Loading...
CC Staff Report 1-8-07 CITY OF CIlANllASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone,: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us .1}-1 MEMORANDUM TO: Todd Gerhardt, City Manager FROM: Bob Generous, Senior Planner January 8, 2007 ~ ~ Final Plat Approval for Lakeside Second Addition - Planning Case No. 06-26 DA TE: SUBJ: PROPOSAL SUMMARY The applicant is requesting final plat approval for the second phase of Lakeside consisting of 41 lots and one outlot. Seven of the lots are for Wooddale Builders, 32 of the lots are for Charles Cudd C,ompany, 2 lots would be common open space and Outlot A is for future platting for building sites. The subdivision improvements for the project are bei ndertaken as part of the first addition. No additional subdivision improvemen.;~_ proposed with this phase of the development. - The subdivisi R) regulations Lakeside Seeo ,.wi~h the Planned Unit De ': 'taff i~.ommen ~;:~~idential (pUD- "~ 'lIlalplat for BACKGRO On October 23, 20Qdji,'dle.a. Lakeside eonsisti ,II first phase of the}~ water pond, 11 lots for (W ooddale Builders, Ino'.. development (Charlet street and utilitieifar site. OnJ\11,2~, ' 10 '..'1..... .~: ':.:'.: ..... >.; ... . .. tbe~b: A. Rezoning of, High Density- Residential (, B. Preliminary Plat for Lakesid.e. c. Site Plan for 231 housing uaits ;.0,'. 'T,:litybltilding with pool, with a Variance for building height for the condominium units consistent with the Building elevations prepared by Harriss Architects. The City of Chanhassen . A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play. Todd Gerhardt Lakeside Second Addition Final Plat January 8, 2007 Page 2 D. Conditional Use Permit for a recreational beach lot with a Variance from the requirement that 80 percent of the units be within 1,000 feet of the recreational beach lot. FINAL PLAT REVIEW The developer is performing all the site improvements as part of the original plat. Grading, streets and utility construction for Lakeside Second Addition is under the first addition construction contract; therefore, no security is required for site improvements. COMPLIANCE There are no minimum lot dimensions or lot areas established for the Lakeside Planned Unit Development. The overall project is limited to 231 dwelling units consisting of twin homes, townhouses, and three condominium buildings and their ancillary uses. Setbacks The PUD ordinance requires setbacks from roadways and exterior property lines. The following table displays those setbacks. Setback Standards Highway 212 50 feet East(Perimeter) Lot Line 50 feet -townhouses/twin homes; Building Height - Condominiums with a minimum of 30 feet Lyman Boulevard' 50 feet/30 feet for beach lot West(Perimeter) Lot Line 50 feet Twin Home separation between buildings 15 feet Townhouse separation between buildings 20 feet Minimum Driveway length (to back of curb, 25 feet trail or sidewalk) Hard Surface Coverage 50%* Wetland: Buffer and buffer setback 16.5 feet and 40 feet Lake Riley 75 feet # Decks, patios, porches, and stoops may project up to seven (7) feet in to the required yard. * The entire development, including the public and private streets and Outlots, may not exceed 50 percent hard coverage. Individual lots will exceed the 50 percent site coverage. LOT INFORMA TION TABLE Parcel Ll Bl L2Bl L3Bl Area (s . ft.) 4,465 4,465 4,465 Notes Twin home unit Town house unit Town house unit Todd Gerhardt Lakeside Second Addition Final Plat January 8, 2007 Page 3 Parcel Area (sq. ft.) Frontage (ft.) Depth (ft.) Notes UBI 4,465 43 104 Town house unit L5Bl 4,465 43 104 Twin home unit L6Bl 4,465 43 104 Twin house unit L7Bl 4,465 43 104 Twin house unit L8Bl 4,465 43 104 Twin house unit L9Bl 4,465 43 104 Twin house unit LIO Bl 4,465 43 104 Twin house unit Lll Bl 4,465 43 104 Twin house unit L12 Bl 4,465 43 104 Twin house unit L13 Bl 4,465 43 104 Twin house unit L14 Bl 4,465 43 104 Twin h'ollse unit LI5 Bl 4,465 43 104 Twin house unit L16 Bl 4,465 43 104 Twin house unit L17 Bl 4,465 43 104 Twin house unit L18 Bl 45,023 NA NA Common Area, Designate as Outlot A Ll B2 4,130 43 96 Town house unit L2B2 3,661 38 96 Town house unit L3B2 4.142 43 96 Town house