Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
00 - CSG 21429 GAYLE MORIN SUBDIVISION STORMWATER REPORT - 05-18-22Civil Site Group, PC 4931 West 35th Street Suite 200 St. Louis Park Minnesota 55416
www.CivilSiteGroup.com (612) 615-0060
Stormwater Management Report
Owner:
Gayle Morin
1441 Lake Lucy Rd.
Chanhassen, MN 55317
Project:
Gayle Morin Subdivision
1441 Lake Lucy Rd.
Chanhassen, MN 55317
Engineer’s Certification:
All plans and supporting Documentation contained in this report have been reviewed by me and it is hereby
certified that to the best of my knowledge the plans comply with the requirements of the ordinance.
I hereby certify that this report was prepared by me or under my direct supervision and that I am a duly
Registered Professional Engineer under the laws of the State of Minnesota.
_________________
Matthew R. Pavek P.E.
Registration Number: 44263
Date:
05-13-2022
Civil Site Group, PC 4931 West 35th Street Suite 200 St. Louis Park Minnesota 55416
www.CivilSiteGroup.com (612) 615-0060
Table of Contents:
1.0 Cover Sheet, Engineer’s Certification
2.0 Summary Analysis / Narrative
2.1 Introduction
2.2 Existing Site Conditions
2.3 Proposed Site Conditions
2.4 Stormwater Requirements – City
2.5 Stormwater Requirements – Watershed District
2.6 Stormwater Requirements – MPCA / NPDES
3.0 Stormwater Calculations
3.1 Proposed Stormwater Management Strategy & Facilities Description
3.2 Rate Control
3.3 Volume Control
3.4 Water Quality
3.5 Wetland Buffer
3.6 Wetland Bounce, and Inundation
4.0 Conclusions
Figures:
Figure 1 – Existing Conditions Drainage Area map
Figure 2 – Proposed Conditions Drainage Area Map
Appendices:
Drainage Calculations Summary Table
MIDS Results
HydroCAD
Existing Conditions HydroCAD Modeling
Proposed Conditions HydroCAD Modeling
Geotech Report
MnRAM Results
Engineer’s Probable Opinion of Probable Cost
Civil Site Group, PC 4931 West 35th Street Suite 200 St. Louis Park Minnesota 55416
www.CivilSiteGroup.com (612) 615-0060
2.0 Summary Analysis / Narrative:
2.1 Introduction:
This stormwater management report accompanies the Civil Engineering Plans prepared by Civil Site
Group for the subject project dated 01/28/2022 (Resubmitted 05/17/2022). This report includes a
summary of the existing and proposed site conditions, the stormwater requirements of relevant
regulatory agencies, proposed design calculations, and data to meet the requirements.
2.2 Existing Site Conditions :
Site Description:
The existing site is an existing home with driveway. Below is the existing surface area tabulation.
Existing Soils:
The existing soil borings show primarily sandy lean clay and clayey sand under a layer of topsoil.
These soil types have a soil group of D which was used in the modeling.
Groundwater:
Groundwater was not observed at the time of soil boring. After discussion with the geotechnical
engineer, they explained in the clay type soil and high blow out counts the only water they would
expect to encounter would be perched or water trapped in sand veins. Infiltration testing was not able
to be completed during the planning stage due to frozen soils.
2.3 Proposed Site Conditions:
Site Description:
The proposed site is a lot split with the addition of a home with associated parking, drive entrances,
landscaping, and stormwater improvements.
The proposed site surface coverage areas are shown in the table below:
Area [SF] CN Value Area [SF] CN Value Area [SF] CN Value
EX1A 3245 98 0 84 3245 98
EX1B 7290 98 55517 84 62807 86
EX1C 0 98 4200 84 4200 84
WETLAND A 0 99 9788 84 9788 84
OFFSITE A 8875 98 40698 84 49573 87
OFFSITE B 6076 98 68789 84 74865 85
EX2 2278 98 3302 84 5580 90
UNDISTURBED 0 98 125400 84 125400 84
Existing Conditions
Total AreaImpervious AreaDrainage Area Pervious Area
Area [SF] CN Value Area [SF] CN Value Area [SF] CN Value
PR1A 3245 98 0 84 3245 98
PR1B 7290 98 21877 84 29167 87
PR1C 0 98 5573 84 5573 84
PR1D 6135 98 28982 84 35117 86
OFFSITE A 8875 98 40698 84 49573 87
OFFSITE B 6076 98 68789 84 74865 85
PR2 2313 98 323 84 2636 96
UNDISTURBED 0 98 125400 84 125400 84
Pervious Area Total Area
Proposed Conditions
Drainage Area Impervious Area
Civil Site Group, PC 4931 West 35th Street Suite 200 St. Louis Park Minnesota 55416
www.CivilSiteGroup.com (612) 615-0060
2.4 Stormwater Requirements City (Chanhassen):
The city of Chanhassen’s stormwater requirements defers to watershed.
2.5 Stormwater Requirements Watershed District – (Riley Purgatory Bluff Creek Watershed District
(RPBCWD))
Requirement threshold – Alteration or removal of 5,000 square feet or more of land-surface area or
vegetation.
Rate Control – Peak runoff rate may not exceed existing conditions for the 2-yr, 10-yr, 100-yr 24-
hour rainfall events, and a 100-year frequency, 10-day snowmelt event. Utilize Atlas 14 rainfall data
Water Quality – 60% annual removal efficiency of total phosphorus (TP) and 90% annual removal
of total suspended solids (TSS) or provide required abstraction volume.
Volume Control – Provide for the abstraction of 1.1” of runoff from the new impervious surface
area of the parcel.
Wetland Buffers – A buffer area must be crated or maintained around a wetland disturbed by
wetland-disturbing activity.
Wetland Bounce and Inundation – No activity may alter a site that increases the bounce in water
level, duration of inundation, for any wetland receiving discharge directly from the site beyond the
limits specified.
2.6 Stormwater Requirements - Minnesota Pollution Control Agency – NPPDES permit (MPCA):
Requirement threshold - A permit is required for projects with a disturbed area over 1 acre in size,
Stormwater management is required for a project adding 1-acre of more of NEW impervious surface
(reconstructed impervious is not included).
Rate Control – No specific regulation, may not degrade downstream facilities.
Water Quality – Stormwater water quality treatment volume must be provided equal to 1.0” over all
new impervious surfaces (includes all newly constructed impervious surfaces only, re-constructed
impervious surfaces are not included).
Volume Control – Must consider volume reduction if feasible and not prohibited on site. The
required infiltration volume is equal to the water quality volume described above.
3.0 Stormwater Calculations:
3.1 Proposed Stormwater Management Strategy & Facilities Description
This project is disturbing 0.5 acres of land. This project triggers the stormwater requirements of
Riley Purgatory Bluff Creek Watershed District, and their rules will be used as a basis for the design
requirements for this project. The proposed stormwater strategy for this project is directing the
project stormwater runoff via surface drainage to a surface biofiltration basin and underground rock
section. This basin and underground rock section are designed to provide water quality treatment,
volume reduction, and rate control requirements.
3.2 Rate Control
Rate control is provided by live storage within the proposed biofiltration basin. This information was
derived using HydroCAD stormwater modeling software. The existing and proposed runoff rates are
shown in the summary table below.
Civil Site Group, PC 4931 West 35th Street Suite 200 St. Louis Park Minnesota 55416
www.CivilSiteGroup.com (612) 615-0060
Runoff rates have been maintained or reduced to all discharge points. The proposed runoff rates in
aggregate are less than the existing peak runoff rates – REQUIREMENT SATISFIED
3.3 Volume Control
Per Rule J 2.3, because this project will disturb less than 50% of existing impervious and increase
impervious by less than 50% of existing, Section 3 (a. Rate, b. Volume, and c. Quality) will only
apply to the disturbed areas an additional impervious surface on the project parcel.
Volume control requirements are met through abstraction of 1.1 inch from the new impervious
surfaces within the biofiltration basin and rock section on site. The following table calculates the
required 1.1” abstraction volume. The MIDS calculator was used to estimate the abstraction volume
provided by the proposed biofiltration basin and rock section with results appended to this report.
2-YR [2.94"] 10-YR [4.47"] 100-YR [7.81"] SNOWMELT [7.20"]
DA1 - EAST 0.32 0.48 0.78 0.01
DA2 - WETLAND A 8.71 16.03 30.18 0.62
DA3 - WETLAND B 7.38 14.97 30.31 0.85
TOTAL 16.41 31.48 61.27 1.48
2-YR [2.94"] 10-YR [4.47"] 100-YR [7.81"] SNOWMELT [7.20"]
DA1 - EAST 0.32 0.48 0.78 0.01
DA2 - WETLAND A 6.93 14.45 28.65 0.56
DA3 - WETLAND B 6.28 13.02 28.83 0.78
TOTAL 13.53 27.95 58.26 1.35
Overall Stormwater Rate Summary
2-Year Event 16.41 13.53
10-Year Event 31.48 27.95
100-Year Event 61.27 58.26
Snowmelt 1.48 1.35
Stormwater Rate Summary
Existing Rate (cfs)
Existing Rate (cfs)
Existing Conditions
Rate (cfs)
Proposed Conditions
Rate (cfs)
Drainage Area
Drainage Area
Stormwater Water Quality Summary
New Impv. Area (sf) Required Volume (cf)
PR1D 6135 562
TOTAL 6135 562
Biofiltration Basin 1* 660
TOTAL 660
*per MIDS calculator
Abstraction Volume =
1.1"*Dist. Impv. Area
Provided Vol (cf)Proposed BMP Area
Drainage Area Required Infiltration Vol. Summary
Civil Site Group, PC 4931 West 35th Street Suite 200 St. Louis Park Minnesota 55416
www.CivilSiteGroup.com (612) 615-0060
The provided abstraction volume is greater than the required volume – REQUIREMENT SATISFIED
3.4 Water Quality
Water quality requirements are met by abstraction within the biofiltration basin and underground
rock section. Because volume abstraction is provided for 1.1 inches over the regulated impervious
surface (per Rule J, 3.b.i.) water quality Rule J, 3.c.i is met.
In addition, all regulated impervious is directed into the biofiltration basin meeting the volume
abstraction requirement prior to discharge into wetland A. – REQUIREMENT SATISFIED
3.5 Wetland Buffer
The wetlands onsite were delineated by Jacobson Environmental, PLLC in a report dated October 11,
2021, including MnRAM assessments. Per RPBCWD Rule D, Appendix D1 both onsite wetlands are
considered a “Medium value wetlands” due to a medium rating category for Wildlife Habitat.
Therefore the wetlands require a 40-foot average, minimum 20-foot buffer “on that portion of the
edge of a wetland that is downgradient from land-disturbing activity regulated by the District”. 1,578
linear feet of Wetland A are downgradient of land disturbing activity and require buffer construction.
The remainder of the edge of Wetland A and the entire onsite edge of Wetland B are not
downgradient of land disturbing activity and will remain undisturbed to preserve vegetation
consistent with the Policy of Rule D.
The onsite area footprint for a 40-foot buffer required is 7,033 sqft. The proposed buffer to be created
has an area of 8,552 sqft with a minimum width of 20-feet and a typical width of 50-feet. Because of
spatial limitation onsite the buffer area will extend into the biofiltration BMP which will also be
planted with native vegetation per Rule D 3.3.– WETLAND BUFFER REQUIREMENT
SATISFIED
3.6 Wetland Bounce and Inundation
The wetlands onsite were reviewed for changes in bounce and inundation due to proposed site
activity. The table below summarizes the existing and proposed wetland conditions, change (if any),
and allowable change based on Table J1.
The project does not cause an increased bounce, volume tributary, or increase the high water level for
either wetland beyond the permissible limit - REQUIREMENT SATISFIED
Wetland Bounce & Innundation Calculations
Wetland A - Medium Value 10-yr HWL Inundation 1-yr (hrs) Inundation 2-yr (hrs) Inundation 10-yr (hrs) Runout Elevation
Existing Conditions 970.15 28.4 28.6 28.4 969.62
Proposed Conditions 970.08 35 35.8 36.2 969.62
Difference 0.07 6.6 7.2 7.8 0
Permissable Limit EX +/- 1.0 feet EX + 2 days EX + 2 days EX + 14 days EX + 1.0 feet
Wetland B - Medium Value 10-yr HWL Inundation 1-yr (hrs) Inundation 2-yr (hrs) Inundation 10-yr (hrs) Runout Elevation
Existing Conditions 961.61 22.8 23.2 22.8 960.82
Proposed Conditions 961.61 26.4 27.6 27.8 960.82
Difference 0.00 3.6 4.4 5 0
Permissable Limit EX +/- 1.0 feet EX + 2 days EX + 2 days EX + 14 days EX + 1.0 feet
Civil Site Group, PC 4931 West 35th Street Suite 200 St. Louis Park Minnesota 55416
www.CivilSiteGroup.com (612) 615-0060
4.0 Conclusions:
To the best of our knowledge, this project meets all State, City and Watershed District stormwater
management requirements to the best of its ability.
S88°03'48"E 180.08S00°10'43"W 1131.8 +/-N00°10'43"E 1220.1 +/-33.0233.021161.341081.20N88°03'48"W 308.34 980990100098099010001020101010201010103097097097096096010301030103410349809809901000100210001002104010361036APPROX. EXISTINGCB LOCATION, TYP.APPROX.EXISTING CBLOCATION,TYP.WETLAND BLAKELUCYWETLANDAEX 2EX IMPV = 2,278 SFEX PERV = 3,302 SFTOTAL = 5,580 SFEX 1BEX IMPV = 7,290 SFEX PERV = 55,517 SFTOTAL = 62,807 SFOFFSITE BEX IMPV = 6,076 SFEX PERV = 68,789 SFTOTAL = 74,865 SFEX 1AEX IMPV = 3,245 SFEX PERV = 0 SFTOTAL = 3,245 SFWETLAND ATOTAL = 9,788 SFUNDISTURBEDEX IMPV = 0 SFEX PERV = 125,400 SFTOTAL = 125,400 SFOFFSITE AEX IMPV = 8,875 SFEX PERV = 40,698 SFTOTAL = 49,573 SFEX 1CEX IMPV = 0 SFEX PERV = 4,200 SFTOTAL = 4,200 SFProject Number:Issue Date:Revision Number:Revision Date:5000 Glenwood AveGolden Valley, MN 55422952.250.2003 / 763.213.394www.CivilSiteGroup.comGAYLE MORIN1441 LUCY LAKE RD, CHANHASSEN, MN 55317DA12142904/29/2022..01" = 100'-0"100'-0"50'-0"NEXISTING DRAINAGE MAP
S88°03'48"E 180.08S00°10'43"W 1131.8 +/-N00°10'43"E 1220.1 +/-33.0233.021161.341081.20N88°03'48"W 308.34
2
4
.
5 48.01
3
.
88.48.58
.
5
2.33
.
4 40.45
9
.
4
24.93
2
.
54.572.798099010009809901000102010101020101097097097010301030980980990WETLANDAEX 2EX IMPV = 2,278 SFEX PERV = 3,302 SFTOTAL = 5,580 SFEX 1BEX IMPV = 7,290 SFEX PERV = 55,517 SFTOTAL = 62,807 SFOFFSITE BEX IMPV = 6,076 SFEX PERV = 68,789 SFTOTAL = 74,865 SFEX 1AEX IMPV = 3,245 SFEX PERV = 0 SFTOTAL = 3,245 SFWETLAND ATOTAL = 9,788 SFOFFSITE AEX IMPV = 8,875 SFEX PERV = 40,698 SFTOTAL = 49,573 SFEX 1CEX IMPV = 0 SFEX PERV = 4,200 SFTOTAL = 4,200 SFProject Number:Issue Date:Revision Number:Revision Date:5000 Glenwood AveGolden Valley, MN 55422952.250.2003 / 763.213.394www.CivilSiteGroup.comGAYLE MORIN1441 LUCY LAKE RD, CHANHASSEN, MN 55317DA12142904/29/2022..01" = 50'-0"50'-0"25'-0"NEXISTING DRAINAGE MAP-BLOWUP
21N88°03'48"W 308.34 WETLAND BLAKELUCYWETLANDAUNDISTURBEDPR IMPV = 0 SFPR PERV = 125,400 SFTOTAL =125,400 SFAPPROX. EXISTINGCB LOCATION, TYP.APPROX. EXISTINGCB LOCATION, TYP.PR 1BPR IMPV = 7,290 SFPR PERV = 21,877 SFTOTAL = 29,167 SFPR 1APR IMPV = 3,245 SFPR PERV = 0 SFTOTAL = 3,245 SFWETLAND AONSITE TOTAL = 9,792 SFDELINEATED TOTAL = 11,587 SFPR 2PR IMPV = 2,313 SFPR PERV = 323 SFTOTAL = 2,636 SFPR 1CPR IMPV = 0 SFPR PERV = 5,573 SFTOTAL = 5,573 SFOFFSITE BPR IMPV = 6,076 SFPR PERV = 68,789 SFTOTAL = 74,865 SFOFFSITE APR IMPV = 8,875 SFPR PERV = 40,698 SFTOTAL = 49,573 SFPR 1DPR IMPV = 6,135 SFPR PERV = 28,982 SFTOTAL = 35,117 SFProject Number:Issue Date:Revision Number:Revision Date:5000 Glenwood AveGolden Valley, MN 55422952.250.2003 / 763.213.394www.CivilSiteGroup.comGAYLE MORIN1441 LUCY LAKE RD, CHANHASSEN, MN 55317DA22142904/29/2022..01" = 100'-0"100'-0"50'-0"NPROPOSED DRAINAGE MAP
21S88°03'48"E 180.08S00°10'43"W 1131.8 +/-N00°10'43"E 1220.1 +/-33.0233.021161.341081.20N88°03'48"W 308.34 WETLANDAPR 1BPR IMPV = 7,290 SFPR PERV = 21,877 SFTOTAL = 29,167 SFPR 1APR IMPV = 3,245 SFPR PERV = 0 SFTOTAL = 3,245 SFWETLAND AONSITE TOTAL = 9,792 SFDELINEATED TOTAL = 11,587 SFPR 2PR IMPV = 2,313 SFPR PERV = 323 SFTOTAL = 2,636 SFPR 1CPR IMPV = 0 SFPR PERV = 5,573 SFTOTAL = 5,573 SFOFFSITE BPR IMPV = 6,076 SFPR PERV = 68,789 SFTOTAL = 74,865 SFOFFSITE APR IMPV = 8,875 SFPR PERV = 40,698 SFTOTAL = 49,573 SFPR 1DPR IMPV = 6,135 SFPR PERV = 28,982 SFTOTAL = 35,117 SFProject Number:Issue Date:Revision Number:Revision Date:5000 Glenwood AveGolden Valley, MN 55422952.250.2003 / 763.213.394www.CivilSiteGroup.comGAYLE MORIN1441 LUCY LAKE RD, CHANHASSEN, MN 55317DA22142904/29/2022..01" = 50'-0"50'-0"25'-0"NPROPOSED DRAINAGE MAP- BLOWUP
Civil Site Group - Stormwater Calculations
Area [SF] CN Value Area [SF] CN Value Area [SF] CN Value
EX1A 3245 98 0 84 3245 98
EX1B 7290 98 55517 84 62807 86
EX1C 0 98 4200 84 4200 84
OFFSITE A 8875 98 40698 84 49573 87
OFFSITE B 6076 98 68789 84 74865 85
EX2 2278 98 3302 84 5580 90
UNDISTURBED 0 98 125400 84 125400 84
Area [SF] CN Value Area [SF] CN Value Area [SF] CN Value
PR1A 3245 98 0 84 3245 98
PR1B 7290 98 21877 84 29167 87
PR1C 0 98 5573 84 5573 84
PR1D 6135 98 28982 84 35117 86
OFFSITE A 8875 98 40698 84 49573 87
OFFSITE B 6076 98 68789 84 74865 85
PR2 2313 98 323 84 2636 96
UNDISTURBED 0 98 125400 84 125400 84
Impervious [SF] Impervious [AC] Pervious [SF] Pervious [AC] Total [SF] Total [AC]
Existing Site 12813 0.29 188419 4.33 201232 4.62
Existing Site & Offsite 27764 0.64 297906 6.84 325670 7.48
Proposed Site 18983 0.44 182155 4.18 201138 4.62
Proposed Site & Offsite 33934 0.78 291642 6.70 325576 7.47
2-YR [2.94"] 10-YR [4.47"] 100-YR [7.81"] SNOWMELT [7.20"]
DA1 - EAST 0.32 0.48 0.78 0.01
DA2 - WETLAND A 8.71 16.03 30.18 0.62
DA3 - WETLAND B 7.38 14.97 30.31 0.85
TOTAL 16.41 31.48 61.27 1.48
2-YR [2.94"]10-YR [4.47"]100-YR [7.81"]SNOWMELT [7.20"]
DA1 - EAST 0.32 0.48 0.78 0.01
DA2 - WETLAND A 6.93 14.45 28.65 0.56
DA3 - WETLAND B 6.28 13.02 28.83 0.78
TOTAL 13.53 27.95 58.26 1.35
Overall Stormwater Rate Summary
2-Year Event 16.41 13.53
10-Year Event 31.48 27.95
100-Year Event 61.27 58.26
Snowmelt 1.48 1.35
Stormwater Water Quality Summary
New Impv. Area (sf) Required Volume (cf)
PR1D 6135 562
TOTAL 6135 562
Biofiltration Basin 1*660
TOTAL 660
*per MIDS calculator
Wetland Bounce & Innundation Calculations
Wetland A - Medium Value 10-yr HWL Inundation 1-yr (hrs) Inundation 2-yr (hrs) Inundation 10-yr (hrs) Runout Elevation
Existing Conditions 970.15 28.4 28.6 28.4 969.62
Proposed Conditions 970.08 35 35.8 36.2 969.62
Difference 0.07 6.6 7.2 7.8 0
Permissable Limit EX +/- 1.0 feet EX + 2 days EX + 2 days EX + 14 days EX + 1.0 feet
Wetland B - Medium Value 10-yr HWL Inundation 1-yr (hrs) Inundation 2-yr (hrs) Inundation 10-yr (hrs) Runout Elevation
Existing Conditions 961.61 22.8 23.2 22.8 960.82
Proposed Conditions 961.61 26.4 27.6 27.8 960.82
Difference 0.00 3.6 4.4 5 0
Permissable Limit EX +/- 1.0 feet EX + 2 days EX + 2 days EX + 14 days EX + 1.0 feet
Abstraction Volume =
1.1"*Dist. Impv. Area
Stormwater Rate Summary
Existing Rate (cfs)
Existing Rate (cfs)
Existing Conditions
Rate (cfs)
Proposed Conditions
Rate (cfs)
Drainage Area
Drainage Area
Provided Vol (cf)Proposed BMP Area
Site Area Summary
1441 Lucy Lake Road
Pervious Area Total Area
Existing Conditions
Proposed Conditions
Drainage Area Impervious Area
Total AreaImpervious AreaDrainage Area Pervious Area
Drainage Area Required Infiltration Vol. Summary
Project Information
Calculator Version:Version 4: July 2020
Project Name:Gayle Morin Lot Split
User Name / Company Name: Civil Site Group - Mike Sheehan
Date:May 13, 2022
Project Description:Lot split. MIDS used for abstraction calculations.
Construction Permit?:No
Site Information
Retention Requirement (inches):1.1
Site's Zip Code:55317
Annual Rainfall (inches):29.9
Phosphorus EMC (mg/l):0.3
TSS EMC (mg/l):54.5
Total Site Area
Land Cover A Soils
(acres)
B Soils
(acres)
C Soils
(acres)
D Soils
(acres)
Total
(acres)
Forest/Open Space -Undisturbed, protected
forest/open space or reforested land
0.665 0.665
Managed Turf -disturbed, graded for yards or
other turf to be mowed/managed
0
Impervious Area (acres) 0.145
Total Area (acres) 0.81
Site Areas Routed to BMPs
Land Cover A Soils
(acres)
B Soils
(acres)
C Soils
(acres)
D Soils
(acres)
Total
(acres)
Forest/Open Space -Undisturbed, protected
forest/open space or reforested land
0.665 0.665
Managed Turf -disturbed, graded for yards or
other turf to be mowed/managed
0
Impervious Area (acres) 0.145
Total Area (acres) 0.81
Summary Information
Performance Goal Requirement
Performance goal volume retention requirement: 579 ft3
Volume removed by BMPs towards performance goal: 579 ft³
Percent volume removed towards performance goal 100 %
Annual Volume and Pollutant Load Reductions
Post development annual runoff volume 0.3835 acre-ft
Annual runoff volume removed by BMPs: 0.109 acre-ft
Percent annual runoff volume removed: 28 %
Post development annual particulate P load:0.1721 lbs
Annual particulate P removed by BMPs: 0.148 lbs
Post development annual dissolved P load: 0.141 lbs
Annual dissolved P removed by BMPs: 0.06 lbs
Total P removed by BMPs 0.208 lbs
Percent annual total phosphorus removed: 66 %
Post development annual TSS load: 56.8 lbs
Annual TSS removed by BMPs:48.7 lbs
Percent annual TSS removed: 86 %
BMP Summary
Performance Goal Summary
BMP Name
BMP Volume
Capacity
(ft3)
Volume
Recieved
(ft3)
Volume
Retained
(ft3)
Volume
Outflow
(ft3)
Percent
Retained (%)
1 - Bioretention basin (with underdrain)660 579 579 0 100
Annual Volume Summary
BMP Name
Volume
From Direct
Watershed
(acre-ft)
Volume
From
Upstream
BMPs
(acre-ft)
Volume
Retained
(acre-ft)
Volume
outflow
(acre-ft)
Percent
Retained
(%)
1 - Bioretention basin (with underdrain)0.3835 0 0.109 0.2745 28
Particulate Phosphorus Summary
BMP Name
Load From
Direct
Watershed
(lbs)
Load From
Upstream
BMPs
(lbs)
Load
Retained
(lbs)
Outflow
Load
(lbs)
Percent
Retained (%)
1 - Bioretention basin (with underdrain)0.1721 0 0.1475 0.0246 86
Dissolved Phosphorus Summary
BMP Name
Load From
Direct
Watershed
(lbs)
Load From
Upstream
BMPs
(lbs)
Load
Retained
(lbs)
Outflow
Load
(lbs)
Percent
Retained (%)
1 - Bioretention basin (with underdrain)0.1408 0 0.0602 0.0806 43
Total Phosphorus Summary
BMP Name
Load From
Direct
Watershed
(lbs)
Load From
Upstream
BMPs
(lbs)
Load
Retained
(lbs)
Outflow
Load
(lbs)
Percent
Retained (%)
1 - Bioretention basin (with underdrain)0.3129 0 0.2077 0.1052 64
TSS Summary
BMP Name
Load From
Direct
Watershed
(lbs)
Load From
Upstream
BMPs
(lbs)
Load
Retained
(lbs)
Outflow
Load
(lbs)
Percent
Retained (%)
1 - Bioretention basin (with underdrain)56.85 0 48.71 8.14 86
BMP Schematic
6S
UNDISTURBED
7S
OFFSITE WETLAND B
WATERSHED
EX1A
EX1A - DRAINS EAST
DOWN LAKE LUCY
ROAD
EX1B
EX1B - DRAINS
SOUTH TO WETLAND
A
EX1C
EX1C - DRAINS
SOUTH TO WETLAND
A
EX2
EX2 - DRAINS SOUTH
TO WETLAND B
OFFSITE A
OFFSITE A - DRAINS
SOUTH TO WETLAND
B
OFFSITE B
OFFSITE B- DRAINS
SOUTH TO WETLAND
A
DA2
DA2 - TOTAL FLOW TO
WETLAND A
DA3
DA3 - TOTAL FLOW TO
WETLAND B
1P
WETLAND A
5P
Wetland B
Routing Diagram for 21429- EXISTING
Prepared by {enter your company name here}, Printed 5/13/2022
HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Subcat Reach Pond Link
21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 2HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Area Listing (all nodes)
Area
(acres)
CN Description
(subcatchment-numbers)
6.839 84 (6S, EX1B, EX1C, EX2, OFFSITE A, OFFSITE B)
3.921 84 1/2 acre lots, 25% imp, HSG B (7S)
0.637 98 Paved parking, HSG C (EX1A, EX1B, EX2, OFFSITE A, OFFSITE B)
1.547 98 Unconnected roofs, HSG B (7S)
12.944 86 TOTAL AREA
21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 3HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Soil Listing (all nodes)
Area
(acres)
Soil
Group
Subcatchment
Numbers
0.000 HSG A
5.468 HSG B 7S
0.637 HSG C EX1A, EX1B, EX2, OFFSITE A, OFFSITE B
0.000 HSG D
6.839 Other 6S, EX1B, EX1C, EX2, OFFSITE A, OFFSITE B
12.944 TOTAL AREA
21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 4HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Ground Covers (all nodes)
HSG-A
(acres)
HSG-B
(acres)
HSG-C
(acres)
HSG-D
(acres)
Other
(acres)
Total
(acres)
Ground
Cover
Subcatchment
Numbers
0.000 0.000 0.000 0.000 6.839 6.839 6S, EX1B,
EX1C,
EX2,
OFFSITE
A,
OFFSITE B
0.000 3.921 0.000 0.000 0.000 3.921 1/2 acre lots, 25% imp 7S
0.000 0.000 0.637 0.000 0.000 0.637 Paved parking EX1A,
EX1B,
EX2,
OFFSITE
A,
OFFSITE B
0.000 1.547 0.000 0.000 0.000 1.547 Unconnected roofs 7S
0.000 5.468 0.637 0.000 6.839 12.944 TOTAL AREA
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 5HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Time span=0.00-240.00 hrs, dt=0.01 hrs, 24001 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Stor-Ind method - Pond routing by Stor-Ind method
Runoff Area=125,400 sf 0.00% Impervious Runoff Depth=1.12"Subcatchment 6S: UNDISTURBED
Tc=6.0 min CN=84 Runoff=5.69 cfs 0.268 af
Runoff Area=238,192 sf 46.22% Impervious Runoff Depth=1.44"Subcatchment 7S: OFFSITE WETLAND B
Flow Length=1,100' Slope=0.1500 '/' Tc=13.4 min CN=WQ Runoff=9.63 cfs 0.657 af
Runoff Area=3,245 sf 100.00% Impervious Runoff Depth=2.27"Subcatchment EX1A: EX1A - DRAINS
Tc=6.0 min CN=WQ Runoff=0.27 cfs 0.014 af
Runoff Area=62,807 sf 11.61% Impervious Runoff Depth=1.25"Subcatchment EX1B: EX1B - DRAINS
Tc=6.0 min CN=WQ Runoff=3.13 cfs 0.150 af
Runoff Area=4,200 sf 0.00% Impervious Runoff Depth=1.12"Subcatchment EX1C: EX1C - DRAINS
Tc=6.0 min CN=WQ Runoff=0.19 cfs 0.009 af
Runoff Area=5,580 sf 40.82% Impervious Runoff Depth=1.59"Subcatchment EX2: EX2 - DRAINS SOUTH
Tc=6.0 min CN=WQ Runoff=0.34 cfs 0.017 af
Runoff Area=49,573 sf 17.90% Impervious Runoff Depth=1.32"Subcatchment OFFSITE A: OFFSITE A -
Tc=6.0 min CN=WQ Runoff=2.59 cfs 0.125 af
Runoff Area=74,865 sf 8.12% Impervious Runoff Depth=1.21"Subcatchment OFFSITE B: OFFSITE B-
Tc=6.0 min CN=WQ Runoff=3.63 cfs 0.173 af
Inflow=6.95 cfs 0.332 afReach DA2: DA2 - TOTAL FLOW TO WETLAND A
Outflow=6.95 cfs 0.332 af
Inflow=5.68 cfs 0.475 afReach DA3: DA3 - TOTAL FLOW TO WETLAND B
Outflow=5.68 cfs 0.475 af
Peak Elev=969.90' Storage=3,265 cf Inflow=6.95 cfs 0.332 afPond 1P: WETLAND A
Outflow=3.64 cfs 0.332 af
Peak Elev=961.61' Storage=894 cf Inflow=18.97 cfs 1.400 afPond 5P: Wetland B
Outflow=18.85 cfs 1.400 af
Total Runoff Area = 12.944 ac Runoff Volume = 1.414 af Average Runoff Depth = 1.31"
75.55% Pervious = 9.780 ac 24.45% Impervious = 3.165 ac
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 6HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment 6S: UNDISTURBED
Runoff = 5.69 cfs @ 12.09 hrs, Volume= 0.268 af, Depth= 1.12"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"
Area (sf) CN Description
* 125,400 84
125,400 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment 6S: UNDISTURBED
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)6
5
4
3
2
1
0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr
1y 24hr Rainfall=2.50"
Runoff Area=125,400 sf
Runoff Volume=0.268 af
Runoff Depth=1.12"
Tc=6.0 min
CN=84
5.69 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 7HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment 6S: UNDISTURBED
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.12 0.00 0.00
10.00 0.38 0.00 0.00
15.00 2.21 0.90 0.20
20.00 2.40 1.04 0.05
25.00 2.50 1.12 0.00
30.00 2.50 1.12 0.00
35.00 2.50 1.12 0.00
40.00 2.50 1.12 0.00
45.00 2.50 1.12 0.00
50.00 2.50 1.12 0.00
55.00 2.50 1.12 0.00
60.00 2.50 1.12 0.00
65.00 2.50 1.12 0.00
70.00 2.50 1.12 0.00
75.00 2.50 1.12 0.00
80.00 2.50 1.12 0.00
85.00 2.50 1.12 0.00
90.00 2.50 1.12 0.00
95.00 2.50 1.12 0.00
100.00 2.50 1.12 0.00
105.00 2.50 1.12 0.00
110.00 2.50 1.12 0.00
115.00 2.50 1.12 0.00
120.00 2.50 1.12 0.00
125.00 2.50 1.12 0.00
130.00 2.50 1.12 0.00
135.00 2.50 1.12 0.00
140.00 2.50 1.12 0.00
145.00 2.50 1.12 0.00
150.00 2.50 1.12 0.00
155.00 2.50 1.12 0.00
160.00 2.50 1.12 0.00
165.00 2.50 1.12 0.00
170.00 2.50 1.12 0.00
175.00 2.50 1.12 0.00
180.00 2.50 1.12 0.00
185.00 2.50 1.12 0.00
190.00 2.50 1.12 0.00
195.00 2.50 1.12 0.00
200.00 2.50 1.12 0.00
205.00 2.50 1.12 0.00
210.00 2.50 1.12 0.00
215.00 2.50 1.12 0.00
220.00 2.50 1.12 0.00
225.00 2.50 1.12 0.00
230.00 2.50 1.12 0.00
235.00 2.50 1.12 0.00
240.00 2.50 1.12 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 8HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment 7S: OFFSITE WETLAND B WATERSHED
Runoff = 9.63 cfs @ 12.18 hrs, Volume= 0.657 af, Depth= 1.44"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"
Area (sf) CN Description
67,393 98 Unconnected roofs, HSG B
* 170,799 84 1/2 acre lots, 25% imp, HSG B
238,192 Weighted Average
128,099 53.78% Pervious Area
110,093 46.22% Impervious Area
67,393 61.21% Unconnected
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
7.9 200 0.1500 0.42 Sheet Flow,
Grass: Short n= 0.150 P2= 2.94"
5.5 900 0.1500 2.71 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
13.4 1,100 Total
Subcatchment 7S: OFFSITE WETLAND B WATERSHED
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)10
9
8
7
6
5
4
3
2
1
0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr
1y 24hr Rainfall=2.50"
Runoff Area=238,192 sf
Runoff Volume=0.657 af
Runoff Depth=1.44"
Flow Length=1,100'
Slope=0.1500 '/'
Tc=13.4 min
CN=WQ
9.63 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 9HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment 7S: OFFSITE WETLAND B WATERSHED
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.12 0.00 0.02
10.00 0.38 0.01 0.12
15.00 2.21 1.14 0.42
20.00 2.40 1.30 0.11
25.00 2.50 1.38 0.00
30.00 2.50 1.38 0.00
35.00 2.50 1.38 0.00
40.00 2.50 1.38 0.00
45.00 2.50 1.38 0.00
50.00 2.50 1.38 0.00
55.00 2.50 1.38 0.00
60.00 2.50 1.38 0.00
65.00 2.50 1.38 0.00
70.00 2.50 1.38 0.00
75.00 2.50 1.38 0.00
80.00 2.50 1.38 0.00
85.00 2.50 1.38 0.00
90.00 2.50 1.38 0.00
95.00 2.50 1.38 0.00
100.00 2.50 1.38 0.00
105.00 2.50 1.38 0.00
110.00 2.50 1.38 0.00
115.00 2.50 1.38 0.00
120.00 2.50 1.38 0.00
125.00 2.50 1.38 0.00
130.00 2.50 1.38 0.00
135.00 2.50 1.38 0.00
140.00 2.50 1.38 0.00
145.00 2.50 1.38 0.00
150.00 2.50 1.38 0.00
155.00 2.50 1.38 0.00
160.00 2.50 1.38 0.00
165.00 2.50 1.38 0.00
170.00 2.50 1.38 0.00
175.00 2.50 1.38 0.00
180.00 2.50 1.38 0.00
185.00 2.50 1.38 0.00
190.00 2.50 1.38 0.00
195.00 2.50 1.38 0.00
200.00 2.50 1.38 0.00
205.00 2.50 1.38 0.00
210.00 2.50 1.38 0.00
215.00 2.50 1.38 0.00
220.00 2.50 1.38 0.00
225.00 2.50 1.38 0.00
230.00 2.50 1.38 0.00
235.00 2.50 1.38 0.00
240.00 2.50 1.38 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 10HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment EX1A: EX1A - DRAINS EAST DOWN LAKE LUCY ROAD
Runoff = 0.27 cfs @ 12.08 hrs, Volume= 0.014 af, Depth= 2.27"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"
Area (sf) CN Description
3,245 98 Paved parking, HSG C
* 0 84
3,245 Weighted Average
3,245 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment EX1A: EX1A - DRAINS EAST DOWN LAKE LUCY ROAD
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.3
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr
1y 24hr Rainfall=2.50"
Runoff Area=3,245 sf
Runoff Volume=0.014 af
Runoff Depth=2.27"
Tc=6.0 min
CN=WQ
0.27 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 11HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment EX1A: EX1A - DRAINS EAST DOWN LAKE LUCY ROAD
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.12 0.02 0.00
10.00 0.38 0.21 0.01
15.00 2.21 1.99 0.01
20.00 2.40 2.17 0.00
25.00 2.50 2.27 0.00
30.00 2.50 2.27 0.00
35.00 2.50 2.27 0.00
40.00 2.50 2.27 0.00
45.00 2.50 2.27 0.00
50.00 2.50 2.27 0.00
55.00 2.50 2.27 0.00
60.00 2.50 2.27 0.00
65.00 2.50 2.27 0.00
70.00 2.50 2.27 0.00
75.00 2.50 2.27 0.00
80.00 2.50 2.27 0.00
85.00 2.50 2.27 0.00
90.00 2.50 2.27 0.00
95.00 2.50 2.27 0.00
100.00 2.50 2.27 0.00
105.00 2.50 2.27 0.00
110.00 2.50 2.27 0.00
115.00 2.50 2.27 0.00
120.00 2.50 2.27 0.00
125.00 2.50 2.27 0.00
130.00 2.50 2.27 0.00
135.00 2.50 2.27 0.00
140.00 2.50 2.27 0.00
145.00 2.50 2.27 0.00
150.00 2.50 2.27 0.00
155.00 2.50 2.27 0.00
160.00 2.50 2.27 0.00
165.00 2.50 2.27 0.00
170.00 2.50 2.27 0.00
175.00 2.50 2.27 0.00
180.00 2.50 2.27 0.00
185.00 2.50 2.27 0.00
190.00 2.50 2.27 0.00
195.00 2.50 2.27 0.00
200.00 2.50 2.27 0.00
205.00 2.50 2.27 0.00
210.00 2.50 2.27 0.00
215.00 2.50 2.27 0.00
220.00 2.50 2.27 0.00
225.00 2.50 2.27 0.00
230.00 2.50 2.27 0.00
235.00 2.50 2.27 0.00
240.00 2.50 2.27 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 12HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment EX1B: EX1B - DRAINS SOUTH TO WETLAND A
Runoff = 3.13 cfs @ 12.09 hrs, Volume= 0.150 af, Depth= 1.25"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"
Area (sf) CN Description
7,290 98 Paved parking, HSG C
55,517 84
62,807 Weighted Average
55,517 88.39% Pervious Area
7,290 11.61% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment EX1B: EX1B - DRAINS SOUTH TO WETLAND A
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)3
2
1
0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr
1y 24hr Rainfall=2.50"
Runoff Area=62,807 sf
Runoff Volume=0.150 af
Runoff Depth=1.25"
Tc=6.0 min
CN=WQ
3.13 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 13HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment EX1B: EX1B - DRAINS SOUTH TO WETLAND A
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.12 0.00 0.00
10.00 0.38 0.00 0.01
15.00 2.21 1.01 0.10
20.00 2.40 1.16 0.03
25.00 2.50 1.24 0.00
30.00 2.50 1.24 0.00
35.00 2.50 1.24 0.00
40.00 2.50 1.24 0.00
45.00 2.50 1.24 0.00
50.00 2.50 1.24 0.00
55.00 2.50 1.24 0.00
60.00 2.50 1.24 0.00
65.00 2.50 1.24 0.00
70.00 2.50 1.24 0.00
75.00 2.50 1.24 0.00
80.00 2.50 1.24 0.00
85.00 2.50 1.24 0.00
90.00 2.50 1.24 0.00
95.00 2.50 1.24 0.00
100.00 2.50 1.24 0.00
105.00 2.50 1.24 0.00
110.00 2.50 1.24 0.00
115.00 2.50 1.24 0.00
120.00 2.50 1.24 0.00
125.00 2.50 1.24 0.00
130.00 2.50 1.24 0.00
135.00 2.50 1.24 0.00
140.00 2.50 1.24 0.00
145.00 2.50 1.24 0.00
150.00 2.50 1.24 0.00
155.00 2.50 1.24 0.00
160.00 2.50 1.24 0.00
165.00 2.50 1.24 0.00
170.00 2.50 1.24 0.00
175.00 2.50 1.24 0.00
180.00 2.50 1.24 0.00
185.00 2.50 1.24 0.00
190.00 2.50 1.24 0.00
195.00 2.50 1.24 0.00
200.00 2.50 1.24 0.00
205.00 2.50 1.24 0.00
210.00 2.50 1.24 0.00
215.00 2.50 1.24 0.00
220.00 2.50 1.24 0.00
225.00 2.50 1.24 0.00
230.00 2.50 1.24 0.00
235.00 2.50 1.24 0.00
240.00 2.50 1.24 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 14HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment EX1C: EX1C - DRAINS SOUTH TO WETLAND A
Runoff = 0.19 cfs @ 12.09 hrs, Volume= 0.009 af, Depth= 1.12"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"
Area (sf) CN Description
0 98 Paved parking, HSG C
* 4,200 84
4,200 Weighted Average
4,200 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment EX1C: EX1C - DRAINS SOUTH TO WETLAND A
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.21
0.2
0.19
0.18
0.17
0.16
0.15
0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr
1y 24hr Rainfall=2.50"
Runoff Area=4,200 sf
Runoff Volume=0.009 af
Runoff Depth=1.12"
Tc=6.0 min
CN=WQ
0.19 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 15HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment EX1C: EX1C - DRAINS SOUTH TO WETLAND A
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.12 0.00 0.00
10.00 0.38 0.00 0.00
15.00 2.21 0.90 0.01
20.00 2.40 1.04 0.00
25.00 2.50 1.12 0.00
30.00 2.50 1.12 0.00
35.00 2.50 1.12 0.00
40.00 2.50 1.12 0.00
45.00 2.50 1.12 0.00
50.00 2.50 1.12 0.00
55.00 2.50 1.12 0.00
60.00 2.50 1.12 0.00
65.00 2.50 1.12 0.00
70.00 2.50 1.12 0.00
75.00 2.50 1.12 0.00
80.00 2.50 1.12 0.00
85.00 2.50 1.12 0.00
90.00 2.50 1.12 0.00
95.00 2.50 1.12 0.00
100.00 2.50 1.12 0.00
105.00 2.50 1.12 0.00
110.00 2.50 1.12 0.00
115.00 2.50 1.12 0.00
120.00 2.50 1.12 0.00
125.00 2.50 1.12 0.00
130.00 2.50 1.12 0.00
135.00 2.50 1.12 0.00
140.00 2.50 1.12 0.00
145.00 2.50 1.12 0.00
150.00 2.50 1.12 0.00
155.00 2.50 1.12 0.00
160.00 2.50 1.12 0.00
165.00 2.50 1.12 0.00
170.00 2.50 1.12 0.00
175.00 2.50 1.12 0.00
180.00 2.50 1.12 0.00
185.00 2.50 1.12 0.00
190.00 2.50 1.12 0.00
195.00 2.50 1.12 0.00
200.00 2.50 1.12 0.00
205.00 2.50 1.12 0.00
210.00 2.50 1.12 0.00
215.00 2.50 1.12 0.00
220.00 2.50 1.12 0.00
225.00 2.50 1.12 0.00
230.00 2.50 1.12 0.00
235.00 2.50 1.12 0.00
240.00 2.50 1.12 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 16HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment EX2: EX2 - DRAINS SOUTH TO WETLAND B
Runoff = 0.34 cfs @ 12.09 hrs, Volume= 0.017 af, Depth= 1.59"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"
Area (sf) CN Description
2,278 98 Paved parking, HSG C
* 3,302 84
5,580 Weighted Average
3,302 59.18% Pervious Area
2,278 40.82% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment EX2: EX2 - DRAINS SOUTH TO WETLAND B
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.38
0.36
0.34
0.32
0.3
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr
1y 24hr Rainfall=2.50"
Runoff Area=5,580 sf
Runoff Volume=0.017 af
Runoff Depth=1.59"
Tc=6.0 min
CN=WQ
0.34 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 17HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment EX2: EX2 - DRAINS SOUTH TO WETLAND B
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.12 0.00 0.00
10.00 0.38 0.02 0.00
15.00 2.21 1.28 0.01
20.00 2.40 1.44 0.00
25.00 2.50 1.53 0.00
30.00 2.50 1.53 0.00
35.00 2.50 1.53 0.00
40.00 2.50 1.53 0.00
45.00 2.50 1.53 0.00
50.00 2.50 1.53 0.00
55.00 2.50 1.53 0.00
60.00 2.50 1.53 0.00
65.00 2.50 1.53 0.00
70.00 2.50 1.53 0.00
75.00 2.50 1.53 0.00
80.00 2.50 1.53 0.00
85.00 2.50 1.53 0.00
90.00 2.50 1.53 0.00
95.00 2.50 1.53 0.00
100.00 2.50 1.53 0.00
105.00 2.50 1.53 0.00
110.00 2.50 1.53 0.00
115.00 2.50 1.53 0.00
120.00 2.50 1.53 0.00
125.00 2.50 1.53 0.00
130.00 2.50 1.53 0.00
135.00 2.50 1.53 0.00
140.00 2.50 1.53 0.00
145.00 2.50 1.53 0.00
150.00 2.50 1.53 0.00
155.00 2.50 1.53 0.00
160.00 2.50 1.53 0.00
165.00 2.50 1.53 0.00
170.00 2.50 1.53 0.00
175.00 2.50 1.53 0.00
180.00 2.50 1.53 0.00
185.00 2.50 1.53 0.00
190.00 2.50 1.53 0.00
195.00 2.50 1.53 0.00
200.00 2.50 1.53 0.00
205.00 2.50 1.53 0.00
210.00 2.50 1.53 0.00
215.00 2.50 1.53 0.00
220.00 2.50 1.53 0.00
225.00 2.50 1.53 0.00
230.00 2.50 1.53 0.00
235.00 2.50 1.53 0.00
240.00 2.50 1.53 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 18HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment OFFSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B
Runoff = 2.59 cfs @ 12.09 hrs, Volume= 0.125 af, Depth= 1.32"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"
Area (sf) CN Description
8,875 98 Paved parking, HSG C
* 40,698 84
49,573 Weighted Average
40,698 82.10% Pervious Area
8,875 17.90% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment OFFSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)2
1
0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr
1y 24hr Rainfall=2.50"
Runoff Area=49,573 sf
Runoff Volume=0.125 af
Runoff Depth=1.32"
Tc=6.0 min
CN=WQ
2.59 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 19HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment OFFSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.12 0.00 0.00
10.00 0.38 0.00 0.02
15.00 2.21 1.08 0.08
20.00 2.40 1.23 0.02
25.00 2.50 1.31 0.00
30.00 2.50 1.31 0.00
35.00 2.50 1.31 0.00
40.00 2.50 1.31 0.00
45.00 2.50 1.31 0.00
50.00 2.50 1.31 0.00
55.00 2.50 1.31 0.00
60.00 2.50 1.31 0.00
65.00 2.50 1.31 0.00
70.00 2.50 1.31 0.00
75.00 2.50 1.31 0.00
80.00 2.50 1.31 0.00
85.00 2.50 1.31 0.00
90.00 2.50 1.31 0.00
95.00 2.50 1.31 0.00
100.00 2.50 1.31 0.00
105.00 2.50 1.31 0.00
110.00 2.50 1.31 0.00
115.00 2.50 1.31 0.00
120.00 2.50 1.31 0.00
125.00 2.50 1.31 0.00
130.00 2.50 1.31 0.00
135.00 2.50 1.31 0.00
140.00 2.50 1.31 0.00
145.00 2.50 1.31 0.00
150.00 2.50 1.31 0.00
155.00 2.50 1.31 0.00
160.00 2.50 1.31 0.00
165.00 2.50 1.31 0.00
170.00 2.50 1.31 0.00
175.00 2.50 1.31 0.00
180.00 2.50 1.31 0.00
185.00 2.50 1.31 0.00
190.00 2.50 1.31 0.00
195.00 2.50 1.31 0.00
200.00 2.50 1.31 0.00
205.00 2.50 1.31 0.00
210.00 2.50 1.31 0.00
215.00 2.50 1.31 0.00
220.00 2.50 1.31 0.00
225.00 2.50 1.31 0.00
230.00 2.50 1.31 0.00
235.00 2.50 1.31 0.00
240.00 2.50 1.31 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 20HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment OFFSITE B: OFFSITE B- DRAINS SOUTH TO WETLAND A
Runoff = 3.63 cfs @ 12.09 hrs, Volume= 0.173 af, Depth= 1.21"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"
Area (sf) CN Description
6,076 98 Paved parking, HSG C
* 68,789 84
74,865 Weighted Average
68,789 91.88% Pervious Area
6,076 8.12% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment OFFSITE B: OFFSITE B- DRAINS SOUTH TO WETLAND A
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)4
3
2
1
0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr
1y 24hr Rainfall=2.50"
Runoff Area=74,865 sf
Runoff Volume=0.173 af
Runoff Depth=1.21"
Tc=6.0 min
CN=WQ
3.63 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 21HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment OFFSITE B: OFFSITE B- DRAINS SOUTH TO WETLAND A
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.12 0.00 0.00
10.00 0.38 0.00 0.01
15.00 2.21 0.96 0.12
20.00 2.40 1.10 0.03
25.00 2.50 1.18 0.00
30.00 2.50 1.18 0.00
35.00 2.50 1.18 0.00
40.00 2.50 1.18 0.00
45.00 2.50 1.18 0.00
50.00 2.50 1.18 0.00
55.00 2.50 1.18 0.00
60.00 2.50 1.18 0.00
65.00 2.50 1.18 0.00
70.00 2.50 1.18 0.00
75.00 2.50 1.18 0.00
80.00 2.50 1.18 0.00
85.00 2.50 1.18 0.00
90.00 2.50 1.18 0.00
95.00 2.50 1.18 0.00
100.00 2.50 1.18 0.00
105.00 2.50 1.18 0.00
110.00 2.50 1.18 0.00
115.00 2.50 1.18 0.00
120.00 2.50 1.18 0.00
125.00 2.50 1.18 0.00
130.00 2.50 1.18 0.00
135.00 2.50 1.18 0.00
140.00 2.50 1.18 0.00
145.00 2.50 1.18 0.00
150.00 2.50 1.18 0.00
155.00 2.50 1.18 0.00
160.00 2.50 1.18 0.00
165.00 2.50 1.18 0.00
170.00 2.50 1.18 0.00
175.00 2.50 1.18 0.00
180.00 2.50 1.18 0.00
185.00 2.50 1.18 0.00
190.00 2.50 1.18 0.00
195.00 2.50 1.18 0.00
200.00 2.50 1.18 0.00
205.00 2.50 1.18 0.00
210.00 2.50 1.18 0.00
215.00 2.50 1.18 0.00
220.00 2.50 1.18 0.00
225.00 2.50 1.18 0.00
230.00 2.50 1.18 0.00
235.00 2.50 1.18 0.00
240.00 2.50 1.18 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 22HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A
[40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 3.257 ac, 9.42% Impervious, Inflow Depth = 1.22" for 1y 24hr event
Inflow = 6.95 cfs @ 12.09 hrs, Volume= 0.332 af
Outflow = 6.95 cfs @ 12.09 hrs, Volume= 0.332 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Reach DA2: DA2 - TOTAL FLOW TO WETLAND A
Inflow
Outflow
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)7
6
5
4
3
2
1
0
Inflow Area=3.257 ac
6.95 cfs
6.95 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 23HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A
Time
(hours)
Inflow
(cfs)
Elevation
(feet)
Outflow
(cfs)
0.00 0.00 0.00
5.00 0.00 0.00
10.00 0.02 0.02
15.00 0.23 0.23
20.00 0.06 0.06
25.00 0.00 0.00
30.00 0.00 0.00
35.00 0.00 0.00
40.00 0.00 0.00
45.00 0.00 0.00
50.00 0.00 0.00
55.00 0.00 0.00
60.00 0.00 0.00
65.00 0.00 0.00
70.00 0.00 0.00
75.00 0.00 0.00
80.00 0.00 0.00
85.00 0.00 0.00
90.00 0.00 0.00
95.00 0.00 0.00
100.00 0.00 0.00
105.00 0.00 0.00
110.00 0.00 0.00
115.00 0.00 0.00
120.00 0.00 0.00
125.00 0.00 0.00
130.00 0.00 0.00
135.00 0.00 0.00
140.00 0.00 0.00
145.00 0.00 0.00
150.00 0.00 0.00
155.00 0.00 0.00
160.00 0.00 0.00
165.00 0.00 0.00
170.00 0.00 0.00
175.00 0.00 0.00
180.00 0.00 0.00
185.00 0.00 0.00
190.00 0.00 0.00
195.00 0.00 0.00
200.00 0.00 0.00
205.00 0.00 0.00
210.00 0.00 0.00
215.00 0.00 0.00
220.00 0.00 0.00
225.00 0.00 0.00
230.00 0.00 0.00
235.00 0.00 0.00
240.00 0.00 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 24HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B
[40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 4.523 ac, 12.44% Impervious, Inflow Depth = 1.26" for 1y 24hr event
Inflow = 5.68 cfs @ 12.12 hrs, Volume= 0.475 af
Outflow = 5.68 cfs @ 12.12 hrs, Volume= 0.475 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Reach DA3: DA3 - TOTAL FLOW TO WETLAND B
Inflow
Outflow
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)6
5
4
3
2
1
0
Inflow Area=4.523 ac
5.68 cfs
5.68 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 25HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B
Time
(hours)
Inflow
(cfs)
Elevation
(feet)
Outflow
(cfs)
0.00 0.00 0.00
5.00 0.01 0.01
10.00 0.04 0.04
15.00 0.33 0.33
20.00 0.09 0.09
25.00 0.02 0.02
30.00 0.00 0.00
35.00 0.00 0.00
40.00 0.00 0.00
45.00 0.00 0.00
50.00 0.00 0.00
55.00 0.00 0.00
60.00 0.00 0.00
65.00 0.00 0.00
70.00 0.00 0.00
75.00 0.00 0.00
80.00 0.00 0.00
85.00 0.00 0.00
90.00 0.00 0.00
95.00 0.00 0.00
100.00 0.00 0.00
105.00 0.00 0.00
110.00 0.00 0.00
115.00 0.00 0.00
120.00 0.00 0.00
125.00 0.00 0.00
130.00 0.00 0.00
135.00 0.00 0.00
140.00 0.00 0.00
145.00 0.00 0.00
150.00 0.00 0.00
155.00 0.00 0.00
160.00 0.00 0.00
165.00 0.00 0.00
170.00 0.00 0.00
175.00 0.00 0.00
180.00 0.00 0.00
185.00 0.00 0.00
190.00 0.00 0.00
195.00 0.00 0.00
200.00 0.00 0.00
205.00 0.00 0.00
210.00 0.00 0.00
215.00 0.00 0.00
220.00 0.00 0.00
225.00 0.00 0.00
230.00 0.00 0.00
235.00 0.00 0.00
240.00 0.00 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 26HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Pond 1P: WETLAND A
Inflow Area = 3.257 ac, 9.42% Impervious, Inflow Depth = 1.22" for 1y 24hr event
Inflow = 6.95 cfs @ 12.09 hrs, Volume= 0.332 af
Outflow = 3.64 cfs @ 12.19 hrs, Volume= 0.332 af, Atten= 48%, Lag= 6.1 min
Primary = 3.64 cfs @ 12.19 hrs, Volume= 0.332 af
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Peak Elev= 969.90' @ 12.19 hrs Surf.Area= 12,254 sf Storage= 3,265 cf
Plug-Flow detention time= 28.8 min calculated for 0.332 af (100% of inflow)
Center-of-Mass det. time= 28.9 min ( 843.0 - 814.2 )
Volume Invert Avail.Storage Storage Description
#1 969.62' 18,824 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
969.62 11,466 0 0
970.00 12,553 4,564 4,564
971.00 15,967 14,260 18,824
Device Routing Invert Outlet Devices
#1 Primary 969.62'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60
Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64
Primary OutFlow Max=3.63 cfs @ 12.19 hrs HW=969.90' (Free Discharge)
1=Broad-Crested Rectangular Weir (Weir Controls 3.63 cfs @ 1.32 fps)
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 27HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Pond 1P: WETLAND A
Inflow
Primary
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)7
6
5
4
3
2
1
0
Inflow Area=3.257 ac
Peak Elev=969.90'
Storage=3,265 cf
6.95 cfs
3.64 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 28HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Pond 1P: WETLAND A
Time
(hours)
Inflow
(cfs)
Storage
(cubic-feet)
Elevation
(feet)
Primary
(cfs)
0.00 0.00 0 969.62 0.00
5.00 0.00 11 969.62 0.00
10.00 0.02 70 969.63 0.02
15.00 0.23 518 969.66 0.24
20.00 0.06 212 969.64 0.07
25.00 0.00 89 969.63 0.02
30.00 0.00 1 969.62 0.00
35.00 0.00 0 969.62 0.00
40.00 0.00 0 969.62 0.00
45.00 0.00 0 969.62 0.00
50.00 0.00 0 969.62 0.00
55.00 0.00 0 969.62 0.00
60.00 0.00 0 969.62 0.00
65.00 0.00 0 969.62 0.00
70.00 0.00 0 969.62 0.00
75.00 0.00 0 969.62 0.00
80.00 0.00 0 969.62 0.00
85.00 0.00 0 969.62 0.00
90.00 0.00 0 969.62 0.00
95.00 0.00 0 969.62 0.00
100.00 0.00 0 969.62 0.00
105.00 0.00 0 969.62 0.00
110.00 0.00 0 969.62 0.00
115.00 0.00 0 969.62 0.00
120.00 0.00 0 969.62 0.00
125.00 0.00 0 969.62 0.00
130.00 0.00 0 969.62 0.00
135.00 0.00 0 969.62 0.00
140.00 0.00 0 969.62 0.00
145.00 0.00 0 969.62 0.00
150.00 0.00 0 969.62 0.00
155.00 0.00 0 969.62 0.00
160.00 0.00 0 969.62 0.00
165.00 0.00 0 969.62 0.00
170.00 0.00 0 969.62 0.00
175.00 0.00 0 969.62 0.00
180.00 0.00 0 969.62 0.00
185.00 0.00 0 969.62 0.00
190.00 0.00 0 969.62 0.00
195.00 0.00 0 969.62 0.00
200.00 0.00 0 969.62 0.00
205.00 0.00 0 969.62 0.00
210.00 0.00 0 969.62 0.00
215.00 0.00 0 969.62 0.00
220.00 0.00 0 969.62 0.00
225.00 0.00 0 969.62 0.00
230.00 0.00 0 969.62 0.00
235.00 0.00 0 969.62 0.00
240.00 0.00 0 969.62 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 29HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Stage-Discharge for Pond 1P: WETLAND A
Elevation
(feet)
Primary
(cfs)
969.62 0.00
969.63 0.02
969.64 0.07
969.65 0.13
969.66 0.20
969.67 0.28
969.68 0.37
969.69 0.46
969.70 0.56
969.71 0.67
969.72 0.79
969.73 0.91
969.74 1.04
969.75 1.17
969.76 1.30
969.77 1.45
969.78 1.59
969.79 1.75
969.80 1.90
969.81 2.06
969.82 2.23
969.83 2.40
969.84 2.58
969.85 2.76
969.86 2.94
969.87 3.13
969.88 3.33
969.89 3.53
969.90 3.73
969.91 3.94
969.92 4.15
969.93 4.36
969.94 4.58
969.95 4.81
969.96 5.03
969.97 5.26
969.98 5.50
969.99 5.74
970.00 5.98
970.01 6.23
970.02 6.48
970.03 6.74
970.04 7.01
970.05 7.28
970.06 7.55
970.07 7.83
970.08 8.12
970.09 8.41
970.10 8.70
970.11 9.00
970.12 9.30
970.13 9.60
Elevation
(feet)
Primary
(cfs)
970.14 9.91
970.15 10.23
970.16 10.55
970.17 10.87
970.18 11.20
970.19 11.53
970.20 11.86
970.21 12.20
970.22 12.55
970.23 12.86
970.24 13.18
970.25 13.49
970.26 13.81
970.27 14.14
970.28 14.46
970.29 14.79
970.30 15.12
970.31 15.45
970.32 15.78
970.33 16.12
970.34 16.46
970.35 16.80
970.36 17.14
970.37 17.49
970.38 17.84
970.39 18.19
970.40 18.54
970.41 18.89
970.42 19.25
970.43 19.61
970.44 19.97
970.45 20.33
970.46 20.69
970.47 21.06
970.48 21.43
970.49 21.80
970.50 22.17
970.51 22.55
970.52 22.92
970.53 23.30
970.54 23.68
970.55 24.07
970.56 24.45
970.57 24.84
970.58 25.23
970.59 25.62
970.60 26.01
970.61 26.40
970.62 26.80
970.63 27.21
970.64 27.62
970.65 28.03
Elevation
(feet)
Primary
(cfs)
970.66 28.45
970.67 28.86
970.68 29.28
970.69 29.70
970.70 30.12
970.71 30.55
970.72 30.98
970.73 31.41
970.74 31.84
970.75 32.27
970.76 32.71
970.77 33.14
970.78 33.58
970.79 34.02
970.80 34.47
970.81 34.91
970.82 35.36
970.83 35.79
970.84 36.22
970.85 36.65
970.86 37.09
970.87 37.52
970.88 37.96
970.89 38.40
970.90 38.84
970.91 39.28
970.92 39.72
970.93 40.17
970.94 40.61
970.95 41.06
970.96 41.51
970.97 41.96
970.98 42.41
970.99 42.86
971.00 43.32
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 30HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Pond 5P: Wetland B
[44] Hint: Outlet device #1 is below defined storage
[95] Warning: Outlet Device #1 rise exceeded
Inflow Area = 12.870 ac, 24.01% Impervious, Inflow Depth = 1.31" for 1y 24hr event
Inflow = 18.97 cfs @ 12.13 hrs, Volume= 1.400 af
Outflow = 18.85 cfs @ 12.15 hrs, Volume= 1.400 af, Atten= 1%, Lag= 0.9 min
Primary = 18.85 cfs @ 12.15 hrs, Volume= 1.400 af
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Peak Elev= 961.61' @ 12.15 hrs Surf.Area= 149,068 sf Storage= 894 cf
Plug-Flow detention time= 0.8 min calculated for 1.400 af (100% of inflow)
Center-of-Mass det. time= 0.8 min ( 817.8 - 817.0 )
Volume Invert Avail.Storage Storage Description
#1 961.60' 841,104 cf Custom Stage Data (Conic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store Wet.Area
(feet) (sq-ft) (cubic-feet) (cubic-feet) (sq-ft)
961.60 149,000 0 0 149,000
962.00 153,597 60,517 60,517 153,630
964.00 201,325 353,847 414,364 201,451
966.00 225,646 426,740 841,104 225,991
Device Routing Invert Outlet Devices
#1 Primary 960.82'Asymmetrical Weir, C= 3.27
Offset (feet) -70.00 -41.00 0.00 49.00 87.00
Height (feet) 0.35 0.09 0.00 0.09 0.35
Primary OutFlow Max=133.92 cfs @ 12.15 hrs HW=961.61' (Free Discharge)
1=Asymmetrical Weir (Weir Controls 133.92 cfs @ 2.74 fps)
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 31HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Pond 5P: Wetland B
Inflow
Primary
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=12.870 ac
Peak Elev=961.61'
Storage=894 cf
18.97 cfs
18.85 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 32HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Pond 5P: Wetland B
Time
(hours)
Inflow
(cfs)
Storage
(cubic-feet)
Elevation
(feet)
Primary
(cfs)
0.00 0.00 0 961.60 0.00
5.00 0.02 1 961.60 0.02
10.00 0.16 8 961.60 0.16
15.00 0.95 45 961.60 0.95
20.00 0.26 12 961.60 0.26
25.00 0.02 1 961.60 0.02
30.00 0.00 0 961.60 0.00
35.00 0.00 0 961.60 0.00
40.00 0.00 0 961.60 0.00
45.00 0.00 0 961.60 0.00
50.00 0.00 0 961.60 0.00
55.00 0.00 0 961.60 0.00
60.00 0.00 0 961.60 0.00
65.00 0.00 0 961.60 0.00
70.00 0.00 0 961.60 0.00
75.00 0.00 0 961.60 0.00
80.00 0.00 0 961.60 0.00
85.00 0.00 0 961.60 0.00
90.00 0.00 0 961.60 0.00
95.00 0.00 0 961.60 0.00
100.00 0.00 0 961.60 0.00
105.00 0.00 0 961.60 0.00
110.00 0.00 0 961.60 0.00
115.00 0.00 0 961.60 0.00
120.00 0.00 0 961.60 0.00
125.00 0.00 0 961.60 0.00
130.00 0.00 0 961.60 0.00
135.00 0.00 0 961.60 0.00
140.00 0.00 0 961.60 0.00
145.00 0.00 0 961.60 0.00
150.00 0.00 0 961.60 0.00
155.00 0.00 0 961.60 0.00
160.00 0.00 0 961.60 0.00
165.00 0.00 0 961.60 0.00
170.00 0.00 0 961.60 0.00
175.00 0.00 0 961.60 0.00
180.00 0.00 0 961.60 0.00
185.00 0.00 0 961.60 0.00
190.00 0.00 0 961.60 0.00
195.00 0.00 0 961.60 0.00
200.00 0.00 0 961.60 0.00
205.00 0.00 0 961.60 0.00
210.00 0.00 0 961.60 0.00
215.00 0.00 0 961.60 0.00
220.00 0.00 0 961.60 0.00
225.00 0.00 0 961.60 0.00
230.00 0.00 0 961.60 0.00
235.00 0.00 0 961.60 0.00
240.00 0.00 0 961.60 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 33HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Stage-Discharge for Pond 5P: Wetland B
Elevation
(feet)
Primary
(cfs)
961.60 0.00
961.65 139.02
961.70 144.59
961.75 149.95
961.80 155.13
961.85 160.13
961.90 164.98
961.95 169.69
962.00 174.28
962.05 178.74
962.10 183.09
962.15 187.35
962.20 191.51
962.25 195.57
962.30 199.56
962.35 203.47
962.40 207.30
962.45 211.06
962.50 214.76
962.55 218.40
962.60 221.97
962.65 225.49
962.70 228.95
962.75 232.36
962.80 235.73
962.85 239.04
962.90 242.31
962.95 245.54
963.00 248.72
963.05 251.87
963.10 254.97
963.15 258.04
963.20 261.07
963.25 264.07
963.30 267.03
963.35 269.96
963.40 272.86
963.45 275.73
963.50 278.56
963.55 281.37
963.60 284.16
963.65 286.91
963.70 289.64
963.75 292.34
963.80 295.02
963.85 297.68
963.90 300.31
963.95 302.92
964.00 305.50
964.05 308.07
964.10 310.61
964.15 313.13
Elevation
(feet)
Primary
(cfs)
964.20 315.63
964.25 318.12
964.30 320.58
964.35 323.02
964.40 325.45
964.45 327.86
964.50 330.25
964.55 332.62
964.60 334.98
964.65 337.32
964.70 339.64
964.75 341.95
964.80 344.24
964.85 346.52
964.90 348.78
964.95 351.03
965.00 353.26
965.05 355.48
965.10 357.69
965.15 359.88
965.20 362.06
965.25 364.23
965.30 366.38
965.35 368.52
965.40 370.65
965.45 372.76
965.50 374.87
965.55 376.96
965.60 379.04
965.65 381.11
965.70 383.17
965.75 385.22
965.80 387.25
965.85 389.28
965.90 391.29
965.95 393.30
966.00 395.29
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 34HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Time span=0.00-240.00 hrs, dt=0.01 hrs, 24001 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Stor-Ind method - Pond routing by Stor-Ind method
Runoff Area=125,400 sf 0.00% Impervious Runoff Depth=1.41"Subcatchment 6S: UNDISTURBED
Tc=6.0 min CN=84 Runoff=7.23 cfs 0.338 af
Runoff Area=238,192 sf 46.22% Impervious Runoff Depth=1.76"Subcatchment 7S: OFFSITE WETLAND B
Flow Length=1,100' Slope=0.1500 '/' Tc=13.4 min CN=WQ Runoff=11.78 cfs 0.801 af
Runoff Area=3,245 sf 100.00% Impervious Runoff Depth=2.64"Subcatchment EX1A: EX1A - DRAINS
Tc=6.0 min CN=WQ Runoff=0.32 cfs 0.016 af
Runoff Area=62,807 sf 11.61% Impervious Runoff Depth=1.55"Subcatchment EX1B: EX1B - DRAINS
Tc=6.0 min CN=WQ Runoff=3.91 cfs 0.187 af
Runoff Area=4,200 sf 0.00% Impervious Runoff Depth=1.41"Subcatchment EX1C: EX1C - DRAINS
Tc=6.0 min CN=WQ Runoff=0.24 cfs 0.011 af
Runoff Area=5,580 sf 40.82% Impervious Runoff Depth=1.91"Subcatchment EX2: EX2 - DRAINS SOUTH
Tc=6.0 min CN=WQ Runoff=0.41 cfs 0.020 af
Runoff Area=49,573 sf 17.90% Impervious Runoff Depth=1.63"Subcatchment OFFSITE A: OFFSITE A -
Tc=6.0 min CN=WQ Runoff=3.21 cfs 0.155 af
Runoff Area=74,865 sf 8.12% Impervious Runoff Depth=1.51"Subcatchment OFFSITE B: OFFSITE B-
Tc=6.0 min CN=WQ Runoff=4.56 cfs 0.216 af
Inflow=8.71 cfs 0.414 afReach DA2: DA2 - TOTAL FLOW TO WETLAND A
Outflow=8.71 cfs 0.414 af
Inflow=7.38 cfs 0.589 afReach DA3: DA3 - TOTAL FLOW TO WETLAND B
Outflow=7.38 cfs 0.589 af
Peak Elev=969.95' Storage=3,933 cf Inflow=8.71 cfs 0.414 afPond 1P: WETLAND A
Outflow=4.80 cfs 0.414 af
Peak Elev=961.61' Storage=1,124 cf Inflow=23.85 cfs 1.728 afPond 5P: Wetland B
Outflow=23.70 cfs 1.728 af
Total Runoff Area = 12.944 ac Runoff Volume = 1.745 af Average Runoff Depth = 1.62"
75.55% Pervious = 9.780 ac 24.45% Impervious = 3.165 ac
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 35HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment 6S: UNDISTURBED
Runoff = 7.23 cfs @ 12.09 hrs, Volume= 0.338 af, Depth= 1.41"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"
Area (sf) CN Description
* 125,400 84
125,400 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment 6S: UNDISTURBED
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)8
7
6
5
4
3
2
1
0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr
Rainfall=2.87"
Runoff Area=125,400 sf
Runoff Volume=0.338 af
Runoff Depth=1.41"
Tc=6.0 min
CN=84
7.23 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 36HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment 6S: UNDISTURBED
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.14 0.00 0.00
10.00 0.43 0.00 0.01
15.00 2.54 1.15 0.24
20.00 2.76 1.32 0.07
25.00 2.87 1.41 0.00
30.00 2.87 1.41 0.00
35.00 2.87 1.41 0.00
40.00 2.87 1.41 0.00
45.00 2.87 1.41 0.00
50.00 2.87 1.41 0.00
55.00 2.87 1.41 0.00
60.00 2.87 1.41 0.00
65.00 2.87 1.41 0.00
70.00 2.87 1.41 0.00
75.00 2.87 1.41 0.00
80.00 2.87 1.41 0.00
85.00 2.87 1.41 0.00
90.00 2.87 1.41 0.00
95.00 2.87 1.41 0.00
100.00 2.87 1.41 0.00
105.00 2.87 1.41 0.00
110.00 2.87 1.41 0.00
115.00 2.87 1.41 0.00
120.00 2.87 1.41 0.00
125.00 2.87 1.41 0.00
130.00 2.87 1.41 0.00
135.00 2.87 1.41 0.00
140.00 2.87 1.41 0.00
145.00 2.87 1.41 0.00
150.00 2.87 1.41 0.00
155.00 2.87 1.41 0.00
160.00 2.87 1.41 0.00
165.00 2.87 1.41 0.00
170.00 2.87 1.41 0.00
175.00 2.87 1.41 0.00
180.00 2.87 1.41 0.00
185.00 2.87 1.41 0.00
190.00 2.87 1.41 0.00
195.00 2.87 1.41 0.00
200.00 2.87 1.41 0.00
205.00 2.87 1.41 0.00
210.00 2.87 1.41 0.00
215.00 2.87 1.41 0.00
220.00 2.87 1.41 0.00
225.00 2.87 1.41 0.00
230.00 2.87 1.41 0.00
235.00 2.87 1.41 0.00
240.00 2.87 1.41 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 37HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment 7S: OFFSITE WETLAND B WATERSHED
Runoff = 11.78 cfs @ 12.18 hrs, Volume= 0.801 af, Depth= 1.76"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"
Area (sf) CN Description
67,393 98 Unconnected roofs, HSG B
* 170,799 84 1/2 acre lots, 25% imp, HSG B
238,192 Weighted Average
128,099 53.78% Pervious Area
110,093 46.22% Impervious Area
67,393 61.21% Unconnected
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
7.9 200 0.1500 0.42 Sheet Flow,
Grass: Short n= 0.150 P2= 2.94"
5.5 900 0.1500 2.71 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
13.4 1,100 Total
Subcatchment 7S: OFFSITE WETLAND B WATERSHED
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)13
12
11
10
9
8
7
6
5
4
3
2
1
0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr
Rainfall=2.87"
Runoff Area=238,192 sf
Runoff Volume=0.801 af
Runoff Depth=1.76"
Flow Length=1,100'
Slope=0.1500 '/'
Tc=13.4 min
CN=WQ
11.78 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 38HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment 7S: OFFSITE WETLAND B WATERSHED
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.14 0.00 0.02
10.00 0.43 0.02 0.16
15.00 2.54 1.42 0.50
20.00 2.76 1.60 0.13
25.00 2.87 1.70 0.00
30.00 2.87 1.70 0.00
