) should bear at least 5 feet below exterior grade for frost protection. We anticipate the foundations and floor slabs will bear on compacted clayey engineered fill or clayey glacial till deposits. With the building pad(s) prepared as recommended, it is our opinion the footings can be designed for a net allowable bearing pressure up to 2,000 pounds per square foot (psf). We anticipate total and differential settlement of the foundations will be less than 1 inch and ½ inch, respectively, across a 30-foot span. 4.4 Dewatering Groundwater was not encountered in the soil borings while drilling and sampling or after removal of the auger from the boreholes. We do not anticipate that groundwater will be encountered and do not anticipate that dewatering will be required. 4.5 Groundwater Separation Distances We recommend that the lowest floor grades for the homes be constructed to meet City of Chanhassen (City) building code requirements with respect to groundwater separation distances. In the absence of township requirements, we recommend the lowest floor slab be 7 constructed to maintain at least a 4-foot separation between the lowest floor slab and the observed groundwater and at least a 2-foot separation between the lowest floor slab and 100- year flood levels of nearby ponds, wetlands or other surface water features. 4.6 Interior Slabs The anticipated floor subgrade will consist of compacted clayey engineered fill or clayey glacial till deposits. It is our opinion a modulus of subgrade reaction, k, of 100 pounds per square inch per inch (pci) of deflection may be used to design the floor. If floor coverings or coatings less permeable than the concrete slab will be used, we recommend that a vapor retarder or vapor barrier be placed immediately beneath the slab. Some contractors prefer to bury the vapor barrier or vapor retarder beneath a layer of sand to reduce curling and shrinkage, but this practice often traps water between the slab and vapor retarder or barrier. Regardless of where the vapor retarder or vapor barrier is placed, we recommend consulting the floor covering manufacturer regarding the appropriate type, use and installation of the vapor retarder or vapor barrier to preserve the warranty. We recommend following all state and local building codes with regards to a radon mitigation plan beneath interior slabs. 4.7 Below Grade Walls We recommend general waterproofing of the below grade walls. We recommend either placing drainage composite against the backs of the exterior walls or backfilling adjacent to the walls with sand having less than 50 percent of the particles by weight passing the #40 sieve and less than 5 percent of the particles by weight passing the #200 sieve. The sand backfill should be placed within 2 feet horizontally of the wall. We recommend the balance of the backfill for the walls consist of sand however the sand may contain up to 20 percent of the particles by weight passing the #200 sieve. We recommend installing drain tile behind the below grade walls, adjacent to the wall footing and below the slab elevation. Preferably the drain tile should consist of perforated pipe embedded in gravel. A geotextile filter fabric should encase the pipe and gravel. The drain tile should be routed to a storm sewer, sump pump or other suitable disposal site. Foundation walls or below grade (basement) walls will have lateral loads from the surrounding soil transmitted to them. Active earth pressures can be used to design the below grade walls if the walls are allowed to rotate slightly. If wall rotation cannot be tolerated, then below grade wall design should be based on at-rest earth pressures. It is our opinion that the estimated soil parameters presented in Table 3, can be used for below grade wall design. These estimated soil parameters are based on the assumptions that the walls are drained, there are no surcharge loads within a horizontal distance equal to the height of the wall and the backfill is level. 8 Table 3. Estimated Soil Parameters Soil Type Estimated Unit Weight (pcf) Estimated Friction Angle (degrees) At-Rest Pressure (pcf) Active Soil Pressure (pcf) Passive Soil Pressure (pcf) Sand (SP or SP-SM) 120 32 55 35 390 Other Soils (CL, SC) 135 28 70 50 375 Resistance to lateral earth pressures will be provided by passive resistance against the wall footings and by sliding resistance along the bottom of the wall footings. We recommend a sliding coefficient of 0.35. This value does not include a factor of safety. 4.8 Exterior Slabs Exterior slabs will likely be underlain by clayey soils which are considered moderately to highly frost susceptible. If these soils become saturated and freeze, frost heave may occur. This heave can be a nuisance in front of doors and at other critical grade areas. One way to help reduce the potential for heaving is to remove the frost-susceptible soils below the slabs down to bottom of footing grades and replace them with non-frost-susceptible backfill consisting of sand having less than 5 percent of the particles by weight passing the number 200 sieve. If this approach is used and the excavation bottoms terminate in non-free draining granular soil, we recommend a drain tile be installed along the bottom outer edges of the excavation to collect and remove any water that may accumulate within the sand. The bottom of the excavation should be graded away from the building. If the banks of the excavations to remove the frost-susceptible soils are not sloped, abrupt transitions between the frost-susceptible and non-frost-susceptible backfill will exist along which unfavorable amounts of differential heaving may occur. Such transitions could exist between exterior slabs and sidewalks, between exterior slabs and pavements and along the slabs themselves if the excavations are confined to only the building entrances. To address this issue, we recommend sloping the excavations to remove frost-susceptible soils at a minimum 3:1 (horizontal:vertical) gradient. An alternative method of reducing frost heave is to place a minimum of 2 inches of extruded polystyrene foam insulation beneath the slabs and extending it about 4 feet beyond the slabs. The insulation will reduce frost penetration into the underlying soil and reduce heave. Six to twelve inches of granular soil is typically placed over the insulation to protect it during construction. Another alternative for reducing frost heave is to support the slabs on frost depth footings. A void space of at least 4 inches should be provided between the slab and the underlying soil to allow the soil to heave without affecting the slabs. 9 4.9 Site Grading and Drainage We recommend the site be graded to provide positive run-off away from the proposed house. We recommend landscaped areas be sloped a minimum of 6 inches within 10 feet of the building and slabs be sloped a minimum of 2 inches. In addition, we recommend downspouts with long splash blocks or extensions. 4.10 Utilities We anticipate that new water and sanitary sewer utilities could be installed as part of this project. We further anticipate that new utilities will bear at depths ranging from about 7 to 10 feet below the ground surface. At these depths we anticipate that the pipe will bear on compacted engineered fill or glacial till soils which in our opinion are generally suitable for pipe support. We recommend removing all vegetation, topsoil, and any soft or otherwise unsuitable soils, if any, beneath utilities prior to placement. We recommend bedding material be thoroughly compacted around the pipes. We recommend trench backfill above the pipes be compacted to a minimum of 95 percent beneath slabs and pavements, the exception being within 3 feet of the proposed pavement subgrade, where 100 percent of standard Proctor density is required. In landscaped areas we recommend a minimum compaction of 90 percent. Groundwater was not encountered in the soil borings while drilling and sampling or after removal of the auger from the boreholes. 4.11 Ponds Based on the plans/maps provided it appears the project will include constructing stormwater ponds on each of the new lots. Design elevations of the proposed pond was not provided. Borings SB-2 and SB-3 were completed near or within the proposed ponds and encountered sandy lean clay and clayey sand. It is our opinion that the infiltration rates presented in Table 5 can be used for stormwater pond/infiltration basin design. These values were obtained from tables included in the “Minnesota Storm Water Manual”. Table 5. Design Infiltration Rates In-situ soils Soil Description Hydrologic Soil Group Design Infiltration Rate (inches/hour) SC Clayey Sand D 0.06 CL Lean Clay/Sandy Lean Clay D 0.06 Field tests (double ring infiltrometer) can be performed within the proposed infiltration basin area to verify infiltration rates of the in-situ soils. We would be pleased to provide these services if required or requested. 10 5.0 CONSTRUCTION CONSIDERATIONS 5.1 Excavation At the anticipated excavation depths, the soil borings encountered sandy lean clay and clayey sand, corresponding to the ASTM Classifications CL and SC, respectively. Soils identified as CL will generally be Type B soils under Department of Labor Occupational Safety and Health Administration (OSHA) guidelines while soils identified as SC will generally be Type C soils. Temporary excavations in Type C soils should be constructed at a minimum of 1 ½ foot horizontal to every 1-foot vertical within excavations. Slopes constructed in this manner may still exhibit surface sloughing. If site constraints do not allow the construction of slopes with these dimensions, then temporary shoring may be required. 5.2 Observations A geotechnical engineer or qualified engineering technician should observe the excavation subgrade to evaluate if the subgrade soils are similar to those encountered in the borings and adequate to support the proposed construction. 5.3 Backfill and Fills We recommend moisture conditioning all soils that will be used as fill or backfill in accordance with Section 4.3 above. We recommend that fill and backfill be placed in lifts not exceeding 4 to 12 inches, depending on the size of the compactor and materials used. 5.4 Testing We recommend density tests of backfill and fills placed for the proposed house foundations. Samples of the proposed materials should be submitted to our laboratory prior to placement for evaluation of their suitability and to determine their optimum moisture content and maximum dry density (Standard Proctor). 5.5 Winter Construction If site grading and construction is anticipated to proceed during cold weather, all snow and ice should be removed from cut and fill areas prior to additional grading and placement of fill. No fill should be placed on frozen soil and no frozen soil should be used as fill or backfill. Frost should not be allowed to penetrate below footings and foundations. Concrete delivered to the site should meet the temperature requirements of ASTM and/or ACI. Concrete should not be placed on frozen soil. Concrete should be protected from freezing until the necessary strength is obtained. Frost should not be permitted to penetrate below the footings. 