unit L4B2 4,139 43 96 Twin home unit L5B2 4,139 43 96 Twin home unit L6B2 4,142 43 96 Twin home unit L7B2 4,142 43 96 Twin home unit L8B2 4,142 43 96 Twin home unit L9B2 4,142 43 96 Twin home unit LI0 B2 4,142 43 96 Twin home unit Lll B2 4,142 43 96 Twin home unit L12 B2 4,142 43 96 Twin home unit L13 B2 4,142 43 96 Twin home unit L14 B2 4,120 43 96 Twin home unit LIS B2 4,092 43 93 Twin home unit L16 B2 4,042 47 86 Town house unit L17 B2 3,612 42 86 Town house unit L18 B2 4,042 47 86 Town house unit L19 B2 4,042 47 86 Town house unit L20 B2 3,612 42 86 Town house unit L21 B2 3,612 42 86 Town house unit L22 B2 4,042 47 86 Town house unit L23 B2 78,075 NA NA Common area, Designate as Outlot B Outlot A 50,634 NA NA Future development. Designate as Outlot C TOTAL 334,062 7.669acres Todd Gerhardt Lakeside Second Addition Final Plat January 8, 2007 Page 4 REVIEW CONDITIONS OF APPROV AL 1. The developer must submit a list of proposed street name(s) and an addressing plan to Chanhassen Building Official and Chanhassen Fire Marshal for review and approval prior to final plat of the property. *This condition has been met: Riley Lake Drive (main road) and Riley Lake Trail (east-west street) . 2. Each lot must be provided with separate sewer and water services. *This condition has been met. 3. Additional fire hydrants will be required. Please contact the Chanhassen Fire Marshal for exact location of additional hydrants and any to be relocated. *This condition has been met. 4. A minimum buffer of 16.5 to 20 feet shall be preserved around the perimeter of the wetland. All structures (including parking lots) shall maintain a 40-foot setback from the wetland buffer. All trails and retaining walls shall be modified to remain outside the wetland buffer. The plans shall be revised to reflect the required wetland buffer and wetland buffer setback. Wetland buffer areas shall be preserved, surveyed and staked in accordance with the City's wetland ordinance. The applicant shall install wetland buffer edge signs before construction begins and s~all pay the City $20 per sign. *This condition does not apply to this phase. 5. The plans shall be revised to depict the OHW of Lake Riley, which is 865.3. All structures shall be located a minimum of 75 feet from the OHW. The proposed fire pit shall be located a minimum of 75 feet from the OHW and shall be buffered from the lake by vegetation. No grading or intensive clearing of vegetation shall occur within the shore impact zone (all areas within 37.5 feet of the OHW). *This condition does not apply to this phase. 6. A conditional use permit (CUP) shall be obtained from the City prior to the operation -of a recreational beach lot. *This condition has been met. 7. All existing amenities and/or structures (including any docks, existing beach that is not proposed to remain and the boat launch) on Outlot B, North Bay shall be removed. A boat launch is not permitted. *This condition does not apply to this phase. Todd Gerhardt Lakeside Second Addition Final Plat January 8, 2007 Page 5 8. The location of the building 0 Lot 1, Block 1 shall be adjusted to respect all drainage and utility easements. *This condition has been met 9. The applicant shall supply de ails about the water feature between the rear yards of the units in Block 3, specifically the so rce for the water in the water feature. As an alternative to the current proposal, the applican should consider revising the plans to utilize storm water as an amenity as part ofa rain gard n system in this area. *This condition still applies. 