35.00 2.87 1.70 0.00
40.00 2.87 1.70 0.00
45.00 2.87 1.70 0.00
50.00 2.87 1.70 0.00
55.00 2.87 1.70 0.00
60.00 2.87 1.70 0.00
65.00 2.87 1.70 0.00
70.00 2.87 1.70 0.00
75.00 2.87 1.70 0.00
80.00 2.87 1.70 0.00
85.00 2.87 1.70 0.00
90.00 2.87 1.70 0.00
95.00 2.87 1.70 0.00
100.00 2.87 1.70 0.00
105.00 2.87 1.70 0.00
110.00 2.87 1.70 0.00
115.00 2.87 1.70 0.00
120.00 2.87 1.70 0.00
125.00 2.87 1.70 0.00
130.00 2.87 1.70 0.00
135.00 2.87 1.70 0.00
140.00 2.87 1.70 0.00
145.00 2.87 1.70 0.00
150.00 2.87 1.70 0.00
155.00 2.87 1.70 0.00
160.00 2.87 1.70 0.00
165.00 2.87 1.70 0.00
170.00 2.87 1.70 0.00
175.00 2.87 1.70 0.00
180.00 2.87 1.70 0.00
185.00 2.87 1.70 0.00
190.00 2.87 1.70 0.00
195.00 2.87 1.70 0.00
200.00 2.87 1.70 0.00
205.00 2.87 1.70 0.00
210.00 2.87 1.70 0.00
215.00 2.87 1.70 0.00
220.00 2.87 1.70 0.00
225.00 2.87 1.70 0.00
230.00 2.87 1.70 0.00
235.00 2.87 1.70 0.00
240.00 2.87 1.70 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 39HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment EX1A: EX1A - DRAINS EAST DOWN LAKE LUCY ROAD
Runoff = 0.32 cfs @ 12.08 hrs, Volume= 0.016 af, Depth= 2.64"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"
Area (sf) CN Description
3,245 98 Paved parking, HSG C
* 0 84
3,245 Weighted Average
3,245 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment EX1A: EX1A - DRAINS EAST DOWN LAKE LUCY ROAD
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.34
0.32
0.3
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr
Rainfall=2.87"
Runoff Area=3,245 sf
Runoff Volume=0.016 af
Runoff Depth=2.64"
Tc=6.0 min
CN=WQ
0.32 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 40HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment EX1A: EX1A - DRAINS EAST DOWN LAKE LUCY ROAD
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.14 0.03 0.00
10.00 0.43 0.26 0.01
15.00 2.54 2.31 0.01
20.00 2.76 2.53 0.00
25.00 2.87 2.64 0.00
30.00 2.87 2.64 0.00
35.00 2.87 2.64 0.00
40.00 2.87 2.64 0.00
45.00 2.87 2.64 0.00
50.00 2.87 2.64 0.00
55.00 2.87 2.64 0.00
60.00 2.87 2.64 0.00
65.00 2.87 2.64 0.00
70.00 2.87 2.64 0.00
75.00 2.87 2.64 0.00
80.00 2.87 2.64 0.00
85.00 2.87 2.64 0.00
90.00 2.87 2.64 0.00
95.00 2.87 2.64 0.00
100.00 2.87 2.64 0.00
105.00 2.87 2.64 0.00
110.00 2.87 2.64 0.00
115.00 2.87 2.64 0.00
120.00 2.87 2.64 0.00
125.00 2.87 2.64 0.00
130.00 2.87 2.64 0.00
135.00 2.87 2.64 0.00
140.00 2.87 2.64 0.00
145.00 2.87 2.64 0.00
150.00 2.87 2.64 0.00
155.00 2.87 2.64 0.00
160.00 2.87 2.64 0.00
165.00 2.87 2.64 0.00
170.00 2.87 2.64 0.00
175.00 2.87 2.64 0.00
180.00 2.87 2.64 0.00
185.00 2.87 2.64 0.00
190.00 2.87 2.64 0.00
195.00 2.87 2.64 0.00
200.00 2.87 2.64 0.00
205.00 2.87 2.64 0.00
210.00 2.87 2.64 0.00
215.00 2.87 2.64 0.00
220.00 2.87 2.64 0.00
225.00 2.87 2.64 0.00
230.00 2.87 2.64 0.00
235.00 2.87 2.64 0.00
240.00 2.87 2.64 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 41HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment EX1B: EX1B - DRAINS SOUTH TO WETLAND A
Runoff = 3.91 cfs @ 12.09 hrs, Volume= 0.187 af, Depth= 1.55"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"
Area (sf) CN Description
7,290 98 Paved parking, HSG C
55,517 84
62,807 Weighted Average
55,517 88.39% Pervious Area
7,290 11.61% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment EX1B: EX1B - DRAINS SOUTH TO WETLAND A
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)4
3
2
1
0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr
Rainfall=2.87"
Runoff Area=62,807 sf
Runoff Volume=0.187 af
Runoff Depth=1.55"
Tc=6.0 min
CN=WQ
3.91 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 42HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment EX1B: EX1B - DRAINS SOUTH TO WETLAND A
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.14 0.00 0.00
10.00 0.43 0.01 0.02
15.00 2.54 1.28 0.13
20.00 2.76 1.46 0.03
25.00 2.87 1.55 0.00
30.00 2.87 1.55 0.00
35.00 2.87 1.55 0.00
40.00 2.87 1.55 0.00
45.00 2.87 1.55 0.00
50.00 2.87 1.55 0.00
55.00 2.87 1.55 0.00
60.00 2.87 1.55 0.00
65.00 2.87 1.55 0.00
70.00 2.87 1.55 0.00
75.00 2.87 1.55 0.00
80.00 2.87 1.55 0.00
85.00 2.87 1.55 0.00
90.00 2.87 1.55 0.00
95.00 2.87 1.55 0.00
100.00 2.87 1.55 0.00
105.00 2.87 1.55 0.00
110.00 2.87 1.55 0.00
115.00 2.87 1.55 0.00
120.00 2.87 1.55 0.00
125.00 2.87 1.55 0.00
130.00 2.87 1.55 0.00
135.00 2.87 1.55 0.00
140.00 2.87 1.55 0.00
145.00 2.87 1.55 0.00
150.00 2.87 1.55 0.00
155.00 2.87 1.55 0.00
160.00 2.87 1.55 0.00
165.00 2.87 1.55 0.00
170.00 2.87 1.55 0.00
175.00 2.87 1.55 0.00
180.00 2.87 1.55 0.00
185.00 2.87 1.55 0.00
190.00 2.87 1.55 0.00
195.00 2.87 1.55 0.00
200.00 2.87 1.55 0.00
205.00 2.87 1.55 0.00
210.00 2.87 1.55 0.00
215.00 2.87 1.55 0.00
220.00 2.87 1.55 0.00
225.00 2.87 1.55 0.00
230.00 2.87 1.55 0.00
235.00 2.87 1.55 0.00
240.00 2.87 1.55 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 43HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment EX1C: EX1C - DRAINS SOUTH TO WETLAND A
Runoff = 0.24 cfs @ 12.09 hrs, Volume= 0.011 af, Depth= 1.41"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"
Area (sf) CN Description
0 98 Paved parking, HSG C
* 4,200 84
4,200 Weighted Average
4,200 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment EX1C: EX1C - DRAINS SOUTH TO WETLAND A
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr
Rainfall=2.87"
Runoff Area=4,200 sf
Runoff Volume=0.011 af
Runoff Depth=1.41"
Tc=6.0 min
CN=WQ
0.24 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 44HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment EX1C: EX1C - DRAINS SOUTH TO WETLAND A
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.14 0.00 0.00
10.00 0.43 0.00 0.00
15.00 2.54 1.15 0.01
20.00 2.76 1.32 0.00
25.00 2.87 1.41 0.00
30.00 2.87 1.41 0.00
35.00 2.87 1.41 0.00
40.00 2.87 1.41 0.00
45.00 2.87 1.41 0.00
50.00 2.87 1.41 0.00
55.00 2.87 1.41 0.00
60.00 2.87 1.41 0.00
65.00 2.87 1.41 0.00
70.00 2.87 1.41 0.00
75.00 2.87 1.41 0.00
80.00 2.87 1.41 0.00
85.00 2.87 1.41 0.00
90.00 2.87 1.41 0.00
95.00 2.87 1.41 0.00
100.00 2.87 1.41 0.00
105.00 2.87 1.41 0.00
110.00 2.87 1.41 0.00
115.00 2.87 1.41 0.00
120.00 2.87 1.41 0.00
125.00 2.87 1.41 0.00
130.00 2.87 1.41 0.00
135.00 2.87 1.41 0.00
140.00 2.87 1.41 0.00
145.00 2.87 1.41 0.00
150.00 2.87 1.41 0.00
155.00 2.87 1.41 0.00
160.00 2.87 1.41 0.00
165.00 2.87 1.41 0.00
170.00 2.87 1.41 0.00
175.00 2.87 1.41 0.00
180.00 2.87 1.41 0.00
185.00 2.87 1.41 0.00
190.00 2.87 1.41 0.00
195.00 2.87 1.41 0.00
200.00 2.87 1.41 0.00
205.00 2.87 1.41 0.00
210.00 2.87 1.41 0.00
215.00 2.87 1.41 0.00
220.00 2.87 1.41 0.00
225.00 2.87 1.41 0.00
230.00 2.87 1.41 0.00
235.00 2.87 1.41 0.00
240.00 2.87 1.41 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 45HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment EX2: EX2 - DRAINS SOUTH TO WETLAND B
Runoff = 0.41 cfs @ 12.09 hrs, Volume= 0.020 af, Depth= 1.91"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"
Area (sf) CN Description
2,278 98 Paved parking, HSG C
* 3,302 84
5,580 Weighted Average
3,302 59.18% Pervious Area
2,278 40.82% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment EX2: EX2 - DRAINS SOUTH TO WETLAND B
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.46
0.44
0.42
0.4
0.38
0.36
0.34
0.32
0.3
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr
Rainfall=2.87"
Runoff Area=5,580 sf
Runoff Volume=0.020 af
Runoff Depth=1.91"
Tc=6.0 min
CN=WQ
0.41 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 46HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment EX2: EX2 - DRAINS SOUTH TO WETLAND B
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.14 0.00 0.00
10.00 0.43 0.03 0.01
15.00 2.54 1.57 0.01
20.00 2.76 1.76 0.00
25.00 2.87 1.87 0.00
30.00 2.87 1.87 0.00
35.00 2.87 1.87 0.00
40.00 2.87 1.87 0.00
45.00 2.87 1.87 0.00
50.00 2.87 1.87 0.00
55.00 2.87 1.87 0.00
60.00 2.87 1.87 0.00
65.00 2.87 1.87 0.00
70.00 2.87 1.87 0.00
75.00 2.87 1.87 0.00
80.00 2.87 1.87 0.00
85.00 2.87 1.87 0.00
90.00 2.87 1.87 0.00
95.00 2.87 1.87 0.00
100.00 2.87 1.87 0.00
105.00 2.87 1.87 0.00
110.00 2.87 1.87 0.00
115.00 2.87 1.87 0.00
120.00 2.87 1.87 0.00
125.00 2.87 1.87 0.00
130.00 2.87 1.87 0.00
135.00 2.87 1.87 0.00
140.00 2.87 1.87 0.00
145.00 2.87 1.87 0.00
150.00 2.87 1.87 0.00
155.00 2.87 1.87 0.00
160.00 2.87 1.87 0.00
165.00 2.87 1.87 0.00
170.00 2.87 1.87 0.00
175.00 2.87 1.87 0.00
180.00 2.87 1.87 0.00
185.00 2.87 1.87 0.00
190.00 2.87 1.87 0.00
195.00 2.87 1.87 0.00
200.00 2.87 1.87 0.00
205.00 2.87 1.87 0.00
210.00 2.87 1.87 0.00
215.00 2.87 1.87 0.00
220.00 2.87 1.87 0.00
225.00 2.87 1.87 0.00
230.00 2.87 1.87 0.00
235.00 2.87 1.87 0.00
240.00 2.87 1.87 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 47HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment OFFSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B
Runoff = 3.21 cfs @ 12.09 hrs, Volume= 0.155 af, Depth= 1.63"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"
Area (sf) CN Description
8,875 98 Paved parking, HSG C
* 40,698 84
49,573 Weighted Average
40,698 82.10% Pervious Area
8,875 17.90% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment OFFSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)3
2
1
0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr
Rainfall=2.87"
Runoff Area=49,573 sf
Runoff Volume=0.155 af
Runoff Depth=1.63"
Tc=6.0 min
CN=WQ
3.21 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 48HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment OFFSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.14 0.00 0.00
10.00 0.43 0.01 0.02
15.00 2.54 1.35 0.10
20.00 2.76 1.53 0.03
25.00 2.87 1.63 0.00
30.00 2.87 1.63 0.00
35.00 2.87 1.63 0.00
40.00 2.87 1.63 0.00
45.00 2.87 1.63 0.00
50.00 2.87 1.63 0.00
55.00 2.87 1.63 0.00
60.00 2.87 1.63 0.00
65.00 2.87 1.63 0.00
70.00 2.87 1.63 0.00
75.00 2.87 1.63 0.00
80.00 2.87 1.63 0.00
85.00 2.87 1.63 0.00
90.00 2.87 1.63 0.00
95.00 2.87 1.63 0.00
100.00 2.87 1.63 0.00
105.00 2.87 1.63 0.00
110.00 2.87 1.63 0.00
115.00 2.87 1.63 0.00
120.00 2.87 1.63 0.00
125.00 2.87 1.63 0.00
130.00 2.87 1.63 0.00
135.00 2.87 1.63 0.00
140.00 2.87 1.63 0.00
145.00 2.87 1.63 0.00
150.00 2.87 1.63 0.00
155.00 2.87 1.63 0.00
160.00 2.87 1.63 0.00
165.00 2.87 1.63 0.00
170.00 2.87 1.63 0.00
175.00 2.87 1.63 0.00
180.00 2.87 1.63 0.00
185.00 2.87 1.63 0.00
190.00 2.87 1.63 0.00
195.00 2.87 1.63 0.00
200.00 2.87 1.63 0.00
205.00 2.87 1.63 0.00
210.00 2.87 1.63 0.00
215.00 2.87 1.63 0.00
220.00 2.87 1.63 0.00
225.00 2.87 1.63 0.00
230.00 2.87 1.63 0.00
235.00 2.87 1.63 0.00
240.00 2.87 1.63 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 49HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment OFFSITE B: OFFSITE B- DRAINS SOUTH TO WETLAND A
Runoff = 4.56 cfs @ 12.09 hrs, Volume= 0.216 af, Depth= 1.51"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"
Area (sf) CN Description
6,076 98 Paved parking, HSG C
* 68,789 84
74,865 Weighted Average
68,789 91.88% Pervious Area
6,076 8.12% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment OFFSITE B: OFFSITE B- DRAINS SOUTH TO WETLAND A
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)5
4
3
2
1
0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr
Rainfall=2.87"
Runoff Area=74,865 sf
Runoff Volume=0.216 af
Runoff Depth=1.51"
Tc=6.0 min
CN=WQ
4.56 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 50HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment OFFSITE B: OFFSITE B- DRAINS SOUTH TO WETLAND A
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.14 0.00 0.00
10.00 0.43 0.00 0.02
15.00 2.54 1.21 0.15
20.00 2.76 1.39 0.04
25.00 2.87 1.48 0.00
30.00 2.87 1.48 0.00
35.00 2.87 1.48 0.00
40.00 2.87 1.48 0.00
45.00 2.87 1.48 0.00
50.00 2.87 1.48 0.00
55.00 2.87 1.48 0.00
60.00 2.87 1.48 0.00
65.00 2.87 1.48 0.00
70.00 2.87 1.48 0.00
75.00 2.87 1.48 0.00
80.00 2.87 1.48 0.00
85.00 2.87 1.48 0.00
90.00 2.87 1.48 0.00
95.00 2.87 1.48 0.00
100.00 2.87 1.48 0.00
105.00 2.87 1.48 0.00
110.00 2.87 1.48 0.00
115.00 2.87 1.48 0.00
120.00 2.87 1.48 0.00
125.00 2.87 1.48 0.00
130.00 2.87 1.48 0.00
135.00 2.87 1.48 0.00
140.00 2.87 1.48 0.00
145.00 2.87 1.48 0.00
150.00 2.87 1.48 0.00
155.00 2.87 1.48 0.00
160.00 2.87 1.48 0.00
165.00 2.87 1.48 0.00
170.00 2.87 1.48 0.00
175.00 2.87 1.48 0.00
180.00 2.87 1.48 0.00
185.00 2.87 1.48 0.00
190.00 2.87 1.48 0.00
195.00 2.87 1.48 0.00
200.00 2.87 1.48 0.00
205.00 2.87 1.48 0.00
210.00 2.87 1.48 0.00
215.00 2.87 1.48 0.00
220.00 2.87 1.48 0.00
225.00 2.87 1.48 0.00
230.00 2.87 1.48 0.00
235.00 2.87 1.48 0.00
240.00 2.87 1.48 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 51HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A
[40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 3.257 ac, 9.42% Impervious, Inflow Depth = 1.53" for 2y 24hr event
Inflow = 8.71 cfs @ 12.09 hrs, Volume= 0.414 af
Outflow = 8.71 cfs @ 12.09 hrs, Volume= 0.414 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Reach DA2: DA2 - TOTAL FLOW TO WETLAND A
Inflow
Outflow
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)9
8
7
6
5
4
3
2
1
0
Inflow Area=3.257 ac
8.71 cfs
8.71 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 52HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A
Time
(hours)
Inflow
(cfs)
Elevation
(feet)
Outflow
(cfs)
0.00 0.00 0.00
5.00 0.00 0.00
10.00 0.04 0.04
15.00 0.28 0.28
20.00 0.08 0.08
25.00 0.00 0.00
30.00 0.00 0.00
35.00 0.00 0.00
40.00 0.00 0.00
45.00 0.00 0.00
50.00 0.00 0.00
55.00 0.00 0.00
60.00 0.00 0.00
65.00 0.00 0.00
70.00 0.00 0.00
75.00 0.00 0.00
80.00 0.00 0.00
85.00 0.00 0.00
90.00 0.00 0.00
95.00 0.00 0.00
100.00 0.00 0.00
105.00 0.00 0.00
110.00 0.00 0.00
115.00 0.00 0.00
120.00 0.00 0.00
125.00 0.00 0.00
130.00 0.00 0.00
135.00 0.00 0.00
140.00 0.00 0.00
145.00 0.00 0.00
150.00 0.00 0.00
155.00 0.00 0.00
160.00 0.00 0.00
165.00 0.00 0.00
170.00 0.00 0.00
175.00 0.00 0.00
180.00 0.00 0.00
185.00 0.00 0.00
190.00 0.00 0.00
195.00 0.00 0.00
200.00 0.00 0.00
205.00 0.00 0.00
210.00 0.00 0.00
215.00 0.00 0.00
220.00 0.00 0.00
225.00 0.00 0.00
230.00 0.00 0.00
235.00 0.00 0.00
240.00 0.00 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 53HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B
[40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 4.523 ac, 12.44% Impervious, Inflow Depth = 1.56" for 2y 24hr event
Inflow = 7.38 cfs @ 12.12 hrs, Volume= 0.589 af
Outflow = 7.38 cfs @ 12.12 hrs, Volume= 0.589 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Reach DA3: DA3 - TOTAL FLOW TO WETLAND B
Inflow
Outflow
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)8
7
6
5
4
3
2
1
0
Inflow Area=4.523 ac
7.38 cfs
7.38 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 54HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B
Time
(hours)
Inflow
(cfs)
Elevation
(feet)
Outflow
(cfs)
0.00 0.00 0.00
5.00 0.01 0.01
10.00 0.05 0.05
15.00 0.40 0.40
20.00 0.11 0.11
25.00 0.02 0.02
30.00 0.00 0.00
35.00 0.00 0.00
40.00 0.00 0.00
45.00 0.00 0.00
50.00 0.00 0.00
55.00 0.00 0.00
60.00 0.00 0.00
65.00 0.00 0.00
70.00 0.00 0.00
75.00 0.00 0.00
80.00 0.00 0.00
85.00 0.00 0.00
90.00 0.00 0.00
95.00 0.00 0.00
100.00 0.00 0.00
105.00 0.00 0.00
110.00 0.00 0.00
115.00 0.00 0.00
120.00 0.00 0.00
125.00 0.00 0.00
130.00 0.00 0.00
135.00 0.00 0.00
140.00 0.00 0.00
145.00 0.00 0.00
150.00 0.00 0.00
155.00 0.00 0.00
160.00 0.00 0.00
165.00 0.00 0.00
170.00 0.00 0.00
175.00 0.00 0.00
180.00 0.00 0.00
185.00 0.00 0.00
190.00 0.00 0.00
195.00 0.00 0.00
200.00 0.00 0.00
205.00 0.00 0.00
210.00 0.00 0.00
215.00 0.00 0.00
220.00 0.00 0.00
225.00 0.00 0.00
230.00 0.00 0.00
235.00 0.00 0.00
240.00 0.00 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 55HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Pond 1P: WETLAND A
Inflow Area = 3.257 ac, 9.42% Impervious, Inflow Depth = 1.53" for 2y 24hr event
Inflow = 8.71 cfs @ 12.09 hrs, Volume= 0.414 af
Outflow = 4.80 cfs @ 12.18 hrs, Volume= 0.414 af, Atten= 45%, Lag= 5.6 min
Primary = 4.80 cfs @ 12.18 hrs, Volume= 0.414 af
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Peak Elev= 969.95' @ 12.18 hrs Surf.Area= 12,408 sf Storage= 3,933 cf
Plug-Flow detention time= 26.8 min calculated for 0.414 af (100% of inflow)
Center-of-Mass det. time= 26.9 min ( 836.7 - 809.8 )
Volume Invert Avail.Storage Storage Description
#1 969.62' 18,824 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
969.62 11,466 0 0
970.00 12,553 4,564 4,564
971.00 15,967 14,260 18,824
Device Routing Invert Outlet Devices
#1 Primary 969.62'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60
Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64
Primary OutFlow Max=4.79 cfs @ 12.18 hrs HW=969.95' (Free Discharge)
1=Broad-Crested Rectangular Weir (Weir Controls 4.79 cfs @ 1.46 fps)
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 56HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Pond 1P: WETLAND A
Inflow
Primary
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)9
8
7
6
5
4
3
2
1
0
Inflow Area=3.257 ac
Peak Elev=969.95'
Storage=3,933 cf
8.71 cfs
4.80 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 57HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Pond 1P: WETLAND A
Time
(hours)
Inflow
(cfs)
Storage
(cubic-feet)
Elevation
(feet)
Primary
(cfs)
0.00 0.00 0 969.62 0.00
5.00 0.00 14 969.62 0.00
10.00 0.04 93 969.63 0.02
15.00 0.28 585 969.67 0.29
20.00 0.08 239 969.64 0.08
25.00 0.00 98 969.63 0.02
30.00 0.00 1 969.62 0.00
35.00 0.00 0 969.62 0.00
40.00 0.00 0 969.62 0.00
45.00 0.00 0 969.62 0.00
50.00 0.00 0 969.62 0.00
55.00 0.00 0 969.62 0.00
60.00 0.00 0 969.62 0.00
65.00 0.00 0 969.62 0.00
70.00 0.00 0 969.62 0.00
75.00 0.00 0 969.62 0.00
80.00 0.00 0 969.62 0.00
85.00 0.00 0 969.62 0.00
90.00 0.00 0 969.62 0.00
95.00 0.00 0 969.62 0.00
100.00 0.00 0 969.62 0.00
105.00 0.00 0 969.62 0.00
110.00 0.00 0 969.62 0.00
115.00 0.00 0 969.62 0.00
120.00 0.00 0 969.62 0.00
125.00 0.00 0 969.62 0.00
130.00 0.00 0 969.62 0.00
135.00 0.00 0 969.62 0.00
140.00 0.00 0 969.62 0.00
145.00 0.00 0 969.62 0.00
150.00 0.00 0 969.62 0.00
155.00 0.00 0 969.62 0.00
160.00 0.00 0 969.62 0.00
165.00 0.00 0 969.62 0.00
170.00 0.00 0 969.62 0.00
175.00 0.00 0 969.62 0.00
180.00 0.00 0 969.62 0.00
185.00 0.00 0 969.62 0.00
190.00 0.00 0 969.62 0.00
195.00 0.00 0 969.62 0.00
200.00 0.00 0 969.62 0.00
205.00 0.00 0 969.62 0.00
210.00 0.00 0 969.62 0.00
215.00 0.00 0 969.62 0.00
220.00 0.00 0 969.62 0.00
225.00 0.00 0 969.62 0.00
230.00 0.00 0 969.62 0.00
235.00 0.00 0 969.62 0.00
240.00 0.00 0 969.62 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 58HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Stage-Discharge for Pond 1P: WETLAND A
Elevation
(feet)
Primary
(cfs)
969.62 0.00
969.63 0.02
969.64 0.07
969.65 0.13
969.66 0.20
969.67 0.28
969.68 0.37
969.69 0.46
969.70 0.56
969.71 0.67
969.72 0.79
969.73 0.91
969.74 1.04
969.75 1.17
969.76 1.30
969.77 1.45
969.78 1.59
969.79 1.75
969.80 1.90
969.81 2.06
969.82 2.23
969.83 2.40
969.84 2.58
969.85 2.76
969.86 2.94
969.87 3.13
969.88 3.33
969.89 3.53
969.90 3.73
969.91 3.94
969.92 4.15
969.93 4.36
969.94 4.58
969.95 4.81
969.96 5.03
969.97 5.26
969.98 5.50
969.99 5.74
970.00 5.98
970.01 6.23
970.02 6.48
970.03 6.74
970.04 7.01
970.05 7.28
970.06 7.55
970.07 7.83
970.08 8.12
970.09 8.41
970.10 8.70
970.11 9.00
970.12 9.30
970.13 9.60
Elevation
(feet)
Primary
(cfs)
970.14 9.91
970.15 10.23
970.16 10.55
970.17 10.87
970.18 11.20
970.19 11.53
970.20 11.86
970.21 12.20
970.22 12.55
970.23 12.86
970.24 13.18
970.25 13.49
970.26 13.81
970.27 14.14
970.28 14.46
970.29 14.79
970.30 15.12
970.31 15.45
970.32 15.78
970.33 16.12
970.34 16.46
970.35 16.80
970.36 17.14
970.37 17.49
970.38 17.84
970.39 18.19
970.40 18.54
970.41 18.89
970.42 19.25
970.43 19.61
970.44 19.97
970.45 20.33
970.46 20.69
970.47 21.06
970.48 21.43
970.49 21.80
970.50 22.17
970.51 22.55
970.52 22.92
970.53 23.30
970.54 23.68
970.55 24.07
970.56 24.45
970.57 24.84
970.58 25.23
970.59 25.62
970.60 26.01
970.61 26.40
970.62 26.80
970.63 27.21
970.64 27.62
970.65 28.03
Elevation
(feet)
Primary
(cfs)
970.66 28.45
970.67 28.86
970.68 29.28
970.69 29.70
970.70 30.12
970.71 30.55
970.72 30.98
970.73 31.41
970.74 31.84
970.75 32.27
970.76 32.71
970.77 33.14
970.78 33.58
970.79 34.02
970.80 34.47
970.81 34.91
970.82 35.36
970.83 35.79
970.84 36.22
970.85 36.65
970.86 37.09
970.87 37.52
970.88 37.96
970.89 38.40
970.90 38.84
970.91 39.28
970.92 39.72
970.93 40.17
970.94 40.61
970.95 41.06
970.96 41.51
970.97 41.96
970.98 42.41
970.99 42.86
971.00 43.32
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 59HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Pond 5P: Wetland B
[44] Hint: Outlet device #1 is below defined storage
[95] Warning: Outlet Device #1 rise exceeded
Inflow Area = 12.870 ac, 24.01% Impervious, Inflow Depth = 1.61" for 2y 24hr event
Inflow = 23.85 cfs @ 12.13 hrs, Volume= 1.728 af
Outflow = 23.70 cfs @ 12.14 hrs, Volume= 1.728 af, Atten= 1%, Lag= 0.9 min
Primary = 23.70 cfs @ 12.14 hrs, Volume= 1.728 af
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Peak Elev= 961.61' @ 12.14 hrs Surf.Area= 149,086 sf Storage= 1,124 cf
Plug-Flow detention time= 0.8 min calculated for 1.728 af (100% of inflow)
Center-of-Mass det. time= 0.8 min ( 813.6 - 812.8 )
Volume Invert Avail.Storage Storage Description
#1 961.60' 841,104 cf Custom Stage Data (Conic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store Wet.Area
(feet) (sq-ft) (cubic-feet) (cubic-feet) (sq-ft)
961.60 149,000 0 0 149,000
962.00 153,597 60,517 60,517 153,630
964.00 201,325 353,847 414,364 201,451
966.00 225,646 426,740 841,104 225,991
Device Routing Invert Outlet Devices
#1 Primary 960.82'Asymmetrical Weir, C= 3.27
Offset (feet) -70.00 -41.00 0.00 49.00 87.00
Height (feet) 0.35 0.09 0.00 0.09 0.35
Primary OutFlow Max=134.10 cfs @ 12.14 hrs HW=961.61' (Free Discharge)
1=Asymmetrical Weir (Weir Controls 134.10 cfs @ 2.74 fps)
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 60HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Pond 5P: Wetland B
Inflow
Primary
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)26
24
22
20
18
16
14
12
10
8
6
4
2
0
Inflow Area=12.870 ac
Peak Elev=961.61'
Storage=1,124 cf
23.85 cfs
23.70 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 61HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Pond 5P: Wetland B
Time
(hours)
Inflow
(cfs)
Storage
(cubic-feet)
Elevation
(feet)
Primary
(cfs)
0.00 0.00 0 961.60 0.00
5.00 0.03 1 961.60 0.03
10.00 0.23 11 961.60 0.22
15.00 1.14 54 961.60 1.14
20.00 0.31 15 961.60 0.31
25.00 0.02 1 961.60 0.03
30.00 0.00 0 961.60 0.00
35.00 0.00 0 961.60 0.00
40.00 0.00 0 961.60 0.00
45.00 0.00 0 961.60 0.00
50.00 0.00 0 961.60 0.00
55.00 0.00 0 961.60 0.00
60.00 0.00 0 961.60 0.00
65.00 0.00 0 961.60 0.00
70.00 0.00 0 961.60 0.00
75.00 0.00 0 961.60 0.00
80.00 0.00 0 961.60 0.00
85.00 0.00 0 961.60 0.00
90.00 0.00 0 961.60 0.00
95.00 0.00 0 961.60 0.00
100.00 0.00 0 961.60 0.00
105.00 0.00 0 961.60 0.00
110.00 0.00 0 961.60 0.00
115.00 0.00 0 961.60 0.00
120.00 0.00 0 961.60 0.00
125.00 0.00 0 961.60 0.00
130.00 0.00 0 961.60 0.00
135.00 0.00 0 961.60 0.00
140.00 0.00 0 961.60 0.00
145.00 0.00 0 961.60 0.00
150.00 0.00 0 961.60 0.00
155.00 0.00 0 961.60 0.00
160.00 0.00 0 961.60 0.00
165.00 0.00 0 961.60 0.00
170.00 0.00 0 961.60 0.00
175.00 0.00 0 961.60 0.00
180.00 0.00 0 961.60 0.00
185.00 0.00 0 961.60 0.00
190.00 0.00 0 961.60 0.00
195.00 0.00 0 961.60 0.00
200.00 0.00 0 961.60 0.00
205.00 0.00 0 961.60 0.00
210.00 0.00 0 961.60 0.00
215.00 0.00 0 961.60 0.00
220.00 0.00 0 961.60 0.00
225.00 0.00 0 961.60 0.00
230.00 0.00 0 961.60 0.00
235.00 0.00 0 961.60 0.00
240.00 0.00 0 961.60 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 62HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Stage-Discharge for Pond 5P: Wetland B
Elevation
(feet)
Primary
(cfs)
961.60 0.00
961.65 139.02
961.70 144.59
961.75 149.95
961.80 155.13
961.85 160.13
961.90 164.98
961.95 169.69
962.00 174.28
962.05 178.74
962.10 183.09
962.15 187.35
962.20 191.51
962.25 195.57
962.30 199.56
962.35 203.47
962.40 207.30
962.45 211.06
962.50 214.76
962.55 218.40
962.60 221.97
962.65 225.49
962.70 228.95
962.75 232.36
962.80 235.73
962.85 239.04
962.90 242.31
962.95 245.54
963.00 248.72
963.05 251.87
963.10 254.97
963.15 258.04
963.20 261.07
963.25 264.07
963.30 267.03
963.35 269.96
963.40 272.86
963.45 275.73
963.50 278.56
963.55 281.37
963.60 284.16
963.65 286.91
963.70 289.64
963.75 292.34
963.80 295.02
963.85 297.68
963.90 300.31
963.95 302.92
964.00 305.50
964.05 308.07
964.10 310.61
964.15 313.13
Elevation
(feet)
Primary
(cfs)
964.20 315.63
964.25 318.12
964.30 320.58
964.35 323.02
964.40 325.45
964.45 327.86
964.50 330.25
964.55 332.62
964.60 334.98
964.65 337.32
964.70 339.64
964.75 341.95
964.80 344.24
964.85 346.52
964.90 348.78
964.95 351.03
965.00 353.26
965.05 355.48
965.10 357.69
965.15 359.88
965.20 362.06
965.25 364.23
965.30 366.38
965.35 368.52
965.40 370.65
965.45 372.76
965.50 374.87
965.55 376.96
965.60 379.04
965.65 381.11
965.70 383.17
965.75 385.22
965.80 387.25
965.85 389.28
965.90 391.29
965.95 393.30
966.00 395.29
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 63HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Time span=0.00-240.00 hrs, dt=0.01 hrs, 24001 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Stor-Ind method - Pond routing by Stor-Ind method
Runoff Area=125,400 sf 0.00% Impervious Runoff Depth=2.61"Subcatchment 6S: UNDISTURBED
Tc=6.0 min CN=84 Runoff=13.69 cfs 0.626 af
Runoff Area=238,192 sf 46.22% Impervious Runoff Depth=3.01"Subcatchment 7S: OFFSITE WETLAND B
Flow Length=1,100' Slope=0.1500 '/' Tc=13.4 min CN=WQ Runoff=20.68 cfs 1.373 af
Runoff Area=3,245 sf 100.00% Impervious Runoff Depth=4.03"Subcatchment EX1A: EX1A - DRAINS
Tc=6.0 min CN=WQ Runoff=0.48 cfs 0.025 af
Runoff Area=62,807 sf 11.61% Impervious Runoff Depth=2.78"Subcatchment EX1B: EX1B - DRAINS
Tc=6.0 min CN=WQ Runoff=7.15 cfs 0.334 af
Runoff Area=4,200 sf 0.00% Impervious Runoff Depth=2.61"Subcatchment EX1C: EX1C - DRAINS
Tc=6.0 min CN=WQ Runoff=0.46 cfs 0.021 af
Runoff Area=5,580 sf 40.82% Impervious Runoff Depth=3.19"Subcatchment EX2: EX2 - DRAINS SOUTH
Tc=6.0 min CN=WQ Runoff=0.70 cfs 0.034 af
Runoff Area=49,573 sf 17.90% Impervious Runoff Depth=2.87"Subcatchment OFFSITE A: OFFSITE A -
Tc=6.0 min CN=WQ Runoff=5.77 cfs 0.272 af
Runoff Area=74,865 sf 8.12% Impervious Runoff Depth=2.73"Subcatchment OFFSITE B: OFFSITE B-
Tc=6.0 min CN=WQ Runoff=8.42 cfs 0.390 af
Inflow=16.03 cfs 0.745 afReach DA2: DA2 - TOTAL FLOW TO WETLAND A
Outflow=16.03 cfs 0.745 af
Inflow=14.97 cfs 1.051 afReach DA3: DA3 - TOTAL FLOW TO WETLAND B
Outflow=14.97 cfs 1.051 af
Peak Elev=970.15' Storage=6,422 cf Inflow=16.03 cfs 0.745 afPond 1P: WETLAND A
Outflow=10.08 cfs 0.745 af
Peak Elev=961.61' Storage=2,106 cf Inflow=44.74 cfs 3.050 afPond 5P: Wetland B
Outflow=44.41 cfs 3.050 af
Total Runoff Area = 12.944 ac Runoff Volume = 3.075 af Average Runoff Depth = 2.85"
75.55% Pervious = 9.780 ac 24.45% Impervious = 3.165 ac
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 64HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment 6S: UNDISTURBED
Runoff = 13.69 cfs @ 12.09 hrs, Volume= 0.626 af, Depth= 2.61"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"
Area (sf) CN Description
* 125,400 84
125,400 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment 6S: UNDISTURBED
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr
Rainfall=4.27"
Runoff Area=125,400 sf
Runoff Volume=0.626 af
Runoff Depth=2.61"
Tc=6.0 min
CN=84
13.69 cfs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 65HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment 6S: UNDISTURBED
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.12 0.00 0.00
10.00 0.55 0.01 0.07
15.00 3.89 2.27 0.43
20.00 4.17 2.52 0.06
25.00 4.27 2.61 0.00
30.00 4.27 2.61 0.00
35.00 4.27 2.61 0.00
40.00 4.27 2.61 0.00
45.00 4.27 2.61 0.00
50.00 4.27 2.61 0.00
55.00 4.27 2.61 0.00
60.00 4.27 2.61 0.00
65.00 4.27 2.61 0.00
70.00 4.27 2.61 0.00
75.00 4.27 2.61 0.00
80.00 4.27 2.61 0.00
85.00 4.27 2.61 0.00
90.00 4.27 2.61 0.00
95.00 4.27 2.61 0.00
100.00 4.27 2.61 0.00
105.00 4.27 2.61 0.00
110.00 4.27 2.61 0.00
115.00 4.27 2.61 0.00
120.00 4.27 2.61 0.00
125.00 4.27 2.61 0.00
130.00 4.27 2.61 0.00
135.00 4.27 2.61 0.00
140.00 4.27 2.61 0.00
145.00 4.27 2.61 0.00
150.00 4.27 2.61 0.00
155.00 4.27 2.61 0.00
160.00 4.27 2.61 0.00
165.00 4.27 2.61 0.00
170.00 4.27 2.61 0.00
175.00 4.27 2.61 0.00
180.00 4.27 2.61 0.00
185.00 4.27 2.61 0.00
190.00 4.27 2.61 0.00
195.00 4.27 2.61 0.00
200.00 4.27 2.61 0.00
205.00 4.27 2.61 0.00
210.00 4.27 2.61 0.00
215.00 4.27 2.61 0.00
220.00 4.27 2.61 0.00
225.00 4.27 2.61 0.00
230.00 4.27 2.61 0.00
235.00 4.27 2.61 0.00
240.00 4.27 2.61 0.00
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 66HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment 7S: OFFSITE WETLAND B WATERSHED
Runoff = 20.68 cfs @ 12.18 hrs, Volume= 1.373 af, Depth= 3.01"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"
Area (sf) CN Description
67,393 98 Unconnected roofs, HSG B
* 170,799 84 1/2 acre lots, 25% imp, HSG B
238,192 Weighted Average
128,099 53.78% Pervious Area
110,093 46.22% Impervious Area
67,393 61.21% Unconnected
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
7.9 200 0.1500 0.42 Sheet Flow,
Grass: Short n= 0.150 P2= 2.94"
5.5 900 0.1500 2.71 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
13.4 1,100 Total
Subcatchment 7S: OFFSITE WETLAND B WATERSHED
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr
Rainfall=4.27"
Runoff Area=238,192 sf
Runoff Volume=1.373 af
Runoff Depth=3.01"
Flow Length=1,100'
Slope=0.1500 '/'
Tc=13.4 min
CN=WQ
20.68 cfs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 67HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment 7S: OFFSITE WETLAND B WATERSHED
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.12 0.00 0.02
10.00 0.55 0.05 0.33
15.00 3.89 2.63 0.85
20.00 4.17 2.89 0.13
25.00 4.27 2.98 0.00
30.00 4.27 2.98 0.00
35.00 4.27 2.98 0.00
40.00 4.27 2.98 0.00
45.00 4.27 2.98 0.00
50.00 4.27 2.98 0.00
55.00 4.27 2.98 0.00
60.00 4.27 2.98 0.00
65.00 4.27 2.98 0.00
70.00 4.27 2.98 0.00
75.00 4.27 2.98 0.00
80.00 4.27 2.98 0.00
85.00 4.27 2.98 0.00
90.00 4.27 2.98 0.00
95.00 4.27 2.98 0.00
100.00 4.27 2.98 0.00
105.00 4.27 2.98 0.00
110.00 4.27 2.98 0.00
115.00 4.27 2.98 0.00
120.00 4.27 2.98 0.00
125.00 4.27 2.98 0.00
130.00 4.27 2.98 0.00
135.00 4.27 2.98 0.00
140.00 4.27 2.98 0.00
145.00 4.27 2.98 0.00
150.00 4.27 2.98 0.00
155.00 4.27 2.98 0.00
160.00 4.27 2.98 0.00
165.00 4.27 2.98 0.00
170.00 4.27 2.98 0.00
175.00 4.27 2.98 0.00
180.00 4.27 2.98 0.00
185.00 4.27 2.98 0.00
190.00 4.27 2.98 0.00
195.00 4.27 2.98 0.00
200.00 4.27 2.98 0.00
205.00 4.27 2.98 0.00
210.00 4.27 2.98 0.00
215.00 4.27 2.98 0.00
220.00 4.27 2.98 0.00
225.00 4.27 2.98 0.00
230.00 4.27 2.98 0.00
235.00 4.27 2.98 0.00
240.00 4.27 2.98 0.00
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 68HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment EX1A: EX1A - DRAINS EAST DOWN LAKE LUCY ROAD
Runoff = 0.48 cfs @ 12.08 hrs, Volume= 0.025 af, Depth= 4.03"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"
Area (sf) CN Description
3,245 98 Paved parking, HSG C
* 0 84
3,245 Weighted Average
3,245 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment EX1A: EX1A - DRAINS EAST DOWN LAKE LUCY ROAD
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr
Rainfall=4.27"
Runoff Area=3,245 sf
Runoff Volume=0.025 af
Runoff Depth=4.03"
Tc=6.0 min
CN=WQ
0.48 cfs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 69HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment EX1A: EX1A - DRAINS EAST DOWN LAKE LUCY ROAD
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.12 0.02 0.00
10.00 0.55 0.36 0.01
15.00 3.89 3.65 0.01
20.00 4.17 3.93 0.00
25.00 4.27 4.03 0.00
30.00 4.27 4.03 0.00
35.00 4.27 4.03 0.00
40.00 4.27 4.03 0.00
45.00 4.27 4.03 0.00
50.00 4.27 4.03 0.00
55.00 4.27 4.03 0.00
60.00 4.27 4.03 0.00
65.00 4.27 4.03 0.00
70.00 4.27 4.03 0.00
75.00 4.27 4.03 0.00
80.00 4.27 4.03 0.00
85.00 4.27 4.03 0.00
90.00 4.27 4.03 0.00
95.00 4.27 4.03 0.00
100.00 4.27 4.03 0.00
105.00 4.27 4.03 0.00
110.00 4.27 4.03 0.00
115.00 4.27 4.03 0.00
120.00 4.27 4.03 0.00
125.00 4.27 4.03 0.00
130.00 4.27 4.03 0.00
135.00 4.27 4.03 0.00
140.00 4.27 4.03 0.00
145.00 4.27 4.03 0.00
150.00 4.27 4.03 0.00
155.00 4.27 4.03 0.00
160.00 4.27 4.03 0.00
165.00 4.27 4.03 0.00
170.00 4.27 4.03 0.00
175.00 4.27 4.03 0.00
180.00 4.27 4.03 0.00
185.00 4.27 4.03 0.00
190.00 4.27 4.03 0.00
195.00 4.27 4.03 0.00
200.00 4.27 4.03 0.00
205.00 4.27 4.03 0.00
210.00 4.27 4.03 0.00
215.00 4.27 4.03 0.00
220.00 4.27 4.03 0.00
225.00 4.27 4.03 0.00
230.00 4.27 4.03 0.00
235.00 4.27 4.03 0.00
240.00 4.27 4.03 0.00
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 70HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment EX1B: EX1B - DRAINS SOUTH TO WETLAND A
Runoff = 7.15 cfs @ 12.09 hrs, Volume= 0.334 af, Depth= 2.78"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"
Area (sf) CN Description
7,290 98 Paved parking, HSG C
55,517 84
62,807 Weighted Average
55,517 88.39% Pervious Area
7,290 11.61% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment EX1B: EX1B - DRAINS SOUTH TO WETLAND A
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)8
7
6
5
4
3
2
1
0
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr
Rainfall=4.27"
Runoff Area=62,807 sf
Runoff Volume=0.334 af
Runoff Depth=2.78"
Tc=6.0 min
CN=WQ
7.15 cfs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 71HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment EX1B: EX1B - DRAINS SOUTH TO WETLAND A
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.12 0.00 0.00
10.00 0.55 0.03 0.06
15.00 3.89 2.45 0.22
20.00 4.17 2.70 0.03
25.00 4.27 2.79 0.00
30.00 4.27 2.79 0.00
35.00 4.27 2.79 0.00
40.00 4.27 2.79 0.00
45.00 4.27 2.79 0.00
50.00 4.27 2.79 0.00
55.00 4.27 2.79 0.00
60.00 4.27 2.79 0.00
65.00 4.27 2.79 0.00
70.00 4.27 2.79 0.00
75.00 4.27 2.79 0.00
80.00 4.27 2.79 0.00
85.00 4.27 2.79 0.00
90.00 4.27 2.79 0.00
95.00 4.27 2.79 0.00
100.00 4.27 2.79 0.00
105.00 4.27 2.79 0.00
110.00 4.27 2.79 0.00
115.00 4.27 2.79 0.00
120.00 4.27 2.79 0.00
125.00 4.27 2.79 0.00
130.00 4.27 2.79 0.00
135.00 4.27 2.79 0.00
140.00 4.27 2.79 0.00
145.00 4.27 2.79 0.00
150.00 4.27 2.79 0.00
155.00 4.27 2.79 0.00
160.00 4.27 2.79 0.00
165.00 4.27 2.79 0.00
170.00 4.27 2.79 0.00
175.00 4.27 2.79 0.00
180.00 4.27 2.79 0.00
185.00 4.27 2.79 0.00
190.00 4.27 2.79 0.00
195.00 4.27 2.79 0.00
200.00 4.27 2.79 0.00
205.00 4.27 2.79 0.00
210.00 4.27 2.79 0.00
215.00 4.27 2.79 0.00
220.00 4.27 2.79 0.00
225.00 4.27 2.79 0.00
230.00 4.27 2.79 0.00
235.00 4.27 2.79 0.00
240.00 4.27 2.79 0.00
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 72HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment EX1C: EX1C - DRAINS SOUTH TO WETLAND A
Runoff = 0.46 cfs @ 12.09 hrs, Volume= 0.021 af, Depth= 2.61"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"
Area (sf) CN Description
0 98 Paved parking, HSG C
* 4,200 84
4,200 Weighted Average
4,200 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment EX1C: EX1C - DRAINS SOUTH TO WETLAND A
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.5
0.48
0.46
0.44
0.42
0.4
0.38
0.36
0.34
0.32
0.3
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr
Rainfall=4.27"
Runoff Area=4,200 sf
Runoff Volume=0.021 af
Runoff Depth=2.61"
Tc=6.0 min
CN=WQ
0.46 cfs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 73HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment EX1C: EX1C - DRAINS SOUTH TO WETLAND A
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.12 0.00 0.00
10.00 0.55 0.01 0.00
15.00 3.89 2.27 0.01
20.00 4.17 2.52 0.00
25.00 4.27 2.61 0.00
30.00 4.27 2.61 0.00
35.00 4.27 2.61 0.00
40.00 4.27 2.61 0.00
45.00 4.27 2.61 0.00
50.00 4.27 2.61 0.00
55.00 4.27 2.61 0.00
60.00 4.27 2.61 0.00
65.00 4.27 2.61 0.00
70.00 4.27 2.61 0.00
75.00 4.27 2.61 0.00
80.00 4.27 2.61 0.00
85.00 4.27 2.61 0.00
90.00 4.27 2.61 0.00
95.00 4.27 2.61 0.00
100.00 4.27 2.61 0.00
105.00 4.27 2.61 0.00
110.00 4.27 2.61 0.00
115.00 4.27 2.61 0.00
120.00 4.27 2.61 0.00
125.00 4.27 2.61 0.00
130.00 4.27 2.61 0.00
135.00 4.27 2.61 0.00
140.00 4.27 2.61 0.00
145.00 4.27 2.61 0.00
150.00 4.27 2.61 0.00
155.00 4.27 2.61 0.00
160.00 4.27 2.61 0.00
165.00 4.27 2.61 0.00
170.00 4.27 2.61 0.00
175.00 4.27 2.61 0.00
180.00 4.27 2.61 0.00
185.00 4.27 2.61 0.00
190.00 4.27 2.61 0.00
195.00 4.27 2.61 0.00
200.00 4.27 2.61 0.00
205.00 4.27 2.61 0.00
210.00 4.27 2.61 0.00
215.00 4.27 2.61 0.00
220.00 4.27 2.61 0.00
225.00 4.27 2.61 0.00
230.00 4.27 2.61 0.00
235.00 4.27 2.61 0.00
240.00 4.27 2.61 0.00
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 74HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment EX2: EX2 - DRAINS SOUTH TO WETLAND B
Runoff = 0.70 cfs @ 12.08 hrs, Volume= 0.034 af, Depth= 3.19"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"
Area (sf) CN Description
2,278 98 Paved parking, HSG C
* 3,302 84
5,580 Weighted Average
3,302 59.18% Pervious Area
2,278 40.82% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment EX2: EX2 - DRAINS SOUTH TO WETLAND B
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.75
0.7
0.65
0.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr
Rainfall=4.27"
Runoff Area=5,580 sf
Runoff Volume=0.034 af
Runoff Depth=3.19"
Tc=6.0 min
CN=WQ
0.70 cfs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 75HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment EX2: EX2 - DRAINS SOUTH TO WETLAND B
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.12 0.00 0.00
10.00 0.55 0.07 0.01
15.00 3.89 2.81 0.02
20.00 4.17 3.08 0.00
25.00 4.27 3.18 0.00
30.00 4.27 3.18 0.00
35.00 4.27 3.18 0.00
40.00 4.27 3.18 0.00
45.00 4.27 3.18 0.00
50.00 4.27 3.18 0.00
55.00 4.27 3.18 0.00
60.00 4.27 3.18 0.00
65.00 4.27 3.18 0.00
70.00 4.27 3.18 0.00
75.00 4.27 3.18 0.00
80.00 4.27 3.18 0.00
85.00 4.27 3.18 0.00
90.00 4.27 3.18 0.00
95.00 4.27 3.18 0.00
100.00 4.27 3.18 0.00
105.00 4.27 3.18 0.00
110.00 4.27 3.18 0.00
115.00 4.27 3.18 0.00
120.00 4.27 3.18 0.00
125.00 4.27 3.18 0.00
130.00 4.27 3.18 0.00
135.00 4.27 3.18 0.00
140.00 4.27 3.18 0.00
145.00 4.27 3.18 0.00
150.00 4.27 3.18 0.00
155.00 4.27 3.18 0.00
160.00 4.27 3.18 0.00
165.00 4.27 3.18 0.00
170.00 4.27 3.18 0.00
175.00 4.27 3.18 0.00
180.00 4.27 3.18 0.00
185.00 4.27 3.18 0.00
190.00 4.27 3.18 0.00
195.00 4.27 3.18 0.00
200.00 4.27 3.18 0.00
205.00 4.27 3.18 0.00
210.00 4.27 3.18 0.00
215.00 4.27 3.18 0.00
220.00 4.27 3.18 0.00
225.00 4.27 3.18 0.00
230.00 4.27 3.18 0.00
235.00 4.27 3.18 0.00
240.00 4.27 3.18 0.00
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 76HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment OFFSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B
Runoff = 5.77 cfs @ 12.09 hrs, Volume= 0.272 af, Depth= 2.87"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"
Area (sf) CN Description
8,875 98 Paved parking, HSG C
* 40,698 84
49,573 Weighted Average
40,698 82.10% Pervious Area
8,875 17.90% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment OFFSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)6
5
4
3
2
1
0
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr
Rainfall=4.27"
Runoff Area=49,573 sf
Runoff Volume=0.272 af
Runoff Depth=2.87"
Tc=6.0 min
CN=WQ
5.77 cfs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 77HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment OFFSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.12 0.00 0.00
10.00 0.55 0.04 0.05
15.00 3.89 2.54 0.17
20.00 4.17 2.79 0.03
25.00 4.27 2.89 0.00
30.00 4.27 2.89 0.00
35.00 4.27 2.89 0.00
40.00 4.27 2.89 0.00
45.00 4.27 2.89 0.00
50.00 4.27 2.89 0.00
55.00 4.27 2.89 0.00
60.00 4.27 2.89 0.00
65.00 4.27 2.89 0.00
70.00 4.27 2.89 0.00
75.00 4.27 2.89 0.00
80.00 4.27 2.89 0.00
85.00 4.27 2.89 0.00
90.00 4.27 2.89 0.00
95.00 4.27 2.89 0.00
100.00 4.27 2.89 0.00
105.00 4.27 2.89 0.00
110.00 4.27 2.89 0.00
115.00 4.27 2.89 0.00
120.00 4.27 2.89 0.00
125.00 4.27 2.89 0.00
130.00 4.27 2.89 0.00
135.00 4.27 2.89 0.00
140.00 4.27 2.89 0.00
145.00 4.27 2.89 0.00
150.00 4.27 2.89 0.00
155.00 4.27 2.89 0.00
160.00 4.27 2.89 0.00
165.00 4.27 2.89 0.00
170.00 4.27 2.89 0.00
175.00 4.27 2.89 0.00
180.00 4.27 2.89 0.00
185.00 4.27 2.89 0.00
190.00 4.27 2.89 0.00
195.00 4.27 2.89 0.00
200.00 4.27 2.89 0.00
205.00 4.27 2.89 0.00
210.00 4.27 2.89 0.00
215.00 4.27 2.89 0.00
220.00 4.27 2.89 0.00
225.00 4.27 2.89 0.00
230.00 4.27 2.89 0.00
235.00 4.27 2.89 0.00
240.00 4.27 2.89 0.00
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 78HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment OFFSITE B: OFFSITE B- DRAINS SOUTH TO WETLAND A
Runoff = 8.42 cfs @ 12.09 hrs, Volume= 0.390 af, Depth= 2.73"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"
Area (sf) CN Description
6,076 98 Paved parking, HSG C
* 68,789 84
74,865 Weighted Average
68,789 91.88% Pervious Area
6,076 8.12% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment OFFSITE B: OFFSITE B- DRAINS SOUTH TO WETLAND A
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)9
8
7
6
5
4
3
2
1
0
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr
Rainfall=4.27"
Runoff Area=74,865 sf
Runoff Volume=0.390 af
Runoff Depth=2.73"
Tc=6.0 min
CN=WQ
8.42 cfs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 79HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment OFFSITE B: OFFSITE B- DRAINS SOUTH TO WETLAND A
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.12 0.00 0.00
10.00 0.55 0.02 0.06
15.00 3.89 2.36 0.26
20.00 4.17 2.61 0.04
25.00 4.27 2.70 0.00
30.00 4.27 2.70 0.00
35.00 4.27 2.70 0.00
40.00 4.27 2.70 0.00
45.00 4.27 2.70 0.00
50.00 4.27 2.70 0.00
55.00 4.27 2.70 0.00
60.00 4.27 2.70 0.00
65.00 4.27 2.70 0.00
70.00 4.27 2.70 0.00
75.00 4.27 2.70 0.00
80.00 4.27 2.70 0.00
85.00 4.27 2.70 0.00
90.00 4.27 2.70 0.00
95.00 4.27 2.70 0.00
100.00 4.27 2.70 0.00
105.00 4.27 2.70 0.00
110.00 4.27 2.70 0.00
115.00 4.27 2.70 0.00
120.00 4.27 2.70 0.00
125.00 4.27 2.70 0.00
130.00 4.27 2.70 0.00
135.00 4.27 2.70 0.00
140.00 4.27 2.70 0.00
145.00 4.27 2.70 0.00
150.00 4.27 2.70 0.00
155.00 4.27 2.70 0.00
160.00 4.27 2.70 0.00
165.00 4.27 2.70 0.00
170.00 4.27 2.70 0.00
175.00 4.27 2.70 0.00
180.00 4.27 2.70 0.00
185.00 4.27 2.70 0.00
190.00 4.27 2.70 0.00
195.00 4.27 2.70 0.00
200.00 4.27 2.70 0.00
205.00 4.27 2.70 0.00
210.00 4.27 2.70 0.00
215.00 4.27 2.70 0.00
220.00 4.27 2.70 0.00
225.00 4.27 2.70 0.00
230.00 4.27 2.70 0.00
235.00 4.27 2.70 0.00
240.00 4.27 2.70 0.00
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 80HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A
[40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 3.257 ac, 9.42% Impervious, Inflow Depth = 2.74" for 10y 24hr event
Inflow = 16.03 cfs @ 12.09 hrs, Volume= 0.745 af
Outflow = 16.03 cfs @ 12.09 hrs, Volume= 0.745 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Reach DA2: DA2 - TOTAL FLOW TO WETLAND A
Inflow
Outflow
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=3.257 ac
16.03 cfs
16.03 cfs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 81HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A
Time
(hours)
Inflow
(cfs)
Elevation
(feet)
Outflow
(cfs)
0.00 0.00 0.00
5.00 0.00 0.00
10.00 0.12 0.12
15.00 0.49 0.49
20.00 0.07 0.07
25.00 0.00 0.00
30.00 0.00 0.00
35.00 0.00 0.00
40.00 0.00 0.00
45.00 0.00 0.00
50.00 0.00 0.00
55.00 0.00 0.00
60.00 0.00 0.00
65.00 0.00 0.00
70.00 0.00 0.00
75.00 0.00 0.00
80.00 0.00 0.00
85.00 0.00 0.00
90.00 0.00 0.00
95.00 0.00 0.00
100.00 0.00 0.00
105.00 0.00 0.00
110.00 0.00 0.00
115.00 0.00 0.00
120.00 0.00 0.00
125.00 0.00 0.00
130.00 0.00 0.00
135.00 0.00 0.00
140.00 0.00 0.00
145.00 0.00 0.00
150.00 0.00 0.00
155.00 0.00 0.00
160.00 0.00 0.00
165.00 0.00 0.00
170.00 0.00 0.00
175.00 0.00 0.00
180.00 0.00 0.00
185.00 0.00 0.00
190.00 0.00 0.00
195.00 0.00 0.00
200.00 0.00 0.00
205.00 0.00 0.00
210.00 0.00 0.00
215.00 0.00 0.00
220.00 0.00 0.00
225.00 0.00 0.00
230.00 0.00 0.00
235.00 0.00 0.00
240.00 0.00 0.00
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 82HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B
[40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 4.523 ac, 12.44% Impervious, Inflow Depth = 2.79" for 10y 24hr event
Inflow = 14.97 cfs @ 12.12 hrs, Volume= 1.051 af
Outflow = 14.97 cfs @ 12.12 hrs, Volume= 1.051 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Reach DA3: DA3 - TOTAL FLOW TO WETLAND B
Inflow
Outflow
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=4.523 ac
14.97 cfs
14.97 cfs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 83HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B
Time
(hours)
Inflow
(cfs)
Elevation
(feet)
Outflow
(cfs)
0.00 0.00 0.00
5.00 0.01 0.01
10.00 0.13 0.13
15.00 0.69 0.69
20.00 0.11 0.11
25.00 0.02 0.02
30.00 0.00 0.00
35.00 0.00 0.00
40.00 0.00 0.00
45.00 0.00 0.00
50.00 0.00 0.00
55.00 0.00 0.00
60.00 0.00 0.00
65.00 0.00 0.00
70.00 0.00 0.00
75.00 0.00 0.00
80.00 0.00 0.00
85.00 0.00 0.00
90.00 0.00 0.00
95.00 0.00 0.00
100.00 0.00 0.00
105.00 0.00 0.00
110.00 0.00 0.00
115.00 0.00 0.00
120.00 0.00 0.00
125.00 0.00 0.00
130.00 0.00 0.00
135.00 0.00 0.00
140.00 0.00 0.00
145.00 0.00 0.00
150.00 0.00 0.00
155.00 0.00 0.00
160.00 0.00 0.00
165.00 0.00 0.00
170.00 0.00 0.00
175.00 0.00 0.00
180.00 0.00 0.00
185.00 0.00 0.00
190.00 0.00 0.00
195.00 0.00 0.00
200.00 0.00 0.00
205.00 0.00 0.00
210.00 0.00 0.00
215.00 0.00 0.00
220.00 0.00 0.00
225.00 0.00 0.00
230.00 0.00 0.00
235.00 0.00 0.00
240.00 0.00 0.00
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 84HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Pond 1P: WETLAND A
Inflow Area = 3.257 ac, 9.42% Impervious, Inflow Depth = 2.74" for 10y 24hr event
Inflow = 16.03 cfs @ 12.09 hrs, Volume= 0.745 af
Outflow = 10.08 cfs @ 12.16 hrs, Volume= 0.745 af, Atten= 37%, Lag= 4.5 min
Primary = 10.08 cfs @ 12.16 hrs, Volume= 0.745 af
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Peak Elev= 970.15' @ 12.16 hrs Surf.Area= 13,049 sf Storage= 6,422 cf
Plug-Flow detention time= 21.3 min calculated for 0.745 af (100% of inflow)
Center-of-Mass det. time= 21.3 min ( 805.4 - 784.1 )
Volume Invert Avail.Storage Storage Description
#1 969.62' 18,824 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
969.62 11,466 0 0
970.00 12,553 4,564 4,564
971.00 15,967 14,260 18,824
Device Routing Invert Outlet Devices
#1 Primary 969.62'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60
Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64
Primary OutFlow Max=10.07 cfs @ 12.16 hrs HW=970.15' (Free Discharge)
1=Broad-Crested Rectangular Weir (Weir Controls 10.07 cfs @ 1.92 fps)
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 85HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Pond 1P: WETLAND A
Inflow
Primary
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=3.257 ac
Peak Elev=970.15'
Storage=6,422 cf
16.03 cfs
10.08 cfs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 86HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Pond 1P: WETLAND A
Time
(hours)
Inflow
(cfs)
Storage
(cubic-feet)
Elevation
(feet)
Primary
(cfs)
0.00 0.00 0 969.62 0.00
5.00 0.00 11 969.62 0.00
10.00 0.12 222 969.64 0.07
15.00 0.49 851 969.69 0.50
20.00 0.07 240 969.64 0.08
25.00 0.00 96 969.63 0.02
30.00 0.00 1 969.62 0.00
35.00 0.00 0 969.62 0.00
40.00 0.00 0 969.62 0.00
45.00 0.00 0 969.62 0.00
50.00 0.00 0 969.62 0.00
55.00 0.00 0 969.62 0.00
60.00 0.00 0 969.62 0.00
65.00 0.00 0 969.62 0.00
70.00 0.00 0 969.62 0.00
75.00 0.00 0 969.62 0.00
80.00 0.00 0 969.62 0.00
85.00 0.00 0 969.62 0.00
90.00 0.00 0 969.62 0.00
95.00 0.00 0 969.62 0.00
100.00 0.00 0 969.62 0.00
105.00 0.00 0 969.62 0.00
110.00 0.00 0 969.62 0.00
115.00 0.00 0 969.62 0.00
120.00 0.00 0 969.62 0.00
125.00 0.00 0 969.62 0.00
130.00 0.00 0 969.62 0.00
135.00 0.00 0 969.62 0.00
140.00 0.00 0 969.62 0.00
145.00 0.00 0 969.62 0.00
150.00 0.00 0 969.62 0.00
155.00 0.00 0 969.62 0.00
160.00 0.00 0 969.62 0.00
165.00 0.00 0 969.62 0.00
170.00 0.00 0 969.62 0.00
175.00 0.00 0 969.62 0.00
180.00 0.00 0 969.62 0.00
185.00 0.00 0 969.62 0.00
190.00 0.00 0 969.62 0.00
195.00 0.00 0 969.62 0.00
200.00 0.00 0 969.62 0.00
205.00 0.00 0 969.62 0.00
210.00 0.00 0 969.62 0.00
215.00 0.00 0 969.62 0.00
220.00 0.00 0 969.62 0.00
225.00 0.00 0 969.62 0.00
230.00 0.00 0 969.62 0.00
235.00 0.00 0 969.62 0.00
240.00 0.00 0 969.62 0.00
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 87HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Stage-Discharge for Pond 1P: WETLAND A
Elevation
(feet)
Primary
(cfs)
969.62 0.00
969.63 0.02
969.64 0.07
969.65 0.13
969.66 0.20
969.67 0.28
969.68 0.37
969.69 0.46
969.70 0.56
969.71 0.67
969.72 0.79
969.73 0.91
969.74 1.04
969.75 1.17
969.76 1.30
969.77 1.45
969.78 1.59
969.79 1.75
969.80 1.90
969.81 2.06
969.82 2.23
969.83 2.40
969.84 2.58
969.85 2.76
969.86 2.94
969.87 3.13
969.88 3.33
969.89 3.53
969.90 3.73
969.91 3.94
969.92 4.15
969.93 4.36
969.94 4.58
969.95 4.81
969.96 5.03
969.97 5.26
969.98 5.50
969.99 5.74
970.00 5.98
970.01 6.23
970.02 6.48
970.03 6.74
970.04 7.01
970.05 7.28
970.06 7.55
970.07 7.83
970.08 8.12
970.09 8.41
970.10 8.70
970.11 9.00
970.12 9.30
970.13 9.60
Elevation
(feet)
Primary
(cfs)
970.14 9.91
970.15 10.23
970.16 10.55
970.17 10.87
970.18 11.20
970.19 11.53
970.20 11.86
970.21 12.20
970.22 12.55
970.23 12.86
970.24 13.18
970.25 13.49
970.26 13.81
970.27 14.14
970.28 14.46
970.29 14.79
970.30 15.12
970.31 15.45
970.32 15.78
970.33 16.12
970.34 16.46
970.35 16.80
970.36 17.14
970.37 17.49
970.38 17.84
970.39 18.19
970.40 18.54
970.41 18.89
970.42 19.25
970.43 19.61
970.44 19.97
970.45 20.33
970.46 20.69
970.47 21.06
970.48 21.43
970.49 21.80
970.50 22.17
970.51 22.55
970.52 22.92
970.53 23.30
970.54 23.68
970.55 24.07
970.56 24.45
970.57 24.84
970.58 25.23
970.59 25.62
970.60 26.01
970.61 26.40
970.62 26.80
970.63 27.21
970.64 27.62
970.65 28.03
Elevation
(feet)
Primary
(cfs)
970.66 28.45
970.67 28.86
970.68 29.28
970.69 29.70
970.70 30.12
970.71 30.55
970.72 30.98
970.73 31.41
970.74 31.84
970.75 32.27
970.76 32.71
970.77 33.14
970.78 33.58
970.79 34.02
970.80 34.47
970.81 34.91
970.82 35.36
970.83 35.79
970.84 36.22
970.85 36.65
970.86 37.09
970.87 37.52
970.88 37.96
970.89 38.40
970.90 38.84
970.91 39.28
970.92 39.72
970.93 40.17
970.94 40.61
970.95 41.06
970.96 41.51
970.97 41.96
970.98 42.41
970.99 42.86
971.00 43.32
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 88HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Pond 5P: Wetland B
[44] Hint: Outlet device #1 is below defined storage
[95] Warning: Outlet Device #1 rise exceeded
Inflow Area = 12.870 ac, 24.01% Impervious, Inflow Depth = 2.84" for 10y 24hr event
Inflow = 44.74 cfs @ 12.12 hrs, Volume= 3.050 af
Outflow = 44.41 cfs @ 12.14 hrs, Volume= 3.050 af, Atten= 1%, Lag= 0.9 min
Primary = 44.41 cfs @ 12.14 hrs, Volume= 3.050 af
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Peak Elev= 961.61' @ 12.14 hrs Surf.Area= 149,161 sf Storage= 2,106 cf
Plug-Flow detention time= 0.8 min calculated for 3.050 af (100% of inflow)
Center-of-Mass det. time= 0.8 min ( 789.1 - 788.3 )
Volume Invert Avail.Storage Storage Description
#1 961.60' 841,104 cf Custom Stage Data (Conic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store Wet.Area
(feet) (sq-ft) (cubic-feet) (cubic-feet) (sq-ft)
961.60 149,000 0 0 149,000
962.00 153,597 60,517 60,517 153,630
964.00 201,325 353,847 414,364 201,451
966.00 225,646 426,740 841,104 225,991
Device Routing Invert Outlet Devices
#1 Primary 960.82'Asymmetrical Weir, C= 3.27
Offset (feet) -70.00 -41.00 0.00 49.00 87.00
Height (feet) 0.35 0.09 0.00 0.09 0.35
Primary OutFlow Max=134.87 cfs @ 12.14 hrs HW=961.61' (Free Discharge)
1=Asymmetrical Weir (Weir Controls 134.87 cfs @ 2.76 fps)
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 89HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Pond 5P: Wetland B
Inflow
Primary
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)50
48
46
44
42
40
38
36
34
32
30
28
26
24
22
20
18
16
14
12
10
8
6
4
2
0
Inflow Area=12.870 ac
Peak Elev=961.61'
Storage=2,106 cf
44.74 cfs
44.41 cfs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 90HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Pond 5P: Wetland B
Time
(hours)
Inflow
(cfs)
Storage
(cubic-feet)
Elevation
(feet)
Primary
(cfs)
0.00 0.00 0 961.60 0.00
5.00 0.02 1 961.60 0.02
10.00 0.53 25 961.60 0.53
15.00 1.98 94 961.60 1.98
20.00 0.30 14 961.60 0.30
25.00 0.02 1 961.60 0.02
30.00 0.00 0 961.60 0.00
35.00 0.00 0 961.60 0.00
40.00 0.00 0 961.60 0.00
45.00 0.00 0 961.60 0.00
50.00 0.00 0 961.60 0.00
55.00 0.00 0 961.60 0.00
60.00 0.00 0 961.60 0.00
65.00 0.00 0 961.60 0.00
70.00 0.00 0 961.60 0.00
75.00 0.00 0 961.60 0.00
80.00 0.00 0 961.60 0.00
85.00 0.00 0 961.60 0.00
90.00 0.00 0 961.60 0.00
95.00 0.00 0 961.60 0.00
100.00 0.00 0 961.60 0.00
105.00 0.00 0 961.60 0.00
110.00 0.00 0 961.60 0.00
115.00 0.00 0 961.60 0.00
120.00 0.00 0 961.60 0.00
125.00 0.00 0 961.60 0.00
130.00 0.00 0 961.60 0.00
135.00 0.00 0 961.60 0.00
140.00 0.00 0 961.60 0.00
145.00 0.00 0 961.60 0.00
150.00 0.00 0 961.60 0.00
155.00 0.00 0 961.60 0.00
160.00 0.00 0 961.60 0.00
165.00 0.00 0 961.60 0.00
170.00 0.00 0 961.60 0.00
175.00 0.00 0 961.60 0.00
180.00 0.00 0 961.60 0.00
185.00 0.00 0 961.60 0.00
190.00 0.00 0 961.60 0.00
195.00 0.00 0 961.60 0.00
200.00 0.00 0 961.60 0.00
205.00 0.00 0 961.60 0.00
210.00 0.00 0 961.60 0.00
215.00 0.00 0 961.60 0.00
220.00 0.00 0 961.60 0.00
225.00 0.00 0 961.60 0.00
230.00 0.00 0 961.60 0.00
235.00 0.00 0 961.60 0.00
240.00 0.00 0 961.60 0.00
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 91HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Stage-Discharge for Pond 5P: Wetland B
Elevation
(feet)
Primary
(cfs)
961.60 0.00
961.65 139.02
961.70 144.59
961.75 149.95
961.80 155.13
961.85 160.13
961.90 164.98
961.95 169.69
962.00 174.28
962.05 178.74
962.10 183.09
962.15 187.35
962.20 191.51
962.25 195.57
962.30 199.56
962.35 203.47
962.40 207.30
962.45 211.06
962.50 214.76
962.55 218.40
962.60 221.97
962.65 225.49
962.70 228.95
962.75 232.36
962.80 235.73
962.85 239.04
962.90 242.31
962.95 245.54
963.00 248.72
963.05 251.87
963.10 254.97
963.15 258.04
963.20 261.07
963.25 264.07
963.30 267.03
963.35 269.96
963.40 272.86
963.45 275.73
963.50 278.56
963.55 281.37
963.60 284.16
963.65 286.91
963.70 289.64
963.75 292.34
963.80 295.02
963.85 297.68
963.90 300.31
963.95 302.92
964.00 305.50
964.05 308.07
964.10 310.61
964.15 313.13
Elevation
(feet)
Primary
(cfs)
964.20 315.63
964.25 318.12
964.30 320.58
964.35 323.02
964.40 325.45
964.45 327.86
964.50 330.25
964.55 332.62
964.60 334.98
964.65 337.32
964.70 339.64
964.75 341.95
964.80 344.24
964.85 346.52
964.90 348.78
964.95 351.03
965.00 353.26
965.05 355.48
965.10 357.69
965.15 359.88
965.20 362.06
965.25 364.23
965.30 366.38
965.35 368.52
965.40 370.65
965.45 372.76
965.50 374.87
965.55 376.96
965.60 379.04
965.65 381.11
965.70 383.17
965.75 385.22
965.80 387.25
965.85 389.28
965.90 391.29
965.95 393.30
966.00 395.29
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 92HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Time span=0.00-240.00 hrs, dt=0.01 hrs, 24001 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Stor-Ind method - Pond routing by Stor-Ind method
Runoff Area=125,400 sf 0.00% Impervious Runoff Depth=5.53"Subcatchment 6S: UNDISTURBED
Tc=6.0 min CN=84 Runoff=26.30 cfs 1.327 af
Runoff Area=238,192 sf 46.22% Impervious Runoff Depth=5.99"Subcatchment 7S: OFFSITE WETLAND B
Flow Length=1,100' Slope=0.1500 '/' Tc=13.4 min CN=WQ Runoff=37.78 cfs 2.732 af
Runoff Area=3,245 sf 100.00% Impervious Runoff Depth=7.17"Subcatchment EX1A: EX1A - DRAINS
Tc=6.0 min CN=WQ Runoff=0.78 cfs 0.045 af
Runoff Area=62,807 sf 11.61% Impervious Runoff Depth=5.72"Subcatchment EX1B: EX1B - DRAINS
Tc=6.0 min CN=WQ Runoff=13.41 cfs 0.687 af
Runoff Area=4,200 sf 0.00% Impervious Runoff Depth=5.53"Subcatchment EX1C: EX1C - DRAINS
Tc=6.0 min CN=WQ Runoff=0.88 cfs 0.044 af
Runoff Area=5,580 sf 40.82% Impervious Runoff Depth=6.20"Subcatchment EX2: EX2 - DRAINS SOUTH
Tc=6.0 min CN=WQ Runoff=1.24 cfs 0.066 af
Runoff Area=49,573 sf 17.90% Impervious Runoff Depth=5.82"Subcatchment OFFSITE A: OFFSITE A -
Tc=6.0 min CN=WQ Runoff=10.68 cfs 0.552 af
Runoff Area=74,865 sf 8.12% Impervious Runoff Depth=5.66"Subcatchment OFFSITE B: OFFSITE B-
Tc=6.0 min CN=WQ Runoff=15.90 cfs 0.811 af
Inflow=30.18 cfs 1.543 afReach DA2: DA2 - TOTAL FLOW TO WETLAND A
Outflow=30.18 cfs 1.543 af
Inflow=30.31 cfs 2.161 afReach DA3: DA3 - TOTAL FLOW TO WETLAND B
Outflow=30.31 cfs 2.161 af
Peak Elev=970.46' Storage=10,705 cf Inflow=30.18 cfs 1.543 afPond 1P: WETLAND A
Outflow=20.71 cfs 1.543 af
Peak Elev=961.63' Storage=4,047 cf Inflow=85.95 cfs 6.220 afPond 5P: Wetland B
Outflow=85.29 cfs 6.220 af
Total Runoff Area = 12.944 ac Runoff Volume = 6.264 af Average Runoff Depth = 5.81"
75.55% Pervious = 9.780 ac 24.45% Impervious = 3.165 ac
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 93HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment 6S: UNDISTURBED
Runoff = 26.30 cfs @ 12.08 hrs, Volume= 1.327 af, Depth= 5.53"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"
Area (sf) CN Description
* 125,400 84
125,400 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment 6S: UNDISTURBED
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)28
26
24
22
20
18
16
14
12
10
8
6
4
2
0
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr
Rainfall=7.41"
Runoff Area=125,400 sf
Runoff Volume=1.327 af
Runoff Depth=5.53"
Tc=6.0 min
CN=84
26.30 cfs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 94HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment 6S: UNDISTURBED
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.15 0.00 0.00
10.00 0.79 0.07 0.30
15.00 6.96 5.11 0.94
20.00 7.29 5.41 0.09
25.00 7.41 5.53 0.00
30.00 7.41 5.53 0.00
35.00 7.41 5.53 0.00
40.00 7.41 5.53 0.00
45.00 7.41 5.53 0.00
50.00 7.41 5.53 0.00
55.00 7.41 5.53 0.00
60.00 7.41 5.53 0.00
65.00 7.41 5.53 0.00
70.00 7.41 5.53 0.00
75.00 7.41 5.53 0.00
80.00 7.41 5.53 0.00
85.00 7.41 5.53 0.00
90.00 7.41 5.53 0.00
95.00 7.41 5.53 0.00
100.00 7.41 5.53 0.00
105.00 7.41 5.53 0.00
110.00 7.41 5.53 0.00
115.00 7.41 5.53 0.00
120.00 7.41 5.53 0.00
125.00 7.41 5.53 0.00
130.00 7.41 5.53 0.00
135.00 7.41 5.53 0.00
140.00 7.41 5.53 0.00
145.00 7.41 5.53 0.00
150.00 7.41 5.53 0.00
155.00 7.41 5.53 0.00
160.00 7.41 5.53 0.00
165.00 7.41 5.53 0.00
170.00 7.41 5.53 0.00
175.00 7.41 5.53 0.00
180.00 7.41 5.53 0.00
185.00 7.41 5.53 0.00
190.00 7.41 5.53 0.00
195.00 7.41 5.53 0.00
200.00 7.41 5.53 0.00
205.00 7.41 5.53 0.00
210.00 7.41 5.53 0.00
215.00 7.41 5.53 0.00
220.00 7.41 5.53 0.00
225.00 7.41 5.53 0.00
230.00 7.41 5.53 0.00
235.00 7.41 5.53 0.00
240.00 7.41 5.53 0.00
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 95HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment 7S: OFFSITE WETLAND B WATERSHED
Runoff = 37.78 cfs @ 12.17 hrs, Volume= 2.732 af, Depth= 5.99"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"
Area (sf) CN Description
67,393 98 Unconnected roofs, HSG B