11 6.0 PROCEDURES 6.1 Soil Classification The drill crew chief visually and manually classified the soils encountered in the borings in general accordance with ASTM D 2488, “Description and Identification of Soils (Visual- Manual Procedure).” Soil terminology notes are included in the Appendix. The samples were returned to our laboratory for review of the field classification by a soils engineer. Samples will be retained for a period of 30 days. 6.2 Groundwater Observations Immediately after taking the final samples in the bottom of the boring, the hole was checked for the presence of groundwater. Immediately after removing the augers from the borehole the hole was once again checked and the depth to water and cave-in depths were noted. 7.0 GENERAL 7.1 Subsurface Variations The analyses and recommendations presented in this report are based on data obtained from a limited number of soil boring(s). Variations can occur away from the boring, the nature of which may not become apparent until additional exploration work is completed, or construction is conducted. A reevaluation of the recommendations in this report should be made after performing on-site observations during construction to note the characteristics of any variations. The variations may result in additional foundation costs and it is suggested that a contingency be provided for this purpose. It is recommended that we be retained to perform the observation and testing program during construction to evaluate whether the design is as expected, if any design changes have affected the validity of our recommendations, and if our recommendations have been correctly interpreted and implemented in the designs, specifications and construction methods. This will allow correlation of the soil conditions encountered during construction to the soil borings and test pits and will provide continuity of professional responsibility. 7.2 Review of Design This report is based on the design of the proposed structures as related to us for preparation of this report. It is recommended that we be retained to review the geotechnical aspects of the design and specifications. With the review, we will evaluate whether any changes have affected the validity of the recommendations and whether our recommendations have been correctly interpreted and implemented in the design and specifications. 7.3 Groundwater Fluctuations We made water level measurements in the borings at the times and under the conditions stated on the boring log. The data was interpreted in the text of this report. The period of observation was relatively short and fluctuations in the groundwater level may occur due to rainfall, 12 flooding, irrigation, spring thaw, drainage, and other seasonal and annual factors not evident at the time the observations were made. Design drawings and specifications and construction planning should recognize the possibility of fluctuations. 7.4 Use of Report This report is for the exclusive use of Ms. Gayle Morin and her design team to use to design the proposed structures and prepare construction documents. In the absence of our written approval, we make no representation and assume no responsibility to other parties regarding this report. The data, analysis and recommendations may not be appropriate for other structures or purposes. We recommend that parties contemplating other structures or purposes contact us. 7.5 Level of Care Haugo GeoTechnical Services has used the degree of skill and care ordinarily exercised under similar circumstance by members of the profession currently practicing in this locality. No warranty expressed or implied is made. APPENDIX S00°10'43"W 1131.8 +/-N00°10'43"E 1220.1 +/-1161.341081.20[12][13 ] Sewe r Easemen t pe rDoc. Nos . 244417 & 244418[13] Turnaround EasementPer Doc. No. 2444188" PVC8" PVCExisting HouseExisting HouseDeck12" RCP[13] Temporary Easementper Doc. No. 244418Upper Level Deckw/ Walkout Beneath32LOT 2BLOC K 1 SB-1 SB-4 SB-2 SB-3 1:30 Silty Clayey Sand, trace Roots, black, frozen. (Topsoil) (CL) Sandy Lean Clay, trace Gravel, brown and gray, wet, rather stiff to very stiff. (Glacial Till) (CL) Sandy Lean Clay, trace Gravel, gray, wet, rather stiff. (Glacial Till) Bottom of borehole at 14.5 feet. AU 5 SS 6 SS 7 SS 8 5-5-6 (11) 5-7-10 (17) 3-4-7 (11) 21 NOTES Ground Surface Elevation Estimated GROUND ELEVATION 978 ft LOGGED BY DRILLING METHOD Hollow Stem Auger/Split Spoon DRILLING CONTRACTOR HGTS GROUND WATER LEVELS: CHECKED BY PG DATE STARTED 2/15/22 COMPLETED 2/15/22 AT TIME OF DRILLING --- Not Encountered AT END OF DRILLING --- Not Encountered AFTER DRILLING --- Not Encountered HOLE SIZE 3 1/4 inches FINES CONTENT (%) 20 40 60 80 20 40 60 80 PL LLMC DEPTH(ft)0.0 2.5 5.0 7.5 10.0 12.5 GRAPHICLOGMATERIAL DESCRIPTION SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE) SPT N VALUE 20 40 60 80 MOISTURE CONT.(%)NOTESPAGE 1 OF 1 BORING NUMBER SB-1 CLIENT Gayle Morin PROJECT NUMBER 21-1312 PROJECT NAME 1441 Lake Lucy Road PROJECT LOCATION Chanhassen, MN GEOTECH BH PLOTS - GINT STD US LAB.GDT - 2/21/22 08:46 - C:\USERS\HGTS 3\DROPBOX (HGTS)\HAUGO GEOTECHNICAL SERVICES\GINT PROJECT BACKUP\PROJECTS\21-1312 1441 LAKE LUCY ROAD.GPJHaugo GeoTechnical Services 2825 Cedar Ave South Minneapolis, MN 55407 Telephone: 612-729-2959 Fax: 763-445-2238 Silty Clayey Sand, trace Roots, black, frozen. (Topsoil) (CL) Sandy Lean Clay, trace Gravel, brown and gray, wet, rather stiff to very stiff. (Glacial Till) P-200=52% Sand Seam at about 10 feet (CL) Sandy lean Clay, trace Gravel, gray, wet, stiff. (Glacial Till) Bottom of borehole at 14.5 feet. AU 1 SS 2 SS 3 SS 4 4-4-5 (9) 40-15-5 (20) 3-5-8 (13) 17.5 NOTES Ground Surface Elevation Estimated GROUND ELEVATION 972 ft LOGGED BY DRILLING METHOD Hollow Stem Auger/Split Spoon DRILLING CONTRACTOR HGTS GROUND WATER LEVELS: CHECKED BY PG DATE STARTED 2/15/22 COMPLETED 2/15/22 AT TIME OF DRILLING --- Not Encountered AT END OF DRILLING --- Not Encountered AFTER DRILLING --- Not Encountered HOLE SIZE 3 1/4 inches FINES CONTENT (%) 20 40 60 80 20 40 60 80 PL LLMC DEPTH(ft)0.0 2.5 5.0 7.5 10.0 12.5 GRAPHICLOGMATERIAL DESCRIPTION SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE) SPT N VALUE 20 40 60 80 MOISTURE CONT.(%)NOTESPAGE 1 OF 1 BORING NUMBER SB-2 CLIENT Gayle Morin PROJECT NUMBER 21-1312 PROJECT NAME 1441 Lake Lucy Road PROJECT LOCATION Chanhassen, MN GEOTECH BH PLOTS - GINT STD US LAB.GDT - 2/21/22 08:46 - C:\USERS\HGTS 3\DROPBOX (HGTS)\HAUGO GEOTECHNICAL SERVICES\GINT PROJECT BACKUP\PROJECTS\21-1312 1441 LAKE LUCY ROAD.GPJHaugo GeoTechnical Services 2825 Cedar Ave South Minneapolis, MN 55407 Telephone: 612-729-2959 Fax: 763-445-2238 Silty Clay, trace Roots, black, wet. (Topsoil) (SC) Clayey Sand, fine grained, gray and brown, wet, loose. (Glacial Till) P-200=47.5 (CL) Sandy Lean Clay, trace Gravel, brown and gray, wet, rather stiff. (Glacial Till) P-200=55.5 (CL) Sandy Lean Clay, trace Gravel, gray, wet, rather stiff. (Glacial Till) Bottom of borehole at 14.5 feet. AU 13 SS 14 SS 15 SS 16 3-3-3 (6) 3-4-2 (6) 3-5-7 (12) 25.5 20.5 NOTES Ground Surface Elevation Estimated GROUND ELEVATION 970 ft LOGGED BY DRILLING METHOD Hollow Stem Auger/Split Spoon DRILLING CONTRACTOR HGTS GROUND WATER LEVELS: CHECKED BY PG DATE STARTED 2/15/22 COMPLETED 2/15/22 AT TIME OF DRILLING --- Not Encountered AT END OF DRILLING --- Not Encountered AFTER DRILLING --- Not Encountered HOLE SIZE 3 1/4 inches FINES CONTENT (%) 20 40 60 80 20 40 60 80 PL LLMC DEPTH(ft)0.0 2.5 5.0 7.5 10.0 12.5 GRAPHICLOGMATERIAL DESCRIPTION SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE) SPT N VALUE 20 40 60 80 MOISTURE CONT.(%)NOTESPAGE 1 OF 1 BORING NUMBER SB-3 CLIENT Gayle Morin PROJECT NUMBER 21-1312 PROJECT NAME 1441 Lake Lucy Road PROJECT LOCATION Chanhassen, MN GEOTECH BH PLOTS - GINT STD US LAB.GDT - 2/21/22 08:46 - C:\USERS\HGTS 3\DROPBOX (HGTS)\HAUGO GEOTECHNICAL SERVICES\GINT PROJECT BACKUP\PROJECTS\21-1312 1441 LAKE LUCY ROAD.GPJHaugo GeoTechnical Services 2825 Cedar Ave South Minneapolis, MN 55407 Telephone: 612-729-2959 Fax: 763-445-2238 Sandy Lean Clay, trace Roots, dark brown, wet. (Topsoil) (CL) Sandy Lean Clay, trace Gravel, brown and gray, wet, very stiff. (Glacial Till) (CL) Sandy Lean Clay, trace Gravel, gray, wet, stiff. (Glacial Till) Bottom of borehole at 14.5 feet. AU 9 SS 10 SS 11 SS 12 4-9-10 (19) 6-9-13 (22) 3-5-8 (13) 19 NOTES Ground Surface Elevation Estimated GROUND ELEVATION 968 ft LOGGED BY DRILLING METHOD Hollow Stem Auger/Split Spoon DRILLING CONTRACTOR HGTS GROUND WATER LEVELS: CHECKED BY PG DATE STARTED 2/15/22 COMPLETED 2/15/22 AT TIME OF DRILLING --- Not Encountered AT END OF DRILLING --- Not Encountered AFTER DRILLING --- Not Encountered HOLE SIZE 3 1/4 inches FINES CONTENT (%) 20 40 60 80 20 40 60 80 PL LLMC DEPTH(ft)0.0 2.5 5.0 7.5 10.0 12.5 GRAPHICLOGMATERIAL DESCRIPTION SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE) SPT N VALUE 20 40 60 80 MOISTURE CONT.(%)NOTESPAGE 1 OF 1 BORING NUMBER SB-4 CLIENT Gayle Morin PROJECT NUMBER 21-1312 PROJECT NAME 1441 Lake Lucy Road PROJECT LOCATION Chanhassen, MN GEOTECH BH PLOTS - GINT STD US LAB.GDT - 2/21/22 08:46 - C:\USERS\HGTS 3\DROPBOX (HGTS)\HAUGO GEOTECHNICAL SERVICES\GINT PROJECT BACKUP\PROJECTS\21-1312 1441 LAKE LUCY ROAD.GPJHaugo GeoTechnical Services 2825 Cedar Ave South Minneapolis, MN 55407 Telephone: 612-729-2959 Fax: 763-445-2238 WETLAND DELINEATION REPORT 10t1 1 t2021 2021-366 1,441 Lake Lucy Rd Delineation Chanhassen, M N Jacobson Environmental, PLLC jacobson env@msn.com Jacobson Environmental, PLLC Environmental Consulta nts www,jacobsonenvi ron mental.com Wayne Jacobson, P.S.S., W.D.C., P.W.S., A.F.S. 5821 Humboldt Avenue North, Brooklyn Center, MN 55430 Email: iacobsonenv@msn.com (612) 802-6619 Cell Ta ble of Contenrs 2.1 EX|ST|NG TNFORMATTON REVTEW ..........................3 2.L.L Antecedent Precipitation ..............3 2.1.2 NationalWetlands Inventory ..........................3 2.1.3 Web Soil Survey. ...........................3 2.1.4 Public Waters Inventory... .............3 2.1.5 Topographic Map........... ...............3 2.2 FIELD DE1|NEATION................. ............4 2.2.1Vegetation............ .........................4 2.2.2 Hydric Soils ........... .........................5 2.2.3 Cautions Used in Applying the Field Indicators of Hydric soi|s........... ......................5 3.1 WETLAND BASTN DESCR|PT|ONS............... ..............6 4.0 CONFIRMATION OF JURISDICTIONAL STATUS ..,..,.....7 Appendices Appendix A Antecedent Precipitation Data Appendix B Sample Data Sheets Appendix C Site Photographs Appendix D Wetland Type and Boundary Approval Forms Figu res Figure 1 Site Location Map Figure 2 National Wetland Inventory Map Figure 3 Soils Map Figure 4 Public Waters Inventory Map Figure 5 Delineation Map Figure 6 Topographic Map Figure 7 Hydric Rating Map Wetland Delineation-Mitigation-Permitting-Monitoring-Banking-Functional Analysis-T & E Surveys Phase I Environmental Assessments-EAW's-Soil ID-Soil Analysis & Delineation-Environmental Referrals Pond & Lake Weed Control & Fish Stocking-Tree Surveys-Natural Resource Manaqement plans Jacobson Flnvironmental, PI,LC Environmental Consulta nts www.jacobsonenvi ron menta l.com Wayne Jacobson, P.S.S., W.D.C., P.W.S., A.F.S. 5821 Humboldt Avenue North, Brooklyn Center, MN 55430 Email: iacobsonenv@msn.com 1.0 SU M MARY (612) 802-6619 Cell Jacobson Environmental, PLLC (JE)visited the project site at 1441 Lake Lucy Rd, Chanhassen, Minnesota 55317 on 10/08/2021.The sitewas approximately 4.9 acres in size, and was located at Section 2,T116N, R23W, Chanhassen, Minnesota See Figure l for a Site Location Map. The purpose of the investigation was to identify areas withrn the project boundary meeting the technrcal criteria for wetlands, delineate the jurisdictional extent of the wetland basins, and classifylhe weland habitat according to the 1987 U.S. Army Corps of Engineers Wetland Delineation Manuat and the 20,10 Regional Supplement to the Corps of Engineers Wetland Delineation: Midwest Region Wetlands are areas that are saturated or inundated with surface and or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in hydric soilconditions. Examples of wetlands include seasonally flooded basins, floodplain forests, wet meadows, shallow and deep marshes, shrub swamos. wooded swamps, fens, and bogs. Wetland boundaries were determined through a routine analysis of the vegetation, soils and hydrology which must all show wetland characteristics for an area to be delineated as a wefland. Two baslns were delineated within the project area, which is summarized below and shown on Fiqure 5 Cowardin Type 2 PEM,1B Type 3 PEMl C Eggers & Reed Wet Meadow Shallow Marsh Dominant Vegetation Nodding Beggartick, Reed Canary Grass, Lake Sedge, and Green Ash Lake Sedge, Duckweed. and Narrow Leaf Cattail Size Fgtqs) 266 zzz All figures and appendices referenced by this report are presented at the end of the text This wetland delineation was performed by Jacobson Environmental, PLLC under the direction of Wayne Jacobson, Minnesota Professional Soil Scientist #3061 '1, Society of Wetland Scientists - professionai Wetland Scienttst #1000, University of Minnesota / BWSR Wetland Delineator, Certified #i0ig. American Fisheries Society - Associate Fisheries Scientist #A-j71. Wetland Delineation-Mitigation-Permitting-Monitoring-Banking-Functional Analysis-T & E Surveys 2 Phase I Environmental Assessments-EAW's-Soil ID-Soil Analysis & Delineation-Environmental Referrals Pond & Lake Weed Control & Fish Stocking-Tree Surveys-Natural Resource Management plans Jacobson Environmentalo PLLC Environmental Consulta nts www.jacobsonenvi ron menta l.com Wayne Jacobson, P.S.S., W.D.C., P.W.S., A.F.S. 5821 Humboldt Avenue North, Brooklyn Center, MN 55430 Email: iacobsonenv@msn.com 2.0 METHODS (612) 802-6619 Cell 2 1 EXISI ING INFORMA'I ION REVIEW Prior to field delineation, Jacobson Environmental reviewed the followinq information: 2.1.1 Antecedent Precipitation The previous three month's precipitation data obtarned from the Minnesota State Climatology Office suggest that the sampling period occurred under normal conditions. Antecedent precipitation data can be found in Appendix A. The growing season in this area is approximately from mid-April to mid-October, when the air temperature averages above 28 degrees F. This delineation was completed during the growing season. 2..1.2 National Wetlands lnventory The National Wetlands lnventory (NWl) identified two (PABH and PFOlA) wefland comptexes within the property boundary (Figure 2) 2.1.3 Web SoilSurvey The National Resource Conservation Service Web Soil Survey (Figure 7) identified the following soils seU Hy9!1r_c_&a!ilg_ C qtQp_Vg We-bs,te r _Co m p |ex 100 _E$pxULle JendJ Lqqm Kr_1kgryry leqter Loams Lester-Kilkeny Corrlglex -4lqq.l"rqq-@l--- 2.1.4 Public Waters Inventory The Mtnnesota Department of Natural Resources Public Waters Inventory shows that one public water exists on the property (Figure 4). 2.1.5 Topographic Map A topographic map with aerial photo overlay was obtained from Carver County (Figure 6). This map was reviewed for suspected wetland areas based on topography and vegetative cover. Wetland Delineation-Mitigation-Permitting-Monrtoring-Banking-Functional Analysis-T & E Surveys Phase I Environmental Assessments-EAW's-Soil ID-Soil Analysis & Delineation-Environmental Referrals Pond & Lake Weed Control & Fish Stocking-Tree Surveys-Natural Resource Management plans 100 _ 0 100 I I I I l Jacobson Environmental, PLI,C Environmental Consultants www.jacobsonenvi ron menta l.com Wayne Jacobson, P.S.S., W.D.C., P.W.S., A.F.S. 5821 Humboldt Avenue North, Brooklyn Center, MN 55430 Email: iacobsonenv@msn.com (612) 802-6619 Cell 2.2 t-ttt_D DEL tN EATtoN The wetlands on the subject property were delineated using the routine determination methodology set forth in the 1987 U S. Army Corps of EngineersWetlands Delineation Manualand the 2010 Regional Supplement to the Corps of Engineers Wetland Delineation: Midwest Region as follows. 1)The vegetative community was sampled in all present strata to determine whether 50% of the dominant plant species were hydrophytic using the 50/20 method Soil pits were dug using a Dutch augerto depths of '18'-40", noting soil profites and any hydric soil characteristics Signs of wetland hydrology were noted and were compared to field criteria such as deptn to shallow water table and depth of soil saturation found in the soil oits. Transects were established in representative areas of each wetland. Each transect consisted of one sample potnt within the wetland and one sample point in upland. Other areas which have one or more of the wetland vegetation, soils, or hydrologic characteristics present, or where questionable conditions exist may also have been sampled. Data sheets for each sample point are available in Appendix B. Wetland classifications discussed rn the text are set forth in Wettands and Deepwater Habitats of the United Sfafes (FWS/OBS Publication 79131, Cowardin et al 1979) and Wetlands of the united Stafes (USFWS Circular 39, Shaw and Fredine, 1971.) Additionally, plant community types as named by Eggers and Reed (1998) are given. Wetland edges were marked with orange numbered pin flags. 4-foot wood lath marked with orange"wetland boundary" flagging tape or flagging tied on vegetation may be used if site conditions warrant Sample points are marked with orange numbered pin flags. Any wetlands or sample points were mapped using GpS. 2.2.1Vegetation The plant species within the parcel were catalogecl and assigned a wetland indicator status according to Lichvar, R.W. D.L. Banks, W N Kirchner, and N.C Melvin, 2016. The NationatWettand Plant List 2016 Wetland Ratings, Phytoneuron 2016-30. i-i7. ln the text of this report and on the enclosed data forms, the plant rndicator status follows the olant's scientific name unless a status has not been assigned. The hydrophytic plant criterion is met when more than 50 percent of the dominant species by the 50/20 rule for each stratum (herb, shrub/sapling tree, and Wetland Delineation-Mitigation-Permitting-Monitoring-Banking-Functional Analysis-T & E Surveys 4 Phase I Environmental Assessments-EAW's-Soil ID-Soil Analysis & Delineation-Environmental Referrals Pond & Lake Weed Control & Fish Stocking-Tree Surveys-Natural Resource Management plans 2) Jacobson Environmental, PLLC Environmental Consultants www.jacobsonenvi ron mental.com Wayne Jacobson, P.S.S., W.D.C., P.W.S., A.F.S. 5821 Humboldt Avenue North, Brooklyn Center, MN 55430 Email: iacobsonenv@msn.com (612) 802-6619 Cell woody vine)were assigned an obligate (OBL)1, facultative wet (FACW), and/or facultative (FAC)weiland With the 50/20 rule, dominants are generally measured by absolute ohcover in each stratum which individually or collectively account for more than 50% of total vegetative cover in the stratum, plus any other species which ttself accounts for at least 2O7o of the total veqetative cover. 2.2.2 l-lydric Soils A hydric soil is a soil formed under condrtions of saturation, flooding, or ponding long enough during the growing season to develop anaerobic conditions in the upper part. lf a soil exhibits the indicators oia hydric soil or is identified as a hydric soil the hydric soil criterion is met. The break between hydric and non-hydric soils was determined by excavating soil pits along transects crossing the wetland/upland eco-tone and evaluating the soil colors, textures, and presence or absence of redoximorphic indicators (i.e., mottles, gley or oxidized rhizospheres). Hydric Soil lndicators for the Midwest Region were noted as presented in the NatronalTechnical Committee for Hydric Soils Field lndicators of Hydric So/s ln the United Stafes version S.7 (USDA NRCS 2017) tf present at each sample point. Upper soil profiles were also compared to the mapped or inclusionary soil series found in the sample area for soil identification purposes 2.2.3 Cautions Used in Applying the Field Indicators of Hydric Soils There are hydric soils with morphologies that are difficult to interpret. These include soils with black gray or red parent material. soils with high pH; soils high or low jn content of organic matter; recently developed hydric soils, and soils high in iron inputs. In some cases, we do not currenily have indicators to assist in the identification of hydric soils in these situations. lf the soil meets the definition of a hydric soil the lack of an indicator does not preclude the soilfrom being hydric. The indicators were developed mostly to identify the boundary of hydric soil areas and generally work best on the margins Not all the obviously wetter hydric soils wrll be identified by the indicators Redoximorphic features are most likely to occur in soils that cycle between anaerobic (reduced) and aerobic (oxidized) condrtions. Morphological features of hydric soils indicate that saturation and anaerobic conditions have existed under either contemporary or former hydrologic regimes. Where soil morphology seems inconsistent with the landscape, vegetation, or observable hydrology, it may be necessary to obtain the assistance of an experienced soil or wetland scientist to determine whether the soil is hydric To clarify, when investigating hydric soils in this area, one must consider the followinq: . Many of these soils have black or gray parent materials. r OBl=Obligate Wetland, occurs an estimated 99% in wetlands. FACW=Facultative Weiland, has an esttmated 67"h-gg"/" probability of occurrence in wetlands. FAC=Facultative, is equally likely to occur in wetlands and non-we|ands, 34%-66%probability FACU=Facultative Upland, occurs in wetlands only occasionally,1ok-23% probability UPL=Upland, almost never occurs in wetlands, <1% probability Nl= No Indicator, insufficiernt information available to determine an indicator status. positive ornegative sign previously indicated a frequency toward higher (+) or lower (-) frequency of occurrence within a category Wetland Delineation-Mitigation-Permitting-Monitoring-Banking-Functional Analysis-T & E Surveys Phase I Environmental Assessments-EAW's-Soil ID-Soil Analysis & Delineation-Environmental Referrals Pond & Lake Weed Control & Fish Stocking-Tree Surveys-Natural Resource Management plans Jacobson Environmental, PLLC www.jacobsonenvironmentar.com Environmental consultants wayne Jacobson, p.s.s., w.D.c., p.w.s., A,F.s. 5821 Humboldt Avenue North, Brooklyn center, MN 55430 (612) 802-6619 cell Email: iacobsonenv@msn.com . Many of the soils have a high organic matter content.. The hydric soil margin is typically higher than the wetland boundary margin on the siter Not all the obviously wetter soils will be identified by the indicators.. Many of the hydric soils are Mollisols which are classic problem hydric soils in many cases 3 O RESULTS 3.1 WEI LAND BASIN DESCRIPTIONS