10. The applicant shall provide a ditional information detailing the proposed emergency overflow (BOF) route from P nd 1 to Lake Riley. *This condition has been met 11. The grading and landscaping oposed around Pond 1 shall be revised to provide a flat, open area so maintenance equipme. t can access,'the flared end secti~s from Lake Riley Road East without damaging the retaini g wall or the landscaping _d without being below the NWL of the pond. *This condition has been met 12. All storm water infrastructuf , including catch basins, storm sewer pipes, manholes, flared- end sections, outlet structures ponds and swales, shall be owned, operated and maintained by the developer and, eventually the homeowners association. Prior to final plat recording, the developer shall enter into an greement with the City that outlines the parameters of operation, inspection and mai tenance of the storm water infrastructure. This agreement shall be transferred to the ho eowners association prior to the developer relinquishing responsibility for the develop ent. *This condition does not app y. The City is requiring these improvements as a public project and will be responsible for m . ntenance once the public improvements have been accepted by City Council. 13. The SWPPP shall be provide to the City for review by the Carver Soil and Water Conservation District. *This condition has been me · 14. The plans shall be revised to how that erosion control blanket will be installed over all areas with 3:1 slopes or steeper. *This condition has been me · Todd Gerhardt Lakeside Second Addition Final Plat January 8, 2007 Page 6 15. A stable emergency overflow (EOF) for the pond shall be provided. The EOF could consist of riprap and geotextile fabric or a turf re-enforcement mat (a permanent erosion control blanket). A typical detail shall be included in the plan. *This condition has been met. 16. Energy dissipation shall be provided for all inlets and outlets within 24 hours of installation *This condition does not apply to this phase. 17. Wimco-type or other comparable inlet controls shall be used and installed within 24 hours of installation of the inlets. Perimeter controls and inlet protection shall be in place and maintained as needed until 70% of the vegetation is established. *This condition still applies. 18. Typical building lot controls shall be shown on the plan in a typical detail. These controls shall include perimeter controls (silt fence), rock driveways, street sweeping, inlet control and temporary mulch after final grade and prior to issuing the C~rtificate of Occupancy (CO). *This condition still applies. 19. The proposed storm water pond shall be used as a temporary sediment basin during mass grading. The pond shall be excavated prior to disturbing up-gradient areas. Plans shall show how the temporary basin will be constructed and how water ~ill be diverted to the temporary basin. Berms and/or ditches may be needed to divert water to the pond, and temporary pond outlets are needed. The outlet could be a temporary perforated standpipe and rock cone. The plans shall be revised to include a detail for the temporary pond outlet. *This condition has been met. 20. The proposed silt fence along Wetland Basin B shall be Type 2 silt fence, as specified in Chanhassen Standard Detail Plate 5300. Type 1 silt fence may be used for the remainder of the site. The grading plan shall be revised to show the proposed silt fence following the grading limits for the site and shall be located outside of the required 16.5-foot wetland buffer. Silt fence shall be placed at the proposed high water level elevation of the proposed storm water pond. *This condition still applies. 21. Street gutters and catch basins are considered "surface waters" and shall be protected from exposed soils with a positive slope within 200 linear feet. Following installation of curb and gutter, silt fence shall be installed curbside along all positive slopes to the street with exposed soils. Todd Gerhardt Lakeside Second Addition Final Plat January 8, 2007 Page 7 *This condition still applies. 22. Plans shall be revised to show erosion and sediment control measures for the road ditch along Lyman Boulevard. All perimeter controls shall be inspected by the city and the SWCD prior to grading. *This condition has been partially met and shall be modified as follows: All perimeter controls shall be inspected by the city and the SWCD prior to grading. 23. Details for concrete washout areas where drivers will wash out their trucks and how the water will be treated should be developed and included in the SWPPP. *This condition still applies. 24. Street cleaning of soil tracked onto public streets shall include daily street scraping and street sweeping as needed. *This condition still applies. 