* 170,799 84 1/2 acre lots, 25% imp, HSG B
238,192 Weighted Average
128,099 53.78% Pervious Area
110,093 46.22% Impervious Area
67,393 61.21% Unconnected
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
7.9 200 0.1500 0.42 Sheet Flow,
Grass: Short n= 0.150 P2= 2.94"
5.5 900 0.1500 2.71 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
13.4 1,100 Total
Subcatchment 7S: OFFSITE WETLAND B WATERSHED
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)42
40
38
36
34
32
30
28
26
24
22
20
18
16
14
12
10
8
6
4
2
0
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr
Rainfall=7.41"
Runoff Area=238,192 sf
Runoff Volume=2.732 af
Runoff Depth=5.99"
Flow Length=1,100'
Slope=0.1500 '/'
Tc=13.4 min
CN=WQ
37.78 cfs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 96HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment 7S: OFFSITE WETLAND B WATERSHED
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.15 0.00 0.03
10.00 0.79 0.14 0.87
15.00 6.96 5.56 1.80
20.00 7.29 5.87 0.16
25.00 7.41 5.99 0.00
30.00 7.41 5.99 0.00
35.00 7.41 5.99 0.00
40.00 7.41 5.99 0.00
45.00 7.41 5.99 0.00
50.00 7.41 5.99 0.00
55.00 7.41 5.99 0.00
60.00 7.41 5.99 0.00
65.00 7.41 5.99 0.00
70.00 7.41 5.99 0.00
75.00 7.41 5.99 0.00
80.00 7.41 5.99 0.00
85.00 7.41 5.99 0.00
90.00 7.41 5.99 0.00
95.00 7.41 5.99 0.00
100.00 7.41 5.99 0.00
105.00 7.41 5.99 0.00
110.00 7.41 5.99 0.00
115.00 7.41 5.99 0.00
120.00 7.41 5.99 0.00
125.00 7.41 5.99 0.00
130.00 7.41 5.99 0.00
135.00 7.41 5.99 0.00
140.00 7.41 5.99 0.00
145.00 7.41 5.99 0.00
150.00 7.41 5.99 0.00
155.00 7.41 5.99 0.00
160.00 7.41 5.99 0.00
165.00 7.41 5.99 0.00
170.00 7.41 5.99 0.00
175.00 7.41 5.99 0.00
180.00 7.41 5.99 0.00
185.00 7.41 5.99 0.00
190.00 7.41 5.99 0.00
195.00 7.41 5.99 0.00
200.00 7.41 5.99 0.00
205.00 7.41 5.99 0.00
210.00 7.41 5.99 0.00
215.00 7.41 5.99 0.00
220.00 7.41 5.99 0.00
225.00 7.41 5.99 0.00
230.00 7.41 5.99 0.00
235.00 7.41 5.99 0.00
240.00 7.41 5.99 0.00
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 97HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment EX1A: EX1A - DRAINS EAST DOWN LAKE LUCY ROAD
Runoff = 0.78 cfs @ 12.08 hrs, Volume= 0.045 af, Depth= 7.17"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"
Area (sf) CN Description
3,245 98 Paved parking, HSG C
* 0 84
3,245 Weighted Average
3,245 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment EX1A: EX1A - DRAINS EAST DOWN LAKE LUCY ROAD
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.85
0.8
0.75
0.7
0.65
0.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr
Rainfall=7.41"
Runoff Area=3,245 sf
Runoff Volume=0.045 af
Runoff Depth=7.17"
Tc=6.0 min
CN=WQ
0.78 cfs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 98HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment EX1A: EX1A - DRAINS EAST DOWN LAKE LUCY ROAD
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.15 0.04 0.00
10.00 0.79 0.58 0.02
15.00 6.96 6.72 0.03
20.00 7.29 7.05 0.00
25.00 7.41 7.17 0.00
30.00 7.41 7.17 0.00
35.00 7.41 7.17 0.00
40.00 7.41 7.17 0.00
45.00 7.41 7.17 0.00
50.00 7.41 7.17 0.00
55.00 7.41 7.17 0.00
60.00 7.41 7.17 0.00
65.00 7.41 7.17 0.00
70.00 7.41 7.17 0.00
75.00 7.41 7.17 0.00
80.00 7.41 7.17 0.00
85.00 7.41 7.17 0.00
90.00 7.41 7.17 0.00
95.00 7.41 7.17 0.00
100.00 7.41 7.17 0.00
105.00 7.41 7.17 0.00
110.00 7.41 7.17 0.00
115.00 7.41 7.17 0.00
120.00 7.41 7.17 0.00
125.00 7.41 7.17 0.00
130.00 7.41 7.17 0.00
135.00 7.41 7.17 0.00
140.00 7.41 7.17 0.00
145.00 7.41 7.17 0.00
150.00 7.41 7.17 0.00
155.00 7.41 7.17 0.00
160.00 7.41 7.17 0.00
165.00 7.41 7.17 0.00
170.00 7.41 7.17 0.00
175.00 7.41 7.17 0.00
180.00 7.41 7.17 0.00
185.00 7.41 7.17 0.00
190.00 7.41 7.17 0.00
195.00 7.41 7.17 0.00
200.00 7.41 7.17 0.00
205.00 7.41 7.17 0.00
210.00 7.41 7.17 0.00
215.00 7.41 7.17 0.00
220.00 7.41 7.17 0.00
225.00 7.41 7.17 0.00
230.00 7.41 7.17 0.00
235.00 7.41 7.17 0.00
240.00 7.41 7.17 0.00
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 99HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment EX1B: EX1B - DRAINS SOUTH TO WETLAND A
Runoff = 13.41 cfs @ 12.08 hrs, Volume= 0.687 af, Depth= 5.72"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"
Area (sf) CN Description
7,290 98 Paved parking, HSG C
55,517 84
62,807 Weighted Average
55,517 88.39% Pervious Area
7,290 11.61% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment EX1B: EX1B - DRAINS SOUTH TO WETLAND A
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr
Rainfall=7.41"
Runoff Area=62,807 sf
Runoff Volume=0.687 af
Runoff Depth=5.72"
Tc=6.0 min
CN=WQ
13.41 cfs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 100HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment EX1B: EX1B - DRAINS SOUTH TO WETLAND A
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.15 0.00 0.00
10.00 0.79 0.10 0.19
15.00 6.96 5.33 0.47
20.00 7.29 5.64 0.04
25.00 7.41 5.76 0.00
30.00 7.41 5.76 0.00
35.00 7.41 5.76 0.00
40.00 7.41 5.76 0.00
45.00 7.41 5.76 0.00
50.00 7.41 5.76 0.00
55.00 7.41 5.76 0.00
60.00 7.41 5.76 0.00
65.00 7.41 5.76 0.00
70.00 7.41 5.76 0.00
75.00 7.41 5.76 0.00
80.00 7.41 5.76 0.00
85.00 7.41 5.76 0.00
90.00 7.41 5.76 0.00
95.00 7.41 5.76 0.00
100.00 7.41 5.76 0.00
105.00 7.41 5.76 0.00
110.00 7.41 5.76 0.00
115.00 7.41 5.76 0.00
120.00 7.41 5.76 0.00
125.00 7.41 5.76 0.00
130.00 7.41 5.76 0.00
135.00 7.41 5.76 0.00
140.00 7.41 5.76 0.00
145.00 7.41 5.76 0.00
150.00 7.41 5.76 0.00
155.00 7.41 5.76 0.00
160.00 7.41 5.76 0.00
165.00 7.41 5.76 0.00
170.00 7.41 5.76 0.00
175.00 7.41 5.76 0.00
180.00 7.41 5.76 0.00
185.00 7.41 5.76 0.00
190.00 7.41 5.76 0.00
195.00 7.41 5.76 0.00
200.00 7.41 5.76 0.00
205.00 7.41 5.76 0.00
210.00 7.41 5.76 0.00
215.00 7.41 5.76 0.00
220.00 7.41 5.76 0.00
225.00 7.41 5.76 0.00
230.00 7.41 5.76 0.00
235.00 7.41 5.76 0.00
240.00 7.41 5.76 0.00
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 101HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment EX1C: EX1C - DRAINS SOUTH TO WETLAND A
Runoff = 0.88 cfs @ 12.08 hrs, Volume= 0.044 af, Depth= 5.53"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"
Area (sf) CN Description
0 98 Paved parking, HSG C
* 4,200 84
4,200 Weighted Average
4,200 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment EX1C: EX1C - DRAINS SOUTH TO WETLAND A
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.95
0.9
0.85
0.8
0.75
0.7
0.65
0.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr
Rainfall=7.41"
Runoff Area=4,200 sf
Runoff Volume=0.044 af
Runoff Depth=5.53"
Tc=6.0 min
CN=WQ
0.88 cfs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 102HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment EX1C: EX1C - DRAINS SOUTH TO WETLAND A
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.15 0.00 0.00
10.00 0.79 0.07 0.01
15.00 6.96 5.11 0.03
20.00 7.29 5.41 0.00
25.00 7.41 5.53 0.00
30.00 7.41 5.53 0.00
35.00 7.41 5.53 0.00
40.00 7.41 5.53 0.00
45.00 7.41 5.53 0.00
50.00 7.41 5.53 0.00
55.00 7.41 5.53 0.00
60.00 7.41 5.53 0.00
65.00 7.41 5.53 0.00
70.00 7.41 5.53 0.00
75.00 7.41 5.53 0.00
80.00 7.41 5.53 0.00
85.00 7.41 5.53 0.00
90.00 7.41 5.53 0.00
95.00 7.41 5.53 0.00
100.00 7.41 5.53 0.00
105.00 7.41 5.53 0.00
110.00 7.41 5.53 0.00
115.00 7.41 5.53 0.00
120.00 7.41 5.53 0.00
125.00 7.41 5.53 0.00
130.00 7.41 5.53 0.00
135.00 7.41 5.53 0.00
140.00 7.41 5.53 0.00
145.00 7.41 5.53 0.00
150.00 7.41 5.53 0.00
155.00 7.41 5.53 0.00
160.00 7.41 5.53 0.00
165.00 7.41 5.53 0.00
170.00 7.41 5.53 0.00
175.00 7.41 5.53 0.00
180.00 7.41 5.53 0.00
185.00 7.41 5.53 0.00
190.00 7.41 5.53 0.00
195.00 7.41 5.53 0.00
200.00 7.41 5.53 0.00
205.00 7.41 5.53 0.00
210.00 7.41 5.53 0.00
215.00 7.41 5.53 0.00
220.00 7.41 5.53 0.00
225.00 7.41 5.53 0.00
230.00 7.41 5.53 0.00
235.00 7.41 5.53 0.00
240.00 7.41 5.53 0.00
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 103HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment EX2: EX2 - DRAINS SOUTH TO WETLAND B
Runoff = 1.24 cfs @ 12.08 hrs, Volume= 0.066 af, Depth= 6.20"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"
Area (sf) CN Description
2,278 98 Paved parking, HSG C
* 3,302 84
5,580 Weighted Average
3,302 59.18% Pervious Area
2,278 40.82% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment EX2: EX2 - DRAINS SOUTH TO WETLAND B
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)1
0
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr
Rainfall=7.41"
Runoff Area=5,580 sf
Runoff Volume=0.066 af
Runoff Depth=6.20"
Tc=6.0 min
CN=WQ
1.24 cfs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 104HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment EX2: EX2 - DRAINS SOUTH TO WETLAND B
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.15 0.00 0.00
10.00 0.79 0.19 0.02
15.00 6.96 5.79 0.04
20.00 7.29 6.10 0.00
25.00 7.41 6.23 0.00
30.00 7.41 6.23 0.00
35.00 7.41 6.23 0.00
40.00 7.41 6.23 0.00
45.00 7.41 6.23 0.00
50.00 7.41 6.23 0.00
55.00 7.41 6.23 0.00
60.00 7.41 6.23 0.00
65.00 7.41 6.23 0.00
70.00 7.41 6.23 0.00
75.00 7.41 6.23 0.00
80.00 7.41 6.23 0.00
85.00 7.41 6.23 0.00
90.00 7.41 6.23 0.00
95.00 7.41 6.23 0.00
100.00 7.41 6.23 0.00
105.00 7.41 6.23 0.00
110.00 7.41 6.23 0.00
115.00 7.41 6.23 0.00
120.00 7.41 6.23 0.00
125.00 7.41 6.23 0.00
130.00 7.41 6.23 0.00
135.00 7.41 6.23 0.00
140.00 7.41 6.23 0.00
145.00 7.41 6.23 0.00
150.00 7.41 6.23 0.00
155.00 7.41 6.23 0.00
160.00 7.41 6.23 0.00
165.00 7.41 6.23 0.00
170.00 7.41 6.23 0.00
175.00 7.41 6.23 0.00
180.00 7.41 6.23 0.00
185.00 7.41 6.23 0.00
190.00 7.41 6.23 0.00
195.00 7.41 6.23 0.00
200.00 7.41 6.23 0.00
205.00 7.41 6.23 0.00
210.00 7.41 6.23 0.00
215.00 7.41 6.23 0.00
220.00 7.41 6.23 0.00
225.00 7.41 6.23 0.00
230.00 7.41 6.23 0.00
235.00 7.41 6.23 0.00
240.00 7.41 6.23 0.00
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 105HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment OFFSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B
Runoff = 10.68 cfs @ 12.08 hrs, Volume= 0.552 af, Depth= 5.82"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"
Area (sf) CN Description
8,875 98 Paved parking, HSG C
* 40,698 84
49,573 Weighted Average
40,698 82.10% Pervious Area
8,875 17.90% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment OFFSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)11
10
9
8
7
6
5
4
3
2
1
0
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr
Rainfall=7.41"
Runoff Area=49,573 sf
Runoff Volume=0.552 af
Runoff Depth=5.82"
Tc=6.0 min
CN=WQ
10.68 cfs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 106HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment OFFSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.15 0.00 0.00
10.00 0.79 0.12 0.16
15.00 6.96 5.44 0.37
20.00 7.29 5.76 0.03
25.00 7.41 5.88 0.00
30.00 7.41 5.88 0.00
35.00 7.41 5.88 0.00
40.00 7.41 5.88 0.00
45.00 7.41 5.88 0.00
50.00 7.41 5.88 0.00
55.00 7.41 5.88 0.00
60.00 7.41 5.88 0.00
65.00 7.41 5.88 0.00
70.00 7.41 5.88 0.00
75.00 7.41 5.88 0.00
80.00 7.41 5.88 0.00
85.00 7.41 5.88 0.00
90.00 7.41 5.88 0.00
95.00 7.41 5.88 0.00
100.00 7.41 5.88 0.00
105.00 7.41 5.88 0.00
110.00 7.41 5.88 0.00
115.00 7.41 5.88 0.00
120.00 7.41 5.88 0.00
125.00 7.41 5.88 0.00
130.00 7.41 5.88 0.00
135.00 7.41 5.88 0.00
140.00 7.41 5.88 0.00
145.00 7.41 5.88 0.00
150.00 7.41 5.88 0.00
155.00 7.41 5.88 0.00
160.00 7.41 5.88 0.00
165.00 7.41 5.88 0.00
170.00 7.41 5.88 0.00
175.00 7.41 5.88 0.00
180.00 7.41 5.88 0.00
185.00 7.41 5.88 0.00
190.00 7.41 5.88 0.00
195.00 7.41 5.88 0.00
200.00 7.41 5.88 0.00
205.00 7.41 5.88 0.00
210.00 7.41 5.88 0.00
215.00 7.41 5.88 0.00
220.00 7.41 5.88 0.00
225.00 7.41 5.88 0.00
230.00 7.41 5.88 0.00
235.00 7.41 5.88 0.00
240.00 7.41 5.88 0.00
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 107HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment OFFSITE B: OFFSITE B- DRAINS SOUTH TO WETLAND A
Runoff = 15.90 cfs @ 12.08 hrs, Volume= 0.811 af, Depth= 5.66"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"
Area (sf) CN Description
6,076 98 Paved parking, HSG C
* 68,789 84
74,865 Weighted Average
68,789 91.88% Pervious Area
6,076 8.12% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment OFFSITE B: OFFSITE B- DRAINS SOUTH TO WETLAND A
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr
Rainfall=7.41"
Runoff Area=74,865 sf
Runoff Volume=0.811 af
Runoff Depth=5.66"
Tc=6.0 min
CN=WQ
15.90 cfs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 108HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment OFFSITE B: OFFSITE B- DRAINS SOUTH TO WETLAND A
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.15 0.00 0.00
10.00 0.79 0.09 0.21
15.00 6.96 5.22 0.56
20.00 7.29 5.53 0.05
25.00 7.41 5.65 0.00
30.00 7.41 5.65 0.00
35.00 7.41 5.65 0.00
40.00 7.41 5.65 0.00
45.00 7.41 5.65 0.00
50.00 7.41 5.65 0.00
55.00 7.41 5.65 0.00
60.00 7.41 5.65 0.00
65.00 7.41 5.65 0.00
70.00 7.41 5.65 0.00
75.00 7.41 5.65 0.00
80.00 7.41 5.65 0.00
85.00 7.41 5.65 0.00
90.00 7.41 5.65 0.00
95.00 7.41 5.65 0.00
100.00 7.41 5.65 0.00
105.00 7.41 5.65 0.00
110.00 7.41 5.65 0.00
115.00 7.41 5.65 0.00
120.00 7.41 5.65 0.00
125.00 7.41 5.65 0.00
130.00 7.41 5.65 0.00
135.00 7.41 5.65 0.00
140.00 7.41 5.65 0.00
145.00 7.41 5.65 0.00
150.00 7.41 5.65 0.00
155.00 7.41 5.65 0.00
160.00 7.41 5.65 0.00
165.00 7.41 5.65 0.00
170.00 7.41 5.65 0.00
175.00 7.41 5.65 0.00
180.00 7.41 5.65 0.00
185.00 7.41 5.65 0.00
190.00 7.41 5.65 0.00
195.00 7.41 5.65 0.00
200.00 7.41 5.65 0.00
205.00 7.41 5.65 0.00
210.00 7.41 5.65 0.00
215.00 7.41 5.65 0.00
220.00 7.41 5.65 0.00
225.00 7.41 5.65 0.00
230.00 7.41 5.65 0.00
235.00 7.41 5.65 0.00
240.00 7.41 5.65 0.00
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 109HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A
[40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 3.257 ac, 9.42% Impervious, Inflow Depth = 5.68" for 100y 24hr event
Inflow = 30.18 cfs @ 12.08 hrs, Volume= 1.543 af
Outflow = 30.18 cfs @ 12.08 hrs, Volume= 1.543 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Reach DA2: DA2 - TOTAL FLOW TO WETLAND A
Inflow
Outflow
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)32
30
28
26
24
22
20
18
16
14
12
10
8
6
4
2
0
Inflow Area=3.257 ac
30.18 cfs
30.18 cfs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 110HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A
Time
(hours)
Inflow
(cfs)
Elevation
(feet)
Outflow
(cfs)
0.00 0.00 0.00
5.00 0.01 0.01
10.00 0.40 0.40
15.00 1.06 1.06
20.00 0.10 0.10
25.00 0.00 0.00
30.00 0.00 0.00
35.00 0.00 0.00
40.00 0.00 0.00
45.00 0.00 0.00
50.00 0.00 0.00
55.00 0.00 0.00
60.00 0.00 0.00
65.00 0.00 0.00
70.00 0.00 0.00
75.00 0.00 0.00
80.00 0.00 0.00
85.00 0.00 0.00
90.00 0.00 0.00
95.00 0.00 0.00
100.00 0.00 0.00
105.00 0.00 0.00
110.00 0.00 0.00
115.00 0.00 0.00
120.00 0.00 0.00
125.00 0.00 0.00
130.00 0.00 0.00
135.00 0.00 0.00
140.00 0.00 0.00
145.00 0.00 0.00
150.00 0.00 0.00
155.00 0.00 0.00
160.00 0.00 0.00
165.00 0.00 0.00
170.00 0.00 0.00
175.00 0.00 0.00
180.00 0.00 0.00
185.00 0.00 0.00
190.00 0.00 0.00
195.00 0.00 0.00
200.00 0.00 0.00
205.00 0.00 0.00
210.00 0.00 0.00
215.00 0.00 0.00
220.00 0.00 0.00
225.00 0.00 0.00
230.00 0.00 0.00
235.00 0.00 0.00
240.00 0.00 0.00
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 111HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B
[40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 4.523 ac, 12.44% Impervious, Inflow Depth = 5.73" for 100y 24hr event
Inflow = 30.31 cfs @ 12.11 hrs, Volume= 2.161 af
Outflow = 30.31 cfs @ 12.11 hrs, Volume= 2.161 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Reach DA3: DA3 - TOTAL FLOW TO WETLAND B
Inflow
Outflow
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)32
30
28
26
24
22
20
18
16
14
12
10
8
6
4
2
0
Inflow Area=4.523 ac
30.31 cfs
30.31 cfs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 112HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B
Time
(hours)
Inflow
(cfs)
Elevation
(feet)
Outflow
(cfs)
0.00 0.00 0.00
5.00 0.01 0.01
10.00 0.47 0.47
15.00 1.48 1.48
20.00 0.14 0.14
25.00 0.03 0.03
30.00 0.00 0.00
35.00 0.00 0.00
40.00 0.00 0.00
45.00 0.00 0.00
50.00 0.00 0.00
55.00 0.00 0.00
60.00 0.00 0.00
65.00 0.00 0.00
70.00 0.00 0.00
75.00 0.00 0.00
80.00 0.00 0.00
85.00 0.00 0.00
90.00 0.00 0.00
95.00 0.00 0.00
100.00 0.00 0.00
105.00 0.00 0.00
110.00 0.00 0.00
115.00 0.00 0.00
120.00 0.00 0.00
125.00 0.00 0.00
130.00 0.00 0.00
135.00 0.00 0.00
140.00 0.00 0.00
145.00 0.00 0.00
150.00 0.00 0.00
155.00 0.00 0.00
160.00 0.00 0.00
165.00 0.00 0.00
170.00 0.00 0.00
175.00 0.00 0.00
180.00 0.00 0.00
185.00 0.00 0.00
190.00 0.00 0.00
195.00 0.00 0.00
200.00 0.00 0.00
205.00 0.00 0.00
210.00 0.00 0.00
215.00 0.00 0.00
220.00 0.00 0.00
225.00 0.00 0.00
230.00 0.00 0.00
235.00 0.00 0.00
240.00 0.00 0.00
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 113HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Pond 1P: WETLAND A
Inflow Area = 3.257 ac, 9.42% Impervious, Inflow Depth = 5.68" for 100y 24hr event
Inflow = 30.18 cfs @ 12.08 hrs, Volume= 1.543 af
Outflow = 20.71 cfs @ 12.15 hrs, Volume= 1.543 af, Atten= 31%, Lag= 3.8 min
Primary = 20.71 cfs @ 12.15 hrs, Volume= 1.543 af
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Peak Elev= 970.46' @ 12.15 hrs Surf.Area= 14,125 sf Storage= 10,705 cf
Plug-Flow detention time= 16.4 min calculated for 1.543 af (100% of inflow)
Center-of-Mass det. time= 16.4 min ( 780.9 - 764.5 )
Volume Invert Avail.Storage Storage Description
#1 969.62' 18,824 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
969.62 11,466 0 0
970.00 12,553 4,564 4,564
971.00 15,967 14,260 18,824
Device Routing Invert Outlet Devices
#1 Primary 969.62'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60
Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64
Primary OutFlow Max=20.69 cfs @ 12.15 hrs HW=970.46' (Free Discharge)
1=Broad-Crested Rectangular Weir (Weir Controls 20.69 cfs @ 2.46 fps)
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 114HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Pond 1P: WETLAND A
Inflow
Primary
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)32
30
28
26
24
22
20
18
16
14
12
10
8
6
4
2
0
Inflow Area=3.257 ac
Peak Elev=970.46'
Storage=10,705 cf
30.18 cfs
20.71 cfs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 115HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Pond 1P: WETLAND A
Time
(hours)
Inflow
(cfs)
Storage
(cubic-feet)
Elevation
(feet)
Primary
(cfs)
0.00 0.00 0 969.62 0.00
5.00 0.01 17 969.62 0.00
10.00 0.40 585 969.67 0.29
15.00 1.06 1,424 969.74 1.07
20.00 0.10 290 969.65 0.10
25.00 0.00 112 969.63 0.03
30.00 0.00 1 969.62 0.00
35.00 0.00 0 969.62 0.00
40.00 0.00 0 969.62 0.00
45.00 0.00 0 969.62 0.00
50.00 0.00 0 969.62 0.00
55.00 0.00 0 969.62 0.00
60.00 0.00 0 969.62 0.00
65.00 0.00 0 969.62 0.00
70.00 0.00 0 969.62 0.00
75.00 0.00 0 969.62 0.00
80.00 0.00 0 969.62 0.00
85.00 0.00 0 969.62 0.00
90.00 0.00 0 969.62 0.00
95.00 0.00 0 969.62 0.00
100.00 0.00 0 969.62 0.00
105.00 0.00 0 969.62 0.00
110.00 0.00 0 969.62 0.00
115.00 0.00 0 969.62 0.00
120.00 0.00 0 969.62 0.00
125.00 0.00 0 969.62 0.00
130.00 0.00 0 969.62 0.00
135.00 0.00 0 969.62 0.00
140.00 0.00 0 969.62 0.00
145.00 0.00 0 969.62 0.00
150.00 0.00 0 969.62 0.00
155.00 0.00 0 969.62 0.00
160.00 0.00 0 969.62 0.00
165.00 0.00 0 969.62 0.00
170.00 0.00 0 969.62 0.00
175.00 0.00 0 969.62 0.00
180.00 0.00 0 969.62 0.00
185.00 0.00 0 969.62 0.00
190.00 0.00 0 969.62 0.00
195.00 0.00 0 969.62 0.00
200.00 0.00 0 969.62 0.00
205.00 0.00 0 969.62 0.00
210.00 0.00 0 969.62 0.00
215.00 0.00 0 969.62 0.00
220.00 0.00 0 969.62 0.00
225.00 0.00 0 969.62 0.00
230.00 0.00 0 969.62 0.00
235.00 0.00 0 969.62 0.00
240.00 0.00 0 969.62 0.00
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 116HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Stage-Discharge for Pond 1P: WETLAND A
Elevation
(feet)
Primary
(cfs)
969.62 0.00
969.63 0.02
969.64 0.07
969.65 0.13
969.66 0.20
969.67 0.28
969.68 0.37
969.69 0.46
969.70 0.56
969.71 0.67
969.72 0.79
969.73 0.91
969.74 1.04
969.75 1.17
969.76 1.30
969.77 1.45
969.78 1.59
969.79 1.75
969.80 1.90
969.81 2.06
969.82 2.23
969.83 2.40
969.84 2.58
969.85 2.76
969.86 2.94
969.87 3.13
969.88 3.33
969.89 3.53
969.90 3.73
969.91 3.94
969.92 4.15
969.93 4.36
969.94 4.58
969.95 4.81
969.96 5.03
969.97 5.26
969.98 5.50
969.99 5.74
970.00 5.98
970.01 6.23
970.02 6.48
970.03 6.74
970.04 7.01
970.05 7.28
970.06 7.55
970.07 7.83
970.08 8.12
970.09 8.41
970.10 8.70
970.11 9.00
970.12 9.30
970.13 9.60
Elevation
(feet)
Primary
(cfs)
970.14 9.91
970.15 10.23
970.16 10.55
970.17 10.87
970.18 11.20
970.19 11.53
970.20 11.86
970.21 12.20
970.22 12.55
970.23 12.86
970.24 13.18
970.25 13.49
970.26 13.81
970.27 14.14
970.28 14.46
970.29 14.79
970.30 15.12
970.31 15.45
970.32 15.78
970.33 16.12
970.34 16.46
970.35 16.80
970.36 17.14
970.37 17.49
970.38 17.84
970.39 18.19
970.40 18.54
970.41 18.89
970.42 19.25
970.43 19.61
970.44 19.97
970.45 20.33
970.46 20.69
970.47 21.06
970.48 21.43
970.49 21.80
970.50 22.17
970.51 22.55
970.52 22.92
970.53 23.30
970.54 23.68
970.55 24.07
970.56 24.45
970.57 24.84
970.58 25.23
970.59 25.62
970.60 26.01
970.61 26.40
970.62 26.80
970.63 27.21
970.64 27.62
970.65 28.03
Elevation
(feet)
Primary
(cfs)
970.66 28.45
970.67 28.86
970.68 29.28
970.69 29.70
970.70 30.12
970.71 30.55
970.72 30.98
970.73 31.41
970.74 31.84
970.75 32.27
970.76 32.71
970.77 33.14
970.78 33.58
970.79 34.02
970.80 34.47
970.81 34.91
970.82 35.36
970.83 35.79
970.84 36.22
970.85 36.65
970.86 37.09
970.87 37.52
970.88 37.96
970.89 38.40
970.90 38.84
970.91 39.28
970.92 39.72
970.93 40.17
970.94 40.61
970.95 41.06
970.96 41.51
970.97 41.96
970.98 42.41
970.99 42.86
971.00 43.32
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 117HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Pond 5P: Wetland B
[44] Hint: Outlet device #1 is below defined storage
[95] Warning: Outlet Device #1 rise exceeded
Inflow Area = 12.870 ac, 24.01% Impervious, Inflow Depth = 5.80" for 100y 24hr event
Inflow = 85.95 cfs @ 12.12 hrs, Volume= 6.220 af
Outflow = 85.29 cfs @ 12.13 hrs, Volume= 6.220 af, Atten= 1%, Lag= 0.9 min
Primary = 85.29 cfs @ 12.13 hrs, Volume= 6.220 af
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Peak Elev= 961.63' @ 12.13 hrs Surf.Area= 149,310 sf Storage= 4,047 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 0.8 min ( 769.9 - 769.1 )
Volume Invert Avail.Storage Storage Description
#1 961.60' 841,104 cf Custom Stage Data (Conic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store Wet.Area
(feet) (sq-ft) (cubic-feet) (cubic-feet) (sq-ft)
961.60 149,000 0 0 149,000
962.00 153,597 60,517 60,517 153,630
964.00 201,325 353,847 414,364 201,451
966.00 225,646 426,740 841,104 225,991
Device Routing Invert Outlet Devices
#1 Primary 960.82'Asymmetrical Weir, C= 3.27
Offset (feet) -70.00 -41.00 0.00 49.00 87.00
Height (feet) 0.35 0.09 0.00 0.09 0.35
Primary OutFlow Max=136.39 cfs @ 12.13 hrs HW=961.63' (Free Discharge)
1=Asymmetrical Weir (Weir Controls 136.39 cfs @ 2.79 fps)
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 118HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Pond 5P: Wetland B
Inflow
Primary
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
Inflow Area=12.870 ac
Peak Elev=961.63'
Storage=4,047 cf
85.95 cfs
85.29 cfs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 119HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Pond 5P: Wetland B
Time
(hours)
Inflow
(cfs)
Storage
(cubic-feet)
Elevation
(feet)
Primary
(cfs)
0.00 0.00 0 961.60 0.00
5.00 0.04 2 961.60 0.04
10.00 1.64 77 961.60 1.63
15.00 4.22 200 961.60 4.22
20.00 0.39 19 961.60 0.39
25.00 0.03 1 961.60 0.03
30.00 0.00 0 961.60 0.00
35.00 0.00 0 961.60 0.00
40.00 0.00 0 961.60 0.00
45.00 0.00 0 961.60 0.00
50.00 0.00 0 961.60 0.00
55.00 0.00 0 961.60 0.00
60.00 0.00 0 961.60 0.00
65.00 0.00 0 961.60 0.00
70.00 0.00 0 961.60 0.00
75.00 0.00 0 961.60 0.00
80.00 0.00 0 961.60 0.00
85.00 0.00 0 961.60 0.00
90.00 0.00 0 961.60 0.00
95.00 0.00 0 961.60 0.00
100.00 0.00 0 961.60 0.00
105.00 0.00 0 961.60 0.00
110.00 0.00 0 961.60 0.00
115.00 0.00 0 961.60 0.00
120.00 0.00 0 961.60 0.00
125.00 0.00 0 961.60 0.00
130.00 0.00 0 961.60 0.00
135.00 0.00 0 961.60 0.00
140.00 0.00 0 961.60 0.00
145.00 0.00 0 961.60 0.00
150.00 0.00 0 961.60 0.00
155.00 0.00 0 961.60 0.00
160.00 0.00 0 961.60 0.00
165.00 0.00 0 961.60 0.00
170.00 0.00 0 961.60 0.00
175.00 0.00 0 961.60 0.00
180.00 0.00 0 961.60 0.00
185.00 0.00 0 961.60 0.00
190.00 0.00 0 961.60 0.00
195.00 0.00 0 961.60 0.00
200.00 0.00 0 961.60 0.00
205.00 0.00 0 961.60 0.00
210.00 0.00 0 961.60 0.00
215.00 0.00 0 961.60 0.00
220.00 0.00 0 961.60 0.00
225.00 0.00 0 961.60 0.00
230.00 0.00 0 961.60 0.00
235.00 0.00 0 961.60 0.00
240.00 0.00 0 961.60 0.00
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- EXISTING
Printed 5/13/2022Prepared by {enter your company name here}
Page 120HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Stage-Discharge for Pond 5P: Wetland B
Elevation
(feet)
Primary
(cfs)
961.60 0.00
961.65 139.02
961.70 144.59
961.75 149.95
961.80 155.13
961.85 160.13
961.90 164.98
961.95 169.69
962.00 174.28
962.05 178.74
962.10 183.09
962.15 187.35
962.20 191.51
962.25 195.57
962.30 199.56
962.35 203.47
962.40 207.30
962.45 211.06
962.50 214.76
962.55 218.40
962.60 221.97
962.65 225.49
962.70 228.95
962.75 232.36
962.80 235.73
962.85 239.04
962.90 242.31
962.95 245.54
963.00 248.72
963.05 251.87
963.10 254.97
963.15 258.04
963.20 261.07
963.25 264.07
963.30 267.03
963.35 269.96
963.40 272.86
963.45 275.73
963.50 278.56
963.55 281.37
963.60 284.16
963.65 286.91
963.70 289.64
963.75 292.34
963.80 295.02
963.85 297.68
963.90 300.31
963.95 302.92
964.00 305.50
964.05 308.07
964.10 310.61
964.15 313.13
Elevation
(feet)
Primary
(cfs)
964.20 315.63
964.25 318.12
964.30 320.58
964.35 323.02
964.40 325.45
964.45 327.86
964.50 330.25
964.55 332.62
964.60 334.98
964.65 337.32
964.70 339.64
964.75 341.95
964.80 344.24
964.85 346.52
964.90 348.78
964.95 351.03
965.00 353.26
965.05 355.48
965.10 357.69
965.15 359.88
965.20 362.06
965.25 364.23
965.30 366.38
965.35 368.52
965.40 370.65
965.45 372.76
965.50 374.87
965.55 376.96
965.60 379.04
965.65 381.11
965.70 383.17
965.75 385.22
965.80 387.25
965.85 389.28
965.90 391.29
965.95 393.30
966.00 395.29
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST
Printed 5/13/2022Prepared by {enter your company name here}
Page 121HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Time span=0.00-240.00 hrs, dt=0.01 hrs, 24001 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Stor-Ind method - Pond routing by Stor-Ind method
Runoff Area=125,400 sf 0.00% Impervious Runoff Depth>6.96"Subcatchment 6S: UNDISTURBED
Tc=6.0 min AMC Adjusted CN=98 Runoff=0.55 cfs 1.670 af
Runoff Area=238,192 sf 46.22% Impervious Runoff Depth>6.96"Subcatchment 7S: OFFSITE WETLAND B
Flow Length=1,100' Slope=0.1500 '/' Tc=13.4 min AMC Adjusted CN=WQ Runoff=1.04 cfs 3.171 af
Runoff Area=3,245 sf 100.00% Impervious Runoff Depth>6.96"Subcatchment EX1A: EX1A - DRAINS
Tc=6.0 min CN=WQ Runoff=0.01 cfs 0.043 af
Runoff Area=62,807 sf 11.61% Impervious Runoff Depth>6.96"Subcatchment EX1B: EX1B - DRAINS
Tc=6.0 min AMC Adjusted CN=WQ Runoff=0.28 cfs 0.836 af
Runoff Area=4,200 sf 0.00% Impervious Runoff Depth>6.96"Subcatchment EX1C: EX1C - DRAINS
Tc=6.0 min AMC Adjusted CN=WQ Runoff=0.02 cfs 0.056 af
Runoff Area=5,580 sf 40.82% Impervious Runoff Depth>6.96"Subcatchment EX2: EX2 - DRAINS SOUTH
Tc=6.0 min AMC Adjusted CN=WQ Runoff=0.02 cfs 0.074 af
Runoff Area=49,573 sf 17.90% Impervious Runoff Depth>6.96"Subcatchment OFFSITE A: OFFSITE A -
Tc=6.0 min AMC Adjusted CN=WQ Runoff=0.22 cfs 0.660 af
Runoff Area=74,865 sf 8.12% Impervious Runoff Depth>6.96"Subcatchment OFFSITE B: OFFSITE B-
Tc=6.0 min AMC Adjusted CN=WQ Runoff=0.33 cfs 0.997 af
Inflow=0.62 cfs 1.889 afReach DA2: DA2 - TOTAL FLOW TO WETLAND A
Outflow=0.62 cfs 1.889 af
Inflow=0.85 cfs 2.620 afReach DA3: DA3 - TOTAL FLOW TO WETLAND B
Outflow=0.85 cfs 2.620 af
Peak Elev=969.70' Storage=981 cf Inflow=0.62 cfs 1.889 afPond 1P: WETLAND A
Outflow=0.61 cfs 1.885 af
Peak Elev=961.60' Storage=116 cf Inflow=2.45 cfs 7.460 afPond 5P: Wetland B
Outflow=2.44 cfs 7.460 af
Total Runoff Area = 12.944 ac Runoff Volume = 7.507 af Average Runoff Depth = 6.96"
75.55% Pervious = 9.780 ac 24.45% Impervious = 3.165 ac
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST
Printed 5/13/2022Prepared by {enter your company name here}
Page 122HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment 6S: UNDISTURBED
Runoff = 0.55 cfs @ 121.26 hrs, Volume= 1.670 af, Depth> 6.96"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=4
Area (sf) CN Adj Description
* 125,400 84 98
125,400 Weighted Average
125,400 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment 6S: UNDISTURBED
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
MN-RPBCWD_Snowmelt_10d_100_yr
Snowmelt 100yr 10d Rainfall=7.20"
AMC=4
Runoff Area=125,400 sf
Runoff Volume=1.670 af
Runoff Depth>6.96"
Tc=6.0 min
AMC Adjusted CN=98
0.55 cfs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST
Printed 5/13/2022Prepared by {enter your company name here}
Page 123HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment 6S: UNDISTURBED
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.04 0.00 0.00
10.00 0.12 0.02 0.02
15.00 0.20 0.07 0.03
20.00 0.28 0.13 0.04
25.00 0.37 0.21 0.04
30.00 0.46 0.29 0.05
35.00 0.56 0.37 0.05
40.00 0.66 0.46 0.05
45.00 0.76 0.56 0.06
50.00 0.86 0.66 0.06
55.00 0.97 0.76 0.06
60.00 1.08 0.87 0.06
65.00 1.19 0.98 0.07
70.00 1.31 1.10 0.07
75.00 1.44 1.22 0.07
80.00 1.57 1.35 0.08
85.00 1.71 1.49 0.08
90.00 1.86 1.64 0.09
95.00 2.03 1.80 0.10
100.00 2.20 1.97 0.10
105.00 2.40 2.17 0.13
110.00 2.65 2.42 0.15
115.00 2.94 2.70 0.20
120.00 3.53 3.29 0.51
125.00 4.27 4.03 0.28
130.00 4.62 4.39 0.17
135.00 4.87 4.63 0.13
140.00 5.06 4.83 0.10
145.00 5.23 4.99 0.09
150.00 5.39 5.15 0.09
155.00 5.53 5.30 0.08
160.00 5.67 5.43 0.08
165.00 5.80 5.56 0.07
170.00 5.92 5.68 0.07
175.00 6.03 5.80 0.06
180.00 6.14 5.91 0.06
185.00 6.25 6.01 0.06
190.00 6.36 6.12 0.06
195.00 6.46 6.22 0.06
200.00 6.55 6.32 0.06
205.00 6.65 6.41 0.05
210.00 6.74 6.50 0.05
215.00 6.82 6.58 0.05
220.00 6.91 6.67 0.05
225.00 6.98 6.75 0.05
230.00 7.06 6.82 0.04
235.00 7.13 6.89 0.04
240.00 7.20 6.96 0.04
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST
Printed 5/13/2022Prepared by {enter your company name here}
Page 124HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment 7S: OFFSITE WETLAND B WATERSHED
Runoff = 1.04 cfs @ 121.33 hrs, Volume= 3.171 af, Depth> 6.96"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=4
Area (sf) CN Adj Description
67,393 98 98 Unconnected roofs, HSG B
* 170,799 84 98 1/2 acre lots, 25% imp, HSG B
238,192 Weighted Average
128,099 53.78% Pervious Area
110,093 46.22% Impervious Area
67,393 61.21% Unconnected
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
7.9 200 0.1500 0.42 Sheet Flow,
Grass: Short n= 0.150 P2= 2.94"
5.5 900 0.1500 2.71 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
13.4 1,100 Total
Subcatchment 7S: OFFSITE WETLAND B WATERSHED
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)1
0
MN-RPBCWD_Snowmelt_10d_100_yr
Snowmelt 100yr 10d Rainfall=7.20"
AMC=4
Runoff Area=238,192 sf
Runoff Volume=3.171 af
Runoff Depth>6.96"
Flow Length=1,100'
Slope=0.1500 '/'
Tc=13.4 min
AMC Adjusted CN=WQ
1.04 cfs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST
Printed 5/13/2022Prepared by {enter your company name here}
Page 125HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment 7S: OFFSITE WETLAND B WATERSHED
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.04 0.00 0.00
10.00 0.12 0.02 0.04
15.00 0.20 0.07 0.06
20.00 0.28 0.13 0.08
25.00 0.37 0.21 0.08
30.00 0.46 0.29 0.09
35.00 0.56 0.37 0.10
40.00 0.66 0.46 0.10
45.00 0.76 0.56 0.11
50.00 0.86 0.66 0.11
55.00 0.97 0.76 0.12
60.00 1.08 0.87 0.12
65.00 1.19 0.98 0.12
70.00 1.31 1.10 0.13
75.00 1.44 1.22 0.14
80.00 1.57 1.35 0.15
85.00 1.71 1.49 0.16
90.00 1.86 1.64 0.17
95.00 2.03 1.80 0.19
100.00 2.20 1.97 0.19
105.00 2.40 2.17 0.24
110.00 2.65 2.42 0.28
115.00 2.94 2.70 0.37
120.00 3.53 3.29 0.95
125.00 4.27 4.03 0.55
130.00 4.62 4.39 0.32
135.00 4.87 4.63 0.24
140.00 5.06 4.83 0.20
145.00 5.23 4.99 0.18
150.00 5.39 5.15 0.17
155.00 5.53 5.30 0.16
160.00 5.67 5.43 0.15
165.00 5.80 5.56 0.14
170.00 5.92 5.68 0.13
175.00 6.03 5.80 0.12
180.00 6.14 5.91 0.12
185.00 6.25 6.01 0.12
190.00 6.36 6.12 0.11
195.00 6.46 6.22 0.11
200.00 6.55 6.32 0.11
205.00 6.65 6.41 0.10
210.00 6.74 6.50 0.10
215.00 6.82 6.58 0.09
220.00 6.91 6.67 0.09
225.00 6.98 6.75 0.09
230.00 7.06 6.82 0.08
235.00 7.13 6.89 0.08
240.00 7.20 6.96 0.07
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST
Printed 5/13/2022Prepared by {enter your company name here}
Page 126HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment EX1A: EX1A - DRAINS EAST DOWN LAKE LUCY ROAD
Runoff = 0.01 cfs @ 121.26 hrs, Volume= 0.043 af, Depth> 6.96"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=4
Area (sf) CN Description
3,245 98 Paved parking, HSG C
* 0 84
3,245 Weighted Average
3,245 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment EX1A: EX1A - DRAINS EAST DOWN LAKE LUCY ROAD
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.015
0.014
0.013
0.012
0.011
0.01
0.009
0.008
0.007
0.006
0.005
0.004
0.003
0.002
0.001
0
MN-RPBCWD_Snowmelt_10d_100_yr
Snowmelt 100yr 10d Rainfall=7.20"
AMC=4
Runoff Area=3,245 sf
Runoff Volume=0.043 af
Runoff Depth>6.96"
Tc=6.0 min
CN=WQ
0.01 cfs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST
Printed 5/13/2022Prepared by {enter your company name here}
Page 127HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment EX1A: EX1A - DRAINS EAST DOWN LAKE LUCY ROAD
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.04 0.00 0.00
10.00 0.12 0.02 0.00
15.00 0.20 0.07 0.00
20.00 0.28 0.13 0.00
25.00 0.37 0.21 0.00
30.00 0.46 0.29 0.00
35.00 0.56 0.37 0.00
40.00 0.66 0.46 0.00
45.00 0.76 0.56 0.00
50.00 0.86 0.66 0.00
55.00 0.97 0.76 0.00
60.00 1.08 0.87 0.00
65.00 1.19 0.98 0.00
70.00 1.31 1.10 0.00
75.00 1.44 1.22 0.00
80.00 1.57 1.35 0.00
85.00 1.71 1.49 0.00
90.00 1.86 1.64 0.00
95.00 2.03 1.80 0.00
100.00 2.20 1.97 0.00
105.00 2.40 2.17 0.00
110.00 2.65 2.42 0.00
115.00 2.94 2.70 0.01
120.00 3.53 3.29 0.01
125.00 4.27 4.03 0.01
130.00 4.62 4.39 0.00
135.00 4.87 4.63 0.00
140.00 5.06 4.83 0.00
145.00 5.23 4.99 0.00
150.00 5.39 5.15 0.00
155.00 5.53 5.30 0.00
160.00 5.67 5.43 0.00
165.00 5.80 5.56 0.00
170.00 5.92 5.68 0.00
175.00 6.03 5.80 0.00
180.00 6.14 5.91 0.00
185.00 6.25 6.01 0.00
190.00 6.36 6.12 0.00
195.00 6.46 6.22 0.00
200.00 6.55 6.32 0.00
205.00 6.65 6.41 0.00
210.00 6.74 6.50 0.00
215.00 6.82 6.58 0.00
220.00 6.91 6.67 0.00
225.00 6.98 6.75 0.00
230.00 7.06 6.82 0.00
235.00 7.13 6.89 0.00
240.00 7.20 6.96 0.00
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST
Printed 5/13/2022Prepared by {enter your company name here}
Page 128HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment EX1B: EX1B - DRAINS SOUTH TO WETLAND A
Runoff = 0.28 cfs @ 121.26 hrs, Volume= 0.836 af, Depth> 6.96"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=4
Area (sf) CN Adj Description
7,290 98 98 Paved parking, HSG C
55,517 84 98
62,807 Weighted Average
55,517 88.39% Pervious Area
7,290 11.61% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment EX1B: EX1B - DRAINS SOUTH TO WETLAND A
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.3
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
MN-RPBCWD_Snowmelt_10d_100_yr
Snowmelt 100yr 10d Rainfall=7.20"
AMC=4
Runoff Area=62,807 sf
Runoff Volume=0.836 af
Runoff Depth>6.96"
Tc=6.0 min
AMC Adjusted CN=WQ
0.28 cfs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST
Printed 5/13/2022Prepared by {enter your company name here}
Page 129HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment EX1B: EX1B - DRAINS SOUTH TO WETLAND A
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.04 0.00 0.00
10.00 0.12 0.02 0.01
15.00 0.20 0.07 0.02
20.00 0.28 0.13 0.02
25.00 0.37 0.21 0.02
30.00 0.46 0.29 0.02
35.00 0.56 0.37 0.03
40.00 0.66 0.46 0.03
45.00 0.76 0.56 0.03
50.00 0.86 0.66 0.03
55.00 0.97 0.76 0.03
60.00 1.08 0.87 0.03
65.00 1.19 0.98 0.03
70.00 1.31 1.10 0.03
75.00 1.44 1.22 0.04
80.00 1.57 1.35 0.04
85.00 1.71 1.49 0.04
90.00 1.86 1.64 0.05
95.00 2.03 1.80 0.05
100.00 2.20 1.97 0.05
105.00 2.40 2.17 0.06
110.00 2.65 2.42 0.08
115.00 2.94 2.70 0.10
120.00 3.53 3.29 0.25
125.00 4.27 4.03 0.14
130.00 4.62 4.39 0.08
135.00 4.87 4.63 0.06
140.00 5.06 4.83 0.05
145.00 5.23 4.99 0.05
150.00 5.39 5.15 0.04
155.00 5.53 5.30 0.04
160.00 5.67 5.43 0.04
165.00 5.80 5.56 0.04
170.00 5.92 5.68 0.03
175.00 6.03 5.80 0.03
180.00 6.14 5.91 0.03
185.00 6.25 6.01 0.03
190.00 6.36 6.12 0.03
195.00 6.46 6.22 0.03
200.00 6.55 6.32 0.03
205.00 6.65 6.41 0.03
210.00 6.74 6.50 0.03
215.00 6.82 6.58 0.02
220.00 6.91 6.67 0.02
225.00 6.98 6.75 0.02
230.00 7.06 6.82 0.02
235.00 7.13 6.89 0.02
240.00 7.20 6.96 0.02
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST
Printed 5/13/2022Prepared by {enter your company name here}
Page 130HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment EX1C: EX1C - DRAINS SOUTH TO WETLAND A
Runoff = 0.02 cfs @ 121.26 hrs, Volume= 0.056 af, Depth> 6.96"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=4
Area (sf) CN Adj Description
0 98 98 Paved parking, HSG C
* 4,200 84 98
4,200 Weighted Average
4,200 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment EX1C: EX1C - DRAINS SOUTH TO WETLAND A
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.02
0.019
0.018
0.017
0.016
0.015
0.014
0.013
0.012
0.011
0.01
0.009
0.008
0.007
0.006
0.005
0.004
0.003
0.002
0.001
0
MN-RPBCWD_Snowmelt_10d_100_yr
Snowmelt 100yr 10d Rainfall=7.20"
AMC=4
Runoff Area=4,200 sf
Runoff Volume=0.056 af
Runoff Depth>6.96"
Tc=6.0 min
AMC Adjusted CN=WQ
0.02 cfs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST
Printed 5/13/2022Prepared by {enter your company name here}
Page 131HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment EX1C: EX1C - DRAINS SOUTH TO WETLAND A
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.04 0.00 0.00
10.00 0.12 0.02 0.00
15.00 0.20 0.07 0.00
20.00 0.28 0.13 0.00
25.00 0.37 0.21 0.00
30.00 0.46 0.29 0.00
35.00 0.56 0.37 0.00
40.00 0.66 0.46 0.00
45.00 0.76 0.56 0.00
50.00 0.86 0.66 0.00
55.00 0.97 0.76 0.00
60.00 1.08 0.87 0.00
65.00 1.19 0.98 0.00
70.00 1.31 1.10 0.00
75.00 1.44 1.22 0.00
80.00 1.57 1.35 0.00
85.00 1.71 1.49 0.00
90.00 1.86 1.64 0.00
95.00 2.03 1.80 0.00
100.00 2.20 1.97 0.00
105.00 2.40 2.17 0.00
110.00 2.65 2.42 0.01
115.00 2.94 2.70 0.01
120.00 3.53 3.29 0.02
125.00 4.27 4.03 0.01
130.00 4.62 4.39 0.01
135.00 4.87 4.63 0.00
140.00 5.06 4.83 0.00
145.00 5.23 4.99 0.00
150.00 5.39 5.15 0.00
155.00 5.53 5.30 0.00
160.00 5.67 5.43 0.00
165.00 5.80 5.56 0.00
170.00 5.92 5.68 0.00
175.00 6.03 5.80 0.00
180.00 6.14 5.91 0.00
185.00 6.25 6.01 0.00
190.00 6.36 6.12 0.00
195.00 6.46 6.22 0.00
200.00 6.55 6.32 0.00
205.00 6.65 6.41 0.00
210.00 6.74 6.50 0.00
215.00 6.82 6.58 0.00
220.00 6.91 6.67 0.00
225.00 6.98 6.75 0.00
230.00 7.06 6.82 0.00
235.00 7.13 6.89 0.00
240.00 7.20 6.96 0.00
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST
Printed 5/13/2022Prepared by {enter your company name here}
Page 132HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment EX2: EX2 - DRAINS SOUTH TO WETLAND B
Runoff = 0.02 cfs @ 121.26 hrs, Volume= 0.074 af, Depth> 6.96"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=4
Area (sf) CN Adj Description
2,278 98 98 Paved parking, HSG C
* 3,302 84 98
5,580 Weighted Average
3,302 59.18% Pervious Area
2,278 40.82% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment EX2: EX2 - DRAINS SOUTH TO WETLAND B
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.026
0.024
0.022
0.02
0.018
0.016
0.014
0.012
0.01
0.008
0.006
0.004
0.002
0
MN-RPBCWD_Snowmelt_10d_100_yr
Snowmelt 100yr 10d Rainfall=7.20"
AMC=4
Runoff Area=5,580 sf
Runoff Volume=0.074 af
Runoff Depth>6.96"
Tc=6.0 min
AMC Adjusted CN=WQ
0.02 cfs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST
Printed 5/13/2022Prepared by {enter your company name here}
Page 133HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment EX2: EX2 - DRAINS SOUTH TO WETLAND B
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.04 0.00 0.00
10.00 0.12 0.02 0.00
15.00 0.20 0.07 0.00
20.00 0.28 0.13 0.00
25.00 0.37 0.21 0.00
30.00 0.46 0.29 0.00
35.00 0.56 0.37 0.00
40.00 0.66 0.46 0.00
45.00 0.76 0.56 0.00
50.00 0.86 0.66 0.00
55.00 0.97 0.76 0.00
60.00 1.08 0.87 0.00
65.00 1.19 0.98 0.00
70.00 1.31 1.10 0.00
75.00 1.44 1.22 0.00
80.00 1.57 1.35 0.00
85.00 1.71 1.49 0.00
90.00 1.86 1.64 0.00
95.00 2.03 1.80 0.00
100.00 2.20 1.97 0.00
105.00 2.40 2.17 0.01
110.00 2.65 2.42 0.01
115.00 2.94 2.70 0.01
120.00 3.53 3.29 0.02
125.00 4.27 4.03 0.01
130.00 4.62 4.39 0.01
135.00 4.87 4.63 0.01
140.00 5.06 4.83 0.00
145.00 5.23 4.99 0.00
150.00 5.39 5.15 0.00
155.00 5.53 5.30 0.00
160.00 5.67 5.43 0.00
165.00 5.80 5.56 0.00
170.00 5.92 5.68 0.00
175.00 6.03 5.80 0.00
180.00 6.14 5.91 0.00
185.00 6.25 6.01 0.00
190.00 6.36 6.12 0.00
195.00 6.46 6.22 0.00
200.00 6.55 6.32 0.00
205.00 6.65 6.41 0.00
210.00 6.74 6.50 0.00
215.00 6.82 6.58 0.00
220.00 6.91 6.67 0.00
225.00 6.98 6.75 0.00
230.00 7.06 6.82 0.00
235.00 7.13 6.89 0.00
240.00 7.20 6.96 0.00
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST
Printed 5/13/2022Prepared by {enter your company name here}
Page 134HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment OFFSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B
Runoff = 0.22 cfs @ 121.26 hrs, Volume= 0.660 af, Depth> 6.96"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=4
Area (sf) CN Adj Description
8,875 98 98 Paved parking, HSG C
* 40,698 84 98
49,573 Weighted Average
40,698 82.10% Pervious Area
8,875 17.90% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment OFFSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.24
0.23
0.22
0.21
0.2
0.19
0.18
0.17
0.16
0.15
0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
MN-RPBCWD_Snowmelt_10d_100_yr
Snowmelt 100yr 10d Rainfall=7.20"
AMC=4
Runoff Area=49,573 sf
Runoff Volume=0.660 af
Runoff Depth>6.96"
Tc=6.0 min
AMC Adjusted CN=WQ
0.22 cfs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST
Printed 5/13/2022Prepared by {enter your company name here}
Page 135HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment OFFSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.04 0.00 0.00
10.00 0.12 0.02 0.01
15.00 0.20 0.07 0.01
20.00 0.28 0.13 0.02
25.00 0.37 0.21 0.02
30.00 0.46 0.29 0.02
35.00 0.56 0.37 0.02
40.00 0.66 0.46 0.02
45.00 0.76 0.56 0.02
50.00 0.86 0.66 0.02
55.00 0.97 0.76 0.02
60.00 1.08 0.87 0.03
65.00 1.19 0.98 0.03
70.00 1.31 1.10 0.03
75.00 1.44 1.22 0.03
80.00 1.57 1.35 0.03
85.00 1.71 1.49 0.03
90.00 1.86 1.64 0.04
95.00 2.03 1.80 0.04
100.00 2.20 1.97 0.04
105.00 2.40 2.17 0.05
110.00 2.65 2.42 0.06
115.00 2.94 2.70 0.08
120.00 3.53 3.29 0.20
125.00 4.27 4.03 0.11
130.00 4.62 4.39 0.07
135.00 4.87 4.63 0.05
140.00 5.06 4.83 0.04
145.00 5.23 4.99 0.04
150.00 5.39 5.15 0.03
155.00 5.53 5.30 0.03
160.00 5.67 5.43 0.03
165.00 5.80 5.56 0.03
170.00 5.92 5.68 0.03
175.00 6.03 5.80 0.03
180.00 6.14 5.91 0.02
185.00 6.25 6.01 0.02
190.00 6.36 6.12 0.02
195.00 6.46 6.22 0.02
200.00 6.55 6.32 0.02
205.00 6.65 6.41 0.02
210.00 6.74 6.50 0.02
215.00 6.82 6.58 0.02
220.00 6.91 6.67 0.02
225.00 6.98 6.75 0.02
230.00 7.06 6.82 0.02
235.00 7.13 6.89 0.02
240.00 7.20 6.96 0.01
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST
Printed 5/13/2022Prepared by {enter your company name here}
Page 136HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment OFFSITE B: OFFSITE B- DRAINS SOUTH TO WETLAND A
Runoff = 0.33 cfs @ 121.26 hrs, Volume= 0.997 af, Depth> 6.96"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=4
Area (sf) CN Adj Description
6,076 98 98 Paved parking, HSG C
* 68,789 84 98
74,865 Weighted Average
68,789 91.88% Pervious Area
6,076 8.12% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment OFFSITE B: OFFSITE B- DRAINS SOUTH TO WETLAND A
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.36
0.34
0.32
0.3
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
MN-RPBCWD_Snowmelt_10d_100_yr
Snowmelt 100yr 10d Rainfall=7.20"
AMC=4
Runoff Area=74,865 sf
Runoff Volume=0.997 af
Runoff Depth>6.96"
Tc=6.0 min
AMC Adjusted CN=WQ
0.33 cfs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST
Printed 5/13/2022Prepared by {enter your company name here}
Page 137HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment OFFSITE B: OFFSITE B- DRAINS SOUTH TO WETLAND A
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.04 0.00 0.00
10.00 0.12 0.02 0.01
15.00 0.20 0.07 0.02
20.00 0.28 0.13 0.02
25.00 0.37 0.21 0.03
30.00 0.46 0.29 0.03
35.00 0.56 0.37 0.03
40.00 0.66 0.46 0.03
45.00 0.76 0.56 0.03
50.00 0.86 0.66 0.04
55.00 0.97 0.76 0.04
60.00 1.08 0.87 0.04
65.00 1.19 0.98 0.04
70.00 1.31 1.10 0.04
75.00 1.44 1.22 0.04
80.00 1.57 1.35 0.05
85.00 1.71 1.49 0.05
90.00 1.86 1.64 0.05
95.00 2.03 1.80 0.06
100.00 2.20 1.97 0.06
105.00 2.40 2.17 0.08
110.00 2.65 2.42 0.09
115.00 2.94 2.70 0.12
120.00 3.53 3.29 0.30
125.00 4.27 4.03 0.17
130.00 4.62 4.39 0.10
135.00 4.87 4.63 0.08
140.00 5.06 4.83 0.06
145.00 5.23 4.99 0.06
150.00 5.39 5.15 0.05
155.00 5.53 5.30 0.05
160.00 5.67 5.43 0.05
165.00 5.80 5.56 0.04
170.00 5.92 5.68 0.04
175.00 6.03 5.80 0.04
180.00 6.14 5.91 0.04
185.00 6.25 6.01 0.04
190.00 6.36 6.12 0.04
195.00 6.46 6.22 0.03
200.00 6.55 6.32 0.03
205.00 6.65 6.41 0.03
210.00 6.74 6.50 0.03
215.00 6.82 6.58 0.03
220.00 6.91 6.67 0.03
225.00 6.98 6.75 0.03
230.00 7.06 6.82 0.03
235.00 7.13 6.89 0.02
240.00 7.20 6.96 0.02
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST
Printed 5/13/2022Prepared by {enter your company name here}
Page 138HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A
[40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 3.257 ac, 9.42% Impervious, Inflow Depth > 6.96" for Snowmelt 100yr 10d event
Inflow = 0.62 cfs @ 121.26 hrs, Volume= 1.889 af
Outflow = 0.62 cfs @ 121.26 hrs, Volume= 1.889 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Reach DA2: DA2 - TOTAL FLOW TO WETLAND A
Inflow
Outflow
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.65
0.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
Inflow Area=3.257 ac
0.62 cfs
0.62 cfs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST
Printed 5/13/2022Prepared by {enter your company name here}
Page 139HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A
Time
(hours)
Inflow
(cfs)
Elevation
(feet)
Outflow
(cfs)
0.00 0.00 0.00
5.00 0.00 0.00
10.00 0.02 0.02
15.00 0.04 0.04
20.00 0.05 0.05
25.00 0.05 0.05
30.00 0.05 0.05
35.00 0.06 0.06
40.00 0.06 0.06
45.00 0.06 0.06
50.00 0.07 0.07
55.00 0.07 0.07
60.00 0.07 0.07
65.00 0.07 0.07
70.00 0.08 0.08
75.00 0.08 0.08
80.00 0.09 0.09
85.00 0.09 0.09
90.00 0.10 0.10
95.00 0.11 0.11
100.00 0.12 0.12
105.00 0.14 0.14
110.00 0.17 0.17
115.00 0.22 0.22
120.00 0.57 0.57
125.00 0.32 0.32
130.00 0.19 0.19
135.00 0.14 0.14
140.00 0.12 0.12
145.00 0.11 0.11
150.00 0.10 0.10
155.00 0.09 0.09
160.00 0.09 0.09
165.00 0.08 0.08
170.00 0.08 0.08
175.00 0.07 0.07
180.00 0.07 0.07
185.00 0.07 0.07
190.00 0.07 0.07
195.00 0.06 0.06
200.00 0.06 0.06
205.00 0.06 0.06
210.00 0.06 0.06
215.00 0.06 0.06
220.00 0.05 0.05
225.00 0.05 0.05
230.00 0.05 0.05
235.00 0.05 0.05
240.00 0.04 0.04
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST
Printed 5/13/2022Prepared by {enter your company name here}
Page 140HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B
[40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 4.523 ac, 12.44% Impervious, Inflow Depth > 6.95" for Snowmelt 100yr 10d event
Inflow = 0.85 cfs @ 121.30 hrs, Volume= 2.620 af
Outflow = 0.85 cfs @ 121.30 hrs, Volume= 2.620 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Reach DA3: DA3 - TOTAL FLOW TO WETLAND B
Inflow
Outflow
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.95
0.9
0.85
0.8
0.75
0.7
0.65
0.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
Inflow Area=4.523 ac
0.85 cfs
0.85 cfs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST
Printed 5/13/2022Prepared by {enter your company name here}
Page 141HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B
Time
(hours)
Inflow
(cfs)
Elevation
(feet)
Outflow
(cfs)
0.00 0.00 0.00
5.00 0.00 0.00
10.00 0.03 0.03
15.00 0.05 0.05
20.00 0.06 0.06
25.00 0.07 0.07
30.00 0.08 0.08
35.00 0.08 0.08
40.00 0.08 0.08
45.00 0.09 0.09
50.00 0.09 0.09
55.00 0.10 0.10
60.00 0.10 0.10
65.00 0.10 0.10
70.00 0.11 0.11
75.00 0.11 0.11
80.00 0.12 0.12
85.00 0.13 0.13
90.00 0.14 0.14
95.00 0.15 0.15
100.00 0.16 0.16
105.00 0.20 0.20
110.00 0.23 0.23
115.00 0.30 0.30
120.00 0.78 0.78
125.00 0.46 0.46
130.00 0.27 0.27
135.00 0.20 0.20
140.00 0.16 0.16
145.00 0.15 0.15
150.00 0.14 0.14
155.00 0.13 0.13
160.00 0.12 0.12
165.00 0.12 0.12
170.00 0.11 0.11
175.00 0.10 0.10
180.00 0.10 0.10
185.00 0.10 0.10
190.00 0.09 0.09
195.00 0.09 0.09
200.00 0.09 0.09
205.00 0.08 0.08
210.00 0.08 0.08
215.00 0.08 0.08
220.00 0.07 0.07
225.00 0.07 0.07
230.00 0.07 0.07
235.00 0.06 0.06
240.00 0.06 0.06
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST
Printed 5/13/2022Prepared by {enter your company name here}
Page 142HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Pond 1P: WETLAND A
Inflow Area = 3.257 ac, 9.42% Impervious, Inflow Depth > 6.96" for Snowmelt 100yr 10d event
Inflow = 0.62 cfs @ 121.26 hrs, Volume= 1.889 af
Outflow = 0.61 cfs @ 121.38 hrs, Volume= 1.885 af, Atten= 1%, Lag= 7.6 min
Primary = 0.61 cfs @ 121.38 hrs, Volume= 1.885 af
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Peak Elev= 969.70' @ 121.38 hrs Surf.Area= 11,708 sf Storage= 981 cf
Plug-Flow detention time= 45.5 min calculated for 1.885 af (100% of inflow)
Center-of-Mass det. time= 31.8 min ( 7,412.6 - 7,380.8 )
Volume Invert Avail.Storage Storage Description
#1 969.62' 18,824 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
969.62 11,466 0 0
970.00 12,553 4,564 4,564
971.00 15,967 14,260 18,824
Device Routing Invert Outlet Devices
#1 Primary 969.62'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60
Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64
Primary OutFlow Max=0.61 cfs @ 121.38 hrs HW=969.70' (Free Discharge)
1=Broad-Crested Rectangular Weir (Weir Controls 0.61 cfs @ 0.72 fps)
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST
Printed 5/13/2022Prepared by {enter your company name here}
Page 143HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Pond 1P: WETLAND A
Inflow
Primary
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.65
0.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
Inflow Area=3.257 ac
Peak Elev=969.70'
Storage=981 cf
0.62 cfs
0.61 cfs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST
Printed 5/13/2022Prepared by {enter your company name here}
Page 144HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Pond 1P: WETLAND A
Time
(hours)
Inflow
(cfs)
Storage
(cubic-feet)
Elevation
(feet)
Primary
(cfs)
0.00 0.00 0 969.62 0.00
5.00 0.00 0 969.62 0.00
10.00 0.02 78 969.63 0.02
15.00 0.04 137 969.63 0.03
20.00 0.05 167 969.63 0.04
25.00 0.05 179 969.64 0.05
30.00 0.05 189 969.64 0.05
35.00 0.06 197 969.64 0.06
40.00 0.06 202 969.64 0.06
45.00 0.06 207 969.64 0.06
50.00 0.07 215 969.64 0.07
55.00 0.07 221 969.64 0.07
60.00 0.07 226 969.64 0.07
65.00 0.07 231 969.64 0.07
70.00 0.08 241 969.64 0.08
75.00 0.08 248 969.64 0.08
80.00 0.09 257 969.64 0.09
85.00 0.09 273 969.64 0.09
90.00 0.10 291 969.65 0.10
95.00 0.11 309 969.65 0.11
100.00 0.12 318 969.65 0.11
105.00 0.14 365 969.65 0.14
110.00 0.17 407 969.66 0.17
115.00 0.22 483 969.66 0.21
120.00 0.57 921 969.70 0.56
125.00 0.32 656 969.68 0.34
130.00 0.19 450 969.66 0.19
135.00 0.14 370 969.65 0.15
140.00 0.12 326 969.65 0.12
145.00 0.11 301 969.65 0.11
150.00 0.10 287 969.64 0.10
155.00 0.09 274 969.64 0.09
160.00 0.09 260 969.64 0.09
165.00 0.08 251 969.64 0.08
170.00 0.08 238 969.64 0.08
175.00 0.07 230 969.64 0.07
180.00 0.07 225 969.64 0.07
185.00 0.07 223 969.64 0.07
190.00 0.07 218 969.64 0.07
195.00 0.06 212 969.64 0.06
200.00 0.06 207 969.64 0.06
205.00 0.06 201 969.64 0.06
210.00 0.06 196 969.64 0.06
215.00 0.06 191 969.64 0.06
220.00 0.05 187 969.64 0.05
225.00 0.05 182 969.64 0.05
230.00 0.05 177 969.64 0.05
235.00 0.05 171 969.63 0.05
240.00 0.04 161 969.63 0.04
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST
Printed 5/13/2022Prepared by {enter your company name here}
Page 145HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Stage-Discharge for Pond 1P: WETLAND A
Elevation
(feet)
Primary
(cfs)
969.62 0.00
969.63 0.02
969.64 0.07
969.65 0.13
969.66 0.20
969.67 0.28
969.68 0.37
969.69 0.46
969.70 0.56
969.71 0.67
969.72 0.79
969.73 0.91
969.74 1.04
969.75 1.17
969.76 1.30
969.77 1.45
969.78 1.59
969.79 1.75
969.80 1.90
969.81 2.06
969.82 2.23
969.83 2.40
969.84 2.58
969.85 2.76
969.86 2.94
969.87 3.13
969.88 3.33
969.89 3.53
969.90 3.73
969.91 3.94
969.92 4.15
969.93 4.36
969.94 4.58
969.95 4.81
969.96 5.03
969.97 5.26
969.98 5.50
969.99 5.74
970.00 5.98
970.01 6.23
970.02 6.48
970.03 6.74
970.04 7.01
970.05 7.28
970.06 7.55
970.07 7.83
970.08 8.12
970.09 8.41
970.10 8.70
970.11 9.00
970.12 9.30
970.13 9.60
Elevation
(feet)
Primary
(cfs)
970.14 9.91
970.15 10.23
970.16 10.55
970.17 10.87
970.18 11.20
970.19 11.53
970.20 11.86
970.21 12.20
970.22 12.55
970.23 12.86
970.24 13.18
970.25 13.49
970.26 13.81
970.27 14.14
970.28 14.46
970.29 14.79
970.30 15.12
970.31 15.45
970.32 15.78
970.33 16.12
970.34 16.46
970.35 16.80
970.36 17.14
970.37 17.49
970.38 17.84
970.39 18.19
970.40 18.54
970.41 18.89
970.42 19.25
970.43 19.61
970.44 19.97
970.45 20.33
970.46 20.69
970.47 21.06
970.48 21.43
970.49 21.80
970.50 22.17
970.51 22.55
970.52 22.92
970.53 23.30
970.54 23.68
970.55 24.07
970.56 24.45
970.57 24.84
970.58 25.23
970.59 25.62
970.60 26.01
970.61 26.40
970.62 26.80
970.63 27.21
970.64 27.62
970.65 28.03
Elevation
(feet)
Primary
(cfs)
970.66 28.45
970.67 28.86
970.68 29.28
970.69 29.70
970.70 30.12
970.71 30.55
970.72 30.98
970.73 31.41
970.74 31.84
970.75 32.27
970.76 32.71
970.77 33.14
970.78 33.58
970.79 34.02
970.80 34.47
970.81 34.91
970.82 35.36
970.83 35.79
970.84 36.22
970.85 36.65
970.86 37.09
970.87 37.52
970.88 37.96
970.89 38.40
970.90 38.84
970.91 39.28
970.92 39.72
970.93 40.17
970.94 40.61
970.95 41.06
970.96 41.51
970.97 41.96
970.98 42.41
970.99 42.86
971.00 43.32
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST
Printed 5/13/2022Prepared by {enter your company name here}
Page 146HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Pond 5P: Wetland B
[44] Hint: Outlet device #1 is below defined storage
[95] Warning: Outlet Device #1 rise exceeded
Inflow Area = 12.870 ac, 24.01% Impervious, Inflow Depth > 6.96" for Snowmelt 100yr 10d event
Inflow = 2.45 cfs @ 121.30 hrs, Volume= 7.460 af
Outflow = 2.44 cfs @ 121.31 hrs, Volume= 7.460 af, Atten= 0%, Lag= 0.5 min
Primary = 2.44 cfs @ 121.31 hrs, Volume= 7.460 af
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Peak Elev= 961.60' @ 121.31 hrs Surf.Area= 149,009 sf Storage= 116 cf
Plug-Flow detention time= 0.8 min calculated for 7.459 af (100% of inflow)
Center-of-Mass det. time= 0.6 min ( 7,391.8 - 7,391.2 )
Volume Invert Avail.Storage Storage Description
#1 961.60' 841,104 cf Custom Stage Data (Conic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store Wet.Area
(feet) (sq-ft) (cubic-feet) (cubic-feet) (sq-ft)
961.60 149,000 0 0 149,000
962.00 153,597 60,517 60,517 153,630
964.00 201,325 353,847 414,364 201,451
966.00 225,646 426,740 841,104 225,991
Device Routing Invert Outlet Devices
#1 Primary 960.82'Asymmetrical Weir, C= 3.27
Offset (feet) -70.00 -41.00 0.00 49.00 87.00
Height (feet) 0.35 0.09 0.00 0.09 0.35
Primary OutFlow Max=133.30 cfs @ 121.31 hrs HW=961.60' (Free Discharge)
1=Asymmetrical Weir (Weir Controls 133.30 cfs @ 2.72 fps)
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST
Printed 5/13/2022Prepared by {enter your company name here}
Page 147HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Pond 5P: Wetland B
Inflow
Primary
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)2
1
0
Inflow Area=12.870 ac
Peak Elev=961.60'
Storage=116 cf
2.45 cfs
2.44 cfs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST
Printed 5/13/2022Prepared by {enter your company name here}
Page 148HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Pond 5P: Wetland B
Time
(hours)
Inflow
(cfs)
Storage
(cubic-feet)
Elevation
(feet)
Primary
(cfs)
0.00 0.00 0 961.60 0.00
5.00 0.00 0 961.60 0.00
10.00 0.09 4 961.60 0.09
15.00 0.14 7 961.60 0.14
20.00 0.18 8 961.60 0.18
25.00 0.20 9 961.60 0.20
30.00 0.22 10 961.60 0.22
35.00 0.23 11 961.60 0.23
40.00 0.24 11 961.60 0.24
45.00 0.25 12 961.60 0.25
50.00 0.26 13 961.60 0.26
55.00 0.27 13 961.60 0.27
60.00 0.28 13 961.60 0.28
65.00 0.29 14 961.60 0.29
70.00 0.31 15 961.60 0.31
75.00 0.33 15 961.60 0.32
80.00 0.34 16 961.60 0.34
85.00 0.37 18 961.60 0.37
90.00 0.41 19 961.60 0.41
95.00 0.44 21 961.60 0.44
100.00 0.46 22 961.60 0.46
105.00 0.57 27 961.60 0.57
110.00 0.67 32 961.60 0.67
115.00 0.87 41 961.60 0.86
120.00 2.24 106 961.60 2.24
125.00 1.29 61 961.60 1.29
130.00 0.75 36 961.60 0.75
135.00 0.57 27 961.60 0.57
140.00 0.46 22 961.60 0.46
145.00 0.42 20 961.60 0.42
150.00 0.39 19 961.60 0.39
155.00 0.37 18 961.60 0.37
160.00 0.34 16 961.60 0.34
165.00 0.33 16 961.60 0.33
170.00 0.30 14 961.60 0.30
175.00 0.29 14 961.60 0.29
180.00 0.28 13 961.60 0.28
185.00 0.28 13 961.60 0.28
190.00 0.27 13 961.60 0.27
195.00 0.26 12 961.60 0.26
200.00 0.25 12 961.60 0.25
205.00 0.24 11 961.60 0.24
210.00 0.23 11 961.60 0.23
215.00 0.22 10 961.60 0.22
220.00 0.21 10 961.60 0.21
225.00 0.20 10 961.60 0.20
230.00 0.19 9 961.60 0.19
235.00 0.18 9 961.60 0.18
240.00 0.16 8 961.60 0.16
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- EXIST
Printed 5/13/2022Prepared by {enter your company name here}
Page 149HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Stage-Discharge for Pond 5P: Wetland B
Elevation
(feet)
Primary
(cfs)
961.60 0.00
961.65 139.02
961.70 144.59
961.75 149.95
961.80 155.13
961.85 160.13
961.90 164.98
961.95 169.69
962.00 174.28
962.05 178.74
962.10 183.09
962.15 187.35
962.20 191.51
962.25 195.57
962.30 199.56
962.35 203.47
962.40 207.30
962.45 211.06
962.50 214.76
962.55 218.40
962.60 221.97
962.65 225.49
962.70 228.95
962.75 232.36
962.80 235.73
962.85 239.04
962.90 242.31
962.95 245.54
963.00 248.72
963.05 251.87
963.10 254.97
963.15 258.04
963.20 261.07
963.25 264.07
963.30 267.03
963.35 269.96
963.40 272.86
963.45 275.73
963.50 278.56
963.55 281.37
963.60 284.16
963.65 286.91
963.70 289.64
963.75 292.34
963.80 295.02
963.85 297.68
963.90 300.31
963.95 302.92
964.00 305.50
964.05 308.07
964.10 310.61
964.15 313.13
Elevation
(feet)
Primary
(cfs)
964.20 315.63
964.25 318.12
964.30 320.58
964.35 323.02
964.40 325.45
964.45 327.86
964.50 330.25
964.55 332.62
964.60 334.98
964.65 337.32
964.70 339.64
964.75 341.95
964.80 344.24
964.85 346.52
964.90 348.78
964.95 351.03
965.00 353.26