Basin 1 Basin 1 was an approximately 0.266 acres, Type2, PEMIB, Wet Meadow wetland. The basin was dominated by Nodding Beggarticks, Reed canary Grass, Lake sedge, and Green Ash Hydrology indicators included A2 (High Water Tabte) and A3 (Saturation). Wetland soils met indicators A10 (2 cm Muck). Adjacent upland was typically dominated by Common Buckthorn, Basswood, and Pennsylvania Sedge. Primary hydrology indicators were not observed at the upland sample point, and no hydric soil indicators were found in the upland sample point soil. The wetland boundary followed a change in vegetation from wetland to upland plant communities, as well as a distinct change in topography. The basin was shown as a PFOlA wetland on the NWI map (Figure 2)and was located within an area mapped as Cordova-Webstercomplex (Hydric Rating='100) by the Web Soil Survey (Figure 7) sample data sheets 1-Up and 1_wet in Appendix B correspond to this basin. Basin 2 Basin 2 was an approximately 2.22 acres, Type 3, PEMlC, Shallow Marsh wetland. The basin was dominated by Lake Sedge, Duckweed, and Narrow Leaf Cattail. Hydrology indicators included Al (Surface Water) A2 (High Water Table), and A3 (Saturation). Wetland soils met indicators A10 (2 cm Muck) Adjacent upland was typically dominated by Common Buckthorn, Pennsylvania Sedge, and Basswood Primary hydrology indrcators were not observed at the upland sample point, and no hydric soil indicators were found in the upland sample point soil. Wetland Delineation-Mitigation-Permitting-Monitoring-Banking-Functional Analysis-T & E Surveys 6 Phase I Environmental Assessments-EAW's-Soil ID-Soil Analysis & Delineation-Environmental Referrals Pond & Lake Weed Control & Fish Stocking-Tree Surveys-Natural Resource Management Plans ,Iacobson Ilnvironmental, PI,LC www.jacobsonenvironmental.com Environmental consultants wayne Jacobson, p.s.s., w.D.c., p.w.s., A.F.s. 5821 Humboldt Avenue North, Brooklyn Center, MN 55430 (612) 802-6619 CellEmail: iacobsonenv@msn.com The wetland boundary followed a change in vegetation from wetland to upland plant communities, as well as a distinct change in topography. The basin was shown as a PABH wetland on the NWI map (Figure 2) and was located within an area mapped as Klossnerand Muskego soils (Hydric Rating=100) by tfre WeO Soil Survey (Figure 7) Sample data sheets 2_Up and 2_wet in Appendix B correspond to this basin. 4.0 CONFIRMATION OF JURISDICTIONAL STATUS Jacobson Environmental is submitting this report to the client and regulatory agencies to request a wetland boundary and type determination. We have enclosed an offi-ial WCA Approval of We|and Type and Boundary form in Appendix D along with a USCOE wetland delineation concurrence reouest 5.O CE RTI F ICATIO N I certify that this wetland delineation meets the standards and criteria described in the '1987 U.S. Army Corps of Engineers Wetland Delineation Manual and the 20'10 Regional Supplement to the Corps of Engineers Wetland Delineation: Midwest Region. This was a Routine On-Site Determination and the results reflect the conditions present at the time of the delineation. I certify that this report has been prepared in accordance with regulatory standards Thank you for the opportunity to provide wetland services on this important projecti lf any wetland impacts are planned for this project, permits would be necessarv from the LGU and other agencies. Sincerely, .//;,,/,,,,/,,,, /:,,,, Wayne Jacobson, WDC, PSS Wetland Delineator, Certified #1019 Professional Soil Scientist #3001 1 Jacobson Environmental, PLLC. Wetland Delineation-Mitigation-Permitting-Monitoring-Banking-Functional Analysis-T & E Surveys 7Phase I Environmental Assessments-EAW's-Soil ID-Soil Analysis & Delineation-Environmental Referrals Pond & Lake Weed Control & Fish Stocking-Tree Surveys-Natural Resource Management plans Figures (-, c) O C.) $-r b0 ft ,g 6 i >n; L6=: - >.i L u >oYi\h-9 b 3 a J F= sFPCvUnQ,^ o a;-i;0*:6nr Y-uF.=oJU6 LO@- =d.PP,2q,?:i!i Z = X n= -'90!v-€g s r a :EE:-Aqi=Fs fiuFod Y:ori-t! g.:tsb!6F EFepio- F db e=s do=6td'fi.sxeE: ;'9 ! P;: E P Etr g I e=k,gP'- ee E * go-Poq;o E.ciXiFd f PEEg .E N Ln b*u I I-' !1[lL$ ss H t,q *E!LS gdEi r,t* uI:=94:f !-o;lf#; ;3;: lTll.lll rLJII "i' {J'l! :{ tr {r'0-o Ctr9.1 =u fOr,-.rCnl!h:. E .x u=#!.- :-sl,!l,F;i6 + 5 E T"o_i,[4[5iuqiuu:€ fr fi 5 5:1tt 4rtr! o; GU .'r -_- C H.*E*. ;Ee*'.1Cq.9!quLrtr,l,u{-' .6u 60E{:D1 -rua!!11!...=aEgi!il-i',|: q".'J r o f q ! q l: Lll Ll -'. ff l-o*,g o s rctg (u I *,o -J 6c .9+,(Ez c.l () - b0 lv vl ltJ UE|r3oo '-'n 1H =igE<3a.Fur<az Ib Soil Map-Carver County, Minnesota (Figure 3 Soils Map) Map Scale: 1 : 2,180 if fi nted on A porb"it (8.5" x 1 1,,) sheet. ^, Metersl!030mlif 180A reetl\0 1mm4{/.r.600Z\ l4ap projedion: Web [4trctor Comercoordjnates: WGSS4 EdqetiG: UTN4 Zor€ 15N WGSB4 Web Soil Survey National Cooperative Soil Survey = 440 53'5'N 44.53'5'N = 10110t2021 Page 1 of 3 440 52'50" N USDA Natural Resources - Conservation Service 440 52',50" N Soil Map-Carver County, Minnesota Figure 3 Soils Map Map Unit Legend Map Unit Symbol Map Unit Name I Acres in AOI Percent of AOI CW Cordova-Webster compf ex I l.q 32.0% EX Essexville sandy loam 0.7 15-8o/o KB Xif f,enny Lest"r f "ar., Z t" O percent slopes 0.2 5.3% KE2 Lesier-Kilkenny complex, 16 to I 0.8 22 percent slopes I 19.1% MP Klossner and Muskego soils, ponded,0tolpercent sropes 1.2 27.704 Totals for Area of Interest 4.3 100.0% USDA Natural Resources =- ConservationService Web Soil Survey National Cooperative Soil Survey 10t10t2021 Page 3 of 3 Figure 4 PWI Map Map layers, Carver Gounty Parcels PWI(Lentic) - PWI (Lotic) - Property Boundary0 .02 .04 .06 - - Mites Figur 5 Delineation Map Map layers -- -' Wetland Boundary o Sample Point Carver Gounty Parcels 2ft Contours - Property Boundary0 .02 .04 .06 I I Miles Figure 6 Topographic Map Map layers r Carver County Parcels 2ft Contours Property Boundary0 .02 .04 .06 I Ir Miles ! 3 R Hydric Rating by Map Unit-Carver County, Minnesota (Figure 7 Hydric Rating Map) 44.53',5"N 440 53'5'N Map SGle: 1 : 2,180 if printed on A porb-ait (8.5" x 1 1',) shet. n, ,Metelsl\030m1zJ180 A psetf\0 lm2g)4m600 Z\ N4apprcjtrtion: WebN4ercator Comercmrdinates: WGSB4 Edqeucs: UTMZonelsNWGSS4 Web Soil Survey National Cooperative Soil Survey = 3 B 10t10t2021 Page 1 of 5 440 52 50" N USDA Natural Resources - Conservation Service 440 52'50'N N* Q c.r =5,oo o- =U) >^ 17) w)d OO =o-G c E$z (5 a 0) .E I d> 9€ t5 /i, c>-T >=>\ooiro- FGt O.E I o',ohg.; o.=,98 Fb =o zo 4tl p c'r ;€^=o6€l!- s ; ;lEp - s r Ea=E t -*Eff=ci g I EEsc e r€F[;FE sE* s i+;sg fi93tg; FA ElE E :E$iE : F*€t€i+uEE$ g gEAg i$,:irFetfgEggH€€C: e' ;efl E€t$* e: c* ts r ;gBE Tq :Hr scil*fr c* ;; A5 a_ giEg pp;ss geE€$k re aE EE ER #EEE E E €) oZEo; -d=tsq= =Ytr=osll o)z.Eo-E =F @ o- =od F-tr l-: o!;*CE.9abo -oHH.ii*g eP f*o-6Y)tr4?€ =;-.Y)Y-co Y o N'X b.9tr E f > j E< oo; f !l \ o)r: + , I rts - f ." dIFdl €*3 -4-go3 FFG^E sFa-E sss-E fH ,83giltE sEEiSE sBEil8: g ^'P H8 ; ; .e .e : 3 'e A ! o o x ; ; B E: E0: g5 g O e: ? i @ o3: Xs : s s F f Ee € € € i i Ee e" € n i EuU dg ggBE I 5g!.ss,; ; eccsE E ; cri!E< oI I I I z 2 oI I i i 2 2 ot i i i Z Z 9.6@trca=EH.E,Ei,,*nllnntEt I : : I : *.rtrtr.o;E -bd 6<.ng ozIrlo IIJJ o- = Hydric Rating by Map Unit-Carver County, Minnesota Figure 7 Hydric Rating Map Hydric Rating by Map Unit Map unit symbol Map unit name Rating I Acres in AOI Percent of AOI CW Cordova-Webster complex 100 32.0% EX Essexville sandy loam 0.7100 15.8% KB Kilkenny-Lester loams, 2 to 6 percent slopes 0 -=--5 100 0.2 5.3% KE2 I _l Totals for Area of lntere: Lester-Kilkenny complex, 16lo 22 _ryr""nt rlol"" _ - Klossner and Muskego soils, ponded, 0 to 1 percent slopes T-0.8 19.1% 1.2 27.7% i 4.3 100.0% USDA - Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 10t10t2021 Page 3 of 5 Appendix A Antecedent Precipitation Data Minnesota State Climatology Office 5ji.a|e {.lrmatr-rlcgy Cffice , 0f ii{ Divislorr r.:f f,coluq;c,rl ald Wat.<.-r l{cstrrr., r honrelcurrentconditionsljournal lpastdatalsummarieslagriculturelothersiteslaboutusffiji Precipitation Worksheet Using Gridded Database Precipitation data for target wetland location: county: Carver township number: 116N township name: Lake Minnewashta range number: 23W nearest community: Carver Beach section number: 2 Aerial photograph or site visit date: Friday, October 8,2021 Score using 1981-2010 normal period Other Resources: . retrieve daily precipitation data. view radar-based precipitation estimates. view weekly precipitation maps. Evaluating Antecedent Precipitation Conditions (BWSR) values are in inches A'R'following a monthly total indjcates a provisional value derived from radar-based estimates. first prior month: September 2021 secono pflor month: August 2021 third prror monIn. July 2021 estimated precipitation total for this location:?-t3 2.51 7.72R 1.50R there is a 30% chance this location will have less than:3.09 21A there is a 30% chance this location will have more than:4.67 5.43 4.17 type of month: dry normat wet ,monthlyscore 3xf =?l 2.3=6 | 1*t=1 multi-month score: ii li: !) (dry1 10 to 14 (norrlal) 15 to 18 (wet))o = rten,"q1 Minnesota State Climatology Office :jial€ Clrmatoloqy Oiil<.<:-DllR D:vi:jon of koiort:rai .rrrd yta.r,:rr ilt,:,uiir,, homelcurrentcondrtionsljoLrrnal lpastclatalsunrmarieslagriculturelothersiteslaboutusffi Nearest $tation Precipitation Data Retrieval Minnesota's precipitation data archive is searched fordata closestto a selected target location foreach month. Values from the site closest to the target location are returned below after clicking the retrieve monthty data or retrieve daily data buttons. The precipitation data are made up of measured rainfall and the measured liqurd content of snowfall. Temperature, snowfall, and snow depth data from National Weather Service reporting stations are no longer retrieved from this application. To obtain those data, see our newest data retrievaltool (May 2014). NationalWeather service precipitation data continue to be available from this applicatron. Obtaining data for legal purposes Guide for colunrn headers in the data table target location: Carver-Lake minnewashta-Carver Beach 1'l6N 23W 32 (latitude: 44.88459longitude: 93.55124) I-ir.r i" r"i"Ci tris"il"*ii"""] years: 2021 w Io 2021 Y number of missing days allowed per month: s iEt'"* ffiihrt-d"t" ] f .;"t'il; ;"'rfi ;6-i resu lts: Target: T116 R23 52 mon year cc tttN rrw ss ,Jan 2021 l0 116N 23W 15 Peb 2021 r0 116N 23W 15 Mar 2021 10 1l6N 23W 15 Apr 2021 10 116N 23w 13 May 2021 10 116N 23w 15 Jun 2021 l0 116N 23W 15 J:uI 202 1 10 116N 23W 15 Aug 2021 10 l16N 23w 15 Sep 2021 10 116N 23w 15 OcL 202I Nov 202 1 Dec 2021 nnnn oooooooo NWS CHAN-NWS NWS CHAN-NWS NWS CHAN-NWS BYRG BYRG BYRG NWS CHAN-NWS I]YRG NWS CHAN-NWS m m m nrp /inahaqt I .06 2 .36 2 .80 3.29 1 .28 2.lI 7 .28 2.L3 ^l - 2 mi . 2 mi. 2 mi. 2 mi. 2 mi . 