25. At this time, the estimated total SWMP fee, due payable to the City at the time of final plat recording, is $195,293. *This condition shall be modified as follows: The SWMP fee for Lakeside Second Addition (including Lots 1-17, Block 1; Lots 1-22, Block 2; and Outlots A and B) is $39,458.50. 26. The owner/operator of the proposed development shall apply for and obtain permits from the appropriate regulatory agencies (e.g., Riley-Purgatory-Bluff Creek Watershed District, Minnesota Pollution Control Agency (NPDES Phase IT Construction Site Permit), Minnesota Department of Natural Resources (for dewatering), Minnesota Department of Transportation, Minnesota Department of Health) and comply with their conditions of approval. *This condition has been met. 27. Tree protection fencing shall be installed prior to construction around all areas designated for preservation and/or at the edge of proposed grading limits. *This condition still applies. 28. A walk-through inspection of the silt/tree preservation fence shall be required prior to construction. *This condition still applies. 29. No burning permits shall be issued for tree removal. All trees removed on site shall be chipped and used on site or hauled off. Todd Gerhardt Lakeside Second Addition Final Plat January 8, 2007 Page 8 *This condition still applies. 30. The applicant shall increase landscape plantings along the east property line to minimum bufferyard requirements. *This condition still applies. 31. No trees shall be removed behind the northwestern comer of the silt fence as shown on grading plans dated 05/19/06. *This condition still applies. 32. A total of 139 trees shall be planted in the development as required for canopy coverage. *This condition still applies. 33. All existing buildings, driveways and accessory structures must be removed before grading commences. *This condition has been met. 34. The lowest floor elevation of 106 Lakeview Road East must be field verified. *This condition has been met. 35. The high water level of the proposed pond must be minimum three feet lower than the lowest floor elevation of the adjacent homes along Lakeview Road East. *This condition does not apply (a variance was granted). 36. The high water level of the wetland must be determined. *This condition has been met 37. The proposed grading in the northwest comer near the wetland needs to be adjusted so that the floor elevation of the homes within Lot 13, Block 2 comply with city standards. *This condition does not apply. 38. Pavement grades at the following locations must be adjusted so that the grade does not exceed 7%: West of Building A, and the northern street extending from the Lakeview Road East intersection. *This condition has been met. Todd Gerhardt Lakeside Second Addition Final Plat January 8, 2007 Page 9 39. Private driveway grades shall not exceed 10%. *This condition has been met 40. Ground (i.e. non-paved) surface grades shall not be less than 2%. * This condition has been met. 41. Emergency overflow locations and elevations must be shown on the plan. *This condition has been met. 42. High point elevations between the catch basins must be shown along the east side of Block 2. *This condition has been met. 43. Each lot must be provided with separate sewer and water services. *This condition has been met. 44. An easement is required from the appropriate property owner for any off-site grading. The developer must receive approval from the City of Eden Prairie for grading in to the Outlot for Bearpath 3rd Addition. *This condition does not apply. 45. If importing or exporting material for development of the site is necessary, the applicant will be required to supply the City with detailed haul routes. *This condition does not apply. 46. Building permits are required for all retaining walls four feet tailor higher and must be designed by a Structural Engineer registered in the State of Minnesota. *This condition still applies. 47. All sanitary sewer, watermain and &torm sewer within this site shall be privately owned and maintained. *This condition still applies. 