965.05 355.48
965.10 357.69
965.15 359.88
965.20 362.06
965.25 364.23
965.30 366.38
965.35 368.52
965.40 370.65
965.45 372.76
965.50 374.87
965.55 376.96
965.60 379.04
965.65 381.11
965.70 383.17
965.75 385.22
965.80 387.25
965.85 389.28
965.90 391.29
965.95 393.30
966.00 395.29
6S
UNDISTURBED
7S
OFFSITE WETLAND B
WATERSHED
OFFSITE B
OFFSITE B - DRAINS
SOUTH TO WETLAND
OUTSITE A
OFFSITE A - DRAINS
SOUTH TO WETLAND
B
PR1A
PR1A - DRAINS EAST
ALONG STREET
PR1B
PR1B - DRAINS
SOUTH TO WETLAND
A
PR1C
PR1C - DRAINS
NORTH TO WETLAND
A
PR1D
PR1D - DRAINS
SOUTH TO RAIN
GARDEN
PR2
PR2 - DRAINS SOUTH
TO WETLAND B
DA2
DA2 - TOTAL FLOW
TO WETLAND A
DA3
DA3 - TOTAL FLOW
TO WETLAND B
1P
FILTRATION BASIN 1
4P
WETLAND A
5P
Wetland B
Routing Diagram for 21429- PROPOSED
Prepared by {enter your company name here}, Printed 5/17/2022
HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Subcat Reach Pond Link
21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 2HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Area Listing (all nodes)
Area
(acres)
CN Description
(subcatchment-numbers)
6.695 84 (6S, OFFSITE B, OUTSITE A, PR1B, PR1C, PR1D, PR2)
3.921 84 1/2 acre lots, 25% imp, HSG B (7S)
0.779 98 Paved parking, HSG C (OFFSITE B, OUTSITE A, PR1A, PR1B, PR1D, PR2)
1.547 98 Unconnected roofs, HSG B (7S)
12.942 87 TOTAL AREA
21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 3HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Soil Listing (all nodes)
Area
(acres)
Soil
Group
Subcatchment
Numbers
0.000 HSG A
5.468 HSG B 7S
0.779 HSG C OFFSITE B, OUTSITE A, PR1A, PR1B, PR1D, PR2
0.000 HSG D
6.695 Other 6S, OFFSITE B, OUTSITE A, PR1B, PR1C, PR1D, PR2
12.942 TOTAL AREA
21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 4HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Ground Covers (all nodes)
HSG-A
(acres)
HSG-B
(acres)
HSG-C
(acres)
HSG-D
(acres)
Other
(acres)
Total
(acres)
Ground
Cover
Subcatchment
Numbers
0.000 0.000 0.000 0.000 6.695 6.695 6S,
OFFSITE B,
OUTSITE A,
PR1B,
PR1C,
PR1D, PR2
0.000 3.921 0.000 0.000 0.000 3.921 1/2 acre lots, 25% imp 7S
0.000 0.000 0.779 0.000 0.000 0.779 Paved parking OFFSITE B,
OUTSITE A,
PR1A,
PR1B,
PR1D, PR2
0.000 1.547 0.000 0.000 0.000 1.547 Unconnected roofs 7S
0.000 5.468 0.779 0.000 6.695 12.942 TOTAL AREA
21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 5HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Pipe Listing (all nodes)
Line# Node
Number
In-Invert
(feet)
Out-Invert
(feet)
Length
(feet)
Slope
(ft/ft)
n Diam/Width
(inches)
Height
(inches)
Inside-Fill
(inches)
1 1P 971.50 971.50 23.0 0.0000 0.012 12.0 0.0 0.0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 6HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Time span=0.00-240.00 hrs, dt=0.01 hrs, 24001 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Stor-Ind method - Pond routing by Stor-Ind method
Runoff Area=125,400 sf 0.00% Impervious Runoff Depth=1.12"Subcatchment 6S: UNDISTURBED
Tc=6.0 min CN=84 Runoff=5.69 cfs 0.268 af
Runoff Area=238,192 sf 46.22% Impervious Runoff Depth=1.44"Subcatchment 7S: OFFSITE WETLAND B
Flow Length=1,100' Slope=0.1500 '/' Tc=13.4 min CN=WQ Runoff=9.63 cfs 0.657 af
Runoff Area=74,865 sf 8.12% Impervious Runoff Depth=1.21"Subcatchment OFFSITE B: OFFSITE B -
Tc=6.0 min CN=WQ Runoff=3.63 cfs 0.173 af
Runoff Area=49,573 sf 17.90% Impervious Runoff Depth=1.32"Subcatchment OUTSITE A: OFFSITE A -
Tc=6.0 min CN=WQ Runoff=2.59 cfs 0.125 af
Runoff Area=3,245 sf 100.00% Impervious Runoff Depth=2.27"Subcatchment PR1A: PR1A - DRAINS
Tc=6.0 min CN=WQ Runoff=0.27 cfs 0.014 af
Runoff Area=29,167 sf 24.99% Impervious Runoff Depth=1.40"Subcatchment PR1B: PR1B - DRAINS
Tc=6.0 min CN=WQ Runoff=1.61 cfs 0.078 af
Runoff Area=5,573 sf 0.00% Impervious Runoff Depth=1.12"Subcatchment PR1C: PR1C - DRAINS
Tc=6.0 min CN=WQ Runoff=0.25 cfs 0.012 af
Runoff Area=35,117 sf 17.47% Impervious Runoff Depth=1.32"Subcatchment PR1D: PR1D - DRAINS
Tc=6.0 min CN=WQ Runoff=1.83 cfs 0.089 af
Runoff Area=2,636 sf 87.75% Impervious Runoff Depth=2.13"Subcatchment PR2: PR2 - DRAINS SOUTH
Tc=6.0 min CN=WQ Runoff=0.21 cfs 0.011 af
Inflow=5.56 cfs 0.352 afReach DA2: DA2 - TOTAL FLOW TO WETLAND A
Outflow=5.56 cfs 0.352 af
Inflow=4.90 cfs 0.488 afReach DA3: DA3 - TOTAL FLOW TO WETLAND B
Outflow=4.90 cfs 0.488 af
Peak Elev=974.01' Storage=2,020 cf Inflow=1.83 cfs 0.089 afPond 1P: FILTRATION BASIN 1
Discarded=0.00 cfs 0.000 af Primary=0.10 cfs 0.089 af Secondary=0.00 cfs 0.000 af Outflow=0.10 cfs 0.089 af
Peak Elev=969.85' Storage=2,771 cf Inflow=5.56 cfs 0.352 afPond 4P: WETLAND A
Outflow=2.85 cfs 0.352 af
Peak Elev=961.61' Storage=855 cf Inflow=18.14 cfs 1.413 afPond 5P: Wetland B
Outflow=18.03 cfs 1.413 af
Total Runoff Area = 12.942 ac Runoff Volume = 1.427 af Average Runoff Depth = 1.32"
74.45% Pervious = 9.636 ac 25.55% Impervious = 3.306 ac
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 7HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment 6S: UNDISTURBED
Runoff = 5.69 cfs @ 12.09 hrs, Volume= 0.268 af, Depth= 1.12"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"
Area (sf) CN Description
* 125,400 84
125,400 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment 6S: UNDISTURBED
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)6
5
4
3
2
1
0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr
1y 24hr Rainfall=2.50"
Runoff Area=125,400 sf
Runoff Volume=0.268 af
Runoff Depth=1.12"
Tc=6.0 min
CN=84
5.69 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 8HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment 6S: UNDISTURBED
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.12 0.00 0.00
10.00 0.38 0.00 0.00
15.00 2.21 0.90 0.20
20.00 2.40 1.04 0.05
25.00 2.50 1.12 0.00
30.00 2.50 1.12 0.00
35.00 2.50 1.12 0.00
40.00 2.50 1.12 0.00
45.00 2.50 1.12 0.00
50.00 2.50 1.12 0.00
55.00 2.50 1.12 0.00
60.00 2.50 1.12 0.00
65.00 2.50 1.12 0.00
70.00 2.50 1.12 0.00
75.00 2.50 1.12 0.00
80.00 2.50 1.12 0.00
85.00 2.50 1.12 0.00
90.00 2.50 1.12 0.00
95.00 2.50 1.12 0.00
100.00 2.50 1.12 0.00
105.00 2.50 1.12 0.00
110.00 2.50 1.12 0.00
115.00 2.50 1.12 0.00
120.00 2.50 1.12 0.00
125.00 2.50 1.12 0.00
130.00 2.50 1.12 0.00
135.00 2.50 1.12 0.00
140.00 2.50 1.12 0.00
145.00 2.50 1.12 0.00
150.00 2.50 1.12 0.00
155.00 2.50 1.12 0.00
160.00 2.50 1.12 0.00
165.00 2.50 1.12 0.00
170.00 2.50 1.12 0.00
175.00 2.50 1.12 0.00
180.00 2.50 1.12 0.00
185.00 2.50 1.12 0.00
190.00 2.50 1.12 0.00
195.00 2.50 1.12 0.00
200.00 2.50 1.12 0.00
205.00 2.50 1.12 0.00
210.00 2.50 1.12 0.00
215.00 2.50 1.12 0.00
220.00 2.50 1.12 0.00
225.00 2.50 1.12 0.00
230.00 2.50 1.12 0.00
235.00 2.50 1.12 0.00
240.00 2.50 1.12 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 9HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment 7S: OFFSITE WETLAND B WATERSHED
Runoff = 9.63 cfs @ 12.18 hrs, Volume= 0.657 af, Depth= 1.44"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"
Area (sf) CN Description
67,393 98 Unconnected roofs, HSG B
* 170,799 84 1/2 acre lots, 25% imp, HSG B
238,192 Weighted Average
128,099 53.78% Pervious Area
110,093 46.22% Impervious Area
67,393 61.21% Unconnected
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
7.9 200 0.1500 0.42 Sheet Flow,
Grass: Short n= 0.150 P2= 2.94"
5.5 900 0.1500 2.71 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
13.4 1,100 Total
Subcatchment 7S: OFFSITE WETLAND B WATERSHED
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)10
9
8
7
6
5
4
3
2
1
0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr
1y 24hr Rainfall=2.50"
Runoff Area=238,192 sf
Runoff Volume=0.657 af
Runoff Depth=1.44"
Flow Length=1,100'
Slope=0.1500 '/'
Tc=13.4 min
CN=WQ
9.63 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 10HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment 7S: OFFSITE WETLAND B WATERSHED
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.12 0.00 0.02
10.00 0.38 0.01 0.12
15.00 2.21 1.14 0.42
20.00 2.40 1.30 0.11
25.00 2.50 1.38 0.00
30.00 2.50 1.38 0.00
35.00 2.50 1.38 0.00
40.00 2.50 1.38 0.00
45.00 2.50 1.38 0.00
50.00 2.50 1.38 0.00
55.00 2.50 1.38 0.00
60.00 2.50 1.38 0.00
65.00 2.50 1.38 0.00
70.00 2.50 1.38 0.00
75.00 2.50 1.38 0.00
80.00 2.50 1.38 0.00
85.00 2.50 1.38 0.00
90.00 2.50 1.38 0.00
95.00 2.50 1.38 0.00
100.00 2.50 1.38 0.00
105.00 2.50 1.38 0.00
110.00 2.50 1.38 0.00
115.00 2.50 1.38 0.00
120.00 2.50 1.38 0.00
125.00 2.50 1.38 0.00
130.00 2.50 1.38 0.00
135.00 2.50 1.38 0.00
140.00 2.50 1.38 0.00
145.00 2.50 1.38 0.00
150.00 2.50 1.38 0.00
155.00 2.50 1.38 0.00
160.00 2.50 1.38 0.00
165.00 2.50 1.38 0.00
170.00 2.50 1.38 0.00
175.00 2.50 1.38 0.00
180.00 2.50 1.38 0.00
185.00 2.50 1.38 0.00
190.00 2.50 1.38 0.00
195.00 2.50 1.38 0.00
200.00 2.50 1.38 0.00
205.00 2.50 1.38 0.00
210.00 2.50 1.38 0.00
215.00 2.50 1.38 0.00
220.00 2.50 1.38 0.00
225.00 2.50 1.38 0.00
230.00 2.50 1.38 0.00
235.00 2.50 1.38 0.00
240.00 2.50 1.38 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 11HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment OFFSITE B: OFFSITE B - DRAINS SOUTH TO WETLAND
Runoff = 3.63 cfs @ 12.09 hrs, Volume= 0.173 af, Depth= 1.21"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"
Area (sf) CN Description
6,076 98 Paved parking, HSG C
* 68,789 84
74,865 Weighted Average
68,789 91.88% Pervious Area
6,076 8.12% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment OFFSITE B: OFFSITE B - DRAINS SOUTH TO WETLAND
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)4
3
2
1
0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr
1y 24hr Rainfall=2.50"
Runoff Area=74,865 sf
Runoff Volume=0.173 af
Runoff Depth=1.21"
Tc=6.0 min
CN=WQ
3.63 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 12HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment OFFSITE B: OFFSITE B - DRAINS SOUTH TO WETLAND
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.12 0.00 0.00
10.00 0.38 0.00 0.01
15.00 2.21 0.96 0.12
20.00 2.40 1.10 0.03
25.00 2.50 1.18 0.00
30.00 2.50 1.18 0.00
35.00 2.50 1.18 0.00
40.00 2.50 1.18 0.00
45.00 2.50 1.18 0.00
50.00 2.50 1.18 0.00
55.00 2.50 1.18 0.00
60.00 2.50 1.18 0.00
65.00 2.50 1.18 0.00
70.00 2.50 1.18 0.00
75.00 2.50 1.18 0.00
80.00 2.50 1.18 0.00
85.00 2.50 1.18 0.00
90.00 2.50 1.18 0.00
95.00 2.50 1.18 0.00
100.00 2.50 1.18 0.00
105.00 2.50 1.18 0.00
110.00 2.50 1.18 0.00
115.00 2.50 1.18 0.00
120.00 2.50 1.18 0.00
125.00 2.50 1.18 0.00
130.00 2.50 1.18 0.00
135.00 2.50 1.18 0.00
140.00 2.50 1.18 0.00
145.00 2.50 1.18 0.00
150.00 2.50 1.18 0.00
155.00 2.50 1.18 0.00
160.00 2.50 1.18 0.00
165.00 2.50 1.18 0.00
170.00 2.50 1.18 0.00
175.00 2.50 1.18 0.00
180.00 2.50 1.18 0.00
185.00 2.50 1.18 0.00
190.00 2.50 1.18 0.00
195.00 2.50 1.18 0.00
200.00 2.50 1.18 0.00
205.00 2.50 1.18 0.00
210.00 2.50 1.18 0.00
215.00 2.50 1.18 0.00
220.00 2.50 1.18 0.00
225.00 2.50 1.18 0.00
230.00 2.50 1.18 0.00
235.00 2.50 1.18 0.00
240.00 2.50 1.18 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 13HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment OUTSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B
Runoff = 2.59 cfs @ 12.09 hrs, Volume= 0.125 af, Depth= 1.32"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"
Area (sf) CN Description
8,875 98 Paved parking, HSG C
* 40,698 84
49,573 Weighted Average
40,698 82.10% Pervious Area
8,875 17.90% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment OUTSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)2
1
0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr
1y 24hr Rainfall=2.50"
Runoff Area=49,573 sf
Runoff Volume=0.125 af
Runoff Depth=1.32"
Tc=6.0 min
CN=WQ
2.59 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 14HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment OUTSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.12 0.00 0.00
10.00 0.38 0.00 0.02
15.00 2.21 1.08 0.08
20.00 2.40 1.23 0.02
25.00 2.50 1.31 0.00
30.00 2.50 1.31 0.00
35.00 2.50 1.31 0.00
40.00 2.50 1.31 0.00
45.00 2.50 1.31 0.00
50.00 2.50 1.31 0.00
55.00 2.50 1.31 0.00
60.00 2.50 1.31 0.00
65.00 2.50 1.31 0.00
70.00 2.50 1.31 0.00
75.00 2.50 1.31 0.00
80.00 2.50 1.31 0.00
85.00 2.50 1.31 0.00
90.00 2.50 1.31 0.00
95.00 2.50 1.31 0.00
100.00 2.50 1.31 0.00
105.00 2.50 1.31 0.00
110.00 2.50 1.31 0.00
115.00 2.50 1.31 0.00
120.00 2.50 1.31 0.00
125.00 2.50 1.31 0.00
130.00 2.50 1.31 0.00
135.00 2.50 1.31 0.00
140.00 2.50 1.31 0.00
145.00 2.50 1.31 0.00
150.00 2.50 1.31 0.00
155.00 2.50 1.31 0.00
160.00 2.50 1.31 0.00
165.00 2.50 1.31 0.00
170.00 2.50 1.31 0.00
175.00 2.50 1.31 0.00
180.00 2.50 1.31 0.00
185.00 2.50 1.31 0.00
190.00 2.50 1.31 0.00
195.00 2.50 1.31 0.00
200.00 2.50 1.31 0.00
205.00 2.50 1.31 0.00
210.00 2.50 1.31 0.00
215.00 2.50 1.31 0.00
220.00 2.50 1.31 0.00
225.00 2.50 1.31 0.00
230.00 2.50 1.31 0.00
235.00 2.50 1.31 0.00
240.00 2.50 1.31 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 15HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment PR1A: PR1A - DRAINS EAST ALONG STREET
Runoff = 0.27 cfs @ 12.08 hrs, Volume= 0.014 af, Depth= 2.27"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"
Area (sf) CN Description
3,245 98 Paved parking, HSG C
* 0 84
3,245 Weighted Average
3,245 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment PR1A: PR1A - DRAINS EAST ALONG STREET
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.3
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr
1y 24hr Rainfall=2.50"
Runoff Area=3,245 sf
Runoff Volume=0.014 af
Runoff Depth=2.27"
Tc=6.0 min
CN=WQ
0.27 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 16HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment PR1A: PR1A - DRAINS EAST ALONG STREET
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.12 0.02 0.00
10.00 0.38 0.21 0.01
15.00 2.21 1.99 0.01
20.00 2.40 2.17 0.00
25.00 2.50 2.27 0.00
30.00 2.50 2.27 0.00
35.00 2.50 2.27 0.00
40.00 2.50 2.27 0.00
45.00 2.50 2.27 0.00
50.00 2.50 2.27 0.00
55.00 2.50 2.27 0.00
60.00 2.50 2.27 0.00
65.00 2.50 2.27 0.00
70.00 2.50 2.27 0.00
75.00 2.50 2.27 0.00
80.00 2.50 2.27 0.00
85.00 2.50 2.27 0.00
90.00 2.50 2.27 0.00
95.00 2.50 2.27 0.00
100.00 2.50 2.27 0.00
105.00 2.50 2.27 0.00
110.00 2.50 2.27 0.00
115.00 2.50 2.27 0.00
120.00 2.50 2.27 0.00
125.00 2.50 2.27 0.00
130.00 2.50 2.27 0.00
135.00 2.50 2.27 0.00
140.00 2.50 2.27 0.00
145.00 2.50 2.27 0.00
150.00 2.50 2.27 0.00
155.00 2.50 2.27 0.00
160.00 2.50 2.27 0.00
165.00 2.50 2.27 0.00
170.00 2.50 2.27 0.00
175.00 2.50 2.27 0.00
180.00 2.50 2.27 0.00
185.00 2.50 2.27 0.00
190.00 2.50 2.27 0.00
195.00 2.50 2.27 0.00
200.00 2.50 2.27 0.00
205.00 2.50 2.27 0.00
210.00 2.50 2.27 0.00
215.00 2.50 2.27 0.00
220.00 2.50 2.27 0.00
225.00 2.50 2.27 0.00
230.00 2.50 2.27 0.00
235.00 2.50 2.27 0.00
240.00 2.50 2.27 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 17HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment PR1B: PR1B - DRAINS SOUTH TO WETLAND A
Runoff = 1.61 cfs @ 12.09 hrs, Volume= 0.078 af, Depth= 1.40"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"
Area (sf) CN Description
7,290 98 Paved parking, HSG C
* 21,877 84
29,167 Weighted Average
21,877 75.01% Pervious Area
7,290 24.99% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment PR1B: PR1B - DRAINS SOUTH TO WETLAND A
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)1
0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr
1y 24hr Rainfall=2.50"
Runoff Area=29,167 sf
Runoff Volume=0.078 af
Runoff Depth=1.40"
Tc=6.0 min
CN=WQ
1.61 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 18HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment PR1B: PR1B - DRAINS SOUTH TO WETLAND A
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.12 0.00 0.00
10.00 0.38 0.00 0.01
15.00 2.21 1.08 0.05
20.00 2.40 1.23 0.01
25.00 2.50 1.31 0.00
30.00 2.50 1.31 0.00
35.00 2.50 1.31 0.00
40.00 2.50 1.31 0.00
45.00 2.50 1.31 0.00
50.00 2.50 1.31 0.00
55.00 2.50 1.31 0.00
60.00 2.50 1.31 0.00
65.00 2.50 1.31 0.00
70.00 2.50 1.31 0.00
75.00 2.50 1.31 0.00
80.00 2.50 1.31 0.00
85.00 2.50 1.31 0.00
90.00 2.50 1.31 0.00
95.00 2.50 1.31 0.00
100.00 2.50 1.31 0.00
105.00 2.50 1.31 0.00
110.00 2.50 1.31 0.00
115.00 2.50 1.31 0.00
120.00 2.50 1.31 0.00
125.00 2.50 1.31 0.00
130.00 2.50 1.31 0.00
135.00 2.50 1.31 0.00
140.00 2.50 1.31 0.00
145.00 2.50 1.31 0.00
150.00 2.50 1.31 0.00
155.00 2.50 1.31 0.00
160.00 2.50 1.31 0.00
165.00 2.50 1.31 0.00
170.00 2.50 1.31 0.00
175.00 2.50 1.31 0.00
180.00 2.50 1.31 0.00
185.00 2.50 1.31 0.00
190.00 2.50 1.31 0.00
195.00 2.50 1.31 0.00
200.00 2.50 1.31 0.00
205.00 2.50 1.31 0.00
210.00 2.50 1.31 0.00
215.00 2.50 1.31 0.00
220.00 2.50 1.31 0.00
225.00 2.50 1.31 0.00
230.00 2.50 1.31 0.00
235.00 2.50 1.31 0.00
240.00 2.50 1.31 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 19HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment PR1C: PR1C - DRAINS NORTH TO WETLAND A
Runoff = 0.25 cfs @ 12.09 hrs, Volume= 0.012 af, Depth= 1.12"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"
Area (sf) CN Description
0 98 Paved parking, HSG C
* 5,573 84
5,573 Weighted Average
5,573 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment PR1C: PR1C - DRAINS NORTH TO WETLAND A
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr
1y 24hr Rainfall=2.50"
Runoff Area=5,573 sf
Runoff Volume=0.012 af
Runoff Depth=1.12"
Tc=6.0 min
CN=WQ
0.25 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 20HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment PR1C: PR1C - DRAINS NORTH TO WETLAND A
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.12 0.00 0.00
10.00 0.38 0.00 0.00
15.00 2.21 0.90 0.01
20.00 2.40 1.04 0.00
25.00 2.50 1.12 0.00
30.00 2.50 1.12 0.00
35.00 2.50 1.12 0.00
40.00 2.50 1.12 0.00
45.00 2.50 1.12 0.00
50.00 2.50 1.12 0.00
55.00 2.50 1.12 0.00
60.00 2.50 1.12 0.00
65.00 2.50 1.12 0.00
70.00 2.50 1.12 0.00
75.00 2.50 1.12 0.00
80.00 2.50 1.12 0.00
85.00 2.50 1.12 0.00
90.00 2.50 1.12 0.00
95.00 2.50 1.12 0.00
100.00 2.50 1.12 0.00
105.00 2.50 1.12 0.00
110.00 2.50 1.12 0.00
115.00 2.50 1.12 0.00
120.00 2.50 1.12 0.00
125.00 2.50 1.12 0.00
130.00 2.50 1.12 0.00
135.00 2.50 1.12 0.00
140.00 2.50 1.12 0.00
145.00 2.50 1.12 0.00
150.00 2.50 1.12 0.00
155.00 2.50 1.12 0.00
160.00 2.50 1.12 0.00
165.00 2.50 1.12 0.00
170.00 2.50 1.12 0.00
175.00 2.50 1.12 0.00
180.00 2.50 1.12 0.00
185.00 2.50 1.12 0.00
190.00 2.50 1.12 0.00
195.00 2.50 1.12 0.00
200.00 2.50 1.12 0.00
205.00 2.50 1.12 0.00
210.00 2.50 1.12 0.00
215.00 2.50 1.12 0.00
220.00 2.50 1.12 0.00
225.00 2.50 1.12 0.00
230.00 2.50 1.12 0.00
235.00 2.50 1.12 0.00
240.00 2.50 1.12 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 21HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment PR1D: PR1D - DRAINS SOUTH TO RAIN GARDEN
Runoff = 1.83 cfs @ 12.09 hrs, Volume= 0.089 af, Depth= 1.32"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"
Area (sf) CN Description
6,135 98 Paved parking, HSG C
* 28,982 84
35,117 Weighted Average
28,982 82.53% Pervious Area
6,135 17.47% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment PR1D: PR1D - DRAINS SOUTH TO RAIN GARDEN
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)2
1
0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr
1y 24hr Rainfall=2.50"
Runoff Area=35,117 sf
Runoff Volume=0.089 af
Runoff Depth=1.32"
Tc=6.0 min
CN=WQ
1.83 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 22HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment PR1D: PR1D - DRAINS SOUTH TO RAIN GARDEN
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.12 0.00 0.00
10.00 0.38 0.00 0.01
15.00 2.21 1.01 0.06
20.00 2.40 1.16 0.02
25.00 2.50 1.24 0.00
30.00 2.50 1.24 0.00
35.00 2.50 1.24 0.00
40.00 2.50 1.24 0.00
45.00 2.50 1.24 0.00
50.00 2.50 1.24 0.00
55.00 2.50 1.24 0.00
60.00 2.50 1.24 0.00
65.00 2.50 1.24 0.00
70.00 2.50 1.24 0.00
75.00 2.50 1.24 0.00
80.00 2.50 1.24 0.00
85.00 2.50 1.24 0.00
90.00 2.50 1.24 0.00
95.00 2.50 1.24 0.00
100.00 2.50 1.24 0.00
105.00 2.50 1.24 0.00
110.00 2.50 1.24 0.00
115.00 2.50 1.24 0.00
120.00 2.50 1.24 0.00
125.00 2.50 1.24 0.00
130.00 2.50 1.24 0.00
135.00 2.50 1.24 0.00
140.00 2.50 1.24 0.00
145.00 2.50 1.24 0.00
150.00 2.50 1.24 0.00
155.00 2.50 1.24 0.00
160.00 2.50 1.24 0.00
165.00 2.50 1.24 0.00
170.00 2.50 1.24 0.00
175.00 2.50 1.24 0.00
180.00 2.50 1.24 0.00
185.00 2.50 1.24 0.00
190.00 2.50 1.24 0.00
195.00 2.50 1.24 0.00
200.00 2.50 1.24 0.00
205.00 2.50 1.24 0.00
210.00 2.50 1.24 0.00
215.00 2.50 1.24 0.00
220.00 2.50 1.24 0.00
225.00 2.50 1.24 0.00
230.00 2.50 1.24 0.00
235.00 2.50 1.24 0.00
240.00 2.50 1.24 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 23HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment PR2: PR2 - DRAINS SOUTH TO WETLAND B
Runoff = 0.21 cfs @ 12.08 hrs, Volume= 0.011 af, Depth= 2.13"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"
Area (sf) CN Description
2,313 98 Paved parking, HSG C
* 323 84
2,636 Weighted Average
323 12.25% Pervious Area
2,313 87.75% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment PR2: PR2 - DRAINS SOUTH TO WETLAND B
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.23
0.22
0.21
0.2
0.19
0.18
0.17
0.16
0.15
0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr
1y 24hr Rainfall=2.50"
Runoff Area=2,636 sf
Runoff Volume=0.011 af
Runoff Depth=2.13"
Tc=6.0 min
CN=WQ
0.21 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 24HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment PR2: PR2 - DRAINS SOUTH TO WETLAND B
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.12 0.00 0.00
10.00 0.38 0.12 0.00
15.00 2.21 1.78 0.01
20.00 2.40 1.97 0.00
25.00 2.50 2.06 0.00
30.00 2.50 2.06 0.00
35.00 2.50 2.06 0.00
40.00 2.50 2.06 0.00
45.00 2.50 2.06 0.00
50.00 2.50 2.06 0.00
55.00 2.50 2.06 0.00
60.00 2.50 2.06 0.00
65.00 2.50 2.06 0.00
70.00 2.50 2.06 0.00
75.00 2.50 2.06 0.00
80.00 2.50 2.06 0.00
85.00 2.50 2.06 0.00
90.00 2.50 2.06 0.00
95.00 2.50 2.06 0.00
100.00 2.50 2.06 0.00
105.00 2.50 2.06 0.00
110.00 2.50 2.06 0.00
115.00 2.50 2.06 0.00
120.00 2.50 2.06 0.00
125.00 2.50 2.06 0.00
130.00 2.50 2.06 0.00
135.00 2.50 2.06 0.00
140.00 2.50 2.06 0.00
145.00 2.50 2.06 0.00
150.00 2.50 2.06 0.00
155.00 2.50 2.06 0.00
160.00 2.50 2.06 0.00
165.00 2.50 2.06 0.00
170.00 2.50 2.06 0.00
175.00 2.50 2.06 0.00
180.00 2.50 2.06 0.00
185.00 2.50 2.06 0.00
190.00 2.50 2.06 0.00
195.00 2.50 2.06 0.00
200.00 2.50 2.06 0.00
205.00 2.50 2.06 0.00
210.00 2.50 2.06 0.00
215.00 2.50 2.06 0.00
220.00 2.50 2.06 0.00
225.00 2.50 2.06 0.00
230.00 2.50 2.06 0.00
235.00 2.50 2.06 0.00
240.00 2.50 2.06 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 25HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A
[40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 3.322 ac, 13.47% Impervious, Inflow Depth = 1.27" for 1y 24hr event
Inflow = 5.56 cfs @ 12.09 hrs, Volume= 0.352 af
Outflow = 5.56 cfs @ 12.09 hrs, Volume= 0.352 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Reach DA2: DA2 - TOTAL FLOW TO WETLAND A
Inflow
Outflow
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)6
5
4
3
2
1
0
Inflow Area=3.322 ac
5.56 cfs
5.56 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 26HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A
Time
(hours)
Inflow
(cfs)
Elevation
(feet)
Outflow
(cfs)
0.00 0.00 0.00
5.00 0.01 0.01
10.00 0.04 0.04
15.00 0.27 0.27
20.00 0.12 0.12
25.00 0.00 0.00
30.00 0.00 0.00
35.00 0.00 0.00
40.00 0.00 0.00
45.00 0.00 0.00
50.00 0.00 0.00
55.00 0.00 0.00
60.00 0.00 0.00
65.00 0.00 0.00
70.00 0.00 0.00
75.00 0.00 0.00
80.00 0.00 0.00
85.00 0.00 0.00
90.00 0.00 0.00
95.00 0.00 0.00
100.00 0.00 0.00
105.00 0.00 0.00
110.00 0.00 0.00
115.00 0.00 0.00
120.00 0.00 0.00
125.00 0.00 0.00
130.00 0.00 0.00
135.00 0.00 0.00
140.00 0.00 0.00
145.00 0.00 0.00
150.00 0.00 0.00
155.00 0.00 0.00
160.00 0.00 0.00
165.00 0.00 0.00
170.00 0.00 0.00
175.00 0.00 0.00
180.00 0.00 0.00
185.00 0.00 0.00
190.00 0.00 0.00
195.00 0.00 0.00
200.00 0.00 0.00
205.00 0.00 0.00
210.00 0.00 0.00
215.00 0.00 0.00
220.00 0.00 0.00
225.00 0.00 0.00
230.00 0.00 0.00
235.00 0.00 0.00
240.00 0.00 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 27HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B
[40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 4.521 ac, 15.58% Impervious, Inflow Depth = 1.30" for 1y 24hr event
Inflow = 4.90 cfs @ 12.11 hrs, Volume= 0.488 af
Outflow = 4.90 cfs @ 12.11 hrs, Volume= 0.488 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Reach DA3: DA3 - TOTAL FLOW TO WETLAND B
Inflow
Outflow
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)5
4
3
2
1
0
Inflow Area=4.521 ac
4.90 cfs
4.90 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 28HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B
Time
(hours)
Inflow
(cfs)
Elevation
(feet)
Outflow
(cfs)
0.00 0.00 0.00
5.00 0.01 0.01
10.00 0.05 0.05
15.00 0.36 0.36
20.00 0.15 0.15
25.00 0.04 0.04
30.00 0.00 0.00
35.00 0.00 0.00
40.00 0.00 0.00
45.00 0.00 0.00
50.00 0.00 0.00
55.00 0.00 0.00
60.00 0.00 0.00
65.00 0.00 0.00
70.00 0.00 0.00
75.00 0.00 0.00
80.00 0.00 0.00
85.00 0.00 0.00
90.00 0.00 0.00
95.00 0.00 0.00
100.00 0.00 0.00
105.00 0.00 0.00
110.00 0.00 0.00
115.00 0.00 0.00
120.00 0.00 0.00
125.00 0.00 0.00
130.00 0.00 0.00
135.00 0.00 0.00
140.00 0.00 0.00
145.00 0.00 0.00
150.00 0.00 0.00
155.00 0.00 0.00
160.00 0.00 0.00
165.00 0.00 0.00
170.00 0.00 0.00
175.00 0.00 0.00
180.00 0.00 0.00
185.00 0.00 0.00
190.00 0.00 0.00
195.00 0.00 0.00
200.00 0.00 0.00
205.00 0.00 0.00
210.00 0.00 0.00
215.00 0.00 0.00
220.00 0.00 0.00
225.00 0.00 0.00
230.00 0.00 0.00
235.00 0.00 0.00
240.00 0.00 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 29HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Pond 1P: FILTRATION BASIN 1
Inflow Area = 0.806 ac, 17.47% Impervious, Inflow Depth = 1.32" for 1y 24hr event
Inflow = 1.83 cfs @ 12.09 hrs, Volume= 0.089 af
Outflow = 0.10 cfs @ 13.54 hrs, Volume= 0.089 af, Atten= 95%, Lag= 87.3 min
Discarded = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Primary = 0.10 cfs @ 13.54 hrs, Volume= 0.089 af
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Peak Elev= 974.01' @ 13.54 hrs Surf.Area= 2,324 sf Storage= 2,020 cf
Plug-Flow detention time= 228.5 min calculated for 0.089 af (100% of inflow)
Center-of-Mass det. time= 228.5 min ( 1,034.4 - 805.8 )
Volume Invert Avail.Storage Storage Description
#1 973.00' 5,291 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
973.00 1,624 0 0
973.50 2,040 916 916
974.00 2,320 1,090 2,006
974.50 2,686 1,252 3,258
975.10 3,068 1,726 4,984
975.20 3,068 307 5,291
Device Routing Invert Outlet Devices
#1 Primary 971.50'12.0" Round OUTLET PIPE
L= 23.0' CMP, mitered to conform to fill, Ke= 0.700
Inlet / Outlet Invert= 971.50' / 971.50' S= 0.0000 '/' Cc= 0.900
n= 0.012 Concrete pipe, finished, Flow Area= 0.79 sf
#2 Device 1 974.00'24.0" Horiz. RIM- Orifice/Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 975.10'10.0' long x 10.0' breadth EOF
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60
Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64
#4 Device 5 973.00'1.600 in/hr Exfiltration over Surface area above 970.50'
Excluded Surface area = 0 sf
#5 Device 1 971.50'6.0" Vert. Orifice 6" draintile C= 0.600
#6 Discarded 973.00'0.600 in/hr Exfiltration-Infiltration into Rock over Surface area from 970.00' - 970.50'
Excluded Surface area = 0 sf
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 30HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Discarded OutFlow Max=0.00 cfs @ 0.00 hrs HW=973.00' (Free Discharge)
6=Exfiltration-Infiltration into Rock ( Controls 0.00 cfs)
Primary OutFlow Max=0.10 cfs @ 13.54 hrs HW=974.01' (Free Discharge)
1=OUTLET PIPE (Passes 0.10 cfs of 4.73 cfs potential flow)
2=RIM- Orifice/Grate (Weir Controls 0.01 cfs @ 0.25 fps)
5=Orifice 6" draintile (Passes 0.09 cfs of 1.42 cfs potential flow)
4=Exfiltration (Exfiltration Controls 0.09 cfs)
Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=973.00' (Free Discharge)
3=EOF ( Controls 0.00 cfs)
Pond 1P: FILTRATION BASIN 1
Inflow
Outflow
Discarded
Primary
Secondary
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)2
1
0
Inflow Area=0.806 ac
Peak Elev=974.01'
Storage=2,020 cf
1.83 cfs
0.10 cfs
0.00 cfs0.10 cfs
0.00 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 31HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Pond 1P: FILTRATION BASIN 1
Time
(hours)
Inflow
(cfs)
Storage
(cubic-feet)
Elevation
(feet)
Outflow
(cfs)
Discarded
(cfs)
Primary
(cfs)
Secondary
(cfs)
0.00 0.00 0 973.00 0.00 0.00 0.00 0.00
5.00 0.00 1 973.00 0.00 0.00 0.00 0.00
10.00 0.01 7 973.00 0.01 0.00 0.01 0.00
15.00 0.06 1,883 973.95 0.08 0.00 0.08 0.00
20.00 0.02 888 973.49 0.08 0.00 0.08 0.00
25.00 0.00 1 973.00 0.00 0.00 0.00 0.00
30.00 0.00 0 973.00 0.00 0.00 0.00 0.00
35.00 0.00 0 973.00 0.00 0.00 0.00 0.00
40.00 0.00 0 973.00 0.00 0.00 0.00 0.00
45.00 0.00 0 973.00 0.00 0.00 0.00 0.00
50.00 0.00 0 973.00 0.00 0.00 0.00 0.00
55.00 0.00 0 973.00 0.00 0.00 0.00 0.00
60.00 0.00 0 973.00 0.00 0.00 0.00 0.00
65.00 0.00 0 973.00 0.00 0.00 0.00 0.00
70.00 0.00 0 973.00 0.00 0.00 0.00 0.00
75.00 0.00 0 973.00 0.00 0.00 0.00 0.00
80.00 0.00 0 973.00 0.00 0.00 0.00 0.00
85.00 0.00 0 973.00 0.00 0.00 0.00 0.00
90.00 0.00 0 973.00 0.00 0.00 0.00 0.00
95.00 0.00 0 973.00 0.00 0.00 0.00 0.00
100.00 0.00 0 973.00 0.00 0.00 0.00 0.00
105.00 0.00 0 973.00 0.00 0.00 0.00 0.00
110.00 0.00 0 973.00 0.00 0.00 0.00 0.00
115.00 0.00 0 973.00 0.00 0.00 0.00 0.00
120.00 0.00 0 973.00 0.00 0.00 0.00 0.00
125.00 0.00 0 973.00 0.00 0.00 0.00 0.00
130.00 0.00 0 973.00 0.00 0.00 0.00 0.00
135.00 0.00 0 973.00 0.00 0.00 0.00 0.00
140.00 0.00 0 973.00 0.00 0.00 0.00 0.00
145.00 0.00 0 973.00 0.00 0.00 0.00 0.00
150.00 0.00 0 973.00 0.00 0.00 0.00 0.00
155.00 0.00 0 973.00 0.00 0.00 0.00 0.00
160.00 0.00 0 973.00 0.00 0.00 0.00 0.00
165.00 0.00 0 973.00 0.00 0.00 0.00 0.00
170.00 0.00 0 973.00 0.00 0.00 0.00 0.00
175.00 0.00 0 973.00 0.00 0.00 0.00 0.00
180.00 0.00 0 973.00 0.00 0.00 0.00 0.00
185.00 0.00 0 973.00 0.00 0.00 0.00 0.00
190.00 0.00 0 973.00 0.00 0.00 0.00 0.00
195.00 0.00 0 973.00 0.00 0.00 0.00 0.00
200.00 0.00 0 973.00 0.00 0.00 0.00 0.00
205.00 0.00 0 973.00 0.00 0.00 0.00 0.00
210.00 0.00 0 973.00 0.00 0.00 0.00 0.00
215.00 0.00 0 973.00 0.00 0.00 0.00 0.00
220.00 0.00 0 973.00 0.00 0.00 0.00 0.00
225.00 0.00 0 973.00 0.00 0.00 0.00 0.00
230.00 0.00 0 973.00 0.00 0.00 0.00 0.00
235.00 0.00 0 973.00 0.00 0.00 0.00 0.00
240.00 0.00 0 973.00 0.00 0.00 0.00 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 32HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Stage-Discharge for Pond 1P: FILTRATION BASIN 1
Elevation
(feet)
Discharge
(cfs)
Discarded
(cfs)
Primary
(cfs)
Secondary
(cfs)
973.00 0.00 0.00 0.00 0.00
973.05 0.06 0.00 0.06 0.00
973.10 0.06 0.00 0.06 0.00
973.15 0.06 0.00 0.06 0.00
973.20 0.07 0.00 0.07 0.00
973.25 0.07 0.00 0.07 0.00
973.30 0.07 0.00 0.07 0.00
973.35 0.07 0.00 0.07 0.00
973.40 0.07 0.00 0.07 0.00
973.45 0.07 0.00 0.07 0.00
973.50 0.08 0.00 0.08 0.00
973.55 0.08 0.00 0.08 0.00
973.60 0.08 0.00 0.08 0.00
973.65 0.08 0.00 0.08 0.00
973.70 0.08 0.00 0.08 0.00
973.75 0.08 0.00 0.08 0.00
973.80 0.08 0.00 0.08 0.00
973.85 0.08 0.00 0.08 0.00
973.90 0.08 0.00 0.08 0.00
973.95 0.08 0.00 0.08 0.00
974.00 0.09 0.00 0.09 0.00
974.05 0.32 0.00 0.32 0.00
974.10 0.74 0.00 0.74 0.00
974.15 1.28 0.00 1.28 0.00
974.20 1.93 0.00 1.93 0.00
974.25 2.66 0.00 2.66 0.00
974.30 3.47 0.00 3.47 0.00
974.35 4.35 0.00 4.35 0.00
974.40 5.17 0.00 5.17 0.00
974.45 5.22 0.00 5.22 0.00
974.50 5.28 0.00 5.28 0.00
974.55 5.33 0.00 5.33 0.00
974.60 5.38 0.00 5.38 0.00
974.65 5.43 0.00 5.43 0.00
974.70 5.48 0.00 5.48 0.00
974.75 5.53 0.00 5.53 0.00
974.80 5.58 0.00 5.58 0.00
974.85 5.63 0.00 5.63 0.00
974.90 5.68 0.00 5.68 0.00
974.95 5.73 0.00 5.73 0.00
975.00 5.78 0.00 5.78 0.00
975.05 5.83 0.00 5.83 0.00
975.10 5.87 0.00 5.87 0.00
975.15 6.20 0.00 5.92 0.28
975.20 6.76 0.00 5.97 0.79
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 33HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Pond 4P: WETLAND A
Inflow Area = 3.322 ac, 13.47% Impervious, Inflow Depth = 1.27" for 1y 24hr event
Inflow = 5.56 cfs @ 12.09 hrs, Volume= 0.352 af
Outflow = 2.85 cfs @ 12.19 hrs, Volume= 0.352 af, Atten= 49%, Lag= 6.4 min
Primary = 2.85 cfs @ 12.19 hrs, Volume= 0.352 af
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Peak Elev= 969.85' @ 12.19 hrs Surf.Area= 12,138 sf Storage= 2,771 cf
Plug-Flow detention time= 31.2 min calculated for 0.352 af (100% of inflow)
Center-of-Mass det. time= 31.3 min ( 898.6 - 867.3 )
Volume Invert Avail.Storage Storage Description
#1 969.62' 18,824 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
969.62 11,466 0 0
970.00 12,553 4,564 4,564
971.00 15,967 14,260 18,824
Device Routing Invert Outlet Devices
#1 Primary 969.62'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60
Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64
Primary OutFlow Max=2.85 cfs @ 12.19 hrs HW=969.85' (Free Discharge)
1=Broad-Crested Rectangular Weir (Weir Controls 2.85 cfs @ 1.21 fps)
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 34HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Pond 4P: WETLAND A
Inflow
Primary
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)6
5
4
3
2
1
0
Inflow Area=3.322 ac
Peak Elev=969.85'
Storage=2,771 cf
5.56 cfs
2.85 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 35HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Pond 4P: WETLAND A
Time
(hours)
Inflow
(cfs)
Storage
(cubic-feet)
Elevation
(feet)
Primary
(cfs)
0.00 0.00 0 969.62 0.00
5.00 0.01 15 969.62 0.00
10.00 0.04 101 969.63 0.03
15.00 0.27 564 969.67 0.27
20.00 0.12 337 969.65 0.13
25.00 0.00 166 969.63 0.04
30.00 0.00 2 969.62 0.00
35.00 0.00 0 969.62 0.00
40.00 0.00 0 969.62 0.00
45.00 0.00 0 969.62 0.00
50.00 0.00 0 969.62 0.00
55.00 0.00 0 969.62 0.00
60.00 0.00 0 969.62 0.00
65.00 0.00 0 969.62 0.00
70.00 0.00 0 969.62 0.00
75.00 0.00 0 969.62 0.00
80.00 0.00 0 969.62 0.00
85.00 0.00 0 969.62 0.00
90.00 0.00 0 969.62 0.00
95.00 0.00 0 969.62 0.00
100.00 0.00 0 969.62 0.00
105.00 0.00 0 969.62 0.00
110.00 0.00 0 969.62 0.00
115.00 0.00 0 969.62 0.00
120.00 0.00 0 969.62 0.00
125.00 0.00 0 969.62 0.00
130.00 0.00 0 969.62 0.00
135.00 0.00 0 969.62 0.00
140.00 0.00 0 969.62 0.00
145.00 0.00 0 969.62 0.00
150.00 0.00 0 969.62 0.00
155.00 0.00 0 969.62 0.00
160.00 0.00 0 969.62 0.00
165.00 0.00 0 969.62 0.00
170.00 0.00 0 969.62 0.00
175.00 0.00 0 969.62 0.00
180.00 0.00 0 969.62 0.00
185.00 0.00 0 969.62 0.00
190.00 0.00 0 969.62 0.00
195.00 0.00 0 969.62 0.00
200.00 0.00 0 969.62 0.00
205.00 0.00 0 969.62 0.00
210.00 0.00 0 969.62 0.00
215.00 0.00 0 969.62 0.00
220.00 0.00 0 969.62 0.00
225.00 0.00 0 969.62 0.00
230.00 0.00 0 969.62 0.00
235.00 0.00 0 969.62 0.00
240.00 0.00 0 969.62 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 36HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Stage-Discharge for Pond 4P: WETLAND A
Elevation
(feet)
Primary
(cfs)
969.62 0.00
969.63 0.02
969.64 0.07
969.65 0.13
969.66 0.20
969.67 0.28
969.68 0.37
969.69 0.46
969.70 0.56
969.71 0.67
969.72 0.79
969.73 0.91
969.74 1.04
969.75 1.17
969.76 1.30
969.77 1.45
969.78 1.59
969.79 1.75
969.80 1.90
969.81 2.06
969.82 2.23
969.83 2.40
969.84 2.58
969.85 2.76
969.86 2.94
969.87 3.13
969.88 3.33
969.89 3.53
969.90 3.73
969.91 3.94
969.92 4.15
969.93 4.36
969.94 4.58
969.95 4.81
969.96 5.03
969.97 5.26
969.98 5.50
969.99 5.74
970.00 5.98
970.01 6.23
970.02 6.48
970.03 6.74
970.04 7.01
970.05 7.28
970.06 7.55
970.07 7.83
970.08 8.12
970.09 8.41
970.10 8.70
970.11 9.00
970.12 9.30
970.13 9.60
970.14 9.91
Elevation
(feet)
Primary
(cfs)
970.15 10.23
970.16 10.55
970.17 10.87
970.18 11.20
970.19 11.53
970.20 11.86
970.21 12.20
970.22 12.55
970.23 12.86
970.24 13.18
970.25 13.49
970.26 13.81
970.27 14.14
970.28 14.46
970.29 14.79
970.30 15.12
970.31 15.45
970.32 15.78
970.33 16.12
970.34 16.46
970.35 16.80
970.36 17.14
970.37 17.49
970.38 17.84
970.39 18.19
970.40 18.54
970.41 18.89
970.42 19.25
970.43 19.61
970.44 19.97
970.45 20.33
970.46 20.69
970.47 21.06
970.48 21.43
970.49 21.80
970.50 22.17
970.51 22.55
970.52 22.92
970.53 23.30
970.54 23.68
970.55 24.07
970.56 24.45
970.57 24.84
970.58 25.23
970.59 25.62
970.60 26.01
970.61 26.40
970.62 26.80
970.63 27.21
970.64 27.62
970.65 28.03
970.66 28.45
970.67 28.86
Elevation
(feet)
Primary
(cfs)
970.68 29.28
970.69 29.70
970.70 30.12
970.71 30.55
970.72 30.98
970.73 31.41
970.74 31.84
970.75 32.27
970.76 32.71
970.77 33.14
970.78 33.58
970.79 34.02
970.80 34.47
970.81 34.91
970.82 35.36
970.83 35.79
970.84 36.22
970.85 36.65
970.86 37.09
970.87 37.52
970.88 37.96
970.89 38.40
970.90 38.84
970.91 39.28
970.92 39.72
970.93 40.17
970.94 40.61
970.95 41.06
970.96 41.51
970.97 41.96
970.98 42.41
970.99 42.86
971.00 43.32
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 37HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Pond 5P: Wetland B
[44] Hint: Outlet device #1 is below defined storage
[95] Warning: Outlet Device #1 rise exceeded
Inflow Area = 12.868 ac, 25.12% Impervious, Inflow Depth = 1.32" for 1y 24hr event
Inflow = 18.14 cfs @ 12.13 hrs, Volume= 1.413 af
Outflow = 18.03 cfs @ 12.14 hrs, Volume= 1.413 af, Atten= 1%, Lag= 0.9 min
Primary = 18.03 cfs @ 12.14 hrs, Volume= 1.413 af
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Peak Elev= 961.61' @ 12.14 hrs Surf.Area= 149,065 sf Storage= 855 cf
Plug-Flow detention time= 0.8 min calculated for 1.413 af (100% of inflow)
Center-of-Mass det. time= 0.8 min ( 831.9 - 831.1 )
Volume Invert Avail.Storage Storage Description
#1 961.60' 841,104 cf Custom Stage Data (Conic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store Wet.Area
(feet) (sq-ft) (cubic-feet) (cubic-feet) (sq-ft)
961.60 149,000 0 0 149,000
962.00 153,597 60,517 60,517 153,630
964.00 201,325 353,847 414,364 201,451
966.00 225,646 426,740 841,104 225,991
Device Routing Invert Outlet Devices
#1 Primary 960.82'Asymmetrical Weir, C= 3.27
Offset (feet) -70.00 -41.00 0.00 49.00 87.00
Height (feet) 0.35 0.09 0.00 0.09 0.35
Primary OutFlow Max=133.89 cfs @ 12.14 hrs HW=961.61' (Free Discharge)
1=Asymmetrical Weir (Weir Controls 133.89 cfs @ 2.74 fps)
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 38HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Pond 5P: Wetland B
Inflow
Primary
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=12.868 ac
Peak Elev=961.61'
Storage=855 cf
18.14 cfs
18.03 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 39HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Pond 5P: Wetland B
Time
(hours)
Inflow
(cfs)
Storage
(cubic-feet)
Elevation
(feet)
Primary
(cfs)
0.00 0.00 0 961.60 0.00
5.00 0.02 1 961.60 0.02
10.00 0.17 8 961.60 0.17
15.00 0.98 46 961.60 0.98
20.00 0.32 15 961.60 0.32
25.00 0.04 2 961.60 0.04
30.00 0.00 0 961.60 0.00
35.00 0.00 0 961.60 0.00
40.00 0.00 0 961.60 0.00
45.00 0.00 0 961.60 0.00
50.00 0.00 0 961.60 0.00
55.00 0.00 0 961.60 0.00
60.00 0.00 0 961.60 0.00
65.00 0.00 0 961.60 0.00
70.00 0.00 0 961.60 0.00
75.00 0.00 0 961.60 0.00
80.00 0.00 0 961.60 0.00
85.00 0.00 0 961.60 0.00
90.00 0.00 0 961.60 0.00
95.00 0.00 0 961.60 0.00
100.00 0.00 0 961.60 0.00
105.00 0.00 0 961.60 0.00
110.00 0.00 0 961.60 0.00
115.00 0.00 0 961.60 0.00
120.00 0.00 0 961.60 0.00
125.00 0.00 0 961.60 0.00
130.00 0.00 0 961.60 0.00
135.00 0.00 0 961.60 0.00
140.00 0.00 0 961.60 0.00
145.00 0.00 0 961.60 0.00
150.00 0.00 0 961.60 0.00
155.00 0.00 0 961.60 0.00
160.00 0.00 0 961.60 0.00
165.00 0.00 0 961.60 0.00
170.00 0.00 0 961.60 0.00
175.00 0.00 0 961.60 0.00
180.00 0.00 0 961.60 0.00
185.00 0.00 0 961.60 0.00
190.00 0.00 0 961.60 0.00
195.00 0.00 0 961.60 0.00
200.00 0.00 0 961.60 0.00
205.00 0.00 0 961.60 0.00
210.00 0.00 0 961.60 0.00
215.00 0.00 0 961.60 0.00
220.00 0.00 0 961.60 0.00
225.00 0.00 0 961.60 0.00
230.00 0.00 0 961.60 0.00
235.00 0.00 0 961.60 0.00
240.00 0.00 0 961.60 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr 1y 24hr Rainfall=2.50"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 40HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Stage-Discharge for Pond 5P: Wetland B
Elevation
(feet)
Primary
(cfs)
961.60 0.00
961.65 139.02
961.70 144.59
961.75 149.95
961.80 155.13
961.85 160.13
961.90 164.98
961.95 169.69
962.00 174.28
962.05 178.74
962.10 183.09
962.15 187.35
962.20 191.51
962.25 195.57
962.30 199.56
962.35 203.47
962.40 207.30
962.45 211.06
962.50 214.76
962.55 218.40
962.60 221.97
962.65 225.49
962.70 228.95
962.75 232.36
962.80 235.73
962.85 239.04
962.90 242.31
962.95 245.54
963.00 248.72
963.05 251.87
963.10 254.97
963.15 258.04
963.20 261.07
963.25 264.07
963.30 267.03
963.35 269.96
963.40 272.86
963.45 275.73
963.50 278.56
963.55 281.37
963.60 284.16
963.65 286.91
963.70 289.64
963.75 292.34
963.80 295.02
963.85 297.68
963.90 300.31
963.95 302.92
964.00 305.50
964.05 308.07
964.10 310.61
964.15 313.13
964.20 315.63
Elevation
(feet)
Primary
(cfs)
964.25 318.12
964.30 320.58
964.35 323.02
964.40 325.45
964.45 327.86
964.50 330.25
964.55 332.62
964.60 334.98
964.65 337.32
964.70 339.64
964.75 341.95
964.80 344.24
964.85 346.52
964.90 348.78
964.95 351.03
965.00 353.26
965.05 355.48
965.10 357.69
965.15 359.88
965.20 362.06
965.25 364.23
965.30 366.38
965.35 368.52
965.40 370.65
965.45 372.76
965.50 374.87
965.55 376.96
965.60 379.04
965.65 381.11
965.70 383.17
965.75 385.22
965.80 387.25
965.85 389.28
965.90 391.29
965.95 393.30
966.00 395.29
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 41HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Time span=0.00-240.00 hrs, dt=0.01 hrs, 24001 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Stor-Ind method - Pond routing by Stor-Ind method
Runoff Area=125,400 sf 0.00% Impervious Runoff Depth=1.41"Subcatchment 6S: UNDISTURBED
Tc=6.0 min CN=84 Runoff=7.23 cfs 0.338 af
Runoff Area=238,192 sf 46.22% Impervious Runoff Depth=1.76"Subcatchment 7S: OFFSITE WETLAND B
Flow Length=1,100' Slope=0.1500 '/' Tc=13.4 min CN=WQ Runoff=11.78 cfs 0.801 af
Runoff Area=74,865 sf 8.12% Impervious Runoff Depth=1.51"Subcatchment OFFSITE B: OFFSITE B -
Tc=6.0 min CN=WQ Runoff=4.56 cfs 0.216 af
Runoff Area=49,573 sf 17.90% Impervious Runoff Depth=1.63"Subcatchment OUTSITE A: OFFSITE A -
Tc=6.0 min CN=WQ Runoff=3.21 cfs 0.155 af
Runoff Area=3,245 sf 100.00% Impervious Runoff Depth=2.64"Subcatchment PR1A: PR1A - DRAINS
Tc=6.0 min CN=WQ Runoff=0.32 cfs 0.016 af
Runoff Area=29,167 sf 24.99% Impervious Runoff Depth=1.72"Subcatchment PR1B: PR1B - DRAINS
Tc=6.0 min CN=WQ Runoff=1.97 cfs 0.096 af
Runoff Area=5,573 sf 0.00% Impervious Runoff Depth=1.41"Subcatchment PR1C: PR1C - DRAINS
Tc=6.0 min CN=WQ Runoff=0.32 cfs 0.015 af
Runoff Area=35,117 sf 17.47% Impervious Runoff Depth=1.62"Subcatchment PR1D: PR1D - DRAINS
Tc=6.0 min CN=WQ Runoff=2.27 cfs 0.109 af
Runoff Area=2,636 sf 87.75% Impervious Runoff Depth=2.49"Subcatchment PR2: PR2 - DRAINS SOUTH
Tc=6.0 min CN=WQ Runoff=0.24 cfs 0.013 af
Inflow=6.93 cfs 0.436 afReach DA2: DA2 - TOTAL FLOW TO WETLAND A
Outflow=6.93 cfs 0.436 af
Inflow=6.28 cfs 0.603 afReach DA3: DA3 - TOTAL FLOW TO WETLAND B
Outflow=6.28 cfs 0.603 af
Peak Elev=974.06' Storage=2,144 cf Inflow=2.27 cfs 0.109 afPond 1P: FILTRATION BASIN 1
Discarded=0.00 cfs 0.000 af Primary=0.38 cfs 0.109 af Secondary=0.00 cfs 0.000 af Outflow=0.38 cfs 0.109 af
Peak Elev=969.90' Storage=3,313 cf Inflow=6.93 cfs 0.436 afPond 4P: WETLAND A
Outflow=3.72 cfs 0.436 af
Peak Elev=961.61' Storage=1,069 cf Inflow=22.70 cfs 1.743 afPond 5P: Wetland B
Outflow=22.56 cfs 1.743 af
Total Runoff Area = 12.942 ac Runoff Volume = 1.759 af Average Runoff Depth = 1.63"
74.45% Pervious = 9.636 ac 25.55% Impervious = 3.306 ac
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 42HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment 6S: UNDISTURBED
Runoff = 7.23 cfs @ 12.09 hrs, Volume= 0.338 af, Depth= 1.41"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"
Area (sf) CN Description
* 125,400 84
125,400 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment 6S: UNDISTURBED
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)8
7
6
5
4
3
2
1
0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr
Rainfall=2.87"
Runoff Area=125,400 sf
Runoff Volume=0.338 af
Runoff Depth=1.41"
Tc=6.0 min
CN=84
7.23 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 43HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment 6S: UNDISTURBED
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.14 0.00 0.00
10.00 0.43 0.00 0.01
15.00 2.54 1.15 0.24
20.00 2.76 1.32 0.07
25.00 2.87 1.41 0.00
30.00 2.87 1.41 0.00
35.00 2.87 1.41 0.00
40.00 2.87 1.41 0.00
45.00 2.87 1.41 0.00
50.00 2.87 1.41 0.00
55.00 2.87 1.41 0.00
60.00 2.87 1.41 0.00
65.00 2.87 1.41 0.00
70.00 2.87 1.41 0.00
75.00 2.87 1.41 0.00
80.00 2.87 1.41 0.00
85.00 2.87 1.41 0.00
90.00 2.87 1.41 0.00
95.00 2.87 1.41 0.00
100.00 2.87 1.41 0.00
105.00 2.87 1.41 0.00
110.00 2.87 1.41 0.00
115.00 2.87 1.41 0.00
120.00 2.87 1.41 0.00
125.00 2.87 1.41 0.00
130.00 2.87 1.41 0.00
135.00 2.87 1.41 0.00
140.00 2.87 1.41 0.00
145.00 2.87 1.41 0.00
150.00 2.87 1.41 0.00
155.00 2.87 1.41 0.00
160.00 2.87 1.41 0.00
165.00 2.87 1.41 0.00
170.00 2.87 1.41 0.00
175.00 2.87 1.41 0.00
180.00 2.87 1.41 0.00
185.00 2.87 1.41 0.00
190.00 2.87 1.41 0.00
195.00 2.87 1.41 0.00
200.00 2.87 1.41 0.00
205.00 2.87 1.41 0.00
210.00 2.87 1.41 0.00
215.00 2.87 1.41 0.00
220.00 2.87 1.41 0.00
225.00 2.87 1.41 0.00
230.00 2.87 1.41 0.00
235.00 2.87 1.41 0.00
240.00 2.87 1.41 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 44HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment 7S: OFFSITE WETLAND B WATERSHED
Runoff = 11.78 cfs @ 12.18 hrs, Volume= 0.801 af, Depth= 1.76"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"
Area (sf) CN Description
67,393 98 Unconnected roofs, HSG B
* 170,799 84 1/2 acre lots, 25% imp, HSG B
238,192 Weighted Average
128,099 53.78% Pervious Area
110,093 46.22% Impervious Area
67,393 61.21% Unconnected
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
7.9 200 0.1500 0.42 Sheet Flow,
Grass: Short n= 0.150 P2= 2.94"
5.5 900 0.1500 2.71 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
13.4 1,100 Total
Subcatchment 7S: OFFSITE WETLAND B WATERSHED
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)13
12
11
10
9
8
7
6
5
4
3
2
1
0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr
Rainfall=2.87"
Runoff Area=238,192 sf
Runoff Volume=0.801 af
Runoff Depth=1.76"
Flow Length=1,100'
Slope=0.1500 '/'
Tc=13.4 min
CN=WQ
11.78 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 45HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment 7S: OFFSITE WETLAND B WATERSHED
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.14 0.00 0.02
10.00 0.43 0.02 0.16
15.00 2.54 1.42 0.50
20.00 2.76 1.60 0.13
25.00 2.87 1.70 0.00
30.00 2.87 1.70 0.00
35.00 2.87 1.70 0.00
40.00 2.87 1.70 0.00
45.00 2.87 1.70 0.00
50.00 2.87 1.70 0.00
55.00 2.87 1.70 0.00
60.00 2.87 1.70 0.00
65.00 2.87 1.70 0.00
70.00 2.87 1.70 0.00
75.00 2.87 1.70 0.00
80.00 2.87 1.70 0.00
85.00 2.87 1.70 0.00
90.00 2.87 1.70 0.00
95.00 2.87 1.70 0.00
100.00 2.87 1.70 0.00
105.00 2.87 1.70 0.00
110.00 2.87 1.70 0.00
115.00 2.87 1.70 0.00
120.00 2.87 1.70 0.00
125.00 2.87 1.70 0.00
130.00 2.87 1.70 0.00
135.00 2.87 1.70 0.00
140.00 2.87 1.70 0.00
145.00 2.87 1.70 0.00
150.00 2.87 1.70 0.00
155.00 2.87 1.70 0.00
160.00 2.87 1.70 0.00
165.00 2.87 1.70 0.00
170.00 2.87 1.70 0.00
175.00 2.87 1.70 0.00
180.00 2.87 1.70 0.00
185.00 2.87 1.70 0.00
190.00 2.87 1.70 0.00
195.00 2.87 1.70 0.00
200.00 2.87 1.70 0.00
205.00 2.87 1.70 0.00
210.00 2.87 1.70 0.00
215.00 2.87 1.70 0.00
220.00 2.87 1.70 0.00
225.00 2.87 1.70 0.00
230.00 2.87 1.70 0.00
235.00 2.87 1.70 0.00
240.00 2.87 1.70 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 46HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment OFFSITE B: OFFSITE B - DRAINS SOUTH TO WETLAND
Runoff = 4.56 cfs @ 12.09 hrs, Volume= 0.216 af, Depth= 1.51"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"
Area (sf) CN Description
6,076 98 Paved parking, HSG C
* 68,789 84
74,865 Weighted Average
68,789 91.88% Pervious Area
6,076 8.12% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment OFFSITE B: OFFSITE B - DRAINS SOUTH TO WETLAND
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)5
4
3
2
1
0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr
Rainfall=2.87"
Runoff Area=74,865 sf
Runoff Volume=0.216 af
Runoff Depth=1.51"
Tc=6.0 min
CN=WQ
4.56 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 47HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment OFFSITE B: OFFSITE B - DRAINS SOUTH TO WETLAND
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.14 0.00 0.00
10.00 0.43 0.00 0.02
15.00 2.54 1.21 0.15
20.00 2.76 1.39 0.04
25.00 2.87 1.48 0.00
30.00 2.87 1.48 0.00
35.00 2.87 1.48 0.00
40.00 2.87 1.48 0.00
45.00 2.87 1.48 0.00
50.00 2.87 1.48 0.00
55.00 2.87 1.48 0.00
60.00 2.87 1.48 0.00
65.00 2.87 1.48 0.00
70.00 2.87 1.48 0.00
75.00 2.87 1.48 0.00
80.00 2.87 1.48 0.00
85.00 2.87 1.48 0.00
90.00 2.87 1.48 0.00
95.00 2.87 1.48 0.00
100.00 2.87 1.48 0.00
105.00 2.87 1.48 0.00
110.00 2.87 1.48 0.00
115.00 2.87 1.48 0.00
120.00 2.87 1.48 0.00
125.00 2.87 1.48 0.00
130.00 2.87 1.48 0.00
135.00 2.87 1.48 0.00
140.00 2.87 1.48 0.00
145.00 2.87 1.48 0.00
150.00 2.87 1.48 0.00
155.00 2.87 1.48 0.00
160.00 2.87 1.48 0.00
165.00 2.87 1.48 0.00
170.00 2.87 1.48 0.00
175.00 2.87 1.48 0.00
180.00 2.87 1.48 0.00
185.00 2.87 1.48 0.00
190.00 2.87 1.48 0.00
195.00 2.87 1.48 0.00
200.00 2.87 1.48 0.00
205.00 2.87 1.48 0.00
210.00 2.87 1.48 0.00
215.00 2.87 1.48 0.00
220.00 2.87 1.48 0.00
225.00 2.87 1.48 0.00
230.00 2.87 1.48 0.00
235.00 2.87 1.48 0.00
240.00 2.87 1.48 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 48HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment OUTSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B
Runoff = 3.21 cfs @ 12.09 hrs, Volume= 0.155 af, Depth= 1.63"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"
Area (sf) CN Description
8,875 98 Paved parking, HSG C
* 40,698 84
49,573 Weighted Average
40,698 82.10% Pervious Area
8,875 17.90% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment OUTSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)3
2
1
0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr
Rainfall=2.87"
Runoff Area=49,573 sf
Runoff Volume=0.155 af
Runoff Depth=1.63"
Tc=6.0 min
CN=WQ
3.21 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 49HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment OUTSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.14 0.00 0.00
10.00 0.43 0.01 0.02
15.00 2.54 1.35 0.10
20.00 2.76 1.53 0.03
25.00 2.87 1.63 0.00
30.00 2.87 1.63 0.00
35.00 2.87 1.63 0.00
40.00 2.87 1.63 0.00
45.00 2.87 1.63 0.00
50.00 2.87 1.63 0.00
55.00 2.87 1.63 0.00
60.00 2.87 1.63 0.00
65.00 2.87 1.63 0.00
70.00 2.87 1.63 0.00
75.00 2.87 1.63 0.00
80.00 2.87 1.63 0.00
85.00 2.87 1.63 0.00
90.00 2.87 1.63 0.00
95.00 2.87 1.63 0.00
100.00 2.87 1.63 0.00
105.00 2.87 1.63 0.00
110.00 2.87 1.63 0.00
115.00 2.87 1.63 0.00
120.00 2.87 1.63 0.00
125.00 2.87 1.63 0.00
130.00 2.87 1.63 0.00
135.00 2.87 1.63 0.00
140.00 2.87 1.63 0.00
145.00 2.87 1.63 0.00
150.00 2.87 1.63 0.00
155.00 2.87 1.63 0.00
160.00 2.87 1.63 0.00
165.00 2.87 1.63 0.00
170.00 2.87 1.63 0.00
175.00 2.87 1.63 0.00
180.00 2.87 1.63 0.00
185.00 2.87 1.63 0.00
190.00 2.87 1.63 0.00
195.00 2.87 1.63 0.00
200.00 2.87 1.63 0.00
205.00 2.87 1.63 0.00
210.00 2.87 1.63 0.00
215.00 2.87 1.63 0.00
220.00 2.87 1.63 0.00
225.00 2.87 1.63 0.00
230.00 2.87 1.63 0.00
235.00 2.87 1.63 0.00
240.00 2.87 1.63 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 50HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment PR1A: PR1A - DRAINS EAST ALONG STREET
Runoff = 0.32 cfs @ 12.08 hrs, Volume= 0.016 af, Depth= 2.64"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"
Area (sf) CN Description
3,245 98 Paved parking, HSG C
* 0 84
3,245 Weighted Average
3,245 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment PR1A: PR1A - DRAINS EAST ALONG STREET
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.34
0.32
0.3
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr
Rainfall=2.87"
Runoff Area=3,245 sf
Runoff Volume=0.016 af
Runoff Depth=2.64"
Tc=6.0 min
CN=WQ
0.32 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 51HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment PR1A: PR1A - DRAINS EAST ALONG STREET
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.14 0.03 0.00
10.00 0.43 0.26 0.01
15.00 2.54 2.31 0.01
20.00 2.76 2.53 0.00
25.00 2.87 2.64 0.00
30.00 2.87 2.64 0.00
35.00 2.87 2.64 0.00
40.00 2.87 2.64 0.00
45.00 2.87 2.64 0.00
50.00 2.87 2.64 0.00
55.00 2.87 2.64 0.00
60.00 2.87 2.64 0.00
65.00 2.87 2.64 0.00
70.00 2.87 2.64 0.00
75.00 2.87 2.64 0.00
80.00 2.87 2.64 0.00
85.00 2.87 2.64 0.00
90.00 2.87 2.64 0.00
95.00 2.87 2.64 0.00
100.00 2.87 2.64 0.00
105.00 2.87 2.64 0.00
110.00 2.87 2.64 0.00
115.00 2.87 2.64 0.00
120.00 2.87 2.64 0.00
125.00 2.87 2.64 0.00
130.00 2.87 2.64 0.00
135.00 2.87 2.64 0.00
140.00 2.87 2.64 0.00
145.00 2.87 2.64 0.00
150.00 2.87 2.64 0.00
155.00 2.87 2.64 0.00
160.00 2.87 2.64 0.00
165.00 2.87 2.64 0.00
170.00 2.87 2.64 0.00
175.00 2.87 2.64 0.00
180.00 2.87 2.64 0.00
185.00 2.87 2.64 0.00
190.00 2.87 2.64 0.00
195.00 2.87 2.64 0.00
200.00 2.87 2.64 0.00
205.00 2.87 2.64 0.00
210.00 2.87 2.64 0.00
215.00 2.87 2.64 0.00
220.00 2.87 2.64 0.00
225.00 2.87 2.64 0.00
230.00 2.87 2.64 0.00
235.00 2.87 2.64 0.00
240.00 2.87 2.64 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 52HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment PR1B: PR1B - DRAINS SOUTH TO WETLAND A
Runoff = 1.97 cfs @ 12.09 hrs, Volume= 0.096 af, Depth= 1.72"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"
Area (sf) CN Description
7,290 98 Paved parking, HSG C
* 21,877 84
29,167 Weighted Average
21,877 75.01% Pervious Area
7,290 24.99% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment PR1B: PR1B - DRAINS SOUTH TO WETLAND A
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)2
1
0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr
Rainfall=2.87"
Runoff Area=29,167 sf
Runoff Volume=0.096 af
Runoff Depth=1.72"
Tc=6.0 min
CN=WQ
1.97 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 53HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment PR1B: PR1B - DRAINS SOUTH TO WETLAND A
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.14 0.00 0.00
10.00 0.43 0.01 0.02
15.00 2.54 1.35 0.06
20.00 2.76 1.53 0.02
25.00 2.87 1.63 0.00
30.00 2.87 1.63 0.00
35.00 2.87 1.63 0.00
40.00 2.87 1.63 0.00
45.00 2.87 1.63 0.00
50.00 2.87 1.63 0.00
55.00 2.87 1.63 0.00
60.00 2.87 1.63 0.00
65.00 2.87 1.63 0.00
70.00 2.87 1.63 0.00
75.00 2.87 1.63 0.00
80.00 2.87 1.63 0.00
85.00 2.87 1.63 0.00
90.00 2.87 1.63 0.00
95.00 2.87 1.63 0.00
100.00 2.87 1.63 0.00
105.00 2.87 1.63 0.00
110.00 2.87 1.63 0.00
115.00 2.87 1.63 0.00
120.00 2.87 1.63 0.00
125.00 2.87 1.63 0.00
130.00 2.87 1.63 0.00
135.00 2.87 1.63 0.00
140.00 2.87 1.63 0.00
145.00 2.87 1.63 0.00
150.00 2.87 1.63 0.00
155.00 2.87 1.63 0.00
160.00 2.87 1.63 0.00
165.00 2.87 1.63 0.00
170.00 2.87 1.63 0.00
175.00 2.87 1.63 0.00
180.00 2.87 1.63 0.00
185.00 2.87 1.63 0.00
190.00 2.87 1.63 0.00
195.00 2.87 1.63 0.00
200.00 2.87 1.63 0.00
205.00 2.87 1.63 0.00
210.00 2.87 1.63 0.00
215.00 2.87 1.63 0.00
220.00 2.87 1.63 0.00
225.00 2.87 1.63 0.00
230.00 2.87 1.63 0.00
235.00 2.87 1.63 0.00
240.00 2.87 1.63 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 54HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment PR1C: PR1C - DRAINS NORTH TO WETLAND A
Runoff = 0.32 cfs @ 12.09 hrs, Volume= 0.015 af, Depth= 1.41"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"
Area (sf) CN Description
0 98 Paved parking, HSG C
* 5,573 84
5,573 Weighted Average
5,573 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment PR1C: PR1C - DRAINS NORTH TO WETLAND A
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.34
0.32
0.3
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr
Rainfall=2.87"
Runoff Area=5,573 sf
Runoff Volume=0.015 af
Runoff Depth=1.41"
Tc=6.0 min
CN=WQ
0.32 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 55HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment PR1C: PR1C - DRAINS NORTH TO WETLAND A
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.14 0.00 0.00
10.00 0.43 0.00 0.00
15.00 2.54 1.15 0.01
20.00 2.76 1.32 0.00
25.00 2.87 1.41 0.00
30.00 2.87 1.41 0.00
35.00 2.87 1.41 0.00
40.00 2.87 1.41 0.00
45.00 2.87 1.41 0.00
50.00 2.87 1.41 0.00
55.00 2.87 1.41 0.00
60.00 2.87 1.41 0.00
65.00 2.87 1.41 0.00
70.00 2.87 1.41 0.00
75.00 2.87 1.41 0.00
80.00 2.87 1.41 0.00
85.00 2.87 1.41 0.00
90.00 2.87 1.41 0.00
95.00 2.87 1.41 0.00
100.00 2.87 1.41 0.00
105.00 2.87 1.41 0.00
110.00 2.87 1.41 0.00
115.00 2.87 1.41 0.00
120.00 2.87 1.41 0.00
125.00 2.87 1.41 0.00
130.00 2.87 1.41 0.00
135.00 2.87 1.41 0.00
140.00 2.87 1.41 0.00
145.00 2.87 1.41 0.00
150.00 2.87 1.41 0.00
155.00 2.87 1.41 0.00
160.00 2.87 1.41 0.00
165.00 2.87 1.41 0.00
170.00 2.87 1.41 0.00
175.00 2.87 1.41 0.00
180.00 2.87 1.41 0.00
185.00 2.87 1.41 0.00
190.00 2.87 1.41 0.00
195.00 2.87 1.41 0.00
200.00 2.87 1.41 0.00
205.00 2.87 1.41 0.00
210.00 2.87 1.41 0.00
215.00 2.87 1.41 0.00
220.00 2.87 1.41 0.00
225.00 2.87 1.41 0.00
230.00 2.87 1.41 0.00
235.00 2.87 1.41 0.00
240.00 2.87 1.41 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 56HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment PR1D: PR1D - DRAINS SOUTH TO RAIN GARDEN
Runoff = 2.27 cfs @ 12.09 hrs, Volume= 0.109 af, Depth= 1.62"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"
Area (sf) CN Description
6,135 98 Paved parking, HSG C
* 28,982 84
35,117 Weighted Average
28,982 82.53% Pervious Area
6,135 17.47% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment PR1D: PR1D - DRAINS SOUTH TO RAIN GARDEN
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)2
1
0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr
Rainfall=2.87"
Runoff Area=35,117 sf
Runoff Volume=0.109 af
Runoff Depth=1.62"
Tc=6.0 min
CN=WQ
2.27 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 57HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment PR1D: PR1D - DRAINS SOUTH TO RAIN GARDEN
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.14 0.00 0.00
10.00 0.43 0.01 0.02
15.00 2.54 1.28 0.07
20.00 2.76 1.46 0.02
25.00 2.87 1.55 0.00
30.00 2.87 1.55 0.00
35.00 2.87 1.55 0.00
40.00 2.87 1.55 0.00
45.00 2.87 1.55 0.00
50.00 2.87 1.55 0.00
55.00 2.87 1.55 0.00
60.00 2.87 1.55 0.00
65.00 2.87 1.55 0.00
70.00 2.87 1.55 0.00
75.00 2.87 1.55 0.00
80.00 2.87 1.55 0.00
85.00 2.87 1.55 0.00
90.00 2.87 1.55 0.00
95.00 2.87 1.55 0.00
100.00 2.87 1.55 0.00
105.00 2.87 1.55 0.00
110.00 2.87 1.55 0.00
115.00 2.87 1.55 0.00
120.00 2.87 1.55 0.00
125.00 2.87 1.55 0.00
130.00 2.87 1.55 0.00
135.00 2.87 1.55 0.00
140.00 2.87 1.55 0.00
145.00 2.87 1.55 0.00
150.00 2.87 1.55 0.00
155.00 2.87 1.55 0.00
160.00 2.87 1.55 0.00
165.00 2.87 1.55 0.00
170.00 2.87 1.55 0.00
175.00 2.87 1.55 0.00
180.00 2.87 1.55 0.00
185.00 2.87 1.55 0.00
190.00 2.87 1.55 0.00
195.00 2.87 1.55 0.00
200.00 2.87 1.55 0.00
205.00 2.87 1.55 0.00
210.00 2.87 1.55 0.00
215.00 2.87 1.55 0.00
220.00 2.87 1.55 0.00