2 mi. 2 mi. 2 mi. 2 mi. 999 mi. 999 mi. 999 mi. tor precrprtat on data while the NWS lD' wil always be correct for tho temperature dala lf no PLS info ls supplied the thc 'NWS lD' number app ies 10 at shown data State Climatology Office - MnDNR - Ecological and Water Resources Appendix B Sample Data Sheets [)rolect/Site 1441 Lake Lucy Rd WETLAND DETERMINATION DATA FORM - Midwest Region City/County:Chanhassen Applicant/Owner: ChadHalbur State IVN Sampling Date Sampling Point 10t08t2021 1Up Investigator(s): Jessica Lillie iectron, Township, Range Sec. 2, T1 16N, R23W Lanoform (hillslope. terrace, etc.)toeslope Local relief (concave, convex, none) Slope (%): 2-3%LAI:Long Datum: Soil Map Unit Name Cordova-Wedbester complex \Wl Classification: Are climatic/hydrologic conditions of the site typical forthis time of the year? Y (lf no, explain in remarrsl Are vegetation , or hydrology s;ignificantly disturbed?, soll Are vegetation _, soil SUMMARY Or TNIOIruCS - , or hydrology_ naturaliy problematic? convex Are "normal circumstances" present? Ycs (lf needed, explain any answers in remarks.) Remarks: (Explain alternative procedures here or in a separate report.) VEGETATION -- Use scientific names of plants. Hydrophytic vr..getation present? llydric soil present? Indicators of wetland hydrology present? Y N N ls the sampled area within a wetland? f yes, optional wetland site lD: Ilqq9tratuO 1 filia americana (Plot size:30 Absolute Dominan Indicator % Cover t Species Staus 70 FACU FACW 80 = Total Cover FAC 70 = Total Cover N N FAC 72 = Total Cover 0 = Total Cover 2 Fraxinus pennsylvanica 10 70 3 4 5 Saplinq/Shrub stratun (Plot size: 1 Rhamnus catharlrca t3 2 3 4 5 1_l€rL$rc!m 1 Rhamnus cathaftrca (Plot size: 60 EAA FACW 2 Carex pensylvanica UPLN 3 Viola sororia 4 Pilea pumila 5 6 7 8 I 10 Wopdy v4e_sllqlqll 1 (Plot size:30 Dominance Test Worksheet Number of Dominant Species that are OBL, FACW, or FAC: 2 (A) Total Number of Dominant Spe cies Across all Strata; 3 (B) Percent of Dominant Species that are OBL, FACW, or FAC: 66.670/0 (A/B) Prevalence Index Worksheet Total % Cover of: OBLspecies 0 x1= FAUW specres 12 x2 = FACspecies -lg5 *g= FACU species --76- , q = UPLspec,es 5 x5- Column totats --ZZl- 61 0---;- 4Os 280 % I Jt+ (bl Prevalencc 1n,1ul =114 =3.31 Hydrophytic Vegetation Indicators: _ Rapid test for hydrophytic vegetation X Dominance test is >50% _ Prevalence index is <3.0- Morphogical adaptations. (provide supporting data in Remarks or on a _ separate sheet) Problematic hydrophytic vegetation" _ (explain) -lndicators of hydric soil and wetland hydrology must be present, unless disturbed or problematic r-rydrophyttc vegetation present? Y Remarks: (lnclude photo numbers here or on a separate sheet) US Amy Corps of Engineers Midwest Region SOIL Hydric Soil Indicators: _ Histisol (Al ) _ Histic Epipedon (A2) _ Black Histic (A3) _ Hydrogen Sulfide (A+7 _ Stratified Layers (A5) _2 cm Muck (A10) __ Depleted Below Dark Surface (A11) _Thick Dark Surface (A12) _Sandy Mucky Mineral (S'1 ) _ 5 cm Mucky Peat or Peat (S3) Sandy Gleyed Matrix (S4) Sandy Redox (Sti) Stripped Matrix (S6) Loamy Mucky Mineral (Fl) Loamy Gleyed Matrix (F2) Depleted Matrix (F3) Redox Dark Surface (F6) Depleted Dark Surface (F7) Redox Depressions (FB) Sampling Point: lndicators for Problematic Hydric Soils: _Coast Prairie Redox (A16) (LRR K, L, R) Dark Surface (57) (LRR K, L) -lron-Manganese Masses (Fl2) (LRR K, L, R) Very Shallow Dark Surface (TF12) _ Other (explain in remarks) *lndicators of hydrophytic vegetation and weltand hydrology must be present, unless disturbed or problematic HYDROLOGY Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) MAIII Color (moist) %Color (moist) % Type- Loc*. 1 0YR2/1 -Type: C = Concentration, D = Depletion, RM = Reduced Matrix, MS= Masked Sand Grains. ..Locatron: pL= pore Lininq, M = Matrix Restrictive Layer (if Type.Hydric soil present? Wetland Hydrology Indicators: fulfprv Indicators (min _ Surface Water (A1 ) _ Hlgh Water Table (A2) _ Saturation (A3) _ Water Marks (81) _ Scdiment Deposits (82) _ Drift Deposits (83) -Alqal Mat or Crust (84) lron Deposits (85) - lnundation Visible on Aerial lmagery (87) - Sparsely Vegetated Concavc Surface (BB) Water-Stained Leaves (Bg) Aquatic Fauna (B'13) True Aquatic Plants (814) Hydrogen Sulfide Odor (Cl ) Oxidized Rhrzospheres on Livrng Roots (c3) Presence of Reduced lron (C4) Recent lron Reduction ln Tilled Soils (c6) Thin Muck Surfacc (C7) Gauge or Well Data (D9) Other (Explain ln Remarks) Secondarv I ndicators (mini mum of_ two req.l41qd_ Surface Soil Cracks (86) Drainage Patterns (1310) Dry-Season Water Table (C2) Cray.fish Burrows (C8) Saturation Visible on Aerial lmagery (C9) Stunted or Stressed Plants (D1) Geomorphic Position (D2) FAC-Neutral Test (D5) X Depth (inches): X Depth (inches): >24- -X- Depth (inches) : >ZT- Field Observations: Surface water present? Water table present? Saturation present? (includes capillary fringe) Yes Yes Yes NO No No Indicators of wetland hydrology present?N Describe recorded data (stream gauge, monitoring well, aerial photos, previous inspections), if available: {emarKS: US Army Corps of Engineers Midwest Region Project/Site 1441 Lake Lucy Rd WETLAND DETERMINATION DATA FORM - Midwest Region City/Ccrunty: Chanhassen Sampling Date: lOlOBl2O2j State: MN Sampling Point: 1 Wet Section, Township, Range: Sec. 2, T1 16N, R23W Depression Local relief (concave, convex, none)concave LOng:Datum PFOlA , or hydrology_ significantly disturbed? Are ,,normal circumstances , or hydrology rraturally problematic?present? Ycs (lf needed, explain any answers in remarks.) Applicant/Owner: ChadHalbur Investigator(s): Jessica l-illie Landform (hillslope, terrace. etc.) Slope (%): 0-1% Lat: Soil Map Urt Nrr"C-CouuW"n.GEffi tlWl Classification: Are climatic/hydrologic conditions of the site typical for this time of the year? Y (lf no, explain in remamsl Are vegetation _, soil Are vegetation _, soil SUDIMARY OF FINDINGS VEGETATION -- Use scientific names of Hydrophytic vegetation present? Y llydric soil present? Y | '. the sampled area within a wefland? y lndicators of wetland hydrology present? Y I f yes, optional wetland site lD: Remarks: (Explain alternative procedures here or in a separate report.) JU screntrlrc names Tree Stratum (Plot size 30 1 Fraxinuspennsylvanica Absolute Dominan lndicator % Cover t Species Staus FACW 30 = Total Cover 0 = Total Cover 75 FACW 30 2 3 A 5 Saplinq/Shrub stratun 1 (Plot size IJ tl_crb stratunl 1 Carex /acusfrls 2 3 4 5 (Plot size OBL 2 Phalaris arundinacea 20 Dominance Test Worksheet Number of Dominant Species that are OBL, FACW, or FAC: 3 (A) Total Number of Dominant Species Across all Strata: 3 (B) Percent of Dominant Species that are OBL, FACW, or FAC. 100.00% (A/B) Prevalence Index Worksheet Iotal ok Cover of: OBLspecies 75 x1= 75. -----=:--FACW specres 50 x2 = 100 FACspecies O-*S- 0 FACU species --T-* + - O UPL species --i-" S = 0 Column totats -T25 (nt --Tzs rgr Prevalence Index = B/A = 130 95 = Total Cover 0 = Total Cover J 4 5 6 7 8 9 1O W oo d V, vl ne ! trq_tu_{ll 1 (Plot size:30 Hydrophytic Vegetation Indicators: _ Rapid test for hydrophytic vegetation X Dominance test is >50%-I- Prevalence index is <3.0* Morphogical adaptations. (provide supporting data in Remarks or on a _ separate sheet) Problematic hydrophytic vegetatton. _ (explain) 'lndicators of hydrjc soil and wetland hydrology must be present, unless disturbed or problematic nyoropnyUc vegetation present? Y Remarks: (lnclude photo numbers here or on a separate sheet) US Amy Corps of Engineers Midwest Region _ Histic Epipedon (A2) _ Black Histic (A3) _ Hydrogen Sulfide (A4) _ Stratified Layers (A5) X 2 cm Muck (A10) _ Depleted Below Dark Surface (Al 1) _Thick Dark Surface (A12) _Sandy Mucky Mineral (S'1 ) _ 5 cm Mucky Peat or Peat (S3) Sandy Gleyed Matrix (S4) Sandy Redox (Sf;) Stripped Matrix (56) Loamy Mucky Mineral (Fl ) Loamy Gleyed Matrix (F2) Depleted Matrix (F3) Redox Dark Surface (F6) Depleted Dark Surface (F7) Redox Depressions (FB) Sampling Point: lndicators for Hydric Soils: _Coast Prairie Redox (A16) (LRR K, L, R) Dark Surface (S7) (LRR K, L) -lron-Manganese Masses (F12) (LRR K, L, R) Very Shallow Dark Surface (TF12) _ Other (explain in remarks) "lndicators of hydrophytic vegetation and weltarrd hydrology must be present, unless disturbed or problematic HYDROLOGY Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Mslrg Color (moist) % Ecdq&elues Oolor (moist) % Type' Loc** 10YR2/1 .Type: C = Concentration, D= Depletion, RM = Reduced Matrix, MS= Masked Sand Grains. ..Locatron: PL= Pore Lining, M = Matrrx rictive Layer (if observed): Hydric soil present? Y Wetland Hydrology Indicators: fuLmarv lndicators (minimum of one is required: check all that applv) _ Surface Water (Al ) X H,gh Watcr lab e (A2) X Saturation {43) _ Water Marks (Bl ) _ Sediment Deposits (82) _ t)rift Deposrrs (83) _Algal Mat or Crust (B4) _ lron Deposits (85) lnundation Visible on Aerial lmagery (87) - Sparsely Vegetated Concave Surface (BB) Water Stainco Leaves (B9l Aquatic Fauna (813) True Aquatic Plants (814) Hydrogen Sulfide Odor (Cl ) Oxidized Rhizospheres on Lrving Roots (c3) Presence of Reduced lron (C4) Recent lron Reduction in Tilled Soils (c6) Thin Muck Surface (C7) Gauge or Well Data (D9) Other (Explain in Remarks) S e c o n d a rv I n d i c a to rs ( m i n i m u m pl_!wo1e_qq1re d) Surface Soil Cracks (BO) Drainage Patterns (Bl 0) Dry-Season Water Table (C2) Crayfish Burrows (CB) Saturation Visible on Aerial lmagery (C9) Stunted or Stressed Plants (Dl ) Geomorphic Position (D2) FAC-Neutral Test (D5) Depth (inches): Depth (inches): 6- Depth (inches): 0 - Frelo ubservattons: Surface water present? Water table present? Saturation present? (includes capillary fringe) Yes Yes Yes NoX --X- No -X- No Indicators of wetland hydrology present? y Describe recorded data (stream gauge, monitoring well, aerial photos, previous inspections), if available: \emarKS: US Army Corps of Engineers Midwest Region f)roject/Site 1441 Lake Lucy Rd WETLAND DETERMINATION DATA FORM - Midwest Region City/County: Chanhassen Sampling Date: 1OlOBl2O21 State: IVN Sampling Point: 2 Up Section, Township, Range: Sec. 2, Tl 16N, R23W footslope Local relief (concave, convex, none)convex LOng:Datum Applicant/Owner. ChadHalbur lnvestigator(s): Jessica Lillie Landform (hillslope, terrace, etc. ) Slope (%): 2-3fo Latr Soil Map Unil Name Cordova-Webster Complex \Wl Classification Are climatic/hydrologic conditions of the site typical for thrs time of the year? Y (lf no, explain in remarks) Are vegetation _, soil Are vegetation _, soil SUMMARY OF FINDINGS , or hydrology_ significantly disturbed? , or hydrology naturally problematrc? Are "normal circumstances" present? Yes (lf needed, explain any answers in remarks.) VEGETATION -- Use scientific names of plants. Hydrophytic vegetation present? Hydric soil present? N N ls the sampled area within a wetland? N Indicators of wetland hydrology present? N I f yes. optional wetland site lD: Remarks: (Explain alternative procedures here or in a separate report.) Tree Slratum 1 Tilia americana (Plot size 30 Absolute Dominan lndicator % Cover t Spectes Staus FACU 30 = Jotal Cover EAA 30 = Total Cover 45 10 30 2 3 / 5 S?plhE_Shrub stratun 1 Rhamnus cathaftica (Plot size tc 30 llsbslrclurl 1 Carex pensylvanica 2_ 3 4 5 4 5 6 7 B 9 10 (Plot size 2 Rhamnus cathartica FAC 60 = Total Cover 0 = Total Cover N N UPL OBL3 Carex /acustrls Wqody v_pe_ slralUry 1 /Plnt cizo'30 Dominance Test Worksheet Number of Dominant Species that are OBL, FACW, or FAC: 1 (A) Total Number of Dominant Species Across all Strata: 3 (B) Percent of Dominant Species that are OBL, FACW, or FAC: 33.33% (A/B) Prevalence Index Worksheet Iotal o/o Cover of: OBLspecres 5 x1= FACW species 0 x2 = FACspecies - +O "S=i-AUU spectes 30 x 4 .- UPL species --l!