48. The watermain extension from Lyman Boulevard must be wet-tapped and must be done under traffic. *This condition is duplicated in the next condition and may be deleted. Todd Gerhardt Lakeside Second Addition Final Plat January 8, 2007 Page 10 49. The developer must provide ingress/egress to the North Bay residents for the duration of the utility extension within Lake Riley Road East. *This condition has been met. 50. Each new lot is subject to the sanitary sewer and water hookup charges. The 2006 trunk hookup charge is $1,575 for sanitary sewer and $4,078 for watermain. Sanitary sewer and watermain hookup fees may be specially assessed against the parcel at the time of building permit issuance. All of these charges are based on the number of SAC units assigned by the Met Council and are due at the time of building permit issuance. *This condition shall be modified as follows: Each new lot is subject to the sanitary sewer and water hookup charges. The 2007 trunk hookup charge is $1,669 for sanitary sewer and $4,485 for watermain. Sanitary sewer and watermain hookup fees may be specially assessed against the parcel at the time of building permit issuance. All of these charges are based on the number of SAC units assigned by the Met Council and are due at the time of building permit issuance. 51. The IS-foot wide sanitary sewer easement on the northwest side of the property must be vacated. *This condition has been met. 52. The proposed pool house must not lie within the drainage and utility easement. *This condition has been met. 53. The payment of full park dedication fees at the rate in force upon final plat approval in lieu of parkland dedication. *This condition can be modified as follows: The developer shall pay $179,400.00 park dedication fees in lieu of parkland dedication for the second phase of the development prior to final plat recording. 54. The applicant shall provide all design, engineering, construction and testing services required of the "Lyman Boulevard Trail." All construction documents shall be delivered to the Park and Recreation Director and City Engineer for approval prior to the initiation of each phase of construction. The trail shall be 10 feet in width, surfaced with bituminous material, and constructed to meet all'city specifications. The applicant shall be reimbursed for the actu'al cost of construction materials for the Lyman Boulevard Trail. This reimbursement payment shall be made upon completion and acceptance of the trail and receipt of an invoice documenting the actual costs for the construction materials utilized in its construction. *This condition does not apply to this phase. Todd Gerhardt Lakeside Second Addition Final Plat January 8, 2007 Page 11 55. The trail connection at the northeast comer of the site connecting the Lakeside area to the future Highway 212 trail and underpass, as depicted in the applicant's plans, is completed. *This condition does not apply to this phase. Based on the review of the subdivision plans, staff recommends that the following conditions be added: 1. Before the plat is filed, the developer must pay the Arterial Collector fee, which is calculated as follows: 3.76 developable acres x $2,4oo/acre = $9,024. 2. Designate proposed Outlot A as Outlot C, Lakeside Second Addition. Designate Lot 18, Block 1, as Outlot A, Lakeside Second Addition and Lot 23, Block 2 as Outlot B, Lakeside Second Addition. RECOMMENDATION Staff recommends that the City Council adopt the following motion: "The Chanhassen City Council approves the Final Plat for Lakeside Second Addition creating 39 lots and 3 outlots (plans prepared by Pioneer Engineering, date stamped received 12/14/06), subject to the following conditions: 1. The applicant shall supply details about the water feature between the rear yards of. the units in Block 3, specifically the source for the water in the water feature. As an alternative to the current proposal, the applicant should consider revising the plans to utilize storm water as an amenity as part of a rain garden system in this area. 2. Wimco-type or other comparable inlet controls shall be used and installed within 24 hours of installation of the inlets. Perimeter controls and inlet protection shall be in place and maintained as needed until 70% of the vegetation is established. 