225.00 2.87 1.55 0.00
230.00 2.87 1.55 0.00
235.00 2.87 1.55 0.00
240.00 2.87 1.55 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 58HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment PR2: PR2 - DRAINS SOUTH TO WETLAND B
Runoff = 0.24 cfs @ 12.08 hrs, Volume= 0.013 af, Depth= 2.49"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"
Area (sf) CN Description
2,313 98 Paved parking, HSG C
* 323 84
2,636 Weighted Average
323 12.25% Pervious Area
2,313 87.75% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment PR2: PR2 - DRAINS SOUTH TO WETLAND B
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr
Rainfall=2.87"
Runoff Area=2,636 sf
Runoff Volume=0.013 af
Runoff Depth=2.49"
Tc=6.0 min
CN=WQ
0.24 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 59HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment PR2: PR2 - DRAINS SOUTH TO WETLAND B
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.14 0.01 0.00
10.00 0.43 0.16 0.01
15.00 2.54 2.10 0.01
20.00 2.76 2.31 0.00
25.00 2.87 2.42 0.00
30.00 2.87 2.42 0.00
35.00 2.87 2.42 0.00
40.00 2.87 2.42 0.00
45.00 2.87 2.42 0.00
50.00 2.87 2.42 0.00
55.00 2.87 2.42 0.00
60.00 2.87 2.42 0.00
65.00 2.87 2.42 0.00
70.00 2.87 2.42 0.00
75.00 2.87 2.42 0.00
80.00 2.87 2.42 0.00
85.00 2.87 2.42 0.00
90.00 2.87 2.42 0.00
95.00 2.87 2.42 0.00
100.00 2.87 2.42 0.00
105.00 2.87 2.42 0.00
110.00 2.87 2.42 0.00
115.00 2.87 2.42 0.00
120.00 2.87 2.42 0.00
125.00 2.87 2.42 0.00
130.00 2.87 2.42 0.00
135.00 2.87 2.42 0.00
140.00 2.87 2.42 0.00
145.00 2.87 2.42 0.00
150.00 2.87 2.42 0.00
155.00 2.87 2.42 0.00
160.00 2.87 2.42 0.00
165.00 2.87 2.42 0.00
170.00 2.87 2.42 0.00
175.00 2.87 2.42 0.00
180.00 2.87 2.42 0.00
185.00 2.87 2.42 0.00
190.00 2.87 2.42 0.00
195.00 2.87 2.42 0.00
200.00 2.87 2.42 0.00
205.00 2.87 2.42 0.00
210.00 2.87 2.42 0.00
215.00 2.87 2.42 0.00
220.00 2.87 2.42 0.00
225.00 2.87 2.42 0.00
230.00 2.87 2.42 0.00
235.00 2.87 2.42 0.00
240.00 2.87 2.42 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 60HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A
[40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 3.322 ac, 13.47% Impervious, Inflow Depth = 1.58" for 2y 24hr event
Inflow = 6.93 cfs @ 12.09 hrs, Volume= 0.436 af
Outflow = 6.93 cfs @ 12.09 hrs, Volume= 0.436 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Reach DA2: DA2 - TOTAL FLOW TO WETLAND A
Inflow
Outflow
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)7
6
5
4
3
2
1
0
Inflow Area=3.322 ac
6.93 cfs
6.93 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 61HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A
Time
(hours)
Inflow
(cfs)
Elevation
(feet)
Outflow
(cfs)
0.00 0.00 0.00
5.00 0.01 0.01
10.00 0.05 0.05
15.00 0.30 0.30
20.00 0.14 0.14
25.00 0.06 0.06
30.00 0.00 0.00
35.00 0.00 0.00
40.00 0.00 0.00
45.00 0.00 0.00
50.00 0.00 0.00
55.00 0.00 0.00
60.00 0.00 0.00
65.00 0.00 0.00
70.00 0.00 0.00
75.00 0.00 0.00
80.00 0.00 0.00
85.00 0.00 0.00
90.00 0.00 0.00
95.00 0.00 0.00
100.00 0.00 0.00
105.00 0.00 0.00
110.00 0.00 0.00
115.00 0.00 0.00
120.00 0.00 0.00
125.00 0.00 0.00
130.00 0.00 0.00
135.00 0.00 0.00
140.00 0.00 0.00
145.00 0.00 0.00
150.00 0.00 0.00
155.00 0.00 0.00
160.00 0.00 0.00
165.00 0.00 0.00
170.00 0.00 0.00
175.00 0.00 0.00
180.00 0.00 0.00
185.00 0.00 0.00
190.00 0.00 0.00
195.00 0.00 0.00
200.00 0.00 0.00
205.00 0.00 0.00
210.00 0.00 0.00
215.00 0.00 0.00
220.00 0.00 0.00
225.00 0.00 0.00
230.00 0.00 0.00
235.00 0.00 0.00
240.00 0.00 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 62HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B
[40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 4.521 ac, 15.58% Impervious, Inflow Depth = 1.60" for 2y 24hr event
Inflow = 6.28 cfs @ 12.11 hrs, Volume= 0.603 af
Outflow = 6.28 cfs @ 12.11 hrs, Volume= 0.603 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Reach DA3: DA3 - TOTAL FLOW TO WETLAND B
Inflow
Outflow
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)7
6
5
4
3
2
1
0
Inflow Area=4.521 ac
6.28 cfs
6.28 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 63HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B
Time
(hours)
Inflow
(cfs)
Elevation
(feet)
Outflow
(cfs)
0.00 0.00 0.00
5.00 0.01 0.01
10.00 0.06 0.06
15.00 0.42 0.42
20.00 0.17 0.17
25.00 0.08 0.08
30.00 0.00 0.00
35.00 0.00 0.00
40.00 0.00 0.00
45.00 0.00 0.00
50.00 0.00 0.00
55.00 0.00 0.00
60.00 0.00 0.00
65.00 0.00 0.00
70.00 0.00 0.00
75.00 0.00 0.00
80.00 0.00 0.00
85.00 0.00 0.00
90.00 0.00 0.00
95.00 0.00 0.00
100.00 0.00 0.00
105.00 0.00 0.00
110.00 0.00 0.00
115.00 0.00 0.00
120.00 0.00 0.00
125.00 0.00 0.00
130.00 0.00 0.00
135.00 0.00 0.00
140.00 0.00 0.00
145.00 0.00 0.00
150.00 0.00 0.00
155.00 0.00 0.00
160.00 0.00 0.00
165.00 0.00 0.00
170.00 0.00 0.00
175.00 0.00 0.00
180.00 0.00 0.00
185.00 0.00 0.00
190.00 0.00 0.00
195.00 0.00 0.00
200.00 0.00 0.00
205.00 0.00 0.00
210.00 0.00 0.00
215.00 0.00 0.00
220.00 0.00 0.00
225.00 0.00 0.00
230.00 0.00 0.00
235.00 0.00 0.00
240.00 0.00 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 64HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Pond 1P: FILTRATION BASIN 1
Inflow Area = 0.806 ac, 17.47% Impervious, Inflow Depth = 1.62" for 2y 24hr event
Inflow = 2.27 cfs @ 12.09 hrs, Volume= 0.109 af
Outflow = 0.38 cfs @ 12.54 hrs, Volume= 0.109 af, Atten= 83%, Lag= 27.4 min
Discarded = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Primary = 0.38 cfs @ 12.54 hrs, Volume= 0.109 af
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Peak Elev= 974.06' @ 12.54 hrs Surf.Area= 2,363 sf Storage= 2,144 cf
Plug-Flow detention time= 206.2 min calculated for 0.109 af (100% of inflow)
Center-of-Mass det. time= 206.2 min ( 1,008.4 - 802.2 )
Volume Invert Avail.Storage Storage Description
#1 973.00' 5,291 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
973.00 1,624 0 0
973.50 2,040 916 916
974.00 2,320 1,090 2,006
974.50 2,686 1,252 3,258
975.10 3,068 1,726 4,984
975.20 3,068 307 5,291
Device Routing Invert Outlet Devices
#1 Primary 971.50'12.0" Round OUTLET PIPE
L= 23.0' CMP, mitered to conform to fill, Ke= 0.700
Inlet / Outlet Invert= 971.50' / 971.50' S= 0.0000 '/' Cc= 0.900
n= 0.012 Concrete pipe, finished, Flow Area= 0.79 sf
#2 Device 1 974.00'24.0" Horiz. RIM- Orifice/Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 975.10'10.0' long x 10.0' breadth EOF
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60
Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64
#4 Device 5 973.00'1.600 in/hr Exfiltration over Surface area above 970.50'
Excluded Surface area = 0 sf
#5 Device 1 971.50'6.0" Vert. Orifice 6" draintile C= 0.600
#6 Discarded 973.00'0.600 in/hr Exfiltration-Infiltration into Rock over Surface area from 970.00' - 970.50'
Excluded Surface area = 0 sf
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 65HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Discarded OutFlow Max=0.00 cfs @ 0.00 hrs HW=973.00' (Free Discharge)
6=Exfiltration-Infiltration into Rock ( Controls 0.00 cfs)
Primary OutFlow Max=0.38 cfs @ 12.54 hrs HW=974.06' (Free Discharge)
1=OUTLET PIPE (Passes 0.38 cfs of 4.79 cfs potential flow)
2=RIM- Orifice/Grate (Weir Controls 0.29 cfs @ 0.79 fps)
5=Orifice 6" draintile (Passes 0.09 cfs of 1.44 cfs potential flow)
4=Exfiltration (Exfiltration Controls 0.09 cfs)
Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=973.00' (Free Discharge)
3=EOF ( Controls 0.00 cfs)
Pond 1P: FILTRATION BASIN 1
Inflow
Outflow
Discarded
Primary
Secondary
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)2
1
0
Inflow Area=0.806 ac
Peak Elev=974.06'
Storage=2,144 cf
2.27 cfs
0.38 cfs
0.00 cfs
0.38 cfs
0.00 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 66HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Pond 1P: FILTRATION BASIN 1
Time
(hours)
Inflow
(cfs)
Storage
(cubic-feet)
Elevation
(feet)
Outflow
(cfs)
Discarded
(cfs)
Primary
(cfs)
Secondary
(cfs)
0.00 0.00 0 973.00 0.00 0.00 0.00 0.00
5.00 0.00 1 973.00 0.00 0.00 0.00 0.00
10.00 0.02 9 973.01 0.02 0.00 0.02 0.00
15.00 0.07 1,948 973.97 0.09 0.00 0.09 0.00
20.00 0.02 1,022 973.55 0.08 0.00 0.08 0.00
25.00 0.00 53 973.03 0.06 0.00 0.06 0.00
30.00 0.00 0 973.00 0.00 0.00 0.00 0.00
35.00 0.00 0 973.00 0.00 0.00 0.00 0.00
40.00 0.00 0 973.00 0.00 0.00 0.00 0.00
45.00 0.00 0 973.00 0.00 0.00 0.00 0.00
50.00 0.00 0 973.00 0.00 0.00 0.00 0.00
55.00 0.00 0 973.00 0.00 0.00 0.00 0.00
60.00 0.00 0 973.00 0.00 0.00 0.00 0.00
65.00 0.00 0 973.00 0.00 0.00 0.00 0.00
70.00 0.00 0 973.00 0.00 0.00 0.00 0.00
75.00 0.00 0 973.00 0.00 0.00 0.00 0.00
80.00 0.00 0 973.00 0.00 0.00 0.00 0.00
85.00 0.00 0 973.00 0.00 0.00 0.00 0.00
90.00 0.00 0 973.00 0.00 0.00 0.00 0.00
95.00 0.00 0 973.00 0.00 0.00 0.00 0.00
100.00 0.00 0 973.00 0.00 0.00 0.00 0.00
105.00 0.00 0 973.00 0.00 0.00 0.00 0.00
110.00 0.00 0 973.00 0.00 0.00 0.00 0.00
115.00 0.00 0 973.00 0.00 0.00 0.00 0.00
120.00 0.00 0 973.00 0.00 0.00 0.00 0.00
125.00 0.00 0 973.00 0.00 0.00 0.00 0.00
130.00 0.00 0 973.00 0.00 0.00 0.00 0.00
135.00 0.00 0 973.00 0.00 0.00 0.00 0.00
140.00 0.00 0 973.00 0.00 0.00 0.00 0.00
145.00 0.00 0 973.00 0.00 0.00 0.00 0.00
150.00 0.00 0 973.00 0.00 0.00 0.00 0.00
155.00 0.00 0 973.00 0.00 0.00 0.00 0.00
160.00 0.00 0 973.00 0.00 0.00 0.00 0.00
165.00 0.00 0 973.00 0.00 0.00 0.00 0.00
170.00 0.00 0 973.00 0.00 0.00 0.00 0.00
175.00 0.00 0 973.00 0.00 0.00 0.00 0.00
180.00 0.00 0 973.00 0.00 0.00 0.00 0.00
185.00 0.00 0 973.00 0.00 0.00 0.00 0.00
190.00 0.00 0 973.00 0.00 0.00 0.00 0.00
195.00 0.00 0 973.00 0.00 0.00 0.00 0.00
200.00 0.00 0 973.00 0.00 0.00 0.00 0.00
205.00 0.00 0 973.00 0.00 0.00 0.00 0.00
210.00 0.00 0 973.00 0.00 0.00 0.00 0.00
215.00 0.00 0 973.00 0.00 0.00 0.00 0.00
220.00 0.00 0 973.00 0.00 0.00 0.00 0.00
225.00 0.00 0 973.00 0.00 0.00 0.00 0.00
230.00 0.00 0 973.00 0.00 0.00 0.00 0.00
235.00 0.00 0 973.00 0.00 0.00 0.00 0.00
240.00 0.00 0 973.00 0.00 0.00 0.00 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 67HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Stage-Discharge for Pond 1P: FILTRATION BASIN 1
Elevation
(feet)
Discharge
(cfs)
Discarded
(cfs)
Primary
(cfs)
Secondary
(cfs)
973.00 0.00 0.00 0.00 0.00
973.05 0.06 0.00 0.06 0.00
973.10 0.06 0.00 0.06 0.00
973.15 0.06 0.00 0.06 0.00
973.20 0.07 0.00 0.07 0.00
973.25 0.07 0.00 0.07 0.00
973.30 0.07 0.00 0.07 0.00
973.35 0.07 0.00 0.07 0.00
973.40 0.07 0.00 0.07 0.00
973.45 0.07 0.00 0.07 0.00
973.50 0.08 0.00 0.08 0.00
973.55 0.08 0.00 0.08 0.00
973.60 0.08 0.00 0.08 0.00
973.65 0.08 0.00 0.08 0.00
973.70 0.08 0.00 0.08 0.00
973.75 0.08 0.00 0.08 0.00
973.80 0.08 0.00 0.08 0.00
973.85 0.08 0.00 0.08 0.00
973.90 0.08 0.00 0.08 0.00
973.95 0.08 0.00 0.08 0.00
974.00 0.09 0.00 0.09 0.00
974.05 0.32 0.00 0.32 0.00
974.10 0.74 0.00 0.74 0.00
974.15 1.28 0.00 1.28 0.00
974.20 1.93 0.00 1.93 0.00
974.25 2.66 0.00 2.66 0.00
974.30 3.47 0.00 3.47 0.00
974.35 4.35 0.00 4.35 0.00
974.40 5.17 0.00 5.17 0.00
974.45 5.22 0.00 5.22 0.00
974.50 5.28 0.00 5.28 0.00
974.55 5.33 0.00 5.33 0.00
974.60 5.38 0.00 5.38 0.00
974.65 5.43 0.00 5.43 0.00
974.70 5.48 0.00 5.48 0.00
974.75 5.53 0.00 5.53 0.00
974.80 5.58 0.00 5.58 0.00
974.85 5.63 0.00 5.63 0.00
974.90 5.68 0.00 5.68 0.00
974.95 5.73 0.00 5.73 0.00
975.00 5.78 0.00 5.78 0.00
975.05 5.83 0.00 5.83 0.00
975.10 5.87 0.00 5.87 0.00
975.15 6.20 0.00 5.92 0.28
975.20 6.76 0.00 5.97 0.79
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 68HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Pond 4P: WETLAND A
Inflow Area = 3.322 ac, 13.47% Impervious, Inflow Depth = 1.58" for 2y 24hr event
Inflow = 6.93 cfs @ 12.09 hrs, Volume= 0.436 af
Outflow = 3.72 cfs @ 12.19 hrs, Volume= 0.436 af, Atten= 46%, Lag= 5.9 min
Primary = 3.72 cfs @ 12.19 hrs, Volume= 0.436 af
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Peak Elev= 969.90' @ 12.19 hrs Surf.Area= 12,265 sf Storage= 3,313 cf
Plug-Flow detention time= 29.0 min calculated for 0.436 af (100% of inflow)
Center-of-Mass det. time= 29.0 min ( 886.5 - 857.5 )
Volume Invert Avail.Storage Storage Description
#1 969.62' 18,824 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
969.62 11,466 0 0
970.00 12,553 4,564 4,564
971.00 15,967 14,260 18,824
Device Routing Invert Outlet Devices
#1 Primary 969.62'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60
Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64
Primary OutFlow Max=3.71 cfs @ 12.19 hrs HW=969.90' (Free Discharge)
1=Broad-Crested Rectangular Weir (Weir Controls 3.71 cfs @ 1.33 fps)
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 69HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Pond 4P: WETLAND A
Inflow
Primary
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)7
6
5
4
3
2
1
0
Inflow Area=3.322 ac
Peak Elev=969.90'
Storage=3,313 cf
6.93 cfs
3.72 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 70HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Pond 4P: WETLAND A
Time
(hours)
Inflow
(cfs)
Storage
(cubic-feet)
Elevation
(feet)
Primary
(cfs)
0.00 0.00 0 969.62 0.00
5.00 0.01 20 969.62 0.01
10.00 0.05 128 969.63 0.03
15.00 0.30 618 969.67 0.31
20.00 0.14 356 969.65 0.14
25.00 0.06 235 969.64 0.08
30.00 0.00 3 969.62 0.00
35.00 0.00 0 969.62 0.00
40.00 0.00 0 969.62 0.00
45.00 0.00 0 969.62 0.00
50.00 0.00 0 969.62 0.00
55.00 0.00 0 969.62 0.00
60.00 0.00 0 969.62 0.00
65.00 0.00 0 969.62 0.00
70.00 0.00 0 969.62 0.00
75.00 0.00 0 969.62 0.00
80.00 0.00 0 969.62 0.00
85.00 0.00 0 969.62 0.00
90.00 0.00 0 969.62 0.00
95.00 0.00 0 969.62 0.00
100.00 0.00 0 969.62 0.00
105.00 0.00 0 969.62 0.00
110.00 0.00 0 969.62 0.00
115.00 0.00 0 969.62 0.00
120.00 0.00 0 969.62 0.00
125.00 0.00 0 969.62 0.00
130.00 0.00 0 969.62 0.00
135.00 0.00 0 969.62 0.00
140.00 0.00 0 969.62 0.00
145.00 0.00 0 969.62 0.00
150.00 0.00 0 969.62 0.00
155.00 0.00 0 969.62 0.00
160.00 0.00 0 969.62 0.00
165.00 0.00 0 969.62 0.00
170.00 0.00 0 969.62 0.00
175.00 0.00 0 969.62 0.00
180.00 0.00 0 969.62 0.00
185.00 0.00 0 969.62 0.00
190.00 0.00 0 969.62 0.00
195.00 0.00 0 969.62 0.00
200.00 0.00 0 969.62 0.00
205.00 0.00 0 969.62 0.00
210.00 0.00 0 969.62 0.00
215.00 0.00 0 969.62 0.00
220.00 0.00 0 969.62 0.00
225.00 0.00 0 969.62 0.00
230.00 0.00 0 969.62 0.00
235.00 0.00 0 969.62 0.00
240.00 0.00 0 969.62 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 71HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Stage-Discharge for Pond 4P: WETLAND A
Elevation
(feet)
Primary
(cfs)
969.62 0.00
969.63 0.02
969.64 0.07
969.65 0.13
969.66 0.20
969.67 0.28
969.68 0.37
969.69 0.46
969.70 0.56
969.71 0.67
969.72 0.79
969.73 0.91
969.74 1.04
969.75 1.17
969.76 1.30
969.77 1.45
969.78 1.59
969.79 1.75
969.80 1.90
969.81 2.06
969.82 2.23
969.83 2.40
969.84 2.58
969.85 2.76
969.86 2.94
969.87 3.13
969.88 3.33
969.89 3.53
969.90 3.73
969.91 3.94
969.92 4.15
969.93 4.36
969.94 4.58
969.95 4.81
969.96 5.03
969.97 5.26
969.98 5.50
969.99 5.74
970.00 5.98
970.01 6.23
970.02 6.48
970.03 6.74
970.04 7.01
970.05 7.28
970.06 7.55
970.07 7.83
970.08 8.12
970.09 8.41
970.10 8.70
970.11 9.00
970.12 9.30
970.13 9.60
970.14 9.91
Elevation
(feet)
Primary
(cfs)
970.15 10.23
970.16 10.55
970.17 10.87
970.18 11.20
970.19 11.53
970.20 11.86
970.21 12.20
970.22 12.55
970.23 12.86
970.24 13.18
970.25 13.49
970.26 13.81
970.27 14.14
970.28 14.46
970.29 14.79
970.30 15.12
970.31 15.45
970.32 15.78
970.33 16.12
970.34 16.46
970.35 16.80
970.36 17.14
970.37 17.49
970.38 17.84
970.39 18.19
970.40 18.54
970.41 18.89
970.42 19.25
970.43 19.61
970.44 19.97
970.45 20.33
970.46 20.69
970.47 21.06
970.48 21.43
970.49 21.80
970.50 22.17
970.51 22.55
970.52 22.92
970.53 23.30
970.54 23.68
970.55 24.07
970.56 24.45
970.57 24.84
970.58 25.23
970.59 25.62
970.60 26.01
970.61 26.40
970.62 26.80
970.63 27.21
970.64 27.62
970.65 28.03
970.66 28.45
970.67 28.86
Elevation
(feet)
Primary
(cfs)
970.68 29.28
970.69 29.70
970.70 30.12
970.71 30.55
970.72 30.98
970.73 31.41
970.74 31.84
970.75 32.27
970.76 32.71
970.77 33.14
970.78 33.58
970.79 34.02
970.80 34.47
970.81 34.91
970.82 35.36
970.83 35.79
970.84 36.22
970.85 36.65
970.86 37.09
970.87 37.52
970.88 37.96
970.89 38.40
970.90 38.84
970.91 39.28
970.92 39.72
970.93 40.17
970.94 40.61
970.95 41.06
970.96 41.51
970.97 41.96
970.98 42.41
970.99 42.86
971.00 43.32
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 72HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Pond 5P: Wetland B
[44] Hint: Outlet device #1 is below defined storage
[95] Warning: Outlet Device #1 rise exceeded
Inflow Area = 12.868 ac, 25.12% Impervious, Inflow Depth = 1.63" for 2y 24hr event
Inflow = 22.70 cfs @ 12.13 hrs, Volume= 1.743 af
Outflow = 22.56 cfs @ 12.14 hrs, Volume= 1.743 af, Atten= 1%, Lag= 0.9 min
Primary = 22.56 cfs @ 12.14 hrs, Volume= 1.743 af
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Peak Elev= 961.61' @ 12.14 hrs Surf.Area= 149,082 sf Storage= 1,069 cf
Plug-Flow detention time= 0.8 min calculated for 1.742 af (100% of inflow)
Center-of-Mass det. time= 0.8 min ( 826.3 - 825.5 )
Volume Invert Avail.Storage Storage Description
#1 961.60' 841,104 cf Custom Stage Data (Conic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store Wet.Area
(feet) (sq-ft) (cubic-feet) (cubic-feet) (sq-ft)
961.60 149,000 0 0 149,000
962.00 153,597 60,517 60,517 153,630
964.00 201,325 353,847 414,364 201,451
966.00 225,646 426,740 841,104 225,991
Device Routing Invert Outlet Devices
#1 Primary 960.82'Asymmetrical Weir, C= 3.27
Offset (feet) -70.00 -41.00 0.00 49.00 87.00
Height (feet) 0.35 0.09 0.00 0.09 0.35
Primary OutFlow Max=134.06 cfs @ 12.14 hrs HW=961.61' (Free Discharge)
1=Asymmetrical Weir (Weir Controls 134.06 cfs @ 2.74 fps)
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 73HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Pond 5P: Wetland B
Inflow
Primary
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=12.868 ac
Peak Elev=961.61'
Storage=1,069 cf
22.70 cfs
22.56 cfs
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 74HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Pond 5P: Wetland B
Time
(hours)
Inflow
(cfs)
Storage
(cubic-feet)
Elevation
(feet)
Primary
(cfs)
0.00 0.00 0 961.60 0.00
5.00 0.03 2 961.60 0.03
10.00 0.23 11 961.60 0.23
15.00 1.15 55 961.60 1.15
20.00 0.36 17 961.60 0.36
25.00 0.08 4 961.60 0.08
30.00 0.00 0 961.60 0.00
35.00 0.00 0 961.60 0.00
40.00 0.00 0 961.60 0.00
45.00 0.00 0 961.60 0.00
50.00 0.00 0 961.60 0.00
55.00 0.00 0 961.60 0.00
60.00 0.00 0 961.60 0.00
65.00 0.00 0 961.60 0.00
70.00 0.00 0 961.60 0.00
75.00 0.00 0 961.60 0.00
80.00 0.00 0 961.60 0.00
85.00 0.00 0 961.60 0.00
90.00 0.00 0 961.60 0.00
95.00 0.00 0 961.60 0.00
100.00 0.00 0 961.60 0.00
105.00 0.00 0 961.60 0.00
110.00 0.00 0 961.60 0.00
115.00 0.00 0 961.60 0.00
120.00 0.00 0 961.60 0.00
125.00 0.00 0 961.60 0.00
130.00 0.00 0 961.60 0.00
135.00 0.00 0 961.60 0.00
140.00 0.00 0 961.60 0.00
145.00 0.00 0 961.60 0.00
150.00 0.00 0 961.60 0.00
155.00 0.00 0 961.60 0.00
160.00 0.00 0 961.60 0.00
165.00 0.00 0 961.60 0.00
170.00 0.00 0 961.60 0.00
175.00 0.00 0 961.60 0.00
180.00 0.00 0 961.60 0.00
185.00 0.00 0 961.60 0.00
190.00 0.00 0 961.60 0.00
195.00 0.00 0 961.60 0.00
200.00 0.00 0 961.60 0.00
205.00 0.00 0 961.60 0.00
210.00 0.00 0 961.60 0.00
215.00 0.00 0 961.60 0.00
220.00 0.00 0 961.60 0.00
225.00 0.00 0 961.60 0.00
230.00 0.00 0 961.60 0.00
235.00 0.00 0 961.60 0.00
240.00 0.00 0 961.60 0.00
MN-RPBCWD_v1_Atlas14_24-hr2y_S1 2y 24hr Rainfall=2.87"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 75HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Stage-Discharge for Pond 5P: Wetland B
Elevation
(feet)
Primary
(cfs)
961.60 0.00
961.65 139.02
961.70 144.59
961.75 149.95
961.80 155.13
961.85 160.13
961.90 164.98
961.95 169.69
962.00 174.28
962.05 178.74
962.10 183.09
962.15 187.35
962.20 191.51
962.25 195.57
962.30 199.56
962.35 203.47
962.40 207.30
962.45 211.06
962.50 214.76
962.55 218.40
962.60 221.97
962.65 225.49
962.70 228.95
962.75 232.36
962.80 235.73
962.85 239.04
962.90 242.31
962.95 245.54
963.00 248.72
963.05 251.87
963.10 254.97
963.15 258.04
963.20 261.07
963.25 264.07
963.30 267.03
963.35 269.96
963.40 272.86
963.45 275.73
963.50 278.56
963.55 281.37
963.60 284.16
963.65 286.91
963.70 289.64
963.75 292.34
963.80 295.02
963.85 297.68
963.90 300.31
963.95 302.92
964.00 305.50
964.05 308.07
964.10 310.61
964.15 313.13
964.20 315.63
Elevation
(feet)
Primary
(cfs)
964.25 318.12
964.30 320.58
964.35 323.02
964.40 325.45
964.45 327.86
964.50 330.25
964.55 332.62
964.60 334.98
964.65 337.32
964.70 339.64
964.75 341.95
964.80 344.24
964.85 346.52
964.90 348.78
964.95 351.03
965.00 353.26
965.05 355.48
965.10 357.69
965.15 359.88
965.20 362.06
965.25 364.23
965.30 366.38
965.35 368.52
965.40 370.65
965.45 372.76
965.50 374.87
965.55 376.96
965.60 379.04
965.65 381.11
965.70 383.17
965.75 385.22
965.80 387.25
965.85 389.28
965.90 391.29
965.95 393.30
966.00 395.29
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 76HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Time span=0.00-240.00 hrs, dt=0.01 hrs, 24001 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Stor-Ind method - Pond routing by Stor-Ind method
Runoff Area=125,400 sf 0.00% Impervious Runoff Depth=2.61"Subcatchment 6S: UNDISTURBED
Tc=6.0 min CN=84 Runoff=13.69 cfs 0.626 af
Runoff Area=238,192 sf 46.22% Impervious Runoff Depth=3.01"Subcatchment 7S: OFFSITE WETLAND B
Flow Length=1,100' Slope=0.1500 '/' Tc=13.4 min CN=WQ Runoff=20.68 cfs 1.373 af
Runoff Area=74,865 sf 8.12% Impervious Runoff Depth=2.73"Subcatchment OFFSITE B: OFFSITE B -
Tc=6.0 min CN=WQ Runoff=8.42 cfs 0.390 af
Runoff Area=49,573 sf 17.90% Impervious Runoff Depth=2.87"Subcatchment OUTSITE A: OFFSITE A -
Tc=6.0 min CN=WQ Runoff=5.77 cfs 0.272 af
Runoff Area=3,245 sf 100.00% Impervious Runoff Depth=4.03"Subcatchment PR1A: PR1A - DRAINS
Tc=6.0 min CN=WQ Runoff=0.48 cfs 0.025 af
Runoff Area=29,167 sf 24.99% Impervious Runoff Depth=2.97"Subcatchment PR1B: PR1B - DRAINS
Tc=6.0 min CN=WQ Runoff=3.48 cfs 0.166 af
Runoff Area=5,573 sf 0.00% Impervious Runoff Depth=2.61"Subcatchment PR1C: PR1C - DRAINS
Tc=6.0 min CN=WQ Runoff=0.61 cfs 0.028 af
Runoff Area=35,117 sf 17.47% Impervious Runoff Depth=2.86"Subcatchment PR1D: PR1D - DRAINS
Tc=6.0 min CN=WQ Runoff=4.08 cfs 0.192 af
Runoff Area=2,636 sf 87.75% Impervious Runoff Depth=3.86"Subcatchment PR2: PR2 - DRAINS SOUTH
Tc=6.0 min CN=WQ Runoff=0.38 cfs 0.019 af
Inflow=13.79 cfs 0.776 afReach DA2: DA2 - TOTAL FLOW TO WETLAND A
Outflow=13.79 cfs 0.776 af
Inflow=12.81 cfs 1.067 afReach DA3: DA3 - TOTAL FLOW TO WETLAND B
Outflow=12.81 cfs 1.067 af
Peak Elev=974.25' Storage=2,618 cf Inflow=4.08 cfs 0.192 afPond 1P: FILTRATION BASIN 1
Discarded=0.00 cfs 0.000 af Primary=2.72 cfs 0.192 af Secondary=0.00 cfs 0.000 af Outflow=2.72 cfs 0.192 af
Peak Elev=970.11' Storage=5,905 cf Inflow=13.79 cfs 0.776 afPond 4P: WETLAND A
Outflow=8.86 cfs 0.776 af
Peak Elev=961.61' Storage=2,008 cf Inflow=42.60 cfs 3.066 afPond 5P: Wetland B
Outflow=42.34 cfs 3.066 af
Total Runoff Area = 12.942 ac Runoff Volume = 3.092 af Average Runoff Depth = 2.87"
74.45% Pervious = 9.636 ac 25.55% Impervious = 3.306 ac
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 77HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment 6S: UNDISTURBED
Runoff = 13.69 cfs @ 12.09 hrs, Volume= 0.626 af, Depth= 2.61"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"
Area (sf) CN Description
* 125,400 84
125,400 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment 6S: UNDISTURBED
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr
Rainfall=4.27"
Runoff Area=125,400 sf
Runoff Volume=0.626 af
Runoff Depth=2.61"
Tc=6.0 min
CN=84
13.69 cfs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 78HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment 6S: UNDISTURBED
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.12 0.00 0.00
10.00 0.55 0.01 0.07
15.00 3.89 2.27 0.43
20.00 4.17 2.52 0.06
25.00 4.27 2.61 0.00
30.00 4.27 2.61 0.00
35.00 4.27 2.61 0.00
40.00 4.27 2.61 0.00
45.00 4.27 2.61 0.00
50.00 4.27 2.61 0.00
55.00 4.27 2.61 0.00
60.00 4.27 2.61 0.00
65.00 4.27 2.61 0.00
70.00 4.27 2.61 0.00
75.00 4.27 2.61 0.00
80.00 4.27 2.61 0.00
85.00 4.27 2.61 0.00
90.00 4.27 2.61 0.00
95.00 4.27 2.61 0.00
100.00 4.27 2.61 0.00
105.00 4.27 2.61 0.00
110.00 4.27 2.61 0.00
115.00 4.27 2.61 0.00
120.00 4.27 2.61 0.00
125.00 4.27 2.61 0.00
130.00 4.27 2.61 0.00
135.00 4.27 2.61 0.00
140.00 4.27 2.61 0.00
145.00 4.27 2.61 0.00
150.00 4.27 2.61 0.00
155.00 4.27 2.61 0.00
160.00 4.27 2.61 0.00
165.00 4.27 2.61 0.00
170.00 4.27 2.61 0.00
175.00 4.27 2.61 0.00
180.00 4.27 2.61 0.00
185.00 4.27 2.61 0.00
190.00 4.27 2.61 0.00
195.00 4.27 2.61 0.00
200.00 4.27 2.61 0.00
205.00 4.27 2.61 0.00
210.00 4.27 2.61 0.00
215.00 4.27 2.61 0.00
220.00 4.27 2.61 0.00
225.00 4.27 2.61 0.00
230.00 4.27 2.61 0.00
235.00 4.27 2.61 0.00
240.00 4.27 2.61 0.00
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 79HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment 7S: OFFSITE WETLAND B WATERSHED
Runoff = 20.68 cfs @ 12.18 hrs, Volume= 1.373 af, Depth= 3.01"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"
Area (sf) CN Description
67,393 98 Unconnected roofs, HSG B
* 170,799 84 1/2 acre lots, 25% imp, HSG B
238,192 Weighted Average
128,099 53.78% Pervious Area
110,093 46.22% Impervious Area
67,393 61.21% Unconnected
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
7.9 200 0.1500 0.42 Sheet Flow,
Grass: Short n= 0.150 P2= 2.94"
5.5 900 0.1500 2.71 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
13.4 1,100 Total
Subcatchment 7S: OFFSITE WETLAND B WATERSHED
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr
Rainfall=4.27"
Runoff Area=238,192 sf
Runoff Volume=1.373 af
Runoff Depth=3.01"
Flow Length=1,100'
Slope=0.1500 '/'
Tc=13.4 min
CN=WQ
20.68 cfs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 80HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment 7S: OFFSITE WETLAND B WATERSHED
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.12 0.00 0.02
10.00 0.55 0.05 0.33
15.00 3.89 2.63 0.85
20.00 4.17 2.89 0.13
25.00 4.27 2.98 0.00
30.00 4.27 2.98 0.00
35.00 4.27 2.98 0.00
40.00 4.27 2.98 0.00
45.00 4.27 2.98 0.00
50.00 4.27 2.98 0.00
55.00 4.27 2.98 0.00
60.00 4.27 2.98 0.00
65.00 4.27 2.98 0.00
70.00 4.27 2.98 0.00
75.00 4.27 2.98 0.00
80.00 4.27 2.98 0.00
85.00 4.27 2.98 0.00
90.00 4.27 2.98 0.00
95.00 4.27 2.98 0.00
100.00 4.27 2.98 0.00
105.00 4.27 2.98 0.00
110.00 4.27 2.98 0.00
115.00 4.27 2.98 0.00
120.00 4.27 2.98 0.00
125.00 4.27 2.98 0.00
130.00 4.27 2.98 0.00
135.00 4.27 2.98 0.00
140.00 4.27 2.98 0.00
145.00 4.27 2.98 0.00
150.00 4.27 2.98 0.00
155.00 4.27 2.98 0.00
160.00 4.27 2.98 0.00
165.00 4.27 2.98 0.00
170.00 4.27 2.98 0.00
175.00 4.27 2.98 0.00
180.00 4.27 2.98 0.00
185.00 4.27 2.98 0.00
190.00 4.27 2.98 0.00
195.00 4.27 2.98 0.00
200.00 4.27 2.98 0.00
205.00 4.27 2.98 0.00
210.00 4.27 2.98 0.00
215.00 4.27 2.98 0.00
220.00 4.27 2.98 0.00
225.00 4.27 2.98 0.00
230.00 4.27 2.98 0.00
235.00 4.27 2.98 0.00
240.00 4.27 2.98 0.00
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 81HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment OFFSITE B: OFFSITE B - DRAINS SOUTH TO WETLAND
Runoff = 8.42 cfs @ 12.09 hrs, Volume= 0.390 af, Depth= 2.73"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"
Area (sf) CN Description
6,076 98 Paved parking, HSG C
* 68,789 84
74,865 Weighted Average
68,789 91.88% Pervious Area
6,076 8.12% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment OFFSITE B: OFFSITE B - DRAINS SOUTH TO WETLAND
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)9
8
7
6
5
4
3
2
1
0
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr
Rainfall=4.27"
Runoff Area=74,865 sf
Runoff Volume=0.390 af
Runoff Depth=2.73"
Tc=6.0 min
CN=WQ
8.42 cfs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 82HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment OFFSITE B: OFFSITE B - DRAINS SOUTH TO WETLAND
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.12 0.00 0.00
10.00 0.55 0.02 0.06
15.00 3.89 2.36 0.26
20.00 4.17 2.61 0.04
25.00 4.27 2.70 0.00
30.00 4.27 2.70 0.00
35.00 4.27 2.70 0.00
40.00 4.27 2.70 0.00
45.00 4.27 2.70 0.00
50.00 4.27 2.70 0.00
55.00 4.27 2.70 0.00
60.00 4.27 2.70 0.00
65.00 4.27 2.70 0.00
70.00 4.27 2.70 0.00
75.00 4.27 2.70 0.00
80.00 4.27 2.70 0.00
85.00 4.27 2.70 0.00
90.00 4.27 2.70 0.00
95.00 4.27 2.70 0.00
100.00 4.27 2.70 0.00
105.00 4.27 2.70 0.00
110.00 4.27 2.70 0.00
115.00 4.27 2.70 0.00
120.00 4.27 2.70 0.00
125.00 4.27 2.70 0.00
130.00 4.27 2.70 0.00
135.00 4.27 2.70 0.00
140.00 4.27 2.70 0.00
145.00 4.27 2.70 0.00
150.00 4.27 2.70 0.00
155.00 4.27 2.70 0.00
160.00 4.27 2.70 0.00
165.00 4.27 2.70 0.00
170.00 4.27 2.70 0.00
175.00 4.27 2.70 0.00
180.00 4.27 2.70 0.00
185.00 4.27 2.70 0.00
190.00 4.27 2.70 0.00
195.00 4.27 2.70 0.00
200.00 4.27 2.70 0.00
205.00 4.27 2.70 0.00
210.00 4.27 2.70 0.00
215.00 4.27 2.70 0.00
220.00 4.27 2.70 0.00
225.00 4.27 2.70 0.00
230.00 4.27 2.70 0.00
235.00 4.27 2.70 0.00
240.00 4.27 2.70 0.00
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 83HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment OUTSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B
Runoff = 5.77 cfs @ 12.09 hrs, Volume= 0.272 af, Depth= 2.87"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"
Area (sf) CN Description
8,875 98 Paved parking, HSG C
* 40,698 84
49,573 Weighted Average
40,698 82.10% Pervious Area
8,875 17.90% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment OUTSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)6
5
4
3
2
1
0
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr
Rainfall=4.27"
Runoff Area=49,573 sf
Runoff Volume=0.272 af
Runoff Depth=2.87"
Tc=6.0 min
CN=WQ
5.77 cfs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 84HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment OUTSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.12 0.00 0.00
10.00 0.55 0.04 0.05
15.00 3.89 2.54 0.17
20.00 4.17 2.79 0.03
25.00 4.27 2.89 0.00
30.00 4.27 2.89 0.00
35.00 4.27 2.89 0.00
40.00 4.27 2.89 0.00
45.00 4.27 2.89 0.00
50.00 4.27 2.89 0.00
55.00 4.27 2.89 0.00
60.00 4.27 2.89 0.00
65.00 4.27 2.89 0.00
70.00 4.27 2.89 0.00
75.00 4.27 2.89 0.00
80.00 4.27 2.89 0.00
85.00 4.27 2.89 0.00
90.00 4.27 2.89 0.00
95.00 4.27 2.89 0.00
100.00 4.27 2.89 0.00
105.00 4.27 2.89 0.00
110.00 4.27 2.89 0.00
115.00 4.27 2.89 0.00
120.00 4.27 2.89 0.00
125.00 4.27 2.89 0.00
130.00 4.27 2.89 0.00
135.00 4.27 2.89 0.00
140.00 4.27 2.89 0.00
145.00 4.27 2.89 0.00
150.00 4.27 2.89 0.00
155.00 4.27 2.89 0.00
160.00 4.27 2.89 0.00
165.00 4.27 2.89 0.00
170.00 4.27 2.89 0.00
175.00 4.27 2.89 0.00
180.00 4.27 2.89 0.00
185.00 4.27 2.89 0.00
190.00 4.27 2.89 0.00
195.00 4.27 2.89 0.00
200.00 4.27 2.89 0.00
205.00 4.27 2.89 0.00
210.00 4.27 2.89 0.00
215.00 4.27 2.89 0.00
220.00 4.27 2.89 0.00
225.00 4.27 2.89 0.00
230.00 4.27 2.89 0.00
235.00 4.27 2.89 0.00
240.00 4.27 2.89 0.00
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 85HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment PR1A: PR1A - DRAINS EAST ALONG STREET
Runoff = 0.48 cfs @ 12.08 hrs, Volume= 0.025 af, Depth= 4.03"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"
Area (sf) CN Description
3,245 98 Paved parking, HSG C
* 0 84
3,245 Weighted Average
3,245 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment PR1A: PR1A - DRAINS EAST ALONG STREET
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr
Rainfall=4.27"
Runoff Area=3,245 sf
Runoff Volume=0.025 af
Runoff Depth=4.03"
Tc=6.0 min
CN=WQ
0.48 cfs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 86HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment PR1A: PR1A - DRAINS EAST ALONG STREET
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.12 0.02 0.00
10.00 0.55 0.36 0.01
15.00 3.89 3.65 0.01
20.00 4.17 3.93 0.00
25.00 4.27 4.03 0.00
30.00 4.27 4.03 0.00
35.00 4.27 4.03 0.00
40.00 4.27 4.03 0.00
45.00 4.27 4.03 0.00
50.00 4.27 4.03 0.00
55.00 4.27 4.03 0.00
60.00 4.27 4.03 0.00
65.00 4.27 4.03 0.00
70.00 4.27 4.03 0.00
75.00 4.27 4.03 0.00
80.00 4.27 4.03 0.00
85.00 4.27 4.03 0.00
90.00 4.27 4.03 0.00
95.00 4.27 4.03 0.00
100.00 4.27 4.03 0.00
105.00 4.27 4.03 0.00
110.00 4.27 4.03 0.00
115.00 4.27 4.03 0.00
120.00 4.27 4.03 0.00
125.00 4.27 4.03 0.00
130.00 4.27 4.03 0.00
135.00 4.27 4.03 0.00
140.00 4.27 4.03 0.00
145.00 4.27 4.03 0.00
150.00 4.27 4.03 0.00
155.00 4.27 4.03 0.00
160.00 4.27 4.03 0.00
165.00 4.27 4.03 0.00
170.00 4.27 4.03 0.00
175.00 4.27 4.03 0.00
180.00 4.27 4.03 0.00
185.00 4.27 4.03 0.00
190.00 4.27 4.03 0.00
195.00 4.27 4.03 0.00
200.00 4.27 4.03 0.00
205.00 4.27 4.03 0.00
210.00 4.27 4.03 0.00
215.00 4.27 4.03 0.00
220.00 4.27 4.03 0.00
225.00 4.27 4.03 0.00
230.00 4.27 4.03 0.00
235.00 4.27 4.03 0.00
240.00 4.27 4.03 0.00
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 87HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment PR1B: PR1B - DRAINS SOUTH TO WETLAND A
Runoff = 3.48 cfs @ 12.08 hrs, Volume= 0.166 af, Depth= 2.97"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"
Area (sf) CN Description
7,290 98 Paved parking, HSG C
* 21,877 84
29,167 Weighted Average
21,877 75.01% Pervious Area
7,290 24.99% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment PR1B: PR1B - DRAINS SOUTH TO WETLAND A
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)3
2
1
0
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr
Rainfall=4.27"
Runoff Area=29,167 sf
Runoff Volume=0.166 af
Runoff Depth=2.97"
Tc=6.0 min
CN=WQ
3.48 cfs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 88HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment PR1B: PR1B - DRAINS SOUTH TO WETLAND A
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.12 0.00 0.00
10.00 0.55 0.04 0.04
15.00 3.89 2.54 0.10
20.00 4.17 2.79 0.02
25.00 4.27 2.89 0.00
30.00 4.27 2.89 0.00
35.00 4.27 2.89 0.00
40.00 4.27 2.89 0.00
45.00 4.27 2.89 0.00
50.00 4.27 2.89 0.00
55.00 4.27 2.89 0.00
60.00 4.27 2.89 0.00
65.00 4.27 2.89 0.00
70.00 4.27 2.89 0.00
75.00 4.27 2.89 0.00
80.00 4.27 2.89 0.00
85.00 4.27 2.89 0.00
90.00 4.27 2.89 0.00
95.00 4.27 2.89 0.00
100.00 4.27 2.89 0.00
105.00 4.27 2.89 0.00
110.00 4.27 2.89 0.00
115.00 4.27 2.89 0.00
120.00 4.27 2.89 0.00
125.00 4.27 2.89 0.00
130.00 4.27 2.89 0.00
135.00 4.27 2.89 0.00
140.00 4.27 2.89 0.00
145.00 4.27 2.89 0.00
150.00 4.27 2.89 0.00
155.00 4.27 2.89 0.00
160.00 4.27 2.89 0.00
165.00 4.27 2.89 0.00
170.00 4.27 2.89 0.00
175.00 4.27 2.89 0.00
180.00 4.27 2.89 0.00
185.00 4.27 2.89 0.00
190.00 4.27 2.89 0.00
195.00 4.27 2.89 0.00
200.00 4.27 2.89 0.00
205.00 4.27 2.89 0.00
210.00 4.27 2.89 0.00
215.00 4.27 2.89 0.00
220.00 4.27 2.89 0.00
225.00 4.27 2.89 0.00
230.00 4.27 2.89 0.00
235.00 4.27 2.89 0.00
240.00 4.27 2.89 0.00
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 89HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment PR1C: PR1C - DRAINS NORTH TO WETLAND A
Runoff = 0.61 cfs @ 12.09 hrs, Volume= 0.028 af, Depth= 2.61"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"
Area (sf) CN Description
0 98 Paved parking, HSG C
* 5,573 84
5,573 Weighted Average
5,573 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment PR1C: PR1C - DRAINS NORTH TO WETLAND A
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.65
0.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr
Rainfall=4.27"
Runoff Area=5,573 sf
Runoff Volume=0.028 af
Runoff Depth=2.61"
Tc=6.0 min
CN=WQ
0.61 cfs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 90HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment PR1C: PR1C - DRAINS NORTH TO WETLAND A
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.12 0.00 0.00
10.00 0.55 0.01 0.00
15.00 3.89 2.27 0.02
20.00 4.17 2.52 0.00
25.00 4.27 2.61 0.00
30.00 4.27 2.61 0.00
35.00 4.27 2.61 0.00
40.00 4.27 2.61 0.00
45.00 4.27 2.61 0.00
50.00 4.27 2.61 0.00
55.00 4.27 2.61 0.00
60.00 4.27 2.61 0.00
65.00 4.27 2.61 0.00
70.00 4.27 2.61 0.00
75.00 4.27 2.61 0.00
80.00 4.27 2.61 0.00
85.00 4.27 2.61 0.00
90.00 4.27 2.61 0.00
95.00 4.27 2.61 0.00
100.00 4.27 2.61 0.00
105.00 4.27 2.61 0.00
110.00 4.27 2.61 0.00
115.00 4.27 2.61 0.00
120.00 4.27 2.61 0.00
125.00 4.27 2.61 0.00
130.00 4.27 2.61 0.00
135.00 4.27 2.61 0.00
140.00 4.27 2.61 0.00
145.00 4.27 2.61 0.00
150.00 4.27 2.61 0.00
155.00 4.27 2.61 0.00
160.00 4.27 2.61 0.00
165.00 4.27 2.61 0.00
170.00 4.27 2.61 0.00
175.00 4.27 2.61 0.00
180.00 4.27 2.61 0.00
185.00 4.27 2.61 0.00
190.00 4.27 2.61 0.00
195.00 4.27 2.61 0.00
200.00 4.27 2.61 0.00
205.00 4.27 2.61 0.00
210.00 4.27 2.61 0.00
215.00 4.27 2.61 0.00
220.00 4.27 2.61 0.00
225.00 4.27 2.61 0.00
230.00 4.27 2.61 0.00
235.00 4.27 2.61 0.00
240.00 4.27 2.61 0.00
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 91HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment PR1D: PR1D - DRAINS SOUTH TO RAIN GARDEN
Runoff = 4.08 cfs @ 12.09 hrs, Volume= 0.192 af, Depth= 2.86"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"
Area (sf) CN Description
6,135 98 Paved parking, HSG C
* 28,982 84
35,117 Weighted Average
28,982 82.53% Pervious Area
6,135 17.47% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment PR1D: PR1D - DRAINS SOUTH TO RAIN GARDEN
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)4
3
2
1
0
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr
Rainfall=4.27"
Runoff Area=35,117 sf
Runoff Volume=0.192 af
Runoff Depth=2.86"
Tc=6.0 min
CN=WQ
4.08 cfs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 92HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment PR1D: PR1D - DRAINS SOUTH TO RAIN GARDEN
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.12 0.00 0.00
10.00 0.55 0.03 0.04
15.00 3.89 2.45 0.12
20.00 4.17 2.70 0.02
25.00 4.27 2.79 0.00
30.00 4.27 2.79 0.00
35.00 4.27 2.79 0.00
40.00 4.27 2.79 0.00
45.00 4.27 2.79 0.00
50.00 4.27 2.79 0.00
55.00 4.27 2.79 0.00
60.00 4.27 2.79 0.00
65.00 4.27 2.79 0.00
70.00 4.27 2.79 0.00
75.00 4.27 2.79 0.00
80.00 4.27 2.79 0.00
85.00 4.27 2.79 0.00
90.00 4.27 2.79 0.00
95.00 4.27 2.79 0.00
100.00 4.27 2.79 0.00
105.00 4.27 2.79 0.00
110.00 4.27 2.79 0.00
115.00 4.27 2.79 0.00
120.00 4.27 2.79 0.00
125.00 4.27 2.79 0.00
130.00 4.27 2.79 0.00
135.00 4.27 2.79 0.00
140.00 4.27 2.79 0.00
145.00 4.27 2.79 0.00
150.00 4.27 2.79 0.00
155.00 4.27 2.79 0.00
160.00 4.27 2.79 0.00
165.00 4.27 2.79 0.00
170.00 4.27 2.79 0.00
175.00 4.27 2.79 0.00
180.00 4.27 2.79 0.00
185.00 4.27 2.79 0.00
190.00 4.27 2.79 0.00
195.00 4.27 2.79 0.00
200.00 4.27 2.79 0.00
205.00 4.27 2.79 0.00
210.00 4.27 2.79 0.00
215.00 4.27 2.79 0.00
220.00 4.27 2.79 0.00
225.00 4.27 2.79 0.00
230.00 4.27 2.79 0.00
235.00 4.27 2.79 0.00
240.00 4.27 2.79 0.00
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 93HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment PR2: PR2 - DRAINS SOUTH TO WETLAND B
Runoff = 0.38 cfs @ 12.08 hrs, Volume= 0.019 af, Depth= 3.86"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"
Area (sf) CN Description
2,313 98 Paved parking, HSG C
* 323 84
2,636 Weighted Average
323 12.25% Pervious Area
2,313 87.75% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment PR2: PR2 - DRAINS SOUTH TO WETLAND B
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.42
0.4
0.38
0.36
0.34
0.32
0.3
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr
Rainfall=4.27"
Runoff Area=2,636 sf
Runoff Volume=0.019 af
Runoff Depth=3.86"
Tc=6.0 min
CN=WQ
0.38 cfs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 94HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment PR2: PR2 - DRAINS SOUTH TO WETLAND B
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.12 0.00 0.00
10.00 0.55 0.25 0.01
15.00 3.89 3.43 0.01
20.00 4.17 3.71 0.00
25.00 4.27 3.81 0.00
30.00 4.27 3.81 0.00
35.00 4.27 3.81 0.00
40.00 4.27 3.81 0.00
45.00 4.27 3.81 0.00
50.00 4.27 3.81 0.00
55.00 4.27 3.81 0.00
60.00 4.27 3.81 0.00
65.00 4.27 3.81 0.00
70.00 4.27 3.81 0.00
75.00 4.27 3.81 0.00
80.00 4.27 3.81 0.00
85.00 4.27 3.81 0.00
90.00 4.27 3.81 0.00
95.00 4.27 3.81 0.00
100.00 4.27 3.81 0.00
105.00 4.27 3.81 0.00
110.00 4.27 3.81 0.00
115.00 4.27 3.81 0.00
120.00 4.27 3.81 0.00
125.00 4.27 3.81 0.00
130.00 4.27 3.81 0.00
135.00 4.27 3.81 0.00
140.00 4.27 3.81 0.00
145.00 4.27 3.81 0.00
150.00 4.27 3.81 0.00
155.00 4.27 3.81 0.00
160.00 4.27 3.81 0.00
165.00 4.27 3.81 0.00
170.00 4.27 3.81 0.00
175.00 4.27 3.81 0.00
180.00 4.27 3.81 0.00
185.00 4.27 3.81 0.00
190.00 4.27 3.81 0.00
195.00 4.27 3.81 0.00
200.00 4.27 3.81 0.00
205.00 4.27 3.81 0.00
210.00 4.27 3.81 0.00
215.00 4.27 3.81 0.00
220.00 4.27 3.81 0.00
225.00 4.27 3.81 0.00
230.00 4.27 3.81 0.00
235.00 4.27 3.81 0.00
240.00 4.27 3.81 0.00
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 95HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A
[40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 3.322 ac, 13.47% Impervious, Inflow Depth = 2.80" for 10y 24hr event
Inflow = 13.79 cfs @ 12.10 hrs, Volume= 0.776 af
Outflow = 13.79 cfs @ 12.10 hrs, Volume= 0.776 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Reach DA2: DA2 - TOTAL FLOW TO WETLAND A
Inflow
Outflow
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=3.322 ac
13.79 cfs
13.79 cfs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 96HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A
Time
(hours)
Inflow
(cfs)
Elevation
(feet)
Outflow
(cfs)
0.00 0.00 0.00
5.00 0.01 0.01
10.00 0.14 0.14
15.00 0.51 0.51
20.00 0.14 0.14
25.00 0.06 0.06
30.00 0.00 0.00
35.00 0.00 0.00
40.00 0.00 0.00
45.00 0.00 0.00
50.00 0.00 0.00
55.00 0.00 0.00
60.00 0.00 0.00
65.00 0.00 0.00
70.00 0.00 0.00
75.00 0.00 0.00
80.00 0.00 0.00
85.00 0.00 0.00
90.00 0.00 0.00
95.00 0.00 0.00
100.00 0.00 0.00
105.00 0.00 0.00
110.00 0.00 0.00
115.00 0.00 0.00
120.00 0.00 0.00
125.00 0.00 0.00
130.00 0.00 0.00
135.00 0.00 0.00
140.00 0.00 0.00
145.00 0.00 0.00
150.00 0.00 0.00
155.00 0.00 0.00
160.00 0.00 0.00
165.00 0.00 0.00
170.00 0.00 0.00
175.00 0.00 0.00
180.00 0.00 0.00
185.00 0.00 0.00
190.00 0.00 0.00
195.00 0.00 0.00
200.00 0.00 0.00
205.00 0.00 0.00
210.00 0.00 0.00
215.00 0.00 0.00
220.00 0.00 0.00
225.00 0.00 0.00
230.00 0.00 0.00
235.00 0.00 0.00
240.00 0.00 0.00
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 97HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B
[40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 4.521 ac, 15.58% Impervious, Inflow Depth = 2.83" for 10y 24hr event
Inflow = 12.81 cfs @ 12.13 hrs, Volume= 1.067 af
Outflow = 12.81 cfs @ 12.13 hrs, Volume= 1.067 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Reach DA3: DA3 - TOTAL FLOW TO WETLAND B
Inflow
Outflow
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=4.521 ac
12.81 cfs
12.81 cfs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 98HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B
Time
(hours)
Inflow
(cfs)
Elevation
(feet)
Outflow
(cfs)
0.00 0.00 0.00
5.00 0.01 0.01
10.00 0.15 0.15
15.00 0.70 0.70
20.00 0.17 0.17
25.00 0.08 0.08
30.00 0.00 0.00
35.00 0.00 0.00
40.00 0.00 0.00
45.00 0.00 0.00
50.00 0.00 0.00
55.00 0.00 0.00
60.00 0.00 0.00
65.00 0.00 0.00
70.00 0.00 0.00
75.00 0.00 0.00
80.00 0.00 0.00
85.00 0.00 0.00
90.00 0.00 0.00
95.00 0.00 0.00
100.00 0.00 0.00
105.00 0.00 0.00
110.00 0.00 0.00
115.00 0.00 0.00
120.00 0.00 0.00
125.00 0.00 0.00
130.00 0.00 0.00
135.00 0.00 0.00
140.00 0.00 0.00
145.00 0.00 0.00
150.00 0.00 0.00
155.00 0.00 0.00
160.00 0.00 0.00
165.00 0.00 0.00
170.00 0.00 0.00
175.00 0.00 0.00
180.00 0.00 0.00
185.00 0.00 0.00
190.00 0.00 0.00
195.00 0.00 0.00
200.00 0.00 0.00
205.00 0.00 0.00
210.00 0.00 0.00
215.00 0.00 0.00
220.00 0.00 0.00
225.00 0.00 0.00
230.00 0.00 0.00
235.00 0.00 0.00
240.00 0.00 0.00
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 99HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Pond 1P: FILTRATION BASIN 1
Inflow Area = 0.806 ac, 17.47% Impervious, Inflow Depth = 2.86" for 10y 24hr event
Inflow = 4.08 cfs @ 12.09 hrs, Volume= 0.192 af
Outflow = 2.72 cfs @ 12.15 hrs, Volume= 0.192 af, Atten= 33%, Lag= 4.1 min
Discarded = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Primary = 2.72 cfs @ 12.15 hrs, Volume= 0.192 af
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Peak Elev= 974.25' @ 12.15 hrs Surf.Area= 2,506 sf Storage= 2,618 cf
Plug-Flow detention time= 140.2 min calculated for 0.192 af (100% of inflow)
Center-of-Mass det. time= 140.2 min ( 919.6 - 779.4 )
Volume Invert Avail.Storage Storage Description
#1 973.00' 5,291 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
973.00 1,624 0 0
973.50 2,040 916 916
974.00 2,320 1,090 2,006
974.50 2,686 1,252 3,258
975.10 3,068 1,726 4,984
975.20 3,068 307 5,291
Device Routing Invert Outlet Devices
#1 Primary 971.50'12.0" Round OUTLET PIPE
L= 23.0' CMP, mitered to conform to fill, Ke= 0.700
Inlet / Outlet Invert= 971.50' / 971.50' S= 0.0000 '/' Cc= 0.900
n= 0.012 Concrete pipe, finished, Flow Area= 0.79 sf
#2 Device 1 974.00'24.0" Horiz. RIM- Orifice/Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 975.10'10.0' long x 10.0' breadth EOF
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60
Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64
#4 Device 5 973.00'1.600 in/hr Exfiltration over Surface area above 970.50'
Excluded Surface area = 0 sf
#5 Device 1 971.50'6.0" Vert. Orifice 6" draintile C= 0.600
#6 Discarded 973.00'0.600 in/hr Exfiltration-Infiltration into Rock over Surface area from 970.00' - 970.50'
Excluded Surface area = 0 sf
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 100HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Discarded OutFlow Max=0.00 cfs @ 0.00 hrs HW=973.00' (Free Discharge)
6=Exfiltration-Infiltration into Rock ( Controls 0.00 cfs)
Primary OutFlow Max=2.71 cfs @ 12.15 hrs HW=974.25' (Free Discharge)
1=OUTLET PIPE (Passes 2.71 cfs of 5.01 cfs potential flow)
2=RIM- Orifice/Grate (Weir Controls 2.62 cfs @ 1.65 fps)
5=Orifice 6" draintile (Passes 0.09 cfs of 1.50 cfs potential flow)
4=Exfiltration (Exfiltration Controls 0.09 cfs)
Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=973.00' (Free Discharge)
3=EOF ( Controls 0.00 cfs)
Pond 1P: FILTRATION BASIN 1
Inflow
Outflow
Discarded
Primary
Secondary
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)4
3
2
1
0
Inflow Area=0.806 ac
Peak Elev=974.25'
Storage=2,618 cf
4.08 cfs
2.72 cfs
0.00 cfs
2.72 cfs
0.00 cfs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 101HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Pond 1P: FILTRATION BASIN 1
Time
(hours)
Inflow
(cfs)
Storage
(cubic-feet)
Elevation
(feet)
Outflow
(cfs)
Discarded
(cfs)
Primary
(cfs)
Secondary
(cfs)
0.00 0.00 0 973.00 0.00 0.00 0.00 0.00
5.00 0.00 1 973.00 0.00 0.00 0.00 0.00
10.00 0.04 21 973.01 0.04 0.00 0.04 0.00
15.00 0.12 2,039 974.01 0.12 0.00 0.12 0.00
20.00 0.02 1,291 973.68 0.08 0.00 0.08 0.00
25.00 0.00 250 973.15 0.06 0.00 0.06 0.00
30.00 0.00 0 973.00 0.00 0.00 0.00 0.00
35.00 0.00 0 973.00 0.00 0.00 0.00 0.00
40.00 0.00 0 973.00 0.00 0.00 0.00 0.00
45.00 0.00 0 973.00 0.00 0.00 0.00 0.00
50.00 0.00 0 973.00 0.00 0.00 0.00 0.00
55.00 0.00 0 973.00 0.00 0.00 0.00 0.00
60.00 0.00 0 973.00 0.00 0.00 0.00 0.00
65.00 0.00 0 973.00 0.00 0.00 0.00 0.00
70.00 0.00 0 973.00 0.00 0.00 0.00 0.00
75.00 0.00 0 973.00 0.00 0.00 0.00 0.00
80.00 0.00 0 973.00 0.00 0.00 0.00 0.00
85.00 0.00 0 973.00 0.00 0.00 0.00 0.00
90.00 0.00 0 973.00 0.00 0.00 0.00 0.00
95.00 0.00 0 973.00 0.00 0.00 0.00 0.00
100.00 0.00 0 973.00 0.00 0.00 0.00 0.00
105.00 0.00 0 973.00 0.00 0.00 0.00 0.00
110.00 0.00 0 973.00 0.00 0.00 0.00 0.00
115.00 0.00 0 973.00 0.00 0.00 0.00 0.00
120.00 0.00 0 973.00 0.00 0.00 0.00 0.00
125.00 0.00 0 973.00 0.00 0.00 0.00 0.00
130.00 0.00 0 973.00 0.00 0.00 0.00 0.00
135.00 0.00 0 973.00 0.00 0.00 0.00 0.00
140.00 0.00 0 973.00 0.00 0.00 0.00 0.00
145.00 0.00 0 973.00 0.00 0.00 0.00 0.00
150.00 0.00 0 973.00 0.00 0.00 0.00 0.00
155.00 0.00 0 973.00 0.00 0.00 0.00 0.00
160.00 0.00 0 973.00 0.00 0.00 0.00 0.00
165.00 0.00 0 973.00 0.00 0.00 0.00 0.00
170.00 0.00 0 973.00 0.00 0.00 0.00 0.00
175.00 0.00 0 973.00 0.00 0.00 0.00 0.00
180.00 0.00 0 973.00 0.00 0.00 0.00 0.00
185.00 0.00 0 973.00 0.00 0.00 0.00 0.00
190.00 0.00 0 973.00 0.00 0.00 0.00 0.00
195.00 0.00 0 973.00 0.00 0.00 0.00 0.00
200.00 0.00 0 973.00 0.00 0.00 0.00 0.00
205.00 0.00 0 973.00 0.00 0.00 0.00 0.00
210.00 0.00 0 973.00 0.00 0.00 0.00 0.00
215.00 0.00 0 973.00 0.00 0.00 0.00 0.00
220.00 0.00 0 973.00 0.00 0.00 0.00 0.00
225.00 0.00 0 973.00 0.00 0.00 0.00 0.00
230.00 0.00 0 973.00 0.00 0.00 0.00 0.00
235.00 0.00 0 973.00 0.00 0.00 0.00 0.00
240.00 0.00 0 973.00 0.00 0.00 0.00 0.00
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 102HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Stage-Discharge for Pond 1P: FILTRATION BASIN 1
Elevation
(feet)
Discharge
(cfs)
Discarded
(cfs)
Primary
(cfs)
Secondary
(cfs)
973.00 0.00 0.00 0.00 0.00
973.05 0.06 0.00 0.06 0.00
973.10 0.06 0.00 0.06 0.00
973.15 0.06 0.00 0.06 0.00
973.20 0.07 0.00 0.07 0.00
973.25 0.07 0.00 0.07 0.00
973.30 0.07 0.00 0.07 0.00
973.35 0.07 0.00 0.07 0.00
973.40 0.07 0.00 0.07 0.00
973.45 0.07 0.00 0.07 0.00
973.50 0.08 0.00 0.08 0.00
973.55 0.08 0.00 0.08 0.00
973.60 0.08 0.00 0.08 0.00
973.65 0.08 0.00 0.08 0.00
973.70 0.08 0.00 0.08 0.00
973.75 0.08 0.00 0.08 0.00
973.80 0.08 0.00 0.08 0.00
973.85 0.08 0.00 0.08 0.00
973.90 0.08 0.00 0.08 0.00
973.95 0.08 0.00 0.08 0.00
974.00 0.09 0.00 0.09 0.00
974.05 0.32 0.00 0.32 0.00
974.10 0.74 0.00 0.74 0.00
974.15 1.28 0.00 1.28 0.00
974.20 1.93 0.00 1.93 0.00
974.25 2.66 0.00 2.66 0.00
974.30 3.47 0.00 3.47 0.00
974.35 4.35 0.00 4.35 0.00
974.40 5.17 0.00 5.17 0.00
974.45 5.22 0.00 5.22 0.00
974.50 5.28 0.00 5.28 0.00
974.55 5.33 0.00 5.33 0.00
974.60 5.38 0.00 5.38 0.00
974.65 5.43 0.00 5.43 0.00
974.70 5.48 0.00 5.48 0.00
974.75 5.53 0.00 5.53 0.00
974.80 5.58 0.00 5.58 0.00
974.85 5.63 0.00 5.63 0.00
974.90 5.68 0.00 5.68 0.00
974.95 5.73 0.00 5.73 0.00
975.00 5.78 0.00 5.78 0.00
975.05 5.83 0.00 5.83 0.00
975.10 5.87 0.00 5.87 0.00
975.15 6.20 0.00 5.92 0.28
975.20 6.76 0.00 5.97 0.79
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 103HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Pond 4P: WETLAND A
Inflow Area = 3.322 ac, 13.47% Impervious, Inflow Depth = 2.80" for 10y 24hr event
Inflow = 13.79 cfs @ 12.10 hrs, Volume= 0.776 af
Outflow = 8.86 cfs @ 12.19 hrs, Volume= 0.776 af, Atten= 36%, Lag= 5.3 min
Primary = 8.86 cfs @ 12.19 hrs, Volume= 0.776 af
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Peak Elev= 970.11' @ 12.19 hrs Surf.Area= 12,913 sf Storage= 5,905 cf
Plug-Flow detention time= 22.7 min calculated for 0.776 af (100% of inflow)
Center-of-Mass det. time= 22.7 min ( 839.1 - 816.4 )
Volume Invert Avail.Storage Storage Description
#1 969.62' 18,824 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
969.62 11,466 0 0
970.00 12,553 4,564 4,564
971.00 15,967 14,260 18,824
Device Routing Invert Outlet Devices
#1 Primary 969.62'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60
Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64
Primary OutFlow Max=8.85 cfs @ 12.19 hrs HW=970.11' (Free Discharge)
1=Broad-Crested Rectangular Weir (Weir Controls 8.85 cfs @ 1.82 fps)
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 104HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Pond 4P: WETLAND A
Inflow
Primary
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=3.322 ac
Peak Elev=970.11'
Storage=5,905 cf
13.79 cfs
8.86 cfs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 105HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Pond 4P: WETLAND A
Time
(hours)
Inflow
(cfs)
Storage
(cubic-feet)
Elevation
(feet)
Primary
(cfs)
0.00 0.00 0 969.62 0.00
5.00 0.01 16 969.62 0.00
10.00 0.14 261 969.64 0.09
15.00 0.51 867 969.69 0.51
20.00 0.14 359 969.65 0.14
25.00 0.06 241 969.64 0.08
30.00 0.00 6 969.62 0.00
35.00 0.00 0 969.62 0.00
40.00 0.00 0 969.62 0.00
45.00 0.00 0 969.62 0.00
50.00 0.00 0 969.62 0.00
55.00 0.00 0 969.62 0.00
60.00 0.00 0 969.62 0.00
65.00 0.00 0 969.62 0.00
70.00 0.00 0 969.62 0.00
75.00 0.00 0 969.62 0.00
80.00 0.00 0 969.62 0.00
85.00 0.00 0 969.62 0.00
90.00 0.00 0 969.62 0.00
95.00 0.00 0 969.62 0.00
100.00 0.00 0 969.62 0.00
105.00 0.00 0 969.62 0.00
110.00 0.00 0 969.62 0.00
115.00 0.00 0 969.62 0.00
120.00 0.00 0 969.62 0.00
125.00 0.00 0 969.62 0.00
130.00 0.00 0 969.62 0.00
135.00 0.00 0 969.62 0.00
140.00 0.00 0 969.62 0.00
145.00 0.00 0 969.62 0.00
150.00 0.00 0 969.62 0.00
155.00 0.00 0 969.62 0.00
160.00 0.00 0 969.62 0.00
165.00 0.00 0 969.62 0.00
170.00 0.00 0 969.62 0.00
175.00 0.00 0 969.62 0.00
180.00 0.00 0 969.62 0.00
185.00 0.00 0 969.62 0.00
190.00 0.00 0 969.62 0.00
195.00 0.00 0 969.62 0.00
200.00 0.00 0 969.62 0.00
205.00 0.00 0 969.62 0.00
210.00 0.00 0 969.62 0.00
215.00 0.00 0 969.62 0.00
220.00 0.00 0 969.62 0.00
225.00 0.00 0 969.62 0.00
230.00 0.00 0 969.62 0.00
235.00 0.00 0 969.62 0.00
240.00 0.00 0 969.62 0.00
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 106HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Stage-Discharge for Pond 4P: WETLAND A
Elevation
(feet)
Primary
(cfs)
969.62 0.00
969.63 0.02
969.64 0.07
969.65 0.13
969.66 0.20
969.67 0.28
969.68 0.37
969.69 0.46
969.70 0.56
969.71 0.67
969.72 0.79
969.73 0.91
969.74 1.04
969.75 1.17
969.76 1.30
969.77 1.45
969.78 1.59
969.79 1.75
969.80 1.90
969.81 2.06
969.82 2.23
969.83 2.40
969.84 2.58
969.85 2.76
969.86 2.94
969.87 3.13
969.88 3.33
969.89 3.53
969.90 3.73
969.91 3.94
969.92 4.15
969.93 4.36
969.94 4.58
969.95 4.81
969.96 5.03
969.97 5.26
969.98 5.50
969.99 5.74
970.00 5.98
970.01 6.23
970.02 6.48
970.03 6.74
970.04 7.01
970.05 7.28
970.06 7.55
970.07 7.83
970.08 8.12
970.09 8.41
970.10 8.70
970.11 9.00
970.12 9.30
970.13 9.60
970.14 9.91
Elevation
(feet)
Primary
(cfs)
970.15 10.23
970.16 10.55
970.17 10.87
970.18 11.20
970.19 11.53
970.20 11.86
970.21 12.20
970.22 12.55
970.23 12.86
970.24 13.18
970.25 13.49
970.26 13.81
970.27 14.14
970.28 14.46
970.29 14.79
970.30 15.12
970.31 15.45
970.32 15.78
970.33 16.12
970.34 16.46
970.35 16.80
970.36 17.14
970.37 17.49
970.38 17.84
970.39 18.19
970.40 18.54
970.41 18.89
970.42 19.25
970.43 19.61
970.44 19.97
970.45 20.33
970.46 20.69
970.47 21.06
970.48 21.43
970.49 21.80
970.50 22.17
970.51 22.55
970.52 22.92
970.53 23.30
970.54 23.68
970.55 24.07
970.56 24.45
970.57 24.84
970.58 25.23
970.59 25.62
970.60 26.01
970.61 26.40
970.62 26.80
970.63 27.21
970.64 27.62
970.65 28.03
970.66 28.45
970.67 28.86
Elevation
(feet)
Primary
(cfs)
970.68 29.28
970.69 29.70
970.70 30.12
970.71 30.55
970.72 30.98
970.73 31.41
970.74 31.84
970.75 32.27
970.76 32.71
970.77 33.14
970.78 33.58
970.79 34.02
970.80 34.47
970.81 34.91
970.82 35.36
970.83 35.79
970.84 36.22
970.85 36.65
970.86 37.09
970.87 37.52
970.88 37.96
970.89 38.40
970.90 38.84
970.91 39.28
970.92 39.72
970.93 40.17
970.94 40.61
970.95 41.06
970.96 41.51
970.97 41.96
970.98 42.41
970.99 42.86
971.00 43.32
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 107HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Pond 5P: Wetland B
[44] Hint: Outlet device #1 is below defined storage
[95] Warning: Outlet Device #1 rise exceeded
Inflow Area = 12.868 ac, 25.12% Impervious, Inflow Depth = 2.86" for 10y 24hr event
Inflow = 42.60 cfs @ 12.13 hrs, Volume= 3.066 af
Outflow = 42.34 cfs @ 12.14 hrs, Volume= 3.066 af, Atten= 1%, Lag= 0.9 min
Primary = 42.34 cfs @ 12.14 hrs, Volume= 3.066 af
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Peak Elev= 961.61' @ 12.14 hrs Surf.Area= 149,154 sf Storage= 2,008 cf
Plug-Flow detention time= 0.8 min calculated for 3.066 af (100% of inflow)
Center-of-Mass det. time= 0.8 min ( 797.7 - 797.0 )
Volume Invert Avail.Storage Storage Description
#1 961.60' 841,104 cf Custom Stage Data (Conic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store Wet.Area
(feet) (sq-ft) (cubic-feet) (cubic-feet) (sq-ft)
961.60 149,000 0 0 149,000
962.00 153,597 60,517 60,517 153,630
964.00 201,325 353,847 414,364 201,451
966.00 225,646 426,740 841,104 225,991
Device Routing Invert Outlet Devices
#1 Primary 960.82'Asymmetrical Weir, C= 3.27
Offset (feet) -70.00 -41.00 0.00 49.00 87.00
Height (feet) 0.35 0.09 0.00 0.09 0.35
Primary OutFlow Max=134.80 cfs @ 12.14 hrs HW=961.61' (Free Discharge)
1=Asymmetrical Weir (Weir Controls 134.80 cfs @ 2.76 fps)
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 108HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Pond 5P: Wetland B
Inflow
Primary
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)46
44
42
40
38
36
34
32
30
28
26
24
22
20
18
16
14
12
10
8
6
4
2
0
Inflow Area=12.868 ac
Peak Elev=961.61'
Storage=2,008 cf
42.60 cfs
42.34 cfs
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 109HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Pond 5P: Wetland B
Time
(hours)
Inflow
(cfs)
Storage
(cubic-feet)
Elevation
(feet)
Primary
(cfs)
0.00 0.00 0 961.60 0.00
5.00 0.03 1 961.60 0.03
10.00 0.55 26 961.60 0.54
15.00 1.98 94 961.60 1.98
20.00 0.36 17 961.60 0.36
25.00 0.08 4 961.60 0.08
30.00 0.00 0 961.60 0.00
35.00 0.00 0 961.60 0.00
40.00 0.00 0 961.60 0.00
45.00 0.00 0 961.60 0.00
50.00 0.00 0 961.60 0.00
55.00 0.00 0 961.60 0.00
60.00 0.00 0 961.60 0.00
65.00 0.00 0 961.60 0.00
70.00 0.00 0 961.60 0.00
75.00 0.00 0 961.60 0.00
80.00 0.00 0 961.60 0.00
85.00 0.00 0 961.60 0.00
90.00 0.00 0 961.60 0.00
95.00 0.00 0 961.60 0.00
100.00 0.00 0 961.60 0.00
105.00 0.00 0 961.60 0.00
110.00 0.00 0 961.60 0.00
115.00 0.00 0 961.60 0.00
120.00 0.00 0 961.60 0.00
125.00 0.00 0 961.60 0.00
130.00 0.00 0 961.60 0.00
135.00 0.00 0 961.60 0.00
140.00 0.00 0 961.60 0.00
145.00 0.00 0 961.60 0.00
150.00 0.00 0 961.60 0.00
155.00 0.00 0 961.60 0.00
160.00 0.00 0 961.60 0.00
165.00 0.00 0 961.60 0.00
170.00 0.00 0 961.60 0.00
175.00 0.00 0 961.60 0.00
180.00 0.00 0 961.60 0.00
185.00 0.00 0 961.60 0.00
190.00 0.00 0 961.60 0.00
195.00 0.00 0 961.60 0.00
200.00 0.00 0 961.60 0.00
205.00 0.00 0 961.60 0.00
210.00 0.00 0 961.60 0.00
215.00 0.00 0 961.60 0.00
220.00 0.00 0 961.60 0.00
225.00 0.00 0 961.60 0.00
230.00 0.00 0 961.60 0.00
235.00 0.00 0 961.60 0.00
240.00 0.00 0 961.60 0.00
MN-RPBCWD_v1_Atlas14_24-hr10y_S1 10y 24hr Rainfall=4.27"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 110HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Stage-Discharge for Pond 5P: Wetland B
Elevation
(feet)
Primary
(cfs)
961.60 0.00
961.65 139.02
961.70 144.59
961.75 149.95
961.80 155.13
961.85 160.13
961.90 164.98
961.95 169.69
962.00 174.28
962.05 178.74
962.10 183.09
962.15 187.35
962.20 191.51
962.25 195.57
962.30 199.56
962.35 203.47
962.40 207.30
962.45 211.06
962.50 214.76
962.55 218.40
962.60 221.97
962.65 225.49
962.70 228.95
962.75 232.36
962.80 235.73
962.85 239.04
962.90 242.31
962.95 245.54
963.00 248.72
963.05 251.87
963.10 254.97
963.15 258.04
963.20 261.07
963.25 264.07
963.30 267.03
963.35 269.96
963.40 272.86
963.45 275.73
963.50 278.56
963.55 281.37
963.60 284.16
963.65 286.91
963.70 289.64
963.75 292.34
963.80 295.02
963.85 297.68
963.90 300.31
963.95 302.92
964.00 305.50
964.05 308.07
964.10 310.61
964.15 313.13
964.20 315.63
Elevation
(feet)
Primary
(cfs)
964.25 318.12
964.30 320.58
964.35 323.02
964.40 325.45
964.45 327.86