--1 5 = Column totats --176- 1n; 5 O 1n ao 2n +zo tel Prevalence lna"" = g/A =3.92 Hydrophytic Vegetation Indicators: _ Rapid test for hydrophytic vegetation _ Dominance test is >50% _ Prevalence index is <3.0. Morphogical adaptations. (provide supporting data in Remarks or on a _ separate sheet) Problematic hydrophytic vegetation. _ (explain) 'lndicators of hydric soll and wetland hydrology must be present, unless disturbed or problematic) l-rydrophyttc vegetation present? N Remarks: (lnclude photo numbers here or on a separate sheet) US Amy Corps of Engineers Midwest Region SOIL Hydric Soil Indicators: _ Histisol (Al ) _ Histic Epipedon (A2) _ Black Histic (A3) ._ Hydrogen Sulfide (A4) __ Stratified Layers (A5) _2 cm Muck (A10) _- Depleted Below Dark Surface (A11) _Thick Dark Surface (A12) _Sandy Mucky Mineral (Sl) _ 5 cm Mucky Peat or Peat (S3) Sandy Gleyed Matrix (54) Sandy Redox (55) Stripped Matrix (56) Loamy Mucky Mineral (F1) Loamy Gleyed Matrix (F2) Depleted Matrix (F3) Redox Dark Surface (F6) Depleted Dark Surface 1F7) Redox Depressions (F8) Indicators for Problematic Hydric Soils: _Coast Prairie Redox (A16) (LRR K, L, R) Dark Surface (57) (LRR K, L) -lron-Manganese Masses (F12) (LRR K, L, R) Very Shallow Dark Surface (TF12) _Other (explain in remarks) *lndicators of hydrophytic vegetation and weltand hydrology must be present, unless disturbed or problematic HYDROLOGY Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) l-l o nth ( | nches)Color (moist) % Type. Loc** .Type: C =Concentration, D= Depletion, RM= Reduced Matrix, MS=MaskedSandGrains. -.Location: pL=pore Lining, M =Matrix Restrictive Layer (if Type, Depth (inches): Hydric soil present? Wetland Hydrology Indicators: Prrmaly Indrcators (minimum of one is required: check all that applv) _ Surface Water (A1) _ High Water Table (A2) _ Saturation (A3) _ Water Marks (Bl ) _ Sediment Deposits (82) _ Drift Deposits (83) _ Algal Mat or Crust (84) lron Deposits (85) - Inundation Vrsible on Aerial lmagery (87) - Sparsely Vegetated Concave Surface (88) Water-stained Leaves (Bg) Aquatic Fauna (813) True Aquatic Plants (814) Hydrogen Sulfide Odor (Cl ) Oxidized Rhizospheres on Living Roots (ca) Presence of Reduced lron (C4) Recenl lron Reduction n Tilled Soils (c6) I'hin Muck Surface (C7) Gauge or Well Data (D9) Other (Explain in Remarks) S eco n d a ry I n d i cato rs ( m i n i m u m_ ptWp_ 15>_qq rlq!.) SurJace Soil Cracks (86) Drainage Patterns (Bl 0) Dry-Season Water Table (C2) Crayfish Burrows (C8) Saturation Visible on Aerial lmagery (C9) Stunted or Slressed Plants (Dl ) Geomorphic Position (D2) FAC-Neutral Test (D5) X Depth (inches): F Depth (inches): ----;A---J- Oeptn (inches): - >24- rrero uDservaltons: Surface water present? Water table present? Saturatron present? (includes capillary fringe) Yes Yes Yes No NO No Indicators of wetland hydrology present?N Describe recorded data (stream gauge, monitoring well, aerial photos, previous inspections), if available: xe marKS: US Army Corps of Engineers Midwest Region Project/Site 1441 Lake Lucy Rd WETLAND DETERMINATION DATA FORM - Midwest Region City/County: Chanhassen Sampling Date: 1Ol0Bl2O21 State: MN Sampling Point: 2.--Wet iection, Township, Range: Sec.2, T116N, R23W Depression Local relief (concave, convex, none): concave present? Yes (lf needed, explain any answers in remarks.) Applicant/Owner ChadHalbur Investigator(s): Jessica Lillie Landform (hillslopc. terrace, etc.): Slope (%): 0 Lat Soil Map Unit Name Klossner and Muskego soils, ponded \Wl Classification: Are climatlc/hydrologtc conditions of the site typical forthis time of the year? Y (lf no, exptain in remamsl Datum: PABH orhydrology_ significantlydisturbed? Are,,normalcircumstances,,Are vegetation , soil Are vegetation _, soil , or hydrology naturally problematic? SUMMARY OF FINDINGS Hydrophytic vegetation present? Hydric soil present? Y Y ls the sampled area within a wetland? Y Indicators of wetland hydrology present? y I f yes, optional weiland site lD: Remarks: (Explain aiternative procedures here or in a separate report.) VEGETATION -- Use scientific names of olants. Tree Stratum (Plot size:30 Absolute Dominan Indicator % Cover t Species Staus 1 Fraxinuspcnnsylvanica 10 FACW z 3 A 5 10 = l-otal Cover SapjrndShruustrelq! (PIot size: 1 Rhamnus cathaftica IJ 10 FAC 2 3 4 5 10 = Total Cover f erb $ralut 1 Lemna obscura (Plot size: 20 OBL 2 Carex /acuslris 10 OBL Dominance Test Worksheet Number of Dominant Species thal are OBL, FACW, or FAC: 5 (A) Total Number of Dominant Specjes Across all Strata: 5 (B) Percent of Dominant Species that are OBL, FACW, or FAC: '100.00% (A/U) Prevalence Index Worksheet Total % Cover of: OBL species 35 x 1 =. -----:=--I-ACW species 25 x2'- FAC species --lO-": =.-------:-FAUUSpecres U x4- UPL species --l-r S = Column totats --)O- 1n1 35 50 3O 0 0 rrs lni Prevalence tna": g/A 1.64 ypna FACW 4 5 6 7 B I 10 Typha angustifolia FACW Persicaria amphibra OBL 50 = Total Cover Wqodj vine str_alulir 1 (Plot size:30 Hydrophytic Vegetation Indicators: _ Rapid test for hydrophytic vegetation X Dominance test ls >50% -I-Prevalence index is <3 O. Morphogical adaptations. (provide supporting data in Remarks or on a _ separate sheet) Problematic hydrophytic vegetation. _ (explain) "lndicators of hydric soil and wetiand hydrology must be present, unless disturbed or problematic z 0 = Total Cover Hydrophytic vegetation present? Y Remarks: (lnclude photo numbers here or on a separate sheet) US Amy Corps of Engineers Midwest Region sorL Hydric Soil Indicators: Histisol (Al ) _ Histic Epipedon (A2) _ Black Histic (A3) _ Hydrogen Sulfide (A4) _ Stratified Layers (A5) X 2 cm Muck (A10) _ Depleted Below Dark Surface (Al l ) _Thick Dark Surface (A12) _Sandy Mucky Mineral (Sl) _ 5 cm Mucky Peat or Peat (S3) Sandy Gleyed Matrix (54) Sandy Redox (Sli) Stripped Matrix (S6) Loamy Mucky Mineral (Fl) Loamy Gleyed Matrix (F2) Depleted Matrix (F3) Redox Dark Surface (F6) Depleted Dark Surface (F7) Redox Depressions (FB) Sampling Point:2 Wet Indicators for Problematic Hydric Soils: _Coast Prairie Redox (A16) (LRR K, L, R) Dark Surface (S7) (LRR K, L) -lron-Manganese Masses (F12) (LRR K, L, R) Very Shallow Dark Surface (TF12) _ Other (explain in remarks) *lndicators of hydrophytic vegetation and weltarrd hydrology must be present, unless disturbed or problematic HYDROLOGY le Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) M4!I Color (moist) %Color (moist) % Type- Loc"- 1 0YR2/1 10YRzi 1 llype: C = Concentration, D= Depletion, RM = Reduced Matrix, MS = MaskedSand Grains. ..Location: pL= pore Lininq, M = Matrix Hydric soil present? Wetland Hydrology Indicators: P!!1arv Indicators (minl X Surface Water (Al ) X Hrgh Water Table (A2) X Saturation (A3) _ Water Marks (Bl ) _ Sedrment Deposits (B2) _ Drift Deposrts (U3) _Algal Mat or Crrst 1841 _ lron Deposits (85) Inundation Visible on Aerial lmagery (87) - Sparsely Vegetated Concave Surface (ts8) Warer-Stained Leaves (Bg) Aquatic Fauna (813) True Aquatic Plants (B14) Hydrogen Sulfide Odor (Cl ) Oxidized Rhizospheres on Living Roots (ca) Presence of Reduced lron (C4) Recent lron Reduction in Tilled Soils (c6) Thin Muck Surface (C7) Gauge or Well Data (D9) Other (Explain in Remarks) Secondarv Indrcators (minimum of two requi.red.) Surface Soil Cracks (86) Drainage Patterns (t3 1 0) Dry-Season Water Table (C2) Crayfish Burrows (C8) Saturation Visible on Aerial lmagery (C9) Stunted or Stressed Plants (D 1 ) Geomorphic Position (D2) FAC-Neutral Test (D5) Surface water present? Water table present? Saturation present? (includes capillary fringe) Yes X Yes --T- Yes ---T- Depth (inches): 0 Depth (inches): -T-Deptn iinchesj: ----- 0-- No No No Indicators of wetland hydrology present?Y Describe recorded data (stream gauge, monitoring well, aerial photos, previous inspections), if available: l{emarks US Army Corps of Engineers Midwest Region Appendix C Site Photographs Appendix C Site Photographs Basin L t-U p 1_Wet Basin 2 2-U p 2 Wet Appendix D Wetland Type and Boundary Approval Forms Project Name and/or Number: PART ONE: Applicant Information lf applicant is an entity (company, government entity, partnership, etc.), an authorized contact person must be identified. lf the applicant is using an agent (consultant, lawyer, or otherthird party) and has authorized them to act on their behalf, the agent s contact information must also be provided. Applicant/Landowner Name: Dlanne G. Morin Mailing Address: 1441 Lake Lucy Rd, Chanhassen, MN 55317 Phone: 952-474-It86 E-mailAddress: gayle.morin@gmail.com Authorized Contact (do not complete if same as above): Chad Halbur Mailing Address: 4470 W 78th Street Circle, Suite 200, Bloomington, MN 55435 Phone: 6t2-462-3072 E-mailAddress: Chalbur@cornerstonetrust.net Agent Name: Wayne Jacobson, WDC, pSS Jacobson Environmental Maifing Address: 5B2L Humboldt Ave N Brooklyn Center, MN 55430 Phone: 612-802-661,9 E-mailAddress: jacobsonenv@msn,com PART TWO: Site Location Information County: Carver County City/Township: Chanhassen Parcel lD and/or Address: 1441 Lake Lucy Rd, Chanhassen, MN 55317 Legal Description (Section, Township, Range): Section 2,TtI6 N, R23W Lat/Long (decimal degrees): Attach a map showing the location of the site in relation to local streets, roads, highways. Approximate size of site (acres) or if a linear project, length (feet): 4.9 acres lf you'know that your proposal will require an individual Permit from the U,S. Army Corps of Engineers, you must provide the namesandaddressesofall propertyownersadjacenttotheprojectsite. Thisinformationmaybeprovidedbyattachingalistto your application or by using block 25 of the Application for Department of the Army permit which can be obtained at: http:/lwww,mvp.usace.armv.mil/Portals/57ldocs/resulatorv/ReeulatorvDocs/engform 4345. zO12oct.pdf PART THREE: General Project/Site Information lf this application is related to a delineation approval, exemption determination, jurisdictional determination, or other correspondence submitted prior to this application then describe that here and provide the Corps of Engineers project number. Describe the project that is being proposed, the project purpose and need, and schedule for implementation and completion. Theproject description must fully describe the nature and scope of the proposed activity including a description of all project elementsthat effect aquatic resources (wetland, lake, tributary, etc.) and must also include plans and cross section or profile drawings shovrling the location, character, and dimensions of all proposed activities and aquatic resource impacts. L Minnesota Interagency water Resource Application Form Februarv 201,4 Page 3 of 1L l Project Name and/or Number: PART FOUR: Aquatic Resource lmpactl Summary lf your proposed project involves a direct or indirect impact to an aquatic resource (wetland, lal<e, tributary, etc.) identify each impact in the table below. Include all anticipated impacts, including those expected to be temporary. Attach an overhead view map, aerial photo, and/or drawing showing all of the aquatic resources in the project area and the location(s) of the proposed impacts. Label each aquatic resource on the map with a reference number or letter and identify the impacts in the following table. 1lf impactsaretemporary; enterthedurationoftheimpactsindaysnexttothe"T". Forexample,aprojectwithatemporaryaccessfill that would be removed after 22O days would be entered "T (220\" . 