3. Typical building lot controls shall be shown on the plan in a typical detail. These controls shall include perimeter controls (silt fence), rock driveways, street sweeping, inlet control and temporary mulch after final grade and prior to issuing the Certificate of Occupancy (CO). 4. The proposed silt fence along Wetland Basin B shall be-Type 2 silt:fence, as specified in Chanhassen Standard Detail Plate 5300. Type 1 silt fence may be used for the remainder of the site. The grading plan shall be revised to show the proposed silt fence following the grading limits for the site and shall be located outside of the required 16.5-foot wetland buffer. Silt fence shall be placed at the proposed high water level elevation of the proposed storm water pond. 5. Street gutters and catch basins are considered "surface waters" and shall be protected from exposed soils with a positive slope within 200 linear feet. Following installation of curb and Todd Gerhardt Lakeside Second Addition Final Plat January 8, 2007 Page 12 gutter, silt fence shall be installed curbside along all positive slopes to the street with exposed soils. 6. All perimeter controls shall be inspected by the city and the SWCD prior to grading. 7. Details for concrete washout areas where drivers will wash out their trucks and how the water will be treated should be developed and included in the SWPPP. 8. Street cleaning of soil tracked onto public streets shall include daily street scraping and street sweeping as needed. 9. The SWMP fee for Lakeside Second Addition (including Lots 1-17, Block 1; Lots 1-22, Block 2; and Outlots A and B) is $39,458.50. 10. Tree protection fencing shall be installed prior to construction around all areas designated for preservation and/or at the edge of proposed grading limits. 11. A walk-through inspection of the silt/tree preservation fence shall be required prior to construction. 12. No burning permits shall be issued for tree removal. All trees removed on site shall be chipped and used on site or hauled off. 13. The applicant shall increase landscape plantings along the east property line to minimum bufferyard requirements. 14. No trees shall be removed behind the northwestern comer of the silt fence as shown on grading plans dated 05/19/06. 15. A total of 139 trees shall be planted in the development as required for canopy coverage. 16. Building permits are required for all retaining walls four feet tall or higher and must be designed by a Structural Engineer registered in the State of Minnesota. 17. All sanitary sewer, watermain and storm sewer within this site shall be privately owned and maintained. 18. Each new lot is subject to the sanitary sewer and water hookup charges. The 2007 trunk hookup charge is $1,669 for sanitary sewer and $4,485 for watermain. Sanitary sewer and watermain hookup fees may be specially assessed against the parcel at the time of building permit issuance. All of these charges are based on the number of SAC units assigned by the Met Council and are due at the time of building permit issuance. 19. The developer shall pay $179,400.00 park dedication fees in lieu of parkland dedication for the second phase of the development prior to final plat recording. Todd Gerhardt Lakeside Second Addition Final Plat January 8, 2007 Page 13 20. Before the plat is filed, the developer must pay the Arterial Collector fee, which is calculated as follows: 3.76 developable acres x $2,400/acre = $9,024. 21. Designate proposed Outlot A as Outlot C, Lakeside Second Addition. Designate Lot 18, Block 1, as Outlot A, Lakeside Second Addition and Lot 23, Block 2 as Outlot B, Lakeside Second Addition." ATTACHMENTS 1. Reduced Copy Final plat. 2. Development Design Standards g:\plan\2006 planning cases\06-26 lakeside \second addition\lakeside 2nd fp memo.doc -_._---_.~.---.._......._.. _.__._._._._.._---------_._._~.._~-_.......~.~._......._.... . -.-.--.. .-.-.--.....--.-.----.--.........----....-......---....----.---..................__..-._._........_--..,-_.--...__._...._._._.._.__.....-..~....--.-..--..- J I ~ ~ ; ~ ~ I · II 1 ~J J ~J J , I I i J i II J . ~n aU ~ .......... Q Q ,..Ia ~ df~ nit I I I h e d,il 1'1 ~ lfP o ~'hJ J ~ ~1;!