964.50 330.25
964.55 332.62
964.60 334.98
964.65 337.32
964.70 339.64
964.75 341.95
964.80 344.24
964.85 346.52
964.90 348.78
964.95 351.03
965.00 353.26
965.05 355.48
965.10 357.69
965.15 359.88
965.20 362.06
965.25 364.23
965.30 366.38
965.35 368.52
965.40 370.65
965.45 372.76
965.50 374.87
965.55 376.96
965.60 379.04
965.65 381.11
965.70 383.17
965.75 385.22
965.80 387.25
965.85 389.28
965.90 391.29
965.95 393.30
966.00 395.29
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 111HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Time span=0.00-240.00 hrs, dt=0.01 hrs, 24001 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Stor-Ind method - Pond routing by Stor-Ind method
Runoff Area=125,400 sf 0.00% Impervious Runoff Depth=5.53"Subcatchment 6S: UNDISTURBED
Tc=6.0 min CN=84 Runoff=26.30 cfs 1.327 af
Runoff Area=238,192 sf 46.22% Impervious Runoff Depth=5.99"Subcatchment 7S: OFFSITE WETLAND B
Flow Length=1,100' Slope=0.1500 '/' Tc=13.4 min CN=WQ Runoff=37.78 cfs 2.732 af
Runoff Area=74,865 sf 8.12% Impervious Runoff Depth=5.66"Subcatchment OFFSITE B: OFFSITE B -
Tc=6.0 min CN=WQ Runoff=15.90 cfs 0.811 af
Runoff Area=49,573 sf 17.90% Impervious Runoff Depth=5.82"Subcatchment OUTSITE A: OFFSITE A -
Tc=6.0 min CN=WQ Runoff=10.68 cfs 0.552 af
Runoff Area=3,245 sf 100.00% Impervious Runoff Depth=7.17"Subcatchment PR1A: PR1A - DRAINS
Tc=6.0 min CN=WQ Runoff=0.78 cfs 0.045 af
Runoff Area=29,167 sf 24.99% Impervious Runoff Depth=5.94"Subcatchment PR1B: PR1B - DRAINS
Tc=6.0 min CN=WQ Runoff=6.35 cfs 0.331 af
Runoff Area=5,573 sf 0.00% Impervious Runoff Depth=5.53"Subcatchment PR1C: PR1C - DRAINS
Tc=6.0 min CN=WQ Runoff=1.17 cfs 0.059 af
Runoff Area=35,117 sf 17.47% Impervious Runoff Depth=5.82"Subcatchment PR1D: PR1D - DRAINS
Tc=6.0 min CN=WQ Runoff=7.56 cfs 0.391 af
Runoff Area=2,636 sf 87.75% Impervious Runoff Depth=6.97"Subcatchment PR2: PR2 - DRAINS SOUTH
Tc=6.0 min CN=WQ Runoff=0.63 cfs 0.035 af
Inflow=28.65 cfs 1.592 afReach DA2: DA2 - TOTAL FLOW TO WETLAND A
Outflow=28.65 cfs 1.592 af
Inflow=28.83 cfs 2.180 afReach DA3: DA3 - TOTAL FLOW TO WETLAND B
Outflow=28.83 cfs 2.180 af
Peak Elev=974.57' Storage=3,439 cf Inflow=7.56 cfs 0.391 afPond 1P: FILTRATION BASIN 1
Discarded=0.00 cfs 0.000 af Primary=5.35 cfs 0.391 af Secondary=0.00 cfs 0.000 af Outflow=5.35 cfs 0.391 af
Peak Elev=970.44' Storage=10,462 cf Inflow=28.65 cfs 1.592 afPond 4P: WETLAND A
Outflow=20.08 cfs 1.592 af
Peak Elev=961.63' Storage=3,980 cf Inflow=84.50 cfs 6.238 afPond 5P: Wetland B
Outflow=83.88 cfs 6.238 af
Total Runoff Area = 12.942 ac Runoff Volume = 6.283 af Average Runoff Depth = 5.83"
74.45% Pervious = 9.636 ac 25.55% Impervious = 3.306 ac
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 112HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment 6S: UNDISTURBED
Runoff = 26.30 cfs @ 12.08 hrs, Volume= 1.327 af, Depth= 5.53"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"
Area (sf) CN Description
* 125,400 84
125,400 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment 6S: UNDISTURBED
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)28
26
24
22
20
18
16
14
12
10
8
6
4
2
0
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr
Rainfall=7.41"
Runoff Area=125,400 sf
Runoff Volume=1.327 af
Runoff Depth=5.53"
Tc=6.0 min
CN=84
26.30 cfs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 113HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment 6S: UNDISTURBED
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.15 0.00 0.00
10.00 0.79 0.07 0.30
15.00 6.96 5.11 0.94
20.00 7.29 5.41 0.09
25.00 7.41 5.53 0.00
30.00 7.41 5.53 0.00
35.00 7.41 5.53 0.00
40.00 7.41 5.53 0.00
45.00 7.41 5.53 0.00
50.00 7.41 5.53 0.00
55.00 7.41 5.53 0.00
60.00 7.41 5.53 0.00
65.00 7.41 5.53 0.00
70.00 7.41 5.53 0.00
75.00 7.41 5.53 0.00
80.00 7.41 5.53 0.00
85.00 7.41 5.53 0.00
90.00 7.41 5.53 0.00
95.00 7.41 5.53 0.00
100.00 7.41 5.53 0.00
105.00 7.41 5.53 0.00
110.00 7.41 5.53 0.00
115.00 7.41 5.53 0.00
120.00 7.41 5.53 0.00
125.00 7.41 5.53 0.00
130.00 7.41 5.53 0.00
135.00 7.41 5.53 0.00
140.00 7.41 5.53 0.00
145.00 7.41 5.53 0.00
150.00 7.41 5.53 0.00
155.00 7.41 5.53 0.00
160.00 7.41 5.53 0.00
165.00 7.41 5.53 0.00
170.00 7.41 5.53 0.00
175.00 7.41 5.53 0.00
180.00 7.41 5.53 0.00
185.00 7.41 5.53 0.00
190.00 7.41 5.53 0.00
195.00 7.41 5.53 0.00
200.00 7.41 5.53 0.00
205.00 7.41 5.53 0.00
210.00 7.41 5.53 0.00
215.00 7.41 5.53 0.00
220.00 7.41 5.53 0.00
225.00 7.41 5.53 0.00
230.00 7.41 5.53 0.00
235.00 7.41 5.53 0.00
240.00 7.41 5.53 0.00
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 114HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment 7S: OFFSITE WETLAND B WATERSHED
Runoff = 37.78 cfs @ 12.17 hrs, Volume= 2.732 af, Depth= 5.99"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"
Area (sf) CN Description
67,393 98 Unconnected roofs, HSG B
* 170,799 84 1/2 acre lots, 25% imp, HSG B
238,192 Weighted Average
128,099 53.78% Pervious Area
110,093 46.22% Impervious Area
67,393 61.21% Unconnected
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
7.9 200 0.1500 0.42 Sheet Flow,
Grass: Short n= 0.150 P2= 2.94"
5.5 900 0.1500 2.71 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
13.4 1,100 Total
Subcatchment 7S: OFFSITE WETLAND B WATERSHED
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)42
40
38
36
34
32
30
28
26
24
22
20
18
16
14
12
10
8
6
4
2
0
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr
Rainfall=7.41"
Runoff Area=238,192 sf
Runoff Volume=2.732 af
Runoff Depth=5.99"
Flow Length=1,100'
Slope=0.1500 '/'
Tc=13.4 min
CN=WQ
37.78 cfs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 115HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment 7S: OFFSITE WETLAND B WATERSHED
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.15 0.00 0.03
10.00 0.79 0.14 0.87
15.00 6.96 5.56 1.80
20.00 7.29 5.87 0.16
25.00 7.41 5.99 0.00
30.00 7.41 5.99 0.00
35.00 7.41 5.99 0.00
40.00 7.41 5.99 0.00
45.00 7.41 5.99 0.00
50.00 7.41 5.99 0.00
55.00 7.41 5.99 0.00
60.00 7.41 5.99 0.00
65.00 7.41 5.99 0.00
70.00 7.41 5.99 0.00
75.00 7.41 5.99 0.00
80.00 7.41 5.99 0.00
85.00 7.41 5.99 0.00
90.00 7.41 5.99 0.00
95.00 7.41 5.99 0.00
100.00 7.41 5.99 0.00
105.00 7.41 5.99 0.00
110.00 7.41 5.99 0.00
115.00 7.41 5.99 0.00
120.00 7.41 5.99 0.00
125.00 7.41 5.99 0.00
130.00 7.41 5.99 0.00
135.00 7.41 5.99 0.00
140.00 7.41 5.99 0.00
145.00 7.41 5.99 0.00
150.00 7.41 5.99 0.00
155.00 7.41 5.99 0.00
160.00 7.41 5.99 0.00
165.00 7.41 5.99 0.00
170.00 7.41 5.99 0.00
175.00 7.41 5.99 0.00
180.00 7.41 5.99 0.00
185.00 7.41 5.99 0.00
190.00 7.41 5.99 0.00
195.00 7.41 5.99 0.00
200.00 7.41 5.99 0.00
205.00 7.41 5.99 0.00
210.00 7.41 5.99 0.00
215.00 7.41 5.99 0.00
220.00 7.41 5.99 0.00
225.00 7.41 5.99 0.00
230.00 7.41 5.99 0.00
235.00 7.41 5.99 0.00
240.00 7.41 5.99 0.00
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 116HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment OFFSITE B: OFFSITE B - DRAINS SOUTH TO WETLAND
Runoff = 15.90 cfs @ 12.08 hrs, Volume= 0.811 af, Depth= 5.66"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"
Area (sf) CN Description
6,076 98 Paved parking, HSG C
* 68,789 84
74,865 Weighted Average
68,789 91.88% Pervious Area
6,076 8.12% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment OFFSITE B: OFFSITE B - DRAINS SOUTH TO WETLAND
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr
Rainfall=7.41"
Runoff Area=74,865 sf
Runoff Volume=0.811 af
Runoff Depth=5.66"
Tc=6.0 min
CN=WQ
15.90 cfs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 117HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment OFFSITE B: OFFSITE B - DRAINS SOUTH TO WETLAND
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.15 0.00 0.00
10.00 0.79 0.09 0.21
15.00 6.96 5.22 0.56
20.00 7.29 5.53 0.05
25.00 7.41 5.65 0.00
30.00 7.41 5.65 0.00
35.00 7.41 5.65 0.00
40.00 7.41 5.65 0.00
45.00 7.41 5.65 0.00
50.00 7.41 5.65 0.00
55.00 7.41 5.65 0.00
60.00 7.41 5.65 0.00
65.00 7.41 5.65 0.00
70.00 7.41 5.65 0.00
75.00 7.41 5.65 0.00
80.00 7.41 5.65 0.00
85.00 7.41 5.65 0.00
90.00 7.41 5.65 0.00
95.00 7.41 5.65 0.00
100.00 7.41 5.65 0.00
105.00 7.41 5.65 0.00
110.00 7.41 5.65 0.00
115.00 7.41 5.65 0.00
120.00 7.41 5.65 0.00
125.00 7.41 5.65 0.00
130.00 7.41 5.65 0.00
135.00 7.41 5.65 0.00
140.00 7.41 5.65 0.00
145.00 7.41 5.65 0.00
150.00 7.41 5.65 0.00
155.00 7.41 5.65 0.00
160.00 7.41 5.65 0.00
165.00 7.41 5.65 0.00
170.00 7.41 5.65 0.00
175.00 7.41 5.65 0.00
180.00 7.41 5.65 0.00
185.00 7.41 5.65 0.00
190.00 7.41 5.65 0.00
195.00 7.41 5.65 0.00
200.00 7.41 5.65 0.00
205.00 7.41 5.65 0.00
210.00 7.41 5.65 0.00
215.00 7.41 5.65 0.00
220.00 7.41 5.65 0.00
225.00 7.41 5.65 0.00
230.00 7.41 5.65 0.00
235.00 7.41 5.65 0.00
240.00 7.41 5.65 0.00
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 118HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment OUTSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B
Runoff = 10.68 cfs @ 12.08 hrs, Volume= 0.552 af, Depth= 5.82"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"
Area (sf) CN Description
8,875 98 Paved parking, HSG C
* 40,698 84
49,573 Weighted Average
40,698 82.10% Pervious Area
8,875 17.90% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment OUTSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)11
10
9
8
7
6
5
4
3
2
1
0
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr
Rainfall=7.41"
Runoff Area=49,573 sf
Runoff Volume=0.552 af
Runoff Depth=5.82"
Tc=6.0 min
CN=WQ
10.68 cfs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 119HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment OUTSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.15 0.00 0.00
10.00 0.79 0.12 0.16
15.00 6.96 5.44 0.37
20.00 7.29 5.76 0.03
25.00 7.41 5.88 0.00
30.00 7.41 5.88 0.00
35.00 7.41 5.88 0.00
40.00 7.41 5.88 0.00
45.00 7.41 5.88 0.00
50.00 7.41 5.88 0.00
55.00 7.41 5.88 0.00
60.00 7.41 5.88 0.00
65.00 7.41 5.88 0.00
70.00 7.41 5.88 0.00
75.00 7.41 5.88 0.00
80.00 7.41 5.88 0.00
85.00 7.41 5.88 0.00
90.00 7.41 5.88 0.00
95.00 7.41 5.88 0.00
100.00 7.41 5.88 0.00
105.00 7.41 5.88 0.00
110.00 7.41 5.88 0.00
115.00 7.41 5.88 0.00
120.00 7.41 5.88 0.00
125.00 7.41 5.88 0.00
130.00 7.41 5.88 0.00
135.00 7.41 5.88 0.00
140.00 7.41 5.88 0.00
145.00 7.41 5.88 0.00
150.00 7.41 5.88 0.00
155.00 7.41 5.88 0.00
160.00 7.41 5.88 0.00
165.00 7.41 5.88 0.00
170.00 7.41 5.88 0.00
175.00 7.41 5.88 0.00
180.00 7.41 5.88 0.00
185.00 7.41 5.88 0.00
190.00 7.41 5.88 0.00
195.00 7.41 5.88 0.00
200.00 7.41 5.88 0.00
205.00 7.41 5.88 0.00
210.00 7.41 5.88 0.00
215.00 7.41 5.88 0.00
220.00 7.41 5.88 0.00
225.00 7.41 5.88 0.00
230.00 7.41 5.88 0.00
235.00 7.41 5.88 0.00
240.00 7.41 5.88 0.00
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 120HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment PR1A: PR1A - DRAINS EAST ALONG STREET
Runoff = 0.78 cfs @ 12.08 hrs, Volume= 0.045 af, Depth= 7.17"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"
Area (sf) CN Description
3,245 98 Paved parking, HSG C
* 0 84
3,245 Weighted Average
3,245 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment PR1A: PR1A - DRAINS EAST ALONG STREET
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.85
0.8
0.75
0.7
0.65
0.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr
Rainfall=7.41"
Runoff Area=3,245 sf
Runoff Volume=0.045 af
Runoff Depth=7.17"
Tc=6.0 min
CN=WQ
0.78 cfs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 121HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment PR1A: PR1A - DRAINS EAST ALONG STREET
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.15 0.04 0.00
10.00 0.79 0.58 0.02
15.00 6.96 6.72 0.03
20.00 7.29 7.05 0.00
25.00 7.41 7.17 0.00
30.00 7.41 7.17 0.00
35.00 7.41 7.17 0.00
40.00 7.41 7.17 0.00
45.00 7.41 7.17 0.00
50.00 7.41 7.17 0.00
55.00 7.41 7.17 0.00
60.00 7.41 7.17 0.00
65.00 7.41 7.17 0.00
70.00 7.41 7.17 0.00
75.00 7.41 7.17 0.00
80.00 7.41 7.17 0.00
85.00 7.41 7.17 0.00
90.00 7.41 7.17 0.00
95.00 7.41 7.17 0.00
100.00 7.41 7.17 0.00
105.00 7.41 7.17 0.00
110.00 7.41 7.17 0.00
115.00 7.41 7.17 0.00
120.00 7.41 7.17 0.00
125.00 7.41 7.17 0.00
130.00 7.41 7.17 0.00
135.00 7.41 7.17 0.00
140.00 7.41 7.17 0.00
145.00 7.41 7.17 0.00
150.00 7.41 7.17 0.00
155.00 7.41 7.17 0.00
160.00 7.41 7.17 0.00
165.00 7.41 7.17 0.00
170.00 7.41 7.17 0.00
175.00 7.41 7.17 0.00
180.00 7.41 7.17 0.00
185.00 7.41 7.17 0.00
190.00 7.41 7.17 0.00
195.00 7.41 7.17 0.00
200.00 7.41 7.17 0.00
205.00 7.41 7.17 0.00
210.00 7.41 7.17 0.00
215.00 7.41 7.17 0.00
220.00 7.41 7.17 0.00
225.00 7.41 7.17 0.00
230.00 7.41 7.17 0.00
235.00 7.41 7.17 0.00
240.00 7.41 7.17 0.00
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 122HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment PR1B: PR1B - DRAINS SOUTH TO WETLAND A
Runoff = 6.35 cfs @ 12.08 hrs, Volume= 0.331 af, Depth= 5.94"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"
Area (sf) CN Description
7,290 98 Paved parking, HSG C
* 21,877 84
29,167 Weighted Average
21,877 75.01% Pervious Area
7,290 24.99% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment PR1B: PR1B - DRAINS SOUTH TO WETLAND A
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)7
6
5
4
3
2
1
0
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr
Rainfall=7.41"
Runoff Area=29,167 sf
Runoff Volume=0.331 af
Runoff Depth=5.94"
Tc=6.0 min
CN=WQ
6.35 cfs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 123HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment PR1B: PR1B - DRAINS SOUTH TO WETLAND A
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.15 0.00 0.00
10.00 0.79 0.12 0.11
15.00 6.96 5.44 0.22
20.00 7.29 5.76 0.02
25.00 7.41 5.88 0.00
30.00 7.41 5.88 0.00
35.00 7.41 5.88 0.00
40.00 7.41 5.88 0.00
45.00 7.41 5.88 0.00
50.00 7.41 5.88 0.00
55.00 7.41 5.88 0.00
60.00 7.41 5.88 0.00
65.00 7.41 5.88 0.00
70.00 7.41 5.88 0.00
75.00 7.41 5.88 0.00
80.00 7.41 5.88 0.00
85.00 7.41 5.88 0.00
90.00 7.41 5.88 0.00
95.00 7.41 5.88 0.00
100.00 7.41 5.88 0.00
105.00 7.41 5.88 0.00
110.00 7.41 5.88 0.00
115.00 7.41 5.88 0.00
120.00 7.41 5.88 0.00
125.00 7.41 5.88 0.00
130.00 7.41 5.88 0.00
135.00 7.41 5.88 0.00
140.00 7.41 5.88 0.00
145.00 7.41 5.88 0.00
150.00 7.41 5.88 0.00
155.00 7.41 5.88 0.00
160.00 7.41 5.88 0.00
165.00 7.41 5.88 0.00
170.00 7.41 5.88 0.00
175.00 7.41 5.88 0.00
180.00 7.41 5.88 0.00
185.00 7.41 5.88 0.00
190.00 7.41 5.88 0.00
195.00 7.41 5.88 0.00
200.00 7.41 5.88 0.00
205.00 7.41 5.88 0.00
210.00 7.41 5.88 0.00
215.00 7.41 5.88 0.00
220.00 7.41 5.88 0.00
225.00 7.41 5.88 0.00
230.00 7.41 5.88 0.00
235.00 7.41 5.88 0.00
240.00 7.41 5.88 0.00
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 124HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment PR1C: PR1C - DRAINS NORTH TO WETLAND A
Runoff = 1.17 cfs @ 12.08 hrs, Volume= 0.059 af, Depth= 5.53"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"
Area (sf) CN Description
0 98 Paved parking, HSG C
* 5,573 84
5,573 Weighted Average
5,573 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment PR1C: PR1C - DRAINS NORTH TO WETLAND A
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)1
0
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr
Rainfall=7.41"
Runoff Area=5,573 sf
Runoff Volume=0.059 af
Runoff Depth=5.53"
Tc=6.0 min
CN=WQ
1.17 cfs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 125HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment PR1C: PR1C - DRAINS NORTH TO WETLAND A
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.15 0.00 0.00
10.00 0.79 0.07 0.01
15.00 6.96 5.11 0.04
20.00 7.29 5.41 0.00
25.00 7.41 5.53 0.00
30.00 7.41 5.53 0.00
35.00 7.41 5.53 0.00
40.00 7.41 5.53 0.00
45.00 7.41 5.53 0.00
50.00 7.41 5.53 0.00
55.00 7.41 5.53 0.00
60.00 7.41 5.53 0.00
65.00 7.41 5.53 0.00
70.00 7.41 5.53 0.00
75.00 7.41 5.53 0.00
80.00 7.41 5.53 0.00
85.00 7.41 5.53 0.00
90.00 7.41 5.53 0.00
95.00 7.41 5.53 0.00
100.00 7.41 5.53 0.00
105.00 7.41 5.53 0.00
110.00 7.41 5.53 0.00
115.00 7.41 5.53 0.00
120.00 7.41 5.53 0.00
125.00 7.41 5.53 0.00
130.00 7.41 5.53 0.00
135.00 7.41 5.53 0.00
140.00 7.41 5.53 0.00
145.00 7.41 5.53 0.00
150.00 7.41 5.53 0.00
155.00 7.41 5.53 0.00
160.00 7.41 5.53 0.00
165.00 7.41 5.53 0.00
170.00 7.41 5.53 0.00
175.00 7.41 5.53 0.00
180.00 7.41 5.53 0.00
185.00 7.41 5.53 0.00
190.00 7.41 5.53 0.00
195.00 7.41 5.53 0.00
200.00 7.41 5.53 0.00
205.00 7.41 5.53 0.00
210.00 7.41 5.53 0.00
215.00 7.41 5.53 0.00
220.00 7.41 5.53 0.00
225.00 7.41 5.53 0.00
230.00 7.41 5.53 0.00
235.00 7.41 5.53 0.00
240.00 7.41 5.53 0.00
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 126HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment PR1D: PR1D - DRAINS SOUTH TO RAIN GARDEN
Runoff = 7.56 cfs @ 12.08 hrs, Volume= 0.391 af, Depth= 5.82"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"
Area (sf) CN Description
6,135 98 Paved parking, HSG C
* 28,982 84
35,117 Weighted Average
28,982 82.53% Pervious Area
6,135 17.47% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment PR1D: PR1D - DRAINS SOUTH TO RAIN GARDEN
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)8
7
6
5
4
3
2
1
0
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr
Rainfall=7.41"
Runoff Area=35,117 sf
Runoff Volume=0.391 af
Runoff Depth=5.82"
Tc=6.0 min
CN=WQ
7.56 cfs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 127HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment PR1D: PR1D - DRAINS SOUTH TO RAIN GARDEN
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.15 0.00 0.00
10.00 0.79 0.10 0.11
15.00 6.96 5.33 0.26
20.00 7.29 5.64 0.02
25.00 7.41 5.76 0.00
30.00 7.41 5.76 0.00
35.00 7.41 5.76 0.00
40.00 7.41 5.76 0.00
45.00 7.41 5.76 0.00
50.00 7.41 5.76 0.00
55.00 7.41 5.76 0.00
60.00 7.41 5.76 0.00
65.00 7.41 5.76 0.00
70.00 7.41 5.76 0.00
75.00 7.41 5.76 0.00
80.00 7.41 5.76 0.00
85.00 7.41 5.76 0.00
90.00 7.41 5.76 0.00
95.00 7.41 5.76 0.00
100.00 7.41 5.76 0.00
105.00 7.41 5.76 0.00
110.00 7.41 5.76 0.00
115.00 7.41 5.76 0.00
120.00 7.41 5.76 0.00
125.00 7.41 5.76 0.00
130.00 7.41 5.76 0.00
135.00 7.41 5.76 0.00
140.00 7.41 5.76 0.00
145.00 7.41 5.76 0.00
150.00 7.41 5.76 0.00
155.00 7.41 5.76 0.00
160.00 7.41 5.76 0.00
165.00 7.41 5.76 0.00
170.00 7.41 5.76 0.00
175.00 7.41 5.76 0.00
180.00 7.41 5.76 0.00
185.00 7.41 5.76 0.00
190.00 7.41 5.76 0.00
195.00 7.41 5.76 0.00
200.00 7.41 5.76 0.00
205.00 7.41 5.76 0.00
210.00 7.41 5.76 0.00
215.00 7.41 5.76 0.00
220.00 7.41 5.76 0.00
225.00 7.41 5.76 0.00
230.00 7.41 5.76 0.00
235.00 7.41 5.76 0.00
240.00 7.41 5.76 0.00
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 128HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment PR2: PR2 - DRAINS SOUTH TO WETLAND B
Runoff = 0.63 cfs @ 12.08 hrs, Volume= 0.035 af, Depth= 6.97"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"
Area (sf) CN Description
2,313 98 Paved parking, HSG C
* 323 84
2,636 Weighted Average
323 12.25% Pervious Area
2,313 87.75% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment PR2: PR2 - DRAINS SOUTH TO WETLAND B
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.7
0.65
0.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr
Rainfall=7.41"
Runoff Area=2,636 sf
Runoff Volume=0.035 af
Runoff Depth=6.97"
Tc=6.0 min
CN=WQ
0.63 cfs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 129HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment PR2: PR2 - DRAINS SOUTH TO WETLAND B
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.15 0.01 0.00
10.00 0.79 0.44 0.02
15.00 6.96 6.49 0.02
20.00 7.29 6.81 0.00
25.00 7.41 6.93 0.00
30.00 7.41 6.93 0.00
35.00 7.41 6.93 0.00
40.00 7.41 6.93 0.00
45.00 7.41 6.93 0.00
50.00 7.41 6.93 0.00
55.00 7.41 6.93 0.00
60.00 7.41 6.93 0.00
65.00 7.41 6.93 0.00
70.00 7.41 6.93 0.00
75.00 7.41 6.93 0.00
80.00 7.41 6.93 0.00
85.00 7.41 6.93 0.00
90.00 7.41 6.93 0.00
95.00 7.41 6.93 0.00
100.00 7.41 6.93 0.00
105.00 7.41 6.93 0.00
110.00 7.41 6.93 0.00
115.00 7.41 6.93 0.00
120.00 7.41 6.93 0.00
125.00 7.41 6.93 0.00
130.00 7.41 6.93 0.00
135.00 7.41 6.93 0.00
140.00 7.41 6.93 0.00
145.00 7.41 6.93 0.00
150.00 7.41 6.93 0.00
155.00 7.41 6.93 0.00
160.00 7.41 6.93 0.00
165.00 7.41 6.93 0.00
170.00 7.41 6.93 0.00
175.00 7.41 6.93 0.00
180.00 7.41 6.93 0.00
185.00 7.41 6.93 0.00
190.00 7.41 6.93 0.00
195.00 7.41 6.93 0.00
200.00 7.41 6.93 0.00
205.00 7.41 6.93 0.00
210.00 7.41 6.93 0.00
215.00 7.41 6.93 0.00
220.00 7.41 6.93 0.00
225.00 7.41 6.93 0.00
230.00 7.41 6.93 0.00
235.00 7.41 6.93 0.00
240.00 7.41 6.93 0.00
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 130HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A
[40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 3.322 ac, 13.47% Impervious, Inflow Depth = 5.75" for 100y 24hr event
Inflow = 28.65 cfs @ 12.08 hrs, Volume= 1.592 af
Outflow = 28.65 cfs @ 12.08 hrs, Volume= 1.592 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Reach DA2: DA2 - TOTAL FLOW TO WETLAND A
Inflow
Outflow
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)32
30
28
26
24
22
20
18
16
14
12
10
8
6
4
2
0
Inflow Area=3.322 ac
28.65 cfs
28.65 cfs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 131HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A
Time
(hours)
Inflow
(cfs)
Elevation
(feet)
Outflow
(cfs)
0.00 0.00 0.00
5.00 0.01 0.01
10.00 0.39 0.39
15.00 1.09 1.09
20.00 0.16 0.16
25.00 0.07 0.07
30.00 0.00 0.00
35.00 0.00 0.00
40.00 0.00 0.00
45.00 0.00 0.00
50.00 0.00 0.00
55.00 0.00 0.00
60.00 0.00 0.00
65.00 0.00 0.00
70.00 0.00 0.00
75.00 0.00 0.00
80.00 0.00 0.00
85.00 0.00 0.00
90.00 0.00 0.00
95.00 0.00 0.00
100.00 0.00 0.00
105.00 0.00 0.00
110.00 0.00 0.00
115.00 0.00 0.00
120.00 0.00 0.00
125.00 0.00 0.00
130.00 0.00 0.00
135.00 0.00 0.00
140.00 0.00 0.00
145.00 0.00 0.00
150.00 0.00 0.00
155.00 0.00 0.00
160.00 0.00 0.00
165.00 0.00 0.00
170.00 0.00 0.00
175.00 0.00 0.00
180.00 0.00 0.00
185.00 0.00 0.00
190.00 0.00 0.00
195.00 0.00 0.00
200.00 0.00 0.00
205.00 0.00 0.00
210.00 0.00 0.00
215.00 0.00 0.00
220.00 0.00 0.00
225.00 0.00 0.00
230.00 0.00 0.00
235.00 0.00 0.00
240.00 0.00 0.00
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 132HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B
[40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 4.521 ac, 15.58% Impervious, Inflow Depth = 5.79" for 100y 24hr event
Inflow = 28.83 cfs @ 12.12 hrs, Volume= 2.180 af
Outflow = 28.83 cfs @ 12.12 hrs, Volume= 2.180 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Reach DA3: DA3 - TOTAL FLOW TO WETLAND B
Inflow
Outflow
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)32
30
28
26
24
22
20
18
16
14
12
10
8
6
4
2
0
Inflow Area=4.521 ac
28.83 cfs
28.83 cfs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 133HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B
Time
(hours)
Inflow
(cfs)
Elevation
(feet)
Outflow
(cfs)
0.00 0.00 0.00
5.00 0.01 0.01
10.00 0.47 0.47
15.00 1.48 1.48
20.00 0.19 0.19
25.00 0.08 0.08
30.00 0.00 0.00
35.00 0.00 0.00
40.00 0.00 0.00
45.00 0.00 0.00
50.00 0.00 0.00
55.00 0.00 0.00
60.00 0.00 0.00
65.00 0.00 0.00
70.00 0.00 0.00
75.00 0.00 0.00
80.00 0.00 0.00
85.00 0.00 0.00
90.00 0.00 0.00
95.00 0.00 0.00
100.00 0.00 0.00
105.00 0.00 0.00
110.00 0.00 0.00
115.00 0.00 0.00
120.00 0.00 0.00
125.00 0.00 0.00
130.00 0.00 0.00
135.00 0.00 0.00
140.00 0.00 0.00
145.00 0.00 0.00
150.00 0.00 0.00
155.00 0.00 0.00
160.00 0.00 0.00
165.00 0.00 0.00
170.00 0.00 0.00
175.00 0.00 0.00
180.00 0.00 0.00
185.00 0.00 0.00
190.00 0.00 0.00
195.00 0.00 0.00
200.00 0.00 0.00
205.00 0.00 0.00
210.00 0.00 0.00
215.00 0.00 0.00
220.00 0.00 0.00
225.00 0.00 0.00
230.00 0.00 0.00
235.00 0.00 0.00
240.00 0.00 0.00
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 134HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Pond 1P: FILTRATION BASIN 1
Inflow Area = 0.806 ac, 17.47% Impervious, Inflow Depth = 5.82" for 100y 24hr event
Inflow = 7.56 cfs @ 12.08 hrs, Volume= 0.391 af
Outflow = 5.35 cfs @ 12.14 hrs, Volume= 0.391 af, Atten= 29%, Lag= 3.6 min
Discarded = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Primary = 5.35 cfs @ 12.14 hrs, Volume= 0.391 af
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Peak Elev= 974.57' @ 12.14 hrs Surf.Area= 2,729 sf Storage= 3,439 cf
Plug-Flow detention time= 81.7 min calculated for 0.391 af (100% of inflow)
Center-of-Mass det. time= 81.7 min ( 843.3 - 761.6 )
Volume Invert Avail.Storage Storage Description
#1 973.00' 5,291 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
973.00 1,624 0 0
973.50 2,040 916 916
974.00 2,320 1,090 2,006
974.50 2,686 1,252 3,258
975.10 3,068 1,726 4,984
975.20 3,068 307 5,291
Device Routing Invert Outlet Devices
#1 Primary 971.50'12.0" Round OUTLET PIPE
L= 23.0' CMP, mitered to conform to fill, Ke= 0.700
Inlet / Outlet Invert= 971.50' / 971.50' S= 0.0000 '/' Cc= 0.900
n= 0.012 Concrete pipe, finished, Flow Area= 0.79 sf
#2 Device 1 974.00'24.0" Horiz. RIM- Orifice/Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 975.10'10.0' long x 10.0' breadth EOF
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60
Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64
#4 Device 5 973.00'1.600 in/hr Exfiltration over Surface area above 970.50'
Excluded Surface area = 0 sf
#5 Device 1 971.50'6.0" Vert. Orifice 6" draintile C= 0.600
#6 Discarded 973.00'0.600 in/hr Exfiltration-Infiltration into Rock over Surface area from 970.00' - 970.50'
Excluded Surface area = 0 sf
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 135HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Discarded OutFlow Max=0.00 cfs @ 0.00 hrs HW=973.00' (Free Discharge)
6=Exfiltration-Infiltration into Rock ( Controls 0.00 cfs)
Primary OutFlow Max=5.35 cfs @ 12.14 hrs HW=974.57' (Free Discharge)
1=OUTLET PIPE (Inlet Controls 5.35 cfs @ 6.81 fps)
2=RIM- Orifice/Grate (Passes < 8.75 cfs potential flow)
5=Orifice 6" draintile (Passes < 1.59 cfs potential flow)
4=Exfiltration (Passes < 0.10 cfs potential flow)
Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=973.00' (Free Discharge)
3=EOF ( Controls 0.00 cfs)
Pond 1P: FILTRATION BASIN 1
Inflow
Outflow
Discarded
Primary
Secondary
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)8
7
6
5
4
3
2
1
0
Inflow Area=0.806 ac
Peak Elev=974.57'
Storage=3,439 cf
7.56 cfs
5.35 cfs
0.00 cfs
5.35 cfs
0.00 cfs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 136HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Pond 1P: FILTRATION BASIN 1
Time
(hours)
Inflow
(cfs)
Storage
(cubic-feet)
Elevation
(feet)
Outflow
(cfs)
Discarded
(cfs)
Primary
(cfs)
Secondary
(cfs)
0.00 0.00 0 973.00 0.00 0.00 0.00 0.00
5.00 0.00 1 973.00 0.00 0.00 0.00 0.00
10.00 0.11 116 973.07 0.06 0.00 0.06 0.00
15.00 0.26 2,103 974.04 0.26 0.00 0.26 0.00
20.00 0.02 1,446 973.75 0.08 0.00 0.08 0.00
25.00 0.00 445 973.26 0.07 0.00 0.07 0.00
30.00 0.00 0 973.00 0.00 0.00 0.00 0.00
35.00 0.00 0 973.00 0.00 0.00 0.00 0.00
40.00 0.00 0 973.00 0.00 0.00 0.00 0.00
45.00 0.00 0 973.00 0.00 0.00 0.00 0.00
50.00 0.00 0 973.00 0.00 0.00 0.00 0.00
55.00 0.00 0 973.00 0.00 0.00 0.00 0.00
60.00 0.00 0 973.00 0.00 0.00 0.00 0.00
65.00 0.00 0 973.00 0.00 0.00 0.00 0.00
70.00 0.00 0 973.00 0.00 0.00 0.00 0.00
75.00 0.00 0 973.00 0.00 0.00 0.00 0.00
80.00 0.00 0 973.00 0.00 0.00 0.00 0.00
85.00 0.00 0 973.00 0.00 0.00 0.00 0.00
90.00 0.00 0 973.00 0.00 0.00 0.00 0.00
95.00 0.00 0 973.00 0.00 0.00 0.00 0.00
100.00 0.00 0 973.00 0.00 0.00 0.00 0.00
105.00 0.00 0 973.00 0.00 0.00 0.00 0.00
110.00 0.00 0 973.00 0.00 0.00 0.00 0.00
115.00 0.00 0 973.00 0.00 0.00 0.00 0.00
120.00 0.00 0 973.00 0.00 0.00 0.00 0.00
125.00 0.00 0 973.00 0.00 0.00 0.00 0.00
130.00 0.00 0 973.00 0.00 0.00 0.00 0.00
135.00 0.00 0 973.00 0.00 0.00 0.00 0.00
140.00 0.00 0 973.00 0.00 0.00 0.00 0.00
145.00 0.00 0 973.00 0.00 0.00 0.00 0.00
150.00 0.00 0 973.00 0.00 0.00 0.00 0.00
155.00 0.00 0 973.00 0.00 0.00 0.00 0.00
160.00 0.00 0 973.00 0.00 0.00 0.00 0.00
165.00 0.00 0 973.00 0.00 0.00 0.00 0.00
170.00 0.00 0 973.00 0.00 0.00 0.00 0.00
175.00 0.00 0 973.00 0.00 0.00 0.00 0.00
180.00 0.00 0 973.00 0.00 0.00 0.00 0.00
185.00 0.00 0 973.00 0.00 0.00 0.00 0.00
190.00 0.00 0 973.00 0.00 0.00 0.00 0.00
195.00 0.00 0 973.00 0.00 0.00 0.00 0.00
200.00 0.00 0 973.00 0.00 0.00 0.00 0.00
205.00 0.00 0 973.00 0.00 0.00 0.00 0.00
210.00 0.00 0 973.00 0.00 0.00 0.00 0.00
215.00 0.00 0 973.00 0.00 0.00 0.00 0.00
220.00 0.00 0 973.00 0.00 0.00 0.00 0.00
225.00 0.00 0 973.00 0.00 0.00 0.00 0.00
230.00 0.00 0 973.00 0.00 0.00 0.00 0.00
235.00 0.00 0 973.00 0.00 0.00 0.00 0.00
240.00 0.00 0 973.00 0.00 0.00 0.00 0.00
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 137HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Stage-Discharge for Pond 1P: FILTRATION BASIN 1
Elevation
(feet)
Discharge
(cfs)
Discarded
(cfs)
Primary
(cfs)
Secondary
(cfs)
973.00 0.00 0.00 0.00 0.00
973.05 0.06 0.00 0.06 0.00
973.10 0.06 0.00 0.06 0.00
973.15 0.06 0.00 0.06 0.00
973.20 0.07 0.00 0.07 0.00
973.25 0.07 0.00 0.07 0.00
973.30 0.07 0.00 0.07 0.00
973.35 0.07 0.00 0.07 0.00
973.40 0.07 0.00 0.07 0.00
973.45 0.07 0.00 0.07 0.00
973.50 0.08 0.00 0.08 0.00
973.55 0.08 0.00 0.08 0.00
973.60 0.08 0.00 0.08 0.00
973.65 0.08 0.00 0.08 0.00
973.70 0.08 0.00 0.08 0.00
973.75 0.08 0.00 0.08 0.00
973.80 0.08 0.00 0.08 0.00
973.85 0.08 0.00 0.08 0.00
973.90 0.08 0.00 0.08 0.00
973.95 0.08 0.00 0.08 0.00
974.00 0.09 0.00 0.09 0.00
974.05 0.32 0.00 0.32 0.00
974.10 0.74 0.00 0.74 0.00
974.15 1.28 0.00 1.28 0.00
974.20 1.93 0.00 1.93 0.00
974.25 2.66 0.00 2.66 0.00
974.30 3.47 0.00 3.47 0.00
974.35 4.35 0.00 4.35 0.00
974.40 5.17 0.00 5.17 0.00
974.45 5.22 0.00 5.22 0.00
974.50 5.28 0.00 5.28 0.00
974.55 5.33 0.00 5.33 0.00
974.60 5.38 0.00 5.38 0.00
974.65 5.43 0.00 5.43 0.00
974.70 5.48 0.00 5.48 0.00
974.75 5.53 0.00 5.53 0.00
974.80 5.58 0.00 5.58 0.00
974.85 5.63 0.00 5.63 0.00
974.90 5.68 0.00 5.68 0.00
974.95 5.73 0.00 5.73 0.00
975.00 5.78 0.00 5.78 0.00
975.05 5.83 0.00 5.83 0.00
975.10 5.87 0.00 5.87 0.00
975.15 6.20 0.00 5.92 0.28
975.20 6.76 0.00 5.97 0.79
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 138HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Pond 4P: WETLAND A
Inflow Area = 3.322 ac, 13.47% Impervious, Inflow Depth = 5.75" for 100y 24hr event
Inflow = 28.65 cfs @ 12.08 hrs, Volume= 1.592 af
Outflow = 20.08 cfs @ 12.16 hrs, Volume= 1.592 af, Atten= 30%, Lag= 4.3 min
Primary = 20.08 cfs @ 12.16 hrs, Volume= 1.592 af
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Peak Elev= 970.44' @ 12.16 hrs Surf.Area= 14,066 sf Storage= 10,462 cf
Plug-Flow detention time= 17.1 min calculated for 1.592 af (100% of inflow)
Center-of-Mass det. time= 17.0 min ( 800.1 - 783.1 )
Volume Invert Avail.Storage Storage Description
#1 969.62' 18,824 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
969.62 11,466 0 0
970.00 12,553 4,564 4,564
971.00 15,967 14,260 18,824
Device Routing Invert Outlet Devices
#1 Primary 969.62'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60
Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64
Primary OutFlow Max=20.07 cfs @ 12.16 hrs HW=970.44' (Free Discharge)
1=Broad-Crested Rectangular Weir (Weir Controls 20.07 cfs @ 2.44 fps)
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 139HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Pond 4P: WETLAND A
Inflow
Primary
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)32
30
28
26
24
22
20
18
16
14
12
10
8
6
4
2
0
Inflow Area=3.322 ac
Peak Elev=970.44'
Storage=10,462 cf
28.65 cfs
20.08 cfs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 140HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Pond 4P: WETLAND A
Time
(hours)
Inflow
(cfs)
Storage
(cubic-feet)
Elevation
(feet)
Primary
(cfs)
0.00 0.00 0 969.62 0.00
5.00 0.01 25 969.62 0.01
10.00 0.39 592 969.67 0.29
15.00 1.09 1,446 969.74 1.09
20.00 0.16 392 969.65 0.16
25.00 0.07 254 969.64 0.08
30.00 0.00 12 969.62 0.00
35.00 0.00 0 969.62 0.00
40.00 0.00 0 969.62 0.00
45.00 0.00 0 969.62 0.00
50.00 0.00 0 969.62 0.00
55.00 0.00 0 969.62 0.00
60.00 0.00 0 969.62 0.00
65.00 0.00 0 969.62 0.00
70.00 0.00 0 969.62 0.00
75.00 0.00 0 969.62 0.00
80.00 0.00 0 969.62 0.00
85.00 0.00 0 969.62 0.00
90.00 0.00 0 969.62 0.00
95.00 0.00 0 969.62 0.00
100.00 0.00 0 969.62 0.00
105.00 0.00 0 969.62 0.00
110.00 0.00 0 969.62 0.00
115.00 0.00 0 969.62 0.00
120.00 0.00 0 969.62 0.00
125.00 0.00 0 969.62 0.00
130.00 0.00 0 969.62 0.00
135.00 0.00 0 969.62 0.00
140.00 0.00 0 969.62 0.00
145.00 0.00 0 969.62 0.00
150.00 0.00 0 969.62 0.00
155.00 0.00 0 969.62 0.00
160.00 0.00 0 969.62 0.00
165.00 0.00 0 969.62 0.00
170.00 0.00 0 969.62 0.00
175.00 0.00 0 969.62 0.00
180.00 0.00 0 969.62 0.00
185.00 0.00 0 969.62 0.00
190.00 0.00 0 969.62 0.00
195.00 0.00 0 969.62 0.00
200.00 0.00 0 969.62 0.00
205.00 0.00 0 969.62 0.00
210.00 0.00 0 969.62 0.00
215.00 0.00 0 969.62 0.00
220.00 0.00 0 969.62 0.00
225.00 0.00 0 969.62 0.00
230.00 0.00 0 969.62 0.00
235.00 0.00 0 969.62 0.00
240.00 0.00 0 969.62 0.00
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 141HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Stage-Discharge for Pond 4P: WETLAND A
Elevation
(feet)
Primary
(cfs)
969.62 0.00
969.63 0.02
969.64 0.07
969.65 0.13
969.66 0.20
969.67 0.28
969.68 0.37
969.69 0.46
969.70 0.56
969.71 0.67
969.72 0.79
969.73 0.91
969.74 1.04
969.75 1.17
969.76 1.30
969.77 1.45
969.78 1.59
969.79 1.75
969.80 1.90
969.81 2.06
969.82 2.23
969.83 2.40
969.84 2.58
969.85 2.76
969.86 2.94
969.87 3.13
969.88 3.33
969.89 3.53
969.90 3.73
969.91 3.94
969.92 4.15
969.93 4.36
969.94 4.58
969.95 4.81
969.96 5.03
969.97 5.26
969.98 5.50
969.99 5.74
970.00 5.98
970.01 6.23
970.02 6.48
970.03 6.74
970.04 7.01
970.05 7.28
970.06 7.55
970.07 7.83
970.08 8.12
970.09 8.41
970.10 8.70
970.11 9.00
970.12 9.30
970.13 9.60
970.14 9.91
Elevation
(feet)
Primary
(cfs)
970.15 10.23
970.16 10.55
970.17 10.87
970.18 11.20
970.19 11.53
970.20 11.86
970.21 12.20
970.22 12.55
970.23 12.86
970.24 13.18
970.25 13.49
970.26 13.81
970.27 14.14
970.28 14.46
970.29 14.79
970.30 15.12
970.31 15.45
970.32 15.78
970.33 16.12
970.34 16.46
970.35 16.80
970.36 17.14
970.37 17.49
970.38 17.84
970.39 18.19
970.40 18.54
970.41 18.89
970.42 19.25
970.43 19.61
970.44 19.97
970.45 20.33
970.46 20.69
970.47 21.06
970.48 21.43
970.49 21.80
970.50 22.17
970.51 22.55
970.52 22.92
970.53 23.30
970.54 23.68
970.55 24.07
970.56 24.45
970.57 24.84
970.58 25.23
970.59 25.62
970.60 26.01
970.61 26.40
970.62 26.80
970.63 27.21
970.64 27.62
970.65 28.03
970.66 28.45
970.67 28.86
Elevation
(feet)
Primary
(cfs)
970.68 29.28
970.69 29.70
970.70 30.12
970.71 30.55
970.72 30.98
970.73 31.41
970.74 31.84
970.75 32.27
970.76 32.71
970.77 33.14
970.78 33.58
970.79 34.02
970.80 34.47
970.81 34.91
970.82 35.36
970.83 35.79
970.84 36.22
970.85 36.65
970.86 37.09
970.87 37.52
970.88 37.96
970.89 38.40
970.90 38.84
970.91 39.28
970.92 39.72
970.93 40.17
970.94 40.61
970.95 41.06
970.96 41.51
970.97 41.96
970.98 42.41
970.99 42.86
971.00 43.32
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 142HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Pond 5P: Wetland B
[44] Hint: Outlet device #1 is below defined storage
[95] Warning: Outlet Device #1 rise exceeded
Inflow Area = 12.868 ac, 25.12% Impervious, Inflow Depth = 5.82" for 100y 24hr event
Inflow = 84.50 cfs @ 12.12 hrs, Volume= 6.238 af
Outflow = 83.88 cfs @ 12.13 hrs, Volume= 6.238 af, Atten= 1%, Lag= 0.9 min
Primary = 83.88 cfs @ 12.13 hrs, Volume= 6.238 af
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Peak Elev= 961.63' @ 12.13 hrs Surf.Area= 149,304 sf Storage= 3,980 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 0.8 min ( 774.9 - 774.1 )
Volume Invert Avail.Storage Storage Description
#1 961.60' 841,104 cf Custom Stage Data (Conic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store Wet.Area
(feet) (sq-ft) (cubic-feet) (cubic-feet) (sq-ft)
961.60 149,000 0 0 149,000
962.00 153,597 60,517 60,517 153,630
964.00 201,325 353,847 414,364 201,451
966.00 225,646 426,740 841,104 225,991
Device Routing Invert Outlet Devices
#1 Primary 960.82'Asymmetrical Weir, C= 3.27
Offset (feet) -70.00 -41.00 0.00 49.00 87.00
Height (feet) 0.35 0.09 0.00 0.09 0.35
Primary OutFlow Max=136.34 cfs @ 12.13 hrs HW=961.63' (Free Discharge)
1=Asymmetrical Weir (Weir Controls 136.34 cfs @ 2.79 fps)
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 143HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Pond 5P: Wetland B
Inflow
Primary
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
Inflow Area=12.868 ac
Peak Elev=961.63'
Storage=3,980 cf
84.50 cfs
83.88 cfs
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 144HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Pond 5P: Wetland B
Time
(hours)
Inflow
(cfs)
Storage
(cubic-feet)
Elevation
(feet)
Primary
(cfs)
0.00 0.00 0 961.60 0.00
5.00 0.04 2 961.60 0.04
10.00 1.64 77 961.60 1.63
15.00 4.22 200 961.60 4.22
20.00 0.45 21 961.60 0.45
25.00 0.08 4 961.60 0.09
30.00 0.00 0 961.60 0.00
35.00 0.00 0 961.60 0.00
40.00 0.00 0 961.60 0.00
45.00 0.00 0 961.60 0.00
50.00 0.00 0 961.60 0.00
55.00 0.00 0 961.60 0.00
60.00 0.00 0 961.60 0.00
65.00 0.00 0 961.60 0.00
70.00 0.00 0 961.60 0.00
75.00 0.00 0 961.60 0.00
80.00 0.00 0 961.60 0.00
85.00 0.00 0 961.60 0.00
90.00 0.00 0 961.60 0.00
95.00 0.00 0 961.60 0.00
100.00 0.00 0 961.60 0.00
105.00 0.00 0 961.60 0.00
110.00 0.00 0 961.60 0.00
115.00 0.00 0 961.60 0.00
120.00 0.00 0 961.60 0.00
125.00 0.00 0 961.60 0.00
130.00 0.00 0 961.60 0.00
135.00 0.00 0 961.60 0.00
140.00 0.00 0 961.60 0.00
145.00 0.00 0 961.60 0.00
150.00 0.00 0 961.60 0.00
155.00 0.00 0 961.60 0.00
160.00 0.00 0 961.60 0.00
165.00 0.00 0 961.60 0.00
170.00 0.00 0 961.60 0.00
175.00 0.00 0 961.60 0.00
180.00 0.00 0 961.60 0.00
185.00 0.00 0 961.60 0.00
190.00 0.00 0 961.60 0.00
195.00 0.00 0 961.60 0.00
200.00 0.00 0 961.60 0.00
205.00 0.00 0 961.60 0.00
210.00 0.00 0 961.60 0.00
215.00 0.00 0 961.60 0.00
220.00 0.00 0 961.60 0.00
225.00 0.00 0 961.60 0.00
230.00 0.00 0 961.60 0.00
235.00 0.00 0 961.60 0.00
240.00 0.00 0 961.60 0.00
MN-RPBCWD_v1_Atlas14_24-hr100y_S1 100y 24hr Rainfall=7.41"21429- PROPOSED
Printed 5/17/2022Prepared by {enter your company name here}
Page 145HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Stage-Discharge for Pond 5P: Wetland B
Elevation
(feet)
Primary
(cfs)
961.60 0.00
961.65 139.02
961.70 144.59
961.75 149.95
961.80 155.13
961.85 160.13
961.90 164.98
961.95 169.69
962.00 174.28
962.05 178.74
962.10 183.09
962.15 187.35
962.20 191.51
962.25 195.57
962.30 199.56
962.35 203.47
962.40 207.30
962.45 211.06
962.50 214.76
962.55 218.40
962.60 221.97
962.65 225.49
962.70 228.95
962.75 232.36
962.80 235.73
962.85 239.04
962.90 242.31
962.95 245.54
963.00 248.72
963.05 251.87
963.10 254.97
963.15 258.04
963.20 261.07
963.25 264.07
963.30 267.03
963.35 269.96
963.40 272.86
963.45 275.73
963.50 278.56
963.55 281.37
963.60 284.16
963.65 286.91
963.70 289.64
963.75 292.34
963.80 295.02
963.85 297.68
963.90 300.31
963.95 302.92
964.00 305.50
964.05 308.07
964.10 310.61
964.15 313.13
964.20 315.63
Elevation
(feet)
Primary
(cfs)
964.25 318.12
964.30 320.58
964.35 323.02
964.40 325.45
964.45 327.86
964.50 330.25
964.55 332.62
964.60 334.98
964.65 337.32
964.70 339.64
964.75 341.95
964.80 344.24
964.85 346.52
964.90 348.78
964.95 351.03
965.00 353.26
965.05 355.48
965.10 357.69
965.15 359.88
965.20 362.06
965.25 364.23
965.30 366.38
965.35 368.52
965.40 370.65
965.45 372.76
965.50 374.87
965.55 376.96
965.60 379.04
965.65 381.11
965.70 383.17
965.75 385.22
965.80 387.25
965.85 389.28
965.90 391.29
965.95 393.30
966.00 395.29
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 146HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Time span=0.00-240.00 hrs, dt=0.01 hrs, 24001 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Stor-Ind method - Pond routing by Stor-Ind method
Runoff Area=125,400 sf 0.00% Impervious Runoff Depth>6.96"Subcatchment 6S: UNDISTURBED
Tc=6.0 min AMC Adjusted CN=98 Runoff=0.55 cfs 1.670 af
Runoff Area=238,192 sf 46.22% Impervious Runoff Depth>6.96"Subcatchment 7S: OFFSITE WETLAND B
Flow Length=1,100' Slope=0.1500 '/' Tc=13.4 min AMC Adjusted CN=WQ Runoff=1.04 cfs 3.171 af
Runoff Area=74,865 sf 8.12% Impervious Runoff Depth>6.96"Subcatchment OFFSITE B: OFFSITE B -
Tc=6.0 min AMC Adjusted CN=WQ Runoff=0.33 cfs 0.997 af
Runoff Area=49,573 sf 17.90% Impervious Runoff Depth>6.96"Subcatchment OUTSITE A: OFFSITE A -
Tc=6.0 min AMC Adjusted CN=WQ Runoff=0.22 cfs 0.660 af
Runoff Area=3,245 sf 100.00% Impervious Runoff Depth>6.96"Subcatchment PR1A: PR1A - DRAINS
Tc=6.0 min CN=WQ Runoff=0.01 cfs 0.043 af
Runoff Area=29,167 sf 24.99% Impervious Runoff Depth>6.96"Subcatchment PR1B: PR1B - DRAINS
Tc=6.0 min AMC Adjusted CN=WQ Runoff=0.13 cfs 0.388 af
Runoff Area=5,573 sf 0.00% Impervious Runoff Depth>6.96"Subcatchment PR1C: PR1C - DRAINS
Tc=6.0 min AMC Adjusted CN=WQ Runoff=0.02 cfs 0.074 af
Runoff Area=35,117 sf 17.47% Impervious Runoff Depth>6.96"Subcatchment PR1D: PR1D - DRAINS
Tc=6.0 min AMC Adjusted CN=WQ Runoff=0.15 cfs 0.468 af
Runoff Area=2,636 sf 87.75% Impervious Runoff Depth>6.96"Subcatchment PR2: PR2 - DRAINS SOUTH
Tc=6.0 min AMC Adjusted CN=WQ Runoff=0.01 cfs 0.035 af
Inflow=0.56 cfs 1.927 afReach DA2: DA2 - TOTAL FLOW TO WETLAND A
Outflow=0.56 cfs 1.927 af
Inflow=0.78 cfs 2.618 afReach DA3: DA3 - TOTAL FLOW TO WETLAND B
Outflow=0.78 cfs 2.618 af
Peak Elev=973.72' Storage=1,388 cf Inflow=0.15 cfs 0.468 afPond 1P: FILTRATION BASIN 1
Discarded=0.00 cfs 0.000 af Primary=0.08 cfs 0.467 af Secondary=0.00 cfs 0.000 af Outflow=0.08 cfs 0.467 af
Peak Elev=969.70' Storage=909 cf Inflow=0.56 cfs 1.927 afPond 4P: WETLAND A
Outflow=0.55 cfs 1.923 af
Peak Elev=961.60' Storage=112 cf Inflow=2.37 cfs 7.458 afPond 5P: Wetland B
Outflow=2.37 cfs 7.458 af
Total Runoff Area = 12.942 ac Runoff Volume = 7.506 af Average Runoff Depth = 6.96"
74.45% Pervious = 9.636 ac 25.55% Impervious = 3.306 ac
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 147HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment 6S: UNDISTURBED
Runoff = 0.55 cfs @ 121.26 hrs, Volume= 1.670 af, Depth> 6.96"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=4
Area (sf) CN Adj Description
* 125,400 84 98
125,400 Weighted Average
125,400 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment 6S: UNDISTURBED
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
MN-RPBCWD_Snowmelt_10d_100_yr
Snowmelt 100yr 10d Rainfall=7.20"
AMC=4
Runoff Area=125,400 sf
Runoff Volume=1.670 af
Runoff Depth>6.96"
Tc=6.0 min
AMC Adjusted CN=98
0.55 cfs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 148HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment 6S: UNDISTURBED
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.04 0.00 0.00
10.00 0.12 0.02 0.02
15.00 0.20 0.07 0.03
20.00 0.28 0.13 0.04
25.00 0.37 0.21 0.04
30.00 0.46 0.29 0.05
35.00 0.56 0.37 0.05
40.00 0.66 0.46 0.05
45.00 0.76 0.56 0.06
50.00 0.86 0.66 0.06
55.00 0.97 0.76 0.06
60.00 1.08 0.87 0.06
65.00 1.19 0.98 0.07
70.00 1.31 1.10 0.07
75.00 1.44 1.22 0.07
80.00 1.57 1.35 0.08
85.00 1.71 1.49 0.08
90.00 1.86 1.64 0.09
95.00 2.03 1.80 0.10
100.00 2.20 1.97 0.10
105.00 2.40 2.17 0.13
110.00 2.65 2.42 0.15
115.00 2.94 2.70 0.20
120.00 3.53 3.29 0.51
125.00 4.27 4.03 0.28
130.00 4.62 4.39 0.17
135.00 4.87 4.63 0.13
140.00 5.06 4.83 0.10
145.00 5.23 4.99 0.09
150.00 5.39 5.15 0.09
155.00 5.53 5.30 0.08
160.00 5.67 5.43 0.08
165.00 5.80 5.56 0.07
170.00 5.92 5.68 0.07
175.00 6.03 5.80 0.06
180.00 6.14 5.91 0.06
185.00 6.25 6.01 0.06
190.00 6.36 6.12 0.06
195.00 6.46 6.22 0.06
200.00 6.55 6.32 0.06
205.00 6.65 6.41 0.05
210.00 6.74 6.50 0.05
215.00 6.82 6.58 0.05
220.00 6.91 6.67 0.05
225.00 6.98 6.75 0.05
230.00 7.06 6.82 0.04
235.00 7.13 6.89 0.04
240.00 7.20 6.96 0.04
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 149HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment 7S: OFFSITE WETLAND B WATERSHED
Runoff = 1.04 cfs @ 121.33 hrs, Volume= 3.171 af, Depth> 6.96"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=4
Area (sf) CN Adj Description
67,393 98 98 Unconnected roofs, HSG B
* 170,799 84 98 1/2 acre lots, 25% imp, HSG B
238,192 Weighted Average
128,099 53.78% Pervious Area
110,093 46.22% Impervious Area
67,393 61.21% Unconnected
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
7.9 200 0.1500 0.42 Sheet Flow,
Grass: Short n= 0.150 P2= 2.94"
5.5 900 0.1500 2.71 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
13.4 1,100 Total
Subcatchment 7S: OFFSITE WETLAND B WATERSHED
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)1
0
MN-RPBCWD_Snowmelt_10d_100_yr
Snowmelt 100yr 10d Rainfall=7.20"
AMC=4
Runoff Area=238,192 sf
Runoff Volume=3.171 af
Runoff Depth>6.96"
Flow Length=1,100'
Slope=0.1500 '/'
Tc=13.4 min
AMC Adjusted CN=WQ
1.04 cfs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 150HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment 7S: OFFSITE WETLAND B WATERSHED
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.04 0.00 0.00
10.00 0.12 0.02 0.04
15.00 0.20 0.07 0.06
20.00 0.28 0.13 0.08
25.00 0.37 0.21 0.08
30.00 0.46 0.29 0.09
35.00 0.56 0.37 0.10
40.00 0.66 0.46 0.10
45.00 0.76 0.56 0.11
50.00 0.86 0.66 0.11
55.00 0.97 0.76 0.12
60.00 1.08 0.87 0.12
65.00 1.19 0.98 0.12
70.00 1.31 1.10 0.13
75.00 1.44 1.22 0.14
80.00 1.57 1.35 0.15
85.00 1.71 1.49 0.16
90.00 1.86 1.64 0.17
95.00 2.03 1.80 0.19
100.00 2.20 1.97 0.19
105.00 2.40 2.17 0.24
110.00 2.65 2.42 0.28
115.00 2.94 2.70 0.37
120.00 3.53 3.29 0.95
125.00 4.27 4.03 0.55
130.00 4.62 4.39 0.32
135.00 4.87 4.63 0.24
140.00 5.06 4.83 0.20
145.00 5.23 4.99 0.18
150.00 5.39 5.15 0.17
155.00 5.53 5.30 0.16
160.00 5.67 5.43 0.15
165.00 5.80 5.56 0.14
170.00 5.92 5.68 0.13
175.00 6.03 5.80 0.12
180.00 6.14 5.91 0.12
185.00 6.25 6.01 0.12
190.00 6.36 6.12 0.11
195.00 6.46 6.22 0.11
200.00 6.55 6.32 0.11
205.00 6.65 6.41 0.10
210.00 6.74 6.50 0.10
215.00 6.82 6.58 0.09
220.00 6.91 6.67 0.09
225.00 6.98 6.75 0.09
230.00 7.06 6.82 0.08
235.00 7.13 6.89 0.08
240.00 7.20 6.96 0.07
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 151HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment OFFSITE B: OFFSITE B - DRAINS SOUTH TO WETLAND
Runoff = 0.33 cfs @ 121.26 hrs, Volume= 0.997 af, Depth> 6.96"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=4
Area (sf) CN Adj Description
6,076 98 98 Paved parking, HSG C
* 68,789 84 98
74,865 Weighted Average
68,789 91.88% Pervious Area
6,076 8.12% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment OFFSITE B: OFFSITE B - DRAINS SOUTH TO WETLAND
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.36
0.34
0.32
0.3
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
MN-RPBCWD_Snowmelt_10d_100_yr
Snowmelt 100yr 10d Rainfall=7.20"
AMC=4
Runoff Area=74,865 sf
Runoff Volume=0.997 af
Runoff Depth>6.96"
Tc=6.0 min
AMC Adjusted CN=WQ
0.33 cfs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 152HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment OFFSITE B: OFFSITE B - DRAINS SOUTH TO WETLAND
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.04 0.00 0.00
10.00 0.12 0.02 0.01
15.00 0.20 0.07 0.02
20.00 0.28 0.13 0.02
25.00 0.37 0.21 0.03
30.00 0.46 0.29 0.03
35.00 0.56 0.37 0.03
40.00 0.66 0.46 0.03
45.00 0.76 0.56 0.03
50.00 0.86 0.66 0.04
55.00 0.97 0.76 0.04
60.00 1.08 0.87 0.04
65.00 1.19 0.98 0.04
70.00 1.31 1.10 0.04
75.00 1.44 1.22 0.04
80.00 1.57 1.35 0.05
85.00 1.71 1.49 0.05
90.00 1.86 1.64 0.05
95.00 2.03 1.80 0.06
100.00 2.20 1.97 0.06
105.00 2.40 2.17 0.08
110.00 2.65 2.42 0.09
115.00 2.94 2.70 0.12
120.00 3.53 3.29 0.30
125.00 4.27 4.03 0.17
130.00 4.62 4.39 0.10
135.00 4.87 4.63 0.08
140.00 5.06 4.83 0.06
145.00 5.23 4.99 0.06
150.00 5.39 5.15 0.05
155.00 5.53 5.30 0.05
160.00 5.67 5.43 0.05
165.00 5.80 5.56 0.04
170.00 5.92 5.68 0.04
175.00 6.03 5.80 0.04
180.00 6.14 5.91 0.04
185.00 6.25 6.01 0.04
190.00 6.36 6.12 0.04
195.00 6.46 6.22 0.03
200.00 6.55 6.32 0.03
205.00 6.65 6.41 0.03
210.00 6.74 6.50 0.03
215.00 6.82 6.58 0.03
220.00 6.91 6.67 0.03
225.00 6.98 6.75 0.03
230.00 7.06 6.82 0.03
235.00 7.13 6.89 0.02
240.00 7.20 6.96 0.02
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 153HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment OUTSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B
Runoff = 0.22 cfs @ 121.26 hrs, Volume= 0.660 af, Depth> 6.96"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=4
Area (sf) CN Adj Description
8,875 98 98 Paved parking, HSG C
* 40,698 84 98
49,573 Weighted Average
40,698 82.10% Pervious Area
8,875 17.90% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment OUTSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.24
0.23
0.22
0.21
0.2
0.19
0.18
0.17
0.16
0.15
0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
MN-RPBCWD_Snowmelt_10d_100_yr
Snowmelt 100yr 10d Rainfall=7.20"
AMC=4
Runoff Area=49,573 sf
Runoff Volume=0.660 af
Runoff Depth>6.96"
Tc=6.0 min
AMC Adjusted CN=WQ
0.22 cfs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 154HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment OUTSITE A: OFFSITE A - DRAINS SOUTH TO WETLAND B
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.04 0.00 0.00
10.00 0.12 0.02 0.01
15.00 0.20 0.07 0.01
20.00 0.28 0.13 0.02
25.00 0.37 0.21 0.02
30.00 0.46 0.29 0.02
35.00 0.56 0.37 0.02
40.00 0.66 0.46 0.02
45.00 0.76 0.56 0.02
50.00 0.86 0.66 0.02
55.00 0.97 0.76 0.02
60.00 1.08 0.87 0.03
65.00 1.19 0.98 0.03
70.00 1.31 1.10 0.03
75.00 1.44 1.22 0.03
80.00 1.57 1.35 0.03
85.00 1.71 1.49 0.03
90.00 1.86 1.64 0.04
95.00 2.03 1.80 0.04
100.00 2.20 1.97 0.04
105.00 2.40 2.17 0.05
110.00 2.65 2.42 0.06
115.00 2.94 2.70 0.08
120.00 3.53 3.29 0.20
125.00 4.27 4.03 0.11
130.00 4.62 4.39 0.07
135.00 4.87 4.63 0.05
140.00 5.06 4.83 0.04
145.00 5.23 4.99 0.04
150.00 5.39 5.15 0.03
155.00 5.53 5.30 0.03
160.00 5.67 5.43 0.03
165.00 5.80 5.56 0.03
170.00 5.92 5.68 0.03
175.00 6.03 5.80 0.03
180.00 6.14 5.91 0.02
185.00 6.25 6.01 0.02
190.00 6.36 6.12 0.02
195.00 6.46 6.22 0.02
200.00 6.55 6.32 0.02
205.00 6.65 6.41 0.02
210.00 6.74 6.50 0.02
215.00 6.82 6.58 0.02
220.00 6.91 6.67 0.02
225.00 6.98 6.75 0.02
230.00 7.06 6.82 0.02
235.00 7.13 6.89 0.02
240.00 7.20 6.96 0.01
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 155HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment PR1A: PR1A - DRAINS EAST ALONG STREET
Runoff = 0.01 cfs @ 121.26 hrs, Volume= 0.043 af, Depth> 6.96"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=4
Area (sf) CN Description
3,245 98 Paved parking, HSG C
* 0 84
3,245 Weighted Average
3,245 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment PR1A: PR1A - DRAINS EAST ALONG STREET
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.015
0.014
0.013
0.012
0.011
0.01
0.009
0.008
0.007
0.006
0.005
0.004
0.003
0.002
0.001
0
MN-RPBCWD_Snowmelt_10d_100_yr
Snowmelt 100yr 10d Rainfall=7.20"
AMC=4
Runoff Area=3,245 sf
Runoff Volume=0.043 af
Runoff Depth>6.96"
Tc=6.0 min
CN=WQ
0.01 cfs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 156HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment PR1A: PR1A - DRAINS EAST ALONG STREET
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.04 0.00 0.00
10.00 0.12 0.02 0.00
15.00 0.20 0.07 0.00
20.00 0.28 0.13 0.00
25.00 0.37 0.21 0.00
30.00 0.46 0.29 0.00
35.00 0.56 0.37 0.00
40.00 0.66 0.46 0.00
45.00 0.76 0.56 0.00
50.00 0.86 0.66 0.00
55.00 0.97 0.76 0.00
60.00 1.08 0.87 0.00
65.00 1.19 0.98 0.00
70.00 1.31 1.10 0.00
75.00 1.44 1.22 0.00
80.00 1.57 1.35 0.00
85.00 1.71 1.49 0.00
90.00 1.86 1.64 0.00
95.00 2.03 1.80 0.00
100.00 2.20 1.97 0.00
105.00 2.40 2.17 0.00
110.00 2.65 2.42 0.00
115.00 2.94 2.70 0.01
120.00 3.53 3.29 0.01
125.00 4.27 4.03 0.01
130.00 4.62 4.39 0.00
135.00 4.87 4.63 0.00
140.00 5.06 4.83 0.00
145.00 5.23 4.99 0.00
150.00 5.39 5.15 0.00
155.00 5.53 5.30 0.00
160.00 5.67 5.43 0.00
165.00 5.80 5.56 0.00
170.00 5.92 5.68 0.00
175.00 6.03 5.80 0.00
180.00 6.14 5.91 0.00
185.00 6.25 6.01 0.00
190.00 6.36 6.12 0.00
195.00 6.46 6.22 0.00
200.00 6.55 6.32 0.00
205.00 6.65 6.41 0.00
210.00 6.74 6.50 0.00
215.00 6.82 6.58 0.00
220.00 6.91 6.67 0.00
225.00 6.98 6.75 0.00
230.00 7.06 6.82 0.00
235.00 7.13 6.89 0.00
240.00 7.20 6.96 0.00
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 157HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment PR1B: PR1B - DRAINS SOUTH TO WETLAND A
Runoff = 0.13 cfs @ 121.26 hrs, Volume= 0.388 af, Depth> 6.96"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=4
Area (sf) CN Adj Description
7,290 98 98 Paved parking, HSG C
* 21,877 84 98
29,167 Weighted Average
21,877 75.01% Pervious Area
7,290 24.99% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment PR1B: PR1B - DRAINS SOUTH TO WETLAND A
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
MN-RPBCWD_Snowmelt_10d_100_yr
Snowmelt 100yr 10d Rainfall=7.20"
AMC=4
Runoff Area=29,167 sf
Runoff Volume=0.388 af
Runoff Depth>6.96"
Tc=6.0 min
AMC Adjusted CN=WQ
0.13 cfs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 158HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment PR1B: PR1B - DRAINS SOUTH TO WETLAND A
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.04 0.00 0.00
10.00 0.12 0.02 0.01
15.00 0.20 0.07 0.01
20.00 0.28 0.13 0.01
25.00 0.37 0.21 0.01
30.00 0.46 0.29 0.01
35.00 0.56 0.37 0.01
40.00 0.66 0.46 0.01
45.00 0.76 0.56 0.01
50.00 0.86 0.66 0.01
55.00 0.97 0.76 0.01
60.00 1.08 0.87 0.01
65.00 1.19 0.98 0.02
70.00 1.31 1.10 0.02
75.00 1.44 1.22 0.02
80.00 1.57 1.35 0.02
85.00 1.71 1.49 0.02
90.00 1.86 1.64 0.02
95.00 2.03 1.80 0.02
100.00 2.20 1.97 0.02
105.00 2.40 2.17 0.03
110.00 2.65 2.42 0.03
115.00 2.94 2.70 0.05
120.00 3.53 3.29 0.12
125.00 4.27 4.03 0.07
130.00 4.62 4.39 0.04
135.00 4.87 4.63 0.03
140.00 5.06 4.83 0.02
145.00 5.23 4.99 0.02
150.00 5.39 5.15 0.02
155.00 5.53 5.30 0.02
160.00 5.67 5.43 0.02
165.00 5.80 5.56 0.02
170.00 5.92 5.68 0.02
175.00 6.03 5.80 0.02
180.00 6.14 5.91 0.01
185.00 6.25 6.01 0.01
190.00 6.36 6.12 0.01
195.00 6.46 6.22 0.01
200.00 6.55 6.32 0.01
205.00 6.65 6.41 0.01
210.00 6.74 6.50 0.01
215.00 6.82 6.58 0.01
220.00 6.91 6.67 0.01
225.00 6.98 6.75 0.01
230.00 7.06 6.82 0.01
235.00 7.13 6.89 0.01
240.00 7.20 6.96 0.01
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 159HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment PR1C: PR1C - DRAINS NORTH TO WETLAND A
Runoff = 0.02 cfs @ 121.26 hrs, Volume= 0.074 af, Depth> 6.96"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=4
Area (sf) CN Adj Description
0 98 98 Paved parking, HSG C
* 5,573 84 98
5,573 Weighted Average
5,573 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment PR1C: PR1C - DRAINS NORTH TO WETLAND A
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.026
0.024
0.022
0.02
0.018
0.016
0.014
0.012
0.01
0.008
0.006
0.004
0.002
0
MN-RPBCWD_Snowmelt_10d_100_yr
Snowmelt 100yr 10d Rainfall=7.20"
AMC=4
Runoff Area=5,573 sf
Runoff Volume=0.074 af
Runoff Depth>6.96"
Tc=6.0 min
AMC Adjusted CN=WQ
0.02 cfs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 160HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment PR1C: PR1C - DRAINS NORTH TO WETLAND A
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.04 0.00 0.00
10.00 0.12 0.02 0.00
15.00 0.20 0.07 0.00
20.00 0.28 0.13 0.00
25.00 0.37 0.21 0.00
30.00 0.46 0.29 0.00
35.00 0.56 0.37 0.00
40.00 0.66 0.46 0.00
45.00 0.76 0.56 0.00
50.00 0.86 0.66 0.00
55.00 0.97 0.76 0.00
60.00 1.08 0.87 0.00
65.00 1.19 0.98 0.00
70.00 1.31 1.10 0.00
75.00 1.44 1.22 0.00
80.00 1.57 1.35 0.00
85.00 1.71 1.49 0.00
90.00 1.86 1.64 0.00
95.00 2.03 1.80 0.00
100.00 2.20 1.97 0.00
105.00 2.40 2.17 0.01
110.00 2.65 2.42 0.01
115.00 2.94 2.70 0.01
120.00 3.53 3.29 0.02
125.00 4.27 4.03 0.01
130.00 4.62 4.39 0.01
135.00 4.87 4.63 0.01
140.00 5.06 4.83 0.00
145.00 5.23 4.99 0.00
150.00 5.39 5.15 0.00
155.00 5.53 5.30 0.00
160.00 5.67 5.43 0.00
165.00 5.80 5.56 0.00
170.00 5.92 5.68 0.00
175.00 6.03 5.80 0.00
180.00 6.14 5.91 0.00
185.00 6.25 6.01 0.00
190.00 6.36 6.12 0.00
195.00 6.46 6.22 0.00
200.00 6.55 6.32 0.00
205.00 6.65 6.41 0.00
210.00 6.74 6.50 0.00
215.00 6.82 6.58 0.00
220.00 6.91 6.67 0.00
225.00 6.98 6.75 0.00
230.00 7.06 6.82 0.00
235.00 7.13 6.89 0.00
240.00 7.20 6.96 0.00
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 161HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment PR1D: PR1D - DRAINS SOUTH TO RAIN GARDEN
Runoff = 0.15 cfs @ 121.26 hrs, Volume= 0.468 af, Depth> 6.96"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=4
Area (sf) CN Adj Description
6,135 98 98 Paved parking, HSG C
* 28,982 84 98
35,117 Weighted Average
28,982 82.53% Pervious Area
6,135 17.47% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment PR1D: PR1D - DRAINS SOUTH TO RAIN GARDEN
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.17
0.16
0.15
0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
MN-RPBCWD_Snowmelt_10d_100_yr
Snowmelt 100yr 10d Rainfall=7.20"
AMC=4
Runoff Area=35,117 sf
Runoff Volume=0.468 af
Runoff Depth>6.96"
Tc=6.0 min
AMC Adjusted CN=WQ
0.15 cfs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 162HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment PR1D: PR1D - DRAINS SOUTH TO RAIN GARDEN
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.04 0.00 0.00
10.00 0.12 0.02 0.01
15.00 0.20 0.07 0.01
20.00 0.28 0.13 0.01
25.00 0.37 0.21 0.01
30.00 0.46 0.29 0.01
35.00 0.56 0.37 0.01
40.00 0.66 0.46 0.02
45.00 0.76 0.56 0.02
50.00 0.86 0.66 0.02
55.00 0.97 0.76 0.02
60.00 1.08 0.87 0.02
65.00 1.19 0.98 0.02
70.00 1.31 1.10 0.02
75.00 1.44 1.22 0.02
80.00 1.57 1.35 0.02
85.00 1.71 1.49 0.02
90.00 1.86 1.64 0.03
95.00 2.03 1.80 0.03
100.00 2.20 1.97 0.03
105.00 2.40 2.17 0.04
110.00 2.65 2.42 0.04
115.00 2.94 2.70 0.05
120.00 3.53 3.29 0.14
125.00 4.27 4.03 0.08
130.00 4.62 4.39 0.05
135.00 4.87 4.63 0.04
140.00 5.06 4.83 0.03
145.00 5.23 4.99 0.03
150.00 5.39 5.15 0.02
155.00 5.53 5.30 0.02
160.00 5.67 5.43 0.02
165.00 5.80 5.56 0.02
170.00 5.92 5.68 0.02
175.00 6.03 5.80 0.02
180.00 6.14 5.91 0.02
185.00 6.25 6.01 0.02
190.00 6.36 6.12 0.02
195.00 6.46 6.22 0.02
200.00 6.55 6.32 0.02
205.00 6.65 6.41 0.01
210.00 6.74 6.50 0.01
215.00 6.82 6.58 0.01
220.00 6.91 6.67 0.01
225.00 6.98 6.75 0.01
230.00 7.06 6.82 0.01
235.00 7.13 6.89 0.01
240.00 7.20 6.96 0.01
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 163HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment PR2: PR2 - DRAINS SOUTH TO WETLAND B
Runoff = 0.01 cfs @ 121.26 hrs, Volume= 0.035 af, Depth> 6.96"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=4
Area (sf) CN Adj Description
2,313 98 98 Paved parking, HSG C
* 323 84 98
2,636 Weighted Average
323 12.25% Pervious Area
2,313 87.75% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment PR2: PR2 - DRAINS SOUTH TO WETLAND B
Runoff
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.013
0.012
0.011
0.011
0.01
0.01
0.009
0.009
0.008
0.008
0.007
0.007
0.006
0.006
0.005
0.005
0.004
0.004
0.003
0.003
0.002
0.002
0.001
0.001
0.000
0
MN-RPBCWD_Snowmelt_10d_100_yr
Snowmelt 100yr 10d Rainfall=7.20"
AMC=4
Runoff Area=2,636 sf
Runoff Volume=0.035 af
Runoff Depth>6.96"
Tc=6.0 min
AMC Adjusted CN=WQ
0.01 cfs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 164HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Subcatchment PR2: PR2 - DRAINS SOUTH TO WETLAND B
Time
(hours)
Precip.