2lmpacts less than 0.0L acre should be reported in square feet. lmpacts 0.0L acre or greater should be reported as acres and rounded to the nearest0.01 acre. Tributaryimpactsmustbereportedinlinearfeetof impactandanareaof impactbyindicatingfirstthelinearfeetof impactalong'theflowlineofthestreamfollowedbytheareaimpactinparentheses). Forexample,aprojectthatimpacts50feetofastreamthatis6 feet rry.ide would be reported as 50 ft (300 square feet). ]].hit,1; e1n"t:1y only applicable if you are applying for a de minimis exemption under MN Rules 8420.0420 Subp, 8, otherwise enter ,,N/A,,. aUse Wetland Plants and Plant Community Types of Minnesoto qnd Wisconsin 3rd Ed. as modified in MN Rules g420.0405 Subo, 2.sReferto Majorwatershed and Bank service Area maps in MN Rules g42o.os22subp. 7. lf any of the above identified impacts have already occurred, identify which impacts they are and the circumstances associateo with each: PART FIVE: Applicant Signature f, cfreckhereifyouarerequestingapre-applicationconsultationwiththeCorpsandLGUbasedontheinformationvouhave provi.ded. Regulatory entities will not initiate a formal application review if this box is checked. By signature below, I attest that the information in this application is complete and accurate. I further attest that I possess the authority to undertake the work described herein. Signatu re:Date: t0/L1,/202L I hereby authorize Jacobson Environmental to act on my behalf as my agent in the processing of this application and to furnish, upon request, supplemental information in support of this application. 1 The:term "impact" as used in this joint application form is a generic term used for disclosure purposes to identify activities that may require approval from one or more regulatory agencies. For purposes of this form it is not meant toi indicate whether or not those activities may require mitigation/replacement. I Minnesota Interagency water Resource Application Form Februarv 201,4 Aquatic Resource lD (as noted on ove,r'head v ew) Aquatic Resource Type (wetland, lake, tributary etc.) Type of lmpact (fill, excavate, dra in, or remove vegetation) Duration of lmpact Permanent (P) or Temporary {T)' Size of lmpact2 Overall Size of Aquatic Resource 3 Existing Plant Community Type(s) in lmpact Areaa County, Major Watershed #, and Bank Service Area # of lmpact Area: Page 4 of LL Project Name and/or Number: Attachment A Request for Delineation Review, Wetland Type Determination, or J urisdictional Determination By submission of the enclosed wetland delineation report, lam requesting thatthe U.S. Army Corps of Engineers, St. paul District (Corps) and/or the Wetland Conservation Act Local Government Unit (LGU) provide me with the following (check allthat apply): I Wetland Type Confirmation ffi Oelineation Concurrence. Concurrence with a delineation is a written notification from the Corps and a decision from the LGU concurring, not concurring, or commenting on the boundaries of the aquatic resources delineated on the property. Delineation concUrrences are generally valid for five years unless site conditions change. Under this request alone, the Corps will not adoress the jurisdictional status of the aquatic resources on the property, only the boundaries ofthe resources within the review area (including wetlands, tributaries, lakes, etc.). I ereliminary Jurisdictional Determination. A preliminary jurisdictional determination (pJD) is a non-binding written indicatron from the Corps that waters, including wetlands, identified on a parcel may be waters of the United States. For purposes of computation of impacts and compensatory mitigation requirements, a permit decision made on the basis of a pjD will treat allwatersandwetlandsinthereviewareaasiftheyarejurisdictional watersoftheU.S. pJDsareadvisoryinnatureandmavnotbe appealed. l-l Approved Jurisdictional Determination. An approved jurisdictional determination (AJD) is an official Corps determination thatjurisdictional waters of the United States are either present or absent on the property. AJDs can generally be relied upon by the affected party for five years. An AJD may be appealed through the Corps administrative appeal process. In order for the Corps and LGU to process your request, the wetland delineation must be prepared in accordance with the 19g7 Corpsof EngineersWetlandDelineationManual,anyapprovedRegional SupplementstothelgBTManual,andthe Guidelinesfor Submitting Wetlond Delineotions in Minnesoto (2013). http://www. mvp. usa ce.a rmy. mil/M issiQns/Regu lato:^v/D_elineationJ DGu ida nce.aspx Minnesota Interagency water Resource Application Form February 2ol4 Page 5 of L1 MnRAM_3.2_Score_Sheet.xls 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 3637 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 A B C D E F G H I J K L M N P MnRAM 3.2 Digital Worksheet, Side 2 Lake Lucy W1 Question Description Rating Highest-rated: 1 Veg. Table 2, Option 4 0.10 0 TOTAL VEG Rating 0.1 L 4 Listed, rare, special plant species?n next 5 Rare community or habitat?n next 6 Pre-European-settlement conditions?n next 7 hydrogeo & topo #N/A 8 Water depth (inches) Water depth (% inundation) 9 Local watershed/immedita drainage (acres) 10 Existing wetland size 0.266 11 SOILS: Up/Wetland (survey classification + site) 12 Outlet characteristics for flood retention b 0.5 13 Outlet characteristics for hydrologic regime b 0.5 14 Dominant upland land use (within 500 ft)b 0.5 0.5 15 Soil condition (wetland) a 1 16 Vegetation (% cover)100%H 1 17 Emerg. veg. flood resistance b 0.5 18 Sediment delivery b 0.5 19 Upland soils (based on soil group)b 0.5 20 Stormwater runoff pretreatment & detention b 0.5 0.5 21 Subwatershed wetland density b 0.5 22 Channels/sheet flow a 1 23 Adjacent naturalized buffer average width (feet)100 M WQ 0.1 M 0.5 24 Adjacent Area Management: % Full 100%1 1 1 adjacent area mgmt: % Manicured 0%0 adjacent area mgmt: % Bare 0%0 25 Adjacent Area Diversity & Structure: % Native 90%0.9 2 0.95 adjacent area diversity: % Mixed 10%0.05 adjacent area diversity: % Sparse/Inv./Exotic 0%0 26 Adjacent Area Slope: % Gentle 50%0.5 3 0.71 adjacent area slope: % Moderate 40%0.2 adjacent area slope: % Steep 10%0.01 27 Downstream sensitivity/WQ protection a 1 28 Nutrient loading b 0.5 29 Shoreline wetland? N N 30 Rooted shoreline vegetation (%cover )Enter a percentage 31 Wetland in-water width (in feet, average)Enter a percentage 32 Emergent vegetation erosion resistance Enter valid choice 33 Shoreline erosion potential Enter valid choice 34 Bank protection/upslope veg. Enter valid choice 35 Rare Wildlife N N 36 Scarce/Rare/S1/S2 local community N N 37 Vegetation interspersion cover (see diagram 1)1 L 0.1 38 Community interspersion (see diagram 2)1 L 0.1 0 39 Wetland detritus b 0.5 40 Wetland interspersion on landscape b 0.5 0.5 41 Wildlife barriers c 0.1 42 Amphibian breeding potential-hydroperiod I 0 43 Amphibian breeding potential--fish presence c 0.1 44 Amphibian & reptile overwintering habitat c 0.1 45 Wildlife species (list) 46 Fish habitat quality N/A N/A 47 Fish species (list) 48 Unique/rare educ./cultural/rec.opportunity N N 49 Wetland visibility c 0.1 50 Proximity to population Y 1 51 Public ownership c 0.1 52 Public access c 0.1 53 Human influence on wetland c 0.1 54 Human influence on viewshed c 0.1 55 Spatial buffer c 0.1 56 Recreational activity potential c 0.1 57 Commercial crop--hydrologic impact c 0.1Digital worksheet, section IIDigital worksheet, section IUser entry This comes in from Side 1 automatically using the weighted average. To use the highest rated veg. Community rating, please manually overwrite that value (shown to the right) into the field at E5. Enter data starting here. Yellow boxes are used in calculations. Scroll down to answer more questions and see formula calculations MnRAMW1_T2.xls 1 3/22/2022 MnRAM_3.2_Score_Sheet.xls 71 A B C D E F G H I J K L M N P MnRAMW1_T2.xls 2 3/22/2022 MnRAM_3.2_Score_Sheet.xls 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 9091 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 A B C D E F G H I J K L M N P 58 GW - Wetland soils D R or D 1 59 GW - Subwatershed land use R R or D 0.1 60 GW - Wetland size and soil group D R or D 1 61 GW - Wetland hydroperiod R R or D 0.1 62 GW - Inlet/Outlet configuration R R or D 0.1 63 GW - Surrounding upland topographic relief D R or D 1 64 Restoration potential w/o flooding N Y or N 3.3 65 Landowners affected by restoration E a b c Enter valid choice 66A Existing wetland size (acres) [from #10]0.266 __ acres 66B Total wetland restoration size (acres) __ acres 0.1 66C (Calculated) Potential New Wetland Area [B-A] -0.266 __ acres #### 67 Average width of naturalized upland buffer (potential)0 __ feet 0.1 value: #### 68 Likelihood of restoration success a b c Enter valid choice 69 Hydrologic alteration type Outlet, Tile, Ditch, GW pump, Wtrshd div., Filling 70 Potential wetland type (Circ. 39) 1, 2, 3, 4, 5, 6, 7, 8 71 Wetland sensitivity to stormwater b E a b c 72 Additional stormwater treatment needs c a b c Function Name Formula shown to the right. Vegetative Diversity/Integrity 0.10 L Hydrology - Characteristic 0.63 Med Flood Attenuation 0.62 Med Water Quality--Downstream 0.62 Med Water Quality--Wetland 0.40 Med Shoreline Protection N/A N/A Characteristic Wildlife Habitat Structure 0.33 0.33 Med Maintenance of Characteristic Fish Habitat ######N/A N/A Maintenance of Characteristic Amphibian Habitat 0.00 N/A Aesthetics/Recreation/Education/Cultural 0.21 0.21 Low Commercial use 0.10 Low 0.1 Special Features listing: - ____ Groundwater Interaction indeterminate GW source Groundwater Functional Index no special indicators Restoration Potential (draft formula) N/A N/A Stormwater Sensitivity (not active)Additional questions% effectively drained:Final RatingRating CategoryFunctional Rating SummariesRaw scoreMnRAMW1_T2.xls 3 3/22/2022 MnRAM_3.2_Score_Sheet.xls 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 3637 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 Q R S T U V W X Y Z AA AB AC AD AE AF Highest-rated: I Depressional/Isolated FT Depress'l/Flow-through Trib Depress'l/Tributary R Riverine Lac Lacustrine Peat Peatland Flood Floodplain S Slope O Other Habitat n/a formulator E49 0.00 "=IF(E49="n/a",1,0)" E50 0.00 "=IF(E50="n/a",1.5,0)" E51 0.00 "=IF(E51="n/a",2,0)" Add 0.00 CC Rtg Ltr 1 0.1 L 2 0.1 L 3 0.5 M 4 0.5 M 5 1 H 6 0.5 M 7 1 H 8 0.1 L N/A N/A N/A - "Pick an example from the image" 1 L 0.1 2 M 0.5 3 H 1 4 H 1 N/A N/A N/A - "Pick an example from the image" These are supplemental Lookup Tables and Intermediary formulas: Community Interspersion LookUp Open Water Interspersion LookUp Hydrogeology and Topography LookUp MnRAMW1_T2.xls 4 3/22/2022 MnRAM_3.2_Score_Sheet.xls 71 Q R S T U V W X Y Z AA AB AC AD AE AF MnRAMW1_T2.xls 5 3/22/2022 MnRAM_3.2_Score_Sheet.xls 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 9091 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 Q R S T U V W X Y Z AA AB AC AD AE AF Vegetative formula "=C4", the Weighted Average Option 4 from Veg. Worksheet Characteristic Hydrology formula "=(E17+E18+E19+F24)/4" F24 is the reverse rating Flood Attenuation Formula breakout (not linked to D72) (E16 is reverse rated) n/a formula is: none 0.616667 ((E16+(F18+E23)/2+(E19+E22)/2+(E24+E25)/2+(F20+E21+E26)/3)/5) flood