~ JI CI) :: II IUljf ~ il!l~i S 1~'lljll ~ 1:11 r_", plalJ ~ IUU ~ d z , .. I J I~ II J ~ i II ~ I~ f II I Ii 71 ;1 ~ if I t I . 1 t ~ J I f J I , I t I jJ IiI J Ji I ; I J: fl I _I ~ J t J 1 'I . I II 14 II II ~ jI !J II~ ; I .. 11 ! II · J~ t 11 J Ii IJ I 11 f I I' I IJ · 11 ~ n 11 Jt I !~f jl Jill! Ilf .~ J I .. J f I I 4 I J I - I 3 , )11 .Ii J i I 1:, In i ! l' I I I. 'I f. I'll Iii :J ;f~ , .t iil B \1 'i~': . 'I ! J!~ I I I Jill I IIU.fl ! If I ' I 'I t I :;I~ i , ...1 I f 11 'I ~I ,I I J f. I, I I I I III ", t ;1, ! LeJ C:l t~ I il~ III!~: ~~ j !t t~i! ~IJ J::! g ~ t ! t~ l~taJ . ~"j i iJi.ll I 'I ,.Jg ~ 1'1;1 ~ Jl : fJ U!ji ~'l:f~ ~f!l ! AI ~~13 t: ~i~h ! Ii iI Q W Z Z <( (,) (I) I I I I I I :;: I (,') t..J ~ ~( " /" ,/ LJ () -J . :11 ~ · _I II !~ I I -~. · 5::1 Adopted July 24, 2006 DEVELOPMENT DESIGN STANDARDs Lakeside Development Standards a. Intent The purpose of this zone is to create a PUD for a mix housing type multi-family development. The use of the PUD zone is to allow for more flexible design standardS while creating a higher quality and more sensitive proposal. The PUD requires that the development demonstrate a higher quality of architectural standards and site design. Ancillary uses may be permitted as listed below once a primary use has occupied the site. b. Permitted Uses The permitted uses in this zone shall be twin homes, townhouses, and three condominium buildings and their ancillary uses. If there is a question as to whether or not a use meets the definition, the Planning 'Director shall make that interpretation. The type of uses to be provided on common areas shall be low-intensity neighborhood-oriented accessory structures to meet daily needs of residents. Such uses may include a bus shelter, community building, development signage, fountain, garden, gazebo, maintenance shed, picnic shelter, pool, playground equipment or tennis courts. c. Setbacks The PUD ordinance requires setbacks from roadways and exterior property lines. The following table displays those setbacks. Setback Standards Highway 212 50 feet East(Perimeter) Lot Line 50 feet -townhouses/twin homes; Building Height - Condominiums with a minimum of 30 feet Lyman Boulevard 50 feet/30 feet for beach lot West(Perimeter) Lot Line 50 feet Twin Home separation between buildings 15 feet Townhouse separation between buildings 20 feet Minimum Driveway length (to back of curb, trail or sidewalk) 25 feet Hard Surface Coverage 50%* Wetland: Buffer and buffer setback 16.5 feet and 40 feet Lake Riley 75 feet # Decks, patios, porches, and stoops may project up to seven (7) feet in to the required yard. 1 * .The entire development, including the public and private streets and Outlots, may not exceed 50 percent hard coverage. Individual lots will exceed the 50 percent site coverage. d. Building Materials and Design 1. Townhouses . Building height shall be limited to 35 feet. . Building exterior material shall be a combination of fiber-cement or vinyl siding or shake and brick or stone. . No two adjacent structures shall be of the same color scheme. . Colors used shall be varied across color tones. . All units shall utilize minimum ti~berline 30-year asphalt shingles. . Each unit shall have a minimum of one overstory tree within its front landscape yard. . All mechanical equipment shall be screened with material compatible to the building, landscaping or decorative fencing. . Garage doors shall be decorative and have windows. 2. Community Clubhouse . Building height shall be limited to 35 feet. . Building exterior material shall be a combination of stone and stucco and fiber-cement. . Natural cedar shakes roofing. Condominium Building . Building height shall be limited to 48 feet. . Building exterior material shall be a combination of 80 percent or greater stone and brick. Accent and trim areas in fiber-cement lap siding and shake. . Roofing shall be a minimum timberline 30-year asphalt shingles (pitched roofs). e. Signage Signage shall comply with city standards for Residential Districts. f. Landscaping Landscaping shall comply with the landscaping plan prepared by Pioneer Engineering, dated May 19, 2006, revised June 7, 2006. 2