(inches)
Excess
(inches)
Runoff
(cfs)
0.00 0.00 0.00 0.00
5.00 0.04 0.00 0.00
10.00 0.12 0.02 0.00
15.00 0.20 0.07 0.00
20.00 0.28 0.13 0.00
25.00 0.37 0.21 0.00
30.00 0.46 0.29 0.00
35.00 0.56 0.37 0.00
40.00 0.66 0.46 0.00
45.00 0.76 0.56 0.00
50.00 0.86 0.66 0.00
55.00 0.97 0.76 0.00
60.00 1.08 0.87 0.00
65.00 1.19 0.98 0.00
70.00 1.31 1.10 0.00
75.00 1.44 1.22 0.00
80.00 1.57 1.35 0.00
85.00 1.71 1.49 0.00
90.00 1.86 1.64 0.00
95.00 2.03 1.80 0.00
100.00 2.20 1.97 0.00
105.00 2.40 2.17 0.00
110.00 2.65 2.42 0.00
115.00 2.94 2.70 0.00
120.00 3.53 3.29 0.01
125.00 4.27 4.03 0.01
130.00 4.62 4.39 0.00
135.00 4.87 4.63 0.00
140.00 5.06 4.83 0.00
145.00 5.23 4.99 0.00
150.00 5.39 5.15 0.00
155.00 5.53 5.30 0.00
160.00 5.67 5.43 0.00
165.00 5.80 5.56 0.00
170.00 5.92 5.68 0.00
175.00 6.03 5.80 0.00
180.00 6.14 5.91 0.00
185.00 6.25 6.01 0.00
190.00 6.36 6.12 0.00
195.00 6.46 6.22 0.00
200.00 6.55 6.32 0.00
205.00 6.65 6.41 0.00
210.00 6.74 6.50 0.00
215.00 6.82 6.58 0.00
220.00 6.91 6.67 0.00
225.00 6.98 6.75 0.00
230.00 7.06 6.82 0.00
235.00 7.13 6.89 0.00
240.00 7.20 6.96 0.00
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 165HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A
[40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 3.322 ac, 13.47% Impervious, Inflow Depth > 6.96" for Snowmelt 100yr 10d event
Inflow = 0.56 cfs @ 121.26 hrs, Volume= 1.927 af
Outflow = 0.56 cfs @ 121.26 hrs, Volume= 1.927 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Reach DA2: DA2 - TOTAL FLOW TO WETLAND A
Inflow
Outflow
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
Inflow Area=3.322 ac
0.56 cfs
0.56 cfs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 166HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Reach DA2: DA2 - TOTAL FLOW TO WETLAND A
Time
(hours)
Inflow
(cfs)
Elevation
(feet)
Outflow
(cfs)
0.00 0.00 0.00
5.00 0.00 0.00
10.00 0.02 0.02
15.00 0.04 0.04
20.00 0.05 0.05
25.00 0.05 0.05
30.00 0.06 0.06
35.00 0.06 0.06
40.00 0.06 0.06
45.00 0.06 0.06
50.00 0.07 0.07
55.00 0.07 0.07
60.00 0.07 0.07
65.00 0.08 0.08
70.00 0.08 0.08
75.00 0.08 0.08
80.00 0.09 0.09
85.00 0.10 0.10
90.00 0.10 0.10
95.00 0.11 0.11
100.00 0.12 0.12
105.00 0.15 0.15
110.00 0.17 0.17
115.00 0.23 0.23
120.00 0.51 0.51
125.00 0.33 0.33
130.00 0.22 0.22
135.00 0.18 0.18
140.00 0.12 0.12
145.00 0.11 0.11
150.00 0.10 0.10
155.00 0.09 0.09
160.00 0.09 0.09
165.00 0.08 0.08
170.00 0.08 0.08
175.00 0.07 0.07
180.00 0.07 0.07
185.00 0.07 0.07
190.00 0.07 0.07
195.00 0.07 0.07
200.00 0.06 0.06
205.00 0.06 0.06
210.00 0.06 0.06
215.00 0.06 0.06
220.00 0.05 0.05
225.00 0.05 0.05
230.00 0.05 0.05
235.00 0.05 0.05
240.00 0.04 0.04
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 167HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B
[40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 4.521 ac, 15.58% Impervious, Inflow Depth > 6.95" for Snowmelt 100yr 10d event
Inflow = 0.78 cfs @ 121.30 hrs, Volume= 2.618 af
Outflow = 0.78 cfs @ 121.30 hrs, Volume= 2.618 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Reach DA3: DA3 - TOTAL FLOW TO WETLAND B
Inflow
Outflow
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.85
0.8
0.75
0.7
0.65
0.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
Inflow Area=4.521 ac
0.78 cfs
0.78 cfs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 168HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Reach DA3: DA3 - TOTAL FLOW TO WETLAND B
Time
(hours)
Inflow
(cfs)
Elevation
(feet)
Outflow
(cfs)
0.00 0.00 0.00
5.00 0.00 0.00
10.00 0.03 0.03
15.00 0.05 0.05
20.00 0.06 0.06
25.00 0.07 0.07
30.00 0.08 0.08
35.00 0.08 0.08
40.00 0.08 0.08
45.00 0.09 0.09
50.00 0.09 0.09
55.00 0.10 0.10
60.00 0.10 0.10
65.00 0.10 0.10
70.00 0.11 0.11
75.00 0.11 0.11
80.00 0.12 0.12
85.00 0.13 0.13
90.00 0.14 0.14
95.00 0.15 0.15
100.00 0.16 0.16
105.00 0.20 0.20
110.00 0.23 0.23
115.00 0.30 0.30
120.00 0.71 0.71
125.00 0.46 0.46
130.00 0.29 0.29
135.00 0.23 0.23
140.00 0.17 0.17
145.00 0.15 0.15
150.00 0.14 0.14
155.00 0.13 0.13
160.00 0.12 0.12
165.00 0.12 0.12
170.00 0.11 0.11
175.00 0.10 0.10
180.00 0.10 0.10
185.00 0.10 0.10
190.00 0.09 0.09
195.00 0.09 0.09
200.00 0.09 0.09
205.00 0.08 0.08
210.00 0.08 0.08
215.00 0.08 0.08
220.00 0.07 0.07
225.00 0.07 0.07
230.00 0.07 0.07
235.00 0.06 0.06
240.00 0.06 0.06
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 169HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Pond 1P: FILTRATION BASIN 1
Inflow Area = 0.806 ac, 17.47% Impervious, Inflow Depth > 6.96" for Snowmelt 100yr 10d event
Inflow = 0.15 cfs @ 121.26 hrs, Volume= 0.468 af
Outflow = 0.08 cfs @ 124.91 hrs, Volume= 0.467 af, Atten= 48%, Lag= 219.0 min
Discarded = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Primary = 0.08 cfs @ 124.91 hrs, Volume= 0.467 af
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Peak Elev= 973.72' @ 124.91 hrs Surf.Area= 2,166 sf Storage= 1,388 cf
Plug-Flow detention time= 57.7 min calculated for 0.467 af (100% of inflow)
Center-of-Mass det. time= 55.6 min ( 7,436.4 - 7,380.8 )
Volume Invert Avail.Storage Storage Description
#1 973.00' 5,291 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
973.00 1,624 0 0
973.50 2,040 916 916
974.00 2,320 1,090 2,006
974.50 2,686 1,252 3,258
975.10 3,068 1,726 4,984
975.20 3,068 307 5,291
Device Routing Invert Outlet Devices
#1 Primary 971.50'12.0" Round OUTLET PIPE
L= 23.0' CMP, mitered to conform to fill, Ke= 0.700
Inlet / Outlet Invert= 971.50' / 971.50' S= 0.0000 '/' Cc= 0.900
n= 0.012 Concrete pipe, finished, Flow Area= 0.79 sf
#2 Device 1 974.00'24.0" Horiz. RIM- Orifice/Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 975.10'10.0' long x 10.0' breadth EOF
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60
Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64
#4 Device 5 973.00'1.600 in/hr Exfiltration over Surface area above 970.50'
Excluded Surface area = 0 sf
#5 Device 1 971.50'6.0" Vert. Orifice 6" draintile C= 0.600
#6 Discarded 973.00'0.600 in/hr Exfiltration-Infiltration into Rock over Surface area from 970.00' - 970.50'
Excluded Surface area = 0 sf
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 170HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Discarded OutFlow Max=0.00 cfs @ 0.00 hrs HW=973.00' (Free Discharge)
6=Exfiltration-Infiltration into Rock ( Controls 0.00 cfs)
Primary OutFlow Max=0.08 cfs @ 124.91 hrs HW=973.72' (Free Discharge)
1=OUTLET PIPE (Passes 0.08 cfs of 4.38 cfs potential flow)
2=RIM- Orifice/Grate ( Controls 0.00 cfs)
5=Orifice 6" draintile (Passes 0.08 cfs of 1.33 cfs potential flow)
4=Exfiltration (Exfiltration Controls 0.08 cfs)
Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=973.00' (Free Discharge)
3=EOF ( Controls 0.00 cfs)
Pond 1P: FILTRATION BASIN 1
Inflow
Outflow
Discarded
Primary
Secondary
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.17
0.16
0.15
0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
Inflow Area=0.806 ac
Peak Elev=973.72'
Storage=1,388 cf
0.15 cfs
0.08 cfs
0.00 cfs
0.08 cfs
0.00 cfs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 171HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Pond 1P: FILTRATION BASIN 1
Time
(hours)
Inflow
(cfs)
Storage
(cubic-feet)
Elevation
(feet)
Outflow
(cfs)
Discarded
(cfs)
Primary
(cfs)
Secondary
(cfs)
0.00 0.00 0 973.00 0.00 0.00 0.00 0.00
5.00 0.00 0 973.00 0.00 0.00 0.00 0.00
10.00 0.01 3 973.00 0.01 0.00 0.01 0.00
15.00 0.01 5 973.00 0.01 0.00 0.01 0.00
20.00 0.01 7 973.00 0.01 0.00 0.01 0.00
25.00 0.01 7 973.00 0.01 0.00 0.01 0.00
30.00 0.01 8 973.00 0.01 0.00 0.01 0.00
35.00 0.01 9 973.01 0.01 0.00 0.01 0.00
40.00 0.02 9 973.01 0.02 0.00 0.02 0.00
45.00 0.02 9 973.01 0.02 0.00 0.02 0.00
50.00 0.02 10 973.01 0.02 0.00 0.02 0.00
55.00 0.02 10 973.01 0.02 0.00 0.02 0.00
60.00 0.02 11 973.01 0.02 0.00 0.02 0.00
65.00 0.02 11 973.01 0.02 0.00 0.02 0.00
70.00 0.02 11 973.01 0.02 0.00 0.02 0.00
75.00 0.02 12 973.01 0.02 0.00 0.02 0.00
80.00 0.02 13 973.01 0.02 0.00 0.02 0.00
85.00 0.02 14 973.01 0.02 0.00 0.02 0.00
90.00 0.03 15 973.01 0.03 0.00 0.03 0.00
95.00 0.03 16 973.01 0.03 0.00 0.03 0.00
100.00 0.03 17 973.01 0.03 0.00 0.03 0.00
105.00 0.04 21 973.01 0.04 0.00 0.04 0.00
110.00 0.04 25 973.02 0.04 0.00 0.04 0.00
115.00 0.05 32 973.02 0.05 0.00 0.05 0.00
120.00 0.14 599 973.34 0.07 0.00 0.07 0.00
125.00 0.08 1,388 973.72 0.08 0.00 0.08 0.00
130.00 0.05 1,017 973.55 0.08 0.00 0.08 0.00
135.00 0.04 433 973.25 0.07 0.00 0.07 0.00
140.00 0.03 17 973.01 0.03 0.00 0.03 0.00
145.00 0.03 15 973.01 0.03 0.00 0.03 0.00
150.00 0.02 15 973.01 0.02 0.00 0.02 0.00
155.00 0.02 14 973.01 0.02 0.00 0.02 0.00
160.00 0.02 13 973.01 0.02 0.00 0.02 0.00
165.00 0.02 12 973.01 0.02 0.00 0.02 0.00
170.00 0.02 11 973.01 0.02 0.00 0.02 0.00
175.00 0.02 11 973.01 0.02 0.00 0.02 0.00
180.00 0.02 10 973.01 0.02 0.00 0.02 0.00
185.00 0.02 10 973.01 0.02 0.00 0.02 0.00
190.00 0.02 10 973.01 0.02 0.00 0.02 0.00
195.00 0.02 9 973.01 0.02 0.00 0.02 0.00
200.00 0.02 9 973.01 0.02 0.00 0.02 0.00
205.00 0.01 9 973.01 0.01 0.00 0.01 0.00
210.00 0.01 8 973.01 0.01 0.00 0.01 0.00
215.00 0.01 8 973.00 0.01 0.00 0.01 0.00
220.00 0.01 8 973.00 0.01 0.00 0.01 0.00
225.00 0.01 7 973.00 0.01 0.00 0.01 0.00
230.00 0.01 7 973.00 0.01 0.00 0.01 0.00
235.00 0.01 7 973.00 0.01 0.00 0.01 0.00
240.00 0.01 6 973.00 0.01 0.00 0.01 0.00
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 172HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Stage-Discharge for Pond 1P: FILTRATION BASIN 1
Elevation
(feet)
Discharge
(cfs)
Discarded
(cfs)
Primary
(cfs)
Secondary
(cfs)
973.00 0.00 0.00 0.00 0.00
973.05 0.06 0.00 0.06 0.00
973.10 0.06 0.00 0.06 0.00
973.15 0.06 0.00 0.06 0.00
973.20 0.07 0.00 0.07 0.00
973.25 0.07 0.00 0.07 0.00
973.30 0.07 0.00 0.07 0.00
973.35 0.07 0.00 0.07 0.00
973.40 0.07 0.00 0.07 0.00
973.45 0.07 0.00 0.07 0.00
973.50 0.08 0.00 0.08 0.00
973.55 0.08 0.00 0.08 0.00
973.60 0.08 0.00 0.08 0.00
973.65 0.08 0.00 0.08 0.00
973.70 0.08 0.00 0.08 0.00
973.75 0.08 0.00 0.08 0.00
973.80 0.08 0.00 0.08 0.00
973.85 0.08 0.00 0.08 0.00
973.90 0.08 0.00 0.08 0.00
973.95 0.08 0.00 0.08 0.00
974.00 0.09 0.00 0.09 0.00
974.05 0.32 0.00 0.32 0.00
974.10 0.74 0.00 0.74 0.00
974.15 1.28 0.00 1.28 0.00
974.20 1.93 0.00 1.93 0.00
974.25 2.66 0.00 2.66 0.00
974.30 3.47 0.00 3.47 0.00
974.35 4.35 0.00 4.35 0.00
974.40 5.17 0.00 5.17 0.00
974.45 5.22 0.00 5.22 0.00
974.50 5.28 0.00 5.28 0.00
974.55 5.33 0.00 5.33 0.00
974.60 5.38 0.00 5.38 0.00
974.65 5.43 0.00 5.43 0.00
974.70 5.48 0.00 5.48 0.00
974.75 5.53 0.00 5.53 0.00
974.80 5.58 0.00 5.58 0.00
974.85 5.63 0.00 5.63 0.00
974.90 5.68 0.00 5.68 0.00
974.95 5.73 0.00 5.73 0.00
975.00 5.78 0.00 5.78 0.00
975.05 5.83 0.00 5.83 0.00
975.10 5.87 0.00 5.87 0.00
975.15 6.20 0.00 5.92 0.28
975.20 6.76 0.00 5.97 0.79
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 173HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Pond 4P: WETLAND A
Inflow Area = 3.322 ac, 13.47% Impervious, Inflow Depth > 6.96" for Snowmelt 100yr 10d event
Inflow = 0.56 cfs @ 121.26 hrs, Volume= 1.927 af
Outflow = 0.55 cfs @ 121.41 hrs, Volume= 1.923 af, Atten= 1%, Lag= 8.8 min
Primary = 0.55 cfs @ 121.41 hrs, Volume= 1.923 af
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Peak Elev= 969.70' @ 121.41 hrs Surf.Area= 11,691 sf Storage= 909 cf
Plug-Flow detention time= 45.3 min calculated for 1.923 af (100% of inflow)
Center-of-Mass det. time= 31.8 min ( 7,426.1 - 7,394.3 )
Volume Invert Avail.Storage Storage Description
#1 969.62' 18,824 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
969.62 11,466 0 0
970.00 12,553 4,564 4,564
971.00 15,967 14,260 18,824
Device Routing Invert Outlet Devices
#1 Primary 969.62'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60
Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64
Primary OutFlow Max=0.55 cfs @ 121.41 hrs HW=969.70' (Free Discharge)
1=Broad-Crested Rectangular Weir (Weir Controls 0.55 cfs @ 0.70 fps)
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 174HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Pond 4P: WETLAND A
Inflow
Primary
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)0.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
Inflow Area=3.322 ac
Peak Elev=969.70'
Storage=909 cf
0.56 cfs
0.55 cfs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 175HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Pond 4P: WETLAND A
Time
(hours)
Inflow
(cfs)
Storage
(cubic-feet)
Elevation
(feet)
Primary
(cfs)
0.00 0.00 0 969.62 0.00
5.00 0.00 0 969.62 0.00
10.00 0.02 79 969.63 0.02
15.00 0.04 140 969.63 0.04
20.00 0.05 169 969.63 0.05
25.00 0.05 181 969.64 0.05
30.00 0.06 191 969.64 0.06
35.00 0.06 199 969.64 0.06
40.00 0.06 205 969.64 0.06
45.00 0.06 210 969.64 0.06
50.00 0.07 218 969.64 0.07
55.00 0.07 224 969.64 0.07
60.00 0.07 229 969.64 0.07
65.00 0.08 234 969.64 0.08
70.00 0.08 244 969.64 0.08
75.00 0.08 251 969.64 0.08
80.00 0.09 261 969.64 0.09
85.00 0.10 277 969.64 0.10
90.00 0.10 296 969.65 0.10
95.00 0.11 314 969.65 0.11
100.00 0.12 322 969.65 0.12
105.00 0.15 369 969.65 0.15
110.00 0.17 412 969.66 0.17
115.00 0.23 488 969.66 0.22
120.00 0.51 855 969.69 0.50
125.00 0.33 660 969.68 0.34
130.00 0.22 500 969.66 0.23
135.00 0.18 430 969.66 0.18
140.00 0.12 333 969.65 0.12
145.00 0.11 305 969.65 0.11
150.00 0.10 292 969.65 0.10
155.00 0.09 278 969.64 0.10
160.00 0.09 264 969.64 0.09
165.00 0.08 254 969.64 0.08
170.00 0.08 241 969.64 0.08
175.00 0.07 233 969.64 0.07
180.00 0.07 228 969.64 0.07
185.00 0.07 226 969.64 0.07
190.00 0.07 221 969.64 0.07
195.00 0.07 214 969.64 0.07
200.00 0.06 210 969.64 0.06
205.00 0.06 203 969.64 0.06
210.00 0.06 198 969.64 0.06
215.00 0.06 194 969.64 0.06
220.00 0.05 189 969.64 0.05
225.00 0.05 185 969.64 0.05
230.00 0.05 179 969.64 0.05
235.00 0.05 173 969.64 0.05
240.00 0.04 163 969.63 0.04
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 176HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Stage-Discharge for Pond 4P: WETLAND A
Elevation
(feet)
Primary
(cfs)
969.62 0.00
969.63 0.02
969.64 0.07
969.65 0.13
969.66 0.20
969.67 0.28
969.68 0.37
969.69 0.46
969.70 0.56
969.71 0.67
969.72 0.79
969.73 0.91
969.74 1.04
969.75 1.17
969.76 1.30
969.77 1.45
969.78 1.59
969.79 1.75
969.80 1.90
969.81 2.06
969.82 2.23
969.83 2.40
969.84 2.58
969.85 2.76
969.86 2.94
969.87 3.13
969.88 3.33
969.89 3.53
969.90 3.73
969.91 3.94
969.92 4.15
969.93 4.36
969.94 4.58
969.95 4.81
969.96 5.03
969.97 5.26
969.98 5.50
969.99 5.74
970.00 5.98
970.01 6.23
970.02 6.48
970.03 6.74
970.04 7.01
970.05 7.28
970.06 7.55
970.07 7.83
970.08 8.12
970.09 8.41
970.10 8.70
970.11 9.00
970.12 9.30
970.13 9.60
970.14 9.91
Elevation
(feet)
Primary
(cfs)
970.15 10.23
970.16 10.55
970.17 10.87
970.18 11.20
970.19 11.53
970.20 11.86
970.21 12.20
970.22 12.55
970.23 12.86
970.24 13.18
970.25 13.49
970.26 13.81
970.27 14.14
970.28 14.46
970.29 14.79
970.30 15.12
970.31 15.45
970.32 15.78
970.33 16.12
970.34 16.46
970.35 16.80
970.36 17.14
970.37 17.49
970.38 17.84
970.39 18.19
970.40 18.54
970.41 18.89
970.42 19.25
970.43 19.61
970.44 19.97
970.45 20.33
970.46 20.69
970.47 21.06
970.48 21.43
970.49 21.80
970.50 22.17
970.51 22.55
970.52 22.92
970.53 23.30
970.54 23.68
970.55 24.07
970.56 24.45
970.57 24.84
970.58 25.23
970.59 25.62
970.60 26.01
970.61 26.40
970.62 26.80
970.63 27.21
970.64 27.62
970.65 28.03
970.66 28.45
970.67 28.86
Elevation
(feet)
Primary
(cfs)
970.68 29.28
970.69 29.70
970.70 30.12
970.71 30.55
970.72 30.98
970.73 31.41
970.74 31.84
970.75 32.27
970.76 32.71
970.77 33.14
970.78 33.58
970.79 34.02
970.80 34.47
970.81 34.91
970.82 35.36
970.83 35.79
970.84 36.22
970.85 36.65
970.86 37.09
970.87 37.52
970.88 37.96
970.89 38.40
970.90 38.84
970.91 39.28
970.92 39.72
970.93 40.17
970.94 40.61
970.95 41.06
970.96 41.51
970.97 41.96
970.98 42.41
970.99 42.86
971.00 43.32
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 177HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Summary for Pond 5P: Wetland B
[44] Hint: Outlet device #1 is below defined storage
[95] Warning: Outlet Device #1 rise exceeded
Inflow Area = 12.868 ac, 25.12% Impervious, Inflow Depth > 6.96" for Snowmelt 100yr 10d event
Inflow = 2.37 cfs @ 121.30 hrs, Volume= 7.458 af
Outflow = 2.37 cfs @ 121.31 hrs, Volume= 7.458 af, Atten= 0%, Lag= 0.5 min
Primary = 2.37 cfs @ 121.31 hrs, Volume= 7.458 af
Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Peak Elev= 961.60' @ 121.31 hrs Surf.Area= 149,009 sf Storage= 112 cf
Plug-Flow detention time= 0.8 min calculated for 7.458 af (100% of inflow)
Center-of-Mass det. time= 0.6 min ( 7,395.4 - 7,394.8 )
Volume Invert Avail.Storage Storage Description
#1 961.60' 841,104 cf Custom Stage Data (Conic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store Wet.Area
(feet) (sq-ft) (cubic-feet) (cubic-feet) (sq-ft)
961.60 149,000 0 0 149,000
962.00 153,597 60,517 60,517 153,630
964.00 201,325 353,847 414,364 201,451
966.00 225,646 426,740 841,104 225,991
Device Routing Invert Outlet Devices
#1 Primary 960.82'Asymmetrical Weir, C= 3.27
Offset (feet) -70.00 -41.00 0.00 49.00 87.00
Height (feet) 0.35 0.09 0.00 0.09 0.35
Primary OutFlow Max=133.30 cfs @ 121.31 hrs HW=961.60' (Free Discharge)
1=Asymmetrical Weir (Weir Controls 133.30 cfs @ 2.72 fps)
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 178HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Pond 5P: Wetland B
Inflow
Primary
Hydrograph
Time (hours)
2402302202102001901801701601501401301201101009080706050403020100Flow (cfs)2
1
0
Inflow Area=12.868 ac
Peak Elev=961.60'
Storage=112 cf
2.37 cfs
2.37 cfs
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 179HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Hydrograph for Pond 5P: Wetland B
Time
(hours)
Inflow
(cfs)
Storage
(cubic-feet)
Elevation
(feet)
Primary
(cfs)
0.00 0.00 0 961.60 0.00
5.00 0.00 0 961.60 0.00
10.00 0.09 4 961.60 0.09
15.00 0.14 7 961.60 0.14
20.00 0.18 8 961.60 0.18
25.00 0.20 9 961.60 0.20
30.00 0.22 10 961.60 0.22
35.00 0.23 11 961.60 0.23
40.00 0.24 11 961.60 0.24
45.00 0.25 12 961.60 0.25
50.00 0.26 13 961.60 0.26
55.00 0.27 13 961.60 0.27
60.00 0.28 13 961.60 0.28
65.00 0.29 14 961.60 0.29
70.00 0.31 15 961.60 0.31
75.00 0.32 15 961.60 0.32
80.00 0.34 16 961.60 0.34
85.00 0.37 18 961.60 0.37
90.00 0.41 19 961.60 0.41
95.00 0.44 21 961.60 0.44
100.00 0.46 22 961.60 0.46
105.00 0.57 27 961.60 0.57
110.00 0.67 32 961.60 0.67
115.00 0.86 41 961.60 0.86
120.00 2.17 103 961.60 2.17
125.00 1.29 61 961.60 1.29
130.00 0.78 37 961.60 0.78
135.00 0.60 29 961.60 0.60
140.00 0.47 22 961.60 0.47
145.00 0.42 20 961.60 0.42
150.00 0.39 19 961.60 0.39
155.00 0.37 18 961.60 0.37
160.00 0.34 16 961.60 0.34
165.00 0.33 16 961.60 0.33
170.00 0.30 14 961.60 0.30
175.00 0.29 14 961.60 0.29
180.00 0.28 13 961.60 0.28
185.00 0.28 13 961.60 0.28
190.00 0.27 13 961.60 0.27
195.00 0.26 12 961.60 0.26
200.00 0.25 12 961.60 0.25
205.00 0.24 11 961.60 0.24
210.00 0.23 11 961.60 0.23
215.00 0.22 10 961.60 0.22
220.00 0.21 10 961.60 0.21
225.00 0.20 10 961.60 0.20
230.00 0.19 9 961.60 0.19
235.00 0.18 9 961.60 0.18
240.00 0.16 8 961.60 0.16
MN-RPBCWD_Snowmelt_10d_100_yr Snowmelt 100yr 10d Rainfall=7.20", AMC=421429- PR
Printed 5/17/2022Prepared by {enter your company name here}
Page 180HydroCAD® 10.00-26 s/n 02202 © 2020 HydroCAD Software Solutions LLC
Stage-Discharge for Pond 5P: Wetland B
Elevation
(feet)
Primary
(cfs)
961.60 0.00
961.65 139.02
961.70 144.59
961.75 149.95
961.80 155.13
961.85 160.13
961.90 164.98
961.95 169.69
962.00 174.28
962.05 178.74
962.10 183.09
962.15 187.35
962.20 191.51
962.25 195.57
962.30 199.56
962.35 203.47
962.40 207.30
962.45 211.06
962.50 214.76
962.55 218.40
962.60 221.97
962.65 225.49
962.70 228.95
962.75 232.36
962.80 235.73
962.85 239.04
962.90 242.31
962.95 245.54
963.00 248.72
963.05 251.87
963.10 254.97
963.15 258.04
963.20 261.07
963.25 264.07
963.30 267.03
963.35 269.96
963.40 272.86
963.45 275.73
963.50 278.56
963.55 281.37
963.60 284.16
963.65 286.91
963.70 289.64
963.75 292.34
963.80 295.02
963.85 297.68
963.90 300.31
963.95 302.92
964.00 305.50
964.05 308.07
964.10 310.61
964.15 313.13
964.20 315.63
Elevation
(feet)
Primary
(cfs)
964.25 318.12
964.30 320.58
964.35 323.02
964.40 325.45
964.45 327.86
964.50 330.25
964.55 332.62
964.60 334.98
964.65 337.32
964.70 339.64
964.75 341.95
964.80 344.24
964.85 346.52
964.90 348.78
964.95 351.03
965.00 353.26
965.05 355.48
965.10 357.69
965.15 359.88
965.20 362.06
965.25 364.23
965.30 366.38
965.35 368.52
965.40 370.65
965.45 372.76
965.50 374.87
965.55 376.96
965.60 379.04
965.65 381.11
965.70 383.17
965.75 385.22
965.80 387.25
965.85 389.28
965.90 391.29
965.95 393.30
966.00 395.29
February 21, 2022 HGTS Project Number: 21-1312
Ms. Gayle Morin
1441 Lake Lucy Road
Chanhassen, MN
Re: Geotechnical Exploration Report, Proposed Single-Family Homes, 1441 Lake Lucy
Road, Chanhassen, Minnesota.
Dear Ms. Morin:
We have completed the geotechnical exploration report for the proposed homes at 1441 Lake
Lucy Road in Chanhassen, Minnesota. A brief summary of our results and recommendations
is presented below. Specific details regarding our procedures, results and recommendations
follow in the attached geotechnical exploration report.
Four (4) soil borings were completed for this project that encountered about 1 foot of topsoil
underlain by sandy lean clay and clayey sand glacial till deposits that extended to the
termination depths of the borings. Groundwater was not encountered in the soil borings while
drilling and sampling or after removal of the auger from the boreholes.
The vegetation and topsoil are not suitable for foundation support and will need to be
removed and replaced as needed with suitable compacted engineered fill. It is our opinion
that the underlying native glacial till soils are suitable for foundation support.
With the building pad prepared as recommended it is our opinion that the foundations for the
proposed building can be designed for a net allowable soil bearing capacity up to 2,000 pounds
per square foot.
Thank you for the opportunity to assist you on this project. If you have any questions or need
additional information, please contact Paul Gionfriddo at 612-729-2959.
Sincerely,
Haugo GeoTechnical Services
Jesse Miller, E.I.T. Paul Gionfriddo, P.E.
Staff Engineer Senior Engineer
GEOTECHNICAL EXPLORATION REPORT
PROJECT:
Proposed Single-Family Homes
1441 Lake Lucy Road
Chanhassen, Minnesota
PREPARED FOR:
Ms. Gayle Morin
1441 Lake Lucy Road
Chanhassen, MN
PREPARED BY:
Haugo GeoTechnical Services
2825 Cedar Avenue South
Minneapolis, Minnesota 55407
Haugo GeoTechnical Services Project: 21-1312
February 21, 2022
I hereby certify that this plan, specification, or report was prepared by me or under my
direct supervision and that I am a duly Registered Professional Engineer under the laws of
the State of Minnesota.
Paul Gionfriddo, P.E.
Senior Engineer
License Number: 23093
Table of Contents
1.0 INTRODUCTION 1
1.1 Project Description 1
1.2 Purpose 1
1.3 Site Description 1
1.4 Scope of Services 1
1.5 Documents Provided 2
1.6 Locations and Elevations 2
2.0 FIELD PROCEDURES 2
3.0 RESULTS 3
3.1 Soil Conditions 3
3.2 Groundwater 3
3.3 Laboratory Testing 4
3.4 OSHA Soil Classification 4
4.0 DISCUSSION AND RECOMMENDATIONS 4
4.1 Proposed Construction 4
4.2 Discussion 5
4.3 Site Grading Recommendations 5
4.4 Dewatering 6
4.5 Groundwater Separation Distances 7
4.6 Interior Slabs 7
4.7 Below Grade Walls 7
4.8 Exterior Slabs 8
4.9 Site Grading and Drainage 9
4.10 Utilities 9
4.11 Ponds 9
5.0 CONSTRUCTION CONSIDERATIONS 10
5.1 Excavation 10
5.2 Observations 10
5.3 Backfill and Fills 10
5.4 Testing 10
5.5 Winter Construction 10
6.0 PROCEDURES 11
6.1 Soil Classification 11
6.2 Groundwater Observations 11
7.0 GENERAL 11
7.1 Subsurface Variations 11
7.2 Review of Design 11
7.3 Groundwater Fluctuations 11
7.4 Use of Report 12
7.5 Level of Care 12
APPENDIX
Boring Location Sketch
Soil Boring Logs, SB-1 thru SB-4
Descriptive Terminology
1
1.0 INTRODUCTION
1.1 Project Description
Ms. Gayle Morin in conjunction with her civil engineering consultants, Civil Site Group, is
preparing to split the property at 1441 Lake Lucy Road in Chanhassen, Minnesota and
potentially construct 2 new homes on the newly spit parcels. Haugo GeoTechnical Services
(HGTS) was retained to perform a geotechnical exploration to evaluate the suitability of site
soil conditions to support the proposed homes.
1.2 Purpose
The purpose of this geotechnical exploration was to characterize subsurface soil and
groundwater conditions and provide recommendations for foundation design and
construction of the proposed residences.
1.3 Site Description
The project site is a residential lot which carries the mailing address of 1441 Lake Lucy Road
in Chanhassen, Minnesota. We understand the existing lot was or will be split into 3 lots and
new homes will be built on 2 of the newly split lots.
A home with an attached garage and bituminous driveway existed on the northern portion of
the overall property. Areas surrounding the home were generally wooded. The remaining
portions of the property contained wooded areas and ponds and wetlands.
Site topography varied significantly and ranged from about elevation 1020 along Lake Lucy
Road to about elevation 960 near Lake Lucy on the south end of the property. Ground surface
elevations at the soil boring locations ranged from about 968 to 978 feet above mean sea level
(MSL).
1.4 Scope of Services
Our services were performed in accordance with the Haugo GeoTechnical Services proposal
21-1312 dated December 21, 2021. Our scope of services was performed under the terms of
our General Conditions and limited to the following tasks:
Completing two (4) standard penetration test (SPT) borings, extending each to
nominal depths of 20 feet.
Sealing the boreholes in accordance with MDH requirements.
Visually/manually classifying samples recovered from the soil borings.
Obtaining ground surface elevations and GPS coordinates at the soil boring locations.
Performing laboratory tests on select soil samples.
Preparing soil boring logs describing the materials encountered and the results of
groundwater level measurements.
Preparing an engineering report describing soil and groundwater conditions, and
providing recommendations for foundation support.
2
1.5 Documents Provided
To aid in our evaluation, we were provided with an untitled, single-page plan sheet that we
assume was prepared by Civil Site Group. The plan sheet showed a layout of the existing
property, the proposed property boundaries, hand-drawn annotations showing the proposed
soil boring locations, proposed home outlines, infiltration basin outlines, and utility details
overlain onto and aerial photograph. The map did not include a signature or date.
We were also provided with a document titled “Easement Agreement” from the Office of
County Recorder – Carver County Minnesota, dated February 4, 1999. The document listed
details including, but not limited to: Creation of Easement Rights, Construction
Reconstruction, Maintenance and Repair, and Miscellaneous Provisions. The document was
drafted by Bruce A. Boeder of Lambert & Boeder, P.L.L.P.
Except for the documents described above specific architectural, structural or civil engineering
plans were not provided.
1.6 Locations and Elevations
The soil boring locations were selected by Civil Site Group. The approximate locations of the
soil borings are shown on the plan sheet in the Appendix. The sketch is the plan sheet that was
prepared and provided by Civil Site Group.
We attempted to obtain the ground surface elevations and coordinates at the soil boring
locations using GPS equipment but the GPS unit could not capture a signal which we assume
was due to tree cover. We therefore estimated the ground surface elevations at the boring
locations based on topographic information from the plan sheet provided.
2.0 FIELD PROCEDURES
Four (4) standard penetration test borings were advanced on February 15, 2022 by HGTS with
a rotary drilling rig, using continuous flight augers to advance the boreholes. Representative
samples were obtained from the borings, using the split-barrel sampling procedures in general
accordance with ASTM Specification D-1586. In the split-barrel sampling procedure, a 2-inch
O.D. split-barrel spoon is driven into the ground with a 140-pound hammer falling 30 inches.
The number of blows required to drive the sampling spoon the last 12 inches of an 18-inch
penetration is recorded as the standard penetration resistance value, or "N" value. The results
of the standard penetration tests are indicated on the boring logs. The samples were sealed in
containers and provided to HGTS for testing and soil classification.
Field log of each boring was prepared by HGTS. The logs contain visual classifications of the
soil materials encountered during drilling, as well as the driller's interpretation of the
subsurface conditions between samples and water observation notes. The final boring logs
included with this report represent an interpretation of the field logs and include
modifications based on visual/manual method observation of the samples.
The soil boring logs, general terminology for soil description and identification, and
classification of soils for engineering purposes are also included in the appendix. The soil
3
boring logs identify and describe the materials encountered, the relative density or consistency
based on the Standard Penetration resistance (N-value, “blows per foot”) and groundwater
observations.
The strata changes were inferred from the changes in the samples and auger cuttings. The
depths shown as changes between strata are only approximate. The changes are likely
transitions, variations can occur beyond the location of the borings.
3.0 RESULTS
3.1 Soil Conditions
It should be noted that soils were frozen to a depth of about 2 to 3 feet below the ground
surface at the time of drilling .
At the surface, the soil borings encountered about 1 foot of topsoil consisting of silty clayey
sand, silty clay, and sandy lean clay that were black and dark brown in color and contained
traces of roots.
The topsoil was underlain by glacial till deposits that extended to the termination depths of
the soil borings. The glacial till consisted of sandy lean clay and clayey sand that were brown
and gray in color and contained varying amounts of gravel. A sand seam within clayey glacial
till was noted at a depth of about 10 feet in soil boring SB-2.
Penetration resistance values (N-Values), shown as blows per foot (bpf) on the boring logs,
within the sandy lean clay glacial till ranged from 6 to 22 bpf, indicating a medium to very
stiff consistency. N-Values within the clayey sand glacial till was 6 bpf, indicating a loose
relative density or medium consistency.
3.2 Groundwater
Groundwater was not encountered in the soil borings while drilling and sampling or after
removal of the auger from the boreholes. Groundwater appears to be below the depths
explored by our borings. We do not anticipate that groundwater will be encountered during
construction.
Water levels were measured on the dates as noted on the boring logs and the period of water
level observations was relatively short. Given the cohesive nature of soils encountered, it is
possible that insufficient time was available for groundwater to seep into the borings and rise
to its hydrostatic level. Groundwater monitoring wells or piezometers would be required to
more accurately determine water levels. Seasonal and annual fluctuations in the groundwater
levels should be expected.
4
3.3 Laboratory Testing
Laboratory moisture content and P-200 content tests were performed on selected samples
recovered from the soil borings. Moisture contents ranged from about 19 to 25 ½ percent.
These values indicate the soils were likely above their assumed optimum soil moisture
content. The P-200 content is a measure of the silt and clay sized particles (fines) in the soils
which can affect soil infiltration rates. In general. the greater the P-200 content of a sample the
less permeable the soils will be. Table 1 below summarizes the results of the laboratory tests.
Results of the moisture content tests and P-200 tests are also shown on the boring logs adjacent
to the sample tested.
Table 1. Summary of Laboratory Tests
Boring
Number
Sample
Number
Depth
(feet)
Moisture Content
(%) *
P-200 Content
(%) *
SB-1 SS-6 5 21 -
SB-2 SS-2 5 17 ½ 52
SB-3 SS-14 5 25 ½ 47 ½
SB-3 SS-15 10 20 ½ 55 ½
SB-4 SS-10 5 19 -
*Moisture and P-200 content values rounded to the nearest ½ percent.
3.4 OSHA Soil Classification
At the anticipated excavation depths, the soil borings encountered sandy lean clay and clayey
sand, corresponding to the ASTM Classifications CL and SC, respectively. Soils identified as
CL will generally be Type B soils under Department of Labor Occupational Safety and Health
Administration (OSHA) guidelines while soils identified as SC will generally be Type C soils.
An OSHA-approved qualified person should review the soil classification in the field.
Excavations must comply with the requirements of OSHA 29 CFR, Part 1926, Subpart P,
“Excavations and Trenches.” This document states excavation safety is the responsibility of
the contractor. The project specifications should reference these OSHA requirements.
4.0 DISCUSSION AND RECOMMENDATIONS
4.1 Proposed Construction
Specific architectural, structural or civil engineering or construction plans were not provided.
For the purposes of this evaluation, we assume the new homes will have walkout or lookout
style foundations with one or two stories above grade. We anticipate the main floors will bear
slightly above existing grades with the basement floors bearing about 10 feet below the main
floor level.
The new homes are assumed to consist of cast-in-place concrete foundation walls supported
on concrete spread footings with above grade construction consisting of wood framing, a
pitched roof and asphalt shingles. Based on the assumed construction we estimate wall
5
loadings will range from about 2 to 3 kips (2,000 to 3,000 pounds) per lineal foot and column
loads, if any will be less than 75 kips (75,000 pounds).
If the proposed loads exceed these values, the proposed grades differ by more than 2 feet from
the assumed values or if the design or location of the proposed building changes, we should
be informed. Additional analyses and revised recommendations may be necessary.
4.2 Discussion
The vegetation and topsoil are compressible and are not suitable for foundation support.
These materials will need to be removed from below the building and oversize areas and
replaced as needed with suitable compacted engineered fill.
It is our opinion that the underlying native glacial soils are suitable for foundation support
and based on the borings we do not anticipate that soil corrections in excess of stripping the
topsoil will be required.
Groundwater was not encountered in the borings while drilling and sampling or after removal
of the auger from the boreholes. We generally do not anticipate that groundwater will be
encountered during construction and do not anticipate that dewatering will be required.
With the building pad prepared as recommended, it is our opinion the footings can be
designed for a net allowable bearing pressure up to 2,000 pounds per square foot (psf).
The following sections provide recommendations for foundation design and construction.
4.3 Site Grading Recommendations
Excavation We recommend that all vegetation, topsoil and any soft or otherwise unsuitable
soils, if encountered, be removed from below the proposed building and oversize areas. Table
2 below summarizes the anticipated excavation depths at the soil boring locations. Excavation
depths may vary and could be deeper.
Table 2. Anticipated Excavation Depths
Boring
Number
Estimated
Surface
Elevation
(feet)
Anticipated
Excavation Depth
(feet)*
Anticipated
Excavation
Elevation (feet)*
Approximate
Groundwater
Elevation
(feet)*
SB-1 Estimated 978 1 Estimated 977 NE
SB-2 Estimated 972 Pond – Cut to Grade Cut to Grade NE
SB-3 Estimated 970 Pond – Cut to Grade Cut to Grade NE
SSB-4 Estimated 968 1 Estimated 967 NE
* = Excavation and groundwater elevations were rounded to nearest ½ foot. NE = Not Encountered
Oversizing In areas where the excavations extend below the proposed footing elevations, the
excavations require oversizing. We recommend the perimeter of the excavation be extended
a foot outside the proposed footprint for every foot below footing grade (1H:1V oversizing).
The purpose of the oversizing is to provide lateral support of the foundation.
6
Fill Material Fill required to attain site grades may consist of any debris-free, non-organic
mineral soil. Except we recommend that fill or backfill placed in wet excavations or within 2
feet of the groundwater table, if encountered, consist of granular soil (sand) with less than 5
percent passing the number 200 sieve and at least 50 percent retained on the number 40 sieve.
The clayey glacial till soils, excavated during foundation construction appear to be generally
suitable for reuse as structural fill or backfill. However, moisture contents ranged from about
19 to 25 ½ percent, indicating the soils were likely above their assumed optimum soil moisture
contents based on the standard Proctor test. Soils that will be reused as fill or backfill could
require some moisture conditioning (drying) to meet the recommend compaction levels.
Summer months are typically more favorable for drying wet soils.
Topsoil, organic soils or soils that are black in color are not suitable for reuse as structural fill
or backfill.
Backfilling We recommend that backfill placed to attain site grades be compacted to a
minimum of 95 percent of its standard Proctor density (ASTM D 698). Granular fill classified
as SP or SP-SM should be placed within 65 percent to 105 percent of its optimum moisture
content as determined by the standard Proctor. Other fill soils should be placed within 3
percentage points above and 1 percentage point below its optimum moisture content as
determined by the standard Proctor. All fill should be placed in thin lifts and be compacted
with a large self-propelled vibratory compactor operating in vibratory mode.
Foundations We recommend the perimeter footings bear a minimum of 42 inches below the
exterior grade for frost protection. Interior footings may be placed immediately below the
slab provided construction does not occur during below freezing weather conditions.
Foundation elements in unheated areas (i.e., deck or porch footings) should bear at least 5 feet
below exterior grade for frost protection.
We anticipate the foundations and floor slabs will bear on compacted clayey engineered fill or
clayey glacial till deposits. With the building pad(s) prepared as recommended, it is our
opinion the footings can be designed for a net allowable bearing pressure up to 2,000 pounds
per square foot (psf).
We anticipate total and differential settlement of the foundations will be less than 1 inch and
½ inch, respectively, across a 30-foot span.
4.4 Dewatering
Groundwater was not encountered in the soil borings while drilling and sampling or after
removal of the auger from the boreholes. We do not anticipate that groundwater will be
encountered and do not anticipate that dewatering will be required.
4.5 Groundwater Separation Distances
We recommend that the lowest floor grades for the homes be constructed to meet City of
Chanhassen (City) building code requirements with respect to groundwater separation
distances. In the absence of township requirements, we recommend the lowest floor slab be
7
constructed to maintain at least a 4-foot separation between the lowest floor slab and the
observed groundwater and at least a 2-foot separation between the lowest floor slab and 100-
year flood levels of nearby ponds, wetlands or other surface water features.
4.6 Interior Slabs
The anticipated floor subgrade will consist of compacted clayey engineered fill or clayey
glacial till deposits. It is our opinion a modulus of subgrade reaction, k, of 100 pounds per
square inch per inch (pci) of deflection may be used to design the floor.
If floor coverings or coatings less permeable than the concrete slab will be used, we
recommend that a vapor retarder or vapor barrier be placed immediately beneath the slab.
Some contractors prefer to bury the vapor barrier or vapor retarder beneath a layer of sand to
reduce curling and shrinkage, but this practice often traps water between the slab and vapor
retarder or barrier. Regardless of where the vapor retarder or vapor barrier is placed, we
recommend consulting the floor covering manufacturer regarding the appropriate type, use
and installation of the vapor retarder or vapor barrier to preserve the warranty.
We recommend following all state and local building codes with regards to a radon mitigation
plan beneath interior slabs.
4.7 Below Grade Walls
We recommend general waterproofing of the below grade walls. We recommend either
placing drainage composite against the backs of the exterior walls or backfilling adjacent to
the walls with sand having less than 50 percent of the particles by weight passing the #40 sieve
and less than 5 percent of the particles by weight passing the #200 sieve. The sand backfill
should be placed within 2 feet horizontally of the wall. We recommend the balance of the
backfill for the walls consist of sand however the sand may contain up to 20 percent of the
particles by weight passing the #200 sieve.
We recommend installing drain tile behind the below grade walls, adjacent to the wall footing
and below the slab elevation. Preferably the drain tile should consist of perforated pipe
embedded in gravel. A geotextile filter fabric should encase the pipe and gravel. The drain
tile should be routed to a storm sewer, sump pump or other suitable disposal site.
Foundation walls or below grade (basement) walls will have lateral loads from the
surrounding soil transmitted to them. Active earth pressures can be used to design the below
grade walls if the walls are allowed to rotate slightly. If wall rotation cannot be tolerated, then
below grade wall design should be based on at-rest earth pressures. It is our opinion that the
estimated soil parameters presented in Table 3, can be used for below grade wall design.
These estimated soil parameters are based on the assumptions that the walls are drained, there
are no surcharge loads within a horizontal distance equal to the height of the wall and the
backfill is level.
8
Table 3. Estimated Soil Parameters
Soil Type
Estimated
Unit
Weight
(pcf)
Estimated
Friction
Angle
(degrees)
At-Rest
Pressure
(pcf)
Active Soil
Pressure
(pcf)
Passive Soil
Pressure
(pcf)
Sand
(SP or SP-SM) 120 32 55 35 390
Other Soils
(CL, SC) 135 28 70 50 375
Resistance to lateral earth pressures will be provided by passive resistance against the wall
footings and by sliding resistance along the bottom of the wall footings. We recommend a
sliding coefficient of 0.35. This value does not include a factor of safety.
4.8 Exterior Slabs
Exterior slabs will likely be underlain by clayey soils which are considered moderately to
highly frost susceptible. If these soils become saturated and freeze, frost heave may occur.
This heave can be a nuisance in front of doors and at other critical grade areas. One way to
help reduce the potential for heaving is to remove the frost-susceptible soils below the slabs
down to bottom of footing grades and replace them with non-frost-susceptible backfill
consisting of sand having less than 5 percent of the particles by weight passing the number
200 sieve.
If this approach is used and the excavation bottoms terminate in non-free draining granular
soil, we recommend a drain tile be installed along the bottom outer edges of the excavation to
collect and remove any water that may accumulate within the sand. The bottom of the
excavation should be graded away from the building.
If the banks of the excavations to remove the frost-susceptible soils are not sloped, abrupt
transitions between the frost-susceptible and non-frost-susceptible backfill will exist along
which unfavorable amounts of differential heaving may occur. Such transitions could exist
between exterior slabs and sidewalks, between exterior slabs and pavements and along the
slabs themselves if the excavations are confined to only the building entrances. To address
this issue, we recommend sloping the excavations to remove frost-susceptible soils at a
minimum 3:1 (horizontal:vertical) gradient.
An alternative method of reducing frost heave is to place a minimum of 2 inches of extruded
polystyrene foam insulation beneath the slabs and extending it about 4 feet beyond the slabs.
The insulation will reduce frost penetration into the underlying soil and reduce heave. Six to
twelve inches of granular soil is typically placed over the insulation to protect it during
construction.
Another alternative for reducing frost heave is to support the slabs on frost depth footings. A
void space of at least 4 inches should be provided between the slab and the underlying soil to
allow the soil to heave without affecting the slabs.
9
4.9 Site Grading and Drainage
We recommend the site be graded to provide positive run-off away from the proposed house.
We recommend landscaped areas be sloped a minimum of 6 inches within 10 feet of the
building and slabs be sloped a minimum of 2 inches. In addition, we recommend downspouts
with long splash blocks or extensions.
4.10 Utilities
We anticipate that new water and sanitary sewer utilities could be installed as part of this
project. We further anticipate that new utilities will bear at depths ranging from about 7 to 10
feet below the ground surface. At these depths we anticipate that the pipe will bear on
compacted engineered fill or glacial till soils which in our opinion are generally suitable for
pipe support. We recommend removing all vegetation, topsoil, and any soft or otherwise
unsuitable soils, if any, beneath utilities prior to placement.
We recommend bedding material be thoroughly compacted around the pipes. We
recommend trench backfill above the pipes be compacted to a minimum of 95 percent beneath
slabs and pavements, the exception being within 3 feet of the proposed pavement subgrade,
where 100 percent of standard Proctor density is required. In landscaped areas we
recommend a minimum compaction of 90 percent.
Groundwater was not encountered in the soil borings while drilling and sampling or after
removal of the auger from the boreholes.
4.11 Ponds
Based on the plans/maps provided it appears the project will include constructing stormwater
ponds on each of the new lots. Design elevations of the proposed pond was not provided.
Borings SB-2 and SB-3 were completed near or within the proposed ponds and encountered
sandy lean clay and clayey sand. It is our opinion that the infiltration rates presented in Table
5 can be used for stormwater pond/infiltration basin design. These values were obtained from
tables included in the “Minnesota Storm Water Manual”.
Table 5. Design Infiltration Rates
In-situ soils Soil Description Hydrologic Soil
Group
Design Infiltration Rate
(inches/hour)
SC Clayey Sand D 0.06
CL Lean Clay/Sandy Lean Clay D 0.06
Field tests (double ring infiltrometer) can be performed within the proposed infiltration basin
area to verify infiltration rates of the in-situ soils. We would be pleased to provide these
services if required or requested.
10
5.0 CONSTRUCTION CONSIDERATIONS
5.1 Excavation
At the anticipated excavation depths, the soil borings encountered sandy lean clay and clayey
sand, corresponding to the ASTM Classifications CL and SC, respectively. Soils identified as
CL will generally be Type B soils under Department of Labor Occupational Safety and Health
Administration (OSHA) guidelines while soils identified as SC will generally be Type C soils.
Temporary excavations in Type C soils should be constructed at a minimum of 1 ½ foot
horizontal to every 1-foot vertical within excavations. Slopes constructed in this manner may
still exhibit surface sloughing. If site constraints do not allow the construction of slopes with
these dimensions, then temporary shoring may be required.
5.2 Observations
A geotechnical engineer or qualified engineering technician should observe the excavation
subgrade to evaluate if the subgrade soils are similar to those encountered in the borings and
adequate to support the proposed construction.
5.3 Backfill and Fills
We recommend moisture conditioning all soils that will be used as fill or backfill in accordance
with Section 4.3 above. We recommend that fill and backfill be placed in lifts not exceeding 4
to 12 inches, depending on the size of the compactor and materials used.
5.4 Testing
We recommend density tests of backfill and fills placed for the proposed house foundations.
Samples of the proposed materials should be submitted to our laboratory prior to placement
for evaluation of their suitability and to determine their optimum moisture content and
maximum dry density (Standard Proctor).
5.5 Winter Construction
If site grading and construction is anticipated to proceed during cold weather, all snow and
ice should be removed from cut and fill areas prior to additional grading and placement of
fill. No fill should be placed on frozen soil and no frozen soil should be used as fill or backfill.
Frost should not be allowed to penetrate below footings and foundations.
Concrete delivered to the site should meet the temperature requirements of ASTM and/or
ACI. Concrete should not be placed on frozen soil. Concrete should be protected from
freezing until the necessary strength is obtained. Frost should not be permitted to penetrate
below the footings.
11
6.0 PROCEDURES
6.1 Soil Classification
The drill crew chief visually and manually classified the soils encountered in the borings in
general accordance with ASTM D 2488, “Description and Identification of Soils (Visual-
Manual Procedure).” Soil terminology notes are included in the Appendix. The samples were
returned to our laboratory for review of the field classification by a soils engineer. Samples
will be retained for a period of 30 days.
6.2 Groundwater Observations
Immediately after taking the final samples in the bottom of the boring, the hole was checked
for the presence of groundwater. Immediately after removing the augers from the borehole
the hole was once again checked and the depth to water and cave-in depths were noted.
7.0 GENERAL
7.1 Subsurface Variations
The analyses and recommendations presented in this report are based on data obtained from
a limited number of soil boring(s). Variations can occur away from the boring, the nature of
which may not become apparent until additional exploration work is completed, or
construction is conducted. A reevaluation of the recommendations in this report should be
made after performing on-site observations during construction to note the characteristics of
any variations. The variations may result in additional foundation costs and it is suggested
that a contingency be provided for this purpose.
It is recommended that we be retained to perform the observation and testing program during
construction to evaluate whether the design is as expected, if any design changes have affected
the validity of our recommendations, and if our recommendations have been correctly
interpreted and implemented in the designs, specifications and construction methods. This
will allow correlation of the soil conditions encountered during construction to the soil borings
and test pits and will provide continuity of professional responsibility.
7.2 Review of Design
This report is based on the design of the proposed structures as related to us for preparation
of this report. It is recommended that we be retained to review the geotechnical aspects of the
design and specifications. With the review, we will evaluate whether any changes have
affected the validity of the recommendations and whether our recommendations have been
correctly interpreted and implemented in the design and specifications.
7.3 Groundwater Fluctuations
We made water level measurements in the borings at the times and under the conditions stated
on the boring log. The data was interpreted in the text of this report. The period of observation
was relatively short and fluctuations in the groundwater level may occur due to rainfall,
12
flooding, irrigation, spring thaw, drainage, and other seasonal and annual factors not evident
at the time the observations were made. Design drawings and specifications and construction
planning should recognize the possibility of fluctuations.
7.4 Use of Report
This report is for the exclusive use of Ms. Gayle Morin and her design team to use to design
the proposed structures and prepare construction documents. In the absence of our written
approval, we make no representation and assume no responsibility to other parties regarding
this report. The data, analysis and recommendations may not be appropriate for other
structures or purposes. We recommend that parties contemplating other structures or
purposes contact us.
7.5 Level of Care
Haugo GeoTechnical Services has used the degree of skill and care ordinarily exercised under
similar circumstance by members of the profession currently practicing in this locality. No
warranty expressed or implied is made.
APPENDIX
S00°10'43"W 1131.8 +/-N00°10'43"E 1220.1 +/-1161.341081.20[12][13
]
Sewe
r
Easemen
t
pe
rDoc.
Nos
.
244417
&
244418[13] Turnaround EasementPer Doc. No. 2444188"
PVC8" PVCExisting HouseExisting HouseDeck12" RCP[13] Temporary Easementper Doc. No. 244418Upper Level Deckw/ Walkout Beneath32LOT
2BLOC
K
1
SB-1
SB-4
SB-2
SB-3
1:30
Silty Clayey Sand, trace Roots, black, frozen. (Topsoil)
(CL) Sandy Lean Clay, trace Gravel, brown and gray, wet, rather
stiff to very stiff. (Glacial Till)
(CL) Sandy Lean Clay, trace Gravel, gray, wet, rather stiff. (Glacial
Till)
Bottom of borehole at 14.5 feet.
AU
5
SS
6
SS
7
SS
8
5-5-6
(11)
5-7-10
(17)
3-4-7
(11)
21
NOTES Ground Surface Elevation Estimated
GROUND ELEVATION 978 ft
LOGGED BY
DRILLING METHOD Hollow Stem Auger/Split Spoon
DRILLING CONTRACTOR HGTS GROUND WATER LEVELS:
CHECKED BY PG
DATE STARTED 2/15/22 COMPLETED 2/15/22
AT TIME OF DRILLING --- Not Encountered
AT END OF DRILLING --- Not Encountered
AFTER DRILLING --- Not Encountered
HOLE SIZE 3 1/4 inches
FINES CONTENT (%)
20 40 60 80
20 40 60 80
PL LLMC
DEPTH(ft)0.0
2.5
5.0
7.5
10.0
12.5 GRAPHICLOGMATERIAL DESCRIPTION
SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE) SPT N VALUE
20 40 60 80
MOISTURE CONT.(%)NOTESPAGE 1 OF 1
BORING NUMBER SB-1
CLIENT Gayle Morin
PROJECT NUMBER 21-1312
PROJECT NAME 1441 Lake Lucy Road
PROJECT LOCATION Chanhassen, MN
GEOTECH BH PLOTS - GINT STD US LAB.GDT - 2/21/22 08:46 - C:\USERS\HGTS 3\DROPBOX (HGTS)\HAUGO GEOTECHNICAL SERVICES\GINT PROJECT BACKUP\PROJECTS\21-1312 1441 LAKE LUCY ROAD.GPJHaugo GeoTechnical Services
2825 Cedar Ave South
Minneapolis, MN 55407
Telephone: 612-729-2959
Fax: 763-445-2238
Silty Clayey Sand, trace Roots, black, frozen. (Topsoil)
(CL) Sandy Lean Clay, trace Gravel, brown and gray, wet, rather
stiff to very stiff. (Glacial Till)
P-200=52%
Sand Seam at about 10 feet
(CL) Sandy lean Clay, trace Gravel, gray, wet, stiff. (Glacial Till)
Bottom of borehole at 14.5 feet.
AU
1
SS
2
SS
3
SS
4
4-4-5
(9)
40-15-5
(20)
3-5-8
(13)
17.5
NOTES Ground Surface Elevation Estimated
GROUND ELEVATION 972 ft
LOGGED BY
DRILLING METHOD Hollow Stem Auger/Split Spoon
DRILLING CONTRACTOR HGTS GROUND WATER LEVELS:
CHECKED BY PG
DATE STARTED 2/15/22 COMPLETED 2/15/22
AT TIME OF DRILLING --- Not Encountered
AT END OF DRILLING --- Not Encountered
AFTER DRILLING --- Not Encountered
HOLE SIZE 3 1/4 inches
FINES CONTENT (%)
20 40 60 80
20 40 60 80
PL LLMC
DEPTH(ft)0.0
2.5
5.0
7.5
10.0
12.5 GRAPHICLOGMATERIAL DESCRIPTION
SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE) SPT N VALUE
20 40 60 80
MOISTURE CONT.(%)NOTESPAGE 1 OF 1
BORING NUMBER SB-2
CLIENT Gayle Morin
PROJECT NUMBER 21-1312
PROJECT NAME 1441 Lake Lucy Road
PROJECT LOCATION Chanhassen, MN
GEOTECH BH PLOTS - GINT STD US LAB.GDT - 2/21/22 08:46 - C:\USERS\HGTS 3\DROPBOX (HGTS)\HAUGO GEOTECHNICAL SERVICES\GINT PROJECT BACKUP\PROJECTS\21-1312 1441 LAKE LUCY ROAD.GPJHaugo GeoTechnical Services
2825 Cedar Ave South
Minneapolis, MN 55407
Telephone: 612-729-2959
Fax: 763-445-2238
Silty Clay, trace Roots, black, wet. (Topsoil)
(SC) Clayey Sand, fine grained, gray and brown, wet, loose.
(Glacial Till)
P-200=47.5
(CL) Sandy Lean Clay, trace Gravel, brown and gray, wet, rather
stiff. (Glacial Till)
P-200=55.5
(CL) Sandy Lean Clay, trace Gravel, gray, wet, rather stiff. (Glacial
Till)
Bottom of borehole at 14.5 feet.
AU
13
SS
14
SS
15
SS
16
3-3-3
(6)
3-4-2
(6)
3-5-7
(12)
25.5
20.5
NOTES Ground Surface Elevation Estimated
GROUND ELEVATION 970 ft
LOGGED BY
DRILLING METHOD Hollow Stem Auger/Split Spoon
DRILLING CONTRACTOR HGTS GROUND WATER LEVELS:
CHECKED BY PG
DATE STARTED 2/15/22 COMPLETED 2/15/22
AT TIME OF DRILLING --- Not Encountered
AT END OF DRILLING --- Not Encountered
AFTER DRILLING --- Not Encountered
HOLE SIZE 3 1/4 inches
FINES CONTENT (%)
20 40 60 80
20 40 60 80
PL LLMC
DEPTH(ft)0.0
2.5
5.0
7.5
10.0
12.5 GRAPHICLOGMATERIAL DESCRIPTION
SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE) SPT N VALUE
20 40 60 80
MOISTURE CONT.(%)NOTESPAGE 1 OF 1
BORING NUMBER SB-3
CLIENT Gayle Morin
PROJECT NUMBER 21-1312
PROJECT NAME 1441 Lake Lucy Road
PROJECT LOCATION Chanhassen, MN
GEOTECH BH PLOTS - GINT STD US LAB.GDT - 2/21/22 08:46 - C:\USERS\HGTS 3\DROPBOX (HGTS)\HAUGO GEOTECHNICAL SERVICES\GINT PROJECT BACKUP\PROJECTS\21-1312 1441 LAKE LUCY ROAD.GPJHaugo GeoTechnical Services
2825 Cedar Ave South
Minneapolis, MN 55407
Telephone: 612-729-2959
Fax: 763-445-2238
Sandy Lean Clay, trace Roots, dark brown, wet. (Topsoil)
(CL) Sandy Lean Clay, trace Gravel, brown and gray, wet, very
stiff. (Glacial Till)
(CL) Sandy Lean Clay, trace Gravel, gray, wet, stiff. (Glacial Till)
Bottom of borehole at 14.5 feet.
AU
9
SS
10
SS
11
SS
12
4-9-10
(19)
6-9-13
(22)
3-5-8
(13)
19
NOTES Ground Surface Elevation Estimated
GROUND ELEVATION 968 ft
LOGGED BY
DRILLING METHOD Hollow Stem Auger/Split Spoon
DRILLING CONTRACTOR HGTS GROUND WATER LEVELS:
CHECKED BY PG
DATE STARTED 2/15/22 COMPLETED 2/15/22
AT TIME OF DRILLING --- Not Encountered
AT END OF DRILLING --- Not Encountered
AFTER DRILLING --- Not Encountered
HOLE SIZE 3 1/4 inches
FINES CONTENT (%)
20 40 60 80
20 40 60 80
PL LLMC
DEPTH(ft)0.0
2.5
5.0
7.5
10.0
12.5 GRAPHICLOGMATERIAL DESCRIPTION
SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE) SPT N VALUE
20 40 60 80
MOISTURE CONT.(%)NOTESPAGE 1 OF 1
BORING NUMBER SB-4
CLIENT Gayle Morin
PROJECT NUMBER 21-1312
PROJECT NAME 1441 Lake Lucy Road
PROJECT LOCATION Chanhassen, MN
GEOTECH BH PLOTS - GINT STD US LAB.GDT - 2/21/22 08:46 - C:\USERS\HGTS 3\DROPBOX (HGTS)\HAUGO GEOTECHNICAL SERVICES\GINT PROJECT BACKUP\PROJECTS\21-1312 1441 LAKE LUCY ROAD.GPJHaugo GeoTechnical Services
2825 Cedar Ave South
Minneapolis, MN 55407
Telephone: 612-729-2959
Fax: 763-445-2238
WETLAND DELINEATION
REPORT
10t1 1 t2021
2021-366
1,441 Lake Lucy Rd Delineation
Chanhassen, M N
Jacobson Environmental, PLLC
jacobson env@msn.com
Jacobson Environmental, PLLC
Environmental Consulta nts
www,jacobsonenvi ron mental.com
Wayne Jacobson, P.S.S., W.D.C., P.W.S., A.F.S.
5821 Humboldt Avenue North, Brooklyn Center, MN 55430
Email: iacobsonenv@msn.com
(612) 802-6619 Cell
Ta ble of Contenrs
2.1 EX|ST|NG TNFORMATTON REVTEW ..........................3
2.L.L Antecedent Precipitation ..............3
2.1.2 NationalWetlands Inventory ..........................3
2.1.3 Web Soil Survey. ...........................3
2.1.4 Public Waters Inventory... .............3
2.1.5 Topographic Map........... ...............3
2.2 FIELD DE1|NEATION................. ............4
2.2.1Vegetation............ .........................4
2.2.2 Hydric Soils ........... .........................5
2.2.3 Cautions Used in Applying the Field Indicators of Hydric soi|s........... ......................5
3.1 WETLAND BASTN DESCR|PT|ONS............... ..............6
4.0 CONFIRMATION OF JURISDICTIONAL STATUS ..,..,.....7
Appendices
Appendix A Antecedent Precipitation Data
Appendix B Sample Data Sheets
Appendix C Site Photographs
Appendix D Wetland Type and Boundary Approval Forms
Figu res
Figure 1 Site Location Map
Figure 2 National Wetland Inventory Map
Figure 3 Soils Map
Figure 4 Public Waters Inventory Map
Figure 5 Delineation Map
Figure 6 Topographic Map
Figure 7 Hydric Rating Map
Wetland Delineation-Mitigation-Permitting-Monitoring-Banking-Functional Analysis-T & E Surveys
Phase I Environmental Assessments-EAW's-Soil ID-Soil Analysis & Delineation-Environmental Referrals
Pond & Lake Weed Control & Fish Stocking-Tree Surveys-Natural Resource Manaqement plans
Jacobson Flnvironmental, PI,LC
Environmental Consulta nts
www.jacobsonenvi ron menta l.com
Wayne Jacobson, P.S.S., W.D.C., P.W.S., A.F.S.
5821 Humboldt Avenue North, Brooklyn Center, MN 55430
Email: iacobsonenv@msn.com
1.0 SU M MARY
(612) 802-6619 Cell
Jacobson Environmental, PLLC (JE)visited the project site at 1441 Lake Lucy Rd, Chanhassen,
Minnesota 55317 on 10/08/2021.The sitewas approximately 4.9 acres in size, and was located at
Section 2,T116N, R23W, Chanhassen, Minnesota See Figure l for a Site Location Map.
The purpose of the investigation was to identify areas withrn the project boundary meeting the technrcal
criteria for wetlands, delineate the jurisdictional extent of the wetland basins, and classifylhe weland
habitat according to the 1987 U.S. Army Corps of Engineers Wetland Delineation Manuat and the 20,10
Regional Supplement to the Corps of Engineers Wetland Delineation: Midwest Region
Wetlands are areas that are saturated or inundated with surface and or groundwater at a frequency and
duration sufficient to support, and that under normal circumstances do support, a prevalence of
vegetation typically adapted for life in hydric soilconditions. Examples of wetlands include seasonally
flooded basins, floodplain forests, wet meadows, shallow and deep marshes, shrub swamos. wooded
swamps, fens, and bogs.
Wetland boundaries were determined through a routine analysis of the vegetation, soils and hydrology
which must all show wetland characteristics for an area to be delineated as a wefland.
Two baslns were delineated within the project area, which is summarized below and shown on Fiqure 5
Cowardin
Type 2 PEM,1B
Type 3 PEMl C
Eggers & Reed
Wet Meadow
Shallow Marsh
Dominant Vegetation
Nodding Beggartick, Reed
Canary Grass, Lake Sedge,
and Green Ash
Lake Sedge, Duckweed.
and Narrow Leaf Cattail
Size
Fgtqs)
266
zzz
All figures and appendices referenced by this report are presented at the end of the text
This wetland delineation was performed by Jacobson Environmental, PLLC under the direction of Wayne
Jacobson, Minnesota Professional Soil Scientist #3061 '1, Society of Wetland Scientists - professionai
Wetland Scienttst #1000, University of Minnesota / BWSR Wetland Delineator, Certified #i0ig. American
Fisheries Society - Associate Fisheries Scientist #A-j71.
Wetland Delineation-Mitigation-Permitting-Monitoring-Banking-Functional Analysis-T & E Surveys 2
Phase I Environmental Assessments-EAW's-Soil ID-Soil Analysis & Delineation-Environmental Referrals
Pond & Lake Weed Control & Fish Stocking-Tree Surveys-Natural Resource Management plans
Jacobson Environmentalo PLLC
Environmental Consulta nts
www.jacobsonenvi ron menta l.com
Wayne Jacobson, P.S.S., W.D.C., P.W.S., A.F.S.
5821 Humboldt Avenue North, Brooklyn Center, MN 55430
Email: iacobsonenv@msn.com
2.0 METHODS
(612) 802-6619 Cell
2 1 EXISI ING INFORMA'I ION REVIEW
Prior to field delineation, Jacobson Environmental reviewed the followinq information:
2.1.1 Antecedent Precipitation
The previous three month's precipitation data obtarned from the Minnesota State Climatology Office
suggest that the sampling period occurred under normal conditions. Antecedent precipitation data can be
found in Appendix A. The growing season in this area is approximately from mid-April to mid-October,
when the air temperature averages above 28 degrees F. This delineation was completed during the
growing season.
2..1.2 National Wetlands lnventory
The National Wetlands lnventory (NWl) identified two (PABH and PFOlA) wefland comptexes within the
property boundary (Figure 2)
2.1.3 Web SoilSurvey
The National Resource Conservation Service Web Soil Survey (Figure 7) identified the following soils
seU Hy9!1r_c_&a!ilg_
C qtQp_Vg We-bs,te r _Co m p |ex 100
_E$pxULle JendJ Lqqm
Kr_1kgryry leqter Loams
Lester-Kilkeny Corrlglex
-4lqq.l"rqq-@l---
2.1.4 Public Waters Inventory
The Mtnnesota Department of Natural Resources Public Waters Inventory shows that one public water
exists on the property (Figure 4).