outlet 0.645833 ((F18+E23)/2+(E19+E22)/2+(E24+E25)/2+(F20+E21+E26)/3)/4 F-T 0.65 ((E16+(F18+E23)/2+(E19+E22)/2+(E24+E25)/2+ E26)/5) both 0.6875 ((F18+E23)/2+(E19+E22)/2+(E24+E25)/2+ E26)/4 Water Quality--Wetland "=(D6*2+E18+F24+(G27+G28+G34)/3+E22+E40)/7" Shoreline Protection "=IF(E41="y",((E42+E43+E44+E45+E46)/5),"N/A")" N/A H38 =Habitat formula breakout/lookup (E22 is RR) Special Features Bump is below. none 0 0.331667 (D6*2+E51+F49+F50+E52+E53+(I27+G28+G31)/3+E17+F24)/10 49 1 0.357407 (D6*2+E51+ F50+E52+E53+(I27+G28+G31)/3+E17+F24)/9 50 1.5 0.357407 (D6*2+E51+F49+ E52+E53+(I27+G28+G31)/3+E17+F24)/9 51 2 0.312963 (D6*2+ F49+F50+E52+E53+(I27+G28+G31)/3+E17+F24)/9 49&50 2.5 0.389583 (D6*2+E51+ E52+E53+(I27+G28+G31)/3+E17+F24)/8 49&51 3 0.339583 (D6*2+ F50+E52+E53+(I27+G28+G31)/3+E17+F24)/8 50&51 3.5 0.339583 (D6*2+ F49+ E52+E53+(I27+G28+G31)/3+E17+F24)/8 49&50&51 4.5 0.37381 (D6*2+ E52+E53+(I27+G28+G31)/3+E17+F24)/7 Characteristic Fish Habitat formula Characteristic Amphibian Habitat formula (see Lookup breakout below) E112=VLOOKUP(E54,T116:U117,2,FALSE) Amphibian Habitat Formula Breakout 0 0.00 Amphibian breeding is controlling factor 1 0.04 "=((E55)*(E56+(I27*2)+E53+E18+F24)/6)" Aesthetics/Rec/Ed/Cultural formula "=E69" Commercial use reflects just the rating for the question. Special Features Bump-up reference table a Fish Habitat=E b Veg=E c Aesthetics=E d n AND #5=Y, then Wildlife=E g Wildlife/Fish=E h Aesthetics=E I Veg=E j N AND #35 =Y, Wildlife=E qindeterminate GW sourceGW=recharge, GW=E rindeterminate GW sourceY and GW=recharge, GW=E u Aesthetics=E Recharge/Discharge Tendency R 0.1 D 1 - Enter "R" or "D" "IF(E65=".1",(E62+E63+E64+2*E65+E66+E67+E68)/8,(E61+E62 +E63+E64+E65+E66+E67+E68)/8)" "=IF(D41="Y",((E58*2+G28+E22+F24+E40+E43+E42+F45)/9),(( E58*2+G28+E22+F24+E40)/6))"These are the formulas for the f inal functional ratings shown at the MnRAMW1_T2.xls 6 3/22/2022 MnRAM_3.2_Score_Sheet.xls 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 3637 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 A B C D E F G H I J K L M N P MnRAM 3.2 Digital Worksheet, Side 2 Lake Lucy W2 Question Description Rating Highest-rated: 1 Veg. Table 2, Option 4 0.10 0 TOTAL VEG Rating 0.1 L 4 Listed, rare, special plant species?n next 5 Rare community or habitat?n next 6 Pre-European-settlement conditions?n next 7 hydrogeo & topo #N/A 8 Water depth (inches) Water depth (% inundation) 9 Local watershed/immedita drainage (acres) 10 Existing wetland size 2.22 11 SOILS: Up/Wetland (survey classification + site) 12 Outlet characteristics for flood retention b 0.5 13 Outlet characteristics for hydrologic regime b 0.5 14 Dominant upland land use (within 500 ft)b 0.5 0.5 15 Soil condition (wetland) a 1 16 Vegetation (% cover)100%H 1 17 Emerg. veg. flood resistance b 0.5 18 Sediment delivery b 0.5 19 Upland soils (based on soil group)b 0.5 20 Stormwater runoff pretreatment & detention b 0.5 0.5 21 Subwatershed wetland density b 0.5 22 Channels/sheet flow b 0.5 23 Adjacent naturalized buffer average width (feet)50 L WQ 0.1 M 0.5 24 Adjacent Area Management: % Full 80%0.8 2 0.9 adjacent area mgmt: % Manicured 20%0.1 adjacent area mgmt: % Bare 0%0 25 Adjacent Area Diversity & Structure: % Native 80%0.8 2 0.9 adjacent area diversity: % Mixed 20%0.1 adjacent area diversity: % Sparse/Inv./Exotic 0%0 26 Adjacent Area Slope: % Gentle 90%0.9 2 0.95 adjacent area slope: % Moderate 10%0.05 adjacent area slope: % Steep 0%0 27 Downstream sensitivity/WQ protection b 0.5 28 Nutrient loading b 0.5 29 Shoreline wetland? N N 30 Rooted shoreline vegetation (%cover )Enter a percentage 31 Wetland in-water width (in feet, average)Enter a percentage 32 Emergent vegetation erosion resistance Enter valid choice 33 Shoreline erosion potential Enter valid choice 34 Bank protection/upslope veg. Enter valid choice 35 Rare Wildlife N N 36 Scarce/Rare/S1/S2 local community N N 37 Vegetation interspersion cover (see diagram 1)1 L 0.1 38 Community interspersion (see diagram 2)1 L 0.1 0 39 Wetland detritus b 0.5 40 Wetland interspersion on landscape a 1 0.5 41 Wildlife barriers c 0.1 42 Amphibian breeding potential-hydroperiod A 1 43 Amphibian breeding potential--fish presence c 0.1 44 Amphibian & reptile overwintering habitat b 0.5 45 Wildlife species (list) 46 Fish habitat quality N/A N/A 47 Fish species (list) 48 Unique/rare educ./cultural/rec.opportunity N N 49 Wetland visibility c 0.1 50 Proximity to population Y 1 51 Public ownership c 0.1 52 Public access c 0.1 53 Human influence on wetland c 0.1 54 Human influence on viewshed c 0.1 55 Spatial buffer b 0.5 56 Recreational activity potential b 0.5 57 Commercial crop--hydrologic impact c 0.1Digital worksheet, section IIDigital worksheet, section IUser entry This comes in from Side 1 automatically using the weighted average. To use the highest rated veg. Community rating, please manually overwrite that value (shown to the right) into the field at E5. Enter data starting here. Yellow boxes are used in calculations. Scroll down to answer more questions and see formula calculations MnRAMW2_T3.xls 1 3/22/2022 MnRAM_3.2_Score_Sheet.xls 71 A B C D E F G H I J K L M N P MnRAMW2_T3.xls 2 3/22/2022 MnRAM_3.2_Score_Sheet.xls 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 9091 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 A B C D E F G H I J K L M N P 58 GW - Wetland soils D R or D 1 59 GW - Subwatershed land use R R or D 0.1 60 GW - Wetland size and soil group D R or D 1 61 GW - Wetland hydroperiod R R or D 0.1 62 GW - Inlet/Outlet configuration R R or D 0.1 63 GW - Surrounding upland topographic relief D R or D 1 64 Restoration potential w/o flooding N Y or N 3.3 65 Landowners affected by restoration E a b c Enter valid choice 66A Existing wetland size (acres) [from #10]2.22 __ acres 66B Total wetland restoration size (acres) __ acres 0.1 66C (Calculated) Potential New Wetland Area [B-A] -2.22 __ acres #### 67 Average width of naturalized upland buffer (potential)0 __ feet 0.1 value: #### 68 Likelihood of restoration success a b c Enter valid choice 69 Hydrologic alteration type Outlet, Tile, Ditch, GW pump, Wtrshd div., Filling 70 Potential wetland type (Circ. 39) 1, 2, 3, 4, 5, 6, 7, 8 71 Wetland sensitivity to stormwater b E a b c 72 Additional stormwater treatment needs c a b c Function Name Formula shown to the right. Vegetative Diversity/Integrity 0.10 L Hydrology - Characteristic 0.63 Med Flood Attenuation 0.58 Med Water Quality--Downstream 0.56 Med Water Quality--Wetland 0.41 Med Shoreline Protection N/A N/A Characteristic Wildlife Habitat Structure 0.38 0.38 Med Maintenance of Characteristic Fish Habitat ######N/A N/A Maintenance of Characteristic Amphibian Habitat 0.04 Low Aesthetics/Recreation/Education/Cultural 0.31 0.31 Low Commercial use 0.10 Low 0.1 Special Features listing: - ____ Groundwater Interaction indeterminate GW source Groundwater Functional Index no special indicators Restoration Potential (draft formula) N/A N/A Stormwater Sensitivity (not active)Final RatingRating CategoryFunctional Rating SummariesRaw scoreAdditional questions% effectively drained: MnRAMW2_T3.xls 3 3/22/2022 MnRAM_3.2_Score_Sheet.xls 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 3637 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 Q R S T U V W X Y Z AA AB AC AD AE AF Highest-rated: I Depressional/Isolated FT Depress'l/Flow-through Trib Depress'l/Tributary R Riverine Lac Lacustrine Peat Peatland Flood Floodplain S Slope O Other Habitat n/a formulator E49 0.00 "=IF(E49="n/a",1,0)" E50 0.00 "=IF(E50="n/a",1.5,0)" E51 0.00 "=IF(E51="n/a",2,0)" Add 0.00 CC Rtg Ltr 1 0.1 L 2 0.1 L 3 0.5 M 4 0.5 M 5 1 H 6 0.5 M 7 1 H 8 0.1 L N/A N/A N/A - "Pick an example from the image" 1 L 0.1 2 M 0.5 3 H 1 4 H 1 N/A N/A N/A - "Pick an example from the image" These are supplemental Lookup Tables and Intermediary formulas: Community Interspersion LookUp Open Water Interspersion LookUp Hydrogeology and Topography LookUp MnRAMW2_T3.xls 4 3/22/2022 MnRAM_3.2_Score_Sheet.xls 71 Q R S T U V W X Y Z AA AB AC AD AE AF MnRAMW2_T3.xls 5 3/22/2022 MnRAM_3.2_Score_Sheet.xls 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 9091 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 Q R S T U V W X Y Z AA AB AC AD AE AF Vegetative formula "=C4", the Weighted Average Option 4 from Veg. Worksheet Characteristic Hydrology formula "=(E17+E18+E19+F24)/4" F24 is the reverse rating Flood Attenuation Formula breakout (not linked to D72) (E16 is reverse rated) n/a formula is: none 0.583333 ((E16+(F18+E23)/2+(E19+E22)/2+(E24+E25)/2+(F20+E21+E26)/3)/5) flood outlet 0.604167 ((F18+E23)/2+(E19+E22)/2+(E24+E25)/2+(F20+E21+E26)/3)/4 F-T 0.55 ((E16+(F18+E23)/2+(E19+E22)/2+(E24+E25)/2+ E26)/5) both 0.5625 ((F18+E23)/2+(E19+E22)/2+(E24+E25)/2+ E26)/4 Water Quality--Wetland "=(D6*2+E18+F24+(G27+G28+G34)/3+E22+E40)/7" Shoreline Protection "=IF(E41="y",((E42+E43+E44+E45+E46)/5),"N/A")" N/A H38 =Habitat formula breakout/lookup (E22 is RR) Special Features Bump is below. none 0 0.376667 (D6*2+E51+F49+F50+E52+E53+(I27+G28+G31)/3+E17+F24)/10 49 1 0.407407 (D6*2+E51+ F50+E52+E53+(I27+G28+G31)/3+E17+F24)/9 50 1.5 0.407407 (D6*2+E51+F49+ E52+E53+(I27+G28+G31)/3+E17+F24)/9 51 2 0.362963 (D6*2+ F49+F50+E52+E53+(I27+G28+G31)/3+E17+F24)/9 49&50 2.5 0.445833 (D6*2+E51+ E52+E53+(I27+G28+G31)/3+E17+F24)/8 49&51 3 0.395833 (D6*2+ F50+E52+E53+(I27+G28+G31)/3+E17+F24)/8 50&51 3.5 0.395833 (D6*2+ F49+ E52+E53+(I27+G28+G31)/3+E17+F24)/8 49&50&51 4.5 0.438095 (D6*2+ E52+E53+(I27+G28+G31)/3+E17+F24)/7 Characteristic Fish Habitat formula Characteristic Amphibian Habitat formula (see Lookup breakout below) E112=VLOOKUP(E54,T116:U117,2,FALSE) Amphibian Habitat Formula Breakout 0 0.00 Amphibian breeding is controlling factor 1 0.04 "=((E55)*(E56+(I27*2)+E53+E18+F24)/6)" Aesthetics/Rec/Ed/Cultural formula "=E69" Commercial use reflects just the rating for the question. Special Features Bump-up reference table a Fish Habitat=E b Veg=E c Aesthetics=E d n AND #5=Y, then Wildlife=E g Wildlife/Fish=E h Aesthetics=E I Veg=E j N AND #35 =Y, Wildlife=E qindeterminate GW sourceGW=recharge, GW=E rindeterminate GW sourceY and GW=recharge, GW=E u Aesthetics=E Recharge/Discharge Tendency R 0.1 D 1 - Enter "R" or "D" "IF(E65=".1",(E62+E63+E64+2*E65+E66+E67+E68)/8,(E61+E62 +E63+E64+E65+E66+E67+E68)/8)" "=IF(D41="Y",((E58*2+G28+E22+F24+E40+E43+E42+F45)/9),(( E58*2+G28+E22+F24+E40)/6))"These are the formulas for the f inal functional ratings shown at the MnRAMW2_T3.xls 6 3/22/2022 ENGINEER'S OPINION OF PROBABLE COST ITEM ESTIM. NO.DESCRIPTION UNIT QTY.UNIT PRICE AMNT. ($) STORMWATER SW1 COMMON EXCAVATION CY 850 $3.00 $2,550.00 SW2 TURF REINFORECEMNT MAT SF 3000 $3.50 $10,500.00 SW3 Biofiltration Media Mix C CY 155 $50.00 $7,750.00 SW4 COARSE FILTER AGGREGATE, 0.6' DEPTH, 1- 1.5" WASHED ROCK, SEE PLAN CY 40 $50.00 $2,000.00 SW5 6" PVC SCH 40 DRAIN PIPE PERFORATED LF 170 $20.00 $3,400.00 SW6 6" PVC SCH 40 DRAIN PIPE SOLID LF 10 $20.00 $200.00 SW7 12" HDPE LF 25 $20.00 $500.00 SW8 12" FES EA 1 $1,000.00 $1,000.00 SW9 6" DRAINTILE CLEANOUT EA 5 $100.00 $500.00 SW10 CLASS 3 RIPRAP CY 4 $100.00 $400.00 SW11 OCS1 EA 1 $4,000.00 $4,000.00 TOTAL ENGINEER ESTIMATE $32,800.00 $32,800.00TOTAL ENGINEERS ESTIMATE (ALL BMPS) GAYLE MORIN SUBDIVISION - CHANHASSEN ENGINEER ESTIMATE 3/15/2022 CIVIL SITE GROUP Above Ground Filtration Basin 1