2.1.5 Topographic Map
A topographic map with aerial photo overlay was obtained from Carver County (Figure 6). This map was
reviewed for suspected wetland areas based on topography and vegetative cover.
Wetland Delineation-Mitigation-Permitting-Monrtoring-Banking-Functional Analysis-T & E Surveys
Phase I Environmental Assessments-EAW's-Soil ID-Soil Analysis & Delineation-Environmental Referrals
Pond & Lake Weed Control & Fish Stocking-Tree Surveys-Natural Resource Management plans
100 _
0
100
I
I
I
I
l
Jacobson Environmental, PLI,C
Environmental Consultants
www.jacobsonenvi ron menta l.com
Wayne Jacobson, P.S.S., W.D.C., P.W.S., A.F.S.
5821 Humboldt Avenue North, Brooklyn Center, MN 55430
Email: iacobsonenv@msn.com
(612) 802-6619 Cell
2.2 t-ttt_D DEL tN EATtoN
The wetlands on the subject property were delineated using the routine determination methodology set
forth in the 1987 U S. Army Corps of EngineersWetlands Delineation Manualand the 2010 Regional
Supplement to the Corps of Engineers Wetland Delineation: Midwest Region as follows.
1)The vegetative community was sampled in all present strata to determine
whether 50% of the dominant plant species were hydrophytic using the 50/20 method
Soil pits were dug using a Dutch augerto depths of '18'-40", noting soil profites and any
hydric soil characteristics
Signs of wetland hydrology were noted and were compared to field criteria such as deptn
to shallow water table and depth of soil saturation found in the soil oits.
Transects were established in representative areas of each wetland. Each transect consisted of one
sample potnt within the wetland and one sample point in upland. Other areas which have one or more of
the wetland vegetation, soils, or hydrologic characteristics present, or where questionable conditions exist
may also have been sampled. Data sheets for each sample point are available in Appendix B.
Wetland classifications discussed rn the text are set forth in Wettands and Deepwater Habitats of the
United Sfafes (FWS/OBS Publication 79131, Cowardin et al 1979) and Wetlands of the united Stafes
(USFWS Circular 39, Shaw and Fredine, 1971.) Additionally, plant community types as named by Eggers
and Reed (1998) are given.
Wetland edges were marked with orange numbered pin flags. 4-foot wood lath marked with orange"wetland boundary" flagging tape or flagging tied on vegetation may be used if site conditions warrant
Sample points are marked with orange numbered pin flags.
Any wetlands or sample points were mapped using GpS.
2.2.1Vegetation
The plant species within the parcel were catalogecl and assigned a wetland indicator status according to
Lichvar, R.W. D.L. Banks, W N Kirchner, and N.C Melvin, 2016. The NationatWettand Plant List 2016
Wetland Ratings, Phytoneuron 2016-30. i-i7.
ln the text of this report and on the enclosed data forms, the plant rndicator status follows the olant's
scientific name unless a status has not been assigned. The hydrophytic plant criterion is met when more
than 50 percent of the dominant species by the 50/20 rule for each stratum (herb, shrub/sapling tree, and
Wetland Delineation-Mitigation-Permitting-Monitoring-Banking-Functional Analysis-T & E Surveys 4
Phase I Environmental Assessments-EAW's-Soil ID-Soil Analysis & Delineation-Environmental Referrals
Pond & Lake Weed Control & Fish Stocking-Tree Surveys-Natural Resource Management plans
2)
Jacobson Environmental, PLLC
Environmental Consultants
www.jacobsonenvi ron mental.com
Wayne Jacobson, P.S.S., W.D.C., P.W.S., A.F.S.
5821 Humboldt Avenue North, Brooklyn Center, MN 55430
Email: iacobsonenv@msn.com
(612) 802-6619 Cell
woody vine)were assigned an obligate (OBL)1, facultative wet (FACW), and/or facultative (FAC)weiland
With the 50/20 rule, dominants are generally measured by absolute ohcover in each stratum which
individually or collectively account for more than 50% of total vegetative cover in the stratum, plus any
other species which ttself accounts for at least 2O7o of the total veqetative cover.
2.2.2 l-lydric Soils
A hydric soil is a soil formed under condrtions of saturation, flooding, or ponding long enough during the
growing season to develop anaerobic conditions in the upper part. lf a soil exhibits the indicators oia
hydric soil or is identified as a hydric soil the hydric soil criterion is met.
The break between hydric and non-hydric soils was determined by excavating soil pits along transects
crossing the wetland/upland eco-tone and evaluating the soil colors, textures, and presence or absence
of redoximorphic indicators (i.e., mottles, gley or oxidized rhizospheres). Hydric Soil lndicators for the
Midwest Region were noted as presented in the NatronalTechnical Committee for Hydric Soils Field
lndicators of Hydric So/s ln the United Stafes version S.7 (USDA NRCS 2017) tf present at each sample
point. Upper soil profiles were also compared to the mapped or inclusionary soil series found in the
sample area for soil identification purposes
2.2.3 Cautions Used in Applying the Field Indicators of Hydric Soils
There are hydric soils with morphologies that are difficult to interpret. These include soils with black gray
or red parent material. soils with high pH; soils high or low jn content of organic matter; recently
developed hydric soils, and soils high in iron inputs. In some cases, we do not currenily have indicators to
assist in the identification of hydric soils in these situations. lf the soil meets the definition of a hydric soil
the lack of an indicator does not preclude the soilfrom being hydric. The indicators were developed
mostly to identify the boundary of hydric soil areas and generally work best on the margins Not all the
obviously wetter hydric soils wrll be identified by the indicators Redoximorphic features are most likely to
occur in soils that cycle between anaerobic (reduced) and aerobic (oxidized) condrtions.
Morphological features of hydric soils indicate that saturation and anaerobic conditions have existed
under either contemporary or former hydrologic regimes. Where soil morphology seems inconsistent with
the landscape, vegetation, or observable hydrology, it may be necessary to obtain the assistance of an
experienced soil or wetland scientist to determine whether the soil is hydric
To clarify, when investigating hydric soils in this area, one must consider the followinq:
. Many of these soils have black or gray parent materials.
r OBl=Obligate Wetland, occurs an estimated 99% in wetlands. FACW=Facultative Weiland, has an esttmated 67"h-gg"/"
probability of occurrence in wetlands. FAC=Facultative, is equally likely to occur in wetlands and non-we|ands, 34%-66%probability FACU=Facultative Upland, occurs in wetlands only occasionally,1ok-23% probability UPL=Upland, almost never
occurs in wetlands, <1% probability Nl= No Indicator, insufficiernt information available to determine an indicator status. positive ornegative sign previously indicated a frequency toward higher (+) or lower (-) frequency of occurrence within a category
Wetland Delineation-Mitigation-Permitting-Monitoring-Banking-Functional Analysis-T & E Surveys
Phase I Environmental Assessments-EAW's-Soil ID-Soil Analysis & Delineation-Environmental Referrals
Pond & Lake Weed Control & Fish Stocking-Tree Surveys-Natural Resource Management plans
Jacobson Environmental, PLLC www.jacobsonenvironmentar.com
Environmental consultants wayne Jacobson, p.s.s., w.D.c., p.w.s., A,F.s.
5821 Humboldt Avenue North, Brooklyn center, MN 55430 (612) 802-6619 cell
Email: iacobsonenv@msn.com
. Many of the soils have a high organic matter content.. The hydric soil margin is typically higher than the wetland boundary margin on the siter Not all the obviously wetter soils will be identified by the indicators.. Many of the hydric soils are Mollisols which are classic problem hydric soils in many cases
3 O RESULTS
3.1 WEI LAND BASIN DESCRIPTIONS
Basin 1
Basin 1 was an approximately 0.266 acres, Type2, PEMIB, Wet Meadow wetland. The basin was
dominated by Nodding Beggarticks, Reed canary Grass, Lake sedge, and Green Ash
Hydrology indicators included A2 (High Water Tabte) and A3 (Saturation).
Wetland soils met indicators A10 (2 cm Muck).
Adjacent upland was typically dominated by Common Buckthorn, Basswood, and Pennsylvania Sedge.
Primary hydrology indicators were not observed at the upland sample point, and no hydric soil indicators
were found in the upland sample point soil.
The wetland boundary followed a change in vegetation from wetland to upland plant communities, as well
as a distinct change in topography. The basin was shown as a PFOlA wetland on the NWI map (Figure
2)and was located within an area mapped as Cordova-Webstercomplex (Hydric Rating='100) by the Web
Soil Survey (Figure 7)
sample data sheets 1-Up and 1_wet in Appendix B correspond to this basin.
Basin 2
Basin 2 was an approximately 2.22 acres, Type 3, PEMlC, Shallow Marsh wetland. The basin was
dominated by Lake Sedge, Duckweed, and Narrow Leaf Cattail.
Hydrology indicators included Al (Surface Water) A2 (High Water Table), and A3 (Saturation).
Wetland soils met indicators A10 (2 cm Muck)
Adjacent upland was typically dominated by Common Buckthorn, Pennsylvania Sedge, and Basswood
Primary hydrology indrcators were not observed at the upland sample point, and no hydric soil indicators
were found in the upland sample point soil.
Wetland Delineation-Mitigation-Permitting-Monitoring-Banking-Functional Analysis-T & E Surveys 6
Phase I Environmental Assessments-EAW's-Soil ID-Soil Analysis & Delineation-Environmental Referrals
Pond & Lake Weed Control & Fish Stocking-Tree Surveys-Natural Resource Management Plans
,Iacobson Ilnvironmental, PI,LC www.jacobsonenvironmental.com
Environmental consultants wayne Jacobson, p.s.s., w.D.c., p.w.s., A.F.s.
5821 Humboldt Avenue North, Brooklyn Center, MN 55430 (612) 802-6619 CellEmail: iacobsonenv@msn.com
The wetland boundary followed a change in vegetation from wetland to upland plant communities, as well
as a distinct change in topography. The basin was shown as a PABH wetland on the NWI map (Figure 2)
and was located within an area mapped as Klossnerand Muskego soils (Hydric Rating=100) by tfre WeO
Soil Survey (Figure 7)
Sample data sheets 2_Up and 2_wet in Appendix B correspond to this basin.
4.0 CONFIRMATION OF JURISDICTIONAL STATUS
Jacobson Environmental is submitting this report to the client and regulatory agencies to request a
wetland boundary and type determination. We have enclosed an offi-ial WCA Approval of We|and Type
and Boundary form in Appendix D along with a USCOE wetland delineation concurrence reouest
5.O CE RTI F ICATIO N
I certify that this wetland delineation meets the standards and criteria described in the '1987 U.S. Army
Corps of Engineers Wetland Delineation Manual and the 20'10 Regional Supplement to the Corps of
Engineers Wetland Delineation: Midwest Region. This was a Routine On-Site Determination and the
results reflect the conditions present at the time of the delineation.
I certify that this report has been prepared in accordance with regulatory standards Thank you for the
opportunity to provide wetland services on this important projecti
lf any wetland impacts are planned for this project, permits would be necessarv from the LGU and other
agencies.
Sincerely,
.//;,,/,,,,/,,,, /:,,,,
Wayne Jacobson, WDC, PSS
Wetland Delineator, Certified #1019
Professional Soil Scientist #3001 1
Jacobson Environmental, PLLC.
Wetland Delineation-Mitigation-Permitting-Monitoring-Banking-Functional Analysis-T & E Surveys 7Phase I Environmental Assessments-EAW's-Soil ID-Soil Analysis & Delineation-Environmental Referrals
Pond & Lake Weed Control & Fish Stocking-Tree Surveys-Natural Resource Management plans
Figures
(-,
c)
O
C.)
$-r
b0
ft
,g
6 i >n;
L6=:
- >.i L u
>oYi\h-9 b 3 a
J F= sFPCvUnQ,^ o a;-i;0*:6nr Y-uF.=oJU6
LO@-
=d.PP,2q,?:i!i
Z = X n=
-'90!v-€g s r a
:EE:-Aqi=Fs
fiuFod Y:ori-t! g.:tsb!6F EFepio- F db e=s do=6td'fi.sxeE: ;'9 ! P;: E P Etr g
I e=k,gP'- ee E * go-Poq;o
E.ciXiFd f PEEg
.E
N
Ln
b*u
I I-' !1[lL$ ss
H t,q *E!LS gdEi
r,t* uI:=94:f
!-o;lf#; ;3;:
lTll.lll rLJII
"i'
{J'l!
:{
tr
{r'0-o
Ctr9.1 =u
fOr,-.rCnl!h:.
E .x u=#!.-
:-sl,!l,F;i6 + 5 E T"o_i,[4[5iuqiuu:€ fr fi 5 5:1tt
4rtr!
o;
GU
.'r -_- C
H.*E*. ;Ee*'.1Cq.9!quLrtr,l,u{-' .6u 60E{:D1
-rua!!11!...=aEgi!il-i',|: q".'J r o f q
! q l: Lll Ll -'. ff
l-o*,g
o
s
rctg
(u
I *,o
-J
6c
.9+,(Ez
c.l
()
-
b0
lv
vl
ltJ
UE|r3oo
'-'n
1H
=igE<3a.Fur<az
Ib
Soil Map-Carver County, Minnesota
(Figure 3 Soils Map)
Map Scale: 1 : 2,180 if fi nted on A porb"it (8.5" x 1 1,,) sheet.
^, Metersl!030mlif 180A reetl\0 1mm4{/.r.600Z\ l4ap projedion: Web [4trctor Comercoordjnates: WGSS4 EdqetiG: UTN4 Zor€ 15N WGSB4
Web Soil Survey
National Cooperative Soil Survey
=
440 53'5'N 44.53'5'N
=
10110t2021
Page 1 of 3
440 52'50" N
USDA Natural Resources
- Conservation Service
440 52',50" N
Soil Map-Carver County, Minnesota Figure 3 Soils Map
Map Unit Legend
Map Unit Symbol Map Unit Name I Acres in AOI Percent of AOI
CW Cordova-Webster compf ex I l.q 32.0%
EX Essexville sandy loam 0.7 15-8o/o
KB Xif f,enny Lest"r f "ar., Z t" O
percent slopes
0.2 5.3%
KE2 Lesier-Kilkenny complex, 16 to I 0.8
22 percent slopes I
19.1%
MP Klossner and Muskego soils,
ponded,0tolpercent
sropes
1.2 27.704
Totals for Area of Interest 4.3 100.0%
USDA Natural Resources
=- ConservationService
Web Soil Survey
National Cooperative Soil Survey
10t10t2021
Page 3 of 3
Figure 4 PWI Map
Map layers, Carver Gounty Parcels
PWI(Lentic)
-
PWI (Lotic)
- Property Boundary0 .02 .04 .06
- -
Mites
Figur 5 Delineation Map
Map layers
-- -' Wetland Boundary
o Sample Point
Carver Gounty Parcels
2ft Contours
- Property Boundary0 .02 .04 .06
I I
Miles
Figure 6 Topographic Map
Map layers
r Carver County Parcels
2ft Contours
Property Boundary0 .02 .04 .06
I Ir Miles
!
3
R
Hydric Rating by Map Unit-Carver County, Minnesota
(Figure 7 Hydric Rating Map)
44.53',5"N 440 53'5'N
Map SGle: 1 : 2,180 if printed on A porb-ait (8.5" x 1 1',) shet.
n, ,Metelsl\030m1zJ180
A psetf\0 lm2g)4m600
Z\ N4apprcjtrtion: WebN4ercator Comercmrdinates: WGSB4 Edqeucs: UTMZonelsNWGSS4
Web Soil Survey
National Cooperative Soil Survey
=
3
B
10t10t2021
Page 1 of 5
440 52 50" N
USDA Natural Resources
- Conservation Service
440 52'50'N
N*
Q c.r
=5,oo
o-
=U)
>^
17)
w)d
OO
=o-G
c
E$z
(5
a
0)
.E
I
d>
9€
t5 /i,
c>-T
>=>\ooiro-
FGt
O.E
I
o',ohg.;
o.=,98
Fb
=o
zo
4tl
p c'r
;€^=o6€l!-
s ; ;lEp
- s r
Ea=E t -*Eff=ci g I EEsc e r€F[;FE sE* s i+;sg fi93tg; FA ElE E :E$iE : F*€t€i+uEE$ g gEAg
i$,:irFetfgEggH€€C:
e' ;efl E€t$* e: c* ts r ;gBE
Tq :Hr scil*fr c* ;; A5 a_ giEg
pp;ss geE€$k re aE EE ER #EEE
E
E
€)
oZEo;
-d=tsq=
=Ytr=osll o)z.Eo-E
=F
@
o-
=od
F-tr l-:
o!;*CE.9abo
-oHH.ii*g eP f*o-6Y)tr4?€
=;-.Y)Y-co Y o N'X b.9tr E f > j E<
oo; f !l \ o)r: + , I rts - f ." dIFdl
€*3
-4-go3 FFG^E sFa-E sss-E fH ,83giltE sEEiSE sBEil8: g
^'P H8 ; ; .e .e : 3 'e A ! o o x ; ; B E: E0: g5 g O e: ? i @ o3: Xs : s s F f Ee € € € i i Ee e" € n i EuU dg ggBE I 5g!.ss,; ; eccsE E ; cri!E< oI I I I z 2 oI I i i 2 2 ot i i i Z Z 9.6@trca=EH.E,Ei,,*nllnntEt I : : I : *.rtrtr.o;E -bd 6<.ng
ozIrlo
IIJJ
o-
=
Hydric Rating by Map Unit-Carver County, Minnesota Figure 7 Hydric Rating Map
Hydric Rating by Map Unit
Map unit symbol Map unit name Rating I Acres in AOI Percent of AOI
CW Cordova-Webster
complex
100 32.0%
EX Essexville sandy loam 0.7100 15.8%
KB Kilkenny-Lester loams, 2
to 6 percent slopes
0
-=--5
100
0.2 5.3%
KE2
I
_l
Totals for Area of lntere:
Lester-Kilkenny
complex, 16lo 22
_ryr""nt rlol"" _ -
Klossner and Muskego
soils, ponded, 0 to 1
percent slopes
T-0.8 19.1%
1.2 27.7%
i
4.3 100.0%
USDA
-
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
10t10t2021
Page 3 of 5
Appendix A
Antecedent Precipitation Data
Minnesota State Climatology Office
5ji.a|e {.lrmatr-rlcgy Cffice , 0f ii{ Divislorr r.:f f,coluq;c,rl ald Wat.<.-r l{cstrrr., r
honrelcurrentconditionsljournal lpastdatalsummarieslagriculturelothersiteslaboutusffiji
Precipitation Worksheet Using Gridded Database
Precipitation data for target wetland location:
county: Carver township number: 116N
township name: Lake Minnewashta range number: 23W
nearest community: Carver Beach section number: 2
Aerial photograph or site visit date:
Friday, October 8,2021
Score using 1981-2010 normal period
Other Resources:
. retrieve daily precipitation data. view radar-based precipitation estimates. view weekly precipitation maps. Evaluating Antecedent Precipitation Conditions (BWSR)
values are in inches
A'R'following a monthly total indjcates a provisional value derived from
radar-based estimates.
first prior month:
September
2021
secono pflor
month:
August
2021
third prror
monIn.
July 2021
estimated precipitation total for this location:?-t3
2.51
7.72R 1.50R
there is a 30% chance this location will have less than:3.09 21A
there is a 30% chance this location will have more than:4.67 5.43 4.17
type of month: dry normat wet ,monthlyscore 3xf =?l 2.3=6 | 1*t=1
multi-month score:
ii li: !) (dry1 10 to 14 (norrlal) 15 to 18 (wet))o = rten,"q1
Minnesota State Climatology Office
:jial€ Clrmatoloqy Oiil<.<:-DllR D:vi:jon of koiort:rai .rrrd yta.r,:rr ilt,:,uiir,,
homelcurrentcondrtionsljoLrrnal lpastclatalsunrmarieslagriculturelothersiteslaboutusffi
Nearest $tation Precipitation Data Retrieval
Minnesota's precipitation data archive is searched fordata closestto a selected target location foreach month. Values
from the site closest to the target location are returned below after clicking the retrieve monthty data or retrieve daily
data buttons. The precipitation data are made up of measured rainfall and the measured liqurd content of snowfall.
Temperature, snowfall, and snow depth data from National Weather Service reporting stations are no longer
retrieved from this application. To obtain those data, see our newest data retrievaltool (May 2014). NationalWeather
service precipitation data continue to be available from this applicatron.
Obtaining data for legal purposes
Guide for colunrn headers in the data table
target location: Carver-Lake minnewashta-Carver Beach 1'l6N 23W 32 (latitude: 44.88459longitude: 93.55124)
I-ir.r i" r"i"Ci tris"il"*ii"""]
years: 2021 w Io 2021 Y
number of missing days allowed per month: s
iEt'"* ffiihrt-d"t" ] f .;"t'il; ;"'rfi ;6-i
resu lts:
Target: T116 R23 52
mon year cc tttN rrw ss
,Jan 2021 l0 116N 23W 15
Peb 2021 r0 116N 23W 15
Mar 2021 10 1l6N 23W 15
Apr 2021 10 116N 23w 13
May 2021 10 116N 23w 15
Jun 2021 l0 116N 23W 15
J:uI 202 1 10 116N 23W 15
Aug 2021 10 l16N 23w 15
Sep 2021 10 116N 23w 15
OcL 202I
Nov 202 1
Dec 2021
nnnn oooooooo
NWS CHAN-NWS
NWS CHAN-NWS
NWS CHAN-NWS
BYRG
BYRG
BYRG
NWS CHAN-NWS
I]YRG
NWS CHAN-NWS
m
m
m
nrp /inahaqt
I .06
2 .36
2 .80
3.29
1 .28
2.lI
7 .28
2.L3
^l -
2 mi .
2 mi.
2 mi.
2 mi.
2 mi .
2 mi.
2 mi.
2 mi.
2 mi.
999 mi.
999 mi.
999 mi.
tor precrprtat on data while the NWS lD' wil always be correct for tho temperature dala lf no PLS info ls supplied the thc 'NWS lD' number app ies 10 at shown data
State Climatology Office - MnDNR - Ecological and Water Resources
Appendix B
Sample Data Sheets
[)rolect/Site 1441 Lake Lucy Rd
WETLAND DETERMINATION DATA FORM - Midwest Region
City/County:Chanhassen
Applicant/Owner: ChadHalbur State IVN
Sampling Date
Sampling Point
10t08t2021
1Up
Investigator(s): Jessica Lillie iectron, Township, Range Sec. 2, T1 16N, R23W
Lanoform (hillslope. terrace, etc.)toeslope Local relief (concave, convex, none)
Slope (%): 2-3%LAI:Long Datum:
Soil Map Unit Name Cordova-Wedbester complex \Wl Classification:
Are climatic/hydrologic conditions of the site typical forthis time of the year? Y (lf no, explain in remarrsl
Are vegetation , or hydrology s;ignificantly disturbed?, soll
Are vegetation _, soil
SUMMARY Or TNIOIruCS
-
, or hydrology_ naturaliy problematic?
convex
Are "normal circumstances"
present? Ycs
(lf needed, explain any answers in remarks.)
Remarks: (Explain alternative procedures here or in a separate report.)
VEGETATION -- Use scientific names of plants.
Hydrophytic vr..getation present?
llydric soil present?
Indicators of wetland hydrology present?
Y
N
N
ls the sampled area within a wetland?
f yes, optional wetland site lD:
Ilqq9tratuO
1 filia americana
(Plot size:30
Absolute Dominan Indicator
% Cover t Species Staus
70 FACU
FACW
80 = Total Cover
FAC
70 = Total Cover
N
N
FAC
72 = Total Cover
0 = Total Cover
2 Fraxinus pennsylvanica 10
70
3
4
5
Saplinq/Shrub stratun (Plot size:
1 Rhamnus catharlrca
t3
2
3
4
5
1_l€rL$rc!m
1 Rhamnus cathaftrca
(Plot size:
60 EAA
FACW
2 Carex pensylvanica UPLN
3 Viola sororia
4 Pilea pumila
5
6
7
8
I
10
Wopdy v4e_sllqlqll
1
(Plot size:30
Dominance Test Worksheet
Number of Dominant Species
that are OBL, FACW, or FAC: 2 (A)
Total Number of Dominant
Spe cies Across all Strata; 3 (B)
Percent of Dominant Species
that are OBL, FACW, or FAC: 66.670/0 (A/B)
Prevalence Index Worksheet
Total % Cover of:
OBLspecies 0 x1=
FAUW specres 12 x2 =
FACspecies -lg5 *g=
FACU species --76- , q =
UPLspec,es 5 x5-
Column totats --ZZl- 61
0---;-
4Os
280
%
I Jt+ (bl
Prevalencc 1n,1ul =114 =3.31
Hydrophytic Vegetation Indicators:
_ Rapid test for hydrophytic vegetation
X Dominance test is >50%
_ Prevalence index is <3.0-
Morphogical adaptations. (provide
supporting data in Remarks or on a
_ separate sheet)
Problematic hydrophytic vegetation"
_ (explain)
-lndicators of hydric soil and wetland hydrology must be
present, unless disturbed or problematic
r-rydrophyttc
vegetation
present? Y
Remarks: (lnclude photo numbers here or on a separate sheet)
US Amy Corps of Engineers Midwest Region
SOIL
Hydric Soil Indicators:
_ Histisol (Al )
_ Histic Epipedon (A2)
_ Black Histic (A3)
_ Hydrogen Sulfide (A+7
_ Stratified Layers (A5)
_2 cm Muck (A10)
__ Depleted Below Dark Surface (A11)
_Thick Dark Surface (A12)
_Sandy Mucky Mineral (S'1 )
_ 5 cm Mucky Peat or Peat (S3)
Sandy Gleyed Matrix (S4)
Sandy Redox (Sti)
Stripped Matrix (S6)
Loamy Mucky Mineral (Fl)
Loamy Gleyed Matrix (F2)
Depleted Matrix (F3)
Redox Dark Surface (F6)
Depleted Dark Surface (F7)
Redox Depressions (FB)
Sampling Point:
lndicators for Problematic Hydric Soils:
_Coast Prairie Redox (A16) (LRR K, L, R)
Dark Surface (57) (LRR K, L)
-lron-Manganese
Masses (Fl2) (LRR K, L, R)
Very Shallow Dark Surface (TF12)
_ Other (explain in remarks)
*lndicators of hydrophytic vegetation and weltand
hydrology must be present, unless disturbed or
problematic
HYDROLOGY
Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.)
MAIII
Color (moist) %Color (moist) % Type- Loc*.
1 0YR2/1
-Type: C = Concentration, D = Depletion, RM = Reduced Matrix, MS= Masked Sand Grains. ..Locatron: pL= pore Lininq, M = Matrix
Restrictive Layer (if
Type.Hydric soil present?
Wetland Hydrology Indicators:
fulfprv Indicators (min
_ Surface Water (A1 )
_ Hlgh Water Table (A2)
_ Saturation (A3)
_ Water Marks (81)
_ Scdiment Deposits (82)
_ Drift Deposits (83)
-Alqal
Mat or Crust (84)
lron Deposits (85)
- lnundation Visible on Aerial lmagery (87)
- Sparsely Vegetated Concavc Surface (BB)
Water-Stained Leaves (Bg)
Aquatic Fauna (B'13)
True Aquatic Plants (814)
Hydrogen Sulfide Odor (Cl )
Oxidized Rhrzospheres on Livrng Roots
(c3)
Presence of Reduced lron (C4)
Recent lron Reduction ln Tilled Soils
(c6)
Thin Muck Surfacc (C7)
Gauge or Well Data (D9)
Other (Explain ln Remarks)
Secondarv I ndicators (mini mum of_ two req.l41qd_
Surface Soil Cracks (86)
Drainage Patterns (1310)
Dry-Season Water Table (C2)
Cray.fish Burrows (C8)
Saturation Visible on Aerial lmagery (C9)
Stunted or Stressed Plants (D1)
Geomorphic Position (D2)
FAC-Neutral Test (D5)
X Depth (inches):
X Depth (inches): >24-
-X- Depth (inches) : >ZT-
Field Observations:
Surface water present?
Water table present?
Saturation present?
(includes capillary fringe)
Yes
Yes
Yes
NO
No
No
Indicators of wetland
hydrology present?N
Describe recorded data (stream gauge, monitoring well, aerial photos, previous inspections), if available:
{emarKS:
US Army Corps of Engineers Midwest Region
Project/Site 1441 Lake Lucy Rd
WETLAND DETERMINATION DATA FORM - Midwest Region
City/Ccrunty: Chanhassen Sampling Date: lOlOBl2O2j
State: MN Sampling Point: 1 Wet
Section, Township, Range: Sec. 2, T1 16N, R23W
Depression Local relief (concave, convex, none)concave
LOng:Datum
PFOlA
, or hydrology_ significantly disturbed? Are ,,normal circumstances
, or hydrology rraturally problematic?present? Ycs
(lf needed, explain any answers in remarks.)
Applicant/Owner: ChadHalbur
Investigator(s): Jessica l-illie
Landform (hillslope, terrace. etc.)
Slope (%): 0-1% Lat:
Soil Map Urt Nrr"C-CouuW"n.GEffi tlWl Classification:
Are climatic/hydrologic conditions of the site typical for this time of the year? Y (lf no, explain in remamsl
Are vegetation _, soil
Are vegetation _, soil
SUDIMARY OF FINDINGS
VEGETATION -- Use scientific names of
Hydrophytic vegetation present? Y
llydric soil present? Y | '.
the sampled area within a wefland? y
lndicators of wetland hydrology present? Y I f yes, optional wetland site lD:
Remarks: (Explain alternative procedures here or in a separate report.)
JU screntrlrc names
Tree Stratum (Plot size 30
1 Fraxinuspennsylvanica
Absolute Dominan lndicator
% Cover t Species Staus
FACW
30 = Total Cover
0 = Total Cover
75
FACW
30
2
3
A
5
Saplinq/Shrub stratun
1
(Plot size IJ
tl_crb stratunl
1 Carex /acusfrls
2
3
4
5
(Plot size
OBL
2 Phalaris arundinacea 20
Dominance Test Worksheet
Number of Dominant Species
that are OBL, FACW, or FAC: 3 (A)
Total Number of Dominant
Species Across all Strata: 3 (B)
Percent of Dominant Species
that are OBL, FACW, or FAC. 100.00% (A/B)
Prevalence Index Worksheet
Iotal ok Cover of:
OBLspecies 75 x1= 75. -----=:--FACW specres 50 x2 = 100
FACspecies O-*S- 0
FACU species --T-* + - O
UPL species --i-" S = 0
Column totats -T25 (nt --Tzs rgr
Prevalence Index = B/A = 130
95 = Total Cover
0 = Total Cover
J
4
5
6
7
8
9
1O
W oo d V, vl ne ! trq_tu_{ll
1
(Plot size:30
Hydrophytic Vegetation Indicators:
_ Rapid test for hydrophytic vegetation
X Dominance test is >50%-I- Prevalence index is <3.0*
Morphogical adaptations. (provide
supporting data in Remarks or on a
_ separate sheet)
Problematic hydrophytic vegetatton.
_ (explain)
'lndicators of hydrjc soil and wetland hydrology must be
present, unless disturbed or problematic
nyoropnyUc
vegetation
present? Y
Remarks: (lnclude photo numbers here or on a separate sheet)
US Amy Corps of Engineers Midwest Region
_ Histic Epipedon (A2)
_ Black Histic (A3)
_ Hydrogen Sulfide (A4)
_ Stratified Layers (A5)
X 2 cm Muck (A10)
_ Depleted Below Dark Surface (Al 1)
_Thick Dark Surface (A12)
_Sandy Mucky Mineral (S'1 )
_ 5 cm Mucky Peat or Peat (S3)
Sandy Gleyed Matrix (S4)
Sandy Redox (Sf;)
Stripped Matrix (56)
Loamy Mucky Mineral (Fl )
Loamy Gleyed Matrix (F2)
Depleted Matrix (F3)
Redox Dark Surface (F6)
Depleted Dark Surface (F7)
Redox Depressions (FB)
Sampling Point:
lndicators for Hydric Soils:
_Coast Prairie Redox (A16) (LRR K, L, R)
Dark Surface (S7) (LRR K, L)
-lron-Manganese
Masses (F12) (LRR K, L, R)
Very Shallow Dark Surface (TF12)
_ Other (explain in remarks)
"lndicators of hydrophytic vegetation and weltarrd
hydrology must be present, unless disturbed or
problematic
HYDROLOGY
Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.)
Mslrg
Color (moist) %
Ecdq&elues
Oolor (moist) % Type' Loc**
10YR2/1
.Type: C = Concentration, D= Depletion, RM = Reduced Matrix, MS= Masked Sand Grains. ..Locatron: PL= Pore Lining, M = Matrrx
rictive Layer (if observed):
Hydric soil present? Y
Wetland Hydrology Indicators:
fuLmarv lndicators (minimum of one is required: check all that applv)
_ Surface Water (Al )
X H,gh Watcr lab e (A2)
X Saturation {43)
_ Water Marks (Bl )
_ Sediment Deposits (82)
_ t)rift Deposrrs (83)
_Algal Mat or Crust (B4)
_ lron Deposits (85)
lnundation Visible on Aerial lmagery (87)
- Sparsely Vegetated Concave Surface (BB)
Water Stainco Leaves (B9l
Aquatic Fauna (813)
True Aquatic Plants (814)
Hydrogen Sulfide Odor (Cl )
Oxidized Rhizospheres on Lrving Roots
(c3)
Presence of Reduced lron (C4)
Recent lron Reduction in Tilled Soils
(c6)
Thin Muck Surface (C7)
Gauge or Well Data (D9)
Other (Explain in Remarks)
S e c o n d a rv I n d i c a to rs ( m i n i m u m pl_!wo1e_qq1re d)
Surface Soil Cracks (BO)
Drainage Patterns (Bl 0)
Dry-Season Water Table (C2)
Crayfish Burrows (CB)
Saturation Visible on Aerial lmagery (C9)
Stunted or Stressed Plants (Dl )
Geomorphic Position (D2)
FAC-Neutral Test (D5)
Depth (inches):
Depth (inches): 6-
Depth (inches): 0
-
Frelo ubservattons:
Surface water present?
Water table present?
Saturation present?
(includes capillary fringe)
Yes
Yes
Yes
NoX
--X- No
-X- No
Indicators of wetland
hydrology present? y
Describe recorded data (stream gauge, monitoring well, aerial photos, previous inspections), if available:
\emarKS:
US Army Corps of Engineers Midwest Region
f)roject/Site 1441 Lake Lucy Rd
WETLAND DETERMINATION DATA FORM - Midwest Region
City/County: Chanhassen Sampling Date: 1OlOBl2O21
State: IVN Sampling Point: 2 Up
Section, Township, Range: Sec. 2, Tl 16N, R23W
footslope Local relief (concave, convex, none)convex
LOng:Datum
Applicant/Owner. ChadHalbur
lnvestigator(s): Jessica Lillie
Landform (hillslope, terrace, etc. )
Slope (%): 2-3fo Latr
Soil Map Unil Name Cordova-Webster Complex \Wl Classification
Are climatic/hydrologic conditions of the site typical for thrs time of the year? Y (lf no, explain in remarks)
Are vegetation _, soil
Are vegetation _, soil
SUMMARY OF FINDINGS
, or hydrology_ significantly disturbed?
, or hydrology naturally problematrc?
Are "normal circumstances"
present? Yes
(lf needed, explain any answers in remarks.)
VEGETATION -- Use scientific names of plants.
Hydrophytic vegetation present?
Hydric soil present?
N
N ls the sampled area within a wetland? N
Indicators of wetland hydrology present? N I f yes. optional wetland site lD:
Remarks: (Explain alternative procedures here or in a separate report.)
Tree Slratum
1 Tilia americana
(Plot size 30
Absolute Dominan lndicator
% Cover t Spectes Staus
FACU
30 = Jotal Cover
EAA
30 = Total Cover
45
10
30
2
3
/
5
S?plhE_Shrub stratun
1 Rhamnus cathaftica
(Plot size tc
30
llsbslrclurl
1 Carex pensylvanica
2_
3
4
5
4
5
6
7
B
9
10
(Plot size
2 Rhamnus cathartica FAC
60 = Total Cover
0 = Total Cover
N
N
UPL
OBL3 Carex /acustrls
Wqody v_pe_ slralUry
1
/Plnt cizo'30
Dominance Test Worksheet
Number of Dominant Species
that are OBL, FACW, or FAC: 1 (A)
Total Number of Dominant
Species Across all Strata: 3 (B)
Percent of Dominant Species
that are OBL, FACW, or FAC: 33.33% (A/B)
Prevalence Index Worksheet
Iotal o/o Cover of:
OBLspecres 5 x1=
FACW species 0 x2 =
FACspecies - +O "S=i-AUU spectes 30 x 4 .-
UPL species --l!--1 5 =
Column totats --176-
1n;
5
O
1n
ao
2n
+zo tel
Prevalence lna"" = g/A =3.92
Hydrophytic Vegetation Indicators:
_ Rapid test for hydrophytic vegetation
_ Dominance test is >50%
_ Prevalence index is <3.0.
Morphogical adaptations. (provide
supporting data in Remarks or on a
_ separate sheet)
Problematic hydrophytic vegetation.
_ (explain)
'lndicators of hydric soll and wetland hydrology must be
present, unless disturbed or problematic)
l-rydrophyttc
vegetation
present? N
Remarks: (lnclude photo numbers here or on a separate sheet)
US Amy Corps of Engineers Midwest Region
SOIL
Hydric Soil Indicators:
_ Histisol (Al )
_ Histic Epipedon (A2)
_ Black Histic (A3)
._ Hydrogen Sulfide (A4)
__ Stratified Layers (A5)
_2 cm Muck (A10)
_- Depleted Below Dark Surface (A11)
_Thick Dark Surface (A12)
_Sandy Mucky Mineral (Sl)
_ 5 cm Mucky Peat or Peat (S3)
Sandy Gleyed Matrix (54)
Sandy Redox (55)
Stripped Matrix (56)
Loamy Mucky Mineral (F1)
Loamy Gleyed Matrix (F2)
Depleted Matrix (F3)
Redox Dark Surface (F6)
Depleted Dark Surface 1F7)
Redox Depressions (F8)
Indicators for Problematic Hydric Soils:
_Coast Prairie Redox (A16) (LRR K, L, R)
Dark Surface (57) (LRR K, L)
-lron-Manganese
Masses (F12) (LRR K, L, R)
Very Shallow Dark Surface (TF12)
_Other (explain in remarks)
*lndicators of hydrophytic vegetation and weltand
hydrology must be present, unless disturbed or
problematic
HYDROLOGY
Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.)
l-l o nth
( | nches)Color (moist) % Type. Loc**
.Type: C =Concentration, D= Depletion, RM= Reduced Matrix, MS=MaskedSandGrains. -.Location: pL=pore Lining, M =Matrix
Restrictive Layer (if
Type,
Depth (inches):
Hydric soil present?
Wetland Hydrology Indicators:
Prrmaly Indrcators (minimum of one is required: check all that applv)
_ Surface Water (A1)
_ High Water Table (A2)
_ Saturation (A3)
_ Water Marks (Bl )
_ Sediment Deposits (82)
_ Drift Deposits (83)
_ Algal Mat or Crust (84)
lron Deposits (85)
- Inundation Vrsible on Aerial lmagery (87)
- Sparsely Vegetated Concave Surface (88)
Water-stained Leaves (Bg)
Aquatic Fauna (813)
True Aquatic Plants (814)
Hydrogen Sulfide Odor (Cl )
Oxidized Rhizospheres on Living Roots
(ca)
Presence of Reduced lron (C4)
Recenl lron Reduction n Tilled Soils
(c6)
I'hin Muck Surface (C7)
Gauge or Well Data (D9)
Other (Explain in Remarks)
S eco n d a ry I n d i cato rs ( m i n i m u m_ ptWp_ 15>_qq rlq!.)
SurJace Soil Cracks (86)
Drainage Patterns (Bl 0)
Dry-Season Water Table (C2)
Crayfish Burrows (C8)
Saturation Visible on Aerial lmagery (C9)
Stunted or Slressed Plants (Dl )
Geomorphic Position (D2)
FAC-Neutral Test (D5)
X Depth (inches):
F Depth (inches): ----;A---J- Oeptn (inches): - >24-
rrero uDservaltons:
Surface water present?
Water table present?
Saturatron present?
(includes capillary fringe)
Yes
Yes
Yes
No
NO
No
Indicators of wetland
hydrology present?N
Describe recorded data (stream gauge, monitoring well, aerial photos, previous inspections), if available:
xe marKS:
US Army Corps of Engineers Midwest Region
Project/Site 1441 Lake Lucy Rd
WETLAND DETERMINATION DATA FORM - Midwest Region
City/County: Chanhassen Sampling Date: 1Ol0Bl2O21
State: MN Sampling Point: 2.--Wet
iection, Township, Range: Sec.2, T116N, R23W
Depression Local relief (concave, convex, none): concave
present? Yes
(lf needed, explain any answers in remarks.)
Applicant/Owner ChadHalbur
Investigator(s): Jessica Lillie
Landform (hillslopc. terrace, etc.):
Slope (%): 0 Lat
Soil Map Unit Name Klossner and Muskego soils, ponded \Wl Classification:
Are climatlc/hydrologtc conditions of the site typical forthis time of the year? Y (lf no, exptain in remamsl
Datum:
PABH
orhydrology_ significantlydisturbed? Are,,normalcircumstances,,Are vegetation , soil
Are vegetation _, soil , or hydrology naturally problematic?
SUMMARY OF FINDINGS
Hydrophytic vegetation present?
Hydric soil present?
Y
Y ls the sampled area within a wetland? Y
Indicators of wetland hydrology present? y I f yes, optional weiland site lD:
Remarks: (Explain aiternative procedures here or in a separate report.)
VEGETATION -- Use scientific names of olants.
Tree Stratum (Plot size:30
Absolute Dominan Indicator
% Cover t Species Staus
1 Fraxinuspcnnsylvanica 10 FACW
z
3
A
5
10 = l-otal Cover
SapjrndShruustrelq! (PIot size:
1 Rhamnus cathaftica
IJ
10 FAC
2
3
4
5
10 = Total Cover
f erb $ralut
1 Lemna obscura
(Plot size:
20 OBL
2 Carex /acuslris 10 OBL
Dominance Test Worksheet
Number of Dominant Species
thal are OBL, FACW, or FAC: 5 (A)
Total Number of Dominant
Specjes Across all Strata: 5 (B)
Percent of Dominant Species
that are OBL, FACW, or FAC: '100.00% (A/U)
Prevalence Index Worksheet
Total % Cover of:
OBL species 35 x 1 =. -----:=--I-ACW species 25 x2'-
FAC species --lO-":
=.-------:-FAUUSpecres U x4-
UPL species --l-r S =
Column totats --)O-
1n1
35
50
3O
0
0
rrs lni
Prevalence tna": g/A 1.64
ypna FACW
4
5
6
7
B
I
10
Typha angustifolia FACW
Persicaria amphibra OBL
50 = Total Cover
Wqodj vine str_alulir
1
(Plot size:30
Hydrophytic Vegetation Indicators:
_ Rapid test for hydrophytic vegetation
X Dominance test ls >50%
-I-Prevalence index is <3 O.
Morphogical adaptations. (provide
supporting data in Remarks or on a
_ separate sheet)
Problematic hydrophytic vegetation.
_ (explain)
"lndicators of hydric soil and wetiand hydrology must be
present, unless disturbed or problematic
z
0 = Total Cover
Hydrophytic
vegetation
present? Y
Remarks: (lnclude photo numbers here or on a separate sheet)
US Amy Corps of Engineers Midwest Region
sorL
Hydric Soil Indicators:
Histisol (Al )
_ Histic Epipedon (A2)
_ Black Histic (A3)
_ Hydrogen Sulfide (A4)
_ Stratified Layers (A5)
X 2 cm Muck (A10)
_ Depleted Below Dark Surface (Al l )
_Thick Dark Surface (A12)
_Sandy Mucky Mineral (Sl)
_ 5 cm Mucky Peat or Peat (S3)
Sandy Gleyed Matrix (54)
Sandy Redox (Sli)
Stripped Matrix (S6)
Loamy Mucky Mineral (Fl)
Loamy Gleyed Matrix (F2)
Depleted Matrix (F3)
Redox Dark Surface (F6)
Depleted Dark Surface (F7)
Redox Depressions (FB)
Sampling Point:2 Wet
Indicators for Problematic Hydric Soils:
_Coast Prairie Redox (A16) (LRR K, L, R)
Dark Surface (S7) (LRR K, L)
-lron-Manganese
Masses (F12) (LRR K, L, R)
Very Shallow Dark Surface (TF12)
_ Other (explain in remarks)
*lndicators of hydrophytic vegetation and weltarrd
hydrology must be present, unless disturbed or
problematic
HYDROLOGY
le Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.)
M4!I
Color (moist) %Color (moist) % Type- Loc"-
1 0YR2/1
10YRzi 1
llype: C = Concentration, D= Depletion, RM = Reduced Matrix, MS = MaskedSand Grains. ..Location: pL= pore Lininq, M = Matrix
Hydric soil present?
Wetland Hydrology Indicators:
P!!1arv Indicators (minl
X Surface Water (Al )
X Hrgh Water Table (A2)
X Saturation (A3)
_ Water Marks (Bl )
_ Sedrment Deposits (B2)
_ Drift Deposrts (U3)
_Algal Mat or Crrst 1841
_ lron Deposits (85)
Inundation Visible on Aerial lmagery (87)
- Sparsely Vegetated Concave Surface (ts8)
Warer-Stained Leaves (Bg)
Aquatic Fauna (813)
True Aquatic Plants (B14)
Hydrogen Sulfide Odor (Cl )
Oxidized Rhizospheres on Living Roots
(ca)
Presence of Reduced lron (C4)
Recent lron Reduction in Tilled Soils
(c6)
Thin Muck Surface (C7)
Gauge or Well Data (D9)
Other (Explain in Remarks)
Secondarv Indrcators (minimum of two requi.red.)
Surface Soil Cracks (86)
Drainage Patterns (t3 1 0)
Dry-Season Water Table (C2)
Crayfish Burrows (C8)
Saturation Visible on Aerial lmagery (C9)
Stunted or Stressed Plants (D 1 )
Geomorphic Position (D2)
FAC-Neutral Test (D5)
Surface water present?
Water table present?
Saturation present?
(includes capillary fringe)
Yes X
Yes --T-
Yes ---T-
Depth (inches): 0
Depth (inches):
-T-Deptn iinchesj: ----- 0--
No
No
No
Indicators of wetland
hydrology present?Y
Describe recorded data (stream gauge, monitoring well, aerial photos, previous inspections), if available:
l{emarks
US Army Corps of Engineers Midwest Region
Appendix C
Site Photographs
Appendix C Site Photographs
Basin L
t-U p
1_Wet
Basin 2
2-U p
2 Wet
Appendix D
Wetland Type and Boundary Approval Forms
Project Name and/or Number:
PART ONE: Applicant Information
lf applicant is an entity (company, government entity, partnership, etc.), an authorized contact person must be identified. lf the
applicant is using an agent (consultant, lawyer, or otherthird party) and has authorized them to act on their behalf, the agent s
contact information must also be provided.
Applicant/Landowner Name: Dlanne G. Morin
Mailing Address: 1441 Lake Lucy Rd, Chanhassen, MN 55317
Phone: 952-474-It86
E-mailAddress: gayle.morin@gmail.com
Authorized Contact (do not complete if same as above): Chad Halbur
Mailing Address: 4470 W 78th Street Circle, Suite 200, Bloomington, MN 55435
Phone: 6t2-462-3072
E-mailAddress: Chalbur@cornerstonetrust.net
Agent Name: Wayne Jacobson, WDC, pSS Jacobson Environmental
Maifing Address: 5B2L Humboldt Ave N Brooklyn Center, MN 55430
Phone: 612-802-661,9
E-mailAddress: jacobsonenv@msn,com
PART TWO: Site Location Information
County: Carver County City/Township: Chanhassen
Parcel lD and/or Address: 1441 Lake Lucy Rd, Chanhassen, MN 55317
Legal Description (Section, Township, Range): Section 2,TtI6 N, R23W
Lat/Long (decimal degrees):
Attach a map showing the location of the site in relation to local streets, roads, highways.
Approximate size of site (acres) or if a linear project, length (feet): 4.9 acres
lf you'know that your proposal will require an individual Permit from the U,S. Army Corps of Engineers, you must provide the
namesandaddressesofall propertyownersadjacenttotheprojectsite. Thisinformationmaybeprovidedbyattachingalistto
your application or by using block 25 of the Application for Department of the Army permit which can be obtained at:
http:/lwww,mvp.usace.armv.mil/Portals/57ldocs/resulatorv/ReeulatorvDocs/engform 4345. zO12oct.pdf
PART THREE: General Project/Site Information
lf this application is related to a delineation approval, exemption determination, jurisdictional determination, or other
correspondence submitted prior to this application then describe that here and provide the Corps of Engineers project number.
Describe the project that is being proposed, the project purpose and need, and schedule for implementation and completion. Theproject description must fully describe the nature and scope of the proposed activity including a description of all project elementsthat effect aquatic resources (wetland, lake, tributary, etc.) and must also include plans and cross section or profile drawings
shovrling the location, character, and dimensions of all proposed activities and aquatic resource impacts.
L Minnesota Interagency water Resource Application Form Februarv 201,4 Page 3 of 1L
l Project Name and/or Number:
PART FOUR: Aquatic Resource lmpactl Summary
lf your proposed project involves a direct or indirect impact to an aquatic resource (wetland, lal<e, tributary, etc.) identify each
impact in the table below. Include all anticipated impacts, including those expected to be temporary. Attach an overhead view map,
aerial photo, and/or drawing showing all of the aquatic resources in the project area and the location(s) of the proposed impacts.
Label each aquatic resource on the map with a reference number or letter and identify the impacts in the following table.
1lf impactsaretemporary; enterthedurationoftheimpactsindaysnexttothe"T". Forexample,aprojectwithatemporaryaccessfill that
would be removed after 22O days would be entered "T (220\" .
2lmpacts less than 0.0L acre should be reported in square feet. lmpacts 0.0L acre or greater should be reported as acres and rounded to the
nearest0.01 acre. Tributaryimpactsmustbereportedinlinearfeetof impactandanareaof impactbyindicatingfirstthelinearfeetof impactalong'theflowlineofthestreamfollowedbytheareaimpactinparentheses). Forexample,aprojectthatimpacts50feetofastreamthatis6
feet rry.ide would be reported as 50 ft (300 square feet).
]].hit,1; e1n"t:1y only applicable if you are applying for a de minimis exemption under MN Rules 8420.0420 Subp, 8, otherwise enter ,,N/A,,.
aUse Wetland Plants and Plant Community Types of Minnesoto qnd Wisconsin 3rd Ed. as modified in MN Rules g420.0405 Subo, 2.sReferto Majorwatershed and Bank service Area maps in MN Rules g42o.os22subp. 7.
lf any of the above identified impacts have already occurred, identify which impacts they are and the circumstances associateo
with each:
PART FIVE: Applicant Signature
f, cfreckhereifyouarerequestingapre-applicationconsultationwiththeCorpsandLGUbasedontheinformationvouhave
provi.ded. Regulatory entities will not initiate a formal application review if this box is checked.
By signature below, I attest that the information in this application is complete and accurate. I further attest that I possess the
authority to undertake the work described herein.
Signatu re:Date: t0/L1,/202L
I hereby authorize Jacobson Environmental to act on my behalf as my agent in the processing of this application and to furnish,
upon request, supplemental information in support of this application.
1 The:term "impact" as used in this joint application form is a generic term used for disclosure purposes to identify
activities that may require approval from one or more regulatory agencies. For purposes of this form it is not meant toi indicate whether or not those activities may require mitigation/replacement.
I Minnesota Interagency water Resource Application Form Februarv 201,4
Aquatic Resource
lD (as noted on
ove,r'head v ew)
Aquatic
Resource Type
(wetland, lake,
tributary etc.)
Type of lmpact
(fill, excavate,
dra in, or
remove
vegetation)
Duration of
lmpact
Permanent (P)
or Temporary
{T)'
Size of lmpact2
Overall Size of
Aquatic
Resource 3
Existing Plant
Community
Type(s) in
lmpact Areaa
County, Major
Watershed #,
and Bank
Service Area #
of lmpact Area:
Page 4 of LL
Project Name and/or Number:
Attachment A
Request for Delineation Review, Wetland Type Determination, or
J urisdictional Determination
By submission of the enclosed wetland delineation report, lam requesting thatthe U.S. Army Corps of Engineers, St. paul District
(Corps) and/or the Wetland Conservation Act Local Government Unit (LGU) provide me with the following (check allthat apply):
I Wetland Type Confirmation
ffi Oelineation Concurrence. Concurrence with a delineation is a written notification from the Corps and a decision from the LGU
concurring, not concurring, or commenting on the boundaries of the aquatic resources delineated on the property. Delineation
concUrrences are generally valid for five years unless site conditions change. Under this request alone, the Corps will not adoress
the jurisdictional status of the aquatic resources on the property, only the boundaries ofthe resources within the review area
(including wetlands, tributaries, lakes, etc.).
I ereliminary Jurisdictional Determination. A preliminary jurisdictional determination (pJD) is a non-binding written indicatron
from the Corps that waters, including wetlands, identified on a parcel may be waters of the United States. For purposes of
computation of impacts and compensatory mitigation requirements, a permit decision made on the basis of a pjD will treat allwatersandwetlandsinthereviewareaasiftheyarejurisdictional watersoftheU.S. pJDsareadvisoryinnatureandmavnotbe
appealed.
l-l Approved Jurisdictional Determination. An approved jurisdictional determination (AJD) is an official Corps determination thatjurisdictional waters of the United States are either present or absent on the property. AJDs can generally be relied upon by the
affected party for five years. An AJD may be appealed through the Corps administrative appeal process.
In order for the Corps and LGU to process your request, the wetland delineation must be prepared in accordance with the 19g7
Corpsof EngineersWetlandDelineationManual,anyapprovedRegional SupplementstothelgBTManual,andthe Guidelinesfor
Submitting Wetlond Delineotions in Minnesoto (2013).
http://www. mvp. usa ce.a rmy. mil/M issiQns/Regu lato:^v/D_elineationJ DGu ida nce.aspx
Minnesota Interagency water Resource Application Form February 2ol4 Page 5 of L1
MnRAM_3.2_Score_Sheet.xls
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
3637
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
A B C D E F G H I J K L M N P
MnRAM 3.2 Digital Worksheet, Side 2
Lake Lucy W1
Question Description Rating
Highest-rated:
1 Veg. Table 2, Option 4 0.10 0
TOTAL VEG Rating 0.1 L
4 Listed, rare, special plant species?n next
5 Rare community or habitat?n next
6 Pre-European-settlement conditions?n next
7 hydrogeo & topo #N/A
8 Water depth (inches)
Water depth (% inundation)
9 Local watershed/immedita drainage (acres)
10 Existing wetland size 0.266
11 SOILS: Up/Wetland (survey classification + site)
12 Outlet characteristics for flood retention b 0.5
13 Outlet characteristics for hydrologic regime b 0.5
14 Dominant upland land use (within 500 ft)b 0.5 0.5
15 Soil condition (wetland) a 1
16 Vegetation (% cover)100%H 1
17 Emerg. veg. flood resistance b 0.5
18 Sediment delivery b 0.5
19 Upland soils (based on soil group)b 0.5
20 Stormwater runoff pretreatment & detention b 0.5 0.5
21 Subwatershed wetland density b 0.5
22 Channels/sheet flow a 1
23 Adjacent naturalized buffer average width (feet)100 M WQ 0.1 M 0.5
24 Adjacent Area Management: % Full 100%1 1 1
adjacent area mgmt: % Manicured 0%0
adjacent area mgmt: % Bare 0%0
25 Adjacent Area Diversity & Structure: % Native 90%0.9 2 0.95
adjacent area diversity: % Mixed 10%0.05
adjacent area diversity: % Sparse/Inv./Exotic 0%0
26 Adjacent Area Slope: % Gentle 50%0.5 3 0.71
adjacent area slope: % Moderate 40%0.2
adjacent area slope: % Steep 10%0.01
27 Downstream sensitivity/WQ protection a 1
28 Nutrient loading b 0.5
29 Shoreline wetland? N N
30 Rooted shoreline vegetation (%cover )Enter a percentage
31 Wetland in-water width (in feet, average)Enter a percentage
32 Emergent vegetation erosion resistance Enter valid choice
33 Shoreline erosion potential Enter valid choice
34 Bank protection/upslope veg. Enter valid choice
35 Rare Wildlife N N
36 Scarce/Rare/S1/S2 local community N N
37 Vegetation interspersion cover (see diagram 1)1 L 0.1
38 Community interspersion (see diagram 2)1 L 0.1 0
39 Wetland detritus b 0.5
40 Wetland interspersion on landscape b 0.5 0.5
41 Wildlife barriers c 0.1
42 Amphibian breeding potential-hydroperiod I 0
43 Amphibian breeding potential--fish presence c 0.1
44 Amphibian & reptile overwintering habitat c 0.1
45 Wildlife species (list)
46 Fish habitat quality N/A N/A
47 Fish species (list)
48 Unique/rare educ./cultural/rec.opportunity N N
49 Wetland visibility c 0.1
50 Proximity to population Y 1
51 Public ownership c 0.1
52 Public access c 0.1
53 Human influence on wetland c 0.1
54 Human influence on viewshed c 0.1
55 Spatial buffer c 0.1
56 Recreational activity potential c 0.1
57 Commercial crop--hydrologic impact c 0.1Digital worksheet, section IIDigital worksheet, section IUser
entry This comes in from Side 1 automatically using the
weighted average. To use the highest rated veg.
Community rating, please manually overwrite that
value (shown to the right) into the field at E5.
Enter data starting here. Yellow
boxes are used in calculations.
Scroll
down to
answer
more
questions
and see
formula
calculations
MnRAMW1_T2.xls 1 3/22/2022
MnRAM_3.2_Score_Sheet.xls
71 A B C D E F G H I J K L M N P
MnRAMW1_T2.xls 2 3/22/2022
MnRAM_3.2_Score_Sheet.xls
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
9091
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
A B C D E F G H I J K L M N P
58 GW - Wetland soils D R or D 1
59 GW - Subwatershed land use R R or D 0.1
60 GW - Wetland size and soil group D R or D 1
61 GW - Wetland hydroperiod R R or D 0.1
62 GW - Inlet/Outlet configuration R R or D 0.1
63 GW - Surrounding upland topographic relief D R or D 1
64 Restoration potential w/o flooding N Y or N 3.3
65 Landowners affected by restoration E a b c Enter valid choice
66A Existing wetland size (acres) [from #10]0.266 __ acres
66B Total wetland restoration size (acres) __ acres 0.1
66C (Calculated) Potential New Wetland Area [B-A] -0.266 __ acres ####
67 Average width of naturalized upland buffer (potential)0 __ feet 0.1 value: ####
68 Likelihood of restoration success a b c Enter valid choice
69 Hydrologic alteration type Outlet, Tile, Ditch, GW pump, Wtrshd div., Filling
70 Potential wetland type (Circ. 39) 1, 2, 3, 4, 5, 6, 7, 8
71 Wetland sensitivity to stormwater b E a b c
72 Additional stormwater treatment needs c a b c
Function Name Formula shown to the right.
Vegetative Diversity/Integrity 0.10 L
Hydrology - Characteristic 0.63 Med
Flood Attenuation 0.62 Med
Water Quality--Downstream 0.62 Med
Water Quality--Wetland 0.40 Med
Shoreline Protection N/A N/A
Characteristic Wildlife Habitat Structure 0.33 0.33 Med
Maintenance of Characteristic Fish Habitat ######N/A N/A
Maintenance of Characteristic Amphibian Habitat 0.00 N/A
Aesthetics/Recreation/Education/Cultural 0.21 0.21 Low
Commercial use 0.10 Low 0.1
Special Features listing: - ____
Groundwater Interaction indeterminate GW source
Groundwater Functional Index no special indicators
Restoration Potential (draft formula) N/A N/A
Stormwater Sensitivity (not active)Additional questions% effectively drained:Final RatingRating CategoryFunctional Rating SummariesRaw scoreMnRAMW1_T2.xls 3 3/22/2022
MnRAM_3.2_Score_Sheet.xls
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
3637
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
Q R S T U V W X Y Z AA AB AC AD AE AF
Highest-rated:
I Depressional/Isolated
FT Depress'l/Flow-through
Trib Depress'l/Tributary
R Riverine
Lac Lacustrine
Peat Peatland
Flood Floodplain
S Slope
O Other
Habitat n/a formulator
E49 0.00 "=IF(E49="n/a",1,0)"
E50 0.00 "=IF(E50="n/a",1.5,0)"
E51 0.00 "=IF(E51="n/a",2,0)"
Add 0.00
CC Rtg Ltr
1 0.1 L
2 0.1 L
3 0.5 M
4 0.5 M
5 1 H
6 0.5 M
7 1 H
8 0.1 L
N/A N/A N/A
- "Pick an example from the image"
1 L 0.1
2 M 0.5
3 H 1
4 H 1
N/A N/A N/A
- "Pick an example from the image"
These are supplemental Lookup Tables and
Intermediary formulas:
Community Interspersion
LookUp
Open Water Interspersion
LookUp
Hydrogeology and Topography LookUp
MnRAMW1_T2.xls 4 3/22/2022
MnRAM_3.2_Score_Sheet.xls
71 Q R S T U V W X Y Z AA AB AC AD AE AF
MnRAMW1_T2.xls 5 3/22/2022
MnRAM_3.2_Score_Sheet.xls
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
9091
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
Q R S T U V W X Y Z AA AB AC AD AE AF
Vegetative formula
"=C4", the Weighted Average Option 4 from Veg. Worksheet
Characteristic Hydrology formula
"=(E17+E18+E19+F24)/4" F24 is the reverse rating
Flood Attenuation Formula breakout (not linked to D72) (E16 is reverse rated)
n/a formula is:
none 0.616667 ((E16+(F18+E23)/2+(E19+E22)/2+(E24+E25)/2+(F20+E21+E26)/3)/5)
flood outlet 0.645833 ((F18+E23)/2+(E19+E22)/2+(E24+E25)/2+(F20+E21+E26)/3)/4
F-T 0.65 ((E16+(F18+E23)/2+(E19+E22)/2+(E24+E25)/2+ E26)/5)
both 0.6875 ((F18+E23)/2+(E19+E22)/2+(E24+E25)/2+ E26)/4
Water Quality--Wetland
"=(D6*2+E18+F24+(G27+G28+G34)/3+E22+E40)/7"
Shoreline Protection
"=IF(E41="y",((E42+E43+E44+E45+E46)/5),"N/A")"
N/A H38 =Habitat formula breakout/lookup (E22 is RR) Special Features Bump is below.
none 0 0.331667 (D6*2+E51+F49+F50+E52+E53+(I27+G28+G31)/3+E17+F24)/10
49 1 0.357407 (D6*2+E51+ F50+E52+E53+(I27+G28+G31)/3+E17+F24)/9
50 1.5 0.357407 (D6*2+E51+F49+ E52+E53+(I27+G28+G31)/3+E17+F24)/9
51 2 0.312963 (D6*2+ F49+F50+E52+E53+(I27+G28+G31)/3+E17+F24)/9
49&50 2.5 0.389583 (D6*2+E51+ E52+E53+(I27+G28+G31)/3+E17+F24)/8
49&51 3 0.339583 (D6*2+ F50+E52+E53+(I27+G28+G31)/3+E17+F24)/8
50&51 3.5 0.339583 (D6*2+ F49+ E52+E53+(I27+G28+G31)/3+E17+F24)/8
49&50&51 4.5 0.37381 (D6*2+ E52+E53+(I27+G28+G31)/3+E17+F24)/7
Characteristic Fish Habitat formula
Characteristic Amphibian Habitat formula (see Lookup breakout below)
E112=VLOOKUP(E54,T116:U117,2,FALSE)
Amphibian Habitat Formula Breakout
0 0.00 Amphibian breeding is controlling factor
1 0.04 "=((E55)*(E56+(I27*2)+E53+E18+F24)/6)"
Aesthetics/Rec/Ed/Cultural formula
"=E69" Commercial use reflects just the rating for the question.
Special Features Bump-up reference table
a Fish Habitat=E
b Veg=E
c Aesthetics=E
d n AND #5=Y, then Wildlife=E
g Wildlife/Fish=E
h Aesthetics=E
I Veg=E
j N AND #35 =Y, Wildlife=E
qindeterminate GW sourceGW=recharge, GW=E
rindeterminate GW sourceY and GW=recharge, GW=E
u Aesthetics=E
Recharge/Discharge Tendency
R 0.1
D 1
- Enter "R" or "D"
"IF(E65=".1",(E62+E63+E64+2*E65+E66+E67+E68)/8,(E61+E62
+E63+E64+E65+E66+E67+E68)/8)"
"=IF(D41="Y",((E58*2+G28+E22+F24+E40+E43+E42+F45)/9),((
E58*2+G28+E22+F24+E40)/6))"These are the formulas for the f inal functional ratings shown at the MnRAMW1_T2.xls 6 3/22/2022
MnRAM_3.2_Score_Sheet.xls
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
3637
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
A B C D E F G H I J K L M N P
MnRAM 3.2 Digital Worksheet, Side 2
Lake Lucy W2
Question Description Rating
Highest-rated:
1 Veg. Table 2, Option 4 0.10 0
TOTAL VEG Rating 0.1 L
4 Listed, rare, special plant species?n next
5 Rare community or habitat?n next
6 Pre-European-settlement conditions?n next
7 hydrogeo & topo #N/A
8 Water depth (inches)
Water depth (% inundation)
9 Local watershed/immedita drainage (acres)
10 Existing wetland size 2.22
11 SOILS: Up/Wetland (survey classification + site)
12 Outlet characteristics for flood retention b 0.5
13 Outlet characteristics for hydrologic regime b 0.5
14 Dominant upland land use (within 500 ft)b 0.5 0.5
15 Soil condition (wetland) a 1
16 Vegetation (% cover)100%H 1
17 Emerg. veg. flood resistance b 0.5
18 Sediment delivery b 0.5
19 Upland soils (based on soil group)b 0.5
20 Stormwater runoff pretreatment & detention b 0.5 0.5
21 Subwatershed wetland density b 0.5
22 Channels/sheet flow b 0.5
23 Adjacent naturalized buffer average width (feet)50 L WQ 0.1 M 0.5
24 Adjacent Area Management: % Full 80%0.8 2 0.9
adjacent area mgmt: % Manicured 20%0.1
adjacent area mgmt: % Bare 0%0
25 Adjacent Area Diversity & Structure: % Native 80%0.8 2 0.9
adjacent area diversity: % Mixed 20%0.1
adjacent area diversity: % Sparse/Inv./Exotic 0%0
26 Adjacent Area Slope: % Gentle 90%0.9 2 0.95
adjacent area slope: % Moderate 10%0.05
adjacent area slope: % Steep 0%0
27 Downstream sensitivity/WQ protection b 0.5
28 Nutrient loading b 0.5
29 Shoreline wetland? N N
30 Rooted shoreline vegetation (%cover )Enter a percentage
31 Wetland in-water width (in feet, average)Enter a percentage
32 Emergent vegetation erosion resistance Enter valid choice
33 Shoreline erosion potential Enter valid choice
34 Bank protection/upslope veg. Enter valid choice
35 Rare Wildlife N N
36 Scarce/Rare/S1/S2 local community N N
37 Vegetation interspersion cover (see diagram 1)1 L 0.1
38 Community interspersion (see diagram 2)1 L 0.1 0
39 Wetland detritus b 0.5
40 Wetland interspersion on landscape a 1 0.5
41 Wildlife barriers c 0.1
42 Amphibian breeding potential-hydroperiod A 1
43 Amphibian breeding potential--fish presence c 0.1
44 Amphibian & reptile overwintering habitat b 0.5
45 Wildlife species (list)
46 Fish habitat quality N/A N/A
47 Fish species (list)
48 Unique/rare educ./cultural/rec.opportunity N N
49 Wetland visibility c 0.1
50 Proximity to population Y 1
51 Public ownership c 0.1
52 Public access c 0.1
53 Human influence on wetland c 0.1
54 Human influence on viewshed c 0.1
55 Spatial buffer b 0.5
56 Recreational activity potential b 0.5
57 Commercial crop--hydrologic impact c 0.1Digital worksheet, section IIDigital worksheet, section IUser
entry This comes in from Side 1 automatically using the
weighted average. To use the highest rated veg.
Community rating, please manually overwrite that
value (shown to the right) into the field at E5.
Enter data starting here. Yellow
boxes are used in calculations.
Scroll
down to
answer
more
questions
and see
formula
calculations
MnRAMW2_T3.xls 1 3/22/2022
MnRAM_3.2_Score_Sheet.xls
71 A B C D E F G H I J K L M N P
MnRAMW2_T3.xls 2 3/22/2022
MnRAM_3.2_Score_Sheet.xls
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
9091
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
A B C D E F G H I J K L M N P
58 GW - Wetland soils D R or D 1
59 GW - Subwatershed land use R R or D 0.1
60 GW - Wetland size and soil group D R or D 1
61 GW - Wetland hydroperiod R R or D 0.1
62 GW - Inlet/Outlet configuration R R or D 0.1
63 GW - Surrounding upland topographic relief D R or D 1
64 Restoration potential w/o flooding N Y or N 3.3
65 Landowners affected by restoration E a b c Enter valid choice
66A Existing wetland size (acres) [from #10]2.22 __ acres
66B Total wetland restoration size (acres) __ acres 0.1
66C (Calculated) Potential New Wetland Area [B-A] -2.22 __ acres ####
67 Average width of naturalized upland buffer (potential)0 __ feet 0.1 value: ####
68 Likelihood of restoration success a b c Enter valid choice
69 Hydrologic alteration type Outlet, Tile, Ditch, GW pump, Wtrshd div., Filling
70 Potential wetland type (Circ. 39) 1, 2, 3, 4, 5, 6, 7, 8
71 Wetland sensitivity to stormwater b E a b c
72 Additional stormwater treatment needs c a b c
Function Name Formula shown to the right.
Vegetative Diversity/Integrity 0.10 L
Hydrology - Characteristic 0.63 Med
Flood Attenuation 0.58 Med
Water Quality--Downstream 0.56 Med
Water Quality--Wetland 0.41 Med
Shoreline Protection N/A N/A
Characteristic Wildlife Habitat Structure 0.38 0.38 Med
Maintenance of Characteristic Fish Habitat ######N/A N/A
Maintenance of Characteristic Amphibian Habitat 0.04 Low
Aesthetics/Recreation/Education/Cultural 0.31 0.31 Low
Commercial use 0.10 Low 0.1
Special Features listing: - ____
Groundwater Interaction indeterminate GW source
Groundwater Functional Index no special indicators
Restoration Potential (draft formula) N/A N/A
Stormwater Sensitivity (not active)Final RatingRating CategoryFunctional Rating SummariesRaw scoreAdditional questions% effectively drained:
MnRAMW2_T3.xls 3 3/22/2022
MnRAM_3.2_Score_Sheet.xls
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
3637
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
Q R S T U V W X Y Z AA AB AC AD AE AF
Highest-rated:
I Depressional/Isolated
FT Depress'l/Flow-through
Trib Depress'l/Tributary
R Riverine
Lac Lacustrine
Peat Peatland
Flood Floodplain
S Slope
O Other
Habitat n/a formulator
E49 0.00 "=IF(E49="n/a",1,0)"
E50 0.00 "=IF(E50="n/a",1.5,0)"
E51 0.00 "=IF(E51="n/a",2,0)"
Add 0.00
CC Rtg Ltr
1 0.1 L
2 0.1 L
3 0.5 M
4 0.5 M
5 1 H
6 0.5 M
7 1 H
8 0.1 L
N/A N/A N/A
- "Pick an example from the image"
1 L 0.1
2 M 0.5
3 H 1
4 H 1
N/A N/A N/A
- "Pick an example from the image"
These are supplemental Lookup Tables and
Intermediary formulas:
Community Interspersion
LookUp
Open Water Interspersion
LookUp
Hydrogeology and Topography LookUp
MnRAMW2_T3.xls 4 3/22/2022
MnRAM_3.2_Score_Sheet.xls
71 Q R S T U V W X Y Z AA AB AC AD AE AF
MnRAMW2_T3.xls 5 3/22/2022
MnRAM_3.2_Score_Sheet.xls
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
9091
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
Q R S T U V W X Y Z AA AB AC AD AE AF
Vegetative formula
"=C4", the Weighted Average Option 4 from Veg. Worksheet
Characteristic Hydrology formula
"=(E17+E18+E19+F24)/4" F24 is the reverse rating
Flood Attenuation Formula breakout (not linked to D72) (E16 is reverse rated)
n/a formula is:
none 0.583333 ((E16+(F18+E23)/2+(E19+E22)/2+(E24+E25)/2+(F20+E21+E26)/3)/5)
flood outlet 0.604167 ((F18+E23)/2+(E19+E22)/2+(E24+E25)/2+(F20+E21+E26)/3)/4
F-T 0.55 ((E16+(F18+E23)/2+(E19+E22)/2+(E24+E25)/2+ E26)/5)
both 0.5625 ((F18+E23)/2+(E19+E22)/2+(E24+E25)/2+ E26)/4
Water Quality--Wetland
"=(D6*2+E18+F24+(G27+G28+G34)/3+E22+E40)/7"
Shoreline Protection
"=IF(E41="y",((E42+E43+E44+E45+E46)/5),"N/A")"
N/A H38 =Habitat formula breakout/lookup (E22 is RR) Special Features Bump is below.
none 0 0.376667 (D6*2+E51+F49+F50+E52+E53+(I27+G28+G31)/3+E17+F24)/10
49 1 0.407407 (D6*2+E51+ F50+E52+E53+(I27+G28+G31)/3+E17+F24)/9
50 1.5 0.407407 (D6*2+E51+F49+ E52+E53+(I27+G28+G31)/3+E17+F24)/9
51 2 0.362963 (D6*2+ F49+F50+E52+E53+(I27+G28+G31)/3+E17+F24)/9
49&50 2.5 0.445833 (D6*2+E51+ E52+E53+(I27+G28+G31)/3+E17+F24)/8
49&51 3 0.395833 (D6*2+ F50+E52+E53+(I27+G28+G31)/3+E17+F24)/8
50&51 3.5 0.395833 (D6*2+ F49+ E52+E53+(I27+G28+G31)/3+E17+F24)/8
49&50&51 4.5 0.438095 (D6*2+ E52+E53+(I27+G28+G31)/3+E17+F24)/7
Characteristic Fish Habitat formula
Characteristic Amphibian Habitat formula (see Lookup breakout below)
E112=VLOOKUP(E54,T116:U117,2,FALSE)
Amphibian Habitat Formula Breakout
0 0.00 Amphibian breeding is controlling factor
1 0.04 "=((E55)*(E56+(I27*2)+E53+E18+F24)/6)"
Aesthetics/Rec/Ed/Cultural formula
"=E69" Commercial use reflects just the rating for the question.
Special Features Bump-up reference table
a Fish Habitat=E
b Veg=E
c Aesthetics=E
d n AND #5=Y, then Wildlife=E
g Wildlife/Fish=E
h Aesthetics=E
I Veg=E
j N AND #35 =Y, Wildlife=E
qindeterminate GW sourceGW=recharge, GW=E
rindeterminate GW sourceY and GW=recharge, GW=E
u Aesthetics=E
Recharge/Discharge Tendency
R 0.1
D 1
- Enter "R" or "D"
"IF(E65=".1",(E62+E63+E64+2*E65+E66+E67+E68)/8,(E61+E62
+E63+E64+E65+E66+E67+E68)/8)"
"=IF(D41="Y",((E58*2+G28+E22+F24+E40+E43+E42+F45)/9),((
E58*2+G28+E22+F24+E40)/6))"These are the formulas for the f inal functional ratings shown at the MnRAMW2_T3.xls 6 3/22/2022
ENGINEER'S OPINION OF PROBABLE COST
ITEM ESTIM.
NO.DESCRIPTION UNIT QTY.UNIT PRICE AMNT. ($)
STORMWATER
SW1 COMMON EXCAVATION CY 850 $3.00 $2,550.00
SW2 TURF REINFORECEMNT MAT SF 3000 $3.50 $10,500.00
SW3 Biofiltration Media Mix C CY 155 $50.00 $7,750.00
SW4
COARSE FILTER AGGREGATE, 0.6' DEPTH, 1-
1.5" WASHED ROCK, SEE PLAN CY 40 $50.00 $2,000.00
SW5 6" PVC SCH 40 DRAIN PIPE PERFORATED LF 170 $20.00 $3,400.00
SW6 6" PVC SCH 40 DRAIN PIPE SOLID LF 10 $20.00 $200.00
SW7 12" HDPE LF 25 $20.00 $500.00
SW8 12" FES EA 1 $1,000.00 $1,000.00
SW9 6" DRAINTILE CLEANOUT EA 5 $100.00 $500.00
SW10 CLASS 3 RIPRAP CY 4 $100.00 $400.00
SW11 OCS1 EA 1 $4,000.00 $4,000.00
TOTAL ENGINEER ESTIMATE $32,800.00
$32,800.00TOTAL ENGINEERS ESTIMATE (ALL BMPS)
GAYLE MORIN SUBDIVISION - CHANHASSEN
ENGINEER ESTIMATE
3/15/2022 CIVIL SITE GROUP
Above Ground Filtration Basin 1